HomeMy WebLinkAbout1950 KELLOGG AVE; ; CB960249; PermitCity of Carlsbad
92008
08-08-2017
1635 Faraday Av Carlsbaq, CA
Building Permit Permit No:CB960249
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
OccGroup:
1950 KELLOGG AV CBAD
PLANCK Sub Type:
2120920300 Lot#:
$720,000.00 Const Type: VN
Reference#:
Project Title: 4 TILT UP BUILDINGS 2@9987 SF
AND 2@ 5029
Applicant:
SILLMAN/WYMAN INC.
6181 CORNERSTONE CT. EAST #1
SAN DIEGO, CA. 92121
619 453-4320
Owner:
SUMITOMO BANK
Total Fees:
$0.00
$0.00 Payments To Date:
Status:
Applied:
Entered By:
Appr/Issued:
Inspect Area:
$0.00
LZ dB
02/13/1996
MDP
03/16/1996
Balance Due:
Description Fee
BUILDING PMTS -1,755.00
Plan Check Fee 1,755.00
P1ffiMTI' hPllCATION PLAN CHECK NO. 1._(o--Z, 't 1
City of Ca:irlsbad Bui.lding Department
2075 Las Palmas Dr., Carlsbad, CA 9~009 (619) 438-1161 ESf.VAL J?_C: cY:.JU .-
PLAN CK DEPOSIT r ( ~ff S"'~~ 1. PmtMlt TYPE VAlID.BY_-,:,-+-+-=,------> __
From list 1 (see back) give code of Permit-Type: ___________ _
For Residential Projects Only: From list 2 (see back) give
~ode of Structure-Type: ____________________ _
Net Loss/Gain of Dwelling Units _________________ _
{V\5 °! soooJ
tJ.:i.O 02/13i96 Oi'.)01 01.
C---PRMT
02
1755~00
2. PROJECI' INFORMATION
Address
FOR OFFICE USE ONLY
Nearest Cross Str~t
LEGAL DESCRIPTION Lot No.
CHECK BEWW lF s0BMil l'EO:
Building or Suite No.
· Subd1VIs1on Name/Number
D 2 Energy Cales D 2 Structural Cales D 2 Soils Report D 1 Addressed Envelope
OmtNo. Phase No.
ASSESSOR'S PARCEL EXISTING USE PROPOSED USE
DEJ.cffllI/?i~F~c;,e::re OJJWINAC, 2 <!. 10,0OO<::;F !f t-~ P;~r~-P.
S(J FT. # OF STORI~ # OF BEDROOMS · '/-#OF~1'HROOMS
;{. WNIACI PEl&JN (If dmerenf from applicant) 1~0 lit,.
NAME (last.name first) ' AO'f>RESS
J JD
. NAMjE (last name first$JJ./VY'N : WYMMJ, JNO,ODRESS €,/t!J/ ~ ct;()p:( ~ ~rre f 0/
CITY SlrN DF!:eo STATE Cir . ZIP CODE ~2./2-) DAY TELEPHONE( (2,/4') ~-~?, ').,Q
s. ~~~t ~::e1Wirst)~ Fof!.. J!V DUS"ff4J -~s ZVZ<; Avf}}NLO'\ P(5-' l.r/t fi.lA.YA
CITY 1../pJOLl:l'I STATEC/t ZIPCODE':JZ0?:,7 DAYTELEPHONE(PI~) 15,~J-17600
1. \,V0RkERs' ooMPENsATION\
Workers' Compensation Oeclaratlon: I hereby affirm that I have a certJhcate of consent to self-insure issued by the O1rector of lndustnal
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3$00, lab. C).
SIGNATURE DATE
8. oWNER-B01IDER DECLAR8110N
Owner-Builder DeciaratJon: I h~reby aihrm that 1 am exempt from the ContractoPs License I.aw for the following r:eason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the·work and the structure is not intended or
offered for sale (Sec. 7044,.Business and Professions Code: The Contractor's license law-does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Gode: The Contractor's license law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's Llcense law).
D I am exempt under Section _______ Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires ~ permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to (ile a signed statement that he is licensed pursuant to the
provisions of the Contractor's license law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars ($500]).
SIGNATURE DATE
COMPLETE 11-us SECTION FOR NON-RESIDENTIAL BO!IDING PERMITS ONLY:
Is the applicant or future building occupant required .to submit a business plan, acutely hazardous materials registration form or risk management aµd
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
0 YES ONO
Is the applicant or future building occupant required to obtain a permit from the air pollution contr9l district or air quality management district?
DYES . D NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
0 YES ONO ·
IF ANY OF nm ANSWERS ARE YFS, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFI'ER JULY 1, 1989 UNLESS nm APPUCANT ~ MET OR IS MEETING nm REQUIREMENTS OF nm OFFICE OF EMERGENCY SERVICES AND nm AIR POU.UTION OON1ROL DISI1UCT.
9. OONS'IROCIIDN I.f'.NOING AGENCY . . .
I hereby affirm that there 1s a ccinstructJon lendu;1g agency for the performance of the work for which this permit 1s issued (Sec 3097(1) CIVIi Cod~J.
LENDER'S NAME LENDER'S ADDRESS
10: APPUCAN1 CERIIFICJrnON
I certify that 1 have read the apphcat1on and state that the above information. 1s correct. 1 agree to comply with all City ordmances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I AISO AGREE TO SAVE INDEMNIFY AND KEEP HARMLF.SS nm CITY OF CARISBAD AGAINSf All. IJABILITIF.S, J{!DGMENTS, CXJSTS
AND EXPENSES WIIlCH MAY IN ANY WAY ACCRUE AGAINSf SAID CITY IN OONSEQUENCE OF nm GRANTING OF TIIIS PERMIT.
OSHA: An OSHA permit is required for ex~avations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by IJmitation and become null and void if the
building or work authorized by sue it is not commenced within 365 days from the date of such permit or if the building or work autho ·zed y
such permit is suspended or a n any time afwi-.....,"7"1'JJrk is ommenced for a period of 180 days (Section 303(d) Uniform Bun,-·. •E,,~~"'>t
APPIJCANT'S 'SIGNATURE A._ ___ .,. DATE: -Soll!~'4-.,.4,,~
··~
i
i
\
\
\
Date:
File:
' " . ' ~' ' . ' . \ '
1, I •' , ', ' \ ~' , 1 '~ i \ '• "' 'J \~
September 13, 1996
096-60088-20
City of Caf'lsbad Building Inspection Department
2075 Las Pa/mas Drive
Carlsbad, California 92009
Field J,ispector: Tim
PROJECT: Homes for liidushy
fl9~7J~i_!{o.g A venu]
Carlsbad, Calif omia
FINAL REPORT
Building Permits: 960465
900464
960452
960453
960462
960463
960454
960455
This letter will serve as confirmation that the required Special lnspectfon for the subject project
has been completed and to the best of my knowledge, the work is in conformance with the
approved plans and specifications and applicable workmanship provisions of the building code.
Registered Inspector's daily reports regarding the special inspections are on file with the City of
Carlsbad Building Inspection Department and include the following:
1) Rei11forced Concrete Inspection
2) Welding of Structural Steel Inspection
3) Epoxy Anclwrs Installation Inspection
The Registered Special Inspectors conducting the aforementioned inspections are licensed with
the City of Carlsbad and are in the employ af Professional Service Industries, Inc.
Professional Service I11dustries, Inc.
Cf:r~t/Q,r-
David J. '-l,an,v ~.1.E. 49661
District Manager
Information To Build On
PSI • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone. 619/455-0544 • Fax 619/455-1170
I Geotechn~cal l -,~ Page_1_of _L , . Construct,on
Consultlng.i. Engineering • Testing INSPECTION REPORT
CLIENT ,Pe-rE.i<e. I./ 1'-7" C4VSr,-;..,,,er;o.,v
DATE 13 Si!>Prel'-1'815/G, /.::;J9(;.;,
Architect __ >J_/U.._~M~rlt-l~'--/2_W~i'l-~_'A'N""'-'-_.a.;./N...;:;._c ____ _
Engineer __________________ _
Contractor. A-rzr1 &:l!G>< //2-q<..f / ~VI t..r ~ .
INSPECTION MAT'LSAMPLING QTY
__ QSHPD __ Concrete Cylinders --
_QSA _Cement
_Specialty __ Mortar Samples --
_. _Mechanical _ Grout Samples --
__ Electrical __ Masonry Prisms --
_Roofing _ Masonry Block --
_concrete .-Fireproofing --
_Masonry _ Units (block or brick) --
_ struct Steel _Asphalt Concrete --
__ Prestress Cone _.Roofing --
__ Pile Driving _ Reinf. Steel
__ Fireproofing __ Steel --
_Waterproofing __ H.S. Bolts --
__ . Non-Destructive __ Tendon (PT Strands)
_Soils Technician __ Other --
_ Batch Plant . __ Other
__ BoltPull-Out __ Other --
REPORT NO.----'-----':;...._-------==------'
Building Permit No. _____________ _
Plan File No, ________________ _
Govt. Contract No.---------------
OSA or OSHPD #-------------
Other __________________ _
MATERIAL DESCRIPTION )NSPECTION CHECKLIST
_Rinf.:Rebar _ Plan & Specs
_ Rinf.: W.W.F. 7:1earances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi / Sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batchinn
_ Units: Block _ Electrode Storage
"7 Units: Brick _ Torque Applied
_Steel~~
_H.S.Bolts
Metal Decking 7 Electrodes B?t:JI fl,
_ Fireproofing
/other~~~ _ Corrective action required __
_ Corrections completed
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME fV/nz,-~~,,,. A ¥. '" ~,
INSPECTOR S;GNATURE ~ .
PSl-8-900-170(1) l(
CERT. NO. . 5"'.:;:z.c:. / S-2::} 77
DATE__._/ ___ 3'_5-Gff_,-a-. ___ /'"-'-:7.----~-------
'/
SEP 13 '96 0?:50AM PRECISION ELECTRIC P.1
COMPANY
10180Quail Canyon Road • El Cajon, California 92021 • (619) 390-2991 • FAX (619} 390-~23
CA License# 534116 • «L. License# 07"501645-M
SEPT 13, 1996
CITY OF CARLSBAD
BUILDING INSPECTOR
AITN:TIM
RE: LOT 39 HO:MES FOR INDUSTRY
KELLOGG ST
PLEASE BE ADVISED mAT ALL BUS BARS HAVE BERN' TORQUED TO THE :MFGS
SPECIFICATIONS
SHOULD YOU NEED ADDITIONAL INFORMATION, PLEASE DO 'N"OT HESITATE TO
CALL
SINCERELY
~
RONMASSOTH
\, AUG-10-1996 00:42 FROM TO
TO:
COMPANY;
FAX:
FROM:
DATE:
SUBJECT:
FAX COVER SHEET
PETERBUILT CORPORATION
6235 LUSK BLVD
SAN DIEGO, CA 92121
PHONE: (619) 597-8800
FAX: (619) 455 .. 1922
Cil_~FB1LUPs:-:]
CITY OF CARLSBAD
438-0894
JIM WEIMAN
8/9/96
HOMES FOR INDUSTRY -LOT 39
1950 KELLOG AVENUE
CARLSBAD,CA
4380894 P.01
COMMENTS: Please review the attached letter with regards
guaranteeing the process of blocking the truss joist at the bolt location.
This is page 1 of 2 pages. If you do not receive all pages,
pJease call (619) 597-8800.
.., '
\ .
AUG-10-1996 ·00:42 FROM
August 9, 1996
Tim Philip.s ·
City of Carslbad
Building Dept..
2075 Las Palmas Driv~
Carlsbad, CA 92009
TO
PETERBUILT
C. 0 R }• ·<.> R A T I O N
RE:. HON!ES FOR INDUSTRY -LOT $9
1950 KELLOG AVE
. CARLSBAD, CA 92008
Dear Tim,
4380894 P.02
Upon your request I'm writing this letter to guarantee the pro~ess ·Of blocking the truss
joist at the bqlt location was completed per the detail. Seeing that the angle of the
· diagonal brace·couldn't be determined at the time the doubler was constructed ·the
sequence of block installation is as follows: · ·
. .
1. : Determi~e· where the brace is going to be installed and b~lted ai ..
2.. Drive a wedge betwe~n the two trusses that form the do.ubler:
3.· Insert the necessary blocking into the proper bolt location. ·
4. Remove wedge from the b9ttom and this will lock the inner blocks into position.
5. Install ciuter blo<?f<~ by nailing through to inner block.
6. Install b.olts. ·
I, Jim Weiman visibly saw this blocking installed. Jf you have any questions, please ·call·
me at 619-597-2088, or fax me at 438-0894.
TJ,a~k you for your assistance in this matter ..
Sincerely,
~Hit.. \hlgtill,,...,. ~.. 1 l.,!,--_·~~..,"""
· Jim Weiman,
Superintendent
GE><F.R.\1. CONTRACTORS• Lt<::J::NSE. #477592 • 6235 LD;K Bi.vo. • SAN Dmco. CA 92121 + 'PHONE {619) 597-8800 • FAX (6191455-19.22
t • ' •
TOTAL P.02
,,..
., ..... .
DEPT. OF BLDG. & SAFETY
CITY OF ~+H2L"$0A;,D
Building Pennit~o. qs ... \ '=,'-( 2= Job No. _______ ___,_Date 7 .. Z 3 , f6
Job Identification/ Address \S~~Q~l:p1)7-cmc:~:a~ U:'4-So,N? ~4 1 '2 og9
General Contractor I Address ~AO 1 . t'2~D ... bl~-~t_--~~t::. Ni ?A~ :]tk bO Q\;1 2 ,re
Sub-Contractor/Address2?v"f1:t 'f!JA..f (~~j)c,.X, l8'u5Ctdf.LA~J? ~~L Ll1:=) c:.-.£) <?tC/fil
Structural Engineer/ Address C l?:AH'.a Q.t.) Sy. tl: 2714 u ~ 12 {a.) ~~ :5~~ Ql "if-12 l:a
TYPE OF WORK: REINFORCED CONCRETE_ MASONRY HI-TENSILE BOLTING 'i--Z/ 27
PRESTRESSED CONCRETE_ WELDING...::£.... GYPSUM CONCRETE
WELDER
DATE OF INSPECTION
S-3
.... ,' .. ·_·-:-' '~ } l ... , ... '
.,_, ·_, .... -·-~ : ...;, ... : ·, :=: ,~
HOURS
Date Re2. Q.T.
7-JJ-7{:; ,b/"
RECEIPT
NUMBER
TIME IN
6 r.'2,/)
WELDER
DESCRIPTION OF WORK INSPECTED:
TIMEOlIT Milea2e
~~70 er Code
RC
RECEIPT
NUMBER
\
Initials
RJ+
All inspections based on a minimum of 4 hours & over 4 hours -8 hour minimum. In addition, any inspection extend-
ing past noon hour will be an 8 hour minimum.
ATTORNEY'S FEES -If any action at law or in equity is Qrought to enforce or interpret the terms of this Contract, the
prevailing party shall be entitled to reasonable attorney's. fees, costs and ne.cessary disbursements in addition to any
other relief to which such party may be entitled.
, ... ·--·· ----...... ----.. . -CERTIFICAT}i; OF COMP-LIAN<;E.
! ,/ --.. ' .:, ... -• ,..) ~
Registefed"bepulf.Builffin;g· Inspe~to.r's c~ffifici,ite s·igfled 9.Y I_rtsp§ctor: ¥( CJiAldl>:.~-J-/lr/2/). f---... _
_ I_:!?:..~J· __ .:~f-_'5h __ :f8_ .~1'7 __ :hcasdbee~ !1~Iedb_·
1
~ndt_i:.it_s!t~~:_s_ that!h~-~~~v~-w~rk·~a: i_~:~e-~ted b~ _him a~d cofuplies w_ith the
prov1s1ons o t e · u1 d1ngi o e app 1ca e uere o. -. . · .. . . ·
· I p , · Respectfull
Approved by: __ &_~_-J..,.· --r-. -+~-S-t-Tr--.... ri_n,-en-d-en_t __ :· ____ "--:_jt:::::::,.i-=.=, =~:::r~-·._:· __ :... ....... --~-,.--.. -... -~:-"·. -.,-. :,.-,-----
,,. ~ .. ··.• .. ·•_';~ ·':'"' ' .. ' .. ,;..;,·. '.' .. -, .... ; . . . ·. ·., ..... ·-
..... . .,,.
/· 'f.ARTh 5 Y5TCm~ G~cj~"1ee,1tv_Cj Grovp
SPECIAL INSPECTION REPORT
DEPT. OF BLDG. & SAFETY
CITY OF CAR..L::SM)>
Building Pennit No. C\ 5 -\ l, 5 -Z.. Job No. ____________ Date 1 " 2:--\ • 9 kJ
\
-~,\ .• ~ -1 Job Idenlification/ AddreSS\ :ct~=-~rutL..__":,_g~)f~J4:ie~ aa.u;~ C-e 9 2ooe
General Contractor/ Address 12,E;~O, 1G:,5D f..l01€-k Gli?GL~ &. SAN µer-:0 CA q2 \Q:5
Sub-Contractor/Address :'.:Q,nt ~ w:G-LQ1~-G:,, 14cD'2 CJ ;t-va.wy , ~Ar.1<W~k GrT'( @ q11so
StructuralEngin~r/ AddressCVt\(b 12us'-\t;,1tzt, \\ SAS v.J I ~-) ~ W'2C> M
TYPE OF WORK: REINFORCED CONCRETE_. MASONRY HI-TENSILE BOLTING q ·zn-J
WELDER
DATE OF INSPECITON
Date Re2.
7 /912.Ar•C/b 6-
PRESTRESSED CONCRETE_ WELDING ...::£... GYPSUM CONCRETE
O.T.
RECEIPT
NUMBER
8Ci-J 40
WELDER
DESCRIPTION OF WORK INSPECTED:
TIME IN. TIMEOUT. Milea2e
1:~ \1.--.
ALL
Code
5.Sk.1
RECEIPT
NUMBER
Initials
fH
All inspections based on a minimum of 4 hours & over 4 hours -8 hour minimum. In addition, any inspection extend-
ing past noon hour will be an 8 hour minimum.
ATTORNEY'S FEES -If any action at law or in equity is brought Lo enforce or interpret the terms of this Contract, the
prevailing party shall be entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any
other relief to which such party may be entitled.
CERTIFICATE OF COMPLIANCE
Registered D~uty Building Inspector's certificate Signed.by Inspector J?I CHAW J-lA~
I.D. NO. G:i1:7A3J has been filed and it states that ~he above work was inspected by him~mplies with the
provisions of the Building Code applicable theret
Respectfully ubmitted
.... ,r.
If: .• ~
~-.:
Page_1_of 2-
INSPECTION REPORT
CLIENT ~utt..:r Cewsr
DA TE '3-t:? A--" r;, lAS-1 I .!!J .::;e,
Engineer __________________ _
Contractor. A72-r;,,.-,~ 1~
INSPECTION MA T'L SAMPLING QTY
_OSHPD _ Concrete Cylinders --;7;,SA __ Cement --
_Specialty _ Mortar Samples --
_Mechanical _ Grout Samples --
_ Electrical _ Masonry Prisms --
_Roofing _ Masonry Block --
_Concrete __ Fireproofing --
_Masonry _ Units (block or brick) --L Struct Steel _ Asphalt Concrete --
_ Prestress· Cone _Roofing --
_ Pile Driving _ Reinf. Steel --
_Fireproofing _Steel --
_Waterproofing _H.S.Bolts --
_ Non-Destructive _Tendon (PT Strands)
_Soils Technician _Other --
_ Batch Plant _Other
_ Bolt Pull-Out _Other --
PROJECT (Name)&ffGIS ,t;z._ ~tJ!F/2.Y
(Address~.3;, />?'8,fe;~
~.6taU4C
REPORT NO. ~~,a:Eg. -/ ?'-
Building Permit No. ______________ _
Plan File No. _______________ _
Govt. Contract No. _____________ _
OSAorOSHPD#-------------
Other __________________ _
MATERIAL DESCRIPTION ~SPECTION CHECKLIST
_ Rinf.: Rebar _ Plan & Specs
_ Rinf.: W.W.F. / Clearances
_ Rinf.: Tendons 5-Positions
_ Cone.: Mix #/psi _Sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
__ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
v" Steel ~I,
_H.S.Bolts
~Metal Decking
· /Electrodes.G7o/6
"7Fireproofing L.
_ Other gfi)MSito ~ v' Corrective action required __
_ Corrections completed
REMARKS Gxp~~.# ~ ~i,N ?z;;r .3:3 E,L-c;6. 'a" 78•r a.6frZ Q.1'8"
¼tf{-tkV /,,{/4£C7f:?) 2}g-" Jr~/J'¼'::?lt'd t?/ 7o/z /?Xeffe.&t'4 ~ -tf;(/otbZri /7P i?/E
I
I &1hl€r:W CoL t.a£5 ,B &Y2) c; /21"'7P"K ~ %12--~W£$ZS El;El;fr716/2f1ZY
G/!:Jf7l:# l:rtwo i:)7/43 /%, /1-w',1-u-y-~cm? /?~,..,,./f,t;PA:Z2C61 ~ £"?21:??&7/N ?'r
kO ~ t~~ a-~cr 8'Z:L¥t-~ f3Jt,~, ~'*1J~if ~ /3:6 11
/. 77-Zt-~Lr
DI #MEafP-/3/4 1
~ ;(,4e1, c?.r ,tycffeo/3, (/o). iPtCIIV~ lee& ~rf@ ~ ff ff~<@
/# Kc-c>Pat;v<e /411 zy AC; B. c ~c.R-r /4;:J, / 3 72 /{M,) ~,-v~~ ~~&f'N/7~.
Alf P-lt ~NLYCM&>-AfpttfG> ~S'~c /~ ,¢tr,,;,~ 7?,EK'#:: /os-r~).
CERTIFICATION-OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR SIGNATURE_l,j~,__.~1-4,~~-----
PSI-B-soo-1?0(1)
s-w I ~2779-CERT. NO. ___ .:__ ___ _;__ ________ _
DATE /V 47,,-~, /;)2-·
American Engineering Division INSPECTION REPORT
Project Name (per plans) ..6f,ME~ kt;z: h'.o,~@Y
Inspection
Date
Inspector's Name~~.:....:....:....:..s.,:;r.::..i....-~~.J.LL__,r;J.,..____.!,._:.__::~~' ___ _
PSI 8-900-171 (1)
Page ;,-of ~
l1
;;-~,. En~nnnenfaj
Page_1_of +-. .,.a• . Geotechnical
•-. Construction
Consulting • .Engineering ~-Testing -1·NSPECTION REPORT
·'· ,,.
CLIENT ?•f~fiv; kl CD1'2.f
DATE ·t, -112-'?f ld
Architect St Lt'),J-Lu '1 ti\ h~
Engineer '.1,rul.lt H w 'l'MMi
. .
Contractor. rv G-i'"fu"ti, l) \ ~ c..s Ry .
INSPECTION .. MAT'LSAMPLING.
_OSHPD. -___ Concrete Cy_linc;lers
_OSA _Cement.
-$...specialty _ Mortar Samples
_Mechanical _Grout Samples
_ Electrical _Masonry Prisms
_Roofing _Masonry Block
_concrete _ Fireproofing
_Masonry. _ Units (block or brick) _, •.
_ Struct Steel ._Asphalt Concrete
__ Prestress Cone _Roofing
_Pile Driving -__ Reinf. Steel . -
_ Fireproofing _Steel ..
_waterproofing · _H.S. Bolts _,.
_ Non-Destructive _Tendon (PT Strands)
_$oils Technician _Other
_ Batch Plant _Other
_Bolt Pull-Out _Other
REMARKS
QTY.
------
--
---------------·-----
PROJECT (Name)~~& IHQ\K-4'1'
(Address) t9:S'o \(¢µo<,,Cir-Ay 1£. ~,~.
REPORTNO.0$'"C,-&,oo;J{C"( -j b
Building Permit No'"~tfS"z.-91,o '/S:-s-'t~-.,. r:¾o'tS".r'
Plan File No, _______ -_________ _
Govt. Contract No. _______________ _
OSAorOSHPD#--------------.,.-Other _________________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar ~ Plan 8i Specs v'
_ Rinf.: W.W.F. _ Clearances •
_ Rinf.: Tendons -i,._ Positions ,,7
_ Cone.: Mix #/psi $Sizes ,/'
_._ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batchinn
_. _ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_HS.Bolts
_ Metal Decking
_ Electrodes
_ Fireproofing
.$. Other~ leD \.\-(i"" <..-1 /JO _ Corrective action required __
~ --·1.'-i' _ Corrections completed \
~(f.22..M f:.:P cnhl1itl "o u:z 'S ~6£-\ ~k n.ls P'=~ or--\ OoR 1t( c., f&?e1:'-r' ~ f
?4-~-w ~L-~ ~ ~:i?, A--L;f~ '.i)i?)t\:\t-<Pjo I . 1-.JNf:_ (. ( I 10 ~) 'BoTH: ~, p6.s ~f:
v..1A,vi:.
CERTIFICATION-OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications.and applicable sections of the building:codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME <i)A\[ \ D \_., 16-g \..-\ "2--z._ \
~ONM
INSPECTORSIGNATURF ~~
PSl-8-900-170(1)
,, --------... --·-.-...-·--~------·,.,,. __ · ~--....-. --,.. .... __ .,.. ______ ,.,,..,.,..,_...,_ .. __ ~...--·~····-
CERT. NO. 3 9 l,e
DATE---'(e::z._-_f_...t, __ -_9_.___(o _______ _
• Geotechnical ~· ·1 Envirrwnental Page_1_of_{ . • Construction
~· Consu.ltlng • Engineering • Testing INSPECTION REPORT , •.
Architect__,..-----,--------'-··-----
Engineer ____ .,__ ________ .....;.. ___ __;__
Contractor......,.... ___________________ _
INSPECTION-· ,, ·. .. MAT'L SAMPLING · .. QTY
__ OSHPD · __ Concrete Cylinders. --___ OSA .. __ Cement --__ Specialty .. __ Mortar Samples --__ Mechanical __ Grout Samples --· __ Electrical . · __ Masonry Prisms --__ Roofing __ Masonry Block --__ Concrete __ Fireproofing. ' --__ Masonry ,. ___ Units (block or brick) "---__ Struct Steel __ Asphalt Concrete.
__ Prestress Cone __ Roofing --__ Pile Driving __ Reinf. Steel --__ Fireproofing .. __ Steel --__ Waterproofing ___ H.S. Bolts --__ Non-Destructive __ Tendon (PT Strands) --__ Soils Technician __ Other --__ Batch Plant __ Other --
__ Bolt Pull-Out __ Other --
REMARKS
~a,_/4//2 7 .J -
PROJECT (Name) .. ~ <: s /4,.... .Tvr/4sz
(Address) /,9 ::ra ,,e.,//iJ &U<
c!ttte/"5 lz4-;/
REPORTNO.d.5"9·-(., 60&8 --17
Building.Permit.No. _____________ _
Plan File No. ________________ _
Govt. Contract No. _____________ _
OSAorOSHPD#-------------
Other __________________ ____
· ·. -MATERIAL-DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar Plan & Specs
__ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi _Sizes
_ Cone.: Mix #/psi _Laps i
_ Cone.: Mix #/psi _ Future Continuity #/psi ' I _ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching i
·-Units: Block _ Electrode Storage
_ Units: Brick Torque Applied i
_Steel
_H.S.Bolts i
_ Metal Decking I
_.Electrodes I
_ Fireproofing I I __ Other _ Corrective action required __ 1
_ Corrections completed
b et:2Nc:&6:a &;5 cJ t2ti,-,/4 d' / <2 or
/[Jo<,
CERTIFICATION OF COMPLIANCE: T6 the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME /4 <1/41?/t:,J 5
. (Print Cleally)
INSPECTOR SIGNATURF ~ ~
PSl·B-900-170(1)
CERT. NO. _______________ _
DATE__,,&..,...__-_,_/~J_---=-9-'-'£ ____ _
.,
~'!L·~ t·r1J . · ·; ,! : -... ; Li:.~·; i..)A
'.:.!'.clY• ._,p ,,' · .. ::·' .: i_r . .;1_, Li,
~ . .Jl. >.:::·,:·, _I ,,_r;
r:. :·: i' .0 •1,~·REPORT-OF ,CONCRETE·::¢q'iviPRESSION TEST
I l.:.:. J ,' ' .. ,., ••• ·~·-•• •• • ~ ..,I. •• \ ~ '
, . .; .... ~ -
TESTED FOR: MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
PROJECT: HOMES FOR INDUSTRY
[n-s-o-KELLOG ~~
$AN DIEGO, CA 92121
DATE: May 15, 1996
REVISION #1
OUR REPORT NO.: 059-60088-8
FIELD DATA:
-LOCATION OFPLACEMENT TILT-UP PANEL # C-2 RIGH?:'
DAJEPLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
'FIELD DATA SUBMITTEO BY
MIX PATA SUBl\l!ITTED BY
May 14, 1996 SUPPLIER
0 7 : 3 0 am DELIVERY TICKET·NO.fTRUCK NO.
4 1/2 MIX NUMBE;RAND PROPORTIONS
1. 0 CEMENT.
60 WATER
7 4 FINE AGGREGATE
May 15, 19~6 COARSEAGGREGATE
Psr\david.t·t~e:ira±rz-Ztl.:..; .___::.-1~ ;c·~,:i::J.ApM1XTuRE-... :~,· : .: . _,I_,-'
SUP:E!RIOR
' l'I.QT~6LE ASTM STANQABJ2.llJ8!!LESS OTHERWISE INPiCAIEP· SLUMP· cJ.43-RP•· AIR CO!"IENT· c,23J·Plb· TEMPERATURE· illPOH0(93)
•
COMPRESSION TEST RESULTS
ASTMC39-94
SUPERIOR
268532
354P/ 3000 psi
508
306
1358'
377 = 3/811
1417 = 1 11
POZZ 322N 25.4
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE LABORATORY , IDENTIFICATION ,AGE DATE OF LOAD DIAMETER AREA STRENGTH
NUMBER
12437
12437
121;37
12437
SPECIFICATIONS
REMARKS:
OR SET NO. (DAYS) TEST (LB~J
.,
A 6 05/20/96, 86000
B 28 06/11/96 . 117000 c 28 06/11/96 11,5000
D 60 07 /13/96
28 _,
1£. Cylinders made by PSI representative. Cylinders picked up by PSI
-~ representative. ' '
. (IN.)
6.00
6.00
6.00
Cyllnders·made by Architect's or Contracto(s representative. Cylin'ders delivered to PSI laboratory.
TECHNICIAN: david terlizzi
cc: CITY OF CARLSBAD
(SQ.IN.) (PSI) TYPE OF BREAK
28.27 3040 Cone
28.27 4140 Cone
28.27 \31>:?:fil Cone
X
co
: r3-o-o:!\
Test results comply with applicable specificallons.
Test results do not comply with applicable specifications.
F s
Respectfully submitted, »;::;•I ~/Zus~es, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE, CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONA~ SERVICE. INDUSTRIES, INC.
DAVID .:t. RYAN, r
DISTR ·CT MANAGER
Information To Build On
PSI A-200-4 (4)F PSI • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
.. ~• Geotechnical ~ -, Enwrcnnenlm If!."-"• Construction
. ~ Consulting • Engineering • Testing
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DAl'A:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA .92121
May 151 1996
LOC~JlbNOFPLACEMENT TILT-OP PANEL #1-3
DATE Pt.ACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, •F
CONCRETETEMl?ERATURE, °F
May 14,. 1996
09:20 am
4 1/4
1.0
DAtE:·HECEIVED IN LAB May 15, 1996
FIELD DATA Sl:JBMITTED BY PSI\david terlizzi
MIX DATA SUBMiTTED BY SUPERIOR
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
REVISION #2
OUR REPORT NO.: 059-60088-7
SUPPLIER
DELIVERY TIC::KET NO.ITRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
370610
354P/ 3000 psi
508
306
1358
377 = 3/8 11
1417 = 1 11
POZZ 322N 25.4
COMPRESSION TEST RESl.)LTS
SPECIMEN . TEST
LABORATORY . IDENTIFICATION AGE DATE OF
Nl/MBER ORSETNO. (DAYS) TEST
12436 A 6 05/20/96
12436 B 28 06/11/96
12436 C 28 06/11/96
12436 D 60 07/13/96
-~------·-
SPECIFiCATIONS 28
REMARKS: · · f. Cylinders made by PSI representative.
·Cylinders made by Architect's or
Contracto~s representative.
ASTMC39-94
TOTAL CYLINDER
LOAD· DIAMETER
(LBS.) (IN.)
82000 6. oo.
118000 6.00
113000 6.00
.
Cylinders picked up by PSI X iepreseritative ....
__ Cylinders delivered I~ PSI laeo.
TECHNICIAN: david terlizzi
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE
AREA STRENGTH
(SQ.IN.) (PSI) TYPE OF BREAK
28.27 2900 Cone
28.27 ::--..... 4170 Cone
28.27 ~ Cone
~
Test results comply with applicable X specifications.
r:~1~1~,d r.811v
Respectfully submitted,
TH.ESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFf!:SSIONAL. SERVICE INDUSTRIES, INC.
