Loading...
HomeMy WebLinkAbout1932 KELLOGG AVE; ; CB070979; PermitCity of Carlsbad 06-12-2007 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB070979 Building Inspection Request Lin_e (760) 602-2725 Job Address: Permit Type: Parcel No: 1932 KELLOGG AV CBAD Tl .Sub Type: Lot#: INDUST 0 Status: Valuation: 2121700400 $12,320.00 Construction Type: VN Applied: Occupancy Group: Reference #: Entered By: Project Title: LIFE PROPERTIES-352 SF TO CREATE GLEAN ROOM Applicant: AL BECK 1042 PROVENCAL PL SAN DIEGO 92128 619 726 1249 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee c.. LFM Fee ~~'v Bridge Fee r-,,, ~\_;r>: BTD #2 Fee · \~v G~ BTD #3 Fee l < \ ~~\. R'Q~ :{"\ Renewal Fee .1 .U ~ \. ',V Add'I Renewal Fee\) ;,r /"" r(''t.1:',--C;.~ Other Building Fee . /"" ~~..<'C'e,w- Pot. Water Con. Fee /':,CY Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $122)9 $0.00 $19.81 $0.00 $0.00 $2.59 $0.00 0.00 $0.00 $0.00 $0;00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Plan Approved: Issued: Inspect Area: Plan Check#: Owner: LIFE PROPERTIES LL C 1932 KELLOGG AVE CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee TOTAL PERMIT FEES ISSUED 04/11/2007 LSM 06/12/2007 06/12/2007 Total Fees: $282.19 Total Payments To Date: $282.19 Balance Due: ~~ Inspector: Aft FINAL APPROVAL Date: -'-./....w.~~:.._-Clearance: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $57.00 $0.00 $0.00 $0.00 $0.00 ?? $282.19 $0.00 NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively . referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the.protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions f which ou hav r vi I iv n a NOTICE similar to !hi r a t which he stat t of limita ions has revi usl o h rwi e ex ired. FOR OFFICE USE ONLY ), PERMIT APPLICATION PLAN CHECK NO. (160 7097C, CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad, CA 92008 EST. VAL. · :st '220 \2.320 Plan Gk. Deposit -"24.,8'.Q , Validated By_~ ... ~------==----------- Date . . 'fl I l /n-;; Legal Description Lot No. Subdivision Name/Number Unit No. Phase No. Total # of units Assessor's Parcel # Existing Use Proposed Use ~Ji'.::.:J&QNJ!m!l.IQ!G~:Ci>l!~N~·~.Mi~-:, .. ,~.oL,;,;,:. · ,, .. ,,.S,:~:::.~.:~.:;::::2.,,;.:;.. · ~2iik~. ,,;~i'.'Z?m:ZJ:It~::~t;.;:1~:/~; .·~ (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, dem·olish or repair ·any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or' tnat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Name Address City State/Zip Telephone# State License # _________ _ License Class _________ _ City Business License # _______ _ Designer Name State License # Address City State/Zip Telephone @~!iiij~~.~~~Qs>Meitt,imtJ:___,,~~-~~---: __ :,;:: _$~=::~~-:::-·:. \:.;_,_;;;:: a~~-:~·TI;~~~~-~~~:z;~f~ ~.;;~~£.8~;1ac~ Workers' Compensation Declaration: I hereby affirm under penalty of perjury one, of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as pr.o.vided by Section 3700 of the Labor Code, for the performance of the work for w~ich this permit is issued. 0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code; for the performance ·of the work for which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company _____ -'----------------Policy No.____________ Expiration Date _______ _ ·(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS·FOR ONE HUNDRED DOLLARS [$100) OR LESS) D CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this,permit·is issued, I shall not.employ any person in any manner. so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subje<:t an employer to criminal penalties and civil fines up to one hundred thousand·dollars ($100,000), In addition to the cost of compensation, damages es provided for In Section 3706 of the Labor code_, interest and attorney's fees • . SIGNATURE DATE ~~Lol'll'!~l~1J!J2~~RA-I1~::.:::::r:I::.;::.:c:::::.:z;::;;r0~::r:~- 1 hereby affirm that I am exempt from the Contractor's License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered tor sale (Sec. 7044, B.usiness and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work'himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the-owner-builder will have ,the burden of proving .that he did not build or improve for. the purpose of sale). · i;!l, I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The ·contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts tor such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 I am exempt under Section ______ Business and Professions Code tor this reason: 1. I personally plan to provide the major labor and materials tor constructiop of the proposed prc;,perty improvement. 0 YES ONO G: I (have / ·have not) signed an application tor a building permit tor the proposed work. 3. I have contracted .. with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): 4. ·1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number/ contractors license numberl=---------------,-----,----,------,--------,----------------,- 5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type ork):, __________ ::;------,J'--717'..:;,.,_-,,.;,,L-+-A------------------------------------- ~;~~-WC~,..----..,_.c:.,.,,_,,..,, . .:_,iijpiBMiit"UJi~"'T:~~\~~J;:~~~~Sk?'..t;;~r,~~;;.T~~j e applicant or future building occupan equired to submit a business plan, acutely hazardous materials registration fprm or risk management and prevention program under Sections 25505, 25533-or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES O NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D YES D NO Is thE! facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES ,·D NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that·there is a construction lending agency for the performance of the work for which this permit is·issued (Sec. 3097(il Civil Code). LENDER'S NAME LENDER'S ADDRESS I certify that I have read the application and state that the above information is correct and that .the information on the plans is accurate. I agree to comply with all City ordinances and ·state laws relating to building construction. I hereby authorize representatives of the Citt of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or·construction of-structures over 3 stories in height. EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and.become null and void if the building.or work authorized by such permit is not commenced within 180 ays from the date f such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is comme ed for a riod s ec 1 06.4.4 Uniform Building Code). ff I L APPLICANT's s1GNATURE -DATE -;t!--lr ttfZ PINK: Finance •l City of Carlsbad Bldg Inspection Request For: 07/30/2008 Permit# CB070979 Title: .LIFE PROPERTIES-352 SF.TO Description: CREATE CLEAN ROOM Type:TI Jo!:> Address: Suite: Location: Sub Type: IN DUST 1932 -KELLOGG AV Lot 0 APPLICANT AL BECK Owner: GIACOMINI FAMILY TRUST 11-11-92 Remarks: Total Time: CD Description Act Comment Inspector Assignment: TP --- Phone: 6197261249 Jnspector:../2- Requested By: AL Entered By: JANEAN 19 Final Structural !If_-,---------- 29 Final Plumbing 39 Final Electrical 49 . Final Mechanical Comments/Notices/Holds Notice ILLEGAL CONST -RELATE$ TO CODE ENFORCEMENT CASE CV070277 ED DAVIDSON· PLEASE SEE ED BEFORE EXTENDING PERMIT Associated PCRs/CVs Original PC# OV010575 CLOSED CV070277 CLOSED NO BIZ LIC, STORING VpHICLES; H-ILLEGAL CONST; PCR02193 ISSUED LIFE MEDICAL; SEVERAL REVISIONS PCR07135 ISSUED LIFE PROP: ADD SINK& HOLDING; TANKS Inspection History Date Description Act lnsp Comments 07/28/2008 89 Final Combo NR MC VERIFY T-BAR@ CLEAN RM 07/23/2008 89 Final Combo CA TP 07/07/2008 89 Final Combo CA JM AL BECK 07/03/2008 89 Final Combo CA PC 01/10/2008 89 Final Combo CA TP PER CONTRACTOR 07124/2,007 84 Rough Combo NR TP NEED APR. PLUMB. PLAN 07/17/2007 14 Frame/Steel/Bolting/Welding PA PD NO PLAN -CEILING @ HALL 67/16/2007 14 FrameiSteel/Bolting/Welding CA RB 07/03/2007 14 Frame/Steel/Bolting/Welding PA TP OK TO COVER EXPOSED AREAS-SEE CORR. NOTICE ' 1'lnspection List Permit#: CB070979 Type: Tl Date Inspection _Item-·--·- 07/30/2008 89 Final Combo 07/30/2008 89 Final Combo 07/28/2008 89 Final Combo 07/28/2008 89 Final Combo 07/23/2008 89 Final Combo 07/23/2008 89 Final Combo 07/22/2008 89 Final Combo 07/07/2008 89 Final Combo 07/03/2008 89 Final Combo 01/10/2008 89 Final Combo 07/24/2007 84 Rough Combo 07/17/2007 14 Frame/Steel/Bolting/Weldin 07/16/2007 14 Frame/Steel/Bolting/Weldin 07/03/2007 14 Frame/Steel/Bolting/Weldin 07/03/2007 34 Rough Electric Wednesday, July 30, 2008 ' INDUST lnspec;tor Act RI TP AP RI MC NR RI TP CA RI JM CA PC CA TP CA TP -NR PD PA RB CA TP PA TP AP LIFE PROPERTIES-352 SF TO CREATE CLEAN ROOM Comments -·----·-------- VERIFY T-BAR @ CLEAN RM ALBECK PER CONTRACTOR NEED APR. PLUMB. PLAN NO PLAN -CEILING@ HALL OK TO COVER EXPOSED AREAS-SEE CORR. NOTICE WALLS&J.BOXES Page 1 of 1 CIIV DI Carlsbad ~ Flnal Bulldlna IDSPBCIIOD Dept: Building Engineering Planning CMWD St Lite Pire ...:.:.:.) Plan Check #: Permit#: Project Name: Address: CB070979 LIFE PROPERTIES-352 SF TO CREATE CLEAN ROOM 1932 KELLOGG AV Contact Person: AL Phone: 6197261249 Water Dist: CA Sewer Dist: CA Date: 07/07/2008 Permit Type: Tl Sub Type: INDUST Lot: 0 .......................................................................................................................................................... Inspected Date f t ~ By: Approved: Disapprove& __ . Inspected: 7 ~¢>v' Inspected Date By: Inspected·: Approved: Disapproved: __ Inspected Oate By: Inspected: Approved: Disapproved: __ I I 11 I I I I I I I I 11 I I I I I I 111 I I I 11 I I I I I I I I I 111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Ii I I I~! I I! I I I I I I I I I I I 1111 I I I 11 I 11 I I I I I 11 I I I I 1111 I I I I I I I I 11 I I I I I I I I I I I I I I I I I I It I I I I I Comments: ______________________________ __,,.. ______ _ -. .. EsGil Corp.orati·~in In <.Partnersli.ip witli. government for <Builifin{j, Safety DATE: Ju-ne 7, 2007 JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties TI SET: IV ;. -NT . Cl EVIEWER Cl FILE D Tne plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ·r:gj The plans transmitted herewith will sub$tantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the· jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: r:gj Esgil Corporation staff did not advise the applicant that the plan check has been completed. J. