Loading...
HomeMy WebLinkAbout1945 PALOMAR OAKS WAY; ; CB121009; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 09-17-2012 Commercial/Industrial Permit Permit No: CB121009 Building Inspection Request Line (760) 602-2725 Job Address. 1945 PALOMAR OAKS WY CBAD Permity Type. TI Sub Type INDUST Status ISSUED Parcel No: 2130910200 Lot #- 0 Applied. 05/30/2012 Valuation: $104,100.00 Construction Type 5B Entered By JMA Occupancy Group: Reference # Plan Approved: 09/17/2012 Issued 09/17/2012 Inspect Area Plan Check #. Project Title SENDX MEDICAL: TENANT IMPROV TO EXISTING LAB AREAS 2,284 SF Applicant: Owner: PETE BUSSETT ARDEN REALTY LTD PTNSHP SMITH CONSULTING 12220 EL CAMINO REAL #220 P 0 BOX 4900 DEPT 201 SAN DIEGO CA 92130 SCOTTSDALE, AZ 85261 858-793-4777 Building Permit $715.22 Meter Size Add'l Building Permit Fee $000 Add'l Red. Water Con Fee $0.00 Plan Check $50065 Meter Fee $000 Add'l Building Permit Fee $0.00 SDCWA Fee $000 Plan Check Discount $000 CFD Payoff Fee $000 Strong Motion Fee $21 86 PFF (3105540) $0.00 Park Fee $000 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $000 Bridge Fee $0.00 License Tax (4304193) $000 BTD #2 Fee $000 Traffic Impact Fee (3105541) $000 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $4400 Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $80.00 Other Building Fee $0.00 MECHANICAL TOTAL $4800 Pot Water Con. Fee $0.00 Master Drainage Fee $000 Meter Size Sewer Fee $000 AddI Pot. Water Con. Fee $0.00 Redev Parking Fee $000 Recl Water Con. Fee $000 Additional Fees $0.00 Green Bldg Stands (5B1473) Fee $4.00 HMP Fee ?? Fire Expedidted Plan Review $38500 Green Bldg Standards Plan Chk ?? TOTAL PERMIT FEES $1,798.73 Total Fees $1,798 73 Total Payments To Date $1,798.73 Balance Due: $0.00 INALAPPROVAL lnsDector I Date. ,t'tzf 1 Clearance: NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "tees/exactions" You have 90 days from the date this permit was issued to protest imposition of these tees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Casbad Municipal Code Section 332.030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any Building Permit Application Plan Check No.( <07 /3 'z TV 0 F 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 760-602-27111271012719 7604502-8553 Date -z— Isw CARLSBAD Fox www.carlsbadca.gov JOB ADDRESS 1945 Palomar Oaks Way IAPH 213 - 0- 102ROM ________ NAME Gre:iYPE O 5RP lir t 0 1 SenDx Medical, Inc. ill-B I RIP .MECRTPTION OF WONL i,icAMu 5qAM*F.et i'Afiacted Area(s) i-AS Tjr i pn- ( 1 vrs to ez, vi o - Wo jw FLoor Açc4 AFP!X. 30 L cpr tt) '1ALJ eOL)rc.)'T'C.J Ak-n Geo $F op Ti./ EXISIFING UK USE lGJ.MAOE cscr (SET FIREP l)CE A JR coNornor.SNG IflRESPRINKLER5 office and manufacturing JPROFOS same. no changes I I 'D NCCJJ YESDNOIZJ I YosiziNog ONTACf NAME r,wse( saAØeaaU same as Applicant LUCAIIT NAME Pete Bussett I Smith Consulting Architects 12220 El Camino Real, suite 200 ADDRESS ________________________________________________ CRY STATE VP CITY STATE ZIP San Diego CA 92130 PHONE 858-793-4777 .1I3j3-4787 1111 EMAIL PHONE 1FAX EMAIL peterb1sca-sd.com now"cnitIREBNAME Arden Realty, Inc. SIONIRACTOR BUS. NAME Bycor General Contractors ADDRESS 6490 Marindustry Place CITY STATE ZIP San Diego V CA 92121 PHONE ADDRESS 4510 Executive Drive, suite 220 CITY STATE ZP San Diego CA 92121 PHONE 858.521.4204 I 858.546.1006 858-587-1901 j 858-587-1903 (MAIL lrowebycor.com EMAIL kieran.smileyardanreaIty.com .RCIf#T*SICNEU&TME&*DORE - CheM D. Smith TSTATE UCI f C-11701 JfA)ELiC.I 444203 ICIAM B I 4 >3*o 7031.5 saemsa ens "o=%wsL=CNWU 'or ioun1ywnar5 r.QVIVM B psi in,. 10 c0ITN. BO5. Improve asiflohan or repair any SUuc*ure. prior to its issuahoe. CISC reqori.110110 i applicant auTh puimli to CIa a aignud aljtsinenl that uS fl5en5 psrpien IS file provions of the Contractors License LewjChejTter 9 CornrncnngsiU1 Secfjon 7000 of DivISion Sat Vie Buwlsesa and PICfNIICAS CodS) St That lID ie MEIflP( therefrom. and the baSS for the alleged exemption. My vpoISuh of SecUon 1031.5 by any epplicanifar a penr4 j(Jg appioejtta a W p n bVnotmore thuit ftrO hundred dollar. (5500)). Wsa*au'Coresaaiion Dsdir.5ns I bt.aaed,Imdithkuaca,WS.fsan$U'LIO is aurufic, erauyeoiódbySet 3700a(tlw ahotCCkwUspeibmwca th II pseihamd MlimmWern mdifala wad'.,,,' warnsuftswAftbr8am37WolkLaWCaftlarOmpab.m of cm;r!JarIasa 110017 orhorairinsexnsaCo i - -. - - P*iio —' En thee_7/2 /i3 - T aSCtOfl Iteediatbe pu 'Flo pwmlia Ow irteiTheddte.e(5100)arba& OielllcalsclEwipllon: I or* Met inU. peffminameollieteut lerle.'i thle prattle WaitIeliM late qft am personb sew niaans. 15 *1111111 OIl*le thaWs Cmpenr.honLaysol Callorma. W*RIU*G:Feliauteeewfe wortel' USTIParSISmI imvsaipul,UflteM,Ud dull N*Nt III U1pISerfa cd'alni pmAetand dii lInes 'ThIn nsebpndr.d(kcvwid do3a 1IEftC0),In eddWarilofticostel cempanullen. p,pvlaed let lii halls $Mat L cahialeutud r.ya hue. 0 I,seownerolhu popelo'or sly cmhioyme$wllhappsln MW B* colfi(5mlbt. teN deft suit Nd lie l;tThoDle NtPe.dadoniieNd.di15.c7044, DANsiagid PmOiefin Code The Coeinse Ilsme wdoet US app bn oerer olpiopeily who lehi CUS(beBUr. tetiedearteisiikhleTor 0lsihl Oi.ii ciflpla)SIS IWDided thotsidi ffllproømhols ore ml pnbyl;doroff.red ler 'di II. ite onfifOo promoNt is odd wiWn me year ofcomps0im.119am4ANwid hwft butftorpoftOwl be dot rot bAd or Improve far tIle purpece audi). 