Loading...
HomeMy WebLinkAbout1965 Kellogg Ave; ; CBC2018-0627; Recycle... -· .. -··•···------- · (cityof NONRESIDENTIAL GREEN Deve/oe_ment Services BUILDING CODE STANDARDS Building Division MANDATORY MEASURES 1635 Faraday Avenue Carlsbad CERTIFICATION CHECKLIST 760-602-2719 B-52 www.carlsbadca.gov This form, signed and completed, and all receipts for the recycled materials shall be submitted to the Building Inspector prior to Final Inspection. Site Development Mandatory 5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X) the State Storm water NP DES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dust/particulate matter air pollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or ( X) meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X) passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X) of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X) 5.106.8 Light pollution reduction. Comply with lighting power requirements in the California Energy Code and design interior lighting such that zero direct-beam illumination leaves the building ( X) site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: 1. Shield all exterior luminaries or use cutoff luminaries (X) 2. Contain interior lighting within each source (X) 3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) 4. Contain all exterior lighting within property boundaries (X) Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.106.10 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or drainage system will (X) manaQe all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 through 503.1.3. (X) 5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to consume more than 100 gal/day. 2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratory or beauty salon or barber shop projected to consume more than 100 gal/day. B-52 Page 1 of 5 Rev. 5/17 .. -.. ~----------- 5.303.1.2 Excess consumption. Any building within a project or space within a building that is projected to consume more than 1,000 gal/day. (X) 5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the overall use of potable water within the building by 20 percent shall be provided (Calculate ( X) savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are served by more than one showerhead, the combined flow rate of all the showerheads shall not (X) exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in ooeration at a time. 5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable for each type in items listed in Table 5.303.6. 1. Water closets (toilets) -flushometer type (X) 2. Water closets (toilets) -tank type (X) 3. Urinals (X) 4. Public lavatory faucets (X) 5. Public metering self-closing faucets {X) 6. Residential bathroom lavatory sink faucets ( X) 7. Residential bathroom lavatory sinks (X) 8. Residential showerheads (X) 9. Sinale shower fixtures served bv more than one showerhead f Xl Outdoor Water Use 5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X) 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between 1,000 and 5,000 square feet. (X) 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: 1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. ( X) 2. Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (X) communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan 5.408.1 Construction waste diversion. Establish a construction waste management plan or (X) meet local ordinance, whichever is more stringent. (X) 5.408.2 Construction waste management plan. Submit plan per this section to enforcement authority within the city. 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (X) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcement authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more stringent. (X) Exceptions: 1. Excavated soil and land-clearing debris 2. Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soil and land clearina debris. 