HomeMy WebLinkAbout1972 MARCASITE PL; ; CB073039; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-17-2008 Residential Permit Permit No: CB073039
Building Inspection Request Line (760) 602-2725
Job Address: 1972 MARCASITE PL CBAD
Permit Type:
Parcel No:
RESDNTL Sub Type: SFD Status: ISSUED
2132912800 Lot#: 64 Applied: 12/11/2007
Valuation: $276,432.00 Construction Type: VN Entered By: JMA
Occupancy Group:
04/17/2008
Reference #: CT 04-09 Plan Approved:
# Dwelling Units:
Bedrooms:
1 Structure Type: SFD Issued: 04/17/2008
3 Bathrooms: 2 Inspect Area:
Project Title: TRIESTE PL 1: PHS 5 -2448SF LV Orig PC#: PC 06-35
474SF GAR/176SF DECK/173SF LOG/27SF PORCH Plan Check#: PC 07-75
Applicant:
WARMINGTON HOMES
701 PALOMAR AIRPORT RD
CARLSBAD CA 92011
931-4766
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,190.97
$0.00
$774.13
$0.00
($61.93)
$27.64
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,702.00
D1
$0.00
$0.00
Owner:
WARMINGTON TRIESTE ASSOCIATES LP
C/0 WARMINGTON HOMES CALIFORNIA
3090 PULLMAN ST #A
COSTA MESA CA 92626
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
$0.00
$225.00
$7,188.00
$3,618.63
$5,031.06
$0.00
$0.00
$0.00
$750.00
$0.00
$0.00
$217.00
$70.00
$67.50
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL PERMIT FEES $26,800.00
Total Fees: $26,800.00 Total Payments To Date: $26,800.00 Balance Due:
Inspector: fV': ~ FINAL APP,OVAL
Date: 1-zj 0 ~,o~ Clearance: ,:z -~ -Of',
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, of· other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required •nformation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water -:1nd sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
h I Tl hi h f lim· h· h
City of Carlsbad Bldg Inspection Request
For: 12/08/2008
Permit# CB073039 Inspector Assignment: MC ---
Title: TRIESTE PL 1: PHS 5 -2448SF LV
Description: 474SF GAR/176SF DECK/173SF LOG/27SF PORCH
Type: RESDNTL Sub Type: SFD
Phone: 7604271926
Job Address: 1972 MARCASITE PL
Suite: Lot: 64
Location: Inspector: f-./~ l
APPLICANT WARMINGTON HOMES
Owner: WARMINGTON TRIESTE ASSOCIATES L P
Remarks:
Total Time:
CD Description
19
29
39
Final Structural
Final Plumbing
Final Electrical
49 Final Mechanical
Requested By: KYLE
Entered By: JANEAN
Act Comments
~ o ~ J!> tl-E'-L.-1:A-61:-~4~ + f:11 .. -1.-PA,'r"E--(A'r( A1" lf.l.£,. 'Fl).:-n.l/lE.S l>jt.
~ M-Mf..t:"At.-u~ 'f'.IJ>11-.Ud t>E.-'-At-P.'\ M5.~ ~AJE.l. ale..
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC 06-35
lnsQection Histo[Y
Date Description Act lnsp Comments
10/27/2008 39 Final Electrical AP MC EMR ONLY, OK TO RELEASE METER
08/22/2008 82 Drywall/Ext Lath/Gas Test AP PC
08/18/2008 16 Insulation AP MC
08/15/2008 16 Insulation co MC COMPLETE FRAME PICK UP
08/12/2008 84 Rough Combo AP MC MINOR PICK UP
07/25/2008 13 Shear Panels/HD's AP PD
07/23/2008 13 Shear Panels/HD's PA MC COMPLETE STRAPS & NAIL PLATES
07/01/2008 15 Roof/Reroof AP MC DBL CK BLOCKING AT AA2 TRUSS
05/27/2008 81 Underground Combo AP MC RECEIVED SOILS, PT & BLDG PLACEMENT REPORTS
05/23/2008 81 Underground Combo NS MC ROLL TO 5-27
05/15/2008 21 Underground/Under Floor AP MC
05/1512008 22 Sewer/Water Service AP MC
a Chi DI C1rl1bld .
-FIIII IUlldlng Inspection
Dept: Build~ Planning CMWD St Lite Fire
DEC -1 2008 J
~ Plan Check#:
Permit#:
Project Name:
Address:
Contact Person:
PC 07-75
C8073039
TRIESTE PL 1: PHS 5 -2448SF LV
474SF GAR/176SF DECK/173SF LOG/27SF PORCH
1972 MARCASITE PL
Phone:
Sewer Dist: LC Water Dist: CA
' • I
Date:
Permit Type:
Sub Type:
Lot: 64
11/26/2008
RESDNTL
SFD
..........................................................................................................................................................
lnspecte~ ~ Date
l! l eJ <-'</> Inspected: Approved: !>C.. Disapproved: __ By: ~ I
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Comments: _____________________________ _
Southern California Soil and Testing, Inc .
