Loading...
HomeMy WebLinkAbout1940 Camino Vida Roble; ; CBC2018-0391; Permit{city of Carlsbad Commercial Permit Print Date: 11/20/2018 Permit No: CBC2018-0391 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: 1940 Camino Vida Roble BLDG-Commercial 2120921300 $9,570.00 Work Class: Tenant Improvement Lot#: Reference #: Construction Type: Bathrooms: Orig. Plan Check#: Status: Applied: Issued: Permit Finaled: Inspector: Closed -Finaled 07/18/2018 09/11/2018 PBurn Plan Check#: Final Inspection: 11/20/2018 10:29:31AM Project Title: Description: CAL-COMP USA: HIGH PILE STORAGE RACKING Applicant: Owner: Contractor: TURA BILLET HAMANN PROPERTY MANAGEMENT CROWN LIFTTRUCKS 44 S Washington St 619-696-6747 1000 Pioneer Way EL CAJON, CA 92020 NEW BREMEN, OH 45869-1247 619-696-6747 BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL FIRE High Piled Storage MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL S81473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-COMMERCIAL Total Fees: $1,012.11 Total Payments To Date: $1,012.11 Balance Due: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor pfanning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. $0.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov $114.96 $80.47 $41.00 $733.00 $39.00 $1.00 $2.68 ;-,iE FOLLO~ING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: •PLANNING •ENGINEERING •BUILDING •FIRE •HEALTH 0HAZMAT/APCD (city of Building Permit Application Plan Check No.cec,:z.o1st-'D?A I 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value L.\ , ~ 70- Carlsbad Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit email: building@carlsbadca.gov www.carlsbadca.gov Date I -f~ -1 X JOB ADDRESS SUITEI/SPACE#/UNIT# I"" 212 1940 CAMINO VIDA ROBLE -092 -13 -00 CT/PROJECT# rOT # Lt71' Ll"I I PHASE# I# OF UNITS I# BEDROOMS # BATHROOMS r•••• eus~•;c:~~MP USA I coN;;~:;" I oc~ffi:~P "'"" II " o q DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) STORAGE RACKING EXISTING USE I PROPOSED USE I I GARAGE (SF) PATIOS (SF) 'DECKS (SF) FIREPLACE IAIR CONDITIONING I FIRE SPRINKLERS STORAGE RACKING STORAGE RACKI~ YES[), Nc{Z] YES[Z]No• YES[Z]No• APPLICANT NAME CROWN LIFT TRUCKS PROPERTY OWNER NAME TECH PLEX#2 Primary Contact ADDRESS ADDRESS 12725 STOWE DR 1000 PIONEER WAY CITY STATE ZIP CITY STATE ZIP POWAY a CA 92064 EL CAJON CA 92020 PHONE IFAX PHONE IFAX 619-696-6747 858-513-4965 EMAIL TURA.BILLET(ii;C,Q,1>w rJ .COM EMAIL DESIGN PROFESSIONAL STRUCTURAL ENGINEERING DESIGN INill CONTRACTOR BUS. NAME CROWN LIFT TRUCKS ADDRESS ADDRESS 1815 WRIGHT AVE 12725 STOWE DR CITY STATE ZIP CITY STATE ZIP LAVERNE CA 91750 POWAY CA 92064 PHONE IFAX PHONE IFAX 714-632-7330 714-632-7763 619-696-6747 858-513-4965 EMAIL EMAIL BOB@SCEDINC.COM CROWN.COM I STATE UC. '26608 STATE UC.# I CC61 /D24 I CllY BUSBLOS1212510 781358 C61/D21 (Sec~ 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant tor such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's license Law /Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any vIolatIon of Section 7031.5 by any applicant for a permit subJects the applicant to a civil penalty of not more than five hundred dollars {$500}). WORKERS" COMPENSATION Workers' Compensation Declaration: / hereby affinn under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-Insure for workers' r.ompensation as provided by Section 3700 of the Labor Code, for the pertormance of the work for 'Nhich this permit is issued. [Z] I have and will maintain workers' com1Jensation, as reQuired by Section 3700 of the Labor Code, for the pertormance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance co. ACE AMERICAN INSURANCE COMPANY/GALLAGHER BASSETT Policy No. WLRCS-4-414628 Expiration Date 101112018 This section need not be completed if the permit is for one hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and clvll fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages a r · ed for In Section 3706 of the Labor code, interest and attorney's fees . .85 CONTRACTORSIGNATURE / hereby affinn that I am exempt from Contractor's License Law for the following reason: • • • I, as owner of the property, am exclusively contracting with licensed r.ontractors to rue! the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property 'Nho builds or improves thereon, and r.ontracts for such projects wi ractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section ____ ,Business and Professi ode for this reason: 1. I personally plan to pro11kfe the major labor and mat for construction of the proposed property impro11ement. 0Yes 0No 2. I (ha11e I have not) signed an applk:ation for ding permit for the proposed work. n (firm) to prollide the proposed construction (include name address/ phone/ r.ontractors' license number): 4. I plan to pro11ide portions of th rk, but I have hired the following person to coordinate, supervise and prollide the major work (include name /address/ phone/ r.ontractors' license number): rk, but I ha11e contracted (hired) the following persons to provide the work indicated (include name I address I phone I type of work.): .8$ PROPERTY OWNER SIGNATURE )tAGENT DATE " " COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account ActJ • Yes • No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D Yes • No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? • Yes D No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRU,CTION LENDING AGENCY I hereby affirm that there 1s a construction lending agency for the performance of the work this permit 1s issued (Sec 3097 (1) C1v1I Code) lender's Name lender's Address APPLICANT CERTIFICATION I certify that I have read the application and state that the abolle infomiation is correct and that the infonnation on the plans Is accurate. I agree to comply 'Mth all City ordinances and St.ate laws relating to building consbuclion. I hereby authorize representative oflhe Otyof Garlsboo to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEOOENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over3 stories in height. EXPIRATION: Every pennit issued by the Building Official under the provisions of this C.ode shall expire by limitation and become null and void if the building or work authorized by such perm~ is not commenced within 180 days from the date of such pennit or if the ilding or work authorized by such pennit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Unifonn Building C.ode), ~ APPLICANT'S SIGNATURE DATE PERMIT INSPECTION HISTORY REPORT (CBC2018-0391) Permit TypP.: BLDG-Commercial Application Date: 07/18/2018 Owner: HAMANN PROPERTY MANAGEMENT Work Class: Tenant Improvement Issue Date: 09/11/2018 Subdivision: CARLSBAD TCT#81-46 UNIT#02 Status: Closed -Finaled Expiration Date: 