Loading...
HomeMy WebLinkAbout1965 CASSIA RD; BLDG 2; CB032980; Permit04-08-2004 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 04/08/2004 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB032980 Building Inspection Request Line (760) 602-2725 1965 CASSIA RDCBAD RESDNTL 2150201300 $920,424.00 10 26 Sub Type: Lot#: Construction Type: Reference #: Structure Type: Bathrooms: MANZANITA APTS-BLDG 2-10 UNIT APT Status: ISSUED 0 Applied: 07/28/2003 V1 Entered By: RMA A9804388 Plan Approved: MF5+ Issued: 04/08/2004 20 Inspect Area: Orig PC#: PC030036 11,498 SF, 1128 SF DECK.UNITS 100-103,200-203,300-301 Plan Check#: Applicant: MANZANITA PARTNERS L L C ATTN: KIM ROTH 1764 SAN DIEGO AVE SAN DIEGO CA 92110 Owner: MANZANITA PARTNERS L L C ATTN: KIM ROTH 9538 04/08/04 0002 0.1 1764 SAN DIEGO AVE CGP ' SAN DIEGO CA 92110 146146.. .15 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $2,877.37 Meter Size $0.00 Add'l Reel. Water Con. Fee $1,870.29 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $92.04 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $59,400.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $15,360.00 Housing InLieu Fee d2 Housing Credit Fee $3,834.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $470.00 $10,421.00 $18,787.73 $16,751.72 $0.00 $0.00 $0.00 $3,840.00 $0.00 $0.00 $954.00 $810.00 $378.00 $0.00 $0.00 $0.00 $0.00 $10,300.00 $0.00 $146,146.15 Total Fees: $146,146.15 Total Payments To Date:$0.00 Balance Due: $146,146.15 Inspector: FINAL APPROVAL Date: t~*"S Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City if Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit #: CB032980 Project Name: MANZANITA APTS-BLDG 2-10 UNIT 11,498 SF, 1128 SF DECK.UNITS 100-103,200-203,300-3 Date: 02/15/2005 Permit Type: RESDNTL Sub Type: APT Address: 1965 CASSIA RD Contact Person: GABRIEL / Sewer Dist: , CA V H/f f^ Inspected By: Inspected By: Comments: Phone: 6197267591 Water Dist: CA Date Inspected: x-/6-*S Date Inspected: Date Inspected: A _, Lot: 0 Approved: ^ Disapproved: Approved: Disapproved: Approved: Disapproved: f\ / , >*^*^fc cnytfCarisM Final Building Inspection Dept: Building Engineering Planning CMWD StLite Fife Plan Check #: Permit #: Project Name: Address: Contact Person: Sewer Dfst: Inspected ^y Bv: xO^- Inspected By: Inspected By: Comments: CB032980 MANZANITA APTS-BLDG 2-10 UNIT 11,498 SF, 1128 SF DECK.UNITS 100-103,200-203 1965CASSIARD GABRIEL Phone: 6197267591 CA Water Dist: CA /I , Date ~/ /.- A-^^ Inspected: // ?/& ^ Date Inspected: Date Inspected: Date: Permit Type: Sub Type: ,300-3 Lot: 0 Approved: Approved: Approved: 02/15/2005 RESDNTL APT i Disapproved: Disapproved: Disapproved: City of Carlsbad Bldg Inspection Request For: 03/08/2005 Permit# CB032980 Title: MANZANITA APTS-BLDG 2-10 UNIT Description: 11,498 SF, 1128 SF DECK,UNITS 100-103,200-203,300-301 Inspector Assignment: RB Sub Type: APT 1965 CASSIA RD Lot Type: RESDNTL Job Address: Suite: Location: OWNER MANZANITA PARTNERS L L C Owner: Remarks: Phone: 6197267591 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: GABRIEL Entered By: CHRISTINE Act Comment fif Associated PCRs/CVs Inspection History Date Description 02/25/2005 89 Final Combo 02/23/2005 89 Final Combo 02/22/2005 89 Final Combo 02/15/2005 89 Final Combo 02/04/2005 39 Final Electrical 02/03/2005 31 Underground/Conduit-Wiring 02/03/2005 39 Final Electrical 02/02/2005 39 Final Electrical 02/01/2005 39 Final Electrical 01/31/2005 31 Underground/Conduit-Wiring 01/19/2005 34 Rough Electric 01/19/2005 39 Final Electrical 12/14/2004 23 Gas/Test/Repairs 11/17/2004 17 