HomeMy WebLinkAbout1966 OLIVENHAIN RD; CS; CB032425; Permit1ITTJ; ', .C,ity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
11-13-2003 Commercial/Industrial Permit Permit No: CB032425
Building Inspection Request Line (760) 602-2725
Job .Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
1966 OLIVENHAIN RD CBAD Q.S
Tl Sub Type:
Lot#:
$40,000.00 Construction Type:
Reference #:
COMM
0
NEW
Status:
Applied:
Entered By:
Project Title: OLIVENHAIN WATER-CINGULAR
TELECOMUNICATION CABIN!=T W/45 FT FAUX TREE
Plan Approved:
Issued:
Applicant:
CRAIG MGNUDY
4810 EASTGATE MALL 92121
858 228-2692
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Total Fees: $611.07
Inspect Area:
Plan Check#:
, Owner:
$298.59
$0.00
$194.08
$0.00
$0.00
$8.40
$0.00
$0.00
$0:00
$0.00
$0,00.
$0.00
$0.00
$0.00 • ..
$0.00·-. -
$0.00
$0.00
Meter Size
Add'I Reel. Water Cpn. Fee
Meter Fee
SDCWA.fee
CFO Payoff Fee
PFF
_PFF (CFO Fund).·
.License Tax
License Tax (CFO Fund)
· Traffic Impact Fee
-Traffic Impact (CFO Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
rvtECHANICAL TOTAL
Mast$r Drainage F$e
· Sewer Fee
. Redev Parking Fee
Ada1tiohal Fees
: :1: fQl[txtJ=~ERMIT FEES
Total Payments To Date: $194.08. Balance Due:
ISSUED
09/04/2003
RMA
11/13/2003
11/13/2003
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$110.00
$0.00
$0.00
$0.00
$0.00
$0.00
$611.07
$416.99
8605 11/13/03 0002 01. 02
Inspector:
FINAL APPROVAL
Date: 2. -i '1 ... 0 t/
CGP 416-99
Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications; reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
i x i n f hi h h · I · 'mil . h. h f limi i n h s c viousl o h rwi
PERMIT j\"PPLICATION
a"(
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad CA 92008
Legal Description Lot No. Subdivision Name/Number Unit No.
FOR OFFICE USE ONLY
PLAN CHECK NO. en (;)J 2.it )S
EST. VAL. {f(jj (}01:> . ~ . I
Plan Ck. Deposit . , /='i 1 ()f
Validated By ~
Date Cf/ t.f/
Phase No. Total# of units
Assessor's Parcel # Existing Use Proposed Use ~ ._1 ZSS -c3 \-o:,, Qff\C1..: \~<6i.-<04~fa 02
fi1}!rW~BS~~XTio~:~~;\ ~=-~f~f::s~r~~7~ -. ~> ~{-_ ~:,v,'d'' -, -: ·>--/l~J~2i:·;1Lf,E~-;~:Z:1:L· :~f~--~::i1:;J;-~1-~::~J:~:?:i~~$~{~:~~~~~
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
Cl I have·and will maintain a <;ertificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work
for ~h this permit is issued.
liV" I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My
worker's compensation insurance Cilrrier and policy number are: 1 q / / / ,
lnsuranceCompany "'t-Uft'th-'LpSuyg;1ce PolicyNo.wt:..Jl665Jiqo -oo Expiration Date ~ 3', 03
{THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS)
Cl CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to
become subject to the Workers' Compensation Laws of California.
all coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand
lion, damages are provided for in Section 3706 of the Labor Code, interest and atto~s2es.
. . . DATE IC ~ .-a,5
~-~-_ -7
N ~~~~::=-~~~~17;~~~i1l1~~r~iZ:=?:B12r~~::~~~~~~m~111
I hereby affirm that I am .exempt from the Contractor's License Law for the following reason:
Cl I, as owner of the property or my employees with wages as their sole compensation, will d the work and the structure is not intended or offered for sale (Sec. 7044,
Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or
through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of
completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
iJ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's
L.icense Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's
License Law).
Cl I am exempt under Section ________ Business and-Professions Code for this reason:
1. I personally plan to provide the major labor and ·materials for construction of the proposed property improvement. Cl YES Cl NO
2. I (have/have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name/ address / phone number/ contractors license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number/
/ontractors license number):----------,------------------------------------
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name /address / phone number/ type of work):
PROPERTY OWNER SIGNATURE _____________ --,-------------DATE_~---------
I • PERMIT APPLICATION .,.
CiTY OF 'CARLSBAD BUILDING DEPARTMENT .t . 1635 Faraday Ave., Carlsbad CA 92008
Page 2 of 2
~r~1!~f!ii'1r,orwit1P/11:s~~ao1eo~~,:~::<~z-1F:"1rr:irr:q::~:Q'.1,t::!·/t'!:!0~T'J-F"?Zi1ft::1.:::~¥;,m1~~'-l ~~~ 1'1ffl<!~ ~ ~ $ .,.,<:,,,,.v•M,,-~' +<.c,;i..~,¾.......,;.,.~~'i~~-~<;~",~~/4.~~ ' '.:,,,'~Ro,.,;i;,~~~ ..... -..,., .... ,....,M~,\>..:,..,+s.,~-..... ""'-~~~?, ,,,..,,)o,N
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration for or risk management and prevention program under
Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D -YES D NO
Is the applicant or future building occupant·required to obtain a permit from the air pollution control district or air quality management district? D YES D NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D YES D NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
L~~lJ!NDIBt!e!NsY.;--,,,,::;i:/:-: Fr-7,:~~"~:,-~,;.,,,,:st~~:.~:~:::;-1J,;/L::,¾,:j~irw~~F'~:.~,~2~::::6;;;,;;~;.:iJ~J
I hereby affirm that there is-a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(1) Civil Code).
LENDER'S NAME__________________ LENDER'S ADDRESS __________________ _
~:~-~t'!'r»~~hl-~~~~,..~~~l~:~f~:R>r:;~~::::::~~S7t!m:~:~~~~~~M;?~:;::::,: -~-~-~~ii-~~~ "';;!;:v ~ssg
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City
ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGEMENTS, COSTS AND
EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations of 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 1 days ro the da · such ermit or if the building or work authorized by such permit is suspended or abandoned at any time after
the work is commenced for a period of 1 days 10n 10 .:ii Unii Building Code).
APPLICANT'S SIGNATURE _-'-'--14-''-=-l'-~"-"-,"'4{,j~'-"'"~--,H-'.,,..,.,_L.U-~~:q...~"""'-,:.__--DATE _+-9+-1lr---"-'1"'=t+~-{;)-~,.___ _____ _
)
City of Carlsbad Bldg Inspection Request
For: 02/12/2004
Permit# CB032425 Inspector Assignment: PD ---
Title: OLIVENHAIN WATER-CINGULAR
Description: TELECOMUNICATION CABINET W/45 FT FAUX TREE
Type:TI
Job Address:
Suite:
Location:
Sub Type: COMM
1966 OLIVENHAIN RD·
Lot 0
Phon&JL-
lnspecto. ~
APPLICANT CRAIG MCNUDY
Owner:
Remarks:
Total Time: Requested By: NA
Entered By: CHRISTINE
3·9 Final Electrical {J!_ v . /2 / ~ 5
CD Description. ¥Act Comm:n~
------I
Associated PCRs/CVs
PCR01105 ISSUED. OLIVENHAIN -COLUMN,STRUCT; RELOCATE COLUMN, ELEC
Date
01/09/2004
01/02/2004
Inspection History
Description
89 Final Combo
14 Frame/Steel/Bolting/Welding
Act lnsp Comments
CO PD
AP PD
01/02/2004 31 Underground/Conduit-Wiring AP PD ok to release meter
11/24/2003 11 Ftg/Foundation/Piers AP PD
I t ;,
EsGil Corporation
In <Partnersliip witli go11emme,ntforc<Bui{ain9 Sajet;y
DATE: 11/7/03
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 03-2425 SET:11
PROJECT ADDRESS: 1966 01ivenhain Rdad
PROJECT NAME: Cingular Wir~less Omwd Ops Center
D
D
D
D
D
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the -check list is enclosed for the jurisdiction to forward to the applicant
contact person. ·
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Pate contacted: (by: ) Fax #: // ,,,
Mail Telephone Fax In Person ff.{P ~
REMARKS: 1. City to approv~ the special i~s~ection program. 2. Th~uded inked change on
sheet S-3 shall be made on city II set.(at bmldmg department)
13y: David Yao Enclosures:
Esgit Corporation
. D GA D MB D EJ D PC 10/30 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In (!'artnersliip witli government jor<:Bui(aing Safety
DATE: 9/16/03 CJ APPLICANT
~ JURISDICTION: City of Carlsbad CJ PLAN REVIEWER
CJ FILE
PLAN CHECK NO.: 03-2425 SET:I
PROJECi ADDRESS: 1966 Olivenhain Road
PROJ~CT NAME: Cingular Wireless Omwd Ops C'enter
D
D
D
D
D
The.plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plahs transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The c;:heck list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected ·plans are submitted for recheck.
. .
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicaht's copy of the check list has been sent to:
Craig B McNulty 4810 Eastgate Man San Diego, CA 92121
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant thc;it the plan check has been completed.
Person contacted: Craig 8 McNulty ( v. ~.) Telephone#: (858)228-2692
Date contacted: 9 (,1-(o? (by: p,-...) ··· Fax #: {858)228-2010
Mail ~ephone ,./' Fa/ In Person ,
REMARKS:
By: David Yao Enclosures:
Esgil Corporation
D GA [gl MB D EJ D PC 9/5 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + Sanbiego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
")
J
J, l )
'City of Carlsbad 03-2425
9/16/03
GENERAL PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad
'PROJECT ADDRESS: 1966 Olivenh~in Road
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 9/5
REVIEWED BY: David Yao
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 03-2425
DATE REVIEW COMPLETED:
9/16/03
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Cqde, National Electrical Code and state laws
regulating energy conservation, noise attenuation .and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
. based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
. before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
• Please make all corrections on the original tracings, as requested in the correction list. Submit
three sets of plans for commercial/industrial projects (two sets of plans for residential projects).
For expeditious processing, corrected sets can be submitted in one of two ways:,
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring one corrected set of plans and ,calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining
sets of plans and calculations/reports dir~ctly to the City of Carlsbad Building Department for
, routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil Corporation is
,complete.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
D Yes D No ,
).
City of Carlsbad 03-2425
9/16/03
1. Provide a statement on the Title Sheet of the plans that this .project shall comply with the
2001 edition of the California Building Code (Title 24 ), which adopts the 1997 UBC, 2000
UMC-, 2000 UPC and the 1999 NEC.
2. Clearly designate on the site plan existing buildings to remain, existing buildings to be
demolished, buildings to be constructed under this permit _and any proposed future
buildings.(The project description did not indicate new storage shed. Note 15 on sheet
.A3. shows new storage shed. Please clarifx.) · · ·
3. On the cover sheet of the plans, specify any items requiring special inspection, in a
format similar to that shown b~low.
• REQUIRED SPECIAL INSPECTIONS
In addition to the regular inspections, the following checked items will also require Special
Inspection in accordance with Sec .. 1701 of the Uniform Building Code.
ITEM
· SOILS COMPLIANCE PRIOR TO
FOUNDATION INSPECTION
· STRUCTURAL CONCRETE
OVER 2500 PSI
PILES/CAISSONS
· DESIGNER-SPECIFIED
· -OTHER
-REQUIRED? REMARKS
4. When special inspection is required, the architect or engineer of record shall prepare an
inspection program which shall be submitted to the building official for approval prior to
issuance of the building permit. Please review Section 106.3.5. Please complete the
attached form.
5. Provide a statement on the site plan stating: "All property lines, easements and buildings,
both existing and proposed, are shown on this site plan." ·
6. Clearly dimension building setbacks from property lines, street centerlines, and from all
adjacent buildings and structures on the site plan.
7. Provide area analysis to show the floor area of existing building plus the proposed
storage shed still within the allowable floor ar$a. Section 504.3.
8. A 1-hour occupancy separation is required between the S-3 occupancy and the S-1
occupancy. Table· 3-B, Section 302.2. (See exceptions in Section 302)
9. Specify on the foundation plan or $tr~ctural specifications sheet the soil classification, the
soils expansion index and the design bearing capacity of the foundation. Section 106.3.3.
10. Provide a letter from the soils engineer confirming that the foundation plan, grading plan
and specifications have been reviewed _and that it has been determined that the
recommendations in the soil report are properly incorporated into the plans (see page 10 _
.J
~.
! J City of Carlsbad 03-2425
9/16/03
of the soil report).
11. The foundation :plan does not comply with the following soil report recommendation(s) for
this project: Page 7 of the soil report shows the elevated steel platform shall be
supported by shallow footings. The foundation shows different footing system. Please
check with the soil engineer
12. The soils engineer· recommended that he/she review the foundation excavations. Note
on the foundation plan that "Prior to the contractor requesting a Building Department
foundation inspection, the soils engineer shall advise the building· official in writing that:
a) The building pad was prepared in accordance with the soils report,
b) The utility trenches have been properly l::>ackfilled and compacted, and
c) The foundation excavations comply with the intent of the soils report."
13. Provide complete foundation for the rnonopine and storage shed with calculation to
justify it. Section 1806.3.
14. . Provide complete structural details on the plans with cross referencing as needed to
show the structural framirig will comply with the design calculations and building code
requirements. Section 106.3.3.(monopine and storage shed.)
15. Provide calqulations for.main vertical and horizontal framing members and post footings.
Section 106.3.3.(monopine and storage shed)
16. Provide· calculations for lateral loads, shear panels, shear transfer and related. Section
106.3.1.7 .. (monopine and storage shed)
17. Provide calculation to .show the reinforcement for caisson is adequate.(7/S2)
18. To speed up the review wocess, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
19. Please indicate here if any changes have be.en made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly d~scribe them and
where they are located in the plans.
Have changes· been made to the plans not resulting from this correction list? Please
indicate: ·
a Yes c::l No
-20. The jurisdiction has contracted with f=sgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform
the plan review for your project. If you have any questions regarding these plan review
·items, please contact David Yao at Esgil· Corporation. Thank you. ·
)
)
City of Carlsbad 03-2425
9/i6/03
+ ELECTRICAL PLAN REVIEW
+ 1999 NEC
1. Show the available fault current (lsc) from the serving utility co. and at the equipment
where lsc exceeds 10,000 amps.
2. Show the ampere interrupting capacity (AIC) ratings of the service and si.Jbservice
equipment. NEC 110-9
3. Show or note on the pl~ns the method used to limit fault currents to 10,000 amps on
branch circuits.. NEC 230~208
4. Note on the single line diagram that all service disconnect devices shall be labeled as a
"Service Disconnecting Means". I.e., "service disconnecting means 1 of 2" and "service'
di~connecting means 2 of 2". NEC 230-70(b)
Note: If you have any questions regarding this ,electrical plan review list please contact Morteza
Beheshti at (858) 560-1468. To speed the review process, note on this list (or a copy)
where the corrected items have been addressed on the plans.
Oct 21 b3 04:34p DCI PACIFIC
t oci 21 03 04:34p DK DO
09/25/2003 11:48 8582282010
City of Cula1tad OG-1428
9/.'1.6/03
SW DEPLOV
(714) 429-1404
858-502-1227 p.2
PAGE 08
p.2
~PECIAL INSPECTION PRO~ftAM \ '\-' . I C-A Q z.l'd'b,_: \,(..t., Ot,~~U1 'Rq ~r{~,d, ' ---1.
ADDRESS OR LEGAL Dl:SCRIPTIOIII: . 1
..
P~CH&CKNUMBER: 03~2-j2S OWNER'SNAMe: JI~ -, .. _ vnid;ro.l . w°' o.r 1?ts ;r.,af-,. as the owner, or agent of the owner (contractors may ru2! employ the special inspector}, certify that I.
or the archltectlenglnMr of 1'800Rt, will be responsible for empfoyiilg tha 3peclsl inepector(s) as required
by Unlfonn Building C~ (UBC) Section 1701.1 for lhe construction projeotrocated at the site listed =.:;;;;;os;e~ r:~ rl
.1. 3"' tho en!jlne"'1.......,.. Of ~"Y thot I hove prcpt1ied the followfng ~p,,01,11
· Jn,pectlon program a& required by UBC Section 106.3.5 for the conatll.lction.projecl located .at
·the site listed above.
:Signed
. Ha CompJtane• Prior to Foundation fn9P9ctlon
· Stn.lctu,al CDncrete OWtr 2500 PSI ,,,.._, ... conc:me a ~ruc:tural Masonry
Dui9ner Specified
3, Dutlea of the spec,ial inspectors tor the wort HcatGd at.low&:
.A.,
B,
e.
· dro:J 7I9S3
j
City of Carlsbad 03-2425
9/16/03
;VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: David Yao
PLAN CHECK NO.: 03-2425·
DATE: 9/16/03
BUILDING ADDRESS: 1966 Olivenhain Road
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
BUILDING AREA Valuation Reg. VALUE ($)
PORTION (Sq.Ft.) Multiplier Mod.
cell stie per city 40,000 ..
.,
-
Air Conditioning .
Fire Sprinklers
TQTALVALUE 40,000
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance $298.591
Plan Check Fee by Ordinance $194.0BI
Type of Review: 0 Complete Review D Structural Only
D Repetitive Fee . . ; ~q Repeats ... ::,,,
D Other
D Hourly I Hour *
Esgll Plan Review ·Fee $167.21!
Comments:
Sheet 1 of 1
macvalue.doc
.\ J·
~DD
~DD
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
. C :2-'?' Address f2.b6_ (10:14 gd,
Ptar:iner ~~_,..J,,,,=.,;ic;...:..--=--------Phone (760) 602--~ ......... """-'-"~--------
APN: --J""'-l.""--;,.:,c:;;._._-,,.:;.-,,::.,.-----1--------------------
T y p e of Project & Use: Lf... Net Project Density: J't DU/AC
Zoning: t2 General Plan:._""""'---Facilities Management Zone: b
CFD (in/out) #_Date of participation: flt.'a.._ Remaining net dev acres: -
Circle One
(For non-residential _development: Type of land used created by this
permit: · )
Legend: [8J Item Complete D Item Incomplete • Needs your action
Environmental Review Required: YES_NO_TYPE ___ _
DATE OF COMPLETION: _______ _
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required: YES -1::___ N~ t;;/YPE Cv{?
APPROVAUREso. No. _____ 91 ___ / ___ I _____ DATE ~o 3
PROJECT NO. fwf 0,3-0 3 .
OTHER RELATED CASES:------,-.,..._-------.-------
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: _ _,__ __ ...;._ _________________ _
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES__ NO __
CA Coastal Commission Authority? YES __ NO __
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103.,
San Diego CA 92108-4402; (619) 767-e2370
Determine status (Coastal Permit R~quired or Exempt):
Coastal Permit Determination Form already completed? YES
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
NO_
1) . Stamp Building Plans as "Exempt'' or "Coastal Permit Required" (at minimum Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
lnclusionary Housing Fee required: YES NO
(Effective date Qf lnclusionary HOL!~ing Ordinance -May 21, 1993.)
\ .
Data 'Entry Completed?. YES· __ NO __
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATE!)
Site Plan:
H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01
~DD
lXJ DD
,.KJDD
,~DD
cloo
~DD
~DD
[!R(DD
~DD
600
I ·t )•
1. Provide a fully dimensional site ph;m drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-way
width, dimensional setbacks and existing topographical lines (including all side and rear yard
slopes).
