Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2042 CORTE DEL NOGAL; ; CB982941; Permit
BUILDING PERMIT 10/28/98 13 45 Page 1 of 1 Job Address 2042 CORTE DEL NOGAL Suite Permit Type COMMERCIAL TENANT IMPROVEMENT Parcel No 213-061-05-00 Lot*. Valuation. 152,815 Occupancy Group B/S-1 Reference* Description- CT1 15000 SF-ELEC,PLUMB,INTER • WALLS, 9,000 SF NEW OFFICE Permit No Project No Development No CB982941 A9803815 Appl/Owrir * * * JJ CONSTRUCTION 2741 VISTA WAY #201 OCEANSIDE CA 92054 Fees Required *** Construction Type VN 2784 iQ/28/9gtgQt)lL:?)i I§£UED AppQrPBMT ~ Apr/Issue Entered By 760 754-6700 10/28/98 JM A**Fees Collected & Credits Fees 6,884 00 Adjustments- 00 Total Fees 6,884 00 Fee description Building Permit Plan Check Strong MOT: ion Fee Enter "Y" to Autocalc License Tax > (Lie Tx) C F D Enter "Y" for Plumbing Issue Fee > Each Plumbing Fixture or Trap > Each Install/Repair Water Line > Enter "Y" for Electric Issue Fee > Remodel /Alter Per AMP > Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > Each. Exhaust Fan > Total Cre Total Paym Balance Units 4 1 200 1 5 dits ents Due Fee/Unit 7.00 7 00 25 9 00 6 50 1,132 5,752 Ext f 807 525 32 2781 2567 20 28 7 10 50 15 9 32 00 00 00 ee 00 00 00 00 00 . 00 00 00 00 00 00 00 50 Data Y Y Y Y PERWHASEXP.REDINACCORDANCEWTHU.B.C. SECTION 106.4.4 SIGNATURE.DATE PROVAL DATE ' CLEARANCE r_ A PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 2075 Las Palmas Dr, Carlsbad CA 92009 (760)438-1161 f , ""PRO JlCT INFORMATION - J;*t, FOR OFFICE USE ONLY PLAN CHECK NO EST VAL Plan Ck Deposit Validated By ^ Date //3> / / Address (include Bldg/Suite #) Legal Description Assessor's Parcel tt Business Name (at this address) Lot No Subdivision Name/Number Unit No Existing Use (tf<4&s£i Phase No Total tt of units W4&/9B 0001 01 02 -1) C-PRMT 1132. Description of Work SQ FT tt of Bedrooms 2 CONTACT PERSON (if different from applicant) Address OiSgent.forVCpmractor"' Name 4 ...•'PROPERTY.OWNER!>! :£AJ^ Address City State/Zip TelephomName 5 CONTRACTOR,- COMPANY NAME .'"illi;; -.,, ••••••• ,„,:• ..*. . . ,™, .•:: (Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor s License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]) aw Name State License tt Address License Class B City State/Zij City Business License tt Designer Name State License tt Address City State/Zip Telephone . Workers' Compensation Declaration I hereby affirm under penalty of perjury one of the following declarations |~| I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued n I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued My worker's compensation insurance carrier and policy number are Insurance Company |_} TfrOTZTV mtATjJ( A"L Policy No LUC? 11o I fftT? $yQ O/$ Expiration Date 1~ (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) |~| CERTIFICATE OF EXEMPTION I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers Compensation Laws of California WARNING Failure to^secure workers/coinperjsation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100 ODD), in/addiyon to the/pqtf'oTkompensation, damages as provided for in Section 3706 of the Labor code, interest and attorney s fees SIGNATURE LA,// / f/Y I DATE 7 PWNER-BUILDERdbEgtARATION I hereby affirm that I am exempt from the Contractor s License Law for the following reason 0 I, as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale If, however, the building or improvement is sold within one year of completion, the owner builder will have the burden of proving that he did not build or improve for the purpose of sale) l~l I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law) Q] I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and materials for construction of the proposed property improvement l~l YES QNO 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number) 4 I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number / contractors license number) 5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work) PROPERTY OWNER SIGNATURE DATEscoMPLlt!fHis slcf PN'^^ " 'MIS': ..... ;' " " ..... ,. /; •••••p":::. --rwf*>*~ Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act? d YES [;3NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district7 l~l YES QiMO Is the facility to be constructed within 1 000 feet of the outer boundary of a school site? l~l YES B^NO IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT is " '"' ' ' ' " " I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(i) Civil Code) LENDER'S NAME _ LENDER'S ADDRESS I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all City ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An OSHA permit is required for excavations over 5 0" deep and demolition or construction of structures over 3 stories in height EXPIRATION Every permit issued by the Burtdiig OffioaTunder the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit^nbt connenofed within 3yB5 days-ffofy the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time aft APPLICANT'S SIGNATURE 0 days (Section 106 4 4 Uniform Building Code) DATE wmE File YELLOW Applicant PINK Finance City of Carlsbad Building Department May 19, 1999 Permit Number Issue Date CB982941 10/28/98 QUINCE ASSOCIATES LTD C/0 GIRARD INVESTMENTS SUITE 222 7855 IVANHOE AVE LA JOLLA CA 92037 RE: BUILDING PERMIT