Loading...
HomeMy WebLinkAbout2035 CORTE DEL NOGAL; 200; CB110018; PermitCITY OF CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717/2718/2719 Fax 760-602-8558 Plan Check No. \rPlan Ck. Deposit OT STATE STATE EMfflL r- PROrctfirOVMBtNAME CONTRACTOR BUS. NAME 6r STATE CHY S1WEO- PHONE FAX EMAIL EMAIL MtCIVOeSKNER NWK& ADDRESS OIYBUS.UOJI Business and Professions Coda Any ON or Countyto fileasigned statement that ne Is B civil penalty of not more thanfiSe /to 8s I __™-.,____ —_with SecSon 7600 of Diyjsion3of the~ apenrotsuDjectstheappfiranttDa Co. tion,asni*edlvSediM3ra^fela6orCbife;fbrl»^^ "* FdtafNo. OOo f bO ~ a^<yy &^aMiM Tj^sec8onneedrrtbea»flBW»lhBperaaistoonehun*BddoaOT(WOO)orlas5. tar which NspennSelsaied.t3h^ rot einploy any penontaaiy iFiSoBto .UflWGOds.intaBStaiidattoniej'sfees. >fif CONTRACTOR S6NATURE rsoastobecwnesiiijerttofteWoriiffls-CompenBtaonLawof DATE ["I , wiitolheYmkandtestiuctae is irt Wended or <«eradtas* (Set 7044. Bmine^ wiqmimlieBonkindiiindgesaiifttnricMneVvlraii^MiiM r»earofcan?lB^theo«in8r-4Mdw»BliB»efiebuBl8nofpnwiJ8B^ L as rj^ottepnipg».fflnBrt^ (attack v^icaBalcorftaC^ notapplybanoimerof lamenaaplunoerSecSon BnsaiessaiilProfessliBsCodefcrWsraesorr. 1Jpersa^ptotoprovMegien^latoandin«en^teaireaucft)no(8a^ Dfes Qto Zlfli^/harenflsip^ an appfcaSon fora ta*^pea«teS)e proposed «oric ^PROPBirYOWKSlShlNATWE OKIE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-TannerHazardousSubstanceAccountAct? I |Yes LJNo Is the applicant or future building occupant required to obtain a permit ton the air pollution control district or air Quality management district? I lYes I [No Is the facility to be consftuctBwithin 1,000 feet of the outer boundary of a school site? . ..isElYes flNo EMERGENCY SERVICES AND TOE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for tie performance of the work this permit is i Lender's Name Lender's Address . 3097 (i) Civil Code). I certify that I have read the application and state that theabweirrtomiation is OTTO* arri that the i^^ I terebyaulhaizeterjresentelTOofte I ALSO AGREE TO SAVE, INDEMNIFYAND KEEP HARMLESS THE CfTY OF CARLSBAD OSHA: An OSHA permit is required faexcavations over 5ff deep and derra*cficfc«is1rux^ofsta^resover3storiMinheighl EXPIRATION: Evefypemiit issued by the BuldingOffidal under the proviaons of this Code shall expire^ 180 o^ from tec^erf such pemiitw if the Wttigc^ ^"APPLICANTS SIGNATORE ^r^KI / DATE 01-21-2011 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB110018 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2035 CORTE DEL NOGAL CBAD St: 200 Tl Sub Type: 2130611000 Lot#: $74,388.00 Construction Type: Reference #: BY REFERRAL ONLY-2004 SF OFFICE TO OFFICE COMM 0 5B Applicant: LIEN RICK P.O. BOX 930 POWAY CA 92074 619-339-7425 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check#: Owner: BOI CARLSBAD INC C/O LYNN MINNICI PO BOX 121604 ARLINGTON TX 76012 ISSUED 01/04/2011 KG 01/21/2011 01/21/2011 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedited Plan Review $532.18 Meter Size $0.00 Add'l Reel. Water Con. Fee $345.92 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $15.62 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0,00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 frfffic Impact Fee (4305541) $0.00 PdUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees $i.OO BMP Fee $250.00 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34.00 $60.00 $24.00 $0.00 $0.00 $0.00 $0.00 ,262.72 Total Fees:$1,262.72 Total Payments To Date:$1,262.72 Balance Due:$0.00 Inspector: FINAL APPROVAL Date: ^7/f Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit* Project Name: Address: Contact Person: Sewer Dist: Inspected Bv: A Aw^ Inspected Bv: Inspected Bv: CB1 10018 BY REFERRAL ONLY-2004 SF OFFICE TO OFFICE 2035 CORTE DEL NOGAL #200 G & R CONSTRUC CA JtTX/^' O Phone: 6195909385 Water Dist: CA Date I I, Inspected: .31 / / / ,/ / ! Date Inspected: Date Inspected: Date: Permit Type: Sub Type: Lot: 0 / Approved: ^^ Approved: Approved: 02/23/2011 Tl COMM *^ Disapproved: Disapproved: Disapproved: Comments: City of Carlsbad Bldg Inspection Request For: 02/23/2011 Permit* CB110018 Title: BY REFERRAL ONLY-2004 SF Description. OFFICE TO OFFICE Type:TI Sub Type: COMM Job Address: 2035 CORTE DEL NOGAL Suite: 200 Lot: 0 Location: APPLICANT LIEN RICK Owner: BOI CARLSBAD INC Remarks: Inspector Assignment: TP Phone: 6195909385 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: G & R CONSTRUCTION Entered By: CHRISTINE Act Comments Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# CV020274 