HomeMy WebLinkAbout1989 BUCKTHORN CT; ; CB003546; Permit12/22/2000
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
12/22/2000
Applicant:
KTGY
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/lndustriaI Permit Permit No: CB003546
Building Inspection Request Line (760) 602-2725
1989 BUCKTHORN CT CBAD
COMM I N D Sub Type: COMM
Lot #: 0 Status: ISSUED
$238,440.00 Construction Type: VN Applied: 12/22/1999
6 Reference #: CT98-01 Entered By: JM
LA COSTA GLEN VILLAS-TYPE B Plan Approved:
1985-UNIT# 140&141 - 2,698SF,GAR 748 SF Issued: 12/22/2000
Inspect Area:
Owner:
CONTINUING LIFE COMMUNITIES
17992 MITCHELL STREET
IRVINE CA 92614
949-851 -21 33
800 MORNINGSIDE DRIVE
FULLERTN CA 92835
7 14-256-8088
Total Fees: $1 3,247.41 Total Payments To Date: $0.00 Balance Due: $1 3,247.41
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$1,107.58
$0.00
$71 9.93
$0.00
($57.59)
$50.07
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'l Recl. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
LFMZ Transportation Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee:
Sewer Fee:
Redev Parking Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$6,200.81
$4,339.61
$0.00
$0.00
$0.00
$464.00
$0.00
$0.00
$232.00
$1 10.00
$81 .OO
$0.00
$0.00
$0.00
$13,247.41
FINAL APPROVAL
Inspector: wca Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "feeslexactions." You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carfsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees'exactions of which you have previously been piven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
Inspection
Dept: Building Engi ' g Planning CMWD
Plan Check #: PC99-175
Permit #: CB003546
Project Name: LA COSTA GLEN VILLAS-TYPE B
1985-UNIT# 140&141 - 2,698SF,GAR 748 SF
Address: 1989 BUCKTHORN CT
Contact Person: Phone:
Sewer Dist: Water Dist:
St Lite Fire
Date:
Permit Type:
Sub Type:
Lot: 0
06/04/2002
COMMIND
COMM
..........................................................................................................................................................
Date pfl Inspected: d/@z Approved: c/ Disapproved:
Inspected
By:
Inspected Date
By: Inspected: Approved : Disapproved:
Inspected Date
By: Inspected: Approved: Disapproved: ...........................................................................................................................................................
Comments:
City of Carlsbad Bldg Inspection Request
For: 06/10/2002
Permit# CB003546
Title: LA COSTA GLEN VILLAS-TYPE B
Description. 1985 UNIT# 140&141 - 2,698SF,GAR 748 SF 0
Type: COMMIND Sub Type: COMM
Job Address: 1989 BUCKTHORN CT
Suite: Lot 0
Location:
APPLICANT KTGY
Owner:
Remarks: am please
Total Time:
Inspector Assignment: RCB
Phone: 76071 06253
Inspector: RcO
Requested By: JIM BISHOP
Entered By: CHRISTINE
CD Description Act Comments
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
InsDection Historv EJR d%d/h Date Description Act lnsp Comments
02/27/2002 39 Final Electrical CO RC EMR
07/30/2001 82 DrywalllExt Lath/Gas Test AP RC
07/25/2001 17 Interior LathlDrywall PA RC OK TO HANG 2ND SHEET
07/20/2001 16 Insulation AP RC WALLSONLY
07/17/2001 84 Rough Combo AP RC
06/29/2001 13 Shear PaneWHDs AP RC
06/29/2001 16 Insulation PA RC SHOWERS 81 BEDROOM
06/25/2001 13 Shear Panels/HD's AP RC
