HomeMy WebLinkAbout2035 CORTE DEL NOGAL; 200; CB110018; PermitCITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
760-602-2717/2718/2719
Fax 760-602-8558
Plan Check No.
\rPlan Ck. Deposit
OT STATE STATE
EMfflL r-
PROrctfirOVMBtNAME CONTRACTOR BUS. NAME
6r
STATE CHY S1WEO-
PHONE FAX
EMAIL EMAIL
MtCIVOeSKNER NWK& ADDRESS OIYBUS.UOJI
Business and Professions Coda Any ON or Countyto fileasigned statement that ne Is B
civil penalty of not more thanfiSe
/to 8s I __™-.,____ —_with SecSon 7600 of Diyjsion3of the~ apenrotsuDjectstheappfiranttDa
Co.
tion,asni*edlvSediM3ra^fela6orCbife;fbrl»^^
"* FdtafNo. OOo f bO ~ a^<yy &^aMiM
Tj^sec8onneedrrtbea»flBW»lhBperaaistoonehun*BddoaOT(WOO)orlas5.
tar which NspennSelsaied.t3h^ rot einploy any penontaaiy
iFiSoBto
.UflWGOds.intaBStaiidattoniej'sfees.
>fif CONTRACTOR S6NATURE
rsoastobecwnesiiijerttofteWoriiffls-CompenBtaonLawof
DATE
["I
, wiitolheYmkandtestiuctae is irt Wended or <«eradtas* (Set 7044. Bmine^
wiqmimlieBonkindiiindgesaiifttnricMneVvlraii^MiiM
r»earofcan?lB^theo«in8r-4Mdw»BliB»efiebuBl8nofpnwiJ8B^
L as rj^ottepnipg».fflnBrt^ (attack v^icaBalcorftaC^ notapplybanoimerof
lamenaaplunoerSecSon BnsaiessaiilProfessliBsCodefcrWsraesorr.
1Jpersa^ptotoprovMegien^latoandin«en^teaireaucft)no(8a^ Dfes Qto
Zlfli^/harenflsip^ an appfcaSon fora ta*^pea«teS)e proposed «oric
^PROPBirYOWKSlShlNATWE OKIE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-TannerHazardousSubstanceAccountAct? I |Yes LJNo
Is the applicant or future building occupant required to obtain a permit ton the air pollution control district or air Quality management district? I lYes I [No
Is the facility to be consftuctBwithin 1,000 feet of the outer boundary of a school site? . ..isElYes flNo
EMERGENCY SERVICES AND TOE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for tie performance of the work this permit is i
Lender's Name Lender's Address
. 3097 (i) Civil Code).
I certify that I have read the application and state that theabweirrtomiation is OTTO* arri that the i^^
I terebyaulhaizeterjresentelTOofte I ALSO AGREE TO SAVE, INDEMNIFYAND KEEP HARMLESS THE CfTY OF CARLSBAD
OSHA: An OSHA permit is required faexcavations over 5ff deep and derra*cficfc«is1rux^ofsta^resover3storiMinheighl
EXPIRATION: Evefypemiit issued by the BuldingOffidal under the proviaons of this Code shall expire^
180 o^ from tec^erf such pemiitw if the Wttigc^
^"APPLICANTS SIGNATORE ^r^KI / DATE
01-21-2011
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB110018
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2035 CORTE DEL NOGAL CBAD St: 200
Tl Sub Type:
2130611000 Lot#:
$74,388.00 Construction Type:
Reference #:
BY REFERRAL ONLY-2004 SF
OFFICE TO OFFICE
COMM
0
5B
Applicant:
LIEN RICK
P.O. BOX 930
POWAY CA 92074
619-339-7425
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check#:
Owner:
BOI CARLSBAD INC
C/O LYNN MINNICI
PO BOX 121604
ARLINGTON TX 76012
ISSUED
01/04/2011
KG
01/21/2011
01/21/2011
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Fire Expedited Plan Review
$532.18 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$345.92 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$15.62 PFF (3105540)
$0.00 PFF (4305540)
$0.00 License Tax (3104193)
$0,00 License Tax (4304193)
$0.00 Traffic Impact Fee (3105541)
$0.00 frfffic Impact Fee (4305541)
$0.00 PdUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Master Drainage Fee
Sewer Fee
$0.00 Redev Parking Fee
$0.00 Additional Fees
$i.OO BMP Fee
$250.00
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$34.00
$60.00
$24.00
$0.00
$0.00
$0.00
$0.00
,262.72
Total Fees:$1,262.72 Total Payments To Date:$1,262.72 Balance Due:$0.00
Inspector:
FINAL APPROVAL
Date: ^7/f Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
City of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #:
Permit*
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected
Bv: A Aw^
Inspected
Bv:
Inspected
Bv:
CB1 10018
BY REFERRAL ONLY-2004 SF
OFFICE TO OFFICE
2035 CORTE DEL NOGAL #200
G & R CONSTRUC
CA
JtTX/^'
O
Phone: 6195909385
Water Dist: CA
Date I I,
Inspected: .31 / / / ,/ / !
