Loading...
HomeMy WebLinkAbout1945 DOVE LN; ; CB032197; Permit08-28T2003 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit PermitNo: CB032197 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 08/28/2003 # Dwelling Units: Bedrooms: Project Title: 1945 DOVE LN CBAD RESDNTL $3,122,001.00 Sub Type: Lot#: Construction Type: Reference #: APT 0 NEW CT99-03 33 structure Type: MF5+ 87 Bathrooms: 54 LA COSTA GRNS BLDG 3 33 UNTS 36224SF HAB 4878SF CARPORTS 5651 SF DECK Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 08/08/2003 SB Plan Approved: 08/28/2003 PC03-06 Applicant: ALLGIRE GNRL CONTRACTORS INC 5055 AVENIDA ENCINAS CARLSBAD, CA 92008 619-431-2999 Owner: REAL ESTATE COLLATERAL MANAGEMENT CO C/O LIZ LAYMAN/ MORROW DEV 1903 WRIGHT PL #180 CARLSBADCA 92008 Building Permit $7,352.04 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $4,778.83 Meter Fee $0.00 Add'l Plan Check Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $76,063.00 Strong Motion Fee $312.20 PFF $56,820.42 Park in Lieu Fee $0.00 PFF (CFD Fund) $0.00 Park Fee $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFD Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $12,474.00 Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $1,729.00 Renewal Fee $0.00 ELECTRICAL TOTAL $510.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $663.00 Other Building Fee $0.00 Housing Impact Fee $0.00 PoL Water Con. Fee $0.00 Housing InLieu Fee $0.00 Meter Size Housing Credit Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Reel. Water Con. Fee $0.00 Sewer Fee $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $160,702.49 Total Fees: $160,702.49 Total Payments To Date: $0.00 Balance Due: $160,702.49 3027 08/29/03 0002 01 02 CGR 160702.49 Inspecto FINAL APPROVA!., Date: ^ ' '^ Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this pennit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infoimation with the City Manager for processing In accordance with Carlsbad Municipal Code Section 3,32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exacttons DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or sen/Ice fees in connection with this project. NOR DOES JT APPLY to any fees/exacttons of which vou have oreviouslv been oiven a NOTICE similar to this, or as to which the statute of limitations has previouslv othenwise expired. §ltyif6irtsliid Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Plan Check #: Permit #: Project Name: Address: Contact Person: Sewer DIst: CB032197 LA COSTA GRNS BLDG 3 33 UNTS 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100-10 1945 DOVELN Lot: ALGIRE Phone: 7608043952 LC Water Dist: CA Permit Type: Sub Type: 01/26/2005 RESDNTL APT Inspected By: Inspected By: Inspected By: hspected: ^/^J^rT^Approved: _±1 _ Disapproved: Date Inspected: Approved: Disapproved: Date Inspected: Approved: Disapproved: Comments: Inspection List Permit#: CB032197 Type: RESDNTL APT LA COSTA GRNS BLDG 3 33 UNTS 36224SF HAB 4878SF CARPORTS 5651 SF Date Inspection Item Inspector Act Comments 03/29/2005 89 Final Combo PD AP 03/29/2005 89 Final Combo -Rl 01/31/2005 89 Final Combo PD NR 01/26/2005 89 Final Combo PD NR 12/02/2004 