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephene #: ~$. ·~.,; Date contacted: (by: ) .Fax#: Mail Telephone Fax In Person ·.:· __ :·., ~·~ REMARKS: OK to issue with the access review being done by City Staff per MP . By: Bryan Zuppiger Esgil Corporation D· GA D MB D EJ D PC LOG . ' Enclosures: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 ·-.. \!, DATE: June 5, 2007 JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 EsGil Corporation In Cl'artnersliip witli <;;overnmentfor(J3uilifing Safety SET: III PROJECT ADDRESS: 1932 Kellogg Ave:p.ue PROJECT NAME: Life Properties TI ~ANT ~ D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. -cg] The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applica_nt's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. cg] The applicant's copy of the check list has been s.ent to: Al Beck 11142 Provencal Place San Diego, CA 92128 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. cg] Esgil Corporation staff did advise the applicant that .the plan check has been completed. Person contacte~: }IJ3eck Date contacted:~/~ 01by.j,µ ) Mail Telephone Faxvi' In Person D REMARKS: By: Bryan Zuppiger Esgil Corporation Telephone#: 619 726 1249 Fax#: 858 716 0614 Enclosures: D GA D MB D EJ D PC 05/2')/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 ., Carlsbad 07-0979 'l • J. June 5, 2007 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad · PROJECT ADDRESS: 1932 Kellogg Avenue DATE PLAN RECEIVED BY ESGIL CORPORATION: 05/29/07 REVIEWED_BY: Bryan Zuppiger FOREWORD (PLEASE READ): PLAN CHECK NO.: 07-0979 SET: III DATE RECHECK COMPLETED: June 5, 2007 This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit new sets of prints to: See #1 on the next. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been .resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? DYes DNo . C~rlsba.d 07-0979 June 5, 2007 • PLANS NOTE: The items listed below refer to the 'item numbers from previous list. These remaining items have not been adequately addressed. The notes in bold at the end of or contained within each item are to emphasize the remaining problem. 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calcu'lations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 3. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Provide structural calculations for new stairs in Section B on sheet S-1. 9. Exit stairs shall use a uniform load of 100 lbs in their design. UBC Table 16-A. Section B calls out the stairs as new on sheet S-1. 10. Provide stairway and landing details that are referenced to the floor plan. UBC Sections 1003.3.3: Section B calls out the stairs as new on sheet S-1. a) Maximum rise is 7" and minimum run is 11". When the stairs serves less than 10 occupants, or serves an unoccupied roof, rise may be 8" maximum and run 9" minimum. b) Minimum headroom is 6'-8". c) Minimum width is 36". 11. Provide handrail details that are referenced to the floor plan. UBC Section 1003.3.3.6: Section B calls out the stairs as new on sheet S-1. a) Handrails are required on each side of stairways having four or more stairs. Stairways less than 44" wide or stairways serving one dwelling unit may have one handrail (if not open on both sides) .. b) Handrails and extensions shall be 34" to 38" above nosing of treads and be continuous. c) The handgrip portion of all handrails shall be not less than 1-1/4 inches nor more than 2 inches in cross-sectional dimension. Handrails projecting from walls shall have at least 1-1/2 inches between the wall and the handrail. d) Ends of handrails shall be returned or shall have rounded terminations or bends. e) Openings between railings shall be less than 4". The triangular openings formed by the riser, tread and bottom element of a handrail at a stair shall be less than 6". · C~rlsbad 07-0979 June 5, 2007 12. Provide guardrail details that are referenced to the floor plan. UBC Section 509.1: Section B calls out the stairs as new on sheet 5-1. a) Shall be installed at all unenclosed floor openings. b) Shall have a height of 36". c) Shall have connection details adequate to resist the horizontal force prescribed in UBC Table 16-B. d) Openings between railings shall be less than 4". 18. No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official. City Policy. Plans state new HVAC unit on sheet E2. 19. Please complete the lighting controls sheets; a) Complete the mandatory automatic controls. Sheet L TG-1-C. Part 1 of 3. c) Please sign the 1st sheet in both places and check both sets of boxes. 22. The disabled accessible details as shown on the plans do not comply with current requirements. Please remove the ramp from the access aisle and place in the sidewalk in the parking detail on the Cover sheet of the plans. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. . ~· DATE: May 18, 2007 JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 EsGil Corporation In (l'artnersliip witli <;;ovemmentfor(}Juilain9 Safety SET: II PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties TI ~NT ~ CJ PLAN REVIEWER CJ FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ~ The applicant's copy of the check list has been sent to: Al Beck 11142 Provencal Place San Diego, CA 92128 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. ~ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted~fl Be" Telephone#: 619 726 1249 Date contacted(;// Y/o (b'y4M) Fax#: 858 719 0614 Mail vf elephone vFaXV-ln Person D REMARKS: By: Bryan Zuppiger Esgil Corporation D GA D MB D EJ D PC Enclosures: 05/10/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San, Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 · Carlsbad 07-0979 May 18_,,2007 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PROJECT ADDRESS: 1932 Kellogg Avenue DATE PLAN RECEIVED BY ESGIL CORPORATION: 05/10/07 REVIEWED BY: Bryan Zuppiger. FOREWORD (PLEASE READ): PLAN CHECK NO.: 07-0979 SET: II DATE RECHECK COMPLETED: May 18, 2007 This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit new sets of prints to: See #1 on the next. 8. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? DYes ONo · Carlsbad 07-0979 May 18,. 2007 • PLANS NOTE: The items listed below refer to the item numbers from previous list. These remaining items have not been adequately addressed. The notes in bold at the end of or contained within each item are to emphasize the remaining problem. 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 2. 3. 4. 5. a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Provide a statement on the Title Sheet of the plans stating that this project shall comply v.iith the 2001 editions of the California Building/Plumbing/Mechanical Codes and the 2004 edition of the California Electrical Code, which adopt the 1 QQ? UBC, 2000 UMC, 2000 UPC and the 2002 NEC. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California .license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Lateral as well as gravity analysis calculations required. Provide structural calculations for new stairs in section on sheet 5-1 and storage on the mezzanine. On the first sheet of the plans indicate: • The floor area of the remodeled area, please breakdown stairs •1s. clean room • Type of construction of the existing building, • Sprinklers: Yes or No • Present and proposed occupancy classifications of the remodel area, • The story where the tenant improvement is located, • The occupant load of the remodel area(s). A complete description of the activities and processes that will occur in this tenant space should be provided. A listing of all hazardous materials should be included. The materials listing should be stated in a form that would make classification in Tables 3 D and 3 E possible. The building official may require a technical report to identify and develop methods of protection from hazardous materials. UBC Section 307.1.6. • Carlsbad 07-0979 May 18, 2007 6. Glazing in the follo1.ving looations should be of safety glazing material in aooordanoe with UBC Section 2406.4 (see exoeptions): 7. a) b) Fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. Fixed or operable panels adjacent to a door v,here the nearest exposed edge of the glazing is within a 24 inoh arc of either vertical edge of the door in a closed position. Provide a sebtion view of all new interior partitions. Show: a) b) c) d) Type, size and spaoing of studs. Indicate gauge for metal studs. Speoify manufaoturer and approval number or indioate "to be ICBO approved". Method of attaohing top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). 