Loading...
HomeMy WebLinkAbout2045 CORTE DEL NOGAL; ; CB030276; Permit03-21-2003 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Electrical Permit Permit No CB030276 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Reference # Project Title Applicant MUNDY ELECTRIC 720 E WALNUT FULLERTON 92831 714578-8896 2045 CORTE DEL NOGAL CBAD ELEC 2130610900 Lot# SEASILVER UPGRADE TO 2000 AMP 480 SERVICE Status Applied Entered By Plan Approved Issued ISSUED 01/28/2003 MDP 03/20/2003 03/21/2003 Inspect <fcrgg 03/21/03 02 510.00 Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14 92 3200 HIGHLAND AVE #B4 2 NATIONAL CITY CA 91950 Electric Issue Fee Single Phase per AMP Three Phase per AMP Three Phase 480 Per AMP Remodel/Alteration per AMP Remodel Fee Temporary Service Fee Test Meter Fee Other Electrical Fees Additional Fees TOTAL PERMIT FEES 0 0 0 2000 $1000 $000 $000 $000 $500 00 $000 $000 $000 $000 $000 $51000 Total Fees $510 00 Total Payments To Date $0 00 Balance Due $51000 E PERMIT HAS EXPIRED IN ACCORDANCE WITH U.B.C. SECTION 106 4 4 p&TP «5lU\0«A.. SIGNATURE jft/f r , Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave , Carlsbad, CA 92008 1 PROJECT INFORMATION 2.045 C FOR OFFICE USE ONLY PLAN CHECK NO EST VAL Plan Ck Deposit Validated By Date Address (include Bldg/Suite #)Business Name (at this address) Legal Description Lot No Subdivision Name/Number Unit No Phase No Total # of units Assessor s Parcel #Existing Use Proposed Use Description of Work SO FT ^* 2 CONTACT PERSON (if different from applicant) #of Stones # of Bedrooms # of Bathrooms Name Address 3 APPLICANT TgT Contractor O Agent for Contractor D Owner AOALAXJT^ City Agent for Owner: State/Zip Telephone # Fax # C.A ^2831 Name ^^ ftt--\A ! PROPERTY OWNER City State/Zip Telephone # .:,! Address City State/Zip Telephone #Name 5 '^CONTRACTOR CQMPANV«NAME. - -™: --fT' • ^ „:,.... -^i' '" ...... !lh:. :....„ .. (Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct alter improve demolish or repair any structure prior to its issuance also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor s License Law [Chapter 9 commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]) -T7-0 Name State License #5 >J 2*» Address License Class City State/Zip City Business License # _/_y Telephone Designer Name Address City State/Zip ' Telephone State License # 17;:WORKERS COMPENSATION 4ifii'"" .. . J®f' ,:ff" :H:l:v .,.3••*:""""" """"" mi* N- ^f"*"* : Workers Compensation Declaration I hereby affirm under penalty of perjury one of the following declarations T>4, I have and will maintain a certificate of consent to self insure for workers compensation as provided by Section 3700 of the Labor Code for the performance of the work for which this permit is issued C_3^ I have and will maintain workers compensation as required by Section 3700 of the Labor Code for the performance of the work for which this permit is /issued My worker s compensation insurance carrier and policy number are Insurance Company £$ £ tUT V)Sl)>-. Policy No O I KT2. - OOZUfc-S^-L Expiration Date ^-t^T~Q S> (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) D CERTIFICATE OF EXEMPTION I certify that in the performance of the work for which this permit is issued I shall not employ any person in any manner so as to become subject to the Workers Compensation Laws of California WARNING Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100.00p)in^ddition to.the cost of compensation darnages as provided for in Section 3706 of the Labor code interested attorney s fees SIGNATURE '^^CP^^^c: J£7\-- ,, ' DATE ff, 7 OWNER BUILDER DECLARATION ~"~ I hereby affirm that I art exempt-froTrTthe Contractor s License Law for the following reason l~| I as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044 Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees provided that such improvements are not intended or offered for sale If however the building or improvement is sold within one year of completion the owner builder will have the burden of proving that he did not build or improve for the purpose of sale) n I as owner of the property am exclusively contracting with licensed contractors to construct the project (Sec 7044 Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon eind contracts for such projects with contractor(s) licensed pursuant to the Contractor s License Law) 0 I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and materials for construction of the proposed property improvement Q YES QNO 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number) 4 I plan to provide portions of the work but I have hired the following person to coordinate supervise and provide the major work (include name / address / phone number / contractors license number) 5 I will provide some of the work but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work) PROPERTY OWNER SIGNATURE DATE ^COMPLETE THIS SECTiON,FOR WOW RESIDENTIAL BUILDING PERMITS ONLY „ JN:.