39 Final Electrical PD AP NEED UNIT NUMBERS FOR METER RELEASE 09/22/2004 82 Drywall/Ext Lath/Gas Test PD AP 3RD FLR 09/20/2004 17 Interior Lath/Drywall PD AP 1ST, 2ND FLR 09/20/2004 18 Exterior Lath/Drywall PD NR 09/20/2004 23 Gas/Test/Repairs PD NR 09/17/2004 17 Interior Lath/Drywall PD NS 09/16/2004 16 Insulation PD NR 09/13/2004 16 Insulation PD NS 09/09/2004 84 Rough Combo PD AP 09/07/2004 84 Rough Combo PD AP 2ND FLR 09/02/2004 16 Insulation PD AP 09/02/2004 84 Rough Combo PD NR 09/01/2004 16 Insulation PD NR 09/01/2004 84 Rough Combo PD NR 08/31/2004 84 Rough Combo PD CA 08/30/2004 84 Rough Combo PD PA 08/26/2004 84 Rough Combo PD PA 1ST FLR 08/25/2004 22 Sewer/Water Sen/ice PD NR 08/24/2004 84 Rough Combo PD NR 08/09/2004 17 Interior Lath/Drywall PD NR 08/06/2004 18 Exterior Lath/Drywall PD NR 08/03/2004 17 Interior Lath/Drywall PD NR 08/02/2004 18 Exterior Lath/Drywall PD NS 07/29/2004 13 Shear Panels/HD's PD NS 07/27/2004 84 Rough Combo PD NR 07/26/2004 17 Interior Lath/Drywall PD PA BEHIND TUBS 07/23/2004 17 Interior Lath/Drywall PD NR 07/23/2004 27 Shower Pan/Roman Tubs PD NR 07/20/2004 13 Shear Panels/HD's PD AP 3RD FLR 07/20/2004 13 Shear Panels/HD's PD NS 07/19/2004 13 Shear Panels/HD's PD NR 07/15/2004 13 Shear Panels/HD's PD PA DBL WALLS 07/14/2004 13 Shear Panels/HD's PD PA 2ND FLOOR 07/14/2004 16 Insulation PD PA 2ND FLR 07/13/2004 13 Shear Panels/HD's PD PA 07/13/2004 14 Frame/Steel/Bolting/Weldin PD PA 07/13/2004 16 Insulation PD PA 07/12/2004 13 Shear Panels/HD's PD NS NO INSPECTOR AVAILABLE 07/12/2004 14 Frame/Steel/Boltlng/Weldin PD NS Wednesday, Marcti 30, 2005 Page 1 of 3 07/12/2004 16 Insulation PD NS 07/09/2004 13 Shear Panels/HD's PD NS 07/08/2004 14 Frame/Steel/Bolting/Weldin PD PA DROPS @ 4-B 2ND FLR 07/07/2004 14 Frame/Steel/Bolting/Weldin PD NS 07/06/2004 14 Frame/Steel/Bolting/Weldin PD PA DBL SHR. WALLS 07/06/2004 16 Insulation PD PA 07/02/2004 14 Frame/Steel/Bolting/Weldin PD CA DONE ON 7/1 07/01/2004 84 Rough Combo PD PA DROPS 06/30/2004 84 Rough Combo PD PA PRELIM FRAMING 06/29/2004 14 Frame/Steel/Bolting/Weldin PD PA AT DROP AREAS OF A 1ST FLR 06/28/2004 22 Sewer/Water Service PD WC 06/28/2004 24 Rough/Topout PD AP 06/25/2004 22 Sewer/Water Service PD WC 06/25/2004 24 Rough/Topout PD AP C 06/18/2004 22 Sewer/Water Service PD NR 06/17/2004 15 Roof/Reroof PD PA 06/17/2004 22 Sewer/Water Service PD NR 06/17/2004 24 Rough/Topout PD NR 06/16/2004 13 Shear Panels/HD's PD NS 06/16/2004 14 Frame/Steel/Bolting/Weldin PD NS 06/16/2004 22 Sewer/Water Service PD NS 06/14/2004 13 Shear Panels/HD's PD PA 1ST FLR 06/14/2004 18 Exterior Lath/Drywall PD WC 06/03/2004 15 Roof/Reroof PD CA 05/03/2004 14 Frame/Steel/Bolting/Weldin PD PA FLR 04/29/2004 14 Frame/Steel/Bolting/Weldin PD PA 2 FLR SHT 04/29/2004 14 Frame/Steel/Bolting/Weldin PD NS 04/15/2004 14 Frame/Steel/Bolting/Weldin PD PA FLR SHTING 04/15/2004 15 Roof/Reroof PD WC 04/14/2004 14 Frame/Steel/Bolting/Weldin PD PA FLR SHTING 04/14/2004 15 Roof/Reroof PD WC 04/12/2004 14 Frame/Steel/Bolting/Weldin PS AP SEE "C" FLR NAIL 03/16/2004 22 Sewer/Water Service PD WC 03/16/2004 23 Gas/Test/Repairs PD AP TEST-WEST SIDE 03/15/2004 23 