'Nall sheathing material and details of attaohment (size and spaoing of fasteners). Show height of partition and suspended oeiling, and height from floor to roof framing or floor framing. 8. Please elaborate the stair configuration; as drawn the stairs do not appear to go anywhere. The Section calls out the stairs as new on sheet 5-1. 9. Exit stairs shall use a uniform load of 100 lbs in their design. UBC Table 16-A. The Section calls out the stairs as new on sheet 5-1. 10. Provide stairway and landing details that are referenced to the floor plan. UBC Sections 1003.3.3: The Section calls out the stairs as new on sheet 5-1. a) Maximum rise is 7" and minimum run is 11". When the stairs serves less than 10 occupants, or serves an unoccupied roof, rise may be 8" maximum and run 9" minimum. b) Minimum headroom is 6'-8". c) Minimum width is 36". 11. Provide handrail details that are referenced to the floor plan. UBC Section 1003.3.3.6: The Section calls out the stairs as new on sheet 5-1. a) Handrails are required on each side of stairways having four or more stairs. Stairways less than 44" wide or stairways serving one dwelling unit may have one handrail (if not open on both sides). b) Handrails and extensions shall be 34" to 38" above nosing of treads and be continuous. c) The handgrip portion of all handrails shall be not less than 1-1/4 inches nor more than 2 inches in cross-sectional dimension. Handrails projecting from walls shall have at least 1-1/2 inches between the wall and the handrail. d) Ends of handrails shall be returned or shall have rounded terminations or bends. e) Openings between railings shall be less than 4". The triangular openings formed by the riser, tread and bottom element of a handrail at a stair shall be less than 6". ' Carlsbad 07-0979 May 18, 2007 12. Provide guardrail details that are referenced to the floor plan. UBC Section 509.1: The Section calls out the stairs as new on sheet S-1. a) Shall be installed at all unenclosed floor openings. b) Shall have a height of 36". c) Shall have connection details adequate to resist the horizontal force prescribed in UBC Table 16-8. d) Openings between railings shall be less than 4". 13. The clean room "roof' has a plywood panel covering and possible access by stairs; please design as storage per UBC Table 16-A. And provide a guardrail. 14. Roof mounted equipment must be screened and roof penetrations should be minimized. City Policy 80-6. Plans state new HVAC unit on sheet E2. 15. WIRING METHODS: AC Cable is not allowed in A, B, E, H, and I occupancies. NM cable is restricted (without City approval) to one and two family dwellings. Note on plans that an equipment ground conductor is to be installed in all flexible conduits. Plans state new HVAC unit on sheet E2. 16. The UFER ground may only be a copper ooriduotor f.or oommeroial and industrial electrodes. Rebar is allo1Ned f.or residential use only up to 200 amperes. 17. The use of flexible metal conduit as a grounding means must comply with City Policy 84-36. Plans state new HVAC unit on sheet E2. 18. No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official. City Policy. Plans state new HVAC unit on sheet E2. 19. Please complete the lighting controls sheets; Please imprint on the plan sheets. a) Complete the mandatory automatic controls. Sheet LTG-1-C. Part 2 of 4. b) Complete the certificate of compliance state the equipment to be tested and the persons doing the testing. Sheet LTG-1-C. Part 4 of 4. c) Please sign the 1st sheet in both places. d) Please detail the method of compliance on the plans. e) Please fill-out LTG-MM and imprint on the plans. 20. Tl mechanical and electrical plans must be complete f.or State of Calif.ornia Energy plan cheek. V\lhen HVP.C units are being replaced or added MECH f.orms are required to be completed and imprinted on the plans. V\fhen more than 50% of lighting fixtures are being replaced or added LTG forms are required to be completed and imprinted on the plans. 21. If HVP.C units and/or more than 50% of lighting fixtures are not being proposed in the Tl please state so on the Cover Sheet of the plans. 22. The disabled accessible details as shown on the plans do not comply with current requirements. There was no response to this item. ' Carlsbad 07-0979 May l&, 2007 23. When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per CBC Section 11348.2. These requirements apply as follows: There was no response to this item. a) The area of specific alteration, repair or addition must comply as "new" construction. b) A primary entrance to the building and the primary path of travel .to the altered area, must be shown to comply with all accessibility features. c) Existing $anitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 24. Show on the site plan the complying disabled accessible path of travel from the disabled accessible parking spaces to the primary entrance of the tenant space. Please provide detailed plans of the path of travel, indicate slope and width, any pedestrian ramps, curb ramps, walks, handrails, provide dimensioned parking stall details etc. There was no response to this item. 25. It is unclear from the plans if the restrooms servicing the tenant improvement are disabled accessible, please provide a dimensioned restroom plans showing the restroom to be accessible compliant. There was no response to this item. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, · Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. 'c,, EsGil Corporation In <Partnersli.ip witli. fj01lernment for(J3uilain9 Safety DATE: April 23, 2007 JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 SET: I PLICANT RIS. LAN REVIEWER 0 FILE PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties Tl D D D D D The plans transmitted herewith have been cor~ected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of _the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Al Beck 1042 Provencal Place San Diego, CA 92128 Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Date contacted: 'tf" 'ffl(by: ) Person contacte~~/,-Al eek Maillll"retephone Fa~on REMARKS: By: Bryan Zuppiger Esgil Corporation Telephone#: 619 7261249 Fax#: 858 719 0614 Enclosures: D GA D MB D EJ D PC 04/16/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 .; Carlsbad 07-0979 April 23, 2007 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHEGK NO.: 07-0979 OCCUPANCY:unknown TYPE OF CONSTRUCTION: unknown SPRINKLERS?: unknown JURISDICTION: Carlsbad USE: unknown ACTUAL AREA: 352 ft2 OCCUPANT LOAD: 1 DATE PLANS RECEIVED BY DATE PLANS RECEIVED BY JURISDICTION: ESGIL CORPORATION: 04/16/07 DATE INITIAL PLAN REVIEW COMPLETED: Apdl 23, 2007 PLAN .REVIEWER: Bryan Zuppiger FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2001 CBC that adopts the 1997 USC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in ·conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does. not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot J Carlsbad 07-0979 April 23, 2007 • PLANS 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining $ets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2001 editions of the California Building/Plumbing/Mechanical Codes and the 2004 edition of the California Electrical Code, which adopt the 1997 UBC, 2000 UMC, 2000 UPC and the 2002 NEC. 3. Plans and calculations sha.11 be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Lateral as well as gravity analysis calculations required. 4. On the first sheet of the plans indicate: • The floor area of the remodeled area, please breakdown stairs vs. clean room • Type of construction of the existing building, • Sprinklers: Yes or No • Present and proposed occupancy classifications of the remodel area, • The story where the tenant improvement is located, • The occupant load of the remodel area(s). 5. A complete description of the activities and processes that will occur in this tenant space should be provided. A listing of all hazardous materials should be included. The materials listing should be stated in a form that would make classification in Tables 3-D and 3-E possible. The building official may require a technical report to identify and develop methods of protection from hazardous materials. UBC Section 307 .1.6. 