Loading...
HomeMy WebLinkAbout1925 Palomar Oaks Way; 300; CBC2019-0560; PermitBuilding Permit Finaled Commercial Permit Print Date: 03/25/2020 Job Address: {city of Carlsbad Permit No: CBC2019-0560 Permit Type: 1925 Palomar Oaks Way, 300 BLDG-Commercial 2120911800 Work Class: Tenant Improvement Status: Closed -Finaled Parcel No: Lot#: Valuation: $204,550.98 Reference #: Occupancy Group: Construction Type # Dwelling Units: Bathrooms: Bedrooms: Orig. Plan Check#: Plan Check#: Project Title: Description: DA DAVIDSON: 4,398 SF T.I. (OFFICE TO OFFICE) Applicant: Owner: RBN DESIGN LAURA ROCHA 5090 Shoreham Pl BROOKWOOD PACIFIC OFFICE I LLC San Diego, CA 92122-5933 619-297-1011 x102 72 Cherry Hill Dr Brookwood Financial BEVERLY, MA 01915 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-COMMERCIAL Total Fees: $2,083.14 Total Payments To Date: $2,083.14 Applied: 12/04/2019 Issued: PermitFinal 01/17/2020 Close Out: Inspector: LStor Final Inspection: 03/25/2020 Contractor: SP WHITE CONSTRUCTION INC 2524 Gateway Rd Carlsbad, CA 92009-1742 760-931-1130 Balance Due: AMOUNT $998.75 $699.12 $89.00 $175.00 $55.00 $9.00 $57.27 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Buildin Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov Page 1 of 1 ( City of Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Job Address ! q J5 0\ L.O{l']AA OA:t?-5 C6.JA:.1 Suite: Seo Tenant Name: DA DAv1D Sat,,l Plan Checkce,r;;tc,\9(-C,S1a(> Est. Value J ~ O'l, .f@ .9, PC Deposit --------- Date f~-L,l~l'f APN: ?-/ 2--{)c/(-!Y-Oo ' D Addition/New: ___________ New SF and Use, ___________ .New SF and Use, ____ Deck SF, Patio Cover SF (not including flatwork) tf&_Tenant Improvement: L/, 3 o/ A SF, _____ SF, Existing Use ofl;c.e Proposed Use o¾c :f , Existing Use ______ Proposed Use ______ _ 0 Pool/Spa: _____ SF Additional Gas or Electrical Features? ____________ _ D Solar: ___ KW, __ Modules, ___ Mounted, Tilt: Yes/ No, RMA: Yes/ No, Panel Upgrade: Yes/ No D Plumbing/Mechanical/Electrical Only: _________________________ _ D Other: __________________________________ _ Phone: ________________ _ Email: ________________ _ Architect State License: __________ _ 1635 Faraday Ave Carlsbad, CA 92008 B-2 Ph: 760-602-2719 Fax: 760-602-8558 Page 1 of 2 Email: Building@carlsbadca.gov Rev. 06/18 ( OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one af the following declarations: □ I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. □ Certificate of Exemption: I certify that in the performance the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. RNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in dltlon the to t st of mpensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONTRACTOR SIGNATURE: GENT DATE: ( OPTION B ): OWNER-BUI[ I hereby affirm that I am exempt fram Cantractar's License Law far the following reason: □ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). □ I, as owner of the property, am exclusively contra~lng with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an r of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's Licens/ □ I am exempt under Section __ .,,, Business and Professions Code for this reason: 1. I personalty plan to pro~jde the major labor and materials for construction of the proposed property improvement. □ Yes □ No 2. I (have/ have not) ~gfled an application for a building permit for the proposed work. 3. I have contract with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number): 4. I plan to pr 1de portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/ contract license number): 5. I w· provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work): OWNER SIGNATURE: __________________ □AGENT DATE: _____ _ CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: _____________________ Lender's Address: ____________________ _ ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Y~s ~ No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes ~o IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information ls correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Offici by such permit is not commenced within 180 days fr after the work is commenced for a period of 80 d APPLICANT SIGNATURE: 1635 Faraday Ave Carlsbad, CA 92008 8-2 nder the provisions of this Code shall expire