Loading...
HomeMy WebLinkAbout2004 COSTA DEL MAR RD; ; CB073175; Permit03-13-2008 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No Building Inspection Request Line (760) 602-2725 CB073175 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title Applicant JIM WAPLES 2004 COSTA DEL MAR RD CBAD Tl Sub Type 0000000000 Lot # $64,068 00 Construction Type Reference # LA COSTA SPA-672 SF CABANA WITH FOOD PREP/SERVICE GRILL COMM 0 VN Owner Status Apclied Entered By Plan Approved Issued Inspect Area Plan Chsck# ISSUED 12/21/2007 RMA 03/13/2008 03/13/2008 760 929-6360 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee $449 26 $000 $292 02 $000 $000 $1345 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 Meter Size Add'l Reel Water Con Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (3 105540) PFF (4305540) License Tax (31 041 93) License Tax (43041 93) Traffic Impact Fee (31055^1) Traffic Impact Fee (4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee TOTAL PERMIT FEES $000 $000 $000 $000 $1,16604 $1,07634 $000 $000 $000 $000 $146 00 $6000 $5000 $000 $000 $000 $000 99 $3,25311 Total Fees $3,253 11 Total Payments To Date $3,25311 Balance Due $000 BUfkDING PLANS ._^_ IN STORAGE ATTACHED Inspector FINAL APPROVAL, Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations cr other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required Mformation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bat any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv otherwise exoired