HomeMy WebLinkAbout1935 CAMINO VIDA ROBLE; ; CB131917; Permit10-02-2013
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB131917
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
1935 CAMINO VIDA ROBLE CBAD
Tl
2120921800
$20,000 00
Sub Type INDUST
Lot# 0
Construction Type NEW
Reference #
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Plan Check #
ISSUED
08/08/2013
SKS
10/02/2013
10/02/2013
SVN CARLSBAD - FIX FOUNDATION
32' AREA OF SLAB LIFTING IN NW CORNER OF BUILDING - PERMIT
FOR OBSERVATION ONLY - CITY CANNOT GUARANTEE FIX
Applicant
CRAIG ANDERSON
STE 240
24632 SAN JUAN
DANA POINT CA 92677
949-470-2323
Owner
SVN CARLSBAD LLC
18881 VON KARMAN AVE #800
IRVINE CA 92612
Building Permit $224 87 Meter Size
Add'l Building Permit Fee $0 00 Add'l Red Water Con Fee $0 00
Plan Check $157 41 Meter Fee $0 00
Add'l Building Permit Fee $306 59 SDCWA Fee $0 00
Plan Check Discount $0 00 CFD Payoff Fee $0 00
Strong Motion Fee $4 20 PFF (3105540) $0 00
Park Fee $0 00 PFF (4305540) $0 00
LFM Fee $0 00 License Tax (3104193) $0 00
Bridge Fee $0 00 License Tax (4304193) $0 00
BTD #2 Fee $0 00 Traffic Impact Fee (3105541) $0 00
BTD #3 Fee $0 00 Traffic Impact Fee (4305541) $0 00
Renewal Fee $0 00 PLUMBING TOTAL $0 00
Add'l Renewal Fee $0 00 ELECTRICAL TOTAL $0 00
Other Building Fee $0 00 MECHANICAL TOTAL $0 00
Pot Water Con Fee $0 00 Master Drainage Fee $0 00
Meter Size Sewer Fee $0 00
Add'l Pot Water Con Fee $0 00 Redev Parking Fee $0 00
Reel Water Con Fee $0 00 Additional Fees $0 00
Green Bldg Stands (SB1473) Fee $1 00 HMP Fee 99
Fire Expedidted Plan Review $0 00 Green Bldg Standards Plan Chk 99
TOTAL PERMIT FEES $694 07
Total Fees $694 07 Total Payments To Date $694 07 Balance Due: $0.00
Inspector ^
FINAL A
Date - ^ Clearance
NOTICE Please take NOTICSfthat ap|3foval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" Vou have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your nght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
cfianges, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previously othenvise expired
THE POLLDWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE. ^PLANNING ^^B)|PINEERING LOING •FIRE 3 HEALTH •HAZMAT/APCD
^ CiTY OF
CARLSBAD
Building Permit Appiication
1635 Faraday Ave , Carlsbad, CA 92008
Ph 760-602-2719 Fax 760-602-8558
email building@carlsbadca gov
www.carlsbadca.gov
Plan Check NO.^^TC^ f^Pj f I
Est. Value 27^^CO0-
Plan Ck. Deposit
SWPPP
RlJJECT* |L0T# I PHASE # [¥0
SUITE#/SPACE#/UNIT#
CT/PRUJECT* PHASE # # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR TYPE OCC GROUP
DESCRIPTION OF WORK: /nc/ude Square Feet of Affected Area(s)
EXISTINGUSE ""' |PROPOSEDljSE ' j GARAGE (SF) I j PATIOS (SF) | DECKS (SF) IFIRH
CO ^^\CP^
FIREPLACE
YESPV N0| I
AIR CONDITIONING
YES I INO I I
FIRE SPRINKLERS
YES I |NO| I
APPLICANTNAME (Primary Co APPLICANTNAME (Secondary Contact)
7ri . ~ STATE ZIP
ADDRESS ADDRESS
STATE CITY STATE ZIP
EMAIL ~ _ 7
PHONE FAX
EMAIL
CONTRACTOR BUS. NAME
ADDRESS 1. ^^9J ^^g^
i STATE ^ IziP
PHONE
iDRESi, , , .
.ifY- , . rj STATE ZIP
<_^arv^ ?A 4-2-7(35
luriMir • '
PHONE,
EMAIL
VTE LIC # • CLASS ARCH/DESIGNER NAME & ADDRESS
031 5 Business and Professions I ch requires a permifto (Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a
civil penalty of not more than five hundred dollars ($500))
Workers' Compensation Declaration / hereby affirm under penalty of perjury one ofthe following declarations
HI have and will maintain a certificate of consent to self-msure for workers' compensation as provided by Section 3700 of the Labor Code, for the perfomiance of the work for which this permit is issued
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued My workers' compensation insurance carrier and policy
number are Insurance Co Policy No Expiration Date
This section need not be completed if the permit is for one hundred dollars ($100) or less
\_j Certificate of Exemption. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subpct lo the Workers' Compensation Laws of
California WARNING Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to cnminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damages as provided form Section 3706 ofthe Labor code. Interest and attomey's fees.
JS^ CONTRACTOR SIGNATURE • AGENT DATE
/ tereby affirm that I am exempt from Contractoi's License Law for the following reason
I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the stmcture is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose ot sale)
I I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
• am exempt under Section _ .Business and Professions Code for this reason
1 I personally plan to provide (he mapr labor and matenals for construction of the proposed property improvement [^Yes I iNo
2 I (have / have not) signed an application for a building perniit for the proposed work
3 I have contracted with the following person (fimi) to provide the proposed construction (include name address / phone / contractors' license number)
4 I plan to provide portions of the work, but I have hired the following person to coordinate, supen/ise and provide the major work (include name / address / phone / contractors' license number)
5 I will provide some of the work, but 1 have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of wori()
^PROPERTY OWNER SIGNATURE •AGENT DATE
nspection List
Permits: CB131917 Type: Tl INDUST SVN CARLSBAD - FIX FOUNDATION
32' AREA OF SLAB LIFTING IN NW CORN
Date Inspection Item Inspector Act Comments
01/02/2014 89 Final Combo - Rl NO FIRE REQ
01/02/2014 89 Final Combo PY AP
11/07/2013 11 Ftg/Foundation/Piers PY AP
Friday, January 10, 2014 Page 1 of 1
AAA South Coast Geotechnical
Services
24632 San Juan Avenue, Suite 120
Dana Point, CA 92629 • (949) 374-4100
Client Name
Ghent Address
Client Phone
DATE JOB NO
PROJECT
LOCATION 1
CONTRACTOR OWNER HLitP
WEATHER TEMP °at ;
~7 O' 3 Oat PM
PRESENT AT SITE
TIME
COMMENTS
THE FOLLOWING WAS NOTED
Subject- Vi^r Xn 5-Vc\\ cV^^^^
On // / 07 / / 3 a representative of this firm observed the pi^sW
P • tb ^rvi b^sl t)^.0^
-40 0
OC>ci
FIELD OBSERVATION REPORT
CLIENT REPRESENTATIVE SIGNATURE ENGINEERING GEOLOGIST SIGNATURE
AAA South Coast Geotechnical
Services
24632 San Juan Avenue, Suite 120
Dana Point, CA 92629 • (949) 374-4100
Ghent Name
Client Address
Ghent Phone
DATE
/1 - o 5 - O
JOB NO
1 t So- oZ.
