HomeMy WebLinkAbout1960 KELLOGG AVE; ; CB980780; Permit8 Li IL DING PE· RM IT
04/29./9b 14:11
Paqe 1 of -1
Job Address: 1360 KELLOGG AV Suite:
Permit Type: COMMERCIAL TENANT IMPROVEMENT
Parcel No: 212-093-01-00 Lot#:
Valuation: 28,480
Occupancy Group: Reference#:
Description: CTI 910 SF,ADD RESTROOMS
: OFFICE AND STORAGE
Permit No: CB980780
Project No: A9b01030
Development No:
Construction Type: NEW
Status: ISSUED
Applied: 03/17/98
Apr/Issue: 04/29/98
Entered By: JM
Appl/Ownr : AKROPOLYS DESIGN 619 273-3889
3660 CLAIREMONT DRIVE
SAN DIEGO CA 92117
*** Fees R•:>quired
Fees:
Adjustments:
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
***
Enter Traffic Impac
Enter ··y '' for Plumb
Each Plurnbin<r Fixtu
Each Install/Repair
Each Water Heater an
Enter "Y' · for Electri
Remodel/Alter Per AMP
Enter 'Y' for Mechanica
Install Furn/Ducts/Heat
04./29/98 0001 {)J ..
C-Ps..1-ftO
114.00
568.00
***
Ext fee Data
270.00
176.00
6.00
44.00
20.00 Y
84.00
7.00
7.00
10.00 Y
25.00
15.00 Y
18.00
/tJ-3CJ-9~
CLEARANCE ___ , ____ --------------..-... ,-,:.:.-:.-:.-:.-:.:.-:.-:.-.-: .. 1
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
FOR OFFICE USE ONL V
PERMIT APPLICATldN
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palmas Dr., Carlsbad CA 92009
(760) 438-1161
PLAN CHECK NO. -3x'l&D
EST. VAL. /~ 5 ~~n\
Plan Ck. Deposit 1 //: t::Y. U
Validated By 11u. '; lJfi
Date V · 1)/ ~
l
Legal Description Lot No. Subdivision Name/Number Unit No. Phase No. Total ti of units
~ssessor's Parcel# Existing Use _}..,I) I CJ\)~ PrUd 0:l.t7,·,~ 00!51 01
~e1cO~O..L....c:'2€?>:!1:::=:~:r...J~~~~·..Mo~ff:..l...!.l.l=::~.J.t~,r...:.)u~::..:l2:~'P<&~:.::f.:::......;";__-_· --,..,,......1-----~~4::::::.... ___ ,=-:::-~PR~M:-:::T~---_;;1;;;;...1'!·• 00
Description of Work ·
1 _::FT. ___ 5_ tfl_ ·.· ... __ .. · ... u,·.~---·_· ....• ·---. -~=----~---~~:.~~:~-~~~---ti of Bathrooms
3u, !}-~
:2 .. ·c0NtActPiRSOi\iitidlffeiwiffnliniij,pilanii .. -... -.. ,.,. -. -.. --,. . -
4. PROPERTY OWNER
Name Addree1
·s. ct[ •. tllll, llliF'MYiMHI
City · o· o~r· :,:a Aoeni icit 0wn,r
0
City
State/Zip
State/Zip
Telephone I Fax#
Telephone I
ISac. 7031.5 Business and Professions Code: Any City or County which requil'fl • permit to construct, alter, Improve, demolish or repair any structure, prior to Its
issuance, also requires the applicant tor such permit to tile 1 1igned 1t1tement that he II licensed pursuant to the provislon1 ot the Cont,actor'1 License Lew
!Chapter 9, commanding with Section 7000 of Division 3 of the Businen and Protenions Codel or th1t he II exempt therefrom, and the basis for the alleged
exemption. Anv violation of Section 7031 .5 by any applicent for I permit 1 1 the applicant to• civil panalty of not more than five hundred dollars lt6~_9.· 4 ,, .. J. 4'Ua-
d :5 i G· r; 'R, -~OS C./t, 9ob '1. 100--,·, r r 47
Designer Name
9t11a Lit&IISI f et t) 0 b".iO
!ork:?~=on :'c1~~!~=n: I hereby affirm ~d~~ ~~lty ot ~~· =-~~-~ f~l~~~~~~t:,:~~~::~. -
7
: :,~ -·~-=-·:, ~" . ·.
0 I have and will meintain I certificate of consent to all-Insure for -ken' compenaatlon II provided by Section 3700 of the labor Code, for the performance
of the work tor which this permit is Issued.
~ I have and will maintain workers' compansatlon, 11 required by Section 3700 of the Labor Code, for the performance of the work tor which this permit Is
issued. My worker's compan11tion inauranca c1nier and policy number are: . 1:7 ,.a
IIIIIIIIIDll[ICemtllftv ST/JTE FON() 0--· 14s.2'b-J;2/-'7,r 11111 .•. ;tDate JC)-/-9cr
ITHIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS _FOR ONE HUNDRED DOLLARS 1noo1 OR LESSI
0 CERTIFICATE OF EXEMPTION: I certify thet in the performance of the work for which this permit II 111118d, I lhaft not employ any person in eny menner 10 ••
to become subject to the Workers' Compensation Llwt of California .
. WARNING: Fellure to aecure worllera' ~ coverage la unlawful, and 1M11 lllllject an employer to crlmklal ,....._ and chrll flne1 up to one hundNd
thOUllnd dohrs lt~100, 01, 10 the COit of C0111p811Ution, ....... -provldad fer In Section 3708 of the Labor oocle, Int .... and aa-J's fNI, -NM -. . ._ . ._,E q -c:29-96
7. OWNER-BUILDIEC'fflJN . · . . ' . ' ·--,". ,._ .... ·_ ... · •·' . ;.~;r·i;,·:"'.'~~:-;;.-'.J····~',:\7'!'.i;'f".;,,t'!!~~~:.'.'·;;r ::•·,,.s,1··""1ff :'~ ,,,:·:· ,., .. '
I hereby affirm that I am exempt from the Contractor·,· Licenu Lew tor the following renon:
0 I, 11 owner of the property or my employen with wages 11 their sole compansatlon, will do the -k and the structin II not intended or offered for nle
!Sec. 7044, Buein-and Profn1ions Code: The Contractor'• Ucenn Law don not epply to an owner of property who builds or Improves thereon, end who don
1uch work himself or through llis own empto.,..., provided thet 1uch Improvements are not intended or offered for Nie. If, ho-var, the bulldlnO or lmpnlve-nt la
sold within one year of completlon, the owner-builder win heva the burden of proving that he did not build or lmllfO" tor the~ of 1etel.
0 I, 11 owner of the property, em exclullvely contracting with licenud contractora to con1tn1ct the ·project ISec. 7044, llullnee1 end Profenlona Code: The
Contractor'• Ucensa Lew dou not apply to en o-of property who builds or improvu thereon, end contrectl for IUCh project• with contrectorl1I licenHd
pursuant to the Contractor'• Ucensa Lewi.
0 I am axemPt under Section _____ Blllineas encl Profenlons Code for thl1 reason:
1. I personally plan to provide the major labor and meterl1l1 for construction of the propoad property Improvement. 0 YES ONO
2. I lhava / have notl 1ignad en applicetlon for I building permit for the proposed work.
3. · I have contrected with the following panon lflrml to provide the proponct c:onatructlon !Include name/ addreu / phone number/ contractors license numberl:
4. I plan.to provide portions of the work, but I heva hired the following person to coordinate, 1upenrile and provide the mejor work !Include name/ eddren / phone
number / contractors licenae number): '
5. I will provide 1011111 of the -k. but I hive contracted lhlrecll the following peraons to provide the work lncllCllled !Include name / addren / phone number / type
of workl: ·
PROPERTY OWNER SIGNATURE_____________________ DATE-;;;;;;;;;;;;;,:::::-;-~
fCOMPLiTE THIS S_ECTiON FOR~ iUti>iNa l'iliMi1i -~+~"".":"t'~''f"~::""!'l"·~":.';°\"T""m'~ C . ~,,~-,.w·~· ,-'., ·" , .,,,.,,,...,,_:,·· c,,, .... '.~..,
Is the epplicant or future building occupant required to submit I bulinns plan, ecutety henrdoul meterlela regleba~ term or risk management encl .,,._wtion
program under Sections 25606, 25533 or 25534 of the Presley-Tanner-.,.._ Subltence Account Act? 0 YES O NO
Is the epplicant or future building occupant required to obteln e permit from the air pollution control district or air quallty menegement dlstrlct7 0 YES O NO
Is the facility to be constructed within 1 ,ODO fHt of the outer boundlry of I achoo! site? 0 YES O NO
IF ANY OF THE ANSWERS ARE YE$, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
ia, -·· CONSTRUCTION LENDING AGENCY::;,, .. ,_. ... ,.,, ... ~-,~---•. ~--~,--s·:,:-Pf ·,-.,~:·:;'~'.;'-~ ;J~-,.. ..... ~..,~-c,-, ... ,,-_,..~,c:""'"'""''""''··'."'~-,., ..... ~-,-~---,,-· ... ,,,._ .. ··
I hereby affirm that there is• construction lending agency for the performance of the work tor which this permit Is lnued !Sec. 3097(il Clvll Codal.