Interior Lath/Drywall 11/16/2004 44 Rough/Ducts/Dampers 11/03/2004 16 Insulation Act Insp Comments PA RB SEE NOTICE - OK TO OCCUPY CA RB CO RB CA RB AP RB ON REWALK PANSL AP RB TO LIGHT POLE AP RB FOR METER RELEASE CA RB @ 1PM NR RB CO RB COVERED W/OUT INSP WC RB CA RB AP RB AP RB AP RB AP RB City of Carlsbad Bldg Inspection Request For: 02/25/2005 Permit* CB032980 Title: MANZANITA APTS-BLDG 2-10 UNIT Description: 11,498 SF, 1128 SF DECK,UNITS 100-103,200-203,300-301 Inspector Assignment: RB 1965 CASSIA RD Lot Type: RESDNTL Sub Type: APT Job Address: Suite: Location: APPLICANT MANZANITA PARTNERS L L C Owner: Remarks: Phone: 6197267591 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: GABRIEL Entered By: CHRISTINE Act Comment Associated PCRs/CVs Inspection History Date Description 02/23/2005 89 Final Combo 02/22/2005 89 Final Combo 02/15/2005 89 Final Combo 02/04/2005 39 Final Electrical 02/03/2005 31 Underground/Conduit-Wiring 02/03/2005 39 Final Electrical 02/02/2005 39 Final Electrical 02/01/2005 39 Final Electrical 01/31/2005 31 Underground/Conduit-Wiring 01/19/2005 34 Rough Electric 01/19/2005 39 Final Electrical 12/14/2004 23 Gas/Test/Repairs 11/17/2004 17 Interior Lath/Drywall 11/16/2004 44 Rough/Ducts/Dampers 11/03/2004 16 Insulation 11/01/2004 14 Frame/Steel/Bolting/Welding Act Insp Comments CA RB CO RB CA RB AP RB ON REWALK PANSL AP RB TO LIGHT POLE AP RB FOR METER RELEASE CA RB @ 1PM NR RB CO RB COVERED W/OUT INSP WC RB CA RB AP RB AP RB AP RB AP RB AP RB CITY Ol: CARLSBAD BUILDING DEPARTMENT DATE NOTICE (760) 602-2700 1635 FARADAY AVENUE FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? FOR FURTHER INFORMATION, CONTACT ___„_„____ YES BUILDING INSPECTOR PHONE CODE ENFORCEMENT OFFICER City of Carlsbad Bldg Inspection Request For: 09/02/2004 Permit* CB032980 Title: MANZANITA APTS-BLDG 2-10 UNIT Description: 11,498 SF, 1128 SF DECK.UNITS 100-103,200-203,300-301 Inspector Assignment: RB Sub Type: APT 1965 CASSIA RD Lot Type: RESDNTL Job Address: Suite: Location: APPLICANT MANZANITA PARTNERS L L C Owner: Remarks: Phone: 6197267591 Inspector: Total Time:Requested By: GABRIEL Entered By: CHRISTINE CD Description Act Comment 14 Frame/Steel/Bolting/Welding 34 Rough Electric Associated PCRs/CVs Inspection History Date Description Act Insp 08/24/2004 14 Frame/Steel/Bolting/Welding PA PD 08/23/2004 14 Frame/Steel/Bolting/Welding CA PD 08/19/2004 34 Rough Electric CA RB 08/18/2004 14 Frame/Steel/Bolting/Welding CO RB 08/16/2004 14 Frame/Steel/Bolting/Welding CO RB 08/16/2004 22 Sewer/Water Service WC RB 08/16/2004 23 Gas/Test/Repairs PA RB 08/16/2004 24 RoughjTopout PA RB 08/16/2004 34 Rough Electric PA RB 08/12/2004 13 Shear Panels/HD's PA PD 08/12/2004 14 Frame/Steel/Bolting/Welding NS PD 08/12/2004 34 Rough Electric NS PD 08/06/2004 14 Frame/Steel/Bolting/Welding PA RB 08/05/2004 14 Frame/Steel/Bolting/Welding NS RB 08/03/2004 16 Insulation NS RB 08/02/2004 16 Insulation NS RB 07/26/2004 17 Interior Lath/Drywall NR RB 07/20/2004 11 Ftg/Foundation/Piers AP RB 07/20/2004 14 Frame/Steel/Bolting/Welding PA RB 07/20/2004 22 Sewer/Water Service AP RB Comments 1STFLR PARTY WALL WILL DO® FRMG stop @ party wall insp. ON PARTIAL DROP AREA 1STFLROK OK TO INSULATE @ FAN COILS @ TUB AREAS ADD PIER FTGS 2ND FLR NAILING OK C!TY OF CARLSBAD BUILDING DEPARTMENT NOTICE (760) 602-2700 1635 FARADAY AVENUE LOCATION PERMIT NO. TIME #&^J&*^*S^j? &wti^ -£*-} FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? L J YES FOR FURTHER INFORMATION, CONTACT __„____„ _____ PHONE CODE ENFORCEMENT OFFICER IX/IAIMITOU ENGINEERING PLANNING 'CIVIL