Loading...
HomeMy WebLinkAbout1985 BUCKTHORN CT; ; CB003546; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Building Inspection Request Line (760) 602-2725 12/22/2000 CommerciaI/lndustrial Permit Permit No: CB003546 vF35 Job Address: 4489 BUCKTHORN CT CBAD Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 12/22/2000 Applicant: KTGY COMMIND Sub Type: COMM 6 Reference #: CT98-01 Entered By: JM LA COSTA GLEN VILLAS-TYPE B Lot #: 0 Status: ISSUED $238,440.00 Construction Type: VN Applied: 12/22/1999 Plan Approved: 1985-UNIT# 140&141 - 2,698SF,GAR 748 SF Issued: 12/22/2000 Inspect Area: Owner: CONTINUING LIFE COMMUNITIES 17992 MITCHELL STREET IRVINE CA 92614 949-851 -21 33 800 MORNINGSIDE DRIVE FULLERTN CA 92835 7 14-256-8088 Total Fees: $1 3,247.41 Total Payments To Date: $0.00 Balance Due: $13,247.41 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $1,107.58 $0.00 $71 9.93 $0.00 ($57.59) $50.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) LFMZ Transportation Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee: Sewer Fee: Redev Parking Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $6,200.81 $4,339.61 $0.00 $0.00 $0.00 $464.00 $0.00 $0.00 $232.00 $1 10.00 $81 .OO $0.00 $0.00 $0.00 $1 3,247.41 I FINAL APPROVAL Inspector: w'u Date: Glltjr, Clearance: NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter wllectively referred to as "feeslexactiions." You have 90 days from the date this permit was issued to protest imposition of these feedexactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Cartsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any feeslexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Cihl of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD Plan Check# PC99-175 Permit #: CB003546 Project Name: Address: 1989 BUCKTHORN CT Contact Person: Phone: Sewer Dist: Water Dist LA COSTA GLEN VILLAS-TYPE B 1985-UNIT# 140&141 - 2,698SF,GAR 748 SF St Lite Fire Date: Permit Type: Sub Type: Lot: 0 06/04/2002 COMMIND COMM .......................................................................................................................................................... Date Inspected: d/@z Approved: c/ Disapproved: Inspected By: Inspected Date By: Inspected: Approved: Disapproved: inspected Date By: Inspected: Approved: Disapproved: ........................................................................................................................................................... Comments: City of Carlsbad Bldg Inspection Request For: 06/10/2002 Permit## CB003546 Inspector Assignment: RCB Title: LA COSTA GLEN VILLAS-TYPE B UNIT# 140&141 - 2,698SF,GAR 748 SF Type: COMMIND Sub Type: COMM Job Address: 1989 BUCKTHORN CT Suite: Lot 0 Location: APPLICANT KTGY Owner: Remarks: am please Phone: 76071 06253 Inspector: la Total Time: Requested By: JIM BISHOP CD Description Entered By: CHRISTINE Act Comments 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs InsDection History Date Description Act lnsp Comments 02/27/2002 39 Final Electrical CO RC EMR 07/30/2001 82 DrywalllExt LatWGas Test AP RC 07/25/2001 17 Interior LathlDrywall PA RC OK TO HANG 2ND SHEET 07/20/2001 16 Insulation AP RC WALLSONLY 07/17/2001 84 Rough Combo AP RC 06/29/2001 13 Shear PanelslHD's AP RC 06/29/2001 16 Insulation PA RC SHOWERS & BEDROOM 06/25/2001 13 Shear PanelslHD's AP RC OW1 9/2001 15 RooWReroof AP RC 06/18/2001 15 RooWReroof NS PS WORKING BEFORE 8AM ON SAT 06/15/2001 13 Shear Panels/HD's CA RC DID NOT CALL FOR THIS INSPECTlONlLOT 06/13/2001 15 Roof/Reroof AP RC CHECKED NAILING ON CALIF S 05/17/2001 22 SewerMlater Service AP PS 05/14/2001 11 FtglFoundationlPiers AP PS GARAGESLAB 05/09/2001 I1 FtglFoundatiodPiers AP PS 07/24/2001 17 Interior LathlDrywall PA RC LOT 14 OK - LOT 140 - C.O. REMOVE ONE LAYER FOR INSPECTION ' Inspection List Permit#: CB003546 Type: COMMIND COMM LA COSTA GLEN VILLAS-TYPE B 1985-UNIT# 140&141 - 2,698SF,GAR 748 S Date Inspection Item 02/27/2002 39 Final Electrical 07/30/2001 82 DrywalVExt LathIGas Test 07/25/2001 17 Interior LatWDrywall 07/24/2001 17 Interior LathIDrywall 07/20/2001 16 0711 712001 84 06/29/2001 13 06/29/2001 16 06/25/2001 13 0611 912001 15 0611 812001 15 0611 512001 13 0611 312001 15 0511 712001 22 0511 412001 1 1 05/09/2001 11 05/09/2001 12 05/08/2001 81 05/07/2001 1 1 05/02/2001 31 05/01/2001 21 04/30/2001 31 04/27/2001 21 04/25/2001 21 Insulation Rough Combo Shear PanelsIHDs Insulation Shear PaneldHDs RoofIReroof RoofIReroof Shear PanelsIHDs RoofIReroof Sewerwater Service FtgIFoundationlPiers FtgIFoundationlPiers SteelIBond Beam Underground