HomeMy WebLinkAbout1969 Kellogg Ave; ; CBC2018-0467; Recycle•
{Cityof
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
RECEiveo
SEP 2 5 2018
CITY OF CARLSBAD
BUILDING DIVISION
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Owner: Contractor: _____.\.=\.)_,___,h..,__,ttf,___,_____..C.---,,o~n-s-h ........ 1~1 c.=b=\:l~n . .___( s P w ~
Job Address,.~/ 1~ft.__.(j'------'---'&/=(o,4----'---'-f¾'l_.__.-e,~
e--f>e.. ~0 1B -0-Hol
Phone Number;---------------1~~""-()'-------_,_q -'LJ3 /_~ /LL/ 3U-'O""------
Permit#: Estimated Cost of Project: $ ____________ _
Type of Project: [StNew Construction □ Remodel or T.I. □ Residential □ Commercial D Demolition
(check all that apply) D Other -----------------------------~
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result fn a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shalt not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area _______ x 2 lbs."' ________ lbs. of allowable waste.
/ D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete JJ/,1
Brick/ Masonry ._, 'J A
Cardboard
, .... o 11 .... -lfnr'D
Drywall c:""ol I.....:.
Landscape Debris jl /f>r
Lumber/ Wood tJ/ IL n••ll . I,'--ff''-.. ,e,.,
Metals 2.olbs ""Cl> '
Mixed Waste "1 i;I-< IL~ ,::;:ni:-o
Trash I Garba~e
Other: r
TOTAL lbs: 15lbs .ass 11n.~
Estimated Percentage to be Re-Used or Recycled ______ %
Contractor or Owner (signature) Date I I
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: ________________ _
Page 1 of 2 REV.O1-2O17
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash I Garballe
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled ______ %
Official Use Only
D 65% Goat Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by: _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt / Concrete 0 3000
Brick/ Mason!)' 100 950
Cardboard 0 150
Drywall 0 50
Landscape Debris 0 i20
Lumber/ Wood 500 0
Metals 300 200
Mixed Waste i500 0
Trash I Garbage 300 0
Other: Pool o::::;L-<.l/1.,Lte 0 900
TOTAL lbs.: 2700 5,3;'0
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re.used or Recycled
(Total Combined Waste)
Waste Houllng Company or Re-Use Method
AB.C f-tCL<L[,1,~ Co.
WM / RH,sed B.rlci< O,1,-slte
Al:>,,,., i-+ciuLi vv~ ,,,., ".
AB.C liOL<L[,1,~ Co.
ML<Lcheci ,; Re-L<sed O,1,-s[te
wi:iste MC!V\.tiaeVi,teV\,t
WM/ AB.C li0L<Llvcg
WM
WM
L.{$eC\ C,l.$ Cn,1.s.V1ed "g,ti$e ol/l,-$Lte
5370 X 100 = 67% Re.used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2