HomeMy WebLinkAbout1950 CAMINO VIDA ROBLE; ; CB960027; PermitProject No
Development, No
BUILDING PERMIT Permit No
01/22/96 15:49
Page 1 of 1
Job Address: 1950 CAMINO VIDA ROBLE Suite: =:-,-,_. /,, /7, --,. ,,,
Permit Type: RETAINING WALL —.-.*--, __,
Parcel No: 212-093-12-00 Lot#: 33 34
Valuation: 47,655 Construction Type
Occupancy Group: Referenced: Status
Description: 3530 SF RETAINING WALL
Appl/Ownr : SHER, CHARLIE
990 HIGHLAND DRIVE#202
SOLANA BEACH, CA. 9207
*** Fees Required ***
Fees :
Adjustments:
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
* BUILDING TOTAL
Applied
Apr/Issue
Entered By
CB960027
A960U058
VN
ISSUED
01/05/96
01/22/96
MDP
619 792-8800
ted & Credits * *
. 00
261.00
407. 00
Ext fee Data
402. 00
261 .00
5.00
668. 00
CITY OF CARLSBAD
2075 Us Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
PERMIT APPLICATIONCity of Carlsbad Building DepartmentZ075 Las PaUra Dr., Carlsbad, CA 92009 (619) 438-11611. PERMIT TYPEFrom List 1 (see back) give code of Permit-Type:For Residential Projects Only: From list 2 (see back) giveCode of Structure-Type:Net Loss/Gain of Dwelling Units2, PROJECT INFORMATION PLAN CHECK NO.PLANCK DEPOSIT,VALID. BY_DATE FOR OFFICE USE ONLYAddress
Nearest
Building or Suite No.
ss Street
LEGAL DESCRIPTION Lot No.Subdivision Name/Number Unit No.Phase No.
CHECK BELOW IF SUBMITTED:
D 2 Energy Calcs [ft2 Structural Calcs D 2 Soils Report D1 Addressed Envelope
ASSESSOR'S PARGET.; USE .PRQPOSEELUSE
# OF STORIES OF BEDROOMS OF BATHROOMS
3. UJNIAL.I rtttttiun (.11 dmerent trom applicant;
NAME (last name first)f*A<>r
CITY STATE
ADDRESS
ZIP CODE DAY TELEPHONE
4. APPIICAN 1 LJ CON FRAC 1UR LJ AGLN t MM CON 1 HACTOK
NAME (last name first) .Li.6 S ADDRESS
OWNER U AbLN 1 FOH OWNER
cfcwd Dv I*"
CITY STATE ZIP CODE DAY TELEPHONE 63 f ?
5. PROPERTY OWNER _. ^ ^NAME (last name first)£ft*t3C>frl>
STATE Z1P CODE DAY TELEPHONE_.
" NAME (last name first)fc£lJ[?JEN
CITY STATE O* ZIP CODE
STATE LIC. #67/069 LICENSE CLASS O
ADDRESS PO
DAY TELEPHONE fa] ? —
CITY BUSINESS L1C. # /.S.O C3
_. . _orkers' Compensation Declaration: hereby affirm that! have a certificate ot consent to se -insure issued Dy the Director o industrial
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C).
INSURANCE COMPANY POLICY NO.EXPIRATION DATE
Certificate of Exemption: I certify that in the pertormance of the worlc for which this permit is issued, I shall not employ any person in any manner
so as to become subject to the Workers' Compensation Laws of California.
SIGNATURE DATE
8. OWNER-BUILDER DECLARATION
Owner-Builder Declaration: I nereoy attirra mat 1 am exempt trom tne Qjanlractors License Law tor tne lollowmg reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
P£ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's License Law).
n I am exempt under Section Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
SIGNATURE (* QJi \ Jt 0 DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 2S534 of the Presley-Tanner Hazardous Substance Account Act?
D YES ff NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
D YES QhNO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
O YES rjsNO
IF ANY OF THE ANSWERS ARE YES, A RNAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFTER mYl, 1989 WIESS THE APPLICANT
HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE Am POLLUTION CONTROL DISTRICT.
9. CONSTRUCTION LADING AUENCY
I hereby attirm that there ts a construction lending agency tor ihtTpertormance ol ttie worfc lor which this permit is issuetTtSec 3o9?U) Civil Code).
LENDER'S NAME LENDER'S ADDRESS
ID. APPLICANT
Tcertiry that I nave read the application and state that the above information is correct. 1 agree to comply with all City ordinances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned^ propertyfor inspection
purposes.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by
such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform BuildingCode).
APPLICANTS SIGNATURE /~ . I / Q DATE: /-5*- *f/^\ AJL
WHITE: FFile YELLOW: Applicant PINK: Finance
01/11/97 INSPECTION HISTORY LISTING
FOR PERMIT* CB960027
DATE INSPECTION TYPE
04/22/96 Retaining Walls
04/22/96 Retaining Walls
04/19/96 Grout
04/19/96 Grout
04/18/96 Grout
04/18/96 Grout
04/16/96 Ftg/Foundation/Piers
04/16/96 Ftg/Foundation/Piers
04/15/96 Footing
04/15/96 Footing
04/11/96 Footing
04/11/96 Footing
04/04/96 Grout
04/04/96 Grout
04/02/96 Footing
04/02/96 Footing
03/27/96 Footing
03/27/96 Footing
03/26/96 Footing
03/26/96 Footing
03/22/96 Footing
03/22/96 Footing
INSP ACT COMMENTS
RI RI RS/BILL/431-9788
PY AP OK TO GROUT SOUTH WALL
RI RI MW/BILL/431-9788
PK AP 2ND LIFT/EAST WALLS
RI RI MW/BILL/431-9788
PY CA
RI RI BJN/BILL/431-9788
PY AP OK TO GROUT & POUR STEM
RI RI BJN/BILL/431-9788
PY NR NO ONE THERE/4:05 PM
RI RI BJN/BILL/
TP NR
RI RI MW/BILL/AM PLEASE
TP AP 1ST LIFT 12&8" WALLS
RI RI MW/BILL/431-9788/AM PLS
PY PA NORTHEAST SIDE
RI RI MW/BILL/431-9788
PY AP SOUTH SIDE WALLS/UPPERS LOWER
RI RI MW/BILL/431-9788
TP CO NOT COMPLETE/ENG REV
RI RI MW/BILL/431-9788
PK CO DETAILED INCORRECTLY
HIT <RETURN> TO CONTINUE...
International
Conference of Building Officials
GREG W GIFFORD
CERTIFIED SPECIAL INSPECTOR
STRUCTURAL MASONRY
1994 EDITION - UNIFORM BUILDING CODE
The individual named hereon is CERTIFIED In the category
shown, having been so certified pursuant to successful
completion of the prescribed written examination. A
Expiration date: November 18, 19S&/ /I J /
No. 88479 _J_ZOyyl ' "' ' ^ * ~Not valia ur— —Jfss signed
ICBO certification attests to competent kfYovmstandards. Applicable experience should bejurisdictions.
Bolder.
_ of codes andverified by local
International
Conference of Building Officials
GREG W GIFFORD
CERTIFIED SPECIAL INSPECTOR
REINFORCED CONCRETE
1994 EDITIONS - UBC & ASTM STANDARDS
The individual named hereon is CERTIFIED in the category
shown, having been so certified pursuant to successful
completion of the prescribed written examination..
Expiration date: July 15*1998 » J t I /
No. 84466 .jXnfr* ^TliAA^q
Not valid unless signed (t^certifitfate holder.
ICBO certification attests to competent knowledge of codes and
standards. Applicable experience should be verified by localjurisdictions.
International
Conference of Building Officials
GREO W GIFFORD
BUILDING INSPECTOR
1991 EDITION - UNIFORM BUILDING CODE
The individual named hereon is CERTIFIED in the category
shown, haying been so certified pursuant to successful
completion of the prescribed written examination.
Expiration date: Notwntw 19, 4M7
No. 75721 _ JtnfrA i (Hi
ICBO certification
standards.
Not valid
attest* to
nlesa signpp by certificate holder,
competer* knowledge of code* and
-I
International Conference
of Building Officials
International Association
of Plumbing and
Mechanical Officials
- 5: v vyjora
189tSff,7l2*ll«l«IW*>r
assKssSSBsa..crr.r.r'-'^2?5""
No 096219 untess sigfvcertificate holder
International
Conference of Building Officials
GREG W GIFFORD
CERTIFIED SPECIAL INSPECTOR
STRUCTURAL STEEL AND WELDING
1994 EDITION - UNIFORM BUILDING CODE
The individual named hereon is CERTIFIED in the category
shown, having been so certified pursuant to successful
completion of the prescribed written examination.
