Loading...
HomeMy WebLinkAbout2031 MAR AZUL WAY; ; CB141433; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-23-2014 . Residential Permit Permit No CB141433 Building Inspection Request Line (760) 602-2725 Job Address: 2031 MAR AZUL WY CBAD Permit Type:. RESDNTL Sub Type RAD . Status: ISSUED Parcel No: 2151305100 Lot #: 0 Applied: 06/20/2014 Valuation: $75,912.00 Constuction Type: 5B Entered By: RMA Occupancy Group: . Reference #: Plan Approved: 07/23/2014 # Dwelling Units: 1 Structure Type: Issued: 07/23/2014 Bedrooms: 0 Bathrooms: 0 Inspect Area: Orig PC #: Plan Check #: Project Title: LARSON RES- ADD 285 SF TO MASTER BEDROOM, ADD 195 SF BEDROOM @ FRONT OF HOUSE, REMODEL 200 SF - FROM BEDROM #2 - TO BECOME BATH, CLOSET & SITIING RM FOR NEW BEDROOM Applicant: . Owner: RA BOOKER BUILDERS, INC KMRE & ANNA LARSON 2240 ENCINITAS BLVD SUITE D 2031 MAR AZUL WAY PMB-547 92024 . CARLSBAD CA 92009 858-759-5170 . . 949 295-7395 Building Permit . $578.02 Meter Size Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check . $404.61 Meter Fee $0.00 Add'I Plan Check Fee . $0.00 SDCWA Fee $0.00. .. Plan Check Discount $0.00 CFD Payoff Fee . $0.00 Strong Motion Fee . . $7.59 PFF (3105540) $0.00 Park in Lieu Fee . $0.00 PFF (4305540) $0.00 Park Fee $0.00 License Tax (3104193) S $0.00 LFM Fee . . $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) S $0;00 Other Bridge Fee . $0.00 TrafficImpact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee • . $0.00 BTD #3 Fee . $0.00 PLUMBING TOTAL $54.00 Renewal Fee . $0.00 ELECTRICAL TOTAL . $43.00 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $49.28 Other Building Fee $0.00 Housing Impact Fee $000 HMP Fee $0.00 Housing InLieu Fee $0.00 Pot. Water Con. Fee . . $0.00 Housing Credit Fee .. . $0.00 Meter Size . Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee . $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $1.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $1,137.50 Total Fees: $1,137.50 Total Payments to Date: $1,137.50 Balance Due: $0.00 7 . FINALAPEROVA Inspector: Date: (f (7 LI Clearance: NOTICE: Please take NOTICE that approval of your project includes the imposition of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordanóe with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has oreviously otherwise expired. • City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 07-23-2014 . . Permit No:SW140210 Job Address: 2031 MAR AZUL WY CBAD - Permit Type: SWPPP Status: ISSUED Parcel No: 2151305100 Lot #: 0 Applied:. 06/20/2014 Reference #: Entered By: RMA CB#: CB141433 . Issued: 07123/2014 Inspect Area: Project Title: LARSON ADDITION Tier: 1 Priority: L Applicant: Owner: BOB BOOKER ( HENSLEY CLAYTON A&DANIELLE R 2031 MAR AZUL WAY CARLSBAD CA 92009 858.759-5170 Emergency Contact: BOB BOOKER . 858 759-5170 SWPPP Plan Check . . $48.00 SWPPP Inspections ' ' . $57.00 'Additional Fees . ' $0.00 TOTAL PERMIT FEES • . $105.00 Total Fees: • $105.00 Total Payments To Date: $105.00 Balance Due: $0.00 FINAL APPROVAL - ' DATEjL7L CL' N2 SIGNATURE— THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: [--]PLANNING , ENGINEERING DBUILDING EDFIRE DHEALTH DHAZMATIAPCD I ll • Building Permit Application IS A Plan Check No. 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 7T79. f CI T Y Of . Ph: 760-602-2719 'Fax: 760-602-8558 ' . ' , , email: buildingcarlsbadca.gov CARLSBAD Plan Ck Deposit/ ' Date / [pp I , -www.carlsbadca.gov ,JOB ADDRESS ' ' ' ,.W4' LL 'c/Ay IsuITE#/sPACE#/uNIT , .. • 0 IAPN ' zlc - 13o - 51 -00 CT/PROJECT# LOT# PHASER #OFiJNITS BEDROOMS #BATHROOMS ' BUSINESS NAME ' . I# [TENANT CONST=.00C.P DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) s1T 4 et.o5ei- 4-V OF *4044C-2. AA a)eL 'f%owt e1740M' -f t4 W- (e($6T /s (rr,.c, 2a4 2o F teu aeL..' PA 13't 4b R14 8P f4dA<s EXISTING USE' I PROPOSED USE ' (SF) PATIOS (SF) I DECKS (SF) I FIREPLACE ' .1 AIR CONDITIONING I FIRE SPRINKLERS IGARAGE — ' YESD# NOI YESJNO YESDNO APPLICANT NAME (Primary Contact) ' , ' APPLICANT NAME (Secondary Contact) ADDRESS , R A Booker Builders Inc. ' ' : ADDRESS 2240 Encinttas Boulevard SuIteD.PMB 547 CITY , qQ4STATE ZIP CITY STATE , ZIP ' PHONE ' Ix ' ' PHONE ,FAX EMAIL EMAIL606(9 PROPERTY O ER NAME 4 3r,44i LA4e.J . CONTRACTOR BUS. NAME 'R A Booker Builders Inc. ADDRESS ( LC(L '#c•L ' ADDRESS ' 2240 Encinitas Boulevard ' Sulte D, PMB 547 ATE ZIP " ' CITY ST . CAW , . CA . En— ZIP CITY PHONE AF . PHONE IFIX EMAIL EAIL ARCH/DESIGNER NAME & ADDRESS CKVIVIK -r D'3L STATE LIC a Zi1,3(, STATE LlC.# . I CLASS I 13 I CITY BUS. LlC.# d,,U r,u,ebwuns ..uue. Mriy iity or i..uunxy wnicn requires a permit to construct, alter, improve, aemossn or repair any structure, prior to Its issuance, also requires the applicant for Such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9. commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to 'a civil penalty of not more than five hundred dollars ($5001). . . Workers' Compensation Declaration: thereby affirm undvir penalty of perjury one of the following declarations: [i I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 91 have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the workjr which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co )tT'. ft'#JJ> • Policy No. 04 9 3 O • • Expiration Date This section section need not be completed if the permit is for one hundred dollars ($100) or less. [] Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In addition to the cost of compensation da s s provi ed for in Sectio 06 of the abor cod=nterestand attorney's fees. CONTRACTOR SIGNATURE Yc9j.,j&__1 . AGENT DATE '' - '. I ..' stv- t .. •w . .•. s I hereby affirm that lam exempt from Contractor's License Law for the following mason: , . ,' • 0 [] I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for [] sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). • 0 , I am exempt under Section - Business and Professions Code for this reason: , • . 0 • 0 . 0' 1_1 personally plan to provide the major, labor and materials for construction of the proposed property improvement DYes DNo 2. I (have I have not) signed an application for a building permit for the proposed work. ' • ... 