-. ::"" BJ!""... :..., *"•..„ ;! Is the applicant or future building occupant required to submit a business plan acutely hazardous materials registration form or risk management and prevention program under Sections 25505 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act? [_] YES O NO Is the applicant or future building occupant required to obtain a permit from the air pollution control distrn t or air quality management district' [_] YES [_J NO Is the facility to be constructed within 1 000 feet of the outer boundary of a school site? l~l YES [_] NO IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT 8 CONSTRUCTION LENDING AGENCY ,,/r ,iw' .<• v 4 I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(i) Civil Code) LENDER S NAME LENDER S ADDRESS 9 APPLICANT CERTIFICATION /'|::: -J! -r;ii:' ... f .,...., ? : .«...:•• ^H'"" " :?iii:'" • "" .. ^ *••* '"" I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all City ordinances and State laws relating to building construction I hereby authorize representatives of the CitV of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An OSHA permit is required for excavations over 5 0" deep and demolition or construction of structures over 3 stories in height EXPIRATION Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106 4 4 Uniform Building Code) APPLICANT S SIGNATURE Vlio.-.U_,. jfc> O X>.*^ DATE I ~ 2, R- YELLOW Applicant PINK Finance City of Carlsbad March 2, 2004 MUNDY ELECTRIC 720 E WALNUT AV FULLERTONCA 92831-4530 RE BUILDING PERMIT EXPIRATION PERMIT TYPE ELEC Building Department Permit Number CB030276 Issue Date 3/21/03 ADDRESS 2045 CORTE DEL NOGAL PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that your building permit will expire by limitation of time on 4/28/04 The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state "EXPIRATION Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit (unless issued prior to 7/1/99 which is one year from date of permit), or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of 180 days or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within 180 days of the date of permit issuance Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each 180 day period upon the initial commencement of work authorized by such permit Before such work can be recommenced, a new permit shall be obtained to do so, and the fee, therefore, shall be one-half the amount required for a new permit for such work, and provided that no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year In order to renew action on a permit after expiration, the permittee shall pay a new permit fee Any person holding an unexpired permit may apply for an extension of the time within which work may commence under that permit when the permittee is unable to commence work within the time period required by this section for good and satisiactory reasons The Building Official may extend the time for action by the permittee for a period not exceeding 180 days on written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken No permit shall be extended more than once Please check below indicating your intentions and return this letter to us Project abandoned A new permit will be obtained prior to commencing work No fee extension requested for 180 days (attach a letter of explanation) Renewal permit requested If the project has been completed and only a final inspection is needed, please call the inspection request line at (760) 602-2725 If you have any questions, please contact the Building Inspection Department at (760) 602-2700 PAT KELLEY Building and Code Enforcement Manager 1635 Faraday Avenue • Carlsbad, CA 92OO8-7314 • (76O) 602-270O • FAX (76O) 6O2-856O Sep 04 03 10-12a P 2 City of Carlsbad September 2, 2UU3 MUNDY ELECTRIC 720 E WALNUT AV FULLERTONCA 92831-4530 B u 11 ding De parl m e n I Permit Number CB030276 Issue Date 3/21/03 RE BUILDING PERMIT EXPIRATION PERMIT TYPE- ELEC ADDRESS 2045 CORTE DEL NOGAL PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our recoids indicate that your building permit will expue by limitation oJ time on 10/28/03 