ENGINEERING • SURVEYING May 12,2004 Gene Roper Project Manager Manzanita Apartments 1901 Cassia Road Carlsbad, CA 92009 Dear Mr. Roper, Manitou's surveyors located the forms for Building #2 at 1965 Cassia Road shown as Building #2-101b on the Grading Plan for Project No. SDP 98-19, DWG 389-9A, approved by the City of Carlsbad Engineering and Planning Departments on September 23, 2003. The forms were located on May 10, 2004. The location of the forms is in substantial conformance with the horizontal location shown on the above Grading Plan, DWG 389-9A. The finish floor elevation shown on the approved plan is 317.37 feet above Mean Sea Level and the elevation of the forms was measured at 317.41 feet above Mean Sea Level. Please call if you have any questions concerning the above information. Thank you for requesting Manitou Engineering Company to assist you with the Manzanita Project. Sincerely, Francis W, FitzpatriCK, PLS 4539 350 WEST NINTH AVENUE • SUITE B • ESCONDIDO. CALIFORNIA 92025 • (760) 741-9921 • FAX (760) 745-7487 BAYVIEWELECTRI :,S2~ llno\iT .\\omiL-. Suiic I). N.iliomil (. ii>. <-' \ I'hnnc. (ii\ l>) 474-"4X- l';i\: (''I1'} 474-^-1. 1 -niiiil: b_y_ejectriC'f/:sbcglobal.net vvvv vv. b veconnect.com January 28,2005 City of Carlsbad Building Department 1635 Faraday Avenue Carlsbad, CA 92008 Re: Manzanita Apartments Bldg2 ..- -^ <*"~1965 Cassia Road, Carlsbad ^v Building Dept: Please see attached documents as to the metering equipment. Bay View Electric guarantees that the metering equipment is torqued to specs. Please call if you have any questions. Thank you, Bill Faulk President Attachments Dac-10-04 15:16 From-Cal Electric Supply Chula Vista 16194278073 T-389 P.001/012 F-583 Cutier-Hamnw 6*»icwpwfco Memo T461BA2.730B " Irv^Ktf *• I* ! 4MNUn ttEMaftccm Dite TP Copy From Subject December 10,2004 JonZelter CES / Chula Vista Julie Lam Torqulng Metering Equipment Jon. AN metering equipment manufactured by Eaton Electrical ships with an Instruction Manual. These manuals reference torqulng values. All factory connections ana torqued m the factory prior to shipping, but any Incoming, outgoing, etc connections, are obviously connected by the contractor in the field. Attached are some pages out of these Installation manuals, rr the entire manual is needed, it can be provided. Any further questions, let me Know. Thank you, Julie Lam Sales Engineer Eaton Electrical DocumMittr | Z. DiHO-04 15:16 Fron-Cal Electric Supply Chula Vista 16194279073 T-389 P.002/012 F-563 I r LL7HJOI «• bUMnpuv (Brutal) dc zonA (Nil mnun ^y««* I« I"** iT« •*'* IVit at 'II Dic-10-04 15:17 From-Cal Electric Supply Chula Vista 16194279073 T-369 P.003/012 F-583 |i I bMnctfoiu br the towllition of a P)WM Balancing Kit ft HMM W« BP* PI HMBMK »**. « s *3t! s_ i !! 8-8 L I Dec-10-04 15:17 From-Cal Elictric Supply Chula Vista 16194279073 T-389 P.004/012 M83 r o f-I i IW MMUBnONI fitt MAC 4PTMWIT u g Itl * Dic-10-04 15:17 From-Cal Elictrlc Supply Chula Vista 16194279073 T-389 P.005/012 M83 InttalUion IratnirfWtt for type 1MM, 3UM. 35MM, S7MM. 35SS, and 57SS Modular Uttering Comers l.LTWWH OS .WpMMMAMWtlMl•V-WMIIMainAKSfiMMflil.NftttMMMn' * ffMMt wstm • IBSSBB vy fe ^BBnwwuw • •• '—•r-im LJU •it Dic-10-04 I5M7 FroiKal Elactnc Supply Chu!a Vista 16!84279073 T-389 P.006/012 F-583 t.LTMJM WMCAMi MwapM KM HIM nomwn ( ••M*lHli<M Ijfjj*<^l*fr^^yBBSS.*.^ »3EI Ol ?^^^*I'W*™™~^'''1*1 WtPil*"** v j' » WWH^HM-MhwOiMlVHMW* MUMMUIIEMLlMlMl^^^.saSSS^S- RBRT&£^£!^^^^^^^^d. ^^M^lMAMtf ^^b^h Mm^mmmmf V H^PBB^h ^^i^HV ••••!