CLOSED BIZ LICENSE-OWES PRIOR YR FEE; PCR91085 ISSUED ADD'L AIR CONDIT.TO COMPUTR RM; REVISE MECH SYSTEM Inspection History Date 02/14/2011 02/14/2011 02/14/2011 02/14/2011 01/25/2011 01/24/2011 01/24/2011 01/24/2011 Description 14 24 34 44 17 14 24 34 Frame/Steel/Bolting/Welding Rough/Topout Rough Electric Rough/Ducts/Dampers Interior Lath/Drywall Frame/Steel/Bolting/Welding Rough/Topout Rough Electric Act AP we AP AP AP AP AP AP Insp TP TP TP TP TP TP TP TP Comments T-CLNG RE-LOC RE-LOC GRID LITES PATCH-IN DUCTS TJ_ CITY OF CARLSBAD BUILDING Plan Check Comments Development Services Building Division 1635 Faraday Avenue 760-602-2719- www.carlsbadca.gov 1 By: Steve BorOSSay (Contact Hours for Steve: Tues.-Fri., 1 pm - 5pm) Phone: 760-602-7541 Permit- C^^> \ \Oo\,R Address: "2.O5S" CJaf^-rg !>€-*- }4o£AUDate: (/ ^~/\\ * When corrections from all departments are received please run new prints * * Please respond by indicating location of Plan Check items on plans * H Provide: A statement on the Title Sheet of the plans stating that the project shall comply with the 2010 CA Building Code, 2010 CA Residential Code, 201 OCA Green Code, 2010 CMC, 2010 CPC, 2010 CEC, 2008 CA Energy Efficiency Standards, 2010 CA Fire Code and the Carlsbad Municipal Code —\~ j _ -^ ^ O Provide: A note titled "Scope of Work" describing the work to be performed under this permit. v T-2.17- \-S-0 Approved on:.By:. PLANNING/ENGINEERING APPROVALS PERMIT NUMBER ADDRESS DATE RESIDENTIAL TENANT IMPROVEMENT RESIDENTIAL ADDITION MINOR « $17,000.00) SOLAR PANELS PLAZA CAMINO REAL PREMIER OUTLETS VILLAGE FAIRE COMPLETE OFFICE BUILDING OTHER PLANNER ENGINEER DATE .u DATE (f(fl // Docs/Misforms/Plannlng Engineering Approvals PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB 11-18 DATE 1/7/11 ADDRESS 2035 Corte Del Nogal RESIDENTIAL ADDITION- Ml NOR (<17,000.00) RETAINING WALL VILLAGE FAIRE POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING OTHER office to office PLANNER ENGINEER DATE f-l-)| DATE H:\ADMIN\COUNTER/PLANN1NC/ENCINEERINCAPPROVA1S Y Brenda Wardwell From: Daryl [kitfire@sbcglobal.net] Sent: Wednesday, January 19, 2011 9:17 AM To: Brenda Wardwell Cc: Janet Altar; Raenette Abbey Subject: CB110018 Recommended for Approval Attachments: CB110018 Recommended for Approval.doc Initial Review $157.50 Inv. 2740 Approval_$67.50 Tota 'Thanks, . James . James & JAssoc. Inc. 205 CoCina Terrace Vista, CA. 92084 760-724-7001 RECOMMENDED FOR APPROVAL Page: "I of 2 DEPT COPYDaryl K. James & Associates, Inc. Plan Checker: Da 205 Co//na Terrace Date: January 19. 2011 Vista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Bill Kochert Bill@maggettielam.com JURISDICTION: Carlsbad Fire Department PROJECT NAME: Progressive PROJECT ADDRESS: 2035 Corte Del Nogal Ste 200 PROJECT DESCRIPTION: CB110018 Tenant Improvement INSTRUCTIONS « This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. • The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. • To expedite the recheck process, please note on this list (or copy) where each correction item has been addressed, i.e. sheet number, note number, detail number, legend number, etc Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates. • PLEASE SEND OR DELIVER REVISED PLANS WITH ESGIL COMMENTS DIRECTLY TO: DARYL K. JAMES 205 COLINA TERRACE VISTA, CA 92084 • Please direct any questions regarding this review directly to: Daryl K. James kitfire@sbcglobal.net VT1-0.0 Project Notes Replace applicable codes with the following 2010 California Codes based on the 2009 International Codes adopted as the Building Standards Code. 2010 California Administrative Code 2010 California Building Code (CBC), Volumes 1 and 2 2010 California Electrical Code (CEC 2010 California Mechanical Code (CMC 2010 California Plumbing Code (CPC 2010 California Energy Code 2010 California Fire Code (CFC) 2010 California Energy Code Applicable Standards 2010 NFPA 13 Deferred fire sprinkler design 2010 NFPA 72 Deferred fire alarm design. Page: 2 of 2 VT1-0.3 Address dead end corridor conditions. CBC 1018.4 Not applicable. Dead end condition does not exist. Verify that all adjacent tenant spaces are B occupancy classifications. Means of Egress Legend Add 90-minute to back-up power source. Added Means of Egress Notes 5. Add CBC 715,4.3 Ac/ctec/ T1-3.0 Denote emergency lighting equipped with 90-minute emergency battery back-up and directional exit signs to stairway means of egress. Added T1-6.0 Detail 2 Provide UL listing, ICC ES report or reference to applicable Item No. in CBC Table 720 for 1-hr rated assembly details. Not applicable. Demising wall is not rated. M0.1 General Notes Revise notes 9, 13 & 15 to 2010 codes.Rewsed Exiting Package Unit Revise area of service. Identify equipment requiring automatic shutoff. (CMC 609) and provide details. Shown on plans. SD not required. 