Loading...
HomeMy WebLinkAbout1956 COBALT DR; ; CB063522; Permit02-06-2007 - Job Address Permit Type Parcel No Valuation Occupancy Group 02/06/2007 # Dwelling Units Bedrooms Project Title City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No CB063522 Building Inspection Request Line (760) 602-2725 1956 COBALT DRCBAD RESDNTL 2132904300 $276,432 00 1 Sub Type Lot# Construction Type Reference # Structure Type Bathrooms SFD 106 VN CT 04-09 SFD 2 TRIESTE PL 1 2448SF LV, 474SF GAR/176SF DECK/173SF LOG/27SF PORCH Status Applied Entered By Issued Inspect Area Ong PC# Plan Check* ISSUED 12/18/2006 JMA Plan Approved 02/06/2007 PC 06-35 PC 06-66 Applicant WARMINGTON HOMES 701 PALOMAR AIRPORT RD CARLSBAD CA 92011 931-4766 Owner WARMINGTON TRIESTE ASSOCIATES L P C/0 WARMINGTON HOMES CALIFORNIA 3090 PULLMAN ST #A COSTA MESA CA 92626 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee $1,09172 Meter Size $0 00 Add'l Reel Water Con Fee $709 62 Meter Fee $0 00 SDCWA Fee ($56 77) CFD Payoff Fee $2764 PFF (3105540) $0 00 PFF (4305540) $0 00 License Tax (3104193) $0 00 License Tax (4304193) $000 Traffic Impact Fee (3105541) $0 00 Traffic I mpact Fee (4305541) $0 00 Sidewalk Fee $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Housing Impact Fee $0 00 Housing InLieu Fee $3,389 00 Housing Credit Fee D5/8 Master Drainage Fee $0 00 Sewer Fee $0 00 Additional Fees TOTAL PERMIT FEES $000 $16000 $4,31300 $2,960 75 $5,031 06 $000 $000 $000 $720 00 $000 $000 $21700 $7000 $6750 $000 $000 $000 $000 $000 $17900 $18,87952 Total Fees $18,879 52 Total Payments To Date $18,87952 Balance Due $000 Inspector FINAL APPROVAL Date "Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning, zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired City of Carlsbad Final Building Inspection Dept Building Engineering Planning CMWD Plan CheckS PC 06-66 Permits CB063522 Project Name TRIESTE PL 1 2448SF LV, 474SF GAR/1 76SF DECK/1 73SF LOG/27SF PORCH Address 1956 COBALT DR Contact Person Phone Sewer Dist LC Water Dist CA Inspected . Date / / By C&AJ& ^rXS^KoV Inspected <6yv'5/<D Inspected Date By Inspected Inspected Date By Inspected Comments ' L_ St Lite Fire FNciVmuM; U?PAKT?IEM Date 08/16/2007 Permit Type RESDNTL Sub Type SFD Lot 106 7 Approved K Disapproved Approved Disapproved Approved Disapproved City of Carlsbad Bldg Inspection Request For 08/22/2007 Permit* CB063522 Title TRIESTE PL 1 2448SF LV, 474SF Description GAR/176SF DECK/173SF LOG/27SF PORCH Sub Type SFD Inspector Assignment MC 1956 COBALT DR Lot 106 Type RESDNTL Job Address Suite Location APPLICANT WARMINGTON HOMES Owner WARMINGTON TRIESTE ASSOCIATES L P Remarks Phone 7604271926 Inspector Total Time CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By KYLE Entered By CHRISTINE Act Comments Comments/Notices/Holds Associated PCRs/CVs Original PC# PC 06-35 Inspection History Date 08/20/2007 07/24/2007 06/18/2007 06/04/2007 05/30/2007 05/29/2007 05/24/2007 05/03/2007 04/26/2007 03/15/2007 03/15/2007 03/15/2007 03/15/2007 Description 89 Final Combo 39 Final Electrical 17 Interior Lath/Drywall 82 Drywall/Ext Lath/Gas Test 16 Insulation 16 Insulation 84 Rough Combo 13 Shear Panels/HD's 15 Roof/Reroof 11 Ftg/Foundation/Piers 12 Steel/Bond Beam 21 Underground/Under Floor 31 Underground/Conduit-Wiring Act NR AP NR AP AP NR AP AP AP AP AP AP AP Insp MC MC MC MC MC MC MC MC MC MC MC MC MC Comments EMR PER CONTRACTOR AFTER STOP MINOR PICK UP RECEIVED PT, SOILS & BLDG PLACEMENT REPORT CONDUIT ONLY UFER City of Carlsbad Bldg Inspection Request For 03/15/2007 Permit# CB063522 Title TRIESTE PL 1 2448SF LV, 474SF Description GAR/176SF DECK/173SF LOG/27SF PORCH Inspector Assignment MC 1956 COBALT DR Lot 106 Type RESDNTL Job Address Suite Location APPLICANT WARMINGTON HOMES Owner Remarks Sub Type SFD Phone 7604271926 Inspector Total Time CD Description 11 Ftg/Foundation/Piers 12 Steel/Bond Beam 21 Underground/Under Floor 31 Underground/Conduit-Wiring Act Comment Requested By KYLE Entered By CHRISTINE Comments/Notices/Holds Associated PCRs/CVs Original PC# PC 06-35 Inspection History Date Description Act Insp Comments 03/05/2007 21 Underground/Under Floor AP MC BACK FLOW PREVENTER REQ 03/05/2007 22 Sewer/Water Service PA MC HUN SAKE R ^ASSOCIATES SAN o i