0 L wwwof Be prepaty, Nieth.ii* =1=09 wiih Owed ml;actsn Insarabild Bepieitcf (Sec. lmdesi eramwol popely who bells erITu,us Belsaihetot OFdI5cbIor sath prrocS eltr mnactor(t) lcenNd hosuorit IS the CAM Elsie. Lar 0 le'eemtsBe5edls ------- BNtiassuaiR*edifdeBeBibiiaieeIc LI p ullypte ae lie mupINd I W broaAglimcgonaillial 9 1 propmV,Qres [}ia 211byvufllverld0 eiadm I I babrebiROpmrMlorthe flspceedAMt 31 huia e Be fateig eei m)bpree'du hupft5OID lAMletlenlaldoll Bela aftimstphorwicallieVi.N' bow IWBej 4.1 pbytbpOIl1pehl5olhBBVl%bUlI Mra INdlPe&divhig perace In warl;Nt.açul;eerdpreiiethem odckwle lUBe IedtheieIia1.TAeieeW&etAM) I VA PWA usa alUm emt but Ihen ce*eded Clad) hi Thigpssa IS pWd. Me oak aftlail was I often IwMItgpsefceod'. .'pRaPEJ1ramwatMENA1uRE EJAGENT DATE 1O Is sn or More MEog ooparn requeo bsinls Isen eute hswdo lEMenols reQisvauon Mm or ret sb... dp olse ns$d 534 Pr.oley.1ennef Husidotis &Mwo Amer Al' DY.. LLIM Ii the pbint or Mii's bulog oiIpafll requved looblen e pined kern po.ilion reekol lc(crk 'by managelseni dMel? Dyes Ijaio Is the fedty Ia be uboried nlhin Isol bi reIsrboundazy ale sixisoe° Dies i No IF ANY OF THE ANSWERS ARE YN, A FINAL CERTVRCA7E OF OCCUPANCY MAY NOT BE ISWIJED UNLESS THEAPPLICAW WA MET OR IS MEETItIG THE KqglwmWSOFTHEOFPICEOF EMERGENCY SERIACES AND ThELAIR RGU.UTICN CC4J1ROI. OffMUr thci - IhysNhmthalIhuea consIiun bida owthepebywco, oflhe werk Mb perivillisissued ram 309701 Ci.9Coda). Lends?. N.me Lends?. AMrags t1 3D OJ) I hereby adoizempserdaloveoftheC4y dCaftid ID erdarupori the eboze merrier IzcbipechorlpJtpcthna IALSOA(EETOSAVE AG4INSTALI. LJA8ILI1E9. UD3 ENTS.COS MID RrlSE$Wl4C1 MAY IN ANY WAYACCRUE AGAINST SAID CI1Y IN OlS ICE CFTI no 4AM0S4ApenmedbrorcavaMorover5 deep and deoncrmealiudnofskeolwescesr3elmieskihed jiddbibiAd ISO pbmd'sb homed ° O orKerry be dUeW1 is QtaIzeICdOf daeSuMIre 109&4IJrlbmffieçcc DAlE 5 /3fA°z Inspection List Permit#: CB121009 Type: TI INDUST SENDX MEDICAL: TENANT IMPROV TO EXISTING LAB AREAS 2,284 SF Date Inspection Item Inspector Act Comments 10/19/2012 89 Final Combo - RI 10/19/2012 89 Final Combo PB AP 09/24/2012 84 Rough Combo PB CO 09/19/2012 17 Interior Lath/Drywall PB AP 09/18/2012 14 Frame/Steel/BoltingNveldin PB AP 09/18/2012 21 Underground/Under Floor PB AP 09/18/2012 24 Rough/Topout PB AP 09118/2012 34 Rough Electric PB AP Monday, October 22, 2012 Page 1 of 1 CITY OF CARLSBAD INSPECTION RECORD Building Division II INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB CB12 1009 1945 PALOMAR OAKS WY SENDX MEDICAL. TENANT IMPROV TO EXISTING LAB AREAS 2,284 SF TI INDUST Lot#. PETE BUSSETT IJ CALL BEFORE 3:30 om FOR NEXT WORKDAY INSPECTION t! FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.Carlsbadca.aov/Buildlng AND CLICK ON C()Y Request Inspection DATE: 9/'7f"2. If If you have signed off— Carlsbad, NO YES "YES" is checked the Division's approval is required prior to requesting any ques flonsplease call the applicable divisions a e p one num eis fax to 760-602-8560, email to bldginspections(d)carisbadca.gov or bring CA 92008. Building Inspectors can be reached at 760-602-2700 between Required for Building Final If Checked YES Date a Final provi e e ovv. in a COPY of this 7:30 am — 8~00 am Inspector Building Inspection- ter a required approvals are card to: 1635 Faraday Ave., the day of your inspection. Notes Planning! Landscape 760-9448463 Allow 48 hours CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm Fire Prevention 760-602-4660 Allow 48 hours Type of Inspection Date Inspector Type of Inspection Date Inspector :IiJIIp]I4[. FOUNDATION D ELECTRIC UNDERGROUND 0 UFER REINFORCED STEEL ROUGH ELECTRIC WALLS MASONRY ROUGH ELECTRIC CEILING 0 GROUT 0 WALL DRAINS 0 ELECTRIC SERVICE D TEMPORARY TILT PANELS 0 BONDING 0 POOL POUR STRIPS PHOTO VOLTAIC COLUMN FOOTINGS FINAL ROOF SHEATHING SUBFRAME 0 FLOOR JCEIUNG UNDERGROUND DUCTS & PIPING EXT. SHEAR PANELS 0 DUCT& PLENUM 0 REF. PIPING FRAME q i i ii.- f6 HEAT-AIR COND. SYSTEMS INSULATION VENTILATION SYSTEMS EXTERIOR LATH FINAL INTERIOR LATH & DRYWALL I1l:Jl'[ SEWER & BI/CO 0 PI/CO FINAL OCCUPANCY Date Inspector lri A/S UNDERGROUND VISUAL Date Inspector UNDERGROUND 0 WASTE " WATER 1S (2' A/S UNDERGROUND HYDRO TOPOUT CANASTE IWATER A/S UNDERGROUND FLUSH TUB & SHOWER PAN A/S OVERHEAD VISUAL GAS TEST 0 GAS PIPING A/S OVERHEAD HYDROSTATIC WATER HEATER 0 SOLAR WATER A/S FINAL fri I i- FINAL F/A ROUGH-IN 600- PRE-CONSTRUCTION MEETING F/A FINAL FIXED EXTINGUISHING SYSTEM ROUGH-IN 603 FOLLOW UP FIXED EXTING SYSTEM HYDROSTATIC TEST 605- NOTICE TO CLEAN FIXED EXTINGUISHING SYSTEM FINAL 607 - WRITTEN WARNING MEDICAL GAS PRESSURE TEST NOTICE OF VIOLATION MEDICAL GAS FINAL VERBAL WARNING FINAL REV 5/2012 SEE BACK FOR SPECIAL NOTES EsGil Corporation In (Partners flip with government for Bui(Iing Safety DATE: 9/13/12 U APPLICANT ca'i ) JURISDICTION: City of Carlsbad A-NRIEWER IJ FILE PLAN CHECK NO.: 12-1009 SET. III PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT NAME: SenDx - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at-Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person REMARKS: By: Doug Moody Enclosures: EsGil Corporation El GA LI EJ [1 PC 9/6/12 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In Partnership with Govemment forisuiffing Safety O APPLI ANT JURIS. U PLAN REVIEWER U FILE DATE: 8/23/12 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 12-1009 SET: II PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT NAME: SenDx - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Smith Consulting Architects I Pete Bussett 12220 El Camino Real Suite 200, San Diego, CA 92130 EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Pete Bussett Telephone #: 858-793-4777 Date contacted: 912 46- (by: o.,) Email: peterb(sca-sd.com Fax #: 858-793-4787 Mail -4elephone Fax In Person LI REMARKS: By: Doug Moody Enclosures: EsGil Corporation [:1 GA EJ DPC 8/16/12 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 12-1009 8/23/12 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Provide a fully dimensioned floor plan in addition to the demo showing the size and use of all rooms or areas within the space being improved or altered. Show all cabinets, equipment, office cubicles, laboratory work stations etc. Sec. Al 07.2. The response sheet and the cover sheet of the plans indicate see sheet A-3 yet the set does not contain an A-3? Please provide the UL listing and manufacturer's installation information for all new equipment to be installed (Laser, Chiller etc). Show all new equipment to be installed. Show all electrical requirements, plumbing requirements, exhaust or mechanical requirements, operational weight, anchorage and seismic restraints if required etc. Section 107.2. The electrical plans indicate new electrical to a new Laser and Chiller? Please clarify the plans and provide the listing and installation information. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural support of the 565# rooftop air handler unit and roof screening. Include all calculations and finding on the plans. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. The roof screening details on sheet ADI reference detail 7/SDI yet there is no sheet SDI as part of this set? 10. Show a level area, or landing, per Section 1133B.2.4.2: a) —>60" in the direction of door swing at the door to the vestibule at the new stair (access.) The corridor to the stairs does not appear to be 60" in the direction of the door swing. City of Carlsbad 12-1009 8/23/12 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes El No C3 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In cPartnersliip wit/i government for Bui(iing Safety DATE: 6/8/12 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 12-1009 SET: I PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT NAME: SenDx - TI O APPLICANT O PLAN REVIEWER O FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Smith Consulting Architects I Pete Bussett 12220 El Camino Real Suite 200, San Diego, CA 92130 EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Pete Bussett Telephone #: 858-793-4777 Date contacted: (((i2_ (by: (-_) Email: peterb(sca-sd.com Fax #: 858-793-4787 Mail - Telephone Fax -' In Person LI REMARKS: By: Doug Moody Enclosures: EsGil Corporation [I GA U EJ EJ PC 6/1/12 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 City of Carlsbad 12-1009 6/8/12 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 12-1009 OCCUPANCY: B TYPE OF CONSTRUCTION: VB ALLOWABLE FLOOR AREA: SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 5/30/12 DATE INITIAL PLAN REVIEW COMPLETED: 6/8/12 FOREWORD (PLEASE READ): JURISDICTION: City of Carlsbad USE: Laboratory ACTUAL AREA: 2284sf STORIES: 1 HEIGHT: OCCUPANT LOAD: 22 DATE PLANS RECEIVED BY ESGIL CORPORATION: 6/1/12 PLAN REVIEWER: Doug Moody This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad 12-1009 6/8/12 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. A complete description of the activities and processes that will occur in this tenant space should be provided (not the outdoor storage). A listing of all hazardous materials should be included. The materials listing should be stated in a form that would make classification in Tables 307.7(1) and 307.7(2) possible. The building official requires a technical report to identify and develop methods of protection from hazardous materials. Section 307.7. 2. Provide a fully dimensioned floor plan in addition to the demo showing the size and use of all rooms or areas within the space being improved or altered. Show all cabinets, equipment, office cubicles, laboratory work stations etc. Sec. A107.2. Please clarify the plans to show the door to the stair enclosure to be the same rating as the enclosure. Correct the keynote at the new door. Please provide the UL listing and manufacturer's installation information for all new equipment to be installed (Laser, Chiller etc). Show all new equipment to be installed. Show all electrical requirements, plumbing requirements, exhaust or mechanical requirements, operational weight, anchorage and seismic restraints if required etc. Section 107.2. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural support of the 565# rooftop air handler unit and roof screening. Include all calculations and finding on the plans. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Clearly indicate on the plans the fume hood exhaust ventilation system compliance with UMC Chapters 5 & 6. City of Carlsbad 12-1009 6/8/12 Detail the required make-up air as per UMC, it appears there is not enough make up air, Section 505.3. Clearly show the type of material to be exhausted by each exhaust system. Clearly show the duct materials are suitable for the intended use. UMC, Section 506.1 & 610.1. Clearly show the exhaust duct material and gage used for each duct size. See UMC Table 6-7. Separate and distinct systems shall be provided for incompatible materials. UMC Section 505.1 Detail ducts conveying explosives or flammable vapors, fumes or dusts shall extend directly to the exterior of the building without entering other spaces. UMC Section 505.1. Detail minimum duct conveying velocities as per UMC Section 505.2 and Table 5-1. Detail duct cleanouts as per UMC Section 506.3. Detail required explosion venting of dust collection systems as per UMC Section 506.4 & 610.4. Detail duct support as per UMC Sections 506.5 & 610.5. Detail fire protection as per UMC Sections 506.6 & 610.6. I) Detail