EXPIRATION PERMIT TYPE: CTI ADDRESS: 2042 CORTE DEL NOGAL PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that your building permit will expire by limitation of time on 5/3/99 The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state "EXPIRATION Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within one calendar year from the date of such permit, or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of six consecutive calendar months or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within one year of the date of permit issuance Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each six month period upon the initial commencement of work authorized by such permit " Before such work can be recommenced, a new permit, or a renewal permit as specified in the attached copy of the code, shall be obtained Any person holding an unexpired permit may apply for an extension of the time within which he may commence work under that permit when he is unable to commence work within the time required by this section for good and satisfactory reasons The Building Official may extend the time for action by the permittee for a period not exceeding 180 days upon written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken No permit shall be extended more than once Please check below indicating your intentions and return this letter to us Project abandoned A new permit will be obtained prior to commencing work No fee extension requested for 180 days (attach a letter of explanation) Renewal permit requested If the project has been completed and only a final inspection is needed, please call the inspection request line at (760)438-3101 If you have any questions, please contact the Building Inspection Department at (760) 438-3550 PAT KELLEY Principal Building Inspector Attachment 2O75 Las Palmas Dr • Carlsbad, CA 92009-1576 • (76O) 438-1161 • FAX (760) 438-0894 City of Carlsbad Building Department May 19, 1999 J J CONSTRUCTION SUITE 201 2741 VISTA WAY OCEANSIDECA 92054 RE: BUILDING PERMIT EXPIRATION PERMIT TYPE: CTI Permit Number Issue Date CB982941 10/28/98 ADDRESS: 2042 CORTE DEL NOGAL PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that your building permit will expire by limitation of time on 5/3/99 The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state "EXPIRATION Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within one calendar year from the date of such permit, or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of six consecutive calendar months or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within one year of the date of permit issuance Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each six month period upon the initial commencement of work authorized by such permit " Before such work can be recommenced, a new permit, or a renewal permit as specified in the attached copy of the code, shall be obtained Any person holding an unexpired permit may apply for an extension of the time within which he may commence work under that permit when he is unable to commence work within the time required by this section for good and satisfactory reasons The Building Official may extend the time for action by the permittee for a period not exceeding 180 days upon written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken No permit shall be extended more than once Please check below indicating your intentions and return this letter to us Project abandoned A new permit will be obtained prior to commencing work No fee extension requested for 180 days (attach a letter of explanation) Renewal permit requested If the project has been completed and only a final inspection is needed, please call the inspection request line at (760) 438-3101 If you have any questions, please contact the Building Inspection Department at (760) 438-3550 PAT KELLEY Principal Building Inspector Attachment —— — 2075 Las Palmas Dr • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (76O) 438-O894 Inspection List Permit* CB982941 Type CTI CT115000 SF-ELEC,PLUMB,INTER WALLS, 9,000 SF NEW OFFICE Date 11/20/98 11/18/98 11/4/98 10/30/98 10/30/98 10/30/98 10/30/98 10/29/98 10/29/98 10/29/98 10/29/98 10/29/98 Inspection Item 84 84 Inspector Act Comments^ Rough Combo Rough Combo 17 Interior Lath/Drywall 14 Frame/Steel/Bolting/Weldm 24 Rough/Topout 34 Rough Electric 44 Rough/Ducts/Dampers 14 Frame/Steel/Boltmg/Weldin 21 Underground/Under Floor 24 Rough/Topout 34 Rough Electric 44 Rough/Ducts/Dampers TP PS TP TP TP TP TP TP TP TP TP TP CO NR AP AP WC AP WC CO AP WC CO WC SEE NOTICE LOW WALLS WALLS Wednesday, May 12, 1999 Page 1 of 1 CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB982941 FOR 11/20/98 DESCRIPTION: CTI 15000 SF-ELEC,PLUMB,INTER WALLS, 9,000 SF NEW OFFICE TYPE: CTI JOB ADDRESS APPLICANT: : 2042 CORTE JJ CONSTRUCTION DEL NOGAL CONTRACTOR: OWNER: PHONE: PHONE: PHONE: INSPECTOR AREA TP PLANCK# CB982941 OCC GRP B/S-1 CONSTR. TYPE VN STE: LOT: 760 754-6700 REMARKS: C/JOE/7 5 4-6 7 0 0 SPECIAL INSTRUCT: CEILING INSPECTION INSPECTOR TOTAL TIME: —RELATED PERMITS— CD 14 24 34 44 PERMIT! CB911127 ITI AS930022 ASTI AS980181 ASC LVL DESCRIPTION TYPE STATUS EXPIRED ISSUED ISSUED ACT COMMENTS ST Frame/Steel/Bolting/Welding PL Rough/Topout EL Rough Electric ME Rough/Ducts/Dampers ***** INSPECTION HISTORY ***** DATE