12 Denote emergency lighting equipped with 90-minute emergency battery back-up and directional exit signs to stairway means of egress. Denoted BUILDING ENERGY ANALYSIS REPORT PROJECT: By Refera! Only 2035 Corte Del Nogal Carlsbad, Ca 92011 Project Designer: Maggetti Elam 3160 Camino Del Rio N Ste 207 San Diego, Ca92108 619-624-0521 Report Prepared by: Greater San Diego Air Conditioning Co. Inc. Job Number: Date: 12/29/2010 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and Is authorized by the California Energy Commission for use with both the Residential and Nonresidehtlal 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 5. 1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID: TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MECH-1-C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 9 Form MECH-3-C Mechanical Ventilation 12 Form MECH-4-C HVAC Misc. Prescriptive Requirements 14 ^nergyPro S.1 by EnergySoft Job Number ID: User Number 6272 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date By Referal Only 12/29/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2035 Corte Del Nogal Carlsbad 7 6,436 n/a GENERAL INFORMATION Building Type: ' 0 Nonresidentia! D High-Rise Residential D Hotel/Motel Guest Room D Schools (Public School) D Relocatable Public School Bldg. El Conditioned Spaces D ^^^^ Spaces Phase of Construction: D New Construction D Addition ED Alteration Approach of Compliance: D Component O Overall Envelope TDV Q Unconditiorigd (fi!e affidavit) Front Orientation: N, E, S, W or in Degrees: odeg HVAC SYSTEM DETAILS Equipment2 Item or System Tags (Le.AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Equipment2 Item or System Tags (i.e. AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Inspection Criteria Existing HP 2-15 Hydronic Heat Pump 1 30,003 Btu/hr 4.20 COP 55,774 Btu/hr 12.0EER R-4.2 No No Economizer Setback Required Constant Volume Inspection Criteria Existing HP 2-14 Hydronic Heat Pump 1 2,1 32 Btu/hr 4.20 COP 51,219 Btu/hr 12.0EER R-4.2 No No Economizer Setback Required Constant Volume FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Pass D D D a a a a p a a a a Fail - Describe Reason2 n D D D n D n P D P D P FIELD INSPECTION ENERGY CHECKLIST Pass P n n a a n n n a a a n Fail - Describe Reason2 P P P P P P P P P P P P 1 . If the Actual installed equipment performance efficiency and capacity is less than She Proposed {from the energy com pliance submittal or from the building plans) the responsible party shall resubmit energy comp! anoe to include the new changes, 2. For additional detailed discrepancy use Page 2 of the inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro5.1byEnergySoft User Number 6272 RunCode: 2010-12-29713:35:28 /Or Page 3 of 21 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date By Referal Only 12/29/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2035 Corte Del Nogal Carlsbad 7 6,436 n/a GENERAL INFORMATION Building Type: ^ Nonresidential D High-Rise Residential D Hotel/Motel Guest Room D Schools (Public School) O Relocatable Public School Bldg. 0 Conditioned Spaces D /^d^fl°ned SpaC9S Phase of Construction: D New Construction D Addition D Alteration Approach of Compliance: O Component D Overall Envelope TDV n Uncondjtioned {file affidavit) Front Orientation: N, E, S,W or in Degrees: Qdeg HVAC SYSTEM DETAILS Equipment2 Item or System Tags (i.e.AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooiing Efficiency1 Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Equipment2 Item or System Tags (i.e. AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R- Value When duct testing Is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Inspection Criteria Existing AC 1 Split DX 1 -1,244 Btu/hr n/a 43,704 Btu/hr 13.0 SEER/ 11. SEER R-4.2 No No Economizer Setback Required Constant Volume Inspection Criteria Existing HP 2-13 Hydronic Heat Pump 1 1,679 Btu/hr 4.20 COP 32,341 Btu/hr 12.0 EER R-4.2 No No Economizer Setback Required Constant Volume RELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Pass D D n n n n n n n n n n Fail - Describe Reason2 D D n n n n n n n n n n FIELD INSPECTION ENERGY CHECKLIST Pass n D a a a a D a n a D D Fall - Describe Reason2 n D n D D D D n n o n o 1 . If the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance subrnittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydranic, PTAG, or other. EnergyProS.lbyEn&fQySoft User Number. 