HomeMy WebLinkAbout2034 ARENAL RD; ; CB901776; PermitBUILDING PERMIT Permit No: CB901776
11/20/90 13:41 Project No: A9002023
Page 1 of 1
Permit Type: RESIDENTAL ADD/ALT [UNDR $10K)
Parcel No: 215-160-03-00 C-??fiT
Valuation: 26,280
:I<..! (!
Construction Type: VN flcp6ga
Occupancy Group: Class Code: Status: ISSUED
Description: ADD 366 SF BATHROOM/CLOSET Applied: 11/07/90
Apr/Issue: 11/20/90
I Job Address: 2034 ARENAL RD
Development No:
Str : F1: Ste :
9475 11/2(3/YQ OOOl :)I. 3::
: SEE PC 90-96
Validated By: DC
Appl/Ownr : HUGHES, ED
265 PORTIA AVENUE
619 945-8459
619 945-4000
Credits ***
172.00
.oo
316.00
Ext fee Data """""-"""
265.00
172.00
2.00
439.00
7.50 Y
20.00
6.50
34.00
5.00 Y
10.00 REMODEL
15.00
INSP. DATE
CLEARANCE
CITY OF CARLSBAD
2075 Las Palmas Dr., ciuisbad CA 92009 (619) 4381161
PERMIT APPLICATION City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
1. PERMIT TYPE A - OCCUMERCIAL UNEW UTENAUT IMPROVEMENT
CITY STATE ZIP CWE DAY TELEPHONE
STAlE LIC. X LICENSE CLASS CITY BUSINESS LIC. X
LENDER'S NAME LENOER'S ADDRESS
1 10. APPLICANT'S SIGNATURE
~ I I certify fhaT I have read the awlicafion and state that the above informrim is correct. I agree to c-ly wlth all Clly ordinances and Ifare laws relating to building ConLfmClim. I hereby authorize represenfeflves af the City of Carlrbad fo enter upon the above mnrloned properly for lnspeclion pulposer. I ALSO
AGREE 10 SAVE INDElYIFl AND KEEP HMMLESP THE CITY OF WLSW AWIYSl ALL LIIBILITIES. JWUIEYTS, COS15 AYD EXPENSES WlCB UI IY ANI YAY ACCRUE AWINST SAID
CITY IN COYSEWENCE OF THE GRAYllYG OF THIS PERMIl.
ial under the provisions of this Ccde shall expire by 1,rnilaflon and becm null and void if the building
in 180 days fm the date of such permit or if the building or work authorized by such permit is suspended
or a period of 180 days llecflon 30316) Uniform Building Code).
WNER OCONTRACTOR APPROVED BY:
1-
CITY OF CARLSBAD INSPECTION REQUEST
PERMIT# CB901776 FOR 04/17/92 INSPECTOR AREA PD DESCRIPTION: ADD 366 SF BATHROOM/CLQSET PLANCK# CB901176
TYPE: RAD CONSTR. TYPE VN JOB ADDRESS: 2034 ARENAL RD STR: FL:
APPLICANT: HUGHES, ED PHONE: 619 945-8459
STE:
CONTRACTOR: HUGHES, ED CONSTRUCTION PHONE: 619 945-4000 OWNER : ALESIA, FRANK
REMARKS: RS/ED/727-4125 INSPECTOR SPECIAL INSTRUCT:
SEE PC 90-96 OCC GRP
\
TOTAL TIME:
--RELATED PERMITS-- PERMIT# TYPE STATUS
ISSUED CB890015 CB900096 RAD CB891144 RAD
ISSUED
CB900639 RAD
ISSUED ISSUED CB900571 POOL ISSUED
RW910179 ROW ISSUED
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural
29 PL Final Plumbing 39 EL Final Electrical
49 ME Final Mechanical
***** INSPECTION HISTORY *****
DATE
041092
032092 102391
102291
101091
082291
030591
022291
021391
012991
012991
012991
010791
010391
112890
112890
DESCRIPTION
Final Structural Interior Lath/Drywall Frame/Steel/Bolting/Welding Frame/Steel/Bolting/Welding
Compliance Investigation Final Combo Interior Lath/Drywall Frame/Steel/Bolting/Welding
Rough Combo Frame/Steel/Bolting/Welding
Rough/Ducts/Dampers Shower Pan/Roman Tubs
Rough/Topout
Rough/Topout Ftg/Foundation/Piers
Steel/Bond Beam
ACT INSP COMMENTS CO PD
NR PD PA PD
NR PD PA PD WORK PROGRESSING
AP PD NR PD
AP PD
AP PD
PA PD PA PD
PA PD
AP PD
NR PD AP PD
AP PD
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(819) 5601468 &O.L-L b(0\40
DATE : u\3140
JURISDICTION: 1
PLAN CHECK NO: 40 -11Tb SET: riups 9DESIGNER PROJECT ADDRESS: $?o% &WGW~~*~L Go,
PROJECT NAME : 3 4 V 1 T.
