HomeMy WebLinkAbout1969 Kellogg Ave; ; CBC2018-0369; Recycle('city of
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www .carlsbadca.gov
Owner: rl(JmGrJO 'IJ l~ f'::c ff-• J-"CT)j>et'' Contractor: SPW Construction t..., f' ' 1_ .,•-~:· r)
JUL J 7
Job Address: 1969 Kellogg Ave, Carlsbad, CA 92008 Phone Number: __ 76_0_-9_3_1_-1_1_3-~·~•f,._T--+~c~('-')-----2_0_18 ____ _
Du11.c:: .'\o
Permit#: CBC2018 -0369 Estimated Cost of Project: $ __ 1_o_3_,0_0_0_-_._.·_-_ ... ,_, __ , :"_:__:}_(,_\·~\/ __ _
Type of Project: D New Construction 129 Remodel or T.L □ Residential D Commercial D Demolition
(check all that apply) 0 Other --------------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area ________ X 2 lbs. = ________ lbs. of allowable waste.
IJI I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1-Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete NIA
Brick/ Masonry NIA
Cardboard lOlbs EDCO
Drywall 50 lbs EDCO
Landscape Debris NIA
Lumber/ Wood NIA Mill work sub will recvcle at shop
Metals 20 lbs EDCO
Mixed Waste 225 lbs EDCO
Trash/ GarbaE!:e
Other: 25 lbs
TOTAL lbs: 75 lbs 255 lbs
Estimated Percentage to be Re-Used or Recycled __ 77 ____ %
I certify that the information provided herein, to the best of my knowledge, is true and correct.
Contractor or Owner (print name)
Contractor or Owner (signature) r---
Official Use Only
07/17118
Date
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1 of 2 REV.01-2017
(city of
Carlsbad
Owner:
WASTE MANAGEMENT
PLAN
B-59
Contractor:
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Job Address:. __ /_~_G_9_~fu.~/i~1,fj,.._,"cJ>"-lf--lJ. ___ ;-<_ __ _ Phone Number:. _ _._7_6=---C>_'J_-_S_I_I I_S:.._t ______ _
Permit#: C.P:C .. 2..C, \~) -u'3Lo 9 lo :J, Oo<) Estimated Cost of Project: $ _____________ _
Type of Project: □ New Construction □ Remodel or T.I. □ Residential □ Commercial !JI Demolition
(check all that apply) D Other _____________________________ _
Non-hazardous construction waste generated during the course of this project shall be_ recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new constwction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area, ________ X 2 lbs.= ________ lbs. of allowable waste . •. D I plan on using a WASTE MANAGEMENT roll-off btn. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to )aG. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete J.t/4
Brick/ Masonry µ/4
Cardboard /() (!,IXC
Drywall So FA'.:¥•
Landscape Debris N/A
Lumber/ Wood 11//A ,,_, Ut.. KA>~<!:: '(,,viii "'4_.,,,./.., ~./ 0 ..
Metals 'lo ccu:a
Mixed Waste -Z.~5 -'c,e,J
Trash / Garbaee
Other: ,ZS
TOTAL lbs: ~ ,t;" 7 ~.5' ~'-l
Estimated Percentage to be Re-Used or Recycled ·7---7
I certify that the informa~rovided herein, to tie best of my knowledge, is true and correct. /~~ t,1,/. k""'
Contractor or Owner (print name) ~
Contractor or Owner (signature) Date
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1of2 REV.01-2017
Table 2 -Actua I Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash / Garba~e
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled, ______ %
Official Use Only
D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by: _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt / Concrete 0 3000
Brick I Masonry 100 050
Cardboard 0 1SO
Drywall 0 so
Landscape Debris 0 120
Lumber/ Wood 500 0
Metals 300 200
Mixed Waste 1500 0
Trash/ Garbage 300 0
Other: Pool c;uvclte 0 000
TOTAL lbs.: 2J-OO 5,3-,JO
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
Waste Hauling Company or Re-Use Method
A"lsC 1-tnullvcc, Co.
WM I Re-1,,\Seci "lsrldz Ovc-slte
"-1sC 1-+nullvcr, c~.
A1sC 1-tn"llvcc, Co.