Expiration date: September 16,^1998, 1
No. 86314 . >(*icq V(, HLM-^.VNot valid uoless signefT|by certificate holder.
ICBO certification attests to competent knowledge of codes and
standards. Applicable experience should he verified by tocel
jurisdictions.
EsGil Corporation
Professional'Pfan Review 'Engineers
DATE: 1/17/96 O^PPklCANT
XQ JURIS. a FIRE
JURISDICTION: Carlsbad ^-a-PtKN REVIEWER
Q FILE
PLAN CHECK NO.: 96-27 SET: I
PROJECT ADDRESS: 195O Camino Vida Roble
PROJECT NAME: Retaining Walls
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified in the attached list are resolved and checked by building
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted: (by: ) Telephone #:
REMARKS:
By: David Yao Enclosures:
Esgil Corporation
n CM n GP n PC 1/9
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 * (619)560-1468 4 Fax (619) 560-1576
Carlsbad 96-27 I
1/17/96
1. Provide a statement on the Title Sheet of the plans that this project shall comply
with the 1994 UBC.
2. Specify on the foundation plan the design bearing capacity of the foundation.
Section 1804.3.(2250psf)
3. Note on the foundation plan that "Prior to the contractor requesting a Building
Department foundation inspection, the soils engineer shall advise the building
official in writing that:
a)The building pad was prepared in accordance with the soils report,
b)The utility trenches have been properly backfilled and compacted, and
c)The foundation excavations comply with the intent of the soils report."
4. Where special inspection is required for masonry, note on the plans that prism
tests shall be performed in accordance with Section 2105.3.
When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official for
approval prior to issuance of the building permit. Please review Section
106.3.5.
Please attach 3 sheets of the calculation to the site plan as the plan for the
retaining wall.
If you have any questions regarding these items, please contact David Yao of
Esgil Corporation at (619) 560-1468. Thank you.
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PU\N CHECK NO.: 96-27
PREPARED BY: David Yao DATE: 1/17/96
BUILDING ADDRESS: 1950 Camino Vida Roble BUILDING OCCUPANCY:
TYPE OF CONSTRUCTION:
BUILDING PORTION 1 BUILDING AREA
I (sq. ft.)
retaining wall
Air Conditioning
Fire Sprinklers
TOTAL VALUE
3530
VALUATION 1 VALUE
MULTIPLIER | ($)
per permit application 47,655.00
UBC Building Permit Fee:
UBC Plan Check Fee:
Comments:
$ 395.00
$ 256.75
Sheet 1 of 1
valuefee.dot
9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 + (619)560-1468 + Fax (619) 560-1576
City of Carlsbad
Engineering Department
DATE: -
BUILDING PLANCHECK CHECKLIST
PLANCHiCK NO.
BUILDING ADDRESS: /
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER:EST. VALUE.
/APPROVAL
Kern you haw submitted for review has been
approved The approval la baaad on plane, information
and/or spaciflcations providad in you sutxnrttal; therefore
any changes to these Hems after this data, including flaw
modiflcationa, most oa raviawad by this office to insure
continued conformance with applicable codas. Please
review carefully all comments attached, as failure to
comply with instructions In this report can rasuM in
suspension of permit to build.
CJ A Right-of-Way permit is required prior to construction
of the following improvements:
ENGINEERING DEPARTMENT
DENIAL
Please see the attached report of deficiencies marked
with O Make necessary corrections to plane or
specifications for compliance with applicable codes and
standards. Submit corrected plans and/or specifications
to this office for review.
By..Date:
By:Date:
By:.Date:
ATTACHMENTS
D Dedication
D Dedication
LJ Improvement Appfcattoo
LJ Improvement ChackNat
LJ Future Improvement Agreement
O Grading Permit Application
D Grading Submttal Checklist
D Right of Way Parmt Appfcation
D Right of Way Pern* Submittal Checklist
and Information Sheet
LJ Sewer Fee Information Sheet
ENGINEERING DEPT. CONTACT PERSON
o
NAMg-yV
'ctty'ofCartsbad
ADDRESS: 2075 ' •• Palmes Dr.. Carlsbad. CA 92009
PHONE 438-1161. Ext
A-4
REV 06/11/«4
2O75 Las Palmas Dr. • Carlsbad, CA 92OO9-1576 • (619) 438-1161 • FAX (619) 436-0894
BUILDING PLANCHECK CHECKUST
SITEPUUt
ED D 1. Provide • fully dimensioned site plan drawn to scale. Show:
m/a
A. North Arrow D. Property Lines Easements
B. Existing & Proposed Structures E. Easements
C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets
D 2. Show on site plan:
A. Drainage Patterns C. Existing Topography
B. Existing & Proposed Slopes
$Z D D 3. Include note: "Surface water to be directed away from the building foundation at a 2%
gradient for no less than 5* or 2/3 the distance to the property line (whichever is less).'
[Per 1985 UBC 2907(d)5].
On graded sttes, the top of any exterior foundation shall extend above the elevation
of the street gutter at point of discharge or the inlet of an approved drainage device
a minimum of 12 Inches plus two percent" (per 1990 UBC 2907(d)5.).
D D 4. Include on title sheet
A. Site address
B. Assessor's Parcel Number
C. Legal Description
For commercial/Industrial buildings and tenant Improvement projects, indude: Total
building square footage with the square footage for each different use, existing sewer
permits showing square footage of different uses (manufacturing, warehouse, office,
etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
ft\DOCs\CHKLSTMPoooi.niM Pag* 1 of 4
BUILDING PLANCHECK CHECKLIST
DISCRETIONARY APPROVAL COMPLIANCE
D D D 5. Project does not comply with the following Engineering Conditions of approval for
Project No. ;
Conditions were complied with by: Date:
DEDICATION REQUIREMENTS
D D D 6. Dedication for all street Rtghts-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and for
remodels with a value at or exceeding $ -pursuant to Code Section
18.40.030.
Dedication required as follows:
Attached please find an application form and submfttal checklist for the dedication
process. Provide the completed application form and the requirements on the
checklist at the time of resubmittal.
Dedication completed by Date:
IMPROVEMENT REQUIREMENTS
D D O 7a. All needed public Improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the construction
exceeds $ -pursuant to Code Section 18.40.040.
Public improvements required as follows:
Please have a registered CM Engineer prepare appropriate improvement plans and
submtt them together with the requirements on the attached checklist for a separate
planchack process through the Engineering Department Improvement plans must be
approved, appropriate securities posted and fees paid prior to issuance of permit
Attached please find an application form and submfttaJ checklist for the public
improvements requirements. Provide the completed application form and the
requirements on the checklist at the time of resubmittal.
Improvement Plans signed bv: Date:
ft\OOCS\CHKUT\BPOOm.FW Pagt2Qf4 MVM/11/M
BUILDING PLANCHECK CHECKUST
/3rd^/
ET D lU 9. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are not
limited to: street improvements, trees, driveways, tieing into public storm drain, sewer
and water utilities.
Right-of-Way permit required
/Z/97U7 ( ^K (tt ILL
red for
A separate Right-of-Way permit issued by the Engineering Department is required for
the following:
10. A SEWER PERMIT is required concurrent with the building permit issuance. The fee
is noted in the fees section on the following page.
11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial
Waste Permit Application Form and submit for City approval prior to issuance of a
Permit
Industrial waste permit accepted by: Date:
P^DOCS\CHKLST\BP0001.mi Pap4of4 RCVM/11/M
Plan Check No.
Planner
PLANNING CHECKLIST
2-7 Address 1 4 JO /j//U
Phone 438-1161 ext.
« « *>WWW• • a000
(Name)
APN:
Type of Project and Use
Zone P ^ Facilities Management Zone
CFD (4nfoutT) #
566
S S i a
property in, complete SPECIAL TAX CALCULATION
WORKSHEET provided by Building Department.)
Item Complete
Item Incomplete - Needs your action
1, 2, 3 Number in circle indicates plancheck number where deficiency was
identified
Environmental Review Required: YES NO ^ TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
Discretionary Action Required: YES NO TYPE
APPROVAL/RESO. NO. DATE:
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions of approval? Ifnot, state conditions which/ require action
Conditions of Approval
n
J£ /t o,k
U/D D California Coastal Commission Permit Required: YES NO X.