The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state 'EXPIRATION Every permit issued by the Building Official under the provisions of this code shall expue by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days fiom the date of such permit (unless issued prior to 7/1/99 which is one year from date of permit), or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of 180 days or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be piesumed to have commenced if the permittee has obtained a requned inspection approval of work authorized by the permit by the Building Official within 180 days of the date of permit issuance Work shall be piesumed to be stopped if the permittee has not obtained a required inspection appioval of woik by the Building Official within each 180 day period upon the initial commencement of work authorized by such permit Before such work can be recommenced, a new permit shall be obtained to do so, and the fee, therefore, shall be one-half the amount required for a new peimit for such work, and provided that no changes have been made or will be made in the original plans and specifications for such woik, and provided further that such suspension or abandonment has not exceeded one year In order to renew action on a permit after expiration, the permittee shall pay a new permit fee Any person holding an unexpired peimit may apply for an extension of the time within which work may commence under that permit when the permittee is unable to commence work within the time period required by this section for good and satisfactory reasons The Building Official may extend the time for action by the permittee for a penod not exceeding 180 days on wntten lequest by the permittee showing that circumstances bevond the control of the permittee have prevented action from being taken No permit shall be extended more than once Please check below indicating your intentions and return this letter to us _ Project abandoned A new permit will be obtained prior to commencing work _ No fee extension requested for 180 days, (attach a letter of explanation) _ Renewal permit lequested If the project has been completed and only a final inspection is needed, please call the inspection request line at (760) 602-2725 If you have any questions), please contact the Building Inspection Depaitment at (760) 602-2700 PATKELLEY Principal Building Inspector ' f Septembei 2, 2003 MUNDY ELECTRIC 720 E WALNUT AV FULLERTONCA 92831-4530 RE BUILDING PERMIT EXPIRATION PERMIT TYPE ELEC Peimit Number CB030276 Issue Date 3/21/03 ADDRESS 2045 CORTE DEL NOGAL PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that youi building permit will expne by limitation of time on 10/28/03 The provisions of UBC, Section 106 4 4 as amended by the Cailsbad Municipal Code state "EXPIRATION Eveiy permit issued by the Building Official under the provisions of this code shall expue by limitation and become null and void if the building or woik authorized by such permit, is not commenced within 180 days fiom the date of such peimit (unless issued pnor to 7/1/99 which is one year from date of permit), or if the building or woik authorized by such permit is stopped at any time after the work is commenced for a period of 180 days or if the building or work authorized by such peimit exceeds thiee calendar years from the issuance date of permit Work shall be presumed to have commenced if the permittee has obtained a requned inspection approval of work authorized by the permit by the Building Official within ISO days of the date of permit issuance Work shall be piesumed to be stopped if the peimittee has not obtained a requned inspection appioval of woik by the Building Official within each ISO day penod upon the initial commencement of woik authorized by such permit Befoie such woik can be recommenced, a new permit shall be obtained to do so, and the fee, therefore shall be one-half the amount required for a new permit for such woik, and provided that no changes have been made or will be made in the onginal plans and specifications for such woik, and provided further tnat such suspension 01 abandonment has not exceeded one year In ordei to renew action on a peimit after expnation, the peimittee shall pay a new permit fee Any peison holding an unexpired peimit may apply for an extension of the time within which woik may commence under that permit when the permittee is unable to commence work within the time penod required by this section for good and satisfactory reasons The Building Official may extend the time for