Loading...
HomeMy WebLinkAbout1964 KELLOGG AVE; ; CB100665; Permit" ... . . "' City of Carlsbad i. 06-07-2010 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB100665 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Applicant: 1964 KELLOGG AV CBAD Tl Sub Type: Lot#: 2120930200 $44,940.00 Construction Type: Reference #: GIA-1,284 Tl STORAGE TO EQUIP STORAGE INDUST 0 NEW Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check#: ISSUED 04/16/2010 LSM 06/07/2010 06/07/2010 JON JACKSON _GEMOLOGICAL INSTITUTE OF AMERICA INC 14636 EVENING STAR DR POWAY CA 92064 858 5131167 Building Permit Add'I Building Permit Fee Plan Check Add'! Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD#2 Fee BTD#3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. F,ee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee· Fire Expedited Plan Review $385.71 $0.00 $250.71 $0.00 $0.00 · $9..44 $0.00 $0.00 , $'0,00 •$0.00 '$(1.00 $0.00 $0,00 ··$0,00 .· $0.00 5345 ARMADA DR CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee . Meter Fee SDCWA Fee CFD Payoff Fee PFF(3105540) . f'FF (4305540) , l:.i<;:ense Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee ( 4305541) PLUMBING, TOTAL ELECTRICAL TOTAL . MECHANICAL TOTAL Mc1ster 'Dr:c1inage Fee Sewer Fee. , $0.00 Redev Parking Fee $0:·oo-_i '· ;Additional Fees $1.00 ·: lfMP Fee $317.50 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $28.50 $0.00 $0.00 $0.00 $0.00 ?? $1,012.86 Total Fees: $1,012.86 Total Payments To Date: $1,012.86 Balance Due: $0.00 Inspector:~ FINAL APPROVAL Date: lij?-8,h D Clearance: _____ _ NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your r\ght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has nreviouslv otherwise exoired. ... «~~ l Plan Check No. ·(!6 ! 0 () (o G S-' Building Permit Application Est. Value 4Lf ql.fo ~ CITY 1635 Faraday Ave., Carlsbad, CA 92008 0 F 760-602-2717 I 2718 / 2719 I Plan Ck. Deposit .;). BO.; I ) CARLSBAD Fax 760-602-8558 www.carlsbadca.gov Date If-/, Ct:;/10 ~ JOB ADDRESS-1964 Kellogg Avenue, Carlsbad; Ca 92008 SUIJE#/SPACE#/UNIT# IAPN 212 N/A -093 -02 - CT/PROJECT# 'LOT# I PHASE# r OF UNITS [ BEDROOMS #BATHROOMS . I TENANT BUSINESS NAM~IA I CONSTR. lYPE I occ. GROUP 30 VN B,F1,S1 DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) ' Tenant Improvement /;;_ g,t_,f ( i/1 67812..,/t--(J-€ '10 8Q U I f'/l'\Eu11 6 7fJ ,0,. ,¥- EXISTING USE I PROPO~ED USE I GARAGE (SF) PATIOS(SF) 'DECKS (SF) FIREPLACE I AIR CONDITIONING I FIRE SPRINKLERS Office/Warehouse Office Warehouse · N/A __ N/A N/A YESO. No[Z] YESIZJNoD YESIZJNoD CONTACT NAME (If Different Fom Applicant) Jon Jackson APPLICANT NAME Jon Jackson ADDRESS 146361:vening Star Driv~ ADDRESS 14636 Evening Star Drive CITY STATE ZIP CITY STATE ZIP Poway Ca ·92064 Poway Ca 92064 PHONE 'FAX PHONE 'FAX .. 858-513-1167 858-513-1'167 858.:513-1167 858-513-1168 EMAIL EMAIL Jon@in_novativeti.com .. Jon@innovativeti.com PROPERTY OWNER NAME _ Gemological lnstitut, e>f Ap,_erica CONTRACTOR BUS. NAME Innovative Tenant lmorovements .. _ ADDRESS-ADDRESS .. .. 5345 Armada. Drive .. . 14636 Evening Star Drive . CITY STATE ZIP CITY STATE ZIP _CarlJbad Ca 92008 Poway Ca 92064 PHONE IFAX Pl:IONE IFAX 760-603-4000 760-603-4034 858-513-1167 858-513-1168 EMAIL EMAIL clabahn@gia.edu Jon@innovativeti.com ARCH/DESIGNERNAM~&ADDR~~"D I~ Gro.bO.:c.ho s,. ,ISTAT~LJC.# STATE UC.# ICLASS I CllY BUS. UC.# s~e rA\<.C.. f\~C.\\ i i':1=!-C:.i\->-.f~ C. o-.,+s.bo-d cA '!J~oo~ _ _ C-18322 906968 B 1tPPL-fetJ ,~ r'rJ(,..(J .. (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair an~ structure, prior to its issuance, also requires the applicant for such permit to file a signed statement tl\at he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis fo'r the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not-more than five.hundred dollars {$500]). ,.,,,,..,,..,,-,-,.,.,.,.,--,,.,...-------,----,-,-....,..,---:--...,..,--,,,_...,,.....,....,.,..,...,-,,.,,,.,.-=-,-,-.,...,, '~~-(fJ~ • , . Workers' CQmpensatlon Declaration: I hereby affirm under penalty of petjury one of the following declarations: D I have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work tor which this permit is issued. [{] I have and will maintain workers' compensation, as reQuired by Section 3700 of the Labor Code, for the perform~nce of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co Stata Fund-. -Policy No. • . . 0028155-2007 Expiration Date 01-01-11 This section need not be completed if the permitis for one hundred dollars ($100) or less. D Certificate of Exemption: I certify that in the performance of1he work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Fa_ilure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages a provided fo ·n Sectio 3706 of the Labor code, interest and attorney's fees. RS CONTRACTOR SIGNATURE --e;,-/.-? OAGENT I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason: D , I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is nofintended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he·did not build or improve for the purpose of sale). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuan! to the Contractors License Law). D I am exempt under Section ___ ____,Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed propef(y improvement 0Yes 0No 2. I (have I have not) signed an application for a b_uilding permit for the proposed work. 3.1 have contracted with the following person (firm} to provide the proposed construction:(include·name address I phone I contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address/ phone/ contractors' license number}: 5.1 will provide some of the work, but I have contracted (hired} the following persons to provide the work indicated {include name I address I phone I type of work): RS PROPERTY OWNER SIGNATURE 0AGENT DATE er \€~·· Is the applicant or future building occupant requir~d to submit a business,.Q!fil), acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D Yes WNo Is the applicant or future building occupant required to obtain a permit from the air pollution control district or a~ality management district? 0Yes [Z] No Is the facility lo be constructed within 1,000 feet of the.outer boundary of a school site? 0Yes L:llNo IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED ~NLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performarice of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name . ~LA Lender's Address N/A I certify that I haYE1 read the application and state that the above Information Is correct and that the Information on the plans is accurate. I agree to comply with all City ordinances and State laws relatingto building construction. I hereby authorize representative of the City of Cartsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permitis required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height ·EXPIRATION: ~very permit issued by the Building Official under the provisions of this Code shall expire by umitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the buildi g or work au orized such permitis suspended or abandoned at any time after the work is commenced fora period of 180 days (Section 106.4.4 Uniform Building Code). DATE Afr;/ Ii JO/() Cltv 11 Carlsbad · Flnal Bulldln11 Inspection Dept: J3uilding Engineering Planning CMWD St Lite Fire Plan Check #: Permit#: Project Name: Address: CB100665 GIA-1,284 Tl STORAGE TO EQUIP STORAGE 1964 KELLOGG AV ContactPerson: JIMMY Phone: 6197339231 Water Dist: CA Sewer Dist: CA Date: Permit Type: Sub Type: Lot: 0 08/24/2010 Tl INDUST I I I 111 I I I 11 I I I I.I I I 11 I I I I I I I I I I I I 11111 I I I I 11 I I~ I I I I I I I I I I I I I I I I I 11 I 11 I I I I I I 11 I I I 11 I I I I I I I 11 I I I 11 I I I 111 I 11 I I I I I I I I I 1111 I 11 I I 111 I I I I 11I1111 I 111 I I I I I 1111 I 1 I I I lnsp(?cte9 \t)J \ \ \ c) Approved: ~ved: __ By: Inspected Date By: Inspected:· Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ I I I I I 1111 ~(I I I I 11 I I I I I I I I 111 I I I I I I 11 I I I I I I I I 1111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1111 I I I I I I I I I I 11 I I I I I I I I 11111 I I I I I 111111IIII111111IIIII11111 I I I I I I I I I I 11 I I I Comments: ---------,----------------------------- .. Gity of Carlsbad B'ldg Inspection Request For: 08/24/2010 Permit# CB100665 Title: GIA-1,284 Tl STORAGE TO EQUIP Description: STORAGE Type: Tl Sub Type: INDUST Job Address: 1964 KELLOGG AV Suite: Lot: 0 Location: f',PPLICANT JON JACKSON Owner; GEMOLOGICAL INSTITUTE OF AIV!ERICA INC Remarks: Total Time: CD Description Act Comments Inspector Assignment: TP --- Phone: £231 Inspector: ·- Requested By: JIMMY Entered By: CHRISTINE 19 Final Structural Af) --~------- 29 39 49 Final Plumbing Final Electrical Final Mechanical t.JL-------------------- _AL __ -'--------- w(_/ ___________________ _ Comments/NoticesLHolds Associated PCRs/CVs/SWPPPs Origim1I PC# PCR10082 ISSUl;:D GIA: ADA PARKING; Inspection History Date Description Act lnsp Comments 06/23/2010 89 Final Combo PA TP FOR OQC!.JPANCY -SEE CARD CORR. 06/14/2010 17 Interior Lath/Drywall AP PD 06/14/2010 84 Rough Combo AP PD CEILING 06/10/2010 14 Frame/SteeliBolting/Welding AP TP 06/10/2010 34 Rough Electric AP TP _} EsGil Corporation In (Partnetsliip witli <)o'f/ernment for (]3ui{ain9 Safety · DATE: 4/27/10 JURISDICTION: Ci~y of Carlsbad . PLAN CHECK NO.: 10-0665 SET: I CJ~~NT ~ CJ PLAN REVIEWER CJ FILE PROJECT ADDRESS: 1964 Kellogg Ave PROJECT NAME: GIA -TI ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted· herewith have significant deficiencies identified on the enclosed check list and should be·corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jµrisdiction to forward to the applicant contact person. D The applicant's Cbpy of the check list has been sent to: ~ Esgil Corporation staff did not advise the ~pplicant that the plan check has been completed. D Esgil Corporation. staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: ) Fax#: Mail Telephone F;:ix In Person D REMARKS: By: Doug Moody Enclosures: EsGil Corporation D GA D EJ 0 PC 4/19/10 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 / .'