100 nercent of trees. Stumos, rocks and B-52 Page 2 of5 Rev. 5/17 associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. Building Maintenance and Operation 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of nonhazardous materials ( X) for recycling. 5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (X) commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include items listed in Section 5.410.2. - 5.410.2.6 ( X) 5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of the project begins the OPR shall include items listed in Section 5.410.4. (X) 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. (X) 5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include items listed in Section 5.410.2.3. (X) 5.410.2.4 Functional performance testing shall demonstrate the correct installation and operation of each component, system and system-to-system interface in accordance with the (X) approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training are required. (X) 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. (X) 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. ( X) 5.410.2.6 Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X} buildings less than 10,000 square feet. 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X) Systems to be included for testing and adjusting shall include, as applicable to the project, the systems listed in Section 5.410.3.2. ( X) 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry best practices and applicable national standards on each system. (X) 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the procedures defined by national standards listed in Section 5.410.3.3.1. ( X) 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report ( X) of testing signed by the individual responsible for performing those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports reQuired bv the enforcinq aqencv. B-52 Page 3 of 5 Rev. 5/17 ·---,-~--------- Environmental Quality Fireplaces 5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a ( X) sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. As Applicable 5.503.1.1 Woodstoves. Woodstoves shall comolv with US EPA Phase II emission limits. (X) Weather Resistance and Moisture Management 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X) manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5.407.2 Moisture control. Employ moisture control measured by the following methods: 5.407 .2.1 Sprinklers. Prevent irrigation spray on structures. (X) 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X) into buildings. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until final start up of the heating and cooling equipment, all duct and other related air distribution (X) component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the amount of debris or duct which mav collect in the svstem. 5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the building with outside and return air prior to occupancy that provides at least a MERV of 8. 5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet the requirements of the following standards: (X) 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 voe limits as shown in Tables 5.504.4.1 and 5.504.4.2. 2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide voe standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certification and specifications 2. Chain of custody certifications 3. Other methods acceptable to the enforcing agency 5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 (X) CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the FloorScore proqram of the Resilient Floor Coverinq Institute. B-52 Page 4 of 5 Rev. 5117 Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Buildinq Code, Title 24 Part 2, Sections 1203 (Ventilation\ Chaoter 14.1. IXl Air quality and Exhaust 5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the ( X) minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X) reauirements of the latest edition of the California Enernv Code, Title 24, Part 6, Section 120.1./Cl 14). Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As 5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X) IX) I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: I~~ S:: JC1"_.L!.::12C:-Cti Plan Check Number: C.(3c. 2-01 & -Of, "Z-• U/~ "?A-,-rt,::cit. J Af Ut.L-1'\-.N'! S O J ,:/ Print Name: Signed: -c ) License Number: 6BOS-6 l Date: riLi-u/11 B-52 Page 5 of 5 Rev. 5117 PArrf:, Complt~te he for<• final insp(~ction, obtain WASTE MANAGEMENT signature, and return with receipts prior to final buildirig approval. DEBRIS RECYCLING REPORT {ACTUAL): SECTION A Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. C.f'3C...2. 01 g -O(o -Z.. J Address [Of bS-ICcL-L00 0 A-VE. Print Name SECTION B Use this Final Log below to track loads of materials as they leave the Job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) ~xample: 01/05/2018 SECTION C Salvaged Concrete (broken) @TOTAL 5 tons • -i .t.t& \. 'Z-'- ,32 • 2..- Landfill Palomar Transfer Station, 5960 El Camino Real -760 603-0153 • I?... °6~,JQl:,,()O • I • ~I • '?,, , l..- Diversion Rate Achieved __ 1.._._~I __ J_-L-,L,._!!L_J__ __ = • I I % ~65%-,.\,.{ ~65%~ Attach the following documentation to this Report: Original recycling weight tickets, landfill weight tickets Original donation receipts with photos and/or itemized descriptions Any other relevant information to support Recycling Report DIVERSION 1(lu /r1 Return completed form and documentation to: City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 !ii 'iEscortdido Resource Recovery ''1021 W Mission Ave Escondido, CA 92025 (760) 745-3203 INVOICE , Custom~r: 0000 Ticket: 52891 Date: 08/02/19 In: 14 :48 Out: 14:48 Truck: 6436/0000 Container: TRI VISTA Commodity ,a_4 MIXED C & }[Gross (In): Units D .40 9,680. lbs Scl#2 tSClHlroo RESOLRCEs 1044 U J.IASHitfiTCW AVE ESClN:lIOD, CA • .92825-1672 768-746-3203 Sale xxxxxxxxxxxx$?8 VISA Total: $ 08102119 Inv#: M97 PllPrvd: Onlint CN>IT/1'.. IJ£ VISA AID: ~018 11/R: 00 Be 00 89 0!l TS!: F8 00 Entri /lethod: ChiP 53.00 · 14:48:57 P.PPr Code: 057264 I Rate 92.00 per Tare, 8,880. TON lbs Scl#2 Route: 08614 Origin: 086 Carlsbad Net: 800. Extended Charge 53.00 lbs] PAID CREDIT CARD 53.00 ESCONDIDO RESOURCE ECOVERY AND WASTE TRANSFER SERVICE "We'll Take Care of It" Driver 8934 Construction & Demolition Diversion Certificate Received at :Escondido Resource Recovery Processed At : SRR Lemon Grove, CAD Date: ~/z_ /,/; I COi San Marcos, CA ~ Customer: Tr1 V: < k Ticket# Project: Number/Description _ _.Jl1=eu""'-'(_,_/ ""0J~i'f---------- Total Tons Received: ~Tons ion Percentage: ~% This certifies that the company listed above has utilized a E CO facili to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based on an ov all tonnage percentage of the respective EDCO facility. 'Escondido Resource Recovery 1021 W Mission Ave Escondido, CA 92025 (760) 745-3203 10%J ~ -l ¼, I 30°/o I ~ -f ~ + Cc:stomer: 0000 Ticket: 40531 Date: 07/11/19 In: 15:03 Out: 15:03 Ti:<.I VISTA Commodity 14 MIXED C & D [Gross (In) : 9·, 820. lbs Units .45 Scl#2 Rate 92,00 per TON Tare 8,920. lbs Scl#2 INVOICE Truck: 6436/0000 container: Route: 08614 Origin: 086 Carlsbad Net: 900. Extended Charge 53.00 lbs] PAID CREDIT CARD _53. 00 ESCCHIIDO RESCdCES 1044 U WISHll«iTON AV£ ESC(H)IDO, CA. 92025-1672 760-745-3203 Sale xxxxxxxxxxxx9678 VISA Total: $ 07111119 EnlrY llelhod: ChiP 53.00 15:04:24 liPPr Code: 027499 Driver Inv fl: 000000069 APPrvd: Online --------- CAPITAi. lH: VISA AID: !MlM31010 !Vil: 00 80 00 80 00 TS!: F8 00 TIWI< YOU! ESCONDIDO RESOURCE ECOVERY AND WASTE TRANSFER SERVICE "We'll Take Care of It" I Construction & Demolition Diversion Certificate Received at :Escondido Resource Recovery Date: -, I I I I I I =i i Processed At : SRR Lemon Grove, CAD CDI San Marcos, CA Customer: y: U ;--s..l-i.. Ticket# Lf{) '53/ ' Project: Number/Description -""""l'-U-=-..;.cll'-"6/+'J=i---------- Total Tons Received: ,l-/ Sons 7 ( % 8991 ~ This certifies that the company listed above has utilized a ED O facility t ·vert construction demolition materials in accordance · with LEED requirements. The diversion tonnage is based on an overall t age percentage of the respective EDCO facility. Escondido Resource Recovery 1021 W Mission Ave Es=ondido, CA 92025 (760) 745-3203 customer: 0000 Ticket: 19487 Date: 06/04/19 In: 10: 05 Out: 10:05 TRI VISTA Commodity 14 MIXED C & D [Gross(In): 12,420. Units 1. 