Gas/Test/Repairs PD PA START TEST 03/11/2004 23 Gas/Test/Repairs PD AP 24hr test 03/10/2004 23 Gas/Test/Repairs PD PA START 24 HR TEST 02/24/2004 12 Steel/Bond Beam PD NR 02/12/2004 11 Ftg/Foundation/Piers PD AP LIGHT POLE FTGS 02/09/2004 11 Ftg/Foundation/Piers PS AP PAD FTGS 02/02/2004 12 Steel/Bond Beam PD PA 01/23/2004 21 Underground/Under Floor PD AP 01/23/2004 22 Sewer/Water Service PD AP 01/20/2004 11 Ftg/Foundation/Piers PD CA 01/07/2004 22 Sewer/Water Sen/ice PD NR 11/24/2003 22 Sewer/Water Sen/ice PD PA WATER PIPING 11/18/2003 11 Ftg/Foundation/Piers PD AP 11/14/2003 11 Ftg/Foundation/Plers PD AP A&B 11/13/2003 11 Ftg/Foundation/Piers PD CO 11/12/2003 31 Underground/Conduit-Wirin PD CA 11/10/2003 31 Underground/Conduit-Wirin PD NR Wednesday, Marcti 30, 2005 Page 2 of 3 10/21/2003 11 Ftg/Foundatlon/Piers PD AP PAD FTGS to/17/2003 11 Ftg/Foundation/Piers PD NR 10/17/2003 21 Underground/Under Floor PD AP 10/17/2003 22 Sewer/Water Service PD NR Wednesday, Marcti 30, 2005 Page 3 of 3 City of Carlsbad BIdg Inspection Request For: 03/29/2005 Permit* CB032197 Title: LA COSTA GRNS BLDG 3 33 UNTS Inspector Assignment: PD Description: 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100- 108,200-214,300-308 Type: RESDNTL Sub Type: APT Job Address: 1945 DOVELN Suite: Lot 0 Location: APPLICANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: Phone Inspecto, Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs Requested By: ALGIRE Entered By: CHRISTINE Act Comment Inspection Historv Date Description Act Insp Comments 01/31/2005 89 Final Combo NR PD 01/26/2005 89 Final Combo NR PD 12/02/2004 39 Final Electrical AP PD NEED UNIT NUMBERS FOR METER RELEASE 09/22/2004 82 Drywall/Ext Utfi/Gas Test AP PD SRD FLR 09/20/2004 17 Interior Latti/Drywall AP PD 1ST, 2ND FLR 09/20/2004 18 Exterior Lath/Drywall NR PD 09/20/2004 23 Gas/Test/Repairs NR PD 09/17/2004 17 Interior Lath/Drywall NS PD 09/16/2004 16 Insulation NR PD 09/13/2004 16 Insulation NS PD 09/09/2004 84 Rough Combo AP PD 09/07/2004 84 Rough Combo AP PD 2ND FLR 09/02/2004 16 Insulation AP PD 09/02/2004 84 Rough Combo NR PD 09/01/2004 16 Insulation NR PD 09/01/2004 84 Rough Combo NR PD City of Carlsbad BIdg Inspection Request For: 12/01/2004 Inspector Assignment: PD Permit* CB032197 Title: LA COSTA GRNS BLDG 3 33 UNTS Description: 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100- 108,200-214,300-308 • Type: RESDNTL Sub Type: APT Job Address: 1945 DOVE LN V^.'^A.. Suite: Lot 0 Location: OWNER REAL ESTATE COLLATERAL MANAGEMENT CO Owner: Remarks: emr at bidg 3 Phone: 7608043952 Inspecfon Total Time: CD Description 39 Final Electrical Requested By: ALGUIRE Entered By: CHRISTINE Act Comment Associated PCRs/CVs Inspection Historv Date Description Act Insp 09/22/2004 82 Drywall/Ext Lath/Gas Test AP PD 09/20/2004 17 Interior Lath/Drywall AP PD 09/20/2004 18 Exterior Lath/Drywall NR PD 09/20/2004 23 Gas/Test/Repairs NR PD 09/17/2004 17 Interior Latti/Drywall NS PD 09/16/2004 16 Insulation NR PD 09/13/2004 16 Insulation NS PD 09/09/2004 84 Rough Combo AP PD 09/07/2004 84 Rough Combo AP PD 09/02/2004 16 Insulation AP PD 09/02/2004 84 Rough Combo NR PD 09/01/2004 16 