HomeMy WebLinkAbout2011 Palomar Airport Rd; 102, 108-110; CBC2019-0453; Recycle•
(city of.
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faroday Avenue
760-602-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Permit No .. __ ~u,._,,=,_,._L.J~~'-'-""----'-Project Title OFFICE SPACE
Project Address,_2_0_1 _1 _P_A_L_O_M_A_R_A_IR_P_O_R_T_R_D_. _____________ APN 213-061-26-00
Contractor Architect Other --r I A~ Owner
Applicant Name ..:c.l::.:<l'IL,,.,_W\!..II-C,.._ ____ iv_,,,ia,,_f..,_:t1M,..uctt,,,,,.,,:_ ____ 0
Last First 0 00--
Phone 1lcL'( I 7 Ll> foD~
Applicant Malling Address
(if different than project address)
Project Type
/check all that apply}:
Residential
□
E-mailAddress JtlUY\,e..mi=L-toS:: <!.jvntu,I• ~
Commerdal
0
PublitJ/dlng
Brief Description ~e..lnf:: Wadt4-lwshcs,, ~~ lljhl',,, .Luc.f::,_
Project Size ~ ..S.f Estimated Cost of Project$ ________________ _
(square footage)
Please check the appropriate box:
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
!vl I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
□This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief. d L..----f. ~
Print Name ::;:£t1V'fl'!e;, M Qr"~ Signature,_,.__~--1---~------=-Date {j-/ 7"l&f
Page 1 of4 Rev. 11112/18
(City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Section 4.408.1 and Section 5.408.1 of the 2016 California Green Building Standards requires at least 65% of non-hazardous
construction debris is recycled and/or salvaged for reuse.
With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste
Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from
your project.
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the
Applicant's responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up
companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion
receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
ht!J)_://v,__w_w.san_di~o,g_o_v/!'nviro~_rnental-services/r_ecycling/cd/index_shtml.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source
Separated Recycling Facility.
Part 1 -Before the Prolect Begins
Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table.
a. Submit completed and signed form to City with Building Permit application.
Part 2 -During and After the Project
Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully
completed and approved PART 2 of the Construction Waste Management Plan {CWMP) Table.
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum)
65% of the waste generated by your project.
c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector
prior to requesting final inspection.
Rev. 11/12/1 B
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.} No dirt.
Unpainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Estimated
Waste Quantity
(tons)
Place a (✓) check
next to items to be
reused or salvaged
Place a (✓) check next
to items to be
recycled
Place a ( ✓) check next
to items to be
disposed at landfill
✓
✓
✓
TOTAL =
SECTION C
To meet 65% Diversion Requirement (estimate) _________ x 0.65 -___________ tons
Contractor/Owner Signature
Total Estimated Waste from above cl~ Date
Minimum Required Diversion
Page 2 of 4 Rev. 11/12118
•
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL}:
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. _________________ Print Name
Address
SECTION B
____________________________ Date
Use this Final Log below to track loads of materials as they leave the job site.
®®SAVE RECEIPTS®@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date Material Type
A B C
Actual Amt
Reused or
Salvaged
Actual Amt
Recycled
Actual Amt
Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/05/2018 Concrete (broken) 5 tons
Palomar Transfer Station, 5960 El
Camino Real
@TOTAL
SECTION C
Diversion Rate Achieved --------~-----------= _____ %
Total of columns A+ B Total of columns A + B + C DIVERSION
Contractor/Owner Signature ________________ Oate
-760 603-0153
e: 65%
,;65%0
Attach the following documentation to this Report: Return completed form and documentation to:
Original recycling weight tickets, landfill weight tickets
Original donation receipts with photos and/or itemized descriptions
Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of4 Rev. 11/12118