Loading...
HomeMy WebLinkAbout1965 Kellogg Ave; ; CBC2018-0627; Permit{'city of Carlsbad Commercial Permit Print Date: 09/20/2019 Permit No: CBC2018-0627 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwel1ing Units: Bedrooms: Project Title: 1965 Kellogg Ave BLDG-Commercial 2120921100 $716,765.61 Work Class: Lot#: Reference #: Construction Type: Bathrooms: Orig. Plan Check #: Plan Check#: Description: TOOLBOX: 15,411 SF OFFICE/WAREHOUSE/MANUFACTURING Tl BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Owner: CB INVESTMENT PROPERTIES LLC 2454 Alton Pkwy IRVINE, CA 92606 ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL FIRE F Occupancies Tl GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL S81473 GREEN BUILDING STATE STANDARDS FEE SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-COMMERCIAL TRAFFIC IMPACT Commercial-Industrial w/in CFD Tenant Improvement Total Fees: $28,557.49 Total Payments To Date: $28,557.49 Status: Applied: Issued: Permit Finaled: Inspector: Final Inspection: Contractor: TRI VISTA INC 116 Market Pl Escondido, CA 92029-1352 760-294-0277 Balance Due: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the Cit)/ Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES JT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Closed -Finated 11/08/2018 04/04/2019 MColl 9/20/2019 9:53:03AM $0.00 $2,688.00 $1,881.60 $242.00 $628.00 $175.00 $104.00 $29.00 $7,219.2D $200.69 $15,390.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov { Cicyof Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check~:).C)i&'-Oto21 Est. Value , I L~:}lll.D,....... PC Deposit ------~-- Date \\ -R -) ~ Job Address /9~.,-:,t'.e<~ #v-L' Suite:~~'._APN: e/z.•~z •/I Tenant Name: ~')( CT/Project #: _________ Lot#: Occupancy: ~ ; Constructi'; Type: \bv Fir~inkle;s~ no Air Conditioning: tf!!_ 1;r/t..,/ BRIEF DESCRIPTION OF WORK: -,;.r a it:~f"C"-~/47-e,...,.. ,~ - D Addition/New: _ ___.!:,,1;"-~""--------'New SF and Use, ----""'-"''----------New SF and Use, ____ Deck SF, Patio Cover SF (not including flatwork) IKTenant Improvement: tf;W / SF, _____ SF, Existing Use~ ~~ ez Proposed Use Ir, "4 Fz._ Existing Use ______ Proposed Use ______ _ 0 Pool/Spa: ____ SF Additional Gas or Electrical Features? __ ,,_If.._,:.::,.,"--------- D Solar: -------KW, -=::::_Modules,-~ Mounted, Tilt: Yes/ No, RMA: Yes/ No, Panel Upgrade: Yes/ No D Plumbing/Mechanical/Electrical Only: _________________________ _ D Other: ____________________________________ _ DESIGN PROFESSIONAL Address: Z't? , ; frr 174 Name:~ Citv:;.,: • ~:, Q-Zip:4/l#f !:~~~~ci=:f:fr~~ PROPERTY OWNER Name: ~./--,ry,e 6" 1:r Address: I 'i?-'le 04 d< 4,.. Vo& City: l),,,/,t4 v State:c,.{ Zip: 9~6'~1/ Phone: --------------------Email: ___________________ _ CONTRACTOJ,US~INESS Name:~---'-~ Address: 1 I 4-f't,,, City: e:f&m&~of Zip: "l'ZP~ Phone: __________________ _ Email=------,-------------- State License:~ ( Bus. License: Bt.&>~/Z.-Z-42$'(,. (Sec. 7031.S Business and Professions Code: Any City or County which requires a permit to construct, alter, Improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.S by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). 1635 Faraday Ave Carlsbad, CA 92008 B-2 Ph: 760-602--2719 Fax: 760-602--8558 Page 1 of2 Email: Building@carlsbadca.gov Rev. 06/18 • ( OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one of the following declarations: □ I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. ~ve and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the perf rmance of the work f r which thi permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: ~~ Policy No. -,_ I Z,.1-'11, 'fti'dL/ Expiration Date: o/~/Z<:>74 □ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensatlon,damages as provided for In Section 3706 of the Labor Code, lnterestandattorney'sfees. -~ ~ . ;, CONTRACTOR SIGNATURE: ~--,, ~LJAGENT DATE: ~ ( OPTION B ): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractors License Law for the following reason: □ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not Intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that Ile did not build or improve for the purpose of sale). □ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). □ I am exempt under Section ________ ,Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. □ Yes □ No 2. I (have/ have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number): 