PROJECT
LOCATION
c ) 5 .b c a
CONTRACTOR OWNER
WEATHER TEMP °at
"7 o"-> °at / "L '. 'T
AM
PRESENT AT SITE
TIME
COMMENTS
THE FOLLOWING WAS NOTED
Subject. "puiV* P\%.-< Xli^ s\<\\<^\\<-
On // / 05- I j-, a representative of this firm observed the pt^--. ^
p.... z 4 o o o
p 3/ ^QQO K Vt
^ Z4 '
CLIENT REPRESENTATIVE SIGNATURE
FIELD OBSERVATION REPORT
ENGINEERING GEOLOGIST SIGNATURE
SPECIAL INSPECTION AND
GEO TECH SERVICES
Serving all your special inspection needs
In the Greater L.A. Basin
REGISTERED INSPECTOR'S DAILY REPORT
2026 Andreo Avenue
Torrance, CA 90501
Office/Mobile-310 489.9176
Email. swlstacylen2(gsbcglobal net
Veteran Owned
Job No Date Time
/Pf7S TYPE OF
INSPECTION
REQUIRED
• Reinforced Concrete
• Post Tensioned Concrete
• Reinforced Masonry
• Structural Steel Assembly
• Fire Proofing
• Asphalt
• Quality Control
• Epoxy
• Other
Job Address
Job
r
Issued Bf"
Type of Structure -AretiitSSf^
Material Description (type, grade, source) 5/^ ^^^^^^^^
^itmL -^c'^i^. P'Cmi ^i^3OT" Contractor ^i7f.
lnspector(s)Name ^^^J^ LjM ?. Subcontractor* }-rf7^
r r
INSPECTION SUMMARY - LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRES, REMARKS, ETC
INCLUDES INFORMATION ABOUT - AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT NO'S
OF TEST SAMPLES TAKEN STRUCT CONNECTIONS (WELD MADE H T BOLTS TORQUED) CHECKED, ETC
i. I 'Mk7S kMi4\i^rH \o'k\j^yu 0}bf I-D l^iA^ Pki^'Mf.^7 .7^ Y^Yd
fhtr^im^if^'- jJ^^r^ar^ Am/'^j^r'.^-.-.p^.^ KJ7^ 7^s/Z3,yi7
.. . r J, . . r «» - vJ 't - .s li ^ Ik ——————— MJI huJ-fi /•.>-i<>^ tjJ.-U^^' ii.'^aAju^
/^4/y'^ i^U' €f' fx \ 5
7f iTKi If »^ 4/5 '"'''lb-:
QUALITY CONTROL • CHECKED IN WITH CITY a REVIEWED APP PLAN & SPECS • REVIEWED PREVIOUS REPORTS • CALLED IN SAMPLES
CHECKLIST DON TIME TO JOB • CHECKED PERMIT • OBTAINED APPROPRIATE NO OF SAMPLES D OTHER
CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE • PAGE OF
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWL-
EDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED I HAVE FOUND THIS WORK TO COMPLYVVITH THE APPROVED PLANS, SPECI-
FICATIONS.,'AND APPLICABLE SECTfoNS OF THE^GOVERNING BUILDING
SIGNATURE OF. REGISTERED JNSPECTOR
^C... " ^'7€$'
TIME IN TIME OUT REG iHOURS OT HOURS SAMPLES
SPECIALTY
All inspections based on a minimum of 4 hours and over 4 hours -8 hour
minimum All inspections starting before 12 00 pm and running past
12 00 p m. will be charged a 8 hour minimum ..f^"'^'^
Approved by_
Project •Superintendent
WHITE - OFFICE COPY, CANARY - ACCOUNTING COPY. PINK - INSPECTOR'S COPY
SPECIAL INSPECTION AND
GEO TECH SERVICES
Serving all your special inspection needs
In the Greater L.A. Basin
REGISTERED INSPECTOR'S DAILY REPORT
2026 Andreo Avenue
Torrance, CA 90501
Office- 310. 783.0370
Fax- 310. 782.6836
Mobile. 310. 489.9176
6 rif'MA
Job No Date*
//7/7:^
Time
TYPE OF
INSPECTION
REQUIRED
• Reinforced Concrete
• Post Tensioned Concrete
• Reinforced Masonry
• Structural Steel Assembly
• Fire Proofing
• Asphalt
• Quality Control
• Ep-oxy / .
gr Other kifeV'Ar^
JobAddress 0,,^,.^0 M /^J City
Job Name ^^Z, ^ ^ Issued By*"^' / /
Type of structure ^^^^j^ / Arctiitect
Sf/i4 i\ '''W»^ / 'U Matenal Descnption (type, grade, source) 1/J ^ ^ Engineer
Contractor
Inspector(s) Name ^'j .e t . ^
7/i4cJ7 i.77c
Subcontractor /
INSPECTION SUMMARY - LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRES, REMARKS, ETC
INCLUDES INFORMATION ABOUT - AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT NO'S
OF TEST SAMPLES TAKEN STRUCT CONNECTIONS (WELD MADE H T BOLTS TORQUED) CHECKED, ETC
7Y 7^2^/'
QUALITY CONTROL • CHECKED IN WITH CITY • REVIEWED APP PLAN & SPECS • REVIEWED PREVIOUS REPORTS O CALLED IN SAMPLES
CHECKLIST DON TIME TO JOB • CHECKED PERMIT • OBTAINED APPROPRIATE NO OF SAMPLES • OTHER
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWL-
EDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED
I HAVE FOUND'XHIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECI-
FICATIONS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS 7 ^-jd . 7
CONTINUED ON NEXT PAGE • PAGE OF
TIME IN TIME OUT REG. HOURS O.T. HOURS SAMPLES
10 70 y
SIGNATURE OF REGISTERED INSPECTOR
NO AGENCY
All inspections based on a minimum of 4 hours and over 4 hours - 8 hour
minimum All inspections starting before 12 00pm and running past
12 00 p m will be charged a 8 hour minimum
Approved by_
Project Superintendent
WHITE - OFFICE COPY, CANARY - ACCOUNTING COPY, PINK - INSPECTOR'S COPY
SPECIAL INSPECTION AND
GEO TECH SERVICES
Serving all your special inspection needs
In the Greater L.A. Basin
REGISTERED INSPECTOR'S DAILY REPORT
2026 Andreo Avenue
Torranee, CA 90501
Office/Mobile 310 489.9176
Email. swlstacylenz(gsbcglobal.net
Veteran Owned
Job No Date Time
TYPE OF
INSPECTION
REQUIRED
• Reinforced Concrete
• Post Tensioned Concr,ete
• Reinforced Masonry
• Structural steel Assembly
• Fire Proofing
• Asphalt
• Quality Control
• Epoxy
S-^Sfher
JobAddress l^^^^^ Qj^'^^Q^ ck i}
Issued By*^ ^ ,1 ^
Type of Structure Arctiitect
Material Descnption (type, grade, source) 5^'^ VU''' ^ /
Contractor.
