Loading...
HomeMy WebLinkAbout1981 CHESTNUT AVE; ; 79-663; PermitFOKM 1 PAGE I JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-1574 INSPECTION REPORT DATE May 19, 1981 FILE.-#4012-2, Permit #79-633 Church of Jesus Christ of the Latter Day Saints 1975 Chestnut Avenue ADDRESS: Carlsbad, California INSPECTION OF Structural Steel Assembly FABRICATOR OR ERECTOR: Moore Company CONTRACTOR: Bowers Construction Company SHOP FlELD__X__ PLANT DATE REG. MRS. O.T. MRS. REINSP. MRS. INSPECTOR DATE 5/6/81 REG. HRS. 4.0 O.T. MRS. REINSP. HRS. INSPECTOR William F. Gray DATE 5/7/81 REG. HRS. 4.0 O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR Reinforcing Steel: Grade 60 Electrodes: AWS E8018 - confirm to 9018 Certified Welder: J. Hill, #9014-1 Inspection of extending the existing bars in tower section 20'—0" higher with butt welds, 16 #7 bars total. Bevel new 20'0 sections 45° and use 1" x 1" x angle 8" long for backup. Preheat to 500° F. Twelve inches each way from groove, weld full. Eight welds complete this date. Approved as per engineers detail. Continue inspection same as reported on 5/6/81. Eight welds complete this date. Approved as per detail. C/7Y !9S; REPORTED To: (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Co., Attn: Mr. Bob Bowman ::LTy of Carlsbad Building Inspection Dept. TEST1NG ENG|NEERS - SAN DIEGO REVIEWED BY. C, • JCB:cd //John C. Burns, R.E. #C-02B752 FORM 1 PAGE 1 JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 75&J23V of l LABORATORY NUMBER SD36-1612 INSPECTION REPORT DATE May 19, 1981 FILE: JOB: #4012-2, Permit #79-663 Church of Jesus Christ of Latter Day Saints 1975 Chestnut Avenue ADDRESS: Carlsbad, California INSPECTION OF Reinforced Masonry FABRICATOR OR ERECTOR: DeGraff enried Masonry CONTRACTOR: Bowers Construction Company XXXSHOP.FIELD.PLANT. DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE 5/5/81 REG. HRS. 2.0* O.T. HRS. REINSP. HRS. INSPECTOR William Allen DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. KKS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR Reinforcing Steel: Grout: Mortar: ASTM A615, Grade 60 1500 psi 2000 psi Inspected grouting of the tower at the 30' to 33' elevation. Inspected the reinforcing steel for size, grade, position, and cleanliness. Inspected the mixing, placing, and reconsolidation by puddling of the grout. Cast three grout samples and labeled them "LDS #7-A-B-C". Also cast three mortar samples and labeled them "LDS //6-A-B-C". Grout slump measured 9%". *Hours prorated with other work REPORTED To: (i) Arlon L. Van Orden, Architect 11 (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Company, Attn: Mr. Bob Bowman (T7 City o± Carlsbad Building Inspection Dept. TESTING ENGINEERS - SAN DIEGO REVIEWED BY. (_'. ohn C. Burns, R.E. //C-028752 FORM 18 Jf Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 FILE NO 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE- Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1981 •STORED a CURED. NOT TESTED LAB. NO. C36 1163 DATE CAST MO. DA. 4/23 LOCATION IN STRUCTURE Front masonry tower, 5' elev. LDS#2 A-B-C. Made by TESD. J »'jV\V MATERIA PROPORT TYPE- ADMIXTUF SPECIFIED or/™Mortar ?s.r>4v =;-,-•» . 