HomeMy WebLinkAbout2020 CASSIA RD; ; CB151326; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
09-25-2015 Commercial/Industrial Permit Permit No: CB151326
Building Inspection Request Line (760) 602-2725
Job Address: 2020 CASSIA RD CBADSt: CS
Permit Type: Tl Sub Type: INDUST Status: ISSUED
Applied: 04/30/2015
Entered By: LSM
Parcel No: 2150210200 Lot#: 0
Valuation: $250,000.00 Construction Type: 58
Occupancy Group: Reference#
Project Title: VERIZON-INSTALL NEW EQUIP
Plan Approved: 09/25/2015
Issued: 09/25/2015
Inspect Area
Plan Check#:
INSIDE BLOCK ENCLOSURE ON CONCRETE PAD1 //NEW GENERATOR//
12 NEW ANTENNAS //4 RRU UNITS//3 GPS UNITS// NEW 200 AMP
SERVICE//1 MICROWAVE DISH INSIDE NEW CUPOLA
Applicant:
CYNDIBAKER
STE D2
325 CARLSBAD VILLAGE DR
CARLSBAD CA 92008
760-434-84 7 4
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Building Permit Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Fire Expedidted Plan Review
$1,155.56
$0.00
$808.89
$0.00
$0.00
$70.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$10.00
$0.00
. Total Fees: $2,133.45 Total Payments To Date:
Inspector:
Owner:
AMHERST PROPERTIES INC
2710 LOKER AVE W #100
CARLSBAD CA 92010
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (31 04193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
Green Bldg Standards Plan Chk
TOTAL PERMIT FEES
$2, 133.45 Balance Due:
Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$89.00
$0.00
$0.00
$0.00
$0.00
$0.00
??
??
$2,133.45
$0.00
NOTICE: Please take NOTICE that ar:;proval r:f your prqect irdudes tre "ll"l""f:OOtion" r:f fees, dedications, reservations, or otrer exa::tions hereafter oollectively
referre:J to as 'feeslexa::tions." You have 00 days from the date this pemit 'Ni'S issued to protest il"l""f:OOtion r:f these feeslexa::tions. If ycx.1 putest trern ycx.1 rrust
fdla,vthe potest plXlldures set forth in CbJerrrrent OxJe Section ffil20(a), ard file the protest ard arry otrer reqjre:J irtorrration \Mth the Oty rv"anagarfor
r:roressing in acrordance\Mth CarlsbOO M.lridpal OxJe Section 3.32.030. Failuretotirrelyfdla,vthat plXlldure\MII bar any suOOa:luent legal action to attack,
review, set aside, vdd, or annul their il"l""f:OOtion.
You are hereby FURTHER NOTl RED that ycx.~r right to protest the specifie:J feeslexa::tions !XES NOT .APPLY to water ard SEMer W1nedion fees and CBpadty
chalges, nor planning, zoning, grading or other sirrilar application processing or servire fees in W1nedion wth this prqect. 1\ffi !XES IT .APPLY to any
fees/exactions r:f Wich vou have r:reviouslv been oiven a NOTICE sirrilar to this or as to Wlich the statute r:f !irritations has oreviouslv olherWse exoire:J.
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
09-25-2015
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150189
Job Address:
Permit Type:
2020 CASSIA RD CBAD St CS
SWPPP Status:
Parcel No: 2150210200 Lot#: 0 Applied:
Reference #:
CB#:
Project Title:
Applicant
CYNDIBAKER
760-434-84 7 4
Emergency Contact
STEVE JOHNSON
951-541-8905
CB151326
VERIZON-CELL SITE IMPROVMENT
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
AMHERST PROPERTIES INC
2710 LOKER AVE W #1 00
CARLSBAD CA 92010
ISSUED
04/30/2015
LSM
09/25/2015
1
L
$48.00
$58.00
$0.00
$106.00
Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due: $0.00
0PLANNING 0ENGINEERING C) BUILDING DFIRE DHEALTH 0HAZMATIAPCD
Cicy of
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
Plan Check No. C/6/ !5 I 3 ~
Est. Value c;)GO, 000
SWPPP /£> IJ IS"
JOB ADDRESS SUITE#/SPACE#/UNITII
CT/PROJECT # #BEDROOMS #BATHROOMS OCC. GROUP
EXISTING USE GARAGE (SF) AIR CONDITIONING
YES0No0
FIRE SPRINKLERS
YEsONoO
APPLICANT NAME
Primary Contact
.ve-. tu Jfe-/00
_.-ZIP rt;;oJ o
FAX
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: .Q I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. )>'< I have and will maintain workers' compensation, as required !ri.SI\ction 3700 of the Labor Code, for the performance of the work for which this __ ermit is is ued. My workers' compensation insurance carrier and policy
number are: Insurance coOCr\)()JCLI! ()n\(){) ~I VI:L .Jii> # Policy No. '25 ~ Expiration Date '7/ I J J Le ·
This section need not be completed if the permit is for one hundred dollars ($1 00) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
of the Labor code, interest and attorney's fees. q d-61/ ~
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
D
D
D
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section Business and Professions Code for this reason:
1. I per~onally plan to provide the major labor and materials for construction of the proposed property improvement DYes 0No
2. I (have I have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address I phone I type of work):
J¥5 PROPERTY OWNER SIGNATURE 0AGENT DATE
I certify that I have read the application and state that the above information is conect and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby authorize representative ofthe City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA: An OSHA penni! is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permitis not commenced l'lithin
180 days from the date of such permit or if the building or 'Mlrk authorized by such permit is suspended or abandoned at any time after the 'Mlrk is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code).
RS APPLICANT'S SIGNATURE (fr,Jtv DATE J.j, a) 'I 5
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
CE!?TIF!CATI!E OF OCCUPANCY /Commercial Project,; Onl:vl
Fax (760) 602-8560, Email building@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008.
I CO#: (Office Use Only)
CONTACT NAME OCCUPANT NAME
ADDRESS BUILDING ADDRESS
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA
PHONE I FAX
EMAIL OCCUPANT'S BUS. LIC. No.
DELIVERY OPTIONS
PICKUP: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
ASSOCIATED CB# MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1) NO CHANGE IN USE/ NO CONSTRUCTION
MAIL/ FAX TO OTHER:
CHANGE OF USE/ NO CONSTRUCTION
~APPLICANT'S SIGNATURE DATE
I
Permit#: CB151326 Type: Tl IN DUST VERIZON -INSTALL NEW EQUIP
INSIDE BLOCK ENCLOSURE ON CONCR
Date Inspection Item Inspector Act Comments
-----~-~---·---··--··-··-~---··----~--------
02/16/2016 89 Final Combo AEK Fl
02/16/2016 89 Final Combo Rl COF
02/11/2016 89 Final Combo Rl
02/11/2016 89 Final Combo Rl COF
02/11/2016 89 Final Combo AEK co FINISH CONCRETE AT DOORS//
CHANGE BOLTS AT STEEL FRAME
01/13/2016 82 Drywall/Ext Lath/Gas Test AEK AP 17/18
01/07/2016 14 Frame/Steel/Bolting/Weld in AEK PA hold downs at interior foundation
12/22/2015 33 Service Change/Upgrade AEK AP
12/14/2015 13 Shear Panels/HD's AEK AP 2cd floor walls
12/10/2015 33 Service Change/Upgrade AEK co NEED SGDE WORKORDER COPY//
NEED LOCKOUT TAG FOR PRIMARY
DISC
12/08/2015 14 F rame/Steei/Bolti ng/Weldin AEK PI ROOF/FLOOR SHEETING AT 2CD
LEVEL W/ ROOF HATCH
12/04/2015 14 Frame/Steei/Bolting/Weldin AEK PI MECH CONNECTIONS AT FIRST FLOOR
12/01/2015 11 Ftg/Foundation/Piers AEK AP FTG AT FINAL POUR FOR EQUIPMENT
AREA FLOOR
11/23/2015 11 Ftg/Foundation/Piers AEK NS NEEDED INFO///CALLED AND TALKED
ON PHONE
11/10/2015 11 Ftg/Foundation/Piers AEK co FTG AT EQUIPMENT AREA// SECOND
WALL ELEV
11/06/2015 31 Underground/Conduit-Wirin AEK AP CONDUIT ACROSS DRIVEWAY
11/02/2015 66 Grout AEK AP RETAINING WALL AT REAR OF
EQUIPMENT AREA/fLOWER LEVEL
10/30/2015 31 Underground/Conduit-Wirin AEK AP FROM EQUIPMENT LOACTION TO
LIGHT POLE
10/28/2015 31 Underground/Conduit-Wirin AEK AP CONDUIT AT EQUIPMENT AREA
1 0/26/2015 11 Ftg/F oundation/Piers AEK AP EQUIPMENT ENCLOSURE LOWER
RETAINING WALL FOOTING
10/19/2015 92 Compliance Investigation AEK AP REQUEST FOR 3RD PARTY SPECIAL
INSPECTOR FOR WEEKEND WORK
APPROVED
10/16/2015 11 Ftg/Foundation/Piers MC NR
Tuesday, February 16, 2016 Page 1 of 1
ACI Concrete Field Testing Technician ~
Grade I
Nicholas A Narbeth -5220351
NICHOLAS A NARBETH
Certification I D #01115011
Expires on: 04/28/2017
Verify at CheckACI.org
Nicholas A Narbeth -5220351 Reinforced Concrete Special inspector_ Exp. 0410812015
Structural Welding Special Inspector_ Exp 0"12312017 .Sirt~ctural Steel and Bolting Special inspector-Exp. 06/26/2016
C~\LIFORl~lk\_~' DRI~I:.~cUGENSE
~
r:~:' 1);!102/2018
u; NARBETI-i
Gf:ASS C E~ID NONE
f~: i-!ICHOLAS ANTHONY II
·-2054
DOB 0210.2J1!FO
NONE
SEX M HAIR BRitc.}_j EYES BLU
HGT 6'·02" V~GT 29U lb . iSS
DD 01/22/2008596RBIBBFD/18 01/2512013
RECEIVED
OCT 28 20'15
CITY OF CARLSBAD
BUILDING DIVISION
··:ly CEIJs & Cert;ficat;ons
TransactJons & Status
: .. •~ClOUt
''(
:v1y CEUs & Certifications 1 N;c!lolas NarbHh
Cl::rtification: CEU Activiti0s for Renewal
CEU Activ1ty CEU Provider (_)ption
CEU Act1vity Activity
Name Date
Activity CEUs
OuantityHeported
~4 S::n.JCtura~
~~romt:nr. rv'raSOflf)'
-':~:_\ ry'"l,\·f::<R1.1 bv ;CCCan:pus org speCial
0!>CE:Ct0r
a~; Spray
8ppl:ed Frre
See Renevval
") () 20
osr27 ·:a 1s o 20
.~.pplrcatlon O,i: , Gi;:·o 1 .1 2
:\cc:.ec.liteci
~l! 7f,clFiC8.i. 0r
\fc-.. ;3ttonal
~~ Accn::·jited
•Jc.-:upattonal
Sdfety and
H2aith
/\ssoc•atton
Col!ege, p,rnencan
~.r,i!J r~r:hntc:si. rx Concrete
VccattOrlal !nstttute
Course~s1
t:_;(~lJI·Se(.S) ~~:!J 2pproved by
For~-1
C:5H/\·10
hour
cc·nstruct:on 02.<.:2:2013 1 :Jo
rnl.]ustry
f,eld test;ng
Tecr·n!cfan-
rnascnry
·ivr;rkshop
0Sr2f3:2012 0 50
41/10/2011 30G
0St29:20 11 0 45
sz~~ 22!"='7V\"81 Re.lEN.'ai
·.:::..~h:"c;e
.Q'Jll TGchrncai
l.fc,::~1~F:lilal
t policat;on ;\~plicat;on
Certification: Summary
0 02
100
3 :JO
2 50
r::ertrficarlon Program Status Expiration
Date
Certification
~lumber
r.~en:fo:ce·j ·.::oncr·2te ~peCiol inspector C·3rtlfi:::d 05t2"7!201t:3 ':'·22035"':
?tn1Cl1A~I 'Ndd;ng. ;:~p6CI2i r.!:~PBCt?r c;er!iflf;-rj G·t/::3<2017 52;JJ35:
LOCATION Of' WORK !NSPEC'l'EO, TEST SAI.il"t.t:!S TAKEN. WORK RP..JECTED, J08 PF!OBLEMS, I'FIOORESS. REMARKS. ETC. @
1NCWOE$1NFORMA'i!ON AElOIJi·AMOUNTS OF MA'ffiRIAL PI.ACEO OR WORK PREFORMEO, NUMSEF!, 'M'E & !DENT. NO'$ OF
TEST SAMPLES TAKeN, S1RUCT, CONNEC'l'IONS (Wai)Stli!AOE. H.T. OOLTS TORQUED) CHSCl<JEo, ETC.
~----·-+--------4----------:---------------.,_.....---------~-----·-··----·
THlS REPORT DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSlBIUT'f TO BUILD
.PER THE PU\NS, SPECIFICATtONS AND AU. APPLJCABLE CODES.
:THE BEST Of~~~OGE, WORK tNSPECiEO WAS IN ACCORDANCE 1NSPECTOR(m:Ntoo ,._/f~pt.C @ ,
wm-1 lliE SOIL ltM:STIGATION RECOMMENDATIONS. THE APPRO\/Etl PlAN$,
SPECIFICATIONS, AND APPUCI\StE SECTIONS OF THE U.B.C. BIJ!I..OlNG CODE,
UNLESS OTHERWISE tJOiEO.
WHITE-NS! PINK· Building ~al
~'
i
MSI
NARBEli.H STRUCTURAL INSPECTION
Authorized ~CI. ·~ICBO
D REINFORCED .CONCRETE D PRE-STRESSED CONCRETE
~EINFORCED MASONRY
REI;,Of!lT DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILIT'i' TO BUILD
· . PER "{HE PLANS, SPECIFICAtiONS AND ALL CODES. •
TO THE BEST OF MY KNOWLEDGE, WORK INSPECTED WAS IN ACCORDANCE
Wml son.: 1iN~Sn~TION RECbMMENDATIONS. THE APPROVED PLANS,
gp~;CIFICJI:lrtOIIIS·, AND APPUCABLE SECTIONS OF THE U.B.C. BUILDING CODE,
. ·WHITE-NS! CANARY -.Contractor PINK -Building Official
•
j~ :
TORO INTERNATIONAL
FAX: (949) 559-1583 D GEOTECHNICAL ENGINEERING
TEL: (949) 559-1582
DAILY REPORT OF GRADING OBSERVATION
JOB NO. I'?.,
" -~""
LOC~TION .., PROJECT ENGINEER ,. 1./ ltJ
GENERAL LOCATION OF FILL MAX DENSITY STANDARD
C 5 LAVER C OTHER (SEE FILE)
GENERAL CONTRACTOR
*'f:; ·,i'" ~"".r~ r• {'; .:· ,.-t::. "
GRADING OR EARTHWORK CONTRACTOR TODAV'S APPROX. YARDAGE
GEN. CONTRACTOR'S suPi
);(•"l:fl·r::._;:·
GRADING CONTRACTOR'S SUPJ. OR FOREMAN
)' ·~., YARDAGE TO DATE
SOURCE AND CLASSIFICATION OF FILL MATERIAL TECHNICIAN TIME CHARGED
VISITORS
EQUIPMENT USED FOR HAULING, C~PACTION, WATERING, ETC.
fll.;
SPECIFIC LOCATION OF WORK PERFORMED
FAILING TESTS, LiFT THICKNESS, OTHER REMARKS
ADDITIONAl.. TESTS REQUIRED C NO eves WHERE?
ENGINEERING FILE • WHITE FIELD FILE • YELLOW JOB SUI"EAINTENOINT • I"INK OF
EsGil Corporation
In (partnersliip witli (jovernment for CBuiCding Safety
DATE: 8/31/2015
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 15-1326
PROJECT ADDRESS: 2020 Cassia Rd.
PROJECT NAME: Verizon Wireless CASSIA
SET: II
Q~ICANT
~JURIS.
Q PLAN REVIEWER
Q FILE
[g) The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
lZ:J EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted:
Mail Telephone
D REMARKS:
By: David Yao
(by:
Telephone#:
) Email:
Fax In Person
Enclosures:
EsGil Corporation
0 GA 0 EJ 0 MB 0 PC 8/25
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In 1'artnersftip witft government for CBui{tfing Safety
DATE: 5/12/2015
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 15-1326
PROJECT ADDRESS: 2020 Cassia Rd.
PROJECT NAME: Verizon Wireless CASSIA
SET: I
APPLICANT
URIS.
PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Cyndi Baker
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Cyndi Baker , ;:t: .... tJ/ Telephone#: 760-434-8474 ~~ ··---,.-/~c~l-;:)\--• / Date contacted::.JI \(} (by:~) Email: cbaker@boothsuarez.com v
c Mail/relephoneL fl\ Fax In Person
D REMARKS:
By: David Yao Enclosures:
EsGil Corporation
0 GA 0 EJ 0 MB 0 PC 5/4
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 15-1326
5/12/2015
GENERAL PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad
PROJECT ADDRESS: 2020 Cassia Rd.
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 5/4
REVIEWED BY: David Yao
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 15-1326
DATE REVIEW COMPLETED:
5/12/2015
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and disabled access. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
0 Yes 0 No
City of Carlsbad 15-1326
5/12/2015
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one of
two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
1. All sheets of the plans and the first sheet of the calculations are required to be signed by
the licensed architect or engineer responsible for the plan preparation. California State
Law.
2. Provide a Building Code Data Legend on the Title Sheet. Include the following code
information for each building proposed:
• Occupancy Classification(s) B-existing office?
3. Specify on the plans the uses of all rooms or areas. Sec. 107.2. office?
4. Provide a fully dimensioned site plan drawn to scale. Sec. 107.2. Include the following:
a) Clearly dimension building setbacks from property lines, street centerlines, and
from all adjacent buildings and structures on the site plan.
5. Provide a statement on the site plan stating: "All property lines, easements and buildings,
both existing and proposed, are shown on this site plan."
6. Specify minimum 1/4 inch per foot roof/deck slope for drainage. Section 1507.1 0.1.
• NON-RESIDENTIAL GREEN BUILDING STANDARDS
(Additions and Alterations)
The California Building Standards Commission (BSC) has adopted the Green Building
Standards Code which became effective January 1, 2011, and must be enforced by the local
building official. The Green Building Standards apply to nonresidential additions or tenant
improvements throughout California. These standards apply to nonresidential additions of
1,000 sq. ft. or larger or alterations (tenant improvements) with a value of $200,000 or
more. CGC Section 301.3. Provide a sheet on the plans labeled "Green Building Code
Requirements" and include the following notes as applicable.
City of Carlsbad 15-1326
5/12/2015
7. Light pollution reduction. Note on the plans that exterior light pollution must comply
with CGC section 5.1 06.8.
8. Moisture control. Note on the plans that landscape irrigation systems shall be designed
to prevent spray on structures. Exterior entries subject to foot traffic or wind-driven rain
shall be designed to prevent water intrusion into the building. CGC Section 5.407.2.2.1.
9. Waste management. Note on the plans that the contractor must submit to the
Engineering Department or other Agency that regulates construction waste management
a Waste Management Plan that outlines the items listed in CGC Section 5.408.1.1.
10. Recycling. Note on the plans that a minimum of 50% of construction waste is to be
recycled. CGC 5.408.1. Documentation shall be provided to the enforcing agency which
demonstrates compliance. CGC Section 5.408.1.4.
11. Recycling. Note on the plans that an identified, readily accessible area shall be
provided that serves the entire building for collecting recycling, such as paper, cardboard,
glass, plastics, metals, etc. CGC Section 5.41 0.1.
12. Documentation. Note on the plans that a building "Systems Manual" as listed in CGC
Section 5.41 0.2.5 shall be delivered to the building owner or representative and the
facilities operator. Further, note on the plans that the "Systems Manual" shall contain the
required features listed in CGC Section 5.41 0.2.5.1.
13. Pollutant control. Note on the plans that during construction, ends of duct openings are
to be sealed, and mechanical equipment is to be covered. CGC 5.504.3.
14. Pollutant control. Note on the plans that VOC's must comply with the limitations listed
in Section 5.504.4 and Tables 4.504.1, 5.504.4.1 5.504.4.2, 5.504.4.3 and 5.504.4.5 for:
Adhesives, Sealants, Paints and Coatings, Carpet and Composition Wood Products.
CGC 5.504.4.
15. Note on the plans that prior to final inspection the licensed contractor, architect or
engineer in responsible charge of the overall construction must provide to the building
department official written verification that all applicable provisions from the Green
Building Standards Code have been implemented as part of the construction. CGC
102.3.
• FOUNDATION
16. Provide complete calculation to justify the foundation plan.
• STRUCTURAL
17. Sheet 4 of the calculation shows section through the equipment enclosure. It does not
quite match sheet A-9 of the plan. Please clarify.
18. The shear wall construction detail for P1 was not identified on the plan. Please add the
information.
Gity of Carlsbad 15-1326
5/12/2015
19. Sheet 11-13 of the calculation shows shear wall P3 and P4 and lengths for each lines
appears to not quite match the plan (A-7, A-8). Please check. (i.e. line C, 2.5 8 feet long
wall, the plan does not show any 8 feet wall, the plan shoe 2.5 feet long wall, the
calculation does not show it..etc).
20. The framing plan in the calculation for all levels appears to not match the plan on A-7
and A-8. Please revise the calculation or the plan. Complete structural review will be
done after the plan match the calculation. (It appears to the calculation provided is not for
this job.)
21. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform
the plan review for your project. If you have any questions regarding these plan review
items, please contact David Yao at Esgil Corporation. Thank you
City of Carlsbad 15-1326
5/12/2015
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-1326
PREPARED BY: David Yao
BUILDING ADDRESS: 2020 Cassia Rd.
BUILDING OCCUPANCY:
BUILDING AREA
PORTION (Sq. Ft.)
cell site
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb
Bldg. Permit Fee by Ordinance
l ~PI~an~C~he~ck~F~ee~b-'---y O_r_~din~an~c~e -~:':J
Valuation
Multiplier
By Ordinance
Type of Review: 0 Complete Review
D Repetitive Fee 3 Repeats
Comments:
D Other
D Hourly
EsGil Fee
DATE: 5/12/2015
Reg. VALUE ($)
Mod.
per city 250,000
250,000
$1,158.561
$753.061
D Structural Only
1-------~IH' @ • $648.791
Sheet 1 of 1
macvalue.doc +
PLAN CHECK
REVIEW
TRANSMITTAL
DATE:OS/27/2015 PROJECT NAME: VERIZON WIRELESS ENClOSUREANDWCF
PLAN CHECK NO: 2
VALUATION: 200K
SET#: 1 ADDRESS: 2020 CASSIA ROAD
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www .carlsbadca.gov
PROJECT ID: CB151326
APN: 215-021-02-00
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: VALRAY NELSON
A Final-I-nspection by the ENGINEERING Division is required Yes No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
I I
Plan Check Comments have been sent to: CBAKER@BOOTHSUAREZ
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
Gina.Ruiz@carlsbadca.gov
Remarks:
Kathleen Lawrence
760-602-27 41
Kathleen.Lawrence@carlsbadca.gov
Linda.Ontiveros@carlsbadca.gov
VaiRay Marshall
760-602-2773
VaiRay.Marshall@carlsbadca.gov
NEED APPROVAL OF MCUP 14-01 BEFORE I CAN COMPLETETHIS REVIEW.
Dominic.Fieri@carlsbadca.gov
2
E-36
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
North arrow
Existing & proposed structures
Existing street improvements
• Property lines (show all dimensions)
Easements
Right-of-way width & adjacent streets
Show on site plan:
Drainage patterns
Set# 1
Driveway widths
Existing or proposed sewer lateral
Existing or proposed water service
Submit on signed approved plans:
DWG No.
Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining
street or an approved drainage course.
• ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale
5' away from building".
' Existing & proposed slopes and topography
Size, location, alignment of existing or proposed sewer and water service(s) that serves the project.
Each unit requires a separate service; however, second dwelling units and apartment complexes are an
exception.
; Sewer and water laterals should not be located within proposed driveways, per standards.
Include on title sheet:
, Site address
Assessor's parcel number
' Legal description/lot number
For commercial/industrial buildings and tenant improvement projects, include: total building
square footage with the square footage for each different use, existing sewer permits
showing square footage of different uses (manufacturing, warehouse, office, etc.) previously
approved.
Show all existing use of SF and new proposed use of SF.
Example:
Tenant improvement for 3500 SF of warehouse to 3500 SF of office.
LoUMap No.:
Subdivision/Tract:
Reference No(s):
Page 2 of 6 REV 6/01/12
NIA
NIA
E-36
Set#
2. DISCRETIONARY APPROVAL COMPLIANCE
• Project does not comply with the following engineering conditions of approval for project no.:
3. DEDICATION REQUIREMENTS
· Dedication for all street rights-of-way adjacent to the building site and any storm drain or
utility easements on the building site is required for all new buildings and for remodels with a
value at or exceeding $ 24,000 , pursuant to Carlsbad Municipal Code Section 18.40.030.
For single family residence, easement dedication will be completed by the City of Carlsbad,
cost $115.00.
Dedication required as follows:
4. IMPROVEMENT REQUIREMENTS
All needed public improvements upon and adjacent to the building site must be constructed
at time of building construction whenever the value of the construction exceeds
$124,000 00, pursuant to Carlsbad Municipal Code Section 18.40.040.
Public improvements required as follows:
utilities
Construction of the public improvements must be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or current grant
deed on the property and processing fee of $ 440!-Q.Q-so we may prepare the necessary
Neighborhood Improvement Agreement. This agreement must be signed, notarized and
approved by the city prior to issuance of a building permit. Processing .fee $157.00.
· Future public improvements required as follows:
Page 3 of 6
CURB, GUTTER, SIDEWALK
UNDERGROUND UTILITIES
REV6/30/10
E-36
Set# 1
5. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 15.16 of the Municipal
Code.
:Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained prior to issuance of a building permit.
' Graded Pad Certification required. (Note: Pad certification may be required even if a grading
permit is not required.) All required documentation must be provided to your Engineering
Construction Inspector The inspector will then
provide the engineering counter with a release for the building permit.
No grading permit required .
. Minor Grading Permit required. See attached marked-up submittal checklist for project-
specific requirements.
6. MISCELLANEOUS PERMITS
RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way. Types of work include, but are not limited to: street
improvements, tree trimming, driveway construction, tying into public storm drain, sewer and
water utilities.
Right-of-way permit required for: Driveway
Page 4 of 6 REV 6/01/12
2
E-36
Set# 1
7. STORM WATER
Construction Compliance
Project Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 15-1326 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
Storm Water Standards Questionnaire complete.
' Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
' Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.gov/business/building/Documents/EngStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavement/pavers
' Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
· Other:
Page 5 of 6 REV 6/01/12
2
Attachments:
E-36
Set# 1
9. WATER METER REVIEW
8. FEES
Domestic (potable) Use
What size meter is required?
Where a residential unit is required to have an automatic fire
extinguishing system, the minimum meter size shall be a 1" meter.
NOTE: the connection fee, SDCWA system capacity charge and the
water treatment capacity charge will be based on the size of the meter
necessary to meet the water use requirements.
For residential units the minimum size meter shall be 5/8", except where
the residential unit is larger than 3,500 square feet or on a lot larger than
one quarter (1/4) acre where the meter size shall be%".
Required fees have been entered in building permit.
Drainage fee applicable
Added square feet over soo
Added square footage in last two years?
Permit No.
Permit No.
Project built after 1980
Impervious surface > 50%
Impact unconstructed facility
yes
yes
yes
yes
no
no
no
no
Fire sprinklers required
Upgrade
No fees required
.,yes
yes
no (is addition over 150' from center line)
:no
10. Additional Comments
Engineering Application Storm Water Form
Page 6 of 6
Right-of-Way Application/Info. Reference Documents
D
REV 6/01112
Fee Calculation Worksheet
ENGINEERING DIVISION
Prepared by: Date:
Address: Bldg. Permit#:
Fees Update by: Date: 5 Fees Update by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq.Ft.!Units EDU's:
Types of Use:
Types of Use:
Types of Use:
Sq.Ft.!Units
Sq. Ft./Units
Sq.Ft.!Units
ADT CALCULATIONS: List types and square footages for all uses.
EDU's:
EDU's:
EDU's:
Types of Use: Sq.Ft./Units ADT's:
Types of Use:
Types of Use:
Types of Use:
FEES REQUIRED:
Sq.Ft.!Units
Sq.Ft./Units
Sq.Ft./Units
ADT's:
ADT's:
ADT's:
Within CFD: ;YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) • NO
1. PARK-IN-LIEU FEE: 'NW QUADRANT NE QUADRANT .SE QUADARANT · 'SW QUADRANT
ADT'S/UNITS: I X FEE/ADT: ' I =$ D
2.TRAFFIC IMPACT FEE:
ADT'S/UNin X FEE/ADT: 1=$ D
3. BRIDGE & THOROUGHFARE FEE: DIST. #1 DIST.#2 DIST.#3
ADT'S/UNITS: FEE/ADT: 1=$ D
ZONE: 4. FACILITIES MANAGEMENT FEE
ADT'S/UNITS: X FEE/SQ.FT./UNIT: I=$
I=$
I=$
D
D
5. SEWER FEE
EDU's IX FEE/EDU:
BENEFIT AREA:
EDU's IX FEE/EDU: D
6. DRAINAGE FEES: Af\l PLDA: HIGH 1MEDIUM
ACRES: IX FEE/AC: I=$ D
7. POTABLE WATER FEES:
UNITS CODE CONN. FEE METER FEE SDCWA FEE TOTAL
DATE: PROJECT NAME:
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www .carlsbadca.gov
PROJECT ID:
PLAN CHECK NO: SET#: ADDRESS: APN:
VALUATION:
This plan check review is complete and has been APPROVED by the
Division.
By:
A Finai,Jnspection by the Division is required Yes No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
I
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
Remarks:
E-36
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
' North arrow
.· Existing & proposed structures
Existing street improvements
Property lines (show all dimensions)
Easements
Right-of-way width & adjacent streets
Show on site plan:
Drainage patterns
Set# 1
Driveway widths
. Existing or proposed sewer lateral
Existing or proposed water service
Submit on signed approved plans:
DWG No.
.. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining
street or an approved drainage course.
ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale
5' away from building".
Existing & proposed slopes and topography
Size, location, alignment of existing or proposed sewer and water service(s) that serves the project.
Each unit requires a separate service; however, second dwelling units and apartment complexes are an
exception.
Sewer and water laterals should not be located within proposed driveways, per standards.
Include on title sheet:
Site address
Assessor's parcel number
Legal description/lot number
For commercial/industrial buildings and tenant improvement projects, include: total building
square footage with the square footage for each different use, existing sewer permits
showing square footage of different uses (manufacturing, warehouse, office, etc.) previously
approved.
Show all existing use of SF and new proposed use of SF.
Example:
Tenant improvement for 3500 SF of warehouse to 3500 SF of office.
Lot/Map No.:
Subdivision/Tract:
Reference No(s):
Page 2 of 6 REV6/01/12
E-36
Set#
2. DISCRETIONARY APPROVAL COMPLIANCE
Project does not comply with the following engineering conditions of approval for project no.:
3. DEDICATION REQUIREMENTS
Dedication for all street rights-of-way adjacent to the building site and any storm drain or
utility easements on the building site is required for all new buildings and for remodels with a
value at or exceeding $ 24,000 , pursuant to Carlsbad Municipal Code Section 18.40.030.
For single family residence, easement dedication will be completed by the City of Carlsbad,
cost $1 15.00.
Dedication required as follows:
4. IMPROVEMENT REQUIREMENTS
All needed public improvements upon and adjacent to the building site must be constructed
at time of building construction whenever the value of the construction exceeds
$124,000 00, pursuant to Carlsbad Municipal Code Section 18.40.040.
Public improvements required as follows:
Construction of the public improvements must be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or current grant
deed on the property and processing fee of $ 44,;1m.QQ=so we may prepare the necessary
Neighborhood Improvement Agreement. This agreement must be signed, notarized and
approved by the city prior to issuance of a building permit. Processing fee $157.00.
Future public improvements required as follows:
Page 3 of 6
CURB, GUTTER, SIDEWALK
UNDERGROUND UTILITIES
REV 6/30/10
E-36
Set#
5. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 15.16 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained prior to issuance of a building permit.
Graded Pad Certification required. (Note: Pad certification may be required even if a grading
permit is not required.) All required documentation must be provided to your Engineering
Construction Inspector The inspector will then
provide the engineering counter with a release for the building permit.
No grading permit required.
Minor Grading Permit required. See attached marked-up submittal checklist for project-
specific requirements.
6. MISCELLANEOUS PERMITS
RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way. Types of work include, but are not limited to: street
improvements, tree trimming, driveway construction, tying into public storm drain, sewer and
water utilities.
Right-of-way permit required for: Driveway
Page 4 of 6 REV6/01/12
E-36
Set#
7. STORM WATER
Construction Compliance
Project Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development CSUSMPl Compliance
Storm Water Standards Questionnaire complete.
Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
. Bio-retentions cell/rain garden
Pervious pavement/pavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Other:
Page 5 of 6 REV 6/01112
Attachments:
E-36
Set#
9. WATER METER REVIEW
8. FEES
Domestic (potable) Use
What size meter is required?
Where a residential unit is required to have an automatic fire
extinguishing system, the minimum meter size shall be a 1" meter.
NOTE: the connection fee, SDCWA system capacity charge and the
water treatment capacity charge will be based on the size of the meter
necessary to meet the water use requirements.
For residential units the minimum size meter shall be 5/8", except where
the residential unit is larger than 3,500 square feet or on a lot larger than
one quarter (1/4) acre where the meter size shall be%".
Required fees have been entered in building permit.
Drainage fee applicable
Added square feet
Added square footage in last two years?
Permit No.
Permit No.
Project built after 1980
Impervious surface > 50%
Impact unconstructed facility
yes
yes
yes
yes
no
no
no
,no
Fire sprinklers required
Upgrade
No fees required
yes
yes
no (is addition over 150' from center line)
no
10. Additional Comments
Engineering Application Storm Water Form
Page 6 of 6
Right-of-Way Application/Info. Reference Documents c
REV 6/01/12
Fee Calculation Worksheet
ENGINEERING DIVISION
Prepared by: Date: GEO DATA: LFMZ: I B&T:
Address: Bldg. Permit#:
Fees Update by: Date: Fees Update by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq.Ft./Units EDU's:
Types of Use:
Types of Use:
Sq.Ft./Units
Sq.Ft./Units
EDU's:
EDU's:
Types of Use: Sq.Ft./Units EDU's:
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq.Ft./Units ADT's:
Types of Use:
Types of Use:
Types of Use:
FEES REQUIRED:
Sq.Ft./Units
Sq.Ft./Units
Sq.Ft./Units
ADT's:
ADT's:
ADT's:
Within CFD: .YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO
1. PARK-IN-LIEU FEE: NW QUADRANT NE QUADRANT SE QUADARANT SW QUADRANT
ADT'S/UNITS: I X FEE/ADT: I =$ D
2.TRAFFIC IMPACT FEE:
ADT'S/UNIT~ X FEE/ADT:
3. BRIDGE & THOROUGHFARE FEE: DIST. #1
ADT'S/UNITS: FEE/ADT:
4. FACILITIES MANAGEMENT FEE ZONE:
ADT'S/UNITS:
5. SEWER FEE
EDU's
BENEFIT AREA:
X FEE/SQ.FT./UNIT:
I X FEE/EDU:
\X FEE/EDU: EDU's
6. DRAINAGE FEES: AJ\l PLDA: HIGH
FEE/AC: ACRES: IX
7. POTABLE WATER FEES:
1=$ D
DIST.#2
1=$
I=$
I=$
I=$
MEDIUM
I=$
LOW
DIST.#3
D
D
D
D
D
UNITS CODE CONN. FEE METER FEE SDCWA FEE TOTAL
CITY Of
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE:05/05/2015 PROJECT NAME: VERIZON WIRELESS ENCLOSUREANDWCF PROJECT ID: CB151326
APN: 215·021-02-00 PLAN CHECK NOI: 1
VALUATION: 2001<
SET#: 1 ADDRESS: 2020 CASSIA ROAD
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: VAI.RAY NELSON
A Final-Inspection by the ENGINEERING Division is required Yes .; No
I
This p~an check review is NOT COMPLETE. Items missing or incorrect are listed on
the atttached checklist. Please resubmit amended plans as required.
