Loading...
HomeMy WebLinkAbout1933 DOVE LN; ; CB032165; Permit08-28-2003 Job Adciress: Permit Type: Parcel No: Valuation: Occupancy Group: 08/28/2003 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit PermitNo: CB032165 Building Inspection Request Line (760) 602-2725 1933 DOVE LN CBAD RESDNTL Sub Type: APT 2156624566 Lot#: 0 $678,697.00 Construction Type: NEW Reference #: CT99-03 7 Structure Type: MF5-t- 15 Bathrooms: 9 LA COSTA GRNS BLDG 6 7 UNTS 7555SF HAB 2597SF CARPORT 1135SF DECK Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 08/05/2003 SB Plan Approved: 08/28/2003 PC03-06 Applicant: ALLGIRE GNRL CONTRACTORS INC 5055 AVENIDA ENCINAS CARLSBAD, CA 92008 619-431-2999 Owner: REAL ESTATE COLLATERAL MANAGEMENT CO C/O LIZ LAYMAN/ MORROW DEV 1903 WRIGHT PL #180 CARLSBADCA 92008 Building Permit $2,245.75 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Ctieck $1,459.74 Meter Fee $470.00 Add'l Plan Check Fee $0.00 SDCWA Fee $10,421.00 Plan Check Discount $0.00 CFD Payoff Fee $16,135.00 Strong Motion Fee $67.87 PFF $12,352.29 Park In Lieu Fee $0.00 PFF (CFD Fund) $0.00 Park Fee $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFD Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $2,646.00 Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $343.00 Renewal Fee $0.00 ELECTRICAL TOTAL $210.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $136.50 Other Building Fee $0.00 Housing Impact Fee $0.00 Pot. Water Con. Fee $15,360.00 Housing InLieu Fee $0.00 Meter Size D2 Housing Credit Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Reel. Water Con. Fee $0.00 Sewer Fee $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $61,847.15 Total Fees: $61,847.15 Total Payments To Date: $0.00 Balance Due: $61,847.15 3027 08/29/03 0002 01 CGP 02 61847.15 Inspectoi FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedk^tions, resen/attons, or other exactions hereafter collectively referred to as fees/exactions.' Ifou have 90 days from the date this pennit was issued to protest impositton of these fees/exacttons. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infomiation with the City Manager for processing in acconjance with Carisbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal actton to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar applicatton processing or sen/ice fees in connectton with this project. NOR DOES IT APPLY to any fees/exacttons of which vou have orevtouslv been oiven a NOTICE similar to this, or as to whteh the statute of limitations has previously othemvise expired. city If Carfsbad Final Buildiiig Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit*: Project Name: Address: Contact Person; Sewer DIst: CB032165 LA COSTA GRNS BLDG 6 7 UNTS 7555SF HAB 2597SF CARPORT 1135SF DECK 100-102, 1933 DOVE LN Lot: ALGIRE Phone: 7608043952 LC Water DIst: CA Date: Permit Type: Sub Type: 02/10/2005 RESDNTL APT Inspected By: Inspected By: inspected By: Date Inspected:. Date Inspected:. Date Inspected:. . Approved:. . Approved: . Approved: Disapproved: Disapproved: Disapproved: Comments: Inspection List