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
/ Approved: ^^
Approved:
Approved:
02/23/2011
Tl
COMM
*^
Disapproved:
Disapproved:
Disapproved:
Comments:
City of Carlsbad Bldg Inspection Request
For: 02/23/2011
Permit* CB110018
Title: BY REFERRAL ONLY-2004 SF
Description. OFFICE TO OFFICE
Type:TI Sub Type: COMM
Job Address: 2035 CORTE DEL NOGAL
Suite: 200 Lot: 0
Location:
APPLICANT LIEN RICK
Owner: BOI CARLSBAD INC
Remarks:
Inspector Assignment: TP
Phone: 6195909385
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: G & R CONSTRUCTION
Entered By: CHRISTINE
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs/SWPPPs Original PC#
CV020274 CLOSED BIZ LICENSE-OWES PRIOR YR FEE;
PCR91085 ISSUED ADD'L AIR CONDIT.TO COMPUTR RM; REVISE MECH SYSTEM
Inspection History
Date
02/14/2011
02/14/2011
02/14/2011
02/14/2011
01/25/2011
01/24/2011
01/24/2011
01/24/2011
Description
14
24
34
44
17
14
24
34
Frame/Steel/Bolting/Welding
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Interior Lath/Drywall
Frame/Steel/Bolting/Welding
Rough/Topout
Rough Electric
Act
AP
we
AP
AP
AP
AP
AP
AP
Insp
TP
TP
TP
TP
TP
TP
TP
TP
Comments
T-CLNG
RE-LOC
RE-LOC
GRID
LITES
PATCH-IN
DUCTS
TJ_
CITY OF
CARLSBAD
BUILDING
Plan Check
Comments
Development Services
Building Division
1635 Faraday Avenue
760-602-2719-
www.carlsbadca.gov
1
By: Steve BorOSSay (Contact Hours for Steve: Tues.-Fri., 1 pm - 5pm) Phone: 760-602-7541
Permit- C^^> \ \Oo\,R Address: "2.O5S" CJaf^-rg !>€-*- }4o£AUDate: (/ ^~/\\
* When corrections from all departments are received please run new prints *
* Please respond by indicating location of Plan Check items on plans *
H Provide: A statement on the Title Sheet of the plans stating that the project shall comply with the 2010 CA Building Code, 2010
CA Residential Code, 201 OCA Green Code, 2010 CMC, 2010 CPC, 2010 CEC, 2008 CA Energy Efficiency
Standards, 2010 CA Fire Code and the Carlsbad Municipal Code —\~ j _ -^ ^
O Provide: A note titled "Scope of Work" describing the work to be performed under this permit.
v
T-2.17-
\-S-0
Approved on:.By:.
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER
ADDRESS
DATE
RESIDENTIAL TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR
« $17,000.00)
SOLAR PANELS
PLAZA CAMINO REAL
PREMIER OUTLETS
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER
PLANNER
ENGINEER
DATE
.u DATE (f(fl //
Docs/Misforms/Plannlng Engineering Approvals
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB 11-18 DATE 1/7/11
ADDRESS 2035 Corte Del Nogal
RESIDENTIAL ADDITION-
Ml NOR (<17,000.00)
RETAINING WALL
VILLAGE FAIRE
POOL/SPA
TENANT IMPROVEMENT
COMPLETE OFFICE BUILDING
OTHER office to office
PLANNER
ENGINEER
DATE f-l-)|
DATE
H:\ADMIN\COUNTER/PLANN1NC/ENCINEERINCAPPROVA1S
Y
Brenda Wardwell
From: Daryl [kitfire@sbcglobal.net]
Sent: Wednesday, January 19, 2011 9:17 AM
To: Brenda Wardwell
Cc: Janet Altar; Raenette Abbey
Subject: CB110018 Recommended for Approval
Attachments: CB110018 Recommended for Approval.doc
Initial Review $157.50 Inv. 2740
Approval_$67.50
Tota
'Thanks,
. James
. James & JAssoc. Inc.
205 CoCina Terrace
Vista, CA. 92084
760-724-7001
RECOMMENDED FOR APPROVAL Page: "I of 2
DEPT COPYDaryl K. James & Associates, Inc. Plan Checker: Da
205 Co//na Terrace Date: January 19. 2011
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Bill Kochert Bill@maggettielam.com JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Progressive PROJECT ADDRESS: 2035 Corte Del Nogal Ste 200
PROJECT DESCRIPTION: CB110018 Tenant Improvement
INSTRUCTIONS
« This plan review has been conducted in order to verify conformance to minimum requirements of codes
adopted by the Carlsbad Fire Department.
• The items below require correction, clarification or additional information before this plan check can be
approved for permit issuance.
• To expedite the recheck process, please note on this list (or copy) where each correction item has been
addressed, i.e. sheet number, note number, detail number, legend number, etc Corrections or modifications to
the plans must be clouded and provided with numbered deltas and revision dates.
• PLEASE SEND OR DELIVER REVISED PLANS WITH ESGIL COMMENTS DIRECTLY TO:
DARYL K. JAMES
205 COLINA TERRACE
VISTA, CA 92084
• Please direct any questions regarding this review directly to: Daryl K. James kitfire@sbcglobal.net
VT1-0.0
Project Notes
Replace applicable codes with the following 2010 California Codes based on the 2009 International Codes
adopted as the Building Standards Code.
2010 California Administrative Code
2010 California Building Code (CBC), Volumes 1 and 2
2010 California Electrical Code (CEC
2010 California Mechanical Code (CMC
2010 California Plumbing Code (CPC
2010 California Energy Code
2010 California Fire Code (CFC)
2010 California Energy Code
Applicable Standards
2010 NFPA 13 Deferred fire sprinkler design
2010 NFPA 72 Deferred fire alarm design.
Page: 2 of 2
VT1-0.3
Address dead end corridor conditions. CBC 1018.4 Not applicable. Dead end condition does not exist.