I certify that I have read the application and 1t1te that the above Information II correct and that the Information on the plane la accurate. I agree to comply with all
City ordinances and State laws relating to building construetion. I hereby authorize reprHentetivn of the Cltt of C1rl1b1d to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit i1 required for axcevatlons over 5•0• deep end damoHtion or construction of atructurH over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shell expire by llmltatlon end become null and void it the building or
work authorized by such permit is not co encad within 386 da from the date of such permit or If the building or work authorized by 1uch permit is suspended
or abandoned It any time after the I peri of 180 days (Section 108.4.4 Uniform BUilding Codal.
APPLICANT'S SIGNATURE _......;~~-Q::-=f-:~~"I-J~4_e:::,,-------------DATE t} • t7 ,. 't y
YELLOW: Applicant PINK: Finance
S E W E R P E R M I T
04/29/98 14:12
Page ·1 of 1
Job Address: 1960 KELLOGG AV
Fermi t Type: SEWER -OFFICE/WAREHo·usE
Parcel No: 212-093-01-00
Des-cription: CTI 590 SF ,ADD RESTROOMS .
: OFFICE AND STORAGE
Permitee: AKROPOLYS DESIGN
3660 CLAIREMONT-DRIVE
SAN DIEGO CA 92117
suite:
-619 273-3889
Permit No: SE980071
Bldg Planck#: CB980780
Status: ISSUED
Applied: 04/28/98
·Apr/Issue: 04/2 9/98
-Expired:_
Prepared By: DT
Fl~ffe\l-APPROVAl
INSP ...... -====-~--DAi \:: =·"'"""""·----
CLEARANCE ______ .............._ ____ _
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA_ 92009 (619) 438,-llQl
POOR
QUALITY
ORIGINAL S
;i'
'it
:{i).---
'd! :··(/ . :•1
~:
~1 .,
·I I :
. :;
'I
!, ..
.. ·i -~ ' . I
. •'' ..
P.04 i0-2s-1ssa 14:39
•& l t
,, ,, . • , APPROVED TO CO.VEIi · · , . ., :,, ..
·. , Typt of tn•.etton ' Pate lnip~t~r . ·, .Nott't' .. '' ' ,BU/LOIN~ .. ' ,·, ' ·-~ tJ-0 ,,..,,_ N ·~ -.--~-' ·' r . -FOVNDATION __ ,. .. ., •I ~~---,. ... ', .. ,. .. -' .. i' ,, r ' '. REINFORCEt1 STEEL ..• . ,,, ' ' " ,, . -'' ' \
' " \
MASON.RY:•: ' . ' . ,. ' ;' : , . j ,,, ,. / ·. . ' ,. .. •' ', ,. I
COROUT-· Cl WALL DRAl~S . : . ' ' .. .a' ' I . , ' ,. \ '. ..
Tll T rAN~LS , .. ,. '. . ,J I~• f .. ; '. .. , . '
POU1' STRIPS' ,. . i ' ' .. • . . •· ,, ..
.'. COLUMN.FOOTINGS·;· •', .. ,, ' .,. '· ,. . . ,. ,. ,, . ' .,
SU8FRM1E' 0 ~L(?qfl.· '' q CEl~INO .. , .. .. ... " . '\, ..
ROOF SHEATHING , .,, '• ,. , .. ". • ,, . .
I • • ' .. , .. I
. EXT, SH~~ PANRS : . , . ,· ! : ,, ,,' . :-'• . -.i,' . .. ,# ,,. " I
·f~Mt :...~JP r _,.,/ /./. . "'11' l,J .J -. '' IL ~ ,.,. ·-. >,-zr::IL.VA ,, ,, " • INSUL~TION' -\ 15~ .. -'\l l:..l'-'·,'--. .. -,\·-~ ~.II' I .. . . ...--.... -. : I --,,, ' .
E~TER(OR ~TH. · ., . .. ' ': ~ • I .,... .. ., .. .. •' ..
tNyERIP,R_lATH & O~YW~~L. · ·, ' ,, ... ·5 ·.l ~,; 'I. 'I 4/Silr___,-.. , , . • ,, . -.I.. . ... .. . ,'
FtN~l . '·~ ' I r, ,·,
' '. ' ·, ,. • . . ' . . .. ,I . ., ' ,, . Pl:UMB,IN(i : : '. : . .. ,. : '. '• ,. . " t;J ~EWER AND BVCO ,CJ PUCO .. ,' ,,_.,.;;!.J' :~ .., . ~~-tN ;,-.. l,JfL' .A -'UNDERCROUNI;:>. '1!1'.WAS~ 0'\IY,\TEf(. . .c;x r ~-//~-,. ·~l-:'i, "' illW,-..Lr~ ~ ~ . '' . ' . .,, .
TQI' OUT , g..W~STE ~WATER ' It, .. -:-, I '•\-' nT. --~ i:;,Jt· .. -~-t::") -~, . ·V!!!"'f' '/../ .. . y ,--. . _.,!_,~,.---. ' .
. TU8,AND.SHOWER PAN· I .. '' .. . I ,', . '1 ',. ·, • .. , . ' . . ' .,• .. .,
C OAS TEST .. •0 'OAS PIPING . . ' ' ' ' .. ' •'
• C'WATEft HEA T.,ER-'C SOLAlt WATER ' ., ' • .. •' '· . .. ,, .,
FINAL· . ... ,, ., .... '• . ' . ,, . • .. . .. , .. ,. ', .. ,, .. ELEGTRIC!fi I I ' ,;, ,. ' '•: . ·'
QII.E,1.ECTRIC IJNOER,GROUND. :,Cl LIFER', :~:J.f:Yr ·«(:Z:~,-~ ~ .,. : . ' ', . ' ' ' . . .
ROUGH ELECTRIC WALLS · ' ~:,.~r. ~ ~ L/ A . ,, ,,·, " ' . . --.
ROUCH ELECTIUC CEl~INC ' • , ""·"'."'5., \~r.• .. I . . ' .,. .•. ·, '.
'Cl ELE~TRIC.SER.VICE I •~ TEMP.~RAltY ·.• '. • ' ·,
. ,, .. . •'
CBPl'l!DING [J POOL' " ., ,, .. '' .. . .. ' '• . •'
. FINAL. . ' '., . ' •!, ' ' ' . . . . '.
MEC.H!tNIC~L ,' ' . '. ' '· ' .. ,, ,,
UNOEROROUNO'OUCTS'& PIPINO '
.. . .. I I '.1 ' : ..
\ ., .,
! .
' 0 ouc; & Y'L~M.Cl REF, PIPING . .. . . ,, , . .
. I I • j1 • • , .. ' l'MT. AIR CONO. SYSTEM$ .. ' . ,, '• I , . . . , .. .. , '. •' ..
VEN:tllATING SV~;T'EMS . ~ " I i " • ,, . . :-,, .,,'
"
FINAL ... I I •• • ' CALL· FbR FINAL fNSPEGTIQN WHEN ~U:APPROPRIATE ITEMS·AS<:>VEHAVE BEEN!tPPRO,VED .
fl.NA~ • Sl1n~When Approprlat•
.. ..
8uildlng O~P,t. nn,peetlona) ··
Fire-D!Pqnment ,. '
Plannlns·Department I
Engineering DepL (ln~p~tlons)
Building lns~ori (7am-4pin):
'CMWD ·,
' .
Wafer ~nspectfdns I
·kEV 619~·. l.
,: .
.. .
: .
I
.,. ~-'
.-..1e-1101 . &-.I b "'l'~ ) '!f(_-f./.d
' 93 l·2.1:Z1 ..
, dllfl-1161
' 4 38--3891 ' .
"
438~3550 '
,·
43Q-272:2 Ext,1~ • ,
· 4.38~3891 ' .. .. . ..
'
•1, I t• •
:-.,,,
''
' .. ,,
,.