3.1 have contracted with the following person (firm) to provide the proposed construction (include name address / phone I contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include narn / address I phone type of work): .PROPERTY OWNER SIGNATURE 0 • . . ' DAGENT DATE mot, Is the applicant or future building occupant required to submit a business plan, acutely hazardotis materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 at the Presley-Tanner Hazardous Substance Account Act? ' Yes No - Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No Is the facility to be constructed within 1,000 feet of the outer boundary at a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CER11FICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name o3.A— Lender's Address 1.J1 b- r I certify that I have read the application and state that the above information is conectand that the information on the plans is accurate. I agree to complywith all City ordinances and State laws relating to buitdingcenslnictton. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAiNST SAID CITY INCONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over SD' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Oftiotul under the provisions of this Code shall expire by limitation and become null and void rithe building or work authorized by such permit is not commenced within 180 days from the date of such permit or if th authorized by such permit is suspended or abandoned at any time after the work is commenced for aperiod of 180 days (Section 106.4.4 Uniform Building Code). @~ STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. i CERTI FICATE Fax (760) 602-8560, Email bUildincä).carIsbadCa.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. co#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) ASSOCIATED CB# MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) NO CHANGE IN USE / NO CONSTRUCTION MAIL! FAX TO OTHER: CHANGE OF USE / NO CONSTRUCTION .APPLICANT'S SIGNATURE DATE Inspection List Permit#: C13141433 Type: RESDNTL RAD LARSON RES- ADD 285 SF TO MASTER BEDROOM, ADD l95 SF BEDRO Date Inspection Item' InspectorAct Comments 11/13/2014 19 Final Structural - RI 11/13/201489 Final Combo PD AP 09/16/2014 17 Interior Lath/Drywall 'PB AP 09/11/2014 84 Rough Combo PB AP 09/10/2014 84 Rough Combo PB AP 08/21/2014 13 Shear Panels/HD's PD AP 08/21/2014 15 Roof/Reroof PD AP 07/24/2014 11 Ftg/Foundation/Piers PD AP 07/24/2014 21 Underground/Under Floor PD AP Wednesday, November 19, 2014 Page 1 of 1 EsGil Corporation In Partnership with government for Bui(iing Safety DATE: 07/23/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-1433 PROJECT ADDRESS: 2031 Mar Azul Way SET: HI U APPLICANT Ia'J URIS. U PLAN REVIEWER U FILE PROJECT NAME: Room Additions/ Remodel for Larson Residence The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff.. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. El The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. El EsGil Corporation staff did advise the applicant that the plan check has been completed Person contacted: Date contacted: (by: ) Email: Appointment Applicant Hand Carried Plans to the City Mail Telephone Fax In Person REMARKS: City to place soils stamp on the plans at issuance By: Ray Fuller Enclosures: LOG EsGil Corporation El GA E] EJ El MB El PC (P) 07/23/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 9223 • (858) 560-1468 • Fax(858)560-1576 EsGil Corporation In PartnersIlip with government for (Building Safety DATE: 07/21/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-1433 PROJECT ADDRESS:. 2031 Mar Azul Way SET:!! O APLICANT JURIS. 0 PLAN REVIEWER 0 FILE PROJECT NAME: Room Additions/ Remodel for Larson Residence LII The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Bob Booker EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Bob Booker Telephone #: (858) 759-5170 Fax #: 7989 Date contacted: - 7'l (bf . ) ) Email: bob@bookerbuilders.co'yi. LQ, MaiIX Telephone Fax In Person REMARKS: By: Ray Fuller Enclosures: EsGil Corporation LI GA [1 EJ [] MB LI PC 07/15/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 14-1433 07/21/14 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for residential projects. For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92009, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 2. Verify final sets of architectural sheets will be signed by designer and that the structural sheets and any calculations will be stamped and signed architect of record also. SI sheet was not stamped or signed by the architect. 4. he following design loads shall be clearly indicated on the calculations and plans. (Section 1603.1): a) For wind loading note the ultimate Wind speed (3-second gust- 110 mph wind) in addition to the 85 for the nominal design wind speed Section 1603.1.4) Neither the plans nor the calculations reflect the required 3-second gust- 110 mph wind. In addition unclear if detail lO/SOI only applies to line I and how lateral load is complete as referenced to lines 2 and 3 as detail I6ISADI does not reflect shear to roof sheathing? Section B on A4 should reflect interior wall as non bearing or provide required footing. Plans state non bearing but is clearly reflecting bearing as has birds mouth and rafters are setting on top plates. The submitted energy calculations are requiring HERS field verification (Duct Sealing and Testing). The submitted CF-1 R forms must be a "Registered" copy (filed with the HERS provider data registry and assigned a registration number). The submitted T-24 calculations were not registered with the State of California. The energy calculations need to be reviewed closely. For example noting this project to be in climate zone 10 and if this is the case then Radiant barrier would be required etc. If in climate zone 7 then note this instead and complete required boxes concerning cool roofs, special features, radiant barrier etc. To exempt from HERS verification clearly note where extending ducts that it will be less than 40 ft. Carlsbad 14-1433 07/21/14 Verify Owner/designer as well as the documentation author signed corrected CFI-R forms. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes ( ) No () The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. EsGil Corporation In Partnership with government for Bui(iuing Safety DATE: 07/01/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-1433 SET: 1 PROJECT ADDRESS: 2031 Mar Azul Way U APPLICANT .IeJURIS. LI PLAN REVIEWER U FILE PROJECT NAME: Room Additions/ Remodel for Larson Residence LII The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Bob Booker LII EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Bob Booker Telephone #: (858) 759-5170 Fax #: 7989 Date contacted: ( (b ")1 Email: bob@bookerbuilders.co ' PJ Mail lelephone Fax In Person . REMARKS: By: Ray Fuller Enclosures: EsGil Corporation LI GA LI EJ [:1 MB LI PC 06/24/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 Carlsbad 14-1433 07/01/14 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 14-1433 JURISDICTION: Carlsbad PROJECT ADDRESS: 2031Mar Azul Way FLOOR AREA: Additions 489 Remodel 200 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 07/01/14 STORIES: 1 HEIGHT: lift per CBC DATE PLANS RECEIVED BY ESGIL CORPORATION: 06/24/14 PLAN REVIEWER: Ray Fuller FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 14-1433 07/01/14 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for residential projects. For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92009, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 2. Verify final sets of architectural sheets will be signed by designer and that the structural sheets and any calculations will be stamped and signed by engineer and /or architect of record also. 3. It is unclear if structural calculations will be provided for the lateral resisting system for this project? If you choose to use the conventional construction bracing provisions outlined in the CRC please provide the following. Provide documentation to show that the plans comply with the Braced Wall provisions of ,Section R602.10. Include the following: The framing plan seems to reflect that you are using the continuous sheathed method. To use this method a 24" return panel is required at each corner where lines intersect. See upper right corner of sitting room where less than 24"? In lieu of this must provide a hold down capable of minimum 800 uplift at end of wall. Where removing existing stucco shear please show on the plans how remaining walls will comply with conventional construction provisions ( R602- Conventional Light-Frame Construction of the California Building Code) or provide an engineering analysis for the lateral load resistance of the wall(s) in question . The plans did not address existing common wall to proposed addition where it appears proposing to be the removing stucco shear. Plans to reflect how these wall (s) be laterally braced to roof sheathing as the additional 1/2 of the loads from proposed room addition and removal of stucco required that this be replaced with brace wall panels extending to roof sheathing. Specify type, length of panels, nail size and spacing and shear transfer I 4. Please revise the notes on plans for the 2013 CBC & ASCE 7-10 instead 7-05, as shown on SN1. The following design loads shall be clearly indicated on the calculations and plans. (Section 1603.1): a) For wind loading note the ultimate Wind speed (3-second gust- 110 mph wind) in addition to the 85 for the nominal design wind speed Section 1603.1.4) Carlsbad 14-1433 S 07/01/14 5. Please indicate on the plans whether the existing residence has a fire sprinkler system installed. If so, then provide a note stating that any additions/alterations will be provided with an automatic residential fire sprinkler system. Section R313.2. 6. Not necessarily a correction but could not determine why on site plan noting "Existing Two Story" as appears to be a single story? 7. Windows 1 &2 appear to be French casements per south elevation on A3? Please clearly note that at a minimum 20" clear width for egress will be provided (i.e. center mullion generally cannot be fixed). Keynote 11 on A2 to be updated to state the bottom of the clear opening shall not exceed 44" above the floor instead of sill. 8. Include on the plans the following specifications for any new electrical devices being installed Tamper resistant receptacles required for all new locations. Arc-fault Drotection for all new outlets (not just receptacles) located in rooms described in NEC 210.12(B): Family, living, bedrooms, dining, halls, etc. 9. Plans to reflect a exterior WP GFCI at front and back of dwelling if none existing or was removed due to addition. 10. Specify on the plans the following information for the roof materials, per Section R1106.11: Manufacturer's name and ICC approval number, or equal. Some examples are ELK COMP ESR-1475, OWEN CORNING, ESR -1372, CERTAINTEED ESR-1389, GAF E5R1475 etc 11. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314.3.2. 12. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required vent is located no more than 3' below the ridge). Show on the plans the area required and area provided. Section R806.2 13. Keynote 2 On A2 shôüldcleárly reflect Ultra Flush toilet to be 1.28 as could be 1.6. 14. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. Carlsbad 14-1433 S 07/01/14 . RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along with additions/alterations that increase th building's conditioned area, volume or size CGC Section 303 1 1 Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan to the jurisdiction agency that regulates waste management, per CGC 4.408.2. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.410.1. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC 4.504.2. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified in Section 4.505.3. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods'listed in CGC 4.505.3. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions. from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. Carlsbad 14-1433 07/01/14 Section B on A4 should reflect interior wall as non bearing or provide required footing. The submitted energy calculations are requiring HERS field verification (Duct Sealing and Testing). The submitted CF-1 R forms must be a "Registered" copy (filed with the HERS provider data registry and assigned a registration number). The submitted T-24 calculations were not registered with the State of California. Owner/designer as well as the documentation author to sign the CFi-R forms. . CITY OF CARLSBAD REQUIREMENTS All new residential buildings, including additions, require a soils report. An update letter is required if the report is more than 3 years old. If a room addition is less than EGO, sq. ft. in area and only one story, then a soils report is not required. The maximum allowable soil bearing value used in any design must be 1000 psf for this exception. Project is less than 500 sq ft but note non SNI is stating 1500 psf. . Excellent plans! To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes() No () The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. Carlsbad 14-1433 07/01/14 (DO NOTPAY— THIS IS NOTAN IN VOICE) VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 14-1433 PREPARED BY: Ray Fuller DATE: 07/01/14 BUILDING ADDRESS: 2031 Mar Azul Way BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Additions 489 131.73 64,416 Remodel 200 57.48 11,496 Air Conditioning Fire Sprinklers TOTAL VALUE 75,912 Jurisdiction Code Icb IBY Ordinance I Bldg. Permit Fee by Ordinance I $578.021 Plan Check Fee by Ordinance Type of Review: El Complete Review El Structural Only El Repetitive Fee ._I Repeats El Other El Hourly EsGil Fee Hr. @ * I $323.691 Comments: Add 1/2 hourcal green $43.00 Sheet 1 of 1 macvaluedoc + CITY OF CARLSBAD PLAN CHECK REVIEW, TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 7/14/2014 PROJECT NAME: Larson residential addition PROJECT ID: PLAN CHECK NO: CBI.4-1433 SET#: II ADDRESS: 2031 Mar Azul Wy APN: 215-130-5 1 VALUATION: $86,777 SCOPE OF WORK: Add 285 sf to master bedroom and 195 sf new bedroom at front of house >< This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION ***with remarks below*** Final Inspection by Construction Management & Inspection Division is required:. Yes No To determine status by one or more of these divisions listed below, please contact 760-602-2719. F-1 This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to:bob@bookerbuilders.com ENGINEERIN . - I.' I- S 1 7606022750 El Chris Sexton . Kathleen Lawrence Greg Ryan U 760-602-4624 760-602-2741 760602-4663 Chris.Sexton@carlsbacica.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros [T Cindy Wong 760-602-4675 760-602-2773 -- 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov F] Dominic Fieri 760-602-4664 Dorninic.Fieri@carlsbadca.gov Remarks:,Approval is coñt,iet upon 'a note being added to the plans regarding existing pillars and.gate - which are to-be removed I) CITY OF CARLSBAD- PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 7Io8I204 PROJECT NAME: Larson residential addition PROJECT ID: PLAN CHECK NO: CB14-1433 SET#: I ADDRESS: 2031 Mar Azit! Wy APN: 215-130-51 VALUATION: $86,777 SCOPE OF WORK: Add 285 sfto master bedroom and 195 sf new bedroom at front of house F-1 This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by Construction Management & Inspection Division is required: Yes Eli No To determine status by one or more of these divisions listed below, please contact 760-602-2719. XI This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to:bob@bookerbuilders.corn ENGINEERING JJI[IJ jr, 1I!11 760-602-27M - Chris Sexton ----s 760-602-4624 Chris.Sexton@carlsbadca.gov I fl Gina Rüiz 760-602-4675 Gina.Ruiz@carlsbadca.gov Kathleen Lawrence - - 760-602-2741 Kathleen.Lawrence@carlsbadca.gov [fl Greg Ryan 760-602-4663 Gregory.Ryan@carlsbadcagov Z Linda Ontiveros F-1 Cindy Wong 760-602-2773 760-602-4662 Unda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: Larson residential addition PLAN CHECK NO # CB14-1433 1 Outstanding issues are marked with [] . Items that conform to permit i requirements are marked with Ld or have intentionally been left blank. 1. SITEPLAN Provide a fully dimensioned site plan drawn to scale. Show: Scale reads E.J North arrow EJ Driveway widths - = is that correct? Existing & proposed structures j E1 Existing or proposed sewer lateral Existing street improvements j Li Existing or proposed water service Property line Lli LIII Property lines (show all dimensions) [III LIII Submit on signed approved plans: begins 7' from J Easements DWG No. face of curb c:i LJ Right-of-way width & adjacent streets ShoW on site plan: Drainage patterns Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. .=ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building". Existing & proposed slopes and topography Elli ]Size, location, alignment of existing or proposed sewer and water service(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. L.1 L3 Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: 11211 Site address [211 Assessor's parcel number Legal description/lot number Lot/Map No.: *93 M14984 Subdivision/Tract: La Costa Valley Unit 1 Reference No(s): DOC # 2008-0252214 E-36 Page 2of6 REV 6/01/12 Lars'on residential addition PLAN CHECK NO # CB141433 DISCRETIONARY APPROVAL COMPLIANCE [Ii iIZJ Project does not comply with the following engineering conditions of approval for project no.: n/a DEDICATION REQUIREMENTS 1 Dedication for all street rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 24.00000 pursuant to Carlsbad Municipal Code Section 18.40.030. E:J EZJ Dedication required as follows: n/a IMPROVEMENT REQUIREMENTS =,=All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $120,000.00 pursuant to Carlsbad Municipal Code Section 18.40.040. rz Public improvements required as follows: n/a -I Construction of the public improvements must be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee, so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the city prior to issuance of a building permit. EZJ Future public improvements required as follows: n/a E-36 Page 3 of 6 . REV 6/01/12 Larson residential addition PLAN CHECK NO # CB141433 GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. fJ=Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" E1 LJ Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. EJ Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) All required documentation must be provided to your Engineering Construction Inspector . The inspector will then provide the engineering counter with a release for the building permit. EJ £71 No grading permit required. El El Minor Grading Permit required. See attached marked-up submittal checklist for project- specific requirements. MISCELLANEOUS PERMITS RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. El Other: Gate and pillars are not shown on site plan. Gate-must be 20' from property line. In addition, the pillars cannot-encroach within the right of way. E-36 Page 4 of 6 REV 6/01/12 Larscn residential addition PLAN CHECK NO # CB14-1433 7. STORM WATER Construction Compliance TJ Project Threat Assessment Form.complete. J Enclosed Project Threat Assessment Form incomplete. Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW 14-210 EEl Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance Storm Water Standards Questionnaire complete. EIIJ Storm Water Standards Questionnaire'incómplete. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http://www.carlsbadca.Qov/business/buildinp/Documents/EngStandsw-stds-vo14-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) J Vegetated Roof El Bio-retentions cell/rain garden LIII Pervious pavement/payers LIII Flow-through planter/vegetated or rock drip line El Vegetated swales or rock infiltration swales EJ Downspouts disconnect and discharge over landscape EJ Other: E-36 Page 5 of 6 REV 6/01/12 Larscn residential addition PLAN CHECK NO # CB14-1433 A WATER METER REVIEW Domestic (potable) Use EJ j What size meter is required? rF_yfl Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. NOTE: the connection fee, SDCWA system capacity charge and the water treatment capacity charge will be based On the size of the meter necessary to meet the water use requirements. FF jJ For residential units the minimum size meter shall be 5/8", except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be 3/4'. FEES Required fees have been entered in building permit. Drainage fee applicable Added square feet Added square footage in last two years? yes no Permit No. Permit No. Project built after 1980 byes £no Impervious surface >50% byes jno Impact unconstructed facility yes Eno Fire sprinklers required yes Eno (is addition over 150' from center line) Upgrade Jyes Eno No fees required 10. ADDITIONAL COMMENTS Attachments Engineering Application Storm Water Form _J Right-of-Way Application/ Info. Reference Documents E-36 Page 6 of 6 REV 6/01/12 Project Address: Assessor Parcel No. Zoi L44r Z1L3oloc, .Qw eriOwner's Authorized Agt Name: Title: net's Authorized Agent Sijre: Date: - .0 YES ONO 14 Date' 1, 1 Project ID* , I, It -A Al Page 1 of 1 Rev.03/09 CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: Building Permit U Right-of-Way Permit U My project is categorically EXEMPT from Electrical Patio/Deck the requirement to prepare a storm water Fire Additional Photo Voltaic pollution prevention plan (SWPPP) because it Fire Alarm Re-Roofing only requires issuance of one or more of the Fixed Systems Mechanical Sign Spa-Factory following permit types: Mobile Home Sprinkler Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria D My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier I - Low Threat Assessment Criteria ex My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: Results in some soil disturbance; and/or includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or Constructionwif be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 - Significant Threat Assessment Criteria 0 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or Li My project is part of phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, 0 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 CITY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Construction Perceived SWPPP Tier Construction Threat Assessment Criteria* Threatto Level Storm Water Quality Tier 3 - High Construction Threat Assessment Criteria U Project site is 50 acres or more and grading will occur during the rainy season U Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High U Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kf greater than or equal to 0.4) U Site slope is 5 to 1 or steeper U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 - Medium Construction Threat Assessment Criteria Medium U All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria U Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA U Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) High U Site slope is 5 to I or steeper Tier 2 U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years U Site results in one half acre or more of soil disturbance Tier 2 - Medium Construction Threat Assessment Criteria Medium L..J All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 - Medium Inspection Threat Assessment Criteria U Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA U Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) Medium U Site slope is 5 to 1 or steeper Tier 1 U Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). U Owner/contractor received a Storm Water Notice of Violation within past two years U Site results in one half acre or more of soil disturbance Tipf 1 Low Inspection Threat Assessment Criteria Low A11 projects not meting Tier 1 Mediurr Corstrtjction Threat Assessment Criteria E Exempt A • - No pp(icable - • Exempt *The ci.ty engineer may authorize minor variances from the construction threat assessment criteria in special circumstances whe414ante shown that a lesser or higher-amount ofstorm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 4 A\h, ilw IV CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Develonment Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Applicant responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by the applicant, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If applicants are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, they are advised to seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, applicants for construction permits must also complete, sign and submit a Project Threat Assessment Form to address construction aspects of