ONLY ITEMS MARKED 1 X1 NEED CORRECTION/CLARIFICATION
Plan Check Comments have been sent to: CBAKER@BOOTHSUAREZ
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
76()..60:2-4610
Chris.Sexton@carlsbadca.gov
Gina.Ruiz@carlsbadca.gov
Remarks:
ENGINEERING
760-602-2750
Kathleen Lawrence
760-602-27 41
llnda.Ontlveros@carlsbadca.gov
VaiRay Marshall
760-602-2773
VaiRay.Marshall@carlsbadca.gov
FIRE PREVENTION
760-602-4665
Dominic.Fferi@carlsbadca.gov
NEED APPROVAL OF MCUP 14-01 BEFORE I CAN COMPLETE THIS REVIEW. -fvt.C,Uf wp(~ ~SNeif A-00
1
E-36
Set# 1
Any outstanding issues will be marked with X . Make the necessary corrections for
compliance with applicable codes and standards. Submit corrected plans and/or
specifications to the Building division for re-submittal to the Engineering division.
Items that conform to permit requirements are marked with .;
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
.f North arrow
I Existing & proposed structures
.f Existing street improvements
.f Property lines (show all dimensions)
./ Easements
.( Right-of-way width & adjacent streets
Show on site plan:
Drainage patterns
Driveway widths
Existing or proposed sewer lateral
Existing or proposed water service
· Submit on signed approved plans:
DWG No .
Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining
street or an approved drainage course.
ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale
5' away from building".
Existing & proposed slopes and topography
Size, location, alignment of existing or proposed sewer and water service(s) that serves the project
Each unit requires a separate service; however, second dwelling units and apartment complexes are an
exception.
Sewer and water laterals should not be located within proposed driveways, per standards.
Include on title sheet:
I . Site address
,f Assessor's parcel number
,f Legal description/lot number
.( For commercial/industrial buildings and tenant improvement projects, include: total building
square footage with the square footage for each different use, existing sewer permits
showing square footage of different uses (manufacturing, warehouse, office, etc.) previously
approved.
Show all existing use of SF and new proposed use of SF.
Example:
Tenant improvement for 3500 SF of warehouse to 3500 SF of office.
Lot/Map No.:
S ubdivis ion/Tract:
Reference No(s):
Page 2 of 6 REVS/01/12
NEEDS APPROVAL
OF MCUP 14-01
N/A
N/A
E-36
Set#
2. DISCRETIONARY APPROVAL COMPLIANCE
X Project does not comply with the following engineering conditions of approval for project no ..
SUr Cipp(OVeOI ~Ctt(J cW\t Shci IJ.-fJ.O
3. DEDICATION REQUIREMENTS
Dedication for all street rights-of-way adjacent to the building site and any storm drain or
utility easements on the building site is required for all new buildings and for remodels with a
value at or exceeding$ 24,000 , pursuant to Carlsbad Municipal Code Section 18.40.030.
For single family residence, easement dedication will be completed by the City of Carlsbad,
cost $115.00.
Dedication required as follows:
4. IMPROVEMENT REQUIREMENTS
All needed public improvements upon and adjacent to the building site must be constructed
at time of building construction whenever the value of the construction exceeds
$124,000 00. pursuant to Carlsbad Municipal Code Section 18.40.040.
· Public improvements required as follows:
sidewalk, underground utilities
Construction of the public improvements must be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or current grant
deed on the property and processing fee of $ ..4..4;1,QQ-so we may prepare the necessary
Neighborhood Improvement Agreement. This agreement must be signed~ notarized and
approved by the city prior to issuance of a building permit Processing fee $157.00.
Future public improvements required as follows:
Page 3 of 6
CURB, GUTTER, SIDEWALK
UNDERGROUND UTILITIES
REV6/30/10
1
E-36
Set# 1
5. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 15.16 of the Municipal
Code.
'Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained prior to issuance of a building permit.
Graded Pad Certification required. (Note: Pad certification may be required even if a grading
permit is not required.) All required documentation must be provided to your Engineering
Construction Inspector The inspector will then
provide the engineering counter with a release for the building permit.
: No grading permit required .
. Minor Grading Permit required. See attached marked-up submittal checklist for project-
specific requirements.
6. MISCELLANEOUS PERMITS
RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way. Types of work include, but are not limited to: street
improvements, tree trimming, driveway construction, tying into public storm drain, sewer and
water utilities.
, Right-of-way permit required for: Driveway
Page4of6 REV 6101/12
1
E-36
Set# 1
7. STORM WATER
Construction Compliance
X Project Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
X Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 15-1326 ) ~ff. A-trAc.t-f Eb C.O~fO~ C:-d4
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
X Storm Water Standards Questionnaire complete. See /tTrfl-cffe~ CoMf"£-fi:E~
~~-~~ON ~t~ f'o~ e.-3'(
• Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http:!lwww.carlsbadca.gov/businesslbuilding/Docum!1!nts/EngStandsw-stds-vol4-ch2.ru;tf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
, Rainwater harvesting (rain barrels or cistern}
. Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavemenUpavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales .
Downspouts disconnect and discharge over landscape
, Other:
Page5of6 REV6/01/12
1
N/A
Attachments:
E-36
Set# 1
9. WATER METER REVIEW
Domestic (potable) Use
8. FEES
What size meter is required?
FYI Where a residential unit is required to have an automatic fire
extinguishing system, the minimum meter size shall be a 1" meter.
NOTE: the connection fee, SDCWA system capacity charge and the
water treatment capacity charge will be based on the size of the meter
necessary to meet the water use requirements.
FYI For residential units the minimum size meter shall be 5/8", except where
the residential unit is larger than 3,500 square feet or on a lot larger than
one quarter (1/4) acre where the meter size shall be%".
Required fees have been entered in building permit.
Drainage fee applicable
Added square feet over soo
Added square footage in last two years?
Permit No.
Permit No.
Project built after 1980
Impervious surface > 50%
Impact unconstructed facility
yes
:yes
yes
yes
no
.no
no
no
Fire sprinklers required
Upgrade
yes
iyes
no (is addition over 150' from center line)
I No fees required
10. Additional Comments
Engineering Application Storm Water Form
Page 6 of6
Right-of-Way Application/Info. Reference Documents a
REV 6/01/12
Fee Calculation Worksheet
ENGINEERING DIVISION
Prepared by: 05/05/2015
Address: 2020 CASSIA ROAD
Fees Update by:
Date: 05/05/2015 GEO DATA: LFMZ: I B&T:
Bldg. Permit#: CB151326
Date: 05/05/2015 Fees Update by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq.Ft./Units EDU's:
Types of Use:
Types of Use:
Sq.Ft./Units
Sq.Ft./Units
Types of Use: Sq.Ft./Units
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq.Ft./Units
Types of Use: Sq.Ft./Units
Types of Use:
Types of Use:
FEES REQUIRED:
Sq.Ft.!Units
Sq.Ft./Units
EDU's:
EDU's:
EDU's:
ADT's:
ADT's:
ADT's:
ADT's:
Within CFD: YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO
1. PARK-IN-LIEU FEE: NW QUADRANT .f NE QUADRANT SE QUADARANT SW QUADRANT
ADT'S/UNITS: I X FEE/ADT: I =$ D
2.TRAFFIC IMPACT FEE:
ADT'S/UNIH X
I
3. BRIDGE & THOROUGHFARE FEE:
ADT'S/UNITS:
4. FACILITIES MANAGEMENT FEE
ADT'S/UNITS: X
I
5. SEWER FEE
EDU's jx
BENEFIT AREA:
EDU's IX
6. DRAINAGE FEES: NEED AA!i PLDA:
ACRES: jx
7. POTABLE WATER FEES:
UNITS CODE
FEE/ADT:
DIST. #1
FEE/ADT:
ZONE:
FEE/SQ.FT./UNIT:
FEE/EDU:
FEE/EDU:
i=s D
DIST.#2 DIST.#3
1=s D
I =s 0
I =s D
I =s D
HIGH MEDIUM LOW
FEE/AC: I =s D
CONN. FEE METER FEE SDCWA FEE TOTAL
OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www .carlsbadca .gov
I am applying to the City of Carlsbad for the following type(s) of construction permit:
0 Building Permit 0 Right-of-Way Permit
0 My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
0 My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
T~-Low Threat Assessment Criteria
My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 -Moderate Threat Assessment Criteria
0 My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 -Significant Threat Assessment Criteria
0 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
0 My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
0 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s).
I certify to the best of my knowledge that the above
checked statements are true and correct. I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to City Standards.
'The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
8-24
Project Address:
Ctt5S/t{. ,;~. o.:~o
Owner/Owner's Authorized Agent Name:
{l,jnalv l!x:tla.J
Owner/Owl'l"er's Aut~ignature: ~
t
City Concurrence: By:
[J YES [J NO
Page 1 of 1
f(oCtcA Assessor Parcel No.
·~\ '5·-b J I~ ()J
Title:
C{firvttn-0:PI5JcmJ
Date:
J.l, 3o.l.5
Date: ProjectiD:
Rev.03/09
Construction
SWPPPTier
Level
Tier 3
Tier 2
Tier 1
Exempt
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
l;md Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Perceived
Construction Threat Assessment Criteria'* Threat to
Storm Water
Quality
Tier 3 -High Construction Threat Assessment Criteria
0 Project site is 50 acres or more and grading will occur during the rainy season
0 Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
0
USDA-NRCS Erosion factors kt greater than or equal to 0.4)
Site slope is 5 to 1 or steeper
0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
0
through April 30).
Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3-Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 3 High Construction Threat Assessment Criteria -Tier 2 High Construction Threat Assessment Criteria
0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kt greater than or equal to 0.4) High
0 Site slope is 5 to 1 or steeper
0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
0 Owner/contractor received a Storm Water Notice of Violation within past two years
0 Site results in one half acre or more of soil disturbance
Tier 2 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 2 High Construction Threat Assessment Crite1ria
Tier 1 -Medium lnsQection Threat Assessment Criteria
0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kt greater than or equal to 0.4) Medium 0 Site slope is 5 to 1 or steeper
0 Construction is initiated during the rainy season or will extend into the ratiny season (Oct. 1
through April 30).
0 Owner/contractor received a Storm Water Notice of Violation within past two years
0 Site results in one half acre or more of soil disturbance
Tier 1 -Low lnsQection Threat Assessment Criteria Low 0 All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria
-Not Applicable -E
*The c1ty eng1neer may authonze mmor vanances from the construction threat assessment cntena 1n spec1al Circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: ( 1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streets uidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are
designed and constructed in accordance with the US EPA Green Streets guidance?
YES NO
v
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If ou answered "no" to both questions, then o to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
o determine if your project is a priority development project, please answer the following questions:
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial. residential, mixed-use, and public
on land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
· and land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
4. Is your project a new or· redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
of motor vehicles used for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
mntnn,vr·l<>~"' and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
with *
8.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
1
10.1s your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
I
I
./
/
/
Pacific 2,500 square feet or more of . /
im i surface than 10%? V
answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
lamenting structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
lapplic:ati<m(is) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
uestionnaire, check the "my project meets PDP requirements" box and complete applicant information.
you answered "no' to all of the above questions, you ARE NOT a priority development project and are therefore subject
lim!nl<>lm<>lntin'n only Standard Storm Water Requirements such as source control and low impact development BMP's required for
tnevetoornP.t1t projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to
end of this questionnaire, check the "my project does not meet PDP requirements" box and complete appl
E-34 Page 2 of 3 Effective 6127113
)~~; /\ <.;"'/;
¥CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my ro·ect meets PDP re uirements" box and com lete applicant information.
: ~ · .. . ..
D My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
til My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
~~ GA~L$B'I'\.D VILl-A-GrE--DR . .Svln:. ~ ,
Address: CP\ ~!,....SBI\1) C ll1 Cfd-OO f3 Accessors Parc~~5-~e~~: I -o¢
Applicant Name: 0 ..,. ,r......--..,. Applicant Title· 1\ r-"1:-r-.OB£-K I· 2;>UP,R.E7 Tli.:JEN I.
Applicant Signatill'r.A/ L=) Date: 77~ / oca .I CJ. J.or)
// (./
This Box for City Use Only
City Concurrence: NO
By:
Project ID:
*Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
City, of
rlsbad
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
.f My project is not in a category of permit types exempt from the Construction
SWPPP requirements
.f My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
.f My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
.f My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
~A\<.EL
GENT NAME (PRINT)
OS .l9. .~ol?
OWNER(S)/ S AGENT NAME (SIGNATURE) DATE
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
\/ Z \A! Cl!) c.s r($-
Development Services
land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
Site Address: 0-o ;}.0 Cl\5$( A 'fol)/)
Assessor's Parcel Number: ;; I£-o:J.t-o"Jo
Project ID: C & / s-'13;>,t;
Construction Permit No.: ?;,W \5 tJ\~ Cj
Estimated Construction Start Date /2-)/5
Project Duration 5' Months
Emergency Contact:
Name: 5kv& :1Jh nSD J1
24 hour Phone: CffJ l' 5._//. ?flc6
Perceived Threat to Storm Water Quality
Medium
Q
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By: V\1},N 1 •! ~~
Date: ~· 0\l· J$'"'
REV 07/14
Best Management Practice
(BMP) Description -7
~
ell
Erosion Conlre>l
BMPs
'~ :§
~
a. ~ fl c c: Gl ~ E i -"' (() (/)
~ ;z
(() en
Sediment Control BMPs
e "' CD E ~ Cl ~ 0 ti1J 0:: ~ ... a;
Gl "' ,.
~ J:: "' u ii
~ :s ~ (/) en (/)
Tracking
Control
BMPs
Non ..Storm Water
Management BMPs
11 E Q. ·s .,.
IJJ
Waste Management and Materials
Pollution Control BMPs
c Gl 't> E Gl iii
I $. J ~ Cl c: Gl "' "!i) c ,2 "' c ~ :::! "' :I <l> 0 !i "E "' "' "' c "' c I u
j "' ~
l.t:lJU!:Y.ctions: Begin by reviewing the lis! of construction activities and checking !he box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions ln the
blank activity description boxes provided for thai purpose and place a check in the box immediately lo the left of the added activity de11cription. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with lh€1 BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from I he list For Example-U the project Includes site access across dirt, then check the box to the left of "Site Access Across Dirl". Then revtew
the list for something that applies such as "Stabilized Construction Ingress! Egress· under Tracking Control. Follow along the "Site Access Across Dirt'' row until you get to the "Stabilized Constructiof1
Ingress/Egress" column af1d place an X in the box where the two meet As another example say the project included a stockpile that you iniE<nd to co11er with a plastic sheet Since plastic sheeting is not on
the list ol BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X In the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
Tu learn more about what each BMP description means. you may wish to relliew the 8MP Reference Hapdouj prepared to assist applicants In !he selectlon of appropriata Best Management Prar:lice
measures. The reference also explains !he California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPslo a project.
E·29 Page 2 of 3 REV 01/14
PLANNING DIVISION
BUILDING PLAN CHECK
REVIEW CHECKLIST
P-28
DATE: August 24,2015 PROJECT NAME: Cassia PROJECT ID: MCUP 14-01
Planning Division
1635 Faraday Avenue
{760) 602-4610
www.carlsbadca.~~:ov
PLAN CHECK NO: CB151326 SET#: II ADDRESS: 2020 Cassia Road APN: 215-021-02
[8J This plan check review is complete and has been APPROVED by the Planning
Division.
By: Jason Goff, Asociate Planner ~
A Final Inspection by the Planning Division is required ~Yes D No
Plan Check Comments have been sent to: cbaker@boothsuarez.com
You may a/so have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
~ Jason Goff
760-602-4643
Jason.Goff@carlsbadca.gov
Remarks: See Below
REVIEW#:
'
1 2 3
~DO
D~D
~DO
~DO
~DO
~DO
~DO
~DO
~DO
~DO
D~D
Plan Check No. CB151326 Address 2020 Cassia Road Date August 24, 2015 Review# 2.
Planner Jason Goff Phone (760) 602-4643 APN: 215-021-02-00
Type of Project & Use: WCF Net Project Density: NA
Zoning: 0 General Plan: 0 Facilities Management Zone: 10
CFD (in/out)#_ Date of participation:__ Remaining net dev acres: NA
(For non-residential development: Type of land use created by this permit: WCF)
Legend: ~ Item Complete D Item Incomplete -Needs your action
Environmental Review Required: YES~ NOD TYPE: CEQA Cat. Exemption §15303
Discretionary Action Required: YES ~ NO D TYPE: Minor Conditional Use Permit
ADMINISTRATIVE APPROVAL LETTER, DATE June 9, 2015
PROJECT NO. MCUP 14-01
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: ~
Regarding Condition No. 9. The Notice of Restriction is being mailed to the applicant.
PlanCom. Inc., for ovmer's signature. Once this document is signed. returned and properly
notarized for official recordation. the Planning Division will be able to release building permit.
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES 0 NO [81
Habitat Management Plan
Data Entry Completed? YES D NOD N/A ~
lnclusionary Housing Fee required: YES D NO D N/A ~
(Effective date of lnclusionary Housing Ordinance-May 21, 1993.)
Housing Tracking Form (form P-20) completed: YES D NO D N/A ~
Site Plan:
Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44-Neighborhood Architectural Design Guidelines
1. Applicability: YES D NO ~
Zoning:
1. Setbacks (New Equipment Enclosure):
Interior Side (East Side): Required 0'-0" Shown +0'-0"
Rear (North Side): Required 2'-8" Shown 2'-8"
2. Height (New Cupola): Required 29' -0" Shown 29'-0"
Additional Comments
'1. Please label the setback dimension for the equipment enclosure along the eastern property line.
oK To 1ssuE AND ENTERED APPROVAL INTo coMPUTER~ DATE <>8/u / ._,, ;;-
P-28 Page 2 of 2 07111
Aif~ '~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
REVIEW CHECKLIST
P-28
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.!lov
DATE: April30, 2015 PROJECT NAME: Cassia PROJECT ID: MCUP 14-01
PLAN CHECK NO: CB151326 SET#: 1 ADDRESS: 2020 Cassia Road APN: 215-021-02
D This plan check review is complete and has been APPROVED by the
Division.
By:
A Final Inspection by the Division is required DYes D No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
~ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: cbaker@boothsuarez.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
760-602-4675
Gina.Ruiz@carlsbadca.gov
Jason Goff
760-602-4643
760-602-27 41
VaiRay.Marshall@carlsbadca.gov
760-602-2773
D
760-602-4662
Cynthia.Wong@carlsbadca.gov
760-602-4664
Remarks: This project is subject to the approval of a MCUP (MCUP 14-01 -
Verizon Cassia), which it has not yet received. No building permits should be
issued at this time. Planning Division will complete its plan check review
following the approval of the MCUP. t:J./;).._
((~·
~ CITY OF
CARLSBAD
DATE: 05/13/2015
PLAN CHECK NO: SET#: 1/1
PLAN CHECK
REVIEW
TRANSMITTAL
PROJECT NAME: VERIZON WCF-CASSIA
ADDRESS: 2020 CASSIA RD
COPY
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECTID:CB151326
APN:
IZI This plan check review is complete and has been APPROVED by the FIRE Division.
By: GR
A Final Inspection by the FIRE Division is required IZ! Yes 0 No
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: cbaker@boothsuarez & suarez@boothsuarez
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
D Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
D Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
D
D Kathleen Lawrence
760-602-27 41
Kathleen.Lawrence@carlsbadca.gov
D
D
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
~ Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
D CindyWong
760-602-4662
Cynth ia.Wong@carlsbadca.gov
D Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Carlsbad Fire Department
Plan Review
Date of Report:
Name:
Address:
Permit#:
Job Name:
Job Address:
Requirements Category: Tl, INDUST
05-13-2015
CYNDI BAKER
325 CARLSBAD VILLAGE DR
STE D2
CARLSBAD CA
92008
CB151326
VERIZON-INSTALL NEW EQUIP
2020 CASSIA RD CBAD St: CS
Please review carefully all comments attached.
Conditions:
CITY OF CARLSBAD FIRE DEPARTMENT-APPROVED:
BUILDING DEP1':
COPY
Reviewed by: q tt}al(
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
Entry: 05/13/2015 By: GR Action: AP
',.,
90EI 8 CLE:VELAr-.JD ST
OCEAN!;IDE. C.•' 9205 <J
760.966.6355 Ph.
760.966.6360 r·;.:.
DS>~'J.!euRH:.>f:kf:!Dt..r EH1~IL
STRUCTURAL CALCULATIONS
FOR
VERIZON-CASSIA
2020 Cassia Road
Carlsbad, CA 92009
(DSI PROJECT NO. 15-100.33)
(ARCHITECT: Booth & Suarez)
ITEM
DESIGN CRITERIA
DESIGN LOADS
TOWER lATERAl ANAL VSIS
MAY 20,2015
TABLE OF CONTENTS
TOWER SHEARWAll AND HOLDOWN DESIGN
TOWER FRP VERTICAL TUBE DEISGN
TOWER PLATFORM LEVEL-F PLATFORM FRAMING DESIGN
TOWER PLATFORM LEVEL-F LEDGER CONNECTION DESIGN
TOWER DECK LEVEL-D FRAMING DEISGN
TOWER FOUNDATION DESIGN
EQUIPMENT ENCLOSURE WAll AND FOOTING LOADS
ENCLOSURE FREESTANDING WALL DESIGN
ENCLOSURE RETAINGIN WALL DESIGN
EQUIPMENT ANCHORAGE DESIGN
~' l
PAGE
1
2
3-8
9-20
21-22
23-28
29
30-40
41-57
58-59
60-63
64-67
68-72 r2/JJ /"1D-..1 t2'
CODE:
SEISMIC:
DUNN SAVOIE INC.
STRUCTURAL ENGINEERING
908 S. CLEVELAND ST.
OCEANSIDE, CA. 92054
PH: (760] 956-6355
FAX: (760} 966-6360
2012 International Building Code (IBC)
2013 California Building Code (CBC)
Risk Category of Building: II
Seismic Design Category: D
le = 1.00
Fa= 1.0
Fv = 1.563
Sos = 0.800
So1 =
T=
R=
Qo=
Cd=
0.455
0.250
6.50
3.00
4.00
Seismic Base Shear: V = 1.0E = 0.123
0.086
0.112
V=0.7E=
Vw/ p=1.3=
Basic Wind Speed =
Exposure=
NDS 2012
MASONRY: MSJC 2011
CONCRETE: ACI 318-11
STEEL: AISC 14TH EDITION
110
c
sec
*W
*W
*W
MPH
(Strength Design)
(ASD)
ASD Seismic Design Force
(3-sec Gust)
PER TORO INTERNATIONAL (PROJ # 13-109.52, 2/18/15)
ALLOWABLE SOIL PRESSURE FOR D+L 1500 PSF
LATERAL EQUIVELENT FLUID PRESSURE
COEFFICIENT OF FRICTION
SHORTTERMINCREASE
300 PCF
0.25
1.33
DUNN SAVOIE INC.
STRUCTURAL ENGINEERING
908 S. CLEVELAND ST.
OCEANSIDE, CA. 92054
PH: (760) 966-6355
FAX: {760) 966-6a60
PLATFORM FRAMING (LEVEL-F)
DEAD LOADS (osf)
McNichols GW -225 Grating 15.8
Steel Framing 8.2
ME&P 12.3
Miscellaneous 3.7
l:: Dead Load 40.0
Live Load 40.0
DECK FRAMING _{LEVEL - D
DEAD LOADS (psf)
Parex Mer-Ko Shur Deck 2.0
3/4" plywood 2.3
2x12@ 16" o.c. 3.9
518" Gyp. Board 3.1
ME&P 1.0
Miscellaneous 3.7
l:: Dead Load 16.0
Live Load 40.0
NEW TOWER FRP SCREEN WALL
DEAD LOADS (psf}
6x4x1/4 FRP Tube 1.4
FRP Panel 0.8
lnsulfoam 2.5
ME&P 0.5
Miscellaneous 2.7
l:: Dead Load 8.0
NEW TOWER WALLS Exterior Exterior Interior
DEAD LOADS (g_sf} (osf) (psf)
2-112" Stone Veneer 34.4 - -
1" Mortar 12.0 --
Metal Lath 0.4 --
Stucco -10.0 -
Parex Mer-Ko Shur Deck -2.0 2.0
1/2" Plywood 1.5 3.0 3.0
2x6 @16" o.c. 1.4 1.4 1.4
Insulation 0.8 0.8 0.8
Miscellaneous 1.5 1.8 1.8
l::Dead Load 52.0 19.0 9.0
ENCLOSURE WALLS
DEAD LOADS (psf) (psf)
2-1/2" Stone Veneer 34.4 -
1" Mortar 12.0 -
Metal Lath 0.4 -
Stucco 10.0 20.0
8" Solid Grout Block Wall 84.0 84.0
Rock Veneer 10.0 10.0
Mise 1.2 1.0
l::Dead Loads 152.0 115.0
ENCLOSURE CHAINLINK LID
DEAD LOADS (psf)
9 GA 1" x 1" Mesh 1.7
3" Steel Pipe 4.0
Mise 0.8
~ueaa Loaa 6.5
~Hl R~ ~AI!Ufl
PANtL llmH 'SKJO'l'H '51' XCC
Fl>lc'SH, POM:l SIIAI.I loL\l'CI1
£l<lSli!C sulif.OC£ "' Ttxll.JII< a. 00.0'! (SOOWN :SW.::ED)
KEY PLAN
TOWER ELEVATION
'o ' i<:
KEY PLAN
SECTION D
DUNN EiAVOIE iNC.
S'TRUCTURAL ENGINEERING
909 S. CLEVELAND ST.
OCEANStDE, CA. 92054
F'H: (760) 966-6355
FAX: !760) 966-6350
Light-Frame (wood) walls sheathed with wood structural panels rated for shear resistance or steel sheets.
Therefore, per 201218C, for the entire structure, R= 6.50 00= 3.00 Cd = 4.00
IBC 2012, ASCE 7·10 Chapter 11, 12, 13 Seismic Design Criteria
Soil Site Class D
Method 1 Input Project Zip Code 92009
Response Spectral Ace. (0.2 sec) Ss = 118%g
Response Spectral Ace.( 1.0 sec) S1 =
Site Coefficient Fa =
44%g
1.028
Site Coefficient Fv= 1.556
Max Considered Earthquake Ace. SMs = F •. Ss
Max Considered Earthquake Ace. SM1 = Fv.S1
Method 2
@ 5% Damped Design Sos = 213{SMs)
So1 = 213(SM1}
Input the coordinate of project latitude
Longitude
= 1.180 g
=0.444 g
=1.213g
= 0.691 g
= 0.809 g
= 0.461 g
33.11435
-117.27061
From the Ground Motion Parameter Calculator by USGS
The seismic design parameters are
Ss= 1.157 g Fa= 1.037
S1 = 0.437 g Fv= 1.563
Table 20-3-1, Default= D
Figure 22-1 through 22-14
Figure 22-1 through 22-14
Table 11.4-1
Table 11.4-2
(11.4-1)
(11.4-2)
(11.4-3)
(11.4-4)
(24. to so·}
(-125" to -65•)
SMS= 1.200
SM1=-0.683
SDS= 0.800
SD1= 0.455
Use the seismic parameters from Method 2 to supercede those from Method 1 .
ISi<li~rnic Design Category (SOC) Determination
Risk Category of Building II
Seismic Design Category for 0.1 sec D
Seismic Design Category for 1.0sec D
S1 = 0.437 < 0.75g
Therefore, SOC = D
Equivalent lateral force procedure
To Determine Period Ct = 0.02
Building ht. Hn = 29 ft
X= 0.75
Table 1.5-1
Table 11.6-1
Table 11.6-2
Section 11.6 NOT Apply !
Section 12.8
Table12.8-2
Cu = 1.4 for So, of 0 .455g Table12.8-1
Figure 22-15 Approx Fundamental period, Ta = Ct(hn)x = 0.250 TL = 8 Sec
Calculated T shall not exceed $ Cu.Ta = 0.350 Use T = 0.250
Per Section 11.6 T::; 0.8Ts = 0.8 S01/Sos = 0.455
Is Structure Regular & s 5 stories ?
Response Spectral Ace.( 0.2 sec) S, =
Yes
1.50g
@ 5% Damped Design Sos = %(Fa.Ss) = 0.010g
Response Modification Coef. R = 6.5
Over Strength Factor no~ 3.0
Importance factor I = 1.00
Seismic Base Shear V = c.w
c-Sos s Rll =0.123
or need not lo exceed, C5 = So1
(RII).T = 0.280
orCs= S01TL
T2(RII) N/A
C, shall not be less than = 0.01
Fa= 1.00
ForT>TL
sec.
sec. OK!
Section 12.8.1.3
(11.4-3)
Table-12.2-1
Table 11.5-1
(12.8-2)
(12.8-3)
Min Cs= 0.5S11/R =0.034 For 81 20.6g
(12.8-4)
(12.8-5)
(12.8-6)
Use Cs = 0.123
Design Base Shear V = 0.123 w x0.7(ASD)x1.3(r) = 0.112W
9
g
g
g
DUNN SAVOIE lNG.
STRUCTURAL ENGINEERING
908 S. CLEVELAND ST.
OGEANSIDE, CA. 92054
PH: (760) 966-6355
!="AX: (760} 966-6360
ltATERAL ANALYSIS
r
PLATFORM DECK (LEVEL~ {i)
Area of Roof = =
Total Weight of Roof= =
Interior Wall Weight= 8 r-s( 9 I) L'"l I :s) r Ci fYhl ( ·l'f IY) =
Exterior Wall Weight= (19 P9F >< '?,t,. 7' t 52. fl7("' o, :~tl /A2.><1g· +-'foc3 .')" •·2"lS 1 2.?'1 ') =
u/1 tt2
07~0 lbs
lbs
ibs
Additional Weight= = -.,,_,_--,-_lbs
Total Roof Diaphragm Weight = ! s "j '5 ·-::, lbs
TOWER DECK (LEVEL -D)
Seismic Design:
Design Base Shear: (Taken from previous page)
W(ASD)
load Distribution:
level w h (w!{h~ F
Roof l~,q')'? k 20.'2-ft 321-.~Sl k*ft 2.35Z. k (all directions)
Floor k \]..' 2 "SuO· 'tY 7 k*ft z.l"l, 1 k (all directions)
Total: k & , "H'~ k*ft ,.-13 k •)
DUNN SAVOIE INC:. JOB Verizon -Cassia
STRUCTURAL ENGINEERING ~7
SHEET NO OF 908 S. CLEVELAND ST.
OCEANSIDE, CA. 92054 CALCULATEDUY HG DATE 5/15
PH: (760) 966·6355 CHECKED BY 0ATE
FAX; !7601 966·6360 SCALE
ASCE 7-10 Wind Lateral Design Analy_sis For Rigid Structures With Flat Roofs
Directiona II~ lnde12endent: -n
Design Parameters: II
Risk Category of Building = II Top of Roof Elevation 20ft
Basic Wind Speed (3-sec. mph). V = 110 Top of Parapet Elevation 29 f1
Exposure Category = c Max Horizontal Dimension 15 f1
Directionality Factor, ~ = 0.85 Min Horizontal Dimension 15 ft
ro= Parapet Factor Windward 1.5
Parapet Factor leeward -1.0
Veloci!ll: Pressure EX!;!osure Coefficient:
«= 9.5
~= 900 ft _j L.
Structure Height (ft) 15 20 20 20 20 20 20 Parapet
Kz-2.01 *(zi~) "= 0.85 o.go 0.90 0.90 0.90 0.90 0.90 0.98
ToQograghic Factor:
2-D Ridge! X !2-D Escarpj 3-D Hill! ("X" One Box)
Elevation Change, H = 10 fl <15ft Topographic Factor NOT Required
Crest to Mid-Height. lh = 1 ft
Dis! from Crest. x = 0 ft Downwind of Crest? No (Yes or No)
Hlln= 0.50 MAX
K, = 0.73 'I= 3.0
K2 = 1 -(lxl/)!lh) = 1.00 J.l= 1.5
Structure Height ft) 15 20 20 20 20 20 20 Parapet
K3 =e"'l 0.11 0.05 0.05 0.05 0.05 0.05 0.05 0.01
K:z1 = (1 + K, K2 K3f = 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Veloci!ll: Pressure:
Structure Height (ft) 15 20 20 20 20 20 20 Parapet
Qz" 0.00256 K,Kzt~ V ro = 22.35 23.75 23.75 23.75 23.75 23.75 23.75 25.68 psf
Oirectionall:t Deeendent:
Gust Effect Factor: Gs= O.S50 GL= 0.850
External Pressure Coefficients:
Short Direction: Windward leeward Long Direction: Windward Leeward
Walls, Cp= 0.8 -0.50 Walls, Cp = 0.8 -0.50
Design l!l£ind Pressures:
Short Direction: Windward leeward leeward Parapet
PWalb = Gh Gs Cp = See Below -10.09 psf -25.68 psf
Structure Height (ft) 15 20 20 20 20 20 20 Parapet
Pwall> -Qz Gs Cp -15.20 16.15 16.15 16.15 16.15 16.15 16.15 38.52 psf
Ptotal -qz Gs Cp -q• G, Cp"' 25.29 26.24 26.24 26.24 26.24 26.24 26.24 64.20 psf
long Direction: Windward leeward leeward Parapet
Pwa11s = Gn GL Cp = See Below -10.09 psf -25.68 psf
Structure Height (ft) 15 20 20 20 20 20 20 Parapet
Pwalls = Qz GL Cp = 15.20 16.15 16.15 16.15 16.15 16.15 16.15 38.52 psf
Pto"'' = Qz Gs Cp ·Gn G, CP>= 25.29 26.24 26.24 26.24 26.24 26.24 26.24 64.20 psf
Building Elements:
(+)GCP (-)GCP GCP, Force at Highest Elev
Wa!ls Main-{4): p= qh[(GCp)·(Gcp;)] 0.93 -1.1 -0.18 30.40 psf
Walls Corners-(5): p= qh[(GC,)-(GcP,)J -1.2 -0.18 32.77 psf
Parapets: p= qp(GCp·Gcp1) 2.2 0 56.49 psf
Main Roof Uplift-(1): p= qh[(GCp)·(Gcp;)J 1 -0.8 0.18 28.02 psf
Roof uplift at Ends and Peaks-(2): p= q.[(GCp)-(Gcp1)] 1.1 -1.0 0.18 30.40 psf
DUNN SAVOIE INC:.