4. I plan to provide portions of tile work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/ contractors' license number): 5. J wJII provide some of the work, but I hav include name/ address/ phone/ type of work): OWNER SIGNATUR □AGENT DATE: _____ _ CONSTRUCTION LENDING AGENCY. IF ANY: I hereby affirm that there Is a construction lending agency for the performance of the work this permit is issued {Sec. 3097 (i) Civil Code). Lender's Name: ____________________ _ Lender's Address: ____________________ _ ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes O No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes □ No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE Of OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that r have read the application and state that the above information is correct and tllat the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I AlSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories ln height. 1635 Faraday Ave Carlsbad, CA 92008 B-2 Ph: 760-602-2719 Fax: 760-602-8558 Page 2 of2 Email: Building@carlsbadca.gov Rev. 06118 PERMIT INSPECTION HISTORY REPORT (CBC2018-0627) Permit Type: BLDG-Commercial Application Date: 11/08/2018 Owner: C B INVESTMENT PROPERTIES LLC Work Class: Tenant Improvement Issue Date: 04/04/2019 Subdivision: CARLSBAD TCT#81-46 UNIT#02 Status: Closed -Finaled Expiration Date: 02/18/2020 Address: 1965 Kellogg Ave Carlsbad, CA 92008-6582 IVR Number: 15291 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete 06126/2019 06/26/2019 BLDG-17 Interior 095626-2019 Partial Pass Michael Collins Reinspectlon Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency South coffee bar & women's restroom. Yes BLDG-Building Deficiency Single use restroom, custodial closet, Yes men's restroom BLDG-Building Deficiency Open Office pony walls only Yes BLDG-Building Deficiency Walls only at east side offices and full Yes height demising wall BLDG-Building Deficiency Walls, see card Yes 08(01/2019 08/01/2019 BLDG-Final 099401-2019 Failed Michael Collins Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No 08(2212019 08(2212019 BLDG-Fire Final 099948-2019 Passed Felix Salcedo Complete Checklist Item COMMENTS Passed Fl RE-Building Final Yes 09/20/2019 09/20/2019 BLDG-Final 104786-2019 Passed Paul York Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready Yes September 20, 2019 Page 3 of 3 PERMIT INSPECTION HISTORY REPORT (CBC2018-0627) Permit Type: BLDG-Commercial Application Date: 11/08/2018 Owner: C B INVESTMENT PROPERTIES LLC Work Class: Tenant Improvement Issue Date: 04/04/2019 Subdivision: CARLSBAD TCT#81-46 UNIT#02 Status: Closed -Finaled Expiration Date: 02/18/2020 Address: 1965 Kellogg Ave IVR Number: 15291 Cartsbad, CA 92008-6582 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Open Office pony walls only Yes BLDG-Building Deficiency Walls only at east side offices and full Yes height demising wall BLDG-34 Rough 094269-2019 Failed Michael Collins Relnspection Complete Electrical Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, at restrooms No 06/13/2019 06/13/2019 BLDG-17 Interior 094764-2019 Partial Pass Michael Collins Reinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Walls, see card Yes BLDG-Building Deficiency Open Office pony walls only Yes BLDG-Building Deficiency Walls only at east side offices and full Yes height demising wall BLOG-84 Rough 094763-2019 Partial Pass Michael Colllns Reinspection Incomplete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Cancelled per contractor No BLDG-14 Restrooms and furring wall Yes Frame-Steel-Bolting-Welding (Decks) BLDG-14 See card. Yes Frame-Steel-Bolting-Welding (Decks) BLDG-14 Need approved, revised plans. No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-34 Rough Electrical Yes 06/24/2019 06/24/2019 BLDG-17 Interior 096442-2019 Partial Pass Michael Collins Reinapection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Open Office pony walls only Yes BLDG-Building Deficiency Walls only at east side offices and full Yes height demising wall BLDG-Building Deficiency Walls, see card Yes BLDG-Building Deficiency South coffee bar & women's restroom. Yes BLDG-24 096629-2019 Passed Michael Colllns Complete Rough/Topout Checklist Item COMMENTS Passed BLDG-Building Deficiency West coffee bar sink & custodial Yes closeVsingle use restroom September 20, 2019 