»;;;(Jess/onal• Service
. DAV . RYAN, CE
DIS ICT MANAGER
Information To Build On
Ps1A-200.4 C4JF 'PSI .. • 6867 Nancy Ridge Drive, $uite E. • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
~ .. ,,,...,___,., . .,....,,. _Qeotechn~cal
•• Construction Page--1.of _L
Consulting • Engineering • Testing INSPECTION REPORT ~ ..
CLIENT ~e,/;;/r ...
DAT~ ~-3-9~
PROJECT (Name) 4,,, "J JL . .kc:lu.sl-;v . J
(Address)/?S-o /i{.//:7 4"e
. &_,.../5,le(c/ · (; r
REPORTNO. cJ59-bCJ088 -/?
Building Permit No. 9~o r~::t..-9G6 </ "-,= ·
Plan File No, _______________ _
Govt. Contract No.--------------
.CSA.or OSHPD #-------------twek?AJ_J Other _______________ _
INSPECTION· -· · MAT'L-SAMPLING .. QTY MATERIAL DESCRIPTION INSPECTION ·CHECKLIST
__ QSHPD __ Concrete Cylinders --_ Rinf.: Rebar -'Plan&Specs
_OSA __ Cement --_ Rinf.: W.W.F. _ Clearances
__ Specialty : __ Mortar Samples --_ Rinf.: Tendons _Positions
__ Mechanical . __ Grout Samples --_ Cone.: Mix #/psi _Sizes
__ Electrical __ Masonry Prisms --_ Cone.: Mix #/psi _Laps
__ Roofing . --. Masonry Block --_ Cone.: Mix #/psi _ Future Continuity #/psi
· __ concrete __ Fireproofing --_,_ Grout: Mix #/psi _ Consolidation
~nry. __ Units (block or brick) --_ Mortar:. Type/psi _ Mortar Batching
truct Steel __ Asphalt Concrete --_ Units: Block ~lectrode Storage {f!.K
__ Prestress Cone __ Roofing --_ Units: Brick _ Torque Applied
__ Pile Driving _ Reinf. Steel --__6teel A 1 'Z 6
___ Fireproofing __ Steel _H.S.Bolts
__ Waterproofing __ H.S. Bolts --_ Metal Decking
___ Non-Destructive __ Tendon (PT Strands) --~lectrodes E?/ ,;rd
__ Soils Technician __ Other --_ Fireproofing
__ Batch Plant __ Other ··other g , ____ -r-/p. / /. l ·· Corrective action required __
__ Bolt Pull-Out __ Other ---e4d~.r.2:ua..c:2 7 k-:::.k.e. -~rrections completed
REMARKS
;,,d/4Z:,. · '!-J' 7!' : :r: &Ct!/ /1?/e $ cuJ/7 ,e,,, ,od 0~Nec~D4 ,z7"" .£u1//:&f:7 £4"(~/ J
~f: &:Jee<" ,?u.ss1"!:j em/etL ,P'kr77es &J4ie,/ LrtrJ n1.=yae?at:, -e -,1y4aet: <Z~ $-:Z'/-9(.
/,V s,ae<OL 4 z e//2~ e:td 1vt.£l-k-h12tt1 o /.~-;,,.i";:/~-J-4:P-0,/-1; ,4-e-~e,x;~q,:-1-"",e.e.r.:. , .J
a/.,/eP?ta-R°~7t:: ~-/J %-z {¼7'?'if: &-:£·r--·9te
F
c&41t?!et?I ..uel/4 b.)ere t~e ol YI ,1fJ< Mc is a·NL CFC<. e~fel I l
CERTIFICATION OF COMPLIANCE: To \he best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME ~ c:a,lf.) $ CERT. NO. /~6'D 7S-.3'.<0
(Print Clearly)
~~c:~) SIGNATURE d d/~+t~==-:::;:::~:i~ .-=-,:!..,'-.,.--..L...4":e..._ ________ ~=~-----_=-
.REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. PET,ER LASENSKY
PETERBUILT CQRP
6:?35 LUSK BLVD
· SAN DIEGO, CA n121
-DATE: May 09, 1996 ====-...::::==
FIELD DATA:
LOCATION OF PLACEMENT BUILDING J, PANEL 1-3
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
May 06,, 1996
5
AIR T,EMPERATURE, °F 74
CONCRETE TEMPERATURE, °F 7 8
DATE RECEIVE!;) IN· LAB May O 9, 19 96 ·
FIELD DATA SUBMITTED BY PSI\CHRIS DAVIS
MIX DATA SUBMITTED BY SUPI?LIER
PROJECT: HOMES FOR INDUSTRY
\i9-..5_o_KELLOG..:.AV.EN.UE
REVISION #1
,OUR REPORT NO.: 059-60088-6
SUPPl,.IER
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER ANQ PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTLJRE
SUPERIOR
370506
354P/ 3000 psi
5.4 SK
NOI~:.AePJ.ICABLE.~SJM.SI1~DARD.S,U~.!:_f:~!L?!:~E__B~~S_:!~OlCA.~l:_D:.SLU~1P:.Cl.4.:t9-0a.:.A".:'..l'.'.:8.Q:'.:0::'.NI::'.::E:::ti:::::I::C:::· ;:::/?3=:i,::'.ll.1~b;Jl:;:::'.. ~MeE~BA::'.T'.::U:'.::BE~·:::Cl'.:::06'.:=~~{9'.::::====================
COMPRESSION TEST RESULTS
-··
SPECIMEN TEST DATE·OF LABORATORY IDENTIFICATION AGE
NUMBER ORSET,NO. (DAYS)· TEST.
,.
:).2406 A 7 05/13/9
12406 B 28 0.6/03/9
:).2406 C 28 06/03/9
12406 D 60 0·7 /05/9
-· -·---·-· --~--~-. ...,... ____
SPECIFICATIONS
28 ... .. ,. .. ,. -··-·· --·-<-----·-··· .......
REMARKS; X .. Cylinder~ made by PSI representalive.
Cylinders made by Architect's or Conlraclo(s representative.
6
6
6
6
. ASTM C39-94
TOTAL CYLINDER l:OAD DIAMETER
(LBS.) (IN.).
93.0QO 6.00
134000 6.QO
i33000 6.00
X Cylin,ders, P!c.ked up by PSI
representaltve.
Cylinders delivered to Psi·laboratoiy.
TECHNICI~: caRIS DAVIS
cc: CI+Y OF CARLSBAD
CYLINDER COMPRESSIVE
AREA STRENGTH
(SQ.IN.) (PSI) TYPE OF BREAK
28.27 3290 Cone
28.27 4740 Cone
28.27 4700 Cone
3000
X., Test results comply with applicable
specifications.
Test results do not comply with
applicable specifications.
Respectfully submitted,
:Elofe~s~ion I Se~i~c.
DAVID RYAN, ... ;fl-.
DISTR T MANAGER
Information To Build On
PSI A,200-4 (4)F RSI• 6867 Nancy Ridge Drive, Suite E • San Diego, CA.92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CqNCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. PETER LASENSKY
PE'rERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 09, 1:996
LOCATION OF PLACEMENT :i?UILDING 1 PANEL C-.1
. [)ATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
F.IELD DATA SUBMITTED BY
MIX DATA Sl;JBMITTED BY
May 06, 1996
07:00 am
6
74
May 09, 199.6
PSI\CHRIS DAVIS
SUPPLIER
PRbJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
REVISION #1
OUR REPORT NO.: 059-60088-5
SUPPLIER
DEUVERY TICKET NO./TRUCK NO.
. MIX NUMBER AND PROPORTIONS
CEMENT
WATER
' FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
1459819
3545P/ 3000 psi
5.5 SK
C::OMPRESSION TEST RESULTS
·---------------·--4-.
SPECIMEN TEST
LABORATORY IDENTIFICATION AGE DATE·OF
NUMBER ORSETNO. (QAYS) TEST
12405 A 7 05/13/96
12405 B 28 06/03/96
124.05 C 28 06/03/96
12405 D 60 07/05/96
----~--~. ~--. ·----+--
. SPECIFICATIQNS
28
REMARKS: X Cylinders made by PSI represental_ive.
CYJinders ·made by Arch!lect's or
Cor,lracto~s representalive.
ASTM C39-94
TOTAL CYLINDER
LOAD DIAMETER
(LBS.) (IN.)
66000 6.00
94000 6:oo
96000 6.00
Cylinders picked up by PSI X representative.
Cylinders.delivered lo PSI laboratory.
TECHN·ICIAN: CHRIS DAVIS
cc: ¢ITY OF CARLSBAD
CYLINDER
AREA (SQ.IN.)
28.27
28.27
. 28 .27
COMPRESSIVE
STRENGTH
(PSI)
2330
3330
3400
TYPE OF BREAK
Cone
Cone
Cone
e -;;;;,r----
Test results do not comply with .applicable specifications.
Respectfully submitted,
THESE TEST RESULTS APPlY ONLY TO THE SPECIFIC SAMPLES TESTEO AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAt.~ERVICE INDUSTRIES, INC.
n:::tiiona/ S~rvice /Ln-"l!.~Ol-"-
DAVID CT RYAN,
DISTR T MANAGER
Information To Build On
Ps1 A-200-4 (4)F . PSI • 6867 Nancy .Ridge Driv-=i, Suite E • San Diego, CA 92121. • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. PETER LASENSKY .PROJECT: HOMES FOR INDUSTRY
PETERBUILT CORP' 1950 KELLOG AVENUE
6235 LUSK BLVD
SAN DIEGO, CA 92121
REVISION #1
DATE: May 06:::.:i ·:;:::· 1:..::9=.9=6===-=· =· _ :::·.:....:· ======O=.U=R=·=R=E=P=O=R=T=N=O=·=: =05=9=-=6=0=0=8=8=-=2===========
FIELb,bATA:
:LOCATION OF PLACEMENT PANEL 1-3
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRE'.fE TEMPERATURE, 0F.
DATE RECEIVED IN LAB
FIELD DAT-A SUBMITTED BY
MIX DATA SUBMITTED BY
May 03 1 1996
. 10: 25 am
4
75
79
May 06, 1996
PS.I\CHRIS DAVIS
SUPPLIER
$UPPLIER
DELIVERY TICKET NO.fTRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
. , ADMIXTURE
SUPERIOR
370466
354P/ 3000 psi
5.4 SK
NQTE:.heeLIC]!<BLE.6.SIM.S.Ih~D.~D_ll,µ.NLES.S~O.IlJEBWLS.lilllOJCAIED1.SLUM1_1::P..~::':'C.~lli:.I!~, ::il:':.-o~_a:~.Afil.Qlfil~~:':r,rr;_c~-~-,2:~3~1-~91~b_·=::IE~_M~PE~BA~TU~-~Be5::~~~'=====================
COMPRESSION TEST RESUI,. TS
ASTM C39-94
I -1 · ........ ---------
SPECIMEN TEST TOTAL . CYLINDER CYLINDER COMPRESSIVE
LABORATORY ID~NTIFICATION. AGE DATE OF LOAD DIAMETER AREA STRENGTH
NUMBER __ : _ o~--~ET ~o. __ (D~:~L TEST (LBS.) (IN.) (SQ. IN.) (PSI) TYPE OF BREAK ---·--
12394 A 7 05/10/96 86000 6:. 00 28.27 3040 Cone
12394 B 28 05/31/96 :J,34000 6.00 28.27 4740 Cone & Split
12394 c 2-8' 05/31/9G 132000 .6. OQ 28.27 4670 Cone
12394 D 60 07 /02/96
.. -------..L..------.-J.----1------1------------;
SPECIFICATIONS. 28 s-------
REMARKS: :x;_ Cylinders made by PSI representalive.
Cy~inders. ;;:k~~~p :by PS;---c O ~J!t. s -X representative. I ~c, a
Cylinder~ made by Architect's or Con)racto(s representalive.
Test results do nol comply with Cylinders delivered to:PSI laboratory._ _ applicable specifications.
TECHNICIAN: CH~IS DAVIS
cc: CITY OF CARLSBAD
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMP(ES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRJES,'INC.
Respectfully submitted,
~~ional S~rvice In
DAVID RYAN,
DISTR T MANAGER
Information To Build On
ps1A-200.4 <4>F PSI• 6867 Nancy: Ridge Drive, Suite E • San Di~go, CA 92121 .",Phone 619i455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. P~TER LASENS~Y
VETERBUILT CORP
-6235 LUSK BLVD
SAµ DIEGO, CA 92121
May 06, 1996
l;.OCATION OF PLACEMENT PANEL 3-3
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
May 03, 1996
07:46 am
5 3/4
64
CONCRETE TEMPERATURE, ~F 7 8
DATE RECEIVE0 IN LAB May O 6, 19 9 6
FIELD DATA$UBMITIE0 BY PSI\CHRIS DAVIS
MIX DATA SUBMITTED BY SUPPLIER
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
REVISION #1
OURR~PORT NO.: 059-60088-1
.SUPPLIER
DELiVERY TICKET NO.ffRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
AOMIXTURE
SUPERIOR
370448
354P/ 3000 psi
COMPRESSION 1EST RES UL TS
ASTM,C39-94 .,. __________ ------. --
SPECIMEN TEST TOTAL CYLINDER CYLINDER COMPRESSIVE
,LABORAT.ORY ,IDENTIFICATION AGE DATE OF l:OAD DIAMETER AREA STRENGTH
NUMBER ,OR SET NO: (DAYS) TEST (LBS.) JIN.) (SQ.IN.) (PSI) TYPE OF BREAK
12393 A 7 05/10/96 1.06000 6.00 28.27 3750 Cone
12393 .B' 28 05/.31/96 129000 6.00 28.27 4560 Cone
12393 C 28 05/31/96 126'000 6. o.p 28.27 4460' Con$
1·
i 1
. . ' ---_i_____ '-~· ---+----1-----
1 SPECIFICATIONS
i
REMARKS: X Cylinders 'made by PSI representative.
Cylinders made by Archilect's or Contiacto~s representative.
Cylinders picked up by PSI X_ representative.
Cylinders delivered to PSI laboratory.
TECHNICIAN: CHRIS DAVIS
cc: CITY OF CARLSBAD
Test results comply with applicable .X specifications.
Test·results do not comply with applicable specifications.
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONL Y·TO THE SPECIFIC SAMPLES TESTED AND IMY•NOT BE INDICATIVE OF THE ENTIRE CONCRETE Pi:ACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
~~-~ DISTRIC~AGER
Information To Build On
PSl,A,200,4 (4)F PSI• 6867 Nancy Ridge Drive, Suite E • San Diego, CA92121 • Phone 619/455-0544 • Fax 619/455-1170
Page_1_of J_
,. INSPECTION REPORT
CLIENT /!,e,T.u b'-1-//r Cell' f,
j.) '
DATE __ D_ .... _Z-_t../_ ..... _7.;.._:t,_:::;__ __
S,.-r-I Ii.;,.:_._ Architect _____ ,4?_-_~...;_• _____________ _
Engineer __ tJ_y.___'h-J-'--~-.a..----------7
Contractor. Sk 'P .S t-J-e / ~::5'
INSPECTION MA T'L SAMPLING QTY
_OSHPD __ Concrete Cylinders --__ OSA __ Cement --__ Specialty __ Mortar Samples --
_Mechanical __ Grout Samples --
_ Electrical __ Masonry Prisms --__ Roofing __ Masonry Block --
_Concrete __ Fireproofing --__ Masonry __ Units (block or brick) --,.k. Struct Steel _Asphalt Concrete
__ Prestress Cone __ Roofing --
__ Pile Driving __ Reinf. Steel --
_ Fireproofing __ Steel --
_waterproofing __ H.S. Bolts --
__ Non-Destructive __ Tendon (PT Strands) --
__ Soils Technician __ Other --
_Batch Plant __ Other
__ Bolt Pull-Out __ Other
PROJECT (Name) flo""le. s 4_,, .J;,,, J,.,,; tr,,-1,,
7
(Address) /9S-t) i<~ /IC:fj .,:v.e...
~ls6evcl ~ ..
REPORT NO. 0 S-£ -(:, Cl O '8 S _ I iA
Building Pe_rmit No. _____________ _
Plan File No, _______________ _
Govt. Contract No. _____________ _
OSAorOSHPD#--------------
Other ___________________ _
MATERIAL DESCRIPTION-INSPECTION CHECKLIST
_ Rinf.: Rebar ~Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi _Sizes
_.__ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electroc;fe Storage
_ Units: Brick _ Torque Applied
-Pf.steel A-3 "-
_H.S.Bolts
_ Metal Decking
_ Electrodes
_ Firepro~ng ., ~ Other C...""1 s-e-T"Yt',,u:f ~ Corrective action required __
d~c..-.,~} OJ.i J,ht;.J ~r · Corrections completed
~ 7
f".e,,,,,.., c...-i .>r '-b UJ..e--/ cl' -e c/' ~ e n m,[ ~ s, ... v
J
L-,1..-r=e-1-~-c:L.6..). Co..c.h.:e..r
J
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME ~/ Sc.,,LM/ c-clv'
~a~
INSPECTOR SIGNATURE-~----~-~--------
ps1-s-soo-11oc1 l
CERT. NO._..-.?_</_c_--=---------
DATE __ ~_-_-z.,_z./_-_1_",,___--------
r • Geotechnical l I -, Enviromlental
Pag~_1_· of __ _ • Construction
Consulting • Engineering • Testing INSPECTION REPORT
CLIENT f'er~6t-t/ lr·Cc-r-,1->, JJ ,,
DATE_S-_-_2..._3_-_9_6 __ _
Architect __ s_:; _i_/f._/J'/_~ ________ _
Engineer_---'tJ'---,1.,,,..V_m_a_-_'1..__ _____ ~-----
Contractor: S k ,',.o.r ?J .e / c:£;!!:J
INSPECTION MAT'L SAMPLING QTY
__ OSHPD __ Concrete Cylinders --
_OSA __ Cement --
_Specialty _ Mortar Si;mples --
_ Mechanical _ Grout Samples --
_Electrical __ _ Masonry Prisms --
_Roofing __ Masonry Block --__ concrete __ Fireproofing --
Masonry _ Units (block or brick) --
:::=Kstruct Steel __ Asphalt Concrete --
_ Prestress Cone ._Roofing --__ Pile Driving _ Reinf. Steel --
__ Fireproofing __ Steel --
_waterproofing __ H.S. Bolts --
_Non-Destructive __ Tendon (PT Strands)
__ Soils Technician __ Other --___ Batch Plant __ Other --
__ Bolt Pull-Out __ Other --
REMARKS
PROJECT (Name) lfow,es ~ :J;,idusii-J,,·
7
(Address) /9s-<.> ke/ log q,y~
Ca..r /.; 6a... c( Ca.... ,
REPORT NO. OS-7-60c/9 8 \~
Building Permit No. _____________ _
Plan File No, ________________ _
Govt. Contract No. _____________ _
OSAorOSHPD#--------------
Other __________________ _
MATERIA[ DESCRIPTION INSPECTION CHECKLIST
___ Rinf.: Rebar _ Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi _Sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batchinn
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_½_steel A-3~
_H.S.Bolts
_ Metal Decking
_p{ Electrodes B7 / r-1 I
_ Fireproofing
_Other _ Corrective action required __
_ Corrections completed
t/:sc.,,ev/tt: 1',;, SJ?--ec-1?-.ed' J"o//4 < ./2,."~ '1-4 ~ r::f W -e f c:L-1:J
_ T T 7 1
c; .err>' f; ~ d w "6' / r:/, -er--S /Jt:X"' iO ro A ..er ~ Co G-e-ci'"' r e0 ~ cl
I
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME&/ Mttu · cir-
~ (P.rin /t;ea~ / ._--,, , ..
INSPECTOR SIGNATURE-~---,.-----.:!>'°_P~-----
Pst-s-soo-110(1)
6trz_ CERT. NO. _____ c,..__ ____________ _
,S--Z,3 -'J/-DATE ________ P;__ ________ _
Page_1_of_
INSPECTION REPORT
CLIENT F.e ,.ru--h vt/ Ir Corp,
I\. t...
DATE .,s-:Z. Z. -~~
PROJECT (Name) #ol'11e..r -fJOJ" L d L-is7i
(Address) /'JS-O J(.e, //°:) ,
Cow-1s6c...-J, c~,
REPORT NO. OS--7 C'P0088 -\~
Architect._S_,_' /_/_l?1_4_n ....... /t_'?J--,,,,...Y-'-m_;._a,,.-=--v1-__ ~_--_~_c_ .. _
I
Bui!ding Permit No. _____________ _
Engineer Sr"1i:.-e, lJ,y~e:i,"'1
Contractor. ._5· k, P .s c:J .e / c0 ~
Plan File No ________________ _
Govt. Contract No.--------------
OSA or OSHPD #-------------
Other __________________ _
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTI? INSPECTION CHECKLIST
_OSHPD _ Concrete Cylinders ~ Rinf.: Rebar ./1--76 K Plan & Specs
_OSA __ Cement --_ Rinf.: W.W.F. _ Clearances
·_Specialty _ Mortar Samples --_ Rinf.: Tendons _ Positions
_Mechanical _ Grout Samples --_ Cone.: Mix #/psi _Sizes
_Electrical _ Masonry Prisms --_ Cone.: Mix #/psi _Laps
_Roofing _ Masonry Block --_ Cone.: Mix #/psi _ Future Continuity #/psi
_concrete __ Fireproofing --_ Grout: Mix #/psi _ Consolidation
Masonry _ Units (block or brick) --_ Mortar: Type/psi _ Mortar Batching R Siruct Steel _Asphalt Concrete --_ Ur:iits: Block _ Electrode Storage
_ Prestress Cone __ Roofing --_ Units: Brick _ Torque Applied
_Pile Driving _ Reinf. Steel --..Ksteel A-:Jfo
-_Fireproofing _Steel .. --_H.S. Bolts
_waterproofing _H.S.Bolts --__ Metal Decking
-_ Non-Destructive _Tendon (PT Strands) --_ Electrodes
_Soils Technician _Other --_ Fireproofing
_ Batch Plant _Other --_Other _ Corrective action required __
_Bolt Pull-Out _Other --_ Corrections completed
REMARKS
!/is t.-t (;,.., II v , ·;i .r .i0 -e-c T...e--r:I i c,, ·"'
J ,
/o/bi p> ~ e / Sh -.e<:t..r Gq-'1 ~ ec, ,, o VJ s JO ~
19/L)
I
I l
2.. , 0 6s -er t/ -e d c.,e.r 'T t' ..g' .e-ct ~ -e lei~ .s f?o r
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable-sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME e&,J'"'1 se,t;b7, .. cir
~-INSPECTOR SIGNATURE~~--,::;;.._ __________ _
tC/2 CERT. NO·---=---------------
DATE___;;s--;;;;__---=Z~"2.._-...... 'J-'-'-------
PSl·B-900-170(1)
j
m.~ ail' -Environmental ,.,SI Geotechn~cal
•-.Construct,on
Consulting • Engineering • Testing·
Page_1_of J_
INSPECTION REPORT
.,..
DATE -5"-(4-q l,.,,
Architect <:> \ L--M A:N ) L...M?, 12..::f \<.. ,
Engineer ~ ~v l..,e-, H-, W Y t"-1'-1\.)
Contractor Jlfk\ E.,g.4¢,u \ L'f
INSPECTION MAT'LSAMPLING
_OSHPD -A Concrete Cylinders
_OSA _Cement
_Specialty _ Mortar Samples
_ Mechanical _ Grout Samples
_Electrical _ Masonry Prisms
_Roofing _ Masonry Block
-$-concrete _ Fireproofing
_Masonry _ Units (block or brick)
_ struct Steel _ Asphalt Concrete
_ Prestress Cone _Roofing
_Pile Driving _ Reinf. Steel
_ Fireproofing _Steel
_waterproofing _H.S.Bolts
_ Non-Destructive _Tendon (PT Strands)
_. _Soils Technician _Other
_Batch Plant _ Other
_Bolt Pull-Out _Other
REMARKS
QTY 1-
--------------
-·-----
----
--
--
--
--
PROJECT (Name)\.n2m~S fctt. 1K'2vS.fts '(
(Addres'ajJ;\50 K~1XZfG:-~~,
U\<.½6~D I CA-,
REPORT NO. (9 59-&~o ~ -I I
Building Permit No. 't~o 4:~ Z • 9~ '1~3 :::'i<P 4 :r'</ -9,;o 'fS'
Plan File No, ________________ _
Govt. Contract No.--------------
OSA or OSHPD #-------------
Other __________________ _
MATERIAL DESCRIPTION INSPECTION~CKLIST 1
_ Rinf.: Rebar ~ Plan & Specs
___ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions l
_ Cone.: Mix #/psi _ Sizes
_ Cone.: Mix #/psi _Laps '
_ Cone.: Mix #/psi _ Future Continu,,/psi
_ Grout: Mix #/psi ~ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_H.S.Bolts
_ Met1;1I Decking
_ Electrodes
_ Fireproofing
_Other Corrective action required __
_ Corrections completed
q?~R.f'.'t;,'f2.z:11i=-12 CaN'.fiN\21!2'1S sp~, Arv 1rJs96;;por-J Du\2.\t::\le ~\c&f/4.NIG:Mf"
CERTIFICATION OF COMPLIANCE: To the best of our knowledge,all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections· of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME J)W \ Q \e, T~R '--\ -z_?... I
(Print !early)
INSPECTORSIGNATUR• ~ ;I?~
PSl·B-900-170(1)
CERT. NO. S 1 {_p
DATE __ 5'"_-_/_Lf-_-_'f_,_(e ________ _
1/
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 15, 1996
LOCATION OF PLACEMENT TILT-UP PANEL # C-2 RIGHT
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
May 14, 1996
07:30 am
4 1/2
1. 0
60 AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F 74
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 15, 1996
PSI\david terlizzi
SUPERIOR
PROJECT: ,_HOMES FOR INDUSTRY
L195J) KELLOG AVENUE]
OUR REPORT NO.: 059-60088-8
SUPPLIER
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
268532
354P/ 3000 psi
508
306
1358
377 = 3/8"
1417 = 1 11
POZZ 322N 25.4
NOTE: Al:P.LICABLE.ASIM..S'UINDABD.S.\J.NLE;S.S..9.Il:!Efi~Ql~IEO:.&Ll.l.Me.;J;ll;l:90a· AIB CONTENT-'C231-91b• TEMPEBAIURE· C1064-88(
COMPRESSION TEST RESULTS
ASTMC39-94 --·-
SPECIMEN TEST LABORATORY IDENTIFICATION AGE DATE OF NUMBER OR SET NO. (DAYS) TEST
12437 A 6 05/20/96
12437 B 28 06/11/96
12437 C 28 06/11/96
12437 D 60 07/13/96
I
I --·-----~----.
SPECIFICATIONS 28
-···· ---'
REMARKS: ~ Cylinders made by PSI representative.
Cylinders made by Architect's or Contracto(s representative.
TOTAL CYLINDER
LOAD DIAMETER (LBS.) (IN.)
86000 6.00
Cylinders picked up by PSI ~ representative.
Cylinders delivered to PSI laboratory.
TECHNICIAN: david terlizzi
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE
AREA STRENGTH
(SO.IN.) (PSI) TYPE OF BREAK
28. 21-: ~ Cone
Q_ooo)
Test results comply with applicable specifications.
Test results do not comply with applicable specifications.
Respectfully submitted,
Professional Service lndu
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED ANO MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITT!=N PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
~/!:.
DISTRICT MANAG
Information To Build On
PSIA-200-~ (4JF PSI• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
V
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 15, 1996
LOCATION OF PLACEMENT TILT-UP PANEL #1-3
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
PATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 14, 1996
09:20 am
4 1/4
1.0
May 15, 1996
PSI\david terlizzi
SU~ERIOR
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
OUR REPORT NO.: 059-60088-7
SUPPLIER
DELIVERY TICKET NO.rrRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
370610
354P/ 3000 psi
508
306
1358
377 = 3/8"
1417 = 1 11
POZZ 322N 25.4
tl.QTJ:: /lePJ.JC.ABLE.MIMJlI/IND.ABD.$..llliLE.S~.Il:IJIBW!.s.E..l)iD.lC.AIJ:O.:.JiL.UMf::..Clli:iO.a:.AIB CONTENT-C23HJb· TEMPEBATUBE• C1084,11Br93l
SPECIMEN TEST LABORATORY IDENTIFICATION AGE
NUMBER OR SET NO. (DAYS)
12436 A 6
12436 B 28
12436 C 28
12436 D 60
SPECiFICATIONS 28
COMPRESSION TEST RESULTS
ASTMC39-94
TOTAL CYLINDER DATE OF LOAD DIAMETER
TEST (LBS.) (IN.)
05/20/96 82000 6.00
06/11/96
06/11/96
07/13/96
REMARKS; _K Cylinders made by PSI representative.
Cylinders picked up by PSI _K representative.
Cylinders made by Architect's or Contracio(s representative. , Cylinders delivered to PSI laboratory.
TECHNICIAN: david terlizzi
cc: CITY OF CARLSBAD
CYLINDER COMPRESSNE AREA STRENGTH
(_SO. IN.) (PSI) TYPE OF BREAK
28.27 .-2,9.0.0, Cone
~
Test results comply with applicable
specifications.
Test results do not comply with applicable specifications.
Respectfully submitted, <;&/}{eel
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT,
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
DAVID J. RY , RCE
DISTRICT MANAGER
Information To Build On
Psi A-200-4 (4)F PSI • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR: MR. PETER LASENSKY PROJECT: HOMES FOR INDUSTRY
PETERBUILT CORP 1950 KELLOG AVENUE
6235 LUSK BLVD
SAN DIEGO, CA 92121
DATE: May 09, 1996
FIELD DATA:
LOCATION OF PLACEMENT BUILDING J, PANEL 1-3
DATE PLACED May 06, 1996
TIME
SLUMP,.IN. 5
AIR CONTENT, %
AIR TEMPERATURE, °F 74
CONCRETE TEMPERATURE, °F 7 8
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 09, 1996
PSI\CHRIS DAVIS
SUPPLIER
OUR REPORT NO.: 059-60088-6
SUPPLIER
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
370506
354P/ 3000 psi
5.4 SK
COMPRESSION TEST RESULTS
ASTMC39-94
SPECIMEN TEST
LABORATORY IDENTIFICATION AGE DATE OF
NUMBER OR SET NO. (DAYS) TEST
12:406 A 7 05/13/96
12406 B 28 06/03/96
12406 C 28 06/03/96
124·06 D 60 07/05/96
SPECIFICATIONS
28
REMARKS: _X Cylinders made by PSI representalive.
Cylinders made by Architect's or
Contracto(s representative.
TOTAL CYLINDER
LOAD DIAMETER
(LBS.) (IN.)
93000 6.00
Cylinders picked up by PSI
-~ representalive.
Cylinders delivered lo PSI laboratory.
TECHNICIAN: CHRIS DAVIS
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE AREA STRENGTH
(SQ. IN.) (PSI) TYPE OF BREAK
28.27 \:3290l Cone
-
0§61
Test results comply with applicable
specifications.
Test results do not comply with
applicable specifications.
Respectfully submitted,
Professional Service Industries, Inc.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATiVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL, WITHO\JT 1/VRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
~~LX-
DISTRICT MANAGER
Information To Build On
PSI A-200-• (4)F PSI• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 09, 1996
LOCATION OF PLACEMENT BUILDING 1 PANEL C-1
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
May 06, 1996
07.: 00 am
6
CONCRETE TEMPERATURE, °F 7 4
DATE RECEIVED IN LAB May 09, 1996
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
PSI\CHRIS DAVIS
SUPPLIER
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
OUR REPORT NO.: 059-60088-5
SUPPLIER
DELIVERY TICKET NO./TRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
1459819
3545P/ 3000 psi
5.5 SK
COMPRESSION TEST RESULTS
ASTM C39-94 I SPECIMEN TEST LABORATORY IDENTIFICATION AGE DATE OF NUMBER OR SET NO. (DAYS) TEST
12405 A 7 05/13/96
12405 B 28 06/03/96
12405 C 28 06/03/96
12405 D 60 07/05/96
--·
SPECIFICATIONS 28
REMARKS: X Cylinders made by PSI representative.
Cylinders made by Architect's or
Contracto~s representative.
TOTAL CYLINDER
LOAD .DIAMETER
(LBS.) (IN.)
66000 6.00
Cylinders picked up by PSI
~-representative.
Cylinders delivered to PSI laboratory.
TECHNICIAN: CHRIS DAVIS
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE
AREA STRENGTH
(.8O. IN.J (PSI) TYPE OF BREAK
28.27 ""2':3'3·0 Cone
,,.,......,,.3-00:0:i
Test results comply with applicable specifications.
Test results do not comply with
applicable specifications.
Respectfully submitted,
~~Ice Industries, Inc ..