6272 RunCode: 2010-12-29713:35:28 ID: Page 4 of 21 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name - Data By Refera! Only 12/29/2010 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2035 Corte Del Nogal Carlsbad 7 6,436 n/a GENERAL INFORMATION Building Tvoe: ^ Nonresidential D High-Rise Residential D Hotel/Motel Quest Room D Schools (Public School) D Relocatable Public School Bldg. El Conditioned Spaces D ^maM?^ Spaces Phase of Construction: D New Construction D Addition D Alteration Approach of Compliance: D Component ' O Overall Envelope TDV n Uncanditioned (fi|e affidavft) Front Orientation: N, E, S, W or in Degrees: odeg HVAC SYSTEM DETAILS Equipment2 Item or System Tags (Le.AC-1, RTU-1.HP-1) Equipment Tvce3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Va!ue When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Equipment2 Item or System Tags (i.e.AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Inspection Criteria Existing HP 2-12 Hydronic Heat Pump 1 14,987 Btufrr 4.20 COP 23,275 Btu/hr 12.0 EER R-4.2 No No Economizer Setback Required Constant Volume inspection Criteria Existing HP 2-11 Hydronic Heat Pump 1 25,285 Btu/hr 4.20 COP 69,531 Btu/hr 12.0EER R-4.2 No No Economizer Setback Required Constant Volume FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Pass D n a a a D n n n a n n Fail - Describe Reason2 n n D n n a a a n D a a FIELD INSPECTION ENERGY CHECKLIST Pass 0 n n n n p n n o a a a Fail - Describe Reason2 n a n a a n n n a a n n 1 . If the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnerqyPm 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID: Page 5 of 21 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Date By Referal Only 12/29/2010 Project Address . Climate Zone Total Goncf. Floor Area Addition Floor Area 2035 Corte Del Nogal Carlsbad 7 6,436 n/a GENERAL INFORMATION Building Type: Ef Nonresidentra! d High-Rise Residential D Hotel/Motel Guest Room D Schools {Public School) O Relocatable Public School Bldg. 0 Conditioned Spaces U ^mavlt)0"^ SpaGSS Phase of Construction: C New Construction D Addition D Alteration Approach of Compliance: D Component D Overall Envelope TDV n UnconditJoned pe affidavit)energy Front Orientation: N, E, S, W or in Degrees: o cleg HVAC SYSTEM DETAILS Equipment2 Item or System Tags (i.e.AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Allowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Equipment2 Item or System Tags (i.e,AC-1,RTU-1,HP-1) Equipment Type3: Number of Systems Max Aliowed Heating Capacity1 Minimum Heating Efficiency1 Max Allowed Cooling Capacity1 Cooling Efficiency1 Duct Location/ R-Va!ue When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control Inspection Criteria Existing HP 2-10 Hydronic Heat Pump 1 3,521 Btu/hr 4.20 COP 47,788 Btu/hr 12.0 EER R-4.2 No No Economizer Setback Required Constant Volume inspection Criteria Existing HP 2-9 Hydronic Heat Pump 1 20,059 Btu/hr 4.20 COP 66,406 Btu/hr 12.0 EER R-4.2 No No Economizer Setback Required Constant Volume FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Pass n n n a n D D a a n n a Fail - Describe Reason2 D n n n n n n n n n n n FIELD INSPECTION ENERGY CHECKLIST Pass P n D P P P P P n n n D Fail - Describe Reason2 D P P P P P P P P D D D 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from (he energy compliance submittal or Jrom the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form, Compliance falls if a Fail box is checked. 3. indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5. 1 by Energy-Soft User Number: 6272 RunCode; 2010-12-29713:35:28 ID: Page6of21 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 5)MECH-1C Project Name By Referal Only Data 12/29/2010 Discrepancies: EnergyPro 5.1 by EnergySort___User Number 6272 RunGode: W10-12-29T13:3S:2S ID:Page 7 oi 21 CERTIFICATE OF COMPLIANCE (Part 5 of 5)MECH-1C Project Nams By Referal Only Date 12/29/2010 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name fess Signature Company Greafer San Diego Air Conditioning Co. Inc.Date 12/29/2010 Address CEA# CEPE# City/State/Zip.Cc, 92,123 Phone The Principal Mechanical Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical » This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title-24, Parts 1 and 6 of the California Code of Regulations. » The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Ross