Page 2 of3 PERMIT INSPECTION HISTORY REPORT (CBC2018-0627) Permit Type: BLDG-Commercial Application Date: 11/06/2016 Owner: Work Class: Tenant Improvement Issue Date; 04/04/2019 Subdivision: Status: Closed -Finaled Expiration Date: 02/16/2020 Address: Scheduled Date 04/17/2019 0411812019 06/0712019 06/23/2019 06/10/2019 Actual Start Date 04/17/2019 04/18/2019 06/07/2019 06/23/2019 06/1012019 September 20, 2019 IVR Number: 15291 Inspection Type Inspection No. BLOG-84 Rough 089117-2019 Combo(14,24,34,44) Checklist Item BLDG-Building Deficiency BLDG-84 Rough 089330-2019 Combo(14,24,34,44) Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLOG-84 Rough 091106-2019 Combo(14,24,34,44) Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Botting-Welding (Decks) BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-34 Rough Electrical BLDG-14 092899-2019 Frame/Steel/Bolting/ Welding (Decks) Checklist Item BLOG-Building Deficiency BLOG-17 Interior 092695-2019 Lath/Drywall Checklist Item BLDG-Building Deficiency BLDG-81 092696-2019 Underground Combo(11, 12,21,31) Checklist Item BLDG-21 Underground-Underfloor Plumbing BLDG-31 Underground-Conduit Wiring BLDG-17 Interior 094270-2019 Lath/Drywall Inspection Status Primary Inspector Cancelled Michael Collins COMMENTS Cancelled per contractor Falled Michael Collins COMMENTS Cancelled per contractor Need approved, revised plans. Partial Pass Michael Collins COMMENTS Cancelled per contractor See card. Need approved, revised plans. Partial Pass Michael Collins COMMENTS Full height Demising wall at Line 1-2 & 8.8 only Partial Pass Michael Collins COMMENTS Open Office pony walls only Passed Michael Collins COMMENTS Waste to POC Conduit only Partial Pa88 Michael Collins C B INVESTMENT PROPERTIES LLC CARLSBAD TCT#61-46 UNIT#02 1965 Kellogg Ave Ca~sbad, CA 92006-6562 Re inspection Relnspectlon Passed No Reinspection Passed No No Relnspectlon Passed No Yes No Yes Reinspectlon Passed Yes Reinspectlon Passed Yes Passed No No Relnspectlon Complete Complete Complete Incomplete Incomplete Incomplete Complete Incomplete Page 1 of3 DATE: February 1, 2019 JURISDICTION: Carlsbad ✓• EsG1I A SAFEbu1lt Company PLAN CHECK#.: CBC2018-0627 PROJECT ADDRESS: 1065 Kellogg Ave. SET: III PROJECT NAME: Toolbox Medical Innovations TI □ APPLICANT □ JURIS. ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise the applicant that the plan check has been completed. Person contacted: / ('u Telephone#: Date contacted: /' (b~ ) Email: Mail Telephone Fax In Person 0 REMARKS: By: Kurt Culver EsGil 1/25/19 Enclosures: 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 DATE: November 20, 2018 JURISDICTION: Carlsbad ✓• EsG1I A SAFEbuitf Company PLAN CHECK#.: CBC2018-0627 PROJECT ADDRESS: 1065 Kellogg Ave. SET: I PROJECT NAME: Toolbox Medical Innovations TI □ APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. IZJ The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. IZJ The applicant's copy of the check list has been sent to: Richard Lund D EsGil staff did not advise the applicant that the plan check has been completed. IZJ EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Richard Lund Telephone#: 619-920-2134 Date contacted: Mail Telephone 0 REMARKS: By: Kurt Culver EsGil (by: ) Email: LundGrupoPacific@gmail.com Fax In Person Enclosures: 11 /13/18 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad CBC2018-0627 November 20, 2018 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK#.: CBC2018-0627 OCCUPANCY: B/Fl/S1 TYPE OF CONSTRUCTION: V-B ALLOWABLE FLOOR AREA: OK SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 11/8/18 DATE INITIAL PLAN REVIEW COMPLETED: November 20, 2018 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: Office/Industrial ACTUAL AREA: 15,411 STORIES: 2 HEIGHT: n/c OCCUPANT LOAD: -100 DATE PLANS RECEIVED BY ESGIL CORPORATION: 11/13/18 PLAN REVIEWER: Kurt Culver This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2016 CBC, which adopts the 2015 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBC2018-0627 November 20, 2018 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Kurt Culver BUILDING ADDRESS: 1065 Kellogg Ave. BUILDING OCCUPANCY: B BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier Tl Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance 1997 UBC Building Permit Fee 1997 UBC Plan Check Fee Type of Review: D Repetitive Fee 3 Repeats Comments: 0 Complete Review D Other 0 Hourly EsGil Fee PLAN CHECK#.: CBC2018-0627 DATE: November 20, 2018 Reg. VALUE ($) Mod. 716,766 716,766 D Structural Only 1-------11 Hr. @ • $1,639.841 Sheet 1 of 1 Carlsbad CBC2018-0627 November 20, 2018 GENERAL 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring IWQ corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. PLANS 2. There are quite a few sheets listed in the Sheet Index that weren't provided. Next time, review the plans before submitting. 