HomeMy WebLinkAbout1951 MARCASITE PL; ; CB160952; Permit... . ..
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-23-2016 Pool Permit Permit No: CB160952
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
1951 MARCASITE PL CBAD
POOL
2132922200
Status:
Lot#: 54 Applied:
Valuation: $14,695.00 Construction Type: NEW Entered By:
Reference #:
PC#:
Project Title: CUZENS: 285 SF POOL & SPA
Applicant:
H2OASIS BY JOHN CHARRON
14119 SEGUNDO CT
POWAY CA 92064-3025
858-705-5114
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Electrical Fee
Plumbing Fee
Strong Motion Fee
Green Bldg Standards (SB1473) Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
Plan Approved:
Owner:
CUZENS JARROD W
1951 MARCASITE PL
CARLSBAD CA 92009
Issued:
Inspect Area:
ISSUED
03/10/2016
SLE
03/23/2016
03/23/2016
$158.94
$0.00
$111.26
$0.00
$35.00
$35.00
$1.91
$1.00
$0.00
$0.00
$0.00
$0.00
$343.11
Total Fees: $343.11 Total Payments To Date: $343. 11 Balance Due:
Inspector: Clearance:
$0.00
NOTICE: Please take NOTICE that approval of your project indudes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referrecl to as ''fees/exactions.'' You have 00 days from the date this permit was issued to protest inl)Osition of these fees/exactions. If you protest them, you must
foll CM' the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City ~nager for
processing in accordance 'Nith Carlsbad tv\Jnicipal Code Section 3. 32.030. Failure to timely fol law that procedure 'Mil bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and seNer connection fees and capacity
d'langes, net planning, zoning, grading or other sitlllar application processing cr service fees in connection with this project. NOR DOES IT APPLY to any I.
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-23-2016
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW160119
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
1951 MARCASITE PL CBAD
SWPPP
2132922200
CB160952
CUZENS: 285 SF POOL & SPA
H2OASIS BY JOHN CHARRON
14119 SEGUNDO CT
POWAY CA 92064-3025
858-705-5114
Emergency Contact:
JOHN CHARRON
858-705-5114
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Lot#: 54
Owner:
CUZENS JARROD W
1951 MARCASITE PL
CARLSBAD CA 92009
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
ISSUED
03/10/2016
SLE
03/23/2016
1
M
$54.00
$228.00
$0.00
$282.00
Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due:
FINAL APPROVAL
DATE C ·zz. ~~'----
SIGNATURE IL__ ..,,;;c _....c__-=.._ ____ _
$0.00
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: [] PLANNING D ENGINEERING □BUILDING 0FIRE □HEALTH 0 HAZMAT/APCD
('city of
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.cartsbadca.gov
Plan Check No. Q6Jt.Q_Q::ns 2
~ri~i:~vaiu; \L\~Oi-oc::;---
Plan Ck. Deposit ·
Date o-10-llD -lswPPP tin-119
JOBj~q___j"j _ __A,1~ ,-re ()__/_.. ·----i7"'C SUITTf/SPACEI/UNITf ,iNt/ 5 2.C/2-. 2-2-.
CT/PROJECT. I LOT# 7PHASE# r OF UNITS
1
#BEOROOMS 7/BATHROO~-l""ANTBUSINESSNAME --___ ___:__ ___ c---i"""'":"'"Toc~£,--
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) -_L_ ____ _1_ _____ __,_ ________________ _1_ ____ _1_ ___ --j
r5 Pl>
EXISTING USE 1 PROPOSED USE l GARAGE (SF) PATIOS (SF) l DECKS (SF) FIREPLACE . I AIR CONDITJON!NG !FIRE SPRINKLERS
YESQ Nc01 YES □No □ YES□No□
DESIGN PROFESSIONAL CONTRACTOR BUS. NAME /+2-0 .A-£.. , v,A6
ADDRESS _ __,__•D-DR _,ss / L/-/ / q SGr:ruAJ--i>o er __ _
CITY ---STAT~,~---ZIP CITY Pt)vJ/W STA~ ZIP C/W(J:J4-
PHONE ---_ _JAX
EMAIL
________ _ :i~nJo5-5t ,4 IFAx .
__ ':lo1+N@._'tQutJ-oM16Now. a-o.~,v, __
sr01,,, JJO ]'i~~ J"TYaus uc, -----iSTAlE-UC.# ___ _
(Sec. 7031.5 Business and Professions Code: Any City or Coun_ty which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he Is licensed pursuant to the provisions of the Contractor's L!cense Law JChapter 9, comme_ndIng with Section 7000 of Division 3 of the B_usmess and Professions Code} or that he Is exempt therefrom, and the basis for the alleged exemption. Any vI0IatIon of Section 031.5 by any applicant for a permit subiects the applicant to a
civil penalty of not more than five hundred dollars {$500)).
