Loading...
HomeMy WebLinkAbout2023 CALETA CT; ; 75-145; PermitC ATTACHED SHEET) k: 0 HEW 0 ADWTION 0 ALTERATION 0 REPAIR .. - I PERMIT FEE S ?$- 1Q Churyeof use from ' Chaw of use to 11 Valuation of work: S 3'1".KfZ ,e PLAN CHECK FEE 8 MtClPO FILM FEE SPECIAL CONDITIONS: Type of Occupancy const. Group I I 1 1 I I NO. 6f I Stories S1ra of el-. [Total) Sq. Ft. 1 I SEPARATE PERMiTS ARE REWIRED FOR ELECTRICAL, PLUMB- ING, HEATbNG, VENTILATING OR AIR CONMTIONING. THIS PERMJT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN120DAYS, OR IF I I I CONSTRUCTION OR WORK 1s SUSPENMDOR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM- 1 MENCED. I HEREBY CERTIFY THAT 1 HAVE READ AN0 EXAMINED THIS APPLICATION &NO KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDtNANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIEO WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTlNG OF A PERMIT DOES NOT PRESUME TO GIVk AUTHORlTY 70 V4OLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. PLANNING DEPT. 1 I HEALTH DEW. OTHER (Sp.cify) ENG I N EERl NG DEPT. WATER DEFT. WATuRC O? CONTRACTOR OW AUTWRIZCD ASCNT WHEN PROeRLY VALIDATED (IN THIS SPACE) THIS IS YOUR PfRMlT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VA4IDATION CK. M.O. CASU