STRUGTURAL ENGINEERING
908 S. DLEVELAND ST.
OGEANSIDE, DA. 92054
PH: (760) 966-6::355
FAX: (760} 966-6::360
IWIND ANALYSIS
Exposure: __ Basic Wind Speed = ll '; mph
Pn=0.6W= ,7 PSF(ASD)
P1 = psf at 0'-W 2
P2 = 3'(), s psf at 1-5':20'
P3 = psf at 20'-25'
P4 = psf at 25'-30'
P5 = psf at 30'-40'
' 5'
I Governing Lateral Forces
Wind Design Seismic esign
Roof Level:
(N-S) direction: jO lbs lbs
(E-W) direction: 6oso lbs lbs
Floor Level:
11it?S \
(N-S) direction: fbs \ lbs
(E-W) direction: ~"Sen'S lbs ~\q\ lbs
Total Base Shear:
(N-S) direction: 1'5 lbs lbs
(E-W) direction: B~'ls lbs lbs
\N governs
\J \\J p governs
SYMBOL
G
@
@
Cj
l
SHEAR
SHEAR MATERIAL AND NAILING SILL BOLTING SILL NAILING TRANSFER
(PLF) DESCRIPTION AT THE
TOP
340 1/2" STRUCT I PLYWOOD w/10d 5/8"<1> X 7" MIN. 30dCOMMON A35@24"
@ 6" O.C. E.N. 12" O.C. F.N. EMBED @ 48" O.C. NAILS@ 10" O.C. o.c.
510 1/2" STRUCT I PLYWOOD w/1 Od 5/8"<1> X 7" MIN. 30d COMMON A35@ 16"
@ 4" O.C. E.N. 12" O.C. F.N. EMBED @ 32" O.C. NAILS @ 6" O.C. O.C.
665 1/2" STRUCT I PLYWOOD w/10d 5/8"<1> X 7" MIN. 30dCOMMON A35@ 12"
@ 3" O.C. E.N.12" O.C. F.N. EMBED @ 24" O.C. NAILS @ 5" O.C. o.c.
2x MINIMUM WITH "SIMPSON" CS16 HOLDOWN STRAP w/11-10d NAILS@ EACH END. 2
ROWS 2-1/16" O.C. (17051bs)
2x MINIMUM WITH "SIMPSON" LTT20B HOLDOWN w/ 10-10d x 1 1/2" NAILS AND 1/2
DIAMETER LAG SCREW WITH MINIM 4" EMBEMENT INTO FLOOR BEAM (1355lbs)
4x MIN POST WITH "SIMPSON" CMST14 HOLDOWN STRAP w/ 30-10d NAILS@ EACH END. 2
ROWS 1-3/4" O.C. (51231bs)
2x MINIMUM WITH "SIMPSON" DTT2Z HOLDOWN ANCHOR w/8 SDS 1/4" x 1 1/2" WS AND
"HIL Tl" 1/2"<1> HAS ANCHOR ROD WITH 4" EMBEDMENT WITH "HILT!" HIT HY-200 ADHESIVE
PER ICC ESR-3187 {1825 LBS)
4x MINIMUM WITH "SIMPSON" HDU5 HOLDOWN ANCHOR w/14 SDS 1/4" x 2 1/2" WS AND
"HIL Tl" 5/8"¢ HAS ANCHOR ROD WITH 8" EMBEDMENT WITH "HIL Tl" HIT HY-200 ADHESIVE
PER ICC ESR-3187 (5645 LBS)
6x MINIMUM WITH "SIMPSON" HDU8 HOLDOWN ANCHOR w/20 SDS 1/4" x 2 1/2" WS AND
"HIL Tl" 7/8"¢> HAS ANCHOR ROD WITH 14" EMBEDMENT WITH "HIL Tl" HIT HY-200 ADHESIVE
PER ICC ESR-3187 (7870 LBS)
6x MINIMUM WITH "SIMPSON" HDU14 HOLDOWN ANCHOR w/30 SDS 1/4" x 2 1/2" WS AND
"HILT!" 1"<P HAS ANCHOR ROD WITH 20" MINIMUM EMBEDMENT WITH "HIL Tl" HIT HY-200
ADHESIVE PER ICC ESR-3187 (12000 LBS) .
DUNN SAVOIE INc. Jos Verizon ~Cassia
STRUGTURALENGJNEERING ~~S~H~EE~T~NO~-~~~~~~~~~~O~~~~~~~~OF~~~~~
908 s. CLEVELAND ST. CALCUlATEDBY HG DATE 5/15
OCEANSIDE, GA. 920 54 CHECKED BY DATE
PH: (760) 966-6355 SCALE
FAX: !760) 966-6360
[ Shear Wall Design
Wind Governed Design
Level: P'OOf
Direction: VA\2\rt'?
I Use: (J) per Shear Wall Schedule
Overturning:
Shear Panel Length= ,_., ·
OT Moment= s'O l & lo"; 'c?-
plf
Resisting Moment= i).T., r~ 8Gi~0?5e>'8.t'-r'-'}On"/.lU">'J l3'/-z.
Net Moment= "Z-41175:? l:o -H--1 7131? I b ·· f-l
Uplift= 10'2~"> 1b·H 1 U:.c;'
I Use: <t);:/"Holdown Anchor Schedule
D Holdowns Not Required
Line IO
I,.,_'/,., Projection Length =-~-----,---:;;_;_,..."' __ ~----~-
Lateral Load = _____ ...:.4::::.&...:.Y...lp:...l..:..f_..<_~t>.:..;':..:S_' -----
Other Loads =
--~~-----~--~---------------Total Load, TL = --------,-,---.:---,.,---------
Shear Wall Length, L = 2,'5' + '2. , 'S
T.L./L = 'bo I~ \!:>s I "> '
juse:@per Shear Wall Schedule
Overturning:
Shear Panel Length = 1-/5 /
OT Moment= (Ct>03 elf ""2,>:>/)r-8~
Resisting Moment= C>./rtqr7\ $ e.r..r'~ 6f'"S~Y ~-'--· -t.I-JO f't;,( !<;) /tY;-j z. <; •it/z.
Net Moment= IZC'J/<7 11::vfl-• ?13 lb -PJ.-
Uplift= \ 15'-17 ~~-f-.1! Z-1..:> /
I Use: (")her Hold own Anchor Schedule
D Holdowns Not Required
= ft
= lbs
= fbs
= lbs
= 1 ~a ft
= ~'?,:; ·;;l,. plf
= ~~· ft
= 2'-l,::ae ft-lb
= <?'070 ft-lb
= 11)'2-'55 ft-lb
= cow lbs
= tP~5 ft
= 1oJ(, lbs
= lbs
= 3:Qjlp lbs
= 5' ft
= r;,o'b plf
= z~s' ft
= !'£-0/P 0 ft-lb
= 5 "? ft-lb
= ))51.(7 ft-lb
= 4'-l q lbs
DUNN SAVOIE lNG. JOB Verizon -Cassia
STRUCTURAL ENGINEERING ____ s~H~EE~T~NO~·------~~~--------------------~OF ____ ~~~
908 s. CLEVELAND ST. CALCULATEDBY HG DATE 5/15
OCEANSIDE, CA. 92054 CHECKEDBY DATE
PH: (760) 966-63 55 SCALE
FAX: (760) 966-6360
Wind Governed Design
Level: fL£Op
Direction: _._f-_VJ.;..__ __
.2'? \"?") l~ -~ Lateral Force I Overall Floor Length = v = 1 '?' = ) 6'3 plf
Line r
Projection Length = ['5'/:L
Lateral Load = 10'0 f'it:Y 7S'
Other Loads = ~Olf; l ~""
Total Load, T.L = I 3 7'!; I I;?~ f< ~0'! (, 10s
Shear Wall Length, L = '7·75/ .,. "%.>' 1-:S '
T.UL= ~ '70-~ (_ '1> I Use: {2)per Shear Wall Schedule
Overturning:
= 7.5' ft
= 137S lbs
= 1 t? /{ ... lbs
= t..; :2 Bq lbs
= 'f> ft
= 51.f<j plf
Shear Panel Length = :;;.1.. '5"' = ft _.;..__ __ _
OTMoment= (5'-J'1plf,..f>,'l.."':/)-r: ll' = ft-lb
Resisting Moment= o.:.[q f'?<f:?<:ZO'-r er~~ ,.19, Z' .. '10fl;;'l';o~'3?~· '/ !&r?+'~. &7{!:;J:;;= 1 ~:7-'-1 ft-lb
NetMoment= !9v:Z."7 +-.r{p-l~t-L~Ci\"'-' = ll?'iO':? ft-lb
Uplift = fJ U?!l>.5 = 75 J ".2-lbs
per Hold own Anchor Schedule
0 Holdowns Not Required
line f
Projection Length =------------------------
Lateral Load = Otherloads=----------------------------------
Total Load, T.L =------------------
Shear Wall Length, L =-----------------
T.L/L = I Use: <I) per Shear Wall Schedule
Overturning:
ShearPaneiLength=--------~~~~~-----------------
OT Moment = C5~ ~ p IF,, tp>') "'-11 '
Resisting Moment= o,(;[ qrsr ,o<Zf?"-< tJrG'f-vl',,l I 'r '{Ofi54.,'J.l'5' r lvf:I'Y.tj/:,.r'J <-J,1::r%~
Net Moment= 1%85 N, lb -t..@ 15 ~-l.h
Uplift= zvo7o H -lo ; ttlZ-5'
I use: <.f9rer Holdown Anchor Schedule
0 Holdowns Not Required
=
= =
=
:;:;
=
=
:::
=
=
:;:;
J,5 ft
lg73 lbs
1JO II/ lbs
4~'8q lbs
B ft
51Cf plf
'f,J5 ft
t.1't-6 '5 ft-lb
ZC.t5 ft-lb
;2.1,;010 ft-lb
r.P \'3 Lj lbs
DUNN SAvotE lNG. Joa Verizon-Cassia
STRUGTURAL ENGINEERING __ s;;.;.H;;;:;EE;;.;.T..;.;N;;;.;0. ___ ---:--:-:1 --(.,::------------_;:,;OF ___ -::::-:-:-:::---
908 s. CLEVELAND ST. CALCULATEDBY HG DATE 5/15
0GEANSIDE, CA. 92054 CHECKEDBY DATE
PH: (760) 966-6355 SCALE
FAX: (760) 966-6360
Wind Governed Design
Level: f~f·
Direction: £-V
Lateral Force I Overall Floor Length = v = ____ = I e>0 plf
Line
Projection Length = 15 '/~
Lateral Load= 1 ~'? If /. 1 s'
Other Loads= $t?l v li>""
TotaiLoad,T.L.= ;?:,~r:g ~h;; ;:?ol' 1!7""
Shear Wall Length, L =------,..,..-~6::...'--.,._,,-------
T.L/L = Lf :_;~q . JJ-;6 I g, I Use: @per Shear Wall Schedule
Overturning:
Shear Panel Length =-------~r;:....-/,....--------
OT Moment =----'=C..;...5_'-'..:..I..:..q-~.P:....l_r_,__;;~:::.......'')~:I'.....:..:J !_' _____ _
Resisting Moment=------------------
Net Moment=
----~~-------~~~--------Uplift= -7 f?JJ-7Ci rr· lb /1/~y·
I Use: <lf%er Holdown Anchor Schedule
Line
0 Holdowns Not Required
Projection Length=------------------
Lateral Load = --------------------------Other Loads = ----------------------------Total Load, T.L. =------------------
Shear Wall length, L =------------------
T.LJL =
juse: Qper Shear Wall Schedule
Overturning:
Shear Panel Length =------------------
OT Moment=-----------------
Resisting Moment=---------------------NetMoment; _____________________________ ___
Uplift=
!use: (~er Holdown Anchor Schedule
0 Holdowns Not Required
= ·7. <S ft
= lbs
= lbs
= lf:3g,q lbs
= 'r!?~ ft
= 51-f g plf
= 0 ft
= 461.7C, ft-lb
= ft-lb
= q~ 'Z '1""/ ft-lb
= t./1 37 lbs
= ft
= lbs
= lbs
= lbs
= ft
= plf
= ft
= ft-lb
= ft-lb
= ft-lb
= lbs
DuNN SAVOIE JNc. JoB Verizon-Cassia
STRUCTURAL ENGINEERING _ __;S:.;.;H.;;;EE;;..T.;.;.N0;;.;.. ___ -:-::-::::-1-) ___________ o:::.:,F ___ ~~~
908 s. CLEVELAND ST. CALCUlATEDBY HG DATE 5/15
DGEANSIDE, CA. 92054 CHECKEOBY DATE
PH: (750) 955-5855 SCALE
FAX: (750) 955-5850
Wind Governed Design
Level: (VV'c7r
Direction: •!-\ ~"':>
Lateral Force I Overall Floor Length = v = ____ = __:_.::..___ plf
per Shear Wall Schedule
=
= =
=
=
=
7·5" ft
t'>7~ lbs
;::o1.t, lbs
t.;~ ~Ft lbs
6 ft
5 yq plf
Overturning:
Shear Panel Length =
OT Moment=
Resisting Moment =
Net Moment=
Uplift=
..,,-:;z::;' = '5,~> ft _ _..;;._ __ _
t~9eiF"'~·:?5'),.)1,. = !1?-:2"7 ft-lb
0, L;l. 97Sh ?o' 'l' M~l' •'6.~' 4' lj(Jfi5fr ;l.<J' .. l£.1'::>~' rlr:)] £2.:._" = ft-lb
l"l&:Z/ .,._. ·1b -le;:zo P-f~ )i.? = ft-lb
\0\01 {'.ldb
er Holdown Anchor Schedule
0 Holdowns Not Required
Line~
Projection Length=------------------
Lateral Load=------------------Otherloads= _______________________ _
Total Load, T.L =-----------------
Shear Wall Length, L =----------------
T.L./L =
juse: @per Shear Wall Schedule
Overturning:
=
=
:::
=
=
=
1<5 ft
1,07'h lbs
~0){, lbs
l..j~'/3'4 lbs
t$ ft
5'1 q plf
Shear Panel Length= 1... 75' = '1·7' ft -~---OTMoment= C57"lplr, r..r,w).r 11' = 1<;3&'05 ft-lb
Resisting Moment= o,r,(:.'\?~,::~<10' t '07?(>< 8),-;r, ?J!.lf'5f~ ~.?:S't 1/..PSF"{,·"lJ~ = ) '2.'1 {; ft-lb
Net Moment= 7-6& ~6 1"+-i6 -o~"f(, Plr-,\b = 2.'5!--j'?:>"' ft-lb
Uplift= "l-'5£./ '0 f-L\P "1/1-::7' .,. Ll \II'\ \b:s = l oGb:s lbs
er Holdown Anchor Schedule
0 Holdowns Not Required
DUNN SAVOIE lNG. Joe Verizon-Cassia
STRUGTURAL ~NGINEERING --~S~H=EE~T~NO~·------~~~~~L~f __________________ o=F-------~---
908 s. CLEVELAND ST. CALCULATEDBY HG DATE 5/15
OCEANSIDE, CA. 92054 CHECKEDBY DATE
PH: (760) 966-6355 SCALE
FAX: (760) 966-6360
Wind Governed Design
Level: i""'J..OOf
Direction: 1'!-~
Lateral Force I Overall Floor Length = v = ________ = _ _,l ~"-.:s-plf
Line_!Q_
Projection Length=------~.~------------=
Lateral Load ;;:: 1 0 8 =
Other Loads= ~0\G. U>·:> =
Total Load, T.L. = ~(J\~ ·,:o:;;, ? 7'3 \~?~ =
Shear Wall Length, L = '-!' .r !...J / =
T.L./L= tH~OI lll>z;;/ ~~ = I Use: @per Shear Wall Schedule
Overturning:
Shear Panel Length = 1 =
OT Moment= (.6!-Jct ;;< &...!') K lJ' =
Resisting Moment=-----------------------
Net Moment=
=
= Uplift =-----z.-Lf_.,l,-5_&_/-;-'?--,,5:-,------= I use: 12rer Holdown Anchor Schedule
Line
0 Holdowns Not Required
Projection Length=----------------------
Lateral Load = Other Loads=-----------------
Total Load, T.L. =----------------
Shear Wall Length, L =------------------
T.L/L = I use: Qper Shear Wall Schedule
Overturning:
Shear Panel length= ____________________________ _
OT Moment= ------------------------Resisting Moment=--------------------
Net Moment= -------------------------------Uplift=
!use: <her Holdown Anchor Schedule
0 Holdowns Not Required
=
=
=
= = =
=
=
=
=
=
7;5 ft
\'A7'? lbs
z~·); & lbs
'to'o'l lbs
6 ft
?4-/ q plf
'1' ft
-;2L-J15L, ft-lb
ft-lb
Zt.-1 I 5 {,_ ft-lb
c;.9o -:z. lbs
ft
lbs
lbs
lbs
ft
plf
ft
ft-lb
ft-lb
ft-lb
lbs
www.hilti.us Profis Ancho'r 2.5.2
Company: Page: 1
Specifier: Project: VERIZON • CASSIA
Address: Sub-Project I Pos. No.:
Phone I Fax: Date: 5/15/2015
E-Mail:
Specifier's comments: H8 ANCHORS ON INTERIOR GRADE BEAM
11nput data
Anchor type and diameter:
Effective embedment depth:
Material:
Evaluation Service Report:
Issued I Valid:
Proof:
Stand-off installation:
Anchor plate:
Profile:
Base material:
Installation:
Reinforcement:
Seismic loads (cal. C, D, E, or F)
Geometry [in.] & Loading [lb, in.lb]
HIT -HY 200 + HAS 7/8
her.act = 12.000 in. (hef,timit =-in.)
5.8
ESR-3187
1/1/201513/1/2016
Design method ACI 318-08/ Chern
eb = 0.000 in. (no stand-off); t = 0.135 in.
lx x 11, x l = 4,000 in. x 4.000 in. x 0.135 in.; (Recommended plate thickness: not calculated)
no profile
cracked concrete, 2500, f0' = 2500 psi; h = 24.000 in., Temp. short/long: 32/32 •F
hammer drilled hole, Installation condition: Dry
tension: condition B, shear: condition B; no supplemental splitting reinforcement present
edge reinforcement: > No. 4 bar
yes (0.3.3.5)
z:
:-It' ~.
~ ' 0
Y.--
Input data and results must be checked for agreement with the existing conditions and for plausibilily!
PROFIS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilli is a registered Trademark of Hitti AG, Schaan
www.hilti.us
Company:
Specifier:
Page:
Project:
Profis Anchc•r 2.5.2
2
VERIZON -CASSIA
Address: Sub-Project I Pos. No.:
Phone I Fax:
E-Mail:
2 Proof I Utilization (Governing Cases)
Loading
Tension
Shear
Loading
Proof
Concrete Breakout Strength
Combmed tension and shear loads
3 Warnings
1m
• Please consider aU details and hints/warnings given in the detailed report!
Date:
Design values [lb]
Load Capacity
7870 8532
IW !;______
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
5/15/2015
Utilization
J3N I (Jv [%] Status
93/-OK
-/-
Utilization I!N.v [%] Status
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facillty. The Software serves only as an aid lo interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular. you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in eaGh case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
lv
www.hilti.us Profis Anchor 2.5.2
Company: Page: 1
Specifier:
Address:
Project:
Sub-Project l Pos. No.:
VERIZON -CASSIA
Phone I Fax: Date: 5/15/2015
E-Mail:
Specifier's comments: H14 ANCHOR ON PERIMETER GRADE BEAM
1 Input data
Anchor type and diameter:
Effective embedment depth:
Material:
Evaluation Service Report:
Issued I Valid:
Proof:
Stand-off installation:
Anchor plate:
Profile:
Base material:
Installation:
Reinforcement:
Seismic loads (cat. C, D, E, or F)
Geometry [in.] & Loading [lb, in.lb]
HIT ·HY 200 + HAS 1
hei.act ""20.000 in. (het.limit =-in.)
5.8
ESR-3187
1/1/201513/1/2016
Design method AC1318-08/ Chem
eb = 0.000 in. (no stand-off); t = 0.135 in.
·------------------
lx x ly x t = 4.000 in. x 4.000 in. x 0.135 in.; (Recommended plate thickness: not calculated)
no profile
cracked concrete, 2500, t.; = 2500 psi; h = 24.000 in., Temp. short/long: 32/32 "F
hammer drilled hole, Installation condition: Dry
tension: condition 8, shear: condition B; no supplemental splitting reinforcement present
edge reinforcement: > No. 4 bar
yes (D.3.3.5)
z:
~t 8.
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor {c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.us
Company:
Specifier:
Page:
Project:
Profis Ancho·r 2.5.2
2
VERIZON -CASSIA
Address: Sub-Project I Pos. No.:
Phone I Fax:
E-Mail:
2 Proof I Utilization (Governing Cases)
Loading
Tension
Shear
Loading
Proof
Concrete Breakout Strength
Combined tension and shear loads
3 Warnings
• Please consider all details and hints/warnings given in the detailed report!
Date:
Design values [lb]
Load Capacity
12000 12569
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
5/15/2015
Utilization
PH lfhr [%]
961-
-/-
Utilization JJN.v [%]
. Status OK ____ _
Status
• Any and all information and data contained in the Software concern solely the use of Hifti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to UISing
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a CUIIpable breach of duty by you.
Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROF IS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilli is a registered Trademark of Hilti AG. Schaan
www.hilti.us Profis Anchor 2.5.2
Company: Page: 1
Specifier: Project: VERIZON ·CASSIA
Address: Sub-Project I Pos. No.:
Phone I Fax: Date: 5/15/2015
E-Mail:
Specifier's comments: H8 ANCHORS AT PERIMETER BEAMS
1 Input data
Anchor type and diameter:
Effective embedment depth:
Material:
Evaluation Service Report:
Issued I Valid:
Proof:
Stand-off installation:
Anchor plate:
Profile:
Base material:
Installation:
Reinforcement:
Seismic loads (cat. C, D, E, or F)
Geometry [in.] & Loading [lb, in.lb]
HIT -HY 200 + HAS 718
het,act = 12.000 in. (het,limit =-in.)
5.8
ESR-3187
1/1/2015 13/1/2016
Design method ACI 318-08/ Chern
-------------------------------
eb = 0.000 in. {no stand-off); t = 0.135 in.
I, x ly x t = 4.000 in. x 4.000 in. x 0.135 in.; (Recommended plate thickness: not calculated)
no profile
cracked concrete, 2500, fc' = 2500 psi; h = 24.000 in., Temp. short/long: 32/32 "F
hammer drilled hole, Installation condition: Dry
tension: condition B, shear: condition 8; no supplemental splitting reinforcement present
edge reinforcement: > No. 4 bar
yes (0.3.3.5)
z:
Input data and results must be checked for agreement with !he existing conditions and for plausibility!
PROFIS Anchor (c) 2003·2009 Hilti AG, FL-9494 Schaan Hiltlts a registered Trademark of Hilti AG, Schaan
www.hilti.us
Company:
Specifier:
Page:
Project:
Profis Anchc.r 2.5.2
2
VERIZON -CASSIA
Address: Sub-Project I Pos. No.:
Phone I Fax:
E-Mail:
2 Proof I Utilization (Governing Cases)
Loading
Tension
Shear
loading
Proof
Concrete Breakout Strength
Combined tension and shear loads
3Warnings
llN
• Please consider all details and hints/warnings given in the detailed report!
Date:
Design values [lb]
load Capacity
5645 8622
fW --~
Fastening meets the design criteriaf
4 Remarks; Your Cooperation Duties
5/15/2015
Utilization
llN lllv [%] Status
66/-OK
-I-
Utilization !lN.v [%] Status
• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore. you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific
application.
You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilli on a regular basis. If you do not use
the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case
by carrying out manual updates via the Hilti Website. Hiiti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.
--~--"~·~------
Input dala and results must be checked for agreement with the existing conditions and for plausibility!
PROF IS Anchor (c) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
Dunn Savoie Inc.
Structural Engineering
908 S. Cleveland St., Oceanside, Ca 92054
Ph: (760) 966-6355 Fax: (760) 966-6360
E-mail: dsi@surfdsi.com
H 't!IA'/ -r p /-< •' 1 J ti-r 0 -:' g.S
~ IOO o '' r~ --]'70 A )0-~
0\~'j t-j-/. & '/-'j "I --rz o r ~ 1 v f\ev
~b::: 2700 f' ) S',y 't
v\f'r?1tov-cA<?S\fr\ JOB ________________________________ _
CHECKED BY _____________ DATE-----------
SCALE-----------------------------------
!'/; r -z' 2; ?' ~.::; t L,.. )'! .-/ I
\ \n
c ~l-1 (2. .::; (' (./ . ~:7\.:-~
1. ~& '?; \n
t1 k \_;,\_ 0 '(V '( b ,.-11 CJO 'f' -"::· ~ Y. t') l :)I_,; \I}
i ~
I I L-.? ----...._
PROJiJCT 207
Appendix A
Design Values Load Chart for FRP Materials
ALLOWABLE STRENGTH TABLE FOR FRP SHAPES: Tubes, Channels, Angles
Property Direction Value Units
Tensile Strength Lengthwise 6,600 Pounds per square
Crosswise 1,500 inch (psi)
Compressive Lengthwise 6,600 psi
Strength Crosswise 3,300
Flexural Strength Lengthwise 6,600 psi
Crosswise ~~~!~Do~~ ~~ ' -·<'·11;.,
Flexural Modulus Lengthwise 1,600,000 s psi
Crosswise 800,000
Shear Strength Lengthwise 1.400 psi
Crosswise 500
Modulus of Lengthwise 2,800,000 psi
Elasticity Crosswise
1/2" Bolt Bearing Lengthwise 6,000 psi
Crosswise 3,600
1/2" Bolt Shear Allowable 780 lbs
112" Bolt Tension Allowable 300 lbs
Table Notes:
I) Values based on 1525 series-Thermoset Polyester Class 1 FR (Slate Grey)
2) A Safety Factor of 5.0 has been used to determine Allowable Loads.
ALLOWABLE STRENGTH TABLE FOR FRP FLAT SHEETS:
Property Direction Value Units
Tensile Strength Lengthwise 4,000 Pounds per square
Crosswise 2,500 inch (psi)
Compressive Lengthwise 4,800 psi
Strength Crosswise 3,200
Flexural Strength Lengthwise 7,000 psi
Crosswise 3,000
Flexural Modulus Lengthwise 2,000,000 psi
Crosswise 1,100,000
Modulus of Lengthwise 2,800,000 psi
Elasticity Crosswise
Table Notes:
1) Values based on 1625 series -Thermoset Vinyl Ester Class 1 FR (Beige)
~) A Safety Factor of 5.0 has been used to detem1ine Allowable Loads.
Hi-Tech Composite Structures
Supplement for LARR #25520
Page 1 of I
• "' l •
• ... • .I
0 "" I .....
. " ,I •
KEY PLAN
13'-o'
,.._, 1{2" 4'-l 1/'2"
----®
c..--....-~ f)'if\~"\ j
O§.t ~·· PLATFORM FRAMING PLAN
(LEVEL-F) 1110111.11:1111'•1'·11'
f·-1
Dunn Savoie Inc.
Structural Engineering
908 S. Cleveland St., Oceanside, Ca 92054
Ph: (760) 966-6355 Fax: (760) 966-6360
E-mail: dsi@surfdsi.com
iA
1\-'\ V\IJ I f (c A '
>...i -., z ,.c I
~ I
1\..-/,;p !A
~:;, }b?
O(
'2-/t..-1 y.
-----~---·--------
Vff2'11-o1u-CAss: A JOB---------~---------------
OF __________ _
DATE ?/II/ !5
'
CHECKED BY _______ _ _ DATE
SCALE------------
r-1 ' l
\
~-------------------------------------------------------------------------------·-----
CONSTRUCTION:
MATERIAL:
Welded
stot:i GRATE Powder
HEIGHTS:
WIDTHS:
LENGTHS:
BAR THICKNESS:
1·3{1.6" Bearing Bar Centers
' Measure from the center ol one bar to the center of
the adjacent bearing bar.
Welded bearing and 1/4" square
twisted cross bars ·
Plain Steel
GRATE COAT® Powder
Coated Black"
HD Galvanized Steel
Stainless Steel Type 304 tmiil nnishl
sandblast optional
3/4" to 2-1/2"
See panel width chart
20' STOCK or cut-to-size
1/8" or 3116"
·stack powder coat provides superior durable and uniform finish for interior appl/cauons.
Bar
Spacing
Be a ring Bar Size
3/4"x 118"
3/4" x3/16"
i"x 1/8"
1' X 3/16"
1-1/4" X 1/8"
1-1/4" X 3/16'
1-1/2" X 118"
H/2"x 3116'
1·314" X 3/16"
2" X 3/16"
2·1/4" X 3/16'
2·1/2'x3/16'
.. .. , .. .. a···· m···
Item No. #/SF Item No. #/SF
GAA-75A 4.4 GBB·75A 4.6
GAA-75 5.7 GBB-75 6.4
GAA-100A 5.2 GBB-100A 6.0
GAA-100 7.5 GBB-100 8.3
GAA-125A 6.3 GBB·125A 7.1
GAA-125 9.1 GBB-125 9.9
GAA·150A 7.6 GBB·150A 8.7
GAA-150 11.0 GBB-150 12.1
GAA-175 12.7 GBB-175 13.8
GAA-200 14.3 GBB-200 15.4
GAA-225 16.0 GBB-225 17.1
GAA-250 17.7 GBB-250 18.8
MATERIAL: Plain or HD Galvani;!ed,
Painted steel, Aluminum
Stainless Steel -Mill Finish
CONSTRUCTION:
McNICHDLS0 Press-Locked Steel
Grating cross bars are pressed into the
bearing bars flush top under tremendous
pressure laterally displacing 1/16" of cross
bar material into the "dovetail" slot, assur-
ing firm, rigid connections. Deep 1cross
bars are used for lateral support. The
main bars are not cut, punched or other-
wise deformed below the neutral axis and
therefore can resist up to the yielcl stress
for the full cross-section of the bars.
II
tt .... .,. . m
Item No. ii/SF Item No. ¥/SF
GCC-75A 4.8 GD0-75A 5.5
GCC-75 7.0 GD0-75 7.7
GCC-100A 6.4 G00·100A 7.2
GCC-100 9.3 GDD-100 10.1
GCC-125A 7.9 GOD-125A 8.7
GCC-125 11.3 GDD-125 12.2
GCC-150A 9.5 GDD-150A 10.6
GCG-150 13.7 GDD-150 14.8
GCG-175 15.8 GOD-175 16.9
GCC-200 17.9 GDD-200 19.0
GCC·225 20.0 GOD-225 21.1
GCC·250 22.1 GDD·250 23.2
Available by
specialarder!
Not recommended
for wheel traffic or
barefoot pedestrian.
Visit mcnicliols.com
and enter webcode
for more Jlfoduct
information.
Unit SlreSs 18,000
lbspersq. inch
U -Uniform Load·
Poumlsper Sq Ft
0 • DeHecuon
In lnctles c · Conoentoateo
l-----t-7;-t-"'E'H-~*-IH~h~-t-''*'lH-"*-H--'7iriH--"i-;;;HI--':'*H ~~:~:~~~~~'
at mitlspan
Our website now in English and Spanish!
BEAM 1, PLATFORM FRAMING PLAN (LEVEL -F)
CODE REFERENCES
Calculations per AISC 360-10, IBC 2012, ASCE 7-10
Load Combination Set: ASCE 7-10
Mat~i~LPr~p~_rties ___ ·----
Analysis Method : Allowable Strength Design
Beam Bracing : Beam bracing is defined Beam-by-Beam
Bending Axis : Major Axis Bending
Load Combination ASCE 7-10
Fy : Steel Yield :
E: Modulus:
36.0 ksi
29,000.0 ksi
Unbraced Lengths
Span# 1, Braced @ 1/3 Points ···------------------------------~-----
C8x11.5
-~pplied Loads---~---Service loads entered. Load Factors will be applied for calculations.