Verify that all adjacent tenant spaces are B occupancy classifications.
Means of Egress Legend
Add 90-minute to back-up power source. Added
Means of Egress Notes
5. Add CBC 715,4.3 Ac/ctec/
T1-3.0
Denote emergency lighting equipped with 90-minute emergency battery back-up and directional exit signs to
stairway means of egress. Added
T1-6.0
Detail 2
Provide UL listing, ICC ES report or reference to applicable Item No. in CBC Table 720 for 1-hr rated assembly
details. Not applicable. Demising wall is not rated.
M0.1
General Notes
Revise notes 9, 13 & 15 to 2010 codes.Rewsed
Exiting Package Unit
Revise area of service. Identify equipment requiring automatic shutoff. (CMC 609) and provide details.
Shown on plans. SD not required.
12
Denote emergency lighting equipped with 90-minute emergency battery back-up and directional exit signs to
stairway means of egress. Denoted
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
By Refera! Only
2035 Corte Del Nogal
Carlsbad, Ca 92011
Project Designer:
Maggetti Elam
3160 Camino Del Rio N Ste 207
San Diego, Ca92108
619-624-0521
Report Prepared by:
Greater San Diego Air Conditioning Co. Inc.
Job Number:
Date:
12/29/2010
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and Is
authorized by the California Energy Commission for use with both the Residential and Nonresidehtlal 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 5. 1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID:
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Form MECH-1-C Certificate of Compliance 3
Form MECH-2-C Air & Water System Requirements 9
Form MECH-3-C Mechanical Ventilation 12
Form MECH-4-C HVAC Misc. Prescriptive Requirements 14
^nergyPro S.1 by EnergySoft Job Number ID: User Number 6272
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
By Referal Only 12/29/2010
Project Address Climate Zone Total Cond. Floor Area Addition Floor Area
2035 Corte Del Nogal Carlsbad 7 6,436 n/a
GENERAL INFORMATION
Building Type: ' 0 Nonresidentia! D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. El Conditioned Spaces D ^^^^ Spaces
Phase of Construction: D New Construction D Addition ED Alteration
Approach of Compliance: D Component O Overall Envelope TDV Q Unconditiorigd (fi!e affidavit)
Front Orientation: N, E, S, W or in Degrees: odeg
HVAC SYSTEM DETAILS
Equipment2
Item or System Tags
(Le.AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Value
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Equipment2
Item or System Tags
(i.e. AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Value
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Inspection Criteria
Existing HP 2-15
Hydronic Heat Pump
1
30,003 Btu/hr
4.20 COP
55,774 Btu/hr
12.0EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
Inspection Criteria
Existing HP 2-14
Hydronic Heat Pump
1
2,1 32 Btu/hr
4.20 COP
51,219 Btu/hr
12.0EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Pass
D
D
D
a
a
a
a
p
a
a
a
a
Fail - Describe Reason2
n
D
D
D
n
D
n
P
D
P
D
P
FIELD INSPECTION ENERGY CHECKLIST
Pass
P
n
n
a
a
n
n
n
a
a
a
n
Fail - Describe Reason2
P
P
P
P
P
P
P
P
P
P
P
P
1 . If the Actual installed equipment performance efficiency and capacity is less than She Proposed {from the energy com pliance submittal or from
the building plans) the responsible party shall resubmit energy comp! anoe to include the new changes,
2. For additional detailed discrepancy use Page 2 of the inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro5.1byEnergySoft User Number 6272 RunCode: 2010-12-29713:35:28 /Or Page 3 of 21
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
By Referal Only 12/29/2010
Project Address Climate Zone Total Cond. Floor Area Addition Floor Area
2035 Corte Del Nogal Carlsbad 7 6,436 n/a
GENERAL INFORMATION
Building Type: ^ Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) O Relocatable Public School Bldg. 0 Conditioned Spaces D /^d^fl°ned SpaC9S
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: O Component D Overall Envelope TDV n Uncondjtioned {file affidavit)
Front Orientation: N, E, S,W or in Degrees: Qdeg
HVAC SYSTEM DETAILS
Equipment2
Item or System Tags
(i.e.AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooiing Efficiency1
Duct Location/ R-Value
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Equipment2
Item or System Tags
(i.e. AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R- Value
When duct testing Is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Inspection Criteria
Existing AC 1
Split DX
1
-1,244 Btu/hr
n/a
43,704 Btu/hr
13.0 SEER/ 11. SEER
R-4.2
No
No Economizer
Setback Required
Constant Volume
Inspection Criteria
Existing HP 2-13
Hydronic Heat Pump
1
1,679 Btu/hr
4.20 COP
32,341 Btu/hr
12.0 EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
RELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Pass
D
D
n
n
n
n
n
n
n
n
n
n
Fail - Describe Reason2
D
D
n
n
n
n
n
n
n
n
n
n
FIELD INSPECTION ENERGY CHECKLIST
Pass
n
D
a
a
a
a
D
a
n
a
D
D
Fall - Describe Reason2
n
D
n
D
D
D
D
n
n
o
n
o
1 . If the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance subrnittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydranic, PTAG, or other.