Workers' Compensation Declaration: / hereby affirm under penalty of perjury one of the following declarations: 0 I have and will maintain a certificate of consent lo self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. D I have and will maintain workers' compensation, as required bv Section 3700 of the Labor Code, for the peliormance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
_____________________ Policy No. ______________ Expiration Date _________ _
ction need not be completed ii the permit is for one hundred dollars ($100) or less.
Certificate of Exemption: J certify that in the performance of the work for which this permit is issued, I shall r10t employ any person in any manner so as to become subject to the Workers' Compensation Laws of
WARNING: Failure to secure workers' c sation c s unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
ection 3 06 of the Labor code, Interest and attorney's fees.
I hereby affirm that I am exempt from Contractor's License Law for /he following reason:
/, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). □
□
D
I, as owner of the property, am exclusively contracbng with licensed contractors to construct the project {Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply lo an owner of
property who builds or impro~es thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section---··---· ____ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials ror construction of the proposed property improvement. Oves Oo
2, I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (!inn) to provide the proposed construction (include name address I phone I contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone I contractors' license number)
5, I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address/ phone I type of work):
~ PROPERTY OWNER SIGNATURE □AGENT DATE
..
Is the awlicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? □ Yes D No
Is ttie applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES ANO THE AIR POLLUTION CONTROL DISTRICT.
t certify that I have read the applicatlon and state lhat the above information Is oorrectand lhat the information on the plans is accurate. I agree to comply with an City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter up:,n the aOOve mentioned property br insP3(:lion purp:,ses. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA MOSHA permit is required for excavations over 5'0' deep and deJOOlition or construction of structures over 3 stories in height.
EXPIRATION: Every pennit issued by the Building Ofl'K:ial rthe pro · · of this c.ode shall expire by limitation and become null and vdd if the building or work authorized by such pennit is not commeoced 'Mthin
180 days from the dale of such permit or if the building wo autho · bys d1 permit is suspended or abandoned at any time after the work is commenced for a peno::! of 100days (Section 100.4.4 Unibrrn Building Cooe),
~ APPLICANT'S SIGNATURE DATE
-----------
THE FOLLOWJNG APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: []PLANNING D ENGINEERING □BUILDING □FIRE □HEALTH 0 HAZMATIAPCD
(city of
Building Permit Application Plan Check No. OOJtQ.O=\o 2.
1635 Faraday Ave., Carlsbad, CA 92008 Est. Value \y,q1 oF> -
Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit ' Carlsbad email: building@carlsbadca.gov
www.carlsbadca.gov Date 0-10-llD lswPPP Ho-11 q
SUITE#/SPACE#/UNIT# -(90 JOBA/~S/ A1A-P r k'> i1£ ()L-IAPNt/ 3 -2.q2._ -2-2-
CT/PROJECT# I LOT# I PHASE# 1 • OF UNITIDROOMS # BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE Toce. GROUP
DESCRIPTION OF WORK: Include Square Feet of Affected Area{s)
N51N f c)JL---ts f!J 2-tS-tf-
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE : I AIR CONDITIONING I FIRE SPRINKLERS
YES0, NoCJ YES □No □ YES□No□
APPLICANT NAME H 7-0A-· . . / JoLL-,-i Ct-fft,2../Z..D/\l PROPERlY OWNER NAME lA-.tZ-/2-0 {!,, ,;
Prtna"' Contact . ~ f 5 , 1) D "'7 ,&N
ADDRESS I Lf I I '1 $64-utJ ])0 (!;r AODR/llc,, /L1"..,,, .. PL-I 'A--6/TG:
CITY Pow A-'/ SM qw,.,,,J_ ~ f1fr ZIP
6iJ.4-D Cl/2-oD'ef
PHI~::, fi) 70 5 -5114 I FAX (f,SP,)52-7-q2-,, lP lFAX
EM.AIL JOHN@.. \/ouR,Ol¥.,15NoW, C-01"1
EMAIL . I C,t,rz.&,J.S @ Q-Mkl t..-, C..O fV\
DESIGN PROFESSIONAL CONTRACTOR BUS. NAME H--2--0 6 .. . .A.c 15 Bl/ -Jo,+tJ fl /-HW-(201 1
ADDRESS ADDRESS/ 4-I I q S6&utJ"bo er
Cl1Y STATE ZIP
Cl1Yr~wA-V STfu ZIP C/2-D{t'Jlf
PHONE IFAX pi~<i') 105-51 ,4 TFAX
EMAIL E~O;+N@ Vou/2-0Pr6tSNDW, MM
I STATE LIC. # "q1fn 110 li ,,-q I CITYBUS. UC.#
{Sec. 7031.5 Business and Professions Code: Any City or County which reQuires a permit to_construct. alter, improve, demolish or repair any structure, pnor to its issuance, also requires the applicant for such per_m1t to file a signed statement that he 1s licensed pursuant to the prov1s10nsofthe Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any v1olat1on of Section 1031.5 by any applicant for a permit subjects the applicant to a
civil penalty of not more than five hundred dollars {$500}). ·-::;.'\ .• '0
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance ol the work for which this permit is issued. D I have and will maintain workers' compensation, as reouired by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
n mber are: Insurance Co. Policy No. Expiration Date
ection need not be completed if the permit 1s for one hundred dollars ($100) or less.