Insulation NR PD 09/01/2004 84 Rough Comtio NR PD 08/31/2004 84 Rough Combo CA PD 08/30/2004 84 Rough Combo PA PD 08/26/2004 84 Rough Combo PA PD 08/25/2004 22 Sewer/Water Sen/ice NR PD 08/24/2004 84 Rough Combo NR PD 08/09/2004 17 Interior Lath/Drywall NR PD 08/06/2004 18 Exterior Lath/Drywall NR PD 08/03/2004 17 Interior Lath/Drywall NR PD 08/02/2004 18 Exterior Lath/Drywall NS PD Comments SRD FLR 1ST, 2ND FLR 2ND FLR 1ST FLR City of Carlsbad BIdg Inspection Request For: 03/16/2004 Permit* CB032197 Title: LA COSTA GRNS BLDG 3 33 UNTS Inspector Assignment: PD Description: 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100- 108,200-214,300-308 Type: RESDNTL Sub Type: APT Job Address: 1945 DOVE LN Suite: Lot 0 Location: APPLICANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: 24 liour plumbing test Phone: 76080439 Inspectors Total Time: CD Description 22 Sewer/Water Service Requested By: TIM Entered By: CHRISTINE Act Comment Associated PCRs/CVs Inspection Historv Date Description Act Insp Comments 03/11/2004 23 Gas/Test/Repairs AP PD 24hr test 03/10/2004 23 Gas/Test/Repairs PA PD START 24 HR TEST 02/24/2004 12 Steel/Bond Beam NR PD 02/12/2004 11 Ftg/Foundation/Piers AP PD LIGHT POLE FTGS 02/09/2004 11 Ftg/Foundation/Piers AP PS PAD FTGS 02/02/2004 12 Steel/Bond Beam PA PD 01/23/2004 21 Underground/Under Floor AP PD 01/23/2004 22 Sewer/Water Service AP PD 01/20/2004 11 Ftg/Foundation/Piers CA PD 01/07/2004 22 Sewer/Water Service NR PD 11/24/2003 22 Sewer/Water Service PA PD WATER PIPING 11/18/2003 11 Ftg/Foundation/Piers AP PD 11/14/2003 11 Ftg/Foundation/Piers AP PD A&B 11/13/2003 11 Ftg/Foundation/Piers CO PD 11/12/2003 31 Underground/Conduit-Wiring CA PD 11/10/2003 31 Underground/Conduit-Wiring NR PD 10/21/2003 11 Ftg/Foundation/Piers AP PD PAD FTGS 10/17/2003 11 Ftg/Foundation/Piers NR PD 10/17/2003 21 Underground/Under Floor AP PD 10/17/2003 22 Sewer/Water Service NR PD City of Carlsbad BIdg Inspection Request For: 03/11/2004 Permit* CB032197 Title: LA COSTA GRNS BLDG 3 33 UNTS Inspector Assignment: PD Description: 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100- 108,200-214,300-308 Type: RESDNTL Sub Type: APT Job Address: 1945 DOVELN Suite: Lot 0 Location: APPLICANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: AFTER 1:30PM PLEASE Phone: 7608016822 Inspect) Total Time: CD Description 23 Gas/Test/Repairs Associated PCRs/CVs Requested By: TIM Entered By: CHRISTINE Act ^Comment inspection Historv Date Description Act Insp Comments 02/24/2004 12 Steel/Bond Beam NR PD 02/12/2004 11 Ftg/Foundation/Piers AP PD LIGHT POLE FTGS 02/09/2004 11 Ftg/Foundation/Piers AP PS PAD FTGS 02/02/2004 12 Steel/Bond Beam PA PD 01/23/2004 21 Underground/Under Floor AP PD 01/23/2004 22 Sewer/Water Service AP PD 01/20/2004 11 Ftg/Foundation/Piers CA PD 01/07/2004 22 Sewer/Water Sen/ice NR PD 11/24/2003 22 Sewer/Water Service PA PD WATER PIPING 11/18/2003 11 Ftg/Foundation/Piers AP PD 11/14/2003 11 Ftg/Foundation/Piers AP PD A&B 11/13/2003 11 Ftg/Foundation/Piers CO PD 11/12/2003 31 Underground/Conduit-Wiring CA PD 11/10/2003 31 Underground/Conduit-Wiring NR PD 10/21/2003 11 Ftg/Foundation/Piers AP PD PAD