. .
'
,.
.
'' .
' ... .
,'•
., • •
_. ;,, ; ,,
' •
. . .. . , .
I ' "· .
. ' . , . I ... ..
,, . ' . ·, .
' '•
' . .. .. . '
' · SEE B~~K FQR SPECIAL NOTES ·
I'• I •' ' t
"
'
,,
•
..
.
·.
w' ,,_,_
10/26/98 INSPECTION HISTORY LISTING
FOR PERMIT# CB980780
DATE INS-PECTION .TYPE INSP ACT COMMENTS
06/02/98 Final Plumbing RI RI C/471-9795
06/02/98 Final Plumbing PS co
06/02/98 Final Electrical RI RI C/GARY/471-9795
06/02/98 Final Electrica.l PS AP
06/01/98 Rough/Topout RI RI B/GARY/438-7835Xl67 AM PLEASE
·06/01/98 Rough/Topout PS AP SUMP PUMP SYSTEM
05/12/98 Frame/Steel/Bolting/Wel PS AP
05/12/98 Rough/Topout PS WC
05/12/98 Rough Electric PS co INFORMED ABOUT NO MULTI METERS
05/12/98 Rough Combo RI RI C/RANDY/909/301-0795
05/11/98 Interior Lath/Drywall RJ: RI C/RANDY/909/301-0795
05/11/98 Interior Lath/Drywall PS AP
05/08/98 Insulation RI RI C/BILL/471-9795
05/08/98 Insulation RI RI C/BILL/471-9795
05/08/98 Insulation PS AP
05/07/98 Insulation RI RI C/SCOTT/471-9795 PM PLEASE
05/07/98 Insulation PS CA
05/04/98 underground/Under Floor RI RI R/BILL/471-9795
05/04/98 Underground/Under Floor PS AP NEED CLEAN OUTS
05/04/98 Rough/Topout RI RI R/BILL/471-9795
05/04/98 Rough/Topout PS AP
05/04/98 Rough Electric 1,U RI R/BILL/471-9795
05/04/98 Rough Electric PS AP
HIT <RETURN> TO CONTINUE .••
DATE: 4/17/98
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-780
EsGil Corporation
'l.n Pa~rsliip witli (jovemment for '.Buiftfing Safety
SET:I
PROJECT ADDRESS: 1960 Kellog Ave.
PROJECT NAME: Republic Tool Manufacturing TI
~ANT . JJRIS.
0 PLAN REVIEWER
0 FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes .
• The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified in Remarks below are resolved and checked by building
department staff.
D The plans transmitted herewith have signi~icant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being he)d at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check _list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D . Esgil Corporation staff did not advise the applicant that the plan check has been completed.
• Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Chris
Date contacted: (by: )
Mail Telephone Fax In Person
Plan review inquiry
Fax#:
• REMARKS: Please make the ·notes as circled in red on sheets A-1 and A-5 on the Owner
Set II to the City Set II. Please have inspector verify accessibity statement on A-1 for
complying disabled access.
By: Mike Puckett
Esgil Corporation
0 GA O CM O EJ
•' -'.
0 PG ~.
Enclosures:
478/98 trnsmtl.dot
City of Carlsbad
. M#hf·iht44ihhi•l4·thih,t4hi
r,J BUILDING PLANCHECK CHECKLIST
DATE: ,-3:.--/ C/~o . _ PLANCHECK NO.:
BUILDING ADDRESS:: / ffa f) ~ 9= ~
PROJECT DESCRIPTION: _:C...I.-...,.._ .::::'£=------· ___________ _
ASSESSOR'S PARCEL NUMBER: EST. VALUE:
ENGINEl;RING DEPARTMENT
APPROVAL. DENIAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformanc;:e with applicable codes. Please review
carefully all comments attached, a.s failure to comply
with instructions in this report can result in
suspension of permit to build.
A Right-of~Way permit is required prior to
construction of the following improvements:
attached report of deficiencies
Make necessary corrections to plans
or specifi tion for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
By:.-------Date:
FOR OFFICIAL USE ONLY
~ · ENGINEERING ~urHORiZArio~i to ,ssui:.0su1to1NG PERMIT:
ATTACHMENTS
Dedication Application
Dedication Checklist
~-. · ·•. . Date: A 2f3 13
ENGINEERING DEPT. CONTACT PERSON
Name: Michele Masterson
City of Carlsbad
Improvement Application
Improvement Checklist
Address: 2075 Las Palmas Dr.., Carlsbad, CA 92009
Future Improvement Agreement
Grading Permit Application
GradinQ Submittal Checklist
Right-of-Way Permit Application
Right-of-Way Permit Submittal Checklist
-and lnform~tion Sheet
Sewer Fee Information Sheet
· Phone: (619) 438-1161, ext. 4315
CFD INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
,\\LASPALMAS\SYSl!.IBRARY\ENG\WORD\DOCSICHKLST\Bulldlng Plancheck Cklst BP0001 Form MM.doc . .,
A-4
Rev.OB/0
3l'!2075 Las Palmas br .• Carlsbad, CA 92009·-~ 576 • (619) 438-1161 • FAX (619) 438-0894
/a Ci
BUiLDING PLANCH~CK CHECKLIST
SITE PLAN-
1. Provide· a. fully dimensioned site plan drawn to scale. Show:
A. North Arrow·
B. Existing & Proposed· Structures
C. Existing Street Improvements
2. Show on site plan:
A. Drainage Patterns
D. Property Lines
E. Easements
F. Right-of-Way Width & Adjacent Streets
G. · Driveway widths
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: '1Finish grade will provide a minimum positive
drainage of 2% .to swale 5' away from building."
B. Existing 8t Proposed Slopes and Topography
3. · Include· on title sheet:
A Site address
B. Assessor's Parcel Number
C. Legal Description .pl-ecfse.-proutd-e_ ·
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse,. office, etc.) pre.viously approvet;i.
CL b r-eet_ kc{ C£.Vr\...,
fo~ +h "(_ 5fo )ZJ
-Por -e..aci"-Clv+:-f';..e f-QV'\., i-C,t_~-e_. EXISTING Pl;RMIT NUMBER
f .e.1 · ~ o-f-o+-flc_e_
ci; · l:/l of Si-or-aCJ e__(
"Thts ts n-e.eded. TO -----'-------'--'----
C.c:tlc.u la+.e._ ~-es, DISCRETIONARYAPPROVilL COMPLIANCE
DESCRIPTION
0 0· 0 4a. Project does not comply with the following Engineering Conditions of approval for
Project No. _________________________ _
Q 4b. All conditions are in compliance. Date: _________ _
\\LASPA.LMASl$YS\LIBRARY\!:NGIWORD\DOCS\CHKLST\Bullding Plancheck Cklst BP0001 Form MM.doc
Rev. 09/03/97 2
1ST.r
D
D
o·
D D
D D
BUILDING PLANCHECK CHECKLIST
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ ______ , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows: ------------------'--
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 ½" x 11" plat map
and submit with a title· report. All easement documents must be approved and
signed by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completedby: ___________ _ Date: ___ _
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building $ite must be
constructed .at . time .of building construction whenever the value of the
construction exceeds $ ______ _, pursuant to Carlsbad Municipal Code
Section 1.8.40.040.
Public improvements required as follows: _____________ _
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
. appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
checklist must be submitted ih person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans-signed by: _________ _ Date: -----
6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $ _______ so
we may prepare the necessary Future Improvement Agreement. This agreement
must be signed, . not~rized and approved by the City prior to issuance of a
Building permit. ·
Future public improvements required as follows:
~~b:,~;\SYSIL!BRARY\ENG\WO_RD\DOCSICHKLST\Bullding Plancheck Cklst BP0001 Form MM.doc 3
·~ /. ,,.,,,..~
Cl
a
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Q
Cl
Cl
BUILDiNG PLANCHECK CHECKLIST
6c. Enclosed please· find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions thc:i!t invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
?a. lna<liequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities ( cut, fill. import, export). Write
"No Grading'' on plot plan if none is required.
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: . The Grading Permit must be issued and rough grading
approval o~tained prior to issuance of a Building Permit.
Grading Inspector sign· off by: Date:
7c. Graded Pac:I Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
7d.No Grading. Permit required.
?e.lf grading is not required, write "No Grading" on plot plan.
MISCELLANEOUS PERMITS-. .
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the ·public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tieing
into public storm dr~in, ~ewer and water utilities.