The plans transmitted herewith have been corrected where
building codes.
The Dlans transmitted herewith will substantiallv comDlv
necessary and substantially comply with the .jurisdiction's
with-the jurisdiction's building codes when mino; defic'len-
cies identified B Crwd are resolved and checked by building department staff.
0 identified on the .enclosed check list and should be corrected The plans transmitted herewith have significant deficiencies
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
11 The plans are being held at Esgil Corp. until corrected
0 jurisdiction to return to the applicant contact person.
0 The applicant's copy of the check list has been sent to:
vd Esg,il staff did not advise the applicant contact person that plan check has been completed.
'been completed Esgil staff did advise applicant that the plan check has . Person contacted:
OGA OAA URN ODM
h .
Dater Nh!% Jurisdiction-(&a=&rm
Prepared by: a Bldg. Dept. 5% VALUATION AND PLAN CHECK FEE 0 Esgil
PLAN CHECK NO. %-t7l(r
BUILDING ADDRESS 2034 A--urn 1217
APPLICANT/CONTACT wk-. ~~aq.0 PHONE NO. S4B 220 6
TYPE OF CONSTRUCTION d-d CONTRACTOR PHONE
BUILDING OCCUPANCY e-3 DESIGNER PHONE
COHflENTS;
BEAM DES1GI.I BM1
DESIGN PARAMETERS, Fb 2 1500 .Fv .= ; 95 LDf z 1 L .= 1800000
USING DRESSED LUMBER
" " NO, T/oL./ OM 77g-l-N
FOR A BEAM SPAN = 6
LOADING
UNIFORM LOAD ON MEMRER (PLF) z: 105
REAM REACTIONS R1 = 315 R? = 315 BEAM SPAN = 6
I MAX SMEAR = 315
MAXIMUM MOMENT OCCURS AT 3 FEET FROM R1
MOMENT = 472.5
AREA REQ'D I: l.S*V/(LDF*FV) = 4.213816
SECTION MODULUS REQ'D I: 12*M/(LDF*Fb) = 3.713
- - - - - - I I -
*X************************.*********~.***** *** USE 4 x 6
x** A :I 19.25 *** Sx = 17.64583
***
*** r = 48.52605 ..........................................
...................................................................
PROJECT.. . . ** DATE.. . . 4-17-91 *-a: ENGJNEER . , . .dp~ - a r****.**********%********~~********~********X*********%********** - - - - - - - - - - - - - - - .. . . - - - - - - -. -. - - - -. - - ._ - - .- - - - - .. - .. . ._ - .- -. . . - - -. -
BEAM DESIGN DM2 - - - - - _. - - - - - - - - - - -. - - - - - - ..^ - .. - .- - - - - - - - - .- - .. - - - - - - I - - -
DESIGN PARAME.TERS, ~t, = 1300 FV : ; 8s LDF = L E :: laooooo
USING DRESSED LlJllUCR
FOR A BEAM SPAN = 16,
I-OADING.
UNIFORM L.OAC) ON rlEM8E.R (PLF) = 245
8EAM REACTIONS R1 = 1.960 R2 = 1960 BEAM SPAN x 16
MAX: SHEAR z:: 1960
MRXIMUM MOMEbIT OCCURS AT 8 FEET FROM R1.
AREA REQ'D = I..S*V/(LDF*Fv) = 30.53493
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 72.36923
INERTIA REWIRED (1/2 DL f LL) = 188.16
- - -. - - I - -. -
MOMENT = 7840
*************************X*************** *** USE 6 X 1.2 *** ~ ""_ *** A = 61.875 *** Sx = 116.0156 *.** I = 652.5879 ...........................................
.................................................................
................................................................. PROJECT... . ** DATE .... 4-17-91 ** ENGINEER dgu
.... 2.0 DESIGN CRITERIA
GOVERNING CODE 1988 UNIFORM BUILDING CODE ....... SIESMIC ZUNE 4, V = (ZIC/RW)W = .183W
WIND ZONE 70 MPH, EXPOSURE C
.-
all_mglEB~.Bb-eBPeEBIISS FRAMING -. DCILJGLAS FIR-LARCH GRADE UNLESS NOTED OTHERWISE
RAFTERS AND JOISTS...............NO. 2
KIDGES...........................NCJ. 2
HEGDERS AND POSTS................NO. 1
STlJDS............................CONSTRUCTION
BEAMS............................SELECT STRUCTLJI3AL..