03/19/2019 Address: 1940 Camino Vida Roble Carlsbad, CA 92008-6516 IVR Number: 12624 Scheduled Actual Complete Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection 09/13/2018 09/1312018 BLDG-14 069901-2018 Passed Paul Burnette Complete Frame/Steel/Bolting/ Welding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 09/20/2018 09/20/2018 BLDG-Final 070540-2018 Failed Paul Burnette Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No 11/20/2018 11/20/2018 BLDG-Final 076493-2018 Passed Andy Krogh Complete Inspection Checklist Item COMMENTS Passed BLDG-Structural Final Yes BLDG-Fire Flnal 070104-2018 Scheduled Cindy Wong Incomplete Checklist Item COMMENTS Passed FIRE-Building Final No Checklist Item COMMENTS Passed FIRE-Building Final No Checklist Item COMMENTS Passed FtRE-Building Final No November 20, 2018 Page1of1 \ ~ «~~ ~ CITY OF CARLSBAD SPECIAL INSPECTION AGREEMENT B-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special Inspection, structural observation and construction material testing. Project/Permit:~20 \ 5-0 3"'\ l Project Address: 1940 Gamjno Vida Roble. Gadsbad. CA 92008 A. THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check if you are Owner-Builder •. (If you checked as owner-builder you must also complete Section B of this agreement.) Name: (Please print,-) _,.S~aum=u~e"-1 __________ L.._ __________ _,Pc.au.urt..,A11.r _____ _ (First) (1111.I.) (Last) Mailing Address· 1940 Camino Vjda Roble, Garlsbad, CA 92008 Email· sporter@calcompusa.com Phone· 858-354-4800 I am: •Property Owner ,fF,roperty Owner's Agent of Record •Architect of Record •Engineer of Record State of California Registration Numbe · Expiration Dale: ________ _ AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and is".-tn-c:nmply with the City of Carlsbad requirements for special inspections, structural observations, constr.uctio erials testing an -site fabrication of building components, as prescribed in the statement of special inspections n a n the approved plans d, as required by the California Building Code. Signatur Date: ---"''5+/,.;;'l~/4:+-=R--'----- B. ESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor/ builder/ owner-builder. Contractor's Company Name:_C.c__ro:._w_n_L_ift_T_r_uc_k_s ___________ Please check if you are Owner-Builder • Name: (Please prlnt) ___ ...:C:.:rc.::o;,:w.:.:nc...=.L:.:ift:.T.c..:.cru:.:c::.k::sc.... ___ ~cc-----------~~-------- (FrrstJ (M.I.) {Last) Mailing Address: __ __:1.=2.:..72=5=-=S-=lo:.:w.:..:e=-D=r :....P.::.ow=ay,_,,_:C:.:A.:....::9=.20::.:6:_4;__ _______________ _ Email: --~---_-·_·1 ________________ Phone: __ 61_9_-_6_96_-_6.:..74-'-7'------ State of California Contractor's License Number:_.:..78::.1.:..:3:::5:::8:..... _____ Expiration Date: 7/31/2018 • I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; • I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; • I will have in-place procedures for exercising control within our (the conlractor's) organization, for the method and frequency of reporting and the distribution of the reports; and • I certify that I will have a qualified person within our (the contractor's) organization to exercise such control. • I will proVide a final report /letter In comp/lance with CBC Section 1704.1.2 prior to requesting final inspection. 0 • ~"" Signature~: --~=\--'-· -"-L-\Jk_,,._,,_J:='LJ...--. ___ Date: cllih:£ B-45 Page 1 of 1 Rev. 08/11 \ BDJ Consl!ltint;, !nc. A Califomia C-01µ0,·aUon 17582 Orange Dr. Yorba Linda CA 92886 Cell (71-t:) 863-9180 Fax (877) 764-3939 1•/( F • CONSULTING, INC. Observation Report and Observation Agreement Job Address Job Name Observer Samples: Quantity= City Permit# '2''-~.?4D Architect , Engineer C. s_ Contractor C c ~ Subcontractor -~ S. Sa. Description c,f Wa,-k Observed: _ _.,_\.d""--~.A--vi==c.,......_,_1_,--l-=c-'--'r>=-:,.._ ________________ _ DATE: Cf / I ( / , <;,., I I / .. /-· ,"7 ,t "": .... 1.'~!..•,.::., ::, ,·;~.•t.::, . ..,,i•~~·-••.:. :.i,f.'~!: •.,"" • • • • , _ .'~ ' _ J."" _ _ ; • ! _ .'~ ' • '. "" • • • • t _ .~ ' ~.,"' • • ~ • I_ •~ I ~,I,.._ f-----------------------------'•• •i. .. , , •• • H '° ,, -,. ',. •11 • 1, • h '•! ••• "'I• •I;.,'•• f-----------------------------:~:::~ ~·:~·~~;~.-~~::·~~"/ __ ~~:~~:~:: ~:.\~!:~~::·:·~~~,~~~~: 1,,· 11\1,·•·• ,.'\1 1 ·•,,-,.,;\,,1""••·•·••\1,, '-----------------------------, ,_ ,. ~ • '~ , ,. I ., •: .,_••..,I • _._;• ,:' ol •'"' •• .;;;· _,:, ,1.=,o By this signature on the this Observation Report. I acknowledge that BDJ Consulting, Inc. performed the above observation. Approv by: Certification of Compliance We hereby c5ttfy that,. at the time-of this obseNation. we have observed all of the above reported work, unless othenvis& noted. To !he-best of our knowledge and be:iaf, we MW, foood this work to comply with the approved plat1s, specifications, and applicable section{s) of the Uniform Building Code, as applicable to the locality where this proj~t is located. This report cannot be construed to ba a retomrneni:latlon of worll of any natl.ll'e to ba performed. The perlorrnance of our obseivatic I ject to the tsrms and condiliO!'ls as described on the reverse side of~Jl"!~~.., . The Owner or a -SI.IGCE!SSDI' in .-itaest shall holq\(;,); 'l,i;i,i-.; \ harmless BDJ C -many and all isgal pr~ anynaturev.tlatsoever, th<\1:.; t-1~.c'.' _: :_•~_;;;f smvices . : -:;:~-;~r~•·:i,'·'.;{~~)1> '••~ I '· <--.:;~: Specialty WHITE-OFFICE COPY, CANARY-ACCOUNTING COPY, PfHK-0!3SERVERS COPY, BOTTOM WffiTE-JOBSITE COPY DATE: 7/31/2018 JURISDICTION: City of Carlsbad PLAN CHECK#.: CBC2018-0391 ✓• EsG1I A SAFEbuilfCompany SETI PROJECT ADDRESS: 1940 Camino Vida Roble PROJECT NAME: Storage Racks for Cal Comp , • APPLICANT • JURIS. [:8J The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: [:8J EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise th applicant that the plan check has been completed. Person contacted: Date contacted: Mail Telephon Telephone#: (by~) Email: Fax In Person [:8J REMARKS: 1. Fire Department approval is required. 2. City to field verify that the path of travel from the handicapped parking space to the rack area and the bathrooms serving the rack area comply with all the current disabled access requirements. By: David Yao EsGil 7/23/18 Enclosures: 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad CBC2018-0391 7/31/2018 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PREPARED BY: David Yao PLAN CHECK#.: CBC2018-0391 DATE: 7/31/2018 BUILDING ADDRESS: 1940 Camino Vida Roble BUILDING OCCUPANCY: BUILDING AREA Valuation Reg. PORTION (Sq.Ft.) Multiplier Mod. racks per city Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance ------------- 1997 UBC Buildin Permit Fee ,.. g -~ Pla~--(heck Fee by o;di~ance --------;-i ----------------------_ __:: _ _1_ VALUE Type of Review: Complete Review D Structural Only D Repetitive Fee --___ ~] Repeats Comments: D Other D Hourly EsGil Fee f--------11 Hr. @ * ($) 9,570 9,570 $69.901 Sheet of Structural Engineering $ Design, Inc 1815 Wright Ave La Verne, Ca. 91750 Tel: 909-596-1:351 Fax: 909-596-7186 Project Nome : CAL -COMP USA Project Number: LV-053118-2 Dote: 07/10/18 Street Address: 1940 CAMINO VIDA ROBLE City/State : CARLSBAD, CA 92008 Scope of Work : SELECTIVE o ro ,.