Right-of-Way permit required for:
\\LASPALMASISY,S\LIBRARY\ENGIWORD\DOCS\CHKLST\Bulldlng Plancheck Cklst BP0001 Form MM.doc 4
Rev. 09/03/97
1st.I 2nd.I 3rd.I
Q Q CJ
Q
q Q Q
Q Q
Q 0
BUILDING PLANCHECK CHECKLIST
9. A SEWER PERMIT is required concurrent with the building permit issuance. The
fee is noted in the fees section on the follo'A'.ing page.
10, INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the F;.WA Exempt List. You may telephone (760) 438-2722, extension 153, for
assista·nce. ·
Industrial Waste permit accepted by:
Date:
11. ·NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to.reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
.12. Q Required fees are attached
Q No fees requireq
13. Additional Comments:
\ILASPALMAS\!)YSILIBRARYIENGIWORD\OOCSICHKLST\Bulldlng Plancheck Ck~! BP0001-Form MM.doc
Re_v. 09103197 -5
EsGH Corporation
'l.n Partnusliip Witli (jovemmen.t for 'lJuiftfing Safety
DATE: 3/30/98
JURISDICTION: Carlsbad
PLAN CHECK NO.: 98-780
PROJECT ADDRESS: 1960 Kellog Ave.
SET:I
PROJECT NAME: Republic Tool Manufacturing TI
~NT
~ D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The. plans transmitted herewith will substantially comply with the jurisdiction's building copes
when minor deficiencies identified below are resolved and checked by building department
staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
• The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed,for the jurisdiction to forward to the applicant
contact person.
• The applicant's copy of the check list has been sent to:
Akropolys Design
· 3660 Clai~emont Dr. San Diego, Ca. 92117
• Esgil Corporation staff did not advise the applicant, except by mail, that the plan check has
been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Fax#:
Mail Telephone Fax In Person
D REMARKS:
By: Mike Puckett Enclosures:
Esgil Corporation
D GA DCM 0 EJ D PC 3/19/98 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 98-780
3/30/98
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 98-780
OCCUPANCY: B/S-1
TYPE OF CONSTRUCTION: VN.
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 3/17/98
DATE INITIAL PLAN REVIEW
COMPLETED: 3/30/98
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
USE: Office/Warehouse
ACTUAL AREA: 910sf TI
STORIES: 1
HEIGHT:
OCCUPANT LOAD: 2 TI
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 3/19/98
PLAN REVIEWER: Mike Puckett
This plan review is limited to the technical requirements contained in the Uniform Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 1994 UBC. ·
The following items iisted need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list ( or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 40, T-ENANT IMPROVEMENTS WJTHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC) tiforw.dot
Carlsbad 98-780
3/30/98
1. Please make all corrections -on the original tracings, as requested in the correction
list.
Submit three sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City
of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA 92009,
(619) 438-1161. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619) 560-
1468. Deliver all remaining sets of plans and calculations/reports directly to the 9ity
of Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
2. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
3. Provide a statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC, UMC and UPC and 1993 NEC.
4. Please revise the type of occupancies to reflect that shown on the plans or visa
versa. The plans represent a warehouse use S-3 with office B. No where on the
plans suggests an A-3 use please clarify.
5. Please revise the square footage on the Title sheet to reflect the areas shown on
the plans. Restrooms-418, Storage 312, Janitor-38, and Office-142.5. Total Tl
improvement totals 91 0sf.
6. Please dimension all rooms on the plans to be included in the work.
7. Please show at detail 2/A-5 how interior partition is to be laterally supported to
resist 5 lbs/sqft. of wall area. Show support to roof structure above or exterior wall.
8. Provide notes and/or details to show that the floor and wall finish in toilet rooms are
surfaced with a smooth hard non-absorbent material extending five inches up the
wall. Similar surfacing shall be provided on the walls from the floor to a height of 4
fee_t around urinals and within water closet compartments. Section 807.
9. Note on plan that suspended ceilings sh~II comply with UBC Tables 25-A, 16-0 and
16-8.
Carlsbad 98-780
3/30/98
ELECTRICAL
10. Submit plan showing location of all panels in tenant improvement area.
11. Per the City of Garlsbad request please· note on the plans that "No AC cable or
Romex wiring method is allowed.
MECHANICAL
12. Show the size, location and type of all heating and cooling appliances or systems.
13. Show on the plans mechanical ventilation in all rooms capable of supplying out~_de
air at a minimum rate of 15 cubic feet per minute per occupant. UBC, Section
1202.2.1
14. Provide mechanical plans showing existing and proposed HVAC equipment, ducts
and access to equipment. -
15. Show the required restroom ventilation as per Section 1202.1 UBC. with ducting to
the outside.
PLUMBING
16. Provide complete plumbing plans, including:
• Complete drain, waste and vent plans.
• Provide g-as line plans and calculations, showing pipe lengths and gas demands.
UPC Section 1217.0 .If applicable
• Provide complete water line sizing calculations, including the water pressure,
pressure losses, water demands, and developed pipe lengths. UPC Section 610.0
• Show water heater size, type and location on plans. UPC, Section 501.0
17. Show that water heater is adequately braced to resist seismic forces. Provide two
· straps (one strap at top 1/3 of the tank and one strap at bottom 1/3 of the tank).
UPC, Section 510.0
18. Show P & T valve on water heater .and detail drain line route from P & T valve to the
exterior. UP·C Section 608.5.
ENERGY
19. The completed and signed ENV-1, L TG-1, and MECH-1 forms must be imprinted on
the plans.
i:
Carlsbad 98-780
3/30/98
io speed up the review process, note on this list (or a copy) where each correction
item has been addressed, i.e., plan sheet, note or detail number, calculation page,
etc.
Please indicate here if ahy changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly describe
them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes a No CJ
The jurisdiction has contracted with Esgil C9rporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468,
to perform the plan review for your project. If you have any questions regarding
these plan review items, please contact Mike Puckett at Esgil Corporation.
Thank you.
Carlsbad 98-780
3/30/98
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 98-780
PREPARED BY: Mike P"ckett
BUILDING ADDRESS: 1960 Kellog Ave.
DATE: 3/30/98
BUILDING OCCUPANCY: B/S-1 TYPE OF CONSTRUCTION: VN
BUILDING PORTION BUiLDING ARL.n VALUATION VALUE
(ft.2) MULTIPLIER ($)
Tenant Improvement 910 28.00 25,480.00
Air Conditioning
Fire Sprinklers
TOTAL VALUE 25,480.00
• 1991 UBC Building Permit Fee D Bldg. Permit Fee by ordinance: $ 258.50
• 1991 UBC Plan Check Fee-D Plan Check Fee by ordinance: $ 168.00
Type of Review: 0 Complete Review D Structural Only D Hourly
D Repetitive Fee Applicable D Other:
Esgil Plan Review Fee: $ 134.42
Comments:
Sheet 1 of 1
rriacvalue.doc 5196
ENGINEERII\IG DEPARTM.~NT
FEE CALCULATI.ON WOR-KSHEET
D Estimate base~ on unconfirmed information from applicant.
D Calculation based on building plancheck plan .submittal ..
Address: ;qU? 0 1~~, {i!5~ 4·· .Bldg, Perm.it No,.~~ OZ t50
Prepared by:J) I<< Cf '.S Date: i(zz:¥/f r Checked by: ____ Date: ____ _
. . . l i ·• -. EDU' CALCULATIONS: List types. and squ~re, footages-for all uses;
Types of Use: Off/ c._£_ Sq. Ft./Units:
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: Orr!~ Sq .. Ft./Units: l 2 § £
FEES REQUIRED:.
EDU's: .. 04 --"-_.;;;_ __ _
ADT's: ------
WITHIN CFD: D YES (no bridge & thc;,rougl:ifare fee, _reduced. Traffic Impact Fee) D NO
Cl 1. PARK-IN-LiEU FEE PARK AREA:
FEE/UNIT:. X NO •. UNITS: =$ ____ _
>( 2. TRAFFIC IMPACT FEE
ADT's/UNITS: '2-X FEE/ADT: ::z 2-..a.... = $ _ _,_4_._+_
D 3. BRIDGE AND THOROUGHFARE FEE
ADT's/UNITS: _________ _ X FEE/ADT: ___ _ =$ _____ _
D 4. FACILITIES MANAGEMENT., FEE ZONE: _____ _
UNIT /S:!l.FT. =----,..---,.-
~-SEWER FEE
X FEE/SQ.FT./UNIT: ___ _ :a:$ ____ _
PERMIT No.$8q B~ 7 (
·EDU's:, 04
BENEFIT AREA: tJ IA J
X FEE/EDU: /_,'?z4
DRAINAGE BASIN: S: (b-,
EDU's: ____ .,... -X FEE/EDU: __ _
0 6. DRAINAGE FEES PLDA.______ HIGH ___ /LOW __ _
ACRES: ---~..--X FEE/AC: ___ _
0 7. SEWER LATERAL {$2,500)
7.3 =$ _____ _
=$ _____ _
=$ _____ _
=$ _____ _
TOTAL OF ABOVE FEES*:$ 1 'I 7
*NOTE: This calculation sheet is NOT a complet~ list of all fees which may be due.