by limitation and become null and void if the building or work authorized the da o uch ~rmit or if the building or work authorized by such permit is suspended or abandoned at any time O <1.4 U lform Building Code). Ph: 760-602-2719 Fax: 760-602-8558 Page 2 of 2 Email: Building@carlsbadca.gov Rev. 06/18 Building Permit Inspection History Finaled ( City of Carlsbad " " ... . PERMIT INSPECTION HISTORY for (CBC2019-0560) Permit Type: BLDG-Commercial Application Date: 12/04/2019 Owner: BROOKWOOD PACIFIC OFFICE I LLC Work Class: Tenant Improvement Issue Date: 01/17/2020 Subdivision: CARLSBAD TCT#81-46 UNIT#01 Status· Closed -Finaled Expiration Date: 08/24/2020 Address: 1925 PALOMAR OAKS WAY, # 300 IVR Number: 23487 CARLSBAD, CA 92008-6526 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 01/23/2020 01/23/2020 BLOG-84 Rough 117254-2020 Passed Luke Storno Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Walls approved No Ok to insulate duct. BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 01/30/2020 01/30/2020 BLDG-17 Interior 117895-2020 Passed Luke Storno Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency No 02/25/2020 02/25/2020 BLDG-85 T-Bar, Ceiling 120295-2020 Passed Tony Alvarado Complete Grids, Overhead 03/25/2020 03/25/2020 BLDG-Final Inspection 123148-2020 Passed Tony Alvarado Complete Checklist Item COMMENTS Passed BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes ---·-····-------------------------------·----------- Wednesday, March 25, 2020 Page 1 of 1 DATE: 1/14/2020 JURISDICTION: Carlsbad PLAN CHECK#.: CBC2019-0560 ✓• EsG1I A SAFEbuilfCompany SET II PROJECT ADDRESS: 1925 Palomar Oaks Way #300 PROJECT NAME: DA Davidson Tenant Improvement APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. [gl The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: [gl EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: f 114'\l,O (bySf¥}) Email: Mail Telephone Fax In Person REMARKS: Applicant to transfer red clouded clarifications fro111) sheets Tl-2.1 and Tl-7 to the other approved set II plan prior to permit issuance. \t ~/ By: Jason Pasiut Enclosures: ~ EsGil 12/23/2019 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 DATE: 12/17/2019 JURISDICTION: Carlsbad PLAN CHECK#.: CBC2019-0560 ✓• EsG1I A SAFFbuitfCompany SET: I PROJECT ADDRESS: 1925 Palomar Oaks Way #300 PROJECT NAME: DA Davidson Tenant Improvement □ APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil staff did not advise the applicant that the plan check has been completed. ~ EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Laura Rocha Telephone#: 619-297-1011 x 102 Date contacted: Mail Telephone 0 REMARKS: By: Jason Pasiut EsGil (by: ) Email: lrocha@rbn-design.com Fax In Person Enclosures: 12/9/2019 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad CBC2019-0560 12/17/2019 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK#.: CBC2019-0560 OCCUPANCY: B TYPE OF CONSTRUCTION: V ALLOWABLE FLOOR AREA: complies SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 12/4/2019 DATE INITIAL PLAN REVIEW COMPLETED: 12/17/2019 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: Office ACTUAL AREA: 4,398sf STORIES: 3 HEIGHT: unchanged OCCUPANTLOAD: 101 DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/9/2019 PLAN REVIEWER: Jason Pasiut This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2016 CBC, which adopts the 2015 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBC2019-0560 12/17/2019 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring Ill',!Q corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. BUILDING AND LIFE SAFETY REQUIREMENTS 1. Provide a Building Code Data Legend on the Title Sheet. Include the following code information for each building proposed: ♦ Type of Construction V (A or B?) 2. Please update the following sheets/ notes: a) Sheet Tl-1 O is not listed on the sheet index. b) Sheet Tl-2.1 references incorrect code section for the accessible parking stall signs. 