Loading...
HomeMy WebLinkAbout1989 BUCKTHORN CT; ; CB003546; Permit12/22/2000 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 12/22/2000 Applicant: KTGY City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/lndustriaI Permit Permit No: CB003546 Building Inspection Request Line (760) 602-2725 1989 BUCKTHORN CT CBAD COMM I N D Sub Type: COMM Lot #: 0 Status: ISSUED $238,440.00 Construction Type: VN Applied: 12/22/1999 6 Reference #: CT98-01 Entered By: JM LA COSTA GLEN VILLAS-TYPE B Plan Approved: 1985-UNIT# 140&141 - 2,698SF,GAR 748 SF Issued: 12/22/2000 Inspect Area: Owner: CONTINUING LIFE COMMUNITIES 17992 MITCHELL STREET IRVINE CA 92614 949-851 -21 33 800 MORNINGSIDE DRIVE FULLERTN CA 92835 7 14-256-8088 Total Fees: $1 3,247.41 Total Payments To Date: $0.00 Balance Due: $1 3,247.41 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $1,107.58 $0.00 $71 9.93 $0.00 ($57.59) $50.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) LFMZ Transportation Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee: Sewer Fee: Redev Parking Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $6,200.81 $4,339.61 $0.00 $0.00 $0.00 $464.00 $0.00 $0.00 $232.00 $1 10.00 $81 .OO $0.00 $0.00 $0.00 $13,247.41 FINAL APPROVAL Inspector: wca Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "feeslexactions." You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carfsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees'exactions of which you have previously been piven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Inspection Dept: Building Engi ' g Planning CMWD Plan Check #: PC99-175 Permit #: CB003546 Project Name: LA COSTA GLEN VILLAS-TYPE B 1985-UNIT# 140&141 - 2,698SF,GAR 748 SF Address: 1989 BUCKTHORN CT Contact Person: Phone: Sewer Dist: Water Dist: St Lite Fire Date: Permit Type: Sub Type: Lot: 0 06/04/2002 COMMIND COMM .......................................................................................................................................................... Date pfl Inspected: d/@z Approved: c/ Disapproved: Inspected By: Inspected Date By: Inspected: Approved : Disapproved: Inspected Date By: Inspected: Approved: Disapproved: ........................................................................................................................................................... Comments: City of Carlsbad Bldg Inspection Request For: 06/10/2002 Permit# CB003546 Title: LA COSTA GLEN VILLAS-TYPE B Description. 1985 UNIT# 140&141 - 2,698SF,GAR 748 SF 0 Type: COMMIND Sub Type: COMM Job Address: 1989 BUCKTHORN CT Suite: Lot 0 Location: APPLICANT KTGY Owner: Remarks: am please Total Time: Inspector Assignment: RCB Phone: 76071 06253 Inspector: RcO Requested By: JIM BISHOP Entered By: CHRISTINE CD Description Act Comments 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs InsDection Historv EJR d%d/h Date Description Act lnsp Comments 02/27/2002 39 Final Electrical CO RC EMR 07/30/2001 82 DrywalllExt Lath/Gas Test AP RC 07/25/2001 17 Interior LathlDrywall PA RC OK TO HANG 2ND SHEET 07/20/2001 16 Insulation AP RC WALLSONLY 07/17/2001 84 Rough Combo AP RC 06/29/2001 13 Shear PaneWHDs AP RC 06/29/2001 16 Insulation