DATE OF APPROVAL: _^___
San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725
(619) 521-8036
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
Indusionary Housing Fee required: YES NO xC
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Site Plan:
D
D
D
Zoning:
1. Provide a fully dimensioned site plan drawn to scale. Show: North
arrow, property lines, easements, existing and proposed structures,
streets, existing street improvements, right-of-way width, dimensioned
setbacks and existing topographical lines.
2. Provide legal description of property, and assessor's parcel number.
1. Setbacks:
L>
V*
. '
O^D
crnn
CTDD
DDD
-p$- Front:
' /} A Int. Side:
?^J1^ Street Side:
-^S^^ Rear:
2. Lot coverage:
3. Height:
4. Parking:
Additional Comments
Required
Required
Required
Required
Required
Required
Spaces Required
Guest Spaces Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE /
PLNOCFRM
CARLSBAD AIRPORT CENTER LOT 33/34
SITE RETAINING WALLS
SUBJECT:SHEET NO:
DETAIL & SPECIFICATIONS 1 - 2
BASIS OF DESIGN 3
WALL CALCULATIONS 4 - 19
STRUCTURAL CALCULATIONS
Itfl ENGINEERING, INC.
Consulting Structural Engineers
11545 W. Bernardo Court, Suite 300
San Diego, CA 92127
(619) 673-8416
(619) 673-8418 FAX
Job NO.C95-111 CO 1
By: CR
Check By:
Date: 11/16/95
c:\calc\c95-lll
BY_
R2H Engineering, Inc.
PROJECT
SUBJECT.
JOB NO.
DATE —
R2H Engineering, Inc.
BY_
PRfllFfiT £TTg U>T
JOB NO
HATF
SHEET-OF
REINFORCEMENT:
Intermediate grade, hard grade, or rail steel deformation shall
conform to ASTMA615, A616, A617. BarsshalUap40
diameters, where spliced, unless otherwise shown on the plans.
Bends shall conform to the Manual of Standard Practice, A.C.L
Backing for hooks is four diameters. All bar embedments are
clear distances to outside of bar. Spacing for parallel bars is
center to center of bars.
MASONRY:
All reinforced masonry retaining walls shall be constructed of
regular or light weight standard units conforming to the
•'Standard Specifications for Public Works Construction" and
ASTM C90-90.
JOINTS:
Vertical control joints shall be placed at 32 foot intervals
maximum. Joints shall be designed to resist shear and other
lateral forces while permitting longitudal movement Vertical
expansion joints shall be placed at 96 foot intervals mmnmni
CONCRETE:
Footing concrete shall be 480-C-2000, using B aggregate when
placing conditions permit.
BACKFILL:
Backfill material shall be select backfill material specified by the
project soils engineer. No backfill material shall be placed
against masonry retaining walls until grout has reached design
strength or until grout has cured for a minimum of 28 days.
Compaction of backfill material by jetting or ponding with water
will not be permitted. Each layer of backfill shall be moistened
as directed by the Engineer and thoroughly tamped, rolled or
otherwise compacted until the relative compaction is as specified
by the project soils engineer.
INSPECTION:
Call for inspections as follows:
A. When the footing has been formed, with the steel tied
securely in final position, and is ready for the concrete
to be placed.
B. Where clean out holes are not provided:
(1) After the blocks have been laid up to a height
of 4', or full height for walls up to 5', with
steel in place but before the grout is poured,
and...
C.
(2) After the first lift is properly grouted, the
blocks have been laid up to the top of the wall
with the steel tied securely in place but before
the upper lift is grouted.
Where clean out holes are provided:
After the blocks have been laid up to the top of the
wall, with the steel tied securely in place, but before
grouting.
After grouting is complete and after rock or nibble wall
drains are in place but before earth backfill is placed.
D. Final inspection when all work has been completed.
CONCRETE GROUT AND MORTAR MIXES:
Concrete grout shall attain a minimum compressive strength of
2,000 psi in 28 days and mortar shall attain 1,300 psi in 28 days.
All cells shall be filled with grout Rod or vibrate grout within
10 minutes of pouring to insure consolidation. Bring grout to a
point 2" from the top of masonry units when grouting of second
lift is to be continued at another time.
WALL DRAINS:
Wall drains shall be provided in accordance with the project
soils engineer.
SOIL:
All footings shall extend at least 13 inches into undisturbed
natural soil or approved compacted fill Soil should be
dampened as directed by the project soils engineer prior to
placing concrete in footings.
R2H Engineering, Inc. JOB NO
BY ^- _ gllRIFnT^gl-rg-geTAlrlKr lA.U^> _ SHEET _ OF
PROJECT l^T -??=&/?&-- DATE H"'gl'
MAV -Z-Z&O p*?F /^EEV^fc S^| /^ Ufl^ \u/
' i
R2H ENGINEERING INC.Consulting Structural Engineers11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1SITE RETAINING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 3.67 FT. HEIGHT
HALL & FOOTING DATA
Retained Height = 3.67 ft
Hall Ht. above Soil = 0.00ft
Toe Hidth = n.l7!t
Heel Width = 2.83ft
Total Footing Hidth = 3.00ft
Footing Thickness = 12.00 in
Key Depth = 8.00 in
Key Hidth = 12.00 in
Toe to Key Dist. = **1.00 ft
SLIDIHG CHECKPtg/Soil Friction = 0.30
Soil to Neglect = 0.00 in
Lateral Pressure = 545 \
- Passive Pressure = 352 i
- Friction = 513 I
Add'l Force Required = 0.0 i
SOMHASY
Pressure i Toe
Pressure s Heel
Allowable Press.
Ecc. of resultant
Max. Shear i Toe
Max. Shear @ Heel
Allow. ?tg Shear
Factors of Safety:
Overturning
Sliding
VERTICAL LOADS
Axial DL on Sten = 0 plf
Axial DL on Stem = 0 plf
....Eccentricity = 0.00 in
Surcharge over Toe = 0.0 psf
Surcharge over Heel = 0.0 psfNote: Toe Surcharge Resists Overturning
Note: Heel Surcharge Resists Overturning
SOIL DATA
Allowable Bearing =
Active Lateral =
Max Press. =Slope Press.
Backfill Slope
Passive Press.
LATERAL LOADS
Soil Density
Soil Ht over Toe
2250 psf
50. Opcf
0 pcf
Opcf
0 :1
Opcf
Opcf
0
0
150
1106.00 in
Lateral Load Acting on
Stem Above Soil = 0.00 psf
Add'l Lateral Load -- 0.00 plf
Dist to Load Start = 0.00ft
Dist to Load End = 0.00 ft
ADJACENT FOOTING
Vertical Load = 0.0ft
Load Eccentricity = 0.00 in
Footing Hidth = 0.00 ft
Ptg. CL to Hall = 0.00ft
Vert. Position of Ptg.
...Above/Below:[+/-] = 0.0 ft
Spread Footing ? No
Soil Press. Mult
By ACI Eq 9-1
2250 psf Mu-Dpward
5.23 in Mu-Downward
psi Mu-Design
One-Hay Shear:
Actual
_- Allowable
(3.22 :1 Cover over RebarL1
1065.8 psf
73.5 psf
O.i
-4.27 psi
76.03 psi
Origin of Force...
Active Soil Press. =
Soil over Heel =
Soil over Toe =
Sloped Soil i Heel
Adjacent Ftg. Load =
Surcharge Over Heel =
Surcharge over Toe =
Axial Load on Hall =
Load a Proj. Hall =Averaged Stem His. =Added Lateral Load =Footing Height =Key HeiqhtVertical Component
of Active Pressure
Totals
3.22
1.59 :1 'd'
Ru = Mu/bd"2
SUMMARY OF FORCES
Overturning Moients
* ft ft-*
Toe
1492
20
4
16
0.0
76.03.50
8.500.3ft uniimfi
Heel
103 psf
1026 ft-ft
1819 ft-i
-793 ft-ft
4.3 psi
76.0 psi
2.50 in
9. 50 in
9. 8 psi
f'c
Fy
Mm. AsOmit SP
ft 4 fti 5 8ft 68ft 78
1 8 ft
I 91
Percent
Under Heel
Toe
19.61
30.39
43.14
48.0048.0048.00
?
