12/22/2000 CommerciaI/lndustrial Permit Permit No: CB003546
vF35 Job Address: 4489 BUCKTHORN CT CBAD
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
12/22/2000
Applicant:
KTGY
COMMIND Sub Type: COMM
6 Reference #: CT98-01 Entered By: JM
LA COSTA GLEN VILLAS-TYPE B
Lot #: 0 Status: ISSUED
$238,440.00 Construction Type: VN Applied: 12/22/1999
Plan Approved:
1985-UNIT# 140&141 - 2,698SF,GAR 748 SF Issued: 12/22/2000
Inspect Area:
Owner:
CONTINUING LIFE COMMUNITIES
17992 MITCHELL STREET
IRVINE CA 92614
949-851 -21 33
800 MORNINGSIDE DRIVE
FULLERTN CA 92835
7 14-256-8088
Total Fees: $1 3,247.41 Total Payments To Date: $0.00 Balance Due: $13,247.41
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$1,107.58
$0.00
$71 9.93
$0.00
($57.59)
$50.07
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'l Recl. Water Con. Fee
Meter Fee
SDCWA Fee CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
LFMZ Transportation Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee:
Sewer Fee:
Redev Parking Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00 $6,200.81
$4,339.61
$0.00
$0.00
$0.00
$464.00
$0.00
$0.00
$232.00
$1 10.00
$81 .OO
$0.00
$0.00
$0.00
$1 3,247.41
I FINAL APPROVAL
Inspector: w'u Date: Glltjr, Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter wllectively
referred to as "feeslexactiions." You have 90 days from the date this permit was issued to protest imposition of these feedexactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Cartsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
feeslexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
Cihl of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD
Plan Check# PC99-175
Permit #: CB003546
Project Name:
Address: 1989 BUCKTHORN CT
Contact Person: Phone:
Sewer Dist: Water Dist
LA COSTA GLEN VILLAS-TYPE B
1985-UNIT# 140&141 - 2,698SF,GAR 748 SF
St Lite Fire
Date:
Permit Type:
Sub Type:
Lot: 0
06/04/2002
COMMIND
COMM
..........................................................................................................................................................
Date
Inspected: d/@z Approved: c/ Disapproved:
Inspected
By:
Inspected Date
By: Inspected: Approved: Disapproved:
inspected Date
By: Inspected: Approved: Disapproved: ...........................................................................................................................................................
Comments:
City of Carlsbad Bldg Inspection Request
For: 06/10/2002
Permit## CB003546 Inspector Assignment: RCB
Title: LA COSTA GLEN VILLAS-TYPE B
UNIT# 140&141 - 2,698SF,GAR 748 SF
Type: COMMIND Sub Type: COMM
Job Address: 1989 BUCKTHORN CT
Suite: Lot 0
Location:
APPLICANT KTGY
Owner:
Remarks: am please
Phone: 76071 06253
Inspector: la
Total Time: Requested By: JIM BISHOP
CD Description
Entered By: CHRISTINE
Act Comments
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
InsDection History
Date Description Act lnsp Comments
02/27/2002 39 Final Electrical CO RC EMR
07/30/2001 82 DrywalllExt LatWGas Test AP RC
07/25/2001 17 Interior LathlDrywall PA RC OK TO HANG 2ND SHEET
07/20/2001 16 Insulation AP RC WALLSONLY
07/17/2001 84 Rough Combo AP RC
06/29/2001 13 Shear PanelslHD's AP RC
06/29/2001 16 Insulation PA RC SHOWERS & BEDROOM
06/25/2001 13 Shear PanelslHD's AP RC
OW1 9/2001 15 RooWReroof AP RC
06/18/2001 15 RooWReroof NS PS WORKING BEFORE 8AM ON SAT
06/15/2001 13 Shear Panels/HD's CA RC DID NOT CALL FOR THIS INSPECTlONlLOT
06/13/2001 15 Roof/Reroof AP RC CHECKED NAILING ON CALIF S
05/17/2001 22 SewerMlater Service AP PS
05/14/2001 11 FtglFoundationlPiers AP PS GARAGESLAB
05/09/2001 I1 FtglFoundatiodPiers AP PS
07/24/2001 17 Interior LathlDrywall PA RC LOT 14 OK - LOT 140 - C.O. REMOVE ONE LAYER FOR INSPECTION
' Inspection List
Permit#: CB003546 Type: COMMIND COMM LA COSTA GLEN VILLAS-TYPE B
1985-UNIT# 140&141 - 2,698SF,GAR 748 S
Date Inspection Item
02/27/2002 39 Final Electrical
07/30/2001 82 DrywalVExt LathIGas Test
07/25/2001 17 Interior LatWDrywall
07/24/2001 17 Interior LathIDrywall
07/20/2001 16
0711 712001 84
06/29/2001 13
06/29/2001 16
06/25/2001 13
0611 912001 15
0611 812001 15
0611 512001 13
0611 312001 15
0511 712001 22
0511 412001 1 1
05/09/2001 11
05/09/2001 12
05/08/2001 81
05/07/2001 1 1
05/02/2001 31
05/01/2001 21
04/30/2001 31
04/27/2001 21
04/25/2001 21
Insulation
Rough Combo
Shear PanelsIHDs
Insulation
Shear PaneldHDs
RoofIReroof
RoofIReroof
Shear PanelsIHDs
RoofIReroof
Sewerwater Service
FtgIFoundationlPiers
FtgIFoundationlPiers
SteelIBond Beam
Underground Combo
FtglFoundatiodPiers
UndergroundIConduit-W irin
UndergroundAJnder Floor
UndergroundIConduit-W irin
UndergroundIUnder Floor
UndergroundIUnder Floor
Inspector
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
PS
RCB
RCB
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Act Comments
co
AP
PA
PA
AP
AP
AP
PA
AP
AP
NS
CA
AP
AP
AP
AP
AP
AP
co
AP
co
co
AP
AP
EMR
OK TO HANG 2ND SHEET
ONE LAYER FOR INSPECTION
WALLS ONLY
LOT 14 OK - LOT 140 - C.O. REMOVE
SHOWERS & BEDROOM
WORKING BEFORE 8AM ON SAT
DID NOT CALL FOR THIS
INSPECTIONILOT
CHECKED NAILING ON CALIF S
GARAGE SCAB
WRONG SST BOLTS
OUTSIDE
COPPER UNDER FLR
ALREADY BACK FILLED DITCH
Tuesday, March 19,2002 Page 1 of 1
BILL CARR SURVEY'S Inc.