HIPS AND VALLEYS.. ............... NO. 1
GL.CIL.AMS - SIMPLE SPAN.. ......... .24F .. V4 DF/RF
CANTIL.EVER.. .......... .24F - VU DF/W
ANCHOR BOLTS - A307
CONCRETE - 2000 PSI AT 28 DAYS - SLAB ON GRADE
FOOTINGS
GRADE BEAMS
HEINFORClNG - #S THRU #S GRADE 40
#6 AND LARGER GRADE 60
SOIL -. ALLUWADLE BEARING 1500 PSF PER UNIFORM BLJILDING CODE
RETAINING WALLS 30 PSF EllUIVALENT FLUID PRESSURE
FOLJNDATION WALLS 50 PSF EllLJIVAL.ENT FLUID PRESSLIRE
MASONRY - f'm = 1500 PSI NO SPECIAL INSPECTIQN
GROUT 2000 PSI AT 28 DAYS
MCJRTAH TYPE S
MANNING ENGINEERING
41892 ENTERPRISE CIRCLE SO, STE. E
TEMECULO, CA. Y23YO
BUS:(714)676-1844 FAX:(714)694-6026 -"
............... : .. , , . .: . '., .... ." .=
2
.. ..
3.0 LOADS .. ROOF DL RCI0F:INO TILE. ....................... 10.0 F'SF
FELT................................ 1 .0 PSF
PLYWOOD............................. 1.5 PSF
2X RAFTERS.......................... 2. 0 f::'SF
MISC................................ 0.5 FSF
"""" """-
15.0 PSF LOAD TO RAFTER
2X JOIST.............................
1.0 PSF
1.0 PSF
EL.ECTRICAL AND MECWANICAL..........
INSULATION.......................... . 0.S PSF
OYPSUM.............................. 2.5 PSF
WAL.LS
Fl-QOR
20.0 PSF TUTAL ROOF
ROOF LIVE LOAD E 20 FSF FOR 3/12 PITCH OF LESS
ih F)SF FOR 4/12 PITCH TO 8/12
GYPSUM DOTH SIDES.. ................. 5.0 F'SF
2X STUDS............................ 1.0 PSF
MISC................................. 1. . 0 F'SF - - - - - - - - - __ - - - - -. -
7.0 PSF INTERIOR WALL
STUCCO.............................. 12.0 PSF
2X STUDS............................ 1.0 PSF
INSULATION.......................... 1. U PSF
GYPSUM.............................. 2. 5 F%F
MISC................................ 0.5 I'SF
17.0 PSF EX'TEKICJR WALL.
FLOORING............................ 1.0 PSF
PL.YWOOD.............................
2.5 PSF
1.5 PSF
ELECTRICAL AND MECHANICAL..
2X JOIST............................
0.5 PSF
INSULATION.......................... 1 . 0 F'SF"
GYPSUM.............................. 2. 5 F'SF
MIGC................................. 1.0 PSF
.........
"""" - "_
10.0 PSF TYPICAL FLOOR
TILED AREA WITH MORTAR.............. 12.0 PSF I
22.0 PSF APPLICABLE
TILED AREA
,4 - - - - - - " - - - - - - - - - -
...., , . .. . . .... .. ...
, . .. ...' ,,. . .. , ... . .
: , . ,. ..; . . . ..
,. . .. .. .. ..
.. .. ..
. ...
.. . ., , .
.. . ..
..
.. ,. . .. . .;. ..
.. ..
.. .. . . . .. , . , , . . .. . . ... . . . . .. , '
.. . ,, ...
..
4
..
................................................................
PROJECT = flL
................................
LATERAL FORCE DISTRIBUTION FOR SIESMIC CALCULATIONS
DIRECTION
;,$
j'
_"""""""""""""""""""""""""""""""
SHEAR DISTRIBUTION FOR FORCES TO SHEARWALLS
................................
LEVEL wx Hx WxHx % Vt Vave (PSF)
ROOF 14520 19 275880 .759247 3423.172 7.131607
FLOOR 9720 9 87480 -240753 1085.469 2.261393
SUM OF WxHx = 363360
SUM OF Wx = 24240
SUM OF % = 1 .................................................................
""" """" """" """" ""_ "_" """"
""""""""""i-"""""""""""""""""
................................
SHEAR DISTRIBUTION FOR FORCES IN DIAPHRfiGM """""""""_""""""""""""""""""""""~
LEVEL Fl/Wl Vt = w(Fl/Wl) Vave (PSF)
ROOF .2357556
FLOOR .186 1807.92 3.7665
.................................................................