DESCRIPTION 111898 Rough Combo 110498 Interior Lath/Drywall 103098 Frame/Steel/Bolting/Welding 103098 Rough Electric 102998 Underground/Under Floor 102998 Frame/Steel/Bolting/Welding 102998 Rough Electric ACT NR AP AP AP AP CO CO INSP PS TP TP TP TP TP TP COMMENTS LOW WALLS WALLS CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB982941 FOR 11/18/98 DESCRIPTION: CTI 15000 SF-ELEC,PLUMB,INTER WALLS, 9,000 SF NEW OFFICE TYPE: CTI JOB ADDRESS: 2042 CORTE DEL NOGAL JJ CONSTRUCTIONAPPLICANT: CONTRACTOR: OWNER: REMARKS: C/JOE/754-6700 901-3300 SPECIAL INSTRUCT: PHONE: PHONE: PHONE: INSPECTOR AREA TP PLANCK# CB982941 OCC GRP B/S-1 CONSTR. TYPE VN STE: LOT: 760 754-6700 INSPECTOR TOTAL TIME: —RELATED PERMITS— CD LVL DESCRIPTION 14 24 34 44 PERMIT# TYPE CB911127 ITI AS930022 ASTI AS980181 ASC STATUS EXPIRED ISSUED ISSUED ACT COMMENTS ST Frame/Steel/Bolting/Welding PL Rough/Topout EL Rough Electric ME Rough/Ducts/Dampers ***** INSPECTION HISTORY ***** DATE DESCRIPTION 110498 Interior Lath/Drywall 103098 Frame/Steel/Bolting/Welding 103098 Rough Electric 102998 Underground/Under Floor 102998 Frame/Steel/Bolting/Welding 102998 Rough Electric ACT INSP AP TP TP TP TP TP TP AP AP AP CO CO COMMENTS LOW WALLS WALLS CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB982941 FOR 11/04/98 DESCRIPTION: CTI 15000 SF-ELEC,PLUMB,INTER WALLS, 9,000 SF NEW OFFICE TYPE: CTI JOB ADDRESS:2042 CORTE DEL NOGAL APPLICANT: CONTRACTOR: OWNER: JJ CONSTRUCTION PHONE: PHONE: PHONE: INSPECTOR AREA TP PLANCK* CB982941 OCC GRP B/S-1 CONSTR. TYPE VN STE: LOT: 760 754-6700 REMARKS: C/JOE/901-3300 754-6700 SPECIAL INSTRUCT: INSPECTOR TOTAL TIME: —RELATED PERMITS—PERMIT# TYPE CB911127 ITI AS930022 ASTI AS980181 ASC CD 17 LVL DESCRIPTION ST Interior Lath/Drywall STATUS EXPIRED ISSUED ISSUED ACT COMMENTS ***** INSPECTION HISTORY ***** DATE DESCRIPTION 103098 Frame/Steel/Bolting/Welding 103098 Rough Electric 102998 Underground/Under Floor 102998 Frame/Steel/Bolting/Welding 102998 Rough Electric ACT INSP AP TP AP TP TP TP AP CO CO TP COMMENTS LOW WALLS WALLS CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB982941 FOR 10/30/98 DESCRIPTION: CTI 15000 SF-ELEC, PLUMB, INTER WALLS, 9,000 SF NEW OFFICE TYPE: CTI JOB ADDRESS: 2042 CORTE DEL NOGAL JJ CONSTRUCTIONAPPLICANT: CONTRACTOR : OWNER: REMARKS: C/JOE/901-3300 SPECIAL INSTRUCT: 754-6700 PHONE: PHONE : PHONE: INSPECTOR AREA TP PLANCK* CB982941 OCC GRP B/S-1 CONSTR. TYPE VN STE: LOT: 760 754-6700 INSPECTOR TOTAL TIME: —RELATED PERMITS — CD 14 24 34 44 PERMITft TYPE CB911127 ITI AS930022 ASTI LVL DESCRIPTION STATUS EXPIRED ISSUED ACT COMMENTS ST Frame/Steel/Bolting/Welding PL Rough/Topout EL Rough Electric ME Rough/Ducts/Dampers DATE DESCRIPTION ***** INSPECTION HISTORY ***** ACT INSP COMMENTS CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB982941 FOR 10/29/98 DESCRIPTION: CTI 15000 SF-ELEC,PLUMB,INTER WALLS, 9,000 SF NEW OFFICE TYPE: CTI JOB ADDRESS: 2042 CORTE DEL NOGAL JJ CONSTRUCTIONAPPLICANT: CONTRACTOR: OWNER: REMARKS: C/JOE/901-3300 754-6700 SPECIAL INSTRUCT: PHONE: PHONE: PHONE: INSPECTOR AREA PLANCK* CB982941 OCC GRP B/S-1 CONSTR. TYPE VN STE: LOT: 760 754-6700 INSPECTOR TOTAL TIME: —RELATED PERMITS— CD 21 14 24 34 44 PERMIT* TYPE CB911127 ITI AS930022 ASTI LVL DESCRIPTION STATUS EXPIRED ISSUED ACT COMMENTS PL Underground/Under Floor ST Frame/Steel/Bolting/Welding PL Rough/Topout EL Rough Electric ME Rough/Ducts/Dampers DATE DESCRIPTION ***** INSPECTION HISTORY ***** ACT INSP COMMENTS EsGii Corporation In ^Partnership u>itH government for 'Building Safety DATE 1O/ 12/98 O£EELJ£ANT JURISDICTION Carlsbad a FILE PLAN CHECK NO 98-2941 SET II PROJECT ADDRESS 2042 Corte Del Nogal PROJECT NAME Girard Investment Partners TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified in Remarks below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person I I The applicant's copy of the check list has been sent to Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) Fax # Mail Telephone Fax In Person \\rftJL/ REMARKS: Please make the notes as circled in redon sheets1.1, M1, and E1 of the plan review Set II to the City held Set II and attach the Rqpf Mounted Equipment policy to the plan set. By Mike Puckett Enclosures ^ ^ Esgil Corporation D GA D MB D EJ D PC 10/2/98 trnsmtldot 9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 4 (619) 560-1468 4 Fax (619) 560-1576 EsGil Corporation In Partnership with government for IBuiUing Safety DATE 9/15/98 awAii.UCANT JURISDICTION Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO 98-2941 SET I PROJECT ADDRESS 2042 Corte Del Nogal PROJECT NAME Girard Investment Partners TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person The applicant's copy of the check list has been sent to Joe Jeffrey 2741 Vista Way #201 Oceanside, Ca 92054 Esgil Corporation staff did not advise the applicant, except by mail, that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) Fax # Mail Telephone Fax In Person REMARKS By Mike Puckett Enclosures Esgil Corporation D GA D CM D EJ D PC 9/3/98 trnsmtldot 9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 + (619)560-1468 4 Fax (619) 560-1576 Carlsbad 98-2941 9/15/98 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO 98-2941 OCCUPANCY B/S1 TYPE OF CONSTRUCTION VN ALLOWABLE FLOOR AREA SPRINKLERS'? REMARKS DATE