2. Provide legal description of property and assessor's parcel number ..
Polic¥ 44 -Neighborhood Architectural Design ·Gu'ideiines
1. Api:,licability: YES ______ NO __ _
2. Project complies YES __ NO __ _
Zoning:
1. Setbacks:
Front: Required ______ Shown------
Interior Side: Required Shown _____ _
Street Side: Required Shown _____ _
Rear: Required Shown _____ _
Top of slope: Required Shown _____ _
2. Accessory structure setbacks:
Front: Required ______ Shown _____ _
Interior Side: Required . Sl;lown ---~--
Street Side: Required Shown _____ _
Rear: Required Shown _____ _
Structure separation: Required Shown _____ ____
3. Lot Coverage: Required ______ Shown. _____ _
4. Height: Required ______ Shown _____ _
5. Parking: Spaces Required ______ Shown _____ _
(breakdown by uses for commercial and industrial pr.ejects required)
Residential Guest Spaces Required ______ Shown _____ _
Additional Comments _______ .....__ __________________ _
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUT
H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01
PLANNINC/ENCINEERIN·c· APPROVALS
PERMIT NUMBER CB ~-8''-f~ . DATE Jt),-3CJ-df!::,
· RESIDENTIAL TENANT IMP-ROVEMENT · .
RESIDENTIAL ADDITION MINOR
< < $1l>,000.00) .
PLANNER ------------
ENGINEER~
oocs/Mlsforms/Plannlng Engineering Approvals
PLAZA (:AMINO REAL
CARLSBAD COMPANY STORES
VILLACE FAIRE
COMPLETE OFFICE BUILDING
DATE
Carlsbad Fire Department 032425
1635 Faraday Ave.
Carlsbad, CA 92008 ·
Plan Review Requirements Category:
Fire Prevention
(760) 602-4660
Date of Report: _09_1_08_12_0_0_3 _______ _
Building Plan
Reviewed by:
/~ Name: W.F.I. -------------------------Address: 4810 Eastgate Mall
City, State: San Diego CA 92121
Plan Checker: ____________ Job#: _03_2_42_5 ____ _
Job Name: Olivenhain MWD Bldg #: CB032425 ---,---------------------"''---
Job Address: 1966 Olivenhain Rd Ste. or Bldg. No.
~ Approved
D Approved
Subject to
D Incomplete
Review
FD Job#
The item you have submitted for review has been approved. The approval is
based on plans, information and I or specifications provided in your submittal;
therefore any changes to these items after this date; including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
. The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information and/or
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards.
The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
attached. Please resubmit the necessary plans and/ or specifications to this
office for review and approval.
1st
032425
2nd
FD File#
3rd Other Agency ID
' ;i"'p.
·~1.-;.:;,,., --------------------------------------..
I .\ ;" 'f t,
'!
'A
Structural. Calculations
Project: SD-914-03 OMWD Ops Center Job No: 03-210
Location: 1966 Olivehain Road, Carlsbad, CA Sheet: 1 of
Client: DCI Pacific Date: 10/10/2003
Applicable Codes:
2001 California Building Code
Scope of Calculations:
Platform frame design for new Cingular radio equipment cabinets
W~ter Heater Shed Design
Light Standard Footing Design
CDG
Connell Design Group
Consulting Civil Engineers
16 Technology,-Suite 209, Irvine, CA 92618
949-753-8801 Office -949-753-8833 FAX
31
CDG
Connell Design Group
Consulting Civil Engineers
www.connelldesigngroup.com
Design Criteria:
1. Structural design is based on the 2001 CBC
2. Timber:
JOB: SD-194-03
SUBJECT; Design Criteria
BY: DMC DATE
SHEET NO: 2-of
A. All 2x and 4x lumber shall be Douglass Fir #1 grade unless otherwise noted
B. 6x lumber shall be Douglass Fir #1 grade
3. Glu-Laminaterd beams shall be Douglass Fir 24F-V4
4. Wood Structural panels shall be graded Structural 1
8/20/2003
'hi
'
5. Concrete shall have a minimum compressive strength of 2500 psi @ 28 days unless otherwise noted
6. Cement shall be type I or type II
7. Reinforcing steel shall be ASTM A615 Gr. 60
8. Foundations designed according to the geotechnical report by PSI Dated 8/7/03
9. All rolled steel shapes shall be ASTM A572 GR. 50
1 Q. All steel pipe columns shall be ASTM A500 Gr. B
11. Welding shall be with E?0XX low hydrogen electrodes in an approved fabricating facility
12. All field welding requires continuous special inspection
13. All shop welding shall be done in a city approved welding facility
14. All Concrete masonry Units shall be normal weight, fm = 1500 psi, Special Inspection Rqd.
CDG JOB: OMWD Ops Center
Connell Design Group SUBJECT LATERAL ANALYSIS
Consulting Civil Engineers BY: DMC DATE 8/18/2003
www.connelldesigngroup.com SHEET NO "b of 1:>I
Equi12,ment Weights:
Weight Total
Eguiement {lbs~ Quantit}'. (lbs)
Radio Cabinet 1700 4 6800
Platform Frame 1000 1 1000
Misc. 700 1 700
Total Wt.= . 8500 lbs
Equipment Dimensions:
W= 2.33 ft
L= 18 ft
H= 5.5 ft
Atrans = 12.815 ft,:
Atong· = 99 ft,:
Seismic: (2001 CBC Section 1632)
Na= 1.5 Z= 0.4
Ca= 0.66 Nv= 2
I= 1 Rp= 3
ap = 1 (Table 16-0, 3D-Anchorage of communications equipment)
hx= 1.5 hr= 1
Fp = 4.0 CalpWp = 2.640 Wp (32-1)
Fp = (apCalp/Rp)*(1+3*(hx/hr))Wp = 1.210 Wp (32-2)
V= 10285.0 lbs Transverse
10285.0 lbs Longitudinal
Wind:
70 mph, exposure C
q5 = 12.6 Ce= 1.53
lw = 1.0 Cq = 1.4
P = CeCqqslw = 27.0 psf
V=AP= 2671.9 lbs Transverse
345.9 lbs Longitudinal
Summary:
Seismic Controls in the transverse direction
Seismic Controls in the longitudinal direction
Vtrans. = 10285.0 lbs V trans/ 1 .4 = 7346 lbs
v,ong• = 10285.0 lbs v,ong.11.4 = 7346 lbs
CDG JOB: OMWD Ops Center
Connell Design Group SUBJECT: Design Cales
Consulting Civil Engineers BY: DMC DATE 8/18/2003
www.connelldesigngroup.com SHEET NO ,., of ~I.
Cabinet Mounting To Steel Frame lw
W= 6800 lbs
V= 5877 lbs
V
Summing Moments, "' j3· R2 = [W(1') + V (3')] I 2'
R2= 12215.7 lbs (Compression) t Ii> I R2 R1 = 5415.7 lbs {Tension) R1 2'
Use 5/8" dia. A307 Bolts
Number of mounting connections each side of new BTS Cab., N = 2
Vallow= 3100 lbs/bolt*2*N bolts = 12400 lbs 0.K.
Tallow= 6100 lbs/bolt*N bolts = 12200 lbs O.K.
(N) ACCESS GAlE
2• CLR.
(N) CONC. MAX.
LANDING
24'-0":!;
1·-10· 10·-2·
_____ L (E) RETAINING WAl.l
---------------------------
I
IV ti,:. 11·1 lht--74-1 r, w Ji O / I I
10·-2· 1·-10·
g
~ 0
~
(N) STffi GRATING OYER
ENTIRE PlAlfORM
? "' ,;H
U) I c:o
"
. ~ N
\ l I I I 1----------'------,-~
(E) -;: ~~--------------~---~\---® f. =f @
~ O•
'b~ I
'lo : r----------------------\ f----,---\_ (N) CINGULAR -1,;L~ (E) BUILDING WALL EQUIPMENT CABINETS N
~ s
f l-A; ·-r r tJ /2.M F £ A "-1 [£ pe..,~-N
~ c ~ \t-3 'v
NT5 ~ ~
\} .._,.__, V)
' I
'I 'I).
COG
CONNELL DESIGN GROUP
Consulting Civil Engineers
16 Technology Dr., Ste. 209 Irvine, CA 92618
(949) 753-8807 FAX (949) 753-8833
P-1 o cs L4N ,,
WtiL a / e (~) = 3 6-# i
lu~1.-~ 4o (I?: )fa (3o'*;;
lUc-r ::r I '2-'Z. 15'~ 7 #: s 6 II *I,
2.<0'
6P77 #: :::-21~:#(,
2--.:::!>l
B-2 i)ES,tt;N
P, C f3 I ~',(N ,. '3,3'-(k.
Pi :t. {,o +'-lo) {r 6 '/ L) (r,;/2,)
~ ~r~#
p-'3 D e-s lC,N
JQB __ _,O.:....:_M..,_w--=-/j)------=D---l-r-..s ____ --;-___ _
SHEETNQ. ________ OF __ ?+L~---
CALCULATED BY--~P ...... M~C,,----DATE_____,.E"--
01
-r-#->-----' __ _
CHECKEDBY ________ DATE _____ _
SCALE _______________ _
-'
( WoL+Wi...1.--+l.-\Jcr,·
r7=c;=;=;;i
I ::~-c. I -+------··--···----.--------{'---
-., ,-
S-'-b''
-="} u~~ wir-Z/ 0y 1NSpf:-Cf1cY-J (S!MILPl nr ./3 -2.)
__ [?-i..f D ~<;,. I c.,_"''
f1Jpi:: ,:;
/;,,.h.1.,,. I 36
S p A-.N -::.. I !) '-0 ,.,
0 PRODUCT 207
I:., Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Rev: 510302 User. KW-0604164, Ver5.1.3, 22-Jun-1999, Wln32
(c) 1983-99 ENERCALC
Description Beam B-1 (XX Axis)
General Information
Steel Section : W8X21
Center Span
Left Cant.
Right Cant
Lu : Unbraced Length
I Distributed Loads
DL
i'..L
ST
Start Location
End Location
Summary
#1
0.033
0.130
0.611
10.00 ft
0.00 ft
0.00 ft
10.00 ft
#2
Title : OMWD o"ps Center Job # 03-21 O
Dsgnr: DMC Date:
Description :
Scope : Sheet 7 of ~ \
Steel Beam Design c:lenercalc\03-210 omwd a s center.ecw:Calcul
Calculations are designed to AISC 9th Edition ASD and 1997 UBC Requirements
Pinned-Pinned
Bm Wt. Added to Loads
LL & ST Don't Act Together
#3 #4 #5
Fy
Load Duration Factor
Elastic Modulus
#6
50.00ksi
1.00
29,000.0 ksi
#7
k/ft
k/ft
k/ft
ft
ft
Beam OK
Short Term Load Case Governs Stress
Using: W8X21 section, Span = 10.00ft, Fy = 50.0ksi
End Fixity= Pinned0Pinned, Lu = 10.00ft, LDF = 1.000
Moment
fb : Bending Stress
fb/ Fb
Shear
fv : Shear Stresf
fv I Fv
Actual
8.312 k-ft
5.484 ksi
0.215 : 1
3.325 k
1.606 ksi
0.080 : 1
.. Allowable
38.588 k-ft
25.459 ksi
41.400 k
20.000 ksi
Max. Deflection
Length/DL Def!
Length/(DL +LL Def!)
-0.069 in
21,598.5 : 1
1,751.6 : 1
•
I Force & Stress Summary •
Maximum
Max. M + 8.31 k-ft
Max. M-
Max. M@Left
Max. M @ Right
Shear@ Left
Shear @ Right
Center Defl.
Left Cant Def!
Right Cant Defl
... Query Def!@
Reaction @ Left
Reaction.@ Rt
3.32 k
3.32 k
-0.069in
O.OOOin
0.000 in
0.000 ft
3.32
3.32
Fa calc'd per 1.5-2, K*Ur > Cc
I Section Properties W8X21
Depth
Width
Web Thick
Flange Thickness
Area
8.280 in
5.270in
0.250 in
0.400 in
6.16 in2
DL
___Q_ok_
0.67
0.27
0.27
-0.006
0.000
0.000
0.000
0.27
0.27
Weight
I-xx
1-yy
S-xx
S-yy
<<-These columns are Dead + Live Load placed as noted --»
LL LL +ST LL LL +ST
@ Center @ Center @ Cants @ Cants
2.30 8.31 k-ft
0.92
0.92
-0.019
0.000
0.000
0.000
0.92
0.92
3.32
3.32
-0.069
0.000
0.000
0.000
3.32
3.32
20.92 #/ft
75.30 in4
9.77 in4
18.188 in3
3.708 in3
0.000
0.000
0.000
0.000
r-xx
r-yy
Rt
k-ft
k-ft
k-ft
k
k
0.000 in
0.000 in
0.000 in
0.000 in
k
k
3.496 in
1.259 in
1.410 in
•
Cdn'nell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet i of
Rev: 510302 User. KW-0604164, Ver5.1.3, 22-Jun-1999, Win32
(c) _1983-99 ENERCALC Steel Beam Design c:\enercalc\03-210 omwd a s center.ecw:Calcul
Description Beam B-1 (XX Axis)
I Sketch & Diagram ~~~ B
~-00 ~.oo 5.oo ~.ocr-r-oo s.oo ~o.oo
1W ' I ' I I I Ill ' I : I ' 11 (TlTT;,17711I i ' :, I I i I : l I Jj I 0, 1-,ff tr I If 11 fl i-tf It ti i ii IT IT t !1 II fl T IT h tr 0,774klft
J~--'=-----'-10ft __ J
Mmax = B.3k-ft
Dmax = -0.069in
Rmax = 3,325k
Vmax @ left = 3.325k
I I r··---
Ben
r Cdnnell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Rev: 510302 User. KW-060~184, Ver5.1.3, 22-Jun-1999, Win32
. (c) 1983-99 ENERCALC
Description Beam B-1 (YY Axis)
General Information
Steel Section : W8X21
Center Span
Left Cant.
Right Cant
Lu : Unbraced Length
I Distributed Loads
DL
LL
ST
Start Location
End Location
Summary
#1
0.294
10.000
10.00 ft
0.00 ft
0.00 ft
10.00 ft
#2
Title : OMWD Ops Center Job# 03-210
Dsgnr: DMC Date:
Description :
Scope: Sheet 1 of 1 \
Steel Beam Design c:lenercalc\03-210 omwd o s center.ecw:Calcul
Calculations are designed to AISC 9th Edition ASD and 1997 UBC Requirements
Pinned-Pinned
LL & ST Don't Act Together
Minor Axis Bending !
#3 #4 #5
Fy
Load Duration Factor
Elastic Modulus
#6
50.00ksi
1.00
29,000.0ksi
#7
k/ft
k/ft
k/ft
ft
ft
Beam OK
Short Term Load Case Governs Stress
Using: W8X21 section, Span= 10.00ft, Fy = 50.0ksi
End Fixity= Pinned-Pinned, Lu= 10.00ft, LDF = 1.000
Actual . Allowable
11,587 k-ft
37.500 ksi
Moment
fb : Bending Stress
fb/ Fb
Shear
fv : Shear Stresi
fv /Fv
3.675 k-ft
11.894 ksi
0.317 : 1
1.470 k
0.349 ksi
0.017: 1
84.320 k
20.000 ksi
Max. Deflection
Length/DL Deft
Length/(DL +LL Deft)
-0.233 in
0.0: 1
514.0 : 1
I
/ Force & Stress Summary I
Maximum
Max. M + 3.67 k-ft
Max. M-
Max. M@Left
Max. M @ Right
Shear@ Left
Shear @ Right
Center Deft.
Left Cant Deft
Right Cant Deft
... Query Deft@
Reaction @ Left
Reaction@Rt
1.47 k
1.47 k
-o.233in
o.oooin
0.000 in
0.000 ft
1.47
1.47
Fa calc'd per 1.5-2, K*Ur > Cc
! Section Properties W8X21
Depth
Width
Web Thick
Flange Thickness
Area
8.280in
5.270in
0.250 in
0.400 in
6.16 in2
0,000
0.000
0.000
0,000
Weight
I-xx
1-yy
S-xx
S-yy
<.<--These columns are Dead + Live Load placed as noted -»
LL LL +ST LL LL +ST
@ Center @ Center @ Cants @ Cants
0.000
0.000
0.000
0.000
3.67 k-ft
1.47
1.47
-0.233
0.000
0.000
0.000
1.47
1.47
20.92 #/ft
75.30 in4
9.77 in4
18.188 in3
3.708 in3
0.000
0.000
0.000
0.000
r-xx
r-yy
Rt
k-ft
k-ft
k-ft
k
k
0.000 in
0.000 in
0.000 in
0.000 in
k
k
3.496 in
1.259 in
1.410 in
•
can'nell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Title. : OMWD Ops Center Job# 03-210
Dsgnr: DMC Date:
Description :
Scope : Sheet [ 0 of -~)
Rev: 510302
User. KW-0604164, Ver5,1.3, 22-Jun-1999, Win32
(C) 19.83-99 ENERCALC Steel Beam Design c:\enercalc\03-210 omwd o s center.ecw:Calcul
Description Beam B-1 (YY Axis)
J Sketqh & Diagram -~~~~~, I
fl,00 :4,00 p.00 6,00 !7,00 7l.OO 9.00 :10.00
~f---_1ott _ ___,J
Mmax = 3. 7k-ft
Dmax = -0.2331n
Rmax = 1.470k
Vmax@ left= 1.470k
-----+----:----!---+---+---+----'
Be
Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Rev: 510302 User: KW-0604164, Ver5.i.3, 22-Jun-1999, Win32
(c) 1983-99 ENERCALC
Description 8-2 Design
General Information
Steel Section : W8X21
Center Span
Left Cant.
Right Cant
Lu : Unbraced Length
I Point Loads
Dead Load
Live Load
Short Term
Location
Summary
#1
3.340
-2.000
5.00 ft
2.00 ft
2.00 ft
5.00 ft
#2
3.340
1.000
Title : OMWD Ops Center
Dsgnr: DMC Date:
Job# 03-210
Description :
Scope: Sheet II of
Steel Beam Design. c:lenercalc\03-210 omwd o s center.ecw:Calc
Calculations are designed to AISC 9th Edition ASD and 1997 UBC Requirements
Pinned-Pinned
Bm Wt. Added to Loads
LL & ST Act Together
#3
0.831
7.000
#4
Fy
Load Duration Factor
Elastic Modulus
¥ iWIW1W #5 #6
50.00ksi
1.00
29,000.0 ksi
#7 Mdiiilfii lilt
k
k
k
ft
Beam OK
Static Load Case Governs Stress
Using: W8X21 section, Span = 5.00ft, Fy = 50.0ksi, Left Cant. = 2.00ft, Right Cant. = 2.00ft
End Fixity= Pinned-Pinned, Lu = 5.00ft, LDF = 1.000
Moment
fb : Bending Stress
fb / Fb
Shear
fv : Shear Stresi
fv I Fv
I Force & Stress Summary
Max. M + ·
Max. M-
Max. M@Left
Max. M @ Right
Shear@Left
Shear @ Right
Center Defl.
Left Cant Defl
Right Cant Def!
... Query Defl@
Reaction @ Left
Reaction@Rt
Maximum
6.72 k-ft
3.73 k
0.87 k
o.006in
0.020in
0.011 in
0.000 ft
7.11
0.59
Fa calc'd per 1.5-1, K*Ur < Cc
Actual
6.722 k-ft
4.435 ksi
0.148: 1
3.728 k
1.801 ksi
0.090: 1
DL
..Qn!y_
-6.72
-6.72
-1.70
3.73
0.87
0.006
-0.020
-0.011
0.000
7.11
0.59
Allowable
45.471 k-ft
30.000 ksi
41.400 k
20.000 ksi
Max. Deflection
Length/DL Defl
Length/(DL +LL Defl)
0.020 in
2,343.1 : 1
2,343.1 : 1
«--These columns are Dead + Live Load placed as noted --»
LL LL +ST LL LL +ST
@ Center @ Center @ Cants @ Cants
0.000 0.006
0.000 -0.020
0.000 -0.011
0.000 0.000
7.11
0.59
0.000
0.000
0.000
0.000
k-ft
k-ft
k-ft
k-ft
k
k
0.006 in
-0.020 in
-0.011 in
0.000 in
7.11 k
0.59 k
I
I
l Section Properties W8X21
Depth 8.280in
5.270in
0.250in
0.400 in
Sf& .1
Width
Web Thick
Flange Thickness
Area 6.16in2
Weight
I-xx
1-yy
S-xx
S-yy
20.92 #/ft
75.30 in4
9.77 in4
18.188 in3
3.708 in3
r-xx
r-yy
Rt
3.496 in
1.259 in
1.410 in
Co'nnell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
· Rev: 510302
User. KW-0604164, Ver5.1.3, 22-Jun-1999, Win32 {C) 1963-99 ENERCALC
Description B-2 Design
!.34k !.34k
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet Ii--of
Steel Beam Design c:\enercalc\03-210 omwd o s center.ecw:Calcul
t.631k
7.eo ri.so f,40 /J.3o i7-20 !l, 10 MO
I
~-2---,' l1---~,;;:,,:..._Sft -l,____,2ft ~
Mmax = 6. 7k•ft
omax = 0.0061n
Mmax @ left = 6. 72k-ft
Rmax = 7.110k
Vmax@ left= 3.728k
Oefi @ left end = -0.02051n
Mmax @ right= 1.70k-ft
Rmax = o,590k
Vmax@ rt= 0,872k
Defi@ right end= -0.0110in
Co'n'nell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Rev: 510302
User:-KW-0604164, Ver 5.1.3, 22-Jun-1999, W,n32
(c) 1983-99 ENERCAtC
Description Beam B-4 Design
General Information
Steel Section : W8X10
Center Span
Left Cant.