PA RC SHOWERS 81 BEDROOM 06/25/2001 13 Shear Panels/HD's AP RC 06/19/2001 15 RooWReroof AP RC 06/18/2001 15 Roof/Reroof NS PS WORKING BEFORE 8AM ON SAT 06/15/2001 13 Shear PaneWHD's CA RC DID NOT CALL FOR THIS INSPECTlONlLOT 06/13/2001 15 Roof/Reroof AP RC CHECKED NAILING ON CALIF S 05/1 7/2001 22 Sewerwater Service AP PS 05/14/2001 11 FtglFoundationlPiers AP PS GARAGESLAB 05/09/2001 11 FtglFoundationlPiers AP PS 07/24/2001 17 Interior LathlDrywall PA RC LOT 14 OK - LOT 140 - C.O. REMOVE ONE LAYER FOR INSPECTION * Inspection List Permit#: C6003546 Type: COMMIND COMM LA COSTA GLEN VILLAS-TYPE B 1985-UNIT# 140&141 - 2,698SF,GAR 748 S Date InsDection Item 02/27/2002 39 Final Electrical 07/30/2001 82 DrywalVExt LathIGas Test 07/25/2001 17 Interior LathIDrywall 07/24/2001 17 Interior LathIDrywall 07/20/2001 16 0711 712001 a4 06/29/2001 13 06/29/2001 16 06/25/2001 13 0611 912001 15 0611 812001 15 0611 512001 13 0611 312001 15 0511 712001 22 0511 412001 1 1 05/09/2001 11 05/09/2001 12 05/08/2001 81 05/07/2001 11 05/02/2001 31 0510 1 I200 1 2 1 04/30/2001 31 04/27/2001 21 04/25/2001 21 Insulation Rough Combo Shear PanelsIHD’s Insulation Shear PanelsIHD’s Roof/Reroof RoofIReroof Shear PaneldHDs RoofIReroof SewerMlater Service FtgIFoundationlPiers FtgIFoundationlPiers SteelIBond Beam Underground Combo FtgIFoundationlPiers UndergroundlConduit-W irin UndergroundIUnder Floor Undergroundlconduit-W irin UndergroundIUnder Floor UndergroundIUnder Floor Inspector RCB RCB RCB RCB RCB RCB RCB RCB RCB RCB PS RCB RCB PS PS PS PS PS PS PS PS PS PS PS Act co AP PA PA AP AP AP PA AP AP NS CA AP AP AP AP AP AP co AP co co AP AP Comments EMR OK TO HANG 2ND SHEET ONE LAYER FOR INSPECTION WALLS ONLY LOT 14 OK - LOT 140 - (2.0. REMOVE SHOWERS & BEDROOM WORKING BEFORE 8AM ON SAT DID NOT CALL FOR THIS INSPECTION/LOT CHECKED NAILING ON CALIF S GARAGE SUB WRONG SST BOLTS OUTSIDE COPPER UNDER FLR ALREADY BACK FILLED DITCH Tuesday, March 19,2002 Page 1 of 1 c BILL CARR SURVEY’S Inc. 16412 EAGLE LANE, HUNTINGTON BEACH 92649-2704 ORANGE, CA. (714) 288 - 9623 Fax (714) 288 - 9058 Email: bcarr@billcamurvevs.com May 5,2001 City of Carlsbad, CA. Building Dept. RE: LA COSTA GLEN VILLAS Building Form set-back certification Inspector: On May 5,2001 Bill Carr the owner of B.C.S. observed the set-basks of the following building to be correct as shown on sheets SP- 1, SP-2, Sp-3., prepared by KTGY Group, Inc. The building located were, the building listed on sheet SP-3, building numbers, 129/130, 131/132, 133/134, 135/136, 137/138, 139/140, 141/141, 142/143, 1441145, and 1461147. B.C.S. has found these form’s to be in accordance with the approved plans above. Thank you. Carr P.L.S. << Testing Engineers - San , Inc. Page - 1 of/ 7895 Convoy Ct., Suite 18 San Diego, CA 92111 -A INSPECTION REPORT Government Contract # I N :xTlre:eN -Prestress Conc -Masonry Struct Steel Fireproofing Pile Driving Non-Destructive Batch Plant Soils Technician Mechanical Electrical __,.A I *: . . -Bolt Pull-out Roofing Waterproofing DSA - OSHPD swim . :’ MAT’L SAMPLING QTY -Soil -Base - subgrade -Asphalt Concrete - -Concrete Cylinders - -Cone Flex Beams - - Reinf. Steel -Tendon (PT Strands) -MortarSamples .I grout Samples -Steel >- - H.S. Bdts - Fireproofing -Rooting -Other MATERIAL DESCRIPTION - Conc: Mix #/psi - -Cone: Mix #/psi ’ Conc: Mix #/psi Rinf W.W.F. Rinf: Tendons Grout: Mi #/psi Mortar: Type/psi 7 Rinf Rebar /$$Ti Units: Block steel 1 1, - f H.S. Bolts 5, Metal Decking Electrodes Fireproofing Other , _*, -. -Slump Temperature Unit Weight Consolidation Electrode Storage Toque Applied INSPECTORS NAME INSPECTOR’S SIGNATURE Testing Engineers - San Diego, Inc. 7895 Convoy Ct., Suite 18 San Diego, CA 92111 INSPECTION REPORT PageLof4 / ,c General / Subcontractor yo IC- c402. ///de c f"i..f4& && I Building Permit # DSA # Plan File # OSHPD # Government Contract # Other INSPECTION / Concrete -Prestress Conc Masonry -Struct Steel Fireproofing Pile Driving Non-Destructive Batch Plant Soils Technician Mechanical Electrical ___Bolt PuII-OU~ ___Roofing ___ Waterproofing ___ DSA - OSHPD -Specialty MAT'L SAMPLING QTY -Soil -Base - Subgrade -Asphalt Concrete - -Concrete Cylinders __ -Cone Flex Beams - Reinf. Steel Tendon (PT Strands) - Mortar Samples - Grout Samples Masonry Prisms -Masonry Block -Steel - H.S. Bolts -Fireproofing -Roofing Other MATERIAL DESCRIPTION -Cone: Mix #/psi - -Cone: Mix #/psi -Cone: Mix #/psi -1 Rinf: Rebar / -Rinf: W.W.F. Rinf: Tendons Grout: Mix #/psi Mortar: Type/psi Units: Block Units: Block Steel H.S. Bolts Metal Decking __Electrodes __Fireproofing Other INSPECTION CHECKLIST -Plans / L Specifications L Sizes -Slump -Air Content Temperature Unit Weight Consolidation Electrode Storage Torque Applied Load (Pounds) 7 Thickness cwrediveaclimrequired - Corrections completed // i -&+;i~ 5LjI <4, I , 5n I .A- I Field Representative CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, specifications and the workmanship provisions of the applicable code. with the approved plans and INSPECTOR'S NAME CERT. NO. 4SPECTOR'S SIGNATURE Z&"M DATE t Fo~YO03 i Testing Engineers - San Diego, Inc. 7895 Convoy Ct., Suite 18 San Diego, CA 921 11 FOUNDATION INSPECTION REPORT General / Subcontractor Karl C~s+baCfi8tr Building Permit # 00 ?Fy 6 Plan File # pc -9?- 175 OSHPD # Government Contract # On Y-z5-~/ of the following excavations. Other ~%O$ frpt +# (day, date, year), we completed observations, measurements, and probing Spread Footings / <' - We also reviewed the following documents (Name, Date, Firm, Sheet Nos., Project No.) Geotechnical Report: s '3. r Y. l I Specifications: . :- Based on our observations, measurement, probing, and document review, we noted the following items: 1. The bottom of the foundations were on f f'ry ermational soil / other) which are substantially in conformance with the soil investigation er project documents. %* . 2. The subject foundations extend to the proper depth and bearing strata. The Special Inspector must approve the cleanliness of the foundation excavations and placement of steel reinforcement prior to placement of concrete. Notes: ? Compaction, expansion index, and other test results, if performed, will be provided under separate cover in a final as- graded report for the project. INSPECTOR'S NAME 3- *<yhSav - CERTNO. E/r - -- (PirnClearly) - I INSPECTOR'S SIGNATURE DATE c/*Zc-o/ U