2500 PSI IONS/MIX h> riE-Mp <0. Type "M" NT- RPFC Pi IIMP- .IN, ^E- An<5 SITE- IN ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. t /^t ^1570 \ 28-DAY /"' OTHER TESTAGE RESULTS MAILED 5/1/81 (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Dept. JCB:ac TESTING ENGINEERS. SAN DIEGO REVIEWED BY C. Burns, R. E. #C028752 PAGE I JP Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way;-Unit B, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-1356 INSPECTION REPORT DATE April 24, 1981 4012-2, Permit #79-633 Church of Jesus Christ of the Latter Day Saints FILE: JOB: hesnut Avenue ADDRESS: Carisbad> California INSPECTION OF Reinforced Masonry FABRICATOR OR ERECTOR.- DeGraffenried CONTRACTOR: R. s. Bowers Construction Co. XSHOP.FIELD.PLANT. DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE 4/21/81 REG. HRS. 4.0 O.T. HRS. REINSP. HRS. INSPECTOR fames Argetsinger DATE 4/23/81 REG. HRS. 4.0 O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR Reinforcing Steel: Mortar: Grout: ASTM A615, Grade 40 and 60 Type M (2500 psi) Job Mixed - 2 cement, 4 sand, 3 pea gravel Inspected foundation for masonry tower in front of main building. Foundation is clean and reinforcing steel verticals are in place. Inspected reinforcing steel and grout placing of approximately 1.5' cubic yards of job mixed grout in 1st 4' lift of masonry tower in front of main building. Cast grout sample marked #1. Inspected mortar mixing, masonry unit placing and placing of horizontal reinforcing steel in 2nd lift of masonry tower to 5f elevation. Cast mortar sample,'marked'#2 at: 5' elevation. REPORTED TO; (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Dept. TESTING ENGINEERS - SAN DIEGO REVIEWED BY. JCB:cd John C. Burns, R.E. #C-028752 FORM 18 JP Testing Engineers—San Diego FILE No. 3467KurtzSt., P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 Vista Way. Unit B. Vista, California 92083 (714) 758-3730 JM312-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1931 •STORED a CURED. NOT TESTED LAB. NO C36 1163 1235 1292 DATE CASTMO. DA. 4/23 4/27 5/5/ LOCATION IN STRUCTURE Front masonry tower, 51 elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 A-B-C. Made by TESD. Tower. LDS#6 A-B-C. Made by ^0 % > MATERIAI '. . SPECMortar ?n r PROPORTIONS/MIX h ;IFIED >AY STR.:2500 r*. ,„. Type "M" TYPE- riFMFNT- ^PPT si IIMP- IN ADMIXTUF?E- AGG SI7F- IN ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. -- -- -- 7-DAY >-1570 2190 2480 i,- 28-DAY ..<- ^ t cr OTHER TESTAGE 14 -day iEC MAY rvoF RESULTS 1960 EIV 151981 CAP'' M-AILED 5/1/81 5/8/81 5/14/81 ED :?AO-- in! (1) Thomas & Sowards Engineering, Inc. (l^BCweTrs Construction Company, Attn: Mr. Bob Bowman (f) City of Carlsbad Building Inspection Dept.TESTING ENGINEERS. SAN DIEGO REVIEWED BY JCBrac ( - C. Burns, R. E. #C028752 \ FORM 16 JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 FILE No 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633 Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 'STORED & CURED. NOT TESTED LAB NO C36 1234 1258 1293 DATECAST MO. DA. 4/27 5/1 5/5 LOCATION IN STRUCTURE Tower. LDS#3 A-B-C. Made by TESD. Tower. LDS#5 A-B-C. Made by TESD. Tower. LDS#7 A-B-C. Made by TESD. i •? \ V \ *0 /-. *. SPECIFIED oc<™MATERIAL- trout PA.OAV C.