1129A.4 needs to be revised. c) Sheet Tl-5 references detail 2/Tl-9 for partitions. If this is typical please clarify on sheet Tl-5 or add a wall schedule for different walls. d) Provide detail callouts at the reflected ceiling plan, sheet Tl-7, for the details referenced on sheet Tl-9 for the ceiling connections at new walls. Typical call outs are fine. 3. Show the clear floor space proposed for parallel approach to the sales / service counter at the reception desk. 11 B-904.4.1. MECHANICAL/ ELECTRICAL/ PLUMBING 1. The refrigerator water cooler cold-water line connection is required to be a minimum 1/2". Please correct sheet P-1 to state 1/2" (not 1/4"). 2. The water heater connection lines should be a minimum 1/2" (not 3/8"). Please correct. sheet P-1. Carlsbad CBC2019-0560 12/17/2019 3. Sheet E-1 & E-2 has the incorrect code reference years. The cover (title) sheet does indicate the correct codes. END OF REVIEW To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: □ Yes □ No The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Jason Pasiut at Esgil. Thank you. Carlsbad CBC2019-0560 12/17/2019 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Jason Pasiut PLAN CHECK#.: CBC2019-0560 DATE: 12/17/2019 BUILDING ADDRESS: 1925 Palomar Oaks Way #300 BUILDING OCCUPANCY: B BUILDING AREA Valuation Reg. PORTION (Sq.Fl} Multiplier Mod. Tl 4398 46.51 Air Conditioring Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance 1997 UBC Buildin Permit F•• f.,,; g I 1997 UBC Plan CMck F.. l':!"J VALUE Tw,e ofRelliew: i;; Complete Review r Structural Only r Repetltlvefee -. rTIZl Repeats I t1JJ Comments: r Other r Hourly &Oil Fee ~ ($) 204,551 204,551 1 $649.231 Sheet 1 of 1 January 17, 2020 Re: DA Davidson, 1925 Palomar Oaks Way, Suite #300 To the City of Carlsbad, Permit number #CBCA2018-0107 created the suite I have listed above. We are in the next generation of improvements with an actual client, DA Davidson. Therefore we did not have any asbestos testing needed. Should you have any questions, please feel free to call me at #760-802-5354. Thank you. Debbe Damron, V.P White Construction, Inc. RECF.IVED JAN I 7 2020 CITY OF C1\RLSBAD BUILDl/-JG u:v:'.:310N "' 9-.c "' <= 0 ~ e! 0, <= 32 5 CD 2524 Gateway Road, Carlsbad. CA 92009 I P: 760.931.1130 I F: 760 931.1171 I Uc. #1023856 I whiteconstructionmc.com ENCINA WASTEWATER AUTHORITY INDUSTRIAL WASTEWATER DISCHARGE PERMIT SCREENING SURVEY 6200 Avenida Encinas, Carlsbad, CA 92011 Phone: 760-438-3941 Fax: 760-476-9852 SourceControl@encinajpa.com Date: ii ~~'5-\Cj Business Name: bA '0A\I I ~So~ Street Address: l':12::S: 'fA-L0MA-R o/\\q, \N'fi---1 St--t 300 Email Address: ±:\.::..fr'.($-\1£ &) uJc:o '(j){b . PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) ,10:. Check all below that are present at your facility: o Acid Cleaning o Assembly o Automotive Repair o Battery Manufacturing o Biofuel Manufacturing o Biotech Laboratory o Bulk Chemical Storage o CarWash o Chemical Manufacturing o Chemical Purification o Dental Offices • Dental Schools • Dental Clinics o Dry Cleaning o Electrical Component Manufacturing o Fertilizer Manufacturing o Film/X-ray Processing o Food Processing o Glass Manufacturing o Industrial Laundry o Ink Manufacturing o Laboratory o Machining/Milling o Membrane manufacturing (i.e. water filter membranes) o Metal Casting/Forming o Metal Fabrication o Metal Finishing • Electroplating • Electroless Plating • Anodizing • Coating (i.e. phosphating) • Chemical Etching/Milling • Printed Circuit Board Manufacturing o Metal Powders Forming o Nutritional Supplement/Vitamin Manufacturing o Painting/Finishing o Paint Manufacturing o Personal Care Products Manufacturing o Pesticide Manufacturing/ Packaging o Pharmaceutical Manufacturing (including precursors) o Porcelain Enameling o Power Generation o Print Shop o Research and Development o Rubber Manufacturing o Semiconductor Manufacturing o Soap/Detergent Manufacturing o Waste Treatment/Storage New Business? Yes D No D SIC Code(s) if known: _____ _ Date operation began/will begin:. _______ _ Tenant Improvement? Yes D NoD If yes, briefly describe improvement: __________________ _ Description of operations generating wastewater (discharged to sewer. hauled or evaporated): __________ _ Estimated volume of industrial wastewater to be discharged (gal/ day): ___________________ _ List hazardous wastes generated (type/volume): ___________________________ _ Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes D Date: _____ No D Page 1 of 2 ENCINA WASTEWATER AUTHORITY INDUSTRIAL WASTEWATER DISCHARGE PERMIT SCREENING