EnergyProS.lbyEn&fQySoft User Number. 6272 RunCode: 2010-12-29713:35:28 ID: Page 4 of 21
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name - Data
By Refera! Only 12/29/2010
Project Address Climate Zone Total Cond. Floor Area Addition Floor Area
2035 Corte Del Nogal Carlsbad 7 6,436 n/a
GENERAL INFORMATION
Building Tvoe: ^ Nonresidential D High-Rise Residential D Hotel/Motel Quest Room
D Schools (Public School) D Relocatable Public School Bldg. El Conditioned Spaces D ^maM?^ Spaces
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component ' O Overall Envelope TDV n Uncanditioned (fi|e affidavft)
Front Orientation: N, E, S, W or in Degrees: odeg
HVAC SYSTEM DETAILS
Equipment2
Item or System Tags
(Le.AC-1, RTU-1.HP-1)
Equipment Tvce3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Va!ue
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Equipment2
Item or System Tags
(i.e.AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Value
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Inspection Criteria
Existing HP 2-12
Hydronic Heat Pump
1
14,987 Btufrr
4.20 COP
23,275 Btu/hr
12.0 EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
inspection Criteria
Existing HP 2-11
Hydronic Heat Pump
1
25,285 Btu/hr
4.20 COP
69,531 Btu/hr
12.0EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Pass
D
n
a
a
a
D
n
n
n
a
n
n
Fail - Describe Reason2
n
n
D
n
n
a
a
a
n
D
a
a
FIELD INSPECTION ENERGY CHECKLIST
Pass
0
n
n
n
n
p
n
n
o
a
a
a
Fail - Describe Reason2
n
a
n
a
a
n
n
n
a
a
n
n
1 . If the Actual Installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnerqyPm 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID: Page 5 of 21
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
By Referal Only 12/29/2010
Project Address . Climate Zone Total Goncf. Floor Area Addition Floor Area
2035 Corte Del Nogal Carlsbad 7 6,436 n/a
GENERAL INFORMATION
Building Type: Ef Nonresidentra! d High-Rise Residential D Hotel/Motel Guest Room
D Schools {Public School) O Relocatable Public School Bldg. 0 Conditioned Spaces U ^mavlt)0"^ SpaGSS
Phase of Construction: C New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV n UnconditJoned pe affidavit)energy
Front Orientation: N, E, S, W or in Degrees: o cleg
HVAC SYSTEM DETAILS
Equipment2
Item or System Tags
(i.e.AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Allowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Value
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Equipment2
Item or System Tags
(i.e,AC-1,RTU-1,HP-1)
Equipment Type3:
Number of Systems
Max Aliowed Heating Capacity1
Minimum Heating Efficiency1
Max Allowed Cooling Capacity1
Cooling Efficiency1
Duct Location/ R-Va!ue
When duct testing is required, submit
MECH-4A & MECH-4-HERS
Economizer
Thermostat
Fan Control
Inspection Criteria
Existing HP 2-10
Hydronic Heat Pump
1
3,521 Btu/hr
4.20 COP
47,788 Btu/hr
12.0 EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
inspection Criteria
Existing HP 2-9
Hydronic Heat Pump
1
20,059 Btu/hr
4.20 COP
66,406 Btu/hr
12.0 EER
R-4.2
No
No Economizer
Setback Required
Constant Volume
FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Pass
n
n
n
a
n
D
D
a
a
n
n
a
Fail - Describe Reason2
D
n
n
n
n
n
n
n
n
n
n
n
FIELD INSPECTION ENERGY CHECKLIST
Pass
P
n
D
P
P
P
P
P
n
n
n
D
Fail - Describe Reason2
D
P
P
P
P
P
P
P
P
D
D
D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from (he energy compliance submittal or Jrom
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form, Compliance falls if a Fail box is checked.
3. indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5. 1 by Energy-Soft User Number: 6272 RunCode; 2010-12-29713:35:28 ID: Page6of21
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 2 of 5)MECH-1C
Project Name
By Referal Only
Data
12/29/2010
Discrepancies:
EnergyPro 5.1 by EnergySort___User Number 6272 RunGode: W10-12-29T13:3S:2S ID:Page 7 oi 21
CERTIFICATE OF COMPLIANCE (Part 5 of 5)MECH-1C
Project Nams
By Referal Only
Date
12/29/2010
Documentation Author's Declaration Statement
I certify that this Certificate of Compliance documentation is accurate and complete.
Name fess Signature
Company Greafer San Diego Air Conditioning Co. Inc.Date 12/29/2010
Address CEA#
CEPE#
City/State/Zip.Cc, 92,123 Phone
The Principal Mechanical Designer's Declaration Statement
• I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical
» This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance
with Title-24, Parts 1 and 6 of the California Code of Regulations.
» The design features represented on this Certificate of Compliance are consistent with the information provided to document
this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the
enforcement agency for approval with this building permit application.
Name Ross Baillargeon
Company Greater San Diego Air Conditioing Company, Inc.
Signature
Date
Address •3883 Ruffin Rd, Suite C License #
City/State/Zip San Diego, Ca 92123 Phone 619-469-7818
Mandatory Measures
Indicate location on building plans of Note Block for Mandatory Measures.
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet Is Included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidentia! Manual..
Note: The Enforcement Agency may require alt forms to be incorporated onto the building plans.
E! MECH-1C Certificate of Compliance. Required on plans for all submittals.
SI MECH-2C Mechanical Equipment Summary is required for all submlttais.
MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation.
El MECH-4C Fan Power Consumption is required for al! prescriptive submittals.
EnergyPro 5.1 by EnergySoft User Number: 6272 RunCorfe: 2010-12-29713:35:2 ID:Page 8 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2} MECH-2C
Project Name Dale
By Referal Only 12/29/2010
Item or System Tags
(I.B.AC-1.RTU-1.HP-1)
Number of Systems
MANDATORY MEASURES
Healing Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Efectric Resistance Heating'
Air Cooled Ghiltsr Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
1 . Total installed capacity (MBtu/hr) of £
explain which exception(s) to §1 44{g
Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc.,.)
Existing HP 2-1 5
1
Existing HP 2-14
1
Existing AC 1
1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
T-24 Sections
112(3)
112(a)
112(b>, 112(c)
112(c), 115(a)
121 (fa)
121(b)
121 (c)
121(0
122(e)
122(e)
122(f)
122(g)
123
124
4.20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
4.20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
n/a
13.0 SEER/ 11. 5 EER
n/a
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
144(a&b) '
144(a&b)
144(a&b)
144(a&b)
144(c)
144(c)
144(c)
144(d)
144(e)
144(f)
144ffl
144(g)
144(i)
144(k)
30,003 Btu/hr
50,241 Btu/hr
39,042 Btu/hr
38,883 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
2,132 Btu/hr
46,780 Btu/hr
35, 853 Btu/hr
34,279 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
-1,244 Btu/hr
0 Btu/hr
30,593 Btu/hr
29,580 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
I! electric heat on this project exclusive of electric auxiliary heat ior heat pumps. If electric heat is used
apply.
EnergyProS.lbyEnergySoft User Number: 6272 RunCode: 2010-12-29T1 3:35:28 ID: Page 9 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
By Referal Only , 12/29/2010
Hem or System Tags
JLe. AC-1, RTU-1, HP-1)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostal
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Contra!
Setback and Setup Control
Outdoor Damper Control
isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
'Cool Air Supply Reset
Electric Resistance Heating1
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
1 . Total installed capacity (MBtu/hr) of i
explain which exception(s) to §1 44(g
Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
— ** "^;~^S
-™.^__^._^__
Existing HP 2-13
1
Existing HP 2-1 2
1
Existing HP 2-11
1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
T-24 Sections
H2(a)
H2(a)
112(b),112(c)
112(c), 11 5(a)
121(b)
121(b)
121(c)
121(c)
122(e)
122(e)
122(f)
132(a)
123
124
4.20 COP
12.0 £ER
Yes
n/a
No
Ocfm
No
No
Programmable Svwfcft
Setback Required
Auto
n/a
R-4.2
4.20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
4. 20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
144(a & b)
144[a&b)
144(a & b)
144(a & b)
144(c)
144(c)
144(c)
144(d)
144(e)
144(f)
144(1)
144(3)
144(i)
144(k)
1,579 Btu/tir
25,882 Btu/hr
22,639 Btu/hr
20,262 Blu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Tamp
No
14,987 Btu/hr
19,286 Btu/hr
16,292 Btu/hr
15,596 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
25,285 Btu/hr
35,41 2 Btu/hr
- 48,672 Btu/hr
33,680 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
ill electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
) apply.
EnergyPro 5. t by EnergySoft User Number 6272 RunCode: 2010-12-29T13:35:25 ID: Page 10 of 21
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
By Referal Only . 12/29/2010
Item or System Tags
(i.e.AC-1,RTU-1,HP-1)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Controf
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating1
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
1 . Total installed capacity (MBtu/hr) of ^
explain which exceptions) to §1 44(g
Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
Existing HP 2-10
1
Existing HP 2-9
. 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
T-24 Sections
112(3)
112(a)
112(b), 112(c)
112(c), 115(a)
121 (b)
121{b)
121{c)
121(c)
122(e)
1.22(8)'
122{f)
122(g)
123
124
4.20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
4.20 COP
12.0 EER
Yes
n/a
No
Ocfm
No
No
Programmable Switch
Setback Required
Auto
n/a
R-4.2
144(a&b)
144(a&b)
144(a&b)
144(a8b)
144(c)
144{c)
144(c)
144(d}
144{e)
144(f)
144(f)
144(g)
144(0
144(k)
3,521 Btu/hr
29,760 Btu/hr
33,452 Btu/hr
22,565 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
20,059 Btu/hr
35,376 Btu/hr
46,434 Btu/hr
33,697 Btu/hr
Constant Volume
Yss
No
No Economizer
Constant Temp
Constant Temp
No
ill electric heat on this project exclusive of electric auxiliary heai for heat pumps. If electric heat is used
} apply.
EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:28 ID: Page 11 of 21
OCO
I
Ul
1-
^£LU
X
LU
CC
Z.os^J
H
QJ
_l
O
z
Xo
LUs
oT*"
§05
1"
"c
a, -j.i ^
s *®2, '•C£ ^
§
T
S
I
t
t
J-
U.
S
CC
Si"3J1
r-
<N
S
o
5_j
u
_J
3
i
1
is
"Z
S
§
>
(fi
m
CL
ID
o
tn
at
S
14
z
ii
~a
_
o
u.
Ul
o
0
03
Q
c ff
^
,- E £
-21 1 -is '98 -MlQ| <5§
— H -S° Fj ^ U.
||x-|
^t
CD — •
^0
CD
° N 'S.S5? c cm.