Baillargeon Company Greater San Diego Air Conditioing Company, Inc. Signature Date Address •3883 Ruffin Rd, Suite C License # City/State/Zip San Diego, Ca 92123 Phone 619-469-7818 Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures. MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet Is Included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidentia! Manual.. Note: The Enforcement Agency may require alt forms to be incorporated onto the building plans. E! MECH-1C Certificate of Compliance. Required on plans for all submittals. SI MECH-2C Mechanical Equipment Summary is required for all submlttais. MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. El MECH-4C Fan Power Consumption is required for al! prescriptive submittals. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCorfe: 2010-12-29713:35:2 ID:Page 8 of 21 AIR SYSTEM REQUIREMENTS (Part 1 of 2} MECH-2C Project Name Dale By Referal Only 12/29/2010 Item or System Tags (I.B.AC-1.RTU-1.HP-1) Number of Systems MANDATORY MEASURES Healing Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Efectric Resistance Heating' Air Cooled Ghiltsr Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 1 . Total installed capacity (MBtu/hr) of £ explain which exception(s) to §1 44{g Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc.,.) Existing HP 2-1 5 1 Existing HP 2-14 1 Existing AC 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) T-24 Sections 112(3) 112(a) 112(b>, 112(c) 112(c), 115(a) 121 (fa) 121(b) 121 (c) 121(0 122(e) 122(e) 122(f) 122(g) 123 124 4.20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 4.20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 n/a 13.0 SEER/ 11. 5 EER n/a n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 144(a&b) ' 144(a&b) 144(a&b) 144(a&b) 144(c) 144(c) 144(c) 144(d) 144(e) 144(f) 144ffl 144(g) 144(i) 144(k) 30,003 Btu/hr 50,241 Btu/hr 39,042 Btu/hr 38,883 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 2,132 Btu/hr 46,780 Btu/hr 35, 853 Btu/hr 34,279 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No -1,244 Btu/hr 0 Btu/hr 30,593 Btu/hr 29,580 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No I! electric heat on this project exclusive of electric auxiliary heat ior heat pumps. If electric heat is used apply. EnergyProS.lbyEnergySoft User Number: 6272 RunCode: 2010-12-29T1 3:35:28 ID: Page 9 of 21 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date By Referal Only , 12/29/2010 Hem or System Tags JLe. AC-1, RTU-1, HP-1) Number of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostal Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Contra! Setback and Setup Control Outdoor Damper Control isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset 'Cool Air Supply Reset Electric Resistance Heating1 Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 1 . Total installed capacity (MBtu/hr) of i explain which exception(s) to §1 44(g Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) — ** "^;~^S -™.^__^._^__ Existing HP 2-13 1 Existing HP 2-1 2 1 Existing HP 2-11 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) T-24 Sections H2(a) H2(a) 112(b),112(c) 112(c), 11 5(a) 121(b) 121(b) 121(c) 121(c) 122(e) 122(e) 122(f) 132(a) 123 124 4.20 COP 12.0 £ER Yes n/a No Ocfm No No Programmable Svwfcft Setback Required Auto n/a R-4.2 4.20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 4. 20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 144(a & b) 144[a&b) 144(a & b) 144(a & b) 144(c) 144(c) 144(c) 144(d) 144(e) 144(f) 144(1) 144(3) 144(i) 144(k) 1,579 Btu/tir 25,882 Btu/hr 22,639 Btu/hr 20,262 Blu/hr Constant Volume Yes No No Economizer Constant Temp Constant Tamp No 14,987 Btu/hr 19,286 Btu/hr 16,292 Btu/hr 15,596 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 25,285 Btu/hr 35,41 2 Btu/hr - 48,672 Btu/hr 33,680 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No ill electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used ) apply. EnergyPro 5. t by EnergySoft User Number 6272 RunCode: 2010-12-29T13:35:25 ID: Page 10 of 21 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date By Referal Only . 12/29/2010 Item or System Tags (i.e.AC-1,RTU-1,HP-1) Number of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Controf Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating1 Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 1 . Total installed capacity (MBtu/hr) of ^ explain which exceptions) to §1 44(g Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) Existing HP 2-10 1 Existing HP 2-9 . 