Loading...
HomeMy WebLinkAbout1935 CAMINO VIDA ROBLE; 100; CB051361; Permit05-26-2005 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No CB051361 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title Applicant RICK LIEN P 0 BOX 930 92074 619339-7425 1935 CAMINO VIDA ROBLE CBAD St 100 Tl Sub Type 2120921800 Lot* $228,129 00 Construction Type Reference # SPEC SUITES-7359 SF OFFICE TO OFFICE INDUST 0 Status IIIN Applied PC050037 Plan Approved Issued Inspect Area Plan Check# Owner 1935 CAMINO VIDA ASSOCIATES L L C C/O DOUG MCCORMICK 165 S UNION BLVD #510 LAKEWOODCO 80228 ISSUED 04/15/2005 Entered By 05/26/2005 05/26/2005 RMA ft? 05-37 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee $943 88 Meter Size $000 Add'l Reel Water Con Fee $613 52 Meter Fee $0 00 SDCWA Fee $0 00 CFD Payoff Fee $47 91 PFF $0 00 PFF (CFD Fund) $0 00 License Tax $0 00 License Tax (CFD Fund) $0 00 Traffic Impact Fee $0 00 Traffic Impact (CFD Fund) $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Master Drainage Fee Sewer Fee $0 00 Redev Parking Fee $0 00 Additional Fees TOTAL PERMIT FEES $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $2000 $2400 $000 $000 $000 $000 $1,64931 Total Fees $1,649 31 Total Payments To Date $0 00 Balance Due $1,64931 yJ0305726/Q5 0002 01 CGF" 02 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired City of Carlsbad Final Building Inspection Oept: Building Engineering Plan Check* Permit* Project Name Address1 Contact Person Sewer Dist inspected A/ Bv faf- Inspected Bv Inspected Bv CB051361 SPEC SUITES-7359 OFFICE 1935CAMINOVIDA KEITH CA ^ I Planning CMWD SF OFFICE TO ROBLE #100 Phone' 8585255264 Water Dist CA Date / I Inspected 7/Z3 \&^ Date Inspected Date Inspected StLiteCFire /c -^/^ •**Date Permit Type Sub Type Lot- 0 Y^ Approved ~s^ Approved Approved 08/01/2005 Tl INDUS! Disapproved Disapproved Disapproved Comments City of Carlsbad Bldg Inspection Request For 08/24/2005 Permit* CB051361 Title SPEC SUITES-7359 SF OFFICE TO Description OFFICE Sub Type INDUST Inspector Assignment TP 1935 CAMINO VIDA ROBLE 100 Lot 0 Type TJ Job Address Suite Location APPLICANT RICK LIEN Owner 1935 CAMINO VIDA ASSOCIATES L L C Remarks Phone 8585255264 Inspector Total Time Requested By KEITH Entered By CHRISTINE CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Act Comment Associated PCRs/CVs Inspection History Date 08/01/2005 07/28/2005 07/28/2005 07/28/2005 07/28/2005 07/27/2005 06/15/2005 06/15/2005 06/08/2005 06/03/2005 06/01/2005 06/01/2005 05/31/2005 05/31/2005 05/31/2005 05/31/2005 Description 89 14 24 34 44 84 21 24 17 17 24 44 14 24 34 44 Final Combo Frame/Steel/Bolting/Welding Rough/Topout Rough Electnc Rough/Ducts/Dampers Rough Combo Underground/Under Floor Rough/Topout Interior Lath/Drywall Interior Lath/Drywall Rough/Topout Rough/Ducts/Dampers Frame/Steel/Bolting/Welding Rough/Topout Rough Electric Rough/Ducts/Dampers Act CO AP AP AP AP CO we PA PI AP PA NR AP NR AP we Insp TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP Comments PREV NOTICE APPLIES T-CEIL CEIL LITES DUCTS T-CEIL CU @ JAN CLOSET, NEED MEETING PI SHEET NEED PI SHEET SUBMITTED FOR ADDED MOP SINK