Permit#: CB032165 Type: RESDNTL APT LA COSTA GRNS BLDG 6 7 UNTS 7555SF HAB 2597SF CARPORT 1135SF D Date Inspection Item Inspector Act Comments 03/29/2005 89 Final Combo PD AP 03/29/2005 89 Final Combo -Rl 02/10/2005 89 Final Combo PD CO 02/04/2005 23 Gas/Test/Repairs PD AP 7 METERS RELEASED 01/04/2005 39 Final Electrical PD AP ELECTRIC METER RELEASE 01/03/2005 39 Final Electrical PY NS RAIN 12/30/2004 39 Final Electrical BN CA 12/01/2004 18 Exterior Lath/Drywall PD AP 10/29/2004 84 Rough Combo PD AP 10/28/2004 84 Rough Combo PD NR 10/07/2004 14 Frame/Steel/Boltlng/Weldin PD AP DROP AREAS 10/07/2004 17 Interior Lath/Drywall PD WC 10/06/2004 14 Frame/Steel/Bolting/Weldin PD PA 10/06/2004 17 Interior Lath/Drywall PD WC 09/28/2004 13 Shear Panels/HD's PD NR 09/28/2004 15 Roof/Reroof PD CO 07/22/2004 22 Sewer/Water Service PD WC 07/22/2004 24 Rough/Topout PD AP 03/25/2004 11 Ftg/Foundatlon/Piers PD AP 03/18/2004 11 Ftg/Foundation/Piers PD AP PAD FTG 03/16/2004 21 Underground/Under Floor PD AP 03/15/2004 21 Underground/Under Floor PD CA 02/10/2004 11 Ftg/Foundation/Piers PD AP DEEPEND FTG 01/12/2004 61 Footing PD PA 01/08/2004 22 Sewer/Water Sen/ice PD AP 12/22/2003 21 Underground/Under Floor PD AP 12/22/2003 22 Sewer/Water Service PD WC Wednesday, March 30, 2005 Page 1 of 1 City of Carlsbad BIdg Inspection Request For: 03/29/2005 Permit* CB032165 Inspector Assignment: PD Title: LA COSTA GRNS BLDG 6 7 UNTS Description: 7555SF HAB 2597SF CARPORT 1135SF DECK 100-102,200- 203 Type: RESDNTL Sub Type: APT Job Address: 1933 DOVE LN Suite: Lot 0 Location: APPLIGANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: Phone: Inspector Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: ALGIRE Entered By: CHRISTINE Act, Comment Associated PCRs/CVs Inspection Historv Date Description Act Insp Comments 02/10/2005 89 Final Combo CO PD 02/04/2005 23 Gas/Test/Repairs AP PD 7 METERS RELEASED 01/04/2005 39 Final Electrical AP PD ELECTRIC METER RELEASE 01/03/2005 39 Final Electrical NS PY RAIN 12/30/2004 39 Final Electrical CA BN 12/01/2004 18 Exterior Lath/Drywall AP PD 10/29/2004 84 Rough Combo AP PD 10/28/2004 84 Rough Combo NR PD 10/07/2004 14 Frame/Steel/Bolting/Welding AP PD DROP AREAS 10/07/2004 17 Interior Lath/Drywall WC PD 10/06/2004 14 Frame/Steel/Bolting/Welding PA PD 10/06/2004 17 Interior Lath/Drywall WC PD 09/28/2004 13 Shear Panels/HD's NR PD 09/28/2004 15 Roof/Reroof CO PD 07/22/2004 22 Sewer/Water Service WC PD 07/22/2004 24 Rougti/Topout AP PD Cityof Carlsbad BIdg Inspection Request For: 02/0^2005 Permit* CB032165 "A Inspector Assignment: PD Title: LA COSTA GRNS BLDG 6 7 UNTS Description: 7555SF HAB 2597SF CARPORT 1135SF DECK 100-102,200- 203 Type: RESDNTL Sub Type: APT Job Address: 1933 DOVE LN Suite: Lot 0 Location: APPLICANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: OR 801-5157 Plione: 7608043952 Inspecto Total Time: CD Description 23 Gas/Test/Repairs Requested By: ALGIRE Entered By: CHRISTINE Act _ Comment "7 /Mi^<^/^^ Associated PCRs/CVs Date Description Act Insp Comments 01/04/2005 39 Final Electrical AP PD ELECTRIC