3. Revise the Project Data as follows: a) In one portion, the occupancy is listed as 82," while in another it's listed as "B." Omit the conflict. b) Also, the "F2" designation conflicts with the "F1" designation further on. c) The Type of Construction should be V-8 (not V-N). 4. Each sheet of the plans must be signed by the person responsible for their preparation. California State Law. 5. The door into the WOMEN'S accessible water closet compartment shall be provided with a clearance of at least 18" at the strike side of the door, per Sections 11 B-604.8.1.2 and 11 B-404. 6. Provide structural detailing/design for the support of the new rooftop equipment. Carlsbad CBC2018-0627 November 20, 2018 ADDITIONAL 7. Please see below for MEP corrections. 8. To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 9. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: □ Yes □ No 10. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kurt Culver at Esgil. Thank you. PLUMBING AND MECHANICAL COMMENTS PLAN REVIEWER: Connor Reuss GENERAL P&M ITEMS 1. The licensed designer must provide a signature and a seal to each sheet before the plans can be approved. 2. Specify what types of materials are to be stored within the storage areas. 3. Please show the required 42 inches tall "Guards" (guard rails) or building parapets height where appliances, mechanical equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface. CBC 1015.6 & 1015.7 PLUMBING (2016 CALIFORNIA PLUMBING CODE) 4. Cleanouts are required to be installed above all urinals. Please address. CPC 707.4 5. Show the required floor drains in the following locations, as per CPC. Section 418.3: • Toilet rooms containing 2 or more water closets or a combination of 1 water closet and 1 urinal. Carlsbad CBC2018-0627 November 20, 2018 6. In addition to the detail, show the floor drain trap primer on the plans. CPC 1007.0 7. Floors shall slope to the floor drain locations. Please detail on the architectural floor plans. CPC 418.5 8. Please remove the UPC water pipe sizing chart from sheet P2.0. This jurisdiction is governed by the CPC. Since the pressure loss calculations on sheet P1 .0 were done via CPC Appendix A, the water demand (shown right above the chart) cannot be taken from this chart. Please remove. 9. On sheet P2.0, please show the size of the water line that branches off to the 1st floor bathroom and new coffee bar sink. 10. Describe the method of compliance for temperature limitations for the following fixture types: public use lavatories (limited to 11 0 degrees/ Energy Standards 11 0(c)(3). Note: The water heater thermostat may not be used for compliance. 11. All water supply systems that have quick closing valves installed therein (washing machines, flush valve fixtures, etc.) shall have devices installed as close to the fixtures as possible to control the effects of water hammer. Please detail. CPC 609.10 12. All domestic hot water piping to have the following minimum insulation installed: ½" pipe (1/2" insulation);¾" pipe (1" insulation); 1"-1 ½" pipe (1 ½" insulation). CPC 609.11 & ES 150.00) 13. Drinking fountains are required by CPC Table 422.1 for this occupancy type (if the occupant load exceeds 30. CPC 415.2). Review the requirements of this Table and provide as necessary. Note: If food is consumed indoors, water stations may be substituted for drinking fountains. CPC 415.2 14. On sheet P4.0, the gas sizing chart states the system at low pressure (8" w.c.) yet the gas lines on the plans state MPG. Please address. Note: A complete review of the gas sizing calculations will be conducted upon clarification. 