the project. Please answer the questions below, follow the instructions and sign the form at the end. I 1. Is your project a significant redevelopment? DEFINITION: Significant redevelopment is defined as the creation, addition or replacement of at least 5,000 square feet of impervious surface on an already existing developed site. Significant redevelopment includes, but is not limited to: the expansion of a building footprint; addition to or replacement of a structure; structural development including an increase in gross floor area and/or exterior construction remodeling; replacement of an impervious surface that is not part of a routine maintenance activity, and land disturbing activities related with structural or impervious surfaces. Replacement of impervious surfaces includes any activity that is not part of a routine maintenance activity where impervious material(s) are removed, exposing underlying soil during construction. If your project IS considered significant redevelopment, then please skip Section 1 and proceed with Section 2. lf your projec jnsidered significant redevelopment, then please proceed to Section 1. E-34 Page 1 of 3 REV 3123/10 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 1 NEW DEVELOPMENT PRIORITY PROJECT TYPE YES NO Does you project meet one or more of the following criteria: Housing subdivisions of 10 or more dwelling units. Examples: single family homes, multi-family homes, condominium and apartments Commercial - greater than 1-acre. Any development other than heavy industry or residential. Examples: hospitals; laboratories and other medical facilities; educational institutions; recreational facilities; municipal facilities; commercial nurseries; multi-apartment buildings; car wash facilities; mini-malls and other business complexes; shopping malls; hotels; office buildings; public warehouses; automotive dealerships; airfields; and other light industrial facilities. Heavy Industrial / Industry- greater than I acre. Examples: manufacturing plants, food processing plants, metal working facilities, printing plants, and fleet storage areas (bus,_ truck, _etc.). Automotive repair shop. A facility categorized in any one of Standard Industrial Classification (SIC) codes 5013, 5014, 5541, 7532-7534, and 7536-7539 Restaurants. Any facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the land area for development is greater than 5,000 square feet. Restaurants where land development is less than 5,000 square feet shall meet all SUSMP requirements except for structural treatment BMP and numeric sizing criteria requirements and hydromodification requirements. Hillside development. Any development that creates 5,000 square feet of impervious surface and is located in an area with known erosive soil conditions, where the development will grade on any natural slope that is twenty-five percent (25%) or greater. Environmentally Sensitive Area (ESA)1. All development located within or directly adjacent2 to or discharging directly" to an ESA (where discharges from the development or redevelopment will enter receiving waters within the ESA), which either creates 2,500 square feet of impervious surface on a proposed project site or increases the area of imperviousness of a proposed project site to 10% or more of its naturally occurring condition. Parking lot. Area of 5,000 square feet or more, or with 15 or more parking spaces, and potentially exposed to urban runoff Streets, roads, highways, and freeways. Any paved surface that is 5,000 square feet or greater used for the transportation of automobiles, trucks, motorcycles, and other vehicles Ila Retail Gasoline Outlets. Serving more than 100 vehicles per day and greater than 5,000 square feet Coastal Development Zone. Any project located within 200 feet of the Pacific Ocean and (1) creates more than 2500 square feet of impermeable surface or (2) increases impermeable surface on property by more than 10%. More than 1-acre of disturbance. Project results in the disturbance of more than 1-acre or more of land and is considered a Pollutant-generating Development Project4. 1 Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas or Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and.County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. 2 "Directly adjacent" means situated within 200 feet of the Environmentally Sensitive Area. 3 "Discharging directly to" means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with flow from adjacent lands. 4 Pollutant-generating Development Projects are those projects that generate pollutants at levels greater than background levels. In general, these include all projects that contribute to an exceedance to an impaired water body or which create new, impervious surfaces greate'r than 5000 square feet and/or introdc'new,Aadscàping areas that require routine use of fertilizers and pesticides. In most cases linear pathway projects that are"for infrequent vehicle use, sicWaseme?gency' br "maintenance access, or for pedestrian or bicycle use, are not considered Pollutant-generating Development Projects if they are built with pervious surfaces or if they sheet flow to surrounding pervious surfaces. . - - r Section 1 Results: - .- . ' ." If you anwered YES to ANY of the questions above, your project is subject to Priority Development Project requirements. Please check ,the "meet'" PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3. A Storm Water Management Plan, prepared in accordahce wh,City, Storm Water Standards, must be submitted at time of application. If you answered NO to ALL of the questions above, then your project is subject to Standard Stormwater Requirements. Please check the "does not meet PDP requirements" box in Section 3. E-34 Page 2 of 3 REV 3/23/10 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Develonment Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov [SECTION 2 SIGNIFICANT REDEVELOPMENT Complete the questions below regarding your redevelopment project: YES NO 1. Project results in the disturbance of more than 1-acre or more of land and is considered a Pollutant-generating Development Project (See definition in Section 1). If you answered NO, please proceed to question 2. If you answered YES, then you ARE a significant redevelopment and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PRO[ECT requirements" box in Section 3 below. 