-TO . /DUU PSI PROPORTIONS/MIX ^Jo. 1 cement, 2 rock, 3 sand TYPE- ne-MFNT- «?PFr ^,1 IIMP- IN ADMIXTUFfir. Anr: =:|-rc. Ifj ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 10% 9k 7 -DAY 3970 3150, V-' 4530 , 28-DAY -»' ,r / P cr OTHER TESTAGE RESULTS MAILED 5/8/81 5/14/81 !ECEIV|ED MAY YOF Building 151931 CARLJ Departm >BAD ent (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (l)Bf)wers Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Detp. THCrac TESTING ENGINEERS/SXyN DIEGO T. H. Chapman/ R. E. #12882 FORM 18 JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 FILE Kin 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE- Permit #79-633 JOB: Church of Jesus Christ of the L a 1 1 e r— Day— Saxrrts-^^ ADDRESS: ^^-];975 Chestnut Avenue^ Carl YEAR: 1981 sbad, California •STORED a CURED. NOT TESTED LAB. NO. C36 1163 1235 DATE CAST MO. DA. 4/23 4/27 LOCATION IN STRUCTURE Front masonry tower, 51 elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 A-B-C. Made by TESD. \\^ MATERIA PROPORT TYPE- ADMIXTUF -. . SPECIFIED ocnnMortar 9«.n.« c™ . 2500 P*. IONS/MIX i^ CEME ,„. Tvoe "M" SIT: SPEC. EiLUMP: . IN ?E- Anr; SIZE- *N ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 7 -DAY . \ > 1570 2190 R CIT 28. DAY X' EC8 MAY ] ^OF( Building OTHER TEST AGE 14 -day 1 19S1 JARLS ^epartme RESULTS I960 3AOit DATE MAILED 5/1/81 5/8/81 v /• ^zsf — — y (1)JpMomas & Sowards Engineering, Inc. (iXfiowers Construction Company, Attn: Mr. Bob Bowman 0.) City of Carlsbad Building Inspection Dept. JCB:ac TESTING ENGINEERS. SAN DIEGO REVIEWED BY C. Burns, R. E. #C028752 FORM 18 JP Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 3 Wast Vista Way Unit B. Vista. California 92083 (714) 758-3730 SUMMARY OF COMPRESSION TEST RESULTS PAGE- Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB NO C36 1234 1258 CASTMO. DA. 4/27 5/1 LOCATION IN STRUCTURE Tower. LDS#3 A-B-C. Made by TESD. Tower. LDS#5 A-B-C. Made by TESD. /r^v, MATERIAL _ SPEGrout ?R.r PROPORTIONS/MIX h SIFIED DAY STR.:2000 PS, ,„. 1 cement, 2 rock, 3 sand TYPE- ncMFM-r. <=;prr KJ IIMP- . .. IN. ADMIXTUF [P. Anrz Sl7E- IN ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 10% 7 -DAY 3970 3150,t-' 28-DAY / R OTHER TEST AGE ET^ E&O! MAY] C/TV OF C 3ui/ding | RESULTS 1 1991 ARL8 >Wtme MAILED 5/8/81 -o 3A0it (1) ArloaL. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (l)JB^rers Construction Company, Attn: Mr. Bob Bowman (1*) City of Carlsbad Building Inspection Detp. THC:ac TESTING ENGINEERS^SAN DIEGO T. H. Chapman/ R: E. #12882 FORM IS JP Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 FILE No4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE.ONE Permit #79-633JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO. C36 1162 DATE CAST MO. DA. 4/23 LOCATION IN STRUCTURE Front masonry tower, 4* elev. . LDS#1 A-B-C. Made by TESD. MATERIA PROPORT TYPE- ADMIXTUF SPECIFIED nn/\nGrout 5B.r>Av el-re, . 