SURVEY 6200 Avenida Encinas, Carlsbad, CA 92011 Phone: 760-438-3941 Fax: 760-476-9852 SourceControl@encinajpa.com The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge permitting under normal operating conditions. They are exempt because (a) they discharge no process wastewater (i.e., they only discharge sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no potential to negatively impact the EWPCF or other wastewater treatment plants in the ESS. Any questions regarding exemptions should be referred to EWA Source Control staff. o Automobile Detailers o Hotels/Motels (no laundry) o Barber/Beauty Shops o Laundromats ';)I<, Business/Sales Offices o Cleaning Services o Libraries o Medical Offices (no x-ray developing) o Carpet/Upholstery o Mortuaries o Childcare Facilities o Museums o Churches o Nail Salons o Community Centers o Nursing Homes o Consulting Services o Office Buildings (no process flow) o Contractors o Optical Services o Counseling Services o Pest Control Services (no pesticide repackaging for sale) o Educational Services (no auto repair/film developing) o Pet Boarding/Grooming Facilities o Financial Institutions/Services o Postal Services (no car wash/auto repair) o Fitness Centers o Public Storage Facilities o Gas Stations (no car wash/auto repair) o Restaurants/Bars o Grocery Stores (no film developing) o Retail/Wholesale Stores (no auto repair/film developing) o Residential based Businesses o Theaters (Movie/Live) CERTIFICATION STATEMENT true and correct to the best of my knowledge. Print Name: L ~v (fi gochc;, DATE: Facility Contact:.~,,...Jtrn--'--'---LµL'~i,-~kJ~~~---Title: ENCi NA WASTEWATER AUTHORITY 6200 AVENI DA ENCINAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-476-9852 SourceControl@encinaipa.com Page 2 of 2 Ccityof Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST 8-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool A If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. A Details on CAP ordinance requirements are available on the city's website. A A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. Project Name/Building Permit No.: Property Address/APN: Applicant Name/Co.: Applicant Address: Contact Phone: _,,j)L.,,£.L_A,,_,D~a ..... v --'--'1 d~s,.u,c):..µ/\,..,._l ------BP No.: C O,c, 2-tJ \ 'l · {) S""laO {'1 ZS:: Pal.oraa c e>a,b ~ 2, Z. -oq I -{[-CJCJ ( (e (tJ) o1J 1-IO I I ?( j O :;L Contact Email: Contact information of person completing this checklist (if different than above): Name: Company name/address: B-50 Contact Phone: (wt1)oL'11 ~{ o} (pJ 02- Contact Email: g u "Jl (>,r a> ri., o:, -dt~t->-lM' Page 1 of 6 Revised 08/19 City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet:$ o2 04 1 S:6J> • q g Construction Type I eo,... Section(•) I Notes: D Residential □ New construction □ Additions and alterations: □ BPV < $60,000 □ BPV ::? $60,000 □ Electrical service panel upgrade only □ BPV::? $200,000 &] Nonresidential , □ New construction jfii1.. Alterations: '5(!PV::? $200,000 or additions::? 1,000 quare feet □ BPV::? $1 ,000,000 □ ~ 2,000 sq. ft. new roof addition Checkllstltam A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A, 3A, 1B, 2B, 4A 3B, 4A N/A N/A All residential additions and alterations 1A,4A 4A 1-2 family dwellings and townhouses with attached garages only *Multi-family dwellings only where interior finishes are removed 1A, 4A* 1B,4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 1 B, 2B, 3B, 4B and 5 1B, 5 1B, 2B, 5 Building alterations of~ 75% existing gross floor area 2B,5 1 B also applies if BPV ~ $200,000 Check the appropiale boxes, explai1 al not~ and exception lams, and provide Sl4lP()l1iig cabMons and docurnentaion as necessay. 