HomeMy WebLinkAbout1941 CASSIA RD; BLDG 9; CB032984; Permit04-08-2004
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
04/08/2004
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB032984
Building Inspection Request Line (760) 602-2725
1941 CASSIA RDCBAD
RESDNTL
2150201300
$920,424.00
10
26
Sub Type: APT
Lot #: 0
Construction Type: V1
Reference #: A9804388
Structure Type: MF5+
Bathrooms: 20
MANZANITA APTS-BLDG 9-10 UNIT
11,498 SF, 1128 SF DECK.UNITS 100-103,200-203,300-301 Plan Check#:
Status: ISSUED
Applied: 10/30/2003
Entered By: RMA
Plan Approved:
Issued: 04/08/2004
Inspect Area:
Orig PC#: PC030036
Applicant:
MANZANITA PARTNERS L L C
ATTN: KIM ROTH
1764 SAN DIEGO AVE
SAN DIEGO CA 92110
Owner:
MANZANITA PARTNERS L L C 9588 04/08/04
ATTN: KIM ROTH
1764 SAN DIEGO AVE
SAN DIEGO CA 92110
000201
CGP
02
128361«15
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$2,877.37 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$1,870.29 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$92.04 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$0.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$59,400.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing InLieu Fee
Housing Credit Fee
$0.00 Master Drainage Fee
$0.00 Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$18,787.73
$16,751.72
$0.00
$0.00
$0.00
$3,840.00
$0.00
$0.00
$954.00
$810.00
$378.00
$0.00
$0.00
$0.00
$0.00
$22,600.00
$0.00
$128,361.15
Total Fees: $ 128,361.15 Total Payments To Date:$0.00 Balance Due: $128,361.15
Inspector:
FINAL APPROVAL
Date: Z^ f? -Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
CltyifGirisbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspedieor __
By: l>/^~<
Inspected
By:
Inspected
Bv:
Comments:
CB032984
MANZANITA APTS-BLDG 9-10 UNIT
11,498 SF, 1128 SF DECK.UNITS 100-103,
1941 CASSIA RD
GABRIEL Phone: 6197267591
CA /I Water Dist: CA
^n Date /CA AS** Inspected: £/{&/t/ V V
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
200-203,300-3
Lot: 0
,
0> Approved: ^
Approved:
Approved:
05/13/2005
RESDNTL
APT
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 05/16/2005
Permit# CB032984
Title: MANZANITA APTS-BLDG 9-10 UNIT
Description: 11,498 SF, 1128 SF DECK.UNITS 100-103,200-203,300-301
Inspector Assignment: RB
1941 CASSIA RD
Lot
Type: RESDNTL Sub Type: APT
Job Address:
Suite:
Location:
APPLICANT MANZANITA PARTNERS L L C
Owner:
Remarks:
Phone: 6197267591
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: GARBIEL
Entered By: KAREN
Act Comment
Associated PCRs/CVs
Inspection History
Date Description
05/13/2005 89 Final Combo
05/12/2005 23 Gas/Test/Repairs
04/28/2005 89 Final Combo
04/26/2005 23 Gas/TesVRepairs
04/25/2005 23 Gas/Test/Repairs
04/18/2005 23 Gas/Test/Repairs
04/18/2005 39 Final Electrical
04/15/2005 39 Final Electrical
04/13/2005 39 Final Electrical
04/12/2005 31 Underground/Conduit-Wiring
04/12/2005 39 Final Electrical
04/11 /2005 17 Interior Lath/Drywall
04/11/2005 31 Underground/Conduit-Wiring
03/29/2005 17 Interior Lath/Drywall
01/26/2005 17 Interior Lath/Drywall
01/25/2005 17 Interior Lath/Drywall
Act Insp Comments
NS RB
NS PD WRONG ADDRESS
CO RB
AP RB
NR RB
CA RB
WC RB
AP RB ON HOUSE PANEL ONLY - RELEASED YESTERDAY
AP RB
AP RB UNDRG TO EXT. LIGHTS OK
NS RB
AP RB FIRE CAULKING ON 4/6/05
CO RB NEED MIN. 18IN DEPTH
NR RB ON FIRE CAULKING @ TUBS
AP RB
PA RB MISSING FIRE CAULKING @ 1HR WALLS
GEOTECHNICAL EXPLORATION, INC.
SOIL & FOUNDATION ENGINEERING
GROUNDWATER • ENGINEERING GEOLOGY
FIELD REPORT ON OBSERVATION OF FOUNDATIONS DATE:
TIME:' V5"*
CLIENT: Lx» r+'fl^JOB NO.IK- ?35"fe
PROIECTNAME: '4 U^z^ 4- lA-fh>
PROJECT ADDRESS: /*?#/ (f^iS-, A\J (U-kL'J
D
The footing excavations listed below were bottomed on material for which the bearing values
recommended in the foundation report are applicable.
The cast-in-place drilled friction piles listed below penetrated material for which the
allowable supporting capacities recommended in the foundation report are applicable. The
piles were excavated to diameters at least as large as specified and the excavations extended
at least to the depths indicated on the Foundation Plans.
The excavations for the cast-in-place belled piers listed below were bottomed on material for
which the bearing values recommended in the foundation report are applicable. The
excavations were at least as large as specified on the Foundation Plans.
The driven piles listed below were observed to be driven to the specified lengths and/or
driving resistances to obtain the supporting capacities recommended in the foundation
report.
Based upon observations, it is our opinion that the foundation recommendations presented in the
report of the foundation investigation, Job No. ' o ' '^ 4. . dated Sr/2-?/^fr_ ({are)/(a*e~
-mot) applicable to the conditions observed. Foundation Plans hy H^^^- f-* I c- y t*~ ,
'" A' /fa ? were used as a reference for our observations.
J^'-r<f.T - ' ^4- o-'T-
» -li C /-- ' —/V
-J
NOTE:
1.
2.
3.
The observations reported above do not constitute an approval of foundation location,
footing size or depth, reinforcement, or foundation design.
Loose, soft, or disturbed soils must be removed prior to placement of reinforcement or
concrete.
The opinions and recommendations presented in this report were based upon our observa-
tions and are presented in accordance with generally accepted professional engineering
practice. We make no other warranty, either express or implied.
7420 Trade St. San Diego, Ca. 92121 • (858) 549-7222 • FAX: (858) 549-1604 ^