PLANS RECEIVED BY JURISDICTION 9/2/98 DATE INITIAL PLAN REVIEW COMPLETED 9/15/98 JURISDICTION Carlsbad USE Office/Warehouse ACTUAL AREA 15,OOOsfTI STORIES 1 HEIGHT OCCUPANT LOAD 150 TI DATE PLANS RECEIVED BY ESGIL CORPORATION 9/3/98 PLAN REVIEWER Mike Puckett FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled This plan review is based on regulations enforced by the Building Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments Clearance from those departments may be required prior to the issuance of a building permit Code sections cited are based on the 1994 UBC The following items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3, 1994 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc Be sure to enclose the marked up list when you submit the revised plans LIST NO 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC)tiforw dot Carlsbad 98-2941 9/15/98 1 Please make all corrections on the original tracings, as requested in the correction list Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects) For expeditious processing, corrected sets can be submitted in one of two ways 1 Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA 92009, (619) 438-1161 The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments 2 Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619) 560- 1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 2 Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes Business and Professions Code 3 Provide a plot plan showing the distance from the building to the property lines and the location of tenant space (or remodel) within the building 4 Provide a note on the site plan indicating the previous use of the tenant space or building being remodeled Section 106 3 3 5 On the first sheet of the plans indicate 6 The floor area of the remodeled area, • Type of construction of the existing building, • Present and proposed occupancy classifications of the remodel area, • The floor where the tenant improvement is located, • The occupant load of the remodel area(s) • Whether or not the building is spnnklered A complete plan review cannot be done without the above information provided. 7 Provide a fully dimensioned floor plan showing the size and use of all rooms or areas within the space being improved or altered Draw the plans to scale and indicate the scale on the plan Section 106 3 3 Please show the overall dimensions of the improved area and building perimeter Carlsbad 98-2941 9/15/98 8 Please show the use of the area adjacent to the improved space Is one tenant to occupy the entire building space? Please show the area on the project data block of the space occupied by the tenant and the area of the building 9 A complete description of the activities and processes that will occur in this tenant space should be provided A listing of all hazardous materials should be included The materials listing should be stated in a form that would make classification in Tables 3-D and 3-E possible The building official may require a technical report to identify and develop methods of protection from hazardous materials Section 3071 6 10 Note on plan that suspended ceilings shall comply with UBC Tables 25-A, 16-0 and 16-B 11 At detail K/3 1 show the height of the lower horizontal mullion above adjacent walking surface 12 Please revise the detail at K/3 2 to show correct size and gauge of metal ceiling joists as per ICBO report 2274 There is nothing in the tables from the report that shows the size and gauge as shown in the detail 13 Without knowing whether or not the building is sprmklered show what applies on the plans • In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and floor above so that no concealed space exceeds 1,000 s f and no horizontal dimension exceeds 60 L F (if space has sprinklers, then 3,000 s f and 100 L F ) Section 708 • In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and roof above so that no concealed space exceeds 3,000 s f and no horizontal dimension exceeds 60 L F (if space has sprinklers, then 9,000 s f and 100 L F ) Section 708 14 Specify lever-type hardware for passage doors on floors accessible to the disabled Section 2-3304, Title 24 15 Please show the restrooms to be separate sex and identify each location 16 Submit plan showing location of all panels 17 Submit panels schedules 18 Submit electrical load calculations 19. Indicate wiring method, i e EMT, metal flex Per the City of Carlsbad request please note on the E sheet that "No AC cable or Romex wiring methods are allowed". Carlsbad 98-2941 9/15/98 20 Show the size, location and type of all heating and cooling appliances or systems 21 Provide mechanical ventilation in all rooms capable of supplying outside air at a minimum rate of 15 cubic feet per minute per occupant UBC, Section 1202 2 1 Show the cfm of outside air for the new tenant improvement occupant load 22 Provide mechanical plans showing existing and proposed HVAC equipment, ducts and access to equipment 23 Detail ladder access to roof mounted HVAC equipment 24 Show a fan exhaust ducted to the outside in each restroom capable of providing a complete air change every 15 minutes 25 Provide complete plumbing plans, including • Complete dram, waste and vent plans • Provide complete water line sizing UPC Section 610 0 • Show water heater