THESE TEST RES UL TS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. ~~!~r~ ,g~
Information To Build On
Ps1 A-200.4 (4JF PSI • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
REPORT OF CONCRETE COMPRESSION TEST
TESTED FOR:
DATE:
FIELD DATA:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 06, 1996
LOCATION OF PLACEMENT PANEL 1-3
DATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 03, 1996
10:25 am
4
75
79
May 06, 1996
PSI\CHRIS DAVIS
SUPPLIER
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
OUR REPORT NO.: 059-60088-2
SUPPLIER
DELIVERY TICKET NO.ffRUCK NO.
MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
370466
354P/ 3000 psi
5.4 SK
NOTE. AP.P.LICA6LE.AS1M.SMN0/.18D.S,U.NLES.$_0.lllE8WISEJtlDICAIED:.SLUMP.:::.:-~CJ~4.3~~1!J~Oa'.':::;.Al~B..!::C!~O~tillill~. I:.l:::·:::-C2~3~1-9~1.b~_' ~TE~M::PE~BA~T~UB~E'.'::· C'.'.:1~06'::4-~86~=====================
COMPRESSION TEST RESULTS
--·------
SPECIMEN TEST
LABORATORY IDENTIFICATION AGE DATE OF
NUMBER. OR SET NO. (DAYS) TEST
:J.2394 A 7 05/10/96
12394 B 28 05/31/96
12394 C 28 05/31/96
12394 D 60 07/02/96
l:EO>eJCATIOOS
I
28
REMARKS: X Cylinders made by PSI representative.
Cylinders made by Architect's or
Contracto(s representative.
ASTM C39-94
TOTAL CYLINDER
LOAD DIAMETER
(LBS.) (IN.)
86000 6.00
Cylinders picked up by PSI X representative. -
Cylinders delivered to PSI laboratory.
TECHNICIAN: CHRIS DAVIS
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE
AREA STRENGTH
(SQ. IN.) (PSI) TYPE OF BREAK
28.27 Qo4:o] Cone
(3og]J
Test results comply with applicable specifications.
Test results do not comply with applicable specifications.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
DAVID
DISTRICT MANAGER
Information To Build On
Psi A-200-• <•>F PSI • 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 619/455-0544 • Fax 619/455-1170
dustries, Inc.
REPORT OF CONCRETE' COMPRESSION TEST
TESTED FOR:
DATE:
MR. PETER LASENSKY
PETERBUILT CORP
6235 LUSK BLVD
SAN DIEGO, CA 92121
May 06, 1996 -· . ·-·:-:-:--~ :·:::·-·-=-=--=-==---=======
FIELD DATA:
LOCATION OF Pl,ACEMENT PANEL 3-3
PATE PLACED
TIME
SLUMP, IN.
AIR CONTENT, %
May 03, 1996
07:46 am
5 3/4
64 AIR TEMPERATURE, °F
CONCRETE TEMPERATURE, °F 78
DATE RECEIVED IN LAB
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
May 06, 1996
PSI\CHRIS DAVIS
SUPPLIER
PROJECT: HOMES FOR INDUSTRY
1950 KELLOG AVENUE
OUR REPORT NO.: 059-60088-1
SUPPLIER
DELIVERY TICKET NO./TRUCK NO.
,MIX NUMBER AND PROPORTIONS
CEMENT
WATER
FINE AGGREGATE
COARSE AGGREGATE
ADMIXTURE
SUPERIOR
370448
354P/ 3000 psi
COMPRESSION TEST RESULTS
1-· -·-• -· I SPECIMEN~ IEST
I LABORATORY I IDENTIFICATION AGE DATE OF NUMBER OR SETNO. (DAYS) TEST
; .. -----·-··1 -----··--. -
12393
12393
12393
SPECIFICATIONS
A
B
C
I 7 I 28
I 28
28
05/10/96
05/31/96
05/31/96
-·-------------J'------'------
REMARKS: .K_ Cylinder~ made by PSI representative.
Cylinders made by Architect's or
Conlracto(s representative. ,
ASTM C39-94
TOTAL CYLINDER LOAD DIAMETER (LBS.) (IN.) ·-
106000 6.00
Cylinders picked up by PSI
-~ representativl!,
Cylinders delivered to PSI laboratory.
TECHNICIAN: CHRIS DAVIS
cc: CITY OF CARLSBAD
CYLINDER COMPRESSIVE AREA STRENGTH
(SQ. IN.) (PSI) TYPE OF BREAK
28.27 fil2J Cone
~
Test results comply with applicable
specifications.
Test results do not comply with
applicable specifications.
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED. EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
~-·-d_u_s_~_~_s_,fu~
DAVID J~~
DISTRICT GER
Information To Build On
PSI A-200-• f•)F PSI• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121 • Phone 61~/455-0544 • Fax 619/455-1170
Page_1_of_
INSPECTION REPORT , I ? ., < •
WENT tlkburff Cbrp
DATE ___ 5"'--~Cj_.-_.:;f_..,._~--
PROJECT (Name)
(Address)
Architect-"---___ S ...... t~/~_Yj.....,_tz __ /lTl_v,_/?_,,k/2_-· ~-~--_
REPORT No. osz, -r&oo ea.-.A.
Building Perm~t No. z'6,Q L(6,5:.
Engineer t;;l/hzut(l / ft!/t(4Kt4 ;h1_C,,.
Plan File No, _______________ _
Contractor. £eferbul/f U2R'f?·
Govt. Contract No. ---------t'---------
OSA or OSHPD #-------------
Other---------~----------
INSPECTION
___ OSHPD
_OSA
_Specialty
Concrete
_ Masonry
_ struct Steel
_ Prestress Cone
__ Pile Driving
__ Fireproofing
__ _ Waterproofing
__ Non-Destructive
__ Soils Technician
_ -_ Batch Plant
_ Solt Pull-Out
REMARKS
MAT'LSAMPLING
_ Concrete Cylinders
_ Cement
_ Mortar Samples
_Grout Samples
_ Masonry Prisms
__ Masonry Block
_ Fireproofing
___ tJnits (block or brick)
_Asphalt Concrete
_,Hoofing
_ Reinf. Steel
_ Steel
-__ H.S. Bolts
_-_Tendon (PT Strands)
-_Other
_ _ Other ____ _
_Other ____ _
~PECTION CHE
____ Rint: Rebar ______ ~Ian & Specs__,...y..:'-,..__ __
___ . _ Rinf.: W.W.F. ~learances___._~,,..1....,c.--__ _
____ Rinf.: Tendons -z:ositions___,,,..c.L~,_...,,_...--
_· __ Cone.: Mix #/psi 3/ Sizes -ti:-#5
_____ Cone.: Mix #/psi _• _ Laps_p.:i......~:u;.;,:_µ;...-,,_~~
QTY MATERIAL DESCRIPTION
____ Cone.: Mix #/psi ____ _
____ Grout: Mix #/psi ______ Consolidation _____ _
____ Mortar: Type/psi _ Mortar Batching, ____ _
____ Units: Block -_ Electrode Storage ___ _
____ Units: Brick _ Torque Applied ____ _
____ Steel, _______ _
____ H.S. Bolts ______ _
__ . _ Metal Decking ____ _
_____ Electrodes ______ _
______ Fireproofing _____ _
_____ · Other _ __._ _______ Corrective action required __
_ ___________ Corrections completed __ _
5-9 -9'7 L11h2RSD&0 ~~~ Tuaforo"<e 'S.~ \ n~bn foe
::rn+-up fbrels.l. inspa:z/ecL 18 par-els / ~f=-5 3-0,. ,_ s,,
, _ , . ,4 ... & . tt -;s . c-;; , ,. -:2, L/, -t .. c.-~ . c-3 -9 -i , T -r , -> • r 7 7 7
-r CobE-etve.--..JM ~
NO CPJeeevrtYB OCUQNS eE:QUleef).
CEFITIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the b · 1 codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR SIGNA WE~~~~~_,...._Ji~~~~_::::,
PSl·B-900-170(1)
CERT. NO. JCBJ 51 -117
QATE 5-1-16
Page_1_of_
INSPECTION REPORT
.{j • '
CLIENT 'f)~kwft C,oep
DATE st:= t. -91.
Architect $ )/ov:11-J:J7/ ~4e,.u;J /2c:::
Engineer ~ r'.U.C-!2 { 4v efr1 , )
Contractor. (t-brl,o., {£-_ d.c ~p
INSPECTION MAT'L SAMPLING
_OSHPD ~ncrete Cylinders
_QSA ·_Cement
-.-Specialty ._ Mortar Samples
__ Mechanical __ Grout Samples
_ Electrical __ Masonry Prisms
_Roofing _ Masonry·Block
Lconcrete -. _ Fireproofing
_Masonry __ Units (block or prick)
-: StructSteel __ Asphalt Concrete
_Prestress Cone __ Roofing
__ Pile Driving __ -. Reinf. Steel
_ Fireproofing __ Steel
_Waterproofing __ H.S. Bolts
_-_Non-Destructive __ Tendon (PT Strands)
_Soils technician _Other
_Batch Plant . _._Other
__ Bolt Pall-Out __ -Other
REMARKS
QTY
--
--
--
--
--
--
----
--
--·
--·
--
--
--
PROJECT(Name) Hb'J,/,,1/L~~
(Address) 1-iy,-o LJ~ IJ.Jc ··
clk4k1 C-/Q
REPORTNO. t:LS_,_f 4~~ -9
Building Permit No. 1 L ~ 7' 6 .1.. 2/ 9 4 () it:' :?.
Plan File No, ________________ _
Govt. Contract No.--------------
OSA or OSHPD #-------------
Other __________________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar /.~~J :s _ Plan & Specs
-Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions 6-e_
_ Cone.: Mix #/psi hoo:" Sizes I _ Cone.: Mix #/psi _Laps
-.-Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_H.S.Bolts
_ Metal Decking
_ Electrodes
_ Fireproofing
_Other _ Corrective action required __
_ Corrections completed ~
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otheiwise noted, substantially complies with approved plans,
specifications.and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME C LA-:\J::}.,_$ d ~ts
(Print Clearly)
CERT.No._·+lfi"r-4--4~·--------------
INSPECTOR SIGNATURE c_.~ ~~
PSI-B-900-170(1)
.. -~• Geotechnical t -, Enwrormentcd Page_1_of _J_ Kg• Construction
Consulting • Engineering • Testing INSPECTION REPORT
CLIENT .(L~Jiu, ft C~p
DATE ~--..:3
Engineer_.¥;(3'"'--Lr:-"lu,!l:ool<:....::~'---~_L.J6.« ... ~4'4/d(.~c::i:.c-,11---1o,,1J~------
Contract6r.--"'.6"---::· L;h=--=· -.v:::::-/4:.::&,(..j_~· ("---t-'--------
INSPECTION _ MAT'L SAMPLING QTY
__ QSHPD _ Concrete C:ylinders g_
_OSA __ Cement --
_specialty _ Mortar Samples ---
__ Mechanical _Grout Samples --
_Electrical _ Masonry Prisms
___ Roofing _ Masonry Block --
~oncrete _ Fireproofing ---
_Masonry __ Units (block or brick) ---
_ struct Steel _-_Asphalt Concrete --
_ Prestress Cone __ Roofing
_Pile-Driving __ Reinf. Steel --
_ fireproofing __ Steel
·_waterproofing __ H.S. Bolts
_ Non-Destructive __ Tendon (PT Strands)
__ Soils Technician __ Other --
_ Batch Plant __ Other --
_ Bolt Pull-Out . __ Other --
REMARKS
~ I.
7
PROJECT(Name)~/4lla-~
(Address) f79..:C{-nia;;;l(?J::fH"L
~/41,&;d L, '19
REPORT NO. t,~'i ... t, .oos;:E; ij
Building Permit No. fl-b # f.C '? (,.,1> '/ 4 f
Plan File No, ________________ _
Govt. Contract No. ______________ _
OSAorOSHPD#-------------
Other __________________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar '-os..-,r__l, "-= ~ Plan & Specs _ Rinf.: W.W.F. Clearances
·_ Rinf.: Tendons Positions
_ Cone.: Mix #/psi ~~OQ ¼s ~~
___ -Cone.: Mix #/psi ps
_ Cone.: Mix #/psi _ Future Continuity #/psi
--:-Grout Mix #/psi _ ConsolidatioryV.,,.~l P,(.;;;;/
__ Mortar: Type/psi _ Mortar Batching
___ Units: Block _ Electrode Storage
_ Units: Brick. _ Torque Applied
_Steel
_H.$.Bolts
___ _ Metal Decking
_ Electrodes
_ Fireproofing
-_Other _ Corrective action required __
_ Corrections complete~--;;:; -
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable-sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project.control.
INSPECTOR NAME d l4-v-l'--'c ~ LJcujt'..!!'.
(Print Clearly) ·
INSPECTOR SIGNATl,JRE_~ _ __.;;._·--"---=~='-'Q~_,...~=-:;:..;_-
PSI-B-soo-110(1)
CERT. No._'-ft-q+-7'~-------
DATE __ ..J;.=---~---=----...z:1',=-----------
l ·-,~ . .., I Geotechn~cal
•-. Construction Page_1_of~
Consulting_• E_nglneerlng • Testing INSPECTION REPORT
DATE -C-/ I
Architect __ 5 __ i .... l ..... \ ..... m. ........ ¢..=-t..._t2.,,./_0-'--="-:,Y~M=a.::..u=--_,/.-:.q~.:::-=---
Engineer _ ___,13'"" ...... -r~iJ,.,=--1!.J---'~-=--0-..,,v ....... M'""~=sJ=--------
Coritractor 6:_L,r:::1~'-\\ Cc;.1 ~ t' ;
INSPECTION MAT'L SAMPLING QTY
_QSHPD _ Concrete Cylinders --_. _QSA _Cement --
_Specialty ._ Mortar Samples --
_ Mechanical _ Grout Samples
_ Electrical _ Masonry Prisms -·-·.
_Roofing _ Masonry Block --
_Concrete _ Fireproofing --
_Masonry _ Units (block or brick) --
_Struct Steel _ Asphalt Concrete --
__ prestress Cone __ Roofing --
___ Pile Driving _ Reinf. Steel -·-
_ Fireproofing _Steel -·-
_. Waterproofing · __ H.S. Bolts --
_ Non-Destructive ___ Tendon (PT Strands) -·-
_Soils Technician __ Other --
_ Batch Plant _Other --
_ Bolt Pull-Out _Other --·
REMARKS
PROJECT (Name) l.Jlf>M.W £.o-r /;,..,, d(L 4--ky
(Addres~?,ZJ-.a JZ;;;:lt~-ra
C.4=,,..)sLJ c;:;.
REPORT NO. At:<i -~ tf:>CJ~~ -,3_
Building Permit No. </1,t;> 'ft,.11/~,~ '{, ¢1w:;, ¼.:y'14Wi
Plan File No, _______________ _
Govt. Contract No. ______________ _
OSA or OSHPD #--------------
Other __________________ _
MATERIAL DESCRIPTION INSPECTION CHECKLIST
_ Rinf.: Rebar _ Plan & Specs
_ Rinf.: W.W.F. _ Clearances
_ Rinf.: Tendons _ Positions
_ Cone.: Mix #/psi _Sizes
_ Cone.: Mix #/psi _Laps
_ Cone.: Mix #/psi _ Future Continuity #/psi
_ Grout: Mix #/psi _ Consolidation
_ Mortar: Type/psi _ Mortar Batching
_ Units: Block _ Electrode Storage
_ Units: Brick _ Torque Applied
_Steel
_H.S.Bolts
·_ Metal Decking
_ Electrodes
_ Fireproofing
_Other _ Corrective action required~
Corrections completed
~/-.-9-<.: fuv,d., .l ~}"0 <~,,r;; \ /ufy29,ct1ne-J )3E..k4r--p fc,_~~fl,(4'1.t-S± Cu... -fclfow,et,
-rrlf ¥ . a,_,s, ~ s .' ~ Li,,_,,,~ k l., L
A-I
t-.2. 1-'I /-s--. 1-L
':5-.!L 3-1
f:-I
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin-
ion or project control.
INSPECTOR NAME <!_ h ~ /c, <, c!_ 06.dr,
(Print Cleariy)
INSPECTOR SIGNATURE_d.=':..;~~;__~-...:6_=-Q.,,~=-ec9t--_
PSI-B-900-170(1)
CERT. NO.__,_J./_C/"--'-CZ, __________ _
DATE----",!;'-------/_-_9_6 ___________ _
Ji •J Profession-al Service Industries, Inc. ~ • American Engineering Division
. ' INSPECTION REPORT
Project Name (per plans) t--/ lrn-< h ~ fu.J u ~/'7
Inspection
Date
Inspector's Name_-_CD...: __ :;;:;_=M>:,==L~---=b=-5;).J,C.:0!=4='=·;-p....,_ ___ _
PSI 8-900·171
Page~~
EsGil Corporation
Professiona{ Pfan !R..f.view 'Engineers
DATE: 3/26/96
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-249
PROJECT ADDRESS: Kellogg Avenue
PROJECT NAME: Homes For Industry
SET: III
l:J LICANT
iq JURIS. l:J FIRE
LAN REVIEWER
l:J FILE
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Tom
Date contacted: 3/26 (by: DY) Telephone#: walk-in
By: David Yao Enclosures:
Esgil Corporation
0 GA D CM O GP O . PC log trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
EsGil Corporation
Professiona{ Pfan !l(J.view 'Engineers
DATE: 3/22/96
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-249
PROJECT ADDRESS: Kellogg Avenue
PROJECT NAME: Homes For Industry
SET: II
~NT
~ CJ FIRE
CJ PLAN REVIEWER
CJ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's*********** codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's.********** codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
r:gJ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
r:gJ The applicant's copy of the check list has been fax to:
Tom Newcomer 552-1563
r:gJ Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted: (by: ) Telephone #:
D REMARKS:
By: David Yao Enclosures:
Esgil Corporation
rgJ GA DCM D GP D· PC 3/14 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 96-249 II
3/22/96
RECHECK PLAN CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: Kellogg Avenue
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 3/14
REVIEWED BY: David Yao
FOREWORD (PLEASE Rl;:AD):
PLAN CHECK NO.: 96-249
SET: II
DATE RECHECK COMPLETED:
3/22/96
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the .Planning Department, Engineering Department
or other depijrtri1ents.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in ·conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. Please make all corrections on the original tracings and submit two new sets of prints to:
ESGIL CORPORATION.
8. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
C. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
D. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
DYes DNo
-I
i
v,•
Carlsbad 96-249 II
3/22/96
3. Show the assumed property lines between the buildings.
10. Show the 30 feet required yard for building L at south side.
23. Provide name(s) of the special inspector to the city before the issuance of the
building permit.
27. Note under defer approval at sheet Sp3 that the calculation and detail to transfer
the force from the brace to the T JI will be provided before installation.
a) The sanitary signage shall also be located on the wall adjacent to the latch
outside of the doorways leading to the sanitary facilities, per Section
11178.5.9.
PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
PLAN REVIEWER: Glen Adamek
MECHANICAL (1994 UNIFORM MECHANICAL CODE)
8. Only one set of the revised sheets T24/1, T24/2, M/1, M/2, and M/3 and energy
calculations were provided. Two sets of plans and calculations are required.
ENERGY CONSERVATION
10. The sections on sheet A/12 do not show the interior metal framed walls & R-13
wall insulation and R-19 ceiling insulation on top of the T-Bar ceiling, as per the
energy designs. Please correct.
Note: If you have any questions regarding this plan review list please contact Glen
Adamek at (619) 560-1468. To speed the review process, note on this list (or a copy)
where the corrected items have been addressed on the plans.
EsGil Corporation
Professiona{ PCan ~view 'Engineers
DATE: 2/29/96
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-249
PROJECT ADDRESS: Kellogg Avenue
PROJECT NAME: Homes For Industry
SET:I
D APPLICANT ~ D FIRE
~EVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
C8J The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
C8J The applicant's copy of the check list has been sent to:
Sillman/Wyman,lnc. 6181 Cornerstone Court East Suite 101, San Diego CA 92121
C8J Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
· Person contacted:
Pate contacted: (by: ) Telephone #:
D REMARKS:
By: David Yao Enclosures:
Esgil Corporation
~ GA ~-CM D GP D PC 2/15 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 96-249
2/29/96
PLAN CHECK NO.: 96-249
OCCUPANCY: B/S-1
PLAN REVIEW CORRECTION LIST
COMMERCIAL
JURISDICTION: Carlsbad
USE: office/warehouse
TYPE OF CONSTRUCTION: V-N ·ACTUAL AREA: bldg A,B-5029 SF
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Y?(bldg.C only?)
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: 2/29/96
FOREWORD (PLEASE READ):
bldg C,D-9987 SF
STORIES: 1
HEIGHT:
OCCUPANT LOAD:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 2/15
PLAN REVIEWER: David Yao
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required
prior to the issuance of a building permit.
Code sections cited are based on the 1994 UBC.
The following items listecl need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 22, GENERAL COMMERCIAL WITHOUT ENERGY OR POLICY SUPPLEMENTS (1994 UBC) comforw.dot
Carlsbad 96-249
2/29/96
• PLANS
1. Please make all corrections on the original tracings and submit two new sets of
prints, to:
Esgil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, California
92123, (619) 560-1468.
• GENERAL
2. Provide the site address and a vicinity sketch on the Title Sheet.
3. Provide a Building Code Data Legend on the Title Sheet. Include the following
code information for each building proposed:
Occupancy Group B/S-1
Sprinklers:_ Yes or No (bldg c only?)
Justification to exceed allowable area in Table 5-8. (if applicable)
4. Provide a note with the building data legend stating that yards used for area
increases shall be permanently maintained.
5. Indicate on the Title Sheet whether or not a grading permit is required for this
project.
6. Provide a statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC, UMC and UPC and 1993 NEC.
7. Provide a note on the plans indicating if any hazardous materials will be stored
and/or used within the building which exceed the quantities listed in UBC Tables
3-D and 3-E.
• SITE PLAN
8. Provide a statement on the site plan stating: "All property lines, easements and
buildings, both existing and proposed, are shown on this site plan."
9. Clearly dimension building setbacks from property lines, street centerlines, and
from all adjacent buildings and structures on the site plan.
10. Clearly designate any side yards used to justify increases in allowable area
based on Section 505.
Carlsbad 96-24.9
2/29/96
• LOCATION ON PROPERTY
11. Exterior walls shall have a 30 inch parapet when less than 1 0 feet to a property
line or an assumed property line. The uppermost 18" of such parapets shall be
noncombustible. (see exceptions, Section 709.4)(between building A and B)
• GLASS AND GLAZING
12. Specify on the window schedule the glass type and thickness to show
compliance with Table 24-A and Graph 24-1.
13. Glazing in the following locations should be of safety glazing material in
accordance with Section 2406.4 (see exceptions):
a) Fixed and sliding panels of sliding door assemblies and panels in swinging
doors other than wardrobe doors.
b) Fixed or operable panels adjacent to a door where the nearest exposed
edge of the glazing is within a 24-inch arc of either vertical edge of the door
in a closed position and where the. bottom exposed edge of the glazing is
less than 60 inches above the walking surface.
• ROOFS
14. A Class C roof covering is required. Table 15-A.
15. Specify roof material and application. Chapter 15.
• FOUNDATION
16. Provide a copy of the project soil report prepared by a California licensed
architect or civil engineer. The report shall include foundation design
recommendations based on the engineer's findings and shall comply with UBC
Section 1804.
17. Specify on the foundation plan or structural specifications sheet the soil
classification, the soils expansion index and the design bearing capacity of the
foundation. Section 1804.3.
18. Investigate the potential for seismically induced soil liquefaction and soil
instability in seismic zones 3 and 4. Section 1804.5
19. Provide a letter from the soils engineer confirming that the foundation plan,
grading plan and specifications have been reviewed and that it has been
Carlsbad 96-249
2/29/96
determined that the recommendations in the soil report are properly incorporated
into the plans. (When required by the soil report).
20. Provide notes on the foundation plan listing the soils report recommendations for
foundation slab and building pad preparation.
21. The soils engineer recommended that he/she review the foundation excavations.
Note on the foundation plan that "Prior to the contractor requesting a Building
Department foundation inspection, the soils engineer shall advise the building
official in writing that:
a) The building pad was prepared in accordance with the soils report,
b) The utility trenches have been properly backfilled and compacted, and
c) The foundation excavations comply with the intent of the soils report."
22. Note on plans that surface water will drain away from building and show
drainage pattern and key elevations. Section 1804.7.
• FRAMING
23. When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official for
approval prior to issuance of the building permit. Please review Section
106.3.5.
24. Provide truss details and truss calculations for this project(T JI).
25. Sheet 2 of the calculation show that at end the T JI 96 shall be 2.5 x3.85. The
roof framing plan did not show it. Please clarify.
26. Sheet 5 of the calculation show the brace to the panels at office front. The
locations of the braces appear to not clear on the plan. What is the spacing of
the braces? Please clarify and reference the-details .
. 27. Provide comment and calculation to show how the force will transfer to the flange
of the T JI then to the roof sheathing? Pr~>Vide calculation to justify all the details.
28. Some of the details on sheet D2 show the wall constructed as masonry wall.
Please revise the details.
29. Sheet 6 of the calculation appear to indicating that some of the panels are
12"thick. Please clarify the location of the 12" panels.
30. Are the glu-laminated beams consider the volume factor to reduce the allowable
bending stress?
·r
i I
Carlsbad 96-249
2/29/96
31. Sheet 8 of the calculation show that the ledger anchors for the bldg. 5000 are 2-
7/8" anchors between the purlins. Notes on sheet A7 shows different. Please
clarify.
32. Sheet L-1 of the calculation show that the anchors for bldg. 1000 is PAT 23@
4'-0" o.c .. Detail 1/02 shows PAT18 strap. Please check.
• MISCELLANEOUS
33. Note on the plans that "all weather-exposed surfaces shall have a
we~ther-resistive barrier to protect the interior wall covering and that exterior
openings shall be flashed in such a manner as to make them weatherproof'.
Section 1402. ·
34. Provide details of restrooms to show compliance with Section 807 regarding
floors, walls and showers.
35. Note on the plans that suspended ceilings shall comply with UBC Tables 25-A
and 16-0.
36. Note on the plans that new water closets and associated flushometer valves, if
any; shall use no more than 1.6 gallons per flush and shall meet performance
standards established by the American National Standards Institute Standard
A112.19.2. H & S Code, Section 17921.3(b).
• TITLE 24 DISABLED ACCESS
37. Provide note and details on the plans to show compliance with the enclosed
Disabled Access Review List. Disabled access requirements may be more
restrictive than the UBC.
Please refer to the following corrections for mechanical,plumbing, and
energy items.
• ADDITIONAL
38. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc,
39. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Carlsbad 96-249
2/29/96
Have changes been made to the plans not resulting from this correction list?
Please indicate: ·
0 Yes O No
40. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
619/560-1468, to perform the plan review for your. project. If you have any
questions regarding these plan review items, please contact David Yao at Esgil
Corporation. Thank you ..
+ PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
+ PLAN REVIEWER: Glen Adamek
1. Each sheet of the plans must be signed by the licensed designer.
• PLUMBING (1994 UNIFORM PLUMBING CODE)
2. The plumbing floor plan on sheet P-1 does not match the floor plan on sheet A4.
Please correct
3. Provide complete water line sizing calculations, including the water pressure,
pressure losses, water demands, and developed pipe lengths. UPC Section
610.0
4. Correct the note # 5 on sheets P-1 and P-2. The 1994 edition of the UPC is now
being used, not the 1988 edition of the UPC.
5. Correct the UPC, section number in the note# 12 on sheets P-1 and P-2. UPC
Section 1007.0, not Section 603.
6. Correct the note# 7 on sheets P-1 and P-2. The California Energy Efficiency
Standards has no Section S-5314.
7. The roof drainage on sheet P-2 does not match the roof drainage on sheet A5
and A9.
• MECHANICAL (1994 UNIFORM MECHANICAL CODE)
8. The mechanical floor plan on sheet M3 does not match the floor plan on sheet
A4. Please correct
Carlsbad 96-249
2/29/96
• ENERGY CONSERVATION
9. The plans show more light fixtures than shown in the COMPLY 24 energy
design, LTG-forms. Please correct. The LTG-forms on sheet E4 does not
match the L TG-forms in the COMPLY 24 energy design.
10. On the plans clearly show the wall and roof insulation locations, thickness, and
R-values, as per the energy design.
11. · On sheets T24-1 and T24-2 the envelope and lighting section of the
Performance Certificate of Compliance forms are not signed. Please correct and
completely sign the forms.
Note: If you have any questions regarding this plan review list please contact
Glen Adamek at (619) 560-1468. To speed the review process, note on this list
(or a copy) where the corrected items have been addressed on the plans.
DEPARTMENT OF STATE ARCHITECT NON RESIDENTIAL
TITLE 24 DISABLED ACCESS REQUIREMENTS
• DISABLED ACCESS PARKING SPACES
1. Revise plans to show that at least one in every 8 accessible spaces are served by
an access aisle ~96" in width and designated as VAN ACCESSIBLE, per Section
11298.4.2. All such spaces may be grouped on one level of a parking structure.
• DOORS
2'. Revise plans to show that the minimum strike edge distances are provided at the
level area on the side to which a door (or a gate) swings, per Section 11338.2.4.3:
a) ~18" at interior conditions.(the future bathroom will cause the door not
comply with the requirement)
• SANITARY FACILITIES
3. Note that the doorways leading to sanitary facilities shall be identified, per Section
11158.5, as follows:
a) Signage shall also be located on the wall adjacent to the latch outside of
the doorways leading to the sanitary facilities, per Section 11178.5.9.
Carlsbad 96-249
2/29/96
• SINGLE ACCOMMODATION FACILITIES
4. Revise plans to show a sufficient space in the toilet room for a wheelchair to enter
the room and close the door, per Section 111'5B.7.2. The space is required to be:
a) ~30" X 48".
b) ~60" diameter.
c) AT-shaped space as shown in Figure 11 B-12(a) and (b).
d) Doors are not permitted to encroach into this space.
5. Show that the water closet is located in a space, per Section 1115B7 .2, which
provides:
a) A minimum side clearance of either: . ·
i) ~28" from a fixture.
ii) ~32" from a wall on one side.
b) ~48" clear space in front of the water closet.
• · RESTROOM FIXTURES AND ACCESSORIES
6. Show, or note, on the plans that the accessible water closets meet the following
requirements, California Plumbing Code:
a) The seat is to be ~17" but s19" in height.
b) The controls are:
i) Operable with one hand.
ii) Does riot require tight grasping, pinching or twisting of the wrist.
c) The controls for flush valves shall be:
i) Mounted on the side of the toilet area.
ii) Be s44" above the floor.
d) The force to activate the controls shall be s5# of force.
• GENERAL ACCESSIBILITY REQUIREMENTS
• SIGNAGE
7. Where permanent identification is provided for rooms and spaces, raised letters
shall also be provided and shall be accompanied by Braille. Section 11178.5.
8. Provide a note on the plans stating that the signage requirements of Section
11178.5 will be satisfied.
Carlsbad 96-249
2/29/96
-VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: David Yao
BUILDING ADDRESS: Kellogg Avenue
BLDGA&B
BUILDING PORTION BUILDING AREA
(sq. ft.)_
warehouse 5029
*2 similiar bldgs
Air Conditioning 242
Fire Sprinklers
TOTAL VALUE
UBC Building Permit Fee:
UBC Plan Check Fee:
Comments: 1 @ 93.15;: 93.15
24
3.5
PLAN CHECK NO.: 96-249
DATE: 2/29/96
BUILDING OCCUPANCY: B/S-1
TYPE OF CONSTRUCTION: V-N
VALUATION
MULTIPLIER
VALUE
($)
120,696.00
847
121,543.00
$ 716.50
$ 465.73
Sheet 1 of 3
valuefee.dot
Carlsbad 96-249
2/29/96
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED-BY: David Yao
BUILDING ADDRESS: Kellogg Avenq.e
BLDGC
BUILDING PORTION BUILDING AREA
(sq. ft.)
warehouse 9987
Air Conditioning 242
Fire Sprinklers 9987
TOTAL VALUE
UBC Building Permit Fee:
UBC Plan Check Fee:
Comments:
24
3.5
· 1.7
PLAN CHECK NO.: 96-249
DATE: 2/29/96
BUILDING OCCUPANCY: B/S-1
TYPE OF CONSTRUCTION: V-N
VALUATION
MULTIPLIER
VALUE
($)
239,688.00
847.00
16,977.90
257,512.90
$ 1192.50
$ 775.13
Sheet 2 of 3
valuefee.dot
Carlsbad 96-249
2/29/96
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: David Yao
BUILDING ADDRESS: Kellogg Avenue
BLDGD
BUILDING PORTION BUILDING AREA
(sq. -fl.)
warehouse 9987
Air Conditioning 242
Fire Sprinklers
TOTAL VALUE
UBC Building Permit Fee:
UBC Plan Check Fee:
Comments:
24
3.5
PLAN CHECK NO.: 96-249
DATE: 2/29/96
BUILDING OCCUPANCY: B/S-1
TYPE OF CONSTRUCTION: V-N
VALUATION
MULTIPLIER
VALUE
($)
239,688.00
847.00
240,535.00
$ 1133.00
$ 736.45
Sheet 3 of 3
valuefee.dot
City of Carlsbad
. Miet·h,ikYiht-i•lY•i=ii•eetYeil
. BUILDING PLANCHECK CHECKLIST
DATE: c:2.. ~ S'-9 h PLANCHECK NO. cs90 Oc:2 :f 1
BUILDING ADDRESS: ~ ~ ·
PROJECT DESCRIPTION: =~~ £,b-.nwr-#f ~¥-2¾--L-g,l'.'.7
ASSESSOR'S PARCEL NUMBER: c;:21.aa ·-a Rel =2:?s:i EST. VALUE' Zo?<:2, t2ac1
ENGINEERING DEPARTMENT
APPROVAL
The Item you have submitted f0r r9Yiew ha bNn
apprOYed. The apptOYII la bald on plane, lnf0nnlti0n
and/or specfflcations prOYidld In ycu aubmiftll; tl'llrlfctt
any cnangea to theN ltlffll after this dart, lndudlng. ftlld
modit'lcallonl, muat be reviewed by thil offlcl to . in8url
continued conformance with appllcabll cod-. Pie.
review caratully Ill ccmmenta IIUIChld, • flHur9 to
comply with lnstructiOnl In thil report can rNUI In
suspensk)n ~ permit to build.