action by the peimittee for a penod not exceeding 180 days on wutten lequest by the peimittee showing that circumstances beyond the control of the permittee have prevented action from being taken No peimit sha.ll be extended more than once Please check below indicating your intentions and icturn this letter to us Project abandoned A new permit will be obtained pncr to commencing work /V, No fee extension requested for 180 days (attach a lette: of explanation) Renewal peimit lequested If the project has been completed and only a final inspection is needed, please call the inspection lequest line at (760) 602-2725 If you have any questions, please contact the Building Inspection Depaitment at (760) 602-2700 PAT KELLEY Pancipal Building Inspectoi 1635 Faraday A./e'iue * Carlsbad, CA 92008-731^- =• (760) 602-2700 » i-AX (/ 30) 602-85SO Quality Installations Since 1959 720 E Walnut Avenue © Fullerton, CA 92831-4530 © (714)578-8896 © Fax (714) 578-8899 September 9, 2003 City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008-7314 ATTN Building & Safety Department JOB Seasilver 2045 Corte Del Nogal, Carlsbad RE Building Permit Expiration 1 o Wnom ft May ('oncern Please extend the permit for additional 180 days The owner of Seasilver had some financial problems so the job was stopped The problem i«s solved and we are back on track Thank vou SmcerelyA MUNDY flLECTRIC Michael Mundy President Inspection List Permit* CB030276 Type ELEC Date Inspection Item 04/21/2003 33 04/18/2003 33 04/18/2003 39 04/17/2003 11 04/17/2003 31 04/1 1/2003 33 04/01/2003 34 03/24/2003 31 Service Change/Upgrade Service Change/Upgrade Final Electrical Ftg/Foundation/Piers Underground/Conduit-Winn Service Change/Upgrade Rough Electric Underground/Conduit-Wmn Inspector Act PD PS PS PY PY PS PD PD PA PA we AP AP CO CO PA SEASILVER UPGRADE TO 2000 AMP 480 SERVICE Comments SUBFEEDS/TRANSFORMERS OK NO METER OK TO POUR UFER NOT PE R PLAN NO PLANS FROM TRANSFORMER Tuesday May 11 2004 Page 1 of 1 City of Carlsbad Bldg Inspection Request For 04/21/2003 Permit* CB030276 Title SEASILVER Description UPGRADE TO 2000 AMP 480 SERVICE Inspector Assignment PD Type ELEC Sub Type Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks AM FOR METER RELEASE Phone 7149264768 Inspe Total Time CD Description 33 Service Change/Upgrade >A Requested By MITCH Entered By KAREN Act Comment Associated PCRs/CVs Inspection History Date Description 04/17/2003 11 Rg/Foundation/Piers 04/17/2003 31 Underground/Conduit Wiring 04/11/2003 33 Service Change/Upgrade 04/01/2003 34 Rough Electric 03/24/2003 31 Underground/Conduit Wiring Act Insp Comments AP PY OK TO POUR AP PY UFER CO PS NOT PER PLAN CO PD NO PLANS PA PD FROM TRANSFORMER City of Carlsbad Bldg Inspection Request For 04/18/2003 Permit* CB030276 Title SEASILVER Description UPGRADE TO 2000 AMP 480 SERVICE Type ELEC Sub Type Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks FINAL UFER AND 2000 AMP METER Inspector Assignment PD Phone 7149264768 Inspector Total Time CD Description 39 Final Electrical Act Comment Requested By MITCH Entered By CHRISTINE Associated PCRs/CVs Inspection History Date Description Act Insp Comments 04/11/2003 33 Service Change/Upgrade CO PS NOT PER PLAN 04/01/2003 34 Rough Electric CO PD NO PLANS 03/24/2003 31 Underground/Conduit Wiring PA PD FROM TRANSFORMER City of Carlsbad Bldg Inspection Request For 04/17/2003 Permit* CB030276 Title SEASILVER Description UPGRADE TO 2000 AMP 480 SERVICE Inspector Assignment PD Type ELEC Sub Type Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks UFER GROUND Phone 7149264768 Inspector Total Time Requested By MITCH Entered By CHRISTINE CD Description 31 Underground/Conduit-Win Comment Associated PCRs/CVs Inspection History Date Description Act Insp Comments 04/11/2003 33 Service Change/Upgrade CO PS NOT PER PLAN 04/01/2003 34 Rough Electric CO PD NO PLANS 03/24/2003 31 Underground/Conduit Wiring PA PD FROM TRANSFORMER City of Carlsbad Bldg Inspection Request For 04/11/2003 Permit# CB030276 Title SEASJLVER Description UPGRADE TO 2000 AMP 480 SERVICE Inspector Assignment PD Type ELEC Sub Type Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks Phone 7145788896 Inspector Total Time Requested By SCOTT Entered By CHRISTINE CD Description 33 Service Change/Upgrade Comment Associated PCRs/CVs inspection History Date Description Act Insp Comments 04/01/2003 34 Rough Electric CO PD NO PLANS 03/24/2003 31 Underground/Conduit Wiring PA PD FROM TRANSFORMER City of Carlsbad Bldg Inspection Request For 04/01/2003 