06/19/2001 15 RooWReroof AP RC
06/18/2001 15 Roof/Reroof NS PS WORKING BEFORE 8AM ON SAT
06/15/2001 13 Shear PaneWHD's CA RC DID NOT CALL FOR THIS INSPECTlONlLOT
06/13/2001 15 Roof/Reroof AP RC CHECKED NAILING ON CALIF S
05/1 7/2001 22 Sewerwater Service AP PS
05/14/2001 11 FtglFoundationlPiers AP PS GARAGESLAB
05/09/2001 11 FtglFoundationlPiers AP PS
07/24/2001 17 Interior LathlDrywall PA RC LOT 14 OK - LOT 140 - C.O. REMOVE ONE LAYER FOR INSPECTION
* Inspection List
Permit#: C6003546 Type: COMMIND COMM LA COSTA GLEN VILLAS-TYPE B
1985-UNIT# 140&141 - 2,698SF,GAR 748 S
Date InsDection Item
02/27/2002 39 Final Electrical
07/30/2001 82 DrywalVExt LathIGas Test
07/25/2001 17 Interior LathIDrywall
07/24/2001 17 Interior LathIDrywall
07/20/2001 16
0711 712001 a4
06/29/2001 13
06/29/2001 16
06/25/2001 13
0611 912001 15
0611 812001 15
0611 512001 13
0611 312001 15
0511 712001 22
0511 412001 1 1
05/09/2001 11
05/09/2001 12
05/08/2001 81
05/07/2001 11
05/02/2001 31
0510 1 I200 1 2 1
04/30/2001 31
04/27/2001 21
04/25/2001 21
Insulation
Rough Combo
Shear PanelsIHD’s
Insulation
Shear PanelsIHD’s
Roof/Reroof
RoofIReroof
Shear PaneldHDs
RoofIReroof
SewerMlater Service
FtgIFoundationlPiers
FtgIFoundationlPiers
SteelIBond Beam
Underground Combo
FtgIFoundationlPiers
UndergroundlConduit-W irin
UndergroundIUnder Floor
Undergroundlconduit-W irin
UndergroundIUnder Floor
UndergroundIUnder Floor
Inspector
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
RCB
PS
RCB
RCB
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Act
co
AP
PA
PA
AP
AP
AP
PA
AP
AP
NS
CA
AP
AP
AP
AP
AP
AP
co
AP
co
co
AP
AP
Comments
EMR
OK TO HANG 2ND SHEET
ONE LAYER FOR INSPECTION
WALLS ONLY
LOT 14 OK - LOT 140 - (2.0. REMOVE
SHOWERS & BEDROOM
WORKING BEFORE 8AM ON SAT
DID NOT CALL FOR THIS INSPECTION/LOT
CHECKED NAILING ON CALIF S
GARAGE SUB
WRONG SST BOLTS
OUTSIDE
COPPER UNDER FLR
ALREADY BACK FILLED DITCH
Tuesday, March 19,2002 Page 1 of 1
c
BILL CARR SURVEY’S Inc.
16412 EAGLE LANE, HUNTINGTON BEACH 92649-2704
ORANGE, CA. (714) 288 - 9623 Fax (714) 288 - 9058
Email: bcarr@billcamurvevs.com
May 5,2001
City of Carlsbad, CA.
Building Dept.
RE: LA COSTA GLEN VILLAS
Building Form set-back certification
Inspector:
On May 5,2001 Bill Carr the owner of B.C.S. observed the set-basks of the
following building to be correct as shown on sheets SP- 1, SP-2, Sp-3., prepared by
KTGY Group, Inc.
The building located were, the building listed on sheet SP-3, building numbers,
129/130, 131/132, 133/134, 135/136, 137/138, 139/140, 141/141, 142/143, 1441145, and
1461147. B.C.S. has found these form’s to be in accordance with the approved plans
above.
Thank you.
Carr P.L.S.
<<
Testing Engineers - San , Inc. Page - 1 of/ 7895 Convoy Ct., Suite 18
San Diego, CA 92111 -A INSPECTION REPORT
Government Contract #
I N :xTlre:eN
-Prestress Conc
-Masonry
Struct Steel
Fireproofing
Pile Driving
Non-Destructive
Batch Plant
Soils Technician
Mechanical
Electrical
__,.A I *: . . -Bolt Pull-out
Roofing
Waterproofing
DSA - OSHPD
swim
. :’
MAT’L SAMPLING QTY
-Soil
-Base - subgrade
-Asphalt Concrete -
-Concrete Cylinders -
-Cone Flex Beams - - Reinf. Steel
-Tendon (PT Strands)
-MortarSamples .I
grout Samples
-Steel >- - H.S. Bdts - Fireproofing
-Rooting
-Other
MATERIAL DESCRIPTION - Conc: Mix #/psi -
-Cone: Mix #/psi
’ Conc: Mix #/psi
Rinf W.W.F.