"_""" """"_ """""""-
3423.172
_"""""
7.131607
_""""""""""""""""""""""""""""""""
, .. , . . . . . . .,
c
......................................................................... I,,?
LATERAL ANALYSIS ALONG LINE A AT SECOND FLOOR
SEISMIC FORCE'= ( 1711.2 ) BASED bN FOLLOWING:
................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
"""" """""
1711.20 240.00 7.13 0.00
""""" """"""
WIND FORCE = ( 1319.5 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL
FORCE
1319.50 65.00 0.00 0.00
0 - 20 HGT 20 - 40 HGT FORCE FROM
TRIB AREA TRIB AREA OTHER LEVELS """""_ """"" """"" """"""-
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 7.8
.......................
' MAX UNIT SHEAR = 219.3846
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK """_ """_ """" """""""""""""" """ """"
1.0 5.0 8.0 1755.1 640.0 1115.1 1.6 ~74% 2.0 2.8 8.0 1755.1 358.4 1396.7 2.9 c
(MARKS. SEE SCHEDULES) .............................
EXTERIOR SHEARWALL * >*
INTERIOR SHEARWALL ----- *3
SHEARWALL CONNECTIONS
>*
>*
"""""""""""~
"""""""""""~
*7 """""""""""- .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT ..... ALESIA** ENGINEER ...... dgu** DATE....11-1-90 ..........................................................................
,I
*!:, .........................................................................
LATERAL ANALYSIS ALONG LINE B AT.SECOND FLOOR
,,,,
................................
SEISMIC FORCE = ( 1711.2 ) BASED ON FOLLOWING:
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
"""" """"" """"" """"""
1711.20 240.00 7.13 0.00
WIND FORCE = ( 1319.5 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS FORCE 20 - 40 FT HOT = 22
TOTAL
FORCE
1319.50 65.00 0.00 0.00
0 - 20 HGT 20 - 40 HGT FORCE FROM
TRIB AREA TRIB AREA OTHER LEVELS """""_ """"" """"" """"""_
NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 3.2
MAX UNIT SHEAR = 534.7501
.......................
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK _""" "_"" """" """""""""""""" """ """"
1.0 3.2 8.0 4278.0 409.6 3868.4 2.5 m~48
(MARKS. SEE SCHEDULES) .............................
EXTERIOR SHEARWALL * >*
INTERIOR SHEARWALL ----- *d >*
SHEARWALL CONNECTIONS >*
"""""""""""-
"""""""""~""
* IO "_"""""""""" .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
.......................................................................... ,4
PROJECT ..... ALESIA** ENGINEER ...... dgu** DATE....11-1-90 ..........................................................................
...........................................................................
LATERAL ANALYSIS ALONG LINE 1 AT SECOND FLOOR
SEISMIC FORCE = ( 1711.2 ) BASED ON FOLLOWING:
................................
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
1711.20 240.00 7.13 0.00
"""" """"" """"" -
WIND FORCE = ( 1015 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD FORCE 0 - 20 FT HOT = 20.3 FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
1015.00 50.00 0.00 0.00
"""""_ """"" """"" """"""-
NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 21.6
MAX UNIT SHEAR 79.22222
.......................
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK """_ """_ """" """""""""""""" """ """"
1.0 21.6 8.0 633.8 3628.8 -2995.0 0.4 -
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL
INTERIOR SHEARWALL -----
SHEARWALL CONNECTIONS > E4
>* *I """""""""""-
"""""""""""- *-
"""""""""""- >* .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT... ..ALESIA** ENGINEER ...... dgU** DATE .... 11-1-90 ..........................................................................
9
.........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT SECOND FLOOR
SEISMIC FORCE = ( 1711.2 ) BASED ON FOLLOWING:
""""""""""""""""""""~""""""---"---"-
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
1711.20 240.00 7.13
"""" """"" """"" """"""
0.00
WIND FORCE = ( 1015 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
FORCE 20 - 40 FT HGT I: 22
TOTAL
FORCE
1015.00 50.00 0.00 0.00
0 - 20 HGT 20 - 40 HGT FORCE FROM
TRIB AREA TRIB AREA OTHER LEVELS """""_ """"" """"" """"""*
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 10.5
MAX UNIT SHEAR 162.9714
.......................
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK _""" """_ """" """""""""""""" """ """"
1.0 3.5 8.0 1303.8 588.0 715.8 2.3 ~746
2.0 7.0 8.0 1303.8 1176.0 127.8 1.1 -
............................. (MARKS, SEE SCHEDULES)
EXTERIOR SHEARWALL
INTERIOR SHEARWALL ----- *-
SHEARWALL CONNECTIONS * 4
>* *I ""_"""""""""
"""""""""""~ >*
>* ""_""""""""" .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT.....ALESIA** ENGINEER ...... dgu** DATE .... 11-1-90 ..........................................................................
