HomeMy WebLinkAbout2010 PINTORESCO CT; ; CB154413; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
01-08-2016 Demolition Permit Permit No:CB154413
Job Address:
Permit Type:
Parcel No:
Occupancy Group:
PC#:
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2010 PINTORESCO CT CBAD
DEMO Full Demo: Y
2164813300 Lot#: 0
0
0
SUGG: DEMO POOL
Reference #:
Structure Type:
Bathrooms: 0
Owner:
Status:
Applied:
Entered By:
Plan Approved:
ISSUED
12/14/2015
SLE
01/08/2016
Issued: 01/08/2016
Inspect Area:
JAMES CONSTRUCTION CLEANUP INC
STE 123-381
SUGG WILLIAM E&ROSEMARY P FAMILY TRUST 05-21-97
6755 MIRA MESA BLVD
SAN DIEGO CA 92121
619-861-6700
Building Permit
Plumbing Fee
Other Fee
Additional Fees
TOTAL PERMIT FEES
$20.00
$0.00
$45.00
$0.00
$65.00
2010 PINTORESCO CT
CARLSBAD CA 92009
Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due:
Inspector: f'k· ~S
FINAL APP'1OVAL
Date: ot /-;z., II 6 Clearance:
$0.00
r,.QllCE; A....,ta<e r,.QllCEltat 'WM d'fO.' ~ed irdldestre"lrrµ,sitioo" dfees, dedcaicn; reserv.iicn;, crctte-EO<alic:ns-wledi;ey
referred to a,; '!ees'EO<alicnsi YaJ hal.e 00 C>f1S frcmtre dale ths pemit w,s iSSJed to imest irrµ,siticr, d trese fees'EO<alicns. If YClJ µ-ctest trem YClJ rrust
fcilo.vtre µ-ctest ~ set forth in Ch<errmrt Coo, Sedioo oonl(a), 1rd file tre imest ,rd err; ctte-rBj..ired irfumiioo wth tre O\y ~ fer
~'ll i,,amda rewth Calstm Mndpa eoo, Sedioo 3.32.CnJ. Faluetotirrelyfcilo.vtta ~wll t..-,rr;Slb;eq.Jert lega ediooto~
re.-ie.,v, set asiOO, \ad, er clTU tter irt'pBtirn.
YaJ ,re 1-aecy R.Rn-ffi r,.QllRBJ !tat 'fO.' riifl to i:,uest tre spmed fees'exa:tic:ns IXES I\OT />PA.. Y to"""'" ,rd re,er cxrredicr, fees inl ~
ch!rges, ncr plirri'l), zrri"I! ga:l'l)crdharsinila-~icaioo ~'l)crsenAoofeesin cxrredioowthths ~ed. ~= IT N'FI..Yto err;
i :::. l\nTI(E ~rrila-+,_ fl,;., rr ~ tn wi Lie ct lirrf . .
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
01-08-2016
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150486
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
2010 PINTORESCO CT CBAD
SWPPP
2164813300
CB154413
SUGG: DEMO POOL
JAMES CONSTRUCTION CLEANUP INC
STE 123-381
6755 MIRA MESA BLVD
SAN DIEGO CA 92121
619-861-6700
Emergency Contact:
BILLY (JAMES CONSTRUCTION)
619-861-6700
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Status:
Lot#: 0 Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
ISSUED
12/14/2015
SLE
01/08/2016
1
M
SUGG WILLIAM E&ROSEMARY P FAMILY TRUST 05-21-97
2010 PINTORESCO CT
CARLSBAD CA 92009
$54.00
$228.00
$0.00
$282.00
Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due: $0.00
FINAL APPROVAL
DATE "'tf-z, / / i, CLEARANCE ___ _
SIGNATURE fVI-~s
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: □PLANNING 0 ENGINEERING □BUILDING □FIRE □HEALTH 0 HAZMATIAPCD «'~ Building Permit Application Plan Check No.('I /J-i /f7441?i
1635 Faraday Ave., Carlsbad, CA 92008 Est. Value
~ CITY OF Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit CARLSBAD email: building@carlsbadca.gov
www.carlsbadca.gov Date /7-1u-1c..... lswPPPlnf)~"I
JOB ADDRESS SUITEf/SPACEill/UNITf IAPN 201 O Pintoresco Ct. ---
CT/PROJECT# ILOT# I PHASE# T# OF UNITS I# BEDROOMS # BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP
DESCRIPTION OF WORK: Include Square Feet of Affected Aroa(s)
Demolish (NOT REMOVE) and fill in the existing swimming pool in the backyard of this SFR.