Rinf: Tendons
Grout: Mi #/psi
Mortar: Type/psi
7 Rinf Rebar /$$Ti
Units: Block
steel 1 1, - f H.S. Bolts
5, Metal Decking
Electrodes
Fireproofing
Other , _*,
-.
-Slump
Temperature
Unit Weight
Consolidation
Electrode Storage
Toque Applied
INSPECTORS NAME
INSPECTOR’S SIGNATURE
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
PageLof4
/ ,c
General / Subcontractor yo IC- c402. ///de c f"i..f4& && I
Building Permit # DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION
/ Concrete
-Prestress Conc
Masonry
-Struct Steel
Fireproofing
Pile Driving
Non-Destructive
Batch Plant
Soils Technician
Mechanical
Electrical
___Bolt PuII-OU~
___Roofing
___ Waterproofing
___ DSA
- OSHPD
-Specialty
MAT'L SAMPLING QTY
-Soil
-Base
- Subgrade
-Asphalt Concrete -
-Concrete Cylinders __
-Cone Flex Beams -
Reinf. Steel
Tendon (PT Strands) -
Mortar Samples -
Grout Samples
Masonry Prisms
-Masonry Block
-Steel - H.S. Bolts
-Fireproofing
-Roofing
Other
MATERIAL DESCRIPTION
-Cone: Mix #/psi -
-Cone: Mix #/psi
-Cone: Mix #/psi
-1 Rinf: Rebar / -Rinf: W.W.F.
Rinf: Tendons
Grout: Mix #/psi
Mortar: Type/psi
Units: Block
Units: Block
Steel
H.S. Bolts
Metal Decking
__Electrodes
__Fireproofing
Other
INSPECTION CHECKLIST
-Plans /
L Specifications
L Sizes
-Slump
-Air Content
Temperature
Unit Weight
Consolidation
Electrode Storage
Torque Applied
Load (Pounds) 7 Thickness
cwrediveaclimrequired -
Corrections completed
// i -&+;i~ 5LjI <4, I , 5n I .A- I
Field Representative
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated,
specifications and the workmanship provisions of the applicable code.
with the approved plans and
INSPECTOR'S NAME CERT. NO.
4SPECTOR'S SIGNATURE Z&"M DATE
t Fo~YO03 i
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 921 11
FOUNDATION INSPECTION REPORT
General / Subcontractor Karl C~s+baCfi8tr
Building Permit # 00 ?Fy 6 Plan File # pc -9?- 175
OSHPD #
Government Contract #
On Y-z5-~/
of the following excavations.
Other ~%O$ frpt +#
(day, date, year), we completed observations, measurements, and probing
Spread Footings /
<' - We also reviewed the following documents (Name, Date, Firm, Sheet Nos., Project No.)
Geotechnical Report:
s '3. r Y. l I Specifications: . :-
Based on our observations, measurement, probing, and document review, we noted the following items:
1. The bottom of the foundations were on f f'ry ermational soil / other) which are
substantially in conformance with the soil investigation er project documents.
%* . 2. The subject foundations extend to the proper depth and bearing strata.
The Special Inspector must approve the cleanliness of the foundation excavations and placement of
steel reinforcement prior to placement of concrete.
Notes:
?
Compaction, expansion index, and other test results, if performed, will be provided under separate cover in a final as-
graded report for the project.
INSPECTOR'S NAME 3- *<yhSav - CERTNO. E/r - -- (PirnClearly) -
I INSPECTOR'S SIGNATURE DATE c/*Zc-o/ U