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) T-24 Sections 112(3) 112(a) 112(b), 112(c) 112(c), 115(a) 121 (b) 121{b) 121{c) 121(c) 122(e) 1.22(8)' 122{f) 122(g) 123 124 4.20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 4.20 COP 12.0 EER Yes n/a No Ocfm No No Programmable Switch Setback Required Auto n/a R-4.2 144(a&b) 144(a&b) 144(a&b) 144(a8b) 144(c) 144{c) 144(c) 144(d} 144{e) 144(f) 144(f) 144(g) 144(0 144(k) 3,521 Btu/hr 29,760 Btu/hr 33,452 Btu/hr 22,565 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 20,059 Btu/hr 35,376 Btu/hr 46,434 Btu/hr 33,697 Btu/hr Constant Volume Yss No No Economizer Constant Temp Constant Temp No ill electric heat on this project exclusive of electric auxiliary heai for heat pumps. If electric heat is used } apply. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID: Page 11 of 21 OCO I Ul 1- ^£LU X LU CC Z.os^J H QJ _l O z Xo LUs oT*" §05 1" "c a, -j.i ^ s *®2, '•C£ ^ § T S I t t J- U. S CC Si"3J1 r- <N S o 5_j u _J 3 i 1 is "Z S § > (fi m CL ID o tn at S 14 z ii ~a _ o u. Ul o 0 03 Q c ff ^ ,- E £ -21 1 -is '98 -MlQ| <5§ — H -S° Fj ^ U. ||x-| ^t CD — • ^0 CD ° N 'S.S5? c cm. LO'W W° Q £=||$s D S U > -j , *Q ^3 i>ll E ci CO u. o1 ^ ^ if Q C, §s.| 5 * Z a. S cdu. g O °<X If cS"110 o D-*" -lie (5 *£ """ 0) £ CO OS oN V-00 o T-cot- 00 10 ci s ^1 0 T- 00 s iS u> 5j ^Co.c: 'SS K 0 g N!*• T- C! I 03 0 •KT- 1 CM ^f W iS ^ Q * o o m ^ S ^ IN <B 1 C. « 1 ^0 P SiS 8 0 Ol 1 10 o 1 o o Oj T- 3 TO CVI | i? •SS § o is § 10 ci § <l> 1 o H)CO I fJi ^toc: •93 § o « cS !£ 0 S15 CD 1 o CO "cS >2 rv ^?•a3 R o R f?"^ S 0 S q, 1 <=> S 1 0v- rij ^? wa s o s s s Ci i CD 1 ^C.3 Js c > cgi 8s O 3(2 — J o Mfa £ <. SiJDOJr— W C CD 1 SSg Minimum ventilatiO ra 1 "O 1 •t; •f « 1S v! | c c 8 1CC c t303o 1 ooCQo I"B in (n § O CD g -o 0 Q cu I "o $. cu U: £ o to Based on fixed sem c o ^~ 1 "c 0 CO CO CD o Q_ OOo o CO3m 55DC cCO C0 Tl ra o COCOE _o "cs j= 'S 0)E CO CD.E .2 5 Q GLU CC l_ o | Required VentilatiI d ^ to QZl <D "SEa zc.E •5-ii < J2 g H OCO O X 0 "CD13 w0 §| Must be greater tt— CJ T Q 0) | 'S oo 1o cscOJ"w CD CD O 0in X " U_o £ ^O j CO _|3 Q -J 0 <t 1 Tf O X 1 Condition area (ft:^ LL O O b X 1 Maximum of Colu_j 2 COjri X CO E 8 "o ZJ a> o CO 3FTs o §.E i5 1O) c3_I 113 OOo 3 CB O 1 1 This must be less2 oIs O>s I E '3 •scto TD "S0- S Is 3 » iff pT § Ea! 12 £ S 3 Ci EC 31§Ol^s< ll ^ ^If£ti -0 0><Dco-c x| - *? II c 7T |< 3 O l| S <B~ > B "^ir-snU- £ CD /ided whsetween tt3 -° D p-0 m Transfer Air mustequal to the differ•2. CM 15 <\ t- 0> 1 Q" S I I <ir- oi ou1 3 Q | > CD W ^by Energy-Softv- id C>s 5 OCOi OLU*>EHEATEC Q < 1 LU _l Oz*t oms o o OSCSj pQ « "*""Q "5O I ~£5 » o>S Oc § XO-CQ ^ 5ITCO zog1- Eli «tLL XLUcr SA ^^«un TILATION (jMECHANICAL VEN5 —Sz S g ^ im o §CLD O AREA BASISz 2 ^ _ X <3 IL Ul a 0 m ** JS"tn .^|< c E £ 'i? £ 5 i O •*= '5 W ^_ to .5O ^ ij£ u. x T O •§ o "°o£?j ^tO ~- u_0 01 **•" o >, fM_g (• cc .2 a I<0 5* P -oOO< x fcjj > m °a: 5a 1SP cS >~ ^ a. 0 •|gg Z CL u, g o i^m |^ l!i8 £ W Sc o S Jjfi 0) CM Cnc; 1LU .^ ^.^ •J3 J5! "E > c "w.3 rd 1 — c£ "oQ 1—i c\l o o CO i Minimum veniO c_c aCO 1t; C .*" « cE ,2 ccig (0to (D O "D03_O "c03a g Ocao <D *^ g W § tfl 3 number of occthe greater of the expectedd seat or1 C O"gen(0m UJ c c Qc E •g 0 CO V. oz: CL OOo ^ BASIS or i*^.m onan AR•Q 1 JJ U COB g of the ventilati<5 §r (REQ'D V.A.) is the li1 1 Required Venx ifference.•a<D-C Q oj£caEo c I ' equal to H, or use Transfer:er than 01Must be great'«'a SsO "?5 9 S esign zone OLT3 O X 11-Oc£ U-O | n § cra 'oi Q -3 4CFM/f!2;ord X Condition arei^ oooCO 0 1^ R Maximum of C_, z M "HI ColumnsB £ tfi 0>£ 2 TS DCO •eater than oror equal to Column L and qiless thanThis must bes cre fe15 D) Ui E 'S fl5 1 <D cr £o5 *"2 5 s ^4._c 11i| ^^i=O E5^ cE P Design Minm Air (Coluiqj a li l-iCO Q) 11 ^•a= sE T-"^ gCJ.E Ventilation Air:ilation Air (Coovided where the Requiredbetween the Required Vent10 Q>Transfer Air nequaltofhedz c\j o S 1Q- Q TJ3.-35.-2SN -Zt-QIQZ •Q)8oge i jyog/ySjsug /^S >,& cUJ FAN POWER CONSUMPTION MECH-4C Project Name Data By Referat Only 12/29/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption ot fan §144(c). A Fan Description Supp/K Fan B Design Brake HP 0.450 C D Efficiency Motor 66.0% Drive 97.0% E Number of Fans 1.0 F Peak Watts B X E X 746 / (CXD) 524 TOTALS AND ADJUSTMENTS F^LE^PR.ES,S.U-RIAJDJUSTMENT EqUati°n 14^A in §144(C) D TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM R 2) SUPPLY DESIGN AIRFLOW (CFM) A, tp^_^W*^to^VI£.« 3] TorALFANSYSrreM POWER-INDEX Btowl/ft^a pressure drop across the fan (S Pi) on Lines. 