15. If the line is MPG, detail the gas regulator requirements: An accessible shut-off valve installed prior to the regulator and vented to the exterior. CPC 1208.7.5(1) &1210.11 16. Include the gas piping sediment trap installed downstream of the appliance shutoff valve as close to the inlet of the appliance as practical. Exceptions: Appliances with an internal sediment trap,(or) ranges, clothes dryers, gas fireplaces, and outdoor grilles. CPC 1212.8. Carlsbad CBC2018-0627 November 20, 2018 17. Provide the following information concerning the water heater: ·------·-- • Provide combustion air design: Show opening sizes and routing of ducts. CPC 506.0 • Detail the water heater vent installation: Size, routing, slope, and termination location (Minimum 8' from vertical surfaces). CPC 509.0 18. For the instantaneous water heater, show shutoff valves and hose bibs on both the cold-water and hot-water piping. MECHANICAL (2016 CALIFORNIA MECHANICAL CODE) 19. Please detail the duct work for the 1st floor bathroom exhaust fans (including the janitor closet exhaust fan) that terminate up through the roof. The 2nd floor mechanical plan on sheet M1 .1 does not address the exhaust fans going from the 1st floor to the roof. 20. Please detail the each 1st floor 6" outside duct work for that terminates up through the roof. The 2nd floor mechanical plan on sheet M 1.1 does not address the outside air ductwork going from the 1st floor to the roof. 21. Sheet M2.0 shows a 6" outside air duct along the top of the building. Specify the air moving device this is connected too. 22. Specify what types of materials are to be stored within the storage areas. 23. Please provide the MECH-3-C forms showing the required mechanical ventilation rates for the new or revised conditioned spaces. Coordinate the mechanical and the Title 24 outside air design. Title 24 121(b) 2 & (d). 24. Please show the required 42 inches tall "Guards" (guard rails) or building parapets height where appliances, mechanical equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface. CBC 1015.6 & 1015.7 25. Detail the p secondary mechanical condensate waste design for indoor fan coils. CMC 310.0 & CPC 814.0. 26. Specify compliance with CMC 603.4.1 for length limitations for factory made flexible air ducts (5') and use (not to be used for rigid elbows or fittings). Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Connor Reuss at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. Carlsbad CBC2018-0627 November 20, 2018 ELECTRICAL, and ENERGY COMMENTS PLAN REVIEWER: Morteza Beheshti 27. The licensed designer must sign the approved set of the plans. ELECTRICAL (2016 CALIFORNIA ELECTRICAL CODE) 28. Provide lighting for the first floor main open office area. 29. Emergency illumination is required to be installed in electrical equipment rooms. Please provide. CBC 1008.3.3 CEC 700.16 30. Egress (emergency back-up) lighting is required for exterior landings of required exit doors/exterior stairways located at other than the level of exit discharge. Please add to the plans. 31. For buildings that require two or more exits, emergency illumination is required to be installed at exterior exit door landings and/or vestibules. Please provide. CBC 1008.3.2 32. Please indicate electrical power for the insta hot water heaters shown on plumbing plans. ENERGY (2016 CALIFORNIA BUILDING ENERGY STANDARDS) 33. A complete energy plan check will be performed after completed and/or the corrected energy design has been provided. 34. On the plans clearly show the building envelope design as applicable: insulation design, fenestration specifications, door insulation specifications, radiant barrier, and the roof covering specifications. 35. Instantaneous water heaters (rating greater than 2 kW) shall have isolation valves and hose bibs installed on both the cold-water supply and hot water output piping. ES 110.3 36. Hot water recirculating loop systems requirements: Detail the following: (See ES 110.3 for specifics) • The installation of an air release valve on the inlet side of the recirculation pump, within 4' of the pump. • A check valve is required between the recirculating pump and the water heating equipment to prevent the hot water from flowing backwards through the recirculation loop. • Pump isolation valves 37. Local control.of lighting must be in the same room or area and controlled by a readily accessible switch. Carlsbad CBC2018-0627 November 20, 2018 38. Multilevel lighting controls are required in areas 100 square feet or greater that have a connected general lighting load exceeding .5 watts per square foot (Classrooms are .7 watts). LED