lnspecto,s)Name,^ LM £ ' Subcontractor/" t _
INSPECTION SUMMARY - LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WpRK REJECTED, JOB PROBLEMS, PROGRES, REMARKS, ETC
INCLUDES INFORMATION ABOUT - AMOUNT^ OF MATERIAL Pti^CED OR WORK PERFORMED, NUMBER, TYPE & IDENT NO'S
OF TEST SAMPLES TAKEN |STRtllCT>GO|»jfjECTIONS (WELD MKDE H T BOLTS TORQUED) CHECKED, ETC
7 S
\
A4
QUALITY CONTRei, {0'CH^C.KED IN WITH CITY • REVIEWED APP PLAN & SPECS • REVIEWED PREVIOUS REPORTS • CALLED IN SAMPLES
CHECKLIST n 'ON f IME'TO JOB • CHECKED PERMIT • OBTAINED APPROPRIATE NO OF SAMPLES • OTHER
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF MY KNOWL-EDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED
I HAVE FOUND.T.HIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECI-FICATIONS„,AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING
CONTINUED ON NEXT PAGE • PAGE OF
TIME IN TIME OUT REG HOURS O.J HOURS SAMPLES
•c
SIGNATURE OF REGISTERED INSg^^OR
7/7<c^{
NO
All inspections based on a minimum of 4 hours and over 4 hours - 8 hour
minimum All inspections starting before 12 00 pm and running past
12 00 p m will be charged a 8 hour minimum
Approved by __
Project Superintendent
WHITE - OFFICE COPY, CANARY - ACCOUNTING COPY. PINK - INSPECTOR'S COPY
EsGll Corporation
In (PartnersHip witli government for (BuiCding Safety
DATE: SEPT. 26, 2013 • APPLICANT
• JURIS
JURISDICTION- CARLSBAD • PLAN REVIEWER
• FILE
PLAN CHECK NO.: 13-1917 SET II
PROJECT ADDRESS: 1935 CAMINO VIDA ROBLE
PROJECT NAME: SLAB LIFTING OR A 32' AREA 86 TILT-UP PANELS RECONNECTION
XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
CRAIG ANDERSON 24632 SAN JUAN #240, DANA POINT, CA 92677
IXI EsGll Corporation staff did not advise the applicant that the plan check has been completed.
I I EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: CRAIG Telephone #: 949-470-2323
Date contacted: (by: ) Email: craiq(%andse.com Fax #: 949-470-2324
Mail Telephone Fax In Person
AI REMARKS. The demolition/ shoring plans for a 32' long building segment is under this permit
as well as tilt-up panels reconnection.
By: ALI SADRE, S.E. Enclosures:
EsGil Corporation
• GA • EJ • PC 9/18
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In (PartnersHip wttH government for (BuiCding Safety
DATE: AUG. 16, 2013 • AEEIJCANT
••^RIS^^
JURISDICTION CARLSBAD d^PL^AN REVIEWER
• FILE
PLAN CHECK NO.: 13-1917 SET I
PROJECT ADDRESS: 1935 CAMINO VIDA ROBLE
PROJECT NAME: SLAB LIFTING OR A 32' AREA 86 TILT-UP PANELS RECONNECTION
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
XI The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the junsdiction to forward to the applicant
contact person.
X The applicant's copy of the check list has been sent to:
CRAIG ANDERSON 24632 SAN JUAN #240, DANA POINT, CA 92677
I I EsGil Corporation staff did not advise the applicant that the plan check has been completed.
X EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: CRAIG M) Telephone #- 949-470-2323
Date contacted: '^(l^ (by: ) Email- craig(i^andse.com Fax #: 949-470-2324
& Mail'-' Telephone^ Fax In Person
X REMARKS. The demolition/ shoring plans for a 32' long building segment is under this permit
as well as tilt-up panels reconnection.
By: ALI SADRE, S.E. Enclosures:
EsGil Corporation
• GA • EJ • PC 8/12
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
GENERAL PLAN CORRECTION LIST
JURISDICTION: CARLSBAD PLAN CHECK NO.: 13-1917
PROJECT ADDRESS: 1935 CAMINO VIDA ROBLE
OCCUPANCY = B; CONSTRUCTION = 1 ll-B, STORIES = 2; HEIGHT = 30';
SPRINKLERS = Y; AREA = 40,500
DATE PLAN RECEIVED BY
ESGIL CORPORATION- 8/12
DATE REVIEW COMPLETED:
AUG. 16, 2013
REVIEWED BY: ALI SADRE, S.E.
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the International
Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical
Code and state laws regulating energy conservation, noise attenuation and disabled
access. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the
Planning Department, Engineering Department or other departments.
The following items listed need clarification, modification or change. All items must be
satisfied before the plans will be in conformance with the cited codes and regulations.
The approval of the plans does not permit the violation of any state, county or city law.
• Please make all corrections, as requested in the correction list Submit FOUR new
complete sets of plans for commercial/industnal projects (THREE sets of plans for
residential projects) For expeditious processing, corrected sets can be submitted in one
of two ways;
1 Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760) 602-2700
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineenng
and Fire Departments
2 Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete
• To facilitate rechecking, please identify, next to each item, the sheet of the plans
upon which each correction on this sheet has been made and return this sheet
with the revised plans
• STRUCTURAL
1. Please revise the pile design load calculations, on page #2 of the submitted
package, which indicates that the tributary weights (from panel, pilaster & roof) =
2K/ft @ 4' pile spacing =4K (design loads). [This portion of the tributary loads
should be 8K (instead of 4K, as noted)].