DENIAL
D . By· Catt: A Right-of-Way permit ilrequ~ prlorto~ ··--· -------------
~ thl following impt'0Yel'T1en18:
ATTACHMENTS
OoedlcallonAPJ*llmn
D Otdlcallon a..
D 1mprovtm1n1 Applcll0rl
0 lmprOYtrnent ChlCklll
D Future lmprovtrnent AgtNmn
D Grading Ptnnll AppllcadQn
0GradingSubmltll01tcklll
0 Right of Way Ptnnlt Applcll0rl
0 Right of Way Ptnnit Submiltll ChlckJllt
and, lnf0m'llalon Shilt
D Sawtr FN lnf0m'llalon Shilt
P:\DOCI\CHICLl1\IP0001.,,.
By: ________ Ollt: __ _
ENGINEERING DEPT. CONTACT PERSON
·NAMe~"?YJ~
Cly'otClrtlbad
ADDRESS: 2075 Lp Palma Or., cartsbad. CA 92009
PHONE: (619) 438-1161, Ext 43 IS
A-4
RIVOl/11/N
2075 Las Palmas Or.• Carlsbad, CA 92009-1578 • (619) 438-1181 • FAX (619) 438-0894
(,
J,.
S[IE PLAN·
BUILDING PLANCHECK CHECKLIST
1st/ 2nd./ 3rdv'
(3 D D · 1. Provide a fully dimensioned site plan drawn to scale. Show:
A. North Arrow .
B. Existing & Proposed Structures
C. Existing Street Improvements
0. Property Unes Easements e. Easements
F. Right-of-Way Width & Adjacent Streets
D D D 2. Show on site plan:
~D D
C¥6·o
A. · Drainage Patterns
B. Existing & Proposf(I Slopes
C. Existing Topography
/
3. -Include note: •surface water to be directed away from the building foundation at a 2%
gradient for no less than 5' or 2/3 the distance to the property tine {whichever is less).•
[Per 1985 UBC 2907(d)5].
On graded sites, the top of any exterior foundation shall extend above the elevation
of the street gutter at point of discharge or the inlet of an approved drainage device
a minimum of 12 Inches plus two percenr (per 1990 UBC 2907(d)5.).
4. Include on title sheet
A. Site address
EJ. Assessor's Parcel Number
C. Legal Oescrfptlon
For eommercial/Jndustrlal buildings and tenant Improvement projects, Include: Total
building square footage with the square footage for each different use, existing sewer
permits showing square footage of different uses (manufacturing, warehouse, office,
etc.) previously approved.
~NG PERMrT NUMBER DESCRIPTION
MVOl/11/N
BUILDING PLANCHECK CHECKLIST
DISCAEDQNABY APPROVAL COMPLIANCE 2ndv' 3rdv' · ·
0 D 5. Project does not comply with the following Engineering Conditions of approval for
Project ~o. . . ·
Conditions were complied with .by: . Date: ______ _
Lffetd /JIPC/5-of ~
DEDICATION REQUIREMENTS
D D O 8. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the b.ullding site is required for all new buildings and for
remodels with a value at or exceeding S _____ -pursuant to Code Section
18.40.030.
Dedication required as follows: _. ---------,.-..-------
Attached pl•-find an application form and submittal checklist for the dedication
process. Provide the completed application form and the requirements on the
checklist at the tim• of resubmittai.
Oed.ication completed by __________ _ Date: ___ _
IMPROVEMENT REQUIREMENTS
D O O 7a. AJI needed public Improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the construction
exceeds S · -pursuant to Code Section 18.40.040.
Public Improvements required 8' follows: ____________ _
P1NM hffl a registered CMI EnglnMf prepare appropriate Improvement plans and
submit 1hlm together wfth the requirements on tht attached checklist for a separate
plancheck proceu through the Enginffring Department. Improvement plans must be
app,owd, appropriate MCUritiM posted and f ... paid prior to issuance of permit.
Attached ,-... ftnd an application form and submittal checklist for the publlc
improvementa requlrementa. Provide the completed application form and the
requirements on the checklist It the time of r'8Ubmittal.
Improvement Plana signed by: __________ Date: __ _
IIIVOll11/M
..
'· BUILDING PLANCHECK CHECKLIST
, . .
~~~ . . .
U D· D 7b. Con11ruc1or, of the public Improvements may be deferred pursuant to code Section
18.40. P11111 aubmlt a recent property title' report or current grant deed on the property and processing fff of· $. ________ so we may prepare the
n.c111a,y Future Improvement Agreement. This agreement must be signed, notarized
and approved by the City prfor to issuance of a Building Permit.
Future public improvements required as follows: __________ _
Improvement Plana signed by: __________ Date: ___ _
0 D O 7c. Enclosed please flnd your Future lrnprovement Agreement. Please retum signed and
notarized Agreement to the Engineering Department.
Future Improvement Agreement completed by: __________ _
Date: ______ _
D D O 7d. No Public Improvements required. SPECIAL NOTE: Damaged or defectfyf-
lmproyements found adjacent to building site must be repaired to the satisfaction of
thtp City tnsQtCtor prior to occupancy,
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section 11.06.030
of the. Municipal Code.
D D D 8a. Inadequate Information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantiti• (cut, fill import, export).
D D O 8c. No Grading ~ermlt r9quir~.
Plgl3af4 MYOM1/N
/. .
.• . /
~; .
llUILDINQ PLANCHECK CHECKLIST
. _ .MISCf! 1 !NEQUS PERMITS
1 sty1/2n~./ 3rd . ./
•
!lf O o· 9~ A RIGHT-OF-WAY· PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the pub_llc Right-of-Way. Types of work include, but are not
limited to~ street Improvements, trees, driveways, tieing into public storm drain, sewer
and water utilitJN.
0
D D D·
Right-of-Way permit required for c/&&u/4l?O ~ ~-
A separate Right-of-Way permit Issued by the Engineering Department is required for the following: _______________________ _
1 O. A SEWER PERMIT is required concurrent with the building permit issuance. The fee
is noted in the fees section on the following page.
11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial
Waste Permit Application Form and submit for City approval prior to issuance of a
Permit.
,Industrial waste permit accepted by: _______ Date: ___ _
-
Plgl4af4 RIYOl/11114
{).J a r-eh Oc./ 'S. e_ (3#-~! .
Pr i_ 8, 5~G aCj 4-;4~ ~ tt raco¢ ·.
c_ 9 qg7 0, 3f1 ri /oc:P ¢
b qqg7 q, 68 7 ¢' &;00;6.
,f • ,...,.._-FROM: Sillmam/Wyman,Inc
\
I \ I I
1 I \ I l
\ I '
I \ l
l
' I I
I .
I,,,
HOMl:8 ~OR INDUSTRY
PHONE NO. : 6195521563
I
I I,
I
I
'
Feb. 29 1996 11:23AM P2
-_d,il~l,Y J 1
I I
I I r-f-.W
I I
I I
I
.I
&ILLMAN / WYMAN, INC. . .:~_-_,
AKCHITl!«;TURE a ENtllN&ERINQ 1--l-11------1
---IV!l¢T,II am Nii SAIi Nto, CMl'OIIII\ , • .: kin.,_ .
ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION
FEE CALCU.LATl·ON WORKSHEET
D Estimate b8$ed on unconfirmed information from applicant.
D Calculation based on building plancheck plan submittal. ~
Address: 2oc,u~ <t[·_· .,._ • · Bldg. Permit No. . (: 1:3 9h CJ c)... 'f-7
Prepared by: IJ1t<Jm Date: .3/2 /9·,:~· Checked by: _____ Date: ______ _
EDU CALCULATIONS: _List types and square footages fo't~~~-f ;ga:;; • 3 3
Types of Use:~~ Sq. Ft.Jt-:Jn~f,+-~-zpf-!.-si O~l~u•s: __ ,,_g_1 ___ _
Total EDU's: /., ;z_ ~
ADT CALCULATIONS: Li~ types and square footages for all ~ /l{ ~000 1 Q_
Types ·of Use:~ Sq. i=t./Unitr.::2::b-f .J.'1/Z{~IDJnOADT's: _ ___.,d,~~-----
Total ADT's 34-
FEES REQUIRED:
PUBLIC FACILITIE~ ~ REQUIRED ~S O NO (See Building Department for amount)
WITHIN CFO: li2J"YES (no bridg~ & thoroughfare fee, 0 NO
reduced Traffic Impact Fee)
~RK~N-LIEU FEE PARK AREA: _______ _
~ / FEE/UNIT: .
~ 2.TRAFFIC IMPACT FEE
ADT's/UNITS: s 3 4:-: .
~iDGE AND THOROUGHFARE FEE
· . / ADT's/UNITS: ·
!Ii 4'. FACILITIES MANAGEMENT FEE .
SQ,FT.:~ Q ~ 9
~ SEWER FEE ·
PERMIT No.5 /;" CJ (pCOd-h
X NO. UNITS: __ _
X FEE/ADT:
X FEE/ADT:_.. __ _
ZONE: 5
X FEE/SQ.FT.: e.4-0
X FEE/EDU: / ~Oo EDU's: I O 2', ~
BENEFIT·AREA: .... (_,.~--DRAINAGE BASIN: ,5 p-. ' n/ e,O
X FEE/EDU; / LQ -• L.-f'v,, ,,_. EDU's: / .. d:a ¢:-, .
f'~RAINA~E FEES PLDA. ______ _ HIGH.:. __:_ /LOW __ _
ACRES: _ X FEE/AC: __
. ~WER LA TERA:(~.~ -D~POSIT)
rn<wATER FE!::
EDU's: & J..c±:-, X FEE/EDU: Jl_4C()
=$ fl=
l:>o
=$ rz+s-
=$ -0
=$ 'J., of~
=
=$ ;i_) ::lo~. -
TOTAL OF ABOVE FEES*: $ '7 t Cj_ 8±-::-
*NOTE: Thia calculation sheet la NOT a complete Hat of all feea which may be due.
Dedications and lmprovemen~s may also be required with Building Permits.
P:\DOC$\MISFORMS\BP0002.FRM REV 01/04/95
ENGINEERING DEPARTMENT ENGiNEERING REVIEW SECTION .
FEE CALCULATION WORKSHEET
D Estimate based on unconfirmed information from applicant.
D Calculation based on building plencheck plan submittal.
Address: fu~-· . J3 ______ Bldg.Permit No.
Prepared by: /m/YJ Date: .3/2 /9°·;·_ Checked by:. _____ Date:. ______ _
EDU CALCULATIONS: List types and square footages for.)lll U~_t /J'CJ::) • 3 3 ~ · {fl C)O ~ • I'
Types of Use: W ~ Sq. Ft.~f-!4-;A9p(-! 6i ooE~U"s:. __ -_._gaaa.. -'1 _____ _
Total EDU's: / • ;),_ .;l_
ADT CALCULATIONS: ~ ty~ and square footages for ajl ~ {lj ~ooO · I ~
Types of Use:~ Sq. Ft./~ f,J.?fff/nt"JoADrs:._--"a6=~~----
Total ADrs 34-
FEES REQUIRED:
PUBLIC FACILITIE~ ~ REQUIRED ~S O NO.(~ Building Department for amount).
WITHIN CFO: u2rves (no bridge & thoroughf~re fee, D NO
reduced Traffic Impact Fee)
~ARK~N-UEU FEE
_ / FEE/UNIT:
PARK AREA:. __ _
D"° 2.TRAFFIC .IMPACT FEl;
ADrs/UNITS: s 3 4-:
~iDGE. AND THOROUGH~ARE FEE
-/ ADrs/UNITS:
fG( 4. FACILITIES MANAGEMENT FEE
SQ.~.:6; 0 ¢ °I
~SEWER FEE
X NO. UNITS: __ _
X FEE/ADT:
X.' FEE/ADT: ___ _
ZONE: .5
X FEE/SQ.FT.: t> 4P
PERMIT No5 E q &cJO~l
X FEE/EDU: / ~L0 EDU's: I •_.A·¢)
. DRAINAGE BASIN: ,5·p
. /7/ e,C>
X Fl:E/EDU: / L<D __.
BENEFIT AREA: _.(_7 ___ _
. L~ / EDU's: J• d-d:::-
\?~RAINA~E FEES PLDA. __ _ HIGH _/LOW. __ _
ACRES: X FEE/AC: __
. itt;WER LA TERA: ($2,500 D~POSIT)
~ATERFEE
EDU's: . /_·r)...d:-., x FEE/EDU: :J....4CO
=$._....;:fz::i......::;.. __
=$
=$ :::()
IPD
=$ -;),DI~
=
=$ ;;z) ~0.3·. -
e> '[3 ~ =$
~~
=$oJ: Pt:y_µ_( Ii? 0-t°
=$._....;-0===:;;_ __
TOTA~ OF ABOVE FEES*: $ '7 l Cj_ 8±::-
*NOTE: Thia calculatlon sheet la NOT a complete list of all fHS ·which may be due.
Dedications and Improvements may ~lso be required with Building Permits.
P:\D0C~\MISF0RMS\BP0002.FRM . REV 01/04/95 ·
,, '#
ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION
FEE CALCULATION WORKSHEET
D Estimate base<:! on unconfirmed information from applicant.
D Calculation based on building plancheck plan submittal.
Address: 3.u,, ~· C----· . Bldg, Permit No. /7~ ~'7
Pr~pared by:/nfJ t½.,, Date:™ fe Checked by: _____ Date: _______ _
EDU CALCULATIONS: List types and square footages for all uses~ / 00. d ...! // ()6 l "•J ~ · J ~ u? 'fQ: ,~-!.:raoo o o
Types of Use'tJ'-f../'//JJ~. Ft./Units:?V~3.f7 'EDU's: ______ _
Total EDU's: ____ J,_6_a._~~( _
ADT CALCULATIONS: List ty~ and square foota~es forA!J,u~~..% , ~oo~ ----rt'DO O I :L.
Types of Use: · . Ft./Units(_'. '938-Z&~ct> ADT's: ___ 41
J .-•
Total ADT's_...,, 5_.__c; ____ _
FEES REQUIRED:
PUBLIC FACILITIES ~~EQUIRED ~S O NO (See Building Department for .amount)
WITHIN CFO:· 13' YES (no bridge & thoroughfare fee, 0,NQ ·
·~-IN-LIEU FEE
. / FEE/UNIT:
~.TRAFFIC IMPACT FEE
reduced Traffic Impact Fee)
PARK AREA: _____ _
X NO. UNITS: __ _ =$ -Er
,!>Co
ADT's/UNITS: 5:J ~ AND THOROUGHFARE. FEE
X FEE/ADT: =$ ;,;_ q p-
_ / ADT's/UNITS: . .
[lJ/4, FACILITIES MANAGEMENT FEE
• / SQ.FT.: q 30
iz?s. SEWER FEE
PERMIT No0E 9 bt){);;).. <f
. EDU's: d,. J-,. {. .
X · FEE/ADT: ___ _
X
ZONE: --S
FEE/SQ.FT.:
c,0
=$ 3)1ss-
X FEE/EDU: 18 {J b
BENEFIT AREA: ____ (a __ DRAINAGE BASIN: s5P-
1<e EDU's: :)._,,, d---(
~INAGE FEES PLDA. ___ _
X FEE/EDU:
HIGH ______ /LOW __ _
,_I~ ACRES: .
Jb::ffj. ~EWER LATERAL ($2,500 DEPOSll)
~WATER FEE.
EDU's: d-o J_ I
X
X
FEE/AC: __ _
FEE/EDU:~ 40{)
oo
·=$ 5) C y]j--
. DO ' 4-.;:..--
TOT AL OF A~OVE FEES*: $ / I SI (o
*NOTE: Thia calc~latlon sheet la NOT a complete llat of all fees which m~y be due.
Dedications. and Improvements may also be req.uired with Building Permits.
P:\DOCS\MISFORMS\BP0002.FRM REV. 01/04/95
-.,.-
' ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION .
FEE CALCULATION WOR-KSHEET
D Estimate based on unconfirmed information from applicant.
D Calculation based on building plancheck plan submittal.
Address: Eu.,,,_~-Q Bldg. Pennlt No. /7~ ./-"j
Prepared bv:/rJfl fu_ Date:~l Checked ·by: _____ Date: ______ _
FEES REQUIRED:
PUBLIC FACILITIES ~REQUIRED ~S O NO (See Building Department for amount):
WITHIN CFO: C9"vEs (no bridge & thoroughfare fee, D NO
reduced Traffic Impact Fee)
~-IN-Ll~U FEE PARK AREA:. __ _
. / FEE/UNIT:
~.TRAFFIC IMPACT FEE
X NO. UNITS:
ADrs/UNITS: 50
~E AND THOROUGH~ARE FEE;.
X FEE/ADT: d.~
ADT's/UNITS: ___ _
~CIU~ES MANAGEMENT Fl;E
x. FEl:/ADT:
ZONE: .. s
: / . SQ.~.:q· 30.
IZ?'s. SEWER FEE
PERMIT No.SF o/. focfJ;)..1
X · FEE/SQ.FT.: .4-0
EDU's: di-J--( X FEE/EDU: /JQ ~
. BENEFIT AREA: @ DRAINAGE BASIN: s 5 p-
EDU's: . :i.. c)._{ x FEE/EDU: 1w
~~INAGE FEES PLOA. __ ___ HIGH ____ /LOW __ _
;_I~ ACRES: ·. .
µrf. ~EWER LATERAL ($2,500 DEPOSll)
~WATERFEE.
X FEE/AC: __ _
EDU's: X FEE/EQU: ~ 40{)
=$ ff
=$
00
=$ 31_1ss-
oCO
=$ >3; 991--
=$ 11og~·
-~~
=$d:~/Yl~
=$ ::CC:
C)O
=$ 5),301--
, . .!:3---
TOT AL OF ABOVE FEES*: $ / 4-1 5/ b
*NOTE: Thia calculation sheet 18 NOT a complete llat of all fe .. which may be due.
Dedications and Improvements sriay also be required with Building Permits.
P:\DOCS\MISFORMS\BP0002.FRM REV 01/04/95 ·
TO:
FROM:
DATE:
City of Carlsbad
_ ,M§ef·11 ei44iih41•l4·i=iii,,t4UI
DEVELOPMENT PROCESSING SERVICES
ENGINEERING INSPECTION DIVISION
3-27-96
ROUGH. GRADING APPROVAL FOR PROJECT NO. G-R 9600041 MS 95-({)~
(P.E. OR TRACT#)
•
1-/0/{;{E:5 FD£ /.AJl>{J8T/€Y _ /950 ka.Low A{/€.
(PROJECT NAME &' ADDRESS) .
/JETE&;/LT t!LJ&f>.
(DEVELOPER'S NAME & ADDRESS)
We have inspected the grading for Lot/. _ 39 or Phase_:_-__
of the above mentioned project. In addition-, we have received rough grading certification
from (i-EOSOIL.S 1:Ve-., -·_ , . , the Soils Engineer, dated 3-19-96
an_d from £ D. L4AllJSIJIW£W,{}<c,cEAJGltU{;G??l.{}<r, the Supervision Grading Engineer,
dated 3-26-96 , and are satisfied that the rough grading has been completed in
accordance with City Standards. ·
Based on these certifications and our observation, we take no exception to the issuance
of a building permjt for Lo~ _ 39 . _ or Phase _:__ ·of project
J/O/JfG-'2 EOf< /.,(}l)f)S?Ry . from a grading .standpoint. This release, however, is
not intended to certify the project from other engineering concerns including site
development, water or sewer availability, or final grading.
We will need to be adviseo prior to the issuance of a Certificate of Occupancy so that we
can verify that final grading and landscaping has been completed in accordance with the
approved plans. for the project.
APPROVED:
PROJECT GRADING INSPECTOR , SR. CONSTRUCTION INSPECTOR
H:\LIBRAAY\DPS\WPDATA\INSPECl\ROUG~RAD,FOA
2075 Las Palmas Drive • Carlsbad, California 92009-1576 • (61"9) 438-1161
CITY OF CARLSB_AD
GRADING INSPECTION CHECKLIST
FOR PARTIAL SITI: RELEASE
PROJECT INSPECTOR: lJ.. /1} 00 £.f:!"'
PROJECT ID /tlf5 95---05'
DATE: 3-27-96
. GRADING PERMIT NO. {j-te 96 0004
I
LOTS REQUESTED FOR RELEASE: ______ 3_9 ___________________ _
NIA = NOT APPLICABLE
,/ = COMPLETE
0 = lncomple~e or unacceptable
2nd.
1. Site access to requested lots adequate and logically grouped
1----,,4---~
2. Site erosion control measures adequate.
1----,t,'-+---I
3. Overall site adequate for health, safety and welfare of public:
1-----r'-+---I
4. Letter of request for p?1rtial release submitted -----5. 8½" x 11" site plan showing requested lots submitted. I-......+ __ _
-----6. Cor:npaction report from soils engineer submitted.
7. Engineer of work certification of work done and pad
elevations.
tvA 8. Geologic engineer's letter if unusual geologic or subsurface
conditions exist.
-----y
9. Project conditions of approval checked for conflicts
10. Can Water service be installed prior to bringing building
combustibles on site.
Partial release of grading for·the above stated lots is approved for the purpose of building
permit issuance. Issuance of building permits is still subject to all normal City
requirements required pursuant to the building permit process.
D Partial release of the site is depied for the following reasons:
Project Inspector
3~27,-9'6
Date Project Engineer Date
l1X.~ ;y/27/Pt'
Date
H:\LIBRARY\ENG\WPDATA \INSPECT\FORMS\PARTSTIE .FRM
~
I
rn
l\j
l ()
' Q) Q) Q) 1ii 1ii 1ii C C C
~ ~ >, .Q .Q
,-C\I t')
=II= =II= =II=
~ ~ ~ 0 0 .o Q) Q) Q) .c: .c: .c: u u u
C: C: C: <11 <11 <11
£ a: a: '
0 0
goo
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No~ CB qtp-24Cj Address K.Q( I~ Ave.VtJ..W
Planner \tJ2J2..\ \06'-DS · Phone (619) 438-1161 ext. <)4 4----z
(Name)
APN: _ --z.1-z..-Dq-z_ ---~
-Type-of Project and Use: Tla111 Vl.tJ ) hd1..,1si1]a.,Q,
Zone: "f}'.V\ Facilities Management Zone: _ _,;;:5::;._. __ _
CFO kirwout) # _________ _
~cle (If property in, complete SPECIAL TAX CALCULATION
WORKSHEET provid~d by Building Department)
Legend
~ Item Complete
(g Item Incomplete -Needs your action
E~vironmental Review Required: YES V NO TYPE ----
DATE OF COMPLETION:_ ....... \-_____ \ 3 ____ -_Cfi~l--J2 __ _
· . Compliance with cohditions of approval? If not, state conditions which require action.
Conditions of Approval ____________________ _
Discretionary Action R~quired: YES V NO __ TYPE '\)[P }PLtD )/IVl S
APPROVAL/RESO. NO. A:1)~,». A-f()vO~TE l -l 8 -°/ (p
PROJECT NO. 9t-P q5-ov_/ Ptl.D q5-02,/ /VLS C/'5-o<:; rD
OTHER RELATED CASES: tAvls. kt J. A-1r~v:±:: Ce,af--{t;; ?f-PC-t .{;,, 1/ lo,1 . -· ~ P l ~ J CJ4-)
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval #-+12,1s -:1: ott11~ erRSeYM rt-
'2'-t: 1 #' _ f.e.r .o"f c ~
Caiifornia Coastal Commission Permit Required: YES __ NO X
DATE OF APPROVAL: __ .c:::= ___ . __________ _
San Diego Co~st District, 3111 Camino Del Rio North, Suite 200, San Diego, CA 92108
(619) 521-8036
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ____________________ _
loo
Joo
Jo D d'o D
rdo.o
DOD
lnclusionary Housing Fee required: YES __ NO;< __
(Effective date of lnclusionary Housing Ordinance -May 21, 1993).
Site Plan:
1. Provi~e a fully dimensioned site plan drawn to scale. Show: North arrow, property
lines, easements, existing and proposed structures, streets, existing street
improvements, right-of-way width, dimensioned setbacks and existing topographical
lines.
2. Provide legal description of property, and assessor's parcel number.
Zoning:
1. Setbacks:
Front: Required ':PJ Shown ~D tMt~
Int. Side: Required Shown LO M(~ [O
Street Side: Required '/JO Shown
Rear: Required ~-ZS Shown ~s: Yv1. { ~
2. Lot Coverage: Required 50 °( o. wt~Shown 2::.5 'f ()
'3':/ ~(JI
J
3. Height: Required Shown
tp, ' ,~ \~
4. Parking: Spaces Required . \ ~ l Shown tor-z-I;, \"3
Guest Spaces Required Shown c,;,'r ? ;;).(., ::2-,
L-014 d'(( JJ...p
Additional Comments. ______________________ _
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER _______ DATE __ _
K:\ADMIN\COUNTER\PLANCK.FRM 1-17-96
City of Carlsbad · · 95241
Fire Department • Bureau of Prevention
..
Plan Review: Requirements Category: Building Plan Check
Date of Report: Monday, April 1, 1996
Contact Name
Address
City, State
Sillman/Wyman, Inc.
6181 Cornerstone Crt. E. Ste. 101
San Diego CA 92121
Reviewed by: (! ~ /3(p __ ,e__c.1..J
Bldg. Dept. No. _96_-_2_4_9 __ -'--_ Planning No. PIP95-0B
Job Name Lot 39 Homes for Ind
Job Address 1950 Kellogg/CVR Ste. or Bldg. No. ____ _
~ Approved -The item you have submitted for revi_ew has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
ther~fore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
D Disapproved -Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st. __ _ 2nd. __ _ 3rd __ _
Other Agency ID
CFO Job#--'---'---95_2_4_1 __ File# ___ _
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
i-; :
BASIS OF i;>ESIGN P~oject Name Homet;;, rb"" 'Indvs f v-7
. \,
· Project Number 9?-'?C:,
BY Zf bate f'Z,/9S Sheet No._·1_
Root .Dead.Load Floor bead. Load
Roofing G,,O PSF Floor Covering ;= Sheath:i.ng rz..o Sheathing
. Framing, '3.o Framing
I Clg &. Insul. '2.,0 Clg & Insu1.
Misc. · --z_.o Misc.
.Total lt:7,o PSF. Total PSF
LIVE I.£)ADS WALL DEAD·. LOAD
Roof Live Load · 12.0 PSF Interior 10 PSF
Balcony Live·Load PSF
Exit Walkway Live Load . PSF
Floor L:i.ve Load . / PSF Exterior 16 PSF
"2~ . -psi' . Concrete strength @ 28 days : ~psi e FTC? ~ .(2 11Cf UP ?/~k.l.EU
Concr:ete·rilasonry block (AS'lM C-90) Grade "N" Regular Weight.
f'm= 1350 p~i ,Grout= 2000 psi ,Mortar Type "S"= 1800 psi
Reinforcing steel .: A-615 .
Grade 40 for# 5 & smaller ,Grade 60 for# 6.& greater
Struqt1.1+al st~el: A-36
LUITIQer: Douglas Fir...,Larch
Joists: No. 2
Beams &· Posts : No. 1 .
Studs ·: 2x4 10 1-011 high or less : Construction
. 2x4 10 1·-011 to 12'-0" high ·: No. Z
2x6 121-011 t9 18'-0" high : No. 2 ,,·
Code: ·Uniform ~uild:i.ng Code 1991
seismic Fo1;ce = (ZIC/Rw) X W = • lb3 l<J
01-2os,· \~.'; PSF
20'-40.. ,Z.l,1? PSF
Ll.:f:[ Pro1·ect No. 3 S ..,,.3s ProjectName_....!n.!.!-...:::...__ _____ _
By _____ ZF_--Date._11/-<--(9-'-1..;;...'J_S. __ Sheet No. r'L
n. = So B4--b -tt--,
¼ V:::. S;oi'2.
e.J:D<; j.e-{g, l\l\ON :;; ~!
n= S9o4-~ ·
V-::: if:;~?r--
I
Sf>.At-i = rlo
~ = ·rzee-z. A--
'1,t!x..-o x t .i.s
:t.0-<.1 = 1-1..rto
'TL1L/-J.4~ '·
I
D
T.,A. = BIO
. :1-\t Pk
-= U tA-( <bio J
(f C.aw,k?e,r '= --~-o_x_\'1-_ x. l'?...-Sc.,o x l,S = . BCj
·2.A-0
ci' GU) I 'SP.A~=f29 =f.A,= 11"7.CS>
-j,-l1 D1.-(.A.) = ll'2.4 ( G:,°?)E, )
f ""' \\14o~ .( (p'2.8c>J
--z. • de,-1 n ::= 11140 ;;t.(p -r (l'2.4-X (p/2, -= f:;;.1672-· .
n+;: r:;A97o'J/I.-i
~ = ::>437e, x n. -t-~ = Sv:3,:1/r,,z.s -4½, 1
Ic-1 _ = S>Sl3
' n..., L, h4-C>
Ccv1·1k.t.c.Y:z 'Z2xt'Z.. X
'2,40
II x.'l,S ,= ·!,IS;>
'3-"I ,t'.JS" d..a.c.(>
,.w p1,..-
!{2.::: l\114-c,. (<P?.oo)
r-----c~.) _____ r
A il---------13"/\_/_-, -
'2-9' ...,,,,
.,,
Q,::__ ?c:. u_t;::!: Project No. .,r.J -7 -" .Project Name _....:,fl.:.:,I~ ·--------
Z.F Date 11/2-t/ 9 s By _ __:;;;_;__,__, __ Sheet No. _,g_
&;of. fiZ-At11N~
If: w
~\1 'Dl..
W = l\'2.A-(<P3b)
r
. ~ . 'Pi -;:: \ 4(t;C{l C fp7_,A,)
~ "' \\ \A-o =f C <p~)
. 1 =\c-1-n--= \4tP0'2-x 7+ ll24-~-1J;; = 17-CJ7S2
. . 1
t2A= \l'Z,4.>(b0/2 + y,'2,ro X 4-½cp + (y,3bX V? )x:; -'-((p24'?) X-7 J/'o(p -((R3bX.t/2_)/2c,,,
. ~ = '301 ot;;.ep
\2~ = l\'2-A-K.1/4,,/4_ + Ci,1.4~x J,~/$&+.(Gi'?>b.x 7) x3-'•c;_ (&2e,oxc;,.)/-2,c,,-(Cl3o;,,C}{)/,u:o . 1~ . :11-' -:::-'Bl/Z...'6 \
'Z -==r--I n = 300$(..,:, X 11,7~ -11 '2& }( 17,154_ .... (<P3'c,x.(p)x '2.o.lS, -C.2Bo A 1.:t>17S ::::: 117 04-b
Cctw1bef'""" '.%,x \1... x 1?'2,1.,,S
"Z.A-<? 9f!;J'oi
J Se GLf'::/S'fo x. 71:>1/t;,
Uf-Vo
C-==: 13/~I
P · N _..,.._ lli;w.,:_c..:I=-·-------Pro1·ect No. 95_35 roiect . arne !IL:
By _____ Z_r;..._--,,---Date ___,_l (_~_4-.,_f ..;;..~_0 __ Sheet No. 4-
f5.t:-$,ll 'DL
6,C> = Ao, $(,z. x (1o-t-\S ) -+-Cp x , S -I l CS>9 ( 7'54--)
~!, wJ\t -= tns ....
'2.. . l-lc:..