luminaires require dimming capability of 10 to 100%. Include control placement and design on the floorplans. (Dual switching no longer complies) ES Table 130.1-A 39. Each floor, each space (not exceeding 5,000 square feet), and each type (general, display, and ornamental) of lighting shall be individually capable of being automatically shut-off when the building is unoccupied. Include the control design. Automatic time switch control requires a 2 hour override. ES 130.1 (c) 40. Occupancy controls are required to shut off all lighting in: Offices 250 square feet or smaller, multipurpose rooms of less than 1,000 square feet, conference rooms, and classrooms of any size. ES 130.1 (c)5 41. Lighting installed in corridors and stairwells shall be controlled by occupant sensing controls that separately reduce the lighting power by at least 50% when the space is unoccupied. ES 130.1c (6) C. 42. Please provide sensor controls for office receptacle outlets. Note: If you have any questions regarding this Electrical and Energy plan review list please contact Morteza Beheshti at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. End Toolbox -Ten ant Improvement (1965 Kellogg Ave, Carlsbad, Ca 92008) Structural Calculations & Details Job No. b18-084 September 12, 2018 Prepared by: Nader B. Khoury ENGINEERING STRUCTURES, Inc. 1278 Glenneyere St. #201 Laguna Beach, CA 92651 Office: (909) 615-6962 Fax: (949) 203-6214 0 CX) """ o~ ~o N ~c::1 (,0 Na, °'~ 0 o-._ NN I ~~ co N 'I"" 0 N 0 m 0 I N A D E R K H O U R Y, C. E. LOADS Roof Roofing Material 1/2" PLYWOOD SHEATHING Roof framing@ 16" o/c 5/8" Gypsum Ceiling Insulation MISC. Rise= O Run= 12 Roof Live Load Roof Live Load Exterior Wall Cone. wall 3406 Linda Vista Ter .• Falfbrook. CA 92028 P: 949.637.8357 F: 949.203.6214 4.0 PSF 1.5 PSF 2.5 PSF 2.8 PSF 0.4 PSF 1.0 PSF PSF PSF = 1 X 12.2 PSF Total 12.2 PSF PSF PSF PSF PSF PSF PSF PSF 20.0 PSF 20.0 PSF Total 20.0 PSF 100.0 PSF 0.0 PSF 0.0 PSF 0.0 PSF 0.0 PSF 0.0 PSF PSF PSF 100.0 PSF Total 100.0 PSF I N A O E R K H O U R Y, C. E. u F-t:"" r,1..J _,,tu tu res LOADS Interior Wall 2x4's at 16" 1/2" GYP 1/2" GYP Mies. Insulation 3406 Linda Vista Ter., Fallbrook, CA 92028 P: 949.637.8357 F: 949.203.6214 1.2 PSF 2.5 PSF 2.5 PSF 0.8 PSF 0.5 PSF PSF PSF PSF 7.5 PSF Total 7.5 PSF Title Block Line 1 You can change this area using the 'Settings' menu item and then using the 'Printing & Title Block' selection. Title Block Line 6 Project Title: Engineer: Project Descr: Project ID: Pnnled: 12 NOV 2018, 2:17PM Steel Beam Rle: C:\Users\Brian\Desklop\ENGINE-1\2018 jobslb1S-084 Toolbox (ti)ICALCS\CALCS.ec6 ENERCALC, INC. 1963-2017, Bllild:10.18.1.23, Ver:6.18.3.31 Description : HSS CODE REFERENCES Calculations per AISC 360-10, IBC 2015, ASCE 7-10 Load Combination Set : IBC 2015 Material Properties Analysis Method : Allowable Strength Design Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Bending Axis : Major Axis Bending Span = 3.250 ft Fy : Steel Yield : E: Modulus : 50.0 ksi 29,000.0 ksi Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weiQht NOT internally calculated and added Uniform Load : D = 0.04880, Lr= 0.080 k/ft, Tributary Width= 1.0 ft Uniform Load: D = 0.80 k/ft, Tributary Width= 1.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = Section used for this span Ma : Applied Mn / Omega : Allowable Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.036: 1 HSS6x5x3/8 1.226 k-ft 34.431 k-ft +D+lr+H 1.625ft Span# 1 Maximum Shear Stress Ratio = Section used for this span Va: Applied Vn/Omega : Allowable Load Combination Location of maximum on span Span # where maximum occurs 0.000 in Ratio= 0.000 in Ratio = 0.002 in Ratio= 0.000 in Ratio= 0<360 0 <360 16370 >=240 0 <240 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Summary of Moment Values Segment Length Span# M V Mmax+ Mmax -Ma Max Mnx Mnx/Omega Cb -+0-+li Dsgn. L = 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 +D+L-+li Rm 1.00 Dsgn. L = 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 +D+Lr-+li Dsgn. L = 3.25 ft 0.036 0.024 1.23 1.23 57.50 34.43 1.00 1.00 +D+S-+li Dsgn. L = 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 -+0+0.750Lr+0.750L-+li Dsgn. L = 3.25 ft 0.035 0.024 1.20 1.20 57.50 34.43 1.00 1.00 +D+0.750L +0.750S-+H Dsgn. L= 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 +D+0.60W-+li Dsgn. L = 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 +D+O. 70E-+li Dsgn. L= 3.25 ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 +D+0.750Lr+0.750L +0.450W-+li Dsgn. L= 3.25 ft 0.035 0.024 1.20 1.20 57.50 34.43 1.00 1.00 +D+0.750L+0.750S+0.450W-+H Dsgn. L = 3.25ft 0.033 0.022 1.12 1.12 57.50 34.43 1.00 1.00 +D-t0.750L +0.750S+0.5250E..