HomeMy WebLinkAbout1949 PALOMAR OAKS WAY; ; CB120710; Permit05-01-2013
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB120710
Building Inspection Request Line (760) 602-2725
Job Address:
PermttType:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
1949 PALOMAR OAKS WY CBAD
11 Sub Type: INDUST
2130910100 Lot#: 0
$25,000.00 Construction Type: NEW
Reference# PCI20018
NEW FLATWORK W/ ADA UPGRADES
Status: EXPIRED
Applied; 04/18/2012
Entered By: JMA
Plan /Approved:
Issued:
Inspect Area
Plan Check #:
/Applicant:
BURGER CONSTRUCTION
Owner:
ARDEN REALTY LTD PTNSHP
131 ABERDEEN DR
CARDIFF, CA 92007
858-75&-1800
P 0 BOX 4900 DEPT 201
SCOTTSDALE,/^Z 85261
Building Permit $273.87 Meter Size
Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00
Plan Check $191.71 Meter Fee $0.00
Add'l Building Permit Fee ($134.00)SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $5.25 PFF (3105540) /$0.00
Park Fee $0.00 PFF (4305540)$0.00
LFM Fee $0.00 License Tax (3104193)$0.00
Bridge Fee $0.00 Ucense Tax (4304193)$0.00
BTD #2 Fee $0.00 Traffic Impad Fee (3105541)$0.00
BTD #3 Fee $0.00 Traffic Impad Fee (4305541)$0.00
Renewal Fee $0.00 PLUMBING TOTAL $0.00
Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $0.00
Other Building Fee $0.00 MECHANICAL TOTAL $0.00
Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Meter Size Sewer Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00
Red. Water Con. Fee $0.00 Addlfonal Fees $0.00
Green BIdg Stands (SB1473) Fee $1.00 HMPFee 77
Fire Expedidted Plan Review $0.00 Green BIdg Standards Plan Chk 77
TOT/U. PERMIT FEES $337.83
Total Fees:$337.83 Total Payments To Date:$0.00 Balance Due;$337.83
Inspector
FINAL APPROVAL
Date:Clearance:
NOTICE- Rease take NOTICE ttiat approval of your project Includes the "Imposition" of fees, dedications, reservations, or other exactions here^r collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions, if you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest anld any other required Information with the City Manager for
processing In accordance with Carlsbad Municlpai Code Section 332.030. Faiiute to timety tokw that procedure wJi bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You ate hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES fJOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other simgar appOc^ion processing or service fees in connection with this project NOR DOES IT APPLY to arty
fees/exacdona of which \rou have ofeviousiv been given a NOTICE slmiar to this, or as to which the statute of limitations has orevlouslv otherwise exolied.