2000 PSI IONS/MIX t»tn 2 cement, 4 sand, 3 pea gravel NT- SPEC. SLUMP: .IN. ULTIMATE^CCy^RESSIVE STRENGTH. PSI SLUMP , IN. /} J/7-DAY 4630 y ,'^28 -DAY / OTHER TEST AGE RESULTS DATE MAILED 5/1/81 (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Company, Attn: Mr. Bob Bowman Carlsbad Building Inspection Dept.TESTING ENGINEERS. SAN DIEGO REVIEWED BY JCBtac ohn C. Burns, R. E. #0028752 FORM 18 JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 Qn/3 West Vista Way, Unit B. Vista. California 92083 (714) 758-3730 FILE Nio4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE.ONE Permit #79-633 JOB Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1931 •STORED & CURED. NOT TESTED LAB NO C36 1162 CASTMO. DA. 4/23 LOCATION IN STRUCTURE Front masonry tower, 4' elev. . LDS#1 A-B-C. Made by TESD. V MATERIAI SPEGrout ?R.r PROPORTIONS/MIX r>> ;IFIED DAY STR.-.2000 PS, ]0 2 cement, 4 sand, 3 pea gravel TYPE- r-.c-ucrwr. <^PFI~ <i MMP- . IN. ADMIXTUFf^. Af^n «^ITP. . llM ULTIMATE COMPRE5S1VE STRENGTH. PSI SLUMP IN. -- 7-DAY 4630 .. ,'•' 28-DAY S 6570x C OTHER TESTAGE 60-day REC iVM TV OF RESULTS *Dise. JEM Y2219* pAtti MAILED 5/1/81 5/21/81 ff i O n A r^(1) Arlon L. Van Orden, Architect R " *"" " U-OD/\jJ (1) Thomas & Sowards Engineering, Inc. (1) Bcjwe-rs Construction Company, Attn: Mr. Bob Bowman (i^City of Carlsbad Building Inspection Dept. Department TESTING ENGINEERS, REVIEWED BY DIEGO JCB-.ac ohn C. Burns, R. E. #C028752 FORM l» Jf Testing Engineers—San Diego FILE No. 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92738 (714)225-9641 03 West \//.ste Way, Unit B, Vista. California 92083 (714)758-3730^ 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1981 "STORED & CURED. NOT TESTED LA3. NO. C36 1163 1235 1292 1410 DATE CAST MO. DA. 4/23 4/27 5/57 5/11 LOCATION IN STRUCTURE Front masonry tower, 5" elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 TESD. Tower. LDS#6 A-B-C. Made by A-B-C. Made by Tower 44 l; elevation. LDS#19 A-B-C. Made by TESD. ^ ^Jpr 1 MATER/AI PROPORT TYPE- ADMIXTUF SPECIFIED 1YLO IT C OP IT ? O O A Y ^T R • IONS/MIX NIo. Type "M" SPEC. SiLU Anr: Cil 2500 PC, HP- IN TIT. !W ULTIMATE COMPRES3IVE STRENGTH. PSI SLUMP IN. . -- ^_ 7-DAY ^1570 2190 2480 * 1680 ,„ 28-DAY ,2520,-- / 7 C OTHER TESTAGE 14 -day •. MA TV Of RESULTS 1960 'En"^ 1 1 g Deos-f± DATE MAILED 5/1/81 5/8/81 5/14/81 5/21/81 I o6Ao (1) Thomas & Sowards Engineering, Inc. (1) Bo^&e-s Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Dept. JCB:ac TESTING ENGINEERS. SAN DIEGO REVIEWED BY _ C • C. Burns, R. E. #C028752 FORM IS JP Testing Engineers—San Diego 3467KurtzSt., P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 /ista Way. Unit 8. Vista, California 92QR3 (714) 7F>R-373n FILE SUMMARY OF COMPRESSION TEST RESULTS PAGE-Olte Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO C36 1234 1258 1293 1409 1411 DATE CAST MO. DA. 4/27 5/1 5/5 5/11 5/12 LOCATION IN STRUCTURE Tower. LDS#3 TESD. Tower. LDS#5 TESD. Tower. LDS#7 TESD. Tower, 40 'to B-C. Made by Tower 48 '-52 Made by TESD A. | A-B-C. Made by A-B-C. Made by A-B-C. Made by 44'. LDS#18 A- TESD. '. LDS#20 A-B-C. / \ » MATERIA PROPORT ADMIXTUF „ SPE<Grout 28-r IONS/MIX hIo . 1 cement, 2 i ;IFIED JAY STR.: -ock, 3 i SPEC. EILU Arrr: c; 2000' PS, sand MP: IN. -re. IM ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 10% 9% 9% 9% 7- DAY 3970 3150,, 4530 . 2980,, 2820 L 28-DAY / / _.