+i -~~ Design OK 0.024: 1 HSS6x5x3/8 1.509 k 62.105 k +D+lr+H 0.000 ft Span# 1 Summary of Shear Values Va Max Vnx Vnx/Omega 1.38 103.72 62.11 1.38 103.72 62.11 1.51 103.72 62.11 1.38 103.72 62.11 1.48 103.72 62.11 1.38 103.72 62.11 1.38 103.72 62.11 1.38 103.72 62.11 1.48 103.72 62.11 1.38 103.72 62.11 Title Block Une 1 You can change this area using the 'Settings' menu item and then using the 'Printing & Trtle Block' selection. Title Block Line 6 Steel Beam t • I : • ; Description : HSS Load Combination Segment Length Dsgn. L = 3.25 ft +0.60D+0.60W+0.60H Dsgn. L = 3.25 ft +0.60D+0.70E+0.60H Span# Max Stress Ratios M V 0.033 0.022 0.020 Dsgn. L = 3.25 ft 1 0.020 0.013 0.013 Overall Maximum Deflections Load Combination +D+Lr+H Vertical Reactions Load Combination Overall MAXimurn overall MINimum +D+H +D+L+H +D+Lr+H +D+S+H +D+O. 750Lr+0.750L +H +D+0.750L+0.750S+H +D+0.60W+H +D+0.70E+H +D+0.750Lr+0.750L +0.450W+H +D+0.750L+0.750S+0.450W+H +D+0.750L +0.750S+0.5250E+H +0.60D+0.60W+0.60H +0.60D+0.70E+0.60H DOnly Lr Only LOnly S On~ WOnly E Only H Only Span Support 1 1.509 0.130 1.379 1.379 1.509 1.379 1.477 1.379 1.379 1.379 1.477 1.379 1.379 0.828 0.828 1.379 0.130 Max."." Defl 0.0024 Support2 1.509 0.130 1.379 1.379 1.509 1.379 1.477 1.379 1.379 1.379 1.477 1.379 1.379 0.828 0.828 1.379 0.130 Mmax• Mmax- 1.12 0.67 0.67 Location In Span 1.634 Project Title: Engineer: Project Descr: Proiect ID: Plinted:12NOV2018, 2:17PM Fi~= C:\Users\Brian\llesktop\ENGINE-1\2018 jobslb111-084 Toolbox lti)\CALCS\CALCS.ec6 ENERCALC, INC. 1983-2017, Bui~:10.18.1.13, Ve,6.18.3.31 . . . Summary of Moment Values Summary of Shear Values Ma Max Mnx Mnx/Omega Cb Rm Va Max Vnx Vnx/Omega 1.12 57.50 34.43 1.00 1.00 1.38 103.72 62.11 0.67 57.50 34.43 1.00 1.00 0.83 103.72 62.11 0.67 57.50 34.43 1.00 1.00 0.83 103.72 62.11 Load Combination Max."+" Defl Location in Span 0.000 Support notation: Far left ~#1 0.0000 Values in KIPS SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY RECORD ID# __________________ I PLAN CHECK # __________________ 1 Zip Code 91!--~ Zip Code BP DATE Plan File# The following questions represent the fa 11ity's acti ities, NOT the sp clfic project description. PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San .Q!!gQ}: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION IHMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building peonit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: □ CalARP Exempt Yg NO (for new construction or remodeling projects) / 1. 0 Is your business listed on the reverse side of this form? (check all that apply). Date Initials 2. J¥ Will your business dispose of Hazardous Substances or Medical Waste in any amount? 3. D ~ Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 D CalARP Required pounds and/or 200 cubic feet? ---~'---- 4. D f Will your business store or handle carcinogens/reproductive toxins in any quantity? Date Initials 5. D Will your business use an existing or install an underground storage tank? 6. D Will your business store or handle Regulated Substances (Ca/ARP)? D Ca/ARP Complete 7. D Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? f 8. D Wm your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to cco-at,...e--71n°"it.,.ia.,.ls-- or rester than 1,320 allons? California's Above round Petroleum Stora e Act , /EGO OUNTY AIR POLLUTIO CONTR L DISTRICT PCD: Any YES• answer requires a stamp from APCD 10124 Old Grove Road, San Diego, CA 2131 a cdcom s count .ca. ov (858) 86-650). [•No s amp required if Q1 Yes and Q3 Yes and Q4-Q6 No]. The following questions are intended to identify the majority of air pollution issues at the planning stage. Projects may require additionTmeasures not identified by these questions. For comprehensive requirements contact APCD. Residences are typically exempt, except -those with more than one building+ on the property; single buildings with more than four dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part of a larger project. rExcludes garages & small outbuildings.) 1. 2. 3. 4. 5. 