2. Please show how the weight of the footings (24"x12"), as per detail 2/S1, are
taken into account in the pile design load calculations. [This should be added to
the pile design load calc's.].
3. Please submit calculations for the wall anchor(s), as presented on detail 1/S2.
4. Please provide a blow-up plan view of detail 3/S2 indicating the relationship
between the 1" hole and the panel joint. [I.e., this will demonstrate that the
purpose of this exercise (added plates) is to simply align the panels in the same
vertical plane].
5. Please provide a section through the slab indicating if any portion needs to be
demolished and re-poured. If so, show reinf. size/ spacing and embedment into
existing concrete. It appears that 2" of displacement within 4' of slab strip will
need to be replaced as opposed to grout injection, as noted on the foundation
plans. Sheet SI.
. ADDITIONAL
6. The jurisdiction has contracted with EsGil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact ALI SADRE, S.E.
at EsGil Corporation Thank you.
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD PLAN CHECK NO.: 13-1917
PREPARED BY: ALI SADRE, S.E. DATE: AUG. 16, 2013
BUILDING ADDRESS: 1935 CAMINO VIDA ROBLE
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: III-B/SPR.
BUILDING
PORTION
AREA
( Sq. Ft.)
Valuation
Multiplier
Reg.
Mod
VALUE ($)
FOUNDATION
& PANEL
RECONNECT
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code CB By Ordinance
Bldg. Permit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review • Complete Review
$580.00
• Structural Only
Repetitive Fee
^ I Repeats
Based on hourly rate
• Other
• Hourly
EsGil Fee $116 00
Hrs.
$464.00
Comments:
Sheet 1 of 1
macvalue doc +
77 CITY OF
CARLSBA'
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE:08/27/13 PROJECT NAME: OFFICE BUILDING
PLAN CHECK NO: 1 SET#: ADDRESS: 1935 CAMINO VIDA ROBLE
VALUATION: $20,000 SLAB REPAIR
PROJECT ID: CB13-1917
APN:
/ This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: KATHLEEN LAWRENCE 08/29/13
A Final Inspection by the Division is required ; jves IZ'NO
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
- the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: CRAIG@ANDSE.COM
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
'f77. PLANNI:N%|3at|t> r?- ENGINEERING ^^
7 7'i7^>imoM)2766B7'7^^
=i 7,£mi7mm7, • A-7mi-Chris Sexton
' - 760-602-4624
Chrls.Sexton@carlsbadca.gov
r/ ; Kathleen Lawrence
' ^' 760-602-2741
Kathleen.Lawrence@carlsbadca.gov
; ; Greg Ryan
760-602-4663
G regorv. Rva n@ca risbadca .gov
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
„ Linda Ontiveros
'—760-602-2773
Unda.Ontiveros@carlsbadca.gov
1 Cindy Wong
^•—'•^ 760-602-4662
Cvnthia.Wong@carlsbadca.gov
1 I i i j Dominic Fieri
^ - 760-602-4664
Dominic.Fien@carlsbadca.gov
Remarks:
^ CITY OF
BUILDING PLANCHECK
CHECKLIST
QUICK-CHECK/APPROVAL
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
ENGINEERING Plan Check for CBl 3-1917 Date 08/27/13
Project Address 1935 CAMINO VIDA ROBLE
SLAB REPAIR
Project Description
APN'
Valuation. $20,000
ENGINEERING Contact. Kathleen LawrencG
Phone 760-602-2741
Email kathleen.lawrence@carlsbadca.gov
Fax 760-602-1052
[•RESIDENTIAL INTERIOR
iZl RESIDENTIAL ADDITION MINOR
(<$20,000.00)
I j CARLSBAD PREMIER OUTLETS
! OTHER: POSEIDON DESAL WALLS
• TENANT IMPROVEMENT
• PLAZA CAMINO REAL
• COMPLETE OFFICE BUILDING
OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERIVIIT
BY: KATHLEEN LAWRENCE
REMARKS: NO ENG. FEES-SLAB REPAIR
DATE: 08/27/13
Notification of Engineering APPROVAL has been sent to CRAIG@ANDSE.COM
via EMAIL on 08/27/13
E-36 1 of 1 REV 4/30/11
CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.eov
DATE: 8/9/13
PLAN CHECK NO:
PROJECT NAME: FOUNDATION REPAIR ONLY PROJECT ID:
SET#: ADDRESS: APN: /) /(^
^ This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required • Yes ^ No
Vou may a/so have corrections from one or more ofthe divisions Usted below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
[• This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: CRAIG@ANDSE.COIVI
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FiRE PREVENTION
760-602-4665
1 1 Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
1 1 Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
1 1 Greg Ryan
760-602-4663
Gregorv.Rvan@carlsbadca.gov
1 1 Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
1 1 Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
1 1 Cindy Wong
760-602-4662
Cynthia.Won^@carlsbadca.gov
• • 1 1 Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.^ov
Remarks:
DERSON
STRUCTURAL ENGINEERING
STRUCTURAL CALCULATIONS:
1935 Camino Vida Robie
Carlsbad
JOB # 13044
contractor
Empire Constr-uction
1570 E Edinger
Santa Ana, CA
DESCRIPTION:
Slab Lifting details
DESIGN DATA:
CODE: 2010 CBC
24632 San Juan Ave # 240. Dana Point, CA 92629
(949)470-2323 FAX(949) 470-2324 Email craig@andse.com Andersonse.com
NDERSON
STRUCTURAL ENGINEERING
DESIGN LOADS:
1935 Camino Vida Roble
Carlsbad
ROOF:
RFG. 3.5 psf
PLY 2.0
2X FRAMING 1.0
PURLINS 1.8
BEAMS 1.5
CLG. 1.8
SPRINKLERS 1.0
MECHANICAL 0.7
MISC. 1.7
TOTAL DEAD 15.0 psf LIVE 20 psf
24632 San Juan Ave # 240. Dana Point, CA 92629
(949)470-2323 FAX (949) 470-2324 Emailcraig@andse.com Andersonse.com
24" WIDE X 12" DEE
Nl>fl\ \)
JOB:
^IN D E R S O N
STRUCTURAL ENGINEERING
DATE:
ITEM.