4) SPa 5) SPf B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1)/SPi C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 524 1,600 W/CFM 0.328 W/CFM 1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25 W/C'FM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:2 ID: Page 14 of 21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Referal Only 12/29/2010 NOTE: Provide one copy of Ihis worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of tan §144(c). A Fan Description Supply Fan B Design Brake HP 0.500 C D Efficiency Motor 80.024 Drive 97.0% E Number of Fans 1.0 F Peak Waits B X E X 746 / (CXD) 481 TOTALS AND ADJUSTMENTS F™ PRESSURE «*"JSTMENT Ecluation 144'A in §144<c> 1, TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F> 2) SUPPLY DESIGN AIRFLOW (CFM) A) Iffll^pr^d^tSPJIs^tert^l^W acr 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) pressure drop across the fan (SPi) or Line 5. 4) SPa 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-(SPa«1)/SPf C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 481 1,200 W/CFM 0.401 W/CFM 1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number. 6272 RunCode: 2010-12-29713:35:2 ID: Page 15 of 21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Referal Only 12/29/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV) Fan Systems or Variable Air Volume (VAV) Systems when using the PrescripJivg Approach. See Power Consumption of fan §1 44(c). A Fan Description Supply Fan B Design Brake HP 0.500 C D Efficiency Motor 80.0 % Drive 97.0% E Number of Fans 1,0 F Peak Watts BXEX746/ (CXD) 481 TOTALS AND ADJUSTMENTS F™ PRES£URE_ ADJUS™ENT £quafa 144'A in §144<c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 2) SUPPLY DESIGN AIRFLOW (CFM) A) H^S^ -?r IT'! ET-r T°t * f YC- °r 3) TOTAL FAN SYSTEM POWER INDEX (Row ' ' Row 2) pressure drop across the fan (SPi) on Line 5. 4) SPa 5) SP, B} Calculate Fan Adlustment and enter on line 6. 6) Fan Adjustment = 1-(SPa-1)/SPi C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 481 1,600 W/CFM 0.300 W/CFM 1. TOTAL FAN SYSTEM POWER SNDEX or ADJUSTED FAN POWER INDEX must not exceed 0,8 W/CFM for Constant Volume systems or 1 ,25 W/CFM for VAV systems. EnergyPmS.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:2 ID: Page16of21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Referal Only 12/29/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). A Fan Description Supply Fan B Design Brake HP 0.450 c D Efficiency Motor 66.0% Drive 97.0% E Number of Fans 1.0 F Peak Watts BXEX746/ (CXD) 524 TOTALS AND ADJUSTMENTS ™ PRES,S,URf ADJUSTMENT Equation 144-A in §144(c) 1} Tom FAN SYSTEM pQWER {WKns< SUM CQLUM F) 2) SUPPLY DESIGN AIRFLOW (CFM) A) !!*S^r^.?r^r^*^Vn2?-GOr 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/ Row 2) pressure drop across the fan (SP() on Line 5. 4.) SPa S) SP, B) Calculate Fan Adjustment and enter on Sine 6, 6} . Fan Adjustment = 1-(SPB-1)/SP[ G) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 524 1,200 W/CFM 0.437 W/CFM 1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25 W/CFM for VAV systems. EnergyPro5.1 byEnergySoft User Number: 8272 RunCode: 2010-12-29713:35:2 ID: Page17of21 FAN POWER CONSUMPTION MECH-4C Project Name • Date By Referal Only 12/29/2010 NOTE: Provide one copy of this worksnee! for each (an system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume {VAV} Systems when using the Prescriptive Approach, See Power Consumption of fan §144(c). A Fan Description Supply Fan B Design Brake HP 0.125 C D Efficiency Motor 55.0% Drive 97.0% E Number of Fans 1.0 F Peak Watts B X E X 746 / (CXD) 175 TOTALS AND ADJUSTMENTS F^E" PRf 4URriE «WUS™EMr E^albn 144"Ain §144<C) 1} TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 2} SUPPLY DESIGN AIRFLOW (CFM) A) lfinerpressuredrop(S^isgraaterthan1™hW.C.or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 /Row2) pressure drop across the fan (SPO on Line 5. 4) SPa 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-(SPa-1>/SPi C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 175 600 W/CFM 0.291 W/CFM 1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPm 5.1 by ' EnergySpft User Number, 6272 RunCode: 2010-12-29713:35:2 ID: Page 18 of 21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Refers/ Only 12/29/2010 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Vofume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144{c). A Fan Description Supply Fan B Design Brake HP 0,330 C D Efficiency Motor 64.0% Drive 97.0% E ' Number of Fans 1.0 F Peak Watts B X E X 746 / (CXD) 397 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c} ^ TOTAL fm s^m poWER (WATTS> $UM CQLUM R 2) SUPPLY DESIGN AIRFLOW (CFM) A) np^^W*wMWK.C.