. 6280 Riverdale Street, San Diego, CA 92120 (619) 280-4321
P.O. Box 600627, San Diego, CA 92160-0627
83-740 Citrus Avenue, Suite G, Indio, CA 92201-3438 (760) 77 5-5983
Concrete (4x8) Compressive Strength Test Report
File Number: 0612215
Project Title: Trieste at La Costa Greens PTCC Phase: 5
Project Location: 1972 Marcasite Place
Architect: n/a
Engineer: Davidson Reinforcing Permit No: CB073039
Contractor: Warmington
Location In Structure: Lot: 64 Slab on Grade
Material Supplier: Superior
Mix Designation: 375p
Admixture(s): n/a
Time In Mixer:
Air Content: (ASTM C173/C231)
Air Temp:
Truck Number:
Samples Made By: (ASTM C31)
Laboratory Number
Mark On Samples
Date Made
Date Received
Date Tested
Diameter, Inches
Area. Square Inches
Maximum Load, Pounds
Compressive Strength, psi
Age Tested
Required 28 Day Strength, psi
Fracture Type
50 minutes
75 degrees F
353
CEN
0870535
LOT#64
5/28/2008
5/29/2008
6/2/2008
4.00
12.57
64530
5140
5 Days
4500
Plan File No:
Slump inches: (ASTM C143)
Unit Weight Plastic/Dry, pcf: (ASTM
C138/C567)
Concrete Temp: (ASTM C1064)
Ticket Number:
Samples Tested By:
0870536 0870537
5/28/2008 5/28/2008
5/29/2008 5/29/2008
6/25/2008 6/25/2008
4.00 4.00
12.57 12.57
91290 94650
7270 7530
28 Days 28 Days
4500 4500
1 2
4.00
I
78 degrees F
116837
CN DH
Specimen sampling, transportation and compressive strength testing were performed by this agency in accordance with the applicable
ASTM C39 standards. This agency makes no other warranties express or implied.
Fracture Type: 1 -Reasonably well formed cones on both ends, less than 1 in. of cracking through caps: 2 -Well formed cone on
one end, vertical cracks running through caps.no well defined cone on other end; 3 -Columnar vertical cracking through both ends,
no well formed cones; 4 -Diagonal fracture with no cracking through ends; 5 -Side fracture at top or bottom (occur commonly with
unbonded caps): 6 -Similar to type 5 but end of cylinder is pointed.
Distribution:
(1) City of Carlsbad -Building Inspection Department
(1) Warmington Homes California
Reviewed By : ~ .--------------1/L--
Gordon T.M. Woodard RCE # 60481
(
.: G~OCON \~o o· ·
GEOTECHNICAL CONSULTANTS C'~~ ■ SAN DIEGO, CALIFORNIA 9 2121-297 4 ■ TEL 1858) 558-6900 ■ FAX 1858) 558-6 159 •
I
JNC ~lli PORA TED
6960 FLANDERS DRIVE
FOUNDATION OBSERVATION REPORT
PROJKT NAME : __ 7_-_,r-___ G_-_1_'<_,;:_·e_-,_...,_:,_~W~"'~··'-_· ~-·-·='--'-o_V-~----
LOCA TION : ---=L:c....::o_l_\ __ '-/_;;;;5_-_'--1....;_·_1'-+-J ___;:(a:__j'--/c._.:,_j .=.t_;;S;___ ___ _
PROJECT NO. o c,, ,h,3 -S" 2... -2 1..
DATE : __ s_-_z_1._--"'-~------
FOUNDATION LOCATION (if not entire building) --------------------------
PLAN FILE NO. PERMIT NOS : -J.5 ·. <..,-.c, l )o~(.,
'-I/,, : 77:,r,L/ </ 0 ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE : ~7.' 7 304 D
0 J,ONVENTIONAL '/ ~ ·. 7 3 c ~ 7
,(7POST-TENSIONED 'f 1,' 7so't I
/ E'.:] SUBSTANTIAL CONFORMANCE
• PURPOSE OF OBSERVATION t-,,1, :f"G
i;(verify soil conditions exposed are similar to those anticipated J!t. ~4. -6 t -;:-fl-·
~rify footing excavations extend to minimum depth recommended in soi repo'":'rt __ _.....___----. ____ __..