<-'<:xi'Hl/'o
CA
Tor.-
JOB:
NDERSON
STRUCTURAL ENGINEERING
DATE:
ITEM:
CA V V
^^^^ O^Yt^ 1^
Page 1 of 9
Anchor Calculations
Anchor Selector (Version 4.12.0.0)
Job Name • SLAB LEVELING
1) Input
Calculation Method : ACI 318 Appendix D For Cracked Concrete
Code: ACl 318-08
Calculation Type: Analysis
Code Report. ICC-ES ESR-3037
a) Layout
Anchor: 5/8" Strong-Bolt 2 Number of Anchors . 2
Steel Grade. Carbon Steel Embedment Depth : 3.375 in
Built-up Grout Pads : No
DateATime : 9/18/2013 12:59:42 PM
''by -
•'ua + • 0, vTTr -J
•uaKiDyt
2,ANCHORS
i.r^b -:.=i-jT?r' c- TWO .ANCHOR:'-'-
Anchor Layout Dimensions
c^., : 24 in
c,2 . 24 in
Cyi . 9 in
Cy2 • 9 'n
\^ Iin
b,2 . 1 in
byi • 1 in
by2 • 1 in
about:biank 9/18/2013
Page 2 of 9
^1 • 9 in
b) Base Material
Concrete : Normal weight f c • 3000.0 psi
Cracked Concrete Yes 'i'^y • ^ -40
Condition . A tension and shear (|)Fp : 1657.5 psi
Thickness, h^ • 5 5 in
Supplementary edge reinforcement" No
c) Factored Loads
Load factor source • ACI 318 Appendix C
Nua O'b V^^^:0lb
V^jay . 8000 Ib M^jx : 0 lb*ft
M,y : 0 lb*ft
e^ . 0 in
ey . 0 in
Moderate/high seismic risk or intermediate/high design category : Yes
Apply entire shear load at front row for breakout: No
d) Anchor Parameters
From ICC-ES ESR-3037 :
Anchor Model = STB2-62CS dg = 0 625 in
Category =1 hgf = 2.75 in
hm,n = 5.5in Cac = 7.5in
Cmm = 6.5 in s^„ = 5 in
Ductile = Yes
2) Tension Force on Each Individual Anchor
Anchor #1 N ^g., = 0.00 ib
Anchor #2 N = 0.00 Ib
Sum of Anchor Tension SN,,^ = 0.00 lb
= 0.00 in
ay = 0.00 in
e'fg^ = 0.00 in
e'^y = 0.00 in
3) Shear Force on Each Individual Anchor
about:blank 9/18/2013
Page 3 of 9
Resultant shear forces in each anchor;
Anchor #1 V ^g., = 4000.00 Ib (V ^^^^ = 0.00 Ib , V ^^.jy = 4000.00 Ib )
Anchor #2 V = 4000.00 Ib (V ^,a2x = O lb , V ^^2si = 4000.00 Ib )
Sum of Anchor Shear IV^gx = 0^0 'b, SV^jgy = 8000.00 Ib
e'^^ = 0.00 in
e',^y = 0.00 in
4) Steel Strength of Anchor in Tension [Sec. D.5.1]
Nsa = nA3efuta[Eq- D-3]
Number of anchors acting in tension, n = 0
Ngg = 19070 Ib (for each individual anchor) [ ICC-ES ESR-3037 ]
(j) = 0.80 [D.4.5]
(j)N_^ = 15256.00 Ib (for each individual anchor)
5) Concrete Breakout Strength of Anchor Group in Tension [Sec. D.5.2]
^cbg " ^Nc^^Nco'^ec.N^ed.N'^cN'^'cp.NNb t^^- ^'^^
Number of influencing edges = 0
hgf = 2.75 in
AN,O = 68.06 in2 [Eq D-6]
A,^^= 136.13 in^
VNx=^ 0000[Eq- D-9]
^gj, = 1.0000 (Combination of x-axis & y-axis eccentricity factors.)
Smallest edge distance, Cg = 9.00 in
Te^,^ = 1.0000 [Eq. D-10 or D-11]
Note- Cracking shall be controlled per D.5.2.6
T^, f^= 1.0000 [Sec. D.5.2.6]
't'cp.N = '' •OOOO [Eq- D-12 or D-13]
Nb = ^c^ f' c ^ef'' ^ = 4246 28 lb [Eq. D-7]
kc= 17[Sec. D.5.2.6]
^cbg 8492.56 Ib [Eq. D-5]
(j. = 0 85 [D.4.5]
'^seis = 0-75
(j)N(,^jg = 5414.01 Ib (for the anchor group)
about:blank 9/18/2013
Page 4 ot 9
6) Pullout Strength of Anchor in Tension [Sec. D.5.3]
Ngq = 38771b irj2,50Q psi)° ^ = 4247.04 Ib
(j) = 0.75
'i'seis = 0.75
(|)N_ = 2388.96 Ib (for each individual anchor)
7) Side Face Blowout of Anchor In Tension [Sec. D.5.4]
Concrete side face blowout strength is only calculated for headed anchors in tension close to
an edge, Cg., < 0.4hgf. Not applicable in this case
8) Steel Strength of Anchor in Shear [Sec D.6.1]
= 9930 00 Ib (for each individual anchor) [ ICC-ES ESR-3037 ]
^ = 0 75 tD.4.5]
(b = 7447.50 Ib (for each individual anchor)
9) Concrete Breakout Strength of Anchor Group in Shear [Sec D.6.2]
Case 1: Anchor(s) closest to edge checked against sum of anchor shear loads at the edge
In x-direction...
'^cbx ~ \cx^\cox^ed,V**'c,V^h.V ^bx [^Q- D-21]
Cg^ = 6.00 in (adjusted for edges per D.6.2.4)
Avcx = 99 00 in2
A,,„,= 162.00 in2 [Eq.D-23]
Tgjj y = 1.0000 [Eq. D-27 or D-28]
T(, v= 1.4000 [Sec. D.6.2.7]
V = A/' (I.SCg-, / hg) = 1.2792 [Sec. D.6.2.8]
Vbx = 7(1,/ d, )0-2 v' dgl^i f,(C3i)^ 5 D-24]
lg = 2.75in
V^j^ = 5991 23 lb
^cbx = 6556.99 lb [Eq. D-22]
(j) = 0.85
^i'seis = 0-75
*t*Vcbx ~ 4180.08 lb (for a single anchor)
In y-direction...