clearances from combustibles as per UMC Sections 506.7 & 610.7. m) Detail protection from physical damage as per UMC Sections 506.8 & 610.8 7. Please clarify the plumbing plans it appears the sink in the Forms Lab is new? If so please provide complete plumbing plans. Note : When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per Section 11 34B.2. These requirements apply as follows: The area of specific alteration, repair or addition must comply as "new" construction. A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. C) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 8. It is unclear from the plans if the restrooms servicing the tenant improvement are disabled accessible, please provide a dimensioned restroom plans showing the restroom to be accessible compliant. City of Carlsbad 12-1009 6/8/12 Show that the minimum strike edge distances are provided at the level area on the side to which a door swings to the lunch room and stair enclosure, per Section 1133B.2.4.3: a) ~18" at interior conditions. Show a level area, or landing, per Section 1133B.2.4.2: a) ~!60" in the direction of door swing at the door to the vestibule at the new stair. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes E3 No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake, Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 12-1009 6/8/12 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 12-1009 PREPARED BY: Doug Moody DATE: 6/8/12 BUILDING ADDRESS: 1945 Palomar Oaks Way BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VU BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) TI 2284 Designer Esti 104,100 Air Conditioning Fire Sprinklers TOTAL VALUE 104,100 Jurisdiction Code Icb IBY Ordinance Bldg. PermIt Fee by Ordinance V I 5.221 Plan check Fee by Ordinance I $464.891 Type of Review. F71 Complete Review Structural Only Other LlRepetibve Fee Repeats Hourly V GiI Fee I $400.521 Comments: Sheet I of I macvalue.doc + 7 ^,A, CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 06/05/12 PROJECT NAME: SENDX MEDICALTENANT IMPROVEMENT PROJECT ID: PLAN CHECK NO: CB 12-1009 SET#: 1 ADDRESS: 1945 PALOMAR OAKS WYSTE 100 APN: 213-091-02-00 V/ This plan check review is complete and has been APPROVED by the ENGINEERING V Division. By: A Final Inspection by the Division is required Yes No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton : Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz i' Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.wong@carlsbadca.gov Dominic Fier! 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTERS kfaATE&3f FINAL INSPECTION REQUIRED YES El NO PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB 12-1009 Address 1945 Palomar Oaks Way Planner Chris Sexton Phone (760) 602-4624 APN: 213-091-02 .' .' Type & Use: fl Net Project Density:N/ADU/AC Circle;' C'J Zoning: ri ueneral Plan: PM/OS Facilities Management Zone: CFD (in/out) #_Date of participation:_____ Remaining net dev acres:_____ (For non-residential development: Type of land used created by this permit: Legend: Z Item Complete El Item Incomplete - Needs your action Z El El Environmental Review Required: YES El NO El TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Z 0 El Discretionary Action Required: YES El NO El TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: Z El El Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES 0 NO D CA Coastal Commission Authority? YES 0 NO 0 If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): El El Habitat Management Plan Data Entry Completed? YES El NO El If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) Z El El Inclusionary Housing Fee required: YES [] NO [] (Effective date of Inclusionary Housing Ordinance - May 21 1993.) Data Entry Completed? YES 0 NO El (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Rev 5/12 Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required Shown Required Shown Required Shown Required Shown Required Shown N OD Housing Tracking Form (form P-20) completed: YES El NO D N/A El Site Plan: O El El Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44— Neighborhood Architectural Design Guidelines El El 1. Applicability: YES El NO El Z El El 2. Project complies: YES El NOEl Z El El 2. Accessory structure setbacks: Front: Required Shown Interior Side: Required Shown Street Side: Required Shown Rear: Required Shown Structure separation: Required Shown Z El El 3. Lot Coverage: Required Shown El El 4. Height: Required Shown Z El El 5. Parking: Spaces Required Shown (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown El El El Additional Comments Rev 5/12 <K \V CITY OF CAD Ak PLAN CHECK REVIEW TRANSMITTAL3LDG. 'qT (IS J traday Avenue Carlsbad CA 92008 www.carlsbadca.gov r Community & Economic Development Department - d%1%tl DATE: 8-24-12 PROJECT NAME: Sendex PROJECT ID: CBI2I009 PLAN CHECK NO: CBI2I009 SET#: II ADDRESS: 1945 Palomar Oaks Way APN: This plan check review is complete and has been APPROVED by the Fire Division. By: D.Fleri A Final Inspection by the Fire Division is required Z Yes LJ No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: 'PLANNING, S - ENGINEERING S FIRE PREVENTION 7qOO246iO S S : 76O6O2275O S '. 