size, type and location on plans UPC, Section 501 0 26 Provide plans, calculations and worksheets to show compliance with current energy standards 27 Provide complete energy designs for the proposed changes in envelope, lighting, and mechanical systems Provide the completed ENV-, LTG-forms showing energy compliance 28 On the plans clearly show the wall and roof insulation locations, thickness, and R- values, as per the energy design 29 The completed and signed ENV-1, LTG-1 forms must be imprinted on the plans DEPARTMENT OF STATE ARCHITECT NON RESIDENTIAL TITLE 24 DISABLED ACCESS REQUIREMENTS 30 The following disabled access items are taken from the 1995 edition of California Building Code, Title 24 Per Section 101 17 11, all publicly and privately funded public accommodations and commercial facilities shall be accessible to persons with disabilities as follows • Any building, structure, facility, complex, or improved area, or portions thereof, which are used by the general public • Any sanitary facilities which are made available for the public, clients, or employees in such accommodations or facilities Carlsbad 98-2941 9/15/98 • Any curb or sidewalk intended for public use that is constructed with private funds • All existing accommodations when alterations, structural repairs or additions are made to such accommodations NOTE All Figures and Tables referenced in this checklist are printed in the California Building Code, Title 24 REMODELS. ADDITIONS AND REPAIRS 31 When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected is required to comply with all of the requirements for new buildings, per Section 1134B 2 These requirements apply only to the area of specific alteration, repair or addition and shall include 32 A primary entrance to the building and the primary path of travel to the area in question, and include the following items which serve the area in question • Sanitary facilities • Drinking fountains • Public telephones 33 If an unreasonable hardship finding is granted, priority should be given to those elements that will provide the greatest access, per Section 1134B 2 1 Exception #1 The order of priority shown below should be followed • An accessible entrance • An accessible route of travel • At least one accessible restroom for each sex • Accessible telephones • Accessible drinking fountains • When possible, additional accessible elements such as parking, storage and alarms 34 On the site plan please show the disabled accessible parking space(s) and parking lot signage Show the disabled accessible path of travel from the parking space(s) to the tenant space entrance 35 On sheet 3 2 please show the additional wall signage at the restroom doors as follows 36 Braille signage shall also be located on the wall adjacent to the latch outside of the doorways leading to the sanitary facilities, per Section 1117B 5 9 Carlsbad 98-2941 9/15/98 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i e , plan sheet, note or detail number, calculation page, etc Please indicate here if any changes have been made to the plans that are not a result of corrections from this list If there are other changes, please briefly describe them and where they are located in the plans Have changes been made to the plans not resulting from this correction list? Please indicate Yes Q No a The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of 619/560-1468, to perform the plan review for your project If you have any questions regarding these plan review items, please contact Mike Puckett at Esgil Corporation Thank you Carlsbad 98-2941 9/15/98 VALUATION AND PLAN CHECK FEE JURISDICTION Carlsbad PLAN CHECK NO 98-2941 PREPARED BY Mike Puckett DATE 9/15/98 BUILDING ADDRESS 2042 Corte Del Nogal BUILDING OCCUPANCY B/S1 TYPE OF CONSTRUCTION VN BUILDING PORTION Tenant Improvement Air Conditioning Fire Sprinklers TOTAL VALUE BUILDING AREA (ft2) 15,000 VALUATION MULTIPLIER City Value VALUE ($) 420,000 00 420,000 00 D 1994 UBC Building Permit Fee • Bldg Permit Fee by ordinance $ 174108 D 1994 UBC Plan Check Fee • Plan Check Fee by ordinance $ 113170 Type of Review Q Complete Review Q Structural Only D Hourly O Repetitive Fee Applicable O Other Esgil Plan Review Fee $ 905 36 Comments Sheet 1 of 1 macvalue doc 5196 City of Carlsbad Engineering Department BUILDING PLANCHECK CHECKLIST DATE BUILDING ADDRESS Z.O42- PROJECT DESCRIPTION ASSESSOR'S PARCEL NUMBER PLANCHECK NO CB - O(0\ - ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved The approval is based on plans, information and/or specifications provided in your submittal, therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build A Right-of-Way permit is required prior to construction of the following improvements EST VALUE DENIAL Please seethe attached report of deficiencies marked witn D Make necessary corrections to plans or specifications for compliance with applicable codes and standards Submit corrected plans and/or specifications to this office for review Date By By Date Date By (Tk FOR OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT 'L/UiA. //LS/^3 Date /, u ATTACHMENTS Dedication Application Dedication Checklist Improvement Application Improvement Checklist Future Improvement Agreement Grading Permit Application Grading Submittal Checklist Right-of-Way Permit