Right Cant
Lu : Unbraced Length
I Distributed Loads
DL
LL
ST
Start Location
End Location
Summary
#1
0.033
0.156
10.00 ft
0.00 ft
0.00 ft
10.00 ft
#2
Title : OMWD Ops Center Job # 03-210
Dsgnr: DMC Date:
Description :
Scope : Sheet f "; of L, \
Steel Beam Design c:\enercalc\03-210 omwd o s center.ecw:Calcul
Calculations c1re designed to AISC 9th Edition ASD and 1997 UBC Requirements
Pinned-Pinned
Bm Wt. Added to Loads
LL & ST Act Together
#3 #4 #5
Fy
Load Duration Factor
Elastic Modulus
#6
36.00ksi
1.00
29,000.0 ksi
#7
k/ft
k/ft
k/ft
ft
ft
Beam OK
Static Load Case Governs Stress
Using: W8X10 section, Span= 10.00ft, Fy = 36.0ksi
End Fixity= Pinned-Pinned, Lu= 10.00ft, LDF = 1.000
Moment
fb : Bending Stress
fb/ Fb
Shear
fv : Shear Stres!
fv I Fv
Actual
2.488 k-ft
3.824 ksi
0.331 : 1
0.995 k
0.742 ksi
0.052 : 1
Allowable
7.528 k-ft
11.571 ksi
19.315 k
14.400 ksi
Max. Deflection
Length/DL Deft
Length/(DL +LL Deft)
-0.050 in
11,064.8: 1
2,393.2: 1
•
I Force & Stress Summary • <<•~ These-columns are Dead + Live Load placed as noted --»
DL LL LL+ST LL LL+ST
Maximym ...Qn!y_ .@Center @Center @Cants @Cants
Max. M+ 2.49 k-ft 0.54 2.49 k-ft
Max. M-k-ft
Max. M@ Left k-ft Max. M @ Right k-ft
Shear@ Left 1.00 k 0.22 1.00 k
Shear @ Right 1.00 k 0.22 1.00 k
Center Deft. -0.050in -0.011 -0.050 -0.050 0.000 0.000 in
Left Cant Deft 0.000in 0.000 0.000 0.000 0.000 0.000 in Right Cant Deft 0.000 in 0.000 0.000 0.000 0.000 0.000 in
... Query Deft@ 0.000 ft 0.000 0.000 0.000 0.000 0.000 in
Reaction @ Left 1.00 0.22 1.00 1.00 k Reaction @ Rt 1.00 0.22 1.00 1.00 k
Fa calc'd per 1.5-2, K*Ur > Cc
I Section Properties W8X10 I Depth 7.890 in Weight 10.05 #/ft r-xx 3.226 in
Width 3.940in I-xx 30.80 in4 r-yy 0.840 in Web Thick 0.170 in 1-yy 2.09 in4 Rt 0.990 in
Flange Thickness 0.205 in S-xx 7.807 in3
Area 2.96in2 S-yy 1.061 in3
., .J, Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807 / 949-753-8833 FAX
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet I~ of ) I
Rev: 510302 User. KW-0604164, Ver 5.1.3, 22-Jun-1999, Wln32
(c) 1983-99 ENERCALC Steel Beam Design c:\enercalc\03-210 omwd o s center.ecw:Calcul
Description Beam B-4 Design
I Sketch & Diagram I
1P~ •,.i I, i Ii I !JI i I; 111 I j I; I 1; i I I I IT1777Trrrrrrm, 1 i ft 0. k/,, I l I l fT ft fl TIT f !1 f IT IT fT f hi! ft I f Jl f 0.189k/
~--'----~10ft ~-~
Mmax = 2.5k·ft
Dmax = -0.0501n
Rmax = 0.995k
Vmax @ left = 0.995k
;a.oo ~-OO 110.00
l ··--/
Ben
;0.02 lo.OJ ____ -
f~o,.,.3_-t----"'·' 1°·04
0.04
I ------1 I
Local "y' Deflection (In)
• I
' '
'.,,
COG
CONNELL DESIGN GROUP
Consulting Civil Engineers
16 Technology Dr., Ste. 209 Irvine, CA 92618
(949) 753-8807 FAX (949) 753-8833
Fo OND-1 T /O!N p~st,:;,/\1
Jos""""'·----1..6,4.M:::.,__w_,.p'----=e>::..Jgc.::~:...___;:C::..:e:..:..N_::_:_1,;;;=---rl-=-------
sHEETNo. ___ _./_S ____ oF ·, I
cALcuLATED sv _ _.µQ..wM._,_,.,~'-----DATE <? / o'!> •
CHECKEDBY ________ DATE _____ _
SCALE ________________ _
p
hi.i.-ow iir ~ ~c; i ~Int /AJ c., -::--g ooo I-:, .r {. -.J, I
l-k1'C(l ,i t · /ge-,'l-~/;\.J{ -::. 3tJ0 p-,:-f / <-t. ' II/ . ~ 7'-?v J· ' ..
J[ I /'if
/..(>¥ /I">'""';!'/' ~
P~ r,~o /z z 42,50-#·
I)
()Sf ~~{A 'P CA.t$;,o,..J,
A-z vr(,)2-~ 7. {Lf .a,.
-.:/
PA ~ ks+ ?( I 1. tft r ::,. 3. t'{ .a z ok =
V :i 73'-(~l!f /2. ..... 's' (,, 71> k-.. @-ri'
' '
-----3 U~f.. 7-11'' + t 6 I l)l:t:p C-. It I S ~ b~ (-ry:p.)
..
D PRODUCT 207
Connell Design Group
16, Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100 User: KW-0604164, Ver 5.6.1, 25-0ct-2002 (c)1983-2002 ENERCALC Engineering Software
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Pole Embedment in Soil
Description Caisson Design
I General Information
Allow Passive
Max Passive
Load duration factor
Pole is Circular
Diameter
No Surface Restraint
I Summary I
Moments @ Surface ...
Point load
Distributed load
Without Surface Restraint ...
Required Depth
Press @ 1/3 Embed ...
Actual
Allowable
250.00 pcf
1,500.00 psf
1.333
24.000 in
3,673.00 ft-#
0.00
6.668 ft
749.81 psf
740.72 psf
Applied Loads ...
Point Load
distance from base
Distributed Load
distance to top
distance to bottom
Total Moment
Total Lateral
M
Job# 03-210
Date:
Sheet { f.p of
y:\computer change 8-21-03\enercalc\03-210 om
e F FSi
3,673.00 lbs
1.000 ft
0.00 #/ft
0.000 ft
0.000 ft
3,673.00 ft-#
3,673.00 lbs
)
Cdn'hell Design Group Title : OMWD Ops Center Job# 03-210
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100
Dsgnr: DMC · Date:
Description :
Scope : Sheet ( ( of ,, I
User: KW-0604164, Ver 5.6.1, 25-0ct-2002
(c)1983-2002 ENERCALC Engineering Software Circular Concrete Column y:\computer change 8-21-03\enercalc\03-210 om
Description BTS Caisson Reinforcement
General Information Calculations are designed to ACI 318-95 and.1997 UBC Requirements
Diameter
Number of Bars
Bar Size
Total. Rebar Area
Rebar Percent
Bar Cover
I Loads
24.000 in
8
7
4.800 in2
1.061 %
3.000 in
fc
Fy
Seismic Zone
. 2,500.0psi
60,000.Q psi
4
LL & ST Loads Act Separate
Spiral Ties. NOT Used
Dead Load Live Load Short Term
Axial Loads 4.250 k k k
Applied Moments ...
Total Height
Unbraced Length
Eff. Length Factor
Column is BRACED
5.000 ft
5.000 ft
1.000
Eccentricity
in
@Top k-ft k-ft 3.673 k-ft
@Bottom k-ft
Lateral Point Loads
#. 1 k #. 2 k
Summary
Column Diameter= 24.00in, with 8 #7 Bars
ACI 9-1
Applied Pu : Max Factored
Allowable Pn * Phi @ Design Ecc.
M-critical
Combined Eccentricity
Magnification Factor
Design Eccentricity
Magnified Design Moment
Po* .80
P: Balanced
Ecc : Balanced
Slenderness per AC/ 318-95 Section 10.12 & 10.13
Actual k Lu / r 10.000
Neutral Axis Distance
Phi
Max Limit kl/r
Beta = M:sustained/M:max
Cm
El/ 1000
Pc: pi"2 EI/ (k Lu)"2
alpha:. MaxPu / (.75 Pc)
Delta
Ecc:. Ecc. Loads + Moments
Design Ecc = Ecc * Delta
5.95 k
693.91 k
0.65 k-ft
1.3200 in
1.00
1.3200 in
0.65 k-ft
991.30 k
412.04 k
8.9707 in
Elastic Modulus
ACI Eq. 9-1
24.2120 in
0.7000
34.0000
1.0000
1.0000
0.00
0.00
0.0000
1.0000
1.3200
0.0000
ACI Factors (per ACI, applied internally to entered loads)
ACI 9-1 & 9-2 DL 1 .400 ACI. 9-2 Group Factor
k-ft
k
k
ACI 9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor
ACI 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor
.... seismic = ST * : 1.100
Spiral Tie Requirements per 97 uac 1010.9.3
k-ft
3.673 k
ACI 9-2
5.95 k
248.85k
k
5.14 k-ft
10.3708 in
1.00
10.3708 in
5.14 k-ft
991.30 k
412.04 k
8.9707 in
2,850.0 ksi
ACI Eq. 9-2
11.5720 in
0.7000
34.0000
1.0000
1.0000
0.00
0.00
0.0000.
1.0000
10.3708
0.0000
0.750
0.900
1.300
Location
ft
ft
Column is OK
Beta
ACI 9-3
3.83 k
145.96 k
5.14 k-ft
16.1324 in
1.00
16.1324in
5.14 k-ft
991.30 k
412.04 k
8.9707 in
ACI Eq. 9-3
·9.2120 in
0.7000
34.0000
1.0000
1.0000
0.00
0.00
0.0000
1.0000
16.1324 in
0.0000 in
UBC 1921.2.7 "1.4" Factor
UBC. 1921.2.7 "0.9" Factor
0.850
1.400
0.900
Spiral Tie Bar Size #
Gross Area of Column
Core Area Within Spirals
3
452.39 in2
254.47 in2
Min. Spiral Reinforcement Ratio
Max Spiral Tie. Spacing
0.015
20.114 in
•
., )
Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Title : OMWD Ops Center Job# 03-210
Dsgnr: DMC Date:
Description :
Scope : Sheet I 16 of 17 \
Rev: 560100
User: KW-0604164, Ver 5.6.1, 25-0ct-2002
(c)1983-2002 ENERCALC Englneertng Software Circular Concrete Column y:\computer change 8-21-03\enercalc\03-210 om
Description BTS Caisson Reinforcement
I Sketch & Diagram I
DL=4.3, LL=0.Os, ST=0.0k
r 241n i
Ll 60.2 •
73,5
(3~
0.0 21.7 43.4 65.1 86.8 108.5 130.2 151.9 173.6 195.3 217.0
Moment : Mn'pnl (k·ft)
I'
7'-0"±
15/32" CDX PLYWOOD SHTG. W/
8d @ 6" 0/C EDGE, 12" 0/C FIELD
#4 @ 16" 0/C
EACH WAY @ MID HT. 2x4 @ 16" 0/C
~N) WALL FOOTING
------------7
2x6-ROOF JOISTS @ 16" oTc
L __ ---------__ J
2':...7 1/2''
(N) ACCESS DOOR (SEE ARCH.)
A= HOLD DOWN LOCATION ·eB
2x FASCIA
(PER ARCH.)
ROOF
OVERHANG
• 1
Connell Design Group
16 Technology Dr., Suite 209
Irvine, CA 92618
949-753-8807 Phone 949-753-8833
Roof Dead Load (RDL)
Plywood Shtg. 2.00 psf
Roofing Material 5.00
Roof Framing 3.00
Misc 4.00 ----Total RDL = 14.00
Roof Live Loads (RLL)
Roof LL = 20.0
Wall Dead Load (WDL)
Framing · 1.60
5/8" Gyp Board 3.00
1/2: Plywood Shtg. 1.5
3/4" Stucco Finish 12
Misc 1.90
Total Wall DL = 20.00
psf
psf
psf
psf
psf
psf
psf
psf
psf
psf
SD-914-03 OMWD OPS
Cale By: DMC
1 0l1Wl2003
Sheet_t,u_of _2_1
t, I 'J l
Connell Design Group
16 Technology Dr., Suite 209
Irvine, CA 92618
949-753-8807 Phone 949-75Hl833
P=CeCqqslw (Eq. 20-1)
I= 1
q5 = 12.6 (Table 16-F,70 mph)
1.4
0.7
A
B
(Table 16°H, Vertical)
(Table 16-H, Upward)
8.00
8.00
P=
P=
16.00
16.00
1.06
18.7
9.3
1.06
1.06
SD-914-03 OMWD OPS
Cale By: DMC
1Qi,10/20031
Sheetb/ of "? -, -
(Table 16-G, Exposure C)
psf
psf
Total=
(vertical)
(upward)
.. ,
l Ii 'J +
Connell Design Group
16 Technology Dr., Suite 209
Irvine, CA 92618
949-753-8807 Phone 949-753-8833
Design Base Shear (01 CBC Section 1630.2.1)
V = (Cvl/RT)W = 1.53 w (30-4)
V = (2.5C81/R)W = 0.30 w (30-5)
V = (.11C81)W = 0.07 w (30-6)
V = (.8*Z*NvllR)W = 0.12 w (30-7)
Na= 1.5 (Seismic source Type A, 2km)
Ca= 0.66 (Soil profile type Sd, Z = 0.4)
Nv= 2 (Seismic source Type A, 2km)
Cv= 1.28 (Soil profile type Sd, Z = 0.4)
R= 5.5
I= 1 (Importance factor = 1)
T = C1(hn)314 = 0.15 (97 lJBC equation 30-8)
Seismic Weight
Roof DL: 392 lbs
WallDL: 2880 lbs
Total: 3.27 Kips
V/1.4= 0.70 Kips
Seismic Governs Design
Controls
V= 0.30
V /1.4 = 0.21
w
w
SD-914-03 OMWD OPS
CalcBy: DMC
10/10/2003
Sheet~of~
Connell Design Group
16 Technology Dr., Suite 209
Irvine, CA 92618
949~753-8807 Phone 949-753-8833
Walll.D. Wall Length
(ft.)
1 4
2 4
A 7
B 3
Wall Design:
Wall Height Total Wall
(ft.) Force (kips)
8 0.35
8 0.35
8 0.35
6 0.35
Wall Force Mot
(kips/ft) (ft-kips)
0.088 2.80
0.088 2.80
0.050 2.80
0.117 2.10
SD-914-03 OMWD OPS
Cale By: DMC
10/10/2003
Sheet -Z.,.} of__:tl
Mres Mnet T=C
(ft-kips) (ft-kips) (lbs)
0 2.80 701.1
0 2.80 701.1
0 2.80 400.7
0 2.10 701.1
Use 15/32" CDX plywood shtg with 8d nails at 6" o.c. edge, 12" o.c. field. Block all unsupported edges. 01 = 260 lbs/ft)
Use Simpson HD5A w/ (2) 2x4 chord (min rqmt.) T = 3705 lb2
Anchor Bolts: use 5/8" dia. Anchor Bolts@ 4' o.c. (v = 27505/4 = 687.5 lbs/ft)
I ' ,. J
t I) +J ,f,
COG
CONNELL DESIGN GROUP
Consulting Civil Engineers
16 Technology Dr., Ste. 209 Irvine, CA 92618
(949) 753-8807 FAX (949) 753-8833
JOB~-__ O~!Vl~Wc......::::::D __________ _
i..i' 11 SHEETNO. ____ ~---OF ___ ......,..._-r---
c I ~ ,//'J/4 'S CALCULATED BY_--i-,1)-M~--::'.~---DATE __ ,__ _ _,/_!. __ _
CHECKEDBY _________ DATE _____ _
SCALE _______________ _
p :z_ (7 1~ 6 '')(1/1) ( 11.r -1 2-0) ~ I Ii ,1,
t lb p9f-fr/) ~ n g#/;.
p
1
11/CI> /2--otJF' J& /$ -,-_~
WC>L tWL-L}
l1i{N/1?) z ( i #IJ WDt. =--
UJl-~ .... -µ; (tt/r z) 7 273/, b' .I'
D PRODUCT 207
' •· Co'hnell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet of 1-J!
Rev: 560100 User:·KW-0604164, Ver 5.6.1, 25-0ct-2002 (c)1983-2002 ENERCALC Engineering Software General Footing Analysis & Design y:\computer change 8-21-03\enercalc\03-210 om
Description Shed Footing
General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements
Allowable Soil Bearing
Short Term Increase
Seismic. Zone
Live & Short Term Combined
re
Fy
Concrete Weight
Overburden Weight
I Loads
Appiied Vertical Load ...
Dead Load
Live Load
Short Term Load
Appiied Moments ...
Dead Load
Live Load
Short Term
Applied Shears ...
Dead Load
Live Load
Short Term.
1,500.0 psf
1.330
4
2,500.0 psi
60,000.0 psi
145.00 pcf
120.00 psf
0.250 k
k
k
Creates Rotation about Y-Y Axis
(pressures. @ left & right)
k-ft
k-ft
k-ft
Creates Rotation about Y-Y Axis
(pressures @ left & right)
k
k
k
Dimensions ...
Width along X-X Axis 1.000 ft
Length along Y-Y Axis 1.000 ft
Footing Thickness 12.00 in
Col Dim. Along.X-X Axis 12.00 in
Col Dim. Along Y-Y Axis 3.50 in
Base. Pedestal Height 1.500 in
Min Steel% 0.0014
Rebar. Center To. Edge Distance
... ecc along X-X Axis
... ecc along Y -Y Axis
0.000 in
4.000 in
Creates Rotation about X-X Axis
(pressures @ top & bot)
k-ft
k-ft
k-ft
Creates Rotation about X-X Axis
(pressures @ top & bot)
k
k
k
3.50 in
Summary Footing Design OK
1.00ft x 1.00ft Footing, 12.0in Thick, w/ Column Support 12.00 x 3.50in x 1.5in high
DL+LL DL+LL+ST Actual Allowable
Max Soil Pressure 1,020.3 1,020.3 psf Max Mu 0.008 k-ft per ft
Allowable 1,500.0 1,995.0 psf Required Steel Area 0.143 in2 per ft
"X'. Ecc, of Resultant 0.000 in 0.000 in Shear Stresses .... Vu Vn * Phi "Y' Ecc, of Resultant 1.922 in 1.922 in 1-Way 0.000 85.000 psi
X-X Min .. Stability, Ratio No Overturning 1.500 :1 2-Way 0.231 158.333 psi
Y-Y Min. Stability Ratio No Overturning
•
I Footing Design I ACI 9-3 Shear Forces ACI 9-1 ACI 9-2 Vn *.Phi
Two-Way Shear 0.23psi 0.23psi 0.15 psi 158.33 psi
One-Way Shears ...