LO'W W°
Q
£=||$s
D S U
>
-j , *Q ^3
i>ll
E ci CO u.
o1 ^ ^
if Q
C,
§s.|
5 *
Z a.
S cdu. g O
°<X
If cS"110
o D-*"
-lie
(5 *£ """
0)
£
CO
OS
oN
V-00
o
T-cot-
00
10
ci
s
^1
0
T-
00
s
iS
u>
5j
^Co.c:
'SS
K
0
g
N!*•
T-
C!
I
03
0
•KT-
1
CM
^f
W
iS
^
Q
*
o
o
m
^
S
^
IN
<B
1
C.
«
1
^0
P
SiS
8
0
Ol
1
10
o
1
o
o
Oj
T-
3
TO
CVI
|
i?
•SS
§
o
is
§
10
ci
§
<l>
1
o
H)CO
I
fJi
^toc:
•93
§
o
«
cS
!£
0
S15
CD
1
o
CO
"cS
>2
rv
^?•a3
R
o
R
f?"^
S
0
S
q,
1
<=>
S
1
0v-
rij
^?
wa
s
o
s
s
s
Ci
i
CD
1
^C.3
Js
c
>
cgi
8s
O
3(2
—
J
o
Mfa
£
<.
SiJDOJr—
W
C
CD
1
SSg
Minimum ventilatiO
ra
1
"O
1
•t;
•f
«
1S
v!
|
c
c
8
1CC
c
t303o
1
ooCQo
I"B
in
(n
§
O
CD
g
-o
0
Q
cu
I
"o
$.
cu
U:
£
o
to
Based on fixed sem
c
o
^~
1
"c
0
CO
CO
CD
o
Q_
OOo
o
CO3m
55DC
cCO
C0
Tl
ra
o
COCOE
_o
"cs
j=
'S
0)E
CO
CD.E
.2
5
Q
GLU
CC
l_
o
| Required VentilatiI
d
^
to
QZl
<D
"SEa
zc.E
•5-ii
<
J2
g
H
OCO
O
X
0
"CD13
w0
§| Must be greater tt—
CJ
T
Q
0)
|
'S
oo
1o
cscOJ"w
CD
CD
O
0in
X
"
U_o
£
^O
j
CO
_|3
Q
-J
0
<t
1
Tf
O
X
1 Condition area (ft:^
LL
O
O
b
X
1 Maximum of Colu_j
2
COjri
X
CO
E
8
"o
ZJ
a>
o
CO
3FTs
o
§.E
i5
1O)
c3_I
113
OOo
3
CB
O
1
1 This must be less2
oIs
O>s
I
E
'3
•scto
TD
"S0-
S
Is
3 »
iff
pT
§ Ea!
12
£ S
3 Ci EC 31§Ol^s<
ll
^ ^If£ti -0
0><Dco-c
x|
- *?
II
c 7T
|<
3 O
l|
S <B~ >
B "^ir-snU-
£ CD
/ided whsetween tt3 -°
D p-0 m
Transfer Air mustequal to the differ•2.
CM
15
<\
t-
0>
1
Q"
S
I
I
<ir-
oi
ou1
3
Q
|
>
CD
W
^by Energy-Softv-
id
C>s
5
OCOi
OLU*>EHEATEC
Q
<
1
LU
_l
Oz*t
oms
o
o
OSCSj
pQ
« "*""Q
"5O
I ~£5
» o>S Oc
§ XO-CQ
^
5ITCO
zog1-
Eli
«tLL
XLUcr
SA
^^«un
TILATION (jMECHANICAL VEN5
—Sz
S
g
^
im
o
§CLD
O
AREA BASISz
2
^
_
X
<3
IL
Ul
a
0
m
**
JS"tn .^|<
c E £
'i? £ 5 i
O •*= '5 W
^_ to .5O ^ ij£ u.
x T O
•§ o "°o£?j
^tO ~-
u_0
01
**•" o >,
fM_g
(•
cc .2
a I<0
5*
P -oOO< x fcjj > m °a: 5a
1SP
cS >~ ^
a.
0
•|gg
Z CL
u, g o
i^m
|^
l!i8
£
W
Sc
o
S
Jjfi
0)
CM
Cnc;
1LU
.^
^.^
•J3
J5!
"E
>
c
"w.3
rd
1 —
c£
"oQ
1—i
c\l
o
o
CO
i
Minimum veniO
c_c
aCO
1t;
C
.*"
«
cE
,2
ccig
(0to
(D
O
"D03_O
"c03a
g
Ocao
<D
*^
g
W
§
tfl
3
number of occthe greater of the expectedd seat or1
C
O"gen(0m
UJ
c
c
Qc
E
•g
0
CO
V.
oz:
CL
OOo
^ BASIS or i*^.m
onan AR•Q
1
JJ
U
COB
g
of the ventilati<5
§r (REQ'D V.A.) is the li1
1
Required Venx ifference.•a<D-C
Q
oj£caEo
c
I
' equal to H, or use Transfer:er than 01Must be great'«'a
SsO
"?5
9
S
esign zone OLT3
O
X
11-Oc£
U-O
|
n
§
cra
'oi
Q
-3 4CFM/f!2;ord
X
Condition arei^
oooCO
0
1^
R
Maximum of C_,
z
M
"HI
ColumnsB
£
tfi
0>£
2
TS
DCO
•eater than oror equal to Column L and qiless thanThis must bes
cre
fe15
D)
Ui
E
'S
fl5
1
<D
cr
£o5 *"2
5 s
^4._c
11i|
^^i=O
E5^ cE P
Design Minm Air (Coluiqj a
li
l-iCO Q)
11
^•a= sE T-"^ gCJ.E
Ventilation Air:ilation Air (Coovided where the Requiredbetween the Required Vent10 Q>Transfer Air nequaltofhedz
c\j
o
S
1Q-
Q
TJ3.-35.-2SN
-Zt-QIQZ •Q)8oge
i
jyog/ySjsug /^S
>,&
cUJ
FAN POWER CONSUMPTION MECH-4C
Project Name Data
By Referat Only 12/29/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption ot fan §144(c).