i: c o INC PLANNING ENGINEERING SURVEYING IRVINE LOS ANGELES RIVERSIDE SAN DIEGO ARIZONA March 6, 2007 f Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 Re Building Form Setback Certification La Costa Greens Neighborhood 1 17 Carlsbad Tract 04-09/PUD 04-08A Drawing No 429-2C Lots 6 through 9, 72 through 74, and 102 through 107 Dear City Inspector Please be advised the building foundation forms are in conformance with the precise grading plans as to horizontal and vertical location The building setbacks were measured in relation to the property lines and were found to be in conformance with the approved precise grading plans for this property Sincerely, Daniel P Smith " L S 6854 Hunsaker & Associates San Diego, Inc DAVE HAMMAR LEX WILLIMAN ALISAVIALPANDO DAN SMITH RAY MARTIN CHUCK CATER 9707 Waples Street Sin Diego CA 92121 (8S8I558 4500 PH (858)558 1414 FX www HunsakerSD com InfoOHunsakerSD com MPkc k \0107\2007\c79 doc wo 0107 268 3/6/2007 4 01 PM GEOCON INCQRPOflA-TED GEOTECHNICAL CONSULTANTS 6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-2974 • TEL (858) 558-690O • FAX (858) 558-6159 FOUNDATION OBSERVATION REPORT PROJECT NAME LOCATION r?-rL:L.cct , 'J I I 7 PROJECT NO DATE /) ' FOUNDATION LOCATION (if not entire build.ng) . l~ U.± PLAN FILE NO FOUNDATION TYPE D CONVENTIONAL a/POST TENSIONED PERMIT NOS JOS': Q, : CIS o 107 D ADDITIONAL OBSERVATION REQUIRED [^SUBSTANTIAL CONFORMANCE • PURPOSE OF OBSERVATION Hverify soil conditions exposed are similar to those anticipated LH"venfy footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report D Vgnfy slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report Qverify footings have been extended to an appropriate bearing strata D Other • APPLICABLE SOIL REPORT TITIF ' ' (Lfi & UJ € \ '' ?f fC/) d 1 1 7 ' Cur /J i?f (!• , i"'A • SOIL REPORT RECOMMENDATIONS BASED ON [Expansion Condition D VERY LOW iTFill Geometry f" I JL-t, Mother Pcrf.TTT. • MINIMUM FOUNDATION RECOMMENDATIONS Er Footing Depth D 12 Inches D 18 Inches Footing Reinforcement D No 4 T&B D 2-No 4 fa^eoh. /^, ,,>r{ V' /*VA?A/ ^/ 1« Cosin • /y\./ (v^rv-/X. r7/-. r- -•' DATE fiH/lOj(6(0 J ' ' ( D LOW Ll^MEDIUM U HIGH D VERY HIGH £" I fo(fl P ?4 Inches OTHFR J 1-^3(6 fil) )\ ~f*~<- //OV/7 -/rt/i, T&B n2-No5T&B ra^ost-Tensioned OTHER l)-/^^ Interior Slab Reinforcement D 6x6-10/10 D 6x6-6/6 D No 3@24lnches D No 3@18lnches CEfPost-Tensioned Slab Bedding Material and Thickness Foundation Width Vapor Barrier .. / € f- A OBSERVATIONS M Substantial conformance with Soil Reports (see "Purpose of Observation") B'Substantial conformance with Foundation Plans Identify / ' / P/ ;J /l <J f '"' ^'"^- - D Other _ COMMENTS NOTE IT IS ASSUMED THAT AU FOOTING EXCAVATIONS Will BE CLEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT THE SOU MOISTURE CONTENT Will BE MAINTAINED GEOCON REPRESENTATIVE SOUTHERN CALIFORNIA SOIL & TESTINQ INC. 6280 RIVERDALE STREET, SAN DIEGO, CA 92120 • Phone (619) 280-4321 Fax (619) 280-4717 83-740 CITRUS AVENUE, SUITE G, INDIO, CA 92201 • Phone (760) 775-5983 Fax (760) 775-8362 71387 SCS&T FILE NO . PO. NO . PL NC FIX PAGE OF / FIELD INSPECTION REPORT FOR Q REINFORCED CONCRETE Q REINFORCED MASONRY D WELDING D FIREPROOFING * HQ.C CONCRETE D ROOFING / WATERPROOFING ESfpT CONCRETE / STRESS Q EPOXY ANCHORS D H S BOLTING Q PHASE*DSA FILE NO DSAAPPNO PLAN FILE NO. ENGINEER GENERALCONTRACTOR: I SUBCONTRACTOR LOCATION OF WORjCpPECTED ,™c DATE £^ DESCRIPTION OF WORK INSPECTED TIME ARRIVED TIME P;T&'••''••'• • •YX ^r <?'f~ T//^ Ts'$'.75 PE REVIEW I; UBC I hereby certifylhat I hiave Inspected the above reported work Unless noted otherwise, the work Inspected 1$ to the best of my knowledge In compliance with the approved plans, specifications and appllcable«ectlons of the governing building laws Inspector Initials vJ-6? DSA I hereby certify that I have Inspected the above reported work In accordance with the requirements of'DSA approved documents Sampling and testing were conducted in accordance with the requirements of the DSA approved documents The work Inspected compiles with the PSA approved documents Yes No Inspector Initials INSPI kTURE ^-^ W REGISTRATION NO •SUPERINTENDENTS SIGNATURE 'signature authorizes the above work DATE SCS&T 205 REV 2/06