Mv -= L7? ~ \1-,s/o ·-s4~1---
'I..--, f = (p K Z-\ (\ '2.oCO -= ' 'l,'L,
\lv .::: '34,7,., /'1,,7..-= l55.S As= . 34:7...... -·SCi;:,
l"'-
<2., ~ uP -a:::oL SfAI-..{~ 1-s'
1 .I . -.:.it-l, 'PL,
C-C> -= 40,Sh x '3S 't"-0 x 1$ -= l3:::::::?e ( Sb.4 )
W0\,t":::: 1. JL.L1
-"2. (-k:.. Hv = '2-x. ts/b-= S0.3 P-= ,1,,7r
kv.:::: Hifr =;a ~:3/ '252--= '2,§,q,:, o·. ~u :: --z_. E::>'l-
A,__ c:::--o / . bfZ, /pO
,-s = ~;.;;,/'Zl~rz.2>?-.::::: .. 3s r·.c,..~ J
(.4-.~),
1,.6..TE:IZ--.AL
'2. ~.,., Mv -= ,c82.x 17 /0 -= ti (p
'f'= '~3 tv-= l,l<.,/,00.9 --(2.-~
.4-..s ;:::: Uf/'/4 x-'2.,3 = "' 1g-3 :-:l, -
Project. Name _.....,Hf."'-'I;.c.-.,... ______ Pr.oject No. 3S -'3S
By __ Z_F_· __ Date _I-'-{ 1l_~_f_~_Cp_~ Sheet No. S
tsP fSr .a.C P<-
W;:: 4o,5/2 x S'S -r-( 4---x. lS -.17S9 C 13S4-)
~(1 c..-0 i.1l-t-. = rz_. Cp ....
1,./1 1-li'---
1· qj = C>'o,'Z.
f = ep x 2 .. i7t'Zco = :::: ·. ZZ-
~ -==-3-Zb :. ctv-= 4.03
A 9 ")'3 /. , ci 7 $ -= u · tZ..; A.o::, x"2--t --,:/
LO ,AD . Tc:> . f3.IZ..A ~.
.. f$F . .:tf
Q. = ( '2.J -o )fr.z. I\, B .i< 1$ x ·=> = 1110
~ Jl~T To fo\_l,_.,... H cl~\.IT. f ,6.,-J I::.<-
\
Ct' c; Tw-z x ,e.'¾ + c -ii-:<? l/4 x ¾] x c 1:1 J( • , J = -z<Pzl
Ts.4 x. LI-,-:.¼ o1c-
Project Narne __ Ha.,_f_J: _______ Project No. 95-SS: .
By __ Z_:r ___ Date _I_,_/ 1._· 4-_,__/_B_(p __ Sheet No. (p
\\
& 'f.Ahl1)--W/ W1J-JDot-v
~'$. Coe.ff, = .3 )( 17.. ~ 0 E,,$
'3 X."2,..
C€A'D ~ 1..-t\/E, LoA:U. ,As A130\/e.
tl,
c,,o, = . 3 )( 7s. ..:::. "2,1,,. s.
w,z.
~-~ ~ ._(pl\,
( • 31,, )
w
'
-
-
w/t? f'T L..:l?
-..-1,z,'
~ (pl
I !
lid-'
' l i I -},
HPI · Project No. 3S-3S Project N~me ____ ~-=-------
By __ -z.;.,;::;·=F__,. _____ Date 1'2--/ 13/ 3& Sheet No. --'7,___
( I l CJ l, A, = . Sl.'v .( b :::: ~SZ-
2 n = L6x'3l ) X _'.3l,S/o -
I
GL--~ Sf'At-.J. = ,Z.o T,.A.,. = G:>% ·" '20
. ~\1 PL-
.u.) = &¾ >< {_ l?_--1-\'2.-) + IJ..O ==-Bll ( ,q9zs)
:c ee.1 "' \ 1 }/};.
Tl. I L-f u-o
&mb.e.y '2.o x!'Z... ::f8t,,
--1--4o x.. l9 (B .s. .
I 7H::i.µ == 1?7..
,,
~ ::z. Ex:,Cdt,J X 11 +:(Zcoo ~l.1..S) ·;;; '3Pf},'L
:c~ ~ S((.pl.
TL-, Lf1,J.,c-;;i
' !, ,, VSe-1,,(p,1:/-/ TJL 'JCP '2,'Z.'=.;., -<'3,o~
CHDt2-0
$. P<...
tz.-,. '.13&S ( 492 . .s )
tl~e.. c~ S1/t:> x tlPY,L,
'ZA-f -V-4 C::: ¾11
Jf ! F ----------
I I '3Z-c.;':,, ---------+---·--/
U $e. GL.& s Yo x 2.2.-V'l..
24-F-Vb
C-=13/b'
·Pro~ect··~;0~.,-.:+.'.·--.~_f_I_· ------. ProjectNo. 95_35
. By ; : : ~··ZIF ~ ; Date 11/l~/ 9$ Sheet No. 0
f,("q,c...e, Q, + c7rr~·c..e-' rein e--ls. ~-f.ep
lLJc.ll fcii,,e,ls, See .. L.J-1 1½H) . t4~.IA--
L~ 05Sl6N.
et..o& lo,cc,c:,
'.3~ ){ V X {'2c>-1-(S).
'
7/6 t · r--.6 ;" c.Af. ;=
//
;, ..
%-
.~ ~ ft.J(2..Llh!. A0,7h )f.b. x: ( rzc>~tS) =, ~tO
,JI--•. .:is-:lt .
WEt4'2-.:; '1.. 791J. /i-u,5 -= rJ:20;, .
. ,.
-~ PAIIZA~l-u.... T-'-:> ·TJI. see...:7~V'-€.....
s1-1i.t:.R--;:: S0.,7aS/Bi·· ;:, 4?":3-:;z..l. ':'
1
.S,aJ--~h11·ve..
' '. \ ~ ~
4x/4LW~
J~ 4-7/~ ~ ,A,6,
@.,EA• 'f1J~"-!-
'2--1g' <f> AB,
4:x<.o L,e.P~
V Se ~3/e: <f' A,1s, ~ S'Z
11
@.,, l=.A, Pl)~\...,1/--J,
,Z. _ 7/. 11 C{) 'tt::> ,A.5,
'·
ProjectN~m~ _:"_f.l:;,;.,f_I. _____ · ______ Project No. 97 -"3<;.
. ' , ' -'·" .... )
. B,y _'--;z_.:F_...,_· ; ____ Date _l'Z....;../_'1.7.-=-1/_9'_5 __ Sheet No. L-l
~l,00 l0tOC>0
l.AT~\.P' At-lAL't'SlS
.i, w/ lO :\?,t.1--rt=-l.--
. ~I .w,: ~,91.
w1,= BAtp~'
"*" t2-A = J\OOf;,?
¥-~: -s1s,ep ,._
•. I
t!;ll.}P;, OtA\?_H ,I 4stl1
. 'Z ..
·w = • 4-'? x ( !e.... )d$o) ,.1_r-1.1
. 1"2. 1ttx. tb
. ?$f . ·. #-(
. ~/~ = 4'?A-ic1/3, ·+ (ep X \'? . X • !2,0) · = 33c?· I :· .
.... · \ ~li .-:2. • ' o.-.,/ . r-. . . --:i> : -ii:-(, c,~
'V · -= 3_~0 X ul tJ,. · -:-,'O = ,__7,_o
QlolZ-0 = 44-o o~ f::i = 53.'P'->,', . z,._e, '*--
... l.o!J.&ITLID\N.t\l. fbi: '381. · . .
. . .P5F 'Z . , .Ps.f ~ $~s. wf..-= [11.4.'7 t-t~ + '2~/4"tf;):~ ·1s. _;,<. -z. J
~ ;_ I lt ).( 52/2. ·-z_~ lSl:4\'-;·. ;
~_:) :: 4bl3 *° .
I *'l, , \*° \ . 'v = 'L-1':J"l.,\ + l'Z.,.-;.~ = 1.:2.ep ·
~~ vtrWH~ S¢Ci~ . ~Ii
. 0-'JW:/'7--F-::'~x_4l(p_--t-{'0\-xlS--x,.ao) _;..._~
. 0$l, = $b$ X 40 ,S-(,i ~-1,-4--'=~'l,.,$. 4i-\1
chcvJ.::: ?.llri::>'t; f-_ r --i?9...ci I · ra ·-Vl,-,V ,/ I 1_.1s )(~I~$ ~ 38c:=i
fto -;::-lo{.t?'Z.. · -Qt;,.
w, l-01. ,' l-01 A,p , ls
~-f--~'t--,r-.. _9_'2:.?. ... ---f
II 'h ecnv o -::,-r r w I --'-=-=====---.s;,I.
\Ock ~ Cr1 v-~! \"L -3'2.c·
~; fro~1 w·. ~,·~--S14~uJ' ~~,
I U s.o.. PAT'23 (:_ 4 -a
( Avi, ?,er: -2..ri,,)
· v'Tl,Z-,A:P 3 'BA\ S
v.J I s-rto
I' , 1(1, ft.1tvP $TI W/lod
~ 3 , 4 ~ c/· -fa1-'ZA'
I ;f·\1
V~¼cllv--CAf -== · 4f)O
' . '
: Proj~ N~m~.,...1-..,..·H .... F_J: _______ Project No. 9S7-3S.
~ -~ ;~~--f··. ·-~ ~ ! ..
B ·_! . . . ·Z:,P.; . . ·. Y-... . . , ' .... Date _l'Z_/_1.,_7_/_9_S __ Sheet No. L-2...
:BLOG· (Oa::,o
L-.~-.-r\i~t--~AL..,'1S.lS
. :·1 : ' .
:·"-·; . --~---~~' i-1°"-;
.. , • ' 1 • . I •
. ; ..
I . f'SF . .
l,..U 14{ ¥Do~ -= 'l080 X '2f1 + . 8 )( IS> X • $
. 0 ~t := lS(f> "' o/4 --;-· f) = ;75,t-li
f=.~S 1 81..i;V, . . . . . ;:J«-.
. ::f f, (.lS1.'.4l5) ·. ~f. . .('3ci?4) Ps.F-'ZS7o'::.> c741;,1.,,) l
V = -4-~o. ~ -+ l'?Oh xzz ·'f :iS:::. + · \l.Px l,J-x 7'7,.. (lCPx'Z--4.S -1.S;e1c..}x\S0Jx,\th =
'$,Oz. k[oa,lt\..-3 · ;,l'i-
('l • 4S,. · · · . · . fSi GS5t1-ru .:. <i,S57zx\.S x ·· 7 ( '3.X..<px.l'.2.. X Cp J = Z:B:2.-l,4-b . . . ·•.· ,,,
'f ,J ~ l, I ; vC' .. ,. a-o,z_ f'S; x.l,is -tx, t>s !
. . ' ~ : .. ' :;:p'· -. *-\
orr-1 -= Llooc::,3 x '26 + \S~e,· ·x··rz¾ + 3o7a.. x 1s + 7 4-ep(,p x 11 = I, I tl-2, J.w
HfL == (1/LX1S +4 x 1s }~x l~h -~ :Zk1o9S: ~ _,
. ;f--
dflJff: ,:, 0,J4SZ-, 4-o Xi.: ,;-.' ~)C ;z.4-70 ':)~ ) + n =. 001 D TlE-PAi-il::L.5 Tow1-1E12...
ffZoi-11 ScDe-.· · ~ ( · , .i. : 1 · t:·· -:w-.
. . . . ... ~ . 'iboe:>I. i~·Pi>F·i-.',' ;.. l~l.i.-3
V ·= ,Z.,:1 \SI + ( '.13 x'2"2. ·x 1-s-··. f '32-.,d4-x.1s ) · x, \ ~
~I~ f.J:.Na .,,.., · • 1'32. ~ L-S
l./ PA/\11:;L..
h/J-= l9/13,s.:.:: l,o~
h/d,. ~ 4/lthc'.;, ~ ,'Zl<P
h/4. ~. 4-/3 = 1,33 ,,
.. ,
.A -= :(,39
. A :·_o,Z.:d:,:
,· . ' :
A= YJ,,.l/~· = J:o?
~4 ~ ·: :2,. i1-;-i;. · .
12:-·=:;··.4-5 ',
·11--_
-,k----,1--'-'-'\ \'--) ---,....' ~
0-'1
. !
-' J, ' I •• _
Prefect ~~rn~ .,..:· ___,..H ..... · f_I ___________ Project No. 9s _ 3 S-
. ~y. ·; ; :~p '. ~--.·: Date 11./1..1 ( 95 Sheet No. L-4---
,.. ,, •'' ,;r,;
'' '
~t; -~o
l-A~AL Ai-J.ALiSl ~ Tl2-AIJ~.VE.i2.St=-
*' 12-.::: $4-'2.--x_ ?fZ.h, .. = ,z,7.,,z,7_,tl,
.:II=
Cf!0(2...D ::::: t"l ~ I
~\ . D \ ·= 1:z,,1-1;,.,1.,,
~\.·. + CPS ;:,: 3~3 .·
(e B1-o _1.83 :i.L, } ,
4st' '2 . I ;::i;:-(,
u) = . 4'7 x I ~ x, lc:;o)· .x.1.1. l--.. f. 4 = lb(S:> · -· _ · ' 1'2.. · 1,ixlb
. ' ' . ~.
Wwtw :::; . 4-\CP x. "L/"b +-( CR~ rs x. .q,} = 3c:4--
. 0 an,= "3QA--x. ~ -:-.ep ;;: .. ~ '1!(, -
Lot--i61T01:>\4A.L
\2-·f Se,lS, W\,
U ~ '2 -':Q:-S LH)
. @,,C..Ho~..r)
l/{ ,pc..,""(wv $TI: Lv/ tod
(:'.. Ci? 1 (p 8t l'l-, l 0 lro ....,_ '?.Fi <.J, -
s.·J..i:.., 4~4'~ c/ na,'l,71=
Us.e. f'ATZ-3
'Pp..I'Z..S>
~!2-A'P '3 '&Al S v.i/
S'Tlb
~ ~;·,,
. fh.:: '1-,\4-b4----'' % = 1o¼b-· lu, (.,0'2.
I ! 1 £, -=#-
c.+torz.o = 4-ins
Su.B>OlA?l:(M0rl . . f . . , . : :~l. _
· · 0 = 11.f; x 4s.t. -t { t<p~ i;\ ,'t, J '. ·:: eis.
;,~, a--/2_'1 / -( . ~l.1 . v = . .:.Jt,'5,.X '-;;}L,.Vl. -:-,(p :-'31S . .
•;,· _" .
' • • i '
:• .
•I
A&
I I
! \c} l<.P \ '32' I l ----·-··--K -/
I>
1/r;_, f't1hJO STi-w/ bJ@,
J';J''z; Lr'1 EN,5t'1.~frJ
l(t,1
-0 ~ e..cic~ e,0-d
· Ptojeci Name · H.f I Project No. ~? -'3$
.. By.: .. :'?zF ·_ -.. Date YL/1..1( 9? Sheet No. L -S
•'.: ~.. . ~ : . .. • ,_ • !
I
LA~L.. AtJAl,,'-fSL'S
. :11
_ \l2 ?,A~f=;l-_· ~_.b.tJ.'>Vtsi2-S·E
' . : .
:I;, ~
~. . . ~~'2-a. f.Sf-. . ~14-f'}f 1Aw '/Sf:; ~
\}::: "'L1fl/l,..'l.;. + ( '?'2 x 1-'/... X 1.S _-t-l~ X l4--X 7S _ -t-· rz._.-11_ x (So ) x, lb3 = 42.424-
~ . ~;
fv= . .'~'J;<( 4,,~~ \6, )-:-( ,.~/x !~ x.a..' ~.k2,i) = $7,4 av:-ftt> .s CoOi'l )( /83 ::;Oo, ~
.I
h/d ~ / ,/'j: 1:-
J1(J_ ;;: f¾e; .;;(,OCP ~ = I,¼~~-
hfcJ = !¾ ,. 4.-z,;· · A = ~•% ~ /4 . .o
A=· /5,c,9.
/2--:::. ,b{{)ep _ · .' ·; : ·.· ~:)-~-~ #-l _~!--t.:'---.a-_'J+--,
("?-I tp .-• r ~2.. ·. . . : .. ·. 1 . 1
• ~I
,c,p 'PAI--J.6-J....
· . h/a :.:: 19/iep -= I.I~
h M -~ 4/t(f? = >2-c;.
hi r.1: = 4h, · ::: (,'??;
. A [:7:A '/;. ~~''.~~}
_,t::,,_ = ,v:;.s _.
A .:::; ~ .. y~· ::::. [,OS,
2-A =tJ;.s4--·
1Z-.::: •'?9 .. : "
~'2--':;; .• s9,,,..~9 + .. ~('Q .. -=· .• .,1. -·· ___ r.·):: .·
(/' 1'.Ahicl,.. ~A(l.a = •S.9/,.91 =-4'3 7;.; !. -.;
. 1111
I\ .. \,I . _:: '•'(1,_/ •3( ;:_;· l~·o/J : .· .·
,. '•
h
(p PA•·v\S.L-
~~~t
11.•,i L....---~
I to
_-oTn -= ~1,fJ.-1:-xw-t-B C:,~2 x H 1-/°po74-x IS + 14-&&x 17 == 773,s4-
. ~l1z..:. =ti (<2'ii1$ -t-4--x IS) X l~(ri, -:4 -i:t_'f:Je{{j(?-it--, ::tr-
Vf'L.Af"r =:(1'Z--:i7S4--:< .'~9 -1\ t>E)&::>x-v E)s.) ~ I CP = Gol 4-
. '
:. r
Projec;:tN;~e.,....1 _· ._H..,..F. ..... :S: _______ ProjectNo. ~-'3S
. ~-Y----...,.
0...,.-~-z:F ___ -._· _______ Date _//l.....,/_1--_?_/_9_S __ Sheet No. (._-Ct:,
BWcp ~a,o . .
~~L-. AWAt..-iS~S
-JJy-lS4CC? , 0>\4-'.::'. -"fC V = "1.-l 4-bA--+ ( t;\ x1i ;<: 1S .. + :Z-z..x [A-X 1>) X> (t,'3 = 43033
=F'-1 ctn== (G,91 'o\?
LI fu fl f:o o 1<:.:-
~-' llp '"L'J3lo~:
j --,· •'
'
,,,.. '
, .. f
' ' ,.~ . '
: ~ .
. ' ' ' ~
., . ' ' ~:
' ' .... ;
· .. j ..
'PS.1
=So
. 1
. ' e W,/.11..-l; f'= -2<P,/2 )( 'b1/,z .l( _?ii
·Project Name...::,~: ~l:l.u.f:'f...::!_;...--.------Project No. 37.-'3S..
. ' ... ,·;:f ,-' '
· _ By. . : ' -?--r : . : Dat~ _l~_!,.('_1.: .... 1 /_,~'--s __ Sheet No. f_ I
. ' ,
, .
' ~ • • i
: . :~
,,. .'
{.
h I\
: rJ A . WIPE--/ 9' <W-<'-r u K V"-t" ' ;x. V
I I I h (I VS< 7;, _(p sco X 'Z4
1,v} '3 -:It-S E.Lv'(!s)
" ( " l)Ge... 4 -0 &cp x -i..\-
i,J I '2 -:fr--c;. e.14 c 13, J
I (i U Se, 24 L) lDt.":. F-"fC;:,,
w/i.-~s T~&
I!
L) ~ 0'.-o ~E{> X '2.-4--
1.,J / 5 _ :l!:-(p C:;.L,J ( B)
l\ \.\. 0~ 3~ c,.. x. --z.4-
lv/1-~c:; EvJ(g)
. .--,,
,' ·~·. .Pr~iect:N~me _' -;_;~...;: H;...;..f_I..,.· . ...,.. _ ___..,. ____ Project No. 9s. -3 >-
. 'j . :~t_7 ,b\ ·; D t !11.,/i7/ci5 Sheet No. f-2. By· , ; ':-V· , : _ a e _ 1
. ~ . ' ·:··i.
. fDVi-!'.DA1toiJ 0es(6i-J-. . . ' . . . rs? . . '-:er.Ii
cru.,--fr b = ,Z,'7,; X 15 + '3½, X 'l$ .::: 'Z'2-\ 0
H lJ U~ '3~ep S:~ tZ4-
w/ 1 -·:/1='5 ew ( r:,J
. ','',
I 1, 11 J~. 4-o s~x,zA,
II
lO P".H_,
I" . · .. lt,4-' · ff(;:, . OIL.
< -_,, ' '
1,Jl 0-~ s El.,) (fs)
' ~ .
. ~
t::JBJ--i x ~t/2_ x · (!s,.r2) = '14ws ( ,, Uk 4,aS<p x-t-4--
w/g _-=t;-CP a-v(rs J
' '
,} ' . ~ '" :· ' ...
[ I
PAGE : W--1 PROJECT: Hf:J:" SUBJECT:_1i..,._1......,~~-< ..... U-=f-½/.,....,.A_Lk ___ _
BY • I
PR~-CAST CONCRETE WALL PANEL DESIGN tfu;>o I01oa-c:>
I ,, ----------------~-----------~------~--------\ b-(p 'fA,-.i~
Considering P-Delta Effects
DESCiUPT.!ON :
ALLOWABLE STRESSES
> f re :· Concrete
> Fy .: Rein£ •
> Phi : . 9 or . 7 2
> Seismic Factor
> Wind Load
= .. .
3,000 psi
60,000 psi
0.86
> Min Vert Steel %
> Min Horiz Steel %
Max. Vert. Spacing=
Max. Horiz.Spacing = = =
CHOICE OF DESIGN METHOD
-' --------.----------------Moment of Inertia: --
SEAOC 11 Yellow·Book11 ,
SEAOC "Green Book11 '
ACI Eq. (9-7) ,
0 ;7
43 psf
Using I-cracked Only
Using l:-cr & I-gross
Usi:rig I-effective
Enter
Enter
Enter
Def l.ection Determination · : --------------
· To Iterate P-Delta Effects To Convergence Enter
To Find Defl. At Moment Capacity of Section Enter
0.0020
0.0012
18.00 in
1.8. 00 in
------>>>
-> 1
-> 2
-> 3
------>>>
-> 1
-> 2
3
1
Shall Uniform. LL Be Used With Wind/Seismic Loadings? Y=l N=0 --> 0
DESIGN· DATA ( Enter All Loads UN-FACTORED)
> C'lear Wall Ht. = 21 ft > Eccentric Dead Load = 705 plf
> Totql Wall Ht. = 22 ft > Eccentric Live Load = 940 ~lf
Ht I Th~ Ratio = 42.0 > Load Eccentricity = 6 in
(default = t/2 + 3 II)
> Wall Thickness. = 6 in
> Rebar siz.e '#' .. 6 > Uniform Lateral Load= 0 plf .
> Rebar _Spacing ·= 9 in > x_.Dist. to Bottom = 0 ft
> X-Dist. to Top = 0 ft
> I?epth To Steel = 3.9 i,n > seismic=l, Wind=2 --> 2 <--
(default = t/2)
> Point Lateral Load = 0 #
> Axial Uniform DL = 600 plf. > x-t>ist! from Bottom = 0 ft
> Axial Uniform LL = 0 plf > Seismic.=l, W:i,.nd=2 --> 1 <--------------~--~~-----------------------------------------------------DESIGN SUMMARY SEISMIC WIND ~-~----------~ ------~-----------
M-n * Phi • MOMENT CAPACITY 106,287 in-# 106,287 in# .
M-u . APPLI·ED MOMENTS 54,767 in-# 40,845 in# .
@ TOP OF WALL. 4,883 4,770
OVERSTRESS = o.o 0.0 % HEIGHT I SERVICE DEFLECT IO~ = NA NA . -. --------------------------------------------------.--------------------LATERAL LOADtNGS
----------------. ' .
Wall Wt@ 1~0 pcf
Lateral Wall Wt =
75.0 psf
52.5 psf
Wind Load* 1.275 =
Lateral Wt* 1.403 = 54.8 psf
73.6 psf
VERTICAL LOADtNGS --------------~--P-Axial: .Seismic -or-Wind
P-Wall : Seismic -or-Wind
Pu-Axial: Seismic -or-Wind
Pu-wall; Seismic -or-Wind
= =
=
=
1,305 plf
863 II
1,370 plf
906 II
-------
Pu-Total: Seismic --or-winq 2,276 plf
ANALYSIS VALUES SEISMIC
' . . ---------------. . -----~----As(eff) = [ Pu:tot + (As*Fy) J / Fy-
'a' = (As*Fy + Pu) /(.85*f'c*12)
'c'= 'a' / .as
Phi: Capacity-Reduction Factor
Mn As(eff) ~ Fy * ( d -a/2)
Mu --Mn.* Phi
E : 57,000 * (f'c".5)
n ! 29,-000 / Ee _ _
Fr: Mod. of Rupture: 5 * (~'c".5)
Section Modulus : (Gross)
Moment. C~pacity@ Cracking= S * Fr
Moment of Inertia: (Gro$$)
Moment of Inertia : (Cracked).
Moment of Inertia: (Effective)
ACTUAL MOMENTS W/ FACTORED LOADS------------------------·--------
=
=
-
=
=
= = = = =
---=
0.627 ~n"2/ft
J..229 in
1.446 in
0.86
123, 5·90 in-#
106,287 in-#
3.1E+06 psi · 9. 2.9
273.9 J?Si 72.0 in" 3
19,718 in-#
216.0 in"4
47.2 iri"4
55~1 in"4
SEISMIC ( Per Design Method Specifie_ct· )
Basic Moment w/o ~-·Delta
_Excess over Cracking Moment
Maximum Mid-Height _Deflection
MAXIMUM APPLIED ~OMENT
---------= 50,928
= 31,210
= 2-.1.1 -54,767
Basic Deflection w/o P-Delta ---1. 96
C-\. ... ~ 'DE:fLiSalOI\J
Ase-_-:::..·$::, ¥'=:>O~OOC) -t-~00 --= • (p cl--:::: (,If:;,,
-(;;o~ooo -'f--.,, .
f1n --= • Cp x ~,-o~ x { 3.et, -1, It,/ '1-) = ll.b44o
A .. C(:::: ·-195
' . ,,
A I'\ -=> c;:,. 1;..c:;,
A = 0 l9S' -t-(_ '¢:}llj '"'" l_~7 tb ) X (~:z ... $".,.. ,l~S) _
llbA-4-c, -197-li:>
A0tloW = '2,\,x \1-/is.o -llPt;" oK--
in-#
in-#
in
in-#
in
,,
WIND --------0.627 in"2
1.229 in
1.446 in
0.86
123,590 in-#
106,287 in-#
3.1E+06 psi
9.29
273.9 J?Si 72.0 in" 3
19,718 in-#
216.0 in"4
47.2 in"4
67.0 in"4
WIND --------
38,490 in-#
18,772 in-#
1."29 in
40,845 in-#
1.22 in
\t.J -1.
. I
PAGE : W_3,.
,,
PROJECT: HF-L SUBJECT:~\-N,L-J..,j_..$--,--------
I
BY _:::lf ___ DATE :~(9~
PRE-CAST CONCRETE WALL PANEL DESIGN --------------~----~------------------------Considering P~Delta Effects
~ to,ooD
1J 9'J'1.. ,P,AIJ\::.L-
DESCRIPTION:
~LLOWABLE STRESSES --·---------·----. > f'c . Concrete . = 3 I 0Q:0 > Fy : Reinf. = 60,000
.9 0 .8·6 > Phi:· or .72
> Seismic Factor o .. 72
> Wind Loctd = 44.5
CHOICE OF DESI,GN METHOD --------------~--------
pst > Min Vert Steel % 0.0020
,E)Sl:. > Min Horiz. Steel % 0.0012
Max. Vert. Spacing = 18.00 in
Max. Horiz.Spacing = 18.00 in
psf
Moment of Inertia: --
SEAOC "Yellow aook11 ,
~ ~ ---~ ---~ ------->>> 3
S':ll:AOC II Green Book 11 ,
ACt Eq. ( 9-7) ,
Using I-c~atked Only
Using I-er & I-gros$
Using I-effective
Enter
Enter Enter
-> 1
-> 2
-> 3
Deflection Determination: --------------
To Iterctte P-Delta Effects-To Convergence Enter
To Find Def 1. At Moment Capacity of ~ecti9n :. Enter
------>>> 1
-> 1
-> 2
Shall .Uniform LL Be Used With wind/S'ei$mic Loadings ? Y=l N=0 --> o
DESIGN DATA ( Enter All Loads UN-FACTORED) -~---------> Clear Wall Ht. = 21 ft > Eccentric Dead Load = 144 plf
> Total Wall Ht. -· 22 ft > Eccentric Live Load = 192 J?lf
Ht/ Thk Ratio = 42.Q > Load Eccentricity = 6 in
(default = t/2 + 3 II)
> Wall.Thickness -6 in > Rebar Size '#' . 6 > Uniform Lateral Load= 0 plf . .
> Rebar Spacing = 9 in ·> x-:oist. to Bottom = 0 ft
> X-Dist. to Top = 0 ft
>·Depth To Steel = 3.9 in > Seismic=*!, Wind=2 --> 2 <--
('default= t/2) > Point Lateral Load = 0 # > Axial Uniform DL = 600 plf > X-:Dist. from Bottom = 0 ft > ~xial Uniform LL = 0 plf > Seismic=l, Wind=2 --> 1 <------------------.----· --------. -· '' ----------------------------DESIGN SUMMARY SEISMIC WIND -----~-~-----------------------
M-n * Phi . MOMENT CAPACITY = 104,929 in-# 104,929 in# .
M-u . APPLIED MOMENTS = 5·3, 095 in-# 39,_559 in# .
'.@ 'rOP OF WALL = .1,362 1,248
OVERSTRESS o.o 0.0 %
HEIGHT I SERVICE DEFLECTION = NA NA -----~----------------~---------~~----~-------------------------------LATERAL LOADINGS
--------~--~-~~-, Wall Wt@ 150 pcf =
Lateral Wall Wt =
VERTICAL LOADINGS -----------------
75.0 psf
54.0 psf
P-Axial: Seismic -or-Wind
. P-Wall Seismic -or-Wind
Pu..,.Axial: Seismic -or-Wind
Pu-wail: Seismic -or-Wind
Pu-Total: Seismic -or-Wind
ANALYSIS VA:LUES
---------------As(eff) = [ Pu:tot + (As*Fy) J / ty
'~' = (A~*Fy + Pu) /(.85*f'c*12) , c , = , a , / . 8·5
Phi :. Capacity Reduction Factor
Mn= As(eff) * Fy· * ( d -a/2) Mu = Mn * Phi . .
E l 57,000 * (f'cA.5)
n : 29,.000 / Ee .
Fr: Mod. of Rupture: 5 * (!'cA.5)
Section Modulus : (Gro$S)
Moment_ Capacity@ Cracking= S * Fr
Moment of Inertia: (Gross)
Moment of Inertia: (Cracked)
Moment of Inertia: (Effective)
ACTU~L MOMENTS W/ FACTOREP LOADS -----~-~-~----------------------( Per Design Method·specified)
Basic Moment w/o P -Delta ·
Excess over Cracking Moment
Ma~imum Mid~Height Defl~ction
M,AXIMUM APPLIED MOMENT
Basic Deflection w/o P-De-lta
Wind Load* 1.275 =
Lateral Wt* 1.403 =
= 744 plf -863 If
= 781 plf = 906 If -------= 1,687 plf
SEISMIC -----------0.617 ~nA2/ft ---= 1.210 in
·-1.424 in
= 0.86 = 122,011 in-# = 104,929 in-#
56.7 psf
75.7 psf
WIND --------0.617 in"2
1.210· in
1.424 in
0.86
122,011 in-#
104,929 in-#
== 3.1E+06 psi 3.1E+06 psi = = = =
=
=
= =
=
9.29
273.9 ~si 72.0 1.n A 3
19_, 718 in-#
216.0 in"4
46.7 in"4
S4.6 inA4
SEISMIC ---------
50,552 in-#
30,834 in-#
2 •. 06 in
53,0"95 in-#
1. 96 in
11
9.29
273.9 ~si 72.0 1.n" 3
19,718 in-#
216.0 in"4
46.7 inA4
65.7 in"4
WIND
37,985 in-#
18,267 in-#
1.27 in
39,559 in-#
1.22 in
-~ == -lCjS -t-( '?;;1~1-s -l':'7\ 'c? ) x ( ~.'2-?-, l9S) -L :,{ O/c-
llc':)4--.\-o -l '?1Lb
,6..al\.oW~l.t,le, : l. 0011 S-... W _'1.-
HF-L
ZF
1/ uP{~(,P
PRE-CAST CONCRETE. WALL PANEL DESIGN --------------------------~-~---------------
DESCRIPTION:
ALLOWABLE STRESSES -----~~-----------> f'c: Concrete
> Fy : Reinf •·
> Phi: .9 or .72
> S~ismic Factor
> Wind Load
= =
= =
Considering P-Delta Effects
3,000 psi
40,000 psi
0.86
0 ... 41
52 psf
> Min Vert Steel %
> Min Horiz Steel %
Max. Vert. Spacing=
Max~ Horiz.Spacing =
CHOICE OF DESIGN METHOD
f ,,
'3-(o
0.0020 ,iot.:tv::_ 0.0012rr•--=:.--=. __ 7
18.00 in
18.00 in
Moment of inertia: --
S~AOC ":Yellow Book",
SEAOC "Green Book" ,
ACI Eq. ( 9-7) _ ,
-----:-->>> 3
Using.I-cracked Only
Using I-er & I-gross
Using I-effective
Enter
: Enter
Enter
-> 1
-> 2
-> 3
Def l:ection Determination ·: ----------------~--->>> 1
· To Iterate P-belta Effects To Convergence :
To Find Defl. At Moment Capacity of Section:
Enter -> 1
Enter -> 2
Shall Uniform LL Be Used With Wind/Seismic Loadings? Y=l N=0 --> O
DESIGN DATA ( Enter All Loads UN-FACTORED)
> Clear Wall Ht. --21 ft > Eccentric De~d Load = 857 plf
> Total Wall Ht. = 22 ft > Eccentric Live Load = 1142 J?lf Ht l Thk Ratio = 42.0 > Load Eccentricity = 6 in
Thickness
(default= t/2 + 3 II)
> Wall = 6 in
> Rebar Size 'I# I . 5 > Uniform Lateral Load= 0 plf .