„•'"" y' OTHER TEST AGE RE RESULTS r*fiCEI MY221 J/TY C Builc FCAb 'ng Deoa DATE MAILED 5/8/81 5/14/81 5/21/81 I/ED\S m*a^ fcfl®' 331 1SBAD rtmenf vx - - - — - - 7 (1) Thomas & Sowards Engineering, Inc. (1) Bg^ers^Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Detp. THC:ac TESTING ENGINEERS^S/VN DIEGO R&V+&WLU B T. H. Chapman/ R. E. #12882 FORM I PAGE t JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, SanDiego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-1703 INSPECTION REPORT DATE May 22, 1981 FILE: JOB: #4012-2, Permit #79-663 Church of Jesus Christ of the Latter Day Saints 1975 Chestnut Avenue ADDRESS.- Carlsbad, California INSPECTION OF Reinforced Masonry . FABRICATOR OR ERECTOR: DeGraf f enried Masonry CONTRACTOR.- Bowers Construction Co. SHOP FiFLn X PLANT DATE REG. MRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE 5/11/81 REG. HRS. 2.0* O.T. HRS. REINSP. HRS. INSPECTOR William C. Allen DATE 5/12/81 REG. HRS. 2.0* O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. RESNSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR Reinforcing Steel: ASTM A615, Grade 60 Grout: 2500 psi Mortar: 2000 psi Inspected grouting of tower 40' to 44' elevation. Inspected the reinforcing steel for size, grade, clearances, and clealiness. Inspected the: mixing, placing, and reconsolidation by puddling of the grout. Cast three samples and labeled them LDS 18A, 18B, 18C. Slump of grout was 10". Cast three samples of mortar labeled LDS 19A, 19B, 19C. Inspected grouting of tower at 48' to 52' elevations.. Steel in place, clean, correct size :and grade. Inspected the mixing, placing and reconsolidation of the grout. Cast three samples and labeled them LDS 20A, 20B, 20C, with a 9V slump. *Hours prorated with other work. RECE MAY 2 71981 CITY OF CARLSBAD Building Department REPORTED TO: (l) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) BowersCojns true t ion Company, Attn: Mr. Bob Bowman by of Carlsbad Building Inspection Dept. JESTING ENGINE SAN DIEGO REVIEWED THC:cd T. HCCnapman, THOMAS & SOWARDS ENGINEERING, INC. PLANNERS, ENGINEERS, ENVIRONMENTAL CONSULTANTS, LAND SURVEYORS P.O. BOX 286, 215 SOUTH HWY. 101, SUITE 101, SOLAN A BE ACH, C A 92075 (714)481-6818 ROBERT SOWARDS RCE 26404 DAVID THOMAS LS 4759 April 21, 1981 Marl in Dustin 1975 Chestnut Avenue Carlsbad, CA 92008 RE: Tower - Carlsbad Stake Center Dear Marl in: This is to confirm our conversation of April 20, 1981. Mortar used in the tower should be type "M" and conform to ASTM C270 with a minimum compressive strength of 2500 psi. Common proportions for this mortar are: 1 part Portland Cement i part Lime 3i parts Damp Loose Solids Grout for the job should be 2000 psi minimum strength at 28 days. I will periodically inspect the tower. Please give me a call prior to grouting operations. Sincerely, THOMAS & SOWARDS ENGINEERING, INC. Robert Sowards R.C.E. 26404 RS/ng cc: Arlon Van Orden, Architect Tony Mata, Building Inspector RECElVEt APR 2 2 198) CITY OF FORM 1 PAGE I JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 LABORATORY NUMBER SD36-1452 INSPECTION REPORT DATE May 14, 1981 FILE: JOB: #4012-2, Permit #79-663., Church of Jesus Christ of the Latter Day Saints 1975 Chestnut Avenue ADDRESS: Carlsbad,. California INSPECTION OF Retnf orced Masonry FABRICATOR OR ERECTOR: DeGraffenried Masonry CONTRACTOR: R. s. Bowers Construction