6. Glazing in the followi~g locations should be of safety glazing material in accordance with UBC Section 2406.4 (see exceptions): a) Fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. b) Fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position. .J Carlsbad 07-0979 April 23, 2007 7. Provide a section view of all new interior partitions. Show: a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approved". b) Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). c) Wall sheathing material and details of attachment (size and spacing of fasteners). d) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 8. Please elaborate the stair configuration; as drawn the stairs do not appear to go anywhere. 9. Exit stairs shall use a uniform load of 100 lbs in their design. UBC Table 16-A. 10. Provide stairway and landing details that are referenced to the floor plan. UBC Sections 1003.3.3: a) Maximum rise is 7" and minimum run is 11 ". When the stairs serves less than 1 O occupants, or serves an unoccupied roof, rise may be 8" maximum and run 9" minimum. b) Minimum headroom is 6'-8". c) Minimu.m width is 36". 11. Provide handrail details that are referenced to the floor plan. UBC Section 1003.3.3.6: a) Handrails are required on each side of stairways having four or more stairs. Stairways less than 44" wide or stairways serving one dwelling unit may have one handrail (if not open on both sides). · b) Handrails and extensions shall be 34" to 38" above nosing of treads and be continuous. c) The handgrip portion of all handrails shall be not less than 1-1/4 inches nor more than 2 inches in cross-sectional dimension. Handrails projecting from walls shall have at least 1-1/2 inches between the wall and the handrail. d) Ends of handrails shall be returned or shall have rounded terminations or bends. e) Openings between railings shall be less than 4". The triangular openings formed by the riser, tread and bottom element of a handrail at a stair shall be less than 6". 12. Provide guardrail details that are referenced to the floor plan. UBC Section 509.1: a) Shall be installed at all unenclosed floor openings. b) Shall have a height of 36". c) Shall have connection details adequate to resist the horizontal force prescribed in UBC Table 16-B. d) Openings between railings shall be less than 4". 13. The clean room "roof' has a plywood panel covering and possible access by stairs; please design as storage per UBC Table 16-A. 14. Roof mounted equipment must be screened and roof penetrations should be minimized. City Policy 80-6. l Carlsbad 07-0979 April 23, 2007 15. WIRING METHODS: AC Cable is not allowed in A, B, E, H, and I occupancies. NM cable is restricted (without City approval) to one and two family dwellings. Note ·on plans that an equipment ground conductor is to be installed in all flexible conduits. 16. The UFER ground may only be a copper conductor for commercial and industrial electrodes. Rebar is allowed for residential use only up to 200 amperes. 17. The use of flexible metal conduit as a grounding means must comply with City Policy 84-36. 18. No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official. City Policy. 19. Please complete the lighting controls sheets; a) Complete the mandatory automatic controls. Sheet L TG-1-C. Part 2 of 4. b) Complete the certificate of compliance state the equipment to be tested and the persons doing the testing. Sheet L tG-1-C. Part 4 of 4. c) Please sign the 1st sheet in both places. d) Please detail the method of compliance on the plans. e) Please fill-out LTG-MM and imprint on the plans. 20. Tl mechanical and electrical plans must be complete for State of California Energy plan check. When HVAC units are being replaced or added MECH forms are required to be completed and imprinted on the plans. When more than 50% of lighting fixtures are being replaced or added L TG forms are required to be completed and imprinted on the plans. 21. If HVAC units and/or more than 50% of lighting fixtures are not being proposed in the Tl please state so on the Cover Sheet of the plans. 22. The disabled accessible details as shown on the plans do not comply with current requirements. 23. When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per CBC Section 11348.2. These requirements apply as follows: a) The area of specific alteration, repair or addition must comply as "new" construction. b) A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. c) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 24. Show on the site plan the complying disabled accessible path of travel from the disabled accessible parking spaces to the pdmary entrance of the tenant space. Please provide detailed plans of the path of travel, indicate slope and width, any pedestrian ramps, curb ramps, walks, handrails, provide dimensioned parking stall details etc. 25. It is unclear from the plans if the. restrooms servicing the tenant improvement are disabled accessible, please provide a dimensioned restroom plans showing the restroom to be accessible compliant. Carlsbad 07-0979 April 23, 2007 The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final structural plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). · To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. Carlsbad 07-0979 April 23, 2007 JURISDICTION: Carlsbad VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 07-0979 PREPARED BY: Bryan Zuppiger DATE: April 23, 2007 BUILDING ADDRESS: 1932 Kellogg Avenue BUILDING OCCUPANCY: unknown TYPE OF CONSTRUCTION: unknown BUILDING AREA Valuation Reg. VALUE PORTION ( $q. Ft.) Multiplier Mod. ti 352 34.37 Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance j ..-j Plan Check Fee by Ordinance J ..... J Type of Review: 0 Complete Review D Structural Only D Repetitive Fee =:=EJ Repeats Comments: D Other D Hourly I I Hour * · Esgil Plan Review Fee ($) 12,098 12,098 $122.791 $79.81 I $68.761 macvalue.doc 'I PLANNI.NG/ENGINEERING APPROVALS PERMIT NUMBER C,RQ7 -q,7q DATE 4-12--07 ADDRESS 193:;2 k;.§1 ~ ~ .. RESIDENTIAL 0~;;;,IMPRO~. Rl!SIDl!NTIAL ADDITION MINOR PLAZA CAMINO Rl!AL (<$10,000.00) CARLSBAD COMPANY STORl!S POOL/ SPA VILLAGI! FAIRI! . ' . . . · Rl!TAININCI WALL COMPLETE OFFiCI! BUILDING OTHER ·Cz~ C~ · .... ~~ PLANNERQo m~v:::J .. ~-:-)U·l) ENGINEER \S? =-----....... ---z:ro DATE..!f.µ1/!J ... BU:ILDING DEPT. · ' C~r,!sb~d Fire Department b COPY ·,,-~~--'-----------~----------------------- Plan Review Requirements Category: TI , INDUST Date of Report: 06-11-2007 Reviewed by: ti,i,f..... -. N~e: Address: Permit #: CB070979 Job Name: LIFE PROPERTIES-352 SF TO Job Address: 1932 KELLOGG AV CBAD Hff 21 l~ftll-i !'C ![8!1lJffl~ i!W'mitte~ for re~iew is inc~mplete. At, this time, this office cannot . adequatey contcf a revrew\ffllne compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the ne_cessary plans and/or specifications, with changes "clouded", to this office for rev~ew and approval. ., Cond: CON0002096 [MET] Du.ring the course of out inspection of the new 'CleanRoom' it was discovered that the applicant and/or occupant had installed hi-piled rack system fot the storage of combustible materials and supplies. The applicant and/or responsible party is hereby ordered to provide to this office a yngineered plan for this rack system, which should include at a minimum, 1. Floor pJan of the building. 2. Type of suppresion/detection systems in place 3. Smoke removal system ( smoke/heat vents) 4. Usable storage height, ·provide the usable storage height for each storage arrangement. 5. Commodity clearance-provide clearance between top· of storage and the sprinkler deflector for each storage arraangement.. 6. Aisle dimensions between each storage arrangement. 7, Maximum pile volume for each storage array 8. Provide a list ofcon1modities in accordance with Article 81 of the CA Fire Code. 9. Identify those commodities which are banded or encapsulated. 10. Complete application for Fire Department Special Use permit for High Piled Combustible storage. Entry: 06/11/2007 By: GR Action: AP Cond: CON0002097 [MET] ++ CLEAN ROOM ONLY++ l'.1 ' ~PROVE;> THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. " THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDlTIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. .. \ . T}IIS APPRQ_V AL :SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. . -~~ i Entry: 05/18/2007 By: GR Action: PA The plan for the construction of the clean room is approved. There is an outstanding Code Violation that needs the attention of a responsible party. Entry: 06/11/2007 By: GR Action: AP I . .. . ., .. POOR . .· .QUALITY· l· ;, r- i f. ·· · O·RIGINAL S . . ,· I I . . I I I ,I· . PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1 PROJECT NAME IJ1~, f1. () /?E.tfn T'-- DATE LIFE ME;OICAL 4/30/2007 PROJECT ADDRESS CARLSBAD PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Building Permit # DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Haynal & Co. (760) 7 43-5408 Enforcement Agency Use GENERAL INFORMATION DATE OF PLANS !BUILDING CONDITIONED FLOOR AREA. I CLIMATE ZONE 7 3,272sq.Ft. · BUILDING TYPE [Z] NONRESIDENTIAL D HIGH RISE RESIDENTIAL D HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION D NEW CONSTRUCTION D ADDITION [XI EXISTING+ ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certiffcate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. -The documentation preparer hereby certifies that the documentation is accurate and complete. "" DOCUMENTATION AUTHOR /SIGNATURE 'itl~ VV} /DATE Mark Gallant 4/30/07 The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with thi: permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and i 40, 142, i 43 or 149 of Title 24, Part 6. ENV. LTG, MECH. D D D 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. D D D · 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed · contractor performing this work. D D D 3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 673.7. i. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms PRINCIPAL ENVELOPE DESIGNER -NAME I SIGNATURE . LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mi'tndatory Measures Required Forms PRINCIPAL LIGHTING DESIGNER -NAME I SIGNATURE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures PRINCIPALMECHANICAL DESIGNER -NAME Run lni i )=nergyPro 4.3 by EnergySoft User Number.: 2875 Required Forms I SIGNATURE /0715:45:25 ENV-1 Ille.NO. /DATE LTG-1, LTG-2 ILIC.NO. /DATE MECH-1 MECH-2 MECH-3 MECH-5 ILIC.NO. 'DATE Page:1 of 14 f PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-J PROJECT NAME DATE LIFE MEDICAL 4/30/2007 ANNUAL TDV ENERGY USE.SUMMARY (kBtu/saft-vr Standard Proposed Compliance ENERGY COMPONENT Design Design Margin Space Heating 15.90 11.79 4.11 Space Cooling 81.63 81.36 0.27 Indoor Fans 49.24 49.41 -0.17. Heat Rejection 0.00 0:00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 0.00 0.00 0.00 Ligl:lting 50.62 52.96 -2.33 Receptacle 39.18 39.18 o.do Process 0.00 0.00 0.00 TOTALS: 236.58 234.70 1.88 Percent better than Standard: 0.8% (. 0.8% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (8) 180 deQ Conditioned Floor Area 3,272 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 2 Conditioned Footprint Area 0 sqft. Number of Zones 3 Fuel Type Natural Gas Orientation Gross Area Glazing Area Glazing Ratio · Front Elevation (8) 0 sqft. 0 sqft. 0.0% Left Elevation (Vv) 90 sqft. 0 sqft. 0.0% Rear Elevation (N) 900 sqft. 0 sqft. 0.0% Right Elevation (E) 1,170 sqft. 0 sqft. 0.0% \ Total 2,160 sqft. 0 sqft. 0.0% Roof I 1,8641 sqft. I olsqft. I 0.0%1 Standard Proi:1osed Lighting Power Density 0.834 W/sqft. 0.873 W/sqft. Prescriptive Env. Heat Loss t,502 Btu/h 1,554 Btu/h Prescriptive Env. Heat Gain 31,047 Btu/h-F 33,295 Btu/h-F Remar,ks: Standard Building (Compliance) Run Initiation Time: 04/30/07 15:45:25 Run r.ntfA: 1177973125 EnergyPro 4.3 by EnergySoft User Number:'287? Job Number: 0201 Page:2of 14 !PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-11 PROJECT NAME /DATE LIFE: MEDICAL 4/30/2007 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads System Name Zone Name Occupancy Type (sqft.) (W/sf)1 (W/sf)2 CW/sf)3 CW/sf)4 (W/sf) Existing existing offlce Office 1,020 ·1.200 CLEAN ROOM Indus.trial Work, Low-Bay 388 1.11~ NewPackageRoo!!g_eHP WAREHOUSE Commercial, Industrial Storage 1,864 0.644 -Notes: 1. See L TG-2-C 2. See L TG-4-C 3. See L TG-5-C 4. See L TG-6-C Items above require special documentation (items marked with asterisk, see L TG-2 -C by others) (by others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These Items require special written justification · and documentation, and special verification to be used witti the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "Exist Rheem RQKA-036" is designated as 3 Phase, or is Exem ted from the NAECA 13 SEER re uirement. The exceptional features listed in this performance approach application have-specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Si nature or Stam Run lni i EnergyPro 4.3 by EnergySoft Page:3 of 14 I jCERtlFICATE OF COMPLIANCE PROJECT NAME LIFE MEDICAl. !OPAQUE SURFACES Surface Insulation Act. Cond: ENV-1-CI DATE 4/30/2007 # . Type Area U-Fac. Cav. Cont. Azm. Tilt Status Joint Appendix IV Reference Location / Comments 1 Wall 9d 0.740 None R-0.0 270 90 Existino 13sF5 WAREHOUSE 2 Wall 71 0.740 None R-0.0 0 90 Existina 13-F5 WAREHOUSE 3 Door 2 0.500 lnsul R-0.0 0 90 New 28-A3 WAREHOUSE 4' Door 16 0.500 lnsul R-0.0 0 90 New 28-A3 WAREHOUSE 5 Wall 1, 17 0.740 None R-0.0 90 90 Existina 13-F5 WAREHOUSE 6 Roof 1,86 0.051 R-19 R-0.0 0 0 Existina 02-A5 WAREHOUSE • N,.E, A, R (New, Existing, Altered, Removed) !FENESTRATION SURFACES D Moreihan or equal to 10,000 sq.ft. of site-built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default LI-factors from Standards Table 116-A and B Certificate shall be filed in the contractor's project office during construction and in the building manage(s office after construction Act. Cond. # Tvne Area U-Fac.1 SHGC2 Azm. Stat. Glazina Tvoe (1) LI-factor Type: 116-A Default·Table from Standards, Table Nl-1 Default Table from the ACM Manual Appendix, NFRC Labeled value. (2) SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value .. EXTERIOR SHADING . Window Overhang # Exterior Shade Type SHGC Hgt. Wd. Len. Hat. LExt.RExt. lMINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES Left Fin Dist. Len. Hat. Location/ Comments Right Fin Dist. Len. Hat. D The proposed building is in climate zones 2 through 15 and contains an enclosed spac~ with floor area greater than 25,000112, a celling height greater than 15 feet, and an LPD for general . lighting of at least 0.5 W/ft2. See Se.ction 743(c). If this box'is checked, ENV-4:C must be filled out. when submitting under the Prescriptive Compliance Approach. Run lniti 4/30/07 15:45:2 EnergyPro 4.3 by i;:nl)rgySoft User Number: 2875 Job Number: 0201 Page:4 of 14 ICERTIFICATE OF COMPLIANCE (Part 1 of 3) L TG-1-CI PROJECT NAME DATE LIFE MEDICAL !INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, CONDITIONED SPACES (From LTG-2-C) PORTABLE LIGHT!NG (From L TG-3-C) LIGHTING CONTROL CREDIT, CONDiTIONED.SPACES (From LTG-4-C) CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG-2-C) LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG-4-C) UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER ALLOWE:D INDOOR LIGHTING POWER FOR CONDITIONED SPACES D COMPLETE BUILDING METHOD (From LTG-5-C) D AREA CATEGORY METHOD (From LTG-5-C) 0 TAILORED METHOD (From L TG-5-C) ALLOWED LIGHTING POWER !ALTERNATE COMPLIANCE [Rj PERFO8MANCE METHOD D COMMMON LIGHTING SYSTEM (From L TG-8oC) . IALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES (From LTG-5-C) IMANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION CONTROL CONTROL TYPE (Room#) IDENTIFICATION (Auto Time Switch, Dimming, etc.) SPACE CONTROLLED Run Initiation Time: 04/30/07.15:45:25 EnergyPro 4.3 by EnergySoft ·User Number: 2875 4/30/2007 INSTALLED WATTS 2856 0 0 2 856 ALLOWED WATTS Check if Daylighting 2,856 0 0 NOTET FIELD Page:5of 14 ' ' ICERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-cl PROJECT NAME IDATE . LIFE MEO.ICAL 4/30/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a·test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test Also indicate the person responsible for performing the tests (Le. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion . of this section will aHow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, L TG-1-A, Forms .shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) ·and Title 24 Part 6. Test Descrintion Test Performed Bv: fxl LTG-2-A: Lighting Control Acceptance Document -Occupancy Sensor Acceptance -Manual. Daylight Controls Acceptance -Automatic Time Switch Control Acceptance Equipment requiring acceptance testing Qccupanc)'. SensQrs Installing Contractor Manual Daylight Controls, Automatic Time Switch fxl L TG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing Automatic Daylighting Controls Installing Contractor Run Initiation Time: 04/30/07 15:45:25 EnergyPro 4.3 by EnergySoft User Number: 2875 Job Number: 0201 Page:6 of 14 !CERTIFICATE OF COMPLIANCE PROJECT NAME LIFE MEDICAL Designer: MECH-1-cj DATE 4/30/2007 This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and.list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the -equipment description and the number of systems tb be tested in-parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM-Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be·part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit-is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or SPc\Ce shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and ooeratinq and maintenance information meet the reauirements of Section 10-103lb) and.Title 24 Part 6. STATEMENT OF COMPLIANCE Iii MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing HV AC Equipment Installing Contractor Test requiq,d on all New systems both New Construction ancf Retrofit. IXJMECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing HY-AC.Equipment Installing Contractor Test required on all New systems both New Construction and Retrofit. D MECH-4-A: Air-Side Economizer Acceptance Document Equipment re.quiring acceptance testing Test required on al/New systems both New Construction and Retrofit. Units with economizers that are ms/ailed at the factory and certified with the commission-do not reqwre equipment testing but"do require construction·inspection. D MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 1/2 of space or less and 25% or more of the ducts are in nontonditioned or semiconditioned space hke an attic. New systems that meet the above reqwrements. Retro/it systems that meet the above requirements and either extend ducts, replace ducts or ~eplace the packaged _vryit. D MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. 