6. YES NO § J □ [:8' Will the project disturb 160 square feet or more of existing building materials? Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition. (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been perfooned by a Certified Asbestos Consultant or Site Surveillance Technician? (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification may be required 10 working days prior to commencing asbestos removal. □ □ D Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet (www.5dapcd.org/info/factslpermits.pdf) for typical equipment requiring an APCD permit. □ (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school bounda Signature of Owner or Autti ,r''t,✓ lt'<f' Date FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ______________________________ _ BY· DATE· I I EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO• APCO COUNTY-HMO APCO COUNTY-HMO APCD *A stamp 1n this box only exempts busmesses from completmg or updating a Hazardous Materials Business Plan. Other pennIttmg requirements may still apply. HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division Print Date: 09/23/2019 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 1965 Kellogg Ave BLDG-Permit Revision 2120921100 $ 0.00 Revision Permit Work Class: Commercial Permit Revi~ Lot#: Reference#: Construction Type Bathrooms: Orig. Plan Check#: CBC2018-0627 Plan Check#: Description: TOOLBOX: INTERIOR FLOOR PLAN CHANGES Applicant: RICHARD LUND 2033 San Elijo Ave Cardiff by the Sea, CA 92007-1726 619-920-2134 FEE BUILDING PLAN CHECK REVISION ADMIN FEE FIRE Plan Review Per Hour -Office Hours MANUAL BUILDING PLAN CHECK FEE Owner: CB INVESTMENT PROPERTIES LLC 2454 Alton Pkwy IRVINE, CA 92606 Total Fees: $ 471.00 Total Payments To Date : $ 471.00 Building Division (city of Carlsbad Permit No: PREV2019-0077 Status: Applied: Issued: Permit Finaled: Inspector: Final Inspection: Closed -Finaled 04/10/2019 05/03/2019 09/23/2019 AMOUNT $35.00 $136.00 $300.00 Balance Due: $0.00 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov (city of Carlsbad PLAN CHECK REVISION OR DEFERRED SUBMITTAL APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Original Plan Check Number e.l!J?,Ul8-06"2-r Plan Revision Number ProjectAddress /"l/,!L /t-e-Uo6,f, Ave: I' ~ General Scope of Revision/Deferred Submittal:~ M?,V-13~~ ~a-;; tA-'U>vr tMli!-!,,.e 6'JV£.Y' CONTACT INFORMATION: Name§-~ 4(.,<(Z?, ~~!Wffc.Phone t:-l'f · "I ZP· 2-1,t./ Fax~M~'A ______ _ Address u:i::'5 ;\&<I &-'r/e, dVEi /Z.t/J City ~ d Zip 9z.e,e, 7: Email Address & t> ✓erut'o 11>4e:.1 ),e, :;J ., ,,,,,. ,/. c t?'r"l T , r ../ Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: ~ Plans D Calculations D Soils D Energy D Other 2. Describe revisions in detail • JI# I. Cc 3. List page( s) where each revision is shown AZ. Z-- I"> 4. Does this revision, in any way, alter the exterior of the project? D Yes 1XJ No 5. Does this revision add ANY new floor area(s)7 D Yes ~ No /?eh1-47t-1~ -/Pe <;,4#f&?: 6. Does this revision affect any fire related issues? D Yes ~ No 7. Is this a complete set? IX! Yes /~ No 2SSignature Z:7~;:;,{~ 1635 Faraday Avenue, Carlsbad, CA 92008 ell: 7 60-602-2719 fall; 760-602-8558 EroaH; building@carlsbadca.gov www.carlsbadca,gov DATE: April 22, 2019 JURISDICTION: Carlsbad ✓• EsG1I A SAFEbuilt Cornpnny PLAN CHECK#.: CBC2018-0627 REV PROJECT ADDRESS: 1965 Kellogg Ave. PROJECT NAME: Toolbox Medical Innovations SET: I TI □ APPLICANT □ JURIS. Revisions IZ! The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: IZ! EsGil staff did not advise the applicant that the plan check has been completed. 0 EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: Telephone #: ) Email: Mail Telephone Fax In Person iZ! REMARKS: PREV2019-0077 By: Kurt Culver EsGil Enclosures: Previously-approved plans 4/15/19 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 ------------·· ........ . Carlsbad CBC2018-0627 REV April 22, 2019 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Kurt Culver PLAN CHECK#.: CBC2018-0627 REV DATE: April 22, 2019 BUILDING ADDRESS: 1965 Kellogg Ave. BUILDING OCCUPANCY: B BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance f 1997 use Building Permrt Fee l ... J [ 1997 USC Plan Check Fee Type of Review: r Complete Review r Repetitive Fee "' l~ Repeats r r * Based on hourly rate Comments: r Other p Hourly EsGil Fee r Reg. VALUE Mod. r Structural Only C==:]Hrs.@• ~ ($) $240.00) Sheet 1 of 1