2. Is the project redeveloping an existing priority project type? (Priority projects are defined in Section 1) If you answered YES, please proceed to question 3. If jou answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the does not meet PDP requirements" box in Section 3 below. 3. ('the project IgLely limited to just one of the following: a. Trenching and resurfacing associated with utility work? .b. Resurfacing and reconfiguring existing surface parking lots? New sidewalk construction, pedestrian ramps, or bike lane on public and/or private existing roads? Replacement of existing damaged pavement? If you answered NO to ALL of the questions, then proceed to question 4. If you answered YES to ANY of the questions then you ARE NOT a significant redevelopment and your project is subject to Standard Stormwater Requirements. Please check the "does not meet PDP requirements" box in Section 3 below. 4. Will your redevelopment project create, replace, or add at least 5,000 square feet of impervious surfaces on an existing development or, be located within 200 feet of the Pacific Ocean and (1)create more than 2500 square feet of impermeable surface or (2) increases impermeable surface on the property by more than 10%? If you answered YES, you ARE a significant redevelopment, and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PRO[ECT requirements" box in Section 3 below. If you answered NO, thenyou ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. I SECTION 3 Questionnaire Results: Li My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and must prepare a Storm Water Management Plan for submittal at time of application. ,JJ My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the ( SUSMP. Applicant Information and Signature Box Address: AssessoriS Parcel Number(s): Applicant Name: Applicant Title Date: min innl. oil i,rii,V'rniil..nl..uil E-34 Page 3 of 3 REV 3/23/10 /\ h> CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER I CONSTRUCTION SWPPP E-29 Develooment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROC AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES STORM WATER COMPLIANCE CERTIFICATE " My project is not in a category of permit types exempt from the Construction SWPPP requirements V My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby storm water runoff or non-storm water discharge(s). V Myrdject does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) V My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. ¶Z- k ie- WNER'S AGENT NA (PIlNT) /OWNER'S AGENT NAME (SIGNATURE) DATE PROJECT INFORMATION Site Address: Z031 t4citu3t (44y Assessors Parcel Number?- Project ID: 5W Construction Permit No.: Estimated Construction Start Date 7 t. I4 Project Duration 2- Months Emergency Contact: Name: '3s)3 C(ø. 24 hour Phone: 9-753 —5170 Perceived Threat to Storm Water Quality U Medium Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY F CARLSBAD STAND TIER 1 SWPPP Approved By: Dat1Q/'/U)t E-29 Page 1 of 3 REV 4/30/10 Erosion Control SethmentControl BMPs Tracking Control Non-Storm Water Waste Management and Materials / - - Management BMPs PotionConfrBMPsBMPs - - - - - - .2 .9 . 16 16 . . 2 2 ) .. . Best Management Practice C C (6 E M 2 (BMP) Description 4 2 0) . , 2 CL 2 2 ° In .L o CL 1) o ° wo .9 (i) Cl) ( U) . 0 • u i 0 Ci)> co U) 22 U) IL C1). n o U)C C COc nC n >(. m Q co 2 () ac C/) C.. 3c U) co' z: cC 0 CASQA Designation 4 r"- CO Cl) 'T U 19 0? Q Cf C? (9 7 Cf ? T U? 9 (9 o w o w 0 w 0 W (n W U) W Cl) W Cl) Lii Cl) W U) W U) • I- I- Cl) Z Cl) Z U)Cl) Z Z Construction Activity W Cl) Gracling/SoilDisturbance - Trenching/Excavation - - - - - - - - -- Stockpiling - Drilling/Boring Concrete/Asphalt Saw cutting Concrete flatwork Paving Conduit/Pipelnstallation Stucco/Mortar Work - Waste Disposal - - - - - - - - - - - - -- - - - Staging/Lay Down Area - Equipment Maintenance -- - and Fueling Hazardous Substance Use/Storage Dewaterirng - - Site Access Across Dirt Other (list): - --------------------- "-" Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add arts? ther àctivitydescription 1rthe blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the 'Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 CITY OF CAR LSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Develooment Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.crIsbadca.ov DATE: 6/23/14 PROJECT NAME: ADDITION PROJECT ID: PLAN CHECK NO: CB141433 SET#: ADDRESS: 2031 MAR AZUL WY APN: j This plan check review is complete and has been APPROVED by the Division. By: A Final Inspection by the PLANNING Division is required El Yes Z No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review isiNQtCOMPLEF Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check comments have been sent to: BOB@BOOKERBUILDERS.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: PNNING'3 40'.1k 466&V& Yá 6oO2'275o'J J)t IREPREvENTIoNr 76O-6O2 Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregorv.Ryan@carlsbadca.gov Gina Ruiz H Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Plan. Check No. CB14 1433 Address 2031 MAR AZUL WY Date 6/23/14 Review # 1 Planner GINA RUIZ Phone(760)602-4675 APN: 215-130-51-00 Type of Project & Use: ADDITION Net Project Density: DU/AC Zoning: R-1 General Plan: ELM Facilities Management Zone: CFD (in/out) #_Date of participation: Remaining net dev acres:_____ (For non-residential development: Type of land use created by this permit: REVIEW #: 1 2 3 Legend: Item Complete LI Li LI Environmental Review Required: YES LI NO TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: LII LI Discretionary Action Required: YES Li NO TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: Li LI Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES 0 NO CA Coastal Commission Authority? YES 0 NO If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Li Li Habitat Management Plan Data Entry Completed? YES Li NO If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) imi• Inclusionary Housing