No ~vqvre_-:,; f"'P~ """-tt,.;$ -s"..,,.lre
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE I AIR CONDITIONING I FIRE SPRINKLERS
YESO No□ YES □No □ YES□No□
APPLICANT NAME (Primary Contact) James Construction APPLICANT NAME (Secondary Contact) Jennifer/Randy Cole
ADDRESS ADDRESS
6755 MIRA MESA BLVD #123-381 9880 Maqnolia Ave #119
CITY STATE ZIP CITY STATE ZIP
San Dieqo CA 92121 Santee CA 92071
PHONE IFAX PHONE lFAX 619-405-2648 619-330-4796
EMAIL EMAIL
jennifer@permitrunner.net
PROPERTY OWNER NAME William Sugg CONTRACTOR BUS. NAME James Construction
ADDRESS ADDRESS
201 O Pintoresco Ct. 6755 MIRA MESA BLVD #123-381
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA 92009 SAN DIEGO CA 92121
PHONE IFAX PHONE IFAX (619) 861-6700
EMAIL EMAIL
ARCH/DESIGNER NAME & ADDRESS I STATE LIC. # STATE UC.# I ''i:~3/C21 I '"y BUS '';'236197 802538
(Sec~ 7031.5 Business and Professions Code: Any City or County which requires a permit to construct. alter, improve, demolish or repair any_ structure, prior to its issuance, also requires the applicant for such permit to file a siro,ed statement that he is licensed pursuant to the provisions of the Contractor's License Law /Chapter 9, commendmgwith Section 7000 of Division 3 of the B_usmess and Professions Code} or fhat he Is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subJects the applicant to a
cIvII penalty of not more than five hundred dollars {$500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following dec/arati011s: D I have and will maintain a certificate of consent to self-insure for Y,'Orkers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. D I have and will maintain workers' compensation, as required by SecUon 3700 of the Labor Code, for the performance of the work for which this pennit is issued, My workers' compensation insurance carrier and policy
number are: Insurance Co STATE COMPENSATION INS Policy No. 1201643 Expira~on Date 09101/2016
~section need not be completed if the permit is for one hundred dollars ($100) or less. LJ Certificate of Exemption: I certify that in the perfo1TT1ance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure worilers' compensation cov e is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damages as rovtded for I 0fl 3706 of the Labor code, Interest and attorney's fees .
.65 CONTRACTOR SIGNATURE
I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason:
□
□
□
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owiier of the property, am exclusively contracting with licensed contractors to const11Jcl the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section ____ ,Business and Professions Code for this reason:
1. I personally plan to provide ttie major labor and materials for construction of the proposed property improvement. 0Yes 0No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number):
4, I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone/ contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address/ phone I type of work):
,6$ PROPERTY OWNER SIGNATURE □AGENT DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk mana;iement and prevenfon program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required to obtain a permit from the air pollution control disbict or air quality management district? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR rs MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there 1s a construction lending agency for the performance of the work this perrrnt 1s issued (Sec 3097 (1) Civil Code)
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I certify that I have read the applk:atlon and state that the above infom,ation Is oonectand that the lnfom,ation on the plans is accura1e. 1 agree to comply 'Mth all Cl1yordlnaooes and State laws relating to building construction.
I hereby authorize representative of the City of Ca~sbad to enter upon the aOOve mentioned !JOperty tir i'lspeclion p.Jrposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY Cf CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUEAGAJNST SAID CITY IN COO SEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: M OSHA permit is required for excavations over 5'0' deep and demolltion or construction of structures over 3 stories in heght.
EXPIRATION: Every permit issued by the Buik:ling Offdal under the 1-Y()Visioos of this shall expire by limitatlon and become nul and void if the DJik:ling orv.ori<. authorized by such permit is not commenced v.ithin
180days from the date of such permit or if the building orv.ori( orized by It is suspended or abandoned at anytime after the 'MJri<. is commenced for a period of 180days (Sectbn 100.4.4 Unifonn Buildh'lg Code).