-. a..-_ C"l O ..,~ ..---(:::! _ N o:> ,..,, O'l ...... 0 o-N I'-I N 00 ..-- 0 N 0 m 0 . Structural Engineering & Design Inc. 1815 Wright Ave La Verne CA 91750 Tel 909 5961351 fax· 909 596 7186 By: Bob TABLE OF CONTENTS Title Page . Table of Contents ................... . Design Data and Definition of Components ... Critical Configuration ........................... . Seismic Loads .. Column ... Beam and connector ............. . Bracing . Anchors ................... . Base Plate ....... . Slab on Grade ..... . type I select-Cal Comp Project: Cal Comp USA 1 2 3 4 5 to 6 7 8 to 9 10 11 12 13 Page (X of I~ Project#: LV-053118-2 G/1/2018 . Structural Engineering & Design Inc. 1815 Wright Aye La Verne CA 91750 Tel· 909.596.1351 Fax 909 596 7186 By: Bob Project: Cal Comp USA Project#: LV-053118-2 Design Data 1) The analyses herein conforms to the requirements of the: 2012 !BC Section 2209 2016 CBC Section 2209A ANSI MH 16.1-2012 Specifications for the Design of Industrial Steel Storage Racks "2012 RMI Rack Design Manual" ASCE 7-10, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=SS ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=SS ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The existing slab on grade is 5.5" thick with minimum 2500 psi compressive strength. Allowable Soil bearing capacity is 750 psf. The design of the existing slab is by others. 6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria Definition of Components Frame Height A ~ Beam ~=:tl======lil=l=====tl= (:=ll======lJl::l:==.====lt Product (: Beam Spacing Beam Length Front View: Down Aisle (Longitudinal} Frame + type I 5elect-Cal Comp Column :j Beam to Column Connector :j Base Plate and Anchors j Pa':Je:, of l J L_ Frame ..J I Deoth 7 Section A: Cross Aisle /Transverse ) Frame Horizontal Brace Diagonal Brace GI 1/2018 \ · . Structural Engineering & Design Inc. 1815 Wrjqht Ave La Verne CA 91750 Tel 909 5961351 Fax· 909 596 7186 By: Bob Project Cal Comp USA Project#: LV-053118-2 Configuration &. Summary: TYPE 1 SELECTIVE RACK T 80" 2 40" + 80" + 80" .. .I ' Seismic Criteria Ss=l.084, Fa=l.066 Component Column Column & Backer Beam Beam Connector Brace-Horizontal Brace-Diagonal Base Plate Anchor Slab & Soil Level j Load** 1 2 3 Per Level 3,000 lb 3,000 lb 3,000 lb 96" # Bm Lvls 3 Fv=SS ksi None Fy=SS ksi Fy=SS ksi Fy=SS ksi Fy=SS ksi Fy=36 ksi 2 per Base Beam Spcg 80.0 in 80.0 in 80.0 in ** Load defined as product weight per pair of beams Notes !4 tab @ lvl 1 type I select-Cal Comp i 68" + 240" +1,c--~-------J + Ir------, 32" J._ ,j-c-42" --,r Frame Depth Frame Height # Diagonals 42 in 240.0 in 4 Description Mecalux 312 3.06"x2.69"x0.105" None Intlk 32E 3.25Hx2.75Wx0.063"Thk **RACK COLUMN REACT10NS ASDLOADS AXIAL DL= 113 lb AXIAL LL= 4,SOO lb SEISMIC AXIAL Ps=+/-6,044 lb BASE MOMENT= 8,000 in-lb Beam Length Frame Type 96in Single Row STRESS P=4613 lb, M=15601 in-lb 0.89-0K None N/A Lu=96 in I Capacity: 3422 lb/pr 0.88-0K Lvl 1: 3 Tab OK I Mconn=8002 in-lb I Mcap=8828 in-lb 0.91-0K Mclx USlS Sgl l.97xl.38x16ga(U80/3lx) Mclx USlS Sgl l.97xl.38x16ga(U80/31x) 7.283x5.118x0.394 I Fixity= 8000 in-lb 0.5" x 3.25" Embed HILT! KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Uplift=3712 lb) 5.5" thk x 2500 psi slab on grade. 750 psf Soil Bearing Pressure Brace 32.0 in 64.0 in 64.0 in 68.0 in I Story Force I Story Force Transv Long it. 201 lb 402 lb 603 lb 102 lb 204Ib 307Ib Total: 1,205 lb 613Ib Page 'f of I ?J Column Axial 4,613 lb 3,075 lb 1,538 lb I Column J Conn. Moment Moment 15,601 "# 10,216 "# 6,130 "# 11,316 "# 8,002 "# 4,426 "# 0.22-0K 0.82-0K 0.59-0K 0.892-0K 0.57-0K Beam Connector 3 Tab NG 3 Tab OK 3 Tab OK G/1 /20 I 8 · . Structural Engineering & Design Inc. 1s1swrjghtAve La Verne CA91750Tel·9095961351 Fax 9095967186 By: Bob Project: Cal Comp USA Seismic Forces Configuration: TYPE 1 SELECTIVE RACK Lateral analysis is performed with regard to the requirements of the 2012 RMI ANSI MH 15.1-2012 Sec 2.6 & ASCE 7-10 sec 15.5.3 Transverse (Cross Aisle) Seismic Load I V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D) v, Csl= Sds/R = 0.1926 Cs-max* Ip= 0.1926 Cs2= 0.044*Sds Vmrr.= 0.015 = 0.0339 Eff Base Shear=Cs= 0.1926 TtJnwmr Flootion Cs3= 0.5*S1/R Ws= (0.67*P4,f1 * PL)+Dl (RMI 2.6.2) = 0.0523 ~---=-'6"',2"'5"-5-"lb'--~-----~ Cs-max= 0.1926 Vtransv=Vt= 0.1926 * (225 lb + 6030 lb) Base Shear Coeff=Cs= 0.1926 Level I 2 3 PRODUCT LOAD P 3,000 lb 3,000 lb 3,000 lb P*0.67*PRF1 2,010 lb 2,010 lb 2,010 lb sum: P=9000 lb 6,030 lb Lonaitudinal (Downaisle) Seismic Load Etransverse= 1,205 lb Limit States Level Transverse seismic shear per upright DL h1 w1*h1 ?Sib 751b 751b 2251b 80in !60in 240in W=6255 lb 166,800 333,600 500,400 1,000,800 Project#: LV-053118-2 Ss= 1.084 SI= 0.418 Fa= 1.066 Fv= 1.582 Sds=2/3*Ss*Fa= 0.770 Sd1=2/3*Sl *Fv= 0.441 ca=0.4*2/3*Ss*Fa= 0.3081 (Transverse, Braced Frame Dir.) R"' 4.0 Ip= LO PRFl= 1.0 Pallet Height=hp= 48.0 in DL per Beam lvl= 75 lb Fi Fi*(hi+h /2) 200.8 lb 20,883-# 401.7 lb 73,913-# 602.5 lb 159,060-# 1,205 lb l=253,856 Similarly for longitudinal seismic loads, using R-6.0 Ws= (0.67 * PLRe2 * P) + DL PRF2-1.0 CJD 10 Csl=Sdl/(T*R)= 0.0980 Cs2= 0.0339 Cs3= 0.0348 Cs-max= 0.0980 Level 1 2 3 PRODUC LOAD P 3,000 lb 3,000 lb 3,000 lb = 6,255 lb (Longitudinal, Unbraced Dir.) R= 6.0 Cs=Cs•max*Ip= 0.0980 T, 0.75 sec I Vlong= 0.098 * (225 lb+ 6030 lb) I Elongltudinal= 613 lb Limit StJIW Level Longlt. seismic she;,r per upright P*0.67*PRF2 2,010 lb 2,010 lb 2,010 lb DL 751b 751b 75 lb h1 80in 160in 240in wi*hi 166,800 333,600 500,400 or 1't::J C]rl DD Fi Ftont Vtew 102.2 lb 204.3 lb 306.5 lb sum: =======6=03=0=1=b===2=2=5=1b====W===6=2=5=5=1b=====l=0=0=0!:8=00=======61=3=1=b======== type I select-Cal Comp _,;- Page ~ of G/1/2018 · .Struc;;tural Engineering & Design Inc. 1815 Wright Aye La Verne GA 91750 Tel 909 596 1351 Fax· 909 596 7186 By: Bob Project: Cal Comp USA Downaisle Seismic Loads Configuration: TYPE 1 SELECTIVE RACK Determine the story moments by applying portal analysis. The base plate is assumed to provide partial fixity. Seismic Story Forces Vlong= 613 lb Vcol=Vlong/2= 307 lb Fl= 102 lb F2= 204 lb F3= 307 lb Seismic Story Moments Typical (ramc made o( two columm -EJ GEJ:GEJ:G -EJ G EJ:G EJ:G ' ' Conceptual System Mbase-max= 81000 in-lb Mbase-v= (Vcol*hleff)/2 <=== Default capacity hl-eff= hl -beam clip height/2 = 77in = 11,800 in-lb <=== Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 8,000 in-lb M 1-1= [Veal* hleff]-Mbase-eff = (307 lb * 77 in)-8000 in-lb = 15,601 in-lb M 2-2= [Vcol-(Fl)/2] * h2 = [307 lb -102.2 lb]'80 in/2 = 10,216 in-lb Vcol h2 h 1 Project#: LV-053118-2 Typ1d 1-'r,1rnc maJc o( two wlum11, --✓----, 1:l__l)[I __ Jjl 11~ i 1r1 Beam to Column Elevation COL Mseis= (Mupper+Mlower)/2 Mseis(l-1)= (15601 in-lb+ 10216 in-lb)/2 = 12,908 in-lb Mseis(2-2)= (10216 in-lb+ 6130 in-lb)/2 = 8,173 in-lb rho= 1.0000 Summary of Forces LEVEL hi Axial Load Column Moment** Mseismic** 1 80in 4,613 lb 15,601 in-lb 12,908 in-lb 2 80in 3,075 lb 10,216 in-lb 8,173 in-lb 3 SO in 1,538 lb 6,130 in-lb 3,065 in-lb Mconn= (Mseismic + Mend-fixity)*0.70*rho Mconn-allow(3 Pin)= 8,828 in-lb **all moments based on limit states level loading type I select-Cal Comp Page 0 of lJ Mend-fixity Mconn** Beam Connector 3,258 in-lb 11,316 in-lb 3 Tab NG 3,258 in-lb 8,002 in-lb 3 Tab OK 3,258 in-lb 4,426 in-lb 3 Tab OK G/1/2018 Structural Engineering & Design Inc. 1815 Wright Aye La Verne CA 91750 Tel· 909.596.1351 fax· 909 596 7186 By: Bob Project: Cal Comp USA Project#: LV-053118-2 Column (Longitudinal Loads) Configuration: TYPE 1 SELECTIVE RACK Section Properties Section: Mecalux 312 3.06"x2.69"x0.105" Aeff = 0.782 inA2 Ix = 1.132 in"4 Sx = 0.740 inA3 rx = 1.203 in Qf= 1.67 Iy = 0.636 inA4 Sy = 0.422 in A 3 ry = 0.902 in Fy= 55 ksi Kx = 1.7 r ,.o•o •• _,.I Cmx= 0.85 E= 29,500 ksi Loads Considers loads at level 1 COLUMN DL= 112 lb Critical load cases are: RMI Sec 2.1 Lx = 78.4 in Ky= 1.0 Ly= 32.0 in Cb= 1.0 ~r 0.105 in 2.690 in _L COLUMN PL= 4,500 lb Load Case 5:: {1+0.l0S*Sds)D + 0.75*{1.4+0.14Sds)*B*P + 0.75*(0.l*rho*E)<= 1.0, ASD Method Meal= 15,600 in-lb axial load coeff: 0.7916244 * P seismic moment coeff: 0.5625 * Meo/ Sds= 0.7704 Load Case 6:: {1+0.104*Sds)D + (0.85+0.14Sds}*8*P + {0.l*rho*E)<= 1.0, ASD Method 1 +0.105*Sds= 1.0809 axialload coeff: 0.67050 seismic moment coeff: 0.7 * Meal By analysis, Load case 6 governs ut1llz1ng loads as such Moment=Mx= 0.7*rho*Mcol l.4+0.14Sds= 1.5079 1+0.14Sds= 1.1079 0.85+0.14*Sds= 0.9579 B= 0.7000 rho= 1.0000 Axial Anal sis bial Load=Pax= 1.107856*112 lb+ 0.957856*0.7*4500 lb = 3,141 lb = 0.7 * 15600 in-lb = 10,920 in-lb KxLx/rx = l.7*78.375"/l.203" = 110.8 Fe= nA2E/(KL/r)maxA2 = 23.7ksi Pn= Aeff*Fn = 18,556 lb P/Pa= 0.33 > 0.15 Bendin Anal sis KyLy/ry = I *32"/0.9021" = 35.5 Fy/2= 27.5 ksi Qc= 1.92 Check: Pax/Pa + (Cmx*Mx)/(Max*µx) ~ 1.0 P/Pao + Mx/Max ~ 1.0 Pno= Ae*Fy Pao= Pno/Qc = 0.782 inA2 *55000 psi = 42,999 lb = 42999Ib/l.92 = 22,395 lb Fe < Fy/2 Fn= Fe = nA2E/(KL/r)maxA2 = 23.7 ksi Pa= Pn/Qc = 18556 lb/1.92 = 9,665 lb Myield=My= Sx*Fy = 0.74 inA3 * 55000 psi = 40,689 in-lb Max= My/Qf Per= nA2EI/(KL)maxA2 = 40689 in-lb/1.67 = 24,365 in-lb µx= {l/[l-(Qc*P/Pcr)]Y-1 = {1/[1-(1.92*3141Ib/18564 lb)]}A-l = 0.68 Combined Stresses = nA2*29500 ksi/(l.7*78.375 in)A2 = 18,564 lb (3141 lb/9665 lb)+ (0.85*10920 in-lb)/(24365 in-lb*0.68) = (3141 lb/22395 lb)+ (10920 in-lb/24365 in-lb) = 0.89 0.59 < 1.0, OK < 1.0, OK (EQCS-1) (EQ C5-2) ** For comparison, total column stress computed for load case 5 is: 84. 0% q loads 3683.369704 lb Axial and M-8190 in-lb type I select-Cal Comp Page 1 of \ 3 G/1/2018 Structural Engineering & Design Inc. 1815 Wright Ave La Verne GA 91750 Jel· 909 5961351 fax· 909 596 Zl66 By: Bob Project: Cal Comp USA BEAM contiguraoon: TYPE 1 SELECTIVE RACK DETERMINE ALLOWABLE MOMENT CAPACITT A) Check compression flange for local buckling (B2.1) W= C -2*t -2*r = 1.75 in -2*0.063 in -2*0.063 in = 1.498 in w/t= 23.78 !=lambda= [1.052/(k)A0.5] * (w/t) * (Fy/E)A0.5 = [J.052/(4)A0.5] * 23,78 * (55/29500)A0_5 = 0.54 < 0.673, Flange is fully effective B} check web for local buckling per section b2.3 fl{comp)= Fy*(y3/y2)= 48.73 ksi f2(tension)= Fy*(y1/y2)= 100.49 ksi V= f2/f1 = -2.062 k= 4 + 2*(1-V)A3 + 2*(1-V) = 67.54 fiat depth=w= yl +y3 Eq. B2.3-5 Eq. B2.3-4 Eq. 82.1-4 Eq. B2.1-1 = 2.998 in w/t= 47.58730159 OK !=lambda= [1.052/(k)A0.5] * (w/t) * (fl/E)A0.5 = [J.052/(67,54)A0_5] * 2,998 * (48.73/29500JA0_5 = 0.248 < 0.673 be=w= 2.998 in bl= be(3-V) = 0.592 b2= be/2 = 1.50 in bl +b2= 2.092 in > 0.979 in, Web is fully effective Determine effect of cold working on steel yield point (Fya) per section A7.2 Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1) C= 2*Lc/(Lf+2*Lc) = 0.165 in Eq 82.3-2 Project#: LV-053118-2 2.75in 0''" + T 1,625 In 3.250 in 1~ 0,063 In Beam= Intlk 32E 3 25Hx2 75Wx0 063"Thk Ix= 0,981 inA4 5x= 0.555 inA3 Veg= 2.145 in t= 0.063 in Bend Radius=r= 0.063 in Fy=Fyv= 55.00 ksi Fu=Fuv= 65.00 ksi E= 29500 ksi top fiange=b= 1.750 in bottom flange= 2.750 in Web depth= 3 ")C:f'l ;.., .....:.: Fy - f1(comp) m Lcorner=Lc= (p/2) * (r + t/2) 0.148 in Lfiange-top=Lf= 1.498 in m= 0.192*(Fu/Fy) -0.068 = 0.1590 (EQ A7.2-4) ""h l Be= 3.69*(Fu/Fy) -0.819*(Fu/Fy)A 2 -1. 79 = 1.427 since fu/Fv= 1.18 < 1.2 and r/t= l < 7 OK then Fye= Be* Fy/(R/t)Am (EQ A7.2-2) = 78.485 ksi Thus, Fya-top= 58.88 ksi (tension stress at top) Fya-bottom= Fya*Vcg/(depth -Veg) = 114.29 ksi (tension stress at bottom) Check allowable tension stress for bottom flange Lfiange-bot=Lfb= Lbottom -2*r*-2*t = 2.498 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.106 Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf = 57.49 ksi Fya= (Fya-top)*{Fyb/Fya-bottom) (EQ A7.2-3) = 29.62 ksi if F= 0.95 Then F*Mn=F*Fya*Sx=! 15.61 in-k ,, Ycg _+ f2(tens1on) yl= Vcg-t-r= 2.019 in y2= depth-Veg= 1.105 in y3= y2-t-r= 0.979 in Structural Engineering & Design Inc. 1815 Wright Ave La Yer•e CA 91750 re1· 909 5961351 fax· 909 596 7186 By: Bob BEAM RMI Section 5.2, PT II Section Project: Cal Comp USA Contiguration: TYPE 1 SELECTIVE RACK Beam= Jntlk 32E 3.25Hx2.75Wx0.063"Thk Ix=lb= 0.981 inA4 Sx= 0.555 inA3 t= 0.063 in Fy= Fyv= 55 ksi Fu= Fuv= 65 ksi Fya= 58.9 ksi E= 29500 ksi F= 225.0 L= 96 in Beam Level= 1 P=Product Load= 3,000 lb/pair D=Dead Load= 75 lb/pair 1. Check Bending Stress Allowable Loads Mcenter=F*Mn= W*L *W*Rm/8 Project#: LV-053118-2 2,75in v, ... 4 - 1 1,625 in T 3.250 in lt:z:==:'.J 0,063 in W=LRFD Load Factor= 1.2*D + 1.4*P+1.4*(0,125)*P FOR DL=2% of PL, RMI 2.2, item B W= 1.599 Rm= 1 · [(2*F*L)/(6*E*lb + 3*F*L)] 1 · (2*225*96 in)/[(6*29500 ksi*0.981 inA3)+(3*225*96 in)] = 0.819 if F= 0.95 Then F*Mn=F*Fya*Sx= 31.04 in-k Thus, allowable load per beam pair=W= F*Mn*8*( # of beams)/(L *Rm*W) = 31.04 in-k * 8 * 2/(96in * 0.819 * 1.599) = 3,951 Ib/pair allowable load based on bending stress Mend= W*L *(l-Rm)/8 = (3951 lb/2) * 96 in* (1-0.819)/8 = 4,291 in-lb @ 3951 lb max allowable load = 3,258 in-lb @ 3000 lb imposed product load 2. Check Deflection Stress Allowable Loads Dmax= Dss*Rd Rd= 1-(4*F*L)/(5*F*L + lO*E*Ib) = 1 -(4*225*96 in)/[(5*225*96 in)+(l0*29500 ksi*0.981 inA4)] = 0.783 in if Dmax= L/180 Based on l/180 Deflection Cnteria and Dss= 5*W*LA3/(384*E*lb) L/180= S*W*LA3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*L A2*Rd) = 384*0.981 inA4*2/[180*5*(96 in)A2*0.783) = 3,422 lb/pair allowable load based on deflection limits II ii 1111 I Ii ltll Ill II I II II IOI 1111111 I! 111111 II --~....,..:.