Permit* CB030276 Inspector Assignment PD Title SEASILVER Description UPGRADE TO 2000 AMP 480 SERVICE Type ELEC Sub Type Phone 7149264768 Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location Inspector APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks AM PLEASE -NEW METER SERVICE Total Time Requested By MITCH Entered By CHRISTINE CD Description Act Comment 34 Rough Etectnc &L ^ ° P Associated PCRs/CVs Inspection History Date Description Act Insp Comments 03/24/2003 31 Underground/Conduit Wiring PA PD FROM TRANSFORMER City of Carlsbad Bldg Inspection Request For 03/24/2003 Permit* CB030276 Inspector Assignment Title SEASILVER Description UPGRADE TO 2000 AMP 480 SERVICE Type ELEC Sub Type Phone 7149264768 Job Address 2045 CORTE DEL NOGAL Suite Lot 0 Location Inspect^ APPLICANT MUNDY ELECTRIC Owner TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 Remarks AM PLEASE Total Time Requested By NA Entered By KLKAREN CD Description Act Comment 31 Underground/Conduit-Wiring Pn _p Associated PCRs/CVs Inspection History Date Description Act Insp Comments EsGii Corporation In (Partnership witA government for <BuiCdtng Safety DATE 3/18/03 a JURISDICTION City of Carlsbad Q PLAN REVIEWER Q FILE PLAN CHECK NO 03-276 SET III PROJECT ADDRESS 2045 Corte Del Nogal PROJECT NAME Seasilver - Electrical Service and Equipment XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete lecheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person The applicant's copy of the check list has been sent to Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) F ax # Mail Telephone Fax In Person REMARKS This review is limited to only the electrical alterations By Doug Moody Enclosures Esgil Corporation D GA D MB D EJ D PC 3/10/03 tmsmUdot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 <* (858)560-1468 * Fax (858) 560-1576 EsGil Corporation In Partnership with government for Quitting Safety DATE 2/28/O3 Q AEEiJ£ANT JURISDICTION City of Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO 03-276 SET II PROJECT ADDRESS 2045 Corte Del Nogal PROJECT NAME Seasilver - Electrical Service and Equipment I | The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck XI The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person XI The applicant's copy of the check list has been sent to Mundy Electric / Mitch DeYoung 720 E Walnut Ave , Fullerton, CA 92831 Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Mundy Electric / Mitch DeYoung Telephone # 714-578-8896 Date contacted 3/3/03 (by FA*-) Fax # {/}fl/)57<? Mail ^Telephone Fax •'\n Person REMARKS By Doug Moody Enclosures Esgil Corporation D GA D MB D EJ D PC 2/21/03 trnsmtldot 9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 + (858)560-1468 * Fax (858) 560-1576 City of Carlsbad O3-276 2/28/03 RECHECK PLAN CORRECTION LIST JURISDICTION City of Carlsbad PLAN CHECK NO O3-276 PROJECT ADDRESS 2045 Corte Del Nogal SET II DATE PLAN RECEIVED BY DATE RECHECK COMPLETED ESGIL CORPORATION 2/21/03 2/28/O3 REVIEWED BY Doug Moody FOREWORD (PLEASE READ) This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access This plan review is based on regulations enforced by the Building Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments The following items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law A Please make all corrections on the original tracings and submit three new sets of prints to ESGIL CORPORATION B To facilitate recheckmg, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans C The following items have not been resolved from the previous plan reviews The original correction number has been given for your reference In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections Please contact me if you have any questions regarding these items D Please indicate here if any changes have been made to the plans that are not a result of corrections from this list If there are other changes, please briefly describe them and where they are located on the plans Have changes been made not resulting from this list? Q Yes a No City of Carlsbad O3-276 2/28/O3 Please make all corrections on the original tracings, as requested in the correction list Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects) For expeditious processing, corrected sets can be submitted in one of two ways 1 Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760) 602-2700 The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments 2 Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete These corrections are in response to items not