Vu@Left O.OOpsi O.OOpsi 0.00 psi 85.00 psi
Vu@Right O.OOpsi O.OOpsi 0.00 psi 85.00 psi
Vu@Top O.OOpsi O.OOpsi 0.00 psi 85.00 psi
Vu@Bottom O.OOpsi O.OOpsi 0.00 psi 85.00 psi
Moments ACI. 9-1 ACI 9-2 ACI 9-3 Ru /.Phi As.Reg'd
Mu@Left O.OOk-ft 0.00 k-ft 0.00 k-ft 0.0 psi 0.01 in2 per ft
Mu@Right 0.00 k-ft 0.00 k-ft 0.00 k-ft O.Opsi 0.01 in2 per ft
Mu@Top 0.00 k-ft 0.00 k-ft 0.00 k-ft O.Opsi 0.01 in2 per ft
Mu@Bottom -0.01 k-ft -0.01k-ft -0.01 k-ft 0.1 psi 0.14 in2 per ft
I ' iJ
Cohhell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100
User: KW-0604164, Ver 5.6.1, 25-0ct-2002 (c)1983-2002 ENERCALC Engineering Software
Description Shed Footing
I Soil Pressure Summary
Service Load Soil Pressures
DL+ LL
DL +LL+ ST
Factored Load Soil Pressures
ACIEq. 9-1
ACI Eq. 9-2
ACI Eq. 9-3
Title : OMWD Ops Center Job # 03-21 0
Dsgnr: DMC Date:
Description :
Scope : Sheet i ~ of 1, I
General Footing Analysis & Design y:\camputer change 8-21-03\enercalc\03-210 om
)
Left Right Top Bottom
520.29 520.29 1,020.29 20.29 psf
520.29 520.29 1,020.29 20.29 psf
728.40 728.40 1,428.40 28.40 psf
721.00 721.00 1,413.89 28.11 psf
463.50 463.50 908.93 18.07 psf
ACI Facio rs (per ACI, applied internally to. entered loads)
ACI. 9-1 & 9-2 DL
ACI 9-1 & 9-2 LL
ACI 9-1 & 9-2 ST
.... seismic = ST. * :
1.400
1.700
1.700
1.100
ACI 9-2 Group Factor
ACI 9-3 Dead Load. Factor
ACI 9-3 Short Term Factor
0.750
0.900
1.300
UBC 1921.2.7 "1.4" Factor
UBC 1921.2.7 "0.9" Factor
1.400
0.900
' l
J'' Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100 User: KW-0604164, Ver 5.6.1, 25-0ct-2002 (c)1983-2002 ENERCALC Engineering Software
Description Shed Roof Framing
I Timber Member Information
Roof
Timber Section 2x6
Beam Width in 1.500
Beam Depth in 5.500
Le: Unbraced Length ft 0.00
Timber Grade )ouglas Fir -Larch,
Fb. -Basic Allow psi 875.0
Fv -Basic Allow psi 95.0
Elastic Modulus ksi 1,600.0
Load Duration. Factor 1.000
Member Type Sawn
Repetitive Status Repetitive
I Center Span. Data
Span ft 6.00
Dead Load #/ft .19.00
Live. Load #/ft 27.00
I Cantilever Span
Span ft 1.00
Uniform Dead Load #/ft 19.00
Uniform Live Load #/ft 21.00·
I Results Ratio= 0.2454
Mmax @ Center in-k 2.43
@X= ft 2.98
Mmax @. Cantilever in-k -0.28
fb: Actual psi 321.0
Fb : Allowable psi 1,308.1
Bending OK
fv: Actual psi 22.0
Fv : Allowable psi 95.0
Shear OK
I Reactions
@Left End DL lbs 55.42
LL lbs 81.00
Max. DL+LL lbs 136.42
@. Right End DL lbs 77.58
LL lbs 110.25
Max. DL+LL lbs 187.83
I Deflections Ratio OK
Center DL Defl in -0.016
L/Deft Ratio 4,632.7
Center LL Deft in -0.024
L/Deft Ratio 3,043.1
Center. Total Deft in -0.039
Location ft 3.000
L/Deft Ratio 1,836.7
Cantilever DL Deft in 0.008
Cantilever LL Deft in 0.011
Total Cant.. Deft in 0.019
L/Deft Ratio 1,279.5
Title : OMWD Ops Center
Dsgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet Zl of i7(
Timber Beam & Joist y:\computer change 8-21-03\enercalc\03-210 om
Calculations are. designed to 1997 NOS and 1997 UBC Requirements I
I
•
I
I
I
1 I ) 1 . -
J +
COG
CONNELL DESIGN GROUP
Consulting Civil Engineers
JOB_--"".tJ_,_M__,___W~Dc...._ __________ _ io ~1 SHEETNQ, ________ OF __ ___;_ __ _
CALCULATED BY D /'Vl L--DATE / Cl · I 5 ~v ~ ' I
16 Technology Dr., Ste. 209 Irvine, CA 92618
(949) 753-8807 FAX (949) 753-8833 CHECKEDBY ________ DATE _____ _
SCALE _______________ _
.....
{cf 7, 5 t) (z s ') + (! {. 7 411,) (i~) z (~)
?-'--I '7 7 • 5 I -/t t , ~ $" 6 ( -'#
b O'f~. 7~ ,-#. ~.
,roK.. /)GS'_(t:iN U~G ·e ·::: -~(t'.) 9'J-7''S° 2 /5. b p-r,
> 70
D
'./
D PRODUCT 207
.. //,.., ,4
I ,, Connell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100 User: KW-0604164, Ver 5,6,1, 25-0ct-2002 (c)1983-2002 ENERCALC Engineering Software
Title : OMWD Ops Center Job# 03-210
Dsgnr: DMC Date:
Description :
Scope : Sheet 71 of 'I
Pole Embedment in Soil y:\computer change 8-21-03\enercalc\03-210 om
Description Light Pole Caisson Embedment
I General Information .
Allow. Passive
Max Passive
Load duration factor
Pole is Circular
Diameter
No Surface Restraint
I Summary I
Moments @ Surface ...
Point load
Distributed load
Without Surface Restraint. ..
Required Depth
Press @ 1/3 Embed ...
Actual
Allowable
250.00 pct
1,500.00 psf
1.330
24.000 in
6,084.00 ft-#
0.00
4.428 ft
498.75 psf
490.78 psf
Applied Loads ...
Point Load
pistance from base
Distributed Load
distance to top
distance to bottom
Total Moment
Total Lateral
390.00 lbs
15.600 ft
0.00 #!ft
3.000 ft
0.000 ft
6,084.00 ft-#
390.00 lbs
•
(i I ,.! ,J,
Cohhell Design Group Title : OMWD Ops Center Job # 03-210
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Rev: 560100
Dsgnr: DMC Date:
Description :
Scope : Sheet 7;? 0 of 7 I
User: KW-0604164, Ver 5.6.1, 25-0ct-2002
(c)1983-2002 ENERCALC Engineering Software Circular Concrete Column y:\computer change 8-21-03\enercalc\03-210 om
Description Light Ploe Caisson Reinforcement
General Information Calculations are designed to ACI 318-95 and 1997 UBC Requirements
Diameter
Number of Bars
Bar Size
totatRebar Area
Rebar Percent
Bar Cover
I Loads
24.000 in
9
7
5.400 in2
1.194%
3.000 in
Dead Load
fc
Fy
Seismic Zone
2,500.0psi
60,000.0 psi
4
LL & ST Loads Act Separate
Spiral Ties NOT Used
Live Load Short Term
Axial Loads 0.500 k k k
Applied Moments ...
Total Height .
Unbraced Length
Eff. Length Factor
Column is BRACED
5.000 ft
5.000 ft
1.000
Eccentricity
in
@Top k-ft k-ft 6.100 k-ft
@Bottom k-ft
Lateral Point Loads
#1 k
#2 k
Summary
Column Diameter= 24.00in, with 9 #7 Bars
ACI 9-1
Applied Pu : Max Factored
Allowable Pn * Phi @ Design Ecc.
M-critical
Combined Eccentricity
Magnification Factor
Design Eccentricity
Magnified Design Moment
Po* .80
P: Balanced
Ecc :. Balanced
Slenderness per AC/ 318-95 Section 10.12 & 10.13
Actual k Lu I r 10.000
0.70 k
713.36 k
0.08 k-ft
1.3200 in
1.00
1.3200 in
0.08 k-ft
1,019.08 k
388.34 k
9.9991 In
Elastic Modulus
ACI Eq. 9-1
Neutral Axis. Distance 24.3120 in m Q7ooo
Max Limit kl/r 34.0000
Beta = M:sustained/M:max 1.0000
Cm 1.0000
El/ 1000 0.00
Pc: pi"2 E I / (k Lu)"2 0.00
alpha: MaxPu I (.75 Pc) 0.0000
Delta 1.0000
Ecc: Ecc Loads.+ Moments 1.3200
Design Ecc = Ecc * Delta 0.0000
ACI Factors (per ACI, applied internally to entered loads)
ACI 9-1 & 9-2 DL 1 .400 ACI 9-2 Group Factor
k-ft
k
k
ACl9-1 & 9-2 LL 1.700 ACI 9-3 Dead Load Factor
ACI. 9-1 & 9-2 ST 1.700 ACI 9-3 Short Term Factor
.... seismic= ST*: 1.100
Spiral Tie Requirements per 97 uac 1910.9.3
k-ft
0.390 k
ACI 9-2
0.70 k
16.90 k
k
8.54 k-ft
146.4000 in
1.00
146.4000in
8.54 k-ft
1,019.08 k
388.34k
9.9991 in
2,850.0 ksi
ACI Eq. 9-2
6.6620 in
0.8761
34.0000
1.0000
. 1.0000
0.00
0.00
0.0000
1.0000
146.4000
0.0000
0.750
0.900
1.300
Location
ft
ft
Column is OK
ACI 9-3
0.45 k
10.90 k
8.54 k-ft
227.7333 in
1.00
227.7333 in
8.54 k-ft
Beta
1,019.08 k
388.34 k
9.9991 in
ACI Eq. 9-3
6.5720 in
0.8847
34.0000
1.0000
1.0000
0.00
0.00
0.0000
1.0000
227.7333 in
0.0000 in
UBC 1921.2.7 "1.4" Factor
USC 1921.2.7 "0.9" Factor
0.850
1.400
0.900
Spiral Tie Bar Size #
Gross Area of Column
Core Are.a Within Spirals
3
452.39 in2
254.47 in2
Min .. Spiral Reinforcement Ratio
Max Spiral Tie Spacing
0.015
20.114 in
I
'(l J I ,P
eonnell Design Group
16 Technology Drive, Suite 209
Irvine, CA 92618
949-753-8807, 949-753-8833 Fax
Title : OMWD Ops Center
Osgnr: DMC
Description :
Scope:
Job# 03-210
Date:
Sheet ~ \ of 1. \
Rev: 560100 User: KW-0604164, Ver 5.6.1, 25-0ct-2002 (c)1983,-2002 ENERCALC Engineering Software Circular Concrete Column y:\computer change 8-21-03\enercalc\03-210 om
Description Light Ploe Caisson Reinforcement
I Sketch & Diagram I
DL=0.5, LL=0.0s, ST•0.0k
i 241n f
(3r"
Axial : Pn'phi (kl ,---,--..-----~1.---,.----r--:---, l
Pu,Mu Eq 9-1): 13.4k, 0.1tfl (
~u,Mu (Eq 9-2) : 8.9k, a.skirt :
l,e..,,,+---'C.:::,,"'-c_j_---+--+--~
1
--Ptl,Mtt\Eq 9-Sr, fr.9k;-6'5~ft--! .014.3
01.8
88.9
6.2 ;..,--;.--..;._--~----4--+---+--+-----P,--1-----,
:· I
83.5
I I ~~---11----l-1------. ----------+---+--1-----i-'\: I ~--~ ----+-------1---1-----1--+ 50.8
38.1 _ _,_ __ Ir------~ --+----+--t--+--J--..;.....---¼
I
5.4 ------1----L--------+--+---+---11----+--} I
12.7
0. 28.7 57.4
I
88.2
I I
114.9 143.6 172.3 201.1
Moment : Mn'pnl (k-ft)
229.8 258.5 287 .2
I . . "
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
l •1 Information
• ®To Build On
Engineering • Consulting • Testing
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
·1
'
' ,, f I
GEOTECHNICAL ENGINEERING REPORT
PROPOSED CINGULAR SD-914-03
OMWD OPS CENTER
1966 OLIVENHAIN ROAD
CARLSBAD, CALIFORNIA 92024
I
I
:I
I
I
I
I
I
I
I
I
-1
I
I
I
I
I
I
I
' ,
l ;/ Information If!. • .To Build On
Engineering • Consulting • Testing
August 28, 2003
DCI Pacific-San Diego
5125 Convoy Street, Suite 312
San Diego, California
Attention: Mr. James Lazo
Subject: Geotechnical Exploration Report, -Proposed Cingular SD-914-03, OMWD OPS
Center, 1966 Olivenhain Road, Carlsbad, California 92024. PSI Project No. 059-
35045
Dear Mr. Lazo:
Professional Service Industries, Inc. (PSI) is pleased to submit our Geotechnical Engineering
Report for the referenced project. This report presents the results of our field investigation,
laboratory testing, and our engineering analysis for preparing recommendations for site
preparation and foundation design.
We appreciate the opportunity to perform this geotechnital exploration and look forward to
continued participation during the design and construction phases of this project. If you have any
questions pertaining to this report, or if we may be of further Service, please contact our office.
Respectfully Submitted,
Professional Service Industries, Inc.
~~
~
Brian A. Waite
Staff Geologist
~~ ~~ ~.
James W. Niehoff,
Geotechnical Consultant
BW/psi/s/Geo
Professional Service Industries, Inc.• 6867 Nancy Ridge Drive, Suite E • San Diego, CA 92121. Phone 858/455-0544. Fax 958,455_1170
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1·
I
I
I
I
. ,, > I
GEOTECHNICAL ENGINEERING REPORT
PROPOSED CINGULAR SD-914-03
OMWD OPS CENTER
1966 OLIVENHAIN ROAD
CARLSBAD, CALIFORNIA 92024
Prepared For:
DCI-PACIFIIC-SAN DIEGO
5125 CONVOY STREET, SUITE312
SAN DIEGO, CALIFORNIA 92111
By:,
PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI Project No. 059-35052
August 28, 2003
I • J
I
I TABLE OF CONTENTS
I INTRODUCTION
Authorization ............................ -.............................................. 1
I Purpose and Scope ........................... .-• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Site and Project Description ........................................................ 1
I GEOLOGY AND SEISMICITY
Regional Geology ............................................... _ ..................... 2
1·
Geologic Units ........................................................................ 2
Regional Seismicity ............................. '. ........................................ 2
Seismic Analysis .... , ................................................................. 3
I Earthquake Design Parameters .................................................... 3
EXPLORATION AND TESTING
I· Scope·········································-·············"······························ 4 Field Tests and Measurements ..................................................... 4
Laboratory Test Program ..................................................... ·-· ..... 4
I SUBSURFACE CONDITIONS
General .................................................................................. 5 :I Soil and Groundwater Conditions .......... , ...... , ................................ 5
CONCLUSIONS ...........................................•.................................. 5
I . FOUNDATION RECOMMENDATIONS
Project Design and Discussion ..................................................... 6
I Monopine.Tower Foundation -Drilled Pier ................................... 6
Elevated Steel Platform-Shallow Footings ..................................... 7
I CONSTRUCTION CONSIDERATIONS
Site Preparation and Grading ....................................................... 8
Compaction Criteria ................................................................... 8
I. Utility Trench Backfill .............................................................. 9
Groundwater Control ....... -........................................ ·-· .................. 9
Drainage Recommendations ........ .-. ............................................... 9
I Safety Requirements ................. , ..... .-.......................................... 9
COMMENTS
I Discussion ............................................................................ 10
Lintltations ............................................................................. 10
I
1·
I
I
I
1·
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
' ,. ! "·
TABLE OF CONTENTS (Continued)
APPENDIX
Site Plan
Exploration Log
Laboratory Test Results
Seismic Analysis
References
I
I
I
I
.I
I
I
I
I
:1
I
I
I
I
I
I
I
I
I
< ,,
INTRODUCTION
Authorization
This report presents the results of our geotechnical exploration fo( a proposed Cingular cellular
communications facility designated as SD-914-03, located at 1966 Olivenhain Road in Carlsbad,
California. Our services were authorized by Mr. D.K. Do by signing our proposal on July 25,
2003. This exploration was accomplished in general accordance with PSI Proposal No. 059-
300099, dated July 25, 2003.
Purpose and Scope ,
The purpose of this exploration was to evaluate tbe subsµrface conditions at the site and to
provide geotechnical recommendations, as well as to provide criteria for the design engineers to
use in preparing foundation plans.
The scope of the exploration and analysis included a review of readily available regional geologic
and geotechnical literature pertinent to the site, seismic evaluation, site reconnaissance,
subsurface exploration, field and laboratory testing, engineering analysis of the subsurface
· materials, and preparation of this report which presents our findings, conclusions, and
recommendations.
The scope of services presented herein did not include an environmental assessment for
determining the presence or absence of wetlands or hazardous or toxic materials in the soil,
surface water, groundwater, or air, on or below or arou,:id this site. Any statements in this report
or on the boring log regarding odors, colors or unusual or suspicious items or conditions are
strictly for client information.
Site and Project Description
The project site is located at 1966 Olivenhain Road in Carlsbad, California. The proposed cell
site is located within the employee/district vehicle parking area at the existing OMWD Ops
Center. Existing improvements on the OMWD facility consist of wood-frame office structures,
metal frame -metal sided maintenance structures, asphaltic concrete pavement, and associated
utilities. Topographically, the area within, tp.e Sprint PCS project site is relatively level with a
gentle slope to the east.
_ According to the project plans provided to PSI, the proposecJ construction at the site will consist
of a 45-foot high, monopine tower with simulated bark cladding, branches and pine needles
within which communications antenna will be installed. In addition, an 18" high elevated steel
platform_ will be installed to the northwest of the existing equipment shelter upon which 4
"Cfugular" BTS high capacity cabinets will be mounted. We understand that the 45-foot high
monopine tower will be supported by a cast-in-place reinforced concrete caisson. The proposed
structures are anticipated to be constructed close to existing grades. The design loads for the 45-
foot high monopine tower have not been provided to PSI.
I
I
I
,1
I
I
I
I
I
I
·1
I
1.
I
I
I
I
I
I
• I
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page2
Regional Geology
GEOLOGY AND SEISMICITY
The subject site is located within the Peninsular Ranges geomorphic province of California.
According to pertinent regional geologic literature, the subject site is underlain by Tertiary-aged
Marine Terrace Deposits (Thomas H. Rogers, 1~65).
The site is structurally dominated by regional tectonic movement, and by local faulting associated
with the Newport-Inglewood-Offshore Fault and the Ro~e Canyon Fault. Area geologic maps
indicate that active faults exist in the regional vicinity, but do not cross the project site or exist
immediately adjacent to the property. In addition, no evidence of active faulting was observed
within or adjacent to the proposed development area at the time of our exploration. Further
discussion of regional faulting is provided in the seismicity sections of this report.
Geologic Units
At our boring location within the area of the proposed 45-foot high monopine tower, the site was
observed to be underlain by Tertiary-aged Marine Terrace Deposits, mantled by approximately 2
feet of fill. The fill Wa$ noted to consist of tan silty sand (SM). The underlying Marine Terrace
Deposits, which extends at least to the maxµnum explored depth of 15 feet below existing grade
was classified as tan silty sand (SM) with increasing clay content at clepths.
Regional Seismicity
Generally, seismicity within California can be · attributed to faulting which has resulted from
regional tectonic movement. This includes the Newport-Inglewood-Offshore Fault, the Rose
Canyon Fault, and other associated fault systems. The portion of California that includes the
subject site is considered to be seismically ,highly active. Seismic hazards within the site can be
attributed to potential ground shaking resulting from earthquake .events along nearby faults or
more distant regional faulting.
According to the regional geologic literature, the closest known Late-Quaternary fault is the Rose
Canyon Fault, located approximately 6;0 miles west of the site. Several other active faults and
numerous potentially-active and Pre-Quaternary faults. also occur within the regional vicinity.