Muld1eci c: Re-useci ovc-slte
wnste Mnvcnc,ev'\,\,eVlt
WM I AB,C 1-tn"llvcg
WM
WM
L-tseci ns Cvusheci "lsnse ovc-slte
(Total Combined Waste)
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
Recycling Calculations
Recycle Trash Total Pounds
QDemo/Edco 12597.2 3762.8 16360
QDemo/Edco 11221.6 2298.4 13520
QDemo/ Edco 11155.2 2284.8 13440
QDemo/ Edco 9594.8 1965.2 11560
QDemo/Edco 6523.8 1336.2 7860
QDemo/Edco 12400.2 2539.8 14940
63492.8 14187.2 77680
Diversion Rate
77%
83%
83%
83%
83%
83%
82%
White Construction, Inc
2524 Gateway Rd
Carlsbad, CA 92009
760-930-1130
T1c"'-et 9S~119
Openl!d by
Cus~omer
Ccn~act ·
KCRAWF02
150•7265! Q iJEMOSITION
2 7"'"7 LOKE~ AVE W
CARLSEAU CA 920l0 6517
"IKE C-OE!lHJS
G19 a-:l-5401
Requested by ~"!!KE
P!'ot 1 ,-
Load T/PP
'Ju.T.p S < te
fM?TY&RE,UR~
EOCO C&.O 1.0ADS-C l -:"i
.,.. -wastC'-
:>att! Requc~tec
:>a~@ u1 sp-:1t.ct.ed
Sfl!''/l Cc
:..HSPosAL PER TOtJ os~:OLITION ~tJ.~ .i' ~ Y!!§ TY£'..;.; WtJ.9.~•r .Joh
!! 1 a T DE:MC
("&~ HF.:C"iC:LE l,OAD P.£P.D~ AFT.gR ',AM -BIG WA..:..EHOL!:'C ROI,.., UP 00:JRS WILt, BE OP
Etl PLC RlGlfT tl/SIIJE C'..!) l,OAuS MUfT Rev
01Dtl1"' OP.DP.R THE 2 TA..??5 sn1ce arus AR£ INSIDE WAR.~HOVSE •~E w1,.,t, H;..:;c:
D~ !VER 'l'AKE !lOT'I TAR?S
fl h l• '"I£ ! t. r l .. '· ' ~L."' ' Ill I n • ,
r ' ' r l l ;) . '. r;, ,, ,
fl
0-3/2!!/20l8
06/i0/20l9
' -· .
"f I
T
I )
1 .. .. ' ., ,,
J, ~ . ) I.: ) { , , . I ✓ ' {"'(,·f.of,t I , '
7:cke~ SS72~~ D:~;er; ~I~~ GA~C:A
')pe;.ed b; ~ r"CR]\;.IF02
C-us::ome:-350-72551. Q :>::Mor..:~IOtl
3,777 LO~ER i\V"E; W
':ARLSEAZI Cr: ~~Oi.O ,;~ ,
Contac... '-1~!'\.£ DOBBI!,j";_,
6;:J-oH-5-!0l
Ra~c~s~ed ~~ MifE
PJ~::,l' 1. le
Load Type
I.lump S1~e
00 NOT P.i;:Tl/RN
::OCO •:&D I.DADS -CTY
I Wnste
oa:~ Requested 07/0i/2018
C~tc 01spacched! 07/0~/2V!&
:S>:!rv:.ce PISPCSAL PE, TON ;JEMOLZTi'.ON Q!:!!Jlt~;,x f YE~ Tl~-~ ,,r-2~!2..~ ~~h
€ 76 T DE1'0
c~o recycle lCJ~d ca;:,:, to EDD -a,G 1'1\R!':HOGS€ R<)LL UP DOC'R'i .,,:.,1 Be ,,
F.h PL,~ R! :t'{. ; ~:s1:n=; C&D LOA:.IS ~es:" P.:CY i:locrt cl~SC" 1H. Zp::-
Oat•~
:-i.cf..e_ 9' l "7,Si; I/:;:. ',,'e.. ,]O~f; U :<!.OL' =-N
Opened tJ'_t. c:c.;~R!HG
C\.tS~c,;mer. 350 7287? 0 CE~OLI7tO~,
FJo:i9 KE:Li.,OGG AV"";';
CARLSBAD CA 9.'.?0'J6 b se ..
~on:.:;i:c: :-t!KE 0088'.i.U~;
760 6i:?•6la:;
F.equested by Mr:<;; bl~ SJ: ~..;o;
Pro!1 le
;:,oad '!yp1~
Dump Sitt.