Heel '
17.54
27.19
38.60
48.00
48.0048,00
2000 psi
40000 psi
0.0012
No
in o/c
in o/c
in o/c
in o/c
in o/cin o/c
Resisting Moients
ft ft-i
545.2
0
-56.3
0
0.0
0
0.0
1.56
0
0.50
0
0.00
0
0.00
848.7
0
-28.1
0
0.0
0
0.0
0874.5
9.2
0.0
0.0
0.0
0.0
0
1.92
0.080.000.00
0.00
0.00
01676.4
0.8
0.0
0.0
0.0
0.0
0
0.0
0
0.0
0
0
489.0
0
0.0
0
0.0
0
0
0.0
0
275.3
0
450.0
100.0
0.50
0
1.50
1.50
137.7
0
675.0
150.0
0.0
Resisting Totals Used For Soil Pressure(Vert. Component of Active Pressure Removed)
820.6ft-| 1709.01
1709.01
2639.8 ft-|
2639.8 ft-|
{continued on next page.
V4.4B (c) 1983-95 SNERCALC R2H ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITS RETAINING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 3.67 FT. HEIGHT
( continued)
STEM SUMMARY
Top Sten: From 0.00 ft to Top of Rail
B.OOin Masonry w/ | 4 @ 24.00in, d= 5.25in
fli= 1500.Opsi, Ps= 24000.Opsi
LDP= 1.00, n= 25.78
Solid Grouted
Hall Ht.= 75.00psf; Bar Enbe(i= 6.0in
Hactual = 410.9 ^ 776.1ft-t
Vactual = 3.62 <= I9.36psi
Interaction Value = 0.529
V4.4B (c) 1983-95 EHBRCALC R2H ENGINEERING, KN060291
£2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 3.67 FT. HEIGHT Ul/
HALL & FOOTING DATA
Retained Height =
Hall Ht. above Soil
Toe Hidth
Heel Hidth
Total Footing Hidth =
Footing Thickness =
Key Depth =
Key Hidth
Toe to Key Dist. =
SLIDING CHECK
Ftg/Soil Friction =
Soil to Neglect
Lateral Pressure
- Passive Pressure- Friction
Add'l Force Required =
SUMMARY
Pressure % Toe =
Pressure 3 Heel
Allowable Press. =
Sec. of resultant
Max. Shear 8 Toe =
Max. Shear e Heel
Allow. Ftq Shear
Factors of Safety:Overturning =Sliding =
VERTICAL LOADS
3.67 ft Axial DL on Stem0.00 ft Axial DL on Stem
"0.17ft ....Eccentricity
2.83 ft Surcharge over Toe =
3.00 ft Surcharge over Heel =
12.00 in Note: Toe Surcharge Resists
8.00 in Note: Heel Surcharge Resists
J2.00in SOIL DATA1.00 ft Allowable Bearing
Active Lateral =
0.40 Max Press. =
0.00 in Slope Press. =
882 f Backfill Slope
469 f Passive Press. =684 S Soil Density
0.0 f Soil Ht over Toe
Oplf
Oplf
0.00 in
0.0 psf
0.0 psf
Overturning
Overturning
LATERAL LOADS
Lateral Load Acting on
Stem Above Soil = 0.00 psf
Add'l Lateral Load = 91.75olf
Dist to Load Start = 0.00 tt
Dist to Load End = 3.67 ft
Origin of Force...
Active Soil Press.
Soil over Reel =
Soil over Toe =
Sloped Soil 8 Heel
Adjacent Ftg. Load =
Surcharge Over Heel =
Surcharge over Toe =
Axial Load on Hall -
Load % Proj. Hall
Averaged Stem Hts. =
Added Lateral Load =
Footing Height =
Key Height
Vertical Component
of Active Pressure
Totals
2251.9 psf Soil Press. Mult. Toe
0.0 psf By ACI Eq 9-1 = 3153
3000 psf Mu-Upward = 42
11.93 in Mu-Downward = 4
0.00 psi Mu-Design = 38
-9.35 psi One-Hay Shear:
76.03 psi Actual = 0.0
Allowable = 76.0
[1.49 :1 Cover over Rebar = 3.50
) 1.31:1 'd1 = 8.50
Ru = Mu/bd*2 = 0.6
SUMMARY OF FORCES
Overturning Moments
f ft ft-f
3000 psf
50.0 pcf
0.0 pcf
0.0 pcf
0.0 :1
200.0 pcf
110.0 pcf
6.00 in
FOOTING DESIGN
Heel f'c
0 psf Fy
ADJACENT FOOTING
Vertical Load
Load Eccentricity =
Footing Hidth =
Ftg. CL to Hall
Vert. Position of Ftg.
...Above/Below:[t/-] =
Spread Footing ?
0.0 *
0.00 in
0.00ft
0.00ft
0.0ft
Ho
2000 psi
40000 psiIll
1819
1708
9.3
76.0
2.50
9.50
21.0
ft-f
ft-f
ft-f
psipsiininpsi
Mm. As PercentOmit SP Onder Heel
Toe
f 4 3 19.61
f 5 1 30.39
f 6 @ 43.14
f 7 a 48.00
f 8 9 48.00
f 9 @ 48.00
Heel
17.54
27.19
38.60
48.00
48.00
48.00
0
inin
in
in
in
in
.0012
No
o/co/c
o/c
o/c
o/c
o/c
Resisting Moments
ft ft-f
545.2
0
-56.3
0
0.0
0
0.0
0
0.0
0
336.7
0
0
1.56
0
0.50
0
0.00
0
0.00
0
0.00
0
2.84
0
0
848.7
0
-28.1
0
0.0
0
0.0
0
0.0
0
954.6
0
0
0
874.5
9.2
0.0
0.0
0.0
0.0
0.0
0
275.3
0
450.0
100.0
0
1.92
0.08
0.00
0.00
0.00
0.00
0.00
0
0.50
0
1.50
1.50
0
1676.4
0.8
0.0
0.0
0.0
0.0
0.0
0
137.7
0
675.0
150.0
0
825.7f
Resisting Totals Used For Soil Pressure
(Vert. Component of Active Pressure Removed)
0 0.0
1775.2 ft-f 1709.0
1709.0
0.00 0.0
2639.8 ft-f
2639.8 ft-f
(continued on next page.
V4.4B (c) 1983-95 ENBRCALC R2H ENGINEERING, KH060291
R2H ENGINEERING INC.Consulting Structural Engineers11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO I
SITE RETAINING HALLS
Date: 11/16/95 Page: ~7
CANTILEVERED RETAINING WALL DESIGN
SITB RBTAINIHG HALL 3.67 FT. HEIGHT
( continued)
STEH STOMA2Y
Top Step: Froffl 0.00 ft to Top of Hall
S.OOin Masonry w/ f 4 8 24.00in, d= 5.25in.
f'i= 1500.Opsi, Ps= 24000.Opsi
"" " n* 25.78LDF= 1.33,
Solid Grouted
Hall Ht.= 75.01Hactual = 1028 sf, Bar Eabed= ID.Oin
<= 1034.8ft-f
Vactual = 7.32 <= 22.36psiInteraction Value = 0.994
V4.4B (cj 1983-95 BHERCALC R2H BNGINEBRING, KH060291
ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING WALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITE RETAIHING HALL 5.33 FT. HEIGHT ll/<?' c-
HALL & FOOTING DATA
Retained Height = 5
Hall Ht. above Soil = 0
Toe Hidth = p
Heel Hidth = 3
Total Footing Hidth = 4
Footing Thickness = 12
Key Depth = U
Key Hidth = |j2Toe to Key Dist. = 0
SLIDING CHBCK
Ftq/Soil Friction
Soil to Heglect
Lateral Pressure
- Passive Pressure
- Friction
Add'l Force Required
SUMMARY
Pressure 3 Toe
Pressure 8 Heel
Allowable Press.
Ecc. of resultant
Max. Shear I Toe
Max. Shear @ Heel
Allow. Ftq Shear
Factors or Safety:Overturning
Sliding
VERTICAL LOADS
,33 ft Axial DL on Stem = 0 plf
,00 ft Axial DL on Stem = 0 plf
,17ft ....Eccentricity = 0.00 in
,83 ft Surcharge over Toe = 0.0 psf
,00 ft Surcharge over Heel = 0.0 psf
,00 in Note: Toe Surcharge Resists Overturning
,00 in Note: Heel Surcharge Resists Overturning
,00 in SOIL DATA
,17 ft Allowable Bearing =
Active Lateral =
0.30 Max Press. =
0.00 in Slope Press. =
1003 i Backfill Slope
602 i Passive Press. =
929 i Soil Density
0.0 I Soil Ht over Toe
2250 psf
50.0 pcf
0 pcf
0 pcf
0 :1
0 pcf
0 pcf
0
0
0
150
110
6.00 in
LATERAL LOADS
Lateral Load Actinq on
Stem Above Soil = 0.00 psf
Add'l Lateral Load = 0.00 plf
Dist to Load Start •- 0.00ft
Dist to Load Bnd = 0.00 ft
ADJACENT FOOTING
Vertical Load = 0.0 i
Load Eccentricity = 0.00 in
Footing Hidth = 0.00ft
Ptg. CL to Hall = 0.00 ft
Vert. Position of Ftg.