•^^VVI IV^PIVPi •VI^'^^^PVHWW'B^B^B ^^^•^vft^^jLA. B£V. g D«-10-04 15:17 Frpm-Cal Elactric Supply Chula Vista 16194279073 T-389 P.007/012 F-583 LLflMBM *** *********.^V. ™a llffif -. Ml [8] * a&fm \mt\i*} IT '11 Oe.HQ-04 15:17 Froffl-Cal Electric Supply Chula VisU 16194279073 T-389 P.008/012 F-533 Instruction Manual Pow-R-Line Switchboards Mar 30 M cutter-Hammer Attaching Switchboard SutioDft The manufacturer has provided hardware whh tha equip- ment to loin vwitehbaard section*,, tho hardware Includes W x 1* carriage boH* end 3/9" hax nuts with captive •allavilla-type waeher. (See Agin* 11.) Holes are provided on the aide of each switchboard seotioo for thli purpoM. Thraa holei are locatad on itie aide of each section towardB ttia rrant and back. Switchboard! with deep dcctflriJ. Including rwr-eonnected ewhchboards, may haw an additional throe hole* for attachment on tha center wrrfcal wcdon support (See Rgun> 14.) Fi|ara1X.Hin1imra by ih« mtnufkoiurvr. Hfvt IS. Jahriai SwUaabaanJ Seciteu Join lectlorw utilizing Ihe carrlige bolts and hex nuts with oaptfva BellflvillB-ivpe woahar throuQh the holes provided. {Sea Rgw* 15.} VVtiile maintaintng Icvfll and altgnmeni of iha struehjras, Torque each connection to The value* shown In Appendix lablv 2. tf switchboard sections are outdoor type, re-inaiatfl roof cap(a). Visually Inspect the roof cap TO ensure a reliable, parmanani watertight fli prior to enargiiino the switchboard. Onca ihe ewhehboard structures are attached, vt»u»Uv Inapaot tha board far foreign obfeeu and visually Inspect the structure for pro par durances of live ports. fektoeri fci For *w« Informabvi wiiit ^fmt.tmnBtaAcAeom IMOIWOOC'E Dec-10-Q4 15:17 Front-Gal Electric Supply Chula Vista 16104279073 Pit-Ill I Cutler-Hamnrar Pow-R-Une Switchboards T-389 P 009/012 F-583 Instruction Manual Qoctrtcal Connection of Swtokbranl Sections Several methods may ba used to make electrical connee- tlgm within swltchboarde. More than an* of these methods may Da used in a section and/or swltebboanJ lineup. These Include bus splice plates, factory metalled cable ind busway connactlans. Coruuh the manufaau'w'i drawings for detailsfor each switchboard section. Remove structure deodfrom coven and side atone •* needed to eoeeea ewttchboard chetala and components. Retain all cover mounting hardwvra and were for re-uwsmbly, ProtBct hardware and para from moferure, dabrlc end damage. Splice Plates Spike plow* are fhon pieces of bue bar that join iha main bin running horizontally through multiple aeotlon jwitoh- boerds. Depending an the configuration and alignment of the switchboard, ihe aplfce plates used tor the main crow bus may va/y. TlMaa plataa may either ba flat or "2* shaped. ISacfiejureellandl?.) Vfew-W TWlHl VtM WhM MoreThe/iifter Par PhtM For Iar0er amporago switchboards, muldpli epllce pletM are to ba used on the *anw phasa. Maintain the orientation, by pnate and sequence of ths splice plates. The orientation of die fpHce plates moat remain Identical ia they were chipped from die manufacture*. Clearaneea mutt be maintained. If unsure about the corrwt odentatton or queetlona about riie Inatallatloa comact Eaton before Installing the splice plates. Spacer figure 17. aaaear leqatf on taweea Cpflca Plam rWIWittu) Spfice plates ere used to attach the main horizontal but between switchboard section! or shipping splits. WhIJs maintaining the correct phot* orientation end sequence, install epllce places with the carriage bolts and hex nuts with captive Balhrllld washers supplied by the manufacturer. Refer to Appendix TaMe 2 for torque values. Carriage bolts must alien with the corresponding