METER RELEASE 01/03/2005 39 Final Electrical NS PY RAIN 12/30/2004 39 Final Electrical CA BN 12/01/2004 18 Exterior Lath/Drywall AP PD 10/29/2004 84 Rough Combo AP PD 10/28/2004 84 Rough Combo NR PD 10/07/2004 14 Frame/Steel/Bolting/Welding AP PD DROP AREAS 10/07/2004 17 Interior Lath/Drywall WC PD 10/06/2004 14 Frame/Steel/Bolting/Welding PA PD 10/06/2004 17 Interior Lath/Drywall WC PD 09/28/2004 13 Shear Panels/HD's NR PD 09/28/2004 15 Roof/Reroof CO PD 07/22/2004 22 Sewer/Water Service WC PD 07/22/2004 24 Rough/Topout AP PD 03/25/2004 11 Ftg/Foundation/Piers AP PD 03/18/2004 11 Ftg/Foundation/Piers AP PD PAD FTG 03/16/2004 21 Underground/Under Floor AP PD 03/15/2004 21 Underground/Under Floor CA PD 02/10/2004 11 Ftg/Foundation/Piers AP PD DEEPEND FTG 01/12/2004 61 Footing PA PD 01/08/2004 22 Sewer/Water Service AP PD 12/22/2003 21 Underground/Under Floor AP PD 0;/31/'2005 IS: IS ALLGIRE GEhERfIL CCKTRflCTORS -> Lfi COSTfi GREENS m.486 caei Jaiiiiaiy31,2005 Pete Dreabelbis Soncv BuUd&ig Inspecbir 1635 Faraday Ave. Carisbad Califonaia 92008 ALLGIRE Re: La Costa Paloma (Greens); Gas Meter Rdease ^ Dear Pete, Wft appreciate your '»fl1lj«g»«« nimitsfs the projects gas meters. The pnipose of this letto: is to docameot tfie bufldiog address iio^ ydllingpess to rdease flie gas inetere wiU alk^ perfoim t^tmg as requiied. ft wiU also ass^ With the advmt of the gas meatew being active, we W occiq>ancy of fliese binUybags i^ sodi time titet yoa rdease fliem for siKb. The Mowiiig are a list of llie Boildiiig addresses: Bmlding # 1; Recar»(ti<»)/office building -195^ Dove Lane Building # 2 Section A, B and C -1949 Dove Lane Building # 3 Section A, B and C -1945 Dove Lane Building # 4 Section A. B and C -1941 Dove Lane Building# 5 Sectioa A, B and C-1937 Dove Lane Building # 61933 Dove Lane Building # 71929 Dove Lane Building # 8 Sectian A, B and C -1925 Dove Lane Thank you for your asastance, fhrtfa^ if thoe is any addidoiid infi^^ ilet me know. Ri(^Donaboo Project Manager La Costa Pakma 5055 Avffluda Endnas, Suite 200 Carisbad, CA 92008 (760)431-2999 cc: Scott Woods: AUgire Gaiend OxDCtia^^ Mary Jane Jagodzinski: Commuoity Housing Woiks 5055 Avenida Encinas Suite 200 Carlsbad, OV 92008 760.431.2999 phone 760.431.1137 fax e-maiLofRce@allgire.coin Lie. #543946 Federal Tax 1.0. #33-0327901 2:^ Carl Schmidt Inspection Services, Inc. P.O. Box 178403 San Diego, CA 92177-8403 (619)855-9252 SPECIAL INSPECTION REPORT Project: Cth^-^ y^l///1 "AA-^t' \ l)^v&'(ojfy?^^)T Address; E-^j-oxAj City: (^^/s/^g/ Permit Number: •• ^/A Plan File Number: TYPE OF OBSEFtVATIONS: Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding /\ Epoxy Prestressed Concrete Shop Welding Bolting ^ Fireproofing Number of Samples: Type: Materials/DesignMix/Psi: ^^i ^ A^ll/l22 \li)f ^ AJZ^ //.S TC FJ-/^ ^ f7dl? Date: ^m-Qj ' REPORT WORK INSPECTED CONfFpRMS WITH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHERWISE NOTED M^/. h.L A iM22B TIME IN: S-PO TIMEOUT: lC>-C2> Inspector (Print) / Certification # /'// ^ General Contractor: Ail c Phone: Authorized Job Site Contact Signature