...Above/Below:[+/-] = 0.0 ft
Spread Footing ? No
1575.9 psf Soil Press. Mult,
0.0 psf 9-1
Toe
2206
30
03 psi
Origin of Force...
Active Soil Press.
Soil over Heel
Soil over ToeSloped Soil % Heel
Adjacent Ftg. Load
Surcharge Over Heel
Surcharge over Toe
Axial Load on Hall
Load § Proj. Hall
Averaged Stem Hts.
Added Lateral Load
Footing Height
Key Height
Vertical Component
of Active Pressure 0
Totals = 946.51
Resisting Totals Used For Soil Pressure
(Vert. Component of Active Pressure Removed)
. ,_ By ACI Bq
2250 psf Mu-Opward
8.28 in Mu-Downward
0.00 psi Mu-Design =
.41 psi One-Hay Shear:
" ' Actual
Allowable =
Cover over Rebar =•d1
Ru = Mu/bd"2
SUMMARY OF FORCES
Overturning Moments
I ft ft-i
4
26
0.0
76.0
3.50
8.50
0.4
Heel
0
2775
5170
-2395
8.4
76.0
2.50
9.50
29.5i
psf
ft-i
ft-i
ft-l
psi
psi
in
in
psi
f'c
Fy
Mm.
Omit
* 4
I 5
I 6
1 7i 8
t 9
As
SP
8
8
8
8
8
Percent
Under Heel
Toe
19.61
30.39
43.14
48.00
48.00
48.00
Heel
17.27.
38.
48.
48.
48.
5
54
19
60
00
00
00
0
inin
in
in
in
in
2000
40000
.0012
No
o/co/c
o/c
o/c
o/c
o/c
psipsi
Resisting Moments
ft ft-i
1002.8
0
-56.3
0
0.0
0
0.0
0
0.0
0
0.0
0
0
2.11
0
0.50
0
0.00
0
0.00
0
0.00
0
0.00
0
0
2116.9
0
-28.1
0
0.0
0
0.0
0
0.0
0
0.0
0
0
0
1857.6
9.2
0.0
0.0
0.0
0.0
0.0
0
429.1
0
600.0
200.0
0
2.42
0.08
0.00
0.00
0.00
0.00
0.00
0
0.74
0
2.00
0.67
0
4489.4
0.8
0.0
0.0
0.0
0.0
0.0
0
319.6
0
1200.0
133.4
0.0
2088.8ft-* 3095,
3095,
6143.2ft-*
6143.2ft-8
(continued on next page.
V4.4B (c) 1983-95 KNBRCALC R2H ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page: °l
CANTILEVERED RETAINING WALL DESIGN
SITB RETAINIHG WALL 5.33 FT. HEIGHT
( continued)
STEM SUMMARY
Top Stem: Fron 0.00 ft to Top of Hall
12.00in Masonry w/ i 5 d 24.00in, d= 9.00in
f'n= 1500.Opsi, Fs= 24000.Opsi
LDP= 1.00, n= 25.78
Solid Grouted
Hall Ht.= HS.OOpsf, Bar Bnbed= 14.7in
Mactual = 1263.1 <= 2192.4ft-S
Vactual = 5.06 <= 19.36psi
Interaction Value = 0.576
Second Sten From 2.67ft to 0.00ftS.OOin Masonry v/ | 4 i 24.00is, d= S.25in
f'i= 1500.Opsi, Fs= 24000.Opsi
LDP= 1.00, n= 25.78
Solid Grouted, Special Insp.
Hall Ht.= 75.00psf( Bar Eubed= 12.3in
Hactual = 157.4 <= 963.2ft-*
Vactual = 1.94 <= 38.73psi
Interaction Value = 0.16J
V4.4B (C) 1983-95 ENSRCALC R2B ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 5.33 FT. HEIGHT LJ/
HALL & FOOTING DATA
Retained Height =Hall Ht. above Soil
Toe Width
Heel Width
Total Footing Hidth =
Footing Thickness =Key Depth =
Key Width
Toe to Key Dist. =
SLIDIHG CHECK
Ptg/Soil Friction
Soil to NeglectLateral Pressure =- Passive Pressure =
- Friction =
Add'l Force Required =
SUMMARY
Pressure 8 Toe =
Pressure 8 Heel =Allowable Press. =Bcc. of resultant =
Max. Shear 8 Toe =
Max. Shear 8 Heel =Allow. Ftg Shear
Factors or Safety:
Overturning =
Sliding =
0.17ft
VERTICAL LOADS
Axial DL on Stem =Axial DL on Stem =
....Eccentricity =
Surcharge over Toe =
Surcharge over Heel =
Note: Toe Surcharge Resists
Note: Heel Surcharge Resists
SOIL DATA
Allowable Bearing =
Active Lateral
Max Press. =
OplfOplf
0.00 in
0.0 psf
0.0 psf
OverturningOverturning
LATERAL LOADS
Lateral Load Acting on
Stem Above Soil = 0.00 psf
Add'l Lateral Load = 133.30 plf
Dist to Load Start = 0.00ft
Dist to Load End = 5.33ft
0.40
0.00 in Slope Press.
1712 I Backfill Slope
803 i Passive Press.
1385 i Soil Density
O.Oi Soil Ht over Toe
76.03 psi
.28
Toe3711
51
Origin of Force...
Active Soil Press. =
Soil over Heel =
Soil over Toe
Sloped Soil % Heel
Adjacent Ptg. Load =
Surcharge Over Heel =
Surcharge over Toe =
Axial Load on Hall
Load @ Proj. Hall =Averaged Stem Hts. -
Added Lateral Load =
Footing Height =
Key Heiqht
Vertical Component
of Active Pressure
2650.6 psf Soil Press. Mult.0.0 psf By ACI Bq 9-1 =
3000 psf Mu-Upward
16.55 in Mu-Downward
0.00 psi Hu-Design =
-19.92 psi One-Hay Shear:-'----• Actual
Allowable =Cover over Rebar =
'd1
Ru = Mu/bd*2
SUMMARY OF FORCESOverturning Moments
i ft ft-i
3000 psf
50.0 pcf
0.0 pcf
0.0 pcf
0.0 :1
200.0 pcf
110.0 pcf
6.00 in
FOOTING DESIGN
Heel f'c
0 psf Fy
ADJACENT FOOTING
Vertical Load =
Load Eccentricity =Footing Hidth =
Ftg. CL to Wall
Vert. Position of Ftg.
...Above/Below:[+/-] =
Spread Footing ?
0.010.00 in0.00ft0.00ft
ft
Bo
2000 psi
40000 psi
4
47
0.0
76.0
3.50
8.50
0.7
1333
6928
5595
19.9
76.0
2.50
9.50
68.9
ft-i
ft-i
ft-i
psipsi
in
inpsi
Min.
Omit
i 4i 5i 6i 7i 88 9
As PercentSP Under Heel
Toe
8 19.61
i 30.39
8 43.14
8 48.00
8 48.00
8 48.00
Heel
9.00
13.95
19.8027.00
35.55
45.00
1
ininin
in
inin
J.0012
No
o/co/co/c
o/c
o/co/c
Resisting Moments
ft ft-i
1001.7
0
-56.3
0
0.0
0
0.0
0
0.0
0
710.5
0
0
2.11
0
0.50
0
0.00
0
0.00
0
0.00
0
3.67
0
0
2113.6
0
-28.1
0
0.0
0
0.0
0
0.0
0
2603.9
0
0
0
2149.6
9.2
0.00.0
0.0
0.0
0.0
0428.7
0
675.0
200.0
0
2.67
0.08
0.00
0.00
0.00
0.00
0.00
0
0.74
0
2.25
0.67
0
5732.5
0.8
0.0
0.0
0.0
0.0
0.0
0
319.3
0
1518.7
133.4
0 0.0 0.00
Totals = 1656.01
Resisting Totals Dsed For Soil Pressure
(Vert. Component of Active Pressure Removed)
4689.5 ft-i 3462.4 If
3462.41
7704.8 ft-i
7704.8 ft-i
(continued on next page.