Dedications and Improvements may also b~ req1,1ired with Building Permits.
P:\DOCSIMISFORMS\FEE CALCULATION WORKSHEl;T REV 01/28/97
/ 2-5-r/.J O /;;::-Ft~
I 28 .!_/ B C)O ;::::.. ,_ f:J7 Eb u '
I zS ..f-Sooo :::-. 0 3
. (C0 4 _~0's r~-
r 28 7/62.fZ>'o A 2..o :::-~~S,
l l S ~tr0 eo x::. ~ ~· , l-A~
Q~~
I•• '
I '
PLANNINC/ENCINEERINC APPROVALS
PERMIT NUMBER CB C/8o;go DATE >...-18 ,rg
ADDRESS . j q (oD k J4£. /Wt.
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
< < $10,000.00)
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLACE FAIRE
COMPLETE OFFICE BUILDINC
OTHER -----------=-----------------
PLANNER
ENCINEER ___ -------DATE -------
DoCS/MlsformsJPlanntng Engtneertno Approvals
City _of Carlsbad . · . . 98102
Fire Department • Bureau of Prevention
Plan Review: . Requirements Category: Building Plan Check
Date of Report: Tuesday, March 24, 1998 Reviewed by:_Q ___ --"'(!"""M'---=-llf--"A-~-__ u 6
Contact Name AkropoJys· lhter·iors
Address .36E;m Clairemont Dr Ste 1 o
City, State San Diego CA 92117
BJdg. Dept. No. CB980780 Planning No.
Job Name . Republic Tool ~~-----~--~---~---
Job Address _1_9_60_K_el_lo=gg"-· -"------~~-~----Ste. or Bldg. No. ____ _
.igi Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements .
. D Disapproved .: Please see the attached-report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance. with applicable
codes and standards. Submit c·orrected plans and/or specifications to this
office for review.
For Fire D?partment Use Only
· Revi$w 1st~. __ _ 2nd.~~~ 3rd.~----
Other Agency ID
·CFD Job#__.,....._98_1..,...0_2~. _ File#_~-~
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
jf -·'.t-in~ncil
TITLE 24 CONSULTING
HVAC DESIGN $ CCI
1ITLE 24 REPORT FOR:
REPUBLIC TOOL AND MANUFACTURING
CARLSBAD, CA.
PROJECT DESIGNER:
AKROPOLYS INTERIORS
3660 CLAIREMONT DR.
San Diego, ~A. 92117-5910
619-273-3889
REPORT PREPARED BY:
Jeanne Fricot, CEA
Haynal & Co., Inc.
2171 India St. Ste. A
San Diego, CA 92101
619-531-1122
Job Number:
Date: 3/6/1998
The COMPLY 24 compute~ program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd/EnergySoft, llc (415) 883-5900.
425 W. 5th Ave., Ste. 201 • Escondido, CA 92025
(760) 743-5408 Escondido• (619) 531~1122 San Diego• (714) 573-4065
w
• Table Of Contents for Title 24 Report
-------------------------------------
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Form ENV-1 Envelope Certificate of Compliance
Form LTG-1 Lighting Certificate of Compliance
3
5
Form MECH-1 Mechanical Certificate of Compliance .................... 7
Form ENV-2 Prescriptive Envelope Summary ............................ 10
Form LTG-2 Prescriptive. Lighting Compliance Summary ................. 14
Form MECH-2 Prescriptive Mechanical Summary ......................... 15
Form ENV-3 Construction Assemblies .................................. 16
Form MECH-3 Mechanical Equipment Summary ..•.......................... 21
Form MEC~-4 Mechanical Ventilation .................................. 22
CERT.IFICATE OF COMPLIANCE -Envelope (part 1 of 2) ENV-1 page 3 of 22
.-----------------------------------------------------------------------
Project Name·: REPUBLIC TOOL AND MANUFACTURING
Address: CARLSBAD, CA.
!Date: 3/6/1998 I _______ _
!Building Permit No
Envelope I _______ _
Designer: AKROPOLYS INTERIORS !Checked by/ Date
I
Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875
-----.----------------.-----------·----------------------------------------
GENERAL INFORMATION
r>ate of Plans: Building Conditioned Floor Area: 681 sf
Building,Type: Nonresiqential Climate Zone: 7
Phase of Construction: o New Construction X Addition O Alteration
Method of Envelope Compliance: Prescriptive -Overall Envelope
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6 of the Calif-
ornia Code of Regulations. This certificate applies only to building
envelope requirements.
rhe documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
yeanne Fricot, CEA
Certificate# 92-95-613
~ ~ 03-06-1998
ignature) (Date)
The Principal Envelope Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
ap.d with any other calculations submitted with this permit application.
The proposed building has been designed to meet the envelope requirements
contained in sections 110, 116 through 118, and 140, 142, 143 or 149 of
Title 24, Part 6, Chapter 1.
Please check one:
O I hereby affirm that I am ·eligible under the provisions of Division 3
of the Bu~iness and Professions Code to sign this pocument as the
person responsible for its preparation; and that I am a civil engineer
or architect.
0 I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
~ents for work that I have contracted to perform.
0 I affirm that I am eligible under the exemption to Division 3 of the
Business and ]?rofessions Code by Section ____ of the
Code t0 sign this document as the person responsible for its
preparation; and for the following reason: ---------------
PRINCIPAL ENVELOPE DESIGNER
AKROPOLYS INTERIORS
619-273-3889
ENVELOPE MANDATORY MEASURES
(Signature) (Lie. #)
Indicate location on plans of Note Block for Mandatory Measures:
(Date)
},
CE~TIFICATE OF COMPLIANCE -Envelope (part 2 of 2)
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation:rHaynal & Co., Inc.
ENV-1 page 4 of 22
jDate: 3/6/1998
I
jCOMPLY 24 User 2875
-------.------------------· ~ ----------------------------------------------
OPAQUE SURFACES
Assembly Name
R-13 Demising Wall(MTL)
R-19 Roof (R.19.2x8.16)
Carpeted Slab On Grade
Exposed Slab On Grade
.8" Concrete Tilt-Up
FENESTRATION Frame
Orient Panes Type
-------------
Front (N) 1 Metal
Const
Type Location/Comments
;Metal
Wood
None
None
None
Exterior Shade
-----------------------
None
OH
N
Glazing Type
Note to
Field
Single Clear Default(N)
.,
CERTIFICATE OF COMPLIANCE -Lighting (part 1 of 2) LTG-1 page 5 of 22
---------------------------------------------------------------------------
Pro'j ect Name: REPUBLIC TOOL AND MANUFACTURING
Address: CARLSBAD, CA.
Lighting
Designer: AKROPOLYS rm::ERIORS
Documentation: Haynal & Co., Ihc.
!Date: 3/6/1998 , _______ _
!Building Permit No , _______ _
jchecked by/ Date
I
!COMPLY 24 User 2875
-----.---------------------------------------------------------------------
GENERAL INFORMATION
Date of _Pl?tns: Building Conditioned Floor Area: 681 sf
Building Type: Nonresidential Climate Zone: 7
Phase of Construction: O New Construction X Addition O Alteration
Method .of Lighting Compliance: Prescriptive
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6 of the Calif-
ornia Code of Regulations. This certificate applies only to building
lighting requirements.
The documentation preparer hereby certifies that the documentation is
accurate and.complete.
DOCUMENTATION AUTHOR
Jeanne Fricot, CEA
Certificate# 92-95-613
~~ 03-06-1998
(7.gi;ature) (Date)
The Principal Lighting Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed _to meet the lighting requirements
contained in sections 110, 119, 130 through 132 and 146 or 149.
Please check one:
O I her~by affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sigh this document as the
person responsible for its preparation; and that I am a civil engineer
electrical engineer or architect.