XSHOP.FIELD.PLANT. DATE REG. HRS. O.T. MRS. REINSP. HRS. INSPECTOR DATE ft/27/81 REG. HRS. 3.0* O.T. HRS. REINSP. HRS. INSPECTOR William C. Allen DATE 5/1/81 REG. HRS. 2.0* O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR DATE REG. HRS. O.T. HRS. REINSP. HRS. INSPECTOR Grout: 2000 psi Mortar: Type M, 2500 psi Inspected the mixing and placing of grout in the tower at front of church from approximately 10' to 14' elevation. Reinforcing steel tied in place per drawings. Grout placed by pump and reconsolidated by puddling. Cast three samples and labeled them LDS 3A, 3B and 3C, with a slump of 9". Also cast three samples of mortar and labeled them 4A, 4B and 4C. Inspected the mixing and placing of grout in the tower at approximately 26' to 28' elevation. Reinforcing steel tied in place per drawings. Inspected steel for size, grade, position, and cleanliness. Grout reconsolidated by puddling. Cast three samples of grout and labeled them LDS 5A, 5B and 5C, with a slump of 10%". RECEIVED MAY 18 1981 CITY OF CARLSBAD Building Department REPORTED To: (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Co., Attn: Mr. Bob Bowman (1.) OlLji 'uf Carlsbad Building Inspection Dept. TEST|NG ENGINEERS^ REVIEWED BY./' / /_ i- SAN DIEGO THC:cd FORM 18 JP Testing Engineers—San Diego 3467KurtzSt., P.O. Box80985, San Diego, Ca. 92738 (714)225-9641 1903 West Vista Way. UnitB. Vista. California 92083 (714) 75R-3730 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1^75 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO. C36 1163 1235 1292 1410 DATE CAST MO. DA. 4/23 4/27 5/5/ 5/11 LOCATION IN STRUCTURE Front masonry tower, 51 elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 A-B-C. Made by TESD. Tower. LDS#6 A-B-C. Made by Tower 44 T elevation. LDS#19 A-B-C. Made by TESD. V /n\ ™ \ MATERIAL PROPORT TYPE- ADMIXTUH SPECMortar 5n.r IONS/MIX Is „. Type "M" &• ,. ,— . ;IFIED )AY STR.: SPEC. SLU Artr: ?i 2500 P*. MP- IN •re. IM ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. -- -- 7-DAY \ "•s. 2190 2480 u 1680 ,„ 28. DAY .. 2520 .--'' 2740 " ' 3450 2550 , ' OTHER TESTAGE 14 -day 60-day 60-day 60-day J///1/ -, \JJ£~ s^ '"* ^ RESULTS 1960 *Disc. *Disc. *Disc. '^ tyf' % DATE MAILED 5/1/81 5/8/81 5/14/81 5/21/81 5/29/81 6/4/81 6/11/81 \o*•-»*' (1) Arlon L. Van Orden, Architect (1) Thoma,8-^ Sowards Engineering, Inc. . / (1) fibers Construction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Dept. JCB:ac TESTING ENGINEERS. SAN DIEGO REVIEWED BY _n C. Burns, R. E. #C028752 FORM 19 Jf» Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE- Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO. C36 1234 1258 1293 1409 1411 DATECASTMO. DA. 4/27 5/1 5/5 5/11 5/12 LOCATION IN STRUCTURE Tower. LDS#3 A-B-C. Made by TESD. Tower. LDS#5 A-B-C. Made by TESD. Tower. LDS#7 A-B-C. Made by TESD. Tower, 40 ' to 44'. LDS#18 A- B-C. Made by TESD. Tower 48*-52'. LDS#20 A-B-C. Made by TESD. J 1 /\KV*f VI \ V MATERIAI PROPORT TYPE- ADMIXTUF SPECGrout 5R.r IONS/MIX h(0 . 1 cement, 2 i TF* ;IFIED onnr>.*)AY STR.: •iUUir PSI •ock, 3 sand SPEC. SLU A*~^l ^l MP: '.,.., IN •»e. lu ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 lok 9% 9% 9% 7-DAY 3970 3150^ 4530 » 2980 v 2820 . 