Beam self weiQht NOT internally calculated and added
Uniform Load: 0 = 0.040, L = 0.040 ksf, Tributary Width= 4.0 fl. (FLOOR DEAD AND LIVE
Point Load : W = 1.698 k @3.0 ft, (WIND FORCE FROM BRACE:
Point Load : W = 1.698 k @10.0 ft, (WIND FORCE FROM BRACE:
DESIGN SUMMARY
Maxlmum8€)nd"lr198fress Ratio-;-o.s1s: 1
Section used for this span C8x11.5
Ma: Applled 8.207k-ft
Mn I Omega : Allowable 15.815 k-ft
0.114:1
C8x11.5
2.584 k
22.764 k
Load Combination +D-tD.750Lr-tD.750L -t{).450W+H
Location of maximum on span 6.500ft
Span# where maximum occurs Span# 1
Maximum Shear Stress Ratio =
Section used for this span
Va: Applied
Vn/Omega :Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
+D-tD.750Lr-tD.750L -tD.450W;·H
0.000 ft
Span# 1
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.185 in Ratio=
0.000 in Ratio=
0.276 in Ratio=
0.000 in Ratio =
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios
Span# M v Mmax+ Mmax-
Dsgn. L = 4.29ft 0.173 0.046 2.99
Dsgn. L = 4.36ft 0.213 0.016 3.38 2.99
Dsgn. L= 4.36 II 0.174 0.046 3.01
+O+l+H
Dsgn. L = 4.29 ft 0.346 0.091 5.98
Dsgn. L = 4.36 ft 0.426 0.031 6.76 5.98
Dsgn. L = 4.36 ft 0.348 0.091 6.02
+O+lr+H
Dsgn. L = 4.29 ft 0.173 0.046 2.99
Dsgn. L= 4.36 II 0.213 0.016 3.38 2.99
Dsgn. L= 4.36 f1 0.174 0.046 3.01
+O+S+H
Dsgn. L = 4.2911 0.173 0.046 2.99
Dsgn. L = 4.36 II 0.213 0.016 3.38 2.99
Dsgn. L= 4.361'1 0.174 0.046 3.01
+0+0.750Lr+0.750L+H
Dsgn. L = 4.2911 0.302 0.080 5.23
Dsgn. L = 4.36fl 0.373 0.027 5.92 5.23
Dsgn. L = 4.36 ft 0.305 0.080 5.27
844
0 <360
566
0 <180
Summary of Moment Values
Ma·Max Mnx Mnx/Omega Cb Rm
2.99 28,89 17.30 1.47 1.00
3.38 26.51 15.88 1.01 1.00
3.01 28.89 1730 1.45 1.00 ~
5.98 28.89 17.30 1.47 1.00
6.76 26.51 15.88 1.01 1.00
6.02 28.89 17.30 1.45 1.00
2.99 28.89 17.30 1.47 1.00
3.38 26.51 15.88 1.01 1.00
3.01 28.89 17.30 1.45 1.00
2.99 28.89 17.30 1.47 1.00
3.38 26.51 15.88 1.01 1.00
3.01 28.89 17.30 1.45 1.00
5.23 28.89 17.30 1.47 1.00
5.92 26.51 15.88 1.01 1.00
5.27 28.89 17.30 1.45 1.00
Summary of ShElar Values
VaMax Vnx Vnx/Omega
1.04 38.02 22.76
0.35 38.02 22.76
1.04 38.02 22.76
2.08 38.02 22.76
0.71 38.02 22.76
2.08 38,02 22.76
1.04 38.02 22.76
0.35 38.02 22.76
1.04 38.02 22.76
1.04 38.02 22.76
0.35 38.02 22.76
1.04 38.02 22.76
1.82 38.02 22.76
0.62 38.02 22.76
1.82 38.02 22.76
Description : BEAM 1, PLATFORM FRAMING PLAN (LEVEL· F)
Load Combination Max Stress Ratios
Segment Length Span# M v Mmax+ Mmax-
+D-+0.750L -+0. 750S+H
Dsgn. L = 4.29 ft 0.302 0.080 5.23
Dsgn. L = 4.36 fl 0.373 0.027 5.92 5.23
Dsgn. L = 4.36!1 0.305 0.080 5.27
+D-+0.60W+H
Dsgn. L = 4.2911 0.349 0.090 6.05
Dsgn. L = 4.36!1 D.408 0.016 6.44 6.05
Dsgn. L= 4.36!1 0.351 0.090 6.07
+1.1120-+0.?0E+H
Dsgn. L= 4.29ft 0.192 0.051 3.32
Dsgn. L = 4.36 ft 0.237 0.017 3.76 3.32
Dsgn. L = 4.36!1 0.194 0.051 3.35
+D+0.750Lr+0.750L+0.450W+H
Osgn. L= 4.29ft 0.435 0.114 7.52
Dsgn. L = 4.36ft 0.519 0.027 8.21 7.52
Dsgn. L= 4.36ft 0.437 0.114 7.56
+D-+0. 750L -+0.750S-+0.450W+H
Osgn. L= 4.29ft 0.435 0.114 7.52
Osgn. L = 4.36ft 0.519 0.027 8.21 7.52
Dsgn. L= 4.36 ft 1 0.437 0.114 7.56
+1.0840-+0 .750L -+0. 750S-+0.5250E+H
Dsgn. L = 4.29ft 1 0.317 0.084 5.48
Dsgn. L= 4.36ft 1 0.390 0.028 6.20 5.48
Dsgn. L= 4.36ft 1 0.319 0.084 5.52
+0.60D-+0.60W-+0.60H
Dsgn. L = 4.29 ft 0.280 0.072 4.85
Dsgn. L= 4.36ft 0.323 0.009 5.08 4.85
Osgn. L = 4.36ft 0.281 0.072 4.86
-+0.4880D-+0.70E-+0.60H
Dsgn. L = 4.29 f1 0.084 0.022 1.46
Dsgn. L = 4.3611 0.104 0.008 1.65 1.46
Dsgn. t. = 4.36ft 0.085 0.022 1.47
Overall Maximum Deflections
'"""'"-' -"----·~~--·-
File ., U:\hgabilan\shared\Booth & Suarez (Hisrone)\Verlzon • Gassia\CALCS\cassia.ec6
ENERCALC,INC.1983-2015, Build:6.15.4.10, Ver:6.15.4.10
• • 8 ' 0
Summary of Moment Values Summary or Shear Values
Ma-Max Mnx Mnx/Omega Cb Rm VaMax Vnx Vnx/Omega
5.23 28.89 17.30 1.47 1.00 1.82 38.02 22.76
5.92 26.51 15.88 1.01 1.00 0.62 38.02 22.76
5.27 28.89 17.30 1.45 1.00 1.82 38.02 22.76
6.05 28.89 17.30 1.40 1.00 2.06 38.02 22.76
6.44 26.33 15.77 1.01 1.00 0.35 38.02 22.76
6.07 28.89 17.30 1.37 1.00 2.06 38.02 22.76
3.32 28.89 17.30 1.47 1.00 1.16 38.02 22.76
3.76 26.51 15.88 1.01 1.00 0.39 38.02 22.76
3.35 28.89 17.30 1.45 1.00 1.16 38.02 22.76
7.52 28.89 17.30 1.43 1.00 2.58 38.02 22.76
8.21 26.41 15.81 1.01 1.00 0.62 38.02 22.76
7.56 28.89 17.30 1.40 1.00 2.58 38.02 22.76
7.52 28.89 17.30 1.43 1.00 2.58 38.02 22.76
8.21 26.41 15.81 1.01 1.00 0.62 38.02 22.76
7.56 28.89 17.30 1.40 1.00 2.58 38.02 22.76
5.48 28.89 17.30 1.47 1.00 1.91 36.02 22.76
6.20 26.51 15.88 1.01 1.00 0.65 38.02 22.76
5.52 28.89 17.30 1.45 1.00 1.91 38.02 22.76
4.85 28.89 17.30 1.38 1.00 1.64 38.02 22.76
5.08 26.31 15.75 1.01 1.00 0.21 38.02 22.76
4.86 28.89 17.30 1.36 1.00 1.64 38.02 22.76
1.46 28.89 17.30 1.47 1.00 0.51 38.02 22.76
1.65 26.51 15.88 1.01 1.00 0.17 38.02 22.76
1.47 28.89 17.30 1.45 1.00 0.51 38.02 22.76
Load Combination Span Max. •.• Deft Location in Span Load Combination Max. "+'Deft Location in Span
+O-t{).750L -+0.750S+0.450W-tH 1 0.2756 6.565 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support2
Overall MAXimum 2.584 2.584
Overall MINimum 0.624 0.624
+D+H 1.040 1.040
+D+L+H 2.080 2.080
+D+Lr+H 1.040 1.040
+D+S+H 1.040 1.040
+D+0.750Lr+0.750L +H 1.820 1.820
+D+O. 750L +0. 750S+H 1.820 1.820
+D+0.60W+H 2.059 2.059
+0-+0.?0E+H 1.040 1.040
+D-+0.750Lr+0.750L-+0.450W+H 2.584 2.584
+0-+0. 750L +0. 750S-+0.450W+H 2.584 2.584
+0+0.750L -+0.750S-+0.5250E+H 1.820 1.820
-+0.60D-+0.60W+0.6DH 1.643 1.643
+0.600+0.70E-+0.60H 0.624 0.624
DOnly 1.040 1.040
Lr Only
LOnly 1.040 1.040
SOnly
WOnly 1.698 1.698
EOnly
H Only
Description: PLATFORM FRAMING PLAN (LEVEL-F)
Wood Beam Design : BEAM 2
Calculations per 2012 NOS, IBC 2012, CBC 2013, A.SCE 7·10 ·-------BEAM Size: 6x10, Sawn, Fully Unbraced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species : Douglas Fir-Larch Wood Grade : No.1
Fb-Tension 1,350.0 psi Fe-Prll 925.0 psi Fv 170.0 psi Ebend-xx
Fb-Compr 1,350.0 psi Fe-Perp 625.0 psi Ft 675.0 psi Eminbend-xx
Applied Loads
Unif Load: 0 = 0.040, L = 0.040 klft, Trib= 6.50 ft
Unif Load: D = 0.0090 klft, Trib= 3.250 fl
Unif Load: 0 = 0.0080 klft, Trib= 8.20 fl
Point: W = 1.698 k @ 1.50 ff
Point: W = 1.698 k @ 6.50 ft
Design Summary
M~~ ~~fu~1 ~atio = 804~3~9p~f 1at 4.000 ft in Span# 1
Fb :Allowable : 1,345.83 psi
Load Comb : +D+O. 750Lr+O. 750L +0.450W+H
Max fv/FvRatio = 0.429: 1
1,600.0 ksi
580.0ksi
fv: Actual : 72.87 psi at 0.000 ft in Span# 1 8.0 ft, 6x10
Density 31.20pcf
Fv: Allowable: 170.00 psi
Load Comb: +D+0.750Lr+0.750L+0.450W+H ~--,Mca~xRD=efl~e~ct~io~n~s--------------------------
Max Reactions (k) .Q l. .br ~ Y!1.. !:!
Left Support 1.42 1.04 1.70
Right Support 1.42 1.04 1. 70
Wood Beam Design : BEAM 3
Downward L +Lr+S
Upward L +Lr+S
Live Load Defl Ratio
0.054 in Downward Total
0.000 in Upward Total
1788 >360 Total Defl Ratio
0.105 in o.ooo in
9'12 >180
Calculations per 2012 NOS, IBC 2012, CBC 2013, .A.SCE 7-10
BEAM Size : 6x8, Sawn, Fully Unbraced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species : Douglas Fir-Larch Wood Grade : No.1
Fb-Tension 1,350.0 psi Fe-Prll 925.0 psi Fv 170.0 psi Ebend-xx 1,600.0 ksi Density
Fb-Compr 1,350.0 psi Fe-Perp 625.0 psi Ft 675.0 psi Eminbend-xx 580.0 ksi
Applied Loads
Unif Load: D = 0.0520 klft, Trib= 4.250 ft
Design Summary
Max fb/Fb Ratio 0.340: 1
fb : Actual : 457.55 ps1 at 4.000 ft in Span# 1
Fb: Allowable: 1,346.75 psi
Load Comb: +1.112D+0.70E+H
Max fv/FvRatio = 0.178: 1 fv : Actual : 30.26 psi at 0.000 ft in Span # 1
Fv: Allowable: 170.00 psi
Load Comb: +1.112D+0.70E+H
Max Reactions (k) .Q l. l.!: ~ ':!f. .E
Left Support 0.88
Right Support 0.88
Downward L+Lr+S 0.000 in Downward Total
Upward L+Lr+S 0.000 in Upward Total
Live Load Defl Ratio ::J99999 >360 Total Defl Ratio
31.20 pcf
0.066 in
0.000 in
14SO >180
Dunn Savoie Inc.
Structural Engineering
908 S. Cleveland St., Oceanside, Ca 92054
Ph: (760) 966-6355 Fax: (760) 966-6360
E-mail: dsi@surfdsi.com
Wl--!f,'/ c:: .1 f:?f ?"
--;: 1,:::::: 1--' 0 ib;ff:T
\\Z'j "
y -""7 '·/'
()J MA f ~ L 1 0 p sF D (
'-·
S?O \bjf~
A'f -(" f) lb j{
zt., c~ z.J [) -1
I'
CALCULATED BY ___ -_1 _··-----DATE ____ _§_)_!:_~------
SCALE----------------·-----------·-·-·--------··-
Q.(p
'\
)
y
fl
1 G.
~~7 \bs
i o·\ cf d.-0"'
y ljco / \If"~ At ~ (1 7 \b--vi . ' \
1?( 4 ~c,
KEY PLAN
u c 0
';, c
" 0 :!:
"' ~ :::> I!'
w
TOWER DECK FRAMING PLAN
(LEVEL-D)
Description : TOWER DECK FRAMING PLAN (LEVEL-_0_,_)~~~~-----~----------
Wood Beam Design : TYPICAL FJ
Calculations per 2012 NDS, IBC 2012, CBC 2013, ASCE 7-10
BEAM Size: 2x12, Sawn, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species : Douglas Fir -Larch Wood Grade : No.2
Fb-Tension 900.0 psi Fe-Prll 1,350.0 psi Fv 180.0 psi Ebend-xx 1,600.0 ksi
580.0ksi
Density
Fb-Compr 900.0 psi Fe-Perp 625.0 psi Ft 575.0 psi Eminbend-xx
Applied Loads
Beam self weight calculated and added to loads
Unif Load: D = 0.0160, L:: 0.040 kffl, Trib= 1.330 ft
Point: 0 = 0.2190 k@ -0.750 ft
Point: D = 0.0870 k@ -0.750 ft
Point: 0 = 0.3460, L = 0.3460 k @ -0.750 ft
Design SummarY
Max fb/Fb Ratio = 0.450; 1
fb : Actual : 465.78 psr at 6.615 ft in Span # 2
Fb : Allowable : 1 ,035.00 psi
Load Comb : +D+L +H, LL Comb Run (*L)
Max fv/FvRatio = 0.522: 1
fv: Actual: 93.92 psi at 0.750 ft in Span# 1
Fv: Allowable: 180.00 psi
Load Comb: +D+L+H, LL Comb Run (LL)
Max Reactions (k} .Q b br ~ '!1. £
Left Support 0.86 0.73 Right Support 0.11 0.33
Wood Beam Design: FJ1
Downward L +Lr+S
Upward L +Lr+S
Live Load Dell Ratio
0.095 in Downward Total
-0.019 in Upward Total
970 >360 Total Defl Ratio
31.20 pcf
0.112 in
-0.017 in
1030 >180
Calculations per 2012 NDS, IBC2012, CBC 2013, ASCE 7-10
BEAM Size: 2-2x12, Sawn, Fully Unbraced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species : Douglas Fir-Larch Wood Grade : No.2
Fb-Tension 900.0 psi Fe-Prll 1,350.0 psi Fv 180.0 psi Ebend-xx 1,600.0ksi
580.0ksi
Density
Fb-Compr 900.0 psi Fe-Perp 625.0 psi Ft 575.0 psi Eminbend-xx
Applied Loads
Unif Load: D = 0.0160, L = 0.040 klft, Trib= 2.50 ft
Design Summary
Max fb/Fb Ratio 0.134: 1
fb :Actual : 119.47 psi at 3.000 fl in Span# 1
Fb: Allowable: 894.15 psi
Load Comb : +D+L +H
Max fv/FvRatio = 0.072: 1 fv: Actual: 12.94 psi at 5.080 ft in Span# 1
Fv: Allowable: 180.00 psi
Load Comb : +D+L +H
Max Reactions (k) .Q b
Left Support 0.12 0.30
Right Support 0.12 0.30
Wood Beam Design : FJ2
1:!
Max Deflections
Downward L +Lr+S
Upward L +Lr+S
Live Load Dell Ratio
6.0 ft. 2-2x12
0.005 in Downward Total
0.000 in Upward Total
13987 >360 Total Defl Ratio
31.20pcf
0.007 in
0.000 in
9991 >180
Calculations per 2012 NDS, IBC 2012, CBC 2013, ASCE 7·10
2-2x12, Sawn, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations. Major Axis Bending
BEAM Size:
Wood Species : Douglas Fir-Larch Wood Grade : No.2
Fb-Tension 900.0 psi Fe-Prll 1,350.0 psi Fv 180.0 psi Ebend-xx
Fb -Compr 900.0 psi Fe-Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Applied Loads
Beam self weight calculated and added to loads
Unif Load: D = 0.0160, L = 0.040 k/ft, Trib= 1.330 ft
Point: D = 0.2190 k@ -0.750 ft
Point: D = 0.0870 k@ -0.750 ft
Point: D = 0.3460, L = 0.3460 k@ -0.750 ft
Point: 0=0.120, L=0.30k@5.0ft
Point D = 0.120, L = 0.30 k@ 8.0 ft
1,600.0 ksi
580.0ksi
Density 31.20 pcf
Design Summarv
Max fb/Fb Ratio =
fb: Actual: Fb : Allowable :
Load Comb:
Max fv/FvRatio = fv: Actual:
Fv : Allowable :
Load Comb:
0.592.: 1
612.43 ps1 at 6.309 ft in Span# 2
1 ,035.00 psi
+D+L+H, LL Comb Run (*L)
0.262: 1 47.08 psi at 0.750 ft in Span# 1
180.00 psi
+D+L +H, LL Comb Run (L *)
Q 1 h!: §. '11. Max Reactions (k)
Left Support Right Support 1.00 1.02 0.26 0.62
J:! Downward L +Lr+S
Upward L +Lr+S
Live Load Den Ratio
12.250 ft, 2-2x12
0.112 in Downward Total
-0.021 in Upward Total
838 >360 Total Defl Ratio
0.14!9 in
-0.0216 in
696 >180
BEAM 4, TOWER DECK FRAMING PLAN (LEVEL-D)
C_O_DE_R_E_Ff::RE=N-'-'C ____ E----5 ________ ~
Calculations per NOS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-10
Fb-Tension
Fb-Compr
Fe-Prll
2,900.0psi
2,900.0psi
2,900.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
: ilevel Truss Joist Fe-Perp
: Parallam PSL 2.0E Fv
Ft
: Beam is Fully Braced against lateral-torsion buckling
Span= 0.750 It Span= 12.250 ft
750.0psi
290.0 psi
2,025.0 psi
Ebend-xx 2,000.0ksi
Eminbend-xx 1,016.54ksi
Density 45.050pcf
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Load for Span Number 1
Uniform Load : D = 0.0090 ksf. Tributary Width= 8.750 ~.(INTERIOR WALLS
Uniform Load ; D = 0.040, L = 0.040 ksf, Tributary Width= 6.50 ft, (STEEL PLATFORM
Uniform Load : D = 0.0080 ksf, Tributary Width= 8.20 ft, (FRP SCREENWALL
Point Load : D = 0.05250 k cal 0.0 ft, (INTERIOR WALLS:
Point load : D = 0.1730, L = 0.1730 k cal 0.0 ft, (STEEL PLATFORM'
Point Load : D = 0.0440 k cal 0.0 ft. (FRP SCREENWALL:
Point Load : W = -0.820 k cal 0.0 ft. (SHEARWALL UPLIFT:
load for Span Number 2
Uniform Load : 0 = 0.0090 ksf, Tributary Width= 8.750 fl. (INTERIOR WALLS
Uniform Load: D = 0.040, L = 0.040 ksf, Tributary Width= 6.50 ft, (STEEL PLATFORM
Uniform Load : D = 0.0080 ksf, Tributary Width= 8.20 ft, (FRP SCREENWALL
Point Load : W = 0.820 k cal 0.0 ft, (SHEARWALL UPLIFT;
~SIGN SL!.MM~RY__ •
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
0.702 1
3.5x11.25
2,037.22psi
2,900.00psi
+O+L +H, LL Comb Run (*L)
6.159f!
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
FB : Allowable
load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Span# 2
0.160 in Ratio=
-0.031 in Ratio;=
0.410 in Ratio=
-0.079 in Ratio=
Fv : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
918
578
358
228
M~imt~m Forces & Stres~es for Load Combinations --·---· .. ·----------
0.47'1 : 1
3.5x11.25
136.58 psi
290.00 psi
+D+l +H, LL Comb Run (Ll.)
0.750ft
" Span# 1
.. 9
Description : BEAM 4, TOWER DECK FRAMING PLAN (LEVEL· D)
Load Combination Max Stress Ratios Moment Values Shear Values
----~
Segment Length Spart# M v cd C FN ci Cr Cm c t CL M fb v rv F'v
+D+H 0.00 0.00 0.00 0.00
Length = 0. 750ft 0.020 0.322 0.90 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 2610.00 2.21 84.09 261.00
Length = 12.250 ft 2 0.477 0.322 0.90 1.000 1.00 1.00 1.00 1.00 1.00 7.66 1,244.53 2610.00 2.21 811.09 261.00
+O-tt +H, LL Comb Rurt ('L) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 O.D18 0.469 1.00 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 2900.00 3.57 135.95 290.00
Length = 12.250 It 2. 0.702 0.469 1.00 1.000 1.00 1.00 1.00 1.00 1.00 12.53 2,037.22 2900.00 3.57 135.95 290.00
-+O+L +H, LL Comb Run (L') 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 It 1 0.029 0.292 1.00 1.000 1.00 1.00 1.00 1.00 1.00 0.52 84.88 2900.00 2.22 84.72 290.00
Length = 12.250 ft 2 0.424 0.292 1.00 1.000 1.00 1.00 1.00 1.00 1.00 7.56 1,228.29 2900.00 2.22 811.72 290.00
+O-tt +H, Ll Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.029 0.471 1.00 1.000 1.00 1.00 1.00 1.00 1.00 0.52 811.88 2900.00 3.59 136.58 290.00
Length = 12.250 ft 2 0.697 0.471 1.00 1.000 1.00 1.00 1.00 1.00 1.00 12.43 2,020.82 2900.00 3.59 136.58 290.00
+D+Lr+H, LL Comb Run ('L) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.014 0.232 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 3625.00 2.21 811.09 362.50
Length = 12.250 ft 2 0.343 0.232 1.25 1.000 1.00 1.00 1.00 1.00 1.00 7.66 1,244.53 3625.00 2.21 84.09 362.50
..U+Lr+H, LL Comb Run (L*) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 o_oo 0.00
Length = 0.750 ft 1 0.014 0.232 1.25 1.000 1.00 1.00 1.00 1_00 1.00 0.32 51.90 3625.00 2.21 84.09 362.50
Length = 12.250 ft 2 0.343 0.232 1.25 1.000 1.00 1.00 1.00 1.00 1.00 7.66 1,244.53 3625.00 2.21 811.09 362.50
+0-ti..r+H, LL Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.014 0.232 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 3625.00 2.21 811.09 362.50
Length= 12.250 ft 2 0.343 0.232 1.25 1.000 1.00 1.00 1.00 1.00 1.00 7.66 1,244.53 3625.00 2.21 84.09 362.50
+D+S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 0.016 0.252 1.15 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 3335.00 2.21 84.09 333.50
Length= 12.250 ft 2 0.373 0.252 1.15 1.000 1.00 1.00 1.00 1.00 1.00 7.66 1,244.53 3335.00 2.21 84.09 333.50
-+04{).750Lr..0.750L +H, LL Comb R1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 It 1 0.014 0339 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 3625.00 3.23 122.98 362.50
Length= 12.250 It 2 0.507 0.339 1.25 1.000 1.00 1_00 1.00 1.00 1.00 11.31 1,839.05 3625.00 3.23 122.98 362.50
+04{).750Lr..0.750L +H. LL Comb R1 1.000 1.00 1.00 1.00 1.00 1_00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.021 0.233 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.47 76.63 3625.00 2.22 84.57 362.50
Length = 12.250 ft 2 0.340 0.233 1.25 1.000 1.00 1.00 1.00 1.00 1.00 7.58 1,232.34 3625.00 2.22 84.57 362.50
..U..0.750Lr4{).750L +H, LL Comb R1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.021 0.341 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.47 76.63 3625.00 3.24 123.46 362.50
Length= 12.250 It 2 0.504 0.341 1.25 1.000 1.00 1.00 1.00 1.00 1.00 11.24 1,826.75 3625.00 3.24 123.46 362.50
-+04{).750L+0.750S+H, LL Comb Rl 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length " 0.750 ft 1 0.016 0.369 1.15 1.000 1.00 1.00 1.00 1.00 1.00 0.32 51.90 3335.00 3.23 122.98 333.50
Length = 12.250 ft 2 0.551 0.369 1.15 1.000 1.00 1.00 1.00 1.00 1.00 11.31 1,839.05 3335.00 3.23 122.98 333.50
+D+0.750L 4{). 750S+H, lL Comb Rl 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 It 1 0.023 0.254 1.15 1.000 1.00 1.00 1.00 1.00 1.00 0.47 76.63 3335.00 2.22 811.57 333.50
Length = 12.250 It 2 0.370 0.254 1.15 1.000 1.00 1.00 1.00 1.00 1.00 7.58 1,232.34 3335.00 2.22 84.57 333.50
..U4{).750L 4{).750S-+t!, LL Comb Rt 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750ft 1 0.023 0.370 1.15 1.000 1.00 1.00 1.00 1.00 1.00 0.47 76.63 3335.00 3.24 123.46 333.50
Length = 12.250 ft 2 0.548 0.370 1.15 1.000 1.00 1.00 1.00 1.00 1.00 11.24 1,826.75 3335.00 3.24 123.46 333.50
+04{).60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.002 0.179 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.06 9.66 4640.00 2.18 82.95 464.00
Length= 12.250 ft 2 0.275 0.179 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.84 1,274.40 4640.00 2.19 83.26 464.00
+D·0.60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.024 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.69 111.88 4640.00 2.24 85.24 464.00
Length"' 12.250 ft 2. 0.262 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.48 1,215.02 4640.00 2.24 85.24 464.00
+1.1120+1.050E+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 0.012 0.202 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.36 57.71 4640.00 2.45 93.51 464.00
Length = 12.250 It 2 0.298 0.202 1.60 1.000 1.00 1.00 1.00 1.00 1.00 8.51 1,383.92 4640.00 2.45 93.51 464.00
..U..0.750Lr..0.750L 4{).450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.001 0.263 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.04 6.92 4640.00 3.21 122.12 464.00
Length = 12.250 ft 2 0.401 0.263 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.45 1,861.41 4640.00 3.21 122.12 464.00
+0..0.7 50Lr..O. 750L +0.450W +H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length"' 0.750 ft 1 0.007 0.180 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.19 31.65 4840.00 2.20 83.71 464.00
Length= 12.250 ft 2 0.270 0.180 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.72 1,254.60 4640.00 2.20 83.71 464.00
+04{).750Lr4{).750L ..0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.007 0.264 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.19 31.65 4640.00 3.22 122.60 464.00
Length"' 12.250 ft 2 0.399 0.264 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.38 1,849.11 4640.00 3.22 122.60 464.00
.. D •
Description : BEAM 4, TOWER DECK FRAMING PLAN (LEVEL ·D)
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# M v cd C FN Ci Cr Cm c t CL M fb F'b v fv F'v
---~"--
+D-+Q.750Lr-+Q.750L-0.450W-+tl, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.021 0.267 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.60 96.88 4640.00 3.25 123.85 464.00
Length= 12.250 ft 2 0.392 0.267 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.18 1,816.75 4640.00 3.25 123.85 464.00
+D-t0.750Lr-+Q.750L-0.450W-+tl, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
length = 0.750 ft 1 0.026 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.75 121.62 4640.00 2.24 85.43 464.00
Length = 12.250 ft 2 0.261 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.45 1,210.28 4640.00 2.24 85.43 464.00
+D-+Q.750Lr-+Q.750L-0.450W-+tl, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.026 0.268 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.75 121.62 4640.00 3.26 124.32 464.00
Length = 12.250 ft 2 0.389 0.268 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.10 1,804.60 4640.00 3.26 124.32 464.00
+D-+Q.750L-+Q.750S-+Q.450W-+tl, Ll 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.001 0.263 1.60 1.000 1.00 100 1.00 1.00 1.00 0.04 6.92 4640.00 3.21 122.12 464.00
Length = 12.250 ft 2 0.401 0.263 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.45 1,861.41 4640.00 3.21 122.12 464.00
+D-+Q.750L -+Q. 750S-+Q.450W-+tl, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.007 0.180 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.19 31.65 4640.00 2.20 83.71 464.00
Length = 12.250 ft 2 0.270 0.180 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.72 1,254.60 4640.00 2.20 83.71 464.00
+D.;{).750L-+Q.750S-+Q.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.007 0.264 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.19 31.65 4640.00 3.22 122.60 464.00
Length = 12.250 ft 2 0.399 0.264 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.38 1,849.11 4640.00 3.22 122.60 464.00
->0-+Q. 750L -+Q.750S-0.450W-+tl, LU 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.021 0.267 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.60 96,88 4640.00 3.25 123.85 464.00
Length = 12.250 ft 2 0.392 0.267 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.18 1,816.75 4640.00 3.25 123.85 464.00
+0-+Q.750L-+Q.750S-0.450W-+tl, LL < 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.026 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.75 121.62 4640.00 2.24 85.43 464.00
Length= 12.250 ft 2 0.261 0.184 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.45 1,210.28 4640.00 2.24 85.43 464.00
->0-+Q.750L -+Q.750S-0.450W-+tl, LL ( 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.026 0.268 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.75 121.62 4640.00 3.26 124.32 464.00
Length= 12.250 ft 2 0.389 0.268 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.10 1,804.60 4640.00 3.26 124.32 464.00
+ 1.0840-+Q. 750L -+Q. 750S-+Q.7875E+ 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 ft 1 0.012 0.280 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.35 56.26 4640.00 3.41 130.05 464.00
Length= 12.250 ft 2 0.419 0.280 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.96 1,943.59 4640.00 3.41 130.05 464.00
+1.084D-+Q.750L .;{).750S.;{).7875E~ 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 1 0.017 0.197 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.50 80.99 4640.00 2.41 91.63 464.00
Length = 12.250 fl 2 0.288 0.197 1.60 1.000 1.00 1.00 1.00 1.00 1.00 8.22 1,336.88 4640.00 2.41 91.63 464.00
+1.084D-+Q.750L -+Q.750S-+Q. 7875E., 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.017 0.281 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.50 80.99 4640.00 3.43 130.52 464.00
Length= 12.250 ft 2 0.416 0.281 1.60 1.000 1.00 1.00 1.00 1.00 1.00 11.88 1,931.29 4640.00 3.43 130.52 464.00
-+Q.600-+Q.60W-+Q.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0.750 ft 1 0.006 0.106 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.18 28.84 4640.00 1.29 49.31 464.00
Length = 12.250 ft 2 0.167 0.109 1.60 1.000 1.00 1.00 1.00 1.00 1.00 4.78 776.70 4640.00 1.32 50.41 464.00
-+Q.60D-0.60W-+Q.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 0. 750 It 1 0.020 0.111 1.60 1.000 100 1.00 1.00 1.00 1.00 0.56 91.12 4640.00 1.35 51.60 464.00
Length = 12.250 ft 2 0.155 0.111 1.60 1.000 1.00 1.00 1.00 1.00 1.00 4.41 717.34 4640.00 1.35 51.60 464.00
-+Q.4880D+ 1.050E-+Q.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 0.750 ft 0.005 0.088 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.16 25.33 4640.00 1.08 41.04 464.00
Length = 12.250 ft 2 0.131 0.088 1.60 1.000 100 1.00 1.00 100 1.00 3.74 607.33 4640.00 108 41.04 464.00
Overall Maximum Deflections ·-------Max."-" Deft Location in Span Load Combination Max."+" Deft Location in Span Load Combination Span
1 0.0000 0.000 ->D+l-+11, LL Comb Run {*L) -0.0787 0~000 ~-
->D+l-+11, LL Comb Run {*L) 2 0.4102 6.159 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
---·--Load Combination Support 1 Support2 Support3 ----------------,-·--~-·
Overall MAXimum 5.137 4.119
Overall MINimum -0.050 -0.017
+D+H 3.160 2.526
+D+l+H, LL Comb Run (*L) 4.753 4.119
+D+l-+11, LL Comb Run (L *} 3.545 2.509
+D+l-+11, LL Comb Run (LL) 5.137 4.102
+D+lr+H, LL Comb Run {*L) 3.160 2.526
Description: BEAM 4, TOWER DECK FRAMING PLAN (LEVEL-D)
Vertical Reactions Support notation : Far left is #1
Load Combination Support 1 Support 2
+D+Lr+H, LL Comb Run (L *) --~3c--..1=6o~-----2'".5=26,.--------
+0+Lr+H, LL Comb Run (LL) 3.160 2.526
+D+S+H 3.160 2.526
+0i{).750Lr+0.750L +H, LL Comb Run (* 4.355 3.720
+0+0.750Lr+0.750L+H, LL Comb Run (l 3.449 2.514
+0+0.750Lr+0.750L+H. LL Comb Run (L 4.643 3.708
+0+0.750L+0.750S+H, LL Comb Run (*L 4.355 3.720
+0i{).750L+0.750S+H, LL Comb Run (L' 3.449 2.514
+0+0.750L+0.750S+H, LL Comb Run (U 4.643 3.708
+0+0.60W+H 3.130 2.556
+0+1.050E+H 3.160 2.526
+0+0.750Lr+0.750L +0.450W+H, LL Carr 4.332 3.743
+0+0.750Lr+0.750L +0.450W+H, LL Carr 3.426 2.536
+0+0.750Lr+0.750L+0.450W+H, LL Corr 4.620 3.731
+0+0.750L +0.750S+0.450W+H, LL Com 4.332 3.743
+0+0.750L+0.750S+0.450W+H. LL Com 3.426 2.536
+0+0.750Li{).750S+0.450W+H, LL Com 4.620 3.731
+0+0.750L +0.750S+0.7875E+H, LL Carr 4.355 3.720
+0+0.750L +0.750S+0.7875E+H, LL Carr 3.449 2.514
+0+0.750L+0.750S+0.7875E+H, LL Carr 4.643 3.708
+0.600+0.60W+0.60H 1.865 1.546
+0.600+1.050Ei{).60H 1.896 1.516
D Only 3.160 2.526
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L*)
Lr Only, LL Comb Run (LL)
L Only, LL Comb Run (*L)
L Only, LL Comb Run (L *)
L Only, LL Comb Run (LL)
SOnly
WOnly
E Only *1.50
HOnly
1.593
0.385
1.977
-0.050
1.593
-0.017
1.576
0.050
Values in KIPS
Description : BEAM 5, TOWER DECK FRAMING PLAN (LEVEL-D)
CODE REFERENCES
----------------~
Calculations per NOS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-10
Wood Species
Wood Grade
: ilevel Truss Joist
: Parallam PSL 2.0E
Fb-Tension
Fb-Compr
Fe-Prll
Fc-Perp
Fv
Ft
Beam Bracing : Beam is Fully Braced against lateral-torsion buckling
Span = 12.250 ft
2,900.0 psi
2,900.0psi
2,900.0 psi
750.0 psi
290.0psi
2,025.0psi
E : Modulus of Elasticity
Ebend-xx 2,000.0ksi
Eminbend-xx 1 ,016.54ksi
Density 45.050pc!