0 MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VAV fan volume controls installed on new or exi'sting systems must be tested 0 MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and th,e pr,mary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and'hot water systems that have a design capacity 9.reater than or equal to 500,000 Btu/hr. -Water-loop Heat Pump Controls Applies to all-new waterloop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution.pumps on new variable flow chilled; hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. _Eauioment requiring acceotance testina EnergyPro 4.3 by En_ergySoft User Number: 2875 Job Nurriber: 0201 Page:7of 14 .. !INDOOR LIGHTING SCHEDULE PROJECT NAME LIFE MEDICAL !INSTALLED LIGHTING POWER FOR CONDITIONED SPACES (Part 1 of 2) LTG-2-CI DATE 4/30/2007 Luminaire Lamps/Ballasts Installed Watts C D rrz C n, C -!• a.~~ '< n, "C 3 ~ en CD CD-a -·""O.., CD~~ Name Type Description 2x4 t5 72w 3 T5H024 3LAMP 8ft 2 tube 2 6_0..w.x._2 Standard Allowance: 1020 sqft at 1.200 w/sf Run lniti EnergyPro 4.3 by EnergySoft User NuTTJber: 2875 E F G H I J . r-OJZ r-r Cl C z ~::/' r-"C ::E 3111:3 C ::E 3 !!!.0 C G) !!l. 3~!l¼ -·°' C" a.-c °' n, m ~·ag. X !l¼\11: b1 !!?. a, ~-~~ 5.0 "C "' -·"C.., ~ ::;· <D -=:"' ~ a~ a al <t> ~ Vo. Nn "' 24 1.5 72.0 X 6 432 nC 1.C 120.0 X 10 1 200 PAGE TOTAL BUILDING TOTAL (sum of all pages) PORTABLE LIGHTING (From LTG-3-C) CONTROL CREDIT (From L TG-4-C) ADJUSTED ACTUAL WATTS Job Number: 0201 1.224 2,856/ 2,8561 ol ol 2,8561 Page:8 of 14 JAtR SYSTEM REQUIREMENTS PROJECT NAME . LIFE MEDICAL iSYSTEM FEATURES ITEM OR SYSTEM T AG(S) Number of $ystems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace·Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand _Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan .Control DP·Sensor Location Supply Pressure Reset (DOC only) Simultaneous.Heat/Cool !=conomizer Heating Air Supply Resef Cooling Air Supply Reset ·Duct Sealing for Prescriptive Compliance3 T-24 Section 112(a) 112/al 112(b) 112(c), 115(a) 121(b) 121(b) 121/c) 121(c) 121/c\ 122/e\ 122rel 122m 122(g) 123 124 144(a&b) 144-/a& bl 144/a&b) 144/a&bl 144 /c\ 144 (cl ·144 /cl 144 /d\ 144 (el 144 If\ 144 (f) 144 (k) Part 1 of 2 MECH-2-Cf DATE 4/30/2007 AIR SYSTEMS Central or Sinale Zone Existing NewPackageRooftopHP 1 1 Reference on Plans or Specification 1 8.00 HSPF 8.00 HSPF 10.0 SEER/ 9.0 EER 13.0 SEER/ 11.0 EER Yes Yes n/a n/a Yes Yes 211 cfm 280cfm No No No No Proarammable Switch Proarammable Switch No Setback Required No Setback Reauired Auto Auto n/a n/a R-4.2 R-4.2 n/a n/a 27,540 btuh 45,899 btuh n/a n/a 25,308 btuh 44,839 btuh Constant Volume Constant Volume Yes Yes No No No Economizer No Economizer Constant Temo Constant Terna Constant Temp Constant Temp No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference ot plans and specificatons per footnote 1. 3: Enter Yes if-System is: Constant Volume, Single Zone; Serves< 5,000·sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF-1 for performance.method duct sealing requirements. INOTES TO FIELD: Foe B~il~lnq DeP@rtment Use on1Y Run lni i EpergyPro 4.3 by EnergySoft User Number: 2875 Job Number: 0201 Page:9 of 14 IMECHANICAL VENTILATION MECH-3-CI PROJECT NAME LIFE MEDICAL MECHANICAL VENTILATION (Section 121(b)2) AREA BASIS OCCUPANCY BASIS A B C D E F G C" CJ) C') .0 ~o-S: z '< ii: 0 C "'Cl C "'Cl ~ )>::, "'-u C') OJ'<-· CII 3 CD "tJ C') m ~ s· ,::, CJ) ... C. a1 ~ ~ X ~C') 0 O" ·fn CD 'TI xno 'Tl CII -• ¥~ ·O .., is: -'D> = 'Tl C')CD 'Tl "lie "II 0 0 --0>:s; :, ---g ii: ZONE/SYSTEM :, 2-· 2. a existing office 1,02( 0.15 153 CLEAN ROOM 38E 0.15 58 Existing Total WAREHOUSE 1,86, 0.15 280 NewPac~ageRooftopHP Total C Minimum ventilation ra'te oer Section 121 Table 121·A H I :a < -· m Oi!:0 o~i' 0 DI • 'Tl:--!!!. ... >< 0 ii: ~I§ .ea: ... 153 153 58 58 211 211 280 280 280 280 DATE 4/30/2007 PRESCRIPTIVE REHEAT LIMITATION (Section 144/d)) VAVMINIMUM J K L M N~ ;:,o;O C CII go'? 0 05!. [ecE' "llm .., C ii: C') CII 0 ~ >< W 3 DI -::, "II CJ)-0:, >< -g ii: ii: CC V, 0 Ou, 0 "CCII fl :i,. ~--ff o:c-"C !/!. ? "!Iv -10 ii:!-l> '<:, ::;• E Based on fixed seat'or the greater of the exoected number of occuoants,and 50% of the CBC occuoant load for earess ourooses for soaces whhout fixed seatfna. H Required -Ventilation Air (REO'D V.A.) is the larger of the-ventilation rates calculated on and.AREA or OCCUPANCY BASIS (column Dor G). I_ Must be oreater·than or eaual to H, or use Transfer Air (column N\ to make uo the difference. J Design ian supply cfm (Fan CFM) x 30%; or K Cond1t1on area (ft. sq) x 04 cfm/ft. sq.; or L Maximum of Columns H, J, K, or 300 elm M This must be less than or eaual to Column Land areater that ar eaual ta the sum of Columns H + N. N Transfer ai; must be provided where the Required Ventilation Air (column I) is. greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the.difference between the Required Ventilation Air (column I) and the Design Minimum Air (column M), column H -M . . .. EnergyPro 4.3 by EnergySoft User Number: 2875 Job Number: 0201 Page:10 of 14 N g ::, ~ ... l> ::;· .. .. -,_ IMECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-Cj PROJECT NAME DATE 4/30/2007 LIFE MEDICAL CHILLER AND TOWER SUMMARY PUMPS Tot. Motor Drive Pump Equipment Name Equipment Type Qty. Efficiency Tons Qty GPM BHP Eff. Eff. Control DHW / BOILER SUMMARY Energy Standby TANK INSUL. Rated Vol. Condition Factor Loss or Ext. System Name System Type Distribut,ion Type Qty Input (Gals.) Status or RE Pilot R-Val. MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pumo Hot Water Piolna Lenath (ft) Control # HP T'{oe In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING Aux. Condition _____$_ystem Name System Tyge Qty ~gut kW Eff. Cutout Efflciencv Status Economizer Tvoe Exist Rheem RQKA-036 Packaged DX 1 36,000 0.0 8.00 HSPF 36,000 10.0 SEER/ 9.0 EER Existing No Economizer new 5ton Packaged DX 1 60;000 0.0 8.00 HSPF 60,000 13.0 SEER/ 11.0 EER New No Economizer CENTRAL SYSTEM FAN SUMMARY !=:I IPPI I l=.11.N RETUJ;N l=.11.N Motor Drive Motor Drive Svstem Name Fan T\lge Motor Location CFM BHP Eff. Eff. CFM BHP Eff. Eff. Exist Rheem RQKA-036 Cqnstant Volume Draw-Through 1,200 1.00 82.5% 97.0% none new5ton Constant Volume Draw-Through 2,000 1.00 82.5% 97.0% none Run Initiation Time: 04/30/0715:45:25 Run r.nrlA· 1111~,.,n~ Energy Pro 4.3, by EnergySoft User Number: 2875 Job Number: 0201 Page:11 of14 •' .. i, ILIGHTING MANDATORY MEASURES PROJECT NAME LIFE MEDICAL DESCRIPTION [XI §131 (d)1 ·For·every floor, all interior lighting systems shalr be equipped with a separate automatic control to shut off the lighting. This automatic control ~hall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. lX:J §131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. IX] §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. IX] §111 D §132 Fluorescent Ballast and Luminaites Certified: All fluorescent'fixtures specified for the project are certified· and listed iri the Directory. All installed fixtures shall be certified. Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132;·or all one and three lamp ·fluorescent fixtures are specified with electronic high-frequency ballasts and are exempt from tandem wiring requirements. IX] §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor-to- ceiling walls. IXJ §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. IX] §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of cjaylight in the.area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because thl:l windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. D §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.3 by EnergySoft User Number: 2875 Job Number: 0201 LTG-MMI DATE 4/30/2007 Desianer Enforcement Page:12 of 14 _. ' . " .. " • !MECHANICAL MANDATORY MEASURES PROJECT NAME LIFE MEDICAL DESCRIPTION Equipment and Systems Efficiencies [X] §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. [Z] §115(a) Fan type central furnaces shall not have a pilot light. [X] § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. [ZJ § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each space conditioning system shall be installed with one of the following: 00 § 122{e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time-switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall b~ capable of programming different schedules for weekdays and weekends ancj have program-backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if p.ower is interrupted; or ' D § 122(e)18 An occupancy sensor to control the operating period of the system; or D § 122(e)1C A 4-hour timer that can be manually operated to control the operating period of the system. [x] § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. D § 122(g) Each space conditioning system serving multiple zones with:a combined conditioned floor area more than 25,000 square feet shall be provided with Isolation