-City of Carlsbad 10-0665 4/27/10· [DO NOT PAY -THIS IS NOT AN· INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PREPARED BY: Doug Moody PLAN CHECK NO.: 10-0665 DATE: 4/27/10 BUILDING ADDRESS: 1964 Kellogg Ave BUILDING OCCUPANCY: B/Fl TYPE OF CONSTRUCTION: VB BUILDING AREA Valuation. PORTION ( Sq. Ft.) Multiplier Tl 1284 34.37 - '' Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinan.ce Bldg. Permit Fee by Ordinance I ,.. I Plan Check Fee by Ordinance / • J Type 6f Review: 0 Complete Review D Repetitive Fee /..., I ~epeats Comments: D Other D Hourly EsGII Fee Reg. VALUE Mod. -. D Structural Only ($) 44,131 44,131 $385.11 I $250.711 $21s.001 Sheet 1 of 1 macvalue.doc + PLANNI.NG/ENGINEERING APPROVALS PERMIT NUMBER CB100665 DATE 4/16/10 ADDRESS 1964 KELLOGG AV RESIDENTIAL ADDITION- MINOR (<17,000.00) RETAINING WALL VILLAGE FAIRE POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING OTHER Tl-NO EXPANSION OF AREA, NO INCREASE IN PARKING DEMANDS, BLDG. APPROVED BY PIP 97-01 PLANNER GINA RUIZ ENGINEEitJ(~ 11:\ADMIN\COUNTER/PLANNING/ENGINEERING APPROVAlS DATE 4/22/10 DATE._~-~---=_/4_o __ ~! · II ~arlsbad Fire Department Plan Review Requirements Category: TI , INDUST Date of Report: 06-07-2010 Name: Address: JON JACKSON 14636 EVENING STAR DR POWAY CA 92064 Permit #: CB 100665 Job Name: Jol,, Address: GIA.:.1,284 TI STORAGE TO EQUIP 1964 KELLOGG AV CBAD e1em BLDG. DEPT COPY Reviewed by: })J<J,/6 S le.) adequately conduct a review to determine compliance with th es and/or standards. Please review carefully all comments attach e necessary plans and/or specifications, with changes "clouded", Conditions: Cond: CON0003989 [NOT MET] 1NSTRUCTIONS " This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Dep&rtment. " The items below require correction, clarification or additional information before this plan qhe<;::k can be approved for permit issuance. " Co:rrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates along with a descriptive narrative of corrections addressing all comments. " Please direct any questions regarding this review to: Daryl James 760-724-7001 or kitfire@sbcglobal.net · " :CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON THIS FORM,AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED DIRECTLY TO: " Daryl K. James 205 Colina Terrace Sheet T-1 Project Summary " Add 2007 CFC which adopts 2006 IFC with California Amendments -see following for list of applicable codes: 2007 California Administrative Code (CAC.-..................... (Part 1, Title 24, CCR) I I , 2007 California Building Code (CBC), Volumes land 2 ....... (Part 2 Title 24 CCR) (2006 Eclition International Building Code with 2007 California Amendments) 2007 California Electrical Code (CEC) .............................. Part 3, Title 24, CCR) (2005 Edition National Electrical Code with 2007 California Amendments) 2007 California Mechanical Code (CMC) ....................... , . (Part 4, Title 24, CCR) (2006 Edition IAPMO Uniform Mechanical Code with 1007 California Amendments) 2007 California Plumbing Code (CPC) ............................ (Part 5, Title 24, CCR) (2006 Edition IAPMO Uniform Phimbing C~de with 2007 California Amendments) 2007 California Energy Code ......................................... (Part 6, Title 24, CCR) (2006 Edition California Energy Commission Building Energy Efficiency Standards) 2007 California Fire Code (CFC) ............................. , ...... (Part 9, Title 24, CCR) (2006 Edition International Fire Code with 2007 California Amendments) II Use 2007 CBC construction type -VB Page: 2 of2 · Notes " 'If Amend Fire Protection Notes 2, 18, 19, 21,22 & 23 -Denote 2007 code sections Amend Floor Plan Note 9· -Denote 2007 code section I)rawing Sheet Index .Match up titles listed under index to titles .shown on sheets. Additional Information Required " Provide a Fire Protection Technical Opinion & Report which provides an inventory list of hazardous materials stored and used within the existing operation and within the newly proposed areas 120, 121 & 122. List must include chemicai name, hazardous materials classification, amount stored and location of storage, amount used ( open and closed use) and location used. " Provide the comparison of hazardous materials summaries to the Maximum Allowable Quantities in CFC Chapter 27 Area of Hazardous Materials Posing a Physical Hazard listed in Table 2703.1.1 (1) of the 2007 CFC and the Maximum Allowable Quantity per Control Area of Hazardous Materials Posing a Health Hazard in Table 2703.1.1 (2} of the 2007 CFC. " Provide a descriptive narrative of the storage, use and handling of materials and equipment in Rooms 120, 121 & 122 and address applicable code requirements set forth by the California Fire Code, California Building Code and California Mechanical Code. " Address dust collection requirements in accordance with CFC Chapter 13 where dust-producing equipment is proposed in areas using dust producing (<420 microns) equipment. SheetA6,5 " Denote rated walls on details. Amend ICBO # to current ICC #. Reference CBC Table 720.1 Item number. II .SheetMI.0 Detail 6 -Denote a 20 minute UL for the rated door assembly will be affixed. Draftstop Notes -Amend to 2007 code sections Detail exhaust ventilation system with the Fire Protection Technical Opinion & Report. Entry: 04/20/2010 By: OKJ/cw Action: CO Cond: CON0004065 [NOT MET] RECOMMENDED FOR APPROVAL WITH NOTE TO REVISE CODE REFERENCE TO UFC ARTICLE 81 TO CBC CHAPTER 23 in FIRE PROTECTION NOTE 23. Cond: CON0004066 [NOT MET] **APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. :fHIS APPROVAL IS SUBJECt TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Carlsbad Fire Department Plan Review Requirements Category: TI , INDUST Date of Report: 05-03-2010 Name: Address: JON JACKSON 14636 EVENING STAR DR POWAY CA ~064 Permit#: CB100665 Job Name: Job Address: GIA-1,284 TI STORAGE TO EQUIP 1964 KELLOGG AV CBAD D-K:s/ew Reviewed by: ~ INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot / adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Conditions: Cond: CON0003989 [NOT MET] INSTRUCTIONS II This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. " . The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. " Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates along with a descriptive narrative of corrections addressing all comments. " Please direct any questions regarding this review to: Daryl James 7 60-724-7001 or kitfire@sbcglobal.net 11 CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON THIS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED DIRECTLY TO: " Daryl K. James 205 Colina Terrace Sheet T-1 Project Summary II Add 2007 CFC which adopts 2006 IFC with California Amendments -see following for list of applicable codes: 2007 California Administrative Code (CAC ...................... (Part 1, Title 24, CCR) ~ .. 2007 California Building Code ( CBC), Volumes 1 and 2 ....... (Part 2 Title 24 CCR) (2006 Edition International Building Code with 2007 California Amendments) 2007 California Electrical Code (CBC) ............................ Part 3, Title 24, CCR) (2005 Edition National Electrical Code with 2007 California Amendments) 2007 California Mechanical Code (CMC) ............ ~ ........... (Part 4, Title 24, CCR) (2006 Edition IAPMO Uniform Mechanical Code with 2007 California Amendments) 2007 California Plumbing Code (CPC) ............................ (Part 5, Title 24, CCR) (2006 Edition IAPMO Uniform Plumbing Code with 2007 California Amendments) 2007 California Energy Code ......................................... (Part 6, Title 24, CCR) (2006 Edition California Energy Conunission Building Energy Efficiency Standards) 2007 California Fire Code (CFC) .................................... (Part 9, Title 24, CCR) (2006 Edition International Fire Code with 2007 California Amendments) II Use 2007 CBC construction type -VB Page: 2 of2 Notes II II Amend Fire Protection Notes 2, 18, 19, 21,22 & 23 -Denote 2007 code sections Amend Floor Plan Note 9 -Denote 2007 code section Drawing Sheet Index Match up titles listed under index to titles shown on sheets. Additional Information Required 11 Provide a Fire Protection Technical Opinion & Report which provides an inventory list of hazardous materials stored and used within the existing operation and within the newly proposed areas 120, 121 & 122. List must include chemical name, hazardous materials classification, amount stored and location of storage, amount used ( open and closed use) and location used. 11 Provide the comparison of hazardous materials summaries to the Maximum Allowable Quantities in CFC Chapter 27 Area of Hazardous Materials Posing a Physical Hazard listed in Table 2703.1.1 (1) of the 2007 CFC and the Maximum Allowable Quantity per Control Area of Hazardous Materials Posing a Health Hazard in Table 2703.1.1(2) of the 2007 CFC. " Provide a descriptive narrative of the storage, use and handling of materials and equipment in Rooms 120, 121 & 122 and address applicable code requirements set forth by the California Fire Code, California Building Code and California Mechanical Code. 11 Address dust collection requirements in accordance with CFC Chapter 13 where dust-producing equipment is proposed in areas using dust producing (<420 microns) equipment. SheetA6,5 II Denote rated walls on details. Amend ICBO # to current ICC #. Reference CBC Table 720.1 Item number. " "" SheetMl.O , Detail 6 -Denote a 20 minute UL for the rated door assembly will be affixed. Draftstop Notes -Amend to 2007 code sections Detail exhaust ventilation system with the Fire Protection Technical Opinion & Report. Entry: 04/20/2010 By: DKJ/cw Action: CO '., 1- , GSS I $tructu:tal Engi.neers Calculations for 10083A GIAHVAC 1964 Kellogg Avenue Carlsbad, CA INNOVATIVE TENANT IMPROVEMENTS 9770 Carroll Center Road~ Suite C San Diego, CA 92126 Phone: 85.8 549-8455 Fax.: 8;58 530-1779 ~GSSI Structural Engineers Loads: Roof Dead Load ( DL ) Roofing 1/2" PlyWood Framing Insulation. Mech. fl1liscellanr,,10·us Live Load { l.,L ) ProJect: GIA HVAC 5.0. psf (3 °psf original + 2 psf refoofing) 1.5 psf. 5.0 psf 0.5 psf 1.0 psf 2.0 psf 1.s.o psf Sheet: lb F 1" GSSI No. 10083A Da{e; 4/4/2010 l,.L L = 20;_0 psf(ReduGible} ! DL+ LL = _____ 35_.o __ ·._ps __ f Sefsmic: Commercial. Site Class: ·Wind Load: Occupo:1ncy Importance Category Factor II 1.00 D Ss:;; 1.36 -S1= ·0.518 Fa= 1.0 Fv= 1.5 Basic Wind'. Speed: 85mph -c Exposure: K.zt = 1.0 SMs,= 1.36 SM1= 0.78 Sos= 0.91 S01= 0.52 Project Name -= .GIA +2-201 o Contefminou~-46 -States 20'<)6 fntemational Building ·Code Latitude.