_,k$ APPLICANT'S SIGNATURE DATE 12/14/15
Inspection List
Permit#: CB154413 Type: DEMO
Date __ _lrlspection Item
01/21/2016 19 Final Structural
01/21/2016 19 Final Structural
01/11/2016 14 Frame/Steel/Bolting/Weldin
01/11/2016 19 Final Structural
Thursday, January 21, 2016
Inspector Act
MC
PY
RI
Fl
AP
RI
SUGG: DEMO POOL
Comments
EARLY AM CALL B4 ARRIVING SWMG
POOL DEMO
POOL DEMO
Page 1 of 1
«~~ ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 12/22/201PROJECT NAME: RESIDENTIAL POOL DEMO PROJECT ID: CB154413
PLAN CHECK NO: 1 SET#:l ADDRESS: 2010 PINTOR ESCO CT APN: 2164815500
VALUATION: APPLICANT CONTACT:JENNIFER@PERMITRUNNER.NET
□
Tlis plan check review transmittal is to notify you of clearance by:
LAND DEVELOPMENT ENGINEERING DIVISION
Final lmpe c tion by the Construction & Inspection Division is required: Yes No X
'f!!!s For status from a division not marked below, please call 760-602-2719
This plan check review is NCI'COMPLBTE Items missing or incorrect are listed
on the attached checklist. Please resubmit amended plans as required.
Chris Sexton
760-602-4624
LAND DEVELOPMENT ENG.
760-602-2750
Chris .Sexton@ca rlsbadca .gov
Kathleen Lawrence
760-602-27 41
Kathleen.Lawrence@carlsbadca.gov
Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
Linda Ontiveros □ 760 -602-2773
Linda.Ontiveros@carlsbadca.gov
VAL RAY MARSHALL
760-602-27 41
VALRA Y.MARSHALL@CARLSBADCA.GOV
Remarks: NO EASEMENT'S PRESENT AND SW PAPERWORK ALL IN ORDER
·cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
«1~ ~ CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
8-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s) of construction permit:
6i'-Building Permit □ Right-of-Way Permit
□ My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
□ My project qua Imes as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWFPP) because
it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 • Low Threat Assessment Criteria
~My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project V -meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 • Moderate Threat Assessment Criteria
□ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Cansbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 -Significant Threat Assessment Criteria
□ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
□ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
□ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receMng waters by way of stonn water runoff or non-stonn water discharge(s).
I certify to tho best of my knowledge that tho above
checked statements are true and correct I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for tho permit typo(•) chock above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to City Standards.
Project Address: Assessor Parcel No.
'The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Leve! is
warranted.
8-24
City Concurrence·
QYES ONO
Page 1 of 1
By: Date:
Tille:
Date:
I Z,/t t../t:J
Project ID:
Rev.03/09
«1'» ~ CITY OF
CARLSBAD
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Construction Perceived
Threat to SWPPPTier Construction Threat Assessment Criteria* Stonn Water
•
Level Quality
Tier 3 -High Construction Threat Assessment Criteria □ Project site is 50 acres or more and grading will occur during the rainy season
□ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
Tier3 □
USDA-NRCS Erosion factors k, greater than or equal to 0.4)
Site slope is 5 to 1 or steeper
□ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
□
through April 30).
Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 High Construction Threat Asse§sment Qr~~,;~
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors k, greater than or equal to 0.4) High
□ Site slope is 5 to 1 or steeper Tier2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier2 Medium QonsirugiQn Thr~~l Assessm§!nt Qriteria Medium □ All projects not meeting Tier 2 High Construction Threat Assessment Criteria
Tier 1 -Medium lns1;2ection Threat Assessment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directiy to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors k, greater than or equal to 0.4) Medium □ Site slope is 5 to 1 or steeper
Tier 1 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier 1 -Low lns"action Threat Assessment Criteria
~All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low
Exempt -Not Applicable -Exempt
The city engineer may authorize minor variances from the construction threat assessment cntena m special circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
«'~ ~ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
INSTRUCTIONS:
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
YES NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or X other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streets quidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are (x_ designed and constructed in accordance with the USEPA Green Streets guidance?
If you answered "yes" to one or more of the above questions, then your project is NOT a ·priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
«~~ ~ C I TY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STEP2
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a priority development project, please answer the following questions: YES
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed-use, and public
develooment oroiects on oublic or orivate land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
industrial, residential mixed-use and public development projects on oublic or orivate land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption.
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
temoorarv oarkinq or storaae of motor vehicles used personally for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
automobiles trucks, motorcvcles, and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
oroiect to the ESA (i.e. not commingles with flows from adjacent lands).*
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles per dav.
10. ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
11. ls your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
NO
[)(
)(
A
X
k
k
X
X:
X
P<
!)G,
If you answered "yes• to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no• to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of 3 Effective 6/27/13
«t~ ~ C IT Y OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Does the redevelopment project result in the creation or replacement of impeNious surface in an amount of less than
50% of the surface area of the reviousl existin develo ment?