75 lbs Scl#2 Rate 88.00 per TON Tare 8,920. lbs Scl#2 INVOICE Truck: 6436/0000 Container;: Route: 08614 Origin: 086 Carlsbad Net: 3,500. Extended Charge 154.00 lbs] PAID CREDIT CARD '154. 00 ESCOtflIDO RESOURCES 1044 J,j MASHINGT~ AVE ESCONDIDO. CA. 92025-16'12 760-745-3203 Sale 1.U.'XXX~678 VISA Total: $ M4119 Inv ff: N00036 Ai>Prvd: Online CADIT/i. 1H: VISA AID: A0000000031010 IVR: 00 80 00 80 00 JS!: F8 00 EnlrY Nethod: ChiP 154.00 10:06:44 I .. lliPr Code: 093315 ---···········--------........ _______ _ ESCONDIDO RESOURCE ECOVERY AND WASTE TRANSFER SERVICE "We'll Take Care of It" Driver THAN!< VCNJ! Jction & Demolition Diversion Certificate Date: 8962 Received at :Escondido Resource Recovery Processed At : SRR Lemon Grove, CAD COi San Marcos, CA ~ Customer: 1v; \); > t.. Ticket# Project: Number/Description _ __J_l::::c~':!"'-< .l..l .:..:l u-1-J~')~------- Total Tons Received: \, )S. Tons Diversion Percentage: 'J/% ) Scale house Operators Signature: __ _.,\ • .t--J .,,_lo_li_{J _,_f-:: ___ _ This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Escondido Resource Re·covery 1021 W Mission Ave Escondido, CA 92025 (760). 745-3203 Customer: 0000 Ticket: 6619 In: 13:47 Out: 13:47 TRI VISTA Commodity 14 MIXED C & D [Gross (In): 10,220. Date: 05/09/19 units .65 lbs Scl#2 Rate 88. 00 per TON Tare 8,920. lbs Scl#2 INVOICE Truck.: 6436/0000 Container: Route: 08614 Origin: 086 Carlsbad Net: 1,300. Extended Charge 57.20 lbs] PAID CREDIT CARD 57.20 , .. ,, . ESCONDIDO HESIU«.'ES UW! ll lolASHH«illll AVE £SC0HHD0, CA. 92025-1672 760-71!5-32S3 Sale xxxxxxxxxxxx9678 VISA Total: $ • 90 05109119 Inv ff: ll00080056 · APPrvd: Online CN'llAf. 0/£ VISA AIO: lilml000031010 TVR: 0ll 88 00 8!l 00 TS!: F8 00 nw.,, YOO/ fntrY ffe!hod: ChiP 57.20 13:48:41 APPr Code: 052428 ESCONDIDO RESOURCE ECOVERY AND WASTE TRANSFER SERVICE "We'll Take Care of It" Driver on & Demolition Diversion Certificate ido Resource Recovery Date: j. ~ .\ 9' 9700 Processed At : SRR Lemon Grove, CAD COi San Marcos, CA CjQ Customer:---r<-: \) .-c; -1-Ticket# Project: Number/Description --Ki=----e...;;_..;.\-'--\ ~o 11-)-1---------- Total Tons Received: {.,.:5 Tons Diversion Percentage: ·7 l % Scale house Operators Signature: \,J tote~ This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Escondido Rc..,'ource Recovery 1021 W Mission Ave Escondido, CA 92025 (760) 745-3203 INVOICE Customer: 0000 Ticket: 98698 Date: 04/24/19 In: 14:27 Out: 14:27 Truck: 6436/0000 Container.: Route: 08614 Origin: 086 Carlsbad Commodity 14 MIXED C & D [Gross(In): 9,800. lbs ESCtHW!W J~ESOURLH Hll!I! 1,/ 1,./ASl·Ht~rOH A1w ESCONDIOO. CA. 9202'" .b'i'2 760 · i'(!S 32r·; Sale xxmxxxxxxxS6/8 VISA Total: $ 04124119 Inv U: 000000083 AiiPrvd: Online CAPIT~ 0/f VISA AID: A00m003101~ TVR: 00 80 00 80 00 TS!: F8 00 lHANK VOIJ! Entry Method: ChiP 50.00 N:21:56 APPr Code: 02/J8q Units .39 Scl#2 Rate 88.00 per TON Tare 9,020. lbs Scl#2 Net: 780. ESCONDIDO RESOURCE ECOVERY AND. WASTE TRANSFER SERVICE "We'll Take Care of It" PAID CREDIT CARD .Driver uction & Demolition Diversion Certificate Received at :Escondido Resource Recovery Extended Charge 50.00 lbs] 50.00 9685 Processed At : SRR Lemon Grove, CAD COi San Marcos, CA [IZJ · Customer: / r ; . Vi's h Ticket# Project Number/Description -----'-\C_0_1.,,~L-~O ~~c;~-------- Total Tons Received: ,3q Tons Diversion Percentage: q-\ % I Sq,le house Operators Signature: __ __._f\\-1-_~fv'J~__,O.,=· ....____,4 __ This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance with LEED requirements, The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.