I4
......................................................................... ,$
LATERAL ANALYSIS ALONG LINE A AT FIRST FLOOR
SEISMIC FORCE' = ( 2181.28 ) BASE6 ON FOLLOWING:
................................
TOTAL
FORCE (=) TRIB AREA (X) PSF
DIAPHRAGM UNIT FORCE FORCE FROM
2181.28 208.00
(+) OTHER LEVELS
"""" """"" """"" """"""
2.26 1711.20
WIND FORCE = ( 3694.6 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HOT E 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL
FORCE
3694.60 117.00 0.00 1319.50
0 - 20 HGT 20 - 40 HGT FORCE FROM TRIB AREA TRIB AREA OTHER LEVELS """""- """"" """"" """"""_
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 16.6
M&X UNIT SHEAR = 222.5663
.......................
SHEAR
PANEL# W H LOAD UPLIFT H/W MARK
UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
------- -""" """" """""""""""""" """ """"
1.0 6.2 8.0 1780.5 1103.6 676.9 1.3 HQAW
2.0 10.4 8.0 1780.5 1851.2 -70.7 0.8 -
............................. (MARKS. SEE SCHEDULES)
EXTERIOR SHEARWALL >*
INTERIOR SHEARWALL ----- *3 >*
SHEARWALL CONNECTIONS *
"""""""_"""" *3
"""""""""""~
"""""""""""- > *') .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
..........................................................................
PROJECT.....ALESIA** ENGINEER ...... dgu** DATE .... 11-1-90 ..........................................................................
I4
.........................................................................
LATERAL ANALYSIS ALONG LINE B AT.FIRST FLOOR
SEISMIC FORCE = ( 2181.28 ) BASED ON FOLLOWING:
................................
TOTAL DIAPHRAGM UNIT FORCE
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
FORCE FROM
2181.28 208.00 2.26 1711.20
- - - - - - - - """"" """"" """"""
WIND FORCE = ( 3694.6 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD
FORCE 0 - 20 FT HGT = 20.3
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS FORCE 20 - 40 FT HGT E 22
TOTAL
FORCE
3694.60 117.00 0.00 1319.50
0 - 20 HGT 20 - 40 HOT FORCE FROM
TRIB AREA TRIB AREA OTHER LEVELS """""- """"" """"" """"""_
NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 14.6
.......................
MAX UNIT SHEAR = 253.0548
SHEAR UPLIFT - DEAD TOTAL
PANEL#
RATIO HOLDDOWN
W H LOAD UPLIFT H/W MARK """_ """_ """" """""""""""""" """ """"
1 .o 14.6 8.0 2024.4 2598.8 -574.4 0.5 -
(MARKS. SEE SCHEDULES) .............................
EXTERIOR SHEARWALL * >*
INTERIOR SHEARWALL ----- *
SHEARWALL CONNECTIONS
"""""""""""-
>* 3
>* *3
"""""""""""-
"""""""""""- .............................
NOTE: PLYWOOD WALLS WITH H/W RATIO > 2 TO 1 TO BE BLOCKED
NOTE: PLYWOOD WALLS MAX H/W RATIO IS 3.5 TO 1
.......................................................................... If
PROJECT. .... ALESIA** ENGINEER ...... dgU** DATE. ... 11-1-90 ..........................................................................
...........................................................................
LATERAL ANALYSIS ALONG LINE 1 AT FIRST FRLOOR
SEISMIC FORCE = ( 2181.28 ) BASED ON FOLLOWING:
""""""""""""""""""""~"""""""""""-
TOTAL DIAPHRAGM UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
2181 -28 208.00
"""" """"" """"" """"""
2.26 1711.20
WINO FORCE = ( 2476.6 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD FORCE 0 - 20 FT HGT = 20.3 FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2476.60 72.00 0.00 1015.00
"""""_ """"" """"" """"""_
NUMBER OF SHEARWALL PANELS SELECTED = 2
TOTAL LINEAR FEET USED IN CALCS = 21
MAX UNIT SHEAR = 117.9333
.......................
SHEAR - UPLIFT - DEAD TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK """_ """_ """" """""""""""""" """ """"
1.0 16.5 8.0 943.5 2937.0 -1993.5
2.0
0.5 -
4.5 8.0 943.5 801 .o 142.5 1.8 -
............................. (MARKS. SEE SCHEDULES)
EXTERIOR SHEARWALL * >*
INTERIOR SHEARWALL ----- * It
SHEARWALL CONNECTIONS * 2 >*
>*
"""""""""""~
"""""""""""-
"""""""""""~ .............................