ertificate of Exemption: I certify that in the perfonnance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' c sation c is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damages as for i ection 3 06 of the Labor code, interest and attorney's fees.
z:S CONTRACTOR SIGNATUR
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale {Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for □
□
□
sale. If, however, the building or improvement is sold within one year of completion, the owner•builder will have the burden of proving that he did not build or improve for the purpose of sale).
I. as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section _____ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. OYes 0No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone I contractors' license number):
5. I will provide some of the work, but I have contracted {hired) the following persons to provide the work indicated {include name I address I phone I type of work):
_g PROPERTY OWNER SIGNATURE □AGENT DATE
Inspection List
Permit#: CB160952 Type: POOL
Date Inspection Item
06/22/2016 59 Final Pool
06/22/2016 59 Final Pool
06/16/2016 55 Fence/Pre-Plaster
06/16/2016 55 Fence/Pre-Plaster
06/16/2016 59 Final Pool
06/09/2016 51 Excav/Steel/Bonding/Fence
06/09/2016 51 Excav/Steel/Bonding/Fence
04/28/2016 23 Gas/TesURepairs
04/28/2016 31 Underground/Conduit-Wirin
04/28/2016 51 Excav/Steel/Bonding/Fence
Wednesday, June 22, 2016
Inspector
PD
PD
PD
PD
PD
PD
Act
RI
AP
RI
AP
RI
RI
AP
AP
AP
AP
CUZENS: 285 SF POOL & SPA
Comments
Page 1 of 1
«~~ ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
DATE: 03/22/2016 PROJECT NAME: CUZENS RESIDENCE POOL AND SPA
PLAN CHECK NO: 1 SET#: 1 ADDRESS: 1951 MARCASITE PL
VALUATION/SCOPE OF WORK: POOLANDSPA
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT ID: CB160952
APN:
✓ This plan check review is complete and has been APPROVED by the ENGINEERING . i \9, Division.
\j ~ 113· By: VALRAYNElSON
tr;· A Final Inspection by the ENGINEERING Division is required Yes ✓ No
X This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the
attached checklist. Please resubmit amended plans as required.
NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X.
Plan Check Comments have been sent to: JOHN@YOUROASISNOW.COM
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the Issuance of a building permit.
Resubmitted plans should Include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
Chris Sexton Kathleen Lawrence Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Qh ri~.S~xtQD~!;2rl~!22!:!!;2 .gQv K2thl~~n.L2wr~ni;~~i;2rl~!22dca.gov Gregoiy.R:tan@carlsbadca.gov
Gina Ruiz Linda Ontiveros Cindy Wong
760-602-4675 760-602-2773 760-602-4662
Gina.Ruiz~carlsbadi;s1.gov Lini;!s1.Qntiv~CQ~~cs1rl~b2!:!i;s1.gov C:tnthia.Wong@carlsbadca.gov
✓ ValRay Ma rshall Dominic Fieri
760-602-2741 760-602-4664
ValRay.Marshall@carlsbadca .gov DQminic.Fieri~carlsbadi;a.gQ:y:
Remarks:
1
SHOW ON SITE
PLAN THEX
ITEMS "ALL
DIRT
REMOVED TO
A LEGAL SITE"
E-37
Any outstanding issues will be marked with an [XJ Make the necessary corrections for
compliance with applietible codes and standards. Submit corrected plans and/or specifications to
the Building division for re-submittal to the Engineering divisions.
Items that conform to permit requirements are marked with [iJ
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
North arrow
Existing & proposed structures
Property line dimensions
Easements
Show on site plan:
Drainage patterns
Existing & proposed slopes
Existing topography
Retaining Walls (location and height)
Indicate what will happen with soil excavated from pool area.
Include on title sheet:
Site address
Assessor's parcel number
Legal description/lot number
Grading: Quantities of
Cut Fill Import!
Project does not comply with the following engineering conditions of approval
for project no:
Conditions were complies with by:
LOT NO. 54
MAP NO. 15161
REF. NO.
Page 2 of4
Date:
REV 6/2012
1 1
2. GRADING PERMIT REQUIREMENTS
3.
IF RIGHT OF WAY['KJ
PERMIT IS NOT
NEEDED PLEASE
INDICATE ON
PLAN All WORK
WILL REMAIN
OUT OF ROW
E-37
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be Issued and rough grading
approval obtained prior to issuance of a building permit. A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
No grading permit required.
MISCELLANEOUS PERMITS
RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way.
