Loading...
HomeMy WebLinkAbout2015 AURA CIR; ; CB143615; Permit12-29-2014 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Demolition Permit Permit No:CBl436l5 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Occupancy Group: PC #: # Dwelling Units: Bedrooms: Project Title: 2015 AURA CR CBAD DEMO 2072303800 0 0 GAFNER: DEMO POOL Full Demo: Lot#: Reference #: Structure Type: Bathrooms: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 12/29/2014 JMA 12/29/2014 12/29/2014 Applicant: S&M TRUST 10-21-09 Owner: S&M TRUST 10-21-09 2015 AURA CIR CARLSBAD CA 92008 2015 AURA CIR CARLSBAD CA 92008 Building Permit Plumbing Fee Other Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $65.00 $0.00 $65.00 Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refen-ed to as "fees/exactions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infomiation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previouslv otherwise expired. 12-29-2014 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW140451 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: 2015 AURA CR CBAD SWPPP 2072303800 CB143615 GAFNER: DEMO POOL Lot#: Applicant: S&M TRUST 10-21-09 Status: Applied: Entered By: Issued: Inspect Area: Tier: Priority: Owner: S&M TRUST 10-21-09 ISSUED 12/29/2014 JMA 12/29/2014 1 M 2015 AURA CIR CARLSBAD CA 92008 2015 AURA CIR CARLSBAD CA 92008 Emergency Contact: STAN GAFNER 760-586-0001 SWPPP Plan Check SWPPP Inspections Additional Fees $0.00 $224.00 $0.00 TOTAL PERMIT FEES $224.00 Total Fees: $224.00 Total Payments To Date: $224.00 Balance Due: $0.00 FINAL APPKOVAL DATE. SIGNATURE _ THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMITISSUANCE: • PUNNING • ENGINEERING • BUILDING QFIRE • HEALTH • HAZMAT/APCD Ccityof Carlsbad Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: buiiding@carlsbadca.gov vmw.carlsbadca.gov Plan Check No. C^i 4 - C Est. Value Plan Ck. Deposit Date m 2.<^liHr SWPPP JOB ADDRESS 2015 Aura Circle SUrrEf/SPACEt/UNIT* 207 - 230 - 38 00 CT/PROJECT # PHASE (t I # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TVPE OCC. GROUP DESCRIPTION OF WORK: /nc/ude Square Feet of Affected Area(s) Pool demolition (200 sq ft in back yard) EXISTING USE pool PROPOSED USE yard GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE YESQ* NOj I AIR CONDITIONING YES I INO I I FIRE SPRINKLERS YES I |NO| I APPLICANT NAME Prtnarv Contact Stan Gafner PROPERTY OWNER NAME S&M Trust 10-21-09 (Stan and Mary Gafner) ADDRESS 950 Saxony Road ADDRESS same as applicant CITY Encinitas STATE CA ZIP 92024 CITY STATE ZIP PHONE 760-586-0001 FAX PHONE FAX EMAIL sg@stangafner.com EMAIL DESIGN PROFESSIONAL CONTRACTOR BUS. NAME ADDRESS ADDRESS CfTY STATE ZIP CITY STATE ZIP PHONE FAX PHONE FAX EMAIL EMAIL STATE UC. tt CLASS CITY BUS. LIC.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to Its Issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Lavif (Chapter 9, commending with Section 7000 of Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). WORKERS' COMPENSATION Workers' Compensation Declaration: / hereby affirm under penalty ofpeijury one ofthe following declarations: • I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the peifomiance of the work for whk:h this permit Is issued. I have and will maintain worlters' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this pemiit is Issued. My workers' compensation insurance carrier and policy number are: Insurance Co. Poltey No. Expiration Date This sectran need not be completed if the pemiit is for one hundred dollars ($100) or less. I I Certificate of Exemption: I certify that in the performance of the work for which this pemnit is issued, I shall not employ any person In any manner so as to become subject to the Workers' Compensatton Laws of California. WARNING: Failure to secure workers' compensatkMi coverage is unlawful, and shall subject an employer to criminal penalties and dvll fines up to one hundred thousand dollars (ft100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. CONTRACTOR SIGNATURE • AGENT DATE OWNER-BUILDER DECLARATI / hereby affirm that I aw exempt from Contractor's License Law for the hikming reason: I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code; The Contractor's Ucense Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). |/| I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I I I am exempt under Section Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for constmction of the proposed property Improvement. [^Yes I iNo 2.1 (have / have not) signed an appllcatbn for a building pemiit for the proposed work. 3.1 have contracted with the foltowing person (fimi) to provide the proposed constniction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supereise and provkle the major work (include name / address / phone / contrxtors' tense number): 5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of wori<): PROPERTYOWNER! , DN: cn=Stan Gaftiw, o, ou, einail=i9^tan<iafnei.oxTi. c=US DatK 2014.12.19 13:42:22 ^»'0O' QAGENT DATE 12/19/2014 Inspection List Pemiit#: CB143615 Type: DEMO GAFNER: DEMO POOL Date Inspection Item 01/12/2015 19 Final Structural Inspector Act 01/12/2015 55 01/12/2015 59 01/02/2015 11 01/02/2015 54 Fence/Pre-Plaster Final Pool Ftg/Foundation/Piers Pre-Site PD PD AP Rl Rl AP Rl Comments Demo POOL DEMO AM PLS Wednesday, January 14, 2015 Page 1 of 1 ^ CITY 0 F CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE <^ My project is not in a category of permit types exempt from the Construction SWPPP requirements My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of stonn water runoff or non-storm water discharge(s). >^ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code) ^ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refijeling and maintenance areas that meets one or more ofthe additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturt>ed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturt>ed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. OWNER(S)/QWNER'S AGEN^^NAME (PRINT) OWNEft(S)/OWNER'S AGENT NCIME (SIGNATURE) DATE STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CPTY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES PROJECT INFORMATION Site Address: Assessor's Parcel Number: Project ID: Construction Pemiit No Estimated Construction Start Date Project Duration Months Emergency Contact: . Name: 24 hour Phone: Perceived Threat to Stonn Water Quality ^SM edium • Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By:. Date: E-29 Page 1 of 3 REV 4/30/10 Erosion Control BMPs Sediment Control BMPs Best Management Practice (BMP) Description -> Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam « o SX il Gravel Bag Bemi Street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Conservation Practlc^es Paving and Grinding Ooeratlons Potable Water/ln-igation Vehicle and Equipment Cleanlna Material Delivery and Material Use Stockpile Management Spill Prevention and CnntrnI Solid Waste Hazardous Waste Mananemnnt ffl « > 0 ffl E •S «• P 0 tj n c c o n U S CASQA Designation Construction Activity f. EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 UJ CO SE-5 ^. SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 WM-8 Grading/Soil Disturbance I/' —y Trenching/Excavation V Stockpiling Drilling/Boring Concrete/Asphalt Saw cutting V Concrete flatwork Paving Conduit/Pipe Installation Stucco/Mortar Work Waste Disposal Staging/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering Site Access Across Dirt Other (list): Tracking Control BMPs Non-Storm Water Management BMPs Waste Management and Materials Pollution Control BMPs Instruction?: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provkled for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descnibed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and fbr each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirf. Then review the list for something that applies such as "Stabilized Constmction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress' column and place an X in the box where the two meet As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" In the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To team more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants In the selection of appropriate Best Management Practice measures. The reference also explains the Califomia Stomwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10