Application Right-of-Way Permit Submittal Checklist and Information Sheet Sewer Fee Information Sheet ENGINEERING DEPT CONTACT PERSON Name Danna Trigs City of Carlsbad Address 2075 Las Palmas Dr, Carlsbad, CA 92009 Phone (619) 438-1161, ext 4374 CFD INFORMATION Parcel Map No Lots Recordation Carlsbad Tract A-4 CA 92OO9-1576 • (76O) 438-1161 • FAX (76O) £' a BUILDING PLANCHECK CHECKLIST SITE PLAN 1 Provide a fully dimensioned site plan drawn to scale Show A North Arrow B Existing & Proposed Structures C Existing Street Improvements 2 Show on site plan D Property Lines E Easements F Right-of-Way Width & Adjacent Streets G Driveway widths A Drainage Patterns 1 Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course 2 ADD THE FOLLOWING NOTE "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building " B Existing & Proposed Slopes and Topography 3 Include on title sheet A Site address B Assessor's Parcel Number C Legal Description For commercial/industrial buildings and tenant improvement projects, include total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc ) previously approved EXISTING PERMIT NUMBER DESCRIPTION DISCRETIONARY APPROVAL COMPLIANCE Q Q 4a Project does not comply with the following Engineering Conditions of approval for Project No Q Q 4b All conditions are in compliance Date H \WORD\DOCS\CHKLS'nBiiilding Plancheck Cklsl 8P0001 Farm DT doc w BUILDING PLANCHECK CHECKLIST DEDICATION REQUIREMENTS -isiv 2ND/ 3RDi/ Q Q Q 5 Dedication for all street Rights-of-Way adjacent to the building site and any storm dram or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ , pursuant to Carlsbad Municipal Code Section 18 40 030 Dedication required as follows Dedication required Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 1/2" x 11" plat map and submit with a title report All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit Attached please find an application form and submittal checklist for the dedication process Submit the completed application form with the required checklist items and fees to the Engineering Department in person Applications will not be accept by mail or fax Dedication completed by Date IMPROVEMENT REQUIREMENTS 6a All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ , pursuant to Carlsbad Municipal Code Section 1840040 Public improvements required as follows Attached please find an application form and submittal checklist for the public improvement requirements A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the ilngmeering Department through a separate plan check process The completed application form and the requirements on the checklist must be submitted in person Applications by mail or fax are not accepted Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit Improvement Plans signed by Date 6b Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 1840 Please submit a recent property title report or current grant deed on the property and processing fee of $ so we may prepare the necessary Future Improvement Agreement This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit Future public improvements required as follows H \WORD\DOCS\CHKLST\Building Plancheck Cklst BP0001 Form DT doc BUILDING PLANCHECK CHECKLIST * $\J r^n<\J qrd/ Q Q Q 6c Enclosed please find your Future Improvement Agreement Please return agreement signed and notarized to the Engineering Department Future Improvement Agreement completed by Date Q Q Q 6d No Public Improvements required SPECIAL NOTE Damaged or defective improvements found adiacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11 06 030 of the Municipal Code Q Q Q 7a Inadequate information available on Site Plan to make a determination on grading requirements Include accurate grading quantities (cut, fill import, export) Write "No Grading" on plot plan if none is required Q Q Q 7b Grading Permit required A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached NOTE The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit Grading Inspector sign off by Date Q Q Q 7c Graded Pad Certification required (Note Pad certification may be required even if a grading permit is not required ) Q Q Q 7d No Grading Permit required Q Q Q 7e If grading is not required, write "No Grading" on plot plan MISCELLANEOUS PERMITS Q Q Q 8 A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way Types of work include, but are not limited to street improvements, tree trimming, driveway construction, tiemg into public storm dram, sewer and water utilities Right-of-Way permit required for H \WORD\DOCS\CHKLST\Buildmg Plancheck Cklsl BP0001 Form DT doc ., Rev 12/26/96 BUILDING PLANCHECK CHECKLIST Q Q Q Q Q A SEWER PERMIT is required concurrent with the building permit issuance fee is noted in the fees section on the following page The 10 INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El Camino Real, Carlsbad, CA 92008 District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List You may telephone (760) 438-2722, extension 153, for assistance Industrial Waste permit accepted by Date Q Q Q 11 NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first 12 13 equired fees are attached fees required'No Additional Comments $fQ\/\a<L -. fforhxc/. G\ ' - ^u t lAd A q svji o ? v V -(-,' ^10 ^_s£ erf-~-J as 4- H \WORDlDOCS\CHKLST\Buildmg Plancheck Cklsl BP0001 Form DT doc Rev 12/26/96 •*** \ LJ J su Iu KLn n n PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No CB Planner l/A*J APN Address Phone (619) 438-1161, extension _£/V£7_ Z/ ?