Span= 0.750 ft
'-1
(
Service loads entered. Load Factors will be applied for calculations. ----------·---·-----------------
Beam self weight calculated and added to loads
Load for Span Number 1
Uniform Load: D = 0.0090 ksf, Tributary Width= 8.750 ft, (INTERIOR WALLS
Uniform Load : D = 0.040, L = 0.040 ksf, Tributary Width = 6.50 ft, (STEEL PLATFORM
Uniform Load : D = 0.0080 ksf, Tributary Width= 8.20 ft, (FRP SCREENWALL
Load for Span Number 2
Uniform Load : D = 0.0090 ksf, Tributary Width= 8.750 ft, (INTERIOR WALLS
Uniform Load: D = 0.040, L = 0.040 ksf, Tributary Width= 6.50 ft, (STEEL PLATFORM
Uniform Load: D = 0.0080 ksf, Tributary Width= 8.20 ft, (FRP SCREENWALL
Point Load: D = 3.160, L = 1.593 k@ 0.750 ft, (BEAM 4 REATIONS'
Point Load : W = 0.050 k @ 0.0 ft, (SHEARWALL UPLIFT:
_Q~$1S'li.$_f.!b1MABY. _________ _
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
0.605: 1
5.25x9.5
1,753.71 psi
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
FB : Allowable = 2,900.00psi
Load Combination
Location of maximum on span
Span # where maximum occurs
+D+L +H, LL Comb Run (L*)
5.817ft
Span# 1
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total DefleCtion
Load Combination Max Stress Raiios
0.177 in
-0.034 in
0.409 in
-0.071 in
Ratio=
Ratio=
Ratio=
Ratio=
Fv : Allowable
Load Combination
Location of maximum on span
Span# where maximum occurs
829
522
359
252
Segment Length Span# M V Cd C FN C i Cr C m C t C L ~~~~----~----------
M
;::; 0.54~5 : 1
5.25x9.5
= 158.28 psi
290.00 psi
+D+L +H, LL Comb Run ('L)
12.250ft
Span# 1
F'b v fv
0.00 0.00 0.00
F'v
0.00
--I
Description : BEAM 5, TOWER DECK FRAMING PLAN (LEVEL·· D)
Load Combination Max Stress Ratios Moment Values Shear Values
----·-
Segment Length Span# M v cd CFN Cj Cr Cm c t CL M fb F'b v fv F'v -
Length= 12.250 It 1 0.389 0.400 0.90 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 2610.00 3.47 104.51 261.00
Length = 0.750 ft 2 0.145 0.400 0.90 1.000 1.00 1.00 1.00 1.00 tOO 2.49 378.09 2610.00 3.47 104.51 261.00
+D+L +H, LL Comb Run (*L) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.320 0.546 1.00 1.000 1.00 1.00 1.00 1.00 1.00 6.11 928.67 2900.00 5.26 158.28 290.00
Length = 0.750 It 2 0.197 0.546 1.00 1.000 1.00 1.00 1.00 1.00 1.00 3.76 570.76 2900.00 5.26 158.28 290.00
+D+l+H, LL Comb Run (L*) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 rt 1 0.605 0.400 1.00 1.000 1.00 1.00 1.00 1.00 1.00 11.54 1.753.71 2900.00 3.86 115.97 290.00
Length = 0. 750 It 2 0.130 0.400 1.00 1.000 100 1.00 1.00 1.00 1.00 2.49 378.09 2900.00 3.47 115.97 290.00
+D+L +H, LL Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length" 12.250 It 1 0.574 0.546 1.00 1.000 1.00 1.00 1.00 1.00 1.00 10.95 1,663.27 2900.00 5.26 158.28 290.00
Length = 0.750 rt 2 0.197 0.546 1.00 1.000 1.00 1.00 1.00 1.00 1.00 3.76 570.76 2900.00 5.26 158.28 290.00
+D+lr+H. LL Comb Run (*L) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.280 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 3625.00 3.47 104.51 362.50
Length= 0.750 ft 2 0.104 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3625.00 3.47 104.51 362.50
+D+lr+H, LL Comb Run (L*) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 rt 1 0.280 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 3625.00 3.47 104.51 362.50
Length= 0.750 It 2 0.104 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3625.00 3.47 104.51 362.50
+D+lr+H, LL Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.280 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 3625.00 3.47 104.51 362.50
Length = 0. 750 ft 2 0.104 0.288 1.25 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3625.00 3.47 104.51 362.50
+D+S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 0.304 0.313 1.15 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 3335.00 3.47 104.51 333.50
Length= 0.750 rt 2 0.113 0.313 1.15 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3335.00 3.47 104.51 333.50
+D+0.750Lr+0.750L +H, LL Comb R1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 fi 1 0.262 0.400 1.25 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 3625.00 4.82 144.84 362.50
Length = 0.750 It 2 0.144 0.400 1.25 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 3625.00 4.82 144.84 362.50
+D+0.750Lr+0.750L +H, LL Comb R1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.433 0.291 1.25 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 3625.00 3.51 105.47 362.50
Length = 0. 750 f! 2 0.104 0.291 1.25 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3625.00 3.47 105.47 362.50
+D+0.750Lr+0.750L+H. LL Comb R1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.414 0.400 1.25 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 3625.00 4.82 144.84 362.50
Length = D. 750 rt 2 0.144 0.400 1.25 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 3625.00 4.82 144.84 362.50
+D+0.750L -1{).750S+H, LL Comb RL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 fi 1 0.285 0.434 1.15 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 3335.00 4.82 144.84 333.50
Length = 0.750 ft 2 0.157 0.434 1.15 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 3335.00 4.82 144.84 333.50
+D-1{).750L +0.750S+H, LL Comb RL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 fi 1 0.470 0.316 1.15 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 3335.00 3.51 105.47 333.50
Length= 0.750 It 2 0.113 0.316 1.15 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 3335.00 3.47 105.47 333.50
+D+0.750L+0.750S+H, LL Comb Rl 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.450 0.434 1.15 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 3335.00 4.82 144.84 333.50
Length = 0.750 ft 2 0.157 0.434 1.15 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 3335.00 4.82 144.84 333.50
+D+0.60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 f! 1 0.219 0.225 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 4640.00 3.47 104.51 464.00
Length = 0.750 It 2 0.081 0.225 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4840.00 3.47 104.51 464.00
+D-0.60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 0.219 0.225 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.68 1,015.43 4640.00 3.47 104.51 464.00
Length = 0.750 It 2 0.081 0.225 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4640.00 3.47 104.51 464.00
+1.112D+1.050E+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 It 1 0.243 0.250 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.43 1,129.16 4640.00 3.86 116.22 464.00
Length = 0. 750 rt 2 0.091 0.250 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.77 420.44 4640.00 3.86 116.22 464.00
+1.112D-1.050E+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 0.243 0.250 1.60 1.000 1.00 1.00 1.00 1.00 1.00 7.43 1,129.16 4640.00 3.86 116.22 464.00
Length = 0.750 ft 2 0.091 0.250 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.77 420.44 4640.00 3.86 116.22 464.00
+0+0. 750Lr+0.750L +0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 f! 1 0.205 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 4640.00 4.82 144.84 464.00
Length = 0. 750ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
+D+0.750Lr+0.750L +0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 rt 1 0.338 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 4640.00 3.51 105.47 464.00
Length = 0.750 It 2 0.081 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4640.00 3.47 105.47 464.00
+D+0.750Lr+0.750L -1{).450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
--D
Descriplion : BEAM 5, TOWER DECK FRAMING PLAN (LEVEL-D)
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# v cd C FN Cj Cr Cm C I CL M fb v fv F'v
Length = 12.250 ft 1 0.324 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 4640.00 4.82 144.84 464.00
Length = 0. 750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
.;.0+0.750Lr-+0.750L-OA50W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.205 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
.;{)+0.750Lr+0.750L-0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.338 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 4640.00 3.51 105.47 464.00
Length = 0. 750 ft 2 0.081 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4640.00 3.47 105.47 464.00
.;.0+0.750Lr+0.750L-0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length "' 12.250 ft 1 0.324 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
.;{)+0.750L +0.750S+0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.205 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
+D-+0.750L +0.750S+0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.338 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 4640.00 3.51 105.47 464.00
Length = 0. 750 ft 2 0.081 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4640.00 3.47 105.47 464.00
.;.0+0.750L -+0.750S-+0.450W+H, LL 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.324 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
.;.0+0.750L +0.750S-0.450W+H, LL C 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.205 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.25 950.00 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
-+D-+0.750L+0.750S-0.450W+H, LL ( 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.338 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.32 1,568.90 4640.00 3.51 105.47 464.00
Length = 0.750 ft 2 0.081 0.227 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.49 378.09 4640.00 3.47 105.47 464.00
.;{)+0.750L +0. 750S-0.450W+H. LL C 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.324 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 9.88 1,501.31 4640.00 4.82 144.84 464.00
Length = 0.750 ft 2 0.113 0.312 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.44 522.59 4640.00 4.82 144.84 464.00
+1.084D-+D.750L -+D. 750S+0.7875E4 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.223 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.81 1,035.22 4640.00 5.11 153.62 464.00
Length= 0.750 ft 2 0.119 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.65 554.35 4640.00 5.11 153.62 464.00
+1.084D+0.750L +0.750S-+O. 7875E_, 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.356 0.244 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.89 1,654.12 4640.00 3.77 113.29 464.00
Length = 0.750 ft 2 0.088 0.244 1.60 1000 1.00 1.00 1.00 1.00 1.00 2]0 409.85 4640.00 3.77 113.29 464.00
+1.084D+0.750L -+0.750S+0.7875E_, 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.342 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.44 1,586.60 4640.00 5.11 153.62 464.00
Length = 0.750 ft 2 0.119 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.65 554.35 4640.00 5.11 153.62 464.00
+1.084D+0.750L+0.750S-0.7875E+I 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.223 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 6.81 1,035.22 4640.00 5.11 153.62 464.00
Length = 0.750 It 2 0.119 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.65 554.35 4640.00 5.11 153.62 464.00
+1.084D+0.750L +0.750S-0.7875E+I 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.356 0.244 1.60 1.000 1.00 1.00 1.00 1.00 1.00 10.89 1,654.12 4640.00 3.77 113.29 464.00
Length = 0. 750 ft 2 0.088 0.244 1.60 1.000 1.00 1.00 1.00 1.00 1.00 2.70 409.85 4640.00 3.77 113.29 464.00
+1.084D-+0.750L +0.750S-0.7875E+I 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.342 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 1044 1,586.60 4640.00 5.11 153.62 464.00
Length = 0. 750 ft 2 0.119 0.331 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.65 554.35 4640.00 5.11 153.62 464.00
+0.60D+0.60W+0.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.131 0.135 1.60 1.000 1.00 1.00 1.00 1.00 1.00 4.01 609.26 4640.00 2.08 62.71 464.00
Length = 0.750 ft 2 0.049 0.135 1.60 1.000 1.00 1.00 1.00 1.00 1.00 1.49 226.85 4640.00 2.08 62.71 464.00
+0.60D-0.60W-+0.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.131 0.135 1.60 1.000 100 1.00 1.00 1.00 1.00 4.01 609.26 4640.00 2.08 62.71 464.00
Length = 0.750 ft 2 0.049 0.135 1.60 1.000 1.00 1.00 1.00 1.00 1.00 1.49 226.85 4640.00 2.08 62.71 464.00
+0.4880D+1.050E+0.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 12.250 ft 1 0.107 0.110 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.26 495.53 4640.00 1.70 51.00 464.00
Length= 0.750 ft 2 0.040 0.110 1.60 1.000 1.00 1.00 1.00 1.00 1.00 1.21 184.51 4640.00 1.70 51.00 464.00
+0.4880D-1.050E+0.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length= 12.250 ft 1 0.107 0.110 1.60 1.000 1.00 1.00 1.00 1.00 1.00 3.26 495.53 4640.00 1.70 51.00 464.00
Length = 0.750 ft 2 0.040 0.110 1.60 1.000 1.00 1.00 1.00 1.00 1.00 1.21 184.51 4640.00 1.70 51.00 464.00
Wood Beam ......
Description : BEAM 5, TOWER DECK FRAMING PLAN (LEVEL-D)
Overall Maximum Deflections --Load Combination Span
-+D+L +H, LL Comb Run (L*) 1
2
Vertical Reactions -· ---"------Load Combination Support 1
Overall MAXimum 3.962
Overall MINimum -0.104
+D+H 2.369
-+D+L+H, LL Comb Run (*L) 2.266
-+D+L +H, LL Comb Run (L*) 3.962
-+D+L +H, LL Comb Run (LL) 3.858
+D+Lr+H, LL Comb Run (*L) 2.369
-+D+Lr+H, LL Comb Run (L *) 2.369
+D+Lr+H, LL Comb Run (LL) 2.369
+D+S+H 2.369
-+D+0.750Lr+0.750L +H, LL Comb Run (* 2.291
-+D+0.750Lr+0.750L +H, LL Comb Run (L 3.563
-+D+0.750Lr+0.750L +H, LL Comb Run (L 3.486
-+D+0.750L +0. 750S+H, LL Comb Run {*l2.291
+0+0. 750L +0.750S+H, LL Comb Run (L' 3.563
+D+0.750L +0.750S+H, LL Comb Run {Ll3.486
+0+0.60W+H 2.369
+D+t050E+H 2.369
-+D+0.750Lr+0.750L +0.450W+H, LL Carr 2.291
+D+0.750Lr+0.750L +0.450W+H, LL Carr 3.563
-+D+0.750Lr+O. 750L -1{}.450W+H, LL Carr 3.486
+D+0.750L -1{}.750S+0.450W+H, LL Com 2.291
+0+0.750L-1{}.750S-1{}450W+H, LL Com 3.563
-+D+0.750L +0.750S+0.450W+H, LL Com 3.486
+0+0.750L+0.750S+0.7875E+H, LL Carr 2.291
-+D+0.750L +0. 750S+0.7875E+H, LL Corr3.563
+D+0.750L +0.750S+0.7875E+H, ll Carr 3.486
+0.60D+0.60W-1{}.60H 1.421
+0.60D+1.050E+0.60H 1.421
D Only 2.369
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (l*)
Lr Only, LL Comb Run (LL)
L Only, LL Comb Run (*L)
L Only, LL Comb Run (L *)
L Only, LL Comb Run (LL)
S Only
WOnly
E Only* 1.50
HOnly
-0.104
1.593
1.489
-0.000
Max.·-· Deft
0.4093
0.0000
Support2
9.734
0.050
6.250
8.142
7.843
9.734
6.250
6.250
6.250
6.250
7.669
7.445
8.863
7.669
7.445
8.863
6,280
6.250
7.691
7.467
8.886
7.691
7.467
8.886
7.669
7.445
8.863
3.780
3.750
6.250
1.892
1.592
3.484
0.050
Location in Span
6.022
6.022
Load Combination
+D+L +H, LL Comb Run (L *)
Support notation : Far Jell is #1
Max.'+' Deff
0.0000
-0.0714
Values in KIPS
Location in Span
0.000
0.750
\
I I . 0 ~I EXISllNG UlBBY I l-> ;, I I I \ ~
I , I ~ I I I
r4} -----_/ _ __:-®
r-4~ ---- - -----t! ____:___-®
15'-0"
DuNN SAVOIE INc. JoB Verizon -Cassia
STRUCTURAL ENGTNEERING _ __;S;;.:H::.;;EE:.:.,T.:.;:N0::.:.· _____ -;-:-:::1 -=-!r------~O.::_F ---.,-,-
9 0 8 s. DLEVELAN D ST. CALCUlATED BY HG DATE 5/15
OCEANSIDE, OA. 92054 CHECKEOBY DATE
PH: (760) 966-6355 SCALE
FAX: (760) 966-6360
Allowable Bearing Pressure: q = \'?CV psf
Mark: c.DPv~~C\y l' /:>, 1..
P = &:156 )f;,<;; ..r ?4 61 \~ = 97$L~ lbs
Area Req'd = (P/q) x 144 = ( q 1 :7-l 1b.7 /!SCV ~) ;.< '1 Lf '-1 = Gf S 1.-\ in2
Use: _2_L_" Square x '2--Y "Deep with ___2_ # 0 Ea. Way (3" Clear from Soil)
Description : GRADE BEAM 1 LINE 10
CODE REFERENCES
Calculations per ACI 318-11, IBC 2012, CBC 2013, ASCE 7-10
Load Combinations Used: ASCE 7-10
Materia_! Properties
fc
fr::: fc 112 * 7.50
\jf Density :::
A. U Wt Factor :::
Elastic Modulus
2.50 ksi
375.0 psi
145.0 pcf
1.0
3,122.0ksi
d> Phi Values Flexure: 0.90
Shear: 0.750
= 0.850
Soil Subgrade Modulus 150.0 psi I (inch deflection)
Load Combination ASCE 7-10
fy -Main Rebar
E -Main Rebar
60.0 ksi
::: 29,000.0 ksi
Fy-Stirrups
E-Stirrups
Stirrup Bar Size#
Number of Resisting Legs Per Stirrup
Beam is supported on an elastic foundation.
40.0 ksi
= 29,000.0 ksi
# 3
2
. . .
··-···-----·-·--·····-·-···--·-----------------·-···----------
0(0.0656)
... ... ... v
[
_ ___fross Section & Reinforcing Details
Rectangular Section, Width= 27.0 in, Height= 24.0 in
Span #1 Reinforcing ....
27" W X 24" h
Span=18.0 ft
4-#5 at 3.0 in from Bottom, from 0.0 to 18.0 fl in this span 4-#5 at 3.0 in from Top, from 0.0 to 18.0 ft in this span
Applied Loads __
Beam self weight calculated and added to loads
Load for Span Number 1
Uniform Load: 0 = 0.0160, L = 0.040 ksf, Extent= 2.0 --» 5.250 It, Tributary Width= 6.50 ft, (FLOOR
Uniform Load : D = 0.0160, L = 0.040 ksf. Extent= 11.250 -» 16.0 It, Tributary Width= 6.50 ft. (FLOOR
Uniform Load : D = 0.040, L = 0.040 ksf, Extent= 11.250 -» 16.0 fl, Tributary Width= 3.250 ft, (PLATFORM
Uniform Load: D = 0.040, L = 0.040 ksf, Extent= 2.0 --» 5.250 ft. Tributary Width= 3.250 ft, (PLATFORM
Uniform Load : D = 0.0090 ksf, Extent= 2.0 --» 5.250 ft. Tributary Width = 22.20 ft, (INTERIOR WALLS
Uniform Load : D = 0.0090 ksf, Extent= 11.250 --» 16.0 ft. Tributary Width= 22.20 ft, (INTERIOR WALLS
Uniform Load: D = 0.0080 ksf, Extent= 11.250 -» 16.0 ft, Tributary Width= 8.20 ft, (FRP SCREENWALLS
Uniform Load: D = 0.0080 ksf. Extent= 2.0 --» 5.250 ft, Tributary Width= 8.20 ft, (FRP SCREENWALLS
Moment: W = 19.627 k-ft, Location= 3.625 ft from left end of this span, (FRP SCREEN WALLS
Moment: W = 28.685 k-ft, Location= 13.625 ft from left end of this span, (FRP SCREEN WALLS
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
0.191:1
Typical Section
22.450 k~ft
117.282 k-ft
+1200+0.50Lr-+0.50L -1.0W
13.553 ft
Span# 1
Mu: Applied
Mn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Soil Pressure =
Shear Stirrup Requirements
0.743 ksf at
Maximum Deflection
Max Downward L +Lr+S Deflection
Max Upward L +Lr+S Deflection
Max Downward Total Deflection
Max Upward Total Deflection
18.00 ft
Entire Beam Span Length : Vu < PhiVci2, Req'(f\is; Not Reqd,. use stirrups spaced at o.ooo in
0.000 in
0.000 in
0.034 in
-0.008 in
-. .
Description : GRADE BEAM 1 LINE 10
Maximum Forces & Stresses for Load Combinations
Load Combination -Location (ft) -----Bending Stress Results-'('--k-~ft._) __
Segment Length Span # in Span Mu : Max Phi'Mnx Stress Ratio
MAXimum BENDING Envelope
Span# 1 13.553 22.45 117.28 0.19
+1.40D+1.60H
Span# 1 13.976 1.48 117.28 0.01
+ 1.200+0.50Lr+ 1. 60L + 1. 60H
Span# 1 13.976 2.59 117.28 0.02
+1.200+1.60L +0.50S+1.60H
Span# 1 13.976 2.59 117.28 0.02
+1.200+1.60Lr+D.50L +1.60H
Span# 1 13.976 1.68 117.28 0.01
+ 1.200+ 1.60Lr+0.50W+1.60H
Span# 1 13.765 4.88 117.28 0.04
+1.20D+1.60Lr-0.50W+ 1.60H
Span# 1 13.553 11.65 117.28 0.10
+1.200+0.50L +1.60S+1.60H
Span#1 13.976 1.68 117.28 0.01
+1.20D+1.60S+0.50W+1.60H
Span#1 13.765 4.88 117.28 0.04
+1.20D+1.60S-0.50W+1.60H
Span#1 13.553 11.65 117.28 0.10
+1.20D+0.50Lr+0.50L +W+1.60H
Span# 1 1 13.765 8.91 117.28 0.08
+1.20D+0.50Lr+0.50L-1.0W+ 1.60H
Span# 1 1 13.553 22.45 117.28 0.19
+1.200+0.50L +0.50S+W+1.60H
Span# 1 1 13.765 8.91 117.28 0.08
+1.20D+0.50L+0.50S-1.0W+1.60H
Span# 1 1 13.553 22.45 117.28 0.19
+1.360D+0.50L +0.20S+E+1.60H
Span# 1 13.976 1.85 117.28 0.02
+0.90D+W+0.90H
Span# 1 13.765 8.18 117.28 0.07
+0.90D·1.0W+0.90H
Span# 1 13.553 21.73 117.28 0.19
+0.740D+E+0.90H
Span# 1 1 13.976 0.78 117.28 0.01
Overall Maximum Deflections -Unfacte>_~c!_~e>_ads __
Load Combination Span Max.·-· Defl Location in Span Load Combination Max.'+' Deft
0.0000 ~~---------------Span 1 1 0.0344 18.000
Detailed Shear Information
Span Distance 'd' Vu (k) Mu d'Vu/Mu Phi*Vc Comment Phi'Vs
Location in Span
0.000
Spadng (in)
Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k)
+1.200+0.50L +0.50S-1.0W+ 1. ·~-'=02..0_0 __ c::22.1~.00-----=-=~0~.19--~0::....1""9 __ c__0~.0:-:-0------:-1.~00:---':-:45'-:.0:-:::5-----;-:V;-u -:-< ;:;::Ph:-;;iV-;-ci-;;;2-----:N-:-o~t R::-eq~d-:----Req'd Suggest
0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 0.21 21.00 0.44 0.44 0.03 1.00 45.05 Vu < PhiVcl2 Not Reqd 0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 0.42 21.00 0.68 0.68 0.10 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.20D+0.50L+0.50S-1.0W+1. 0.64 21.00 0.92 0.92 0.23 1.00 45.05 Vu < PhNcl2 Not Reqd 0.00 0.00
+1.20D+0.50L+0.50S-1.0W+1. 0.85 21.00 1.15 1.15 0.41 1.00 45.05 Vu < PhiVc12 Not Reqd 0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 1.06 21.00 1.38 1.38 0.64 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.200+0.50L +0.50S-1.0W+1. 1.27 21.00 1.60 1.60 0.92 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.2DD+0.50L +0.50S-1.0W+1. 1.48 21.00 1.82 1.82 1.24 1.00 45.05 Vu < PhiVcl2 Not Reqd 0.00 0.00
+1.200+0.50L+0.50S-1.0W+1. 1.69 21.00 2.04 2.04 1.62 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 1.91 21.00 2.25 2.25 2.03 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.200+0.50L+0.50S-1.0W+1. 2.12 21.00 2.36 2.36 2.49 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 2.33 21.00 2.39 2.39 2.95 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.20D+0.50L +0.50S-1.0W+1. 2.54 21.00 2.42 2.42 3.43 1.00 45.05 Vu < PhiVcl2 Not Reqd 0.00 0.00
+1.20D+0.50L+0.50S-1.0W+1. 2.75 21.00 2.45 2.45 3.91 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1.20D+0.50L+0.50S-1.0W+1. 2.96 21.00 2.47 2.47 4.40 1.00 45.05 Vu < PhiVc/2 No!Reqd 0.00 0.00
+1.20D+0.50L+0.50S-1.0W+1. 3.18 21.00 2.48 2.48 4.89 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D-1.0W+0.90H 3.39 21.00 2.52 2.52 4.97 1.00 45.05 Vu < PhiVcl2 Not Reqd 0.00 0.00
+1.20D+0.50L+0.50S+W+1.60 3.60 21.00 -2.66 2.66 4.04 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
. . .
Description :
Detailed Shear Information ~---,., ........... _ .. ~,. ----
Span Distance 'd' Vu (k} Mu d•vutMu Phi•Vc Comment
~~a~d~Co~m~b~in"ati~,o~n~~<M>N_um_b~e_r __ ~(ft~)~_(~in~),~_A_a_ua~I~_D~~ign_~(k_-ft~) ________ ~(k~) ____ ~~~·
+1 ,20D+0,50L +0.50S+W+1 ,60 3.81 21.00 -2.86 2.86 14.99 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 4.02 21.00 -3.06 3.06 14.35 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 4.24 21.00 -3.26 3.26 13.67 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 4.45 21.00 -3.45 3:45 12.95 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 4.66 21.00 -3.63 3.63 12.18 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +0.50S+W+1.60 4.87 21.00 -3.82 3.82 11.38 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +0.50S+W+1.60 5.08 21.00 -3.99 3.99 10.54 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 5.29 21.00 -4.13 4.13 9.66 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +050S+W+1.60 5.51 21.00 -4.13 4.13 8.77 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S+W+1.60 5.72 21.00 -4.12 4.12 7.89 1.00 45.05 Vu < PhiVc/2
+1.20D+O.SOL+0.50S+W+1.60 5.93 21.00 -4.11 4.11 7.00 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+O.SOS+W+1.60 6.14 21.00 -4.10 4.10 6.11 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S+W+1.60 6.35 21.00 -4.09 4.09 5.23 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S+W+1.60 6.56 21.00 -4.06 4.06 4.35 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L +0.50S+W+1.60 6.78 21.00 -4.04 4.04 3.47 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +0.50S+W+1.60 6.99 21.00 -4.01 4.01 2.60 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 7.20 21.00 -3.98 3.98 1.74 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+0.50S+W+1.60 7.41 21.00 -3.94 3.94 0.88 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 7.62 21.00 -3.90 3.90 0.03 1.00 45.05 Vu < PhiVc/2
+0.90D-1.0W+0.90H 7.84 21.00 3.88 3.88 1.43 1.00 45.05 Vu < PhNc/2
+0.90D-1.0W+0.90H 8.05 21.00 3.94 3.94 0.62 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S-1.0W+1. 8.26 21.00 4.04 4.04 0.43 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+0.50S-1.0W+1. 8.47 21.00 4.12 4,12 0.41 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+050S-1.0W+1. 8.68 21.00 4.21 4,21 1.27 1.00 45.05 Vu < PhiVc/2
+1.2QD+0.50L+0.50S-1.0W+1. 8.89 21.00 4.29 4.29 2.15 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S-1.0W+1. 9.11 21.00 4.37 4.37 3.04 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L +0.50S-1.0W+1. 9.32 21.00 4.45 4.45 3.95 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L +0.50S-1.0W+1. 9.53 21.00 4.52 4.52 4.88 1.00 45.05 Vu < PhiVc/2
+1.20D+O.SOL+0.50S-1.0W+1. 9.74 21.00 4.59 4.59 · 5.82 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S-1.0W+1. 9.95 21.00 4.66 4.66 6.78 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S-1.0W+1. 10.16 21.00 4.72 4.72 7.75 1.00 45.05 Vu < PhiVcl2
+1.20D+0.50L+0.50S-1.0W+1. 10.38 21.00 4.78 4.78 8.74 1.00 45.05 Vu < PhiVcl2
+1.20D+O.SOL+0.50S-1.0W+1. 10.59 21.00 4.84 4.84 9.74 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+O.SOS-1.0W+1. 10.80 21.00 4.89 4.89 10.74 1.00 45.05 Vu<PhiVcl2
+1.200+0.50L +0.50S-1.0W+1. 11.01 21.00 4.94 4.94 11.77 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+0.50S-1.0W+1. ·11.22 21.00 4.98 4.98 12.80 1.00 45.05 Vu < PhiVc12
+1.20D+0.50L+0.50S-1.0W+1. 11.44 21.00 4.87 4.87 13,82 1.00 45.05 Vu < PhiVcl2
+1.200+0.50L+0.50S-1.0W+1. 11.65 21.00 4.74 4.74 14.82 1.00 45.05 Vu<PhiVc/2
+1.20D+0.50L+0.50S-1.0W+1. 11.86 21.00 4.61 4.61 15.79 1.00 45.05 Vu<PhiVc/2
+1.20D+0.50L+0.50S-1.0W+1. 12.07 21.00 4.47 4.47 16.74 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L +0.50S-1.0W+1. 12.28 21.00 4.32 4.32 17.65 1.00 45.05 Vu < PhiVc/2
+1_.200+0.50L+0.50S-1.0W+1. 12.49 21.00 4.17 4.17 18.53 1.00 45.05 Vu<PhiVcl2
+1.20D+0.50L+0.50S-1.0W+1. 12.71 21.00 4.02 4.02 19.38 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +O.SOS-1.0W+1. 12.92 21.00 3.86 3.86 20.20 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S·1.0W+1. 13.13 21.00 3.69 3.69 20.99 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L +0.5DS-1.0W+1. 13.34 21.00 3.52 3.52 21.74 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +0.50S-1.0W+1. 13.55 21.00 3.35 3.35 22.45 1.00 45 05 Vu < PhiVc/2
+1.200+0.50L +0.50S-1.0W+1. 13.76 21.00 3.17 3.17 5.56 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50l+0.50S-1.0W+1. 13.98 21.00 2.98 2.98 4.92 1.00 45.05 Vu < PhiVc/2
+0.900-1.0W+0.90H 14.19 21.00 2.82 2.82 5.05 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L+0.50S+W+1.60 14.40 21.00 -2.75 2.75 7.03 1.00 45.05 Vu < PhiVc/2
+1.20D+0.50L +0.50S+W+1.60 14.61 21.00 -2.72 2.72 6.42 1.00 45,05 Vu < PhiVc/2
+1.200+0.50L+0.50S+W+1.60 14.82 21.00 -2.68 2.68 5.81 1.00 45.05 Vu < PhiVc/2
+1.200+0.50L+0.50S+W+t60 15.04 21.00 -2.63 2.63 521 1.00 45.05 Vu < PhiVc/2
Phi'Vs
(k)
NotReqd
NotReqd
NolReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No!Reqd
No!Reqd
NotReqd
No!Reqd
No!Reqd
NotReqd
NotReqd
Not Reqd
No!Reqd
NotReqd
NotReqd
NotReqd
NolReqd
NolReqd
NotReqd
NolReqd
Not Reqd
No!Reqd
NotReqd
NolReqd
NolReqd
NotReqd
No!Reqd
Not Reqd
NotReqd
NotReqd
Not Reqd
NotReqd
Not Reqd
NotReqd
No!Reqd
NolReqd
NotReqd
No!Reqd
NolReqd
NotReqd
NotReqd
No!Reqd
NotReqd
NolReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
Spacing (in)
Req'd Sugg~t
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
O.OCI 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
O.OCI 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
O.OCI 0.00
O.OCI 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
O.OCI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
Description : GRADE BEAM 1 LINE 10
_Detailed She~~J!lfl)rm~~on __
Span
Load Combination Number
+1.20D-+{).50L -+{).50S+W+1.60
+1.20D+0.50L+0.50S+W+1.60
+1.200-+{J.SOL +0.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+ 1.200+0.50L +0.50S+W+1.60
+1.20D-+{).50L +0.50S+W+1.60
+1.200+0.50L +0.50S+W+ 1.60
+1.200-+{J.SOL +0.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+1.200+0.50L +0.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+1.200+0.50L -+{).50S+W+1.60
+0.90D-1.0W+0.90H
Distance 'd'
(fl) (in)
15.25 21.00
1546 21.00
15.67 21.00
15.88 21.00
16.09 21.00
16.31 21.00
16.52 21.00
16.73 21 00
16.94 21.00
17.15 21.00
17.36 21.00
17.58 21.00
17.79 21.00
Vu {k)
Actual Design
-2.58 2.58
-2.52 2.52
-246 2.46
-2.39 2.39
-2.24 2.24
-1.99 1.99
-1.73 1.73
-1.47 1.47
-1.20 1.20
-0.93 0.93
-0.65 0.65
-0.37 0.37
0.15 0.15
Mu d*Vu/Mu
(k-fl)
4.62 1.00
4.04 1.00
3.47 1.00
2.92 1.00
2.39 1.00
1.90 1.00
1.46 1.00
1.08 1.00
0.76 1.00
0.49 1.00
0.28 1.00
0.12 1.00
0.02 1.00
Phi*Vc
(k)
• • I
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
Comment
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
ViJ < PhiVc/2
ViJ <PhiVc/2
VIJ<PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Phi*Vs
(k)
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
Not Reqd
NotReqd
Spacing (in)
Req'd Suggest
0.01) 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
O.Oil 0.00
0.00 0.00
Description : GRADE BEAM 2 LINE F
._C_O_D~REf.=ER-=E::.::_NC=E=S ___ _
Calculations per ACI318-11, IBC 2012, CBC 2013, ASCE 7-10
Load Combinations Used: ASCE 7-10
Material Pr«?~erties .
fc
fr = fc 112 • 7.50
2.50 ksi
375.0 psi
145.0 pcf
1.0
3,122.0ksi
<l> Phi Values Flexure: 0.90
Shear: 0.750
'If Density p1 0.850
'A Lt Wt Factor
Elastic Modulus
Soil Subgrade Modulus 150.0 psi I (inch deflection)
Load Combination ASCE 7-10
Fy -Stirrups fy-Main Rebar
E -Main Rebar
60.0 ksi
29,000.0 ksi E-Stirrups
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Beam is supported on an elastic foundation.
+' • 0(0.0656) • • : 0(0. 72 L . .;sa) ~¥
Cross Section & Reinforcing Details
~Rectangular Section, Width= 27.0 in, Height= 24.0 in
Span #1 Reinforcing ....
... :
40.0 ksi
:29,000.0ksi
# 3
2
27"wx24"h
Span=18.0 ft
. . I
4-#5 at 3.0 in from Bottom, from 0.0 to 18.0 ft in this span 4-#5 at 3.0 in from Top, from 0.0 to 18.0 fl in this span
Applied Loads Service loads entered. Load Factors will be for calculations.
Beam self weight calculated and added to loads
Load for Span Number 1
Uniform Load : D = 0.0160, L = 0.040 ksf, Extent= 2.0 --» 6.750 ft, Tributary Width = 0.670 ft, (FLOOR
Uniform Load: 0 = 0.0160, L = 0.040 ksf, Extent= 12.750 --» 16.0 ft. Tributary Width= 0.670 fl, (FLOOR
Uniform Load: D = 0.040, L = 0.040 ksf, Extent= 12.750 -» 16.0 ft, Tributary Width= 3.250 ft, (PLATFORM
Uniform Load: 0 = 0.040, L = 0.040 ksf, Extent:: 2.0 --» 6.750 ft, Tributary Width = 3.250.ft, (PLATFORM
Uniform Load: D = 0.0090 ksf, Extent= 2.0 --» 6.750 ft, Tributary Width= 22.20 ft, (INTERIOR WALLS
Uniform Load: 0 = 0.0090 ksf, Extent= 12.750 --» 16.0 ft, Tributary Width= 22.20 ft, (INTERIOR WALLS
Uniform Load: 0 = 0.0080 ksf, Extent= 12.750 -» 16.0 ft. Tributary Width= 8.20 fl. (FRP SCREENWALLS
Uniform Load: 0 = 0.0080 ksf, Extent= 2.0 --» 6.750 ft, Tributary Width= 8.20 ft, (FRP SCREENWALLS
Moment : W = 28.625 k-ft, Location = 4.375 ft from left end of this span, (FRP SCREENWALLS
Moment: W = 19.627 k-ft, Location= 13.625 fl from left end of this span, (FRP SCREENWALLS
DESIGN SUMMARY
Maximum i3endi"n9 stress-Ratio = o.1s1: 1
Section used for this span Typical Section
Mu: Applied 21.875 k-ft
Mn *Phi: Allowable 117.282 k-ft
Load Combination +1.200+0 .50Lr+0.50L +W+1.
Location of maximum on span 4.447 ft
Span# where maximum occurs Span# 1
Maximum Soil Pressure = 0.706 ksf at
Shear Stirrup Requirements
Maximum Deflection
Max Downward L +Lr+S Deflection
Max Upward L +Lr+S Deflection
Max Downward Total Deflection
Max Upward Total Deflection
18.00ft
0.000 in
0.000 in
0.033 in
-0.012 in
7
Entire Beam Span length :Vu "<PhiVc/2, Req'd Vs =Not Reqd, use stirrups spaced at 0.000 in --------·------
--.
Maximum Forces & Stresses for Load Combinations
T.oadComllir1ation -----·· · Bending Stress Results ( k-ft) Location (ft)
Segment length Span# in Span Mu : Max Phi*Mnx Stress Ratio .~~~--------------------MAXimum BENDING Envelope
Span# 1 4.447 21.88
+1.40D+1.60H
Span# 1 4.024 1.20
+1.20D+D.50lr+1.60L +1.60H
Span# 1 4.024 1.56
+ 1.20D+ 1.60L +D. 50S+ 1. SOH
Span# 1 4.024 1.56
+ 1.200+ 1.60Lr+D.50L + 1. 60H
Span# 1 4.024 1.20
+1.20D+1.60Lr+D.50W+1.60H
Span# 1 4.447 11.36
+1.20D+1.60Lr-0.50W+1.60H
Span# 1 13.553 6.61
+1.20D+0.50L+1.60S+1.60H
Span# 1 4.024 1.20
+1.20D+1.60S+D.50W+1.60H
Span# 1 4.447 11.36
+1.20D+1.60S-0.50W+1.60H
Span# 1 13.553 6.61
+1.20D+D.50Lr+D.50L +W+1.60H
Span # 1 1 4.447 21.88
+1.20D+0.50Lr+0.50L-1.0W+ 1.60H
Span# 1 1 13.553 12.91
+ 1.20D+0.50l +0.50S+W+1.60H
Span# 1 1 4.447 21.88
+1.20D+D.50L+D.50S-1.0W+1.60H
Span# 1 1 13.553 12.91
+1.360D+0.5DL +0.20S+E+1.60H
Span# 1 4.024 1.33
+0.90D+W+D.90H
Span# 1 4.447 21.46
+0.90D-1.0W+0.90H
Span# 1 13.553 12.76
+0.740D+E+D.90H
Span# 1 1 4.024 0.64
Overall Maximum Deflections • Unfactored Loads
-"""·-d-----~-·-d-----"
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
117.28
0.19
0.01
0.01
0.01
om
0.10
0.06
O.o1
0.10
0.06
0.19
0.11
0.19
0.11
0.01
0.18
0.11
O.D1
Load Combination Span Max.·-· Den Location in Span Load Combination
Spen 1
_ De!'!I~~-~_h_ear_!~f~r!!latio.=.:n;___ ____ __
Span
Load Combination Number
+1.20D+0.50l +0.50S-1.0W+1.
+1.20D+D.50L +D.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+120D+0.50L+D.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+O.SOL +0.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+0.50L +0.50S-1.0W+ 1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+0.50L+0.50S-1.0W+1.