Currently, the seismological literature presents varying opinions regarding seismicity for nearby
potentially active and Pre-Quaternary faults. As such, the following Seismic Analysis only
considers the effects of active faulting.
I ' L
I
I
I
,I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
_, l
DCl Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page3
Seismic Analysis
The seismicify of the site was evaluated utilizing deterministic methods for late Quaternary faults
within the regional vicinity. According to the Alquist-Priolo Haz~d Zones Act, Quaternary faults
which have been classified as "active" faults generally show apparent surface rupture during the
last 11,000 years (i.e., Holocene time). The site is not currently mapped within an Earthquake
Fault Zone (Hart and Bryant, 1997).
Deterministic seismicity at the site was evaluated With the Eqfault computer program (Blake,
2000), which utilizes an updated digitized map (1998) of known late Quaternary earthquake
faults, a catalog of the estimated Maximum Credible and Maximum Probable earthquakes for
each fault, and a user-specified attenuation relationship (Campbell, et. al., 1994/1997).
Based on the analysis described, 30 Late Quaternary faults were located within a 100-mile radius
of the site~ The site appears to be subject to a Maximum Magnitude Event of 6. 9 along the Rose
Canyon Fault, loCrated approximately 6.0 miles west of the site, with a corresponding peak
ground acceleration of 0.379g. · The Maximum Magnitude Event is defined as the maximum
earthquake that is capable of occurring under the presently known tectonic framework. The
Deterministic Site Parameters are presented in the Appendix.
Earthquake Design Parameters
A review of the active fault maps pertaining to the site indicates that the nearest fault is the Rose
Canyon Fault, located approximately 6.0 miles west of the site. Ground shaking from this nearest
fault and the other potentially active and Pre-Quaternary faults in the region is the most likely
event that Will affect the site. According to the 1997 edition of the Uniform Building Code
(UBC), the site is located within UBC Seismic Zone 4. In conjunction with the soil classifications
provided in Table 16-J of the 1997 UBC, Stand~d Penetration Test values obtained from the
borings indicate that the geologic subgrade at the subject site can be characterized as soil profile
type SE. The proposed structure should be designed in accordance with seismic design
requirements of the UBC 1997 edition, Volume II, Chapter 16, utilizing the following criteria:
UBC Chapter 16 Seismic Parameter Value
Table 16-1 Seismic Zone Factor, Z 0.4
Table 16-J Soil Profile Type SE
Table 16-Q Seismic Coefficient, Ca 0.36
Table 16-R Seismic Coefficient, Cv 0.99
Table 16-S Near Source Factor, Na 1.0
I
I
I
I
I
I
I
1_
I
I
I
I
I
I
I
I
I . '
I ,,
I 4
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page4
Table 16-T
Table 16-U
,.
Near Source Factor, Nv 1.0
Seismic Source Type B
In addition, design of structures should comply with the requirements of the governing
· jurisdiction's building codes and standard practices of the Structural Engineers Association of
California.
EXPLORATION AND TESTING
. The on-site exploration, consisting of surficial reconnaissance, drilling, and soil sampling, was
conducted on August 4, 2003. The subsurface exploration was accomplished with a truck-
mounted drill rig equipped with 8-inch diameter, hollow-stem augers. One boring was drilled
within the vicinity of the proposed street light _replacement pole. A schematic Site Plan is
included irt the Appendix along with detailed exploration log.
Field Tests and Measurements
Field testing and measurements generally consisted of visual classification of the encountered
subsurface materials and the routine collection of disturbed and relatively undisturbed soil
samples. Each undisturbed sample was placed in a moisture tight plastic bag for further
laboratory ~alysis. Additionally, a bulk sample of the near-surface soil was also collected for
laboratory testing. The relative densities/consistencies of the encountered earth materials, as
indicated on our exploration log, ~e based on the Standard Penetration Tests conducted at their
respective depths.
Standard Penetration Tests -During the sampling procedure, Standard Penetration Tests (SPT)
were performed at predetermined intervals. The split-barrel standard penetrometer (2-inch O.D.
and 1.4-inch I.D., ASTM D1586) was advanced by a 140-pound hammer falling 30 inches. For
each sample location, the number of blows needed to drive the sampler the last 12 inches of an
18-inch penetration depth was used to quantify the soil "N" value.
Laboratory Test Program
A laboratory-testing program was conducted to evaluate additional pertinent ~ngineering
characteristics of the foundation materials necessary in analyzing the behavior of the proposed
foundation system. The laboratory:.testing program included supplementary visual classification,
in-place moisture content, and expansion index tests. The laboratory-testing program was
'J
DCI Pacific -San Diego
· PSI Project No. 059-35052
August 28, 2003
Page 5 ·
conducted in general accordance with applicable ASTM Specifications or other accepted test
method(s). A summary of test procedures and results are contained in the Appendix of this
report.
SUBSURFACE CONDITIONS
General
The subsurface materials encountered in the exploratory boring have been visually classified as
described on the log, which is presented in the Appendix. The stratifications shown on the boring
log represents the· subsurface conditions at the actual boring location at the time of our
exploration. Variations may occut and should. be ·expected away from b'ori_ng location. The
stratifications represent the approximate boundary between subsurface materials. The actual
transition may be gradual.
Soil and Groundwater Conditions
Within our boring location in the area of the proposed 45-foot high monopine tower, the site was
observed to be underlain by Tertiary-aged Marine Terrace Deposits, ma.ntled by approximately 2
feet of fill. The fill was noted to consist of tan silty sand (SM). The underlying Marine Terrace
Deposits, which extends at least to the maximum explored depth of 15 feet below existing grade,
was classified as tan silty sand (SM) with increasing clay content at depths. Results of our
laboratory testing indicate that the upper on-site soils possess a very low expansion potential
(based on UBC 18-2).
Groundwater was not encountered within the maximum explored depth of 15 feet below the
existing ground surface. It is possible, however·, that transient oversaturated ground conditions at
shallow depths could develop at a later time due to heavy or prolonged precipitation, landscape
waterin$, or other unforeseen events such as pipe ieaks·.
CONCLUSIONS
As observed in our exploratory borings in the area of the proposed 45-foot high monopine
tower, the site was observed to be underlain by Tertiary-aged Marine Terrace Deposits, mantled
by approximately 2 feet of fill. The fill was noted to consist of tan silty sand (SM). The
underlying Marine Terrace Deposits, which extends at least to the maximum explored depth of
15 feet below existing grade, were classified as tan silty sand (SM) with increasing clay content
at depths. These materials are considered suitable for the support of the proposed 45-foot high
monopine tower in their current condition. Based on our review of data collected during our
I
I
I
I
,1
I
I
I
I
I
I
I
I
I
I
I
I
·I
I
. ' ' ..
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page6
exploration, we conclude that the subsurface conditions within the site of the proposed
communications facility are satisfactory for the proposed 45-foot high monopine tower provided
. the recommendations contained herein are properly implemented during design and construction.
FOUNDATION RECOMMENDATIONS
Project Design and Discussion
We· understand that the proposed 45-foot high monopine tower is planned to be supported by a
drilled pier foundation system. petailed foundation recommendations are provided in the
following sec!ions of this report.
The recommendations and design criteria presented herein are "minimums 1
\ in keeping with the
current standard-of-practice. They do not preclude more restrictive criteria by the governing
agency or structural consid·erations. The project structural engineer should evaluate the
foundation configurations and reinforcement requirements for actual structural loadings. The final
choice of foundation type shoµld be · based on the relative economics of each type and
engineering/construction advantages and disadvantages, while keeping in mind the risks
associated with any type of foundation.
Monopine Tower Foundation .,.. Drilled -Pier
Vertical Load Resistance -Axial Loading .,..Drilled piers which are founded at least 20 feet below
existing finish grade should be proportioned such that the maximum end bearing soil contact
pressure will not exceed· .3,000 psf. This allowable bearing capacity may be increased by one-
third for loads of short duration, including wind and seismic forces. The pier will also derived
support from side shear. For the purpose of design, an allowable side shear value of 300 psf may·
be· assumed for the portion of the pier below a depth ·Of 5 feet.
The actual diameter and other aspects of the pier design should ultimately be determined by the
structural engineer based ·on the structural requirements.
Lateral Load Resistance -Drilled and cast-in-place piers which are utilized to support the three
legged self-supporting tower should be embedded sufficiently to resist overturning moments.
Lateral loads may be resisted by any method which incorporates lateral earth pressure and/or
horizontal subgrade reaction. The design may incorporate a passive earth pressure of 250 psf/ft,
provided that the pier concrete is poured tightly against relatively competent native soils. The
passive resistance value may be increased by one-third (1/3) when subject to transient loading
conditions such as seismic impact or wind load.
I
I
I
I
I
I
I
I.
I
I
I
I
I
I
I
I
I
·I
I
. ( , l
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page 7
Minimum Pier Embedment -Drilled pier· embedment should be determined on the basis of the
recommendations contained herein and the structural engineer's analysis, in accordance with the
pier type/dimension, calculated live/dead loads, and predicted overturning moment.
Settlement. -A minimally dimensioned .drilled pier (minimum 24 inches diameter) which is
founded into the alluvium is anticipated to sustain a total settlement of less than 1 inch under
gravity loading. If required, the magnitude of potential settlement may be reduced by oversizing
the pier diameter to lower the imposed bearing pressure.
Drilled Excavations -Precautions should be taken to permit the pier to be drilled and reamed to
the desired depth. Groundwater was not enco1,mtered within the maximum explored depth of 15
feet below existing grade at the time of our exploration. During pier excavations, it may be
necessary to use temporary casing or other special methods to support" the walls of the shaft
excavation.
The bottom of the drilled pier excavations should be firm and free of all loose material prior to
the placement of concrete. Additionally, the excavations should be verified that the pier extends
to the proper depth and complies with the geotechnical recommendations stated herein and/or the
approved plans
The materials encountered below groundwater consisted of marine terrace deposits generally
classified as silty sand with trace clay with low to medium plasticity, that are not considered
subject to liquefaction. Therefore, the potential for liquefaction at the site is considered low.
Elevated Steel Platform -Shallow Footings
Conventional continuous and isolated spread footings .are suitable for structural support of the
proposed elevated steel platform . loads, provided the near surface soils are compacted as
described in the Site Preparation section of this report. Continuous footings which are at least 12
inches wide and supported at a depth of at least _12 inches below the lowest adjacent .finish grade
may be designed for an allowable bearing pressure of 1,500 psf. The allowable soil bearing
values may be increased by one-third for loads of short duration, including wind and seismic
forces. Appropriate reinforcement should be provided oased upon structural loading.
The foundation excavations should be observed by a representative of PSI prior to steel or
concrete placement to-assess that -th~ foundation materials are capable of supporting the design
loads and are .consistent with the materials discussed in this report. Soft or loose soil zones
encountered at the bottom of foundation excavations should be removed as directed by the
geotechnical engineer. Cavities formed as a result of excavation of soft or loose soil zones
should be backfilled with lean concrete or dense graded compacted crushed stone.
·1
·1·
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
> I
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page 8
Based on the known subsurface conditions and site geology, laboratory testing, and past
experience, we anticipate that properly designed. and constructed foundations supported on the
recommended materials should experience m~~imum total and differential settlements of less than
1/2 inch and 1/4 inch; respectively. While settlement of -this magnitude is generally considered
tolerable for structures ·of the type proposed, the design of masonry walls should include
provisions for liberally spaced, vertical control-joints to minimize the effects of cosmetic
"cracking".
CONSTRUCTION CONSIDERATIONS
Site Preparation and Grading
Any areas which are, to be graded or to receiYe structural improvements should be cleared of
pavements and obstructions. The whole development a:rea should then be thoroughly inspected
for any buried objects which need to be removed or relocated prior to the inception of, or during
grading and earthwork. All holes., trenches or pockets left by .the removal of these objects should
be properly backfilled.
The area within the proposed elevated steel platform is anticipated to be underlain by natural
marine deposits. The exploratory boring was placed to the north of this location adjacent to an
existing x:etaining wall within the wall backfill. It is anticipated that the shelter area, which is
approximately three feet lower in elevation than the boring location, will be underlain by
medium dense alluvial deposits that will be suitable for the support of the proposed equipment
shelter. However, during construction, soft or yielding subgrade present in the area of the
proposed equipment shelter should be removed up to firm layer and replaced with properly
compacted fill. The replaced soil should be moisture conditioned to slightly above optimum
moisture and compacted to· at least 90 percent relative compaction (based on ASTM Test Method
D1557).
All grading operations should be performed in accordance with the requirements of the Uniform
Building Code (1997 edition) and any local governmental standards which have jurisdiction over
this project.
Compaction Criteria
All soils subject to compaction on-site, unless otherwise specified, should be moisture-
conditioned to slightly above optimum moisture content and mechanically compacted to a
minimum relative compaction of 90 percent of the maximum dry density, based on ASTM test
I
I
I
I
I
I
I
I
I,
I
I
I
I
I
I
I
I
I
·1
... ' .
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28, 2003
Page9
method D 1557. All materials should be compacted by' suitable compaction equipment in uniform
loose lifts of 8 inches maximum.
Utility Trench Backfill
Utility trenches should be properly backfilled and compacted. Utilities should be properly bedded
and backfilled with approved granular soil to a depth of at least one ( 1) foot over the top of the
pipe. This backfill should be uniformly moisture conditioned and firmly compacted for pipe
support. The remainder of the backfill should consist of on-site soil, or imported soil, placed in
lifts not exceeding 6 inches in thickness, moistened or aerated to slightly above optimum
moisture content, and mechani~ally compacted to at least 90 percent of the maximum dry density
(ASTM D1557). . .
Groundwater Control
Groundwater was not encountered within the maximum explored depth of 15 feet below existing
site grade. It should be noted, however, that fluctuations in the groundwater levei-tnay occur due
to variations in ground .surface topography, subsurface stratification, rainfall, irrigation and other
factors which may not have been evident at the time of our exploration. Every effort should be
made to keep the excavations dry. PSI should be contacted to evaluate excessive seepage
conditions.
Drainage Recommendations
Drainage should be designed to direct surface waters away from foundations. Berms, positive
surface gradients, and other drainage controls should be included in the construction
considerations to minimize discharging or ponding of water near the foundation line. Drainage
patterns approved at the completion or construction should be maintained throughout the life of
the project.
Safety Requirements
Prior to the commencement of constru~tion, the owner and the contractor should make
themselves aware of, rutd become familiar with, the applkable local, state, and federal safety
regulations. Construction safety is generally the sole responsibility of the contractor, who shall
also be solely responsible for the means, methods, and sequencing of construction operations.
I
I
I
I
I
I
I
I
I
I
I
I'
I
I
1-
I
I
I
I
. ,,
DCI Pacific -San Diego
PSI Project No. 059-35052
August 28; 2003
Page 10
Discussion
COMMENTS
After the plans and specifications for this project are complete, it is recommended that PSI be
· provided the opportunity to review the final design and specifications in order to confirm that the
earthwork and foundation recommendations are properly interpreted and implemented. At that
time, it may be necessary to submit supplementary recommendations.
It is recommended that the services of PSf be engaged to monitor and test during construction to
confirm that suitable materials are used for controlled fills and that they are properly placed and
compacted. In addition, subsurface materials exposed within foundation excavations should be
observed prior to placement of concrete in order to confirm that the foundations extend to the
proper depths and that the bearing materials are consistent with those encountered by the
subsurface exploration.
Limitations
The exploration and analys,is of the foundation conditions reported herein are considered
sufficient in detail and scope to form a reasonable basis for the foundation design. The
recommendations submitted for the proposed development are_ based on the available soil
information ;md the proposed structures.
If there are any revisions to the plans for the proposed development, or if deviations from the
subsurface conditions noted in this report are encountered during construction, PSI should be
retained to determine if changes in the fouJ1dation recoininendations are required. If PSI is not
retained to perform these functions, PSI will not be responsible for the impact of those conditions
.on the performance of the project.
The Registered Engineer warrants that the findings, recommendations, specifications, or
professional advice contained herein were prepared in accordance with generally accepted
professional engineering practice -in the fields of foundation engineering, soil mechanics and
engineering geology. No other warranties are implied or expressed.
This report has been prepared for the exclusive use. of DCI Pacific Architects for the specific
application to the proposed Cingular communications facility designated as SD-914-03, OMWD
OPS Center, locatecl at 1966 Olivenhain Road, Carlsbad, California.
I
I
I
I
I
I
I
I
-1
I
I
I
I
I
I
I
I
I
I
•• 'J
REFERENCES
L Blake, T.F., 1995, Documentation for Eqfault. Version 2.01 Update, Thomas F. Blake
Computer Services and Software, Newbury Park, California, p. 79 and .appendices.
2. Blake, Thomas F., 1998; New Fault-Model Files For FRISKSP and EQFAULT,
Thomas F. Slake Corrtf)uter Services and Software, Newbury Park, California.
3. -Campbell, K.W. and Bozorgnia,. Y., 1994, Near-Surface Attenuation of Peak
Horizontal Acceleration From Worldwide Accelerograrrts Recorded From 1957 to
1993, ·Proceedings, Fifth U.S. Nat-ional Conference on Earthquake Engineering, Vol.
III, Earthquake Engineering Research In~titute, pp. 283-29
-4. Foundations and Earth Structures, Naval Facilities Design Manual DM-7.2, 1982,
Department of Navy, Naval Facilities Engineering Command, 224 p.
5. Hart, E.W. and Bryant, W.A., 1.997, Fault-rupture Hazard Zones in California,
California Division of Mines and Geology, Special Publication 42, 34 p.
6. Jennings, C.W., 1994, Fault Activity Map of California and Adjacent Areas, scale
1 :750,000, California Division of Mines and Geology.
-i
7. Kennedy, M.P. and Tan, S.S., 1977, Geology of National.City, Imperial Beach and Otay
Mesa Quadrangles, Southern San Diego Metropolitan Area, California, California
Division of Mines and Geology, Bulletin 200, Scale 1:24,000.
8. Soil Mechanics, Naval Facilities Design Manual DM-7.1, 1982, Department of Navy,
Naval Facilities Engineering Command; 348 p.
9. Uniform Building Code, 1997 Edition, International Conference of Building Officials,
Whittier, CA, 3 Volumes.
Cingular SD-873-02, Chula Vista, CA Professional Service Industries, Inc.
-I . '
1-
-I
I
I
I-
I
I . , . ,' -. '-. '
I
I
I
I
I
I
I
I
I
.I Cingular SD-873-02, Chula Vista, CA Professional Service Industries, Inc.
I
I } ,, ,,
I
I
I
I
I
I ._,,.,
I ~:. ·-\
I
I
I
I
I
.I
·1
I
I
I
-·--------
~
_LEGEND:
B-1
.J""\_(E)omtt:IIWIIIC'\r
0
-----
\_··--\,-. ~
T ~~·
l'ROl'OSUllllCAllOHlat ~"" 'DHCI.Ujl' -.CSS 4$'~· "" ~~~
IIIWOES""'l'IE ""
....
'o,
-
..r.
--
--
'.--, ·--....
..r\_~~'\r ' l'lllPO!(l)SECIORT ~ 1'211 AZMSTH . ,_)
"~ \_(E) IC,_,_\ ,~ .:r
PROPOS!D SECIOR 'C' NIIDll>,240'AllWUTH
'-......./ (4--) ~ m PROPOS!D.lllCAllOH Feil 'CIIICI.UK BTS-
IWflowa: BUlDttC, PNHIID 10 MAICH (E) BlOO.SO:S>tEIJAJFOl!AllCll10ffAI.INf~
..r\_(E)~~"""\.
Ml)t(; ~
·-mu ~ OH 1WSC> S1ID. FUlTOAII IOI TO (E)
"-.__ (E) PN><Hl ST,US.
TrP. •
..r. -----\_(El IC•-N>(A\ _-, iii<,,ir,iiio sfuio<-
l!!l![: ll<EIIE MU. BE HO JO Of!.MXXllOHI<. PARKttC STAI.LS TO El( AIX>ED Cfi
ROl<MDOHlltE(E)PNt<IHClAlll'Jl
--------------------------_.zc _ --(El 20
------
/ (E) DlffC. ruas. TrP.