V4.4B (c) 1983-95 ENERCALC R2H ENGINEERING, KH060291
ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page: //
CANTILEVERED RETAINING WALL DESIGN
SITB RETAINING HALL 5.33 FT. BBIGHT |J/
( continued)
STEM SUMMARY
Top Stei: Pron 0.00 ft to Top of Hall
12.00in Masonry »/ ! 5 i U.OOin, d= 9.00iu
f'ffl= 1500.Opsi, Ps= 24000.Opsi
LDF= 1.33, n= 25.78
Solid Grouted
Hall ttt.= llB.OOpsf, Bar Bnbed= 33.Sin
Mactual = 3154.2 <= 3417.2ft-*
Vactual = 10.16 <* 22.36psi
Interaction Value = 0.92j
Second Stem Prom 2.67ft to 0,00ft
S.OOin Masonry v/ i 4 8 U.OOin, d= 5.25ia
f'ra= 1500.Opsi, Ps= 24000.Opsi
LDP= 1.33, n= 25.78
Solid Grouted
Hall Ht.= 75.00psf, Bar Enbed= 20.9in
Hactual = 628.4 <= 1207.2ft-f
Vactual = 5.83 <= 22.36psi
Interaction Value = 0.521
V4.4B (c) 1983-95 ENERCALC R2H ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page: j ~L
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 6.67 FT. HEIGHT
HALL & FOOTING DATA
Retained Height = 6.67 ft
Hall Ht. above Soil = 0.00ft
Toe Hidth = Hi.17 ft
Heel Hidth = 5.33ft
Total Footing Hidth = 5.50ft
Footing Thickness = 12.00 in
Key Depth = 18.00 in
Key Width = [12.00 in
Toe to Key Dist. = 0.17 ft
SLIDING CHECK
Ft0/Soil Friction
Soil to Neglect
Lateral Pressure- Passive Pressure
- Friction
Add'l Force Required
SUMMARY
Pressure S Toe
Pressure I Heel
Allowable Press.
Ecc. of resultant
Max. Shear & Toe
Max. Shear % Heel
Allow. Ftq Shear
Factors of Safety;
Overturning
Sliding
VERTICAL LOADS
Axial DL on Stem
Axial DL on Stem
....Eccentricity
Surcharge over Toe
Surcharqe over Heel
0.
Oplf
OplfGin
0 psf
0.0 psf
LATERAL LOADS
Lateral Load Acting on
Stem Above Soil = 0.00 psf
Add'l Lateral Load = O.OOplf
Dist to Load Start = 0.00ft
Dist to Load 2nd = 0.00 ft
Note: Toe Surcharge Resists Overturning
Note: Heel Surcharge Resists Overturning
SOIL DATA
Allowable Bearing =
Active Lateral
0.30 Max Press.
0.00 in Slope Press.
14711 Backfill Slope675 I Passive Press.
1521 i Soil Density
O.Oi Soil Ht over Toe
2250 psf
50.0 pcf
0.0 pcf
0.0 pcf
0.0 :1
150.0 pcf
110.0 pcf6. 00 in
ADJACENT FOOTING
Vertical Load = O.Of
Load Eccentricity = 0.00 in
Footing Hidth = 0.00ft
Ptg. CL to Hall = 0.00ft
Vert. Position of Ftg.
... Above/Below: (+/-) = 0.0ft
Spread Footing ? No
Origin of Force...
Active Soil Press. =
Soil over Heel =Soil over Toe =
Sloped Soil @ Heel
Adjacent Ftg. Load =
Surcharge Over Heel =
Surcharge over Toe =Axial Load on Hall =
Load 9 Proj. Hall
Averaged Stem Hts.
Added Lateral Load
Footing Height ~
Key Height
Vertical Componentof Active Pressure
1712.6 psf Soil Press. Mult.130.9 psf By ACI Eq 9-1 =
2250 psf Mu-Opward
9.44 in Mu-Downward =0.00 psi Mu-Design =
-9.31 psi One-Hay Shear:
Actual =
Allowable =
Cover over Rebar =•d'
Ru = Mu/bd"2
SUMMARY OF FORC2S
Overturning Moments
ft ft ft-i
76.03 psi
L67 :1
1.49
Toe Heel
2398 183
33 8814
4 13470
29 -4656
0.0 9.3
76.0 76.0
3.50 2.50
8.50 9.50
0.4 57.3ft NnMmq
psfh-ift-ift-i
psi
psi
in
in
psi
f'c
Fy
Mm. As
Omit SP
ft 4 •
1 59
i 6 9
f 7 8
I 88
i 98
PercentUnder Heel
Toe
19.61
30.39
43.14
48.00
48.00
48.00
Heel
10.
16.
23.
32.
42.
48.
7
86
83
88
57
88
00
0
in
inin
in
inin
2000
40000
.0012
No
o/c
o/co/c
o/c
o/c
o/c
psipsi
Resisting Moments
ft
1470.7
0
-56.3
0
0.0
0
0.0
0
0.0
0
0.0
0
0
2.56
0
0.50
0
0.00
0
0.00
0
0.00
0
0.00
0
0
3760.1
0
-28.1
0
0.0
0
0.0
0
0.0
0
0.0
0
0
0
3423.7
9.2
0.0
0.0
0.0
0.0
0.0
0
586.8
0
825.0
225.0
0
3.17
0.08
0.00
0.00
0.00
0.00
0.00
0
0.72
0
2.75
0.67
0
10842.3
0.8
0.0
0.0
0.0
0.0
0.0
0
424.8
0
2268.7
150.1
0 0 0.0
Totals = 1414.5 i
Resisting Totals Dsed For Soil Pressure
(Vert. Component of Active Pressure Removed)
3732.0 ft-i 5069.71
5069.71
13686.6 ft-i
13686.6 ft-i
(continued on next page.
V4.4B (c) 1983-95 BNERCALC R2E ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page: /
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 6.67 FT. HEIGHT Ul/<?
( continued)
STEH SUMMARY
Top Stem: Proa 0.00 ft to Top of Hall
12.GOin Masonry */ f 5 8 U.OOin, d= 9.00in
f'm= 1500.Opsi, Ps= 24000.Opsi
LDF= 1.00, n= 25.78
Solid Grouted
Hall Ht.= llS.OOpsf, Bar Enbed= 19.Sin
Mactual = 2471.8 <= 2563.0ft-*
Vactual = 7.95 <= 19.36psi
Interaction Value = 0.964
Second Stem From 2.67ft to 0.00ftS.OOin Masonry »/ i 4 8 U.OOin, d= 5.25in
f'n^ 1500.Opsi, Ps= 24000.Opsi
LDP= 1.00, n= 25.78
Solid Grouted, 9f«*NMMp.
Hall Ht.= 75.00psf( Bar Enbed= U.Jin
Mactual = 533.5 <= 1420.5ft-|
Vactual = 4.39 <= 38.73psi
Interaction Value = 0.375
V4.4B (cj 1983-95 ENBRCALC R2H ENGINEERING, KH060291
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95 Page: /
CANTILEVERED RETAINING WALL DESIGN
SITB RETAINING HALL 6.67 FT. HEIGHT
HALL i FOOTING DATA
Retained Height =
Hall Ht. above Soil
Toe Hidth
Heel Hidth
Total Footing Hidth =
Footing Thickness
Key Depth
Key Hidth
Toe to Key Dist.
SLIDING CHECK
Ftg/Soil Friction
Soil to Neglect =
Lateral Pressure =
- Passive Pressure- Friction
Add'l Force Required =
SUMMARY
Pressure 9 Toe =
Pressure 9 Heel =
Allowable Press.Bcc. of resultant =
Max. Shear I Toe =
Max. Shear i Heel
Allow. Ptg Shear =
Factors of Safety:
Overturning =
Sliding =
VERTICAL LOADS
Axial DL on Stem
Axial DL on Sten
....Eccentricity
Surcharge over Toe
Surcharge over Heel
OplfOplf
)0in
.Opsf
0.0 psf
LATERAL LOADS
Lateral Load Acting on
Stem Above Soil
Add'l Lateral Load
Dist to Load Start
Dist to Load End
0.00 psf
166.80 pi!
0.00 ft6.67ft
Note: Toe Surcharge Resists Overturning
Note: Heel Surcharge Resists Overturning
SOIL DATA
Allowable Bearing =Active Lateral0.40 Max Press.