A separate right-of-way issued by the engineering division is required for the following:
Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
Page 3 of4 REV 6/2012
1
E-37
1
4. STORM WATER
Construction Compliance
Project Threat Assessment Form complete[{] incomplete
Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 16-119 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development ISUSMPl Compliance
Storm Water Standards Questionnaire complete incomplete
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.gov/business/building/Documents/EnqStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavemenl/pavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Q1b.er:
5. ADDITIONAL COMMENTS
Page 4 of4 REV 6/2012
'.----------------------------------------------,
Ccityof
Carlsbad
DETERMINATION OF
PROJECT'S SWPPP
TIER LEVEL AND CONSTRUCTION
THREAT LEVEL
E-32
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
I'm applying foJr-□ Grading Permit
Project Name: ~
Address: /t/51 Nl:[£ Pk
~uilding Permit □ Right-of-way permiq C Other
Project ID:~---DWG #/CB# l(.D -i!, '2..
APN 2-1,3-2R2---2-2-·QQDisturbed Area: ---~Ac
Section 1: Determination of Project's SWPPP Tier Level SWPPP
(Check annlicable criteria and circle the corresoondina SWPPP Tier Level, then 110 to section 21 Tier Level
Exemgt -No Threat Project Assessment Criteria
My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided
no significant grading proposed, pursuant to Table1, section 3.2.2 of Storm Water Standards, the
followina oermits are exemot from SWPPP reauirements: Exempt
► Electrical ► Patio ► Mobile Home ► Plumbing ► Spa (Factory-Made)
► Fire Sprinkler ► Mechanical ► Re-Roofing ► Sign ► Roof-Mounted Solar Array ....... .. ........ ········• .. -.......... ........... ······· ............. .......... ................. ......• ............... ................. ...... ............. . ....... .. ..................... .............
Tier 3-Significant Threat Assessment Criteria -(See Construction General Permit (CGP) Section I.BJ'
D My project includes construction or demolition activity that results in a land disturbance of equal to or
greater than one acre including but not limited to clearing, grading, grubbing or excavation; or,
D My project includes construction activity that results in land disturbance of less than one acre but the
construction activity is part of a larger common plan of development or the sale of one or more acres
of disturbed land surface or,
D My Project is associated with construction activity related to residential, commercial, or industrial Tier3
development on lands currently used for agriculture; or
D My project is associated with construction activity associated with Linear Underground/overhead
Projects (LUP) including but not limited to those activities necessary for installation of underground
and overhead linear facilities (e.g. conduits, substructures, pipelines, towers, poles, cables, wire,
towers, poles, cables, wires, connectors, switching, regulating and transforming equipment and
associated ancillary facilities) and include but not limited to underground utility mark out, potholing,
concrete and asphalt cutting and removal, trenching, excavation, boring and drilling, access road,
tower footings/foundation, pavement repair or replacement, stockpile/borrow locations.
D Other per CGP
Tier 2-Moderate Threat Assessment Criteria: My project does not meet any of the Significant Threat
Assessment Criteria described above and meets one or more of the following criteria:
D Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the
Carlsbad Municipal Code); or,
D Project will result in 2,500 square feet or more of soils disturbance including any associated
construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance
areas and project meets one or more of the additional following criteria: Tier2
• located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or
watercourse; and/or
• construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1
throuah Apr. 30).
Tier 1-Low Threat Assessment Criteria
'/4 My project does not meet any of the Significant or Moderate Threat criteria above, is not an exempt g permit type per above and the project meets one or more of the following criteria:
• results in some soil disturbance; and/or
• includes outdoor construction activities (such as roof framing, saw cutting, equipment washing,
material stockpiling, vehicle fueling, waste stockpilinal
* Items hsted are excerpt from CGP. CGP governs cntena for triggers for Tier 3 SWPPP. Developer/owner shall confirm coverage
under the current CGP and any amendments, revisions and reissuance thereof.
E-32 Page 1 of 2 Rev. 2116116
SWPPP Section 2: Determination of Project's Construction Threat Level
Tier (Check applicable criteria under the Tier Level as determined in section 1, circle Construction
Level the corresponding Construction Threat Level, then complete the Threat Level
sianature block below)
Exempt -Not Applicable -Exempt
Tier 3 -High Construction Threat Assessment Crtteria: Mv Project meets one or more of the
following:
□ Project site is 50 acres or more and grading will occur during the rainy season
□ Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed,
inside or within 200 feet of an environmentally·sensitive area (ESA) or discharges directly
to an ESA High
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils
Tier3 with USDA-NRCS Erosion factors kf greater than or equal to 0.4)
□ Site slope is 5 to 1 or steeper
□ Construction is initiated during the rainy season or will extend into the rainy season (Oct.
1 -April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 -High Construction Threat Assessment Criteria: M~ Project meets one or more of
the following:
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an
ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils High
Tier2
with USDA-NRCS Erosion factors k, greater than or equal to 0.4)
□ Site slope is 5 to 1 or steeper
□ Construction is initiated during the rainy season or will extend into the rainy season (Oct.