164 12 EAGLE LANE, HUNTINGTON BEACH 92649-2704
ORANGE, CA. (714) 288 - 9623 Fax (714) 288 - 9058
Email: bca~,~billcamurve~s.c~m
May 5,2001
City of Carlsbad, CA.
Building Dept.
RE: LA COSTA GLEN VILLAS
Building Form set-back certification
Inspector:
On May 5,2001 Bill Carr the owner of B.C.S. observed the set-basks ofthe
following building to be correct as shown on sheets SP- 1, SP-2, Sp-3., prepared by
KTGY Group, Inc.
The building located were, the building listed on sheet SP-3, building numbers,
129/130, 131/132, 133/134, 135/136, 137/138, 1391140, 141/141, 142/143, 144/145, and
146/147. B.C.S. has found these form's to be in accordance with the approved plans
above.
Thank you. " Carr P.L.S.
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
,
-\
Government Contract #
I NWJ71rey
Prestress Conc
Masonry
SNC! s!Wl
-Fireproofing
Pile Driving
Non-Destructb
Batch Plant
Soils Technician
Mechanical
Electrical
Bon Pullaut
>
' Roofing
Waterproofing
DSA - OSHPD - specialty
MAT'L SAMPLING QTY , I ,-
-Soil
-Base
-Concrete Cyli
-conC Flex Be - Reinf. Steel
-Tendon (F7 St
-steel - H.S. Bolts
-Fireproofing - Roofing
-Other
MATERIAL DESCRIPTION TlON CHECKLIST
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
e PageLofJ
I
, /
General / Subcontractor f C-4A //z.// 7';.dLJ PL( e.. (
c-
Building Permit # DSA #
Plan File # OSHPD #
Government Con tract # Other \q-& y /v LA-
INSPECTION
/' Concrete
Prestress Conc
Masonry
Struct Steel
Fireproofing
Pile Driving
Non-Destructive
Batch Plant
Soils Technician
Mechanical
Electrical
Bolt Pull-Out
Roofing
Waterproofing
DSA
- OSHPD
-Specialty
MAT'L SAMPLING QTY
-Soil - Base - Subgrade
-Asphalt Concrete -
Concrete Cylinders -
Conc Flex Beams -
Reinf. Steel
Tendon (PT Strands) -
Mortar Samples -
Grout Samples
Masonry Prisms
-Masonry Block
-Steel
-H.S. Bolts
-Fireproofing
-Other
Roofing
MATERIAL DESCRIPTION I INSPECTION CHECKLIST
-Cone: Mix #/psi -
-Cone: Mix #/psi
Rinf: W.W.F.
Rinf: Tendons
Grout: Mix #/psi
Mortar: Type/psi
Units: Block
Units: Block
Steel
H.S. Bolts
Metal Decking
-Electrodes
Fireprooling
Other
I
/ - Plans
L~ Specifications
1 Sizes
-Slump
-Air Content
Temperature
Unit Weight
Consolidation
Electrode Storage
Torque Applied , Load (Pounds)
Thickness
Cmecheacbonrequired -
Corrections completed -
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in.&formance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME CERT. NO.
4SPECTOR'S SIGNATURE DATE
? i
$ r. I _. i. ,-
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 921 11
FOUNDATION INSPECTION REPORT
General I Subcontractor #GI1 c*rcmcf,&
6uilding Permit # UO 3ry 6 Plan File # @c -77- t7.S
OSHPD #
Government Contract #
On 4-z5-0/
of the following excavations.
Spread Footings /
Other 92-08 * fd
(day, date, year), we completed observations, measurements, and probing
V A
/Tie Beams: Q H ;-f f Y, f 31, /?3. /3& /w, / 4/,
3 !f4. !YS fp6; ./y7
We also r'hiewed the following documents (Name, Date, Firm, Sheet Nos., Project No.)
Geotechnical Report:
Plans: UT* GI' I//// ur # KT6r 6r~nP . / 2- 2 Z -00 c 3. / I f- y. l 'I Specifications: . ""
Based on our observations, measurement, probing, and document review, we noted the following items:
soil / other) which are
substantially in conformance with the
1. The bottom of the foundations were on
er project documents.
%+ . 2. The subject foundations extend to the proper depth and bearing strata.
The Special Inspector must approve the cleanliness of the foundation excavations and placement of
steel reinforcement prior to placement of concrete.
t
Compaction, expansion index, and other test results, if performed, will be provided under separate cover in a final as-
graded report for the project.
I NSP ECTO R' S SI G N ATU RE U