fully addressed or as the result of information provided, the text in bold print indicates the unresolved issue 6 It appears the pull and junction box PB in the new equipment room is undersized9 Please revise the plans to show the junction box to be sized per section 370-28 of the 1999 NEC The 24"x24">12" PB box is undersized for 8 3" PVC coated GRC's The minimum pull box size should be shown as 36"x36"x12" 7 Please revise the plans to show the location of the grounding of the new transformer per section 250-30 of the 1999 NEC Please revise the single line to show the location to be the cold water piping or the building steel must be used a driven ground rod may only be used if the cold water piping or building steel are not available In the case of transformers 5 and 6 the supply piping to the boiler, in the case of transformers 1, 2,3 and 4 the ufer or cold water connection for the service are available EsGil Corporation In (Partnership wttfi government for <Ruitding Safety DATE 2/1O/O3 JURISDICTION City of Carlsbad CTPLAN REVIEWER Q FILE PLAN CHECK NO 03-276 SET I PROJECT ADDRESS 2O45 Corte Del Nogal PROJECT NAME Seasilver - Electrical Service and Equipment The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck XI The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person XI The applicant's copy of the check list has been sent to Mundy Electric / Mitch DeYoung 720 E Walnut Ave , Fullerton, CA 92831 Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Mundy Electric / Mitch DeYoung Telephone # 714-578-8896 Date contacted 7I/O ^3(by ir_ ) Fax # p/M^STS S£9C> Mail ~ Telephone-^ Fax-'' In Person REMARKS By Doug Moody Enclosures Esgil Corporation D GA D MB D EJ D PC 1/30/03 trnsmtldot 9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 * (858)560-1468 4 Fax (858) 560-1576 City of Carlsbad O3-276 2/10/03 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO O3-276 OCCUPANCY Fl TYPE OF CONSTRUCTION Unknown ALLOWABLE FLOOR AREA SPRINKLERS'? Unknown REMARKS DATE PLANS RECEIVED BY JURISDICTION 1/28/03 DATE INITIAL PLAN REVIEW COMPLETED 2/10/03 JURISDICTION City of Carlsbad USE Manufacturing ACTUAL AREA Unknown STORIES 1 HEIGHT OCCUPANT LOAD Unknown DATE PLANS RECEIVED BY ESGIL CORPORATION 1/30/03 PLAN REVIEWER Doug Moody FOREWORD (PLEASE READ) This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled This plan review is based on regulations enforced by the Building Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments Clearance from Ihose departments may be required prior to the issuance of a building permit Code sections cited are based on the 1997 UBC The following items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i e. plan sheet number, specification section, etc Be sure to enclose the marked up list when you submit the revised plans TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC)tiforw dot City of Carlsbad O3-276 2/10/03 Please make all corrections on the original tracings, as requested in the correction list Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects) For expeditious processing, corrected sets can be submitted in one of two ways 1 Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760) 602-2700 The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments 2 Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 1 Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2001 edition of the California Building Code (Title 24), which adopts the 1997 UBC, 2000 UMC, 2000 UPC and the 1999 NEC 2 Please note on the plans "AC Cable is not allowed in A, B, E, H, and I occupancies NM cable is restricted (without City approval) to one and two family dwellings Note on plans that an equipment ground conductor is to be installed in all flexible conduits" 3 Please revise the plans to show the new 2000A 277/480V service to be GFCI protected and comply with all requirements of section 230-45 of the 1999 NEC 4 Please revise the panel schedule to show panel PS4 to be equipped with a mam over-current device per section 384-16 of the 1999 NEC 5 Please revise the single line diagram to show the available fault current at the service and the fault current rating of the new equipment Indicate the fault current rating of all individual panels 6 It appears the pull and junction box PB in the new equipment room is undersized^ Please revise the plans to show the junction box to be sized per section 370-28 of the 1999 NEC 7 Please revise the plans to show the location of the grounding of the new transformer per section 250-30 of the 1999 NEC 8 