=-c,c;----------- Beam length - 0 • Allowable Deflection= L/180 = 0.533 in Deflection at imposed Load= 0.468 in • • Thus, based on the least capacity of item 1 and 2 above: Allowable load= 3,422 lb/pair Imposed Product Load= 3,000 lb/pair Beam at Level 1 ._ ________ __. Beam Stress= 0.88 .Structural Engineering & Design Inc. 1815 Wright Ave I a Verne CA 9175• Tel· 9D9 5961351 Fax· 909 596 7186 By: Bob Project: Cal Comp USA Proiect #: LV-053118-2 4 Tab Beam to Column Connection Configuration: TYPE 1 SELECTIVE RACK Mconn max= (Mseismic + Mend-fixity)•0.70"'Rho = 11,209 in-lb Load at level 1 Connector Type= 4 Tab Shear Capacity of Tab Tab Length= 0.50 in Ashear= 0.5 in * 0.135 in = 0.0675 in"2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.0675in" 2 = 1,485 lb Bearing capacity of Tab Fy= 55,000 psi 4 /8" teal= 0.105 in Omega= 2.22 Fu= 65,000 psi a= 2.22 Bearing Length= 0.5000 In Pbearing= alpha * Fu * tab length * teal/Omega = 2.22 * 65000 psi* 0.5 in * 0.105 in/2.22 = 3,413 lb > 1485 lb Moment Capacity of Bracket Edge Distance=E= LOO in Tab Spacing= 2.0 in C= Pl+P2+P3+P4 tclip= 0.135 in = Pl+Pl '(4.5"/6.S"J+Pl '(LS"/6.S"J+Pl '(0.5"/6.5") = 2.154"" Pl Mcap= Sclip * Fbending = 0.1832 in"3 * 0.66 * Fy = 6,650 in-lb Pclip= Mcap/(2.154 * d) = 6650.16 in-lb/(2.154 * 0.5 in) = 6,175 lb C*d= Mcap = 2.154 Thus, Pl= 1,485 lb Mcann-allaw= (Pl *6.5"+Pl *(4.5"/6.5")*4.5" +Pl *(2.5"/6.5")2.5" +Pl *(0.5"/6.5'')*0.5"] = 1485 LB*[6.5" +( 4. 5"/6.5")*4.5" +(2.5"/6.5")*2.5" +(0.5"/6.5")*0.5"] = 15,764 in-lb > Mconn max, OK Stress= 0.71 type I select-Cal Comp Fy= 55,000 psi 5clip= 0.183 in"3 d= E /2 = 0.50 in 0 d Di. i G/1/2018 · .Structural Engineering & Design Inc. 1815 Wright Ave l a\/erne CA 91750 Tel· 9D9 596 1351 Fax· 909 596 7186 By: Bob Project: Cal Comp USA Project#: LV-053118-2 3 Tab Beam to Column Connection Configuration: TYPE 1 SELECTIVE RACK Mconn max= (Mseismic + Mend-fixity):te0,70"'Rho = 8,002 in-lb Load at level 2 rr .!!),-!II----• P1 Connector Type= 3 Tab Shear Capacity of Tab Tab Length= 0.50 in Ashear= 0.5 in * 0.135 in = 0.0675 in A 2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.0675inA 2 = 1,485 lb Bearing Capacity of Tab tcol= 0.105 in Omega= 2.22 Fy= 55,000 psi Fu= 65,000 psi a= 2.22 Pbearing= alpha * Fu * tab length * teal/Omega = 2.22 * 65000 psi * 0.5 in* 0.105 in/2.22 = 3,413 lb > 14B5 lb Moment Capacity ot Bracket Edge Distance=E= 1.00 in Tab Spacing= 2.0 in C= Pl+P2+P3 = Pl+Pl "'(2.5''/4.S")+Pl *(0.5"/4.5") = 1.667 "'Pl Mcap= Sclip * Fbending = 0.1832 inA3 * 0.66 * Fy = 6,650 in-lb Pclip= Mcap/(1.667 * d) i 4 3/8" 6" tclip= 0.135 in C*d= Mcap = 1.667 = 6650.16 in-lb/(1.667 * 0.5 in) = 7,979 lb Thus, Pl= 1,485 lb Mconn-allow= [Pl *4.S"+Pl *(2.5"/4.5")*2.5"+Pl *(0.5"/4.5")*0.5"] = 1485 LB*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.5"] = 8,828 in-lb > Mconn max, OK Stress= 0,91 type I select-Cal Comp Page tf,1.. of \ ) P2 l7 ... , -,-,------------------.... , .. C Bearing Length= 0.5000 in Fy= 55,000 psi Sclip= 0.183 inA3 d= E /2 = 0.50 in G/1/2018 · .Structural Engineering & Design Inc. 1815 Wright Aye La Verne CA 91750 Tel: 909 596 1351 Fax 909 596 7186 By: Bob Project: Cal Comp USA Project#: LV-053118-2 Transverse Brace Configuration: TYPE 1 SELECTIVE RACK Section Properties Diagonal Member= Mclx U515 Sgl L97xl.38x16ga(U80/31x) Horizontal Member= Mclx US15 Sgl L97xL38x16ga(U80/31x) r 1.%9,n -<=I Area= 0.228 in" 2 r min= 0.446 in Fy= 55,000 psi K= LO Qc= L92 f7178, " j_ Area= 0.228 in"2 r min= 0.446 in Fy= 55,000 psi K= LO Frame Dimensions Dia onal Member Bottom Panel Height=H= 68.0 in Frame Depth=D= 42.0 in Column Width=B= 2.7 in Clear Depth=D-8*2= 36.6 in X Brace= NO rho= LOO 1).'.J.()~,ds;lt)-c17l'o.f,"S+,a,j45u;;;•; 0 jLoad Case 6:: (1±0 tQatSds}D + /(0.85+0.14Sds)*B*P + [0.7*rho*E]<= 1.0, ASD Method Vtransverse= 1,205 lb Vb=Vtransv*0.7*rho= 1205 lb* 0.7 * 1 = 8441b Ldiag= [(D-B*2)A2 + (H-6"Y2]Al/2 = 72.0 in Pmax= V*(Ldiag/D) * 0.75 = 1,085 lb axi'al load on dia onal brace member Pn= AREA*Fn = 0.228 inA2 * 11177 psi = 2,545 lb Pallow= Pn/Q = 2545 lb /L92 = 1,326 lb Pn/Pallow= 0.82 Horizontal brace Vb=vtransv*0.7*rho= 844 lb <= 1.0 OK (kl/r)= (k * Ldiag)/r min = (1 x 72 in /0.446 in ) = 161.4 in Fe= pi A 2*E/(kl/r)A 2 = 11,177 psi Since Fe<Fy/2, Fn= Fe = 11,177 psi Vb B 'ff (kl/r)= (k * Lhoriz)/r min Fe= piA2*E/(kl/r)A2 = 32,811 psi Fy/2= 27,500 psi = (1 x 42 in) /0.446 in = 94.2 in Since Fe>Fy/2, Fn=Fy*(l-fy/4fe) Pn= AREA*Fn Pallow= Pn/Qc Typical ea•e1 Confiquration = 31,951 psi = 0.228inA2*31951 psi = 7,275 lb = 7275 lb /1.92 = 3,789 lb Pn/Pallow= 0.22 <= 1.0 OK type I select-Cal Comp Page ?D of \ ~ T l G/1/2018 · .Structural Engineering & Design Inc. 1815 Wright Aye I a Verne CA 91750 Tel· 909.596.1351 Fax 909 596 7186 By: Bob Project: Cal Comp USA Single Row Frame Overturning Configuration: TYPE 1 SELECTIVE RACK Loads Critical Load case(s): 1) RMI Sec 2,2, item 7: (0,9-0.2Sds)D + (0,9-0,20Sds)*B*Papp -E*rho Vtrans=V=E=Qe= 1,205 lb DEAD LOAD PER UPRIGHT=D= 225 lb PRODUCT LOAD PER UPRIGHT=P= 9,000 lb Papp=P*0,67= 6,030 lb Wst. LCl=Wstl=(0.74592*0 + 0.74592*Papp*l)= 4,665 lb Product Load Top Level, Ptop= 3,000 lb DL/Lvl= 75 lb Seismic Ovt based on E, l:(Fi*hi)= 253,856 in-lb heiohtidenth ratio= 5.7 in Al Fullv Loaded Rack Load case 1: Movt= L(Fi*hi)*E*rho = 253,856 in-lb Sds= 0,7704 (0,9-0,2Sds)= 0.7459 (0,9-0,2Sds)= 0.7459 B= L0000 rho= L0000 Frame Depth=Df= 42.0 in Htop-lvl=H= 240,0 in # Levels= 3 # Anchors/Base= 2 hn-48.0 in h=H+hn/2-264,0 in Mst= Wstl * Df/2 = 4665 lb * 42 in/2 -97,965 in-lb Project#: LV-053118-2 ~Il®lrl H h T STDE ELEVATION T= (Movt-Mst)/Df = (253856 in-lb -97965 in-lb)/42 in -3,712 lb Net Uplift per Column I Net Seismic Unlift-3 712 lb Strennth Level Bl Ton Level Loaded Onlv Load case 1: 0 Vl=Vtop= Cs * Ip * Ptop > = 350 lb for H/D >6.0 Movt= [Vl *h + V2 * H/2]*0.7*rho = 0,1926 * 3000 lb = 110,418 in-lb = 5781b T = (Movt-Mst)/Df Vleff= 578 lb Critical Level= 3 = (110418 in-lb -50517 in-lb)/42 in V2=VoL = Cs*Ip*D Cs*Ip= 0.1926 = 1,426 lb Net Uplift per Column = 43 lb Mst= (0.74592*D + 0.74592*Ptop*l) * 42 in/2 = 50,517 in-lb I Net Seismic Uolift-1 426 lb Strennth Level Anchor Check (2) 0.5'' x 3.25" Embed HILTI KWIKBOLT TZ anchor(s) per base plate. Special