zones. Each zone: shall not exceed 25,00Q·square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. [x] § 122(a&b) Each-space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees For higher. Where used for both heating and cooling, the control shall be capable of providing a deadband·of at least 5 degrees F within which the supply of heating and cooling is shut off or reduC!;!d to a minimum. [X] § 122{c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized perso.nnel. D § 112{b) Heat pumps shall be installed with controls to prevent.electric-resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: 0201 Part 1 of 2 MECH-MM I DATE 4/30/2007 Designer Enforcement Page:13 of 14 . .. ., " •· .... ., '·' .. fMECHANICAL MANDATORY MEAS:U:RES Part 2 of 2 MECH-MMI PROJECT NAME DATE LIFE MEDICAL 4/30/2007 Description Designer Enforcement Ventilation [X] §.121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates.as specified on these plans. [X] § 122(f) Gravity or automatic dampers interlocked and·closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. [X] § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. D §121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (:1989); or [ZJ § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mecnanical contractor and certified by (1J-the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility ,for the design of the ventilation system; or D § 121(f)3 Outside Air Measurement: The system shall be equipped with ;:i calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display dlvice; or D § 121(!)4 Another method approved by tile Commission. Service Water Heating Systems [X] § 113(b)2 If a circulating hot water system is installed, it shall h(lve a control,capable of automatically turning off the circulating pump(s) when hot water is not required. [X] § 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnetgyPro By EnergySoft Usllr Number: User Job Number: 0201 Page:14of14 CB070979 1932 KELLOGG AV LIFE PROPERTIES-352 SF TO CREATE CLEAN ROOM Tl INDUST ~\ Lot#: AL BECK ,Jl~w µ[) ,=e'~s c.ou.~~\_J.,,... rv JJ~_ e.o-,.~ ~ h~lil~ :1~ 4-/11 /01 7D C..,,'r,1 Q--6:S(g.,JL, ~ UILDING LANNING NGINEERING IRE APPR/FORM - ~r -----~~ '-f-/r3)'07 ~ ~ rC, -----tfAZMAT/AlRQUAL U =-----OTHER SEIM:R DISTR TO FROM C-~ ~ ~~ Lf-J.. 5-07 -C $ "JP', C.... l. hJ Ii SCHOOL FORM -; j /) _ _ r _j_ , d-f.· ~ (1 /) (' ----;'"----PE & M WORKSHEET ·•1 ~--1o ~ ----;f----CFDFORM !J f _b ( Ii 7 UYVG ~{ -ri-D: --~ cf// L t,'Ji ~~~=+~-'-"477":i==:...,.,._!~~ci~R cy* ~:::r ~ ~ f~ ~~~:· ~/f-{}1-6#, (!_l./J; · (p--"5"-01-(>if t~rn b h IO'? -C ''TI.J .!.!.!... 51,,,l:,,n, tf 4. /h ( ·s $C ":J Skr//iv,e,,., -/IJOH;:: ed i1ff l o:,,J-; ,,.-0 OWL-- ~ TI[ lJM w ~ ·/2 06/L. &/ f(o 7 -((;1rvs ~ Fe. -w/firi~ ,{;~ F/;e!i? ~~i-01/ t'\~-;ti ~12l~~f_M ~1-14~t 't"f-1, ~ \ ~ '\ City of Carlsbad . 1635 Faraday Av Carlsbad, CA 92008 07-02-2008 Plan Check Revision Permit No:PCR07135 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC#: Project Title: Applicant: AL BECK 61·9-726-1.249 ·Building Inspection Request Line (760) 602-2725 1932 KELLOGG AV CBAD PCR Lot#: Construction Type: 0 NEVV Status: Applied: Entered By: 2121700400 $0.00 CB070979 Plan Approved: LIFE PROP: ADD SINK & HOLDING TANKS Issued: Inspect Area: Owner: LIFE PROPERTIES LL C 1932 KELLOGG AVE CARLSBAD. CA 92008 Plan Check 'Revision Fee Additional Fees ISSUED 07/06/2007 jma 06/27/2008 06/27/2008 $240.00 $0.00 Total Fees: $240.00 Total Payments To Date:· $240 .. 00 Balance Due:· lns,:>_ector: FINAL APPROVAL Date: Clearance: •.' $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review. set aside, void, or annul their imposition. ~ City of Carlsbad 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717 / 2718 / 2719 Fax: 760-602-8558 Buildin9 Permit Application JOB ADDRESS. q 3 2.. --- #BEDROOMS Plan Check No. Est. Value Plan Ck. Deposit Date SUITE#/SPACE#/UNIT# APN #BATHROOMS TENANT BUSINESS NAME CONSTR. n'PE OCC. GROUP L,ffe-Pv- EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS YES D #_ 'No D YES D NO D . YES_ D NO 0 ~~m App/leant) APPLICANT NAME ADDRESS L. STATE CA ZIP qz._,zg-CITY STATE ZIP PHONE FAX PHONE FAX Col EMAIL EMAIL PROPERTY OWNER NAME CONTRACTOR BUS. NAM!a ADDRESS ADDRESS CITY STATE ZIP CITY STATE ZIP PHONE FAX PHONE FAX EMAIL EMAIL ARCH/DESIGNER NAME & ADDRESS STATHIC.# STATE LI(?.# CLASS · Cln' BUS. UC.# (Sec. 7031.5 Business and Professions Code: Any City or CountY, which requires a permit to construe~ alter improve, demolish or reP,air any structure· prior to its issuance, also requires the applicant for such permit to file a signed statement that he is ficensed .J!Urmnt to the provisions of the Contractor's License Law {Chapter. 9, commending with Section 7000 of Division-3 of the Business and Professions Code} or that he is exempt thereli'om, and the basrs for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not m~re than five hundred dollars {$500}). . -. · ._' ~ v> ' -' ~ ~-.,,,~~~'i'<W«J'}'')"IC'"j:"""',,.,,."' -~",<_,.,..V,.,,.,¥ w;«:,-...-.77.,,_.. -~,,...,..-"' •,<><-=~'"!''""~'°"'~'<'...,-,~" ,v ~v-z-'""'r• WORICERS' COMPENSATION . ' . Workers' Compensation Declaration: / hereby affirm under penalty of perjury one of the following declarations: (j I have and will maintain a certificate of consent to self-Insure for workers' compe.nsation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. (j I hav~ and will maintain ~orkers' compens~tlon, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. ____________________ Policy No.----'-----------Expiration Date _______ ~~- This section need not be completed iUhe permit is for one hundred dollars ($100) or less. . · · (j Certificate of E)(eniption: I certify that in the performance of the work for which this permit is Issued, l'shall not employ any person iii any manner so as to become subject to the Workers' Compensation laws of California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the labor code, Interest and attorney's fees. _,6 CONTRACTORSIGNATURE DATE I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason: Cl I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is·not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or impfoves thereoh, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). Cl I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's license Law). Cl I am exempt under Seqtion__,_ ____ .Business and Professions Code for. this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. Cl Yes Cl No 2. I (have/ have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include riame address I phone/ contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number): .5. I will.provide some of the work, but I have contracted (hired) the following persons to provide th!) work indicated (include name/ address/ phone I type of work): ,,6 PROPERTY OWNER SIGNATURE DATE is the applicant or future building occupant required to submit a business plan, acutely h·azardous materials registration' form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Cl Yes ·Cl No . , Is the a~plicant or future building occupant required to obtain a permit from the air polluti_on control district or·air quality management district? Cl Yes Cl No Is the facility to be constructed within 1,000 feet of the.outer boµndary of a s,chool site? Cl Yes . 1:1 No _ IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF QCCUPANCY MAY NOT BE ISSUED UNLESS.THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I certify that I have read the application and state that the above information ls correct and that the infonnation on the plans is accurate. I agree to comply with all City ordinances and State laws relating to bulldlngcolistructlon. J hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection puiposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLES$ THE CllY OF CARLSBAD AGAINST ALL LiABILITIES, JUDGMENTS, COSTS ANQ EXPENSES WHICH MAY'I~ ANY. WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OFTHE GRAN'\ING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and. demolition or construction of strucrures over 3 stories in height. EXPIRATION: Eveiy permit issued by the Building Official under the provisions of this Code shall expire liy limitation and become null and void if the building or work authorized by such permit is not commenced within JIIIJ)IIIJ5,![001the date of such permit or if the building or vb1c authorized by such permit is suspended or abandoned at any time after the work is commenced for a peliod of 180 days (Section 106.4.4 Uniform Building Code). CANT'S SIGNATURE DATE EsGil Corporation In <Partners/Up wit/i. government for <Builaing Safety DATE: June 27, 2008 l:l APPLICANT l:l JURIS. JURISDICTION: Carlsbad l:l PLAN REVIEWER l:J FILE PLAN CHECK NO.: 07-0979 REV (PCR07-135) SET: IV PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties TI ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: ) Fax#: Mail Telephone Fax In Person ~ REMARKS: OK to issue with applicant providing waste water approval. Applicant is perforated plans. By: Bryan Zq.ppiger Esgil Corporation D GA D MB D EJ D PC LOG Enclosures: Original approved plans. trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 . . ·EsGil Co-rporation In <Partners nip witli. <}Oflentment for (}Juilaing Safety DATE: August 1, 2007 CJ APPLICANT C9J~ JURISDICTION: Carlsbad CJ PLAN REVIEWER CJ FILE PLAN CHECK NO.: 07-0979 REV (PCR07-135) SET: II PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties TI D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ~-.. ~ The applicant's copy of the check list has been sent to: Al Beck 11142 Provencal Place San Diego, CA 92128 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. ~ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted:fl Beck Telephone#: 619 726 1249 Date contacted:P'/J /41 (by:4,-l!J ) Fax#: 858 716 0614 Mail -/Telephone Fax vin Person D REMARKS: By: Bryan Zuppiger Esgil Corporation D GA D MB D EJ D PC Enclosures: 07/24/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Ciirlsbad 07-0979 REV (PCR07-135) August 1, 2007 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 REV (PCR07-135) PROJECT ADDRESS: 1932 Kellogg Avenue SET: II DATE PLAN RECEIVED BY ESGIL CORPORATION: 07/24/07 REVIEWED BY: Bryan Zuppiger FOREWORD (PLEASE READ): DATE RECHECK COMPLETED: August 1, 2007 This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will b~ in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit new sets of prints to: See item #1 . next sheet. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon Which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that_ are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulti~g from this list? !JYes · !JNo qad$bad 07-0979 REV (PCR07-135) · August 1, 2007 • PLANS NOTE: The items listed f:>elow refer to the item numbers from previous list. These remaining items have not been adequately addressed. The notes in bold at the end of or contained within each item are to emphasize the remaining problem. 1 . Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets -can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and-the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Driv~. Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to.their Planning, Engineering and Fire D~partments. NOTE: Plans that c:1re submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments·until review by EsGil Corporation is complete. 4. Provide specifications and listings for all piping, valves, pumps and vessels. Please submit c1 design for this system from a mechanical engineer licensed by the State of California. • Include specifications and listings for all piping, valves, pumps and vessels. - • Please submit a seismic overturning design for the 300 gallon tank from a structural engineer licensed by the State of California. • Please show the ABS/PVC transition fittings. • ABS is not approved fc;,r pressurized line use. • The vent should be placed down stream of the traps. • The vessels should be trapped and vented. • Where is the filter installed and what material is used? Based on the response more corrections may follow. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final mechanical plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify· the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been ~ddressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you. '\. t EsGil Corporati~n In <Partnersliip witli (jovernmentfor<Buifaing Safety DATE: July 12, 2007 JURISDICTION: Carlsbad PLAN CHECK NO.: 07-0979 REV (PCR07-135) PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties TI SET:I D APPLICANT ~ ~ REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed-check list and should be corrected and resubmitted for a complete recheck. cg] The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction. to forward to the applicant cohtact person. cg] The applicant's copy of the Check list has been sent to: Al Beck 11142 Provencal Place San Diego, CA 92128 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. [gj Esgil, Corporation staff did advise the applicant that the plan check has been completed. Person contac~iAI J3eck Telephone#: 619 726 1249 Date contacted:V tiiJ1(byJ/g ) Fax#: 859,:719 0614 Mail Telephone / Fax V In Person l 71 ~ ? D REMARKS: By: Bryan Zuppiger Esgil Corporation D GA D MB D EJ D PC Enclosures: 07/10/07 trnsmtl.dot 9320Chesapeake Drive, Suite 208 + San Diego, Califoniia 92123 + (858) 560-1468 + Fax (858) 560-1576 ;.. Carl,bd:d 07-0979 REV (PCR07-135) July 12, 2007 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 07-0979 REV (PCR07-135) JURISDICTION: Carlsbad DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: July 12, 2007 FOREWORD (PLEASE READ): DATE PLANS RECEIVED BY ESGIL CORPORATION: 07/10/07 PLAN REVIEWER: Bryan Zuppiger This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2001 CBC-that adopts the 1997 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the· approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot ,., Carlsbad 07-0979 REV (PCR07-135) July 12, 2007 • PLANS 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. I (._ • 4 2. A complete description of the activities and processes that will occur in this tenant space should be provided. A listing of all hazardous materials should be included. The materials listing should be stated in a form that would make classification in Tables 3-D and 3-E possible. The building official may require a technical report to identify and develop methods of protection from hazardous materials. UBC Section 307.1.6. 3. 'Provide approval from the Sanitation Districffor this system's discharge. 4. Provide specifications and listin9s for all piping, valves, pumps and vessels. The person responsible for their preparation must sign all final sheets of plans. (California Business and Professions Code). Final mechanical plans, specifications and calculations must be signed and sealed by the engineer or architect licensed by the State of California who is responsible for their preparation. Please specify the expiration date of license. (California Business and Professions Code). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plah sheet, note· or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bryan Zuppiger at E~gil Corporation. Thank you. ~ --<.• <.' EsGil Corporation In (l'artners6,ip witli qwernment for cJJui(i{in9 Safety DATE: August 1, 2007 . JURISDICTION: Carlsbad . PLAN CHECK NO.: 07-0979 REV (PCR07-135) SET: :ti PROJECT ADDRESS: 1932 Kellogg Avenue PROJECT NAME: Life Properties Tl CJ APPLICANT C9JQB}&. CJ PLAN REVIEWER CJ FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. , ~ The applicant's copy of the check list has been sent to: Al Beck 11142 Provencal Place San Diego, CA 92128 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. ~ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted:f}Beck Telephone#: 619 726 1249 bate contacted:f// /01 (by:/)lt> ) Fax#: 858 716 0614 Mail /Telephone Fax v'ln Person D REMARKS: By: Bryan Zuppiger Esgil Corporation D GA D MB D EJ D PC Enclosures: 07/24/Q7 trnsmtl.dot 9n0 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 L . . . Carls,bad 07-0979 REV (PCR07-135) July 12, 2007 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Bryan Zuppige:r PLAN CHECK NO.: 07-0979 REV (PCR07-135) DATE: Jp.ly 12, 2007 BUILDING ADDRESS: ·1932 Kellogg Avenue BUILDING AREA Valuation Reg. VALUE PORTION (Sq.Ft.) Multiplier Mod. • <. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance , ... , Plan Check Fee by Ordinance Type of Review: 0 Complete Review D Structural Only D Other D Repetitive Fee / · I ,.: I Repeats 0 Hourly 21 Hours* * Based on hourly rate Comments: Esgil Plan Review Fee ($) .. s240.001 $192.ooj macvalue.doc Carlsbad Fire Department Plan Review Requirements Category: PCR , Date of Report: 07-10-2007 Name: Address: Permit#: PCR07135 Job Name: LIFE PROP: ADD SINK & HOLDING Job Address: 1932 KELLOGG AV CBAD Conditions: Cond: .CON0002181 [MET] APPROVED: BLDG. DEPT COPY THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL,NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 07/10/2007 By: MS Action: AP < • 11 350 gallon Holding tank PH'feSf!'ORi' 350 gallon Holding tank Life Properties 1932 Kellogg Ave. Carlsbad, CA. 92008 ' ' I 2" PVCSch40 \ ~t" ~o 1-~J;l>" '1%%% S) 'I"\~ ~~ "'"\. 'i ~<::,v ~~. ~\~ C,~~'O~ o\ ~~G cit,\.-'O 1?} 2" check valve SIDE VIEW SSSINK ··-··-··-··-··-··-··-··-· • • 50 Gallon Sump tank • • • • • AUTOMATIC 1 HP SUMP PUMP TOP VIEW 0--~ PJ C~ 1 ½"ABS •••• • • • •• • 2" ABS/PVC COUP (ABS MALE SLIP THR FEMALE SLIP THRE 2" discharge valve Drawn By: A J Beck 11142 Provencal Pl. ~an Diego, CA 92128 619 7261249 :f .. • • • • Waist water flow; • •• ••• • • • • ••• . . . , . . . . ... • • ••• • • • # •• •• • • • • • • • • ••• • • • • • • • • • • ••• • • • • • •• • •• • • • t • • • • • • •• • • •• • • • ' • • • • • • • • • • • • • • • • • • • • •• • • ••• • •• • •• • • • ••• • • •• From sink to temporary holding tank~~l9lw ipk.: : • • • • • • When fun, auto pump through check valve: to 300 gaUon tank fqr PH .. processing. When fuHy processed discharged to city sewer. All lines and valves 2'1, vented above sewer discharge point. SS-Sink P-trap 50 gallon Temp tank, w/auto. Pump Check valve 300 gallon Tank Discharge valve Sewer discharge point Vent /