1-Apr. 30).
□ Owner/contractor received a Storm Water Notice of Violation wtthin past two years
□ Site results in 10,000 sq. ft. or more of soil disturbance
Tier 2 -Medium Construction Threat Assessment Criteria Medium □ My project does not meet Tier 2 High Threat Assessment Criteria listed above
Tier 1 -Medium Construction Threat Assessment Criteria: M~ Proiect meets one or more
of the following: .,,,,.,..-" □ Owner/contractor received a Storm Water Notice of Violation within past two years ( Medium □ Site results in 500 sq. ft. or more of soil disturbance / Tier 1 ~ Construction will be initiated during the rainy season or will extend into the rainy season -(Ocl.1-April 30)
Tier 1 -Low Construction Threat Assessment Criteria Low t:!1,..My project does not meet Tier 1 Medium Threat Assessment Criteria listed above
I certify to the best of my knowledge that the above statements are true and correct. I will prepare and submit an appropnate tier level SWPPP as determined above
prepared in accordance with the City SWPPP Manual. I understand and acknowledge that I must adhere to and comply with the storm water best management
practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above.
The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown
that a lesser or higher SWPPP Tier Level is warranted.
Owner/Owner's Authorized Agent Name: Title: City Cona.irrence: ,_Yes __ +-N_o __
11
(For City Use Only)
Date: By.
E-32 ------------Page 2 of 2 Rev. 2/16/16
•
(Cityof
Carlsbad
I INSTRUCTIONS:
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the City requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMP's) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer
to the Engineering Standards (Volume 5).
This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water
standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your
project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT
PROJECT' (PDP) requirements.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City
staff has responsibility for making the final assessment after submission of the development application. If staff determines
that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed
by you, this will result in the return of the development application as incomplete. In this case, please make the changes to
the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the
questions, please seek assistance from Land Development Engineering staff.
A completed and signed questionnaire must be submitted with each development project application. Only one completed
and signed questionnaire is required when multiple development applications for the same project are submitted
I concurrent1v.
PROJECT INFORMATION
PROJECT NAME: JUWD U,\ --ieN ~
PROJECT ID: 0 p.., ll o r 9S ::+ -
The project is (check one): □ New Development □ Redevelopment
The total proposed disturbed area is: -i-~5 ft2 ( ) acres
The total proposed newly created and/or replaced impervious area is: ft2 ( ) acres
If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the
SWQMP # of the larger development project: ✓ Project ID: /lo -'?57--SWQMP#:
Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the City.
E-34 Page 1 of 4 REV 02/16
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a "development project", please answer the following question:
YES NO
Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing
building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)?
If you answered "yes" to the above question, provide justification below then Go to step 5, mark the third box stating "my
project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant
information.
Justification/discussion: (e.g. the project includes only interior remodels within an existing building):
If you answered "no" to the above question, the project is a 'development project', go to Step 2.
STEP2
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer
the following questions:
Is your project LIMITED to one or more of the following:
YES NO
1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:
a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-
erodible permeable areas;
b) Designed and constructed to be hydraulically disconnected from paved streets or roads;
c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA ~ Green Streets guidance?
I
2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed ~ in accordance with the USEPA Green Streets guidance?
3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? ;(
If you answered "yes" to one or more of the above questions, provide discussion/justification below, then Go to step 5,
mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information.
Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with
the USEPA Green Street guidance):
If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3.
E-34 Page 2 of 4 REV. 02/16
STEP3
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a PDP, please answer the following questions
(MS4 Permit Provision E.3.b.(1)):
YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces
collectively over the entire project site? This includes commercial, industrial, residential, mixed-use,
and oublic develooment projects on oublic or orivate land. :x
2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of
impervious surface collectively over the entire project site on an existing site of 10,000 square feet or X more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public
develooment oroiects on oublic or orivate land.
3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a restaurant? A restaurant
is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters X and refreshment stands selling prepared foods and drinks for immediate consumption (Standard
Industrial Classification (SIC) code 5812).
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious
surface collectively over the entire project site and supports a hillside development project? A hillside J(
development oroiect includes development on anv natural slooe that is twentv-five percent or areater.
5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a parking lot? A parking lot ')(
is a land area or facility for the temporary parking or storage of motor vehicles used personally for
business or for commerce.
6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a street, road, highway X freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface
used for the transoortation of automobiles, trucks, motorcvcles, and other vehicles.