+ 1.20D+D.50L +0.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+D.50L +0.50S-1.0W+1.
+1.20D+0.50L +0.50S-1.0W+1.
+1.20D+0.50L +0.50S-1.0W+1.
+1.20D+D.50L+0.50S-1.0W+1.
+1.20D+D.SOL +0.50S-1.0W+1.
Distance 'd'
(ft) (in)
0.00 21.00
0.21 21.00
0.42 21.00
0.64 21.00
0.85 21.00
1.06 21.00
1.27 21.00
1.48 21.00
1.69 21.00
1.91 21.00
2.12 21.00
2.33 21.00
2.54 21.00
2.75 21.00
2.96 21.00
3.18 21.00
3.39 noo
3.60 21.00
0.0327 18.000
Vu (k) Mu d•vuiMu
Actual Design (k-ft)
Phi*Vc
(k)
0.20 0.20
0.47 0.47
0.73 0.73
0.98 0.98
1.23 1.23
1.48 1.48
1.71 1.71
1.94 1.94
2.17 2.17
2.39 2.39
2.54 2.54
2.63 2.63
2.71 2.71
2.79 2.79
2.86 2.86
2.92 2.92
2.98 2.98
3.04 3.04
0.00 1.00
0.03 1.00
0.11 1.00
0.25 1.00
0.45 1.00
0.69 1.00
0.99 1.00
1.34 1.00
1.74 1.00
2.18 1.00
2.67 1.00
3.18 1.00
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
3.71
4.25
4.82
5.39
5.99
6.59
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 4505
1.00 45.05
Comment
Vu < PhiVc/2
Vu <PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Max. '+'Dell
0.0000
Phi*Vs
(k}
Not Reqd
NolReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No!Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No!Reqd
Location in Span
0.000
Spacing (in)
Req'd Suggest
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0,00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Description :
Detailed Shear Information
Span
Load Combination Number
+1.20D-1{}.50L-+0.50S·1.0W+1.
+1.20D-+0.50L -+0.50S-1.0W+1.
-1{},90D-1.0W-1{}.9QH
-+0.90D-1.0W-+0.90H
+ 1 .20D-+0.50L -+0.50S+W+1.60
+1.20D-1{}.5QL -1{}.50S+W+1.60
+1.20D-+0.50L -+0.50S+W+1.60
+1.20D+0.50L -+0.50S+W+1.60
+1.20D-+0.50L -+0.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+1.20D+0.50L -+0.50S+W+1.60
+1.2QD-1{}.50L -+0.50S+W+1.60
... 1.20D+0.50L -+0.50S+W+1.60
+1.20D+0.50L+0.50S+W+1.60
+1.20D+0.50L -1{}.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+1.20D+0.50L +0.50S+W+1.60
+ 1.200-+0.SOL -+0.50S+W+1.60
+1.200-+0.SOL +0.50S+W+1.60
+ 1.200+0.50L +0.50S+W+ 1.60
+1.200+0.50L+0.50S+W+1.60
+1.200+0.50L +0.50S+W+1.60
+1.200-1{}.50L+0.50S+W+1.60
+1.200-+0.50L -+0.50S+W+1.60
+1.200-+0.SOL +0.50S+W+1.60
+1.200+0.50L+0.50S+W+1.60
+1.200+0.50L +0.50S+W+1.60
+0.900-1.0W+0.90H
+1.20D+0.50L -+0.50S-1.0W+1.
+ 1.20D+O .SOL +0.50S-1.DW + 1.
+ 1.200-+0.SOL +0.50S-1.0W+1.
+1.200+0.50L-1{}.50S-1 .OW+1.
+1.200+0.50L+0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+1.
+1.200-+0.SOL +0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+t
+1.200+0.50L +0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+1.
+ 1.200+0.50L -1{}.50S-1.0W+1.
+1.200-+0.SOL -+0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+1.
+1.200+0.50L +0.50S-1.0W+1.
+1 .200+0.50L +0.50S-1 .OW+1.
+ 1.200+0.50L +0.50S-1.DW+ 1.
+1.200+0.50L +0.50S-1.DW+1.
+1.200-+0.50L +0.50S-1.0W+1.
+1.20D+0.50L +0.50S-1.0W+1.
+1 .200-+0.5DL +0.50S-1.0W+ 1.
+1.200-I{}.SOL -+0.50S-1.DW+1.
+1.200-+0.50L +0.50S-1.0W+1.
+1.200-+0.SOL +0.50S-1.0W+1.
+1.20D+0.50L -1{}.50S-1.0W+1.
-+0.90D-1.0W+D.90H
Distance 'd'
(ft) (in)
3.81 21.00
4.02 21.00
4.24 21.00
4.45 21.00
4.66 21.00
4.87 21.00
5.08 21.00
5.29 21.00
5.51 21.00
5.72 21.00
5.93 21.00
6.14 21.00
6.35 21.00
6.56 21.00
6.78 21.00
6.99 21.00
7.20 21.00
7.41 21.00
7.62 21.00
7.84 21.00
8.05 21.00
8.26 21.00
8.47 21.00
8.68 21.00
8.89 21.00
9.11 21.00
9.32 21.00
9.53 21.00
9.74 21.00
9.95 21.00
10.16 21.00
10.38 21.00
10.59 21.00
10.80 21.00
11.01 21.00
11.22 21.00
11.44 21.00
11.65 21.00
11.86 21.00
12.07 21.00
12.28 21.00
12.49 21.00
12.71 21.00
12.92 21.00
13.13 21.00
13.34 21.00
13.55 21.00
13.76 21.00
13.98 21.00
14.19 21 00
14.40 21.00
14.61 21.00
14.82 21.00
15.04 21.00
Vu
Actual
3.08
3.12
3.17
3.22
-3.35
-3.49
-3.62
-3.75
-3.87
-3.99
-4.11
-4.22
-4.33
-4.43
-4.51
-4.48
-4.45
-4.42
-4.38
-4.34
-4.30
-4.25
-4.20
-4.14
-4.08
-4.02
-3.95
3.94
3.95
3.98
4.00
4.02
4.03
4.04
4.05
4.05
4.05
4.05
4.04
4.03
4.01
3.99
3.96
3.84
3.68
3.52
3.36
3.19
3.02
2.84
2.66
2.47
2.28
2.11
..
(k)
Design
3.08
3.12
3.17
3.22
3.35
3.49
3.62
3.75
3.87
3.99
4.11
4.22
4.33
4.43
4.51
4.48
4.45
4.42
4.38
4.34
4.30
4.25
4.20
4.14
4.08
4.02
3.95
3.94
3.95
3.98
4.00
4.02
4.03
4.04
4.05
4.05
4.05
4.05
4.04
4.03
4.01
3.99
3.96
3.84
3.68
3.52
3.36
3.19
3.02
2.84
2.66
2.47
2.28
2.11
Mu
(k-ft)
7.21
7.83
8.04
19.94
21.17
20.43
19.67
18.87
18.05
17.21
16.33
15.43
14.51
13.57
12.61
11.64
10.67
9.71
8.76
7.82
6.89
5.96
5.05
4.14
3.25
2.37
1.51
2.33
1.88
1.06
0.23
0.60
1.44
2.28
3.12
3.96
4.81
5.65
6.49
7.33
8.17
9.01
9.84
10.65
11.44
12.19
12.91
6.03
5.39
4.77
4.20
3.66
3.17
2.95
d*Vu/Mu
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Phi*Vc
(k)
. . .
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
100 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
1.00 45.05
Comment
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu<PhiVc/2
Vu<PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Phi*Vs
(k)
NotReqd
NotReqd
Not Reqd
No!Reqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No!Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No!Reqd
NotReqd
NotReqd
Not Reqd
Not Reqd
Not Reqd
Not Reqd
NotReqd
NotReqd
No!Reqd
NotReqd
NotReqd
No!Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
Not Reqd
Spa,:;ing (in)
Req'd Suggest
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.0(1
0.00
0.00
0.00
0.00
0.0(1
0.00
0.00
0.00
0.00
0.00
0.00
O.OD
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
--•
Description :
Detailed Shear Information
-~"-··--·--·--···--·----·~-·~--
Span Distance 'd' Vu (k) Mu d*Vu/Mu Phi*Vc Comment Phi*Vs Spacing (in)
Load Combination Number (ft} (in) Actual Design (k-ft) (k) (k) Req'd Suggest •··---+1.20D-t{) .50L·+0.50S+W+1.60 15.25 21.00 -2.02 2.02 3.58 1.00 45.05 Vu < PhiVc/2 No!Reqd 0.00 0.00
+1.200-t{).50L-t{).50S+W+1.60 15.46 21.00 -1.96 1.96 3.12 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+1.200+0.50L +0.50S+W+1.60 15.67 21.00 -1.90 1.90 2.68 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+1.200+0.50L+0.50S+W+1.60 1588 21.00 -1.83 1.83 2.25 1.00 45.05 Vu < PhiVc/2 NotReqct 0.00 0.00
+1.200+0.50L +0.50S+W+1.60 16.09 21.00 -1.71 1.71 1.84 1.00 45.05 Vu < PhiVc/2 No!Reqd 0.00 0.00
+1.20D+0.50L +0.50S+W+1.60 16.31 21.00 -1.51 1.51 1.46 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+1.200+0.50L+0.50S+W+1.60 16.52 21.00 -1.32 1.32 1.13 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+1.200+0.50L+0.50S+W+1.60 16.73 21.00 -1.11 1.11 0.83 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+1.200-t{).50L +0.50S+W+1.60 16.94 21.00 -0.91 0.91 0.58 1.00 45.05 Vu < PhiVc/2 Not Reqd 0.00 0.00
+1 .200+0.50l +0.50S+W+ 1.60 17.15 21.00 -0.70 0.70 0.37 1.00 45.05 Vu < PhiVc/2 No!Reqd 0.00 0.00
+1.20D+0.50l +0.50S+W+1.60 17.36 21.00 -0.48 0.48 0.21 1.00 45.05 Vu < PhiVc/2 NotReqd 0.00 0.00
+0.900-1.0W+0.90H 17.58 21.00 0.30 0.30 0.06 1.00 45.05 Vu < PhNc/2 NotReqd 0.00 0.00
-t{).900-1.0W+0.90H 17.79 21.00 0.15 0.15 0.02 1.00 45.05 Vu < PhiVc/2. NotReqd 0.00 0.00
I Beam on Elastic Foundation
Description : GRADE BEAM 3 LINE 8
CODE REFERENCES
Calculations per ACI 318-11, IBC 2012, CBC 2013, ASCE 7-10
Load Combinations Used: ASCE 7-10
!'laterial_ Prope':!ie~
rc
fr = fc 112 • 7.50 :::
'¥Density
').. Lt Wt Factor
Elastic Modulus =
2.50 ksi
375.0 psi
145.0 pel
1.0
3,122.0ksi
<!>Phi Values Flexure : 0.90
Shear: 0.750
0.850
Soil Subgrade Modulus 150.0 psi I (inch deflection)
Load Combination ASCE 7-10
fy -Main Rebar
E -Main Rebar
60.0 ksi
29,000.0 ksi
Fy-Stirrups
E-Stirrups
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Beam is supported on an elastic foundation,
40.0 ksi
= 29,000.0 ksi
# 3
2
E? E?
Cross Section & Reinforcing Details
Rectangular Section, Width= 30.0 in, Height= 24.0 in
Span #1 Reinforcing ....
30" W X 24" h
Span=17.0 ft
4-#5 at 3.0 in from Bottom, from 0.0 to 17.0 ft in this span 4-#5 at 3.0 in from Top, from 0.0 to 17.0 ft in !his span
-~i>PJi!c!~~oa_d_s __ Service loads entered. Load Factors will be for calculations.
Beam self weight calculated and added to loads
Load for Span Number 1
Moment: W = 24.156 k-ft, Location= 3.670 ft from left end of this spar
Moment: W = 24.156 k-ft, Location= 13.830 ft from left end of this spar
DESIGN SUMMARY
Maximum Bending Stress Ratio (>.164: 1
Section used for this span Typical Section
Mu: Applied -19.474 k-ft
Mn *Phi : Allowable 118.690 k-ft
Load Combination +1.20D·t{L50Lr+O 50L +W+1.
Location of maximum on span 13.800 ft
Span # where maximum occurs Span # 1
Maximum Soil Pressure = 0.742 ksf at
Maximum Deflection
Max Downward L +Lr+S Deflection
Max Upward L +Lr+S Deflection
Max Downward Total Deflection
Max Upward Total Deflection
17.00 ft
0.000 in
0.000 in
0.034 in
-0.010 in
Shear Stirrup Requirements
Entire Beam Span Length • Vu < PhKic/2, Req'd lis= Not Reqd, use stirrupssp-a-ce-cdc-a"C"t --,o:-;.o"'"oo""'i,--n -~----------~-----···-··--··-·----···-------
Maximum Forces & Stresses for Load Combinations
Load Combination -------Location (ft) :.::8::--e-nd-::-ing---;:;:S-:--tres-s--;R::--es-u-;;l!s-----;(-,-k-"ft.,-) -------------
Segment Length Span# in Span Mu : Max Phi*Mnx Stress Ratio
MA.Xim,_u_m-,B=E.,.,ND:::-:I'"'NG-=--=En-v..,e/-op_e _____ ___,_ ____ _
Span# 1
+1.40D+1.60H
Span# I
+1.20D+0.50Lr+1.60L +1.60H
16.800
16.800
-0.02
-0.00
--------------------
118.69 0.00
118.69 0.00
Description : GRADE BEAM 3 UNE 8
Load Combination Location (It) Bending Stress Resu_i!S-~(_k-_ft,_) __
Segment Length Span# in Span Mu : Max ~P~hi*_:-M~n~x _s_tr_es_s~R~a~tia __________ _ -S-p-ar~-#~1---=---~1--_::1.:_:6:-;:.8~00;,------~----118.69 0.00
+1 :20D+1.60L +0.50S+1.60H
Span# 1
+1.20D+1.60Lr+0.50L +1.60H
Span# 1
+i .20D+1.60Lr+0.50W+1.60H
Span# 1
+ 1.20D+1.60Lr-0. SOW+ i.60H
Span# 1
+1.200+0.50L +1.60S+1.60H
Span# 1
+i.20D+1.6DS+0.50W+1.60H
Span# 1
+1.20D+1.60S-0.50W+i.60H
Span# 1
+1.200+0.50Lr+0.50L +W+ 1.60H
Span# 1 1
+1.200+0.50Lr+0.50L-1.0W+1.60H
Span# 1 1
+1.200+0.50L +0.50S+W+1.60H
Span# 1 1
+1.20D+0.50L +0.50S-1.0W+1.60H
Span#1 1
+1.360D+0.50L +0.20S+E+1.60H
Span# 1
+0.90D+W+0.90H
Span# 1
+0.90D-1.0W+0.90H
Span# 1
+0.740D+E+0.90H
16.800 -0.00
16.800 -0.00
14.000 2.08
13.800 9.74
16.800 -0.00
14.000 2.08
13.800 9.74
14.000 4.16
13.800 19.47
14.000 4.16
13.800 19.47
16.800 -0.00
14.000 4.16
13.800 19.47
Span# 1 16.800 -0.00
Overall Maximum Deflections • Unfactored Loads
· Load Combination -------Span Max. •.• Defl
Span 1 0.0344
Detailed Shear Information
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
118.69
Location in Span
17.000
0.00
0.00
0.02
0.08
0.00
0.02
0.08
0.04
0.16
0.04
0.16
0.00
0.04
0.16
0.00
Load Combination
Span
Number
Distance 'd' Vu (k) Mu d•VuJMu Phi*Vc
(k) Load Combination
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.900-1.0W+0.90H
+0.900-1.0W-1{L90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.900-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.900-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.900-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
+0.90D-1.0W+0.90H
(It) (in)
0.00 21.00
0.20 21.00
0.40 21.00
0.60 21.00
0.80 21.00
1.00 21.00
1.20 21.00
1.40 21.00
1.60 21.00
1.80 21.00
2.00 21.00
2.20 21.00
2.40 21.00
2.60 21.00
2.80 21.00
3.00 21.00
3.20 21.00
3.40 21.00
3.60 21.00
3.80 21.00
4.00 21.00
4.20 21 00
4.40 21.00
Actual Design
0.18 0.18
0.38
0.58
0.77
0.96
1.14
1.31
1.48
1.65
1.81
1.96
2.11
2.26
2.40
2.53
2.66
2.78
2.90
3.01
3.11
3.21
3.31
3.40
0.38
0.58
0.77
0.96
1.14
1.31
1.48
1.65
1.81
1.96
2.11
2.26
2.40
2.53
2.66
2.78
2.90
3.01
3.11
3.21
3.31
3.40
(k-ft)
0.00 1.00 49.54
0.02
008
0.18
0.32
0.50
0.71
0.96
1.24
1.56
1.90
2.28
2.69
3.13
3.59
4.08
4.60
5.14
5.71
17.86
17.25
16.62
15.98
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
Comment
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu <PhiVc/2
Vu < PhiVc/2
Vu< PhNc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Max. '+' Defl Location in Span
o.oooo o:ooo--
Phi*Vs
(k)
Not Reqd
No!Reqd
NotReqd
NotReqd
NotReqd
Not Reqd
Nat Reqd
Not Reqd
Not Reqd
NotReqd
Not Reqd
Not Reqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
NolReqd
NotReqd
NotReqd
NotReqd
No!Reqd
Spacing (in)
Req'd Suggest
0.00 0.00
0.00
0.00
0.00
o.oc
0.00
0.00
0.00
0.00
000
0.00
0.00
0.00
0.00
0.00
0.0(1
0.00
0.0(1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
File" U:\hgabilan\shared\Booth & Suarez (Hisrona)\Vertzon -Cassia\calculafions\cassia loundation.ec6 ·
ENERCALC, INC. 1983-2015, Build:6.15.4.10, Ver:6.16.4.10
' i"'f®@IFM:U•lll~l~t.mi•JI#JI~t!f.ii3it!jiiJi!iJ!3~®
Description : GRADE BEAM 3 LINE 8
Detailed Shear Information --~---------
Span Distance 'd' Vu (k) Mu d*Vu!Mu Phi*Vc Comment Phi'Vs
Lo~a=d=C....,om"'b"in,.,.ati.,·a,n ...----N_u_m_be_r_..:_(ft-'-) __ (,_in-'-) -,--A_ct_ua_I-,--D_es-=ig:-n:-::---Jk-ft) ____ -'-(k-'-) ------:-c---::-:-::-:--:::--------'-(k~) __
->{).90D-1.0W-+{).90H 4.60 21.00 3.48 3.48 15.31 1.00 49.54 Vu < PhiVc/2 Not Reqd
Spacing (in)
Req'd Suggest
0.00 0.00
-+{).90D-1.0W-+{).90H 4.80 21.00 3.56 3.56 14.63 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W-+{).90H 5.00 21.00 3.64 3.64 13.93 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W->{).90H 5.20 21.00 3.71 3.71 13.22 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1 OW->{).90H 5.40 21.00 3.77 3.77 12.49 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 5.60 21.00 3.84 3.84 11.75 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
-+{).900-1.0W-+{).90H 5.80 21.00 3.89 3.89 11.00 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1.0W-+{).90H 6.00 21.00 3.94 3.94 10.23 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W-+{).90H 6.20 21.00 3.99 3,99 9.46 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900·1.0W->{).90H 6.40 21.00 4.03 4.03 8.68 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1.0W-+{).90H 6.60 21.00 4.07 4.07 7.88 '1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{),900-1.0W-+{).90H 6.80 21.00 4.11 4.11 7.08 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W->{).90H 7.00 21.00 4.14 4.14 6.28 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.DW-+{).90H 7.20 21.00 4.17 4.17 5.46 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
-+{).90D-1.0W-+{).90H 7.40 21.00 4.19 4.19 4.64 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W->{).90H 7.60 21.00 4.21 4.21 3.82 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.QW-+{).9QH 7.80 21.00 4.22 4.22 2.99 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
->{).90D-1.0W->{).90H 8.00 21.00 4.23 4.23 2.16 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
-+{).90D-1.0W->{).90H 8.20 21.00 4.24 4.24 133 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{),900-1.0W-+{).90H 8.40 21.00 4.24 4.24 0.50 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.QW-+{).90H 8.60 21.00 4.24 4.24 0.33 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{),90D·1.0W+0.90H 8.80 21.00 4.23 4.23 1.17 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
->{).90D-1.0W->{).90H 9.00 21.00 4.22 4.22 2.00 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W->{).90H 9.20 21.00 4.21 4.21 2.83 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{),900-1.0W->{).90H 9.40 21.00 4.19 4.19 3.66 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1.0W->{).90H 9.60 21.00 4.17 4.17 4.48 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
-+{).90D-1.0W-+{).90H 9.80 21.00 4.15 4.15 5.30 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-10W->{).90H 10.00 21.00 4.12 4.12 6.12 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1.0W-+{).90H 10.20 21.00 4.08 4.08 6.93 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 10.40 21.00 4.05 4.05 7.73 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1 .OW+O 90H 10.60 21.00 4.00 4.00 8.52 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-10W-+{).90H 10.80 21.00 3.96 3.96 9.31 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W-+{).90H 11.00 21.00 3.91 3.91 10.09 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1.0W->{).90H 11.20 21.00 3.85 3.85 10.85 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0,00
-+{).900-1 .OW->{).90H 11.40 21.00 3.79 3.79 11.61 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 11.60 21.00 3.73 3.73 12.35 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W-+{).90H 11.80 21.00 3.66 3.66 13.08 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1 .0W-+{).90H 12.00 21.00 3.59 3.59 13.80 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W->{).9QH 12.20 21.00 3.51 3.51 14.50 1.00 49 54 Vu < PhiVc/2 No! Reqd 0.00 0.00
->{),90D-1.0W->{).90H 12.40 21.00 3.42 3.42 15.19 1.00 49.54 Vu <PhiVc/2 NotReqd 0.00 0.00
->{)_9QD-1.0W->{).90H 12.60 21.00 3.34 3.34 15.86 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1.0W-+{).90H 12.80 21.00 3.24 3.24 16.51 1.00 49.54 Vu < PhiVc/2 Not Reqd O.OG 0.00
-+{).90D-1.0W->{).90H 13.00 21.00 3.14 3.14 17.15 1.00 49.54 Vu < PhiVc/2 No! Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 1320 21.00 3.04 3.04 17.76 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).90D-1.0W-+{).90H 13.40 21.00 2.93 2.93 18.35 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).900-1.0W-+{).90H 13.60 21.00 2.81 2.81 18.93 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1 .OW-+{).90H 13.80 21.00 2.69 2.69 19.47 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.0() 0.00
->{).90D-1.0W->{).90H 14.00 21.00 2.56 256 4.16 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{)_9QD-1.0W-+{).90H 14.20 21.00 2.43 2.43 3.66 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{)_900-1.0W-+{).90H 14.40 21.00 2.29 2.29 3.19 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1.0W-+{).90H 14.60 21.00 2.15 2.15 2.74 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
-+{).900-1.0W->{).90H 14.80 21.00 2.00 2.00 2.33 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 15.00 21.00 1.84 1.84 1.94 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
->{).90D-1.0W-+{).90H 15.20 21.00 1.68 1.68 1.59 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
I
Description : GRADE BEAM 3 LINE 8
Detailed Shear Information
~~---~ ------·---~-----
Phi*Vs Spacing (in) Span Distance 'd' Vu (k) Mu d*Vu/Mu Phi*Vc Comment Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) Req'd Suggest
~~ +0.900-1 .OW+0.90H 15.40 21.00 1.51 1.51 1.27 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
+0.90D-1.0W+0.90H 15.60 21.00 1.34 1.34 0.98 1.00 49.54 Vu < PhiVc/2 No!Reqd 0.00 0.00
+0.90D-1.0W+0.90H 15.80 21.00 1.16 1.16 0.73 1.00 49.54 Vu < PhiVc/2 NolReqd 0.00 0.00
+0.900-1.0W+0.90H 16.00 21.00 0.97 0.97 0.51 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
+0.90D-1.0W+0.90H 16.20 21.00 0.78 0.78 0.33 1.00 49.54 Vu <PhiVc/2 Not Reqd 0.00 0.00
+0.90D-1.0W+0.90H 16.40 21.00 0.59 0.59 0.19 1.00 49.54 Vu < PhiVc/2 NotReqd 0.00 0.00
+0.900-1 .OW+0.90H 16.60 21.00 0.39 0.39 0.08 1.00 49.54 Vu < PhiVc/2 No!Reqd 0.00 0.00
+0.900-1.0W+0.90H 16.80 21.00 0.18 0.18 0.02 1.00 49.54 Vti<PhiVc/2 No!Reqd 0.00 0.00
Description : GRADE BEAM 4 LINE E
CODE REFERENCES
Calculations per ACI 318-11, IBC 2012, CBC 2013, ASCE 7-10
Load Combinations Used: ASCE 7-10
~aterial Prop~l_!i~~
fc = 2.50 ksi <b Phi Values Flexure: 0.90
fr = fc 112 • 7.50 = 375.0 psi Shear: 0.750
\If Density 145.0 pcf ~1 0.850
A lt WI Factor 1.0
Elastic Modulus = 3,122.0ksi
Soil Subgrade Modulus 150.0 psi I (inch deflection)
Load Combination ASCE 7-1 0
fy • Main Rebar
E -Main Rebar
60.0 ksi
29,000.0 ksi
Fy · Stirrups
E ·Stirrups
Stirrup Bar Size #
Number of Resisting Legs Per Stirrup
Beam is supported on an elastic foundation,
Cross Section & Reinforcing Details
Rectangular Section, Width= 30.0 in, Height= 24.0 in
Span #1 Reinforcing ....
40.0 ksi = 29,000.0 ksi
= # 3
2
30"wx 24" h
Span=13.0 ft
------·----JOil'l --
4-#5 at 3.0 in from Bottom, from 0.0 to 13.0 ft in this span
-~~Pl!~d.-~C?!~ .......... _ ...... .
4-#5 at 3.0 in from Top, from 0.0 to 13.0 ft in this span
Service loads entered. Load Factors will be
Beam self weight calculated and added to loads
Load for Span Number 1
Moment : W = 48.279 k-ft, Location = 6.250 ft from left end of this spar
DESIGN SUMMARY
MaXImum-Bending-Stress R8tlo = 0.213: 1
Section used for this span Typical Section
Mu: Applied 25.315 k-ft
Mn *Phi :Allowable 118.690 k-ft
Load Combination +1.20D1{).50Lr-l{) .50L +W+1.
Location of maximum on span 6.271 ft
Span #where maximum occurs Span# 1
Maximum Soil Pressure = 1.695 ksf at
Shear Stirrup Requirements
Maximum Deflection
Max Downward L +Lr+S Deflection
Max Upward L +Lr+S Deflection
Max Downward Total Deflection
Max Upward Total Deflection
13.00 ft
0.000 in
0.000 in
0.078 in
-0.158 in
.. Entire Beam Span Length :vu < PhiVC/2, Req'd Vs = NotReqd, use stirrups spaced atD.OOO in ··----------------·-··-···
Maximum Forces & Stresses for Load Combinations
for calculations.
Load Combination · -·----··s·-en-cdo-ing-=str_e_ss-=R:-e-su.,.lts~( ,-k-"""ft )c-----------------
Location (ft) Segment Length Span# in Span Mu : Max Phi*Mnx Stress Ratio
MAXimum BENDING Envelope
Span# 1
+1.40D+1.60H
Span# 1
+1.20D->0.50Lr+1.60L+1.60H
Span# 1
6.271
12.847
12.847
25.32
-0.00
-0.00
118.69
118.69
11869
0.21
0.00
0.00
Description :
Load Combination
Segment Length
+1.200+ 1.60L -+0.50S+1.60H
Span# 1
+1.20D+1.60Lr+0.50L+1.60H
Span# 1
+1.20D+1.60Lr+0.50W+1.6DH
Span# 1
+1.20D->0.50L +1.60S+1.60H
Span# 1
+1.20D+1.60S->0.50W+1.60H
Span# 1
Span#
+1 .20D-+0.50Lr+0.5DL +W+1.60H
Span# 1
+1 .20D+0.50L ->0.50S+W+1.60H
Span# 1
+1.360D->0.50L->0.20S+E+1.60H
Span# 1
->0.90D+W->0.90H
Span# 1
+0.740D+E->0.90H
Location (ft)
in Span
12.847
12.847
6.271
12.847
6.271
6.271
6.271
12.847
6.271
__ ____::.Be~n=di2ng Stress Resu~~-'-'( k'---fl"-') __ _
Mu : Max Phi*Mnx Stress Ratio
-0.00
-0.00
12.66
-0.00
12.66
25.32
25.32
-0.00
25.32
118.69
118.69
118.69
118.69
118.69
0.00
0.00
0.11
0.00
0.11
0.21
0.21
0.00
Span# 1 1 12.847 -0.00
118.69
118.69
118.69
118.69
118.69
0.21
0.00
Overall Maximum Deflections • Unfactored Loads
Load Combination Span ·--·Mclx.'YD~-
Span 1 1 0.0785
Location in Span
13000
Load Combination
Span 1
Detailed Shear Information
Load Combination
->0.90D+W-+0.90H
-+0.90D+W->0.90H
-+0.90D+W->0.90H
->0.90D+W->0.90H
->0.90D+W-+0.90H
-+0.90D+W-+0.90H
->0.90D+W->0.90H
->0.90D+W->0.90H
->0.90D+W-+0.90H
-+0.90D+W-+0.90H
+0.90D+W+0.90H
-+0.90D+W+0.90H
->0.90D+W+0.90H
->0.90D+W+0.90H
+0.90D+W+0.90H
+0.90D+W+0.90H
->0.90D·•W+0.90H
->0.90D+W+0.90H
->0.90D+W->0.90H
+0.90D+W->0.90H
->0.90D+W->0.90H
+0.90D+W+0.90H
->0.90D+W+0.90H
->0.90D+W+0.90H
->0.90D+W+0.90H
+0.90D+W->0.90H
-+0.90D+W+0.90H
->0.90D+W+0.90H
+0.90D+W+0.90H
->0.90D+W+0.90H
->0.90D+W+0.90H
+0.90D+W+0.90H
Span
Number
Distance 'd'
(fl) (in)
0.00 21.00
0.15 21.00
0.31 21.00
0.46 21.00
0.61 21.00
0.76 21.00
0.92 21.00
1.07 21.00
1.22 21.00
1.38 21.00
1.53 21.00
1.68 21.00
1.84 21.00
1.99 21.00
2.14 21.00
2.29 21.00
2.45 21.00
2.60 21.00
2.75 21.00
2.91 21.00
3.06 21.00
3.21 21.00
3.36 21.00
3.52 21.00
3.67 21.00
3.82 21.00
3.98 21.00
4.13 21.00
4.28 21.00
4.44 21.00
4.59 21.00
4.74 21.00
Vu (k)
Actual Design
-0.07 0.07
-0.33 0.33
-0.58 0.58
-0.82 0.82
-1.05 1.05
-1.28 1.28
-1.51 1.51
-1.73 1.73
-1.94 1.94
-2.14 2.14
-2.35
-2.54
-2.73
-2.91
-3.09
-3.26
-3.43
-3.59
-3.74
-3.89
-4.03
-4.17
-4.29
-4.42
-4.54
-4.65
-4.75
-4.85
-4.94
-5.03
-5.11
-5.19
2.35
2.54
2.73
2.91
3.09
3.26
3.43
3.59
3.74
3.89
4.03
4.17
4.29
4.42
4.54
4.65
4.75
4.85
4.94
5.03
5.11
5.19
Mu d*Vu/Mu Phi*Vc
(k) (k-fl)
0.00 100 49.54
49.54
49.54
49.54
49.54
49.54
49.54
49.54
49.54
49.54
0.02 1.00
0.08 1.00
0.17 1.00
0.31 1.00
0.48 1.00
0.68 1.00
0.92 1.00
1.19 1.00
1.50 1.00
1.84
2.20
2.60
3.03
3.48
3.96
4.47
5.00
5.56
6.14
6.74
7.37
8.01
8.68
9.36
10.06
10.78
11.52
12.27
13.03
13.81
14.60
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
1.00 49.54
Comment
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu<PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu< PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Vu < PhiVc/2
Max. '+' Defl location in Span
-0.1579 0.000
Phi'Vs
(k)
NotReqd
No\Reqd
NotReqd
NotReqd
No\Reqd
No\Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqcl
NotReqd
NotReqd
NotReqd
NotReqd
Not Reqd
NotReqd
NotReqd
NotReqd
NotReqd
NotReqd
No\Reqd
Spacing (in)
Req'd Suggest
0,00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
O.OCI 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
O.OCI
0.00
0.00
0.00
O.OCI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Description : GRADE BEAM 4 LINE E
Detailed Shear Information
Span Distance 'd' Vu (k) Mu d*Vu/Mu Phi*Vc Comment Phi*Vs Spacing (in)
Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) Req'd Suggest +0-;_::.:;;,90~D:::,+W:.;:;+0:;;;.9;;DH;.:,_ __ ___:_=::::::__~4'-.8-9 ----'C.:2'-1.0_0_:.:..:.:__5-.2.,--5-~5-:-.2-:-5 ~-1~5.-=-40::---1-:-:.0::-::0--'4;:.9~.54:----;V:-;u-<:-;P;;;-hc;-iV;-;c/-;;2 --~N:-:ot-:R:-eq-d;-----::-:-0.00: 0.00
+0.90D+W+0.90H 5.05 21.00 -5.31 5.31 16.22 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 5.20 21.00 -5.37 5.37 17.04 1.00 49.54 Vu<PhiVc/2 NotReqd 0.00 0.00
+0.90D+W+0.90H 5.35 21.00 -5.42 5.42 17.87 1.00 49.54 Vu < PhiVc/2 No!Reqd 0.00 0.00
+0.90D+W+0.90H 5.51 21.00 -5.46 5.46 18.70 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 5.66 21.00 -5.49 5.49 19.55 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 5.81 21.00 -5.52 5.52 20.40 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 5.96 21.00 -5.54 5.54 21.25 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+O 90H 6.12 21.00 -5.56 5.56 22.10 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.0.0 0.00
+0.90D+W+0.90H 6.27 21.00 -5.57 5.57 25,32 1.00 49.54 Vu < PhiVc/2 Not Reqd o.D<D 0.00
+0.90D+W+0.90H 6.42 21.00 -5.57 5.57 24.46 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 6.58 21.00 -5.56 5.56 23.60 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.90D+W+0.90H 6.73 21.00 -5.55 5.55 22.74 1.00 49.54 Vu < PhiVc/2 Not Reqd 0.00 0.00
+0.900+W+0.90H 6.88 21.00 -5.53 5.53 21.88 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.04 21.00 -5.50 5.50 21.02 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.19 21.00 -5.47 5.47 20.17 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.34 21.00 -5.43 5.43 19.33 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.49 21.00 -5.39 5.39 18.49 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.65 21.00 -5.34 5.34 17.66 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.80 21.00 -5.28 5.28 16.83 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 7.95 21.00 -5.22 5.22 16.02 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 8.11 21.00 -5.15 5.15 15.21 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.900+W+0.90H 8.26 21.00 -5.07 5.07 14.41 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 8.41 21.00 -4.99 4.99 13.63 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 8.56 21.00 -4.90 4.90 12.86 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 8.72 21.00 -4.80 4.80 12.10 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 8.87 21.00 -4.70 4.70 11.36 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 9.02 21.00 -4.60 4.60 10.63 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 9.18 21.00 -4.48 4.48 9.92 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.9DH 9.33 21.00 -4.37 4.37 9.23 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 9.48 21.00 -4.24 4.24 8.55 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 9.64 21.00 .4.11 4.11 7.89 1.00 49.54 Vu<PhiVc/2 NotReqd
+0.90D+W+0.90H 9.79 21.00 -3.98 3.98 7.25 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 9.94 21.00 -3.84 3.84 6.64 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.09 21.00 -3.69 3.69 6.04 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.25 21.00 -3.54 3.54 5.47 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.40 21.00 -3.38 3.38 4.92 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.55 21.00 -3.21 3.21 4.40 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.71 21.00 -3.04 3.04 3.90 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 10.86 21.00 -2.87 2.87 3.42 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 11.01 21.00 -2.69 2.69 2.98 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 11.16 21.00 -2.50 2.50 2.56 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0,90H 11.32 21.00 -2.31 2.31 2.17 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.900+W+0.90H 11.47 21.00 -2.11 2.11 1.80 1.00 49.54 Vu < PhiVc/2 NotReqd
+0.90D+W+0.90H 11.62 21.00 -1.90 1.90 1.47 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 11.78 21.00 -1.70 1.70 1.17 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 11.93 21.00 -1.48 1.48 0.91 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 12.08 21.00 -1.26 1.26 0.67 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.9DD+W+0.90H 12.24 21.00 -1.03 1.03 0.47 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.900+W+0.90H 12.39 21.00 -0.80 0.80 0.30 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 12.54 21.00 -0.56 0.56 0.17 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 12.69 21.00 -0.32 0.32 0.08 1.00 49.54 Vu < PhiVc/2 Not Reqd
+0.90D+W+0.90H 12.85 21.00 -0.07 0.07 0.02 1.00 49.54 Vu < PhiVc/2 Not Reqd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Dunn Savoie Inc. v tt/Y!Z-t?tu ~ a k, r Pr JOB _________________ _
Structural Engineering
908 S. Cleveland St., Oceanside, Ca 92054
Ph: (760) 966-6355 Fax: (760) 966-6360
E-mail: dsi@surfdsi.com
SHEETNO. ________ OF __ ~-
CALCULATED BY _______ O~TE _2_]l?