7O6O24665 ' le Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Greeory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.0ntiverps@carlsbadca.ov Cvnthia.Wong@carlsbadca.gov LII Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: Conditions: AO, AM & El: address remaining comments as shown by Daryl James on city and applicant set. Carlsbad Fire Department BLrNr.. !T COPY Plan Review Requirements Category: TI, JNDUST Date of Report: 08-24-2012 Reviewed by: Name: PETE BUSSETT Address: SMITH CONSULTING 12220 EL CAMINO REAL #220 SAN DIEGO CA 92130 Permit #: CB 121009 Job Name: SENDX MEDICAL: TENANT IMPROV Job Address: 1945 PALOMAR OAKS WY CBAD Cond: C0N0005637 Sheet AD: Coordinate exit signs with sheet El Sheet El: Coordinate floor plan, exit doors, exit signs and means of egress illumination locations with egress plan on sheet AO. j)iVLi s/+!1' 1q1 -Uo iItIA!iIJ THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. Entry: 08/24/2012 By: df Action: AP Page 1 of CONDITIONAL RECOMMENDATION FOR APPROVAL CONDITIONS: AO, ADI & El: ADDRESS REMAINING COMMENTS AS SHOWN IN BLUE FONT, OVER THE COUNTER. Daryl K. James & Associates, Inc. Checked by: Daryl Kit James 205 Colina Terrace Date: August 16, 2012 Vista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcgIobal.net APPLICANT: Pete Busseft - SCA JURISDICTION: Carlsbad Fire Department PROJECT NAME: SenDx Medical, Inc. PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT DESCRIPTION: CB121009 Lab tenant improvement in an existing building. No new floor area is being added. There is Approx. 30 LF of new wall construction and 600 sf of new suspended ceiling. COMMENTS TSI V'Sheet Index Provide a door schedule and notes, including, but not limited to, hardware description for all new and relocated doors CBC/CFC Chapter 10. Provide a finish plan and notes for all new finish materials in accordance with CBC/CFC Chapter 8. AO Overall First Floor Plan/Egress Plan s/Round upward, occupant loads determined for all occupied areas. See IBC code & Commentary Figure 1004.1.1 Revise Exit Analysis resulting from revised occupant loads. This will increase the occupant load in Lunch Room 157 to 50 and may require revisions specific to an occupant load of 50 or more, unless it can be illustrated that stationary furnishings decrease the floor area. Okay per CBC 303.1 Exception 3. s/Verify the use of Area 149 as a corridor. Sheet A2 shows 149 as a Hallway. Open Office Coordinate exit signs with Sheet El. Al v'Demolition Plan Legend Legend shows a symbol for the removal of existing ceiling grid and tiles. The removal of existing ceiling grid and tiles is not shown on the plans. Sheet A2 Ceiling Legend C3 and Keynote 3 refer to the removal of existing ceiling grid and tiles, installation and construction. Please clarify. V Demolition Plan Notes Add: Fire safety during construction and demolition shall comply with CFC Chapter 14. i/Partial First Floor Plan Denote locations of hazardous materials storage cabinets. i/A2 Provide a reference to Sheet El for means of egress lighting and exit signs. Coordinate ceiling grid and tile work with Sheet Al. Verify the use of Area 149 as a corridor. Verify the use of Area 149 as a hallway. See Sheet Al. ADI Rated wall detail to include ICC evaluation report # or reference to Item number in 2010 CBC Table 720.1(2). Page 2 of 2 If any rated assemblies will be penetrated, provide details for fireproofing product and denote listings. Respond to this comment. &'Ml Provide fume hood specifications, and details of exhaust/shaft provisions; include face velocity calculations as required per the Hazardous Materials Fire Code Compliance Report rev. 1.2 dated February 20, 2012. Provide a mechanical equipment schedule that shows single or combined air-handler units that move in excess of 2,000 CFM. Refer to 2010 CIVIC 609.0; and CFC 907.4.1. Coordinate with HVAC details and wiring schematics. &'P-3.O There are two sheets labeled P-3.0. Revise the first sheet labeled P-3.0 to P-2.0. Provide fire-stopping details, including listings, for pipe penetrations El Electrical Engineer to sign Sheet El. Coordinate floor plan, exit doors, exit signs and means of egress illumination locations with egress plan on Sheet AO. Shaded signs should indicate direction of egress. #'Add the following notes: Means of egress illumination level shall be not less than 1-foot candle at the walking surface and equipped with not less than 90-minute battery backup, 2010 CBC, Section 1006 Exit signs shall be illuminated at all times and equipped with not less than 90-minute battery backup. 2010 CBC, Section 1011.5.3 E2 VDenote intrinsically safe and/or explosion proof electrical system, where required, if applicable. Add notes, details, specifications, and schematics specific to electrical systems within hazardous (classified) locations. Refer to 2010 CEC, Sections 500 through 517, where applicable. N/A Fume hood maintains vapors befow LFL Provide penetration details in accordance with 2010 CEC, Section 300.21; and 2010 CBC, Section 713. N/A ' Email a copy of Building Department (EsGil) comments e/ Email a copy of hazardous materials fire code compliance report Letter from Klausbruckner & Associates attached. Page lof2 CONDITIONAL RECOMMENDATION FOR APPROVAL CONDITIONS: AO, ADI & El: ADDRESS REMAINING COMMENTS AS SHOWN IN BLUE FONT, OVER THE COUNTER. Daryl K. James & Associates, Inc. Checked by: Daryl Kit James 205 Colina Terrace Date: August 16, 2012 Vista, CA 92084 T. (760) 724-7001 Email: kiffiresbcglobal.net APPLICANT: Pete Bussett - SCA JURISDICTION: Carlsbad Fire Department PROJECT NAME: SenDx Medical, Inc. PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT DESCRIPTION: CB121009 Lab tenant improvement in an existing building. No new floor area is being added. There is Approx. 