7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more
of impervious surface collectively over the entire site, and discharges directly to an Environmentally
Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance ')( of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance
as an isolated flow from the project to the ESA (i.e. not comminaled with flows from adjacent lands).*
8. Is your project a new development or redevelopment project that creates and/or replaces 5,000
square feet or more of impervious surface that supports an automotive repair shop? An automotive t: repair shop is a facility that is categorized in any one of the following Standard Industrial Classification
(SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development or redevelopment project that creates and/or replaces 5,000
square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category
includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average "A
Dailv Traffic (ADTJ of 100 or more vehicles oer dav.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of
land and are expected to generate pollutants post construction? X
11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more
of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMG x
21 .203.040)
If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment
project, Go to step 4. If your project is a new project, Go to step 5, check the first box stating "My project is a PDP ... "
and complete applicant information.
If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT, "Go to step 5, check the
second box statina "Mv proiect is a 'STANDARD PROJECT' ... " and complete aoolicant information.
E-34 Page 3 of 4 REV. 02/16
STEP4
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS
(PDP) ONLY
Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)):
YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount
of less than 50% of the surface area of the previously existing development? Complete the percent
impervious calculation below:
Existing impervious area (A) = sq. ft.
Total proposed newly created or replaced impervious area (B) = sq. ft.
Percent impervious area created or replaced (B/A)*100 = %
If you answered "yes", the structural BMP's required for PDP apply only to the creation or replacement of impervious
surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete
applicant information.
If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, check the
check the first box stating "My project is a PDP ... " and complete applicant information.
STEPS
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
□ My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must
prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application.
□ My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT'
stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project
Requirement Checklist Form E-36'' and incorporate low impact development strategies throughout my project.
Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and
~hibits to verify if 'STANDARD PROJECT' stormwater requirements apply.
y Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual.
Applicant Information and Signature Box
Assessor's Parcel Number(s):
Applicant Nam&i\A--N G~ ~~~Z:-co-1?_
~c~nr,natuc Date: ~-l o-1h
~ -
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of
Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1 994) and
amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San
Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities
and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City.
This Box for Cit
City Concurrence: NO
E-34 Page 4 of 4 REV. 02/16
{cityof
Carlsbad
Project Name: ~ \ M!J2-0 T)
Project ID:
DWG No. or BuildinQ Permit No.:
STANDARD PROJECT
REQUIREMENT
CHECKLIST
E-36
Project Information
W 7~::,
CI#\ l~-\.-1~2..
Source Control BMPs
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible.
See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs
shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1
of the Model BMP Design Manual. Discussion/justification is not required.
• "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must
be provided.
• "NIA" means the BMP is not applicable at the project site because the project does not include the feature that is
addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be
provided.
Source Control Reauirement I Applied?
SC-1 Prevention of Illicit Discharges into the MS4 I □Yes I D No I i1 N/A
Discussion/justification if SC-1 not implemented:
SC-2 Storm Drain Stenciling or Signage I □Yes I D No l ~/A
Discussion/justification if SC-2 not implemented:
SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, I [(Yes I D No I D N/A
Runoff, and Wind Disoersal
Discussion/justification if SC-3 not implemented:
SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, I D Yes I D No I )(NIA
Runoff, and Wind Disoersal
Discussion/justification if SC-4 not implemented:
SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind I □Yes I D No I ~/A
Disoersal
Discussion/justification if SC-5 not implemented:
E-36 Page 1 of 3 REV 02/16
Source Control Reauirement APPiied?
SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must
answer for each source listed below and identify additional BMPs. (See
Table in Appendix E.1 of BMP Manual for guidance).
o On-site storm drain inlets D Yes D No D N/A
□ Interior floor drains and elevator shaft sump pumps □Yes D No D NIA o Interior parking garages □ Yes D No D NIA
□ Need for future indoor & structural pest control □ Yes D No D NIA
□ Landscape/Outdoor Pesticide Use (Yes □ No D N/A
i,Pools, spas, ponds, decorative fountains, and other water features es D No D N/A o Food service □ Yes D No o N/A
□ Refuse areas o Yes D No D NIA □ Industrial processes D Yes □.No D N/A
D Outdoor storage of equipment or materials D Yes D No D NIA
□ Vehicle and Equipment Cleaning □ Yes D No D N/A
□ Vehicle/Equipment Repair and Maintenance □Yes D No D N/A
CJ Fuel Dispensing Areas o Yes D No D N/A
□ Loading Docks □ Yes D No D N/A
□ Fire Sprinkler Test Water o Yes D No □ NIA
D Miscellaneous Drain or Wash Water o Yes D No D N/A
D Plazas, sidewalks, and parking lots □Yes D No D N/A
For "Yes" answers, identify the additional BMP per Appendix E.1. Provide justification for "No" answers.
E-36 Page 2 of 3 REV. 02/16
Site Desian BMPs
All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See
Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs
shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2
thru E.6 of the Model BMP Design Manual. Discussion/ justification is not required.
• "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must
be provided.
• "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that
is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve).
Discussion/iustification may be orovided.
Site Design Reauirement I Aoolied?
SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I □Yes I D No I t"J,N/A
Discussion/justification if SD-1 not implemented:
SD-2 Conserve Natural Areas, Soils, and Vegetation I □ Yes I D No I [)ll'N/A
Discussion/justification if SD-2 not implemented:
SD-3 Minimize Impervious Area I □Yes I D No I o)(QtA
Discussion/justification if SD-3 not implemented:
SD-4 Minimize Soil Compaction I □Yes I □ No I ~N/A
Discussion/justification if SD-4 not implemented:
SD-5 Impervious Area Dispersion I D Yes I D No I l?J'iN/A
Discussion/justification if SD-5 not implemented:
SD-6 Runoff Collection I □ Yes I D No I M N/A
Discussion/justification if SD-6 not implemented:
SD-7 Landscaping with Native or Drought Tolerant Species I □Yes I D No l ~N/A
Discussion/justification if SD-7 not implemented:
I
SD-8 Harvesting and Using Precipitation I D Yes I □ No l 'X!N/A
Discussion/justification if SD-8 not implemented:
E-36 Page 3 of 3 REV. 02/16
21.204.040
21.204.040 Conditional beach uses.
A. Uses substantially similar to the permitted uses listed above may be permitted on the beach subject to
this chapter and Chapters 21.42 and 21.50.
B. Revetments, breakwaters, groins, harbor channels, seawalls, cliff retaining walls, and other such con-
struction that alters natural shoreline processes shall be permitted when required to serve coastal-
dependent uses or to protect existing structures or public beaches in danger from erosion, and when
designed to eliminate or mitigate adverse impacts on local shoreline sand supply. As a condition of ap-
proval, permitted shoreline structures may be required to replenish the beach with imported sand.
Provisions for the maintenance of any permitted seawalls shall be included as a condition of project
approval. As a further condition of approval, permitted shoreline structures shall be required to provide
public access. Projects which create dredge spoils shall be required to deposit such spoils on the
beaches if the material is suitable for sand replenishment. Seawalls shall be constructed essentially
parallel to the base of the bluff and shall not obstruct or interfere with the passage of people along the
beach at any time. (Ord. NS-365 § 22, 1996)
21.204.050 Uses not on the beach subject to coastal shoreline development permit.
Uses permitted by the underlying zone map may be permitted on non-beach areas subject to granting of a
coastal development permit for coastal shoreline development issued pursuant to the procedures of Chapter
21.201 of this title, unless specifically prohibited by policies or other applicable ordinances in the approved
Carlsbad local coastal program. "Non beach areas" are defined as areas at elevations of ten feet or more
above mean sea level (North American Datum, 1929). Permitted uses are subject to the following criteria:
A. Grading and Excavation. Grading and excavation shall be the minimum necessary to complete the pro-
posed development consistent with the provisions of this zone and the following requirements:
1. Building sites shall be graded to direct surface water away from the top of the bluff, or, alterna-
tively, drainage shall be handled in a manner satisfactory to the city which will prevent damage to
the bluff by surface and percolating water.
2. No excavation, grading or deposit of natural materials shall be permitted on the beach or the face
of the bluff except to the extent necessary to accomplish construction pursuant to this section.
➔ B. New development fronting the ocean shall observe at a minimum, an ocean setback based on a
"stringline" method of measurement. No enclosed portions of a structure shall be permitted further
,
Iv, seaward than those allowed by a line drawn between the adjacent structure to the north and south; no
decks or other appurtenances shall be permitted further seaward than those allowed by a line drawn
between those on the adjacent structures to the north and south. A greater ocean setback may be re-
quired for geologic reasons and if specified in the local coastal program. (Ord. NS-365 § 22, 1996)
21.204.060 Requirements for public access.
One or more of the following types of public access shall be required as a condition of development:
A. Lateral Public Access.
1. Minimum Requirements. Developments shall be conditioned to provide the public with the right of
access to a minimum of twenty-five feet of dry sandy beach at all times of the year. The minimum
requirement applies to all new developments proposed along the shoreline requiring any type of
local permit including a building permit, minor land division or any other type of discretionary or
nondiscretionary action.
2. Additional Requirements. New developments as specified below shall be conditioned to provide
the public with lateral public access in addition to minimum requirements.
a. Applicability.
( 1) Seawalls and other shoreline protective devices.
1178
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN
IS EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING
RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5)
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER
EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM
AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
BE INSTALLED AND MAINTAINED.
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY
REGULATIONS.