28-DAY '5950 S 4890 - ^5650 '•'4290 , '4620 * £> ,(• OTHER TEST AGE 60-day 60 -day y- 60 -day ''60 -day " 60-day ' ' -I ,p "r f\,.'•*$** RESULTS *Disc. *Dise. *DIsc. *Disc. *Disc. ?c DATE MAILED .5/8/81 5/14/81 5/21/81 5/29/81 6/4/81 6/11/81 0 (1) Arlon L. Van Orden, Architect (1) Thomaa.,^ Sowards Engineering, Inc. (1) Rpi*£rsConstruction Company, Attn: Mr. Bob Bowman of Carlsbad Building Inspection Detp. THCrac TESTING ENGINEER&r-SAfM DIEGO T. H. Chapman/R. E. #12882 Testing Engineers—San Diego FILE NO 4012-2 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONii Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO. C36 1234 1258 1293 1409 1411 DATECASTMO. DA. 4/27 5/1 5/5 5/11 5/12 LOCATION IN STRUCTURE Tower. LDS#3 A-B-C. Made by TESD. Tower. LDS#5 A-B-C. Made by TESD. Tower. LDS#7 A-B-C. Made by TESD. Tower, 40 'to 44'. LDS#18 A- B-C. Made by TESD. Tower 48 '-52'. LDS#20 A-B-C. Made by TESD. ^ A ^ A\ r/IM \i I/ u ' \J MATERIAL PROPORT TYPE- ADMIXTUP „ SPEGrout ;>R.r IONS/MIX N CEME ,„ . 1 cement, 2 i MT: F. = IFIED DAY STR.: -ock, 3 £ SPEC. SLU A^n Ql 2Q001" PS, 5 and MP: . IN tt:. IKI ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 10% 9% 9% 9% 7 -DAY 3970 3150, 4530 , 2980 ^ 2820 , 28-DAY 5950 / 4890 '' 5650 S ,.' RI CITY Do OTHER TESTAGE 60-day 60 -day 60 -day :CE JIJN8 OFC/ii'ding Oe RESULTS *Disc. *Disc. *Disc. IVE 1981 RLSRpartmefit DATE MAILED 5/8/81 5/14/81 5/21/81 5/29/81 6/4/81 D ^D (1) Arlon L. Van Orden, Architect (1) Thomas & Sowards Engineering, Inc. (1) Bowers Construction Company, Attn: Mr. Bob Bowman Carlsbad Building Inspection Detp. THCrac TESTING ENGINEERS/SAN DIEGO/•/ / / tU OV T. 6. Chapman/ R. E. #12882 FORM 18 JP FILE NO 4012-2 Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way, UnitB, Vista, California 92083 (714) 758-3730 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 1981 •STORED & CURED. NOT TESTED LAB. NO. C36 1163 1235 1292 1410 DATECASTMO. DA. 4/23 4/27 5/5/ 5/11 LOCATION IN STRUCTURE Front masonry tower, 51 elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 A-B-C. Made by TESD. Tower. LDS#6 A-B-C. Made by Tower 44' ; elevation. LDS#19 A-B-C. Made by TESD. V ,4-L r// \\\ r ^ ^ I vj\ ' MATERIAI PROPORT TYPF- ADMIXTUF SPECMortar ?R.r IONS/MIX N,«. Type "M" IF* :IFIED )AY STR.: SPEC. SLU Ann e; 2500 PC, MP- 'N •re. IM ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMPIN. -- -- 7-DAY ^1570 2190 2480 u 1680 i. 28-DAY ,-2520 */ '' 2740 - ' 3450 - R Fk. CITY Du OTHER TEST AGE 14 -day "60 -day 60-day CEI JUN8 DFCA Iding Def RESULTS 1960 *Disc. *Disc. ¥EI 981 RLSB/ artment DATE MAILED 5/1/81 5/8/81 5/14/81 5/21/81 5/29/81 6/4/81 > »D (1) Thomas & Sowards Engineering, Inc. / (1) Bowers Construction Company, Attn: Mr. Bob Bowman f 1 ) r 1 t"][_n_T_r i r 1 Inil Building Inspection Dept. JCB:ac TESTING ENGINEERS. SAN DIEGO REVIEWED BY C. Burns, R. E. #C028752 FORM 16 JP Testing Engineers—San Diego 3467KurtzSt, P.O. Box80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way. UnitB, Vista, California 92083 (714) 758-3730 FILE NO 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE- Permit #79-633 JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 Chestnut Avenue Carlsbad, California YEAR: 1981 •STORED a CURED. NOT