NOTE: GYPBOARD WALLS WITH H/WfRATIO > 1.5 TO 1 TO BE BLOCKED
NOTE: GYPBOARD WALLS MAX H/W RATIO IS 2 TO 1
..........................................................................
.......................................................................... PROJECT.....ALESIA** ENGINEER ...... dgu** DATE. ... 11-1-90
.. .. . ~..~ . , .. . ...
...........................................................................
LATERAL ANALYSIS ALONG LINE 2 AT FIRST FLOOR
SEISMIC FORCE = ( 2181.28 ) BASED ON FOLLOWING:
................................
TOTAL DIAPHRAGM ' UNIT FORCE FORCE FROM
FORCE (=) TRIB AREA (X) PSF (+) OTHER LEVELS
2181.28 208.00 2.26 1711.20
"""" """"" """"" """"""
WIND FORCE = ( 2476.6 ) BASED ON FOLLOWING:
PROJECTED AREA METHOD FORCE 0 - 20 FT HGT = 20.3
FORCE 20 - 40 FT HGT = 22
TOTAL FORCE = WIND PRESSURE X TRIB AREA + FORCE FROM OTHER LEVELS
TOTAL 0 - 20 HGT 20 - 40 HGT FORCE FROM
FORCE TRIB AREA TRIB AREA OTHER LEVELS
2476.60 72.00 0.00 1015.00
"""""~ """"" """"" """"""-
NUMBER OF SHEARWALL PANELS SELECTED = 1
TOTAL LINEAR FEET USED IN CALCS = 10
MAX UNIT SHEAR = 247.66
.......................
SHEAR UPLIFT - DEAD = TOTAL RATIO HOLDDOWN
PANEL# W H LOAD UPLIFT H/W MARK
1.0 10.0 8.0 1981.3 2180.0 -198.7 0.8 L
_""" ""_" """" """""""""""""" """ """"
(MARKS, SEE SCHEDULES) .............................
EXTERIOR SHEARWALL *. >*
INTERIOR SHEARWALL ----- *
SHEARWALL CONNECTIONS
"""""""""""-
>* 3
>* *3
"""""""""""-
"""""""""""- .............................
NOTE: GYPBOARD WALLS WITH H/W, RATIO > 1.5 TO 1 TO BE BLOCKED
NOTE: GYPBOARD WALLS MAX H/W RATIO IS 2 TO 1
..........................................................................
.......................................................................... PROJECT ..... ALESIA** ENGINEER ...... dgu** DATE....11-1-90
SHEAR k4LL BCHEWLE I
MARK Voll bTERIAL kAlUN0 i . C(*(STRUCTION CDNNECTION WALL BEAR WALL I i ?),,'; A. ", .. .. '@I 1
A ai
A
IBO 716 STUCCD ND. I I OA OR UNBLOCKED .. NO-IS OA 01-10 0.5.
6 0.c.ENBFN FRAHINO
86D 716 STUCCO No. I I OA OR UNBLOCKED PER ICE0 NO.16 OA O8-16 O.C. S 0.C.ENBFN FRAMINO
276 WE PLY 80-6 o.C .EN BLDCUED
FRAHINO 0 0.C.FN . 2n-IO0.c.
432 SIB PLY 86-4 0.c.EN BLDCKED
FRAHINO
L? 0.C.M PI-I6O.c.
070 I/* PLY ea-P o.c.~ BLOCKED BTAOOER EN SI -16 0.c. 12 0. C. FN FRAMINO ,
W 112 OYP 56-7 O.C. UNEUCKED EN 8FN FRAMINO 91-18 O.C.
62 112 OYP W- 4 O.C.. UNBLOCKED
EN 8 FN , Or-l6c.c. 'rn
Q. 75 I~OYP 56-40.c. BLOCKED EN 8 FN 28 - I6 O.C. .
FRAMINO
A I25 '112 OYP, W-4 O.C. UNBLDCKED EN am 21- IS O.C. FRAMINO
Q I12 OYR 66-4 O.C. BLDCKED
FRAMINO EN 8 FN 28-16 O.C.
BO4 YE PLY, Ed-4 O.C. BLDCKED
FRAMIYO I4 I2 o.c.FN O~-l(rO.c.