1. Energy Efficiency Please refer to Cartsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for more information when completing this section. A O Residential addition or alteration~ $60,000 building permit valuation. See CMC section 18.30.190. Year Built Single-family Requirements □ Before 1978 Select one: □ Duct sealing □ Attic insulation □ Cool roof □ 1978 and later Select one: □ Lighting package □ Water heating Package □ Between 1978 and 1991 □ 1992 and later □ WA _________ _ □ Exception: Home energy score ~ 7 (attach certification) Multi.family Requirements □ Attic insulation Select one: □ Duct sealing □ Attic insulation □ Cool roof Select one: □ Lighting package □ Water heating package G 9( Nonresidentiar new construction or alterations ~ $200,000 building permit valuation, . . > or additions _ 1,000 square feet □ WA Updated 8/15/20 I 9 2 City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CAL Green Appendix AS, Division A5.2 -Energy Efficiency. AS.203.1.1 Choose one: □ .1 Outdoor lighting □ .2 Warehouse dock seal doors □ .3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) Jl( NIA _________ _ □ .4 Da0ight design PAFs □ .5 Exhaust air heat recovery AS.203.1.2.1 Choose one as applicable: □ .95 Energy budget □ .90 Energy budget NIA AS.211.1 .. □ On-site renewable energy AS.211.3 .. □ Green power (if offered by local utility provider, 50% minimum renewable sources) NIA AS.212.1 □ Elevators and escalators )( N/A AS.213.1 □ Steel framing )( NIA * lnducles hotels/motels and high-rise residential buildings .. For alterations~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMC 18.30.130 instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8) (high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated k\f>Jdc* sheets if necessary) Total System Size: k\f>Jdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ k\f>Jdc B. D Nonresidential new construction or alterations ~$1,000,000 BPV and affecting ~75% existing floor area, or addition that increases roof area by ~2,000 square feet Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hoteL'motel buildings. Choose one of the following methods: D Gross Floor Area (GFA) Method GFA □If < 10,000s.f. Enter: 5 kWdc Min. System Size: □ If<!: 10,000s.f. calculate: 15 kWdc x (GFA/10,000) ** kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. D Time-Dependent Valuation Method Updated 8/ 15/20 I 9 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:--______ x .80= Min. system size: _____ kWdc "-Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A D Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section. □ For systems serving individual dwelling units choose one: □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 ( c) 14 (low-rise residential) □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with all of the following: □ Gas or propane water heating system □ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery D Exception: B. D Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Water heating system is (choose one): □ Heat pump water heater D Electric resistance water heater(s) □ Recovered energy □Solar water heating system with .40 solar savings fraction D Exception: Updated 8/ 15/20 19 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. Elecbic Vehicle Charging A D Residential New construction and major alterations* Please refer to Cartsbad Ordinance CMC section 18.21.140 when completing this section. D One and two-family residential dwelling or townhouse with attached garage: D One EVSE Ready parking space required □ Exception : D Multi-family residential· □ Exception · Total Parking Spaces EVSE Spaces Proposed Capable I Ready I I I Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces-EVSE Installed (EVSE other may be "Capable," "Ready" or "Installed.") Installed I Total I •Major alterations are: (1) for one and lwcrfamily dwellings and townhouses 'Mth attached garages, alterations have a building penntt valuation c? $60,000 or indude an electrical service panel upgrade; (2) for multifamily dwellings (three units or more 'Mthout attached garages), alterations have a building pennit valuation c? $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (includes hotels/motels) □ Exception · Total Parking Spaces EVSE Spaces Proposed Capable I Ready I Installed I Total I I I Calculation: Refer to the table below: Total Number of Parkinq Spaces provided Nul1ller of reQuired EV Spaces Number of reQuired EVSE Installed Soaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 and over 10 percent of total 50 oercent of ReQuired EV Spaces Updated 8/15/2019 5 City of Carlsbad Climate Action Plan Consistency Checklist 5. D Transportation Demand Management (TOM): Nonresidential ONLY M approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the perm~ details. AcknovAedgment: Office (all)2 20 Restaurant 11 Retaib 8 