inspection is required per ESR 1917. Fully Loaded: Top Level Loaded: Pullout (apacity=Tcap= 1,961 lb LA City Jurisdiction? NO Shear Capacity=Vcap= 2,517 lb Phi= 1 (1856 lb/1961 lb)Al + (301 lb/2517 lb)Al = (713 lb/1961 lb)Al + (144 lb/2517 lb)Al = type I select-Cal Comp Page \\ of " 3 L07 0.42 Tcap*Phi= 1,961 lb Vcap*Phi= 2,517 lb <= L2 OK <= L2 OK G/1/2018 Structural Engineering & Design Inc. 1815WrightAye LaYerne CA91750Tel:9095961351 Fax·9095967186 By: Bob Project: Cal Comp USA Base Plate Configuration: TYPE 1 SELECTIVE RACK Section Baseplate= 7.283x5.118x0.394 Eff Width=W = 7.28 in Eff Depth=D = 5.12 in Column Width=b = 3.06 in Column Depth=dc = 2.69 in L = 2.11 in Plate Thickness=t = 0.394 in a = 2.64 in Anchor c.c. =2*a=d = 5.28 in N=# Anchor/Base= 2 Fy = 36,000 psi Project#: LV-053118-2 p Mb I b l+-L ---w Downaisle Elevation Down Aisle Loads load Case 5:: (1+0.105*Sds)D + 0.75*{(1.4+0.14Sds)*B*P + 0.7S*(0.7*rho*El<= 1.0, ASD Method COLUMN DL= 113 lb Axial=P= 1.080892 * 112.5 lb+ 0.75 * (1.507856 * 0.7 * 4500 lb) COLUMN PL= 4,500 lb = 3,684 lb Base Moment= 8,000 in-lb 1+0.105*Sds= 1.0809 1.4+0.14Sds= 1.5079 Mb= Base Moment*0.75*0.7*rho = 8000 in-lb * 0.75*0,7*rho = 4,200 in-lb B= 0.7000 Axial Load P = 3,684 lb Mbase=Mb = 4,200 Axial stress=fa = P/A = P/(D*W) = 99 psi Moment Stress=fb = M/5 = 6*Mb/[(D*BA 2] = 92.8 psi Moment Stress=fbl = fb-fb2 = 39.0 psi M3 = (l/2)*fb2'L *(2/3)'L = (l/3)*fb2*L A 2 = 80 in-lb 5-plate = (l)(tA2)/6 = 0.026 inA3/in fb/Fb = Mtotal/[(5-plate)(Fb)] 0.55 OK Tanchor = (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] = -1,537 lb No Tension Ml= wLA2/2= fa*LA2/2 = 220 in-lb Moment Stress=fb2 = 2 * fb * L/W = 53.8 psi M2= fbl *L A2)/2 = 87 in-lb Mtotal = Ml +M2+M3 = 387 in-lb/in Fb = 0.75*Fy = 27,000 psi F'p= 0.7*F'c = 1,750 psi Tallow= 1,961 lb OK OK in-lb Cross Aisle Loads Critlcalm,dcaseRM[Sec 2.1, /tem4:(1+0.JJSds)DL + (1+0.14SDS)Pl*0.75+EL'0.75 «• 1.0, A${)Method Check uplift load on Baseplate Eff, Effe Pstatic= 3,684 lb Movt*0.75*0.7*rho= 133,274 in-lb Frame Depth= 42.0 in P=Pstatic+Pseismic= 6,857 lb Pseismic= Movt/Frame Depth = 3,173 lb Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. When the base plate configuration consists of two anchor bolts located on either side f the column and a net i.pllft force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal o the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" b =Column Depth= 2.69 in L =Base Plate Depth-Col Depth= 2.11 in fa = P/A = P/(D*W) = 184 psi Sbase/in = (l)(tA2)/6 = 0.026 in A 3/in fb/Fb = M/[(5-plate)(Fb)] 0.59 type I select-Cal Comp OK M= wLA 2/2= fa*L A 2/2 = 410 in-lb/in Fbase = o. 75*Fy = 27,000 psi Page \ !.-of l_J ~ Uplift per Column= 3,712 lb Qty Anchor per BP= 2 Net Tension per anchor=Ta= 1,856 lb C= 2.11 in Mu=Moment on Baseplate due to uplift= Ta*c/2 fb Fb *O. 75= 0.411 = 1,959 in-lb Splate= 0.132 inA3 OK 6/1/2018 .Structural Engineering & Design Inc. 1815 Wright Ave La Verne CA 91750 Tel 909 5961351 fax: 909596 7186 By: Bob Project: Cal Comp USA Project#: LV-053118-2 Slab on Grade Configuration: TYPE 1 SELECTIVE RACK t y L SLAB ELEVATION a .I Baseplate Plan View Concrete fc= 2,500 psi tslab=t= 5.5 in teff= 5.5 in phi=0= 0.6 Soil fsoil= 750 psf Movt= 177,699 in-lb Frame depth= 42.0 in Sds= 0.770 0.2*Sds= 0.154 Base Plate Effec. Baseplate width=B"" 7 .28 in Effec. Baseplate Depth=D"' 5.12 in width=a= 3.06 in depth=b= 2.69 in ,= 0.600 ~=B/D= 1.423 F'cAQ.5= SO.DO psi Column Loads DEAD LOAD=D= 113 lb per column unfactored ASD load PRODUCT LOAD=P= 4,500 lb per column unfactored ASD load Papp= 3,015 lb per column P-seismic=E= (Movt/Frame depth) = 4,230 lb per column unfactored Limit State load B= 0.7000 rho= 1.0000 Sds= 0.7704 1.2 + 0.2*Sds= 1.3541 0. 9 -0.20Sds= 0.7459 Puncture Apunct= [(c+t)+(e+t)]*2*t = 220.83 in A 2 Fpunctl= [(4/3 + 8/(3*P)] *, *(F'cAQ.5) = 96.2 psi Fpunct2= 2.66 * /, * (F'c/\Q,5) = 79.8 psi Fpunct eff= 79.8 psi Slab Bendin Pse=DL+PL+E= 8,866 lb Asoil= (Pse*144)/(fsoil) = 1,702 in/\2 X= (L-y)/2 = 12.9 in Fb= S*(phi)*(fc)A0.5 = 150. psi type I select-Cal Comp midway dist face of column to edge of plate=c= 5.17 in midway dist face of column to edge of plate=e= 3.90 in Load case 1) (1.2+0.2Sds)D + (1.2+0.2Sds)*B*P+ rho*E RMI SEC 2.2EQTN s = 1.35408 * 113 lb+ 1.35408 * 0.7 * 4500 lb+ 1 * 4230 lb = 8,648 lb Load case 2) (D.9-0.2Sds)D + (0.9-0.2Sds)*B*Papp + rho*E RMI SEC 2.2EQTN, = 0.74592 * 113 lb+ 0.74592 * 0.7 * 3015 lb+ 1 * 4230 lb = 5,889 lb Load Case 3) 1.2*D + 1.4*P = 1.2*113 lb+ 1.4*4500 lb = 6,435 lb Load Case 4) 1.2*D + 1.0*P + LOE = 8,866 lb Effective Column Load=Pu= 8,866 lb per column L= (Asoil)AQ.5 = 41.26in M= w*x/\2/2 = (fsoil*xA 2)/(144*2) = 432.1 in-lb Page ('3 of 1) fv/Fv= Pu/(Apunct*Fpunct) 0.503 < 1 OK y= (c*e)AQ.S + 2*t = 15.5 in 5-slab= 1 *teffA 2/6 = 5.04 in/\3 fb/Fb= M/(5-slab*Fb) 0.571 < 1, OK RMI SEC 2.2 EQTN 1,2 >IC! Jta-11 Stt 9.2.l, EQtn9·5 G/1/2018 ProActive Fire Design & Consulting Cal Comp 1940 Camino Vida Roble Carlsbad, CA 43015 Blackdeer Loop #205, Temecula, CA 92590 Phone: (951) 296-FIRE / Fax: (951) 296-3473 Email: proactive.fd@verizon.net C-16#952372 HIGH PILE STORAGE TECHNICAL REPORT June 25, 2018 Report Prepared By: Voncdd, Wciftow NICET CERT#70305 C-16#952373 CBC2018-0391 1940 CAMINO VIDA ROBLE CAL-COMP USA HIGH PILE STORAGE RACKING 2120921300 7/18/2018 CBC2018-0391 TABLE OF CONTENTS L INTRODUCTION.............................................................................................................. 3 2. SUMMARY TABLE............................................................................................................ 4 3. BUILDING CONSTRUCTION, DESIGN, AND OCCUPANCIES................................. 5 3.1 BUILDING CONSTRUCTION & DESIGN....................................................................... 5 3.2 OCCUP ANCIES ...................................... .................................................................... 5 3.3 COMMODITIES.................................................................................................................... 5 3.4 STORAGE ARRANGEMENT ................................................................................................. 5 4. STORAGE REQUIREMENTS .......................................................................................... 6 4.1 AUTOMATIC FIRE SPRINKLER SYSTEM.......................................................... 6 4.2 ALARM/MONITORING............................................................................................... 6 4.3 BUILDING ACCESS/DOORS ....................................................................................... 6 4.4 SMOKEANOHEATVENTS............................................. ....................................... 