rectangular holes In the fixed horizontal bus and the spKoa plates. If multiple aplfce plates are used, Install In the samesequence M shipped from the manufacturer. The neutral {when furnished) and ground bus should be connecrod In the same manner. Inspect splices platea and main fixed horizontal bus priorto installation. If there is arty suspected damage, contactthe manufacturer Immediately for replacement!. NEVER ENERGIZE ANY SWITCHBOARD WITH DAMAGED BUS OR COMPONENTS To accommodate future serviceability, the manufacturer recommends that die heed of the cerrisge boll should be moumsd from the rear of the switchboard for FRONT ACCESSIBLE switchboards with the hex nut with Bellevillewasher positioned to the front. For AEAR ACCESSIBLE iwUchboards, the manufacturer recommends that the head of the carriage belt should be mounted from the front of the switchboard with the hex nut end Belleville washer positioned to the rear, Repeat the process until ell holes In the horizontal bus are connecied with bolts and nuts for each shipping split Inspect connections to ensure that mere la no foreignrnawto at the connection point end that all connections are properly angned and botta ere seated. Torque all connection* to torque requirements on labels affixed to each switchboard and ae shown in Appendix TeMeZ. IM81BOOM1E for iron infaneaiiBrt Ate oam.EaionaQcirical.cor> Dac-!0-Q4 15:17 Prom-Cal Elactric Supply Chula Vista 16194279073 Instruction Manual Pow-R-Une Switchboards T-389 P.010/012 F-5B3 IF5 Switchboard Factory Cafcl jna; Some switchboards utfRu cabJe/wrfre for Mm a connections in lieu of bus* Cabling ia typical in Integrated Facility System™ (IPS™! type ewheriboards that Incorporate lighting and appliance branch Cireuil paneltaaerds and dry-type dJttribuUpn trans formers wtthln • switchboard lineup. Eaton's soltdfon of wire and cable follows utWl switchboard procedure*. National electrical Manufacturers AMDCftn'on, Federal Specifleadon atandards, and the National Electrical Code standards for If S switchboards. The manufacturer idantrflea each phaaa conductor by means of color-coded tap* with markings 'Factory Installed" In IPS switchboards. Markings are affixed to both the Hn« and load end* of the conductors. Markings follow the Induavy accepted pnaae colors. (Set Flaunt 1* and Table 1J Flgm 1* Ifefcsf Peaee '*" MS *ae VAri UM T»M» 1. Wra UM Color Cetfas ana PAWS A PMM8 ftiewc WuVll Wank Rtd Sk* Wfin* QNMNI Rtoutril GfOUrtd Brawn GfBM CDnducton fMtallad by the manufacturer have been cuiand stripped to pni-detarminetf lenoih* for oonnactlon betwaofi compontntf. When coflductara are Mended GO run between componema In two diflWent tfectiana that are joined by d)a manufacturer. The manufacturer will connect both the line and load enda of the conductor*. Not*; Th. NUfOMl Gieartcaf Cod* raMrioia fh« field iMtMtafen of eenduaon ihat run hortmm»Hy through «wUchooartf vanloalMMloM. Rafer M the NEC far spiflMn. When there I* a ehfpping atrih between aectlons that ant cabled* the factory connects one end of the wnducton. The remainder of the conducton am colled »nd aacurad In tha notion with the connection. factory drawtnga included In the mritchtward clearly Indi- cate the required field connecdona for the colled conductors. Imped concHictorafcabtes for cjumafl*. Any damaged conduc- tors mutt be replaced. Contact rnanufecturer far replacement. Factory color-coded markings Indicate phaelneyneuuil and »rm marked an bath th« Kite end load ende of the conductora. Using the factory drawings, the Injuller connccte conduc- tor* ra the componemlsl indicated