> Rebar Spacing = 6 in > X-Dist. to Bottom = 0 ft
> X-Dist. to Top = 0 ft
> D.epth To Steel = 3.9 in > Seisroic=l, Wind=2 --> 2 <--
(default =t/2)
> Point Lateral Load = 0 #
> Axial Uniform DL = 730 plf > x--bist. from Bottom = 0 ft
> Axial Uniform LL = b p,lf > Seismic=l, Wind=2 --> 1 <-----~--------------------------~-~~----------~-------------------------DESIGN SUMMARY SEISMIC WIND -------------. ---·---------------
M-n * Phi MOMENT CAPACITY = 80, 6.14 in-# 80,614 in#
M-u APPLIED MOMENTS = 32,939 in-# 49,993 in#
@ TOP OF WALL. = 5,658 5,797
OVE:RST-RESS = o.o 0.0 %
HEIGHT I SERVICE DEFLECTION = NA NA ---~-------------------------------~----------------------------------LATERAL LOADINGS --------~----~----
Wall Wt@ 150 pcf =
Lateral Wall Wt =
VERTICAL LOADINGS
7~.o psf
30.7 psf Wind Lo.ad * 1. 275 =
Lateral Wt* 1.403 = 66.3 psf
43.1 psf
--~--------------P-~ial .•. Seismic -or-Wind .
P-Wall Seismic -or-Wind
Pu-Axial: Seismic -or-Wind
Pu-Wall . Seismic -or-Wind .
Pu-Total: Seismic -or-Wind
ANALYSIS VALUES ----------------
1,587 plf
= 863 II
= 1,666 plf
= 906 II -------= 2,572 plf
SEISMIC ---------
t-tfI
"2--P
'f1.0/9(f
WIND --------
As(eff) = [ Pu:tot + (As*Fy) J / Fy = 'a'.= {As*Fy + Pu.) /( .8-5*f'c*l2) =
0.678 ~n"2/ft 0.678 in"2
0.886 0.886 in
'c'= 'a' / .85 · .. -
Phi: Capacity Reduction Factor =
Mn As(eff) * Fy * ( d -a/2) =
Mu= t4n * Phi
E : 5 7 , ·0 0 0 * ( f ' c " . 5 ) ...,
n : 29,000 / Ee . =
Fr:_ Mod~ of Rupture : 5 * (f'c".-5) =
Sect.ion Modl:llus : (Gross) ,.,..
Moment CapaQity@ Crac~ing = S * Fr -
Moment of Inertia : (Gross) =
Moment of Inertia: (Cracked.) -
Moment of Inertia: (Effective)
ACTUAL MOMENTS W/ FACTORED LOADS ---------------------------~----
in
1.043 in
0.86
93,737 in-#
80,614 in-#
3.1E+06 psi
9.29
273.9 J?Si 7'2. 0 . "3 in
19,718 in-#
216.0 in"4
55 .·9 in"4
89.5 in"4
SEISMIC --,------( Per Design Method Specified)
Basic Moment w/o P -Delta
Excess over Cracking Moment
M~x.i,mum -Mid-Height Defleqtion
MAXIMUM APPLIED MOMENT
= 31,287 in-#
11,569' in-# = 0.78 in = 32,939 in.,..#
Basiq· Deflection w/o P-Delta = 0.74 in
1.043 in
0.86
93,737 in-#
80,614 in-#
3.1E+06 psi
9.29
273.9 J?Si 72.0 in"3
19,718 in-#
216.0 in"4
55.9 in"4
65.4 in"4
WIND
46,561 in-#
26,843 in-#
1.62 in
49,993 in-#
1.51 in
PRE-CAST CONCRETE WALL· PANEL DESIGN -----------·~----------------'!-----------------
Considering P-Delta Effects
DESCRIPTION · :
ALLOWABLE STRESSES ------------------> f'c : Concrete
> Fy : Reinf.
> Phi: .9 or .72
> Seismic Factor > Wind.Load · =
3,ooo psi
40,000 psi
0.86
0.3
18.5 psf
> Min Vert Steel %
> Min Horiz Steel % :
Max.. Vert. Spacing =
Max. Horiz.Spacing =
0.0020
0.0012
18.00 in
18.00 in =
CHO!CE OF DESIGN METHOP . . . -----------------------Moment of Inertia: --
SEAOC "Yellow Book",
--------~ -------:-->>> 3
· SEAOC II Green Book 11 ,
ACI Eq ~ ( 9-7) ,
Using r~cracked Only
Using I-er~ I-gross Osing !:-effective
Deflection.Determination: ----------
To Iterate P-Del ta Effects T.o Convergence :
To Find Defl. At·Moment Capacity of Section
Enter
Enter
Enter
-> 1
-> 2
-> 3
---------->>>
Enter -> 1
Enter -> 2
1
Shall Uniform LL Be Used With Wind/Seismic Loadings? Y=l N=0 --> o
DESIGN DATA ( Enter All Loads UN-FACTORED) -------------
> Clear Wall Ht. = 21 ft > Eccentric Dead Load = 304 plf
> Tota-l Wall Ht. = 22 ft > Eccentric Live Load = 405 ~lf Ht I Thk Ratio = 42.0 > Load Eccentricity = 6 in
(default= t/2 + 3 II)
> Wall Thickness = 6 .in
> Rebar Size . I# I . 5 > Uhi,1:orm Lateral Load= 0 plf .
> Rebar .Spacing = 16 in > x...:Dist. to Bottom = 0 ft
> X-Dist. to Top = 0 ft
> Depth To Steel = 3 in > Seismic=i, Wintl=2 --> 2 <--
(default =. t/2) Point ·Lateral # > Load = 0
> Ax.ial uniform DL = 0 plf > X:~Dist. from Bottom = 0 ft
> Axiai Uniform LL = 0 plf > Se,ismic=l, Wind=2 --> 1 <-------------~------------------~------~--~--~-----~--------------------DESIGN SUMMARY SEISMIC WIND
. . . -------------------------------
M-n * Phi MOMENT CAPACITY = .2-5,378 in-# 25,378 in#
· M-u : APPLIED MOMENTS = ·22 f 059 in-# 18,370 in#
@ TOP OF WALL = 2,105 2,057
OVERSTRESS = 0.0 0.0 %
~EIGHT/ SERVICE D~!LECTION = . NA NA ----------------------~-----~-----~-----------~-----------------------LATERAL LOAD:INGS --~-----------... --
Wall Wt@ 150 pcf =
Lateral Wall Wt =
VERTICAL LOADINGS
75.0 psf
-22.5 psf
Wind Load* 1.275 =
Lateral Wt* 1.403 =
23.6 psf
31. 6 psf
W-7
--------------P-Axial : Seismic
P-Wail ·: Seismic
Pu-Axial: Seismic
Pu-Wail : Seismic
Pu-Tot&l: Seismic
ANALYSIS VALUES --~~-----------
-or-Wind
-or-Wind
-or-Wind -or.,.. Wind
-or-Wind
As(eff) = [ Pu:~ot + (As*Fy) ] / Fy
'a'= (As*Fy + Pu) /(.85*f'c*12)
'c'= . 'a' / .85 . ·· Phi: Capacity Reduction Factor
Mn-As(eff:) *_Fy * ( d -·a/2) Mu -Mn* Pbi .
E · 57,000 * (£'c".5)
n· : 29,000 / Ee
Fr: Mod. of Rupture: 5 * (f'c".5)
S~ctiort Modu.l,1Js : (Gross)
Moment Capacity@ Cracking·= S * Fr
Momen_t of Inertia : (Gross)
Moment of Inertia: {Cra,cked)
Moment of I.n'erti& ( Effective)
.11'
Acr =. 0 .l9S ~ W-"2-
~ -Ii
1$~1~<'.P
\917\b
' h (\
A :::; 15,lS(ti I x . l~S /l9,71b . -.l:tCR
;~l,
tr-{",· 1-tCJVr'.z., 7iW = , oo-i-s )((pt l'l = · \(?
. "2,l
/If' ' 'fl\~;.. .. :vvrt. == , 001s~ 7' c., x 1,1. ~ o 100
-= 'ZGO X'3 X l'L-=-• /C)
4-o,c,oo
Hf:f lt.J-B
"2f--
VUpfc;Jc;r:,
= 304 plf
= 863 II
= 319 plf
= 906 II -------= 1,225 plf
SEISMIC WIND -----------------
= 0.261 tn"2/ft 0.261 in"2
= 0.341 in 0.341 in
= 0.401 in 0.401 in
= 0.86 0.86
= 29,509 in.,..# 29,509 in-#
= 25,378 in-# 25,378 in-#
= 3.1E+06 psi 3.1E+06 psi
= 9.29 9.29
'= 273.9 J?Si 273.9 J?Si
',=; 72.0 1.n"3 72.0 1.n"3
= 19,718 in-# 19,718 in-#
= 216.0 in"4 216.0 in"4
-16.6 in"4 16.6 in"4
159.0 in"4 16.6 in"4
u
Act \low .: l,(pc:)
·~\,
' 1~
4F s@lb (As~ ,'21 )
PRE-CAST CONCRETE WALL PANEL DESIGN --~----------~----~----------~--------------
DESCRIPTION
ALLOWAB:J:iE STRESSES · ----------------~-
Consideri,ng P-pelta Etfects
> f'c: Concrete
> Fy · : Rein£ .
> Phi: .9 or .. 72
> Seisntic Factor
=
=
3,oob psi
40,000 psi
0.86
0 ."33
> Min Vert .steel % :
> Min Horiz Steel % :
Max. Vert. Spacing=
Max. Horiz.Spacing =
0.0020
0.0012
12.92 in
18.00 in > Wind Load · = 39 psf
CHOICE OF DESIGN METHOD -----~~.-~--------~-~---
Moment of Inertia: --
SEAOC "Yellow Book",
SEAOC "Green Book" ,
ACI Eq. (9-7) ,
-----------..-->>> 3
Using I-cracked Only Using I-er & .. I ...,gross
Using I-effective
Enter
Enter
Enter
-> 1
-> 2
-> 3
D'eflection Determination: ------: ---.., ----------->>> 1
To Iterate P-Dei ta Effects To Co.nvergenc4? Enter
To Find Defl. At Moment Capacity -of Section Enter
-> 1
-> 2
Shall Uniform LL Be Used With Wind/Seismic Loadings? Y=l N=O --> O
DESIGN DATA ( Enter All Loads UN-FACTORED) ---"!"""-~-----
> Clear Wall Ht. = 21 ft > Ecce.ntric Dead Load = 124 plf
> Total Wall Ht. -22 ft > E.ccentric Live Load = 165 J;>lf Ht I T~k Ratio -21.0 > Load Eccentricity = 9 in
(-default = t/2 + 3 II)
> Wall Thickness = 12 in
> Rebq.r Size '#' 5 > Uniform Lateral Load= 0 plf
> Repar Spacing -· 6 . .2 in > X-Dist. to Bottom = 0 ft
> X-Dist. to Top = 0 ft
> Dept:;h To Steel 9.9 in > Seismic:=1, Wind=2 --> 2 <--
(d~fault = t/2)
> Point Lateral Load 324 # =
> Axial Uniform DL -. 1460 plf > X-Dist. from Bottom = 8 ft
> Axial Uniform LL = 0 > Seismic=l, Wind=2 --> 1 <--f>lf _______ .,;;. __ ~---------------------·-----------------.----------------------
DESIGN .SUMMARY SEISMIC WIND -----------------, -------------M-n * .Phi . MOMENT . CAPACITY = 221,389 in-.# 221,389 in#
. M.;.;u_ . APPLIED MOMENTS = 87,573 in-# 33,847 in# .
@ TOP OF WALL 1,5'88 1,470
OVERST:RESS -0.0 0.0 % HEJ;GHT· / SERVICE DEFLECTION = NA NA -----------------------------~------------------------------------LATERAL. LOADINGS --------~-------Wall Wt.@ 1.50 pcf · =
Latetal Wall Wt -
VERTICAL LOADINGS
150.0 p$f
49.5 psf
'W.ind Load * 1. 275 =
Lateral Wt* 1.403 =
49.7 psf
69.4 psf
-~-----~---------P-Axial . Seismic -or-Wind ..
P-Wall Se;Lsmic -or-Wind
Pu-Axial:. Seismic -or-Wind
P~-wail . Seismic -or-Wind .
Pu-Total: Seismic -or.,. Wind
ANALYSIS VALUES ---------------As(eff) = [ Pu:tot + (As*Fy) J / Fy.
'a~= (As*Fy + PU) /(.85*f'c*12)
'c'= -'a' / .85 ··
Phi: Capacity Reduction Factor
Mn -As(eff) * Fy * ( d -a/2 ) Mu -Mn* Phi .
E : 57,000 * (f'c".5)
n : 29,000 / Ee
Fr: Mod. of Rupture: 5 * (f'c".5)
Section Modulus : {Gross) ·
Moment CapaGity@ Cracking= S * Fr
Moment of Inertia: (Gross)
Moment of Inertia: (Cracked)
Moment of Inertia: (Effective)
= = = = =
=
= =
= = =
Jsg · ~-;;, @, C:,1
o •vi ~ S.A, r .Ac..s. ·. ( ,J).
I\ =tt: s e I~ o,c.,. es.A. r;..cs. (JI)
= -
=
=
=
ti Pr W/10
if
1/,z.rp/,c,,
1 ·, 584 plf
1,725 II
1,663 plf
1,811 II -------3,474 plf
SEISMIC WIND -----------------0.681 ~n"2/ft 0.681 in"2
0.890 in 0.890 in
1.047 in 1.047 in
0.86 0.86
257,429 in-# 257,429 in-#
221,389 in-# 221,389 in-#
3.1E+06 psi 3.1E+06 psi
9·. 29 9.29
· 273. 9 Ji>Si 273.9 Ji>Si 288.0 in "3 288.0 in"3
78,872 in-# 78,872 in-#
1728.0 in"4 1728.0 in"4
500.1 in"4 -500. 1 ln"4
769.6 in"4 500.1 in"4
.,
Homes For
Build
Carl ---
PROJECT DESIGNER:
Sillman/Wyman, Inc.
6181 Cornerstone Ct., Ste.101
San Diego, CA 92121
(619)453-4320
REPORT PREPARED BY:
Steve Balderrama, CEA
Haynal & Co., Inc.
425 West Fifth Street
Esco~dido, CA 92025
(619) 743-5408
Job Number:
Date: 1/30/1996
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
\)
Table Of Contents for Title 24 Report -------------------------------------
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Nonresidential Performance Title 24 Forms ........................... 3
Form ENV-3 Construction Assemblies .................................. 17
HVAC System Loads Summary ........................................... 20
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288 --------------------· ____________________ , ________________________________ _
Project Name: Homes For Industry
Address: Building I
Carlsbad
Designer: Sillman/Wyman, Inc.
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
Building Permit No
Checked by/ Date
COMPLY 24 User 2875 ---------------------------------------------------------------------------
STATEMENT OF COMPLIANCE
This Certificate of Compliance. lists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for this permit
application are cons.is tent all other forms and worksheets, specifications,
and other ca:J.culations submitted for this permit application. The proposed
building as designed meets the energy efficiency requirements of the State
contained in sections 110, 116 through 118, and 143 or 149 of Title 24,
· Builqing Code, Title 24, Part 6, Chapter 1.
1. I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Profes·sions Code to sign this document as the person
responsible for its preparation; and that I am a licensed as a civil
engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am e:J.igible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for its
preparation; and that I am a licensed cont+actor preparing documents for
for work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section-----of the
Code to sign this document as the person responsible for its preparation; and for the following reason: ______________ _
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
ENVELOPE -Required Forms: ENV-1, ENV-2
~rincipal Designer
Sillman/Wyman, Inc.
(619)453-4320
LIGHTING -
Principal Designer
(619)
MECHANICAL -
Location of Mandatory Measures on Plans
(signature)
Required Forms: LTG-1, LTG-2
1 2 3
(Date) ( Circle)
Location of Mandatory Measures on Plans
Required Fortns:
Location of Man
(Signature)
1 2 3
(Date) ( Circle)
Principal Designer
Town & Country Heating and Air
(619)471-1142
MECH-2, MECH-3, MECH-4
e~~un1\es on Plans 1'2-:-I
l,J~ !--I-~~
ure Date (Cir e)
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) PERF-1 page 4 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
ANNUAL SOURCE ENERGY USE SUMMARY (KBtu/sqft-yr)
Energy Component
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area/ Wall Area:
Front Orientation:
Number of Zones:
ZONE INFORMATION Floor
Area
Zone Name (sqft) ----------------------------
RECEPTION 178
OFFICE 276
RESTROOM 64
Warehouse 1000
Standard Proposed Compliance
Design Design Margin --------------------------6.95 14.48 -7.53
45.17 28.38 16.80
33.59 23.17 10.42
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
51.54 41.12 10.42
16.80 16.80 0.00
0.00 0.00 0.00 --------------------------154.05 123.94 30.12
Average Ceiling Height: 518
0.46
(N)
Average Glazing U-Value:
8.0
1.25
1
3
O deg Number of Stories:
4 Number of Occupancies:
Display Inst Tailored Process Tailored
Perim. LPD Lighting Loads Vent.
(ft) (w/sf) (watts) (w/sf) (y/n) -----------------------------------
0 1.21 0 0 N
0 1.57 0 0 N
0 1.17 0 0 N
0 0.00 0 0 N
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 3 of 3) PERF-1 page 5 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288 ------------------.-------------------· ------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
The documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEA
(619) 743-5408
~ N.(Z.e-C\r;:,-(O(Z.
(S1,gnature)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
~Ac,
(Date)
The local enforcement agency should pay special attention to the items
specified in this checklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the jm:;tification,_ and may reject a building or design that
otherwise complies based on the adequacy of the special justification and
documentation submitted.
Window/Wall Ratio Value Entered= 0.456
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptiopal features listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use hav~ been provided by the applicant.
authorized signature or stamp
CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time: 14:45:22
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Const OPAQUE SURFACES
Assembly Name Type Location/Comments
Demising Wall
R-19 Roof(Over Ac Tile)
6 11 Concrete Wall
FENESTRATION Frame
Orient Panes Type ------------------
Back (S) 1 Metal
Right (W) 1 Metal
Metal
Wood
None
Exterior Shade OH -----------------------None y
None y
ENV-1 page 6 of 20
Runcode: 2875-540964288
Date: 1/30/1996
COMPLY 24 User 2875
Glazing Type
Note to
Field
-----------------------Graylite 14 by PPG
Graylite 14 by PPG
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 14:45:22
LTG-1 page 7 of 20
Runcode: 2875-540964288 ---------------------------------------------------------------------------Proj,ect Name: Homes For Industry
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps ------·----------------
Fluorescent 3
Incandescent 1
MANDATORY AUTOMATIC CONTROLS
Control
Watts/
Lamp
;;.. -----
34
75
Ballast
Type ----------
Standard
n/a
Date: 1/30/1996
COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field ---------------------
1.5 6
n/a 1
Control Location ID Control Type Zone Controlled
Note to
Field
CONTROLS FOR CREDIT
Control
Control Location ID Control Type Zone Controlled
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of ·20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288 --------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name 2 Ton Package Heat Pump
Time Control
Setback Control
#of Isolation Zones
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
s None __ _
n/a
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B -A-
No Economizer
145
Heat Pump
Trane WCC024
DX
-------------------------------"-----------------Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
OA Damper
A:Auto
G:Gravity
Date: 1/30/1996
COMPLY 24 User 2875
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
---------------------------------------------------------------------------
DUCT INSULATION
System Name Type Duct Location -------------------------------------------------Trane WCC024 Heating Ducts in Attic
Cooling Ducts in Attic
PIPE INSULATION Insul
System Name Pipe Type Required
Domestic Hot Water y I N
NOTES TO, FIELD -For Building Department Use Only
Duct Tape
Allowed
-------
y I N y I N
Insul
R-Val
-----
4.2
4.2
Note to
Field
-------
Note to
Field
ENVELOPE COMPLIANCE SUMMARY -Performance (part 1 of 3)ENV-2 page 10 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288 ------------, ______________ ------------------------------------------------
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION BY ZONE
Zone Name --~------------------
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
Date: 1/30/1996
COMPLY 24 User 2875
Flr Floor Display
No Area Volume Perim.
1
1
1
178
276
64
Total 518
1424
2208
512
0
0
0
ENVELOPE COMPLIANCE SUMMARY -Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 14:45:22 Runcode: 2875-540964288
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
OPAQUE SURFACES Act Solar
Type Area U-Val Azm Tilt Gains Form 3 Reference
---------------------------------Wall 24 0.752 180 90 Yes 6" Concrete Wall
Wall 136 0.192 Int 90 J;-Jo Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Ove:t Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 64 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments --------------------RECEPTION
RECEPTION
RECEPTION
OFFICE
OFFICE
RESTROOM
RESTROOM
ENVELOPE COMPLIANCE SUMMARY -Perf·ormance (part 3 of 3) ENV-2 page 12 of 2 0
Run Initiation Time: 14:45:22 Runcode: 2875-540964288
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
FENESTRATION SURFACES
# Type Area Frame Div -----------------------
1 Wdw Back (S) 64.0 Metal No
2 Wdw Right (W) 32.0 Metal No
3 Wdw Back (S) 96.0 Metal No
4 Wdw Right (W) 184.0 Metal No
OVERHANGS/SIDE FINS
Act
U-Val Azm Tilt -----
1. 25 180 90
1.25 270 90
1.25 180 90
1.25 270 90
SC
Glass
Only -----
0.53
0.53
0.53
0.53
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments ---------------------RECEPTION
RECEPTION
OFFICE
OFFICE
--Window-------Overhang~--------Left Fin------Right Fin--
# Type Ht Wd Len Ht LExt RExt Dist Len Ht Dist Len Ht
1 Wdw
2 Wdw
3 Wdw
4 Wdw
8.0 8.0
8.0 4.0
8.0 12.0
8.0 23.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Time: 14:45:22
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
LTG-2 page 13 of 20
Runcode: 2875-540964288
Pate: 1/30/1996
COMPLY 24 User 2875
------------------------------------------------------------------------
ACTUAL LIGHTING POWER
No of
Name Description Lumin
-----
Watts
per -----Default
-------
Total
Watts
48" T-12 Low Watt /3 Lamp (Tandem)
75 w Surface Mount Incandescent
6 108.0 y -y-648
75 1 75.0 --
SubTotal 723
Less Control Credits (LTG-3) O
Total Proposed Watts 723
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY ZONE
Zone Name
---------------------RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
TOTALS
Modelled
Floor LPD
Area (w/sf) -----------
178 1.213
276 1.565
64 1.172
_.,;. ___ ------
518 1.396
Total Tailored
(watts) (watts)
--------------
216 0
432 0
75 0 --------------
723 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
MECHANICAL EQUIPMENT ZONING SUMMARY -Performance
Run Initiation Time: 14:45:22
Project Name: Homes For Industry
Document~tion: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
System/Zones Served
2 Ton Package Heat Pump
RECEPTION
OFFICE
RESTROOM
Warehouse
Central/Zonal System
Trane WCC024
MECH-2 page 14 of 20
Runcode: 2875-540964288
Date: 1/30/1996
COMPLY 24 User 2875
System Type
No
Sys
Packaged Heat Pump 1
MECHANICAL EQUIPMENT SUMMARY -Performance
Run Initiation Time: 14.: 45: 2·2
MECH-3 page 15 of 20
Runcode: 2875-540964288 -----------" -----------------------·---------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
CENTRAL SYSTEM SUMMARY
Sys No
Date: 1/30/1996
COMPLY 24 User 2875
No· System Name System Type Sys Economizer Type
1 Trane WCC024 Packaged Heat Pu 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys-------Heating---~------------------------------Cooling-----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 23800 0.0 6.80 DX 23800
CENTRAL FAN SUMMARY---------~--Supply Fan-----------
Sys Mtr Drv
No Fan Type Motor Location CFM BHP Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name
None
No CFM
800
Zonal Fan
Mtr
BHP Eff
0.16 55 100
Drv
Eff No CFM
17850 9.40 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
None
Exhaust Fan
Mtr
BHP Eff
Drv
Eff
EVAPORATIVE COOLING
Sys
No Type CFM
Effectiveness
Direct Indir
Integrated
Operation
Return
Air Heat
Recovery
MISCELLANEOUS MOTORS
Sys Mtr Drv
No Type BHP Eff Eff
MECHANICAL VENTILATION -Performance
Run Initiation Time: 14:45:22
Project Name: Homes For Industry
Pocumentation: Haynal & Co., Inc.
VENTILATION SUMMARY BY ZONE
Zone Name T Occupancy --------------------------------, ----
RECEPTION Lobby (.Office)
OFFICE Office
RESTROOM Corridor/Restr
Floor
Area -----
178
276
64
sgft
/Occ
29
140
200
MECH-4 page 16 of 20
Runcode: 2875-540964288
Date: 1/30/1996
COMPLY 24 User 2875
Tran
CFM Dsg Min sfer
/Occ CFM CFM CFM ------
15.4 95 94
20.0 39 41 2
30.0 10 10 ------TOTALS 145 144
WARNING -Total Design Mechanical Ventilation is less than Minimum Required
Tailored OA (T=*) requires ·supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DES~RIPTION
Sketch of Construction Assembly
ASSEMBLY tr-VALUE
Construction Components
Outside Air Film
1. Gypsum or Plaster Board
2. Insulation. Mineral Fiber, R-11
3. Gypsum or Plaster Board
4.
5.
6.
7.
8 •
9 .
Inside Air Film
ENV-3 page 17 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: Demising Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Th R-Value
Fr (in) Cavity Frame
*
0.500
3.500
0.500
Unadjusted R-Values
0.17
0.45
11.00
0.45
0.68
12.75
TOTAL U-VALUE =
0.17
0.45
11.00
0.45
0.68
0.00
0.192
=====
TOTAL R-VALUE = 5.20 ----------
Weight:
Heat Capacity:
4.3 lb/sqft
1.11
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
ENV-3 page 18 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: R-19 Roof(Over Ac Tile)
· Assembly Type: Roof
. -_ .
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: " o.c.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame --------------------------------------------------------------------------
Outside ~ir Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7 .
8 .
9.
Inside Air Film
0.375
0.010
0.500
* 1.250
6.000
0.500
0.17 0.17
0.33 0.33
0.06 0.06
0.62 0.62
0.75 1.24
19.00 19.00
1.43 1.43
0.61 0.61 ------------------------------------------·--------------------------------Unadjusted R-Values 22.97
ADJUSTMENT FOR FRAMING
(1 /22.97) X (0.90) + (1 /23.46) X (0.10)
Weight:
Heat Capacity:
5.0 lb/sqft
1.59
= 0.043
TOTAL U-VALUE =
TOTAL R-VALUE =
23.46
0.043
=====
23.02
=====
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 19 of 20 ---------------------------------------------------------------------------Project Name: Homes For Industry Date: 1/30/1996
Documentation: Haynal & Co., Inc. COMPLY 24 User 2875
-----------------------------------------------------------------------
COMPONENT DESCRIPTION
------------------------------Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried
2.
3.
4.
5 .
6.
7.
8 .
9 .
Inside Air Film
ADJUSTMENT FOR FRAMING
Assembly Name: 6 11 Concrete Wall
Assembly Type: Wall
Assembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: "O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
F~ (in) Cavity Frame
6.000
Unadjusted R-Values
0.17
0.48
0.68
1.33
0.17
0.48
0.68
1.33
(1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) = 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
14.00
TOTAL U-VALUE = 0.752
=====
TOTAL R-VALUE = 1.33
=====
..
HVAC SYSTEM HEATING & COOLING LOAD SUMMARY page 20 of 20 ----------------------------------·----------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
HVAC SYSTEM DESCRIPTION
HVAC System Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
ZONES ON THIS SYSTEM
RECEPTION
OFFICE
RESTROOM
Warehouse
PEAK
(Jan 12am)
(Jan 12am)
(Jan 12am)
(Jan 12am)
TOTAL ZONE LOAD
Duct Gains & Losses:
Ventilation: ( 144 CFM)
Return Air Lighting Gain
Supply/Return Fan Gain:
TOTAL SYSTEM LOAD
SYSTEM OUTPUT AT DESIGN CONDITIONS
MAIN HEATING & COOLING SYSTEM
TOTAL SYSTEM OUTPUT
HEATING
5074
12082
236
0
173~2
1739
4953
0
24.084
19;,09
19509
Date: 1/30/1996
COMPLY 24 User 2875
2 Ton Package Heat Pump
Trane WCC024
1
CA Daytime Fans
COINCIDENT
50 %
COOLING
PEAK SENSIBLE LATENT
(Aug 5pm)
(Aug 5pm)
(Aug 5pm)
(Aug 5pm)
144 CFM)
--------
5960
13758
599
0 --------
20317
2032
619
0
0 --------
22968
19765
19765
------
1613
576
99
0
------
2288
672
------
2960
4975
4975
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equ~pment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1-. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltrati on per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions),
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNAHVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall:be installed and insulated as provided in UMC, Chapter 10.
4. Pilot lights shall ,not be installed for natural gas central Jurnaces, and pool and l?Pa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion arid balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between heating and cooling, Section 122{a) and {b).
2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112{b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122{e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions.
5. Outdoor air supply-and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122(f),
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b),
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.
..
EPORT R:
PROJECT DESIGNER:
Sillman/Wyman, Inc.
6181 Cornerstone Ct., Ste.101
San Diego, CA 92121
(619)453-4320
REPORT PREPARED BY:
Steve Balderrama, CEA
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
(619) 743-5408
Job Number:
Date: 1/30/1996
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
Table Of Contents for Title 24 Report
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
No~residential Performance Title 24 Forms ........................... 3
Form ENV-3 Construction Assemblies .................................. 17
HVAC System Loads Summary ........................................... 20
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272 ---------------------------------------------------------------------------
Project Name: Homes For Industry
Address: Building J
Carlsbad, CA
Designer: Sillman/Wyman, Inc.
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
Building Permit No
Checked by/ Date
COMPLY 24 User 2875 ---------------------------------------------------------------------------
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for this permit
application are consistent all other forms and worksheets, specifications,
and other calculations submitted for this permit application. The proposed
building as designed meets the energy efficiency requirements of the State
contained in sections 110, 116 through 118, and 143 or 149 of Title 24,
Building Code, Title 24, Part 6, Chapter 1.
1. I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am a licensed as a civil
engineer, mechanical engineer, electriqal engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for its
preparation; and that I am a licensed contractor preparing documents for
for work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business .and Professions Code by Section ____ of the
Code to sign this document as the person responsible for its
preparation; and for the following reason: ______________ _
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
Required Forms: ENV-1, ENV-2 ENVELOPE -
Principal Designer
Sillman/Wyman, Inc.
(619)453-4320
Location of Mandatory Measures on Plans
(Signature)
Required Forms: LTG-1, LTG-2
(Date)
1 2 3
(Circle)
LIGHTING -
Principal Designer
(619)
Location of Mandatory Measures on Plans
MECHANICAL -Required Forms:
Location of Ma
Principal Designer
Town & Country Heating and Air
(619)471-1142
(Signature)
1 2 3
(Date) (Circle)
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) PERF-1 page 4 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272 ---------------------------------------·~-----------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
ANNUAL SOURCE ENERGY USE SUMMARY (KBtu/sqft-yr)
Energy Component
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area/ Wall Area:
Front Orientation:
Number of Zones:
ZONE INFORMATION Floor
Area
Zone Name (sqft) ----------------------------
RECEPTION 178
OFFICE 276
RESTROOM 64
Warehouse 1000
Standard Proposed Compliance
Design Design Margin
...;; -------------------------7.53 15.06 -7.53
43.44 26.06 17.37
29.54 19.11 10.42
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
51.54 41.12 10.42
16.80 16.80 0.00
0.00 0.00 0.00
..;. _______ ------------------148.84 118.15 30.69
Average Ceiling Height: 518
0.46
(N)
Average Glazing U-Value:
8.0
1.25
1
3
O deg Number of Stories:
4 Number of Occupancies:
Display Inst Tailored Process Tailored
Perim. LPD Lighting Loads Vent.