Combo FtglFoundatiodPiers UndergroundIConduit-W irin UndergroundAJnder Floor UndergroundIConduit-W irin UndergroundIUnder Floor UndergroundIUnder Floor Inspector RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB PS RCB RCB PS PS PS PS PS PS PS PS PS PS PS Act Comments co AP PA PA AP AP AP PA AP AP NS CA AP AP AP AP AP AP co AP co co AP AP EMR OK TO HANG 2ND SHEET ONE LAYER FOR INSPECTION WALLS ONLY LOT 14 OK - LOT 140 - C.O. REMOVE SHOWERS & BEDROOM WORKING BEFORE 8AM ON SAT DID NOT CALL FOR THIS INSPECTIONILOT CHECKED NAILING ON CALIF S GARAGE SCAB WRONG SST BOLTS OUTSIDE COPPER UNDER FLR ALREADY BACK FILLED DITCH Tuesday, March 19,2002 Page 1 of 1 BILL CARR SURVEY'S Inc. 164 12 EAGLE LANE, HUNTINGTON BEACH 92649-2704 ORANGE, CA. (714) 288 - 9623 Fax (714) 288 - 9058 Email: bca~,~billcamurve~s.c~m May 5,2001 City of Carlsbad, CA. Building Dept. RE: LA COSTA GLEN VILLAS Building Form set-back certification Inspector: On May 5,2001 Bill Carr the owner of B.C.S. observed the set-basks ofthe following building to be correct as shown on sheets SP- 1, SP-2, Sp-3., prepared by KTGY Group, Inc. The building located were, the building listed on sheet SP-3, building numbers, 129/130, 131/132, 133/134, 135/136, 137/138, 1391140, 141/141, 142/143, 144/145, and 146/147. B.C.S. has found these form's to be in accordance with the approved plans above. Thank you. " Carr P.L.S. Testing Engineers - San Diego, Inc. 7895 Convoy Ct., Suite 18 San Diego, CA 92111 INSPECTION REPORT , -\ Government Contract # I NWJ71rey Prestress Conc Masonry SNC! s!Wl -Fireproofing Pile Driving Non-Destructb Batch Plant Soils Technician Mechanical Electrical Bon Pullaut > ' Roofing Waterproofing DSA - OSHPD - specialty MAT'L SAMPLING QTY , I ,- -Soil -Base -Concrete Cyli -conC Flex Be - Reinf. Steel -Tendon (F7 St -steel - H.S. Bolts -Fireproofing - Roofing -Other MATERIAL DESCRIPTION TlON CHECKLIST Testing Engineers - San Diego, Inc. 7895 Convoy Ct., Suite 18 San Diego, CA 92111 INSPECTION REPORT e PageLofJ I , / General / Subcontractor f C-4A //z.// 7';.dLJ PL( e.. ( c- Building Permit # DSA # Plan File # OSHPD # Government Con tract # Other \q-& y /v LA- INSPECTION /' Concrete Prestress Conc Masonry Struct Steel Fireproofing Pile Driving Non-Destructive Batch Plant Soils Technician Mechanical Electrical Bolt Pull-Out Roofing Waterproofing DSA - OSHPD -Specialty MAT'L SAMPLING QTY -Soil - Base - Subgrade -Asphalt Concrete - Concrete Cylinders - Conc Flex Beams - Reinf. Steel Tendon (PT Strands) - Mortar Samples - Grout Samples Masonry Prisms -Masonry Block -Steel -H.S. Bolts -Fireproofing -Other Roofing MATERIAL DESCRIPTION I INSPECTION CHECKLIST -Cone: Mix #/psi - -Cone: Mix #/psi Rinf: W.W.F. Rinf: Tendons Grout: Mix #/psi Mortar: Type/psi Units: Block Units: Block Steel H.S. Bolts Metal Decking -Electrodes Fireprooling Other I / - Plans L~ Specifications 1 Sizes -Slump -Air Content Temperature Unit Weight Consolidation Electrode Storage Torque Applied , Load (Pounds) Thickness Cmecheacbonrequired - Corrections completed - CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in.&formance with the approved plans and specifications and the workmanship provisions of the applicable code. INSPECTOR'S NAME CERT. NO. 4SPECTOR'S SIGNATURE DATE ? i $ r. I _. i. ,- Testing Engineers - San Diego, Inc. 7895 Convoy Ct., Suite 18 San Diego, CA 921 11 FOUNDATION INSPECTION REPORT General I Subcontractor #GI1 c*rcmcf,& 6uilding Permit # UO 3ry 6 Plan File # @c -77- t7.S OSHPD # Government Contract # On 4-z5-0/ of the following excavations. Spread Footings / Other 92-08 * fd (day, date, year), we completed observations, measurements, and probing V A /Tie Beams: Q H ;-f f Y, f 31, /?3. /3& /w, / 4/, 3 !f4. !YS fp6; ./y7 We also r'hiewed the following documents (Name, Date, Firm, Sheet Nos., Project No.) Geotechnical Report: Plans: UT* GI' I//// ur # KT6r 6r~nP . / 2- 2 Z -00 c 3. / I f- y. l 'I Specifications: . "" Based on our observations, measurement, probing, and document review, we noted the following items: soil / other) which are substantially in conformance with the 1. The bottom of the foundations were on er project documents. %+ . 2. The subject foundations extend to the proper depth and bearing strata. The Special Inspector must approve the cleanliness of the foundation excavations and placement of steel reinforcement prior to placement of concrete. t Compaction, expansion index, and other test results, if performed, will be provided under separate cover in a final as- graded report for the project. I NSP ECTO R' S SI G N ATU RE U