Vcbgy = \c/\coy^ec.V^ed,V^c,V^h,V % [Eq- D-22]
aboutblank 9/18/2013
Page i ot y
Cg., = 9.00 in
Ay^y= 198 00 in2
A,,Qy = 364.50 in2 [Eq. D-23]
Teg y= 1.0000 [Eg. D-26]
W^^ y = 1.0000 [Eq. D-27 or D-28]
^^y= 1.4000 [Sec. D 6.2.7]
V = V (1.5Ca., / hg) = 1.5667 [Sec. D.6.2.8]
Vby = Wda)°'V da^V f,(Cg,)^ ^ [Eq. D-24]
Ig = 2.75 in
V(jy = 11006.59 Ib
V^j,gy = 13113 97 lb [Eq. D-22]
(|) = 0.85
•^seis = 0.75
^^cbgy = 8360.16 Ib (for the anchor group)
(t)Vgby ^ 4180.08 Ib (for a single anchor - divided ^^cbg^/ ^y 2)
Case 2 Anchor(s) furthest from edge checked against total shear load
In x-direction...
^cbx ~ \cx^\cox'^ed,V^c,v'^h,V ^bx [E^- D-21]
Cg., = 6.00 in (adjusted for edges per D.6.2.4)
\cx = 99-00
A^cQ^= 162.00 in2 [Eq. D-23]
^g^ y = 1.0000 [Eq D-27 or D-28]
T^ V= 1.4000 [Sec D.6 2.7]
'*'h,V = ('' •5Cg., / hg) = 1.2792 [Sec. D.6.2.8]
Vbx = 7(le/ dg )0 2 ^ dgW f c(Cai)^ ' [Eq. D-24]
Ig = 2.75 in
V^,^ = 5991.23 Ib
V^b^ = 6556.99 Ib [Eq. D-22]
(t) = 0.85
'!>seis = 0.75
't'Vcbx ~ 4180.08 Ib (for a single anchor)
In y-direction...
about:blank 9/18/2013
Page 6 of 9
Vcbgy ~ \cy^'\/coy^ec,v'^ed.V^c,v'^h,V Vfay [^Q- D-22]
Cg., = 9.00 in
A^(,y = 198.00 in2
A,^Qy = 364.50 in2 [Eq.D-23]
4^gc v= 1.0000 [Eq. D-26]
Tg^ ^ = 1.0000 [Eq. D-27 or D-28]
T^^= 1.4000 [Sec. D.6.2.7]
'i'^y= ^ (1.5Cg., /hg) = 1.5667 [Sec. D.6.2.8]
Vby = 7(lg/da da^^'' ^Cai)'' [Eq. D-24]
lg = 2.75 in
V^y = 11006.59 Ib
V,t^gy = 13113.97 lb [Eq D-22]
(j) = 0.85
<l>se.s = 0.75
^Vcbgy ~ 8360.16 Ib (for the entire anchor group)
Case 3: Anchor(s) closest to edge checked for parallel to edge condition
Check anchors at c^., edge
Vcbx ~ \cx^\cox'^ed,v'^c,v'f'h,V ^bx [^d- D-21]
Cg., = 6.00 m (adjusted for edges per D.6.2.4)
Ayj,^ = 99.00 in2
Avcox=''62 00 in2 [Eq.D-23]
*^ed V = 1.0000 [Sec. D.6 2.1(c)]
"V^ y = 1 4000 [Sec. D.6.2.7]
"^h V ^ V C -SCgi / hg) = 1.2792 [Sec. D 6.2.8]
Vbx = 7(le/dg)°2V dgXv' f,(C3^)^5[Eq.D-24]
Ig = 2 75 in
V,j^ = 5991.23 Ib
V^bx = 6556.99 Ib [Eq. D-22]
V = 2 * V,bx [Sec. D.6.2.1(c)]
Vcby= 13113.97 Ib
(j) = 0.85
about:blank 9/18/2013
Page 7 of9
^seis = 0-75
(t)Vj,|3y = 8360.16 Ib (for a single anchor)
Check anchors at Cy., edge
Vcbgy ~ \cy^\coy'^ec,V*^ed,v'^c,v'^h,V ^by [Eq- D-22]
Cg., = 9.00 in
A,,y= 198.00 in2
A^^oy = 364.50 in2 [Eq. D-23]
^g^ V= 1.0000 [Eq. D-26]
Tg^V= '' •OOOO [Sec. D.6.2.1(c)]
T^, v= 1.4000 [Sec. D.6.2.7]
"^hy^ ^ (1 5Cg., / hg) = 1.5667 [Sec D.6.2 8]
V^y = 7(lg/ dg )0-2 V dg^V ^ C^^^ a^)^ ^ ^-^^ ^ ^'^^^^
Ig = 2.75 in
Vt3y= 11006.59 Ib
V,bgy = 13113.97 Ib [Eq. D-22]
Vcbgx = 2 * V^,gy [Sec. D.6 2.1(c)]
Vcbgx = 26227.94 Ib
(j) = 0.85
(b = 0.75 ^seis
^Vcbgx ^ 16720.31 Ib (forthe anchor group)
Check anchors at Cj^2 ®dge
Vcbx = A,,^A,,,,^g, v^h,v Vbx [Eq D-21]
Cg., = 6.00 in (adjusted for edges per D.6.2.4)
A,,, = 99.00 in2
A^^„,= 162.00 in2 [Eq. D-23]
Tg^ y = 1.0000 [Eq. D-27 or D-28] [Sec. D.6.2.1(c)]
T^^= 1.4000 [Sec. D.6.2.7]
"Ph V = V (1 -SCg., / hg) = 1.2792 [Sec. D.6.2.8]
Vbx = dg f 2 V dgA V f JCg^)^-5 [Eq. D-24]
Ig = 2.75 in
V,j^= 5991.23 Ib
about:blank 9/18/2013
Page 8 of 9
Vcbx " 6556.99 Ib [Eq. D-22]
Vcby = 2*V,bx[Sec.D6.2.1(c)]
V^j,y= 13113.97 ib
(t) = 0.85
*seis = 0-75
(j)V^(3y = 8360.16 Ib (for a single anchor)
Check anchors at Cy2 edge
Vcbgy ~ Avcy''Avcoy'^ec,v'^ed,v'*'c,v'*'h,V Vby [Eq- D-22]
Cg., = 9 00 in
A,,y = 198.00 in2
A^^oy = 364 50 in2 [Eq. D-23]
^gc V= "" OOOO [Eq. D-26]
Tg^ y= 1.0000 [Sec D.6.2.1(c)]
4^py= 1.4000 [Sec. D.6.2.7]
V = V (1.5Cgi / hg) = 1.5667 [Sec. D.6.2.8]
Vby = 7(lg/dg)0 2^/ d^l^ f^(Cg,)15[Eq.D-24]
Ig = 2.75 in
V,^y= 11006 59 Ib
V^t,gy= 13113.97 Ib [Eq.D-22]
Vcbgx = 2 * V,,gy [Sec. D.6 2.1(c)]
Vcbgx = 26227 94 Ib
(j) = 0.85
'i'seis = 0.75
^Vcbgx " 16720.31 lb (for the anchor group)
10) Concrete Pryout Strength of Anchor Group in Shear [Sec. D.6.3]
Vcpg = kcpNcbg [Eq- D-30]
k,„ = 2[Sec. D.6.3.1]
cp
e'y^ = 0.00 in (Applied shear load eccentricity relative to anchor group e.g.)
e'^y = 0.00 in (Applied shear load eccentricity relative to anchor group e.g.)