30 LF of new wall construction and 600 sf of new suspended ceiling. COMMENTS flSheet Index Provide a door schedule and notes, including, but not limited to, hardware description for all new and relocated doors CBC/CFC Chapter 10. Provide a finish plan and notes for all new finish materials in accordance with CBC/CFC Chapter 8. AO Overall First Floor Plan/Egress Plan LiRound upward, occupant loads determined for all occupied areas. See IBC code & Commentary Figure 1004.1.1 Revise Exit Analysis resulting from revised occupant loads. This will increase the occupant load in Lunch Room 157 to 50 and may require revisions specific to an occupant load of 50 or more, unless it can be illustrated that stationary furnishings decrease the floor area. Okay per CBC 303.1 Exception 3. LI Verify the use of Area 149 as a corridor. Sheet A2 shows 149 as a Hallway. Open Office Coordinate exit signs with Sheet El. RDu-'4r Al UDemolition Plan Legend Legend shows a symbol for the removal of existing ceiling grid and tiles. The removal of existing ceiling grid and tiles is not shown on the plans. Sheet A2 Ceiling Legend C3 and Keynote 3 refer to the removal of existing ceiling grid and tiles, installation and construction. Please clarify. LiDemolition Plan Notes Add: Fire safety during construction and demolition shall comply with CFC Chapter 14. DPartial First Floor Plan Denote locations of hazardous materials storage cabinets. LIA2 Provide a reference to Sheet El for means of egress lighting and exit signs. Coordinate ceiling grid and tile work with Sheet Al. Verify the use of Area 149 as a corridor. Verify the use of Area 149 as a hallway. See Sheet Al. ADI Rated wall detail to include ICC evaluation report # or reference to Item number in 2010 CBC Table 720.1(2). Page 2 of 2 If any rated assemblies will be penetrated, provide details for fireproofing product and denote listings. Respond to this comment. DM1 Abø L%( Provide fume hood specifications, and details of exhaust/shaft provisions; include face velocity calculations as required per the Hazardous Materials Fire Code Compliance Report rev. 1.2 dated February 20, 2012. Provide a mechanical equipment schedule that shows single or combined air-handler units that move in excess of 2,000 CFM. Refer to 2010 CIVIC 609.0; and CFC 907.4.1. Coordinate with HVAC details and wiring schematics. LIP-3.O There are two sheets labeled P-3.0. Revise the first sheet labeled P-3.0 to P-2.0. Provide fire-stopping details, including listings, for pipe penetrations El Electrical Engineer to sign Sheet El. 54 is Coordinate floor plan, exit doors, exit signs and means of egress illumination locations with egress plan on Sheet AO. jo ,, b+Av. Shaded signs should indicate direction of egress. DAdd the following notes: Means of egress illumination level shall be not less than 1-foot candle at the walking surface and equipped with not less than 90-minute battery backup, 2010 CBC, Section 1006 Exit signs shall be illuminated at all times and equipped with not less than 90-minute battery backup. 2010 CBC, Section 1011.5.3 E2 flDenote intrinsically safe and/or explosion proof electrical system, where required, if applicable. Add notes, details, specifications, and schematics specific to electrical systems within hazardous (classified) locations. Refer to 2010 CEC, Sections 500 through 517, where applicable. N/A Fume hood maintains vapors befow LFL Provide penetration details in accordance with 2010 CEC, Section 300.21; and 2010 CBC, Section 713. N/A flEmail a copy of Building Department (EsGil) comments DEmail a copy of hazardous materials fire code compliance report Letter from Klausbruckner & Associates attached. BLDG. DEPT Copyagel o__ CORRECTION LIST Daryl K. James & Associates, Inc. Checked by: Daryl Kit James 205 Colina Terrace Date: June 2, 2012 Vista, CA 92084 T. (760) 724-7001 Email: kitfiresbcgIobaI.net APPLICANT: Pete Bussett - SCA JURISDICTION: Carlsbad Fire Department PROJECT NAME: SenDx Medical, Inc PROJECT ADDRESS: 1945 Palomar Oaks Way PROJECT DESCRIPTION: CBI2 1009 Lab tenant improvement in an existing building. No new floor area is being added. There is Approx. 30 LF of new wall construction and 600 sf of new suspended ceiling. This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. INSTRUCTIONS Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates along with a descriptive narrative of corrections addressing all comments. Please direct any questions regarding this review to: Daryl K. James 760-724-7001 or CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON THIS FORM, MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS TO AVOID DELAY: DARYL K. JAMES & ASSOCIATES, INC. 205 COLINA TERRACE VISTA, CA 92084 COMMENTS TSI Sheet Index Provide a door schedule and notes, including, but not limited to, hardware description for all new and relocated doors CBC/CFC Chapter 10. Provide a finish plan and notes for all new finish materials in accordance with CBC/CFC Chapter 8. AO Overall First Floor Plan/Egress Plan Round upward, occupant loads determined for all occupied areas. See IBC code & Commentary Figure 1004.1 1 Revise Exit Analysis resulting from revised occupant loads. This will increase the occupant load in Lunch Room 157 to 50 and may require revisions specific to an occupant load of 50 or more, unless it can be illustrated that stationary furnishings decrease the floor area. Verify the use of Area 149 as a corridor. Coordinate Exit signs with Sheet El. Verify the use of Area 149 as a corridor. Sheet A2 shows 149 as a Hallway. Al Demolition Plan Legend Legend shows a symbol for the removal of existing ceiling grid and tiles. The removal of existing ceiling grid and tiles is not shown on the plans. Sheet A2 Ceiling Legend C3 and Keynote 3 refer to the removal of existing ceiling