0.00 in Slope Press,
2583 i Backfill Slope
900 I Passive Press.
2185 i Soil Density
0.0 I Soil Ht over Toe
3000 psf
50.0pcf
0 pcf
0 pcf
0 :1
0 pcf
pcf
0
0
0
200
110
6.00 in
ADJACENT FOOTING
Vertical Load =
Load Eccentricity =
Footing Hidth
Ftg. CL to Hall
Vert. Position of Ftg.
...Above/Below:[+/-] =
Spread Footing ?
0.0$
0.00 in
0,00ft
0.00ft
0.0ft
No
Toe
3641
50
4
46
Origin of Force...
Active Soil Press.
Soil over Heel =
Soil over Toe ~
Sloped Soil i Heel
Adjacent Ftg. Load =
Surcharge Over HeelSurcharge over Toe =
Axial Load on Hall =
Load e Proj. Hall =
Averaged Stem Hts. =
Added Lateral Load =
Footing Height =Key Height
Vertical Component
of Active Pressure
Soil Press. Hult.
By ACI Eq 9-1 =
3000 psf Mu-Upward19.20 in Mu-Downward =
0.00 psi Hu-Design =
One-Hay Shear:
Actual =— Allowable =
1.89 :l Cover over Rebar *
/ 1.19 :1 'd'
^ Ru = Mu/bdA2
SUMMARY OF POBCES
Overturning Moments
i ft ft-i
2600.7 psf
0.0 psf
-22.27 psi
76.03 psi 0.0
76.0
3.50
8.50
0.7
Heel
0
5513
16511
-10998
22.3
76.0
2.50
9.50
135.4
•s
psfh-ift-ift-i
psipsi
inin
psi
f'c
Fy
Mm.Omit
i 4i 5
i 6.
1 7i 8i 9
As
SP
%
ii8
8i
Percent
Under Heel
Toe
19.61
30.39
43.14
48.00
48.00
48.00
Heel
4.48
6.95
9.86
13.45
17.70
22.41
I
in
inin
inin
in
2000
40000
5.0012
No
O/C
o/co/co/co/co/c
psi
psi
Resisting Hoients
ft ft-i
1470.7
0
-56.3
0
0.0
0
0.0
0
0.0
0
1112.6
0
0
2.56
0
0.50
0
0.00
0
0.00
0
0.00
0
4.34
0
0
3760.10
-28.1
0
0.0
0
0.0
0
0.0
0
4822.9
0
0
0
3790.5
9.2
0.0
0.0
0.0
0.0
0.0
0
537.3
0
900.0
225.0
0
3.42
0.08
0.00
0.00
0.00
0.00
0.00
0
0.74
0
3.00
0.67
0
12951.6
0.8
0.0
0.0
0.0
0.0
0.0
0
400.0
0
2700.0
150.1
Totals = 2527.Oi 8555.0 ft-i
Resisting Totals Used For Soil Pressure
(Vert. Component of Active Pressure Removed}
5462,
5462,
0.0
16202.5 ft-i
16202.5 ft-S
(continued on next page.
V4.4B (c) 1983-95 ENBRCALC m , mom
R2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95U1 CO 1
SITS RETAILING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITB RETAINING HALL 6.67 PT. HEIGHT U/
( continued)
STEM SOniUY
Top Stem: From 0.00 ft to Top of Hall
12,00in Masonry w/ I 6 ft 16.00in, d= 9.00in
f'in= 1500.Opsi, Fs= 24000.Opsi
LDP= 1.33, n= 25.78
Solid Grouted, Special Insp.
Hall Ht.= 118.00psf, Bar Enbed= 56.1in
Mactual = 6182.2 <= 7059.5ft-|
Vactual = 15.94 <= 44.72psi
Interaction Value = 0.876
Second Stem From 3.33ft to 0.00ft
8.00in Masonry »/ | 5 8 16.00in, d= 5.25in
'i= 1500.Opsi, Ps= 24000.Opsi
" " " n= 25.78LDP= 1.33,
Solid Grouted
Hall Ht.= 75.0!
Hactual -- 1240
sf, Bar Brabed= 33.7in
<= 1410.6ft-|
Vactual = 9.17 <= 22.36psi
Interaction Value = 0.880
V4.4B (c) 1983-95 BNERCALC R2H ENGINEERING, KH060291
62H ENGINEERING INC.Consulting Structural Engineers11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 8 FT. HEIGHT UJ/P
HALL & FOOTIHG DATA
Retained Height =
Hall Ht. above SoilToe Hidth
Heel Hidth
Total Footing Hidth
Footing Thickness =
Key Depth
Key Hiihh
Toe to Key Dist.
SLIDING CHECK
Ftj/Soil Friction
Soil to Neglect =
Lateral Pressure =- Passive Pressure =
- Friction =
Add'l Force Required =
SfflHARY
Pressure 9 Toe =Pressure e Heel
Allowable Press. =
Ecc. of resultant
Max. Shear 8 Toe
Max. Shear I Heel =Allow. Ptg Shear =
Factors or Safety:Overturning =
Sliding =
Origin of Force...
Active Soil Press. =
Soil over Heel =
Soil over Toe =
Sloped Soil a Heel
Adjacent Ftg. Load =
Surcharge Over Heel =
Surcharge over Toe =
Axial Load on Hall -Load § Proj. Ball =
Averaged Stem Hts. =
Added Lateral Load =
Footing Height =
Key Height
Vertical Component
of Active Pressure
VERTICAL LOADS
8.00 ft Axial DL on StemJ.OO ft Axial DL on Stem
"1.50 ft ....Eccentricity =5.50 ft Surcharge over Toe =
7.00 ft Surcharge over Heel
12.00 in Note: Toe Surcharge Resists
30.00 in Note: Heel Surcharge Resists12.00 in SOIL DATA
"5.17 ft Allowable Bearing =
Active Lateral =
0.30 Max Press.
0.00 in Slope Press. =2025 * Backfill Slope
1200* Passive Press.
1906 I Soil Density
0.0 I Soil Ht over Toe
Oplf
Oplf0.00 in
0.0 psf0.0 psf
Overturning
Overturning
2250 psf
50.0 pcf
0.0 pcf
0.0 pcf
0.0 :1
150.0 pcf
110.0 pcf
6.00 in
LATERAL LOADS
Lateral Load Acting on
Stem Above Soil = 0.00 psf
Add'l Lateral Load = 0.00 plf
Dist to Load Start = 0.00 It
Dist to Load End = 0.00 ft
ADJACENT FOOTINGVertical Load = 0.0 *
Load Eccentricity = 0.00 inFooting Hidth = 0.00ft
Ptg. CL to Hall = 0.00ft
Vert. Position of Ptg.
... Above/Below: [+/-] = 0.0ft
Spread Footing ? Bo
1251.8 psf Soil Press. Mult. Toe
563.8 psf By ACI Eq 9-1 = 1753
2250 psf Hu-Upward = 1894
5.31 in Mu-Downward = 323
10.95 psi Mu-Design = 1571
-13.28 psi One-Hay Shear:
76.03 psi Actual
r— Allowable =Cover over Rebar =4.21 :1
1.53 :1 'dl
Ru = Mu/bd"2
SUMMARY OF FORCES
Overturning Moments
I ft ft-*
11.0
76.0
3.50
8.50
24.2
EUUlli
Heel
789 psf
11809 It-*
16843 ft-ft
-SOU ff-lJVJ1 It, JJ
13. 3 psi
76.0 psi2. 50 in
9. 50 in
( 62.0 psi
1U UBOJf'c
Fy
Mm.
Omit
» 4
* 5
* 6
* 7
* 8
i 9
LOH — —
As Percent
SP Under Heel
TOP1UC
9 19.61
i 30.39
i 43.14
8 48.00
@ 48.00
8 48.00
=
=
=
?
HeelilCCX
10.03
15.54
22.06
30.08
39.60
48.00
2000 psi
40000 psi
0.0012
No
in o/c
in o/c
in o/c
in o/c
in o/c
in o/c
Resisting Moments
ft ft-*
2025.0
0
-56.3
0
0.0
0
0.0
0
0.0
0
0.0
0
0
3.00
0
0.50
0
0.00
0
0.00
0
0.00
0
0.00
0
0
6075.0
0
-28.1
0
0.0
0
0.0
0
0.0
0
0.0
0
0
0
4253.3
82.5
0.0
0.0
0.0
0.0
0.0
0
593.8
0
1050.0
375.0
0
4.58
0.75
0.00
0.00
0.00
0.00
0.00
0
2.10
0
3.50
2.67
0
19494.4
61.9
0.0
0.0
0.0
0.0
0.0
0
1245.9
0
3675.0
1001.2
0 0.0 0.00
Totals = 1968.8 It
Resisting Totals Used For Soil Pressure
(Vert. Component of Active Pressure Removed)
6046.9ft-} 6354.61
6354.68
25478.4 ft-*
25478.4ft-*
(continued on next page.