FTGS 10/17/2003 11 Ftg/Foundation/Piers NR PD 10/17/2003 21 Underground/Under Floor AP PD 10/17/2003 22 Sewer/Water Sen/ice NR PD City of Carlsbad BIdg Inspection Request For: 11/18/2003 Permit* CB032197 Title: LA COSTA GRNS BLDG 3 33 UNTS Inspector Assignment: PD Description: 36224SF HAB 4878SF CARPORTS 5651 SF DECK 100- 108,200-214,300-308 Type: RESDNTL Sub Type: APT Job Address: 1945 DOVELN Suite: Lot 0 Location: APPLICANT ALLGIRE GNRL CONTRACTORS INC Owner: Remarks: Phone: 7608016822 Inspectq Total Time: CD Description 11 Ftg/Foundation/Plers Requested By: TIM BARRET Entered By: CHRISTINE Act Comment Associated PCRs/CVs Inspection Historv Date Description 11/14/2003 11 Ftg/Foundation/Piers 11/13/2003 11 Ftg/Foundation/Piers 11/12/2003 31 Underground/Conduit-Wiring 11/10/2003 31 Underground/Conduit-Wiring 10/21/2003 11 Ftg/Foundation/Piers 10/17/2003 11 Ftg/Foundation/Piers 10/17/2003 21 Underground/Under Floor 10/17/2003 22 Sewer/Water Sen/ice Act Insp Comments AP PD A& B CO PD CA PD NR PD AP PD PAD FTGS NR PD AP PD NR PD Carl Schmidt Inspection Services, Inc. RO.Box 178403 San Diego, CA 92177-8403 (619) 855-9252 SPECIAL INSPECTION REPORT Project: C^^>S'7~^ (^r~~Ji~^^ /^/^^t Ay -e^/^J Address: 1)^1/-^. L^. City: CJoS~/s ^ ^ c/ Permit Number: Plan FUe Number: TYPE OF OBSERVATIONS: Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding Epoxy X Prestressed Concrete Shop Welding Bolting Fireproofing Number of Samples: Type: Materials/DesignMix/Psi: Date: REPORT i TH.///iv ^ 4^iA Q J ~A^ A t~.je,<:^cJ-€^d AO JA /AX7~Q 6 /o t^in P r/d A 'A'o y^j T\ AM 7"^ d ^ . h-A^ ^ ^ /s -Pro, //^^ in. -e r-y Vi^ Q/^ c/ 7- /V ~~~ Q V P{/^ c^^At- Ac>(^, /^/-//C .cc^c/ UL^AT- AOI . (AA~/yf WORK INSPECTED CONFORMS 'MTH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHERWISE NOTED /Sw^n^idT TIME IN: TIMEOUT: Inspector (Print) Certification # s's Signature General Contractor: /}UAA//Z£ ^AJ^.CAfjy Address: City: Phone: Authorized Job Site Contact Signature Carl Schmidt Inspection Services^ Inc. P.O. Box 178403 San Diego, CA 92177-8403 (619) 855-9252 SPECIAL INSPECTION REPORT Project: Address: (171 pp,e L City: Permit Number: l^hL 3 ' C R (y mi? E iL if - BP^ f Plan File Number: /t//^ ' " TYPE OF OBSERVATIONS: Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding Epoxy '^(^ Prestressed Concrete Shop Welding Bolting Fireproofing _ Number of Samples: Type: . Materials/DesignMix/Psi: Alo? m ViA//^-fU/<: REPORT ^F^P'^l/SP- P/PA^ C/^'^ . ^J5./A4 . P /v^.//g»v s/ V^''Jf,L<^A -RlJ^^yfz) ^HTT^yJ^f^n. U.J/JMP' ^^1/—^ j , • • -.^ ^. ' / / / , , , ^ Cl) HQ^A S^<V^//A(4/< P^7>i^ A^j-^ 1^^^ 3-l2lP^ F^- f^>o^^tr^ "fiORK INSPECTED CONFORMS WITH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHERWISE NOTED TIME IN: AP-OO TIME OUT; Inspector (Print) ' / J- Certification # General Contractor: A /<^ li/r/ f ^ Acr^^C/j- Phone: Authorized Job Site Contact Signature INCORPORATED PROJECT NAME PROJECT NO. _ GEOCON B D FIELD MEMO MEMO NO. ,AA* CORRESPONDING FIELD REPORT NO. SUBJECT —^^T,a^j^ p^K^ Z:teT>4>t- I-SCS"] ^ J:2.'S0-/.I jSi^i^G. ^ / p~l(S^ /)A/J3 *' 1^ A. y//rcr^y/W /WoT" /»^ <:-f~r^^tLS_ ^^^f (lSOSZ/91 ^^^5 DISTRIBUTION YES NO GEOCON