HomeMy WebLinkAbout2015 AURA CIR; ; CB143615; Permit12-29-2014
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Demolition Permit Permit No:CBl436l5
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Occupancy Group:
PC #:
# Dwelling Units:
Bedrooms:
Project Title:
2015 AURA CR CBAD
DEMO
2072303800
0
0
GAFNER: DEMO POOL
Full Demo:
Lot#:
Reference #:
Structure Type:
Bathrooms:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
12/29/2014
JMA
12/29/2014
12/29/2014
Applicant:
S&M TRUST 10-21-09
Owner:
S&M TRUST 10-21-09
2015 AURA CIR
CARLSBAD CA 92008
2015 AURA CIR
CARLSBAD CA 92008
Building Permit
Plumbing Fee
Other Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$65.00
$0.00
$65.00
Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
refen-ed to as "fees/exactions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infomiation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previouslv otherwise expired.
12-29-2014
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW140451
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
2015 AURA CR CBAD
SWPPP
2072303800
CB143615
GAFNER: DEMO POOL
Lot#:
Applicant:
S&M TRUST 10-21-09
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
S&M TRUST 10-21-09
ISSUED
12/29/2014
JMA
12/29/2014
1
M
2015 AURA CIR
CARLSBAD CA 92008
2015 AURA CIR
CARLSBAD CA 92008
Emergency Contact:
STAN GAFNER
760-586-0001
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$0.00
$224.00
$0.00
TOTAL PERMIT FEES $224.00
Total Fees: $224.00 Total Payments To Date: $224.00 Balance Due: $0.00
FINAL APPKOVAL
DATE.
SIGNATURE _
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMITISSUANCE: • PUNNING • ENGINEERING • BUILDING QFIRE • HEALTH • HAZMAT/APCD
Ccityof
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: buiiding@carlsbadca.gov
vmw.carlsbadca.gov
Plan Check No. C^i 4 - C
Est. Value
Plan Ck. Deposit
Date m 2.<^liHr SWPPP
JOB ADDRESS 2015 Aura Circle SUrrEf/SPACEt/UNIT*
207 - 230 - 38 00
CT/PROJECT # PHASE (t I # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TVPE OCC. GROUP
DESCRIPTION OF WORK: /nc/ude Square Feet of Affected Area(s)
Pool demolition (200 sq ft in back yard)
EXISTING USE
pool
PROPOSED USE
yard
GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE
YESQ* NOj I
AIR CONDITIONING
YES I INO I I
FIRE SPRINKLERS
YES I |NO| I
APPLICANT NAME
Prtnarv Contact Stan Gafner PROPERTY OWNER NAME S&M Trust 10-21-09 (Stan and Mary Gafner)
ADDRESS 950 Saxony Road ADDRESS
same as applicant
CITY
Encinitas
STATE
CA
ZIP
92024
CITY STATE ZIP
PHONE
760-586-0001
FAX PHONE FAX
EMAIL
sg@stangafner.com
EMAIL
DESIGN PROFESSIONAL CONTRACTOR BUS. NAME
ADDRESS ADDRESS
CfTY STATE ZIP CITY STATE ZIP
PHONE FAX PHONE FAX
EMAIL EMAIL
STATE UC. tt CLASS CITY BUS. LIC.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to Its Issuance, also requires the
applicant for such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Lavif (Chapter 9, commending with Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: / hereby affirm under penalty ofpeijury one ofthe following declarations:
• I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the peifomiance of the work for whk:h this permit Is issued.
I have and will maintain worlters' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this pemiit is Issued. My workers' compensation insurance carrier and policy
number are: Insurance Co. Poltey No. Expiration Date
This sectran need not be completed if the pemiit is for one hundred dollars ($100) or less.
I I Certificate of Exemption: I certify that in the performance of the work for which this pemnit is issued, I shall not employ any person In any manner so as to become subject to the Workers' Compensatton Laws of
California. WARNING: Failure to secure workers' compensatkMi coverage is unlawful, and shall subject an employer to criminal penalties and dvll fines up to one hundred thousand dollars (ft100,000), in
addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
CONTRACTOR SIGNATURE • AGENT DATE
OWNER-BUILDER DECLARATI
/ hereby affirm that I aw exempt from Contractor's License Law for the hikming reason:
I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code; The Contractor's
Ucense Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
|/| I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or Improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I I I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for constmction of the proposed property Improvement. [^Yes I iNo
2.1 (have / have not) signed an appllcatbn for a building pemiit for the proposed work.
3.1 have contracted with the foltowing person (fimi) to provide the proposed constniction (include name address / phone / contractors' license number):
4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supereise and provkle the major work (include name / address / phone / contrxtors' tense number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of wori<):
PROPERTYOWNER!
, DN: cn=Stan Gaftiw, o, ou,
einail=i9^tan<iafnei.oxTi. c=US
DatK 2014.12.19 13:42:22 ^»'0O' QAGENT DATE 12/19/2014
Inspection List
Pemiit#: CB143615 Type: DEMO GAFNER: DEMO POOL
Date Inspection Item
01/12/2015 19 Final Structural
Inspector Act
01/12/2015 55
01/12/2015 59
01/02/2015 11
01/02/2015 54
Fence/Pre-Plaster
Final Pool
Ftg/Foundation/Piers
Pre-Site
PD
PD
AP
Rl
Rl
AP
Rl
Comments
Demo
POOL DEMO AM PLS
Wednesday, January 14, 2015 Page 1 of 1
^ CITY 0 F
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STORM WATER COMPLIANCE CERTIFICATE
<^ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of stonn water runoff or non-storm water
discharge(s).
>^ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code)
^ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refijeling and maintenance areas that meets
one or more ofthe additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturt>ed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturt>ed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
OWNER(S)/QWNER'S AGEN^^NAME (PRINT)
OWNEft(S)/OWNER'S AGENT NCIME (SIGNATURE) DATE
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CPTY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
PROJECT INFORMATION
Site Address:
Assessor's Parcel Number:
Project ID:
Construction Pemiit No
Estimated Construction Start Date
Project Duration Months
Emergency Contact: .
Name:
24 hour Phone:
Perceived Threat to Stonn Water Quality
^SM edium
• Low
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By:.
Date:
E-29 Page 1 of 3 REV 4/30/10
Erosion Control
BMPs Sediment Control BMPs
Best Management Practice
(BMP) Description -> Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam «
o
SX
il Gravel Bag Bemi Street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Conservation Practlc^es Paving and Grinding Ooeratlons Potable Water/ln-igation Vehicle and Equipment Cleanlna Material Delivery and Material Use Stockpile Management Spill Prevention and CnntrnI Solid Waste Hazardous Waste Mananemnnt ffl «
> 0
ffl E
•S «•
P 0
tj n c c o n U S CASQA Designation
Construction Activity
f. EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 UJ
CO SE-5 ^. SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 WM-8 Grading/Soil Disturbance I/'
—y Trenching/Excavation
V Stockpiling
Drilling/Boring
Concrete/Asphalt Saw
cutting V
Concrete flatwork
Paving
Conduit/Pipe Installation
Stucco/Mortar Work
Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering
Site Access Across Dirt
Other (list):
Tracking
Control
BMPs
Non-Storm Water
Management BMPs
Waste Management and Materials
Pollution Control BMPs
Instruction?: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provkled for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descnibed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and fbr each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirf. Then review
the list for something that applies such as "Stabilized Constmction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress' column and place an X in the box where the two meet As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" In the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To team more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants In the selection of appropriate Best Management Practice
measures. The reference also explains the Califomia Stomwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10