^^ec Nx ~ 1-0000 [Eq. D-9] (Calulated using applied shear load eccentricity)
Tgp Ny ~ 10000 [Eq. D-9] (Calulated using applied shear load eccentricity)
Tgj, ^. = 1.0000 (Combination of x-axis & y-axis eccentricity factors)
about:blank 9/18/2013
Page 9 of 9
^cbg ^^c^'^Hc^^'^ecM'^ec.H^^cbg
N^l^g = 8492 56 Ib (from Section (5) of calculations)
A^^ = 136.13 in2 (from Section (5) of calculations)
^Nca - 136,13 in2 (considenng all anchors)
'¥^^ ^ = 1.0000 (from Section(5) of calculations)
^cbg ~ 8492.56 Ib (considering all anchors)
Vcpg = 16985 12 1b
(j) = 0.75 [D.4.5]
<l>seis = 0-75
(j)V^pg = 9554.13 Ib (for the anchor group)
11) Check Demand/Capacity Ratios [Sec. D.7]
Tension
- Steel: 0 OOOO
- Breakout: 0.0000
- Pullout: 0.0000
- Sideface Blowout • N/A
Shear
- Steel 0.5371
- Breakout (case 1): 0 9569
- Breakout (case 2): 0.9569
- Breakout (case 3): 0.4785
- Pryout: 0.8373
T.Max(O) <= 0.2 and V.Max(0.96) <= 1.0 [Sec D.7.2]
Interaction check; PASS
Use 5/8" diameter Carbon Steel Strong-Bolt 2 anchor(s) with 3.375 in. embedment
BRITTLE FAILURE GOVERNS; Governing anchor failure mode is brittle failure. Per ACI 318-
08 Section D.3.3.4, anchors shall be designed to be governed by the steel strength of a
ductile steel element in structures assigned to Seismic Design Category C, D, E, or F.
Alternatively it is permitted to take the design strength ofthe anchors as 0.4 times (0.5 times
for the anchors of stud bearing walls) the design strength determined in accordance with
Section D 3 3.3, or the attachment the anchor is connecting to the structure shall be designed
so that the attachment will undergo ductile yielding at a force level corresponding to anchor
forces no greater than the design strength of anchors specified in Section D.3.3.3. To include
the 0.4 or 0.5 factor in the calculation, select the Apply strength reduction factor for brittle
failure checkbox and re-calculate. Designer must exercise own judgement to determine if this
design is suitable.
aboutiblanlc 9/18/2013
NDERSON
STRUCTURAL ENGINEERING
STRUCTURAL CALCULATIONS:
1935 Camino Vida Roble
Carlsbad
JOB # 13044
contractor
Empire Construction
1570 E Edinger
Santa Ana, CA
DESCRIPTION:
Slab Lifting details
DESIGN DATA:
CODE: 2010 CBC
24632 San Juan Ave # 240. Dana Point, CA 92629
^ 20\3 ^^''^^ ^70-2323 FAX (949) 470-2324 Emailcraig@andse.com Andersonse.com
NDERSON
STRUCTURAL ENGINEERING
DESIGN LOADS:
1935 Camino Vida Roble
Carlsbad
ROOF:
RFG. 3.5 psf
PLY 2.0
2X FRAMING 1.0
PURLINS 1.8
BEAMS 1.5
CLG. 1.8
SPRINKLERS 1.0
MECHANICAL 0.7
MISC. 1.7
TOTAL DEAD 15.0 psf LIVE 20 psf
24632 San Juan Ave # 240. Dana Point, CA 92629
(949)470-2323 FAX (949) 470-2324 Emailcraig@andse.com Andersonse.com
.S2
r, J
Q LJ _J <$)
5 1/2" CONCRETE PANEL
•17 1/2" THICK COL I
o
•24" WIDE X 12" DEEP F
\|\J\JNlNfNj JOB:
NDERSON
STRUCTURAL ENGINEERING
DATE:
ITEM
CA
South Coast Geotechnical
Services
24632 San Juan Avenue
Suite 100
Dana Point, CA 92629
Phone. 949-374-4100
Fax: 949-388-7711
'jar J @S'::qeo , com
May 28, 2013
Mr. Larry Martinez
Empire Construction
1570 E. Edinger Avenue
Suite A
Santa Ana, CA 92705
Project No: 1180-01
Project:
Legal Description:
Reference:
Subject:
Remedial Foundation Repair
1935 Camino Vida Roble
Carlsbad, Califomia
Tract 81-46. Lot 4, City of Carlsbad, Califomia
RECEIVE
AUG 0 7 20131
CITY OF CARLS
BUILDING DIVISI
Limited Geotechnical Report for Proposed Remedial Foundation Repair
South Coast Geotechnical Services (SCCJS) has been retained to prepare this limited geotechnical report
to address a portion of the structure at the subject site that has exhibited distress. Figure 1, Site
Vicinity Map shows the property in relation to the immediate surrounding area. The area that is the
subject of this report is adjacent to the electrical room and has undergone settlement and some lateral
movement. This report addresses current site conditions and provides recommendations for
underpinning of certain to foundation elements. Mgure 2, entitled Boring Location Map, depicts the
approximate area to be underpinned -with respect to the structure. This map is based on a Site Plan and
the grading plan obtained from the City of Carlsbad. This map also depicts geologic information
obtained from the referenced report and the location of our exploratory boring.
Site Description
The site is located on the south side of Camino Vida Roble in the City of Carlsbad. California. The one
story building consists of an irregular shaped concrete tilt up .strticture slightly elevated above street
grade. The property rests on a previously graded pad. Asphalt paving surrounds the building, however
planter areas are located between the pavement and the stnjcture walls. According to grading plans
prepared by Rick Engineering the northwesterly portion ofthe property is cut while the remainder ofthe
property is fill. A filled drainage swale that trends southerly is located near the westerly side of the
property. A subdrain is depicted along the bottom of this swale. At the time of our exploration water
discharge was noted from the inside of the building to a planter in the area where settlement has
occurred.