6 5. CONCLUSION .................................................................................................................. 7 .ffl. ProActive Fire Design & Consulting.ffl. Ca/Comp Page 12 1940 Camino Vida Roble Carlsbad, CA INTRODUCTION The following is a high piled combustible storage code compliance report for Cal Comp. This report does not include the office area or any hazardous materials. This report is intended to help both the owners and the fire department in expediting plan review and effectively determining the requirements necessary to meet the Fire Code. This report is based on the 2016 Edition of the California Fire Code and Building Code, and the 2016 Edition ofNFPA 13, Standard for the Installation of Fire Sprinkler Systems. DISCLAIMER This report is the property of ProActive Fire Design and Consulting and was prepared exclusively for use by Cal Comp for the storage and occupancy conditions described in this report. Cal Comp conditions and operations addressed herein are based on information provided to the report by Cal Comp. Discrepancies between the information presented herein and actual conditions and conditions presented on plans are the sole responsibility of Cal Comp. Copies of this report retained by Cal Comp shall be utilized only by Cal Comp for the storage and occupancy conditions and the 2016 California Fire Code conditions and requirements addressed in this report. This report shall not be used for the purpose of construction for this project or any other project or for any other purpose . .m. ProActive Fire Design & Consulting .m. Cal Comp Page 13 1940 Camino Vida Roble Carlsbad, CA 2. SUMMARY TABLE TOPIC CODE SECTION CRITERIA/REQUIREMENTS Construction Type Existing Building-Concrete tilt up walls with a plywood deck on open web steel bar joist framed onto steel girders. Maximum Roof Height 26'-0" Square Footage High Pile Storage Area: Approx. 2,800 sq. ft. Non-Public Accessible Haz/Materials NIA Not Annlicable. Not part of the scone of this reoort. Storage Commodity NFPA Table A5.6.3 Commodities: Flat Cardboard Cartons -Class JV Electronic Circuits in plastic cases within boxes Cartoned Unexpanded Group A Plastics. All finished products are cartoned and nonencapsulted Occupancy Classified as Cartoned Unexpanded Group A Plastic Max Storal!e Height to 23'-0" Commoditv Class CFC Table 3206.2 High Hazard 2,501 -300,000 sa. ft. Nonoublic accessible Storage Method NFPA 3.9.3.7.1 Double Row Rack Open Shelfs NFPA 3.9.3.7.7 Single Row Racks Open Shelfs Minimum 13 '-6" Aisles Automatic Sprinkler CFC Table 3206.2 Required for High Hazard Commodities 2,50 I -300,000 Protection sa. ft. All Non-Public Accessible. Fire Detection System CFC Table 3206.2 Not Required for High Hazard Commodities 2,501 - 300,000 sa. ft. All Non-Public Accessible. Building Access CFC Table 3206.2 Required for High Hazard Commodities 2,501 -300,000 sa. ft. All Non-Public Accessible. Smoke and Heat Removal CFC Table 3206.2 Required for High Hazard Commodities 2,501 -300,000 sq. ft. All Non-Public Accessible . .ffl. ProActive Fire Design & Consulting.ffl. Ca/Comp Page 14 1940 Camino Vida Roble Carlsbad, CA 3. BUILDING CONSTRUCTION AND OCCUPANCY 3.1 BUILDING CONSTRUCTION Cal Comp occupies a single-story warehouse with concrete tilt up walls, with a plywood deck on open web steel bar joist framed onto open web steel girders. The high point of the roof is 26' -0". 3.2 OCCUPANCIES Cal Comp is an electronic manufacture. The finished products are received in the warehouse and stored on racks for shipping and distribution. 3.3 COMMODITIES The commodities consist of flat carboard boxes for packaging as well as electronics in plastic cases in boxes then packed in cardboard boxes. All finished commodities are cartoned and nonencapsulted. The facility will be protected for 23'-0" of Cartoned Non expanded Group A with a 26'-0" roof. 3.4 STORAGE ARRANGMENT Area: Commodities: Method: Aisles: Shelves: Flue Spaces: Storage Height: Deflector Distance: CalComp 1940 Camino Vida Roble Carlsbad, CA 2,800 square feet Flat Cardboard Boxes -Class IV Electronics in plastic cartons in cardboard boxes Cartoned Nonexpanded Group A Plastics Double Row Racks as defined by NFPA 3.9.3.7.1 Single Row Racks as defined by NFPA 3.9.3.7.7 Minimum 13' -6" Open Shelves CFC Table 3208.3 Storages 25' Option #1 3" transverse flue spaces are required for single row racks. No longitudinal flue spaces are required for single row racks 6" transverse flue spaces are required for double row racks No longitudinal flue spaces are required for double row racks NFPA 13 Section 17.1.9 Flue Space Requirements: Section 17.1.9.1 No longitudinal flue space is required for single and double row racks Section 17.1.10.1.1 Nominal 6" transverse flue spaces between loads and at rack uprights are required for single and double row racks. 6" transverse flue spaces shall be provided as required for each rack. Stickers shall be placed on the racks to indicate required flue space locations The proposed maximum storage height is 23'-0". A minimum of 36" clearance will be maintained between the top of storage and sprinkler deflectors. ffi.ProActive Fire Design & Consultingffi. Pagel5 4. STORAGE REQUIREMENTS 4.1 AUTOMATIC FIRE SPRINKLER SYSTEM The building is supplied by an 8" underground that feeds a single 6" riser. The storage area is protected by a wet pipe gridded system with ULTRA K-17 214 ° Control Mode upright sprinklers spaced at approximately 96 square feet. The hydraulic data card indicates that the system is designed for .80 / 2000 with 1757.0 gpm@ 53 psi at the base of the riser. The pressure on the riser gauge indicated that there was 115 psi on the system. Storage Area Ceiling Sprinkler Design Cartoned Unexpanded Group A: Design Criteria: Storage up to 25' with < 5' clearance Figure 17.2.1.2.l(e) Note #2 .80 / 2000 with K-16.8 storage sprinklers Hose Allowance: 500 gpm combined inside and outside per Table 12.8.6 4.2 FIRE DETECTION Per Table 3206.2 Fire Detection is not required for High Hazard 2,501 -300,000 sq. ft. Nonpublic Accessible. Per CFC 903 .4, all valves and risers have existing monitoring and meet this standard and shall remain. 