CHECKED BY ______ _
SCALE-------
? ~----~----~----------------------------------~--~------------------.
CAGC/AvAvC i-1AX f V'~ LA t4 L-<.?AJ?~
11 \)¢ ~~) D L-L-O;~,
N Q't; ,()~ '"~ f() /~ ~ *',0
~· w !
\\ C-
'--I ,C? -\lj !
lbf(-Y
( '? x ICjSY lbs + 2-r-. '175o
(~'1' _) C\D/)
A\f0 V£\b 1/ Of yJALv
&5 \bj ft
~'7 tP )bj ft
W? ::-\52 f":7f r l~ ~-z:' -r \ \'5 ~Sf'~B' -::::-137 f:<:Jf'
\3"
l.)
1-
j.
1:
L,_____ ______ _j:
Input Values:
Max Height of Wall
Min. Length of Wall
Wall Weight
DUNN SAVOIE INC.
STRUCTURAL ENGINEERING
908 8. GLEVELAND ST.
OCEANSIDE, GA. 92054
PH: ('760) 966-6355
GENERATOR ENCLOSURE WALLS
h= 13.0ft
L = 10.0 ft
Wp = 137 psf
SDs = 0.800
le = 1.00
Spectral Acceleration, Short Period
Importance Factor (Seismic)
Lateral Load For Wind Exposure Category C
V:::; i 10.0 mph Basic Wind Speed
Wind Force (ASCE 7-10 Sec. 29.4)
qz = 0.00256 Kz K21 Kd V2
Kct:;: 0.85 . Directionality Factorfor Free Standing Wall (Table 26.6-1)
Kzt = 1.00 • Topographic Factor (Sec. 26.8)
K2 : Velocity Pressure Exposure Coefficient(Table 29.3-1)
For Wind Exposure C and Table a= 9.5 Zg = 900
z = 13.0 ft (Exposed Height of Wall or Max Height, h)
forz<15 for 15 < z ~ zg
K2 :;: 2.01 (15/ Zg) l/cr Kz == 2.01 (z/Zg) l/11.
Kz = 0.85
Q2 = 22.35 psf
Fw = qz G Cf (psf) , wind force on other structures (29.5-1)
G = 0.85 , Gust-effect factor (Sec 26.9.1)
Cf: Force Coefficient of (Fig 29.4-1)
B = 10.0 Horizontal Dimension of Wall
h= 13.0 HeightofWall
s = 13.0 Vertical Dimension of Wall
Clearance Ratio, s/h = 1.00 Aspect Ratio, 8/s;;;;: 0.77
Therefore, using "Cf, CASE A & CASE 8" of table from figure 29.4-1
Cf = 1.40
jFw = 26.60 psf (UNFACTORED)
Out-Of-Plane Sesimic Force {ASCE 7-10 Sec. 12.11.1)
F = p 0.4 Sos IE wp 0.320 xWp = 43.84 psf
10%WP = 0.100 xWp :;: 13.70 psf
IFP = 43.84 psf (UNFACTORED)
SEISMIC GOVERNS
(Controls)
DL= 761., LL= 0.#, Ecc= O.in
1605.psf
Description :
[Criteria
ENCLOSURE FREESTANDING WALL
Retained Height
Wall height above soil
Slope Behind Wall
:::
Height of Soil over Toe
Water height over heel
Vertical component of active
Lateral soil pressure options:
NOT USED for Soil Pressure.
1.17 ft
9.50ft
0.00: 1
14.00 in
O.Oft
NOT USED for Sliding Resistance.
NOT USED for Overturning Resistance.
[-~------------·---Surcharge Loads
Surcharge Over Heel ::: 194.0 psf
Used To Resist Sliding & Overturning
Surcharge Over Toe 0.0 psf
Used for Slidin & Overturning
.. Axial. Load Applied to Stem ___ ___,
Axial Dead Load
Axial Live Load "
Axial Load Eccentricity :::
761.0 lbs
0.0 lbs
0.0 in
L:J D=-=e:.::s""igc.:.n-=S~umc:.:.m=ary,.__ ______ _]
Wall Stability Ratios Overturning
Sliding
Total Bearing Load
... resultant ecc.
2.40 OK
2.23 OK
3,364 lbs
10.23 in
Soil Pressure @ Toe 1 ,605 psf OK
Soil Pressure@ Heel 0 psf OK
Allowable = 1 ,995 psf Soil Pressure Less Than Allowable
ACI Factored@ Toe 1,926 psf
ACI Factored @ Heel 0 psf
Footing Shear@ Toe 14.7 psi OK
Footing Shear@ Heel = 8.8 psi OK
Allowable 75.0 psi
Sliding Cales (Vertical Component NOT Used)
Lateral Sliding Force 703.4lbs
less 100% Passive Force 726.0 lbs
less 100% Friction Force 84tUI!bs
Added Force Req'd 0.0 lbs OK
.... for 1.5 : 1 Stability 0.0 lbs OK
Load Factors
Dead Load
Live Load
Earth, H
Wind, W
Seismic, E
1.200
1.600
1.600
1.600
1.000
f Soil Data ·--~-----·
Allow Soil Bearing = 1,995.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
Toe Active Pressure
Passive Pressure
Soil Density, Heel
Soil Density, Toe
=
45.0 psf/ft
30.0 psflft
300.0 psf/ft
110.00 pcf
110.00pcf
0.250 Friction Coeff btwn Ftg & Soil =
Soil height to ignore for passive pressure 12.00 in
Calculations per ACI318-11, ACI530·11, IIBC 2012,
CBC 2013, ASCE 7·10
J Lateral Load Applied to Stem
Lateral Load
I Adjacent Footing L __ o_ad ______ =:}
... Height lo Top
... Height to Bottom
43.8 plf
10.67 ft
O.OOft
Wind on Exposed Stem 0.0 psf
l Stem Construction Top Stem
SlemOK
Design Height Above Ftg ft == 0.00
Wall Material Above 'Hl' Masonry
Thickness in= 8.00
Rebar Size # 5
Rebar Spacing in= 16.00
Rebar Placed at Center
Adjacent Footing Load 0.0 lbs
Footing Width 0.00 ft
Eccentricity = 0.00 in
Wall to Ftg CL Dist 0.00 ft
Fooling Type Line Load
Base Above/Below Soil
at Back of Wall
Poisson's Ratio =
O.Oft
0.300
Design Data ---~---·~~------------
fb/FB +fa/Fa o.sos
Total Force @ Section lbs = 632.3
Moment.. .. Actual ft-l = 2,588.4
Momeni.. ... AIIowab!e ft-1 = 3,446.5
Shear. .... Actual psi= 14.1
Shear ..... Ailowable psi= 69.7
Wall Weight psf = 84.0
Rebar Depth 'd' in= 3.75
Lap splice if above in= 45.00
Lap splice if below in= 7.00
Hook embed into footing in= 7.00
Masonry Data fm psi= 1,500
Fy psi= 60,000
Solid Grouting Yes
Modular Ratio 'n'
Short Term Factor
Equiv. Solid Thick.
Masonry Block Type
Masonry Design Method
21.48
1000
in= 7.60
3
= LRFD
Description :
lf~~ting Dimensions & Strengths __j I Footing Design Results
Toe Width = 1.92 ft --lQL __!:!g&_
Heel Width --~
Total Footing Width 4.50
Footing Thickness 15.00 in
Key Width = 0.00 in
Key Depth = 0.00 in
Key Distance from Toe 2.00 ft
rc = 2,500 psi
Footing Concrete Density
Min. As%
Cover@ Top 2.00
Fy = 60,000 psi
150.00 pcf
0.0018
@ Blm.= 3.00 in
Factored Pressure 1,926
Mu': Upward 3,486
Mu' : Downward 822
Mu: Design 2,664
Actua11-Way Shear 14.66
Allow 1-Way Shear 75.00
Toe Reinforcing # 5 @ 16.00 in
Heel Reinforcing == # 5@ 16.00 in
Key Reinforcing = None Spec'd
Other Acceptable Sizes & Spacings
Toe: Not req'd, Mu < S • Fr
Heel: Not req'd, Mu < S • Fr
Key: No key defined
,-::-------i Summary of Overturning & Resisting Forces & Moments
..... OVERTURNING .....
force Distance Moment
Item lbs ft ft-lb
131.4 0.81 105.9 Soil Over Heel
= 191.8 1.21 231.8 Sloped Soil Over Heel
-87.6 0.81 -70.6 Surcharge Over Heel
Adjacent Footing Load
0 psf
0 ft-lb
1,496 ft-ib
1,496 ft-lb
8.81 psi
75.00 psi
=
Heel Active Pressure
Surcharge over Heel
Toe Active Pressure
Surcharge Over Toe
Adjacent Footing Load
Added Lateral Load
Axial Dead Load on Stem
467.8 6.59
Load @ Stem Above Soil
Total 703.4 O.T.M.
Resisting/Overturning Ratio
Vertical Loads used for Soil Pressure =
2.40
3,364.4 lbs
3,080.3
3,347.4
* Axial Live Load on Stem =
Soil Over Toe
Surcharge Over Toe =
Stem Weight(s)
Earth@ Stem Transitions
Footing Weight
Key Weight ::
Vert. Component =
~
..... RESISTING ..... Force Distance Moment
lbs ft ft-lb
246.0 3.54 871.1
371.8 3.54 1,316.5
761.0 2.25 '1,712.0
245.9 0.96 235.6
896.0 2.25 :2,015.8
843.6 2.25 '1,897.9
2.00
--·---Total= 3,364.4 lbs R.M. = 8,049.0
*Axial live load NOT included in total displayed, or used for overturning resistance, but is included for soil pressure calculation.
1'-2"
#S@16.in
@Toe
. /#S@ 16.in o/c ~ 8.1nMasw ~
SolldGmut I
I I I I I I I I ~~-2" ~~.~:::-~---......... =~~=;. r ' ~ '3" -· A
2'-7'' ..... Designer select 1'-11" .......,. -· -
· reinf ~ #5@16.in all honz. .
@Heel ~ 4'-6"
9'-6"
10'-8"
-I
1'-2"
I
1'-3"
'
DL= 761., LL= 0.#, Ecc= O.in
Pp= 1687.5# 1360.#
1948.9psf
Description : ENCLOSURE RETAINING WALL
Retained Height
Wall height above soil
Slope Behind Wall ;:
Height of Soil over Toe
Water height over heel
Vertical component of active
Lateral soil pressure options:
NOT USED for Soil Pressure.
3.50 ft
9.83 ft
0.00:1
24.00 in
0.0 ft
NOT USED for Sliding Resistance.
NOT USED for Overturning Resistance.
/L_S_u_rc_h_ar=ge_L_o __ a_ds _______ J
Surcharge Over Heel = 194.0 psf Used To Resist Sliding & Overturning
Surcharge OverT oe = 0.0 psf
Used for Sliding & Overturning
I Axial Load Applied to Stem
Axial Dead Load 761.0 lbs
Axial Live Load = 0.0 lbs Axial Load Eccentricity = 0.0 in -·-----, I Design Summary -·--~-------j
Wall Stability Ratios
Overturning
Sliding
Total Bearing Load
.. .resultant ecc.
::
4.83 OK 2.02 OK
8,527 lbs 17.52 in
Soil Pressure @ Toe 1,950 psf OK
Soil Pressure@ Heel 0 psf OK
Allowable = 1,995 psf Soil Pressure Less Than Allowable
ACI Factored @ Toe = 2,340 psf
ACI Factored @ Heel = 0 psf
Footing Shear@ Toe = 0.0 psi OK
Footing Shear@ Heel 44.4 psi OK
Allowable 75.0 psi
Sliding Cales {Vertical Component NOT Used)
Lateral Sliding Force 1,360.0 lbs
less 100% Passive Force -• 1,687.5 lbs
less 50 % Friction Force -• 1 ,06fHllbs
Added Force Req'd 0.0 lbs OK
... Jar 1.5: 1 Stability 0.0 lbs OK
Load Factors
Dead Load
Live Load
Earth, H
Wind, W
Seismic, E
1.200
1.600
1.600
1.600
1.000
[Soil Data
Allow Soil Bearing 1,995.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
Toe Active Pressure
Passive Pressure
Soil Density, Heel
45.0 psf/ft
30.0 psf/ft
300.0 psffft
110.00 pcf
110.00 pcf
0.250
Soil Density, Toe =
Friction Coeff btwn Ftg & Soil =
Soil height to ignore
for passive pressure 12.00 in
Calculations per ACI 318·11, ACI530·11, IBC 2012,
CBC 2013, )\SCE 7·10
[ Lateral Load Applied to Stem
Lateral Load
1_1 A_d-=-ja_c_en_t_F_o_ot_in_,gc_L_o_ad _____ ~
... Height to Top
... Height to Bottom
43.8 plf
13.33 ~
0.00 ft
Wind on Exposed Stem 0.0 psf
I Stem Construction J Top Stem
Design Height Above Ftg
Wall Material Above 'Ht'
Thickness
Rebar Size
Rebar Spacing
Rebar Placed at
Design Data
fb/FB +fa/Fa
Total Force @ Section
Moment. ... Actual
MomenL .. AIIowable
Shear ..... Actual
Shear .. ., .Allowable
Wall Weight
Rebar Depth 'd'
Lap splice if above
Lap splice if below
Hook embed into footing
;:
in=
in=
lbs =
ft-1;:;
ft-1 =
psi=
psi=
psf =
in=
in=
in=
in=
Stem OK
4.67
Masonry
8.00
# 5
16.00
Center
0.510
379.7
1,643.9
3,446.5
8.4
69.7
84.0
3.75
45.00
45.00
45.00
Masonry Data ---·---rm psi= 1,500
Fy psi=
Solid Grouting
Modular Ratio 'n'
ShortT erm Factor
Equiv. Solid Thick.
Masonry Block Type
Masonry Design Method
=
in=
60,000
Yes
21.48
1.000
7.60
3
LRFD
Adjacent Footing Load 0.0 lbs
Footing Width 0.00 ft
Eccentricity 0.00 in
Wall to Ftg CL Disl 0.00 ft
Footing Type Line Load
Base Above/Below Soil
at Back of Wall
Poisson's Ratio
2nd
Stem OK
0.00
Masonry
10.00
# 5
16.00
Edge
0.773
1,373.8
5,123.2
7,108.3
15.8
69.7
104.0
7.25
45.00
7.00
7.00
1,500
60,000
Yes
Yes
21.48
1.000
9.60
O.Oft
0.300
I Cantilevered Retaining Wall
l!ffli!JijMANM,f.t!FMI '"
Description : ENCLOSURE RETAINING WALL
File-U:\llgabilan\shared\Booth & Suarez (Hisrone)\Verizon-Cassia\calcula!ions\cassia.ec6
ENERCALC,INC.1983-2015, Build:6.15.4.10, Ver:6.15A10 WIM!t34•~1§=-M•IIJ~I~Ef.1J!lelJjl~tAii31lf)fjiDJ(fi'!#¢[e
[FOoting Dimensions & Strengths [FO"oting Design Res_ul_ts __ ·_·~_-_--_-__j-
Toe Width
Heel Width
Total Footing Width
Footing Thickness
Key Width
Key Depth
Key Distance from Toe
fc "' 2,500 psi
Footing Concrete Density
0.00 ft
8 Z5.
"' 8.75
18.00 in
::: 0.00 in
::: 0.00 in
= 2.00ft
Factored Pressure
Mu': Upward
Mu' : Downward
Mu: Design
Actuai1-Way Shear
Allow 1-Way Shear
Toe Reinforcing
Heel Reinforcing
Key Reinforcing
...lQL
= 2,340
0
0
0
0.00
0.00
= # 6@ 16.00 in
= #6@ 16.00 in = None Spec'd
...J:I.ggL
0 psf
0 ft-lb
0 ft-lb
8,197 fl-lb
44.37 psi
75.00 psi
Min. As%
Cover@ Top 2.00
Fy = 60,000 psi
150.00pcf
0.0018
@ Btm.= 3.00 in Other Acceptable Sizes & Spacings
Toe: Not req'd, Mu < S • Fr
Heel: #4@ 7.25 in, #5@ 11.25 in, #6@ 16.00 in, #7@ 21.75 in, #8@ 28.50 in, #9@ 36
Key: No key defined
[ Summary_ of Overturning & Resisting Forces & Moments
..... OVERTURNING .....
Item
Heel Active Pressure
Surcharge over Heel
Toe Active Pressure
Surcharge Over Toe
Adjacent Footing Load -
Added Lateral Load
Load @ Stem Above Soil
Total
Resisting/Overturning Ratio
Force Distance Moment
Jbs ft ft-!b
562.5 1.67 937.5
396.8 2.50 992.0
-183.8 1.17 -214.4
584.4 8.17 4,771.5
1,360.0 O.T.M. = 6,486.7
Vertical Loads used for Soil Pressure = 4.83
8,526.6 lbs
__________ _]
Soil Over Heel
Sloped Soil Over Heel
Surcharge Over Heel
Adjacent Footing Load
Axial Dead Load on Stem
• Axial Live Load on Stem
Soil Over Toe
Surcharge Over Toe
Stem Weight(s)
Earth@ Stem Transitions
Footing Weight
Key Weight
:::
:::
• .... RESISTING ••.•• Force
lbs
3,047.9
1,535.8
761.0
1,213.1
1,968.8
Distance
ft
4.79
4.79
0.42
0.37
4.38
2.00
Vert. Component _= ____ _
Moment
ft-lb
14,604.6
7,359.2
3'17.1
444.8
8,1513.3
Total= 8,526.6 lbs R.M. = 31,:339.0
*Axial live load NOT included in total displayed1 or used for overturning resistance, but is included for soil pressure calculation.
Designer select
#6@16.in all horiz. reinf . ....c~
@Heel
8'-9"
8'-9"
XX-"="""" ___ _....
2"
T
• l
8'-8"
9'-10"
13'-4"
I
I
4'-8"
3'-6"
I !
1'-6"
'
DUNN SAVOIE lNG.
STRUGTURAL E:N131NEERING
908 5. CLEVELAND ST.
OGEANSIDE, CA. 9.2054
PH: ('760) 966-6855
ELEMENT CRITERIA VERIZON WIRELESS 'RBS-6102'
EQUIPMENT WEIGHT wp =
DIMENSIONS: LENGTH L =
WIDTH (anchor spacing} w =
HEIGHT H =
EQUIPMENT ELEVATION z =
ROOF ELEVATION h =
SEISMIC CRITERIA
SEISMIC DESIGN CATEGORY =
SPECTRAL ACCELERATION, SHORT PERIOD Sos =
IMPORTANCE FACTOR lp =
COMPONENT AMPLIFICATION FACTOR ao =
COMPONENT RESPONSE MODIF. FACTOR Rp =
1984
51
19.5
77
0.0
0.0
D
0.8
1.25
1
2.5
Design Seismic Load per 2012 International Building Code and ASCE 7-10
Design Lateral Force: (13.3-1\ (LRFD)
lbs
in
in
in
ft
ft
(ASD)
FP = 0.4apSos (1 + 2(z/h)) Wp = 0.300 Wp = 0.214 Wp
(Rpflp)
Lower Limit: (13.3-3)
F = 0.3* S05 lp Wp = 0.300 Wp= 0.214 Wp p
UgQer Limit: (13.3-2)
Fp= 1.6* Sos lp Wp = 1.600 Wp = 1.143 Wp
Therefore, Fp= 0.300 Wp (LRFD) = 595 lbs
F0 = 0.214 Wp (ASD) = 425 lbs
ELEMENT ANCHORAGE LRFD
OVERTURNING:
OM= Fp. H/2 = 1909 lb-ft
RM= (0.9-0.2S05)*W p'W/2 = 1193 lb-ft
NET M = OM-RM = 716 lb-ft
ThereforeT = 441 lbs per side
SHEAR:
No. of bolts = 4
V= FP I No. of bolts = 149 lbs
USE: 1/2" SS Hll Tl KB TZ EXPANSION ANCHORS WITH MIN. 3 1/4" EMBED
DUNN SAVOIE lNG.
STRUCTURAL ENGINEERING ..:::..;:=.~::.:_---~!.---------=-:--:-::----i
908 S. CLEVELAND ST.
OCEANSIDE, CA. 92054
PH: ('760) 966-6355
ELEMENT CRIJERIA VERIZON WIRELESS "COMSCOPE" 'BAT -RBA84
EQUIPMENT WEIGHT wp ;:: 4750
DIMENSIONS: LENGTH L ;:: 36
WIDTH (anchor spacing) w ;:: 24
HEIGHT H = 84
EQUIPMENT ELEVATION z ;:: 0.0
ROOF ELEVATION h = 0.0
SEISMIC CRITERIA
SEISMIC DESIGN CATEGORY ;:: D
SPECTRAL ACCELERATION, SHORT PERIOD Sos = 0.8
IMPORTANCE FACTOR lp = 1.25
COMPONENT AMPLIFICATION FACTOR ap = 1
COMPONENT RESPONSE MODIF. FACTOR Rp = 2.5
Design Seismic Load per 20121nternational Building Code and ASCE 7-10
Design Lateral Force: 113.3-11 (LRFD)
lbs
in
in
in
ft
ft
(ASD)
FP = 0.4apSos (1 + 2(z/h)) Wp = 0.300 Wp = 0.214 Wp
(Rpflp)
Lower Limit: {13.3-31
Fp=
UQQer Limit: (13.3-2)
Fp=
Therefore, Fp = 0.300 Wp
Fp= 0.214 Wp
ELEMENT ANCHORAGE LRFD
OVERTURNING:
OM= Fp.H/2
RM = (0.9-0.2S05)*Wp.W/2
NET M = OM-RM
ThereforeT
SHEAR:
No. of bolts =
V = FP I No. of bolls =
0 .3* S0s IP wP =
1.6* S0s lp Wp =
(LRFD)
(ASD)
=
=
=
=
4
= 1425
= 1018
4988 lb-ft
3515 lb-ft
1473 lb-ft
736 lbs
356 Jbs
0.300 Wp= 0.214
1.600 Wp = 1.143
lbs
lbs
per side
USE: 1/2" SS HIL Tl KB TZ EXPANSION ANCHORS WITH MIN. 3 1/4" EMBED
Wp
Wp
DUNN SAVOIE INC.
STRUCTURAL ENGINEERING ...::.;.,;=.;...;.:.:::.;_ __ ___:~-----------,-----J
908 S. CLEVELAND ST.
OCEANSIDE, CA. 92054
PH: ('760) 966-63 55
ELEMENT CRITERIA 10 Kw DC EMERGENCY GENERATOR
EQUIPMENT WEIGHT wp =
DIMENSIONS: LENGTH L =
WIDTH (anchor spacing) w =
HEIGHT H =
EQUIPMENT ELEVATION z =
ROOF ELEVATION h =
SEISMIC CRITERIA
SEISMIC DESIGN CATEGORY =
SPECTRAL ACCELERATION, SHORT PERIOD Sos =
IMPORTANCE FACTOR lp =
COMPONENT AMPLIFICATION FACTOR ap =
COMPONENT RESPONSE MODIF. FACTOR Rp =
1413
32.5
31
42.5
0.0
0.0
D
0.8
1.25
1
2.5
Design Seismic Load per 20121nternational Building Code and ASCE 7-10
Design Lateral Force: (13.3-1) (LRFD)
lbs
in
in
in
ft
ft
(ASD)
FP = 0.4ap Sos (1 + 2(z/h)) wP = 0.300 Wp = 0.214 Wp
(RJip)
Lower Limit: (13.3-3)
Fp = 0 .3* S0s lp wP = 0.300 Wp = 0.214 Wp
UQger Limit: {13.3-2)
Fp = 1 .6* Sos lp wP = 1.600 Wp = 1.143 Wp
Therefore, Fp= 0.300 Wp (LRFD) = 424 lbs
Fp= 0.214 Wp (ASD) = 303 lbs
ELEMENT ANCHORAGE LRFD
OVERTURNING:
OM= Fp. H/2 = 751 lb-ft
RM= (0.9-0.2S05)*Wp.W/2 = 1351 lb-ft
NETM= OM-RM = <0 lb-ft
ThereforeT = 0 lbs per side
SHEAR:
No. of bolts = 4
V= F P I No. of bolts = 106 lbs
USE: 1/2" SS HIL Tl KB TZ EXPANSION ANCHORS WITH MIN. 3 1/4" EMBED
/(
www.hilti.us
Company:
Profis Anchor 2.5.2
Specifier:
Address:
Phone I Fax:
E-Mail:
Dunn Savoie, Inc.
HG
908 S. Cleveland Street
760966635517609666360
Page:
Project: Verizon-Cassia
Sub-Project I Pos. No.:
Dale: 5/8/2015
Specifier's comments: Comscope "RBA84" loads, critical of load of all equipments
11nput data
Anchor type and diameter:
Effective embedment depth:
Material:
Evaluation Service Report:
Issued I Valid:
Proof:
Stand-off installation:
Anchor plate:
Profile:
Base material:
Installation:
Reinforcement:
Seismic loads (cat. C, D, E, or F)
Geometry [in.] & Loading [lb, in.lb]
Kwik Bolt TZ • SS 316 1/2 (3 1/4)
hef,act = 3.250 in., hnom = 3.625 in.
AISI 316
ESR-1917
5/1/201315/1/2015
Design method ACI318-11/ Mech.
eb = 0.000 in. (no stand-off); t = 0.250 in.
lx x ly x t = 39.400 in. x 36.100 in. x 0.250 in.; (Recommended plate thickness: not calculated)
no profile
cracked concrete, 2500, fc' = 2500 psi; h = 6.000 in.
hammer drilled hole, Installation condition: Dry
tension: condi!ion B, shear: condition B; no supplemental splitting reinforcement present
edge reinforcement > No. 4 bar
Tension load: yes (0.3.3.4.3 (b))
Shear load: yes (0.3.3.5.3 (a))
z:
----~-----·-·--------· !nput data and resu!ts must be checked for agreemanl with tne existing conditions and for plausibility!
PROF IS Anchor (c) 2003-2009 Hill! AG. FL-9494 Schaan Hilu IS a registered Trademark of Hilt! AG, Schaan
www.hilti.us
Company:
Specifier:
Dunn Savoie, Inc.
HG
Page:
Project:
Profis Anchor :2.5.2
2
Verizon-Cassia
Address: 908 S. Cleveland Street
760966635517609666360
Sub-Project I Pos. No.:
Phone I Fax:
E-Mail:
2 Proof I Utilization (Governing Cases)
Loading
Tension
Shear
Loading
Proof
Concrete Breakout Strength
Concrete edge failure in direction y+
Combined tension and shear loads 0.193
3 Warnings
• Please consider all details and hints/warnings given in the detailed report!
Date:
Design values [lb]
Load Capacity
673 3487
1425 8319
~ r;
0.171 5/3
Fastening meets the design criteria!
4 Remarks; Your Cooperation Duties
5/8/2015
Utilization
tiN I (}v [%] Status
20 f-OK
-/18 OK
Utilization ~.v [%] Status
12 OK
• Any and all information and data contained in the Software concern solely !he use of Hilli products and are based on the principles, formulas .and
security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly
complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using
the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in.
Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you.
Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to
compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms
and permits without any guarantee as to the absence of errors, the correcfness and the relevance of the results or suitability for a specific
application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the
regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use
the Auto Update function of the Software, you must ensure that you are using the current and thus up-to-dale version of the Software in each case
by carrying out manual updates via the Hilti Website. Hifti will not be liable for consequences, such as the recovery of lost or damaged data or
programs, arising from a culpable breach of duty by you.
Input data and results must be checked for agraemenl w1lh the ex1sling cond1tions and for plaus!bllityl
PROFIS Anchor (c) 2003-2009 Hilli AG, FL-9494 Schaan Hilli 1s a registered Trademar1< of Hill1 AG. Schaan
0 -D
G INDIGO •
TORO
INTERNATIONAL
GEOTECHNICAL INVESTIGATION
for
VERIZON EQUIPMENT ENCLOSURE
CASSIA
2020 CASSIA ROAD
CARLSBAD, CALIFORNIA
Prepared For:
BOOTH & SUAREZ
P. 0. BOX 4651
CARLSBAD, CA 92018
Prepared By:
TOROINTERNATIONAL
6INDIGO
IRVINE, CA 92618
(949) 559-1582
February 18, 2015
IRVINE, CA 9261 B • TEL. (949) 559-1582
GEOTECHNICAL ENG!NEE'RING
• FAX. (949) 559-1583 rot~~r·~;~~
0 -D
TORO
INTERNATIONAL
February 18, 2015
Booth & Suarez
P. 0. Box 4651
Carlsbad, California 92018
Attention: Mr. Robert Suarez
GEOTECHNICAL ENGINEERING
TI Project No. 13-109.52
Subject: Geotechnical Investigation for Proposed Verizon Equipment Enclosure, Cassia Site,
2020 Cassia Road, Carlsbad, California
Toro International (TI) has completed geotechnical investigation for the proposed Verizon
Equipment Enclosure, Cassia Site, located at 2020 Cassia Road, Carlsbad, California. This report
presents our findings, conclusions and recommendations for construction of the proposed V erizon
Equipment Enclosure.
It is our opinion from a geotechnical viewpoint that the subject site is suitable for construction of the
proposed Verizon Equipment Enclosure provided our geotechnical recommendations presented in
this report are implemented.
If you have any questions, please let us know. We appreciate this opportunity to be of service.
Sincerely,
TORO INTERNATIONAL
Hantoro Walujono, GE 2164
Principal
6 INDIGO • IRVINE, CA 92618 • TEL. (949) 559-1582 • FAX. (949) 5!)9-1583
TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................... 1
1.1 General ..................................................................................................................... l
1.2 Proposed Development ............................................................................................ 1
1.3 Site Description ........................................................................................................ !
1.4 Scope of Work ......................................................................................................... 3
2.0 FIELD EXPLORATION AND LABORATORY TESTING ............................................. .4
2.1 Field Exploration ..................................................................................................... 4
2.2 Laboratory Testing ................................................................................................... 4
3.0 SITE CONDITIONS ............................................................................................................ 6
3.1 Geology .................................................................................................................... 6
3.2 Groundwater ............................................................................................................ 6
3.3 General Subsurface Conditions ............................................................................... 6
4.0 SEISMICITY ....................................................................................................................... 7
4.1 General ..................................................................................................................... 7
4.2 Ground Motion ........................................................................................................ 7
4.3 Seismic Design ......................................................................................................... 8
4.4 Liquefaction Potential .............................................................................................. 8
5.0 CONCLUSIONS AND RECOMMENDATIONS .............................................................. 9
5.1 General ..................................................................................................................... 9
5.2 Overexcavations/Removals ..................................................................................... 9
5.3 Grading and Earthwork ............................................................................................ 9
5.4 Foundation Design Parameters .............................................................................. 10
5.5 Cement Type .......................................................................................................... 11
5.6 Geotechnical Observation and Testing .................................................................. 11
6.0 LIMITATIONS .................................................................................................................. l2
7.0 REFERENCES .................................................................................................................. 13
0
-TORO 0 INTERNATIONAL
Section
List of Figures
Figure 1.
Figure 2.
List of Tables
Table 1.
TABLE OF CONTENTS (CONT'D)
ILLUSTRATIONS
Site Location Map .................................................................................................... 2
Boring Location Map ............................................................................................... 5
Summary of Fault Parameters .................................................................................. ?
APPENDICES
Appendix A -Field Exploration
Appendix B -Laboratory Test Results
Appendix C -Standard Guidelines for Grading Projects
0
-TORO 0 INTERNATIONAL
1.0 INTRODUCTION
1.1 General
Cassia
February 18,2015
Page: 1
This report presents the results of geotechnical investigation performed by Toro International (TI)
for proposed Verizon Equipment Enclosure at Cassia Site, located at 2020 Cassia Road, Carlsbad,
California. A Site Location Map is presented in Figure 1 showing the approximate location of the
project site.
The purpose of the geotechnical investigation is to provide geotechnical recommendations for
construction of the V erizon Equipment Enclosure and its associated site preparation.
Our geotechnical investigation was conducted based on plans issued for 100% Zoning Drawing
Revision 5 (Sheets T-l,A-OthroughA-5 and C-1)prepared by Booth& Suarez and dated December
12, 2014.
1.2 Proposed Development
Our understanding ofthe proposed construction is based on the above-mentioned plans. The area of
the proposed equipment concrete slab-on-grade will be about 375 sqft. The thickness of the slab will
be 6 inches. The estimated load from the equipment will be about 40 kips.
1.3 Site Description
The proposed site for the Verizon facility will be located within an office complex, Cassia
Professional Office Building, located at 2020 Cassia Road, Carlsbad, California. The proposed site
is located in the landscape area in the southeast comer of the property. The proposed site is bounded
to the north and south by parking lots, to the west by access driveway of the office complex, which
in tum is bounded by the office building and to the east by a descending slope of more than 100 feet
high with a maximum gradient of2: 1. The proposed site is a relatively flat area; however the overall
site is a hilly area.
0
-TORO D INTERNATIONAl
Page: 2
117°18'00" w 117°17'00" w 117° 16'00" w WGS84 117°15'00" W
lNr1tJN
~ 120
TORO INTERNATIONAL
Geotechnical Engineering
SITE LOCATION MAP
CASSIA
PROJECT NO. 13-109.52 FIGURE 1
1.4 Scope of Work
The scope of work for this geotechnical investigation consisted of the following:
• Review of published reports and geologic maps pertinent to the site
Cassia
February 18, 2015
Page: 3
• Field exploration, consisting of drilling and logging one boring to a maximum depth of5 feet
• Laboratory testing of selected soil samples considered representative of the subsurface
conditions to evaluate the pertinent engineering and physical characteristics of the
representative soils
• Evaluation of the general site geology which could affect the proposed development
• Evaluation of ground shaking potential resulting from seismic events occurring on
significant faults in the area
• Engineering analyses of the collected data to develop geotechnical recommendations for
foundation design of the equipment enclosure, seismic analyses and site preparation for the
proposed concrete slab-on-grade
• Preparation of this report presenting our findings, conclusions, and recommendations.