on tha drivings kmplng phaaea correctly oriented. Car* should be taken In forming insulated cable* to ensure that no (Mutation fa forced per- manently against edges of any maul part*. Torque both line end toad connections to values Indicated on the labeling on the switchboard- Refer to Appendix laMeX for torque values. Installation of Imamlng Swhckbowd Connections CJUJM 8JVHB : eMJURY Off DBA^HAZAraOU3 VOLTAOB.Off DBATK DO NOT work on aleotHcal equipment while cnarglied. Wrffy power enierlng the equipment ia dc-anAnjfzed at tha source. Power (a normally brought Into a awitclibo»rd either bv cabin or by busway (busduct). Romova structure covers M needed u> accesa switchboard chawsls and components. Retain all cover mounting hard- ware, and covers for re*awBmbly. Protect hardware and pan» from molttura, debrte and damage. MOCK A* a m/Almum, aU aMrf«hba«tf eennaadDn* we rated forasm wftti 75*C or hlghar rated coAductDra. When wfe« )• utad with tamfMmbK* rafioga IPOV* 75*0, It shall be ifeed baaed on the•mpMny oT wire rnlcd TS'C. tMra/CaBllitg Whon cable connections ant uatd, either mechanical set •Crtw or compraasion lug* are typically tupplled. (SeeBgnffc 19.) Sea factory drawinfi for sptfcfle lug terminations end wf ra ranges. Some utilities make Their own aewlce envanca eonrwcdona. IA iheat caava, the nwiufaaurer typically aupplfes lug lending provisions or a landing pad In lieu of tufts. Theae are designed to the specific utility's requirements. Refer to tha manufacturer's drawings forSpecific* covering tfiia connection. Haani 1B. S«en( aa4 Ciaiareiiiin Lan Unless a switchboard specifically natricU «mrv to a sinole mauina or area, cabMi may enur through ihe top. bonom, aide or back of the main Incoming section. These restrictions are typically required to conform TO wire bending apaca rocjutnvnenls of the NEC. Consult the manufacturer's drawings far conduit entry data. For rtDta MgmMfton «lltC »H»W.EanmHacirloal.sgin IM01SDHOII Dec-10-04 15:18 FroiKal Elactric Supply Chula Viita 16184279073 KM I Cutler-Hammer *w-R-Une Switchboards T-389 P.OI1/OIZ F-583 _ Instruction Manual M-V2004 Onca the conductors are pulled Inside the main aactfon. the Mbtw mould b« formed in Uta space provided. Clearly Identify efid eegregate conductors by pntM end neutral. Care should b« nlwn In forming Insulated cables to ensure that no Insulation it forced permanandy against tiie edges of any mvtal parts. Using •ppnprleto tool*, the inMatler must strip the conduc- tor Insulation euffldantiy to fill the entire barrel of the con- nector whh turn, un-insufated conductor. Conductor must ba itrippad without damage to tha conductor strand*. Kara strands Mould bt of «quol l«nflth (fluch) on th« end cut Do not strip off mare insulation |h«n nttdod. Sxpowni of bom conductor autstde lug can compromise dMrancu. The connootof and oonduccor ahould be f reo of all fortign Novor ctlpcaMaAvlrvAtrvnda In ordv/n fli wWiln conntc- torc. if cvbiBAvirH dow not match tha niilng of lha connccur. contact the minufaciu r«r. MechonictJ ME cenw lug* »n» rhi moct common. Uia an anrJoxldant compound, r? required, Inwn tun eonducior into luflsg the bare conductor flUt the full length of the lug body, nghttn lug. then torqua to (•vel* Indteiltd on (ho *w(tehboard late). If compression fugs ant utilirtd and supplied with the •whchboerd, the higs wUt bo mounted on the incoming lug pad. Rvmowo luga from dw pad. UK* an antuundant com- pound, )f required. U»e a crtrnplng tool approved for that ipednc lug manufacturer and lus *>». Follow f namiolone provided by the manvtvoturor of the