- Type of Project & Use- Zoning P1^ General Plan _££,Net Project Density DU/AC Facilities Management Zone CFD .Date of participation Remaining net dev acres (For non-residential development Type of land used created by this permit. Legend:/\ Item Complete ©1 Envrronmental Review Required: DATE OF COMPLETION. YES Item Incomplete - Needs your action _ NO _Al TYPE Compliance with conditions of approval7 If not, state conditions which require action Conditions of Approval: Discretionary Action Required: APPROVAL/RESO NO PROJECT NO YES NO 0< TYPE DATE OTHER RELATED CASES' Compliance with conditions or approval' If not, state conditions which require action Conditions of Approval Coastal Zone Assessment/Compliance Project site located in Coastal Zone7 YES CA Coastal Commission Authority7 YES NO AT NO If California Coastal Commission Authority Contact them at - 3111 Camino Del Rio North, Suite 200, San Diego CA 92108-1725, (619) 521-8036 Determine status (Coastal Permit Required or Exempt)' Coastal Permit Determination Form already completed7 If NO, complete Coastal Permit Determination Form now Coastal Permit Determination Log # YES NO Follow-Up Actions. 1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans) 2) Complete Coastal Permit Determination Log as needed I I Inclusionary Housing Fee required. YES _ (Effective date of Inclusionary Housing Ordinance - May 21, 1993 ) Data Entry Completed' YES NO_ (Enter CB 8, UACT, NEXT12, Construct housing Y/N Enter Fee Amount (See fee schedule tor amount! Return Site Plan: |~l 1 Provide a fully dimensional site plan drawn to scale Show North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines. [ 2 Provide legal description of property and assessor's parcel number Zoning: LH d 1 Setbacks. Front: Interior Side: Street Side- Rear. Required Required Required Required CH 2 Accessory structure setbacks: Front. Required Interior Side: Required Street Side Required Rear- Required Structure separation- Required 3 Lot Coverage Required Shown , Shown f /x Shown _/ Shown Shown Shown Shown Shown , Shown ^ Shown \ | 4 Height Required | | 5 Parking Spaces Required Guest Spaces Required Additional Comments PAD Piter (t& 7O Shown Shown Shown feoT7l[j&#£drf ( OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER I /I/• City of Carlsbad 9831 1 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check Date of Report Wednesday, September 9, 1998 Reviewed by Contact Name J J Construction Address 2741 Vista Way #201 City, State Oceanside CA Bldg Dept No CB982941 Planning No Job Name Unknown Job Address 2042 Corte Del Nogal Ste or Bldg No Approved - The item you have submitted for review has been approved The approval is based on plans, information and/or specifications provided in your submittal, therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements Disapproved - Please see the attached report of deficiencies Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards Submit corrected plans and/or specifications to this office for review For Fire Department Use Only Review 1st 2nd 3rd Other Agency ID CFDJob# 98311 File# 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 This AGREEMENT is between: JJ CONSTRUCTION PROJECT: Tenant Improvement 2741 Vista Way, Suite 201 2042 Corte Del Nogal Oceanside, CA, 92054 Carlsbad, CA Tel.: (760) 754-6701 Fax: (760) 754-6702 AND Girard Investment Partners 7855 Ivanhoe Avenue .o^ Suite 222 - (Xb La Jolla, CA A. Description of the work: Contractor will furnish all labor, materials, supervision and construction management to construct and complete in a good, workmanlike and substantial manner all items as per plans. B. Payment: Owner will pay Contractor the sum of $152,815.00 (One hundred fifty two thousand,eight hundred and fifteen and No/100 dollars) in installments as follows: 10% upon mobilization; draws to be received weekly; billing is to match the percentage of work completed to date. Final payment is due upon signature of Building Department of the City of Carlsbad. TERMS AND CONDITIONS: 1. Plans, Specifications, and Permits. The project will be constructed according to plans and specifications which have been "ancTVpay for all required building permits, title 24, testing and inspections; Owner will pay assessments and charges required by public bodies and utilities for financing or repaying the ,^cost of sewers, meters, storm drains, water service and other utilities, including sewer and storm drain reimbursement charges, revolving fund charges/ hook-up charges, and the like. 2) Releases. No waiver or release of mechanic's lien given by Contractor shall be binding until all payments due to Contractor when the release was executed have actually been made. 3) Delay. Contractor shall be excused for any delay in completion of the contract caused by acts of God, acts of owner's agent, stormy weather, labor trouble, acts of public utilities, public bodies or inspectors, extra work, failure of Owner to make progress payments promptly or other contingencies unforeseen by Contractor and beyond the reasonable control of Contractor. 