A
Fan Description
Supp/K Fan
B
Design Brake
HP
0.450
C D
Efficiency
Motor
66.0%
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Watts
B X E X 746 /
(CXD)
524
TOTALS AND ADJUSTMENTS
F^LE^PR.ES,S.U-RIAJDJUSTMENT EqUati°n 14^A in §144(C) D TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM R
2) SUPPLY DESIGN AIRFLOW (CFM)
A, tp^_^W*^to^VI£.« 3] TorALFANSYSrreM POWER-INDEX Btowl/ft^a
pressure drop across the fan (S Pi) on Lines. 4) SPa
5) SPf
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1)/SPi
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
524
1,600
W/CFM
0.328 W/CFM
1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25
W/C'FM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:2 ID: Page 14 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Referal Only 12/29/2010
NOTE: Provide one copy of Ihis worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of tan §144(c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.500
C D
Efficiency
Motor
80.024
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Waits
B X E X 746 /
(CXD)
481
TOTALS AND ADJUSTMENTS
F™ PRESSURE «*"JSTMENT Ecluation 144'A in §144<c> 1, TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F>
2) SUPPLY DESIGN AIRFLOW (CFM)
A) Iffll^pr^d^tSPJIs^tert^l^W acr 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)
pressure drop across the fan (SPi) or Line 5. 4) SPa
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-(SPa«1)/SPf
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
481
1,200
W/CFM
0.401 W/CFM
1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number. 6272 RunCode: 2010-12-29713:35:2 ID: Page 15 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Referal Only 12/29/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the PrescripJivg Approach. See Power Consumption of fan §1 44(c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.500
C D
Efficiency
Motor
80.0 %
Drive
97.0%
E
Number of
Fans
1,0
F
Peak Watts
BXEX746/
(CXD)
481
TOTALS AND ADJUSTMENTS
F™ PRES£URE_ ADJUS™ENT £quafa 144'A in §144<c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F)
2) SUPPLY DESIGN AIRFLOW (CFM)
A) H^S^ -?r IT'! ET-r T°t * f YC- °r 3) TOTAL FAN SYSTEM POWER INDEX (Row ' ' Row 2)
pressure drop across the fan (SPi) on Line 5. 4) SPa
5) SP,
B} Calculate Fan Adlustment and enter on line 6. 6) Fan Adjustment = 1-(SPa-1)/SPi
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
481
1,600
W/CFM
0.300 W/CFM
1. TOTAL FAN SYSTEM POWER SNDEX or ADJUSTED FAN POWER INDEX must not exceed 0,8 W/CFM for Constant Volume systems or 1 ,25
W/CFM for VAV systems.
EnergyPmS.1 by EnergySoft User Number: 6272 RunCode: 2010-12-29713:35:2 ID: Page16of21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Referal Only 12/29/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.450
c D
Efficiency
Motor
66.0%
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Watts
BXEX746/
(CXD)
524
TOTALS AND ADJUSTMENTS
™ PRES,S,URf ADJUSTMENT Equation 144-A in §144(c) 1} Tom FAN SYSTEM pQWER {WKns< SUM CQLUM F)
2) SUPPLY DESIGN AIRFLOW (CFM)
A) !!*S^r^.?r^r^*^Vn2?-GOr 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/ Row 2)
pressure drop across the fan (SP() on Line 5. 4.) SPa
S) SP,
B) Calculate Fan Adjustment and enter on Sine 6, 6} . Fan Adjustment = 1-(SPB-1)/SP[
G) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
524
1,200
W/CFM
0.437 W/CFM
1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25
W/CFM for VAV systems.