grid and tiles, installation and construction. Please clarify. Page 2 ofJi__ Demolition Plan Notes Add- Fire safety during construction and demolition shall comply with CFC Chapter 14. Partial First Floor Plan Denote locations of hazardous materials storage cabinets. A2 Provide a reference to Sheet El for means of egress lighting and exit signs. Coordinate ceiling grid and tile work with Sheet Al. Verify the use of Area 149 as a corridor. Verify the use of Area 149 as a hallway. See Sheet Al ADI Rated wall detail to include ICC evaluation report# or reference to Item number in 2010 CBC Table 720.1(2). If any rated assemblies will be penetrated, provide details for fireproofing product and denote listings. Ml Provide fume hood specifications, and details of exhaust/shaft provisions; include face velocity calculations as required per the Hazardous Materials Fire Code Compliance Report rev. 1.2 dated February 20, 2012. Provide a mechanical equipment schedule that shows single or combined air-handler units that move in excess of 2,000 CFM. Refer to 2010 CMC 609.0; and CFC 907.4.1. Coordinate with HVAC details and wiring schematics. P-3.O There are two sheets labeled P-3.0. Revise the first sheet labeled P-3 0 to P-2.0. Provide fire-stopping details, including listings, for pipe penetrations El Coordinate exit sign and means of egress illumination locations with egress plan on Sheet AO. Shaded signs should indicate direction of egress. Add the following notes: Means of egress illumination level shall be not less than 1-foot candle at the walking surface and equipped with not less than 90-minute battery backup, 2010 CBC, Section 1006 Exit signs shall be illuminated at all times and equipped with not less than 90-minute battery backup. 2010 CBC, Section 1011 5.3 E2 Denote intrinsically safe and/or explosion proof electrical system, where required, if applicable Add notes, details, specifications, and schematics specific to electrical systems within hazardous (classified) locations. Refer to 2010 CEC, Sections 500 through 517, where applicable. Provide penetration details in accordance with 2010 CEC, Section 300.21; and 2010 CBC, Section 713. EMAIL A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS EMAIL A COPY OF HAZARDOUSD MATERIALS FIRE CODE COMPLIANCE REPORT PKLAUSB RUCKN ER 4105 Sorrento Valley Blvd. AND ASSOCIATES San Diego, CA 92121 Tel: (858) 677-9878 June 4, 2012 Fax: (858) 677-9894 Carlsbad Fire Department 1635 Faraday Ave. Carlsbad, CA 92008 RE: Sendx Medical Inc. - Carlsbad, CA Phase III - Tenant Improvements To Whom It May Concern I am writing in reference to a Phase III of the Sendx Medical Inc. tenant improvements. Based on information provided by Sendx Medical Inc. [see attached letter], the Phase Ill tenant improvements do not affect any changes to quantities or locations of any of the hazardous materials [indoors or outdoors]. Based on the above information, we do not believe a new technical report is needed for this phase of the tenant improvements. Should plans and TI scope change resulting in changes to hazardous materials quantities and/or locations, Sendx Medical Inc. agrees to inform Carlsbad Fire Department of these changes. If you need additional information, do not hesitate to contact us. Sincerely, ey Klausbruckner, PE, Principal - Klausbruckner & Associates Inc. By way of my signature, SenDx Medical Inc. agrees to the conditions required and specified in this letter. SenDx Medical Inc.'s Representative (Sign and Print Name) Date C8 I?,-(Goc 05131./2012 19:57 FAX 7809306315 SENDX MEDICAL RADIOMETER In SenDx Medical Inc. 1945 Palomar Oaks Way Carlsbad, CA 92011 www.radion*W.com ELLEY KLAu5BRUcKNER Kl.AUSBRUCKNER & ASSOCIATES INC. 4105 SORRENTO VALLEY BLVD. SAN DIEGO, CA 92121 5-31-2012 RE SenDx Phase III Tenant Improvement Plan - Impost on Hazardous Materials Fire Code Compliance Rprt Deer Ms. Klausbruckner; We are seeking a letter from Kiausbruckner & Associates Inc. which we can submit to I;he City of Carlsbad with our Phase III Tenant Improvement permit application. It is our 1' 3pe to avoid any requirements for an additional environmental study and the associated co5ts and delays. implementation of the SenDx Phase III TI plans will not change the types, quantities or general locations of chemicals that will be used in the building or stored in the'Outdoor Hazardous Materials Storage Area, as was already defined in the phase II plan and a!;soci- ated 'Senox hazardous Materials Fire Code Compliance Report (Rev 1.2, Feb 20, 201i)' which you prepared. It has been suggested that if these facts are conveyed to the plan reviewers, It Is less likely that an additional report will be required. Thank you in advance for your assistance in his matter. Daniel E. Baxter Manufacturing Engineering Manager SenDx Medical Inc. I STRUCTURAL CALCULATIONS PROJECT: T piilarse-:?, 2-.tu /NY1 HTK HOROWITZ TAYLOR KUSHKAK STRUCTURAL ENGINEERS DESIGN ASSUMPTIONS: CONCRETE STRENGTH AT TWENTY EIGHT DAYS: 2 ' U PSI MASONRY: GRADE "N" CONCRETE BLOCK F' M = I. PSI MORTAR TYPES 1,800 PSI GROUT: 2000 PSI REINFORCING STEEL: A-615 GRADE 40: #4 AND LESS (U.O.N.) GRADE 60: #5 AND LARGER STRUCTURAL STEEL: A-36 LUMBER: DOUGLAS FIR-LARCH JOISTS #2 BEAMS AND POSTS #2 STUDS STUD OR BETTER SEISMIC FORCE: ç.