E~P7Y&Rf.7tJR!J
~~OC'O C'~D LOAOS•• .. JT'(
1,,• rid.St~
Date ~equesced 17/lB/201!
Date 01spa~ched G1/1 J/2c~~
:Hr'l lCf~ i:ii'sros;,t, PER 'l"O~I o.:M,:n.1,ror1 2.l:.an_;_u.r· !:'. '(5!::. l~ W~ig'_!L ~ob
6 n T DEMO
~LACE INSIO~ OF WAREHO~SE OtlSITI:: ('"ONTAi~-:-E'!HAH .;.0) 500•75rn ifOS "J. 3
l "'PM
"l
. '
" l • .
f!ck-;:-t;. ';f'€f:!l21l !:l(!VCr JOSE!! :•IOR~::a
Openi,c! b;-
Custcmer
:cu~RRE~
J50-7297S O DE~OLifION
1 JQ9 1'.ELLOGG A'/£
CARi.58A.O CA 9)~08 ~53'
Cont.ace. ~,-:a:E DOBBINS
760•67l 616'
Requestel! by O'.:-'l'/J.'!R 7K1'# 31:):)75"1
P•cf ii C
Lc,,ic Type
01J:r!p Sl ':(I'
fU'.,I. FRO~l fARD·llO Rf.T.JP!I
EOCO C!..D LO,\D.S Ct T\'
!' w,,,,ste
-.:.Ht! Requested
f)/:1:t.e :Jisr>..i:.cl'",ed
ser·:1c:.:•
DISPOSAL PER nm DS:l•IOL ,IC/I ~~i.~1' r ~ IYr..:: O'Veigt_t Jcb 5, 78 T
P;..AC£ HJS~OE 'JF" :-IA,P.1:r-OU'SF: ti03
" tP!•l
1
07/ l9i::!02:
07/20/201:
o,
TlCket • S,9:' ! ~h
Ope:,ed t,y.
Ct!S c:r.er JS0•72875 Q DEMOul'r!Ct:
"96 9 KE'.,LC'GO f\V"E'.
CARLSBA :ti.A -'"008·6~ti
Cont.,lCt · ~1IKE OOBs·a1s
760-672-"181
R1":q,:e St eti b/ ~1! KF.
t'::Of ill'
Lood --::roe
Dump S1:.P
EMPT"/f.P.CTURU
ED20 Cc.D 1,C,,\LS -r !' t'
WaS\.oe"
:;i;a:,.c Reqi..;.t•S"erl
Oar t? "":11.sparct.e J
St>rvicc ,~~y ~ Yds ~~ !'.!_-:ngl_!~ -1_£_9 riiSPOSAL t·ER •ro~1 OE~"IOLLT rot: J :.n 1'
PLACE .iNS!CE OF ;.lKR1:TICUSE: ot:si"I";: CON~ACT E!'lH.AtJ-20l-5~o-75JO HOS· 7 l
0-4--M
0)/;10/201 ~
071'2::d~r;l ~
,..,.,f.et. }=i.1:77 Or1·.·er G:-tE:G "lA'·/A.~R:.O
Op~I~P.C b'l ::CRA(lf02 c· s~orne~; 1so-12s1a ~ iJEMO:..:rt:o~;
.i. :.e 9 ftELf,,JGG AVF
~RLS~AU CA 9J00A•6~3'
r.on:ac~ '-i:KE. OOSNT?~S
700-672 1;193
?.Cejuestoct !::v ,,i-,g-6.9·S4i •~,1
~rocile
Lead Type
... "'umn !°>it:.-::•
DO NOT R£TUR!l
~DCO C&P LOAD5·CITY
T Has•f~
Dd~P R~o~ested C7/~~/J019
rate~ spi~ched a~/25/Ju,6
S~?"V:t.Ce
11SPOS,\i., !.'ER TO!I DEMOLITION
~!!.~_c".L f '(£§ !:iP~ ;.s~,4,;:h_! -Is>£
'7 4 7 D£M'"1
;nc ~ll t,..~ ·lO/d 1:-' rt,!) re?cycle ta!':.e to £DU BTH.l\JJ 203 ")l){J ,530 l{l.,,
0 ·l PM MI ft; ':i 'j, • 8 'i 1 J o v