1104 S/B PLY+ ea-a O.C.EN BLOCKED IO 0. e. FN PI-IO O.C. i
FRAMINQ 01
1464 S/8 PLY* 86-2o.c.a. BLQCKED STAOOER EN SI-16 0.c. I2 0.0. FN FRAMNO A. !
ib , APPLIED TO BOTH SIDES DF FRAYINO
iib Bd or IOd P IN OC REWIRES SI FRAYlNO SILLI PLATE bND STUDS. I . ..'.,. . .. .. ... ,. - , ..
.. .. .. , .. .
SHEAR WALL CONNECTIDN SCHEDULE I
126 . 119 DIA A.B. 16d- IO 0.5. 160- IO O.C. 60 0.e. PX PLATE & BUKXlNQ 2a MUDSILL
115 DIA A.B. I6d - e O.C. 4s 0.e. 16d - 8 0.C. 2. PLATE On BLOCKINQ Za MUDSILL
42 0.c. 119 DIA A.B. I60 - 7 O.C. 1Bd - 7 O.C. f!a BLOCKINO Za PLATE ea MUDSILL
PDB 112 DIA A.8. wld - 6 O.C. I60 - 6 0.C. 36 O.C. ZK PLATE Za -KINO $3 MUDI1I.L
618 DIA A.B. A30F- 6 0. e. ASSF-6o.c. I2 O.C. PI PLATE Pa FRAYNQ 2. WSlU 1.- ..
. -. . ...... ."
985. 618 DIA A. 8. A30F - 6 O.C. A3SF - 6 0.C. 16 ac. 01 PLATE f!a FWINO i
.
...... ... ......... .. ... ............ ....... ,. ... ,. . ... ... +,., ..
.; .: .r;-.. ...,.. ..,.........
~ ~ ~~
.. ,. . .... ~ ~~ ..
. ........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS ***
TYPICAL ROOF RAFTERS AT .16 OC MAXIMUM ALLOWABLE SPAN
GIVEN THE FOLLOWING CRITERIA:
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
........................................................ :! ,, ,
......................
DEAD LOAD = 15 LIVE LOAD = 20 THUS W = 46.66667
Fb x LDF = 1450 X 1.25
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((8XSxXFbXLDF)/(12XW))
SHEAR AREA IS CHECKED Ar = (~.~XWXL-~D>/(~XLDFXFV)
INERTIA IS ALSO CHECKED Ir = (5X1728XWXLEO4)/(384XErnXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 8 MEMBER DF-L N0.2
ALLOWABLE L BASED ON SX, L = 18.44538 WITH SX = SXr
ALLOWABLE L BASED ON Ar, L 18.44538 WITH Ar = 5.192885
”””_”“””””””””””“”””””””””””
”“””””””””””””
ALLOWABLE L BASED ON Ir. L = 16.44538 WITH Ir = 43.16851
...................................... * MAXIMUM SPAN (FT) = 16.44538 * ”””””””””””“” * Sx = 13.14 * A = 10.875 * I = 47.635 ......................................
” ”””””_”””””””””””“”“
L
""""""""""""""""""""""""""-
BEAM DESIGNRE"
DESIGN PARAMETERS, Fb = ,1300 Fv = ; 85 LDF = 1.25 E = 1800000
"""-""""""""""""""""""""""" ;,,,:: ,, ,
USING DRESSED LUMBER FOR A BEAM SPAN 14
LOADING
A POINT LOAD (LBS) = 100 AT 5 FEET FROM Rl UNIFORM LOAD ON MEMBER (PLF) = 280
BEAM REACTIONS R1 = 2024.286 R2 = 1995.714
MAX SHEAR = 2024.286
""""_
BEAM SPAN = 14
MAXIMUM MOMENT OCCURS AT 6.876 FEET FROM R1 MOMENT = 7112.278 AREA REQ'D = l.S*V/(LDF*Fv) = 24.87227 SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 52.52143
INERTIA REQUIRED (1/2 DL + LL) = 192.08
......................................... *** USE 6 X 12 *** """""""""""
*** Sx = 116.0156 *** A = 61.875
*** I = 652.5879 ..........................................
................................ ................................................................
PROJECT.... ADDITION ** DATE.... 10-29-90 ** ENGINEER .... dgu ................................................................
BEAM DESIGN RBM2
DESIGN PARAMETERS, Fb = 1300 Fv = ; 85 LDF = 1.25 E 1800000
USING DRESSED LUMBER
FOR A BEAM SPAN = 8
........................... """""_"""""""""""""""""""""
LOADING ,
UNIFORM LOAD ON MEMBER (PLF) = 350
BEAM REACTIONS R1 = 1400 R2 = 1400 BEAM SPAN = 8 MAX SHEAR = 1400 MAXIMUM MOMENT OCCURS AT 4 FEET FROM R1 MOMENT = 2800
AREA REQ'D = l.S*V/(LDF*Fv) 17.60294 SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 20.67692
""""_
I4 *** USE 12 X 6
......................................... *** """"""""""" *** A = 60.375 *** Sx = 52.82813 *** I = 138.6738 ..........................................