crimp tool. Onco tha lug la affixed 10 die conductor, re-install the lug on the lug pad utllldng 1*9 wMng hardwire. Torque hardware ualng Information provided on wtahboard labeling. Refer to Appondbt YaMo 2 for torque valuv*. Other Requirements for Rear ConMCt*d Switchboard* On avKwna that require than circuit current ratioQi above 10,000 amperes rrrw, Cable Bracing may oe raqulred to restrict cable movement Ushlng and Fffcfng cables accomplish this. For s hot-clreutt radnge above 10,000 ampores rme. install cable braces per die following Instructions: 1. The material required for dw cable brocot It 3/8" dl&mmar nylon rope 4i or any rope having « minimum tenclle strangdi of 2,000 pound*. -• 2. All cable conduetora of e toad circuit are to bi bundled togadwr with five adjacent wnpa of rope at distances of 6 Inehca and 12 tnohesfrem the supply tarmirwte for ratlnos up to 200 wnporef maximum. (See RgurM 20 and 21.) A MMUnoton Pyrltiui IMIi, Inft, MwHion, QA. MlWOg Numbf f 1MW Luo> CttflMl :* CNOMSiippom Support TV0M DtUtl D0C-10-04 15:18 Froi-Cal Eltctrlc Supply ChuliVlita 16184279073 T-3B9 P.012/012 F-583 Instruction Manual Pow-R-Lina Switchboards p^T*M | Gutter-Hammer Btaeflw Appendix A fWV** vrvr KlnohLbi. WMldlLbt.MO Inch LM.atObiofiLbk Appendix B Refer 10 MitmnanoB section or this document on Puff* 1C for detailed Information. SOOPOMLM. f "QUAUffEO HEHSOMS MoM For othtr torqm vtfuM, fttar (o Inoruc- tion (Mrthtfcr th» ^MoMto nmportv*.•m mtVMiT A WARNING OAMAGfTO OOCUH ^ IMfllMOOOlE GEOTECHNICAL EXPLORATION, INC, SOIL & FOUNDATION ENGINEERING GROUNDWATER • ENGINEERING GEOLOGY FIELD REPORT ON OBSERVATION OF FOUNDATIONS CLIENT : PROJECT NAME:/firs PROJECT ADDRESS: i^Oi £?D DATE: TIME: JOB NO. ?fr- 73S6, The footing excavations listed below were bottomed on material for which the bearing values recommended in the foundation report are applicable. The cast-in-place drilled friction piles listed below penetrated material for which the allowable supporting capacities recommended in the foundation report are applicable. The piles were excavated to diameters at least as large as specified and the excavations extended at least to the depths indicated on the Foundation Plans. The excavations for the cast-in-place belled piers listed below were bottomed on material for which the bearing values recommended in the foundation report are applicable. The excavations were at least as large as specified on the Foundation Plans. The driven piles listed below were observed to be driven to the specified lengths and/or driving resistances to obtain the supporting capacities recommended in the foundation report. Based upon observations, it is our opinion that the foundation recommendations presented in the report of the foundation investigation, Job No. *?%' ?35iC, . dated 27 Avy applicable to the conditions observed. Foundation Plans hy Hoft lo - fr - o3 were used as a reference for our observations. DU2C UDX r AO 7 C.,-*irjeA *T 18"J /XJ*. p • J- . NOTE: 1. ....... gfr 2. 3. The observations reported above do not constitute an approval of foundation location, footing size or depth, reinforcement, or foundation design. Loose, soft, or disturbed soils must be removed prior to placement of reinforcement or concrete. The opinions and recommendations presented in this report were based upon our observa- tions and are presented in accordance with generally accepted professional engineering practice. We make no other warranty, either express or implied. : ( JZ/ 7420 Trade St. San Diego, Ca. 92121 • (858) 549-7222 • FAX: (858) 549-1604 .M&9CS001128M 1/00