D Verify foundation reinforcement complies With minimum recommended in soil report
D ~rify slab reinforcement, sand bedding and moisture barrier comply with minimum. ,recommended in soil report
GYVerify footings have been extended to an appropriate bearing strata
0 Other
• APPLICABLE SOIL REPORT : TITLE : v "' o A·, ~,. G-c. ~ ...-,,,. c ~ (2,.. r-·. ....., V. ~
I 17
• SO1':_,REPORT RECOMMENDATIONS BASED ON :
Ql'Expansion Condition D VERY LOW ~w
GrFill Geometry v c. I c ' '-'---
o r:.. L .(. o -s .. ~
DA TE : .3 -I ,J -<l (:,
0 HIGH 0 VERY HIGH
D Other : __ __,,,C'-'-' -_, _/ _-___,,'j~._"---'-/-'-'-1 =~-'-'-r_-_-0:"---_·_'-j...i....a:5_1_0_'· /_. -=-{, ~5"----------
• MINIMUM FOUNDATION RECOMMENDATIONS :
~ooting Depth : &"d1 rkh~ ~ ~~~ D 24 Inches OTHER ____________ _ rs ,
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B Gr'Post-Tensioned OTHER : _____ _
Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches C3"Post-Tensioned
Slab Bedding Material and Thickness : ___________ _ Vapor Barrier :
Foundation Width : ----~1 _·z_-~f"'l_,.__J ________________________ _
• OBSERVATIONS :
Gi-'iubstantial conformance with Soil Reports (see "Purpose of Observation")
~bstantial conformance with Foundation Plans. Identify : / -r /::>...,.,_:, 13-../ 0.~ .,,, i t,.J
#:-4-Q(o"'5
• COMM~-------------------------------------,/ ________________ _
·-·-· TE: IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will Bf a EANfD Of LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT THE SOil MOISTURE CONTENT Will BE MAINTAINED
//7--iJC'c)~ ;:1--s s-2-
FIELD COPIES TO . GEOCON REPRESENTATIVE
l'IHT • Jt:, • .C:::t:n::1t:li ';f; "f:>Hl'I WHl•Wlll'll.:, I Vl'l-::,Hl"I 1J11:.l..:IV
PWINING
ENGINEERING
SUAVEYINC
HUNSAKER
&ASSOCIATES
S A N O I C C n. I N r ..
IRVINE
LOS ANGELES May 14• 200B
RIVERSIDE
SAN DlfCO
ARIZONA
City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Re: Building Form Certification
La Costa Greens Neighborhood 1. 17
Carlsbad Tract 04-09/PUD 04-08A
Drawing No. 429-2C
Lots 45 through 49 and 64 through 71
Dear City Inspector:
NU.b\::'.I( r',C:./C.
Please be advised the building foundation forms ;ire in conformance with the
precise grading plans as to horizontal and vertical location. All locations checked
were found to be within 0.1 of a foot horizontally and vertically per the precise
grading plans.
Sincerely,
CAVE HAMMAR
LEX WILLIMAN
ALIS/\ VIALPANDO
DAN SMITH
RAY MARTIN
CHUC!< CATEft
,:,,o, waple, S1tet1
S,1r.Oi1•~n,CA 92121
(MIU 55~.iClO 11H
ff\f'inl55i\,Ul4FX
www.Huns~l(r.,S0.com
11,fn@Hu11$.ikrrSC.cnm
a..~ Daniel P. Smith LS. 6854
Hunsaker & Associates San Diego, Inc.
Tk kc ~,\Q\O~GU\121 ao~•
"'o 010T·~ltl ill412QOI ID 11-'M
,.~QVTHE~.,CALIFQRN,IA SOIL & TESTIN,G, INC.
6Q80 RIVERDALE STREET, SAN D!EGO, CA192!2d • Phone (6l9) 280-4321 Fax (619) 280-4717 ....
83-740 CITRUS AVENUE, SUITE G, INDIO, CA 92201 • Phone (760) 775-5983 Falt (760) 775-8362
r,..
~ . . .
..
82205
SCS&T FILE ~O.· (2(elZZIS'
P.O. NO._· _________ _
PL · 'NC ' , PAGE I ' OF. :/
' FIEW INSPECTION REPORT FOR: 0 REINFORCED CONCRETE · 0 REINFORCED MASONRY O WELDING O FIREPROOFING
' I, □ ROOFING/ WA'TERPROOFING j)a P.T. CONCRETE'/ STRE~S □ EPOXY ANCHOR'S □ H.S. BOUING □ ---
PHASE#: .r DSA FILE NO.:
,'i
: :uao I hereby ceitlty that I have lnSpec•led'the apove reported wprlt · Unless 1710!09 olhe/wlse,
the WOii< inspected Is to the best of my knowledge In compliance with the apProved plans,'
specifications and applicable sections of th(;! governing building Jaws. ' ' ~ti ' ' lnspectqr Initials•' . • ~, " I\ • ~., , . .,1 • ;,, ,.
DSA t hereby certify that I hove Inspected the above reported work In accordance with the · '
requirements of DSA approved documents. Sampling and testing were conducted In•
occotcfonce with tt:i1neqµlrements of the DSA approved documents: The WQrlc,l~ted
complies with the DSA approved documents, ' ' ·
DSA N'P. NO.:
SCS&I 205 REV 2/06