V4.4B (c) 1983-95 BNBRCALC R2H ENGINEERING, KK060291
foH ENGINEERING INC. LOT 33/34 CARLSBAD AIRPORT CTR
Consulting Structural Engineers C95111 CO 111545 West Bernardo Court Ste. 300 SITE RBTAINING HALLSSan Diego California 92127
Date: 11/16/95
CANTILEVERED RETAINING WALL DESIGN
SITE RBTAIBING HALL 8 FT. HEIGHT
( continued)
STBH SUMMARYTop Stet: Pron 0.00 ft to Top of Hall12.00m Masonry v/ \ 1 I S.GOin, d= 9.00in
fis 1500. Opsi, Fs= 24000. Opsi
LDP= 1.00, n= 25.78Solid Grouted, Special Insp.
Hall Ht.= nS.OQpsf, Bar Embed = 35.1in
Hactual = 4265.6 <= 80l4.1ft-|Vactual = 11.45 <= 38.73psi
Interaction Value = 0.532
Second Stei Prom 4.67ft to 0.00ftB.OQin Masonry w/ t 6 8 16,00in( d= 5.25inf'a= 1500. Opsi, Ps= 24000. OpsiLDP= 1.00, n= 25.78Solid GroutedHall Ht.= 75.00psf, Bar Embed* 20. GinMactual = 307.7 <= H87.2ft-lVactual = 3.04 <= 19.36psiInteraction Value = 0,259
V4.4B (c) 1983-95 ENERCALC R2H ENGINEERING, 0060291
R2H ENGINEERING INC.Consulting Structural Engineers11545 West Bernardo Court Ste. 300San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITE RETAINING HALLS
Date: 11/16/95
CANTILEVERED RETAINING WALL DESIGN
SITE RETAINING HALL 8 FT. HEIGHT
WALL & FOOTING DATA
Retained Height =
Wall Ht. above SoilToe Width
Heel Width
Total Footing Width
Footing Thickness =
Rev Depth =Key Width
Toe to Key Dist. =ST.TDTBC CHHPI
Ptg/Soil Friction
Soil to Neglect
Lateral Pressure =
- Passive Pressure =
- Friction
Add1! Force Required =SUMMARY
Pressure e Toe =
Pressure % Heel
Allowable Press. =
Ecc. of resultant =
Max. Shear i Toe =
Max. Shear i Heel
Allow. Ftq Shear
Factors or Safety:
Overturning =
Sliding =
jT
Origin of Force...
Active Soil Press. =
Soil over HeelSoil over Toe =
Sloped Soil @ Heel
Adjacent Ftg. Load =
Surcharge Over Heel =Surcharge over Toe =
Axial Load on Wall =
Load 8 Proj, Wall =
Averaged Stem Wts. =Added Lateral Load
Footing Weight =
Key Weight
Vertical Componentof Active Pressure
Totals
Resisting Totals Used For S
(Vert. Component of Active
VERTICAL LOADS
8.00 ft Axial DL on Stem0.00 ft Axial DL on Stem =
1.50 ft ....Eccentricity =5.50 ft Surcharge over Toe =
7.00 ft Surcharge over Heel
12.00 in Note: Toe Surcharge Resists24.00 in Note: Heel Surcharge Resist
12. 00 in SOIL DATA2.17 ft Allowable Bearing =
0.40 Max Press.
0.00 in Slope Press =
3625ft Backfill Slope
1225 ft Passive Press.
2512 i Soil Density
0.0 i Soil Ht over Toe
J340.7 psf Soil Press. Mult. Toe
0.0 psf By ACI Eq 9-1 = 3277
3000 psf Mu-Upward = 3343
20.54 in Mu-Downward = 323
21.33 psi Mu-Design = 3020
35. 60 psi One-Way Shear:
76. 03 psi Actual = 21.3
— - Allowable = 76.0
] 1.80 :1 Cover over Rebar = 3.50
/ 1.03 :1 'd1 = 8.50
— Ru = Mu/bd"2 = 46.4
SUMMARY OF FORCES & MOMEff
Overturning Moments
i ft ft-i
2025.0 3.00
0 0
-56.3 \ 0.50
0 0
0.0 0.00
0 0
0.0 0.00
0 0
0.0 0.00
0 0
1600.0 5.00
0 0
0 0
0 0
1568. 8 i
oil Pressure
Pressure Removed)
6075.0
0
-28.1
0
0.0
0
0.0
0
0.0
0
8000.0
0
0
0
14046. 9 ft-i
Oplf
Oplf
0.00 in
0.0 psf0.0 psf
Overturning, Overturning
3000 psf
50.0 pcf
0.0 pcf
0.0 pcf
0.0 :1
200.0 pcf
110.0 pcf
6,00 in
FOOTING
Heel
Opsf
3332 ft-i
16843 ft-i
-13511 ft-i
35. 6 psi
76.0 psi
2. 50 in
9. 50 in
166.3 psiri
i
0
4253.3
82.5
0.0
0.0
0.0
0.0
0.0
0
593.8
0
1050.0
300.0
0.0
6279. 6 i
6279. 6 i
LATSRAI
Lateral Load Acting oStem Above Soil
Ud'l Lateral Loadlist to Load Start
Dist to Load End
ADJACENT
Vertical Load
Iioad EccentricityFooting Width
Ftg. CL to Hall
Vert. Position of Ftg
... Above/Below: [+/-]
Spread Footing
MiTfltf
f'c
Py
Mm. As Percent
Omit SP Under Heel
Toe
I 4 8 15.03
ft 5 8 23.29
ft 6 i 33.06
1 7 % 45.08
i 8 8 48.00
i 9 8 48.00
ft
0
4.58
0.75
0.00
0.00
0.00
0.00
0.00
0
2.10
0
3.50
2.67
0.00
.LOADI
n
* 0.00 psf
= 200.00plf
0.00 It
8.00ft
FQQTTNfi
o.Oi
3 0.00 in
0.00ft
0.00ft
0.0ft
? No
= 2000 psi
= 40000 psi
= 0.0012
? NoHrrl
4.21 in O/C
6.53 in o/c
9.26 in o/c
12.63 in o/c
16.63 in o/c
21.05 in o/c
ft-i
0
19494.4
61.9
0.0
0.0
0.0
0.0
0.0
0
1245.9
0
3675.0
801.0
0.0
25278. 2 ft-i
25278. 2 ft-i
(continued on next page....)
V4.4B (C) 1983-95 ENERCALC R2H ENGINEERING, KN060291
*k2H ENGINEERING INC.
Consulting Structural Engineers
11545 West Bernardo Court Ste. 300
San Diego California 92127
LOT 33/34 CARLSBAD AIRPORT CTR
C95111 CO 1
SITS RETAILING HALLS
Date: 11/16/95 Page:
CANTILEVERED RETAINING WALL DESIGN
SITB RETAINING HALL 8 FT. HEIGHT U/
( continued)
STEM SUMMARY
Top Steni: From 0.00 ft to Top of Hall
12,GQin Masonry v/ I 7 9 8.00m, d= 9.00in
f'in= 1500.Opsi, Fs= 24000.Opsi
LDP= 1.33, n= 25.78
Solid Grouted, Special Insp.
Wall Ht.= 118-OOpsf, Bar Embed = 87.Sin
Mactual = 10665.6 <= 10685.2ft-(f
Vactual = 22.94 <= 44.72psi
Interaction Value = 0.998
Second Stem Prom 4.67ft to 0.00ft •<—
S.OOin Masonry »/ t 6 i U.OOin, d= 5.25in
f'm= 1500.Opsi, Fs= 24000.Opsi
LDP= 1.33, n= 25.78
Solid Grouted
Wall Wt.= 75.00psf, Bar Eiabed= SO.lin
Hactnal = 1416.6 <= 1582.9ft-f
Vactual = 10.34 <= 22.36psi
Interaction Value = 0.895
V4.4B (c) 1983-95 BMERCALC R2H ENGINEERING, KH060291