_____ 9 ___ ~--* --~-.. ~---• .. ,rJi.G, _'11,\C, ~ ~~ ---~ ---~-----"--------------~ T.--
-··-··-·---~·•:t;;U.1,'I" TJ(V/ • :V
(E) f!lQff OfllAYI.K QI.I\ '1:SHAIS RO.ill
~p
PSI PROJECT NO. 059-35052
FIGURE NO.1
---l'IIOHICTAl!r llfOIIMlllOII -
ftC ......,.. CIQllllbNa .... XT o, ~ IOO.lm1ni 8 ....... M'f..,lliUUlllt. lt///trUII[ oe OIICUIII.* onca .,. TMAt
WMtCN MU.l'D ro CMOU1.Mt IIW;l,D:I II Sl'JICII.Y NONlllfflD...
-_ 01/Yl/OJ
#ICMIK't: DIO
_.,. .11\/SSO
_ .. .111,/DC_.
ISSU( STATUS:
Al-. ........ If;
.. 1
.,,.,. ........... ...
tl/'D/ta ........... . 11/IIIJU _,._ -
.. ,,1111 --·· -. •fYIIU ... .... A'
l,,,_ ·C/J co; _..,
::J ~
0)
C:
()
~
! I .. a ..
i!!
11, r1 ;; i
i'
I~ l
I·~~· i3f ••• ,i•-IA!i
"H I i! !
--
OWWO ,OPS CCNT[~ --S0-914-03 ---IHIOI.NOINMIIOolO ..___ ... ,._
[HI.Al!G(O SITE Pl.NI
_,_
A2
ENLARGED SITE PLAN -~~11
I • I ·1,1,
I
I
I
I
I
I
I
1-
I· ,,,
··:.:..
I
I
I
I
I
I:
I
I Cingular SD-873-02, Chula Vista, CA Professional Service Industries, Inc.
I
I
I
I
I
I
I
I
·I
I
I
I
I
I
I
I
I
.1
I
I
; L
Project Name: <;>MWD OPS Center ~D-914-03
Siic: 1966 Olivenhaln Roa~
DESCRIPTION
SURFACE(2" Asphalt)
Eill. Tan silty sand, dry, medium dense.
Marjnc Is:ma~sits: __._
T.an silty sand, dry, loose.
__ Brown°silty clay, tnl~, moi~
Tan Silty sand, !nice clay, wet.
, .Boring Tcm1inated at IS feet.
Groundwater Encountere? at l S feet.
· Backfilled on 8/4/2003.
Professional Service Industries, Inc.
RECORD OF SUBSURFACE EXPLORATION
Boring _____ B-_l _______ _
DEPTH
21/,'
S'
7½'
10'
IS'
20'
25'
30'
35'
40'
45'
SO'
SAMPLE CLASS
SPT·l
SPT-2
CM-I
SPT-3
SS-4
SM
SM
SM
SM
SM
Date of Boring:
Project No.:
N Dd
10
38
7
23
August 4, 2003
059-35052
Mc REMARKS
SA
4.6
I ' ,.
I
I
I
I
1·
1·
I
I
I
·I
I
I
I
I
I
I
I
I
.I
I
I
I
I
I-
I
I
I
I
I
I
I
I
I
I
.1
I
I
'., I'
LABORATORY TESTING
Laboratory Testing Program
Laboratory tests were performed on representative soil samples to determine their relative
engineering properties. Tests were performed in general accordance with test methods of the
American Society for Testing Materials or other accepted standards. The following presents a
brief description of the various test methods used.
Classification -Soils were classified visually according to the Unified Soil Classification
System. Visual classifications were supplemented by laboratory. testing of selected samples in
general accordance with ASTM D2487. The soil classifications are shown on the Exploration .
Logs.
Particle Size Analysis -Particle Size· Analysis was performed on selected representative
sample in general accordance with ASTM D422.
Expansion Index -Expansion testing was performed on representative sample of the
upper on-site soils, remolded and surcharged to 144 pounds per square foot in general accordance
with the Uniform Building Code Standard No. 18-2.
I
I
.I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
' cL
,,,
SUMMARY OF LABORATORY TEST RESULTS
RESULTS OF EXPANSION INDEX TEST
(UBC 18-2)
B-1 @2 ½' 2 (Very Low)
Cingular.SD-873-02, Chula Vista, CA · Professional Service Industries, Inc.
I ). i ',
I
I
I
I
I
I
I
I
I ,.:-·,•,
I
·1
I
:I
I
I
I
I
I
I
I
I
I
I
I
1·
I
I
I
I
I
I
I
1:
I
I
I
I
' ~ ',
DATE: Thursday, August 7, 2003
*************~***********************
*
·*
*
*
*
*
E Q .F A'U LT
Ver. 2.20
*
*
*
*
*
* ~************************************
(Estimation of Peak Horizontal Acceleration
From Digitized California Faults)
SEARCH PERFORMED FOR: Cingular Wirele/3S
JOB NUMBER: 059-35052
JOB NAME: OMWD OPS Center
SITE COORDINATES:
LATITUDE: 33 .·068 N
LONGITUDE: 117.246 W
SEARCH RADIUS: 100 mi
AT.TENUATION RELATION: l) Campbell & Bozorgnia (1994) Horiz. -Alluvium
UNCERTAINTY (M=Mean, S=Mean+l-Sigma): M
SCOND: 0
COMPUTE PEAK HORIZONTAL ACCELERATION
FAULT-D~TA FILE USED: CALIFLT.DAT
SOURCE OF DEPTH VALUES (A=Attenu~tion File, F=Fault Data File): A
·1
I
I·
I
-I
I
I
I
.I
I
I
I
I
I
I
I
I
I
I
L •(; l',J
---------·-------------------DETERMINISTIC SITE PARAMETERS
-----------------------------
Page 1 -----------------------------------------------------------------------------I I IMAX, CREDIBLE EVENTI IMAX, PROBABLE EVENTI
I I APPROX. I ---' ----------------I I -------------------I
I ABBREVIATED I PI STANCE I MAX. I PEAK I SITE 11 MAX. I PEAK I SITE I
I FAULT NAME I mi (km) -I C~ED. r SITE J INTENS 11 PROB. I SITE I INTENS I
I I I MAG. I ACC. g I MM I I MAG. I ACC. g I MM I
1-------------------------1--------1-----1------1------11-----1------1------r !BLUE CUT I 81 (131) I 7,,001 0.0261 V 11 6.001 0.0101 III I
·I --------------------------I ----. ----I --·---I ------I ------I I -----I -------I ------I
I BORREGO MTN. (San Jacinto) I 62 (100) I 6. 50 I O .• 023 I IV 11 6. 20 I O. 018 I IV ,I
1------------------------1---------1 ----1------1------1 I----1------1-----1
lcAMP ROCK-EMER.-COPPER MTNI 97 (156) I 7.001 0.0201 IV I I s.8ol 0.0071 tr I
~------------------------1--------l-----~------1------11-----1------1------I
-ICASA LOMA-CLARK (S.Jacin.) I 49 ( 78) I 7 .. 0ol o.osol VI 11 7.ool o.osol VI I
.I ---------------------------I -----·----I ------I ------I ------I I -----I ------I ------I
!CATALINA ESCARPMENT I 41 ( 66) I 7,001 0.0621 VI I I 6.101 0.0281 V I
1---------------------------I ---------I -----I ------I ------I I -----I ------I ------I
!CHINO I 53 ( 86.) I 7.00I 0.0431 VI 11 5.401 0.0121 IIJ; I
1------------------------.1---------1-----1------1------11-----1------1------~
,I CLAMSHELL-SAWPIT I 87 (141) I 6. 60 I O. 015 I IV 11 4. 90 I O. 004 I I I
1-------------------------1--------1-----1------1------11-----1------1------1
lcoRONADO BANK-AGUA BLANCA I 21 ( 34) I 1.so! 0.2011 VIII I I 6.7ol 0.1091 VII I
1--------------------------1---------1-----1------~------11-----1------.1------1
!COYOTE CREEK (San Jacinto) I so ( 80) I 7.00I 0.0491 VI I I 6.101 0.0221 IV I f-------------------------1-------1-----1------1------11-----1------1------1 I CUCAMONGA I 77 (125.) I 6. 90 I O. 023 I IV 11 6. 10 I O. 012 I III I
1-------------------------1---------1-----1------1------1 l-----~------1------1
I ELSINORE I 25 ( 41) I 7. so I O .167 I VIII 11 6. 60 I O. 081 I VII I
I --------------------------I ----------I, -----I ------I ------I I -----I ------I ------I
1 ELYSIAN PARK sEisMic zoNE 1 8·4 (13s-> r 7.101 o.0241 v 11 s.801 o.0091 III 1
I --------------------------·I ----------I -----I --.----I ------I I -----I ------I ------I
IGLN.HELEN-LYTLE CR-CLREMNTI 53 ( 86) I 7.00I 0.0441 VI I I 6.701 0.0341 V I
1--------------------------1----:----1-----1------1------11----1------1------1
j HELENDALE I 8 7 ( 14 0) I 7 . 3 0 I O . 0 31 j V I I 5 . 5 0 I O . 0 0 6 I II I
-1--------------------------1----------1-----1------1------11-----1------1------1
!HOMESTEAD VALLEY I 97 (156) I "7.soj 0.0321 v 11 4.8ol 0.0031 I I
1-------------------------1--.-----1-----1------r------11-----~------1------1
jHOT S-BUCK ROG. (S .Jacinto.) I 51 ( 82)-1 7. oo I o. 047 I VI 11 6 .10 I o. 021 I IV I
1-------------------------1---------1-----1------1------11-----1------1------1
!IMPERIAL -BRAWLEY I 98 (158) I 7.00I 0.0201 IV 11 7.001 0.0201 IV I
1--------------------------1---------1-----1------1------11-----1------1------1
!JOHNSON VALLEY I 89 (143) I 7.so! 0.0361 v I I s.201 0.0041 I I
I I, ,,,
I
I
I
I
I
I
I
I
I
I
I
I
.I
I
I
I
I
I
1-------------------------1---------1 ----1------1------11-----1------1------1 ILA NACION I 17 ( 27) I 6.501 0.1401 VIII 11 4.201 0.0231 IV I
1------------------------1--------1-----1------1------1 I ---1------1------1 ILENWOOD-OLD WOMAN SPRINGS I .94 (152) I 7.301 0.0201 v 11 5.5ol o.0051 II I
1-------------------------1---------1-----1.-----1------11-----1------1------1 !NEWPORT-INGLEWOOD (NORTH) I 74 (119}1' 6.701 0.0221 IV II 4.201 0.0021 I
I·-------.---· -------------1--------·. I-----I------l------11-----1------1------I ,INEWPORT-INGLEWOOD-OFFSHOREI 13 ( 21)1 7,10·1 0.2471 IX 11 5.901 0.1011 VII I
1------------------------.--1---· -----1-----1------1------11-----1------1------1 !NORTH FRONTAL FAULT ZONE ,. 83 (134)-1 7.701 0.0461 VI 11 6.001 0.0101 III I
1--------· -----------------! · --------1-----1------1------11-----1------1------1 !PALOS VERDES HILLS I 49 ( 78.) I 7 .. 201 0.0601 VI 11 6.201 0.0251 V I !------------------------1---·-----1-----1------1------11-----1------1------1 !PINTO MOUNTAIN -MORONGO I 76 (122) I 7.301 0.0371 v I I 5.001 0.0101 III I
.1-------------------------1---------1-----~------1------11-----1------1------1
----~---'.-------------------
DETERMINISTIC SITE PARAMETERS
Page 2
-------------------------------------------------------------------------. I I MAX. CREDIBLE EVENT 11 MAX. PROBABLE EVENT I
I I APPROX . I -.------------------.-~ I -------------------I I ABBREVIATED !DISTANCE I MAX, I PEAK I SITE 11 MAX, I PEAK I SITE I I FAULT NAME I mi (km.) I CRED. I S.I'i'E I INTENS 11 PROB. I SITE I INTENS I I I I MAG. !ACC. 91 MM 11 MAG. !ACC. 91 MM I
1-------------------------!--------1-----1------1------11-----1------1------1 !RAYMOND I 87 (139) I 7.SOI 0.0321 V 11 4,.901 0.0041 I I
I ---------------------·--1---------1-----1------1------I 1-----1------1------1 !ROSE CANYON I 6 ( 10)·1 7,001 0.3781 I4 II 5.901 0.2101 VIII I
l--------------------------1---------1-----I------I------I 1-----1------1------1 I SAN ANDREAS (Coachella V.) I 75 (120) I 8. 00 I O. 069,I VI 11 6. 80 I o. 024 I IV I
1--------------------------1---------1-----j-----1------11-----1------1------1 jsAN ANDREAS (Moj~ve) I 85 (13·7) I 8.00I 0.0591 VI 11 7.401 0.0341 V I
1-------------------------,--------1-----1------1------11-----1------1------1 ISAN ANDREAS (S. Bern.Mtn.) I 72 ('115) I 8.00I 0.0731 VII 11 6.701 0.0231 IV_ I I --------------------------I ---------I -· ---I -----· -I ------I I -----I ------I ------I lsAN CLEMENTE -SAN ISIDRO I 53 ( 86) I 0.001 0.1051 VII I I 6.sol 0.0291 v I
1--------------------------1---------1-----1-----1------11-----1------1------1 jsAND HILLS I 91-(147)1 0.001 0.0531 VI II 6.6ol o.01s1 IV I
!---------------.---·------1---------1-----1------1------I 1-----1------1------1 jSAN DIEGO TRGH.-BAHIA SOL.j 31_( 51) I 7.501 0.1311 VIII II 6.201 0.0431 VI I
1--------------------------1---------1----1------1------11-----1------1------1 lsAN GABR;tEL I 91 (147) I 7.401 o.o32j. v 11 5.6oj 0.0061 II I
1-------------------------1---------1-----1------1------11-----1------1------1 lsAN GORGONIO -BANNING I 64. ·(104) I 7.soj o.0481 VI 11 6.6ol 0.0241 IV I
I -------------------------1---------1-----I------I -----1 I----1------1------1 jsAN JOSE I 75 (12.1) 1-6.7oj 0~0221 IV 11 s.001 o.oosl II I
1--------------------------1---------1-----1-----1------11-----1------1------1 !SANTA MONICA -HOLLYWOOD I 92 (149) I 7.001 0.0191 Iv I I s.001 0.0071 II I
1--------------------------1---------1-----1------1-----11-----1------1------1 !SANTA MONICA MTNS. THRUST ,. 94 (15-1) I ·7,201 0.0331 V 11 6.301 0.0161 IV I
1--------------------------1---------1----.1------1------11-----1------1------1
I
I
I
I
·1
I
I
I
I
I
I
1.
I
I
I
I
I
I
I·
I J' I J
!SIERRA MADRE-SAN FERNANDO I 78 {125) I 7,joj o.o32j v I I 6.3oj 0.0141 IV I
1--------------------------1----·---1-----1------1------11-----1------1------1
!SUPERSTITION HLS. {S.Jacin) I 8-1 {130') I 7.0oj 0.0261 V 11 6.101 0.0111 III I
1-------------------------1---------1-----1~-----1------11-----1------1------1
I SUPERSTITION MTN. (S.Jacin) I 76 (122) I 7.ooj 0.0201 v 11 6.201 0.0141 III I, !------------------------1---------1-----1------1------11-----1------1------1
!VERDUGO I 89 (143) I 6.7oj 0.016! IV 11 5.201 o.0051 II I
1------·-------------------1---------1-----1------1------11-----1------1------1
jWHitTIER -NORTH ELSINORE I 58 ( 94) I 7.101 0.0431 VI I I 6.001 0.0161 IV I
1--------------------------·I .-------1-----1------1------1 I -.---1------1------1
!WILSHIRE ARCFI I 89 (143) I 5.7oj 0.0111 III 11 5.001 0.006! II I
1--------------------------1---------1-----1-----1------11-----1------1------1
******************~**********************************************************
-END OF SEARCH-44 FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS.
THE ROS~ CANYON FAU~T IS CLOSEST TO THE SITE.
IT I~ ABOUT 6.2 MILES AWAY.
LARGEST MAXIMUM-CREDIBLE SITE ACCELERATION: 0.378 !;)'
LARGEST MAXIMUM-PROBABLE SITE ACCELERATION: 0.210 g
l iiJ Information It!. • ®To Build On
Engineering • Consulting • Testing
October 21, 2003
DCI Pacific-San Diego
5125 Convoy Street, Suite 312
San Diego, California
Attention: Mr. James Lazo
Subject: Geotechnical Review of Structural Plans and Calculations, Architectural Plans and
Specifications, Site Survey Plan, Proposed Cingular SD-914-03, OMWD OPS Center,
1966 Olivenhain Road, Carlsbad, California.
' '
Reference: "Geotechnical Exploration Report, Proposed Cingular SD-914-03, OMWD OPS
Center, 1966 Olivenhain Road, Carlsbad, California", prepared by Professional
Service Industries, Inc., dated August 28, 20~3. PSI Project No. 059-35052.
Dear Mr. Lazo:
In accordance with your request, Professional Service Industries, Inc., (PSI) has performed a
geotechnical review of the architectural plans/drawings and specifications, structural plans, and site
s,,u-vey plans for the proposed communications tower/facility for the above project. The purpose of
our review is to verify that the foundation and grading/civil plans have been prepared in general
accordance with geotechnical considerations presented in the referenced reports. The plans which
were reviewed are as follows:
• Title Sheet Tl, Cingular Wireless, SD-914-03, OMWD OPS Center, 1966
Olivenhain Road, Carlsbad, Ca. 92024, prepared by DCI Pacific, dated September
15,.2003.
• General Notes T2 & T3, Cingular Wireless, SD-914-03, OMWD OPS Center, 1966
Olivenhain Road, Carlsbad, Ca. 92024, prepared by DCI Pacific, dated September
15, 2003.
• Architectual Drawings Al -A5, Cingular Wireless, SD-914-03, OMWD OPS
Center, 1966 Olivenhain Road, Carlsbaq, Ca. 92024, prepared by DCI Pacific, dated
September 15, 2003.
• Detail Drawings DI & D2, Cingular Wireless, SD-914.:03, OMWD OPS Center,
1966 Olivenhain Road, Carlsbad, Ca. 92024, prepared by DCI Pacific, dated
September 15, 2003.
• Structural Drawings Sl -S3, Cingular Wireless, SD-.1914-03, OMWD OPS Center,
1966 Olivenhain Road, Carlsbad, Ca. 92024, prepared by Connell Design Group,
dated October 10, 2003.
• Site Survey, Sheet C-1, Cingular Wireless, SD-914-03, OMWD OPS Center, 1966
Olivenhain Road, Carlsbad, Ca. 92024, prepared by Floyd Surveying, Inc., dated
November 11, 2002.
Profe""'ool SoNlce 100"81,I", ,~. • 6867 Nancy Rldg, o,,~, s,11, E • San Diego, CA 92121 • Phoo, 858/455-0544 • Fax C!lf O') ~ '-f ,:2._J""
,,,
Cingular SD-914:..03, OMWt> OPS Center
DCI Pacific -San Diego
PSI Project No. 059-35052
October 21, 2003
Page2
Based upon our review, the above structural plans, architectural drawings, civil plan and
specifications for the project generally appear to properly incorporate the recommendations
presented in the referenced reports.
We appreciate the opportunity to provide profes$iOnal servi<;:es for this project and look forward to
working with the consultant team during the construction phase. If you have any questions
pertaining to this letter, or if we may be of further service, please contact our office.
Respectfully submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
~~.
Ronald S. Halbert
·· Senior Project Engineer
RCE No. 42202
( 4 copies submitted)
Cingular Wireless
Permit Pkg with Foundation
OMWD OPS Center, CA
Sabre job Number 04-09099
REVISED STAMPED PERMIT DRAWINGS
REPRESENTATIVE IS
Will Fergen
1-800-369-6690 EXT. 198
01 ~urra~ ~trHt •
· P~i;ine·712·251!-68~ ~·,
' •J • 1·
. Structural Design Report
40.5' Monopole
located at: OMWD OPS Center, CA
Site Number: SD-914-03
prepared for: .Cingular Wireless
by: Sabre Communications Corporation ™
Job Number: 04-09099
Revision A.