« 3! TOTALFANSYSTEMPOWERINDEXfRow1/R0w2) pressure drop across the fan (SPf) on Line 5. 4} SPa 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment =• 1-(SPB-1)/SPf C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)r 397 ?,200 W/CFM 0.330 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX musi not exceed 0.8 W/CFM for Constant Volume systems or 125 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode:2010-12-2ST13:35:2 ID: Page 19 of 21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Refers! Only 12/29/2010 NOTE: Provide one copy of this worksheet for each fan system with a totai San system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan |144(e). A Fan Description Supply Fan B Design Brake HP 0.166 C D Efficiency Motor 55.0% Drive 97.0% E Number of Fans 1.0 F Peak Watts B X E X 746 / (CXD) 232 • TOTALS AND ADJUSTMENTS ™j P*E^URE;TUS™ENT EqUati°n W4'A ^ §144{C) D TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 2) SUPPLY DESIGN AIRFLOW (CFM) Al -rer£cZr8 ,? clf'r onT' T SSl?^ " 3) ' TOTAL FAN SYSTEM POWER tNDEX (Row 1 / R™2> pressure drop across the fan (SP,) on Une S. 4) SPa 5} SP, 6) Calculate Fan Adjustment and enier on line 6. 6} Fan Ad!ustment=1-(SPa-1)/SPfl C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)r 232 1000 W/CFM 0.232 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. SnergyPro 5. 1 by EnergySoft User Number: 6272 RunCode: 201 0-12-29713:35:2 ID: Page 20 Of 21 FAN POWER CONSUMPTION MECH-4C Project Name Date By Refers! Only 12/29/2010 NOTE: Provide one copy of this worksheet Jor each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of tan §144(c). A Fan Description Supply Fan B Design Brake HP 0.330 C D Efficiency Motor 64.054 Drive 97.0% E Number of Fans 1.0 F Peak Watls B X E X 746 / (CXD) 397 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1 , TOTAL FAN SYSTEM pQWER (WATTS> SUM CQlm p) 2) SUPPLY DESIGN AIRFLOW (CFM) A) -^1^-t^Fj^ttlS?^" 3) TOTAL FAN SYSTEM POWER ,NDEX (Row 1 /Row2) pressure drop across ths ian (SP() on Line 5. 4) SPa 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjuslment= 1-( SPa-1)/SPi C) Calculate Adjusted Han Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 397 1,200 W/CFM 0.330 W/CFM 1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 201 0-1 2-29T13:3S:2 ID: Page 21 of 21 Check a License - Contractors State License Board Page 1 of2 *"** LI e Board Contractor's License Detail - License # 722261 £ii DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations. ••» CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure, a link for complaint disclosure will appear below. Click on the link or button to obtain complaint and/or legal action information. ••» Per B&P 7071.17 , only construction related civil judgments reported to the CSLB are disclosed. ••» Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration. '-•>> Due to workload, there may be relevant information that has not yet been entered onto the Board's license database. License Number Business Information 722261 Extract Date: 1/21/2011 G & R CONSTRUCTION INC 854 WASHINGTON HEIGHTS ROAD ELCAJON, CA92019 JssueJDate Ex|pjirejjiate_ License Status Classifications: Bonding: _Corrjoration_ 05/02/1996 05/31/2012 This license is current and active. All information below should be reviewed. Workers' Compensation: DESCRIPTION GENERAL BUILDING CONTRACTOR CLASS J3 _ _C1£_ ELECTRICAL CONTRACTOR'S BOND This license filed Contractor's Bond number SC6049064 in the amount of $12,500 with the bonding company Effective Date: 03/02/2009 BOND OF QUALIFYING INDIVIDUAL 1. The Responsible Managing Officer (RMO) DARRIEULAT GEORGE ROGER JR certified that he/she owns 1 0 percent or more of the voting stock/equity of the corporation. A bond of qualifying individual is not required. Effective Date: 05/02/1996 BQi:s..BQOdjnfl..History 2.This license filed Bond of Qualifying Individual number SC6065739 for HATHERILL MARK JAMES in the amount of $12,500 with the bonding company AMERICAN CONTRACTORS INDEMNITY COMPANY. Effective Date: 03/02/2009 This license has workers compensation insurance with the aAIE.mMPENMI!QNJNSUBANCE.FUND Policy Number:461-0001050 Effective Date: 01/01/2008 Expire Date: 01/01/2012 Workers' Compensation History https://www2.cslb.ca.gov/OnlineServices/CheckLicenseII/LicenseDetail.aspx?LicNum=7... 01/21/2011 3 3 sre c a Sra ST n I 3> * .