Fee required: YES LI NO (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES Li NO Li (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed: YES [I NO [I N/A [Z P-28 Page 2 of 3 07/11 (SitëãJ Li LI LI BA City Council Policy 44 - Neighborhood Architectural Design Guidelines LI LI 1. Applicability: YES LI NO 2. Project complies:.YES LI NOD Zoning: SEE ADDITIONAL COMMENTS BELOW Li LI 0 Setbacks: Front: Required 20' Shown (NOTEGiBLE tëuoffiidéii wrd'1O%OF THE LOT L'EGlBLE) Street Side: Required N/A Shown N/A -Rear: Required 2X SIDE YARD SETBACK (MAX. 20) Shown(NCT EGIBL!E Top of slope: Required N/A Shown N/A LI LI Accessory structure setbacks: Front: Required Shown Interior Side: . Required Shown Street Side: . Required Shown Rear: Required Shown Structure separation: Required Shown LI LI Lot Coverage: Required 40% max Shown less than 40% LI F -Height: Required 35' max (5:12 pitch stated) Shown 12.2' LI LI 5. Parking: Spaces Required 2 Shown 2 (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Li Li Li (AJdituöil Co eiit#1PLEASE SHOW THE SET BACK STAS THEARE NOT U (SETBACK ISi 1O'WIDETHE WIDTH ATJKMAXIMUMOF1O'SO THE PROPOSEDADDITION WOULDHAVE TOBE SETBACK TH ETFLOORAREAOF TH ETHOUSE) OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER - DATE P-28 Page 3of3 07/11 PLANNING DIVISION Development Services BUILDING PLAN CHECK Planning Division 1635 CITY OF APPROVAL Faraday Avenue (760) 602-4610 CARLSBAD P-28 DATE: 7/14/14 PROJECT NAME: ADDITION PROJECT ID: PLAN CHECK NO: C13141433 SET#: ADDRESS: 2031 MAR AZUL WY APN: This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A"Final Inspection by the PLANNING Division is required Yes Z No You may also have corrections from, one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or-incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check comments have been sent to: BOB@BOOKERBUILDERS.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: :PLANNING' - ENGINEERING'... .;FIREPREVENTION 7606024610 t , . 7606022750 - .. .- - 7606024665 [J Chris Sexton Kathleen Lawrence [ Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleentawrence@carIsbadca.ov Gregorv.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadcagov Cynthia.Wong@carlsbadca.gov F-] Dominic Fier! - 760-602-4664 - Dominic.Fieri@carlsbadca.gov - Plan Check No. CB141433 Address 2031 MAR AZUL WY Date 7/14/14 Review #2 Planner GINA RUIZ Phone (760) 602- 4675 APN: 215-130-51-00 Type of Project& Use: ADDITION Net Project Density: DU/AC Zoning: R-1 General Plan: RLM Facilities Management Zone: CFD (in/out) #_Date of participation: Remaining net dev acres:_____ (For non-residential development: Type of land use created by this permit: ') 2 3 Legend: Item Complete Li Item Incomplete - Needs your action Li Li Environmental Review Required: YES Li NO 0 TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Li. Li Discretionary Action Required: YES Li NO Z TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: Li Li Coastal Zone AsséssmenfJCompliance Project site located in Coastal Zone? YES Q NO CA Coastal Commission Authority? YES Q NO JK If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 921084402; (619) 767-2370 • • Determine status (Coastal Permit Required or Exempt): Li Li Habitat Management Plan Data Entry Completed? YES Li NO If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (NP/Ds; Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) I.I.l Inclusionary Housing Fee required: YES Li NO Z (Effective date, of lnclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES Li NO Li (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing YIN, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed; YESLi NOLi N/As P-28 Page 2 of 3 07/11 Site Plan: SETBACKS NOT LEGIBLE City Council Policy 44— Neighborhood Architectural Design Guidelines Applicability: YES El NO Z Project complies: YES El N0111 Zoning: SEE ADDITIONAL COMMENTS BELOW El Z E 1. Setback: Front: Required Shown NOT LEGIBLE Interior Side: Required icY Shown 10' to new addition - existing non- conforming house, under 40% of existing area of the house being added Street Side: Required N/A Shown iL Rear: Required 2X SIDE YARD SETBACK (MAX. 201 Shown NOT LEGIBLE Top of slope: Required N/A Shown iL 2. Accessory structure setbacks: Front: Required Shown InteriorSide: Required Shown Street Side: Required Shown Rear: Required Shown Structure separation: Required Shown LI LI. 3. Lot Coverage: Required 40% max Shown less than 40% El El 4. Height: Required 35' max (5:12 pitch stated) Shown 12.2. El El 5. Parking: Spaces Required 2 Shown 2 (breakdown by uses for commercial and industrial projects required) Residential Gtest Spaces Required Shown Ill 0 LI Additional Comments #1. PLEASE SHOW THE SETBACKS AS THEY ARE NOT LEG IBLE• ON THE PLANS. IF THE FRONT OR SIDEYARD SETBACKS TO THE EXISTING STRUCTURE ARE NON CONFORMING, THEADDITIONS ARE LIMITED TO 10% OF THE EXISTING FLOOR AREA OF THE HOUSE AND THE ADDITIONS MUST MEET TODAYS SETBACK REQUIREMENTS (EX., IF THE LOT WIDTH AT THE FRONT YARD 20' SETBACK IS 110' WIDE, THE SIDEYARD SETBACK WOULD BE 1004 OF THAT WIDTH, AT A MAXIMUM OF 10', SO THE PROPOSED ADDITION WOULD HAVE TO BE SETBACK 10' FROM THE SIDE PROPERTY LINE), THEN ADD A TABLE STATING HOW THE PROPOSED ADDITIONS ARE UNDER THE 4090; OF THE FLOOR AREA OF THE HOUSE. House is existing non-conforming by means of an inadequate sideyard setback and the proposed additions are at the required 10' setback and under 40% of the existing floor area of the house. OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Gina Ruiz DATE 7/14/14 P-28 Page 3 of 3 07/11 CB141433 2031 MARAZULI '7/f/if q 1z7r i L9 -7/14/tfi ci—dI Final Inspection required by Plan L3 CM&J u Fire U sw fL,I,9< Ii,KISSUED I Approved Date By BUILDING —i13f('/ ) F PLANNING -71114,1 ENGINEERING FIRE Expedite? V N DIGITAL FILES Required? V N HazMat APCD Health Forms/Fees Sent Rec'd Due? By Encina V N Fire Y HazHealthAPCD V N PE&M sa14eA1' /Xi./iL/ iYii School If V N Sewer If Stormwater If - Special Inspection V N LandUse: Density CFD: V N ImpArea: FY: Annex: Factor: PFF: V N Comments Date Date Date Date Building Planning Engineering Fire Need? 7ç U Done U Done U Done U Done