FLAr wst?
"""""""""""""""""""""""""""""""- ................................................................
PROJECT.... ADDITION ** DATE.... 10-29-90 ** ENGINEER .... dgu ................................................................
n
”””””””””””””””””””“””””””-
BEAM MSIGN RBM3
DESIGN PARAMETERS. Fb = ,1500 Fv = ; 95 LDF = 1.25 E = 1~00000
FOR A BEAM SPAN = 9
”“”“”“””“””””””””””””””””“- !8
USING DRESSED LUMBER
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 140
BEAM REACTIONS R1 = 630 R2 = 630 BEAM SPAN = 9
MAX SHEAR = 630
MAXIMUM MOMENT OCCURS AT 4.5 FEET FROM R1
MOMENT = 1417.5
AREA REQ’D = 1.5*V/(LDF*Fv) = 6.889474
SECTION MODULUS REQ’D = 12*M/(LDF*Fb) = 9.071999
””””_
......................................... *** USE 4 X &Om *** ””””””””””” *** A = 25.375 *** Sx = 30.66146 *** I = 111.1478 ..........................................
................................................................
................................................................ PROJECT. ... ADDITION ** DATE.... 10-29-90 ** ENGINEER .... dgu
”“”““””””””””””””””””””””””””””-
,, """"""""""""""""""""""""""-
BEAM DESIGN ~0m I
...........................
DESIGN PARAMETERS. Fb = 2400 F; = ; 165 LDF = 1 'E = 1800000
USING GLULAM
FOR A BEAM SPAN = 19
LOADING
UNIFORM LOAD ON MEMBER (PLF) = 700
"_"""
BEAM REACTIONS R1 = 6650 R2 = 6650 BEAM SPAN = 19
MAX SHEAR = 6650
MAXIMUM MOMENT OCCURS AT 9.5 FEET FROM R1
MOMENT = 31587.5 AREA REQ'D = l.B*V/(LDF*FV) = 54.09091
INERTIA REQUIRED (1/2 DL + LL) 900.2438
SECTION MODULUS REQ'D = 12*M/(LDF*Fb) = 157.9375
......................................... *** USE 6.75 X 12 *** """"""""""" *** A J: 81 *** Sx = 162 *** I = 972 *** MIN CAMBER = .8798679 ..........................................
................................ ................................................................
PROJECT. ... ADDITION ** DATE .... 11-4-90 ** ENGINEER .... DGU ................................................................
........................................................ *** PROGRAM WOOD STRUCTURE ANALYSIS ........................................................ ***
TYPICAL FLOOR JOISTS AT 16 oc MAX'IMUM ALLOWABLE SPAN '
CONCENTRATED LOAD = 0
GIVEN THE FOLLOWING CRITERIA:
DEAD LOAD = 10 LIVE LOAD = 40 THUS W = 66.66667
FOR INERTIA CALCULATION .5 X DL + LL IS USED FOR W
Fb x LDF = 1,450 X 1.00
Fv = 95
THE FORMULA USED (UNIFORM LOADING) ARE:
MAX L BASED ON BENDING STRESS, L = SQT((EXSxXFbXLDF)/(12XW))
............................
SHEAR AREA IS CHECKED Ar = (1.5XWXL-2D)/(2XLDFXFV) INERTIA IS ALSO CHECKED Ir (5X1728XWXLEO4)/(384XEmXL/240)
L IS ADJUSTED FOR GOVERNING CONDITION
USING 2 X 12 MEMBER DF-L N0.2
ALLOWABLE L BASED ON SX. L = 23.94734 WITH SX SXr
ALLOWABLE L BASED ON Ar. L = 23.94734 WITH Ar = 9.521686
ALLOWABLE L BASED ON Ir, L = 21.94734 WITH Ir = 167.9038
............................
"""""""""~""""~
...................................... * MAXIMUM SPAN (FT) = 21.94734 * """"""""""""" * Sx = 31.64 * A = 16.875 * I = 177.97 ......................................
"""""""""""""
. . . . . . . , ..,... , . . . . . , ,
Ale8ia Witting" Addition
La Costa climate Zone #7
Lloyd & Associates
Title 24 Energy Calculations Compliance Method - CALPAS 4
October 31, 1990
Haynal and Company
Escondido, CA 92025 425 N. Date, Suite A
(619) 743-5408 / (619) 295-9225
Contractorts License #467907