Field Exploration
One test hole was hand augured near the distressed area. Loose landscape fill was encountered to a
depth of 1 foot. A 6 to 12 inch layer of % inch gravel underlies the landscape fill. These layers were
found to be in a saturated condition. Below the gravel layer a medium dense mottled light yellow brown
to -white silty sand with scattered sandstone fragments was encoimtered. This n-iaterial was found to be
in a moist condition. At six feet sandstone bedrock was encountered. Fhe bedrock was found to be in a
dense condition and is considered suitable for support of the proposed underpinning elements. While
satwated conditions were found near the surtace, no freestanding groundwater level was encountered to
the depth explored. Groundwater is not anticipated to be a or construction constraint at this site,
provided the recommendations contained herein are implemented during design and construction.
Laboratory Testing
Samples were reviewed along with field logs to select those that would be analyzed further. Those
selected for laboratory testing include soils that would be exposed and used during grading and those
deemed to be within the influence of the proposed structure. Test resuks are presented in graphic and
tabular form in Appendix B of this report. The tests were conducted in general accordance with the
procedures of the American Society for Testing and Materials (ASTM) or other standardized methods as
referenced below. Our testing program consisted of the following:
y In-situ Moisture Content and Unit Dry Weight for the ring samples.
5*" Particle Size Analysis to classify and evaluate soil composition. The gradation characteristics of
selected samples were made by hydrometer and sieve analysis procedures.
y Consolidation and hydro-consolidation potential ofthe soil to evaluate compressibility.
y Direct Shear to evaluate the relative fi-ictional strength of the soils. Remolded specimens were
placed in contact with water before testing and were then sheared under normal loads ranging
Irom 0.5 to 2.0 kips per square foot.
Recommendations for Foundation Underpinning
General: Those portions of the existing foundation that have been affected by settlement should be
underpinned to the underiying approved dense bedrock. The underpinning may be accomplished by
using hydraulically driven steel tube sections with steel foundation brackets to transfer structural loads
to an approved depth. Actual design of the underpinning, spacing, and structural tics to the existing
structural elements is the responsibility of the Structural Engineer A representative of SCGS should
observe the installation ofthe piers.
file property owner should recognize and accept thatthe use of existing foundations in conjunction with
new structural elements may result in differential perfbrmance between foundation systems. The
support conditions and structural capacity of existing foundations is speculative based on past
performance and limited observations. While the structural engineer should review and analyze existing
foundations fbr anticipated new conditions, it should be understood that the foundation conditions for
existing elements contain some degree of uncertainty.
Allowable bearing pressures arc given below for foundations bearing into approved bedrock /dense earth
materials, at a n-unimum depth of 6 feet below existing grade. An allowable vertical earth pressure of
2000 psf may be used in design.An allowable lateral bearing of 150 psf (below a depth of 3 feet) and a
coefficient of friction of 0.25 may also be used in design. A one-third QA) increase in the bearing
pressure may be used when calculating resistance to wind or seismic loads.
Support locations of the pipe piles should be spaced along the exterior footings/pier or both where
support and lifting is desired, as determined by the structural engineer. Prior to placement of the pipe
pile brackets and piles, a reinforced grade beam may be necessary to supplement the existing foundation
elements. Support locations and the need for grade beams, should be determined by the structm-al
engineer. The structural engineer should evaluate the exterior wall for lateral deflection. If significant
lateral movement is detected that afiects the structural integrity of the wall then helical pier tie backs
may be utilized in conjunction with the push piers.
Pipe piles are to be independently hydraulically driven to reflisal into bedrock with a force of 2.5 times
the ultimate service load of the pile. The geologist or geotechnical engineer should observe all
hydraulically driven piles to verify embedment conditions.
After lifting of the affected area of the structure, a quick setting high strength slurry/or approved
chemical grout should be provided beneath the lifted foundation elements and slabs to fill any voids
created by the leveling and to provide a concrete siab to soil contact.
Site Drainage
Positive drainage should be maintained away from the structure. Drainage or effluent water (including
roof gutters) should not be directed into the planter areas adjacent to the building. Landscape water
should be kept at a minimum.
Development Impact
The proposed development is not anticipated to adversely impact adjacent properties provided the
recommendations contained herein are implemented in design, construction and maintenance of the
project.
Geotechnical Services During Site Development
The use of this report is contingent upon SCGS being retained during construction operations to provide
geotechnical services as required by the jurisdictional building official. Anticipated services include, but
are not necessarily limited to: ^
> Observation of underpiimmg operations to assess embedment and bearing conditions.
Please note that the above services should be requested by the owner, contractor or authorized agent at
least 24 hours in advance notice. Failure to do so may impede project progress.
Closure
It is the opinion of the undersigned that the recommendations provided herein are incorporated in the
dc^sign and that a qualified representative from SCGS is afforded the opportunity to observe the methods
of the foundation underpinning.
We appreciate the oppoitunity to provide our professional services. Please contact our office if there are
any questions or comments conceming this letter.
Respectively submitted,
SOUTH COAST GEOTECHNICAL SERVICES
Carl D. Schrenk
EG 900
Attachments: Figure 1, Site Vicinit
Figure 2, Boring Location Map
Auger Boring Log
Laboratory Testing
Moisture-Density
Direct Shear Test
Hydro-Consolidation Test
Particle Size Analysis (Sieve)
Reviewed by,
David A. Purkj
CE 4281
a.v NO, 42^^.0
\ Exp. 3-31-4
\^7fn77...^7^7^
Distribution: 5/Addressee
NO SCALE
Figure 1
, Site Vicinity IVlap
1935 Camino Vida Roble
Carlsbad, California
SOUTH COAST GEOTECHNICAL SERVIC
CB131917 1935 CAMINO VIDA ROBLE
SVN CARLSBAD - FIX FOUNDATION
ARF A OF .C!l AR I IFTINin IN NW CORNER OF
Final Inspection required by:
1-1 ———1
Approved Date / By
BUILDING ^/^e/(^ ^T
PLANNING
ENGINEERING
FIRE Expedite? Y N
AFS Checked by
HazMat
APCD
Health
Forms/Fees Sent Reed Due? By
Enona y N
Fire Y N
HazHealthAPCD Y N
PES.M y N
School Y N
Sewer Y N
Stormwater Y N
Specral Inspection V N
CFD. Y N
LandUse Density ImpArea FY Annex Factor
PFF Y N
Comments Date Date Date Date
Building
Planning
Engineering
Fire
Need?
«>a(PcC.V- ^ ija;/.pe-C^O.' ^77r-- a Done
jfi.r^^U-<Y,nS.^..Y€4^^0r \rS'-J a Done
QjhTl(/^fi^A./)(m{^J'iC/\jH^u/i^