HomeMy WebLinkAbout1935 CAMINO VIDA ROBLE; 100; CB051361; Permit05-26-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No CB051361
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
Applicant
RICK LIEN
P 0 BOX 930 92074
619339-7425
1935 CAMINO VIDA ROBLE CBAD St 100
Tl Sub Type
2120921800 Lot*
$228,129 00 Construction Type
Reference #
SPEC SUITES-7359 SF OFFICE TO
OFFICE
INDUST
0 Status
IIIN Applied
PC050037
Plan Approved
Issued
Inspect Area
Plan Check#
Owner
1935 CAMINO VIDA ASSOCIATES L L C
C/O DOUG MCCORMICK
165 S UNION BLVD #510
LAKEWOODCO 80228
ISSUED
04/15/2005
Entered By
05/26/2005
05/26/2005
RMA
ft? 05-37
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$943 88 Meter Size
$000 Add'l Reel Water Con Fee
$613 52 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$47 91 PFF
$0 00 PFF (CFD Fund)
$0 00 License Tax
$0 00 License Tax (CFD Fund)
$0 00 Traffic Impact Fee
$0 00 Traffic Impact (CFD Fund)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$0 00 Master Drainage Fee
Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
TOTAL PERMIT FEES
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$2000
$2400
$000
$000
$000
$000
$1,64931
Total Fees $1,649 31 Total Payments To Date $0 00 Balance Due $1,64931
yJ0305726/Q5 0002 01
CGF"
02
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
City of Carlsbad
Final Building Inspection
Oept: Building Engineering
Plan Check*
Permit*
Project Name
Address1
Contact Person
Sewer Dist
inspected A/
Bv faf-
Inspected
Bv
Inspected
Bv
CB051361
SPEC SUITES-7359
OFFICE
1935CAMINOVIDA
KEITH
CA
^
I
Planning CMWD
SF OFFICE TO
ROBLE #100
Phone' 8585255264
Water Dist CA
Date / I
Inspected 7/Z3 \&^
Date
Inspected
Date
Inspected
StLiteCFire /c -^/^ •**Date
Permit Type
Sub Type
Lot- 0
Y^ Approved ~s^
Approved
Approved
08/01/2005
Tl
INDUS!
Disapproved
Disapproved
Disapproved
Comments
City of Carlsbad Bldg Inspection Request
For 08/24/2005
Permit* CB051361
Title SPEC SUITES-7359 SF OFFICE TO
Description OFFICE
Sub Type INDUST
Inspector Assignment TP
1935 CAMINO VIDA ROBLE
100 Lot 0
Type TJ
Job Address
Suite
Location
APPLICANT RICK LIEN
Owner 1935 CAMINO VIDA ASSOCIATES L L C
Remarks
Phone 8585255264
Inspector
Total Time Requested By KEITH
Entered By CHRISTINE
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comment
Associated PCRs/CVs
Inspection History
Date
08/01/2005
07/28/2005
07/28/2005
07/28/2005
07/28/2005
07/27/2005
06/15/2005
06/15/2005
06/08/2005
06/03/2005
06/01/2005
06/01/2005
05/31/2005
05/31/2005
05/31/2005
05/31/2005
Description
89
14
24
34
44
84
21
24
17
17
24
44
14
24
34
44
Final Combo
Frame/Steel/Bolting/Welding
Rough/Topout
Rough Electnc
Rough/Ducts/Dampers
Rough Combo
Underground/Under Floor
Rough/Topout
Interior Lath/Drywall
Interior Lath/Drywall
Rough/Topout
Rough/Ducts/Dampers
Frame/Steel/Bolting/Welding
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Act
CO
AP
AP
AP
AP
CO
we
PA
PI
AP
PA
NR
AP
NR
AP
we
Insp
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
Comments
PREV NOTICE APPLIES
T-CEIL
CEIL LITES
DUCTS
T-CEIL
CU @ JAN CLOSET, NEED
MEETING
PI SHEET
NEED PI SHEET SUBMITTED
FOR ADDED MOP SINK