October 18, 2003
Monopole Profile ..... · . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . 1
Foundation Design Summary. . . . . . . . . . . . . . . . . • . . . . . . . . . . . .. . . . . . . . . . 2
Pole Calculation ....................... -. . . . . . . . . . . . . . . . . . . . . . . . . . . . c1-c&
Foundation Calculations ... ; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1-F7
f<,-r!··· ,....,__. ·Prepared by I' J I
Approved by j:;_,J 1
l
G.L.
Special 9-Arm Mount
37.oo• Rnd BASE 1. 75 • Thick
4 Belts 2.25•,
12.00" Bolt Project 31.00" Bolt Circle
Lev Qtv
1 1
12
1
1
1
1
1
1
1
Flcit-Flat
Sec LEP,iTH TOPf BOTf
1
BP
AB
39.50 12.00
fin\ .113olts
37.00 4
Boltf
84.00 2.25
LOAD CASE DESCRIPTION
LOAD CASE DESCR1PTION
Max 'Mnd
25.43
Hold
12.00
Hold
2.625
Max Wind Load x. 75
Ever a eratln
POI.£ SPECIFICATIONS
POU: HEIGHT 39.50 FEET
TAPER .3400 IN/FT
POLE SHAPE 18 SIDED POLYGON
ORIENTATION
Elev APPURTENANCE ~ ANTENNA ft. Fut DESCRIP ON
36.50 Special 9-Ann Mount
36.50 4.5' X 1'
41.50 F ·TOP BRANCiES
36.50 F BRANCHES
31.50 F BRANCHES
26.50 F BRANCHES
21.50 F BRANCHES
16.50 F BRANCHES
12.00 F BRANa-tES
l}l~<r ,1~r . STEEL
lbs · SPEC FINISH
.1875 1481 A572-65 Galv
1.750 474 A633-60 Galv
TOTAL 1955
597 A615-'-75 Galv-18"
O.LF. RAD FACTORS
'¥£RT. ICE GUST Cf
1.00 1.69 .65
1.00 .50 1.69 ,65
1,00 1.69 .65
. 4.8 15.2 401 1.1 2.45
7.4 11.6 309 .8 1.90
4.8 6.7 178 .5 1.09
1) ANlENNA FEED LINES RUN INSIDE POU:
OMWD OPS Center, CA
~~~~::.J SD-914-03
DRAllH BY
CHECKED BY KJT
40.50 MONOPOLE
DRAWING NO. REV
04-09099-01 A
SCALE
N.T.S.
PAGE
1
~,-, ~abre ~ Communications
..,. Corporation
Two (2) #4 ties
within top 5u of
concrete
Grade
Customer: Cingular Wireless
No.: 04-09099
Page:2
10/18/2003
By:KJT
Revision A
Site: OMWD OPS Center, CA SD-914-03
40.5' Monopole at
75 mph Wind+ 0;5 in. Ice pei"ANSI/TIA/EIA-222-F-1996.
4• .. 5•
I ~ I
I I t------~ I. I
I I I I
~-----~ I . I
I I
I I t------4 I I I I L------1 I I
I I L-------
ELEVATION VIEW
(12.37 Cu. Yds. each)
(1 REQUIRED)
Antenna Loading per Page 1
0 _,
,-
0 I 0 C\J
0 _, .... C\I
Pier
2). Rebars to conform to ASTM specification
A615 Grade 60.
3). All rebar to have a minimum of 3" concrete
cover.
4). All exposed concrete corners to be
chamfered 3/4".
5). The foundation design is based on the
geotechnical report by Professional Service
Industries, Inc., Project No. 059-35045, dated
August 28, 2003.
6). See the geotechnical report for drilled pier
installation requirements, if specified.
Rebar Schedule er Pier
(20) #7 vertical rebar w/#4 ties, two within top
5" of pier then 12" C/C
Information contained herein ls the sole property of Sabre Communications Corporation, constitutes a trade secret as defined by Iowa Code Ch. 550 and
shall not be reproduced, copied or used in whole or part for any purpose whatsoever without the prior written consent of Sabre Communications Corporation.
2101 Murray St, P.O. Box 658-Siou?( City1 !A 51102-069&, pt,one 712;258.6690 -Fax 712.258.8250
SABRE COMMUNICATIONS CORP
2101 Murray Street
Sioux City, IOWA 51101
TOP BOTTOM POLE BASE
JOB: 04-09099
Cingular Wireless.
OMWD o~s Center, CA
DIAMETER 12.00 in. 12.19 in. DIAMETER 25.43 in. 25.82 in. HEIGHT 39.50 ft. 18 SIDED
Page Cl
Sat 18-Oct-03 13:45
Tel: 712.258.6690
Fax: 712.258.8250
Point-Point]
Point-Point} FLAT ORIENTATION HEIGHT 1.00 ft .. ABOVE GROUND E-MODULUS 29000 ksi 12000 ksi SHEAR MODULUS]
APPUJtTENANCES
ATTACH POINTS: NO. x, ft Qty Descript:i,on Status 1 36.50 1 121. 3T-Arrn 5' Standoff Initial Appurt
POLE SECTIONS
Bottom Thick Connect LAP Taper Length Weight Steel Pole
No. Xtft. in. ~ in. in/ft ft. lbs Spec Finish·
1 39.50 .18750 .C-Weld. .3400 39.50 1481 A572-65 GALV
SECTION PROPERTIES
Area Iz IxI~ SxS~ F;f X,ft D,in T,in in"2 in"4 in" in" w/t d/t ksi 39.50 12.00 .1875 7.03 246 123 20.2 9.52 64.0 65.00 TOP 36.50 13.02 .1875 7.64 316 158 23.9 10.48 69.4 65.00 -Pl 31.50 14.72 .1875 8.65 462 231. 30.9 12.08 78.5 65.00 -P2 26.50 16.42 .1875 9.66 644 322 38.6 13.68 87.6 65.00 21.50 18.12 .1875 10.67 866 433 47.1 15.28 96.6 65.00 16.50 19.82 .1875 11.68 1138 569 56.5 16.88 105.7 65.00 -P3 11.50 21.52 .1875 12.70 1460 730 66.8 · 18.47 114.8 65.00 6.50 23.22 .1875 13. 71 1836 918 77 .9 20.07 123.8 65.00 1.50 24.92 .1875 14.72 2274 1137 89.9 21. 67 132.9 65.00 .oo 25.43 .. 1875 15.02 2418 120.9 93.6 22.15 135.6 65.00 BASE
PageC2
SABRE COMMUNICATIONS CORP JOB: 04-09099 Sat 18-Oct-03 13:45
2101 Murray Street Cingular Wireless Tel: 712.258.6690
Si9ux City, IOWA 51101 OMWD OPS Center, CA Fax: 712.258.8250
CASE -1: Max Wind ----~----......... --------~------TIA/EIA-222F
VERTICAL OLF 1.00 WIND SPEED 75.0 mph 120.7 kph ICE COVER .00 in. GUST FACTOR 1.69 STRESS REDUCTION .60 EXPOSURE-COEFF. .2857 STRESS AMPLIFY 1.33 Cf .650 BASE ABOVE Grd 1.0 ft REFERENCE HEIGHT 33.0 ft
PRESSURE @Ref.Ht 24.3 psf 1165.Pa
APPURTENANCE LOADS
Center WEIGHT AREA Tx-CABLE . FOR~ES MOMENT
LEV QTY DESCRIPTION Line each each WIND TranY Ax-Z LongX Elev-ft -lbs ft"2 Qty #/ft psf kips kips ft-k . 36.50 846 · .o 25.29 .00 -.85 .o 1 1 12' 3T-Arm 5' Standoff
12 4.5' X 1' 36.50 30 .0 1 5/8" 12 1.040 25.24 .00 -.82 1 TOP BRANCHES 41.50 250 72.0 None 1 .000 26.16 1.88 -.25 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 ~RANCHES 1 BRANCHES
RESULTS
X, ft 39.50 36.50 31.50 26.50 21.50 16.50 11.50 6.50 1.50 .oo
DISPLACEMENTS
Xft. · 36.50
31.50 16.50.
WIND
psf 16.8 16.4 15.8 15.8 15.8 15.8 15.8
15.8 15.8
15.8
36.50 250 86.8 None 1 .000 25.24 2.19 -.25 31.50 250 86.8 7/8" 1 .000 24.34 2.11 -.25 26.50 250. 86.8 None 1 .000 24.34 2.11 -.25 21.50 250 86.8 None 1 .000 24.34 2.11 -.25 16.50 250 86.8 7/8" 1 .000 24.34 2.11 -.25 12.00 200 69.4 None 1 .000 24.34 1.69 -.20
1---FORCES,kips ---!---MOMENTS ft-kips---jSTRESS ALLOW ShearX ShearY AxiaZ BendX BendY TorqZ ksi ksi .0 .0 .o .0 .0 .o .01 51.87 .0 4.3 -2.1 -9.5 .0 .o 5.14 51.87 .0 10.7 -2.8 .. 8. .0 .o 2.24 51.87 .0 10.8 -3.0 -52.8 .0 .o 16.82 51.87
.0 10.9 -3.2 -106.9 .0 .o 27.62 51.87 .0 14.9 -3.9 -154.0 .0 .0 33.09 51.87 .0 15.0 -4.2 -228.3 .0 .0 41.38 51.87 .0 15.1 -4.6 -303.2 .0 .0 47.09 51.87 .0 15.2 -4.8 -378.7 .0 .0 50.92 51.87 .o 15.2 -4.8 401.4 .o .o 51.79 51.87
CSR .000 .099 .043 .324
.532 .638 .798 .908
.982 .998
!---------DEFLECTION ft.---~-------1-----ROTATION, deg-------lMicroW X y z XY-Result X y z XY-Res Allow .oo .96 -.02 .96< 2.62%> -2.45 .00 .00 2.45 .00 .75 -.01 .75< 2.38%> -2.31 .00 .00 2.31 .00 .22 .oo .22< 1.36%> -1.49 .00 .00 1.49
';, Page C3
SABRE COMMUNICATIONS CORP
2101 Murr9-y Street
JOB: 04-09099
Cingular Wireless
OMWD OPS Center, CA
Sat 18-Oct-03 13:45
Tel: 712.258.6690
Fax: 712.258.8250 Sioux City, IOWA 51101
CASE -2: Max Wind Load x.75
VERTICAL OLF
-~------,----=---------TIA/EIA-222F
1.00 WIND SPEED
GUST FACTOR EXPOSURE COEFF. Cf
65.0 mph 104.5 kph
ICE COVER .so· in. .60 1.33
1. 69 STRESS REDUCTION STRESS AMPLIFY
BA$E ABOVE Grd 1.0 ft REFERENCE HEIGHT PRESSURE @Ref.Ht
.2857 .650 33.0 ft 18.3 psf 873.Pa
APPURTENANCE LOADS
Center WEIGHT AREA Tx-CABLE FORCES MOMENT Line each each WIND TranY Ax-Z LongX LEV QTY DESCRIPTION Elev-ft . lbs ftA2 Qty #/ft psf kips kips ft-k 1 1 12' 3T-Arm 5' Standoff 36.50 930 .o 18.97 .no -.93 .o 12 4.5' X 1' 1 TOP BRANCHES 36.50 59 .0 1 5/8" 12 1.040 18.93 .00 -1.17
4'1.50 500 73.5 None 1 .000 19.62 1.44 -.50 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES
RESULTS
X,ft 39.50 36.50
31.50 26.50
21.50 16.50
11.50 6.50 1.50 .oo
DISPLACEMEN'l'S
Xft. 36.50 31.50 1.6. 50
WIND psf 12.6 12 .,3
11.9 11.9
11.9 11.9 11.9 11.9 11.9 11.9
36.50 500-88.5 None 1 .000 18.93 1.68 -.50 31.50 500 88.5 7/8" 1 .000 18.25 1.62 -.50 26.50 500 88.5 None 1 .000 18.25 1.62 -.50 21.50 500 88.5 None 1 .000 18,25 1.62 -.50 16.50 500 88.5 7/8" 1 .000 18.25 1.62 -.50 12.00 400 10:0 None 1 .ooo 18.25 1.29 -.40
1---FORCES,kips 7 --I---MOMENTS,ft-kips---jSTRE$S ALL9W ShearX ShearY·Axiaz BendX BendY TorqZ ksi ksi .0 .0 -.1 .0 .0 .o .01 51.87 .0 3.3 -3.2 -7.3 .0 .o 4.14 51.87 .o 8.3 -4.7 .4 .0 .o 1.81 51.87 .0 8.4 -5.0 -40.9 .0 .o 13.31 51.87 .0 8.4 -5.3 -82.7 .o .o 21.61 51.87 .0 11.4 -6.4 ~119.0 -.0 .o 25.86 51.87 .0 11.5 -6.8 -17~.2 .o .o 32.21 51.87 .0 11.6 -7.2 ~233.7 .0 .o 36.56 51.87 .0 11.6 , -7.4 -291.7 .0 .0 39.48 51.87 .o 11.6 -7.4 309.1 .0 .o 40.13 51.87
CSR
.000 .080 .035 .257 .417 .499 .621
.705 .761
• 774
!---------DEFLECTION ft. -----------·,-----ROTATION, deg--,-----!Mierow
X y z XY-Result ' X y z XY-Res Allow .00 .74 -.01 .74< 2.03%> -1.89 .00 .00 1.89 .00 .58 -.01 .58< 1.83%> -1.78 .00 .00 1.78 .00 .17 .00 -.17< 1.05%> -1.15 .00 .00 1.15
,, ' 'J
PageC4
SABRE COZOIONICATIONS CORP
2.101 Murray Street
Sioux City, IOWA 51101
JOB: 04-09099
Cingular Wireless
OMWD OPS Center, CA
Sat 18-Oct-03 13:45
Tel: 712.258.6690
Fax: 712.258.8250
CASE -3: Everyday Operating --'--',,---------....... ----~TIA/EIA-22~F
VERTICAL OLF 1.00 WIND SPEED
GUST FACTOR EXPOSURE COEFF. Cf
50.0 mph 80.5 kph
ICE COVER .00 in. 1. 69 STRESS REDUCTION .60 STRESS AMPLIFY 1.33 BASE ABOVE Grd 1.0 ft REFERENCE HEIGHT PRESSURE @Ref.Ht
.2857 .650 33.0 ft 10.8 psf 518.Pa
APPU~TENANCE LOADS
Center WEIGHT AREA Tx-CABLE FORCES MOMENT Line each each WIND TranY Ax-Z LongX
~EV QTY DESCRIPTION Elev-ft ·1bs ft"2 Qty #/ft psJ kips kips ft-k 1 1 12' 3T-Arm 5' Standoff 36.50 846 .0 11.24 .00 -.85 .0 12 4.5' X 1' 36.50· 30 .0 1 5/8" 12 1.040 11.22 .00 -.82
1 TOP-BRANCHES 41.50 250 72.0 None 1 .000 11.63 .84 -.25 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES 1 BRANCHES
RESULTS
x, ft 39.50 36.50 31.50 26.50 21.50 16.50 11.50 6.50 1.50 .00
DISPLACEMENTS
Xft. 36.50 31.50 16.50
WIND psf 7.5 7.3 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
36.50 250 86.8 None 1 .000 11.22 .97 -.25 31.50 250 86.8 7/8" 1 .000 10.82 .94 -.25 26.50 250 86.8 None 1 .000 10.82 .94 -.25 21. 50 250 86. 8 None 1 . 000 10. 82 . 94 -. 25
16.50 250 86.8 7/8" 1 .000 10.82 .94 -.25 12.00 200 69.4 None 1 .000 10.82 .75 -.20
1---FORCES kips ---!---MOMENTS ft-kips---jSTRESS ALLOW ShearX ShearY AxiaZ Bend){ BendY TorqZ ksi ksi .0 .o .0 .0 .0 .o _.01 51.87 .0 1.9 -2.3 -4.2 .o .o 2.45 51.87 . 0 4 :8 · -3 . 1 . 4 . 0 . 0 1. 0 8 51. 8 7 .0 4.8 -3.3 -23.5 .0 .0 7.68 51.87 .0 4.9 -3.5 -47.5 .0 .o 12.47 51.87 .0 6.6 -4.1 -68.5 .o .o 14.91 51.87 . 0 6. 7 -4. 4 -101. 5 . 0 . 0 18. 60 51. 87 .o 6.7 -4.6 -134.8 .0 .0 21.12 51.87 .o 6.7 -4.8 -168.3 .o .0 22.82 51.87
.0 6.7 -4.8 178.4 .0 .0 23.20 51.87
CSR .000 .047 .021 .148 .240 .288 .359 .407 .440 .447
!---------DEFLECTION ft.~---~------1-----ROTATION, deg-------lMicrow X y z XY-Result . X y z XY-Res Allow .00 .43 .00 .43< 1.17%> -1.09 .00 .00 1.09 .oo ~33 .oo· .33< 1.06%> -1.03 .oo .oo 1.03 .oo .10 .oo .10< .61%> --.66 .oo .o·o .66
S.JU3RE COMMUNICATIONS CORP
2101 Murray Street
Sioux City, IOWA 51101
JOB: 04-09099
Cingular Wireless
OMWD OPS Center, CA
Page CS
Sat 18-Oct-03 13:45
Tel: 712.258.6690
Fax: 712.258.8250
-------------------LOAD CASE SUMMARIES
LOAD CASE DESCRIPTION
1 Max Wind
2 Max Wind Load x.75
· 3 Everyday Opera ting
STRESS ENVELOPE
BOT-UP TOP
X,ft. DOWN 39.50 .00 TOP. 36.50 3.00-1 31.50 8.00-2
26.50 13.00
21.50 18.00
16.50 23.00-3 11.50 28.00
6.50 33.00
1.50 38.00 .oo 39.50 BASE
·FORCES, kips
X Y Z --.00 15.18 -4.81
.00 11.64 -'-7.44
.oo 6.74. -4.$1
+-----COMBINED----+ STRESS STRESS LOAD
MOMENTS,
X
401.4
309.1
178.4
ft-kips
y z --. o· . o
• 0 . 0
. 0 • 0
ksi RATIO CASE Qty APPURTENANCE .01 .000 2 -Pl 5.14 .099 1 ( 1) 12 I 3T-Arm 5' Standoff
-P2 2.24 .043 1 (0) None 16.82 .324 1 2T.62 .532 1 -P3 33.09 .638 1 ( 0) None
41.38 .798 1 47.09 .908 1
50.92 .982 1 51.79 .998 1
:, I. .. ., PageC6
SABRE COMMUNICATIONS CORP
2101 Murray Street
Sioux City, IOWA 51101
JOB: 04-09099
Cingular wireless
OMWD OPS Center, CA
Sat 18-0ct~03 13:45
Tel: 712.258.6690
Fax: 712.258.8250
POLE D1',TA
DIAMETER= PLATE = TAPER -'"
SHAPE: 18 SIDED POLYGON with FLAT-FLAT ORIENTATION
BOLTS EVENLY SPACED 21.92 in. ON CENTER
25.43 in. BASE AXIAL FORCE= -4.8 kips
. 1875 in . ACTIONS SHEAR X = .0 kips
.3400 in/ft SHEAR Y = 15.2
Vert Long
Tran kips
POLE Fy = 65.00 ksi X-AXISMOM = 283.8 ft-kips Tran ft-kips Long Y-Axis MOM= 283.8 Z-Axis MOM= .0 ft-kips Vert
DESIGN CASE= 1 Max Wind
Design: ANY Orientation Reactions at 45.00 deg to X-AXIS
BOLT LOADS
AXIAL -COMPRESSION = 156.59 kips.