0
-TORO D INTERNATIONAL
2.0 FIELD EXPLORATION AND LABORATORY TESTING
2.1 Field Exploration
Cassia
February 18,2015
Page:4
The subsurface conditions were explored by drilling one boring. The maximum depth of the boring
is about 5 feet below the existing ground surface. The approximate location of the boring is shown
on the Boring Location Map in Figure 2. Details of the field exploration, including the logs of the
boring, are presented in Appendix A.
2.2 Laboratory Testing
Soil samples considered representative of the subsurface conditions were tested to obtain or derive
relevant physical and engineering soil properties. Laboratory testing included moisture content and
in-situ density, direct shear and sieve analyses.
Moisture content and in-situ density test results are shown in the Borings Log in Appendix A. The
remaining laboratory test results are presented in Appendix B. Descriptions of the test methods are
also included in Appendix B.
0
-TORO D INTERNATIONAL
Page: 5
CASSIA ROAD
SITE PLAN
KA~..E:; or .. ~""""
LEGEND TORO INTERNATIONAJL
• B-1: Approximate Location of Boring No. B-1
BORING LOCATION MAP
CASSIA
PROJECT NO. 13·109.52 FIGUFilE 1
3.0 SITE CONDITIONS
3.1 Geology
Cassia
February 18,2015
Page: 6
The subject site is located approximately 322 feet above mean sea level. The site is located within
the Eocene Marine (Rogers, 1992). The marine deposits are Tertiary in age and the thickness is
probably more than several hundred feet. The marine deposits consist primarily of a mixture of clay
and sand.
3.2 Groundwater
Groundwater was not encountered during our field exploration. The maximum depth of the borehole
is 5 feet below the ground surface.
3.3 General Subsurface Conditions
In general, the site for the proposed development is underlain primarily by clayey sand. The clayey
sand materials are classified as SC according to the Unified Soil Classification System (USCS).
The moisture content for the encountered subsurface soil materials ranges from 12.7 to 13.8 percent
with an average of about 13.2 percent. The predominant consistency of the encountered subsurface
soils is medium dense for the coarse-grain soils and medium stiff for the fine-grain soils.
0
-TORO 0 INTERNATIONAL
4.1 General
4.0 SEISMICITY
Cassia
February 18,2015
Page: 7
Seismicity is a general term relating to the abrupt release of accumulated strain energy in the rock
materials of the earth's crust in a given geographical area. The recurrence of accumulation and
subsequent release of strain have resulted in faults and systems of faults. The subject site is in
seismically active Southern California.
4.2 Ground Motion
California Building Code (CBC). The most widely used technique for earthquake-resistant design
applied to low-rise structures is the California Building Code (CBC). The basic formulas used in the
CBC require determination of the site class, which represents the site soil properties at the site of
interest.
The nearest active fault is the Rose Canyon Fault, which is approximately 10.1 km away (Blake, T.
F., 1998). This fault and other nearest 7 faults, which could affect the site and the proposed
development, are listed in the following "Summary of Fault Parameters" as shown in Table 1.
TABLE 1. SUMMARY OF FAULT PARAMETERS
Fault Name
Rose Canyon
Newport-Inglewood (Offshore)
Coronado Bank
Elsinore-Julian
Elsinore-Temecula
Elsinore-Glen Ivy
Earthquake Valley
Palos Verdes
Approximate
Distance
(km)
10.1
15.5
35.1
37.8
37.8
59.3
64.6
64.9
0
-TORO
Source Type
(A,B,C)
B
B
B
A
B
B
B
B
0 INTERNATIONAL
Maximum
Magnitude
(Mw)
6.9
6.9
7.4
7.1
6.8
6.8
6.5
7.1
Slip Rate Fault Type
(mm/yr) (SS,DS,BT)
1.50 ss
1.50 ss
3.00 ss
5.00 ss
5.00 ss
5.00 ss
2.00 ss
3.00 ss
4.3 Seismic Design
The 2013 CBC seismic zone for use in the seismic design formula is Site Class D.
4.4 Liquefaction Potential
Cassia
February 18,2015
Page: 8
The encountered subsurface soil consists predominantly of medium stiff sandy clay to medium dense
clayey sand. Groundwater was not encountered during our drilling; however the depth of the
borehole is about 5 feet below the ground surface. Therefore, based on the above-mentioned
information, the subsurface soil at the subject site is not likely to liquefy during an earthquake.
0
-TORO D INTERNATIONAL
5.0 CONCLUSIONS AND RECOMMENDATIONS
5.1 General
Cassia
February 18,2015
Page: 9
Based on the results of our geotechnical investigation, it is our opinion from a geotechnical
viewpoint that the subject site is suitable for development of the proposed equipment enclosure
provided our geotechnical recommendations presented in this report are implemented.
The remainder of this report presents our recommendations in detail. These recommendations are
based on empirical and analytical methods typical of the standard of practice in Southern California.
Other professionals in the design team may have different concerns depending on their own
discipline and experience. Therefore, our recommendations should be considered as minimum and
should be superseded by more restrictive recommendations of other members of the design team or
the governing agencies, if applicable.
5.2 Overexcavations/Removals
The upper 24 to 36 inches of subsurface soils may be disturbed and/or contains roots and organic.
Therefore, we recommend that all deleterious materials are discarded off site and the upper 36
inches of the subsurface materials be removed and replaced with compacted fills. Onsite soils may
be reused. The extent of the removal should be within the proposed concrete slab footprint and 3
feet beyond it, wherever is possible. The removal bottom and compacted fill should be prepared in
accordance with the recommendations stated in Section 5.3 below.
5.3 Grading and Earthwork
General. All earthwork and grading for site development should be accomplished in accordance
with the attached Standard Guidelines for Grading Projects (Appendix C), Appendix J ofCBC, and
requirements of the regulatory agency. All special site preparation recommendations presented in
the following paragraphs will supersede those in the attached Standard Guidelines for Grading
Projects.
Site Preparation. Vegetation, organic soil, roots and other unsuitable material should be removed
from the building areas. Prior to the placement of fill, the existing ground should be scarified to a
depth of 6 inches, and recompacted.
Prior to pouring concrete, the subgrade soil for the concrete slab area should be wetted to a slightly
higher than the optimum moisture to a depth of 6 inches from the surface.
0
-TORO 0 INTERNATIONAL
Cassia
February 18,2015
Page: 10
Fill Compaction. All fill and backfill to be placed in association with site development should be
accomplished at slightly over optimum moisture conditions. The minimum relative compaction
recommended for fill is 90 percent relative compaction based on maximum dry density performed in
accordance with ASTM D-1557.
Fill should be compacted by mechanical means in uniform horizontal loose lifts not exceeding 8
inches in thickness.
Fill Material. The on-site soils can be used for compacted fill. However, during grading operations,
soil types other than those analyzed in the geotechnical reports may be encountered by the
contractor. The geotechnical consultant should be notified to evaluate the suitability of those soils
for use as fill and as finished grade soils.
Imported fill materials should be approved by the Geotechnical Engineer prior to importing. Soils
exhibiting any expansion potential should not be used as import materials.
Both imported and on-site soils to be used as fill materials should be free of debris, organic and
cobbles over 3 inches in maximum dimension.
Site Drainage. Foundation and slab performance depends greatly on how well runoff waters drain
from the site. This is true both during construction and over the entire life of the structure. The
ground surface around structures should be graded so that water flows rapidly away from the
structures without ponding.
Utility Trenches. Bedding materials should consist of sand having Sand Equivalent not less than 30,
which may then be jetted. Existing soils may be utilized for trench backfill provided they are free of
organic materials and rocks over 3 inches in dimension.
The backfill should be uniformly compacted to at least 90% relative compaction based on maximum
density performed in accordance with ASTM D-1557.
5.4 Foundation Design Parameters
Equipment Enclosure. The design allowable bearing capacity for the shallow foundation is 1,500
psfprovided the minimum footing depth is 12 inches and the minimum footing width is 12 inches.
In addition, a minimum distance of 15 feet should be maintained between the edge of the footing and
the face of the nearest descending slope. The design lateral equivalent fluid pressure is 300 pcf and
the design coefficient of friction is 0.25. However, a 50 percent reduction of either the coefficient of
friction or passive pressure should be taken ifboth passive pressures and coefficient of friction are
combined for lateral resistance. A one-third increase in the allowable bearing capacity and lateral
passive soil pressures may be used when considering wind, seismic or other short-term loading.
0
-TORO 0 INTERNATIONAL
5.5 Cement Type
Cassia
February 18, 2015
Page: 11
Based on the type of soils, Type V cement and water-cement ratio of 0.45 or less may be used for
concrete in contact with the on-site soils.
5.6 Geotechnical Observation and Testing
It is recommended that geotechnical observations and testings be performed by the geotechnical
consultant at the following stages:
• During all grading operations, including fill placement and soil removals, if any
• Upon completion of footing bottom excavation and prior to pouring of concrete, if any
• Upon completion of subgrade preparation and prior to pouring of concrete for slab
• During backfilling of utility trenches
• When any unusual conditions are encountered
The geotechnical engineering firm providing geotechnical observation/testing shall assume the
responsibility of Geotechnical Engineer of Record.
0
-TORO 0 INTERNATIONAL
6.0 LIMITATIONS
Cassia
February 18, 2015
Page: 12
This report is intended for the use of Booth & Suarez and its client Verizon for the proposed Verizon
Equipment Enclosure at Cassia Site, located at 2020 Cassia Road, Carlsbad, California. This report
is based on the project as described and the information obtained from the boring and other field
investigations at the approximate locations indicated on the plans. The findings are based on the
results of the field, laboratory, and office investigations combined with an interpolation and
extrapolation of conditions between and beyond the boring location. The results reflect an
interpretation of the direct evidence obtained. The recommendations presented in this report are
based on the assumption that an appropriate level of field review (observations and tests) will be
provided during construction. Toro International should be notified of any pertinent changes in the
project plans or if subsurface conditions are found to vary from those described herein. Such
changes or variations may require a re-evaluation of the recommendations contained in this report.
The soil samples collected during this investigation are believed representative of the areas sampled.
However, soil conditions can vary significantly between and away from the locations sampled. As
in most projects, conditions revealed by additional subsurface investigations may be at variance with
preliminary findings. Ifthis occurs, the geotechnical engineer must evaluate the changed condition,
and adjust the conclusions and recommendations provided herein, as necessary.
The data, opinions, and recommendations of this report are applicable to the specific design
element(s) and locations(s) which is (are) the subject of this report. They have no applicability to
any other design elements or to any other locations and any and all subsequent users accept any and
all liability resulting from any use or reuse of the data, opinions, and recommendations without the
prior written consent ofToro International.
Toro International has no responsibility for construction means, methods, techniques, sequences, or
procedures, or for safety precautions or programs in connection with the construction, for the acts or
omissions of the contractor, or any other person performing any of the construction, or for the failure
of any of them to carry out the construction in accordance with the Final Construction Drawings and
Specifications.
Services performed by Toro International have been conducted in a manner consistent with that level
of care and skill ordinarily exercised by members of the profession currently practicing in the same
locality under similar conditions. No other representation, express or implied, and no warranty or
guarantee is included or intended.
0
-TORO D INTERNATIONAL
7.0 REFERENCES
Cassia
February 18, 2015
Page: 13
1. Blake, T. F., 1989,"UBCSEIS", A Computer Program for the Estimation of Uniform
Building Code Coefficients Using 3-D Fault Sources", January 1998
2. California Building Code (CBC), 2013
3. Rogers, Thomas H., 1992, Geologic Map of California; Santa Ana Sheet; Scale 1:250,000.
0
-TORO D INTERNATIONAL
APPENDIX A -Field Exploration
Subsurface conditions were explored by drilling one boring to a maximum depth of approximately 5
feet below the existing grade. The drilled borehole was located in the field by tape measurements
from known landmarks. Its location as shown is therefore within the accuracy of such
measurements.
The field explorations were performed under supervision of our engineer who prepared detailed logs
of the borings, classified the soil encountered, and obtained soil samples for laboratory testing.
Relatively undisturbed soil samples were obtained by means of driving a 2.5-inch diameter sampler
having a hammer weight and drop. Small bulk samples obtained from the SPT tests were collected
for further evaluation in the laboratory.
The soils were classified based on visual observations during the field investigation and results of
the laboratory testing. Soil classifications were conducted in accordance with the Unified Soil
Classification System.
Note:
The actual subsurface conditions at the exact location may be different from the subsurface
conditions shown in the Boring Logs. The purpose of performing the borehole is for evaluating the
subsurface materials in order to develop geotechnical parameters for the proposed development. In
addition, the type of drill rig, the diameter of the borehole, etc. employed during geotechnical
exploration are different from the one used during actual construction. Therefore, for the purposes
of drilling for the proposed caisson, contractor should evaluate the site conditions independently and
make their own judgment as far as for determining the amount oftime to drill, how to drill, type of
equipment needed including but not limited to drill rig and type of drill bit, employing groundwater
dewatering, usage of casing, mud drilling, etc. and not rely on the information shown in the Boring
Logs.
TOROINTERNATIONAL
Cassia
13-109.52
GEOTECHNICAL ENGINEERING
Site
Carrier
2020 Cassia Road, Carlsbad
Verizon
Hollow Stem Flight Auger Drive Weight
Elevation (ft)
140 lbs
<...., u ~ 0.. .:" ~ 0) c. iii c c.
108.6
?F. ~" rFJ 0 ~ rFJ ~ ;:i
13.8 CL
12.7 sc
13.1 sc
13.2 sc
322
HW
(Assumed)
GEOTECHNICAL DESCRIPTION
MARINE(?)
@ 1": Brown fine sandy clay, moist, medium stiff
@ 2'-5': Light brown fine clayey sand, damp to moist, medium dense
Depth: 5 feet
Groundwater Encountered
BORING NO. B-1
Sheet 1 of 1
APPENDIX B -LABORATORY TESTING PROCEDURES AND RESULTS
Moisture Content and Dry Density
Moisture content was determined for small bulk and relatively undisturbed ring samples. Dry
Density was determined for relatively undisturbed ring samples only. The test procedure is in
accordance with ASTM 2216-90. The results of moisture content and dry density are presented in
the Boring Logs.
Sieve Analyses
Sieve analyses were performed on granular materials in accordance with ASTM D 422. Graphs
showing relationship of the various sizes of soil particles versus percentage passing are shown in
Figure B-1.
Direct Shear
Direct shear strength tests were performed on a representative sample of the on-site materials. To
simulate possible adverse field conditions, the samples were saturated prior to shearing. A
saturating device was used which permitted the sample to absorb moisture while preventing volume
change. The rate of strain during the direct shear testing was 0.05 in/min. The test results are
presented in Figure B-2 for the peak and ultimate conditions.
-
11
11 If\ I I 'I
I
II I
100
I
I I I
i I II
I
1\ i~ I I
:1 . 90
I ]\~ I
'I I \ 80
I I II
I
I l I
70
I I ~ I !
-r.
I I
I Cl
I I' I II
I 60 ·a;
I
3:
>-
I
.c
I I Cl
\ II I
50 s:::: "iii
Ul Cll
II
a. I -
II
s::::
40 Cl)
I
I ill[ I
tJ .. Cl) a.
i
I
~-, -nil 30
I i
I I Ill,
20
I I
I I
10
i I II 0
100 10 1 0.1 0.01 0.001
Particle Diameter in Millimeters
Boring No. Sample No. Sample Depth Percent Passing
(ft) No. 200 Sieve Soil Type
B-1 S-2 3 23.3 sc
TORO INTERNATIONAL
GRAIN SIZE DISTRIBUTION CURVE
ASTM 0422 Project Name: Cassia
Project No.: 13-109.52 Figure: Ei-1
5000
4000
C' .9: 3000
(/)
(/) w I 0:: 1-i (/) I ~~ 0:: <( w 2000 :::c ~-· (/) v
1000
/~·
v~--i
• I
0
0 1000 2000 3000 4000 5000
NORMAL STRESS (psf)
I
• Peak
I • Relaxed
Boring No. Sample Depth Friction Angle Cohesion Condition (ft) (degrees) (psf)
B-1 1 27 300 Peak
27 200 Relaxed
TORO INTERNATIONAL
DIRECT SHEAR TEST
ASTM 03080 Project Name: Marron Road
Project No.: 13-109.53 Fiaure: B-
[ OFFICE USE ONLY/
RECORD!Dtf. /
SAN DIEGO REGIONAL , HHMBP ft. /'
HAZARDOUS MATERIALS QUESTIONNAIRE BPDAT~~ .~'--~----!
Business Contact
MYRNA ALLENDE
Telephone#
949-286-7442
Zip Code
State Zip Code
CA 92618
Telephone#
949-286-7442
The following questions represent the facility's activities, NOT the specific project description.
PART l: FIRE DEPARTl\llENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Pr~~ection Agency with juri~diction prior to plan su~mittal. b:) C1t,c Jl, tJal-J.lYie5
occupancy Rating: Facility's Square Footage (rncludtng proposed proJect): · V . 1. ~' . {
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 55 {)tl/ uJt::t!
2. _9mllressect Gases 6. Oxidizers 10. Cryogenics 14. · ther ealth Hazards .::;:r::FI.§l21mable/Combus~ 7. Pyrophorics 11. HighlyToxicorToxlcMaterials 15. NoneofThese.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART ll: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH-HAZARDOUS MATERIALS DIVISION {HMD): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Over! and Avenue, Suite 170, San Diego, Cfl. 92123.
Call (858) 505-6700 prior to the issuance of a building permit
FEES ARE REQUIRED. Project Completion Date: t=:. cted Date of Occupancy: 0 CaiARP Exempt
I
1_
2.
3.
4.
5.
6.
7.
8.
YES NO .. (for w construction or remodeling projects) lit D Is your business listeqootne· reverse side of this form? (check aH 'that apply). g.,. flO Will your business diswose of Hazardous Substances or Medica! . aste in any amount?
4a Will your business stl\lre or handle Hazardous Substances in \ antities greater than or equal to 55 gal!ons, 500
Date Initials
0 CaiARP Required
I
0
0
D
0
D
pounds and/or 200 cu~ic feet? \, 12": Will your business stor~ or handle ~f1cibe1s/t4P}~ductive toxins\in any quantity? 'I Date
l2( Will your business use~' n existing b'r'Tnstafl an undergro.und storag67 tank? v 0 CaiARP Complete !2f Will your business stor or handle Regulated Substances. (CaiARPl? 1
Initials
lZJ Wi!f your business use rinstalf a Hazardo,us Was' ~';JKS tem (title 22, Article 10)? ! Date ·--'-ln..,..iti-.a-,.ls--Gr' Will your business stor~ petroleum-~~ ta!lks' · · Jmo/ with a total facility storage capacity equal to
or greater than 1,320 g I~A~~~~~~~J:g.J,?;.,. m Smrage Act). 1
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT {APCD): If the answer to Question #i below is no or the answew to any of the
Questions #2-5 is yes, applicant must contact the APCD at 10124 Old Grove Road, San Diego, CA 92131-1649 or telephone (858) 586-2600 prior to the issuance
of a building or demoiltion permit. If the answer to questions #4 or #5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10
working days prior to commencing demolition or renovation. (Some residential projects may be exempt from the notification requirements. Contact the APCD for
more information.)
YES
L D
2. D
3. 0
4. D
5. D
NO .121': Has a survey been performed to determine the presence of Asbestos Containing Materials? Z Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD factsheet at http://www.sdapcd.org/info/facts/permits.odf, and the list of typical equipment requiring an APCD permit on tile reverse side
of this from. Contact APCD if you have any questions). 0 (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)?
(Search the California School Directory at http://www.cde.ca.gov/re/sd/ for public and private schools or contact the appropriate school district).
g"' Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? 1Lf"" Will there be demolition involving the removal of a load supporting structural member?
Briefly describe business activities: Briefly describe proposed project / , • \ · .,
wiRELEss TELECOMMUNICATioNs PROVIDER WIRELEss TELEcoMMUNICATIONs siTE 1 lvuu -.5;'/IJ
Name of Owner or Authorized Agent Date
FOR OFF! CAL USE ONLY:
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _________________ -:----:---------------
BY: DATE: I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR OCCUPANCY
COUNTY-HMO* APCD APCD COUNTY-HMO APCD
)¥izardous Materials Business Plan. Other permitting requirements may still apply.
fl.\lf-9!71 (03/14) County of San Diego-DEH-Kazardous Materials Division
soG/"conner:te4 .... /f ELECTRIC UNDERGROUND METER & SERVICE LOCATION
A ~Sempra Energy utility~ Customer Copy
Notification #: 300000065800 Job#: I TB: 11 06-E6
Wanted Date: ON INSPECTION Date Prepared: 1 0/28/2015
Customer Type: Resldential(1-2 Units) Service Type: UG REWIRE (NO TRENCHING)
Project Title: BARBARA JOHNSON {SOT) SOLAR
Project Address: 149 WALNUT AVE lProject City: CARLSBAD
Additional Address Info:
Customer POC: Christina Ruiz Customer Phone #: 951 265 9892
SDGE Contact: Service Coordinator Contact Info: TIM SHERLOCK,760-476·5619
0 Traffic Control Permit Required 0 SDG&E Application Required-Call: 1-800-411-7343 ~ Excavation/Encroachment Permits Required By:
Municipal Inspection required By: CITY OF CARLSBAD J Temp Service Charge due on First Bill $ 0.00
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Install new 200_ amp meter panel at existing location over existing conduit and service co~rs. Joint meet required prior to
start up construction. -:f eA-7}1 -~lltec.J-f/cu,~
760,-'17?-)C:Lf
Station ID #: AG1-58 I Structure #: P26225 I Joint Trench With:
Handhole Installed By: j_ Hand hole Lid Shall Read: Standards Page:
Ladder Arms: Stop Trench: from Pole Riser Quad:
Bend Installed By: Bend Type: Bend Info:
Conduit Installed By: Conduit Size:
Service Panel Rating: 200 Number/Size of Main Switch: I Voltage: 120/240
#ofWires: 3 I Phase: 1 Utilities Maximum Contribution to Fault Current: 10000
Metering: Self-Contained Meter Clips: 4
Meter height --4'0" min. (3'0" min. for multiple installation) --6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be Identified with address
and unit number.
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 760-476-5619 for the following:
-3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
-After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
·When trench is backfilled and compacted, CALL FOR INSPECTION.
-If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state insp,ection
Additional Information: 0 Right of Way Required Assessor's Parcel Number:
To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge
for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and
(2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City/County regarding
permits and inspections.
City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E
crew enough time for reconnection of the service on the same day.
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E.
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Information on this sheet is void after six (6} mo1nths.
Keep this notice with buDding permit.
I Planned By: Lois Higgins ~·---------------1Phone#:7604765613
,aml':l8eiitV rs $vaila.t?IEI for tapping into existing e.lectrlcal
city approval.and submit switchboard drawings for approval.
graqe to CE~nterline of meter base. IIJieters are required to
qfany potentiall}l hazardous or dangerous col'ldition.
· . pt>sed~. c:ontac~ the planner at the nearest SDG&E
djaOEint to eaCh other and be identified with address
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
11-19-2015 Plan Check Revision Permit No:PCR15113
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2020 CASSIA RD CBAD
PCR
2150210200
Status:
Lot#: 0 Applied:
Valuation: $0.00
CB151326
Construction Type: NEW Entered By:
Reference #:
PC#:
Project Title:
Applicant:
RANDY DICKAMORE
STE 102
VERIZON-REVISIONS TO SHEAR
WALLS
325 CARSLBAD VILALGE DR
CARSLBAD CA 92008
760-434-84 7 4
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
Plan Approved:
Issued:
Inspect Area:
Owner:
AMHERST PROPERTIES INC
2710 LOKER AVE W #100
CARLSBAD CA 92010
$200.00
$0.00
$0.00
Total Fees: $200.00 Total Payments To Date: $200.00 Balance Due:
FINAL APPROVAL
Inspector: Date: Clearance:
ISSUED
11/06/2015
LSM
11/19/2015
11/19/2015
$0.00
NanCE: Please take NO"TlCE that approval of your project indudes the "lrrposition'' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this perrrit was issued to protest irrposition of these fees/exactions. If you protest them, you rrust
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information Vvith the aty Manager for
processing in aanrdance Vvith Carlsbad Munidpal Code Section 3.32.030. Failure to timely follow that procedure Vvill bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTl-iER N011FIED that your right to protest the spedfied fees/exactions DOES NOT .APPLY to water and sev~er ronnection fees and capadty
changes, nor planning, zoning, grading or other sinilar application processing or service fees in ronnection Vvith this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been aiven a N011CE sinilar to this or as to which the statute of linitations has oreviouslv otherVvise exoired.
f (_City of
Carlsbad
PLAN CHECK REVISION
APPLICATION
8-15
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Plan Check Revision No. feR. I '51 \ 3 Original Plan Checl< No. ~/!>IS -/J~{p
Project Address 2iJZO Ca0Slt<.-!loo.cl
Contact Rflnf:J {);c/tittfll)(t;
Email Y'dtd{utJWree,_.,hoofh .5Uatt:};.C();~, tbc.k:eewMhsuartl· eom
Contact Address
J;}5 ~rlc5 bad-VdltlSJe. Or~ #o;;.
General Scope of Work
Fttltl Ckt~~ /Jtlkt-~
Date
Fax
City
&trlsbatt
Original plans pretfared by an architect or engineer, revisions must be signed & stamped by tha1t person.
1 . Elements revised:
[2j"'Ptans D Calculations D Soils D Energy D Other
2. 3. ,4.
Describe revisions in detail List page(s) where List rev1ised sheets
each revision is that replace
shown existinq sheets
Cuitfed 110k If 11 .fl£v1.:t.-d Shear pane} ~t-hedq k ti-added IJofe.-4-S II r ,.J/wf wooci xrew.s CWJ ht used un Ut-tu e/ {!;Jmtr~~n ~,.~~.fur shear .... )
~1d al/odltt~e;Jf ~waU.fhimr;;(added flew fJ65/t.ear walk
.,ad/led nok JJ tiP "-5how nt0 Shettr waJ/s on Ubby {1 ... /p fi-{p
Cti'l•~ fl/1411
ded nofes ~&Jol. adclecl f/euJ 5/eav ~aii~-Jo Jvw_M"d~c 11-~ A--1 'if'ttm,·~ plan Uvd /} . .5h1JW Yt /~ettftbn o;-e-Jf..t drt~m doWtt,;JtJuJ.-
{h--q ft.-q " adclect n~c,J 5Aet4r-WCIII t/o 5eehim c, o? added nofet> 4~-J. '-II
fl:ev~Sul cfeftta J~1f 1() C!ttl I ()uJ.. A»hr,;y s11-e,. acl.cJed deftt/Js ()-I {}~J ' /:3/IJ:Jf?lf J 53
5. Does this revision, in any way, alter the exterior of the project? 0 Yes
6. Does this revision add ANY new floor area(s)? D Yes
7. Does this revision affect any fire related issues? 0 Yes ~No
8. Is this a complete set? 0 Yes j2(No
£S'Signature 8MU r/Ja'tv-~
I 635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-27 I 9 Fax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
EsGil Corporation
In CFartnersliip witli government for CBui{aing Safety
DATE: 11/17/2015
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 15-1326 rev(PCR15113)
PROJECT ADDRESS: 2020 Cassia Rd.
SET: I
PROJECT NAME: Verizon Wireless Cassia Revisions
D foP'PLICANT
)4'"JURIS.
D PLAN REVIEWER
D FILE
[8] The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
D REMARKS:
By: David Yao Enclosures: approved plan
EsGil Corporation
D GA D EJ D MB D PC 11/9
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 15-1326 rev(PCR15113)
11/17/2015
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
rev(PCR15113)
PLAN CHECK NO.: 15-1326
PREPARED BY: David Yao
BUILDING ADDRESS: 2020 Cassia Rd.
BUILDING OCCUPANCY:
BUILDING
PORTION
revisions
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb
Bldg. Permit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review:
D Repetitive Fee
___ -~ Repeats
* Based on hourly rate
Comments:
AREA Valuation
(Sq. Ft.) Multiplier
By Ordinance
Complete Review
D Other
0 Hourly
EsGil Fee
DATE: 11/17/2015
Reg. VALUE
Mod.
D Structural Only
l--------i21 H rs. @ *
$100.00
($)
$200.001
Sheet 1 of 1
macvalue.doc +
l/r:.~rZol-1 CA5>.51 A
i?LPG # 17-13?fo
AI Towt:-~ Fov,.JPAT\.ol'-i PLI\N WI£ AR£ rJo Lot-fGER ADPti'-IG NEW ?3
5Hf-A-RPArJE:t.s To t;<.rsna-JG i3utt-l>tr-iG wAL-L> AT G.{Q.DWNE 9 JGRIPLI!-1E:£
~CNCE GwNE-K: D<9E? t-'6T Pf-~ rT W'oR!<-'ro ~E-i:>or-J 1£ tt--l TENNf/-NT" sf/teE',
lt+E:~£-fb~ wE.Al>.PE.D (J.) f-lew >HE-o::Jf?. WAL-L-S \AttiH 31/CLEA?-Ff.o-M
~K ISTit-lG \5-vfLt>oJG A b.JACE:~-JT To 6;2d>W#E: B cJ..GiCIPL.-luJ£ 1E WITH P.J SH.EAI< p~
ALSo J<.e'-lr>ti> SHtA-12 ?ft,..CEL SCtfei>uL-6 To CiiLL-ouT woo[) x12.ews IN 1-t Eu oF
f<-J:\IIS!ot-1? To A FFELJ£D SH £eT5, CoM.MotJ #Alt..>_,
A-7
D-7
A [) i) e-D f'JoT£ -# 17, ~\J(}> f; P S H fAR fAr-JEL .>CH 'fDuL-t?-+ t}D})E{J -No'?£
IHA1 ~ooP Sc:fl£-~S CA-N E.e-vsen rf-1 l--1 tu oF~~of'.l J.lltf'-S F&f!S.HENc~
(>ANEL A-TTACIJ~T ..f-WAu.., F~trJG, f)DPED NEw P3 5H84f!= WALL-S~
fi DP~b NoTE-tf~ b >f ji-Jow ·f.-few 5 f·H~fi/C-'W'fW o~J Lol?Ir>Y C£ruN.G
pl-At-!.
ADDE:P tJoT~.S d<61t-lf(u:,$1. ADPeD NEW 5H~Itf?.-WAU..S lo TowtR
DCC~ FfZA-r-'\ltJ(, j>~ L-Ev fL P. 5Ho\of./ ?EtoC4Tl or-1 oF£)(. D/?/ttH
li)owtJ>{17vT;
A t>J>Ei> NEw >f'IEAR. WALL-iO SECTrot-1 c: 1-ADPEIJ NOTES Lf(,-J.Lf?
(2..~'-lt.SEt> Df&TA lL !'J~ To 01-)Ll ~uT FooTteJG >rzs.
APDe:r> PE-TAfL5 r~:~ 13~ f 13>5
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-09-2015 Plan Check Revision Permit No:PCR15130
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC#:
Project Title:
Applicant:
RANDY DICKAMORE
760-434-84 7 4
Building Inspection Request Line (760) 602-2725
2020 CASSIA RD CBAD
PCR
Lot#: 0
Status:
Applied: 2150210200
$0.00 Construction Type: NEW Entered By:
CELL SITE REVISIONS: WINDOW
REVISIONS
Plan Approved:
Issued:
Inspect Area:
Owner:
AMHERST PROPERTIES INC
2710 LOKER AVE W #100
CARLSBAD CA 92010
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
$120.00
$0.00
$0.00
Total Fees: $120.00 Total Payments To Date: $120.00 Balance Due:
FINAL APPROVAL
Inspector: Date: Clearance:
ISSUED
11/24/2015
JMA
12/09/2015
12/09/2015
$0.00
NOTICE: Rease take N011CE that approval of your project indudes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this perrrit was issued to protest i!TlJOSition of these fees/exactions. If you protest them you rrust
follow the protest procedures set forth in G:lvemrrent Code Section 66020(a), and file the protest and any other required information Vl1th the City M3nager for
prooessing in acrordance wth Carlsbad Munidpal Code Section 3.32.030. Failure to tirrely follow that procedure V\111 bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER N011FIED that your right to protest the spedfied fees/exactions DOES NOT APPLY to water and S8\l\er oonnection fees and capadty
changes, nor planning, zoning, grading or other sinilar application processing or service fees in oonnection Vl1th this prqect. NOR DOES IT APPLY to any
fees/exactions of \1\hich vou have oreviouslv been oiven a NOTICE sirrilar to this or as to 'Aflich the statute of !irritations has PLeviousjy oth_erwise_exnired.
PLAN CHECK REVISION
APPLICATION
B-15
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
C"~)J..j5-~/JJ' (! -~~-'-'---'""--~~"""---Original Plan Check No. -~IJ~ ___ v ___ _
--=------"-"'--~~~---:-'----"--~-------Date_,___//_. o_:::J-_j~· /_· s_·· ___ _
JZ(Plans 0 Calculations 0 Soils 0 Energy 0 Other ___________ _
2. 3. 4.
Describe revisions in detail List page(s) where List revised sheets
each revision is that replace
shown existin sheets
!+-~ 13
4-'-14
5. Does this revision, in any way, alter the exterior of the project? 0 Yes )L1No
6. Does this revision add ANY new floor area(s)? 0 Yes )d' No
7. Does this revision affect any fire related issues? D Yes [Z( No
8. Is this a complete set? 0 Yes )2!/No
~Signature ___________________________________________ _
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
EsGil Corporation
In CJ!artnersfiip witfi government for CBui(ding Safety
DATE: 12/4/2015
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 15-1326 rev#2(PCR15-130) SET: I
PROJECT ADDRESS: 2020 Cassia Rd.
PROJECT NAME: Verizon Wireless Cassia Revision
D APPLICANT
D JURIS.
D PLAN REVIEWER
D FILE
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
D REMARKS:
By: David Yao Enclosures: approved plan
EsGil Corporation
D GA D EJ D MB D PC 11/30
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 15-1326 rev#2(PCR15-130)
1~/4/2015
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
rev#2(PCR15-130)
PLAN CHECK NO.: 15-1326
PREPARED BY: David Yao
BUILDING ADDRESS: 2020 Cassia Rd.
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION (Sq. Ft.) Multiplier
revision
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance .,..
~~----~---~---~-----~------~~-----~----~,
~~~ C_lle_c_I<F~~ !Jy_O_r_din~~---~j
Type of Review: Complete Review
0 Repetitive Fee ~--.... J Repeats
• Based on hourly rate
Comments:
D Other
0 Hourly
EsGil fee
DATE: 12/4/2015
Reg. VALUE ($)
Mod.
D Structural Only
11Hr.@ *
======$1=0=0=. o:o
$1oo.ooj
Sheet 1 of 1
macvalue.doc +
PLANNING DIVISION
BUILDING PLAN CHECK
cITY 0 F APPROVAL
CARLSBAD P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.f!.ov
DATE: 11/25/2015 PROJECT NAME: Verizon Cassia PROJECT ID: MCUP 14-01
PLAN CHECK NO: PCR15130 SET#: 1 ADDRESS: 2020 Cassia Road APN:
IZ! This plan check review is complete and has been APPROVED by the Planning
Division.
By: Jason Goff, Associate Planner
A Final Inspection by the Planning Division is required IZJ Yes 0 No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: rdickamore@boothsuarez.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
D Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
D Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
[g] Jason Goff rjJ:>-760-602-4643
Jason.Goff@carlsbadca.gov
Remarks:
ENGINEERING
760-602-2750
760-602-2773
FIRE PREVENTION
760-602-4665
760-602-4664