= 33:,22 Longjtude = -117.028 Spectra! Response AcGelerations Ss ~md S-1 Ss and S1 = MEipped Spestral Acceleration Values -Site Class B -Fa = 1.0 .Fv = 1.0 Data are based on a o:009·99999977a432sa2 deg grid spacing Period Sa (sec) (g} 0:2 1.361 (Ss-1 Site Class 13) 1.0 0.51 ij, (S1, Site· Class ~) Conterrrffnous 48 States- 2006 Jnternation~I BtlildinQ Code Latitude = 33.22 Lq_ngitude = -117.028. Spectral Response.Accelerations SMs ·and SM1 $Ms-= Fa X Ss and SM1 = ,Fv x S1 Site Class D -Fa = 1.0 ,Fv = 1.5 Period Sa (sec) (g) ().2 1.361 (SMs, Site-Class D) 1,0 0.778 (SM1, Site Class D) Conterminous 48 States 2-006 International Building Code Latitude = 33.22 Long_ituqe = -117.028 Design Spectral Response Accelerations SDs arid SO1 SD$ = 2/3 x SMs and S01 = 2/3 x SM1 Site Class D -Fa= 1.0 ,FV = 1.5 Period Sa (sec) (g} 0.2 0.907 (S-0s, Site Class D) 1.0 0.518 (SO1, Site Class D) L /Ofi0s A +/i,,f 1,,fJl f) ~GSSI Structur-al En_g·ineers . ) PROJECT ---k"-I_ ...... A...c... -------- ENGR g. Gv4 vt t;. . . I . l M.;,.. ;.._,-f.l, _; le (If• . \( ~..... f:1~-,-1.:#. . , ' v,,<-.:.. <!_;-"t?' o )°'?( "1 ':;; 'to11-f 1' i "" +,oo rt. /4 :: l'<; r;-# I~ l. V4(!,A,~ -s ~o# f V4 o. ~ 4tf1f'!.4 y; ... f 3fJ rtf 4 Af~ SHEET __ > __ _ G~SI NO. / 6tJ{J J A DATE. ____ _ ,GSSI Project GJA Sheet f Project No. 10083A . strnctuta! Engineers Engr: B. Qualls Da.te: 4/7/2010 Overturning of the M.echanical E·quipment Design Parameters ap = 2.5 S.os ::: 0.9.1 Ip· = 1.00. Rp = s·.o component·ampfl!cation:factor spectral acceleration, short period importance factor Component response mod. factor .z ·= 2,0 h = 20 ft, (ht. in s~cture of:poirit of atta9hfoent}, ·z=Oi@.gl'ape f!. (avg. roof ht:} zlh = 1.0 Fp = .4*ap*Sos~Wp*(1+2*zlh)/(Ri/1p), (13.3-1) F p(max) =-1.6*Sos*lp *Wp, (J:3.3-2) Fp{min) = (t3*S0s*lp*W11, (13.3-3) Fv = .2*Sos*Wp,. (12.4-4) Fp = l=p(inax) = Fp(min)' = Fv = 0.33.Wp. 1.04'\/Vp .. , 0.20 WP 0.13 Wp Siz~,·feet l)nit widtft I leqgtb I height AC-1 (4YCZ060) 2.8 I 4.0 I ·$:a- Cur~ nt, iri. ~ weight; lbs 4QO Strength Design: .9D +1.0E Allow. Stress Design: .9D + 1.0E/1.4 Sb or ASD? = Allow. Stress Design OTM = Fp*\.mit heignt/2 RM = (,9,.Fv)*Wt*unit width/2 Pp Fv OTM RM Uplift, lbs ft-lbs ft-lbs 1'30 52 314 424 No uplift Structural Engineers GIAHVAC 10083A ' ·'":\ -r2G· s----s--, ~ '., ., structural ErigJneers Joist and Be.am Capacities 2xJoists . ' ' ' Av= 1so psi Repetitive Use Increase = . _Fb: 1000 p$i .. Actl!al .Section Cf Area Width Depth 'Wid.th. Depth Modulus ~ 4 ·1,.5 . 3.5 1.q 5.3 3,1 2 6 1.5 ~.5 1.3 8.3 1.6 2 8 1.5 7..~5 · 1.2 10.9 13;1 2 10· 1.5 9,25 t.1 13.9 · 21A 2 12 1.5 11.25 1 1.6.9' 31.6 2 1,4 1.5 13.25 0.9 19".9 43,9 4x:Beams Av= 180 p$i Fp= 11)00 psi Nominal Actual Cf Area Section Wjdfh D~pftl Wi9th D~pin Mod:uh:.t~. 4 4 3:Q 3.5 1~? 12:;~·, 7-1 ., , 4 6 3.5 .5.5', 1.3 19.~ 17.6 .. '• 7.2.5 30;7 4 8 3,.5 1.3: 2~A 4 10 ;3.5 9.25 1.2 32.4 49.'9 4 12 3.5 . 11.25. 1.1 · 39.4 73,,8 4 14 3.5 13.25-1 46.4 102:4 -4 16 a.s 15.25· 1 53A 1$5.7 . 5· X: f:3·eahl$ · Av= 11P psi F'b.= ·1350, psi Nominal Actu.af Cf .· Area Sectio_n Width Depth Width Depth Moduh.!s ~ 6 5.5 5,5 1 30.3. 27.7 6-8 · 5.5. 7,5 1 4t3 · -51.6 6-10 . 5.5 9.5 1 52.3 82,7 6 12 5.,5 11.5 1 63.3 121.2 6 1'4 5.5 13.5 0.98 74.3 167.1 6 16 5.5 15.5 · Q.97 85~3 .220.2 6 18 5.5 17.5 0.96 96.3-280.7 Project; GIA Engr:: B. Qualls 1,15 Roof Load Increase = Moment Shear Moment of lrier.tia, Vr,-floor Mr,floor ~A 63.0 440 21 990· 942 48 1',305 1,5,11 99 1.,665 2,255 178 2,025 3,032 2-91 2,385, 3,786 Moment Shear Moment of ln~rtia-.Vr,floor Mr,floor '12:5 1A10 893 49. 2!3·10 1,912 111 3,045 3,322 231 3,88q, 4,991 -415 4,725 6,768 6,78 5;565 8,534 1034 6,405 11,305 . Moment Sh~ar Moment of Inertia· Vr,floor Mr,floor 7f,t3 3(630 3,120 193 4,950 5,-801 393 6,270 9_,307 697 7,590 13,638 1128' 8,910 18,419 1.707 9.,662 24,033 2456 10,908 30,319 2x·4x 6x Beams.xis Shear Vr,roof 78? 1,238 1,631 2,081 2,531 2,981' Shear Vr,roef 1,838 2,888 3,,806 4,856 5,906 (i,956 8,006 Shear Vr,roof 4,285 5,844 7,402 8,960 10,519 12,.077 13,635 Sheet ;f-( Project No. /009:A • Date: 4/1/2010 . Snow Load [ncrease 1.15 1.25 Snow snow Moment Shear Moment Mr1rpof Vr,r:oof Mr,roof 550 725 506 1,178 1,139 1,083 1,889 1,501 1,738 2,819 1,915 2,593 3,790 2,329 3,487 4,732 2!743 4,353 $now S.now Moment Shear Moment Mr,roof Vr,roof Mr,roof 1,117 '1,691 1,027 2,390 2,657 2,198 4,152 3,502 3,,820 6,239 4,468 5,740 8,459 5,434 7,783 10,668 '6,400 9,814 14,131 7,366 13,001 $nQW Snow Moment Shear Moment Mr,roof Vr,roof Mr,roof 3,899 3,943 3,587 7,251 5,376 6,671 11,634 6,810 10,703 17,048 8,244 15,684 23,023 9,677 21,181 30,041 11, 111 27,637 37,898 12,545 34,867 UNIT DJMENSIONS ,._ ~ .. .... ..,_ -... -..,._._ ... .... -' !§55;~-..i-N"lt'CI .. 11 ~-~ ~~-• 4 ..... ~ ~ .. .. " .... ¥ ~ • • ,; .. ., § ! ·O 0 0 ; -~ -.;~ L --~ ,_ _______ .,, _______ ... "" N n LJ L- . . -1 6 ·--~ ... ?~ ~- I ~\ 1 A·Z ~ ii .,--~ -. ; ~ i a• -';"-~ ""~ :!:<> ; ~..; Cl~ i -= .. "' .. ~ .., E 0 C II A FORM NO. 9100 .. lP ll 7 <> ~ 46.0630.D. A4.188lD, ' L..... -, ......... __ ~ • 5 4 1.736 16.000 10.(m ~~--21.m----l1~;~~ -2:2.'35 A'J"rACH'TO CUJlll (lO},'#Uliiln'' TEK SClll!.WS U~A t,•WCH . 11.'l'TACll;l'O 'l'Ol'·.'ISSEfltlllil:' WlTll l•f#IV,d/2" SID~ lSl#lllitll,l"·ENDS. ATJ'ACH'f,OllASEASSEMBLYWrTlt (6Hl!)xl/2" SIDES . . . (5}lllllJ<.lf.!"·ENDS f Al,T£l'f StllE>,.ND ENO Tj)(;ETUER ......,---WITH l/4"•l0 X 314" tOCKNUTS ~I'll> lJOtTS ~ MicroMetl ·Corporation DETAILE SCALE l :& 16 GA ~q~QJlflLO .~11:i:~l~-~~)¥$ FULL:PElliMh'TI,;k WOOi> NAILIIR · 8" :16 OA CijRll l'IIAME SPPDIJ.SML-APCBCCRBB !J)lllrks., NY. (800) 884-4661. S'l'E.ELATTACHMENT: NT: l>tdia,.apolls, IN. {IJOO) 6624822 SEE STEEL ATTACHMENT DETAJL SHEETS. J..oneview, TX. (903) 2'/8-4800 ,} 1/4" 3" S!Ml'SON SPSWIWASHER IENTBII ON·CtJU' tLANC!i. J,;\IENI..Y ~ACED, (4) EACH LOl!IG SlUE, !) l:A(:HSUORT SIDE ~ S'UBMITT AL I AP SP'P-SML SERIES CORB DETAIL •l(.MOCICXD,IJO'WH COfllsrRUC'tl!)N •GASu:T l'ACK/l.4t·lliCWD£0 '"PXIUMETEaWOODNAW!k D C B STROCTOl,lALLY CALCOCATED·ADJUSTABLE PJTCH)CNOCKEDJ>OWN CUR,B FOR SMALL FOOTPRIN SMI\LL.PA.CKAGE·QNlTS (MAX W[',496lbs.) pg·l of2 Q I DAffl llfllllOII L -: l 11M.WNBY, JI) f' '·"'' MIN. m'L'lfN,,.<:.<:> I WEJr.ff'l'i •l ....,. MlilJ;t$Sl!ISM!C + tu:OUlltll"®l'tS fO~ FUµ.l)WING COl>l'.S< 1007CBC 1 ............ --:··-----.. ····· .--· ---~---··; ·-···------·r-·-... ··-"-·;·-m·-... ..., .. ----.. ------:·-.. ···--·-· -·· ... ----···--· -~--·-··-,.-! ··-· :.: , ·--~~---F -·-·--¥£~----·--·· ~ ~ ·• I 2~'mc r~ ENGG07 V' Nonresidential Relocatable -indicate New Construction High-Rise Residential This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance comp!ianoo approach. The documentaticm author hereb certifies that the documentation is accurate ~md oo Documentation Author Name Mark Gallant, CEPE · 508 W Mission Aw Ste 201 92()25 Part 1 of 3 1,132 Hotel/Motel Guest R all climates 4 Alteration The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110,116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: EijV. LTG. MECH. ! hereby affirm that I am e!lglble under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a ·civil engineer, mechanical engineer, eleci.rical engineer, or I am a lioensed architect. ! affirm that I am e!lglble under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible fur its preparation; and that ! am a licenood contractor performing this work. I affirm that I am eligible under Division 3 of !he Business and Professions Code to sign thls document because it pertains to a structure or type of work oescnbed as ex.empt pursuant to Business and Professions Code Sections 5537, 5538 and6737.1. """"":"-""=e=-'n_v_tl:';"'lo_p_e--=o::::-·~-~-·~-------,,........----·~·'---- um vathre Tenant Improvements PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1C Project Name I Date Gemological Institute of America 4/8/2010 ANNUAL TDV ENERGY USE SUMMARY (kBtu/scaft-vr) Standard Proposed Compliance Enerav Component Desian Desian Marain Space Heating 10.18 9.06 1.12 Space Cooling 67.52 59.32 8.20 Indoor Fans 32.11 39.57 -7.46 Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 0.00 0.00 0.00 Lighting 50.97 50.97 0.00 Receptacle 50.98 50.$8 0.00 Process 0.00 0.00 0.00 Process Lighting 0.00 0.00. 0.00 TOTALS 211.77 209.90 1.87 Percent better than Standard 0.9% ( 0.9 % excludina orocess) BUILDING COMPLIES . GENERAL INFORMATION Buil9ing Orientation (S) 180deg Conditioned Floor Area 1,132 sqft. Number of Stories 1 · Unconditioned Floor Area 28,000 sqft. Number of Systems 1 Conditioned Footprint Area 1,125 sqft. Nutnbernf Zones 2 Natural Gas Available On Site Yes Orientation . Gross Area Glazina Area Glazina Ratio Front Elevation (S) o sqft. o sqft. 0.0% Left Elevation (W) o sqft. o sqft. 0.0% Rear Elevation (N) 648 sqtt. o sqft. 0.0% Right Elevation (E) o sqft. o sqft. 0.0% Total 648 sqft. o sqft. 0.0% Roof 1,125 sqft. o sqft. 0.0% Standard Prooosed Lighting Power Density 0.900 W/sqft. 0.900 W/sqft. Prescriptive Envelope TDV Energy 10,528 19,747 . Remar:ks: THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:01 ID: Paae 2of16 Pl:RFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name I Date Gemological Institute of America_ 4/8/2010 . ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads Svstem Name Zone Name Occupancy Type (sqft.) (W/sf)1 (W/sf)2 (W/sfi3 /W/sf)4 (W/sf\ new package hp assembly 121 . Industrial Work, Lbw Bay 1,132 *0.900 .uncondwarehouse 103,119; Industrial Work, Low Bay 28,000 •o.9oo Notes: 1. See L TG01 C 2. See L TG-2C 3. See LTG-3C 4. See LTG-4C Items above require special documentation (items marked with asterisk see L TG-1-C by others) (bv others! EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency !',hould pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the soecial iustification and documentation submitted. The HVAC System Carrier 50EZ-A-36-50 includes an Economizer. This system has a cooling output< 75,000 Btuh or a supply cfm < 2500. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written Justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.0 by Ener.qySoft User Number: 2875 RitnCode: 2010-04-0BT0B:53:00 . ID: Page 3of 16 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name I Date. Gemological ln$titute of America 4/8/2010 Project Address I Climate Zone 7 I Total Cond. Floor Area I Addition Floor Area Carlsbad i 1,132 1,132 GENERAL INFORMATION Buildino Tvoe: El Nonresidential [J High-Rise Residential [J Hotel/Motel Guest Room [J Schools (Public School) CJ Relocatable Public School li2I Conditioned Spaces [J Unconditioned Spaces Bldo. CJ Skylight Area for Large Enclosed Space~ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: [J New Construction [J Addition li2I Alteration Approach of Compliance: CJ Component li2I Overall Envelope [J Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 180deg FIELD INSPECTION ENERGY CHECKLIST Cl) il '-,_] C .S! 3: :s ri: C II) ..... ri: 0 Q) 1i .. :s II) " 0 uS C) g,.,11) ·-on ij"E(/) ~II) C :S C ;t: (/) l!S l!S E iii 'ti :s f~.,a-,: II) ,: .!!! uI ·-:s ·;: •;: :s C 'tu iu iii 0~ .. --~~\~: :s .. :::, .. ~ I! I!~ o-Tag/1D1 Assembly Frame Tvoe2 en< Cl)OZ O> oc:: 0(1) Wall Solid Unit Masonry 648 (N) None 0.0 CJ Existing -~~· *~f ~ :rq~;i; Roof Wood Framed Rafter 1,125 (S) R-19 0.0 [J Existing Slab Unheated Slab-oil-Grade 1,125 (N) None o.o CJ Existing i,,-,,'.,,f'; Demising Metal Framed 2,322 (N) R-19 0.0 Cl New t~'[gif [J ti' :,jijt ,'>-\ [J ¥ £{:at [J ~~lid~; !~:P!t ~~:~~~ Cl ~l~;~ (ijfi :f ;Q! 1. Indicate the identifying name of the frame type (i.e. Wall ,1, Ceiling-1, Roof-1, and Floor-1). 2. Indicate type of Assembly Type such as Wood 2x4 or LW CMU 8". For additional other assembly types see Reference Joint Appendix, JA4-1. 3. If furring is checked refer to ENV-2C Mass and Furring Strips Construction worksheet 4. Indicate furring R-value when furred wall are·being used. 5. Indicate Status.of fenestration (New, Existing or Upgrade). 6. Indicate Special Feature on Page 2 of the Inspection Checklist Form .below. 7. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. FENESTRATION SURFACE DETAILS • C .;, j!= Ill Cl) -II) ... 0 Cl C : 8 C .s "'11> .., C 0 8s en C) II) l!S ,_,. l!S = u, -I! l!S l!S C ~ a. () f:! :J: f:! .c 'ti :s .,.. ll)W ><if >< en .. Fenestration ... = :s ~ C '; :::, f :i 'i: .. 0 l!S ' 0 as.-. 0 8u5 Tag/1D1 Tvt:1e2 en< Cl)QZ 'II: == :l Cl) :: !:. en 0 [J rrr~ [J Cl [J [,;gi!s ~::.EI~:: ,""lff' ~g_<,< ,<) [J ¼rt.!t P-.-;:~ ,, ;,.; · er· .i· __ ,,,',,· \:ti~: t;g} :fJ;f;, _,, ~..-.>-~ [J >;~~;;, [J ··~r t. j ~/ r~~'l' '){ ~ ~ -: :~~1:~ ~ltf? [J ;'.fg\ 1EfJ:: ::a.:) i . Indicate the identifying name of the frame type (i.e. Window #1 ). 2. Indicate type of construction Type such, Window, Glass Door, Curtain wall, Skylight, or other. 3. Indicate if the efficiency values are from the NFRC Label Certificate or from the CEC Default Values. Enter NFRC or CEC (FC-1 and FC-2). 4. Indicate Status of fenestration (New, Existing or Upgrade). 5. Indicate Special Feature on Page 2 of the Inspection Checklist Form below. 6. If Fail then describe on Page 2 of the Inspection Checklist Form and take.appropriate action to correct. Verify building plans if necessary. EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Page 4of 16 CERTIFICATE OF COMPLIANCE (Part 2 of 3) ENV-1C AND FIELD INSPECTION ENI;RGY CHECKLIST Project Name I Date Gemological Institute of America 4/8/2010 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or . Performance Aooroach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE"ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: "Pits;;:'. ~Eaili~J :":Nl'N,:. 0 Roofing compliance not required in Climate Zones 1 and16 with a low-Sloped. 2:12 pitch or less. :z:{~f~: [fi;:J.1! ·:;'?:;~: ti Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 lb/ft2• Greater than 2:12 pitch. 1,·/·/ '~ . ./ ,.,. 0 Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted. Solar reflectance and thermal emittance or p· SRI-that have a U-factor of 0.039 or lower, see Ooaaue Surface Details roof assemblv, Column Hof ENV·2C. If ., ~ ~ 0 The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are ' exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at WVIIW.enerav.ca.aov/title24/ ... 0 Roof constructions-that have thermal mass-over the roof membrane with a weight of at least 25 lb/ft' are exempt from the Cool Roof criteria below. High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are ,.,,'.. 0 exemoted from the low-sloped roofino criteria. i:.-~l~ ,._ (\'{-' ,¥!'ft; 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Roof Slope Product Weight Product Aged Solar Thermal ·-Number1 ,;; 2:12 > 2:12 < 5lb/ft2 l!: 5lb/ft2 Tvpe2 Reflectance3 Emmitance SRI , Pa1U? 0 0 0 0 04 ... i!,. . ·-·a, .. ,,., .... ,.,.. .,_ .,, ... ·Ji\ 0 0 0 0 04 :.._, ;. : ;(_, >J;jt~-':'--f~., -~-p,,,',. ? " 0-".},~ c: ·-iS! ,,.,,~ .,_,.£l,<,, L ,Cl,c: '4-),--:--~--,,,¥-;,_,., ~ , , , ":!>:-.' ,: __,<Q'~' , ', ., ,'-, 0 0 Cl 0 04 ~f~';1;1;2:~~~ ~v.c'l',,\ a-', --~r (~ ",'•~:"'t'. f:-\r1;;t~j1\ 0. 0 Cl 0 04 Jllli~ii~;-~;tl~ii {..J;,,li;Jfe,~ :q. '>j,"~...:'% ' 0 0 D 0 04 D 0 D 0 04 ~r:?1~r1~i~ 1. The CRRC Product ID Number can be obtained from the Cool Roof Ratin(J-Council's Rated Product Directory at www.coolroofs.org/groducts/search.ghg 2. Indicate the type of product is being used far the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same-directory and use the equation (0.2+0.7(P1n1tia,-0.2) to obtain a calculated aged value. Where pis the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if_the Aged Reflectance is-a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http:/lwww.energy.ca.gov/title24/ 6. Indicate Special Feature on Page 2 of the Inspection Checklist Form below. 7. If Fail then describe on this paoe of the Inspection Checklist Form and take appropriate action to correct. Verify buildino plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance r!'lquirements listed in §118(i)4. Select the applicable coating: 0 Aluminum-Pigmented Asphalt Roof Coating I 0-Cement-Based Roof Coating IO Other SPECIAL FEATURES INSPECTION CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or desian-that otherwise.comolies based on the acleauacv of the special iustification and documentation submitted. Discrepancies: EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paae 5of 16 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemological Institute of America 4/8/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration oroduct line must be orovided to the owner of the buildina for their records. Test Descriotion ENV-2A Test Performed Bv: Fenestration Products Name or ID Area of like Building Envelope Reauirina Testing or Verification Products Acceptance Test D D D D D D D D D D D D D D D D D D D D D D D D D D - EneravPro 5.0 bv EneravSoft · .User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paqe 6 of 16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1C Project Name Gemological Institute of America Project Address Carlsbad GENERAL INFORMATION Buildin T e: El Nonresidential Climate Zone 7 Cl . High-Rise Residential Date 4/8/2010 Total Cond. Floor Area Addition Floor Area 1,132 1,132 Cl Hotel/Motel Guest Room Cl Schools (Public School) CJ Relocatable Public School Bldg. 121 Conditioned Spaces CJ Unconditioned Spaces affidavit Phase of Construction: CJ New Construction Cl Addition 121 Alteration Approach of Compliance: CJ Component Front Orientation: N, E, S, W or in Degrees: 180 deg li?I Overall Envelope TDV Ener Cl Unconditioned (file affidavit) HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ur ment2 Item or System Tags i.e. AC-1, RTU-1 HP-1 Duct Location/ R-Value Duct Leakage Testing -If Yes, a MECH-4A must be submitted Economizer Thermostat Fan Control E ui ment2 Item or System Tags i.e. AC-1, RTU-1, HP-1 Duct Location/ R-Value Duct Leakage Testing -If Yes, a MECH·4A must be submitted Economizer Thermostat Fan Control Ins ection Criteria new package hp Packaged DX 1 34,600 Btu/hr 7.B0HSPF 36,700 Btu/hr 13.0 SEER I 11.0 EER R-8.0 No Fixed Temp (Non-/nteg) Setback Required ·Constant Volume. Ins ction Criteria 1. Indicate special feature DETAILS on Page 2 of the Inspection Checklist Form. S ecial Feature 1 D D D D D D D D D D D D cial Feature1 D D D D D D D D D D D D 2. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 3. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. 4. Indicate EquipmentType: Gas (Pkg or, Split), VAY, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.0 b Eher Soft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Pa e7of16 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemological Institute of America . 