REPRESENTATIVE SUPERINTENDENT (CLIENT) . ^ f GEOCON REPRESENTATIVE FOREMAN (CONTRACTOR) GEOCON REPRESENTATIVE JOB TRAILER GEOCON REPRESENTATIVE OTHER DATE TIM / IX-IXIX / RSS 6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-2974 PHONE (858) 558-6900 - FAX (858) 558-6159 NOV~14~2003 0Si:2T PM DEl_ MAR ENG I NE;IHR I HG :i B:5 3 ! • ;5 e;51 s I- n: DELMAR ENGINEERING INC- Memorandum Tc»: Mr. Joseph Simon (Rodriguez + Simon Design) CO: Mr. Rick Danalioo (AUgire General Contractors Inc.) From: Hormoz Rezaei >: 11-14-03 Rn: La Costa Greenf; Multi-family, slab reinforcing, job no: 1090 Foundation detail i5/SDl specifies 5" thick slab with #4 bars at 18" on center t ach m.y Ibr : c .mda i :iri category type III. Portions of building number 3 type III falls into categor/ III. ::iJir mdy #.3 a.ars jr.'.. ' -i ti center is provided. In order to make up forthe amount of missing steel, additioric;! •f\bars ri: I'lt br 11: ct:;] I between eve)7 otiier bais (additional #3 bars at 3(>" on center each way). lliaiijfcri ,. 039837 Ch\^A structural Enyncerlng Conmltant^ 8380 Miramai Mall. Suite 234, San Diego, CA 9:2121 • Tel(858)455-031f • h:; (8 58) 45,1-03 9 GEOCON INCORPORATED GEOTECHNICAL CONSULTANTS 6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-2974 • TEL (858) 558-6900 • FAX (858) 558-6159 FOUNDATION OBSERVATION REPORT PROJECT NAME: TTk <a<ggg/Nj^s ^imk. M^L.I-* - f^r-^ '--/A~i><S' LOCATION: AA^^.A.^e.^Q ^y^A FOUNDATION LOCATION (if not entire building) 3A^,^S^ J C f 1»ROJEa NO. ocyoJ-gZ-Ofe DATE: ///"*- /o^ PLAN FILE NO. PERMIT NOS: Bi-Ofti 3A- OS its 7 j 38- • i 3c- • FOUNDATION TYPE: j 38- • i 3c- • ea CONVENTIONAL • POST-TENSIONED • ADDITIONAL OBSERVATION REQUIRED a SUBSTANTIAL CONFORAAANCE • PURPOSE OF OBSRVATION SI Verify soil conditions exposed are similar to those anticipated • Verify footing excavations extend to minimum depth recommended in soil report • Verify foundation reinforcement complies with minimum recommended in soil report Ei Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report El Verify footings have been extended to an appropriate bearing strata • • Other • APPLICABLE SOIL REPORT: TITLE: /cirAaxar Off- y^T-.f^c,^ Ai<~^*e-e'\ of L* As>T-rA- ^ fi/lvrt- DATE: ^_ • SOIL REPORT RECOMMENDATIONS BASED ON: • Expansion Condition • VERY LOW • Fill Geometry — P-^o • Other: • LOW 3A, 3B IK MEDIUM • HIGH • VERY HIGH • MINIMUM FOUNDATION RECOMMENDATIONS: • Footing Depth: • 12 Inches ^ 18 Inches IB-24 Inches OTHER Footing Reinforcement: • No.4 T&B • 2-No.4 T&B • 2-No.5 T&B • Post-Tensioned OTHER : Interior Slab Reinforcement: • 6x6-10/10 • 6x6-6/6 • No.3@24lnches • No.3@18lnches • Post-Tensioned Slab Bedding Material and Thickness : ^ Vapor Barrier: ^ Foundation Width : M »v • ^2 " • OBSERVATIONS: EL Substantial conformance with Soil Reports (see "Purpose of Observation") • Substantial conformance with Foundation Plans. Identify: • Other. • COMMENTS: P^9T-.<>/«i.S ^-.^^.i- <rt.c^^<ja o«» NOTE: IT IS ASSUMED THAT ALL FOOTNG EXCAVATIONS WILL BE aEANED OF LOOSE (ATERIAL PRIOR TO PUONG CONCRETE AND THAT THE SOIL MOISTURE CONTENT WILL BE MAINTAINED ^ Ihn .o3 • RELD COPIES TO GEOCON REPRESENTATIVE