OWNER'S CERTIFICATE:
I UNDERSTAND AND ACKNOl'll.EDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES {BMPS} DURING CONSTRUCTION
ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY THE CITY OF CARLSBAD. ~-we~
NAME (PRINT}
?-\0-1b
DATE
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29 sw-1Y I \9
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials
BMPs Control BMPs Management BMPs Pollution Control BMPs
C C C -0 -.2 0 :;::; C C ,, -:;::; c,, 0 Q) ,, Q) ,, ., C " " C C c,, E C E C -C 2 => 0 ·c a. 0
C -'i, Q) 0
E Q) L :;::; L '5 Q)
::,a ,, ., c,, L --·E >, c,, -C a, L .5 Q) c "'"' ., C s:::_ C' L C C "' c,, a. Q) C i:: L Q) 0
Best Management Practice* '<! C Cc 0 (D C. ·c -C Ul to Q) u.J > C C
"' " "' L L 0 Q) 0 Q) Q) C :;::; -;,: _
:c Q) C C 0 -C t-E UL "' C ,, -.; "' ::,a C Q) C C
(BMP) Description ➔ ., u Q) (/) ·e Q) "' c,, Q) c,, (D ·o C c,, C ,, ., ;,: C 0 :::, l:? -Q) "' Q) Q) C 0 3' C Cc '5 ~ Q) " -0 LO ].!.!:_ ,, >, 0"' C Q) [3 E " E :5 C 0 (D u, ·-c,, 0 ·-0 1l oo c,, Q)
X ::,a 0 c,, Cl C Q) a:: _E 0 -N Ul i:l C 01:;:; Q) ~.E 0 Q) 0 'a. L-;,: Q) 0 Q)
Q) 0 Q) E .,, j .a E il ;;: ~ :=3: ~:;:; :0 ·-c,, ·c ~_g c,, ,, c,, ,, .C C Q) u.. L Q) => --,, CC U C LC il ,, 0 ac -0 -·-a. 'i, " Q) Q) => ,, L-,0 L .0 C bg -~~ C ·-C Q) L Q)
0 LO 0 -Q) C LU C 0 0 C c,, .s 0 -~~ -o -0 = C ,_ C NC
Q) 0 CL in Q) .c .0 L vi~ bl -L 0 0 -C a. 0 oc co
to ;,: u.J 0 vi (/) 0 G: to (/) a.. V) C (/) a:: ;,: il:: C..0 a.. >o ::,a(/) ::,a 1i, (/) 0 (/) ::,a :r ::,a
CASQA Designation ➔ ,__ <X) a, ,,., .... "' "' 0 N ,,., ,__ <X) ' N ,,., .... "' "' '
,__ <X) ' ' ' I I I I I I I I I I I I I I I I I I I
0 0 0 u u.J u.J u.J u.J u.J u.J u.J u.J [!= [!= (/) (/) (/) (/) i i i i i i Construction Activity u.J u.J u.J u.J (/) (/) (/) (/) (/) (/) (/) (/) z z z z
Gradina /Soil Disturbance <I
Trench inn /Excavation " Stockailina
Drillina /Borinn
Concrete/Asphalt Sa\Ycuttina
Concrete Flatwork
Pavina
Condui\/Pice Installation
Stucco/Mortar Work
Waste Disposal
Staaina/Lav Down Area
Eauicment Maintenance and Fuelina
Hazardous Substance Use/Storaae
Dewaterina
Site Access Across Dirt
Other (list):
Instructions:
1. Check the box to the left of all applicable construction activity (first column) expected to occur during construction.
2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Storrnwater Quality Association {CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
PROJECT INFORMATION
Site Address: / q 5/ 1\1 Prf2./dt6! 1€ PL--
Assessor's Parcel Number: 2--f :3 · 2-q L -Z.. 2 · DD
Emergency Contact:
Name: 0"6~ C,~
24 Hour Phone·~-7o5"· 5 Ii 'I
Construction Threat to Storm Water Quality
(Check Box}
□ MEDIUM i;:i'Low
Q) -"' c-;,: C Q)
" E -Q) Q) c,, b c CC 0 C o::,;
<X)
I
i
Page 1 of 1 REV 02/16
«'~'> ~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
DATE: 3/11/2016 PROJECT NAME: POOL AND SPA PROJECT ID:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.eov
PLAN CHECK NO: CB16O952 SET#: 1 ADDRESS: 1951 MARCASITE PL APN:
[g] This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: VERONICA MORONES
A Final Inspection by the PLANNING Division is required □ Yes [2] No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: JOHN@YOUROASISNOW.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
□ Chris Sexton □ Chris Glassen □ Greg Ryan
760-602-4624 760-602-2784 760-602-4663
Chris.Sexton@carl5badca.gov Christogher.Glassen@carlsbadca.gov Gregor:y.Ryan@carlsbadca.gov
□ Gina Ruiz □ Val Ray Marshall □ Cindy Wong
760-602-4675 760-602-27 41 760-602-4662
Gina.Ruiz@carlsbadca.gov ValRay.Marshall@carlsbadca.gov Cynthia.Wong@carlsbad~a.gov
~ Veronica Morones □ Linda Ontiveros □ Dominic Fieri
760-602-4619 760-602-2773 760-602-4664
Veronic~.Morones@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov
Remarks: POOL & SPA OF 285 SQ FT. NO HILLSIDE SLOPES. GATE SPECIFIED ON
PLANS IS UNDER 6'.