4/8/2010 SPECIAL FEATURES INSPECTION CHECKLIST The local enforcement agency should-pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the soecial iustification and documentation submitted. Discr:e0ancies: . EneravPro 5. O bv EneravSoft User Number: 2875 RunCoae: 2010-04-0BTOB:53:00 ID: Page 8 of16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1C Project Name I Date Gemological f{Jstitute of America 4/8/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the·acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requ_ires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices seiving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All-newly installed HV AC equipment must be tested using the Acceptance Requirements. The MECH-1C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information-meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH·2A MECH-3A MECH-4A MECH-5A MECH-GA MECH-7A MECH-BA MECH-SA MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume& Air Control Supply Valve Water Variable Demand For Single-Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Eouioment Reauirina T estina or Verification . Qtv. VAV&CAV Unltarv Ducts Controls DCV VAV Test Reset Control Control Carrier 501:Z-A-36-50 1 ~ ~ D IE! D D D D D D .o D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D t D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D EnemvPra 5. 0 bv EnerovSoft User Number: 2875 RunCode: 2010-04418TOB:53:00 JD: Paae 9af 16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1C Project Name I Date Gemological Institute of America 4/8/2010 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Fault Automatic Fault Distributed Detection & Detection & Energy Storage Thermal Energy Diagnostics Diagnostics for DXAC Storage (TES) Eauioment Reauirlna T estina Div. for DX Units Air &Zone Svstems Svstems Test Performed Bv: Carrier SOEZ-A-38-50 1 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D -0 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D (j D D D D D D D D D D D D D D D D D EneravPro 5.0 bv EnemvSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paae 10of 16 AIR SYST'=M REQUIREMENTS (Part 1 of 2) MECH-2C Project Name l Date Gemological Institute of America 4/8/2010 Item or System Tags Indicate Air Svsten:is Twe (Central, Sinale Zone, Packa1 e, VAV, or etc ... ) ,~-:;;:;;,!f?,'.}~~\f new package hp /i.e.AC-1, RTU-1, HP-1) Number of Systems p;'~-?K;;:)r/ -~'-1 Indicate Paae Reference on Plans or Schedule and indicate the annlicable exception(s) MANDATORY MEASURES T-24Sections Heating Equipment Efficiency 112/al 7.B0HSPF Cooling Equipment Efficiency 112(al 13.0-SEER I 11.0 EER HVAC Heat Pump Thermostat 112/bl, 112/c) Yes Furnace Controls/Thermostat 112fcl, 11 Sfal rt/a , Natural Ventilation 121(b) Yes Mechanical Ventilation 121 (b)_ 170cfm VAV Minimum Position Control 121(c) No Demand Control Ventilation 121/c\ No Time Control 122(e) Programmable Switch Setback and Setup Control 122<el Setback Requireci Outdoor Damper Control 122(f) Auto l'solation Zones 122/n\ nfa Pipe Insulation 123 Duct Insulation 124 R-8.0 PRESCRIPTIVE; MEASURES Calculated Design Heating Load 144(a & bl h/a Proposed Heating Capacity t44(a &bl 26,469-Btufhr Calculated Design Cooling Load 144(a& bl nfa Proposed Cooling Capacity 144/a & bl 24,401 Btu/hr ,Fan Control 144(c) Constant Volume DP Sensor Location 144/cl Supply Pressure Reset (DDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) Fixed Temp (Non-lnteg) Heat and Cool Air Supply Reset 144(f), Constant Temp Electric Resistance Heating 1 144/n\ Constant Temp Air Cooled Chiller. Limitation 144(i\ buct Leakage Sealing. If Yes, a 144(k) No MECH-4-A must be submitted 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPr6 5.0 bYEnergySoft User Number: 2875 RunCode:' 2010-04-0BT0B:53:0 ID: Page 11 of 16 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Date Gemological Institute of America 4/8/2010 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (6144(dll AREA BASIS OCCUPANCY BASIS VAVMINIMUM A B C D E F G H I J K L M N MinCFM REQ'D Design 50%of Max.of Design Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum Area per By Area Of per Occupant Max of Air Supply BX0.4 H,J,K, Air Transfer Zone/Svstem 1112) tt• BXC, PAnnle Person EXF DorG CFM CFM CFM/lt2 300CFM Setooint Air assembly 121 1,132 0.15 170 17G 170 new package hp Total 17G 170 - Totals Column I Total Design Ventilation Air C Minimum ventilation rate oer Section !1121 Table 121-A. E Based on fixed seat or the areater of the ex=ted number of occuoants and 50% of the CBC occuoant load for eoress cu moses for soaces without fixed setting. H Reau ired Ventilation Air IREQ'D V.A.l is the laroer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or Gl. I Must be oreaterthan or eoual to H or use Transfer Air /column NI to make uo the difference. J Desion fan suoolv CFM /Fan CFMI x 50%· or the desion zone outdoor airflow rate per 6121. K Cond~ion area 1lt2l x 0.4 CFM i 112· or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or eauarto Column Land greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column HJ Is greater than the'Design Minimum Air (Column M). Where required, transfer air must be greater than or eoual to the difference between the Reouired Ventilation Air /Column H\ and the Desion Minimum Air /Column Ml. Column H minus M. EnerovPro 5. 0 bv EnernvSoft User Number: 2875 RunCode: 2010.04-0BTOB:53:00 ID: Paae 12of16 MECHANICAL EQUIPMENT DETAILS (Part 1 of 2 MECH-5C Project Name I Date Gemological Institute of America 4/8/2010 CHILLER AND TOWER SUMMARY PUMPS Premium Pump EQUIPment Name Tvna Qtv. Efficlencv Tons Qty. GPM BHP Eff. Motor Control D D D DHW. / BOILER SUMMARY Vol. Energy Factor Standby Loss TankExL Svstem Name Twe Distribution Otv, Rated !neut /Gals\. or RE or Pilot R-Value Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water·Pumo · Hot Water Pioina Lenath ft) Control ntv, HP_ T~ In Plenum Outside Buried Add½" Insulation D D D CENTRALSYSTEM RATINGS HEATING COOLING SVstem Name Tv"" Qtv. OUIDUI Aux.kW Efflciencv Outout Efficiency Status Canter 50EZ-A-36-50 Packaged DX i 34,600 a.a 7.BaHSPF 36,7aa 13.aSEER/ 11.aEER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN Premium Premium Svstem Name FanTvne Economizer Tv"" CFM BHP Eff. Motor CFM BHP Eff. Motor Carrier 5aEZ-A-36-5a Constant Volume Fixed Temo fNon-lnteal 1,200 0.42 D none D D D D D D D 0 0 0 D 0 D EnemvPro 5.0 bv Enerrn-<::aft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paae 13 of16 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name I Date Gemological Institute of America 4/8/2010 DESCRIPTION Buildina Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(6): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2604, and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in· nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in, the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a)1: window area, 0:3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinaina and slidinal and 1.0 cfm/ft.2 for nonresidential double doors (swinaina). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except forunframed glass doors and fire doors). EneravPro 5.0bv EneravSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paae 14 of 16 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Narne I Date Gemological Institute of America 4/812010 Equipment and System Efficiencies §iii: Any appliance for which there is a Californic1 standard established in the Appliance Efficiency Regulations will comply with the applicable standard, §115(a): . Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Contro.ls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section i 12 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's proaram and time settinQ for at least 10 hours if power is interrupted; or 18. An occupancy sensor to control the operating period of the system; or 1C. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §i22(g): square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off indeoendentlv of other isolation areas: and shall be controlled bv a time control device as described above. §122(c): Thermostats.shall have numeric setpoints .in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees For lower. For cooling, the §i22(a&b): control shall be adjustable up to 85 degrees For higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122{f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except'for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the buildina or soace shall be certified as meetina the Acceotance Reauirements for Code Comoliance Service Water Heating Svstems §113(c} Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 11 0 ° F. 2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.0 bv EnergySoft . User Number: 2875 Run Code: 2010-04-0BTOB:53:00 ID: Page 15of16 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Gemological Institute of America 4/8/2010 System Name Floor Area new package hp 1,132 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heatina Svstem CFM Sensible Latent CFM Sensible Output oer Svstem 34,600 Total Room Loads 1,563 20,114 5,377 738 21,851 Total Output (Btuh) 34,{?00 Return Vented Lighting 0 Output (Btuh/sqft) 30.6 Return Air Ducts 1,006 1,093 Coolina Svstem Return Fan 0 0 Output oer System 36,700 Ventilation 170 1,451 -182 170 6,437 Total Output (Btuh) 36,700 Supply·Fan 1,670 -1,670 Total Output (Tons). 3.1 Supply Air Ducts 1,006 1,093 Total Output(Btuh/saft) 32.4 Total OutPut fsaft/Ton) 370.1 TOTAL SYSTEM LOAD 25,247 5,195 28,803 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Carrier S0EZ-A-36-50 . 24,401 13,729 26,469 Airflow (cfm/sqft) 1.06 Airflow (cfm/Ton) 392.4 Outside.Air(%) 14.2% Total Adjusted System Output 24,401 13,729 26,469 Outside Air {cfm/saft) 0.15 (Adjusted for Peak Design conditions) Note: values above alven at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM I Jan 1 AM HEATING SYSTEM PSVCHROMETRICS Alrstream Temoeratures at Time of Heating Peak) 34°F 64'~; 97'F 98 °F . ~ ·~TJT~ >,(;',< i OutsideAir ~ ... S!Jpply Fan 170.cfm Heating Coil 1,200 cfm 97°F '~ f"ROON-- 69°F 70 °F --~ I I I ~: ~ I -- . COOLING SYSTEM PSYCHROMETICS (Airstream Temoeratures at Time of Coolina Peak) 83 / ff8 °F 76/66°F 60 /59 °F 61 / 59 °F -. 