(ft) (w /sf) (watts) (w/sf) (y/n) -----------------------------------
0 1.21 0 0 N
0 1.57 0 0 N
0 1.17 0 0 N
0 ·o.oo 0 0 N
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 3 of 3) PERF-1 page 5 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
The documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEA
(619) 743-5408
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
1/40/q~
(Date)
The local enforcement agency should pay special attention to the items
specified in this checklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the justification, and may reject a building or design that
otherwise complies based on the adequacy of the special justification and
documentation submitted.
Window/Wall Ratio Value Entered= 0.456
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptional features listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
authorized signat~re or stamp
CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time: 15:44:44
ENV-1 page 6 of 20
Runcode: 2875-540966272 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentatiort: Haynal & Co., Inc.
OPAQUE SURFACES Const
Assembly Name Type Location/Comments
Demising Wall
R-19 Roof(Over Ac Tile)
6" Concrete Wall
FENESTRATION Frame
Orient Panes Type ------------------
Left (E) 1 Metal
Back (S) 1 Metal
Metal
Wood
None
Exterior Shade -----------------------None
None
OH
y
y
Date: 1/30/1996
COMPLY 24 User 2875
Glazing Type
Note to
Field
-----------------------Graylite 14 by PPG
Graylite 14 by PPG
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 15:44:44
LTG-1 page 7 of 20
Runcode: 2875-540966272 -------------------------·-------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 ----------------------------------------·----------------------------------
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps -----------------------
Fluorescent 3
Incandescent 1
MANDATORY AUTOMATIC CONTROLS
Control
Watts/ Ballast Ballasts/
Lamp Type Luminaire -------------------------34 Standard 1.5
75 n/a n/a
Control Location ID Control Type Zone Controlled
CONTROLS FOR CREDIT
Control
Control Location ID Control Type Zone Controlled
No of
Fixt.
-----
6
1
Note to
Field
-------
Note to
Field
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name 2 Ton Package Heat Pump
Time Control
Setback Control
#of Isolation Zones
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
s . None--
n/a
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B_ --A-
No Economizer
145
Heat Pu.mp
Trane WCC024
DX
-----------------------------------. ----------
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilation
B:Air Ba;J..ance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
·OA Damper
A:Auto
G:Gravit·y
Date: 1/30/1996
COMPLY 24 User 2875
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
DUCT INSULATION
System Name Type ------------------------------
Trane WCC024 Heating
Cooling
Duct Location
------------------Ducts in Attic
Ducts in Attic
Insul PIPE INSULATION
System Name Pipe Type Required
Domestic Hot Water y I N
NOTES TO FIELD -For Building Department Use Only
Date: 1/30/1996
COMPLY 24 User 2875
Duct Tape
Allowed -------
y I N
y I N
Insul
R-Val
-----
4.2
4.2
Note to
Field
-------
Note to
Field
ENVELOPE COMPLIANCE SUMMARY -Performance (part 1 of 3)ENV-2 page 10 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 -----------------------------.-------------------·-------------------------
GENERAL INFORMATION BY ZONE
Zone Name
RECEPTION
OFFICE
RESTROOM
Warehouse
occupancy
Lobby (Office)
Office
Corridor/Restroom
Unconditioned
Total
Flr
No
1
1
1
1
Floor
Area
-----
178
276
64
1000 -----
1518
Volume ------
1424
2208
512
8000
Display
Perim.
0
0
0
0
ENVELOPE COMPLIANCE SUMMARY -Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272 ----------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
OPAQUE SURFACES Act Solar
Type Area U-Val Azm Tilt Gains Form 3 Reference ----... ----------------------------Wall 24 0.752 180 90 Yes 6" Concrete Wall
Wall 136 0.192 Int 90 No Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 64 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments --------------------RECEPTION
RECEPTION
RECEPTION
OFFICE
OFFICE
RESTROOM
RESTROOM
ENVELOPE COMPLIANCE SUMMARY -Performance (part 3 of 3)ENV-2 page 12 of 20
Run Initiation Time: 15:44:44 Runcode: 2875-540966272
Project Name: Homes For Industry
Do~umentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 ---------------------------------------------------------------------------
FENESTRATION SURFACES SC
Act Glass
# Type Area Frame Div U-Val Azm Tilt Only Location/Comments
. -----------------------------------------------------1 Wdw Back (8) 64;.0 Metal No 1.25 180 90 0.53 RECEPTION
2 Wdw Left (E) 32.0 Metal No 1.25 90 90 0.53 RECEPTION
3 Wdw Back (8) 96.0 Met_al No 1.25 180 90 0.53 OFFICE
4 Wdw Left (E) 184.0 Metal No 1.25 90 90 0.53 OFFICE
OVERHANGS/SIDE FINS
--Window-------Overhang---------Left Fin------Right Fin--
# Type Ht Wd Len Ht LExt RExt Dist Len Ht Dist Len Ht
1 Wdw
2 Wdw
3 Wdw
4 Wdw
8.0 8.0
8.0 4.0
8.0 12.0
8.0 23.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Time: 15:44:44
Project Name: Hornes For Industry
Documentation: Haynal & Co., Inc.
ACTUAL LIGHTING POWER
Name Description
48" T-12 Low Watt /3 Lamp (Tandem)
75 w Surface Mount Incandescent
LTG-2 page 13 of 20
Runcode: 2875-540966272
No of
Lumin -----
6
1
Date: 1/30/1996
COMPLY 24 User 2875
Watts
per
-----
108.0
75.0
Default -------y -y---
Total
Watts
648
75
SubTotal 723
Less Control Credits (LTG-3) O
Total Proposed Watts 723
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY ZONE
Zone Name
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
TOTALS
Floor
Area -----
178
276
64 -----
518
Modelled
LPD
(w /sf) ------
1.213
1.565
1.172 ------
1.396
Total Tailored
(watts) (watts) --------------
216 0
432 0
75 0 --------------
723 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
MECHANICAL EQUIPMENT ZONING SUMMARY -Performance
Run Initiation Time: 15:44:44
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
MECH-2 page 14 of 20
Runcode: 2875-540966272
Date: 1/30/1996
COMPLY 24 User 2875 ---------------------------------------------------------------------------
SYSTEM/ZONING SUMMARY
System/Zones Served
2 Ton Package Heat Pump
RECEPTION
OFFICE
RESTROOM
Warehouse
Central/Zonal System
Trane WCC024
System Type
No
Sys
Packaged Heat Pump 1
MECHANICAL. EQUIPMENT SUMMARY -Performance
Run Initiation Time: 15:44:44
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
CENTRAL SYSTEM SUMMARY
Sys No
MECH-3 page 15 of 20
Runcode: 2875-540966272
Date: 1/30/1996
COMPLY 24 User 2875
No System Name System Type Sys Economizer Type
1 Trane WCC024 Packaged Heat Pu 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys-------Heating-------------~--------------------Cooling-----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 23800 0.0 6.80 DX 23800
CENTRAL FAN SUMMARY------------Supply Fan
Sys
No Fan Type Motor Location CFM BHP
Mtr Drv
Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name
---------------------None
No CFM
800
Zonal Fan
Mtr
BHP Eff
0.16 55 100
Drv
Eff No CFM
17850 9.40 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
None
Exhaust Fan
Mtr
BHP Eff
Drv
Eff
EVAPORATIVE COOLING
Sys
No Type CFM
Effectiveness
Direct Indir
Integrated
Operation
Return
Air Heat
Recovery
MISCELLANEOUS MOTORS
Sys
No Type BHP
Mtr Drv
Eff Eff
MECHANICAL VENTILATION -Performance
Run Initiation Time: 15:44:44
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
MECH-4 page 16 of 20
Runcode: 2875-540966272
Date: 1/30/1996
COMPLY 24 User 2875 -----------------------------------------------·---------------------------
VENTILATION SUMMARY BY ZONE Tran
Floor sqft CFM Dsg Min sfer
Zone Name T Occupancy Area /Occ /Occ CFM CFM CFM ------------------------------------------------
RECEPTION Lobby (Office,) 178 29 15.4 95 94
OFFICE Office 276 140 20.0 39 41 2
RESTROOM Corridor/Restr 64 200 30.0 10 10 ------
TOTALS 145 144
WARNING -Total Design Mechanical Ventilation is less than Minimum Required
Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 17 of 20
---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Gypsum or Plaster Board
2. Insulation, Mineral Fiber, R-11
3. Gypsum or Plaster Board
4.
5.
6.
7 •
8.
9 .
Inside Air Film
Assembly Name:
Assembly Type:
Assembly Tilt:
Date: 1/30/1996
COMPLY 24 User 2875
Demising Wall
Wall
90 deg (Vertical)
F°ram1.ng Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Unadjusted
Th R-Value
Fr (in) Cavity Frame
0.500 * 3.500
0.500
R-Values
0.17
0.45
11.00
0.45
0.68
12.75
TOTAL U-VALUE =
TOTAL R-VALUE =
0.17
0.45
11.00
0.45
0.68
0.00
0.192
=====
5.20
=====
Weight: 4.3 lb/sqft
Heat Capacity: 1.11
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U~VALUE
Construction Components
ENV-3 page 18 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: R-19 Roof(Over Ac Tile)
Assembly Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: II 0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame -----------------------------------------------------------------------Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7.
8 .
9 .
Inside Air Film
0.375
0.010
0.500
* 1. 250
6.000
0.500
0.17 0.17
0.33 0.33
0.06 0.06
0.62 0.62
0.75 1.24
19.00 19.00
1.43 1.43
0.61 0.61 ----·----------------------------------------------------------------------Unadjusted R-Values 22.97
ADJUSTMENT FOR FRAMING
(1 /22.97) X (0.90) + (1 /23.46) X (0.10)
Weight:
Heat Capacity:
5.0 lb/sqft
1.59
= 0.043
TOTAL U-VALUE =
TOTAL R-VALUE =
23.46
0.043
=====
23.02
=====
PROPOSED CONSTRUCTION ASSEMBLY
--~ --. -.
ENV-3 page 19 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Project Name: Homes For Industry
Docume~tation: Haynal & Co., Inc. ---------------------------------------------------------------------------
COMPONENT DESCRIPTION
-----------------------------
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Assembly Name: 6 11 Concrete Wall
Assembly Type: Wall
Assembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: "O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame ---------------------------------------------------------------------------Outside Air Film
1. Concrete, 140 lb, Not Dried
2.
3 .
4.
5.
6.
7.
8.
9 .
Inside Air Film
6.000
0.17
0.48
0.17
0.48
Unadjusted R-Values
0.68
1.33
0.68
1. 33
ADJUSTMENT FOR FRAMING-
(1 / 1.33) x (1.00) + (1 / 1.33) x (0.00)
Weight:
Heat Capacity: .
70.0 lb/sqft
14.00
0.752
TOTAL U-VALUE = 0.752
=====
TOTAL R-VALUE = 1.33
=====
HVAC SYSTEM HEAT.ING & COOLING LOAD SUMMARY page 20 of 20 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 --------------------------------------------------------------------------
HVAC SYSTEM DESCRIPTION
HVAC System Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
ZONES ON THIS SYSTEM
RECEPTION
OFFICE
RESTROOM
Warehouse
PEAK
(Jan 12am)
(Jan 12am)
(Jan 12am)
(Jan 12am)
TOTAL ZONE LOAD
Duct Gains & Losses:
Ventilation: ( 144 CFM)
Return Air Lighting Gain
Supply/Return Fan Gain:
TOTAL SYSTEM LOAD I
SYSTEM OUTPUT AT DESIGN CONDITIONS
MAIN HEATING & COOL~NG SYSTEM
TOTAL SYSTEM OUTPUT
HEATING
507-4
12082
236
0
17392
1739
4953
0
24084
19509
19509
2 Ton Package Heat Pump
Trane WCC024
1
CA Daytime Fans
COINCIDENT
50 %
COOLING
PEAK
(Aug 2pm)
(Aug 2pm)
(Aug 2pm)
(Aug 2pm)
144 CFM)
SENSIBLE LATENT --------
5495
10719
603
0 --------
16817
1682
727
0
0
--------
19226
19734
19734
------
1612
576
99
0
------
2287
669
------
2956
4921
4921
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required_to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
...
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b).
3. All joints. and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions).
2. Lighting shall be uniformly reducible by one halfin areas which are greater than 1 oo·sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions).
4. Separately metered spaces !5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be seperately switched on circuits that are 20 amps-or less (per Section 131 (e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs of one-lamp anc! three-lamp fluorescent luminaires shall-be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 1 O.
4. Pilot'lights shall· not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the clucted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be adjustable down to 55 degrees or lower, and cooling·shall:be adjustable·up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between heating and cooling, Section 122(a) and (b),
2. Heat pump$ with supplementary electric resistance heaters shall have controls per Section 112(b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122(e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions.
5. Outdoor air·supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122(f),
6, Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(9).
SERVICE WATER HEATING SYSTEMS
1. Temperature-controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.
OR:
Homes Fr Industry
Bu· lding K
Ca lsbad, CA
PROJECT DESIGNER:
Sillman/Wyman, Inc.
6181 Cornerstone Ct., Ste.101
San Diego, CA 92121
(619)453-4320
REPORT PREPARED BY:
Steve Balderrama, CEA
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
(619) 743-5408
Job Number:
Date: 1/30/1996
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
..
Table Of Contents fo~ Title 24 Report -----------------·-------------------
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Ta·ble of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Nonresidential Performance Title 24 Forms ........................... 3
Form ENV-3 Construction Assemblies .................................. 17
HVAC System Loads Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 O
. .,
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656
Project Name: Homes For Industry
Address: Building K
Carlsbad, CA
Designer: Sillman/Wyman, Inc.
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
Building Permit No
Checked by/ Date
COMPLY 24 User 2875 ---------------------------------------------------------------------------
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Building features and performance
spec·ifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for this permit
application are consistent all other forms and worksheets, specifications,
and other calculations submitted for this permit application. The proposed
building as designed meets the energy efficiency requirements of the State
contained in sections 110, 116 through 118, and 143 or 149 of Title 24,
Building Code, Title 24, Part 6, Chapter 1.
1. I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am a licensed as a civil
engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for its
preparation; and that I am a licensed contractor preparing documents for
for work that I have contracted to perform.
3. I affirm that I am eligible under the exemption t~ Division 3 of the
Business and Professions Code by Section-=----,---of the
Code to sign this document as the person responsible for its prepar~tion; and for the following reason: ______________ _
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
ENVELOPE -Required Forms: ENV-1, ENV-2
Principal Designer
Sillman/Wyman, Inc.
(619)453-4320
LIGHTING -
Principal Designer
(619)
MECHANI-CAL ,..
Location of Mandatory Measures on Plans
(Signature)
Required Forms: LTG-1, LTG-2
1 2 3
(Date) (Circle)
Location of Mandatory Measures on Plans
Required
Location
(Signature)
1 2 3
(Date) (Circle)
MECH-1, MECH-2, MECH-3, MECH-4
T2..4-\
Principal Designer
Town & Country Heating and Air
(619)471-1142
ewkn Plans
ure
1 G) 3
(Circle)
..,.
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) PERF-1 page 4 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
-------------------------------:-----------------------------------------
ANNUAL SOURCE ENERGY USE SUMMARY (KBtu/sqft-yr)
Energy Component
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domest-ic Hot Water
Lighting
Receptacie
Proces.s
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area/ Wall Area:
Front Orientation:
Number of Zones:
ZONE INFORMATION Floor
Area
Zone Name (sqft) ----------------------------
RECEPTION 178
OFFICE 276
RESTROOM 64
Warehouse 1000
Standard Proposed Compliance
Design Design Margin --------------------------11.00 22.59 -11.58
34 .17 20.27 13.90
26.64 19.11 7.53
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
51.54 41.12 10.42
16.80 16.80 0.00
0.00 0.00 0.00 --------------------------140.15 119.88 20.27
Average Ceiling Height: 518
0.46
(N)
Average Glazing U-Value:
8.0
1.25
1
3
O deg Number of Stories:
4 Number of Occupancies:
Display Inst Tailored Process Tailored
Perim. LPD Lighting Loads Vent.
( ft) (w/sf) (watts) (w/sf) (y/n) ~----------------------------------
0 1.21 0 0 N
0 1.57 0 0 N
0 1.17 0 0 N
0 0.00 0 0 N
•,
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 3 of 3) PERF-1 page 5 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 ---------------------------------------------------------------------------
The documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEA
(619) 743-5408
~--,------.--~M~\'2'--€_----~'-'--_1_0_1 2 __ 1 f_g__,c::,=-,f-ct::fc,,:--,-
(Signature) (Date)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items
specified in this checklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the justification, and may reject a building or design that
otherwise complies based on the adequacy of the special justification and
document~tion submitted.
Window/Wall Ratio Value Entered= 0.456
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptional features listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
authorized signature or stamp
CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time: 15:55:34
ENV-1 page 6 of 20
Runcode: 2875-540966656 --------------------------------~------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Const OPAQUE SURFACES
Assembly Name Type Location/Comments
Demising Wall
R-19 Roof(Over Ac Tile)
6 11 Concrete Wall
FENESTRATION Frame
Orient Panes Type -------------------
Front (N) 1 Metal
Left (E) 1 Metal
Metal
Wood
None
Exterior Shade OH -----------------------None y
None y
Date: 1/30/1996
COMPLY 24 User 2875
Glazing Type
Note to
Field
-----------------------Graylite 14 by PPG
Graylite 14 by PPG
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 15:55:34
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name tamp Type Lamps ---------------" -------
Fluorescent 3
Incandescent 1
MANDATORY AUTOMATIC CONTROLS
Control
Watts/
Lamp ------
34
75
Bailast
Type ----------Standard
n/a
LTG-1 page 7 of 20
Runcode: 2875-540966656
Date: 1/30/1996
COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field ---------------------
1.5 6
n/a 1
Control Location ID Control Type Zone Controlled
Note to
Field
CONTROLS FOR CREDIT
Control
Control Location ID Control Type Zone Controlled
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 20
Run Initiation Tim~: 15:55:34 Runcode: 2875-540966656
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 --------------------------------------------------------------------------
SYSTEM FEATURES
Zone Name
Time Control
Setback Control
#of Isolation Zones
HP Thermostat
Electric.Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
2 Ton Package Heat Pump s None--
n/a
Yes
0. 0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B --A--
N o Economizer
145
Heat Pump
Trane WCC024
DX
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
OA Damper
A:Auto
G:Gravity
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656
------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
-----------------------------------------------------------------------
DUCT INSULATION
System Name -----------------------Trane WCC024
PIPE INSULATION
System Name
Domestic Hot Water
Type Duct Location --------------------------Heating Ducts in Attic
Cooling Ducts in Attic
Insul
Pipe. Type Required
y / N
NOTES TO FIELD -For Building Department Use Only
Duct Tape
Allowed -------
y I N
y I N
Insul
R-Val -----
4.2
4.2
Note to
Field
-------
Note to
Field
ENVELOPE COMPLIANCE SUMMARY~ Perform~nce (part 1 of 3)ENV-2 page 10 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION BY ZONE
Zone Name
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
Date: 1/30/1996
COMPLY 24 User 2875
Flr Floor Display
No Area Volume Perim.
1
1
1
178
276
64
Total 518
1424
2208
512
0
0
0
ENVELOPE COMPLIANCE SUMMA.RY -Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
OPAQUE SURFACES Act Solar
Type Area U-Val Azm Tilt Gains Form 3 Reference ----------... ----------------------------Wall 24 0.752 0 90 Yes 6" Concrete Wall
Wall 136 0.192 Iht 90 No Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 178 0.043 0 2'2 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 64 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments --------------------RECEPTION
RECEPTION
RECEPTION
OFFICE
OFFICE
RESTROOM
RESTROOM
ENVELOPE COMPLIANCE SUMMARY -Performance (part 3 of 3)ENV-2 page 12 of 20
Run Initiation Time: 15:55:34 Runcode: 2875-540966656
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
---~----------------------------------------------------------------------
FENESTRATION SURFACES SC
Act Glass
# Type Ar.ea Frame Div u-Val Azm Tilt Only Location/Comments ------------------------------------------------------1 Wdw Front (N) 64.0 Metal No 1.25 0 90 0.53 RECEPTION
2 Wa.w Left; (E) 32.0 Metal No 1.25 90 90 0.53 RECEPTION
3 Wdw Front (N) 96.0 Metal No 1.25 0 90 0.53 OFFICE
4 Wdw Left (E) 184.0 Metal No 1.25 90 90 0.53 OFFICE
OVERHANGS/SIDE FINS
--Window-------Overhang---------Left Fin------Right Fin--
# Type Ht Wd Len Ht LExt RExt Dist Len Ht Dist Len Ht
1 Wdw
2 Wdw
· 3 Wdw
4 Wdw
8.0 8.0
8.0 4.0
8.0 12.0
8.0 23.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Time: 15:55:34
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
ACTUAL LIGHTING POWER
NamE;= Description J -----------------------------------------48" T-12 Low Watt /3 Lamp (Tandem)
75 w Surface Mount Incandescent
LTG-2 page 13 of 20
Runcode: 2875-540966656
No of
Lumin
-----
6
1
Date: 1/30/1996
COMPLY 24 User 2875
Watts
per
-----
108.0
75.0
Default -------
y -y---
Total
Watts
648
75
SubTotal 723
Less Control Credits (LTG-3) O
Total Proposed Watts 723
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY ZONE
Zone Name
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Off-ice
Corridor/Restroom
TOTALS
Modelled
Floor LPD
Area (w/sf) -----------
178 1.213
276 1.565
64 1.172 -----------
518 1.396
Total Tailored
(watts) (watts) --------------
216 0
432 0
75 0 --------------
723 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
MECHANICAL EQUIPMENT ZONING SUMMARY -Performance
Run Initiation Time: 15:55:34
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
System/Zones Served
2 Ton Package Heat Pump
RECEPTION
OFFICE
RESTROOM
Warehouse
Central/Zonal System
Trane WCC024
MECH-2 page 14 of 20
Runcode: 2875-540966656
Date: 1/30/1996
COMPLY 24 User 2875
System Type
No
Sys
Packaged Heat Pump 1
MECHANICAL EQUIPMENT SUMMARY -Performance
Run Initiation Time: 15:55:34
MECH-3 page 15 of 20
Runcode: 2875-540966656
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 --------------------------------------------------------------------------
CENTRAL SYSTEM SUMMARY
Sys No
No System Name System Type Sys Economizer Type
1 Trane WCC024 Packaged Heat Pu 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys-------Heating----------------------------------Cooling-----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 23800 0.0 6.80 DX 23800
CENTRAL FAN SUMMARY------------Supply Fart-----------
Sys Mtr Drv
No Fan Type Motor Location CFM BHP Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name ----------------------None
No CFM
800
Zonal Fan
Mtr
BHP Eff
0.16 55 100
Drv
Eff No CFM
17850 9.40 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
None
Exhaust Fan
Mtr
BHP Eff
Drv
Eff
EVAPORATIVE COOLING
Sys
No Type CFM
Effectiveness
Direct Indir
Integrated
Operation
Return
Air Heat
Recovery
MISCELLANEOUS MOTORS
Sys Mtr Drv
No Type BHP Eff Eff
-----------·----------------------------
MECHANICAL VENTILATION -Performance
Run Initiation Time: 15:55:34
Proj.ect Name: Homes For Industry
Documentation: Haynal & Co., Inc.
MECH-4 page 16 of 20
Runcode: 2875-540966656
Date: 1/30/1996
COMPLY 24 User 2875 -·-----·-------------------------------------------------------------------
VE.NTILATION SUMMARY BY ZONE Tran
Floor sqft CFM Dsg Min sfer
Zone Name T Occupancy Area /Occ /Occ CFM CFM CFM -----------------------------------, ------------
RECEPTION Lobby (Office) 178 29 15.4 95 94
OFFICE Office 276 140 20.0 39 41 2
RESTROOM Corridor/Restr 64 200 30.0 10 10 ------
TOTALS 145 144
WARNING -Total Design Mechanical Ventilation is less than Minimum Required
Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION ----------------------------
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Gypsum or Plaster Board
2. Insulation, Mineral Fiber, R-11
3. Gypsum or Plaster Board
4.
5 ..
6.
7 .
8 .
9 •
Inside Air Film
ENV-3 page 17 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: Demising Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Absorptivity: 0.70
Roughness: Stucco, Wood Shingles
Th R-Value
Fr (in) Cavity Frame
0.500
* 3.500
0.500
0.17
0.45
11.00
0.45
0.17
0.45
11.00
0.45
Unadjusted R-Values
0.68
12.75
0.68
0.00
Weight:
Heat Capacity:
4.3 lb/sgft
1.11
TOTAL U-VALUE = 0.192
=====
TOTAL R-VALUE = 5.20
=====
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
---~---------------------------Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7.
8 •
9.
Inside Air Film
ENV-3 page 18 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: R-19 Roof(Over Ac Tile)
Assembly Type: Roof
A$Sembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: 11 o.c.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
0.17 0.17
0.375 0.33 0.33
0.010 0.06 0.06
0.500 0.62 0.62
* 1.250 0.75 1.24
6.000 19.00 19.00
0.500 1.43 1.43
Unadjusted R-Values
0.61
22.97
0.61
23.46
ADJUSTMENT FOR FRAMING
(1 /22.9-7) X (0.90) + (1 /23.46) X (0.10)
Weight:
Heat Capacity:
5.0 lb/sgft
"J,..59
= 0.043
TOTAL U-VALUE = 0.043
=====
TOTAL R-VALUE = 23.02
=====
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
'coMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VA~UE
Construction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried
2 .
3.
4.
5.
6.
7 •
8 .
9.
Inside Air Film
ADJUSTMENT FOR FRAMING
ENV-3 page 19 of 20
Date: 1/30/1996
COMPLY 24 User 2875
Assembly Name: 6" Concrete Wall
Assembly Type: Wall
Assembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: 11 O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
6.000
Unadjusted R-V~lues
0.17
0.48
0.68
1. 33
0.17
0.48
0.68
1. 33
(1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) = 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
14.00
TOTAL U-VALUE = 0.752 ----------
TOTAL R-VALUE = 1.33
=====
, ...
<"
HVAC SYSTEM HEATING & COOLING LOAD SUMMARY page 20 of 20 -----------------------------.---------~-----------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
HVAC SYSTEM DESCRIPTION
HVAC System Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Reiative Humidity:
ZONES ON THIS SYSTEM
RECEPTION
OFFICE
RESTROOM
Warehouse
PEAK
(Jan 12am)
(Jan 12am)
(Jan 12am)
(Jan 12am)
TOTAL ZONE LOAl)
HEATING
5074
12·082
236
0
17392
Duct Gains & Losses: 1739
Ventilation: ( 144 CFM) 4953
Return Air Lighting Gain
Supply/Return Fan Gain: 0
TOTAL SYSTEM LOAD
SYSTEM OUTPUT AT DESIGN CONDITIONS
MAIN HEATING & COOLING SYSTEM
TOTAL SYSTEM OUTPUT
24084
19509
19509
Date: 1/30/1996
COMPLY 24 User 2875
2 Ton Package Heat Pump
Trane WCC024
1
CA Daytime Fans
COINCIDENT
50 %
COOLING
PEAK SENSIBLE LATENT
(Aug 2pm)
(Aug 2pm)
(Aug 2pm)
(Aug 2pm)
144 CFM)
--------
5203
10560
603
0 --------
16366
1637
727
0
0 --------
18730
19734
19734
------
1612
576
99
0 ------
2287
669
------
2956
4921
4921
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pi.ck-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note th.at Sensible.and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, arid windows shall be caulked and weather-stripped per Section 116(b).
3. All joints and openings which are potential sources of air leakage.shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions).
2. Lighting shall-be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions includelights in corridors).
3. Daylit areas larger than 250 sf shall be seperately controlled and uniformly reduc;ible by one half (per Section 131 (c) and exceptions).
4. Seperately metered spaces 5,000 sf or greater shali have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be seperately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions).
6. Exterior lightin~ controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service-water heating-equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
accordance with· Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10.
4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall·meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between heating and cooling, Section 122(a) arid (b).
2. Heat pumps with supplementary electric resistance heaters shall-have controls per Section 112(b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122(e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122(f).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113{b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.
-~ .... -
TITLE 24 REPORT FOR:
Homes For Industry
Building L
Car:J.sbad, CA
PROJECT DESIGNER:
Sillma~/Wyman, lnc.
6181 Cornerstone Ct., Ste.101
San Diego, CA 92121
(619)453-4320
REPORT PREPARED BY:
Steve Balderrama, CEA
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
(619) 743-5408
Job Number:
Date: 1/30/1996
The ·COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the Cali:f:ornia Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associ~tes (510) 428-0803.
Table Of Contents for Title 24 Report
Cove:i::-Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Nonresidential Performance Title 24 Forms ........................... 3
Form ENV-3 Construction Assemblies .................................. 17
HVAC System Loads Summary ........................................... 20
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
Project Name: Homes For Industry
Address: Building L
Carlsbad, CA
Designer: Sillman/Wyman, Inc.
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
Building Permit No
Checked by/ Date
COMPLY 24 User 2875 ------------------------------------------------------------------------
STATEMENT OF COMPLIANCE
This Certificate of Compliance iists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for this permit
application are consistent all other forms and worksheets, specifications,
and other calculations submitted for this permit application. The proposed
building as designed meets the energy efficiency requirements of the State
contained in sections 110, 116 through 118, and 143 or 149 of Title 24,
Building Code, Title 24, Part 6, Chapter 1.
1. ·I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am a licensed as a civil
engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for its
preparation; and that I am a licensed contractor preparing documents for
for work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section.,.........---of the
Code to sign this document as the person responsible for its preparation; and for the following reason: ______________ _
SCOPE OF COMPLIANCE (Designers-should circle applicable paragraph numbers)
ENVELOPE -Required Forms: ENV-1, ENV-2
Location of Mandatory Measures on Plans
Principal Designer
Sillman/Wyman, Inc.
(619)453-4320
LIGHTING -
(Signature)
Required Fortns: LTG-1, LTG-2
1 2 3
(Date) (Circle)
Location of Mandatory Measures on Plans
Principal Designer
(619)
MECHANICAL -Required Forms:
Location of Man ·
Principal Designer
Town & Country Heating and Air
(619)471-1142
(Signature)
1 2 3
(Date) (Circle)
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) PERF-1 page 4 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc,.
Date: 1/30/1996
COMPLY 24 User 2875
ANNUAL SOURCE ENERGY USE SUMMARY (KBtu/sgft-yr)
Energy Component
Space Heating
Space Goaling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area/ Wall Area:
F~ont Orientation:
Number of Zones:
ZONE INFORMATION Floor
Area
Zone Name (sgft) ----------------------------
RECEPTION 178
OFFICE 276
RESTROOM 64
Warehouse 1000
Standard Proposed Compliance
Design Design Margin --------------------------6.95 14.48 -7.53
45.17 28.38 16.80
33.59 23.17 10.42
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
51.54 41.12 10 .42
16. a·o 16.80 0.00
O.Od 0.00 0.00 --------------------------154.05 123.94 30.12
Average Ceiling Height: 518
0.46
(N)
Average Glazing U-Value:
8.0
1.25
1
3
O deg Number of Stories:
4 Number of Occupancies:
Display Inst Tailored Process Tailored
Perim. LPD Lighting Loads Vent.
(ft) (w /sf) (watts) (w/sf) (y/n) -----------------------------------
0 1.21 0 0 N
0 1.57 0 0 N
0 1.17 0 0 N
0 0.00 0 0 N
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 3 of 3) PERF-1 page 5 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912 ------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 28'75
-----------------------------· --------------------------------------------
The documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEA
(619) 743-5408
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
(Date)
The locai enforcement agency should pay special attention to the items
specified in this cnecklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the justification, and may reject a buil-ding or design that
otherwise complies based on the adeq~acy of the special justification and
documentation submitted.