Industrial 4 Manufacturing 4 Warehousin 4 , Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1QlhEdition 13 11 4.5 3.5 3 1 2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf / 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT I acknovAedge that the plans submitted may be subject to the City of Ca~sbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance. Applicant Signature: ~ ~ Date: /7 ,..lf-/2 Person other than Applicant to be contacted for TDM compliance (if applicable): Name (Printed): _________________ _ Phone Number: ____ _ Email Address: __________________ _ Updated 8/ 15/20 I 9 6 { City of Carlsbad CAP Building Plan Template B-55 INSTRUCTIONS: The following certificate shall be included on the title sheet of all building plans: CLIMATE ACTION PLAN ICAP) COMPLIANCE Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov The following demonstrates project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version: 1. ENERGY EFFICIENCY APPLICABLE: Complies with CMC 18.30.190 & 18.21.155 Existing Structure, year built: / "IBB Prepared Energy Audit? Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: YES/NO Yes/No Yes/No YES/NO Complies with CMC section 18.30.130 and 2019 California Energy Code section 150.l(c)14 Yes /No Required Provided Size of PV system (kWdc): Sizing PV by load calculations If by Load Calculations: Total calculated electrical load: 80%of load: Hardship Requested Hardship Approved Yes/No Yes/No Yes/No 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: YES/NO Complies with CMC sections 18.30.150 and 18.30.170? Alternative Source: □ Electric □ Passive Solar Hardship Requested Hardship Approved 4. ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: Complies with CMC section 18.21.140? Panel Upgrade? Yes /No Yes/No Yes/No YES/NO Yes /No Yes/No Required Provided Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces; Hardship Requested Hardship Approved 5. TRAFFIC DEMAND MANAGEMENT APPLICABLE: Compliant? TOM Report on file with city? Yes/No Yes/No YES/NO Yes/ no Yes/ no --..... Hollianne Holmes From: Mike Peterson Sent: To: Friday, January 17, 2020 8:47 AM Debbe Damron Cc: Subject: Mike Leviste; Shay Even; Allison Dietrich; Justin Ernst; Hollianne Holmes RE: DA Davidson, 125 Palomar Oaks Way, Suite 300. Debbe- In lieu of a report provide a letter referencing permit number CBCA2018-0107 stating that this permit created the suite and I will accept this instead of a Hazmat form. -Mike Ccityof Carlsbad Michael Peterson Assistant Director Community Development City of Carlsbad 1635 Faraday Ave. Carlsbad, CA 92008-7314 www.carlsbadca.gov 760-602-2721 I 760-602-8558 fax I mike.peterson@carlsbadca.gov Appointment-Based Submittals and Resubmittals Appointments can be made by phone or email: Phone: 760-602-2723 Email: devappt@carlsbadca.gov Facebook I Twitter I You Tube I Flickr I Pinterest I Enews Opportunities don't happen. You create them, From: Debbe Damron [mailto:ddamron@whiteconstructioninc.com] Sent: Friday, January 17, 2020 7:34 AM To: Mike Peterson <Mike.Peterson@carlsbadca.gov> Cc: Mike Leviste <mike@whiteconstructioninc.com> Subject: DA Davidson, 125 Palomar Oaks Way, Suite 300. Importance: High Hi Mike, I wanted to ask you a question. Our permit for the above property is ready to pull, the City is asking for an asbestos report. Last year this entire floor was built out by Lockrul, it was 1 . . . previously completely demo'd before Lockrul built out the spec suites, so no asbestos report was needed. Lockrul built out 3-4 spec suites I believe, this suite were working on had at-bar ceiling, lights and flooring, a warm shell. We went in and demo'd out the ceiling tiles which we have stacked for reuse and demo'd out the flooring. The new tenant wanted a different flooring surface. Because everything was brand new we did not think to test anything, and now I'm not sure what to do? Should I test one of the ceiling tiles I saved? And test a leftover carpet tile that had been installed? Or can you override this so we can just pull the permit? Please let me know, and as always thank you!! Debbe Damron I Vice President White Construction I Since 1983 P: 760.931.1130 x107 C: 760.802.5354 www.whiteconstructioninc.com CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. 2