O I affirm that I am eligible under the exemption to Division 3 of the
.Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its· preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
o I affirm that I am eligible under the exemption to Division 3 of the
Busines~ and Professions Code by Section ____ of the
Code to sign this document as the person responsible for its ------preparation; and for the following reason: ______________ _
PRINCIPAL LIGHTING DESIGNER
AKROPOLYS INTERIORS
619-273-,3889
LIGHTING MANDATORY MEASURES
(Signature) (Lie. #)
Ipdicate locatioh on plans of Note Block for Mandatory Measures:
(Date)
CERTIFICATE OF COMPLIANCE -Lighting (part 2 of 2) LTG-1 page 6 of 22
-------------------------------------------------------------------------
Project Name: REPUBLIC TOOL AND MANUFACTURING jDate: 3/6/1998
I
Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875
------------------.---------------------------------------------------------
INSTALLED LIGHTING SCH~DULE
No ,of
Name Lamp Type Lamps
--------------------
Fluorescent 3
Fluorescent 2
MANDATORY AUTOMATIC CONTROLS
Control
Watts/-
Lamp
------
34
48
Ballast Ballasts/ No of Note to
Type Luminaire. Fixt. Field
--------------------------
Standard 1.5 2
Standard 1.0 6
Note to
Control Location ID Control Type Zone Controlled Field
CQNTROLS FOR CREDIT
Control
Control Location ID Control Type
Note to
Zone Controlled Field
"\
.,
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 3) MECH-1 page 7 of 22 ----------------------------. ------------------------------------------
Project Name: REPUBLIC TOOL ANO MANUFACTURING
Address: CARLSBAD, CA.
Mechanical
Designer: HAYNAL & CO.
Documentation: Haynal & Co., Inc.
!Date: 3/6/1998 , _______ _
!Building Permit No , ____ _
!Checked by/ Date
I
jCOMPLY 24 User 2875
----~----~------,---------------.------------------------------------------
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 681 sf
Building' Type: Nonresidential Climate Zone: 7
Phase of Construction: O New Construction X Addition O Alteration
Method of Mechanical Compliance: Prescriptive
Proof of Envelope Compliance: 0 Previous Permit X Compliance Attached
STATEMENT OF COMPLIANCE
This Certificate of Compliance li·sts the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6 of the Calif-
ornia Code of Regulations. This certificate applies only to building
mechanical requirements.
The -documentation preparer hereby certifies ~hat the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Jeanne Fri cot, CEA·
Certificate# 92-95-613
~~ 03-06-1998 -($&._,_g_n_a_t_u_r_e_)______ (Date)
The Principal Mechanical Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compiiance forms and worksheets, with the specifications,
and with any -other calculations submitted with this permit application.
The proposed Building has been designed to meet the mechanical requirements
contained in sections 110 through 115, 120 through i24, 140 through 142,
144 and 145.
Please check one:
O I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
mechanical engineer or architect.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by· Section 5537.2 of the Business and
Professions Code to sign this document as the person responsiple for
its preparation; and that~ am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section ____ of the
Code to sign this document as the ·person responsible for its
preparation; and for the following reason: _______________ _
PRINCIPAL MECHANICAL DESIGNER
HAYNAL & CO.
"619-531-1i22
MECHANICAL MANDATORY MEASURES
(Signature) (Lie .. #)
Indicate location on plans of Note Block for Mandatory Measures:
(Date)
CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 3)
Project Name: REPUBLIC TOOL AND MANUFACTURING
pocumeµtation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name SPLIT SYSTEM HEAT PUMP
Time Control S ----Setback Control n/a
#of Isolation Zones n/a
HP Thermostat Yes
Electric Heat 5.0 KW
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B
A
No Economizer
102
Heat Pump
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type·
.Make and Model
BDP CO. 661CJ030/FB4A
DX
Code Tables
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilation
B :Air Balan<;ie
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
OA Damper
A:Auto
G:Gravity
MECH-1 page 8 of 22
jDate: 3/6/1998
I
!COMPLY 24 User 2875
Note to
Field
I I
I
·1
I
I
I
I
CERTIFICATE OF COMPLIANCE -Mechanical .(part 3 of 3) MECH-1 page 9 of 22
--------------------------------------------------------------------------
Project. Name: REPUBLIC TOOL AND ·MANUFACTURING !Date: 3/6/1998 ·
I
Documentation: Ha~al & Co., Inc. !COMPLY 24 User 2875
--------------------~-----------------------------------------------------
DUCT INSULATION
System Name Type Duct Location
-----------------------____ " ___ -------------------
BDP co. 661CJ030/FB4A Heating Ducts in Attic
Coo.ling Ducts in Attic
PIPE INSULATION Insul
System Name Pipe Type Required -----------. ------------------------------
Domestic Hot Water
BDP CO. 66iCJ030/FB4A
y
y
NOTES TO FIELD -For B1,1ilding Department Use Only
Duct Tape
Allowed
-------
y
y
Insul
R-Val
4.2
4.2
Note to
Field
-------
Note to
Field
----------------------·---· ------------------------------------------------
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactuAe.d'doors, windows, and fenestration products shall meet the infiltration and U-value certification
requirements of Section 116(a).
2. Site-construced doors, skylights, and wind0ws shall be caulked and weather-stripped per Section 116(b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or
otherwise sealed to limit infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread artd smoke density requirements per Section 11 B(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131(a) and exceptions). .
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more
than one luminaire (per Section 131(b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131 ( c) and .
exceptions).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 ( d) and exceptions).
5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131(e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131(f) and
exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and
exceptions).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirc\,llating pump controls shall meet the requirements of Section 113(a) & (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b )4.
MECHANICAL AND PLUMBING MANDATORY MEASURES
Eguipmertt and Systems Efficiency 1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be
insulated in accordance with Section 123.
3. Air handling duct systems shall be sealed in accordanc!:l with the SMACNA HVAC Ducts Construction Standards, Metal
and Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10.
4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Yentifation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and ( e).
2. Operation and control of outdoor air shall-meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in
accordance with Section 121(d).
4. Systems shall meetthe completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within
the zone. Heating shall be adjustable down to 55 degrees or lower; and cooling shall be adjustable up to 85 degrees or
higher. The control shall provide a dead-band of 5 degrees between heating and cooling. Section 122(a) and (b).
2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours
of up to four hours, per Section 122(e)1.
4. thermostat setup and setback control$ are. required if the summer design dry bulb temperature is more than 99 degrees F,
or if the winter design temperature is less than 33 degrees, per Section 122(e)2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-
use for the areas served by the equipment, per Section 122(f).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square
feet shall be designed,installed, and controlled to serve isolation areas, per Section 122(g).
OVB;RALL ENVELOPE METHOD (part 1 of 4) ENV-2 page 10 of 22 ------------------------------------------------------------------------
'Project Name : REPUBLIC TOOL ANO MANUFACTURING !Date: 3/6/1998
I
Documentation: ~aynal & Co., Inc. jCOMPLY 24 User 2875
WINDOW AREA TEST
A. Display Perimeter 0.0 ft X 6 ft = 0.0 sf Display Area
B. Gross Exterior Wall Area 1002.0 sf X 0.40 = 400.8 sf 40% Area
C. Gross Exterior Wall Area' 1002.0 sf X ,0.10 = 100.2 sf Min Std Area
D. Enter Larger of A or B 400.8 sf Max Std Area
E. Enter Proposed Window Area 73.0 sf Proposed Area
If Eis greater than Dor less than C, proceed to the next calculation
for window area adjustment. If not, go to part 2 of 4.
1. If Eis greater than D:
p. Maximum Standard Area
N/A I
2. If Eis less than C:
C. Minimum Standard Area
100.2 I
SKYLIGHT AREA TEST
E. Proposed ~ea
N/A
E. Proposed Area
73.0
Atrium Height
0.0 ft
Window
Adjustment Factor
N/A
Window
Adjustment Factor
1. 3726
IfHeight < 55 ft
Standard= 5%
If Height>= 55 ft
-----·----+----------Standard= 10%
V
A. Gross Extetior Roof Area 681.0 sf X 0.05 = 34.0 sf Standard Area
B. Enter Proposed Skylight Area O.Q sf Proposed Area
If the Proposed'Skylight Area is greater than the Standard Skylight Area,
proceed to the next calculation for the skylight area adjustment. If not
got to part 2 of 4.
1. If Proposed Skylight Area> Standard Skylight Area:
Standard Skylight Area Proposed Skylight Area
N/A I N/A
Skylight
Adjustment Factor
N/A
OVERALL ENVELOPE METHOD (part 2 of 4)
' . Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: Haynal & Co., Inc.