Window/Wall Ratio Value Entered= 0.456
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptional features listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
authorized signature or stamp
CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time: 16: Q,: 34
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Const OPAQUE SURFACES
Assembly Name Type Location/Comments
Demising Wall
R-19 Roof(Over Ac Tile)
6 11 Concrete Wall
FENESTRATION Frame
Orient Panes Type ------------------
Back (S) 1 Metal
Right (W) 1 Metal
Metal
Wood
None
Exterior Shade OH -----------------------None y
None y
ENV-1 page 6 of 20
Runcode: 2875-540966912
Date: 1/30/1996
COMPLY 24 User 2875
Glazing Type
Note to
Field
-----------------------Graylite 14 by PPG
Graylite 14 by PPG
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 16: 0:34
LTG-1 page 7 of 20
Runcode: 2875-540966912
-----------------------------------------· ------------------------------· Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps -----------------------
Fluorescent 3
Incandescent 1
MANDATORY AUTOMATIC CONTROLS
Control
Watts/
Lamp ------
34
75
Ballast
Type ----------Standard
n/a
Date: 1/30/1996
COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field ---------------------
1.5 6
n/a 1
Control Location I.D Control Type Zone Controlled
Note to
Field
CONTROLS FOR CREDIT
Control
Control Location ID Control Type Zone Controlled
Note to
Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
----------------------· --------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name 2 Ton Package Heat Pump
Time Control
Setback Control
#of Isolation Zones
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
Time Control
S:i?rog Switch
O:Occ Sensor
M:Man Timer
s None--
n/a
Yes ·o.o KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B --A--
N o Economizer
145
Heat Pump
Trane WCC024
DX
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demahd Cont
N:Natural
OA Damper
A:Auto
G:Gravity
Date: 1/30/1996
COMPLY 24 User 2875
Note to
Field
CERTIFICATE OF COMPLIANCE~ Mechanical (part 2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
-----------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875
---------------------------------------------------------------------------
DUCT INSULATION
System Name. Type Duct Location -------------------------------------------------Trane WCC024 Heating. Ducts in Attic
Cooling Ducts in Attic
PIPE INSULATION Insul
System Name Pipe Type Required
Domestic Hot Water y / N
NOTES TO FIELD -For Building Department Use Only
Duct Tape
Allowed -------y I N
y I N
Insul
R-Val
-----
4.2
4.2
Note to
Field
-------
Note to
Field
---------------------------------------------------------------------------
ENVELOPE COMPLIANCE SUMMARY -Performance (part 1 of 3)ENV-2 page 10 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION BY ZONE
Zone Name.
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
Date: 1/30/1996
COMPLY 24 User 2875
Flr Floor Display
No Area Volume Perim.
1
1
1
178
276
64
Total 518
1424
2208
512
0
0
0
ENVELOPE COMPLIANCE SUMMARY -Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912 ---------------------------------------------------------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
OPAQUE SURFACES Act Solar
Type Area u.,.val Azm Tilt Gains Form 3 Reference
---------------------------------Wall 24 0.752 180 90 Yes 6" Concrete Wall
Wall 136 0.192 Int 90 No Demising Wall
Roof 178 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 :rnt 90 No Demising Wall
Roof 1·79 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Wall 144 0.192 Int 90 No Demising Wall
Roof 64 0.043 0 22 Yes R-19 Roof(Over Ac Tile)
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments --------------------RECEPTION
RECEPTION
RECEPTION
OFFICE
OFFICE
RESTROOM
RESTROOM
ENVELOPE COMPLIANCE SUMMARY -Performance (part 3 of 3)ENV-2 page 12 of 20
Run Initiation Time: 16: 0:34 Runcode: 2875-540966912
------------------------------------------------------------------------Project Name: Homes For Industry
Docum~ntation: Haynal & Co., Inc.
FENESTRATION SURFACES
# Type Area Frame Div U-Val ----------------------------
1 Wdw Back (S) 64.0 Metal No 1.25
2 Wdw Right (W) 32.0 Metal No 1.25
3 Wdw Back ( S.) 96.0 Metal No 1.25
4 Wdw Right (W) 184.0 Metal No 1.25
OVERHANGS/SIDE FINS
Act
Azm Tilt
180 90
270 90
180 90
2.70 90
SC
Glass
Only -----
0.53
0.53
0.53
0.53
Date: 1/30/1996
COMPLY 24 User 2875
Location/Comments ---------------------RECEPTION
RECEPTION
OFFICE
OFFICE
--Window-------Overhang---------Left Fin------Right Fin--
# Type Ht, Wd Len Ht LExt RExt Dist Len Ht Dist Len Ht
1 Wdw
2 Wdw
3 Wdw
4 Wdw
8.0 8.0
8.0 4.0
8.0 12.0
8.0 23.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
4.0 0.1 4.0 4.0
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Time: 16: 0:34 '
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
LTG-2 page 13 of 20
Runcode: 2875-540966912
Date: 1/30/1996
COMPLY 24 User 2875 ---------------------------------------------------------------------------
ACTUAL LIGHTING POWER
No of
Name Description Lumin -----
Watts
per
-----Default -------
Total
Watts
48" T-12 Low Watt /3 Lamp (Tandem) 6 108.0 y -y-648
75 75 w Surface Mount Incandescent 1 75.0 --
SubTotal 723
Less Control Credits (LTG-3) O
Total Proposed Watts 723
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY ZONE
Zone Name
RECEPTION
OFFICE
RESTROOM
Occupancy
Lobby (Office)
Office
Corridor/Restroom
TOTALS
Floor
Area -----
178
276
64
-----
518
Modelled
LPD
(w /sf) ------
1.213
1.565
1.172 ------
1.396
Total Tailored
(watts) (watts) --------------
216 0
432 0
75 0 --------------
723 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
MECHANICAL EQUIPMENT ZONING SUMMARY -Performance
Run Initiation Time: 16: 0:34
MECH-2 page 14 of 20
Runcode: 2875-540966912
----,----------------------------------------------------------------------
Project Name: ;Homes For Industry
Documentation: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
System/Zones Served
2 Ton Package Heat Pump
RECEPTION
OFFICE.
RESTROOM
Warehouse
Central/Zonal System
Trane WCC024
Date: 1/30/1996
COMPLY 24 User 2875
System Type
No
Sys
Packaged Heat Pump 1
MECHANICAL EQUIPMENT SUMMARY -Performance
Run Initiation Time: 16: 0:34
MECH-3 page 15 of 20
Runcode: 2875-540966912
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 -------------------------------------------------------------------------
CENTRAL SYSTEM SUMMARY
Sys
No System Name
J. Trane WCC024
CENTRAL SYSTEM RATINGS
No
System Type Sys Economizer Type
Packaged Heat Pu 1 No Economizer
Sys-------Heating--~-------------------------------Cooling
· No ·Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 23800 0.0 6.80 DX 23800 17850 9.40 10.00
CENTRAL FAN SUMMARY------------Supply Fan-----------
Sys Mtr Drv
No Fart Type Motor Location CFM BHP Eff Eff
Return Fan
Mtr Drv
CFM BHP Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name
None
EVAPORATIVE COOLING
Sys
No Type
MISCELLANEOUS MOTORS
No CFM
CFM
800
Zonal Fan
Mtr
BHP Eff
0.16 55 100 None
------------Exhaust Fan
Drv Mtr
Eff No CFM BHP Eff
Effectiveness
Direct Indir
Integrated
Operation
Return
Air Heat
Recovery
Sys Mtr Drv
No Type BHP Eff Eff
-------------------------·--------------
Drv
Eff
MECHANICAL VENTILATION -Performance
Run Initiation Time: 16: 0:34
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
MECH-4 page 16 of 20
Runcode: 2875-540966912
Date: 1/30/1996
COMPLY 24 User 2875 ----~--------------.-------------------------------"-----------------------
VENTILATION SUMMARY BY ZONE Tran
Floor sqft CFM Dsg Min sfer
Zone .Name T Occu,pancy Area /Occ /Occ CFM CFM CFM ------------------------------------------------
RECEl?TION Lobby (Office) 178 29 15.4 95 94
OFFICE Office 276 140 20.0 39 41 2
RESTROOM Corridor/Restr 64 200 30.0 10 10 ------
TOTALS 145 144
WARNING -Total Design Mechanical Ventilation is less than Minimum Required
Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
PROPOSED CONSTRUCTION ASSEMBLY
Pr.oj ect Name: Homes For Industry
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
ENV-3 page 17 of 20
Date: l/30/1996
COMPLY 24 User 2875
Assembly Name: Demising Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Abso~ptivity: 0.70
Roughness: Stucco, Wood Shingles
Th R-Value
Fr (in) Cavity Frame
---------------· --------------------------------------------------------
Outside Air Film
l. Gypsum or Plaster Board
2. Insulation, Mineral Fiber, R-11
3. Gypsum or Plaster Board
4.
5.
6.
7 .
8 .
9 .
Inside Air Film
0.500
* 3.500
0.500
0.17
0.45
11.00
0.45
0.68
0.17
0.45
11.00
0.45
0.68 ---------------------------------------------------------------------------
Weight:
Heat Capacity:
Unadjusted R-Values 12.75 0.00
TOTAL U-VALUE = 0.192
=====
TOTAL R-VALUE = 5.20
4.3 lb/sqft
l.ll
----------
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
ENV-3 page 18 of 20
Date: 1/30/1996
COMPLY 24 User 2875
------· --------------------------------------------------------------------
COMPONENT DESCRIPTION
S~etch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Assembly Name: R-19 Roof(Over Ac Tile)
Assernl?ty Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: II 0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame ---------------------------------------------------------------------------Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood ·
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7.
8 .
9 •
Inside Air Film
0.375
0.010
0.500
* 1.250
6.000
0.500
0.17 0.17
0.33 0.33
0.06 0.06
0.62 0.62
0.75 1.24
19.00 19.00
1.43 1.43
Unadjusted R-Values
0.61
22.97
0.61
23.46
ADJUSTMENT FOR FRAMING
(1 /22.97) X (0.90) + (1 /23.46) X (0.10)
Weight:
Heat Capacity:
5.0 lb/sqft
1.59
= 0.043
TOTAL U-VALUE = 0.043
=====
TOTAL R-VALUE = 23.02
=====
,,_
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 19 of 20
--------------------------------------------------·------------------------Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
Date: 1/30/1996
COMPLY 24 User 2875 ------------------------------------------------,--------------------------
COMPONENT DESCRIPTlON
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Out·side Air Film
1. Concrete, 140 lb; Not Dried
2.
3.
4.
5.
6.
7 •
8 .
9 .
Inside Air Film
ADJUSTMENT FOR FRAMING
Assembly Name: 6 11 Concrete Wall
Assembly Type: Wall
Assembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: 11 o.c.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
,0 .17
6.000 0.48
Unadjusted R-Values
0.68
1.33
0.17
0.48
0.68
1.33
(1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) = 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
14.00
TOTAL U-VALUE = 0.752
=====
TOTAL R-VALUE = 1.33
=====
avAC SYSTEM HEATING & COOLING LOAD SUMMARY
Project Name: Homes For Industry
Documentation: Haynal & Co., Inc.
page 20 of 20
Date: 1/30/1996
COMPLY 24 User 2875 ------------· ·-------------------------------------------------------------
HVAC SYSTEM DESCRIPTION
HVAC System Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humid~ty:
ZONES ON THIS $YSTEM
RECEPTION
OFFICE
RESTROOM
Warehouse
PEAK
(Jan 12am)
(Jan 12am)
(Jan 12am)
(Jan 12am)
TOTAL ZONE LOAD
HEATING
5074
12082
236
0
17392
Duct Gains & Losses: 1739
Ventilation: ( 144 CFM) 4953
Return Air Lighting Gain
Supply/Return Fan Gain: O
TOTAL SYSTEM LOAD
SYSTEM OUTPUT AT DESIGN CONDITIONS
MAIN HEATING & COOLING SYSTEM
TOTAL SYSTEM OUTPUT
24084
19509
19.509
2 Ton Package Heat Pump
Trane WCC024
1
CA Daytime Fans
COINCIDENT
50 %
COOLING
PEAK
(A;ug 5pm)
(Aug 5pm)
(Aug 5pm)
(Aug 5pm)
144 CFM)
SENSIBLE LATENT --------
5960
13758
599
0 --------
20317
2032
619
0
0 --------
22968
19765
19765
------
1613
576
99
0 ------
2288
672
------
2960
4975
4975
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to a9count for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116{b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118{a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118{c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions).
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs.of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
. accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10.
4 .. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor a_ir to a covered HVAC unit, the ducted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be-adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between hea,ting and cooling, Section 122(a) and (b).
2. Heatpumps with supplementary electric resistance heaters shall have controls per Section 112(b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122{e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122{e) 2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122{f).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirculating pump controls shall meet the requirements cif Section 113{a) and (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113{b)4.
MAR-08-96 FRI 17:03 CI TY-CARLSBAD COMM DE P. 02
NON-RESIDENTIAL CERTIFICATE: Non-Residential Land OV't'.ner. please read this
option carefully ar,d be sure you throughly understarid the options b~fore aigning. The option you choose Vii'ill
affect your paym11:nt of the developed :Special Tax assessed on your property. This option is available only at
the time of lhe first bc.ilding permit issuance .. Property owner signature is required before a building permit 'Nill
be issued. Your signature is confirming the accuracy of all parcel and ownership information shown.
HOMES FOR INDUSTRY (619) 551-5600
Name of Owner Telepnone
2223 AVENIDA DE LA PLAYA KEI I OGCJ AV
Address Project Addr~ss
LA JOLLA CA 92037 Carlsbad CA 92008
City State Zip Code . City State Zip Code
APN 212-092-0300
Assessor's Parcel Number, or APN and Lot Number if not yet subdivided.
CB960249·
Building Permit Nurnber
As cited by Ordinance No. NS-155 and adopted by·the City Council or the City of Carlsbad, California, the City
·is authorized to levy a special Tax in Community Facilities district No. 1. All non-resldentiaJ property. upon the
'--....__ issuance of the first buldi~ permit, shall have the option to (1} pay the SPEC_IAL DEVELOPMENT TAX ONE·
'---.. TIME or (2) assume the ANNUAL SPECIAL TAX ·DEVELOPED PROPERTY for a period not to exceed twenty-
'-,,-~ve (25) years. Please indicate your choice by initialing the appropriate line below: · .. ~ ..... ,..._
OPTlbN (1): I elect tc pay the SPECIAL DEVELOPMENT TAX ONE-TIME now, as a one•time payment
AmounL.J:11-+-"-'0e-Time Special Tax: S~!, 3~7 ______ Ovmer's
Initials ·
OPTION (2): \ I ele to pa the SPECIAL O&Vl!LOPME:NT TAX ANNlJALL. Y for a period not t9 exceed
twenty-,ve (2$) yea~. Maximum Annual Special Ta.x: $ 9., 30.t. 25 . Owner
Initials____ ·
I DO HEREBY CERTIFY UNDER PENAL TY OF PERJURY THAT THE UNDERSIGNED IS
0
THE PROPERTY
· OWNER OF THE SUBJECT PROPERTY ANO THAT I UNDERSTAND AND WILL COMPLY-WITH THE
PROVlSIONS AS STA TED ABOVE. .
~~-
Signature of Property Owner Title
PrihtName Date
The City of Carlsbad has not independently verified the information shown above. Therefore, we accept no
responsibility as to the accuracy or completeness of this information.
NON-RESIDENTIAL CERTIFICATE
HAR-11-96 HON 12:03 CITY OF CARLSBAD COMM DE FAX NO. 4380894 P. 02
CERTIFICATE OF COMPLIANCE ........ ,. __ _
CITY OF CARLSBAD Plan Check No. CB960249
COMMUNITY DEVELOPMENT
2075 LAS PALMAS DR., CARLSBAD, CA 92009
(619) 438·1161
This form shall be used to determine. the amount of school fees for a project and to verify that the project
applicant has complied wiLh the school fee requirements. No building permits for the projects shall be
issued until the certification is signed by the appropriate school district and returned to the City of
Carlsbad Building Department.
SCHOOL DISTRICT':
_x_ Carlsbad Unified
801 Pine'Avenue
Carlsbad CA 92009 (434..0661)
Encinitas Union ~ 101 South Rancho Santa Fe Rd.
Encinitas CA 92024 (944-4300)
Project Applicant: HOMES FOR INDUSTRY
San Marcos Unified --1290 West San Marcos Blvd.
San Marcos CA 92024 (744-4776)
_ San Dieguito Union High School
710 Encinitas Boulevard
Encinitas CA 92024 (753-6491)
APN: 212-0-92-0iOO -------
Project Address: 1950A, 19508, 1·9soc & .. · 1950D KELLOGG AV
RESIDENTIAL: SQ. FT. of living area ____ _ number of dwelling units ______ _
SQ. FT. of covered area ____ _ SQ. FT. of garage area ______ _
coMMERCIA~. STRIAL: sq~-FT EA
Prepared by ~ -~
C
30,032
Date _J=-,<;/..;;,,..1,ff---'-9..,c,.,z:;..k---
FEE CERTIFICATION
(To be completed by the School District)
__ Applicant has complied with fee requirement under Government Code 53080
Project is subject m an existing fee agreement ---
___ Project is exempt from Government Code 53080
__ Finaf Map approval and construction started before September 1, 1986.
(other. school fees paid)
__ Other----~-----------------~-------
Residential Fee Levied: $ ______ based on _______ sq. ft. @ ______ _
Comm/lndust Fee Levied:$ 9 6 CJ 9, G?O based on 3 o o 3o< sq. ft.@ ___ , J..._o ____ _
Scho
Assistant Superintendent Business Services
Title
03/18/96
Date
,, ,,
....__
.... .,.,,.:...
.... , ...
'
x--"
'
I I ~ N 19·40·0:r e ·. -"--~ -.390.02' I I I, I I
~ I ~ " ~
I I
, :;t::<::~:~~-~,,2~>-t>~c. '>, ( ____ _
'.{~ ',, :--, . • .. --:,..:.._ -7"'-':'"':::-' ~... :-', . -. ·-..: ' ::--------...;: ... ... .............. .:, ,' ... , .. ""-::;:----~-' __ -... ----
\ ..... ::::::-..... ,, .. -', . --, . ....... . . ~-~ , ... , .. --. . . . -
·1 .......... ',,,, ''--, . . :-,..: .... , -'• . ',· .. ': ~:< -... < -. ~~:-~.:.:_ .
',,
',
)----====.......},'t""""l1f+1_.::.::.--L ..... , ', · · · · ' .... · -• / ' I ·-· -· ---L C • • of I -..;;; ,_ -.... -' ... . .... . ....... . . . . .
. , -...; '-' -------',, .. : ' '--,_· ·,'-------·-
' .,..-,q,_ .I 1., --l~TINGsAREA -..;;;'-'--.: ' ... , •. _··:"·-· ...... >-:-:-.. .:.['~---..: __ .;:-----
\ ._ ______ -:::-... .......... ~'.:_ __ ..-:~!\:.: ,,~:-.. \· ·1>1 ::· -_=--:~:--' ', ' ,,
',, ',
P.ARC.EL ... ''a·
',,
PAR.CE!.. A~ • ~.1928 ,t;e..
·,
',,<i, ~"'
',,
FF 214.4e
PA'D 214.3 ', ·-,
'· -,_ -1'1.~
912, ,/r/f~"''
' ',,
' '
' '
'
in 188.00;. __ _
in
' ...
r:' i' PARC.t:.L -,
PARCEL AREA •
~31&& ,6C. .. ...
FF 214:.5
PAD 21i9..
'
g
(Q ,., -
,o..t:;O ;,-..
IP .
,i .. (111,';,: ~,
TfD 21'4.51t)
P.ARC'.EL 2
PARCEL. AREA.•
~ • .3829 AC. ... ... ...
', FF ~1-4.S
\,,__~"'
"i~,'v1
< ----::::,--.... ,, . ' . . 'I I -,._ ~ ' . \ . \ . I I . ... . \ \ I . I . , I
Q
N
T
P.t-\RCE-L 4
• , . I I
\. I, ' I '
ii} .Ji:IJ.
: I;: : •'•~:JI:•;: 2! I 'II .. I .• I ,,,,,,,'I'. C
I: "I' 1 'I•. : 1 fO I ' I'' 'I,, ., • I : I::~ I! I I I . : (-, 1·;,,,-1,11 .. I,._ : : : ~:::;.:I: ':lg
I '''I' I I ·t · 'I I • :: ,,,.;: : : , ,,!"'"··•· ;e,...._ I : : ; • ; I I : .,. ' I , ... PARCEL AREA • 1.241;, ,6C.
FF 216.5
·PAD 21S.9
,q4~ '
·,
' '
'.
', -...
t f :r: :1 , ;;:,,., I ,,
, : , ' 1 t I : ' I I I ~ ' • : ',
. I ' ~ ' I I , I I ~ I ; . • • I "', : ·t
1
, '. • t , ~ I ; ,. ' I f ,,
: : J: J: I. ! I ; • I :f :
11'11 '. '( 1 ! I;' "f f .1 · ' : 1 · · ., : • · I : • l ,;;1:1 r ''I I :::,!:,·, :,·.·i: , : : j: L. ·1i ! ... : .. ,,·,;,1,', ,., u
I 11 , • I I I I :·:·Tt?J~q:··, :,
I I' ,:•'I: 'I'': . I. I I:·: I 1,' 'I. I ' ·, • I I' I .. : I· ,, .. •'Ii '1 I• ,t • !
' .
;,i41V ;1t
I • I I : : ' t • / ' : ~ : ~ I:: I' I;:;:: : . :,
; '!) J-:1'1: :,·:: . I. I 1, I· I' ' I I, ,,t 1 1 t,. 1 l I I .:11',';: ::~:·:,:
' 1 : ; ' ' 1' •I , ,,, : I ,_,.
' 1I,1 1 ,, , '!1• •
! : : : : I:: : ': ! ' ,\
,11 ,,,,· f'i .lw. I I,, : 'I' ,(Ji, !.191.'tl ''. i /: .' ! ; / 1 :, //·if:
I '/:'::J_,:/1./~
' •· •• 1 It ·:1 f I . I• j :1 •
--=::J,:I 2.zr:w.4tJ:~'. ! : , • • E:A.~,·., , ~..,.,,t-', I •"
I I I I I
I I
:· :::: -::, . : ':;. ·.: ·' : : ·; 'f'-l · I
l :.: :., I I . , : : : :
I : I ' I I
I I : : I
/,-
.;iL----·
'.j
,I il }!
' ! l r
l1
~((~iec,
~ l\. \_ 't u p
C4i J lhb . _____ _.___. ___ _,_
{) l ' ,v,:;,-v•• f 7 'f 'S" ~-;-r .. It:> e!-5-f i f-'if~;rfi'ri'P!/·yi/1~· ,f:@;
',\ ---,.._
-\-c LSj~I ....
l.. I
.
f,~~
fro~ 2-4 9,
DATES
\.,( 'l,t;f Ii C / v~ --1-----HAZMATFORM
. ~ . ! ·!
(I v \. ~~~~ INOWASlEAfP I ~~I--SCHOOLFEEFOAM
~}*& -~ ttvo~sr:1..pr1o. ~ "'I~~...,,=:....==~ -I~=--=~--= 5~
iAt:;ttzf,C~ jj ,~ tu I Of.../ brt,tffl_ ~A ~ rJor,eJ ~-. ~ ~ J / r ----1--ARE PLANS
V /·-\P"' ~~ /~ =::::~t::=== ASSESSORPLANS 'i
. t1 ' : \
J'. !
l
3 Ii ( er 0 -* WLV ~ 1M c:J.jJ ~~-;;~t>J, !ht
Cj.z 7Z> I SSU 'C ~ f' fZ I M TD f fY!t CJJ-}t1 /r/ _ -:f ;;w). -{jYA-~ f.. ,i-~ ft\_ jJ>
_ f p~ f 6 e,lfi/[ . . · _ _ . . / ~ l,! APPROVALS
' 'E
3/ 'J-1,, / o/ 6-~ Ao-/ ~ J //AL ~#, W -fl r,,:id fo ~ *y Dal8 ~-fv,_.J ~ ~~ JR/;t1t ,fr, ,,,,, fL,._ d1t_!_ . ~~ luldln1
ow 11J2.,1P'-SD1 /J r1,,i) CA CCJu~_.;...lA t-PR_ovt,yj I D ~~i..o-Pllnnlnl D~ Y \ ( rt G:, . ..-:..;.,~~ Enatneer~
l ~ ~ °'-4-''M~.:.&;ie."{ t.J,,,.A ~ ,I-~ 1~ :::::::~:tat ____ Health
---,-~-Assoc. lf/1/q0 -m-r-~
t;/1(crb-~ Jlh..J 3/ufqr., C:..Fo 1'h? ,1¼ -(,u7 ./4.. c,,.. ;/, rt/9r,,
;;:;;"i~~.·.; ··._;, : .. ,; {.:·;:~/,:'; ::t.~-: ~::·· ,., ::· .... ,,, ' .. ~... . -~,~
~ ,.; !;'.• ,. •
r• ~-';.'
,' .,t
t· ;'.'.'-_·,_,. )'
>r:·, .,',.-~1>· .. \~~,,-,,• :':~>:_:,: _'·: ~· '_,,,.
·1
i
,I
. CJ-(· -J=t~~oCj
'
' B U I L D I N G P E:R MIT-PCR'No: PCR96043
Project No: A9600366
Development No:
~ 09/04/96 16:54
1 Page :l of 1
Job Address: 1950 KELLOGG AV
• 1~ ,:Permit Type: PLAN CHECK REVISION
Par:cel No: 212-092-03-00
V,;1luat.ion: O
Suite:
' .
Lot#~ .
Dccupancy Group: Reference#(.
De$Cription: ADD ROLL UP DOOR 96-249
Appl/Ownr 619
,•
crrv ,OF CARLSBAD
9474 09/04/96 00<)1 01
C-Pm1T
02
Constructio.n Type: VN
. Status: ISSUED
Appl.ied: 07 /2 5/96
Apr/Issue: 09/04/96
Entered By~ MDP
453-4320
2075 I;as Palmas Dr., Carlspad, CA 92009 (619) 4~8-1161
. '. ,.__ • ... l .:.~:. ·,... ~ -!
DATE: 8/20/96
JURISDICTION: Carlsbad
EsGil Cqrpo~atlon
ProfessionaC Pfan.!ftevlew 'Engineers
SET: II
PROJECT NAME: Homes For industry Revision
·-. '
CJ~ANT
~ CJ FIRE
CJ. PLAN REVIEWER
. CJ FILE
D· The plans transmitted herewith have been corrected where necessary and substantially comply
with the Jurisdiction's *******"'*** codes:
. . ~ The plans transmitted herewith will substantially comply With the jurisdiction's building codes
when minor deficiencies identified _below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be c·orrected and resubmitted for a complete: recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
. Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person. ·
~ The. applicant's copy of the check list has been sent to:
Sillman/Wyman Inc. (Newcomer) 6181 Cornerstone Ct. East #101 San Diego CA 92121
rgJ. Esgil Corporation staff qid not advise the applicant that the plan check has been completed.
D Esgll Corporation staff did advise the applicant that the plan check has been completed~
Person contacted:
Date contacted: (by: ) Telephone#:
-~ REMARKS: 1 ;Pleas~slip_ SQ~~[A~S:~Xi;_-;~~-14--0f·the~revised:-sheets-to~tlie"8ppr0v;a=set::2~
(Provide speciafinspection -program per-use 106-:3-:5· im;ficating-the-name,.of-the.,special:J
t_1_1J2f?~~r: -~?nd d.uty of the insp_ectQr to'fu~JiuJls!!n9offlpiatpii.or.to-issuanee-the-buikt_ing-perm7t.
By: David Yao Enclosures: approved plan
Esgil Corporation
D GA O CM O EJ O GP O PC 8/13 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 +-Fax (619) 560-1576
b
08-13-1996 10:40AM FROM STRUCTURAL DESIGN COMPANY
8/13/96
VIA FAX
To:
Attn:
Project:
(619)552-1563
_Sillman;wy.rna'n, Inc;. Mr. Tom Newcomer
Homes for Industry
From; Zabih F02i
TO SILL0N WYMAN
Prog-rq for Special Inspectio~ ~ "ITWrr Tr:ubolts
Drill holes of the same diameter as the Trubolts. The depth of the hole should be larger than the embedment length
required.. Minimum edge distance and spacing of the TrUbol ts
should be 4.·s inches and 9 inches. respectively. Tap in
Tnzbolts and use standard hexagonal nut.and washer over the fastened structure. Exert a torque of 175 Ft-Lbs ~t .
installation~ Follow all the manufacturer's recommendations for installation of the retrofit bolts.
P.01
TOTAL P.01
r----0Ei-12-1996 · 02: 08PM
·ost-it" Fax Note ·
ro
FRo,t STRUCTURAL DESIGN COMPANY TO 5521563 P.01 --~-
. !~· . .
:~.+ ~· ~fbnES ~,_ f~1 ProJeaNo. 2S-3S \i;. :•. Dille 1/'l:b/ '!Ir, si-No. l?c.V, I
i--
~ .:; ~-~ :l..cP
~:: • \c.-,;
+ ~ = l.9~;.?;.
A
l-411
G.l1,-
l,a-c-,9
r
:· .
'!' ••
. ,···· ; . -..
·-..
. i---~ .!
.... :. ,·• ~
. : =
. -~-: . . ' . '
08-12-1996 02:09PM FROM STRUCTURAL DESIGN COMPANY TO 5521563 P.02
Pro;eaName HoMGS ~ 1~w~1 Project No. $-3~
-Z.,F Date 7/f'J,'; / 9/P Sheet No. ~V, '2. By_..._:::::.;...---r ,
we:w oP'e'J.l'~
. 15!" I PSf ~
H :: ( __ e, x 1S. ~ 4-:X '% ) x l~f~ : ....... ,
r'\v.c-"l..S9'1o
\\
:. c:l..--10,3
•-"-Mc....~ .:a. •3\ x'l.;':J ~,o;; .-·9,-; T~ 1,_c,w
,~;,r.~.W.(;,>A(,~4-. -~ ,z...
~.1-s~~:.,.--s~• -, '?-
~: 1> 'tr~./ f,/ln',Ji i~.Jsovi" f.t'l~, ~ ~4·
~Cf,.¢ f' l"J11-
Ji.~ L.a.~,a,~ Y,z.. __ _
,z., •_o l.D...ic.:,
~
4-av--\J ... es,. (1o'ZA-
= !-M;c~
~ U :;,c:.. 3/~ ct:' I -rw
fl.a~t ~.,bo f1"
c:. '1,..4!-' & ,,,«i .
:U,..fi::.c ~n.n. ,o "~L
TOTAL P.02
. DATE: 8/8/96
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-249 rev
EsGil Corporation
Professiona( PCan ~view 'Engineers
SET:I
PROJECT ADDRESS: 1950 Kellogg Avenue
PROJECT NAME:'Homes For Industry Revision
CJ APPLICANT ~ CJ FIRE
CJ PLAN REVIEWER
CJ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's *********** codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
[X] The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporatior1 until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
[X] The applicant's copy of the check list has been sent to:
Sillman/Wyman Inc. (Newcomer) 6181 Cornerstone Ct. East #101 San Diego CA 92121
[X] Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted: (by: ) Telephone #:
D REMARKS:
By: ·navid Yao Enclosures:
Esgil Corporation
D GA DCM 0 EJ O GP 0 PC 7/29 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 96-249 rev
8/8/96
GENERAL PLAN CORRECTION LIST
. JURISDICTION: Carlsbad
PROJECT ADDRESS: 1950 Kellogg Avenue
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 7/29
REVIEWED BY: David Yao
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 96-249 rev
DATE REVIEW COMPLETED:
8/8/96
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations ~nforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval· of the· plans does not permit the violation of any
state, county or city law.
1. Please make all corrections on the original tracings and submit two new sets of prints to:
ESGIL CORPORATION.
2. To facilitate rechecking, please identify, next to each item, the sheet of the plans
upon which each correction on this sheet has been made and return this sheet
with the revised plans.
3. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there· are other changes, please briefly describe them and
where they are located on the plans. Have changes been made not resulting from this
list?
0 Yes 0 No
4. Provide revised plans to show the new roll-up door for Bldg J.
5. The detail for the new roll-up door shall be on the plan.
6. Provide calculation to justify the detail for the new roll-up door is adequate.
Carlsbad 96-249 rev
8/8/96
. . . . . . .~ ..... '. -... · . .'·.·· •. •.·: .... -~~-
7. Provide special inspection program from the architect or engineer to the building official
for approval prior to issuance of the building permit. Check for UBC 106.3.5 for detail.
8. Provide calculation to show the existing panel construction still adequate with the new
roll-up door.
9. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact David Yao at Esgil Corporation. Thank you.
Carlsbad 96-249 rev
8/8/96
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 96-249 rev
PREPARED BY: David Yao DATE: 8/8/96
BUILDING ADDRESS: 1950 Kellogg Avenue
BUILDING OCCUPANCY: B/S-1 TYPE OF CONSTRUCTION: V-N
BUILDING PORTION BUILDING AREA VALUATION VALUE
(ft.2) MULTIPLIER ($)
revision (new mil-up 1hr
door for bldg.J)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
0 1'991 UBC Building Permit-Fee O Bldg. Permit Fee by ordinance: $
0 1991 UBC Plan Check Fee D Plan Check Fee by ordinance: $ 108.94
Type of Review: O Complete Review D Structural Only ~ Hourly
O Repetitive Fee Applicable O Other:
Esgil Plan Review Fee: $ 87.15
Comments: 1 x 87.15 = 87.15
Fire Services Review: .D Complete Review
O Other:
O Suppression System
O FireAlarm
Es9il Fire Services Review Fee: $
Comments:
Sheet 1 of 1
macvalue.doc 5196
'~. '-:;.'-