4.3 BUILDING ACCESS/DOORS Per Table 3206.2 Building access is required for High Hazard 2,501 -300,000 sq. ft. Nonpublic Accessible. The original building and high pile storage permit was designed to include access that will remain as is. 4.4 SMOKE AND HEAT VENTS Per Table 3206.2 Smoke and heat Vents are required for High Hazard 2,501 -300,000 sq. ft. Nonpublic Accessible. The building and high pile storage permit was originally designed to include smoke and heats vents that will remain as is. .ffl. ProActive Fire Design & Consulting.ffl. Cal Comp Page 16 1940 Camino Vida Roble Carlsbad, CA 5. CONCLUSION The building fire features meet CFC Chapter 32 and NFPA 13 requirements for the commodities and method of storage should be acceptable without any modifications or changes. Please feel free to call with any questions. f ProActive Fire Design & Consultingf CalComp Page [7 1940 Camino Vida Roble Carlsbad, CA High Pile Storage (HPS) Required Information The following information shall be completed and copied onto the HPS plans: Commodity Classification: 0 I O II O Ill O IV (2!: High Hazard !]I Group A plastic Commodity detailed description: ELECTRONICS WITH PLASTIC CASES IN CARDBOARD BOXES For Group A Plastics where the commodity classification Is not High Hazard complete the following: Expanded plastic: Percent by volume: __ %. Percent by weight: ___ % Non-expanded plastic: Percent by weight: ___ % Packaging consist of: ____________________________ _ f2ll Cartoned O Free flowing [3 Non-expanding O Encapsulated [X Non-encapsulated . •Other ___________________________ _ The maximum storage height (solid pile _____ rack _2_3_' --~ The following storage methods are employed at this facility (mark all that apply): •Solid pile storage 12l!Palletized i]ISlngle row rack [lJbouble row rack •Multi-row rack •Other ___________________________ _ Rack storage shelf: D N/A D Load beam only !]I Wire mesh •Wood slates D Plywood D Other (Describe): _________________ _ The area designated in the building and used for high piled storage Is 2,800 square feet. CLASS GRP A commodity, 2 800 sq ft. CLASS ____ .commodity, _____ sq ft. CLASS ---,---,--...,.commodity, ____ sq ft. [211 Smoke vents required D No l2ll Yes Fusible link 314 degree F. D Draft Curtains Required? D Yes Qi NO The overhead fire sprinkler system utilizes the following heads: • ESFR: K __ at~-~~ PSI with ~~~F' heads IXIStandard Coverage Heads: K__!2___ D Pendant C!l' Upright --11! degree with a density of RO gpm over 2000 square feet spaced at a maximum of I 00 square feet per fire sprinkler. NFPA13DeslgnTable: FIG 172 12 J(E) Curve:_N_O_T_E_#_2 _____ _ Minimum distance between top of storage and sprinkler deflector: ~3-' __ Feet In-rack sprinklers required D Yes· [l!: No D There is/are "'7'--c--__ level(s) of in~rack fire sprinkler protection. Aisle width: 13'-6" feet. l]l Fire access doors required? l]l Yes (Maximum distance of 100 lineal feet) •No ISi Flue spaces required? l]l Yes •No [l: Flue space between racks shall be maintained a minimum of: Transverse --1:,__" clear. D Must be vertically aligned (for storage >25'} Longitudinal _1J __ " clear D Column protection required? D Yes [JNo D Pallet Slops Required? •Yes i]INo Longitudinal pallet stop configuration: D Chain Link D Roll Form D "C" Channel D other: _______ _ Transverse Flue Pallet Stop configuration: · D Mechanical means (flue keepers, etc.) El Load beam markings "Keep Clear" Hand Stack? D No D Yes # of tiers: ___ Chain link required D No D Yes SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY RECORD ID# _________________ 1 PLAN CHECK # _________________ 1 BP DATE Business Name Cal-Com USA Business Contact Telephone# Project Address (include suite) 1940 Camino Vida Roble City Carlsbad Zip Code 92008 APN# 2 2-0 Mailing Address (include suite} 1940 Camino Vida Roble City Carlsbad Occupancy Rating: Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 2, Compressed Gases 5, Organic Peroxides 9. Water Reactives 6. Oxidizers 10. Cryogenics 13. Corrosives 14. Other Health Hazards a, None of These. 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II· SAN QJEGQ COUNTY QEPjBJMENT Q~ ENVlflQNMENTAL tt7t.LTH -gne,RD~~~Rl~S QIYISIDN IHMDI; If the answer to any of the questions Is yes, applicant must contithe County O San Diego Hazardous 7terlalslvlsion:88nd~venue, Suite f1o:San Diego, CA 92123. Call (858) 505""6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: • CalARP Exempt 1. 2. 3. 4. 5. 6. 7. 8. YES NO (for new construction or remodeling projects) / D ,5 is your business listed on the reverse side of this form? (check all that apply), Date Initials D 0""" Will your business dispose of Hazardous Substances or Medical Waste in any amount? D B Will your business store or handle Hazardous Substances In quantities greater than or equal to 55 gallons, 500 ,,,,,:r pounds and/or 200 cubic feet? D (U Will your business store or handle carcinogens/reproductive toxins in any quantity? D 0' Will your business use an existing or install an underground storage tank? D Z Will your business store or handle Regulated Substances (Ca)ARP)? D g Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? 0 .la'" Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or reater than 1 320 aUons? California's Above round Petroleum Stora e Act. . • CalARP Required Date Initials 0 CalARP Complete I Date Initials R C D • The following questions are intended to identify the majority of air pollution ssues at the p ann1ng stage. Your p may require a ional measures not Identified by these questions. Some residential projects may be exempt from APCD requirements. For more compre enslve requirements, please contact APCD at apcdcomp@sdcounty.ca.qov; (858) 586-2650: or 10124 Old Grove Road, San Diego, CA 92131. YES NO 1. D J2r Will the project disturb 100 square feet or more of existing building materials? 2. D f:r Will any load supporting structural members be removed? If yes, contact APCD prior to issuance of a building or demolition permit A 3. 4. 5. 6. • • • • notification may be required at least 10 working days prior to commencing demolition. ~ (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been pertormed by an individual that has passed an EPA-approved building inspector course? -tf (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, contact APCD prior to the issuance of a building or demolition permit A notification may be required at least 10 working days prior to commencing asbestos removal. p Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typicat equipment requiring an ..../ APCD permit. If yes, contact APCD prior to the issuance of a building permit. -t'.I (ANSWER ONLY IF QUESTION 515 YES) Will the project or associated construcNon equipment be located within 1,000 feet of a school bounda to the best of my knowledge and belief t FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________ ---,-______________ _ BY· DATE· / / EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO• APCD COUNTY-HMD APCD COUNTY-HMO APCD *A stamp in this box only exempts busmesses from completing or updatmg a Hazardous Materials Business Plan. Other permitting requirements may still apply HM-91711121171 County of San Diego -DEH -Hazardous Materials Division