4) Completion and Occupancy. Owner agrees to sign and record a Notice of Completion within five (5) days after completion of the project. If the project passes final inspection by the public body but Owner fails to record Notice of Completion, then Owner hereby appoints Contractor as Owner's agent to sign and record Notice of Completion on behalf of Owner. This agency is irrevocable and is an agency coupled with an interest. Contractor may use such force as is necessary to deny occupancy of the project by Owner or anyone else until Contractor has received all payments due under this contract, and until Notice of Completion has been recorded. 5) Damage to Project and Insurance. Owner will procure at his own expense and before the commencement of any work hereunder, fire insurance with course of construction, vandalism, and malicious mischief clauses attached; such insurance to, be in a sum at least equal to the contract price with loss, if any, payable to any beneficiary under any deed of trust covering the project, such insurance to name Contractor as an additional insured, and to protect Owner, Contractor, and construction lender as their interests may appear; should owner fail to do so, Contractor may procure such insurance as agent for and at expense of Owner, but is not required to do so. If the project is destroyed or damaged by an accident, disaster or calamity, such as fire, storm, flood, landslide, subsidence or earthquake, or by theft or vandalism, any work done by Contractor in rebuilding or restoring the project shall be paid for by Owner as extra work. Contractor will maintain in full force and effect a workers' compensation insurance policy and a comprehensive liability insurance policy in amounts not less than required by the specifications, or as noted, and shall furnish certificates of insurance to Owner before commencing work. The failure of Owner to demand delivery of certificates hereunder shall not relieve Contractor of any obligation under this paragraph. 6) Right to Stop Work. Contractor shall have the right to stop work if any payment shall not be made to Contractor under this agreement; Contractor may keep the job idle until all payments due are received. 7) Limitations. No action arising from or related to the contract, or the performance thereof, shall be commenced by either party against the other more than one (1) year after the completion or cessation or work under this contract. This limitation applies to aJJ. actions of any character, whether at law or in equity, and whether sounding in contract, tort or otherwise. This limitation shall £aa& be extended /J3K\J|any negligent misrepresentation. •&*- unintentional concealment, SsS shall be extended as provided by law for willful fraud, concealment or misrepresentation. 8) Attorneys' Fees. If either party becomes involved in litigation arising out of this contact or the performance thereof, the court in such litigation, or in a separate unit, shall award reasonable costs and expenses, including attorneys' fees, to the party justly entitled thereto. In awarding attorneys' fees, the court will not be bound by any court fee schedule/ but shall, if it is in the interest of justice to do so, award the full amount of costs, expenses, and attorneys' fees paid or incurred in good faith. 9) Clean-Up. Upon completion of the work, Contractor will remove debris and surplus material from Owner's property and leave it in a neat and broom-clean condition. 10) Taxes and Assessments. Taxes and special assessments of all descriptions will be paid by owner. 11) Notice. Any notice required or permitted under this contract may be given by certified mail or fax at the address contained in this contract; but such address may be changed by written notice given by one party to the other from time to time. JJ Construction Date -ik work. \v\ Q. o»bf ^roo^cfl WkQ-3) , Iff V remove debris and surplus material from Owner's property and leave it in a neat and broom-clean condition. 10) Taxes and Assessments. Taxes and special assessments of all descriptions will be paid by owner. 11) Notice. Any notice required or permitted under this contract may be .given by certified mail or fax at the address contained in this contract; but such address may be changed by written notice given by one party to the other from time to time. v\ <nv dnrf(M TO& 3L OP PSSWI T\W C ITJ OF ADDENDUM "A" j» 1) All conditions as outlined in fax dated 7-16-98 are included 2) Plans, permits, title 24, utility fees, etc. are to be supplied by owner 3) 2x4 drop-in lights have been allotted as per new plan 4) The flooring allowance is $12,000.00. This may be upgraded or reduced as needed 5) All drywall is figured as 5/8 inch, as per new plan All exterior walls are to be furred in and drywalled to 10 foot. Demising wall to be full height and drywalled on one (1) side. All interior walls are to under grid 6) All exterior walls of un-improved area are to have conduits, piping, etc removed and w^ be repainted. 7) All excess vertical electric and water lines hanging from main lines are to be eliminated from improved and un-improved areas inside building 8) Wall with 3 sub panels to remain in industrial area ^"&-x> ^^ ^PS fe^iV- x ^^ O a--^ CC S-2 UJ tr w we C oc S toIt P [L OC g ~ llllills CO Q. co o o i ^U-1 t§^a •^