If you answered "yes,• the structural BM P's required for Priority Development Projects apply only to the creation or replacement
impeNious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "m ro·ect meets PDP re uirements" box and com lete a licant information.
□
STEP4
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only comply with ST ANDA RD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Accessor's Parcel Number(s):
Applicant Title~+
Date: I 2/t ro/C"
This Box for City Use Only
City Concurrence: I YES I NO
I I
By:
Date:
Project ID:
• Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preseNes or their
quivalent under the Multi Species ConseNation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
«~~ ~ CITY Of
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
✓ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean: and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or YJithin 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO. AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
f(_yJ (Jg
OWNER(S)/OWX?R'S AGENT NAME (PRINT) ~ z ~
~ER.St ,R•S AGEITTNAME (SIGNATURE)
( '2.-/i r,/tr
DME
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING OROER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 314 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
Site Address'?o/ 0 ,e. •,.~p C
Assessor's Parcel Number: ______ _
Project ID CJb \'51....\\..,\ \3
Construction Pennit No.:~ \f{)4:Kl D
Estimated Construction Start Date \ 1/17 /,)
Project Duration I Months
Emergency Contact:
Name f;I ( \y
24hourPhon~ (~) 8b/ ~'b700
Perceived Threat to Storm Water Quality
D Medium
~Low
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By: ________ _
Date: _________ _
REV 4130110
Erosion Control Tracking Non-Stonn Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs
C C C c c 0 0 0
"C ti ti "' ~ ., "C .,
C C E C E "C
i ~ C "' "' C "' 2 2 '5 C. ., 2 -g ~ E "' :;; "E ·5 ~ "' "' ::;; "' -~ m t; ,,, t; C 'E "' C ,,, ~ Best Management Practice C C. ., ·e C C"' C ~ 0 " ., C ~ ~ .. le "'~ • E ID C. -0 ., 0 ., 2 w -~ ., "' ~ ., "' (BMP) Description ➔ ,,, .!l 3l [J) C I-E "' l[ ID C u~ u ,,, "C ~ "C Qj ,,, ::;; 2 ,,,
~ ·~ ~ "'
,,, "' ·~ s "C "'
C C C 0 :::, ., ,,,
=> ~ a, c '5 "C >, 0 "' > => .,
~ :, 0 ID "' ., !!! ., "' u "' )j ~ I!! ~ 0 og> 0 C ., "' 0·-~ oi ~ 0: Ei ~ ~ ~3';: "' ~-·c. "E ., "8 • ., E -" Qj
" => " g· ·~ " u ·c -" !=. 0 " C u. u m > "C :E ~ :E -g 2 " "' u "·-C. '5 ., E I!! il C ~ le u :I C ., ~ "'E 0 ~ ., " " -"' "' .s 2 "' "' .!!lo ~ "' ~ "' cl5 ~( 0 0
(!) WO iii [J) u U: (!) [J) > [J) [J) a. 00 .E [J) 0: a. a. :, [J) I u
CASQA Designation ➔ 0 ., "' -~ :z .,. "1 ~ ~ :z 0 ~ ~ -;z .... ;;; -')' i .,. "' 'I' i c..\ c..\ -~ d, d, :!; :!; c..\ w w ::;; i ::;; w UJ w [J) [J) [J) [J) [J) [J) [J) I-I-z z z z s: s: s: s: Construction Activity UJ [J)
Gradina/Soil Disturbance
Trenchina/Excavation
~ Stockoilina -Drillinn/Borino
Concrete/Asphalt Saw
cuttina
Concrete flatwork
Pavina
ConduiVPino Installation
Stucco/Mortar Work
Waste Disoosal
Staaina/Lav Down Area
Equipment Maintenance
and Fuelina
Hazardous Substance
Use/Storaae
Dewaterina
Site Access Across Dirt
Other llistl:
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribecl, pick one or more best
management practices (BMPs) from the list located along the top of the fonn. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt~. Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress• under Tracking Control. Follow along the "Site Access Across Dirt• row until you get to the "Stabilized Construction
Ingress/Egress· column and place an X in the box Ymere the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then Vv'fite in "Cover with Plastic· in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling~ row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stonnwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10
-
\~
.I
\.
' .l
RECORD COPY RECEIVED
DEC 1 S 2015
CITY OF CARLSBAD
1,,v · BUILDING DIVISION
111 ' .J 'RtJ~e~ :v 5 UGG-d-()ID Pl NTo/<.E~to co ua.,
CA /ll s B /11)_, C rl tj a 001
0-
:--~--
~ ~
.... ., 04 ~,v<:r _
T -· -