01 (jr ~~.I J I ~ i ~ -,,,.,.,..."<_, Outside Air ~ ~ 170 cfm Cooling Coil Supply Fah 62 / 60 °F '~ 1,200 cfm !ROOM-· 62.9% - 75/65°F 74 /65 °F ~ ---~Tl7-~< I ~ -- EnergyPto 5.0 by EnergySoft User Number: 2875 RunCode: 2O1O-O4-OBTOB:53:O0 ID: Page 16 of 16 Nonresidential Relocatable -indicate New Construction LIANCE Climate Zone CA Climate Zone 07 High-Rise Residential 1,132 Holm/Motel al! climates 4 Alteration This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. Signature ve Ste 201 Th~ Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other·compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through ·149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. l hereby affirm that ! am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the pan.on responsible for its preparation; and that I am licensed in the State of Califomia as a civil engineer, mechanical engineer, elecirica! engineer, or ! am a licensed architool:. ! affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible fur its: preparation; and that l am a licensed contractor performing this worn:. I affirm that l am eligible ,.mder DM$ion 3 of the ausiness ang Pr®$$ions Code to Sign this document because it pertains to a structure or typ~ of work described as exempt pursuant to Business and Professions Code Sedlons5537, 5538 a.rd 6737.1 . ...,,.,,......,,.~.,,,,,if,....ri_v_e~io_p_e_,,D,,,,..esigner Signature innovative Tenant Improvements Compliance Not tn The Scope Of This Submfltal PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1C Project Name I Date Gemoloaical Institute of America 4/8/2010 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sQft-yr) Standard Proposed Compliance Enerav Component Desian Design Margin Space Heating 10.18 9.06 1.12 Space Cooling 67.52 59.32 8.20 Indoor Fans 32.11 39.57 -7.46 Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.90 0.00 Domestic Hot Water 0.00 0.06 0.00 Lighting 50.97 50.97. 0.00 Receptacle 50.98 50.98 0.00 Process 0.00 0.00 0.00 Process Lighting 0.00 0.00 0.00 TOTALS 211.77 209.90 1.87 Percent better than Standard 0.9% ( 0.9 % excludina orocess) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (S) 180deg. Conditioned Floor Area 1,132 sqft. Number of Stories 1 Unconditioned Floor Area 28,000 sqft. Number of Systems 1 Conditioned Footprint Area 1,125 sqft. Number of Zones 2 Natural Gas Available On Site Yes Orientation Gross Area Glazina Area Glazing Ratio · Front Elevation (S) o sqft. o sqft. 0.0% Left Elevation (W) o. sqft. o sqft. 0.0% Rear Elevation (N) 648 sqft. o sqft. 0.0% Right Elevation (E) o sqft. o sqft. 0.0% Total 648 sqft. o sqft. 0.0% Roof 1,125 sqft. o sqft. 0.0% Standard Proposed Lighting Power Density 0.900 W/sqft. 0.900 W/sqft. Prescriptive Envelope TDV Energy 10,528 19,747 Remarks: THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-0BTOB:53:01 ID: Paae2of16 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name I Date Gemological Institute of America 418/2010 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads S.vstem Name Zone Name Occuoancv Tvoe (soft.) (W/sf)1 (W/sf)2 (W/sf)3 (W/sf)4 (W/sf) new package hp assembly 121 lridus(rial Work, Low Bay 1,132 *0.900 uncond warehouse 103, 119, Industrial Work, Low Bay 28,000 *0.900 ·- I Notes; 1. See L TG-1 C 2. See L TG-20 3. See LTG-30 4. See LTG-4C Items above require special documentation /items marked with asterisk see.LTG-1-C bv others) (bv others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified In this checklist. These items require special written justification and documentation, anc! special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the soecial iustification and documentation submitted. The HVAC System Carrier_50EZ-A-36-50 (ncludes an Economizer. This system has a cooling output< 75,000 Btuh or a supply cfm < 2500. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergvPro 5.0 bv Ener.avSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Page 3 of 16 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemological Institute of America 4/8/2010 Project Address I Climate Zone 7 I Total Cond. Floor Area I Addition Floor Area Carlsbad 1,132 1,132 GENERAL INFORMATION Buildina Tvoe: &21' Nonresidential D High-Rise Residential D Hotel/Motel Guest Room D Schools (Public School) D Relocatable Public School li2I Conditioned Spaces D Unconditioned Spaces Sida. :o Skylight Area for Large Enclosed Space ~ 8000 tt2 {If checked include the ENV-4C with submittal) · Phase of Construction: D New Construction D Addition li2I Alteration Approach of Compliance: D Component li2I Overall Envelope D Unconditioned {file affidavit) Front Orientation: N, E:, S, W or in Degrees: I 180deg FIELD INSPECTION ENERGY CHECKLIST C Ill .e~ ::I er. C --' 0 a>"'' G) m ~ a: ::I Q) .. b, 0 u~ 2' .. 11) --.. u ... (/) ~II) C :I C = en 111· 111 111 C ~ =m 'U ::I ,. ,: .!!! w ·-::I ·;: ·e-= c1u 't: GI ru iii C: > ... ,.~ ::I ... ::, .. ~ 8d: it :I 111 8in ~ .Taa/1D1 Assembly Frame TYDe2 en ct eno z CJ> U.> "' lJ,'.)f,:;', ,.,~ CJ -,.--~;:-:~?m:~:l Wall Solid Unit Masonry 648 (N) None 0.0 Existing ,~ < '-..... ,,,,.,,..,, Roof Wood Framed Rafter 1,125 (S) R-19 0.0 D Existing ')}'>-. ,, Slab Unheated Slab-on-Grade 1,125 (N) None 0.0 CJ Existing ttEt Demising Metal Framed 2,322 (N) R-19 0.0 CJ New ~~):t~ [gt CJ ff~t~ ~1:ft: CJ [~g~·. <gl'. {i,t~ CJ ~,:t ;,::; f~i$; CJ :Jij:;: 'f!~~ r)~1:: 1. lndic;ate the identifying name of the frame type (i.e. Wall -1, Ceiling-1, Roof -1, and Floor-1). 2. Indicate type of Assembly Type such as Wood 2x4 or LW CMU 8". For additional other assembly types see Reference Joint Appendix, JA4-1. 3. If furring is checked refer to ENV-2C Mass and Furring Strips Construction worksheet. 4. Indicate furring R-value when furred wall are being used. 5. Indicate Status of fenestration (New, Existing or Upgrade). 6. Indicate Special Feature on Page 2 of the Inspection Checklist Form below. 7. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. FENESTRATION SURFACE DETAILS wll 6 :: Ill UI :;;i: ' . ! ... CJ Cl C: B :g ~ ., .,II) c; 0 B .e Cl) C) 111 __ ,. ... en 111 = rn 111 111 111 C • a. 0 2 :c 2 .c 'O ::, i~u~·=i )( if ... ,: Cl) -lllw -::, >( CJ) ::, g? C 'to 1~,i·· Fenestration ::, ... ~c§z 0 Ill • 0 111 --0 o ... Tag/1D1 Tvoe2 Cl) ct 'II: ::!:::::> Cl) ::E 5-en 0 CJ CJ) CJ :o:~?~ ~J:rt 1J~)I D ~;ti f?gl]) ::;gJ, Cl (\E:i,~,: ~:;:~*~ i$) D II -· D D D ' . D . 7g;s; !I~~ ~1§;:·: 1. Indicate the identifying name.of the frame type (i.e. Window #1 ). 2. Indicate type of construction Type such, Window, Gl!:!Ss Door, Curtain wall, Skylight, or other. 3. Indicate if the efficiency values are from the NFRC Label Certificate or from the CEC Default Values. Enter NFRC or CEC (FC-1 and FC-2). 4. Indicate Status of fenestration (New, Existing or Upgrade). 5. Indicate Special Feature oh Page 2 of the·lnspection·Checklist Form below. 6. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EneravPro 5.0 bv Ener.avSoft User Number: 2875 RuriCode: 2010-04-0BT0B:53:00 ID: Paae 4of 16 ·CERTIFICATE OF COMPLIANCE (Part 2 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemologica_/ Institute of Americc1 418/2010 . ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Aooroach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: g1>ass~·r:1:f..f'airs~· ,,_.~IA\; ·,-Cl Roofing compliance not required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less. i-'? ,-1,a;W Cl Roofing compliance !!Qt required in Climate Zone 1 with a Steep-Sloped with less than 5 lb/ft2• Greater than 2:12 pitch. Cl Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted. Solar reflectance and thermal emittance or 1 ,• SRI that have a U-factor of 0.039-or lower, see Opaque Surface Details. roof assembly, Column H of ENV-2C. Cl The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exemoted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enemv.ca.aov/title24/ -_,;,i6 Cl Roof constructions that have thermal ·mass over the roof membrane with a weight of at least 25 lb/fr are exempt from f!i!f:? the Cool Roof criteria below. ;· Cl High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are "' .:_, exempted from the low-slooed roofina ·criteria. , ·t; 1. If Fail then describe on this page of the Inspection Checklist Forn, and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Roof Slope Product Weight Product Aged Solar Thermal r;~ ,. Number1 s; 2:12 > 2:12 < 51b/ft2 iii: 51b/ft2 Tvoe2 Reflectance3 Emmitance SRl5 Cl Cl Cl Cl Cl 4 ;i~)t· \s':PJ: Cl Cl Cl Cl [j4 ' _!.Zti~·;i; it~:~}~} Cl Cl Cl Cl [j4 fft;ig;t~It ~ f~ftf·'.~:: Cl Cl Cl Cl [j4 ;~~-~-<iiiji ~1~/itif} :: Cl D Cl Cl [j4 ':(ff~f;if~~ £E~g;0 i~:~~~ Cl Cl D Cl Cl 4 ?1~Y·m.c1i1t1~z?1~ri'A;::l -1. The CRRC Product ID Number can be obtained from the Cool Hoof Rating Council's Rated Product Directory at www.coolroofs.org/groducts/search.ghg 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. lfthe Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(P1n1Ha1-0.2) to obtain a calculated aged value. Where pis the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is-a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energy.ca.gov/title24/ 6. Indicate Special Feature on Page 2 of the Inspection Checklist Form below. 7. If Fail then describe on this oaae of the Inspection Checklist Form and take aporooriate action to correct. Verify buildino plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: Cl Aluminum-Pigmented Asphalt Roof Coating I Cl Cement-Based Roof Coating ID Other SPECIAL FEATURES INSPECTION CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or desian that otherwise comolies based on the adeauacv of the soecial iustification and documentation submitted. Discrepancies: . EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Paae 5of 16 CERTIFICATE OF COMPLfANCE . ENV-1C (Part 3 of 3) AND FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemological Institute of America 4/8/2010 Required Acceptance Tests De$igner: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that . require an acceptance test. If all the sitesbuilt fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA? Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new · fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the. . enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title ~4 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the buildina for their records. Test Description ENV-2A Test Performed Bv: Fenestration Products Name or ID Area of like Building Envelope Reauiring Testing or Verification Products Acceptance Test CJ CJ CJ CJ CJ ' CJ CJ CJ D CJ CJ CJ CJ D CJ CJ CJ CJ CJ .. CJ CJ CJ CJ CJ CJ CJ EneravPro 5.0 bv EnerdvSoft User Number: 2875 .RunCode: 2010-04-0BT0B:53:00 ID: Paqe 6 of16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST Project Name Gemological Institute of America (Part 1 of 4) MECH-1C Date 4/8/2010 Project Address Carlsbad Climate Zone Total Cond. Floor Area Addition Floor Area GENERAL INFORMATION Buildin T e: D Schools (Public School) Phase of Construction: Approach of Compliance: 7 1,132 1,132 El Nonresidential D High-Rise Residential D Hotel/Motel Guest Room D Relocatable Public School Bldg. !fl Conditioned Spaces D Unconditioned Spaces affidavit D New Construction D Component D Addition !fl Overall Envelope TDV Ener !fl Alteration D Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg HVAC SYSTEM DETAILS E ui ment2 Item or System Tags i.e. AC-1, RTU-1, HP-1 Duct Location/ R-Value Duct Leakage Testing -If Yes, a MECH-4A must be submitted Economizer Thermostat Fan Control E ui ment2 Item or System Tags i.e. AC-1, RTU-1, HP-1 FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Re uirements Ins ection Criteria S ecial Feature1 new package hp D Packaged DX D 1 a 34,600 Btu/hr D 7.B0HSPF D 36,700 Btu/hr -D 13.0 SEER 111.0 EER D R-8.0 D No a Fixed Temp (Non-lnteg) a Setback Required a Constant Vo/uml3 a Ins ction Criteria cial Feature1 a D D a a :,. a ~if :-/!~?If~:2 £!f1\iZ~--t1: Coolin Efficienc Duct Location/ R-Value Duct Leakage Testing -If Yes, a MECH-4A must be submitted Economizer Thermostat Fan Control 1. Indicate special feature DETAILS on Page 2 of the Inspection Checklist Form. a a a a a a 2. If the Actual installed equipment perform'ance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 3. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. 4. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.0 b Ener, Soft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Pa e 7 of16 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name I Date Gemological Institute of America 4/8/2010 SPECIAL FEATURES INSPECTION CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the , soecial justification and documentation submitted. Discrepancies: . EneravPro 5.0 bv EneravSoft · User Number: 2875 RunCode: 2010.()4-0BTOB:53:00 ID: Paae 8 of16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1C Project Name I Date Gemological Institute of America 4/8/2010 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Aµpendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HV AC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of, Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIFTION MECH-2A MECH-SA MECH-4A MECH-SA MECH-6A MECH-7A MECH-BA MECH-BA MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume& Air Control Supply Valve Water Variable Demand For Single-Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Eauioment Reauirina Testlna or Verification Qtv. VAV&CAV Unltarv Ducts Controls DCV VAV Test Reset Control Control Carrier 50&-A-36-50 1 e!I e!I D !El D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 0 D D D D D D D D D 0 0, D D D D p D D D D D D D D D D D D D 0 D D D D D D D D D D D D D b D D D D D 0 o. D D D D D D D D D D D D D D D D D D D D D D D D D D D D 0 D D D D o D D D D D EnerovPro 5. 0 bv EneravSoft User Number: 2875 RiJnCode: 2010-04.0BTOB:53:00 JD: Paae 9of 16 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1C Project Name I Date Gemological Institute of America 4/8/2010 TEST DESCRIPTION MECH·12A MECH-13A MECH-14A MECH-15A Fault Automatic Fault Distributed Detection & Detection & Energy Storage Thermal Energy Diagnostics Diagnostics for DXAC Storage (TES) Eauioment Reau Irina T estina Qtv. for DX Units Air&Zone Svstems Svstems Test Performed Bv: Carrier 50EZ-A-36-5q 1 D D D D D D D D D D D D D D D D o, D D D D D D D D D D D D D D D D D D D D D D D D D o, D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D EneravPro 5.0 bv EnemvSoft User Number: 2875 RunCode: 2010-04-0BTOB:53:00 ID: Paae 10af16 AIR SVST~M REQUIREMENTS (Part 1 of 2) MECH-2C Project Name I Date Gemological Institute of America 4/8/2010 Item or System Tags Indicate Air Svstems Type (Central, Single Zone, Packa! e, VAV, or etc ... ) :t,;;itL~ ;;-;:;i~f:Y:' · new package hp (i.e. AC-1, RTU-1, HP~1) Number of Systems :\;,}· "·}t~}j~: x.:.,-, 1 Indicate Paae Reference on Plans or Schedule and indicate the aonlicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 7.80HSPF Cooling Equipment Efficiency 112(al 13.0-SEER 111.0 EER HVAC Heat Pump Thermostat 112/b). 112/cl Yes Furnace Controls/Thermostat 112(c), 115/a) n/a Natural Ventilation 121/b) Yes Mechanical Ventilation 121(b) 170cfm VAY Minimum Position Control 121(c) No Demand Control Ventilation 121(c) No Time Control 122(e) Programmable Switch Setback and Setup Control 122/el Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122/al n/a Pipe Insulation 123 Duct Insulation 124 R-8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a&b) n/a Proposed.Heating Capacity 144/a & bl 26,469 Btu/hr Calculated Design Cooling Load 144/a& b) n/a Proposed Cooling Capacity 144/a & bl 24,401 Btu/hr Fan·Control 144{c) Constant Volume DP Sensor Location 144/c) Supply Pressure Reset (DDC only) 144/cl Yes Simultaneous Heat/Cool 144(d) No Economizer 144/el Fixed Temp (Non-lnteg) Heat and Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating 1 144/al Constant Temp Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a No MECH-4-A must be submitted 144(k) 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain whichexception(s) to §144(g) apply. EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-04-0BT0B:53:0 ID: Page 11 of 16 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Naf'fle Date Gemologic?l Institute of America 4/8/2010 MECHANICAL VENTILATION 16121/b\2\ REHEAT LIMITATION 16144/dll AREA BASIS OCCUPANCY.BASIS VAVMINIMUM A B C D E F G H I J K L M N MinCFM REQ'D Design 50%of Max.of Design Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum Area per By Area Of per Occupant Max of Air Supply BX0.4 H,J,K, Air Transfer Zone/Svstem llt2l ft2 BXC Peoole-Person .EXF DorG CFM CFM CFM/lt" 300CFM Setpoint Air . assembly 121 1,132 0.15 170 17C 170 new package hp Total 17C 170 : - Totals Column I Total Design Ventilation Air C Minimum ventilation rate-oer Section 6121 Table 121-A. E Based on fixed seat or the areater of the ex=ted number of occuoonts and 50% of the CBC occuoant load for earess oumoses for soaces without fixed setting. H Reau ired Ventilation Air /REQ'D V A.1 is 1he lar= of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS /Column D or GI. I Must be areater than or eaual to H or use Transfer Air lcolumn N\ to make un the difference. J Desian fan suoolv CFM /Fan CFMl x50"/o· or the desian zone outdoor airflow rateoer 6121. K Condition-area 11121 x 0.4 CFM / 112· or L Maximum of Columns H, J, K, or 300 CFM M This must be less than oreoual to Column Land areaterthan oreaual to the sum of Columns H clus N. N Transfer Air must be provided where the Required Ventllation Air (Column HJ Is greater than the Design Minimum Air {Column M). Where required, transfer air must be greater than or eaual to the difference between the Renuired Ventilation Air /Column HI and the Desinn Minimum Air/Column Ml. Column H minus M. EneravPro 5. 0 bv EneravSoft User Number. 2875· RunCode: 201(}.04-08T08:53:00 ID: Paae 12of16 MECHANICAL EbUIPMENT DETAILS (Part 1 of 2) MECH-5C Project Name I Date Gemolog(caf./nstitute of America 418/2010 CHILLER AND TOWER SUMMARY PUMPS Premium Pump Eaulcment Name TVDf! Qty. Efllclencv Tons Qtv. GPM BHP Eff. Motor Control D D D DHW / BOILER SUMMARY Vol. Energy Factor Slandby Loss Tank Ext. SvstemName Tvoe Distribution Qtv. Rated lnout (Gals). or RE or Pilot R-Vatue Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water PumD Hot Water PIDill!l Lenath ft) Control Otv. HP T~ In Plenum Outside Burled Add½" Insulation D D D CENTRAL SYSTEM RATINGS - HEATING COOLING Svsteni Name TvDA Qty. Outcut Aux.kW Efflciencv Outout Efflcfencv Status Carrier 50EZ-A-36-50 PaalmnedDX 1 34,600 a.a 7.BOHSPF 36,700 13.0SEER/ 11.0EER New CENTRAL SYSTEM FAN.SUMMARY SUPPLY FAM RETURN FAN Premium Premium SvstemName FanTvoe Economizer Tvoe CFM BHP Eff. Motor CFM BHP Eff. Motor Carrier 50EZ-A-36-50 Constant Volume Fixed Temo {Non-lntea) 1,200 0.42 D none D -D D D D D D D D D D D D Ene""'Pro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04-08T08:S3:00 ID: Paoe 13 of16 ENVELOPE MANDATORY ~EASURES: NONRESIDENTIAL ENV-MM Project Name I Date Gemological Institute of America 4/8/2010 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating l')laterial, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part.2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinaina and slidina), and 1.0 cfm/ft.2 for nonresidential double doors (swinaina). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §116(a)3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EneravPro 5.0 bv EneravSoft User Number: 2875 Run Code: 2010-04-0BTOB:53:00 ID: Paqe 14 of 16 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name I Date Gemological Institute of America 4/812010 Eauipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed ·and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMG Standards. Controls §122(e): Each space condition1pg system shall be installed with onE;i of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's proaram and time settina for at least 1 0 hours if oower is interrupted; or 18. An occupancy sensor to control the operating period of the system; or tC. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(g): square feet shall be provided with isolatiori zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off indeoendently of other isolation areas· and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122{b}: Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees For lower. For cooling, the §122{a&b): control shall be adjustable up to 85 degrees For higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §i2i(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided, with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121 (f): new ventilating systeni serving a building or space is operated for normal use, all ventilation systems serving the buildina or soace shall be certified as meetind the Acceotance Reauirements for Code Comoliance Service Water Heating Systems §i 13(c) Installation 3. Temperature controls .tor public lavatories. The controls shall limit the outlet Temperature to 110 ° F. 2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EneravPro 5.0 bv EneravSoft User Number: 2875 RunCode: 2010-04,,0BTOB:53:00 ID: Paae15of16 ' . HVAC SYSTEM HEATING AND COOLING l-OADS SUMMARY Project Name Date Gemological Institute of America 4/8/2010 System Name Floor Area . new package hp 1,132 ENGINEERING CHECKS SYSTEM LOAD Number of Svstems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Outout oer Svstem 34,600 Total Room Loads 1,563 20,114 5,377 738 21,851 Totai Outout {Btuh) 34,600 Return Vented Lighting 0 Outout {Btuh/saftl 30.6 Return Air Ducts 1,006 1,093 Coolina Svstem Return Fan 0 0 Output per System 36,700 Ventilation 170 1,451 -182 170 6,437 Total Outout (Btuh) 36,700 Supply Fan 1,670 -1,670 Total Output (Tons) 3.1 Supply Air Ducts 1,006 1,093 Total Output CBtuh/saft\ 32.4 Total Output tsaftrron) 370.1 TOTAL SYSTEM LOAD 25,247 5,195 28,803 AirSvstem CFM oer Svstem 1_,200 HVAC EQUIPMENT SELECTION Airflow (cfml 1,200 Carrier 50EZ-A-36-50 24,401 13,729 26,469 Airflow (cfm/sam 1.06 Airflow (cfm/Ton) 392.4 Outside Air (%) 14.2 % Total Adjusted System Output 24,401 13,729 26,469 Outside Air (cfm/saftl 0.15 (Adjusted for Peak Design conditions) Note: values above alven at. ARI conditions TIME OF SYSTEM PEAK Jul 2 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temoeratures at Time of Heatina Peak) 34°F 64"F-9ff 98 °F ---~ EP ~~ I I I C -i <~:,· Outside Air -~ Supply Fan 170 cfm Heating Coil 1,200 cfm 97°F ,,. /ROON 69 °F 70 °F ~-~ --~ I · I I I ~ ~ COOLING SYSTEM PSYCHROMETICS (Airstream Temoeratures at Time of Coolina Peak) 83/68°F 76/66°F 60 I 59 °F 61 / 59 °F . :!Ji{'' ;~ I I I ~ ~ -. ~ i Outside Air ...-4 ~ 110 cfm. Cooling Coil Supply Fan 62 I 60 °F .. 1,200 cfm !ROOM 62.9% -75/65°F 74 /65 °F ~ ~' I [ I c~ I ~ ~ EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-04-0BT0B:53:00 ID: Page 16 of 16 04/16/2010 10:54 7606034034 GIA • 4. 0 5. CJ G, [J 2. D SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE PAGE 02/03 OFFlCE un ONLY UPFPJ _____ _ ff'#. ______ _ IPD4T'E I I Date lni1ialG q. us: [MIO Dale ~i~~~lt-h..'!ffi-~c!OPANCYQ.ASSIRCATION . ._· -------------:----------- BY:_______________________ CATE: __ ,_/ __ ,_/ __ ~GKIIOl'UfflalPll'aia.'rlCl!ttaallllB mMa!DRlllatAllllG l'llllfflll'fllOTRlll~MC'I' Ml..f.A8l!D ~ QCCUl'MC'I' COUNJY•HMC APCO COUNTV"'iMO APC:0 COUN'N-HMO APCO HM-9171 (04/07) CwlllyiifSan Dicgo-DEH-Hn:mdous M111l"rillls Division - - 01/09/2008 01:12 858 513 1168 858-513-1168 ITI PAGE 01/01 -' POLICYHOLDER COPY STATE COMPENSATION IN5UAANCE: P.O. BOX 420807, SAN FRANCISCO.CA 94142-0807 l=UND CERTIFICATE OF WORKERS' COMPENSATION INSURANCE ISSUE DATE: 01•01-2010 CON'l'RACTORS STATE LICENSE BOARD WORKERS COMPENSATION UNIT PO BOX 28000 SACRAMENTO CA 95828-0028 SD GROUP; 000044 POLICY NUMBER: 0028155-2008 CERTIFICATI= IP; 48 CERTIFICATE J:;XPIRES: 01-01-2011 01-01-2010101-01-2011 LIC PERMITH; 908988 INCEPTION DATE;Oi-01-2010 00: it> This is to certify that we have issued a valid Workers' Compensation insuranoe poliey in a form approved by the California ln$urance Commi$$iOner to the err\ployar named below for tha poliey per.iod indicated. This policy is not subject to cancellation by the Fund except upon 30 day$ advance written notice to the employer. We will also give you 30 days advanc1;1 notice $hould this policy be cancelled prior to its normal e:x;piration. This certi.ficate of insurance is t'IQt .an insuranoe policy and does not amend. extend or alter the coverage afforded by the Policy listed· herein. Notwithstanding MY requirement, terrn or condition of any contract or other documerrt with respect to which this certificate of insurance tnay be issued or ta which it rnay pertain. the insurance afforded by the policy described herein is subjeot to all the terms. exclusions. and eonditions. of such policy. PRESIDENT EMPLOYER'S LIABILITY LIMia INCLUDINQ DEFENSE COSTS: $1,000,000 PER OCCURRENCE .. ENDORSEMENT, 61800 -CALIGER, ANTHONY, TREASURER -EXCLUDED. lNDORSENENT H1800 -~ACKSDN, ~ON, PRESIDENT -EXCLUDED. ENDORSEMENT #2085 ENTITLED CERTIFICATE HOLDERS' NOTICE EFFECTIVE 01-01-2009 IS ATTACHED TO AND'FOIU'S A PART OF THIS POLICY. EMPLOYER INNOVATIVE TENANT IMPROVEMENTS INC 14836 EVENING STAR DR POWAY CA 82084 SD PRINTED 12-17-2009 SD M0410 CB100665 1964 KELLOGG AV GIA-1,284 Tl STORAGE TO EpUIP ~T/""\nAr-r- 4-{ l<Q { 10 'TO Gt'ri' , F-vl<..£ "'--6-6&-1 L wJ l-kt\C... ~t.C..S 2(/4!/ro ~I) J;/~f ~ ) +to <ttr@'f<!'. ' t (1 /10 (JT(;uj ..... DCV ' ! Approved Date Sy BUILDING '-f/27 /,o J11,,A--'• PLANNING . c.i "": 12-/0 ClJ/ ENGINEERING wfSW . .-c:: \-7:>-/D '(j ,r_ FIRE Expedite? r v'J N C, /7 /fr, .,. ,x+- ~ ~ A 11-• I AA,_.-. J , 7 ·-(/ Hazr,.1at APCD Health Forms/Fees Sent Rec'd Due? !Jy Enclna 4-/ ft, I ID y N 19""\ Fire y N /. I HazHealthAPCD '-f/fr,,,/ tO LI-H,,..,.lO .Y N I IV PE&M 411-10 ,o y N IP-I School y N I Sewer y N ·Stormwater y N Special Inspection y N CFD: Y ~ LandUse: Density: lmpArea: FY: Factor: PFF: y (N) · Comments Date Date Date Date Building Planning .Engineering Fire 0-3-IO -· Need? -J ./ .-\--~ 11..~ 11 • .fl la. J/ -'./ /, At ~J1 ~ a&t,._'4 .fl ar6'one , r -, DDone DDone DDone DDone (!) Fees Complete? y N By: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-03-2010 Plan Check Revision Permit No:PCR10082 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC#: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 1964 KELLOGG AV CBAD PCR Lot#: 0 2120930200 $0.00 CB100665 Construction Type: NEW GIA: ADA PARKING Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 07/30/2010 JMA 08/03/2010 08/03/2010 ROBERT WYLIE GEMOLOGICAL INSTITUTE OF AMERICA INC 858-964-8333 Plan Check Revision Fee Additional Fees Total Fees: $60.00 Inspector: 5345 ARMADA DR CARt.SBAb CA 92008 Total Payments To Date: $60.00 Balance Due: ···::: ! ,i '' t; ,; ( -_, ;:.1 ,~ .· , .. t ' '; FINAL APPROVAL Date: Clearance: $60.00 $0.00 $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired. «.~ ~ CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION 8-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No.. p CY<. C 6 -f!"2. Original Plan Check No. CB l 00<'.o ro s-- Project Address 'l j6l( K~0--t-i5~ ~ .. ~A Date 1-J>o r(() Contact (k~\;rn ~L/ t Ph ~~J,. 5'6Y..S:!;.;: » $13-If' 'b . Email--~------ Contact Address ('(6'J( CVfk~f ~5"-tv, \)n, City'\?&--Jo-7 Zip 7,,.Zo(r General Scope ofWork ____ ~---------------------- Original plans prepared by an architect or engineer,·revisions must be signed & stamped by that person. 1 Elements revised: D Plans D Calculations D Soils D Energy D Other __________ _ 2 3 4 Describe revisions in detail List page(s) where List revised sheets A_l\ A cp 0.1\ JJ } __ ~ each revision is shown ,-I 5 Does this revision, in any way, alter the exterior of the projec;t? © Yes 6 Does this revision add ANY new floor area(s}? D Yes 7 Does this revision affect any fire related issues? D Yes 8 Is this a complete set? o Yes ~o .lli,No E) No J £>Signa~g-"I?"""-. -PJ-------- 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 7 60-602-2717 / 2718 / 2719 www.carlsbadca.gov that replace existinq sheets D No Fax: 760-602-8558 ' \ ~· «1~ ¥ CITY OF CARLSBAD BUILDING Plan Check Comments Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov By: Steve 1;3orossay (Contact Hours for Steve: Tues.-Fri., 1pm-5pm) Phone: 760-602-7541 Permit: ~CR 10-8LAddress: (~64 . ,lG=:Jl.00~ Sr Date· v/~C)/10 C 6 IO D 6G ~ • When corrections from all departments are received please run new prints. • r 1 D Provide: A statement on the Title Sheet of the plans stating that the project shall comply with the 2007 CA Building Code, 2007 CMC, 2007 CPC, 2007 CEC and the 2008 CA Energy Efficiency Standards. D Provide: A note titled "Scope of Workn describing the work to be performed under this permit. I Approved on=---~,__V3o-"--1,__D..__I 0------,.. By:---=~::;:.._ _________ , PLANNING/ENGINEERING APPROVALS PERMIT NUMBER PCR10082 DATE 7/30/10 ADDRESS 1964 KELLOGG ST RESIDENTIAL ADDITION- MINOR (<17,000.00) RETAINING WALL VILLAGE .FAIRE OTHER ADA PARKING PLANNER GINA RUIZ POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING DATE 8/2/10 ENGINEER'----------'------DATE. ______ _ 11:\ADMIN\COUNTER/PLANNING/ENGINEERING APPROVAL'J PCR10082 1964 KELLOGG AV GIA: ADA PARKING I, i 7(30{10 -To S+VJe. w/ 03too00s- l0 Plf\-1'-J 1-JO-l:J--~ ~ pc fl~ gf--z,/ 1.0 -f<-n') N -'f Vf1Js €,fCf<_ ?/J/10 / ffl![JJ •" J 1-10 BUii.DiNG a-11 P Pt.ANNINO __ .,._.....,.,___ENGINEERING ------~~ORM ------HAZMAT IAIRQtW. ------OTHER8EWERDISTR FROM .ICANI ~ICHOOLFOAM I CFDFORM I p EI M WORl<SHEE' 1 IPECINSP PLANCORR CNGCORR EIGILCORR FIR!COAR