TESTED LAB. NO. C36 1234 1258 1293 1409 1411 DATE CASTMO. DA. 4/27 5/1 5/5 5/11 5/12 LOCATION IN STRUCTURE Tower. LDS#3 A-B-C. Made by TESD. Tower. LDS#5 A-B-C. Made by TESD. Tower. LDS#7 A-B-C. Made by TESD. Tower, 40 'to 44'. LDS#18 A- B-C. Made by TESD. Tower 48 '-52'. LDS#20 A-B-C. Made by TESD. // \ SPECIFIED „„ — .. MATERIA Grout p«.r PROPORTIONS/MIX N JAYSTR.: ^UULT psf lo. 1 cement, 2 rock, 3 sand TYPF- r^cmiPMT. SPFC Pi UMP- .. ,(N ADMIXTUF;c. Afir: =;(££. IN ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. 9 10% 9% 9% 9% 7 -DAY 3970 315 Or> 4530 , 2980 , 2820 L 28-DAY 5950 ' / 4890 - / /*"' ^ ct OTHER TEST AGE 60-day , 60 -day . ^J(_ j\S *»%J RESULTS *Dise. *Disc. **' ^* **• £4/?/( DATE MAILED 5/8/81 5/14/81 5/21/81 5/29/81 "et> )&A ,*. (1) Arlon L. Van Orden, Architect ^dft/}j "^^U (1) Thomas & Sowards Engineering, Inc. e/Jf (ILJ&erwers Construction Company, Attn: Mr. Bob Bowman >o X)City of Carlsbad Building Inspection Detp. TEST.NG ENGINEERS^ DIEGO THCrac T. H. Chapman/ R. E. #12882 FORM 19 JP Testing Engineers—San Diego 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (714)225-9641 1903 West Vista Way. UnitB, Vista, California 92083 (714) 758-3730 F.I r No 4012-2 SUMMARY OF COMPRESSION TEST RESULTS PAGE-ONE Permit #79-633JOB: Church of Jesus Christ of the Latter Day Saints ADDRESS: 1975 chestnut Avenue Carlsbad, California YEAR: 198i •STORED & CURED. NOT TESTED LAB. NO C36 1163 1235 1292 1410 DATECAST MO. DA. 4/23 4/27 5/57 5/11 LOCATION IN STRUCTURE Front masonry tower, 5' elev. LDS#2 A-B-C. Made by TESD. Tower. LDS#4 TESD. Tower. LDS#6 A-B-C. Made by A-B-C. Made by Tower 44' elevation. LDS#19 A-B-C. Made by TESD. \ 't\ ]/ w ~* 0 ' ?• \j i, MATERIA Mortar 2n.r PROPORTIONS/MIX N ;IFIED JAY STR : -2500 Ps, ,«. Type "M" TYPE- riFMFNT- SPF<~ fil IIMP- IN ADMIXTUFIE- AGG SIZE* . >!N ULTIMATE COMPRESSIVE STRENGTH. PSI SLUMP IN. -- ->. 7-DAY \:i 1570 2190 2480 „ 1680 ,,. 28-DAY „ 2520 ^ X2740 " 7 ' C OTHER TESTAGE / 14 -day 60 -day ** RESULTS 1960 *DisC. o*-,v.1 /.I i MAILED 5/1/81 5/8/81 5/14/81 5/21/81 5/29/81 R - ^£-0 ?7 (1) Thojpa<s"""& Sowards Engineering, Inc. (1) Bwers Construction Company, Attn: Mr. Bob Bowman (Ly City of Carlsbad Building Inspection Dept. JCBrac TESTING ENGINEERS. SAN DIEGO REVIEWED BY ( • C. Burns, R. E. #C 02 8 75 2 THOMAS & SOWARDS ENGINEERING, INC. PLANNERS, ENGINEERS, ENVIRONMENTAL CONSULTANTS, LAND SURVEYORS P.O. BOX 286, 21 5 SOUTH HWY. 101, SUITE 101, SOLANA BEACH, CA 92075 (714)481-6818 ROBERT SOWARDS DAVID THOMAS RCE 26404 __ LS4759 April 24, 1981 flpR2?J98! Mr. Arlon Van Orden 1315 Arlington Place ,- El Cajon, CA 92021 " , '• j ' ' • ' ; RE: Carlsbad Stake Center - Tower Dear Arlon: Subsequent to a site visit of April 23, 1981, I instructed the brick mason to alter the #4 ties around the tower steel . They are to be open on one end; in the config- uration of a hairpin. Two "pins" are to be used together with a lap of 18" minimum and wired together. Also I recommended two (2) foot grouting lifts to prevent "blowouts". If you have any questions, please give me a call. Sincerely, THOMAS & SOWARDS ENGINEERING, INC. Robert Sowards R.C.E. 26404 RS/ng X S 'cc: Marl in Oustin \V Tony Mata, Building Inspector v\ \iU . / Vx V