AXIAL'-TENSION = 154 .1,8 kips
SHEAR = 3.80 kil;)S AXIAL STRESS = · 47. 44 ksi SHEAR STRESS = 1.24 ksi
YIELD STRENGTH Fy-= 75.00 ksi CSR
ALLOW STRENGTH Fa [ .60xl.33] = 59.85 ksi .794
TENSIO~ AREA REQUIRED = 2.58 in"2
TENSION AREA FURNISHED = 3.25 in"2
ROOT AREA FURNISHED = 3.07 in"2
ANCHOR BOLT DESIGN USED
4 Bolts on a 31.00 in. Bolt Circle
2.250 in. Diameter 67.13 in. Embedded
12.00 in. Exposed 84.00_ in. Total Length
EIA-F
SHIP
(lbs}
597
CONCRETE BOND -Fe• 4000 psi
TENSION: NUT: ACTING: ALLOW:
LENGTH REQD:
96.49 kil;)S 121. 59 psi
303.26 J?Si
26.91 in.
COMPRESSION: NUT:
ACTING: ALLOW: LENGTH REQD:
81. 51 kiJ?S 158.24 psi
303.26 J?Si 35.03 in.
BASE PLATE
·. [Bend Model: 1/4 Circ]
YIELD STRENGTH = 60.0 ksi BASE PLATE USED
BEND LINE .WIDTH = 20.2 in.
PLATE MOMENT = 429.4 tn-kips THIC!QfESS REQD 1.63
1.75 in. THICK
37.00 in. ROUND SHIP = in. BENDING STRESS = 41. 7 ksi
ALLOWABLE= 47.9 ksi [Fy X .60 X 1.33]
12.00 in. CENTER HOLE (lbs}
. 00 in . 474'
----------------LOAD CASE SUMMARY
ABolt.:.str Plate-Str A.Bolt-Bond
_FORCES-(kip8) _
LC Axial Shearx ShearY
1 4. 8 . 0 15. 2
2 7. 4 . 0 11. 6
3 4.8 .0 6.7
_ MOMEN'l'S-(ft-k)_
x-axis Y-axis TorQ
401 0 • 0
309 0 .0
178 0 . 0
Actual Allow _Actual Aliow _Actual Allow _Design
ksi ksi ksi ksi psi psi Code
-48.3 59.9 41.7 47.9 158 303 EIA-F
-37.4 59.9 31.9 47.9 84 303 EIA-F
-21.6 59.9 18.4 47.9 -23 303 EIA-F
,, ( j J
0409099P.lpo Licensed to: Keith Tindall
sabre communications corporation.
LATERALLY LOADED PILE ANALYSIS· PROGRAM LPILE plus
PC VERSION 3.0 (C) COPYRIGHT ENSOFT,INC. 1997
THE PROGRAM WAS COMPILED USING MICROSOFT FORTRAN COMPILER,
(C) COPYRIGHT MICROSOFT CORPORATION
40.5' Monopole cingular Wireless OMWD OPS center, CA (04-09099) 10-18-03
*************************************************************
ULTIMATE BENDING RESISTANCE AND FLEXURAL RIGIDITY.
*****************************************·********************
DIAMETER= 54.00 IN
CONCRETE COMPRESSIVE STRENGTH= 4.000000 KIP/IN**2
REBAR YIELD STRENGTH= 60.000000 KIP/IN**2
MODULUS OF ELASTICITY OF STEEL= 29000.000000
NUMBER OF REINFORCING BARS= 20
AREA OF ONE REBAR= .600E+00 IN**2
NUMBER OF.ROWS OF REINFORCING BARS= 11
COVER THICKNESS= 3.938 IN
SQUASH LOAD CAPACITY= 8465.95 KIP
ROW AREA OF DISTANCE TO
NUMBER REINFORCEMENT CENTROIDAL AXIS IN**2 IN
1 .600000 23.0625 2 1.200000 21.9338
3 1.200000 18.()580 4 1.200000 13.5558
5 1.200000 7.1267
6 1.200000 .0000
7 1.200000 -7.1267
8 1.200000 -13.5558 9 1.200000 -18.6580 10 1.200000 -21. 9338
11 .60000Q. -23.0625
KIP/IN**2
OUTPUT RESULTS FOR AN AXIAL LOAD= 4.81 KIP
*****************************************************
Page 1
, .
MOMENT EI
IN-KIP KIP-IN**2
.161E+04 .16069E+l0
.789E+04 .15770E+l0
.789E+04 .87613E+09
.789E+04 .60655E+09
.789E+04 .46383E+09
.789E+04 .37549E+09
.789E+04 .31541E+09
.789E+04 .27190E+09
.789E+04 .23895E+09
.817E+04 .22079E+09
.903E+04 .22018E+09
.988E+04 .21960E+09
.107E+05 .21905E+09
.116E+05 .21841E+09
.143E+05 .17263E+09
.153E+OS .13570E+09
.159E+05 .11105E+09
.162E+05 .93837E+08
.i64E+05 .80834E+08
.166E+05 . 71306E+08
.167E+OS .63476E+08
.168E+05 . 57214E+08
.168E+05 .S2092E+08
.168E+05 .47665E+08
.169E+05 .44227E+08
.169E+05 .41015E+08
.169E+05 .38237E+08
.169E+OS .35812E+08
.169E+05 .33676E+08
PROGRAM LPILE plus version 3.0
(C) COPYRIGHT 1997 ENSOFT, INC.
ALL RIGHTS RESERVED
0409099P.lpo
PHI MAX STR N AXIS
1/IN IN/IN IN
.000001 .00003 27.662
.000005 .00014 27.208
.000009 .00011 11. 692
.000013 .00015 11.608
.000017' .00020 11.577
.000021 .00024 11.567
.000025 .00029 11. 570
.000029 .00034 11. 579
.000033 .00038 11. 594
.000037 .00043 11. 612
.000041 .00048 11.632
.000045 .00052 11.655
.000049 .00057 11.679
.000053 .00062 11.700
.000083 ;00091 10.974
.000113 .00116 10.267
.000143 .00139 9.742
'.000173 .00161 9.287
.000203 .00183 9.000
.000233 .00203 8.700
.000263 .00222 8.449
.000293 .00242 8.267
.00032~ .00263 8.131
.000353 .00286 8.100
.000383 .00309 8.067
.000413 .00328 7.935
.000443 .. 00346 7.821
.000473 .00365 7.724
.000503 .00384 7.642
40.5' Monopole cingular wireless OMWD OPS center, CA (04-09099) 10-18-03
UNITS--ENGLISH UNITS
I N P U T I N F O R M A T I O N
*******************·**************
THE LOADING IS STATIC ---·----------------------
PILE GEOMETRY AND PROPERTIES ----------------------------
PILE LENGTH = 252.00 IN
Page 2
· P .. F2-
. 0409099P. l po
2 POINTS
X DIAMETER MOMENT OF AREA
INERTIA
IN IN IN**4 lN**2
.00 54.000 .417E+06 .229E+04
252.00 54.000 .417E+06 .229E+04
SOILS INFORMATION
X AT THE GROUND SURFACE = 12.00 IN
SLOPE ANGLE AT THE GROUND SURFACE = .00 DEG.
4 LAYER(S) OF SOIL
LAYER 1
THE SOIL IS A SAND -P-Y CRITERIA BY REESE ET AL, 1974
X AT THE TOP OF THE LAYER = 12.,00 IN
X AT THE BOTTOM OF THE LAYER· = 36.00 IN
MODULUS OF SUBGRADE REACTION = .• lOOE+Ol LBS/IN**3
LAYER 2 .
THE SOIL IS A SAND -P-Y CRITERIA BY REESE ET AL, 1974
X AT THE TOP OF THE LAYER = 36.00 IN .
X AT THE BOTTOM OF THE LAYER = 96.00 IN
MODULUS OF SUBGRADE REACTION = .250E+02 LBS/IN**3
. LAYER 3
THE SOIL IS A SAND -P-Y CRITERIA BY REESE ET AL, 1974
X AT THE TOP OF THE LAYER = 96.00 IN
X AT THE BOTTOM OF THE LAYER = 192.00 IN MODULUS OF SUBGRADE REACTION = .250E+02 LBS/IN**3
LAYER 4
THE SOIL IS A SAND -P~Y CRITERIA BY REESE ET AL, 1974
X AT-THE TOP OF THE LAYER = 192.00 IN
X AT THE BOTTOM OF THE LAYER = 372.00 IN
MODULUS OF SUBGRADE REACTION = .200E+02 LBS/IN**3
DISTRIBUTION OF EFFECTIVE UNIT WEIGHT WITH DEPTH
X,IN
12.00
36.00
36.00
96.00
96.00
192.00 192.00
372.00
8 POINTS
WEIGHT,LBS/IN**3
. 58.E-01
.SSE-Oi
.SSE-01
.58E-01
.58E-01
.SBE-01
.22E-01 .. 22E-01
DISTRIBUTION OF STRENGTH PARAMETERS WITH DEPTH
MODULUS OF ELASTICITY LBS/IN**2
.360E+07
.360E+07
X,IN
12.00
36.00
36.00
96.00
8 POINTS
C,LBS/IN**2
.OOOE+OO
.OOOE+OO
.OOOE+OO
.OOOE+OO
PHI,DEGREES
.100E+01
.lOOE+Ol
.300E+02
.300E+02
E50
Page 3
96.00
192 .. 00
192.00
372.00
0409099P.lpo
.OOOE+OO .290E+02
.OOOE+OO .290E+02
.OOOE+OO .290E+02
.OOOE+OO .290E+02
BOUNDARY AND LOADING CONDITIONS
1
LOADING NUMBER 1
BOUNDARY-CONDITION CODE .LATERAL LOAD AT THE PILE HEAD
MOMENT AT THE PILE HEAD
= .152E+05 LBS
AXIAL LOAD AT THE PILE HEAD
FINITE-DIFFERENCE PARAMETERS
= .482E+07 IN-LBS
= .481E+04 LBS
NUMBER OF PILE INCREMENTS =
DEFLECTION TOLERANCE ON DETERMINATION OF CLOSURE =
MAXIMUM NUMBER OF ITERATIONS ALLOWED FOR PILE ANALYSIS=
MAXIMUM ALLOWABLE DEFLECTION =
OUTPUT CODES
KOUTPT = 0 KPYOP = 1 INC = 1
DEPTH DIAM
IN IN
PHI GAMMA AVG A B PST
LBS/IN**3
100
.lOOE-11 IN
100
.16E+03 IN
PSD
·66.74 54.00 · 30.0 .579E-01 2.25 1.65 .575E+03 .600E+04
y p
IN LBS/IN
.OOOE+OO .OOOE+OO
. 750E-01 .818E+02
.150E+OO .164E+03
.225E+OO .246E+03 .300E+OO .327E+03 .375E+OO .409E+03 .450E+OO .491E+03
.525E+OO .573E+03
.600E+OO .655E+03
.675E+OO .737E+03
.750E+OO .818E+03
.825E+OO .900E+03
.900E+.OO .949E+03 .203E+Ol .129E+04
.560E+02 .129E+04
.110E+03 .129E+04
.164E+03 .129E+04
DEPTH DIAM PHI GAMMA AVG A B PST PSD
IN IN LBS/IN**3 145.48 54.00 29.0 .579E-01 1.33 .94 .254E+04 .116E+05
y p
IN LBS/IN
Page 4
P. f-4
r ,. ( '.,
I
I
I 0409099P. 1 po
.OOOE+OO .OOOE+OO
.750E-01 .• 232E+03
.lSOE+OO .464E+03
.225E+OO .697E+03
.300E+OO .929E+03
.375E+OO .116E+04
.450E+OO .139E+04
.525E+OO .163E+04 .
. 600E+OO .186E+04
.67SE+OO .209E+04
.750E+OO .224E+04
.825E+OO .231E+04
.900E+OO :238E+04
.203E+Ol .338E+04
.560E+02 .338E+04
.110E+03 .338E+04
.164E+03 .338E+04
DEPTH DIAM PHI GAMMA AVG A B PST· PSD
IN IN LBS/IN**3
224.22 54.00 29.0 .SOSE-01 .94 · .58 .504E+04 .156E+OS
y p
IN LBS/IN
.OOOE+OO .OOOE+OO
.750E-01 .303E+03
.lSOE+OO .607E+03
.225E+OO .910E+03
.3001;+00 .121E+04
.375E+OO .152E+04
.450E+OO .182,E+04
.525E+OO .212E+04
.600E+OO .236E+04
.675E+OO .. 251E+04
.750E+OO .265E+04
.825E+OO ,278E+04
.900E+OO .290E+04
.203E+Ol .474E+04
.560E+02 .474E+04
.110E+03 .474E+04
.164E+03 .474E+04
DEPTH DIAM PHI GAMMA AVG A B PST PSD
IN IN LBS/IN**3
302.96 54.00 29.0 .432E-01 .ss .so .764E+04 .180E+OS
y p
IN LBS/IN
.OOOE+OO .OOOE+OO
.750E-01 .422E+03
.150E+OO· .843E+03
.225E+OO ,126E+04
.300E+OO .169E+04
.375E+OO .211E+04
.450E+OO .251E+04
.525E+OO .27SE+04
.600E+OO .298E+04
.675E+OO .321E+04
.750E+OO .342E+04
.825E+OO .362E+04
.900E+OO .382E+04
Page 5
f_ F5
0409099P.lpo
.203E+Ol
.560E+02
.110E+03
.164E+03
.672E+04
.672E+04
.672E+04
.672E+04
0 U t P U T I N F O R M A T I O N *********************************
*************************************************
* COMPUTE LOAD-DISTRIBUTION AND LOAD-DEFLECTION* * CURVES FOR LATERAL LOADING * *************************************************
LOADING.NUMBER 1
BOUNDARY CONDITION CODE
LATERAL LOAD AT THE PILE HEAD
MOMENT AT THE PILE HEAD
·AXIAL LOAD AT THE PILE HEAD
OUTPUT VERIFICATION
= 1
= .152E+05 LBS
= .482E+07 IN-LBS
= .481E+04 LBS
THE MAXIMUM MOMENT IMBALANCE FOR ANY ELEMENT = .811E-04 IN-LBS
THE MAX. LATERAL FORCE IMBALANCE FOR ANY ELEMENT=· .364E-04 LBS
BOUNDARY
CONDITION
BCl
.1518E+05
BOUNDARY
CONDITION BC2
.4817E+07
S U M M A R Y T A B L E
*************************
AXIAL
LOAD
LBS
.4810E+04
PILE ·HEAD
DEFLECTION IN
.9895E+OO
. ? fcf. LPILE OVTPVT; p. ,=-2_
(p/YlN = 0. Cf (tc,, 1900 "k,) = { S 1 1-lo ''l_
MAX.
SHEAR LBS
·-.5290E+05
/l1(A 1•3 (~180;000\~ 7· 514 ;,t L/S 210 ,I
. /ooo ) 1 1 -
Page 6
UBC 1806.8.2.1
d = .A/2*(1+{1+(4.36*h/A))A0.5)
Monopole
Moment (ft-k)
Shear (k)
Caisson Diameter, b (ft)
Caisson Height Above Ground (ft)
Caisson Height Below Ground (ft)
S1 (lateral soil pres:) lb/ft3
.401.4
15.2
4,5
1
15
333
Applied lateral force, P (lbs) 15180 .
Dist. from ground to application of P, h (ft) 27.44
A= 2.34*P/(S1*b) 4.74
Min. Depth of Embedment Required, d (ft)I 14.51 I
P-f7
OMWOwith.
ant~nnas
OFFICE USE ONLY
Lt, \OS-0
SAN D11:GO REGiONAL · i 7~
UPFP# _______ ,....,.
1
BP DATE _ __,_/ _ __,/ ____ ~1
HAZARDOUS MATERIALS QUESTIONNAIRE
Business Col")tact Telephone#
'c:. \ c~ .. (Ma) t.1..& c9ltA
City Zip Code APN#
~-I..!.~ Q-.. C\-z.ot ZSS--· 03 .. o
· Mailing Address City State Zip Code Plan File# s._....., b, · • ?..\ '2. \
Telephone#
(5Se) 2~
The following uestions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOU MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business
will use, process, or store any of the following hazardous material~. If any of the items are circled, applicant must contact the Fire Protection Agency with
. jurisdiction prior to plan submittal.
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water·Reactives
2. Compressed Gases 6. Oxidizers -10. Cryogenics
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
13. Corrosives
. 14. Other Health Hazards
15. None ofThese.
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISIONS (HMD): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 1255-lmperial Avenue, 3rd floor, San Diego, CA 92101.
Call (619) 338-2222 prior to the issuance of.a building permit. ·
FEES ARE REQUIRED. -1•,-,-, "/ ". ",t· , .,.,. " Expected date of Occupancy •,.:!J ,,;-··_,_·-·ui; : i • .;.,:; ~,"@J.@alARP Exempt-
-.,,-, ·-,i,'"1 I _:: .. _
1.
2.
3.
4.
5.
6.
YES NO
.ii D D Ml
D ~
Is your business listed on the reverse side of this form?
Will your business dispose of Hazardous Substances or Medical Waste-in ~my amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than
55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity?
D
D p
18 Will your business use an existing or install an underground storage tank?
6j Will your business store or handle Regulated Substances (CalARP)? [ji. Will your business use or install a Hazardous Waste Tank System. (Title 22, Article .1 0)?
-~-.
Date Initials' ---
0 CalARP Required
I
Date Initials
D CalARP Complete
I
Date ·initials
PART Ill: San Diego County Air Pollution Control District: If the answer is yes to any of the following questions, applicant must contact the Air Pollution Control
District, 9150Ctiesapeake Drive,_ San Diego, CA, 92123. Call (858)-650-4550 prior to the issuance of a building permit.
YES
1. p
2. D
3. tJ
4. D
NO ~ · Will the subject facility install or use any of the equipment listed on the Listing of Air Pollution Control District Permit Categories, on the reverse
side of this form?
~. (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)
as listed in the current Directory of ~chool and 9ommunity Coll~ge Districts, published by the San Diego County of Education and the current
California Private School Directory, complied in accordance with the provisions of Education Code Section 33190? J.)tJ E·a~
_ Does the building or structure for which this permit is requested contain any friable asbestos? •
· Is there demolition involvin the removal of a load supportin structural member?
Briefly describe business activities: Briefly· describe proposed project:
FOR OFFICAL USE ONLY. FIR!= D!=PARTMENT OCC
JJ~ cc~ s~.\-e:_
t e best of my knowledge· and belief the responses made herein are true and correct.
Si nature of Owner or Authorized A ent
I I
Date
BY: ________ ,__----~--------------DATE: / I
RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY0HMMD APCD COUNTY-HMMD APCD
DEH:HM-9171 (08/02) County of San Diego -DEH -Hazardous Materials Division
,,,
I, I
------· ... --------. -, -, CB032425 1966 OLIVENHAIN RD CBAD
OLIVENHAIN·WATER-CINGULAR
TELECOMUNICATION CABINETW/45 FT FAUX Tl
fl COt,i!M
Lot#: CRAIG MCNUDY
('-1 /0> -To CJs --;/-U//1.,_,,,-.,-l//f( lJ /Jt~ ;f'~ Ck; I v/~ f)C"<-,
C( ~ f)_ ;J-j) -~ · i) · 1(/11=>:> A.w· ,' "--0,v{ VU,.,(:~ ~ -..ff 6 /l 4 Pc_<' · BUILDING
V'. -:::J II~ PLANNING . . _ · · : , ENGfNEERING u.1-. JI . ·O' '?-, r:<c-i J LI.An . · : c-= : FIRE APPR/FPRM LP .J '-";.,..J J · · · . HEALTHDEPT .
(0/)o'/ tj-&n µ/-~p /4 ~IL-y16tj' v/ ~J'~~~,o •\0t1>,.0• !~ll!:.
/O/Jo/fJ
/, {/Io~
5,1,,e,,r ~ r J ;J-/). .Ci ,./ cak APP!.ICANT APPLICANT r ~ . /.J l ~t,__,,, J T l'/µ--e,A -1 PLAN CORR . I . ---+----ENG CORR ~. It ,_f r c._, ~ ,c,.µ' \f\\)',V ==: . i=------ss;:~~i,ORM -) li'0vv . f V --.. -~-,WOP.·,~;,;:c""' ~ T-7> -f, w / ~ ., /,)YI-"' ,r-H,,z-1-0, t-/ ~ ;,,:,~ ' . .. ---., ... ,.,· _.
y~;~~p-c
/I /r!>/D 3 -r5s w.e d
-~
\ \