OVERALL HEAT LOSS
PROPOSED
Assembly Name Area HC U-Vci,1
-----------------------------
8" Concrete Tilt-Up 45.0 18.7 0.671
R-13 Demising Wall(MTL) 288.0 J, .1 0.185
R-19 Roof (R.19.2x8.16) 223.0 2.i 0.049
Single·c1ear Default(N) 48.0 N/A 1.190
R-13 Demising Wall(MTL) ,369. 0 1.1 0.185
R-19 Roof (R.19.2x8.16) 205.0 2.1 0.049
8" Concrete Tilt-Up 20.0 18.7 0.671
R-13 Demising Wall(MTL) 207 .. 0 1.1 0 .185
R-19 Roof (R.19 .2x8 .16) 253.0 2·.1 0.049
Single Clear Default(N) 25.0 N/A 1.190
Total
** OVERALL HEAT LOSS COMPLIES
UxA
------
30.2
53.3
11. 0
57.1
68.3
10.1
13.4
38.3
12.4
.29.8
------
323.9
ENV-2 page 11 of 22
!Date: 3/6/1998
l
!COMPLY 24 User 2875
Adj. STANDARD
Area U-Val UxA
------------
27.1" 0.690 18.7
288.0 0.:)..89 54.4
223.0 0.078 17.4
65.9 1.230 81. 0
369.0 0.189 69.7
205.0 0.078 16.0
10.7 0.690 7.4
207.0 0.189 39.1
253.0 0.078 19.7
34.3 1.230 42.2
------
Total 365.7
PROPOSED UA <= STANDARD UA **
OVERALL ENVELOPE METHOD (part 3 of 4)
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: Haynal & Co., Inc.
ENV-2 page 12 of 22
!Date: 3/6/1998
I
jCOMPLY 24 User 2875
--------------------------------------------------------------------------
OVERALL HEAT GAIN
Glazi:p.g
North
North
WF
0.34.
0.34
PROPO$ED
Area SC
48.0 0.94
25. 0 0. 94.
H
** OVERALL HEAT GAIN COMPLIES
V OHF Total
----------
15.3
9·_ o
------
Total 23.3
PROPOSED
STANDARD
Area RSHG Total
-------------
65.9 0.94 21.1
34.3 0.94 11.0
-------
·Total 32.0
HG <= STANDARD HG **
OVERALL ENVELOPE METHOD (part 4 of 4),
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: Haynal & Co., Inc.
Window Area Adjustment Calculations
Gross Door Window
Wall N?tme Dir Area Area Area
------------------------------------
North N 93.0 48.0
Demising Wall N 288.0 0.0
Demising Wall N 369.0 0.0
North N 45.0 25.0
Demising Wall N 207.0 0.0
------------
TOTALS 1002.0 0.0 73.0
Skylight Area Adjustme_nt Calculations
Gross Skylt
Roof Name Dir Area Area
-----------------------------
ROOF R-19 H 223.0 0.0
ROOF R-19 H 205.0 0.0
ROOF R-19 H 253.0 0.0
------
TOTALS 681. 0 0.0
ENV-2 page 13 of 22
jDate: 3/6/1998
I
!COMPLY 24 User 2875
Adjusted
Adjust Window Wall
Factor Area Area
------------------
1. 3726 65.9 27.1
1.3726 0.0 288.0
1. 3726 0.0 369.0
1. 3 726 34.3 10.7
1.3726 0.0 207.0
------------
100.2 901.8
Adjusted
Adjust Skylt Roof
Factor Area Area
------------------
0.0000 0.0 223.0
0.0000 0.0 205.0
0.0000 0.0 253.0
------------
0.0 681. 0
LIGHTING COMPLIANCE SUMMARY
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: Haynal & Co., Inc.
LTG-2 page 14 of 22 ·
jDate: 3/6/1998
I
jCOMPLY 24 User 2875
-------· -----------------------------------------------------------------
ACTUAL LIGHTING POWER
No of Watts Total
Name Description Lumin per Default Watts
-----------------------------------------. .
48" T-12 Low Watt /3 Lamp (Tandem)
48" Slimline Low Watt /2 Lamp
2 108.0 Y
6 81. 0 Y
216.0
_486. 0
SubTotal 702
Less Control Credits (LTG-3) o
Total Proposed Watts 702
* If not CEC Default value, please provide supporting documentation.
ALLOWED LIGHTING POWER BY ZONE Allowed
Floor LPD Total Tailored
Zone Name Occupancy Area (w/sf) (wa~ts) (watts)
----------------------------------------------------------------
OFFICE 104 Office 223 1.600 357 0
RESTROOM 101 C0rridor/Restroom 205 0.800 164 0
RESTROOM 102 Corridor/Restroom 253 0.800 202 0
--------------------
TOTALS 681 1.062 723 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
.MECHANICAL SIZING AND FAN J;>OWER
Project Name: REPUBLIC TOOL AND MANUFACTURING
MECH-2 page 15 of 22
!Date: 3/6/1998
Documentation:,..Haynal & Co., Inc.
SIZING AND EQUIPMENT SELECTION
HVAC System Name:
Heating System Name:
Cooling System Name:
System Multiplier:
.Peak Load Method:.
Relative Humidity:
1. DESIGN CONDITIONS FOR Carlsbad
2. SIZING
ZONES SERVED BY SYSTEM
OFFICE 104
RESTROOM 101
RESTROOM 102
PEAK
(Jan 12am)
(J1:1-n 12am)
(Jan 12am)
TOTAL ZONE LOAD
Duct Gains & Losses:
Ventilation: 102 CFM)
Return Air Lighting Gain
Supply/Return Fan Gain:
TOTAL SYSTEM LOAD
3. SELECTION
A. Safety/Warmup Factor
B. Maximum Adjusted Load
C. Installed Equipment Capacity
Btu/hr
-------
8710
J:2057
14983
-------
35750
3575
3·525
0
-------
4285'0
1.43
61275
40837
I
jCOMPLY 24 User 2875
SPLIT SYSTEM HEAT PUMP
BDP CO. 661CJ030/FB4A
HEATING
38 F
PEAK
(Jul 3pm)
(Jul 3pm)
(Jul 3pm)
102 CFM)
1
COINCIDENT
50 %
COOLING
SENSIBLE LATENT
83 F
Btu/hr
--------
3929
3704
4474
--------
12107
1211
551
0
0
--------
13868
1.21
16781
16409
68 F
Btu/hr
954
1607
1983
4544
475
5019
5228
If Line 3-C > Line 3-B, Explain:-'-----'----,-----------------
FAN POWER CONSUMPTION
No. Efficiency Peak Conv Peak Supply
~Fan Description Sys BHP Motor Drive HP Fact Watts CFM
---------------------------
Supply Fan 1 X 0.33 I [O. 64 X 1.00] = 0.52 X 746 = 385 1000
------
Totals 0.52 385 1000
FAN POWER DEMAND 385 watts/ 1000 cfm = 0.385 watts/cfm
PROPOSED CONSTRUCTION ASSEMBLY
Project Name.: REPUBLIC TOOL AND ,MANUFACTURING
Documentation: Haynal & Co., Inc.
ENV-3 page 16 of 22
!Date: 3/6/1998
I
jCOMPLY 24 User 2875
COMPONENT DESCRIPTION
I
I I
I
I
I .,
I
I
I
I
. . -------------------------------
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction ·components
Outside Air Film
1. Gypsum or Plaster Board
2. Insulation, Mineral Fiber, R-13
3. Gypsum or Plaster Board
4.
5.
6.
7.
8.
9.
Inside Air Film
As·sembly Name: R-13 Demising Wall (MTL)
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing.Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Absorptivity: 0.00
Roughness: Smooth Plaster, Metal
Th R-Value
Fr (in) Cavity
0.17
0.500 0.45
* 3.500 13.00
0.500 0.45
0.68
Frame
0.17
0.45
13. 00
0.45
0 .6·8
Vnaqjusted R-Values 14.75 0.00
Weight:
Heat Capacity:
4.3 lb/sqft
1.11
TOTAL U-VALUE = 0.185
TOT,lli, R-VALUE = 5.40
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: REPUBLIC TOOL AND MANUFACTURING
ENV-3 page 17 of 22
!Date: 3/6/1998
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
I
I I
I
I I
I
I
I
I
I
I
I
I
I
I I
I I
I
I
I -------------------------------
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7.
8.
9.