- REPORT BY: WIND FORCE: REPORT NO.: SOIL PRESSURE: DESIGN LOADS: ROOF DEAD LOAD. SLOPING ROOFING PLYWOOD JOISTS INSUL. & CLG. MISC. TOTAL = ROOF LIVE LOAD SLOPING = -C2 FLAT= 2c? FLAT FLOOR DEAD LOAD INT. EXT. FLOORING PLYWOOD JOISTS INSUL. & CLG. MISC. TOTAL = FLOOR LIVE LOAD INTERIOR 40 PSF BALCONY 60 PSF (U.O.N.) EXIT WALKWAY 100 PSF WALL DEAD LOAD INTERIOR 10 PSF EXTERIOR 16 PSF These calculations are limited only to the items included herein, selected by the client and do not imply approval of any other portion of the structure by this office. These calculations are not valid if altered in any way, or not accompanied by a wet stamp and signature of the Engineer of Record. Job No. Designed By Date k 5v 14288 Danielson St. • Suite 200 • Poway, CA 92064-8819 • (858) 679-8989 • Fax (858) 679-8959 _l;.9 ...Sz's1g, --S (21)/(b'') .' — °)'> \AC)L?'O V LOL4 , I 000 0011 (ç 0 o-I 1 1) — ii .f3c (i70j7j bz ___ + °ic)ct j +.1_.- =H Iq dct rc 'I , .v ic&ct ' I1civ2 ,,h ,tAp ,-' )i 'C'> "! -VQl-''- T-2 Oh + v cs L. 05 MCIA .,- b_ - -la Ike ,Id g% - I SO)5 f% r.~)ip1Tr k' 19 11zz,i#l4s - -lt) scjy SO)$ 'flrc co - 'fp ç*-q- 46C u, 40 ' 3cVt 1,oç; 5(141')20 ?7t(fL) (y t+=,P-9 th+ I-(0 AS Afel a,2.. b'(7 I k, c( SIPOI65 :- , (O /j3Lj .LIeI5 kQek'd kC• (ob r 70 3k-cv- O/A - 2 ii 152- fit' — (I Li -=- 1• 1 ,01 S?-N C\LC..'t ->1 O?- iOiO O10 A-re. Ir A7 coe)s vlr4al- I i..iU FAA .L19e.U.3LU nI .ULL,AL 1 UUk INDUSTRIAL WASTEWATE.F DISCHARGE PERMIT wit Date SCREENING SURVEY Business name 5e)j Medi'-I1 i. t. Stmet.Address I P#./o Iwar k.r Eni all Address -db 73r @ PLEASE Cl4EO( HERE IF YOUR BUSIIE$S IS E)MP1 (.3N REVERSE SIDE CHEUI1YPEOF 0 thák all below that we pmsnt at your Iecl$ty 7acld aeaning lnkManulacluiin: - Nulillionat Supptsmenjl ,-Assembly Laboralbiy Vltwntn Manufacturing AutomDtive Repair jMachln1ng/MlIn j PalMing! FnIuhng BaIty MII4aCIU71ng 4 Mahulaftglng PRIM Manuftu*g 10fue1 MB1u1autIbg Membrane MaIL Personal Qara Produda Blolath Laboratory (I.e. watç ruler ir gnthranea MehUfaaturIn Salk Chersiod Storage MOMCst1ng. F =1112 Pesllckte MjugJ Car Wash Metal Fabdca or PJn Chemical Manwfactkring MetI F)alhinti Phacautical Manufacturing Chemical Purification Electroplelir g (1nc'ludtr pracuracra) Dry Cleaning EIcIio1assrh ling Porcoten Enameling Electrical Conqonent Anodlilng Power etnsrstbn MafriactuIlng Comillne (I.e. p iosphaUng) /rut Shop FortRlzar Manufeciwiba /Chernk1 SO ng I MIIng Research and Development Film IX-my Processing Printed Cirq Al Board Rubber Manufacturing Food Processing Manufacturlig ScondudorMnufcturing GiSse Manurec(uring Metal Powden F xndiig soap/ Dete,ent Manufacturing lnduMeiLaundly - Waste Traatenl/Storage Sic Code(s) (ITknawn) 3 5'l U 0 - - Brief descrtption of business activities (Productior lMWiufbctudng Operations):___________ MA.s uIA-4 -As -,J Description of operations generating wadawiita (discharged to ,ewér, hauled or evaporated): Li L7d- LIr. L.M1AA. . '-L d.,hjj 1jcr, . c,AL. - --ri 8YPAeDucs-c EsllrnaledvelueoflndUstriai Wa or to bwc scl List hazardous wagenee(typo/voIumr Data operatiOn bege War will begin at this locatI'n jijft Have you applied for a Waetewater Dischprjia Poimit from e Enckis Wastewater Authority? No U yes, vdion:_ (///Ic _c *W?_-Mi_JFJUIL 81eConL_94 _kX _____tA _ MOMIRfW ______ signature )) _)69_H __Phon.No.ji0_o1_i1'Wi NCINA \SflVATER AJTK6r don Avanl.ls Enolnea Carlsbad. CA 92011 (760) 435-3941 FAX (?efl 47"852 Page 1 of I Brian Drache From: Baxter, Dan DEB [dbaxter@sendx corn] Sent: Thursday, May 17, 2012 6:52 PM To: Elley Klausbruckner (Klausbruckner & Associates Inc.) Cc: Worley, Jack JWW; Brian Drache Subject: RE: SenDx Phase Ill plans - cover letter request Hello Elley, Smith Consulting is about ready to submit the SenDx Phase Ill plans to the city of Carlsbad for approval. This phase will not add or change any of the chemical types or quantities listed in the phase II report that you prepared. Smith Consulting believes that a cover letter from you to this effect, submitted with the plans, might help to prevent the sort of delays we experienced in the phase II plan check. Please let me know what you need from us to make this possible, and when it can be completed. Thanks Dan Baxter, SenDx Medical Inc. (760) 603-3407 direct (760) 420-8257 cell Please be advised that this email may contain confidential information. If you are not the intended recipient, please notify us by email by replying to the sender and delete this message. The sender disclaims that the content of this email constitutes an offer to enter into, or the acceptance of, any agreement; provided that the foregoing does not invalidate the binding effect of any digital or other electronic reproduction of a manual signature that is included in any attachment. No virus found in this message. Checked by AVG - www.avg.com Version: 2012.0.2176 / Virus Database: 2425/5006 - Release Date: 05/17/12 P444. U6L24(flb , /O'I-; FIRE 5/30/2012 KLAU SB RUCKN ER 4105 Sorrento Valley Blvd )) ) AND ASSOCIATES San Diego, CA 92121 Tel (858) 677-9878 Fax: (858) 677-9894 SENI)x MEDICAL INC. OUTDOOR HAZARDOUS MATERIALS STORAGE AREA 1945 PALOMAR OAKS WAY, SUITE 100 CARLSBAD, CA 92009 HAZARDOUS MATERIALS FIRE CODE COMPLIANCE REPORT Rev 1.2 February 20, 2012 00 711 CB121009 1945 PALOMAR OAKS WY SENDX MEDICAL TENANT IMPROV TO EXISTING LAB AREAS 5/50/12- 70 p-c / i —/ ptte/e c-' c- uI ititzm 4-r m 573iJi2 &Q2 1) e&-i L L (I7L shphwWpaj P-',F-3,&1 -I O*e ie-r OcvQ ,4-T CrI i L 1/f 7(/2 - 7SSuO Approved Date By BUILDING PLANNING ENGINEERING /-, FIRE E3qedae?('?') N 7 '(/ , L i AFS Checked by HazMat APCD Health Forms/Fees Sent Recd Due? By Encina 2 V N Fire V N HazHealthAPCD V N PE&M 7o)iz. V N School V N Sewer V N Stormwater V N Special Inspection Y N LandUse CFD: Y N Density. ImpArea: FY. Annex* Factor PFF: Y N Comments Date Date Date Date Building L Planning Engineering - Fire Qz/12 r4,111 z Need? O Done O Done U Done U Done U Done SW U Issued