EnergyPro5.1 byEnergySoft User Number: 8272 RunCode: 2010-12-29713:35:2 ID: Page17of21
FAN POWER CONSUMPTION MECH-4C
Project Name • Date
By Referal Only 12/29/2010
NOTE: Provide one copy of this worksnee! for each (an system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume {VAV} Systems when using the Prescriptive Approach, See Power Consumption of fan §144(c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.125
C D
Efficiency
Motor
55.0%
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Watts
B X E X 746 /
(CXD)
175
TOTALS AND ADJUSTMENTS
F^E" PRf 4URriE «WUS™EMr E^albn 144"Ain §144<C) 1} TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F)
2} SUPPLY DESIGN AIRFLOW (CFM)
A) lfinerpressuredrop(S^isgraaterthan1™hW.C.or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 /Row2)
pressure drop across the fan (SPO on Line 5. 4) SPa
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-(SPa-1>/SPi
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
175
600
W/CFM
0.291 W/CFM
1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPm 5.1 by ' EnergySpft User Number, 6272 RunCode: 2010-12-29713:35:2 ID: Page 18 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Refers/ Only 12/29/2010
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Vofume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144{c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0,330
C D
Efficiency
Motor
64.0%
Drive
97.0%
E '
Number of
Fans
1.0
F
Peak Watts
B X E X 746 /
(CXD)
397
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c} ^ TOTAL fm s^m poWER (WATTS> $UM CQLUM R
2) SUPPLY DESIGN AIRFLOW (CFM)
A) np^^W*wMWK.C.« 3! TOTALFANSYSTEMPOWERINDEXfRow1/R0w2)
pressure drop across the fan (SPf) on Line 5. 4} SPa
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment =• 1-(SPB-1)/SPf
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)r
397
?,200
W/CFM
0.330 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX musi not exceed 0.8 W/CFM for Constant Volume systems or 125
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode:2010-12-2ST13:35:2 ID: Page 19 of 21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Refers! Only 12/29/2010
NOTE: Provide one copy of this worksheet for each fan system with a totai San system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan |144(e).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.166
C D
Efficiency
Motor
55.0%
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Watts
B X E X 746 /
(CXD)
232
•
TOTALS AND ADJUSTMENTS
™j P*E^URE;TUS™ENT EqUati°n W4'A ^ §144{C) D TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F)
2) SUPPLY DESIGN AIRFLOW (CFM)
Al -rer£cZr8 ,? clf'r onT' T SSl?^ " 3) ' TOTAL FAN SYSTEM POWER tNDEX (Row 1 / R™2>
pressure drop across the fan (SP,) on Une S. 4) SPa
5} SP,
6) Calculate Fan Adjustment and enier on line 6. 6} Fan Ad!ustment=1-(SPa-1)/SPfl
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)r
232
1000
W/CFM
0.232 W/CFM
1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
SnergyPro 5. 1 by EnergySoft User Number: 6272 RunCode: 201 0-12-29713:35:2 ID: Page 20 Of 21
FAN POWER CONSUMPTION MECH-4C
Project Name Date
By Refers! Only 12/29/2010
NOTE: Provide one copy of this worksheet Jor each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of tan §144(c).
A
Fan Description
Supply Fan
B
Design Brake
HP
0.330
C D
Efficiency
Motor
64.054
Drive
97.0%
E
Number of
Fans
1.0
F
Peak Watls
B X E X 746 /
(CXD)
397
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1 , TOTAL FAN SYSTEM pQWER (WATTS> SUM CQlm p)
2) SUPPLY DESIGN AIRFLOW (CFM)
A) -^1^-t^Fj^ttlS?^" 3) TOTAL FAN SYSTEM POWER ,NDEX (Row 1 /Row2)
pressure drop across ths ian (SP() on Line 5. 4) SPa
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjuslment= 1-( SPa-1)/SPi
C) Calculate Adjusted Han Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
397
1,200
W/CFM
0.330 W/CFM
1 . TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 .25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 6272 RunCode: 201 0-1 2-29T13:3S:2 ID: Page 21 of 21
Check a License - Contractors State License Board Page 1 of2
*"**
LI e Board
Contractor's License Detail - License # 722261
£ii DISCLAIMER: A license status check provides information taken from the CSLB license database. Before
relying on this information, you should be aware of the following limitations.
••» CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure, a link
for complaint disclosure will appear below. Click on the link or button to obtain complaint and/or legal action information.
••» Per B&P 7071.17 , only construction related civil judgments reported to the CSLB are disclosed.
••» Arbitrations are not listed unless the contractor fails to comply with the terms of the arbitration.
'-•>> Due to workload, there may be relevant information that has not yet been entered onto the Board's license database.
License Number
Business Information
722261 Extract Date: 1/21/2011
G & R CONSTRUCTION INC
854 WASHINGTON HEIGHTS ROAD
ELCAJON, CA92019
JssueJDate
Ex|pjirejjiate_
License Status
Classifications:
Bonding:
_Corrjoration_
05/02/1996
05/31/2012
This license is current and active. All information below should be reviewed.
Workers' Compensation:
DESCRIPTION
GENERAL BUILDING CONTRACTOR
CLASS
J3 _
_C1£_ ELECTRICAL
CONTRACTOR'S BOND
This license filed Contractor's Bond number SC6049064 in the amount of $12,500 with
the bonding company
Effective Date: 03/02/2009
BOND OF QUALIFYING INDIVIDUAL
1. The Responsible Managing Officer (RMO) DARRIEULAT GEORGE ROGER JR
certified that he/she owns 1 0 percent or more of the voting stock/equity of the
corporation. A bond of qualifying individual is not required.
Effective Date: 05/02/1996
BQi:s..BQOdjnfl..History
2.This license filed Bond of Qualifying Individual number SC6065739 for
HATHERILL MARK JAMES in the amount of $12,500 with the bonding company
AMERICAN CONTRACTORS INDEMNITY COMPANY.
Effective Date: 03/02/2009
This license has workers compensation insurance with the
aAIE.mMPENMI!QNJNSUBANCE.FUND
Policy Number:461-0001050
Effective Date: 01/01/2008
Expire Date: 01/01/2012
Workers' Compensation History
https://www2.cslb.ca.gov/OnlineServices/CheckLicenseII/LicenseDetail.aspx?LicNum=7... 01/21/2011
3
3
sre
c a
Sra
ST n
I
3>
*
.