Inside Air Film
I
jCOMPLY 24 User 2875
Assembly Name: R-19 Roof (R.19.2x8.16)
Assembly Type: Roof
Assembly-Tilt: 22 deg (Tilted Up)·
Framing Material: Wood
Framing Spacing: II 0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
0.17 0.17
0.375 0.33 0.33
0.010 0.06 0.06
0.500 0.62 0.62
12.000 0.80 0.80
* 6.000 19.00 5.94
0.500 1.43 1.43
0.61 0.61
--------------·------·-----------------------------------------------------. '
Unadjusted R-Values 23.02
ADJUSTMENT FOR FRAMING
(1 /23.02) X (0.90) + (1 / 9.96) X (0.10)
Weight:
Heat Capacity:
6.3 lb/sqft
-2.12
0.049
TOTAL U-VALUE =
'TOTAL R-VALUE =
9.96
0.049
20.35
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: REPUBLIC TOOL AND MANUFACTURING
ENV-3 page 18 of 22
!Date: 3/6/1998
I
Document;atiqn: Haynal & Co., Inc. !COMPLY 24 User 2875
----------------------------·----------------------------------------------
COMPONENT DESCRIPTION
I
I
I
I I I
I
I
I
I
I
I
I
I I
I
I
I
I
I
I
I
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1.. Earth
2. Concrete, 140 lb, Not Dried
3. Flooring, Carpet and Fibrous Pad
4.
5.
6.
7.
8.
9.
Inside Air Film
Assembly Name: Carpeted Slab On Grade
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Framing Material: None
Framing Spacing: 11 o.c.
Framing Percent: o.o %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity
24.000
3.500
0.250
0.17
4.00
0.28
2.08
0.92
Frame
0.17
4.00
0.28
2.08
0.92
·----------. ------------~--------------·-----------------------------------
Unadjusted R-Values 7.45 7.45
ADJUSTMENT FOR FRAMING
(1 / 7.45) X (1.00) + (1 / 7.45) X (0.00)
Weight:
Heat Capacity:
210.9 lb/sqft
42.19"
= 0.134
TOTAL U-VALUE = 0.134
TOTAL R-VALUE = 7.45
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 19 of 22
--------------------------------------------------------------------------
Project Name.: REPUBLIC TOOL AND MANUFACTURING !Date: 3/6/1998
Documentation: Haynal & Co., Inc.
COMPONENT .DESCRIPTION
I
I
I
1. I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Earth
2. Concrete, 140 lb, Not Dried
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
I
jCOMPLY 24 User 2875
Assembly Name: Exposed Slab On Grade
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Framing Material: None
Framing Spacing: 11 o.c.
Framing Percent: 0.0 %
Absorpti.vity: O. 70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity
24.000
3.500
0.17
4.00
0.28
0.92
Frame
0.17
4.00
0.28
0.92
------------.------------------------------------------------------------
Unadjusted R-Values 5.37 5.37
ADJUSTMENT FOR FRAMING
(1 / 5.37) X (1.00) + (1 / 5.37) X (0.00) 0.186
Weight:
Heat Capacity:
210.8 lb/sqft
42.17
TOTAL U-VALUE 0.186
TOTAL R-VALUE = 5.37
I'(
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 20 of 22
!Date: 3/6/1998
I
Pr0ject Name: REPUBLIC TOOL AN1J MANUFACTURING
Documentation: Haynal & Co., Inc. !COMPLY 24 User 2875
---·--------~--------------------------------------------------------------
COMPONENT DESCRIPTION Assembly Name: 8 11 Concrete Tilt-Up
-----------------------------I Assemply Type: Wall
I I Assembly Tilt: 90 deg (Vertical)
I I· Framing Material: None
I I F~aming Spacing: 11 o.c.
I I Framing Percent: o.o %
I I Absorptivity: 0.70
Sketch of Construction Assembly Roughness: Concrete, Asph. Shingles
ASSEMBLY U-VALUE
~onstruction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Th R-Value
Fr (in) Cavity
8.000
0.17
0.64
0.68
Frame
0.17
0.64
0.68 . . --------~-------------------------------------------------------------------
Unadjusted R-Values 1.49 1.49
ADJUSTMENT FOR FRAMING
(1 / 1.49) X (1.00) ·+ (1 / 1.49) X (0.00)
Weig-ht:
Heat. Capacity:
93.3 lb/s.qft
18.67
= 0.671
TOTAL U-VALUE = 0.671
TOTAL R-VALUE = 1.49
MECHANICAL EQUIPMENT SUMMARY
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: rHaynal & Co., Inc.
CENTRAL SYSTEM SUMMARY
Sys No
MECH-3 page 21 of 22
!Date: 3/6/1998
I
jCOMPLY 24 User 2875
No System Name System Type Sys Economizer Type
1 BDP CO. 661CJ030/FB4A Split Heat Pump 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys --------Heati:qg ------·----------------'-----------------Cooling -----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 neat Pump 29000 5.0 7.20 DX 21000
CENTRAL FAN SUMMARY ___ , _________ supply Fan -----------
Sys Mtr Drv
No Fan Type Motor Location CFM BHP Eff Eff
1 Constant Volume Draw-T~rough
ZONAL FAN SUMMARY
Zone Name No CFM
-----------------------~-
None
1000
Zonal Fan
Mtr
BHP Eff
0.33 64 100
Drv
Eff No CFM
14700 9.20 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
None
Exhaust Fan
Mtr
BHP Eff
Drv
Eff
MECHANICAL VENTILATION MECH-4 page 22 of 22
--------------------------------------------------------------------------
!Date: 3/6/1998
I
Project Name: REPUBLIC TOOL AND MANUFAC.TURING
Documentation: Haynal & Co.·, Inc. jCOMPLY 24 User 2875
--------------------" ---. -------. . -------------------·----------------------
VENT;J:LATION SUMMARY BY ZONE
Floor sqft CFM Dsg Min
Zone Name T Occupancy Area /Occ /Occ CFM CFM
------------------------------------------
OFFICE 104 Office 223 100 15.0 33 33
RESTROOM 101 Corridor/Res tr 205 100 15.0 31 31
RESTROOM 102 Corridor/Restr 253 100 15.0 38 38
------
TOTALS 102 102
Tailored OA (T=*) requires sµpporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
Tran
sfer
CFM
0
,
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 20 of 22
Prdject Name: REPUBLIC TOOL AND MANUFACTURING !Date: 3/6/1998
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
I
I
I
I
I
I
I
I
I
I
I
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried.
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
ADJUSTMENT FOR FRAMING
I
!COMPLY 24 User 2875
Assembly Name: 8" Concrete Tilt-Up
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: None
Framing Spacing: "o.c.
Framing Percent: o.o %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity
8.000
Unadjusted R-Values
0.17
0.64
0.68
1.49
Frame
0.17
0.64
0.68
1.49
(1 / 1.49) X (1.00) + (1 / 1.49) X (0.00) 0.671
Weight:
Heat Capacity:
93.3 lb/sqft
18.67
TOTAL U-VALUE = 0.671
TOTAL R-VALUE 1.49
MECHANICAL EQUIPMENT SOMMARY MECH-3 page 21 of 22
---------------------------------------------------------------------------
Project Name: REPUBLIC TOOL AND MANUFACTURING
Documentation: Haynal & Co., Inc.
CENTRAL SYSTEM SUMMARY
Sys No
!Date: 3/6/1998
I
!COMPLY 24 User 2875
No System Name System Type Sys Economizer Type
1 BDP CO. 661CJ030/FB4A Split Heat Pump 1 No Economizer
CENTRAL SYST~M RATINGS
Sys-------Heating----------------------------------Cooling-----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Putnp 29000 5.0 7.20 DX 21000
CENTRAL FAN SUMMARY ------------Supply Fan -----------
Sys
No Fan Type Motor Location
------------------------------
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name No CFM
None
CFM BHP
------
1000
Zonal Fan
Mtr
BHP Eff
0.33
Drv
Eff
Mtr Drv
Eff Eff
64 100
-------
No CFM
14700 9.20 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
------
None
Exhaust Fan
Mtr Drv
BHP Eff Eff
------
MECHANICAL VENTILATION MECH-4 page 22 of 22
-----·----------------------·-----------------------------------------------
Project Name: REPUBLIC TOOL AND MANUFACTURING JDate: 3/6/1998
I
Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875
VENTILATION SUMMARY BY ZONE
Floor sqft CFM Dsg Min
Zone Name T Occupancy Area /Occ /Occ CFM CFM
------------------------------.-------------
OFFICE 104 Office 223 100 15.0 33 33
RESTROOM 101 Corridor/Restr 205 100 15.0 31 31
RESTROOM 102 Corridor/Restr 253 100 15.0 38 38
------
TOTALS 102 102
Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
Tran
sfer
CFM
0