Please clarify the single line diagram to show the grounding of the new service 9 Please revise the plans to show the bonding of the water service City of Carlsbad 03-276 2/1O/03 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i e , plan sheet, note or detail number, calculation page, etc Please indicate here if any changes have been made to the plans that are not a result of corrections from this list If there are other changes, please briefly describe them and where they are located in the plans Have changes been made to the plans not resulting from this correction list? Please indicate Yes Q No a The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to perform the plan review for your project If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation Thank you City of Carlsbad O3-276 2/1O/O3 VALUATION AND PLAN CHECK FEE JURISDICTION City of Carlsbad PLAN CHECK NO 03-276 PREPARED BY Doug Moody DATE 2/10/03 BUILDING ADDRESS 2045 Corte Del Nogal BUILDING OCCUPANCY Fl TYPE OF CONSTRUCTION Unknown BUILDING PORTION Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code 1004 MRr RinWinn Pprmir AREA (Sq Ft) cb :PP •v Valuation Multiplier By Ordinance Reg Mod VALUE ($) 1994 UBC Plan Check Fee Type of Review D Repetitive Fee Repeats $240 00 Complete Review D Other i-n Hourly Structural Only Hours * Esgil Plan Review Fee $19200 * Based on hourly rate Comments Sheet 1 of 1 macvalue doc Quality Installations Since 1959 720 E Walnut Avenue © Fullerton, CA 92831-4530 © (714)578-8896 © Fax (714) 578-8899 April 24, 2003 TO City of Carlsbad Dept of Building & Safety ATTN Pete Dreilbelbis RE SEASILVER 2045 Corte Del Nogal Carlsbad, CA 92009 Dear Mr Dreilbelbis, This letter is to confirm that the General Electric switch-gear at the above address has been properly torqued The torque specifications were achieved by the use of a torque wrench General Electric switch boards are furnished with medium caibon steel hardware having a high tensile strength The manufacture specifications were Bolts '/4"= 8-10 LB ft '/2" = 35-40LB It 3/4v = 45-50 LB ft Breaker Lugs 70A=145LB ft 125A=145LB ft 225A = 21 LB ft 400A = 31 LB ft 500A = 31 LB ft Mundy Electric assures these tolerances were meet If we can be of further assistance please let us know Thank you MUNDY ELECTRIC Mitch Project Manager xx incorporated -Independent Testing & Engineering Services for Electrical Power Systems San Diego Area Office 9825 CARROLL CENTER RD (300) SAN DIEGO CA92126 (858) 695-9551 FAX (858) 695 0861 April 1,2003 Mundy Electric 720 E Walnut Ave Fullerton, CA 92831 Attention Mr Mitch Deyoung Subject Ground Fault System Test Report eti Reference No E004280 Dear Mr Deyoung Enclosed is a copy of the subject test report as prepared by our lead field engineer It was our pleasure to be of service to you on this project If you have any questions, or if we can be of further assistance, please do not hesitate to call Sincerely, Electro-Test, Inc Leif Hoegberg Area Manager Enclosures Independent Testing & Engineering Services for Electrical Power Systems San Diego Area Office 9825 CARROLL CENTER RD (300) SAN DIEGO CA92126 (858) 695 9551 FAX (858) 695-0861 Ground Fault System Test Report at Seasilver Carlsbad, CA for Mundy Electric 720 E Walnut Ave Fullerton, CA 92831 Attention Mr Mitch Deyoung Order No JOB 658 eti Reference No April 1, 2003 E004280 Submitted By Bill Hays Field Engineer Reviewed By Leif H Area Manager TABLE OF CONTENTS PURPOSE Page 1 SUMMARY Page 1 EQUIPMENT TESTED AND INSPECTED Page 1 PROCEDURES Page 1 RESULTS AND RECOMMENDATIONS Page 3 APPENDIX A Ground Fault System Test Data Sheet PURPOSE 1 1 Performance testing of ground fault protective equipment is conducted to verify proper installation and operation The National Electrical Code™ Section 230-95(c) requires an on site test of all ground fault systems upon initial installation In healthcare facilities, the National Electrical Code™ section 517-17 requires at least one additional level of ground fault protection to be installed This Code section also requires the additional testing of each level to ensure the ground fault system is 100% selective 2 SUMMARY 2 1 This project was initiated by Mr Mitch Deyoung with Mundy Electric All testing was performed by Electro-Test Field Engineer Bill Hays on Tuesday, April 01, 2003 2 2 The ground fault system is accepted as tested 2 3 Please refer to Section 5 "Results and Recommendations" for complete details of the testing 3 EQUIPMENT TESTED AND INSPECTED 3 1 General Electric #1787517-1/THPC3620GT Switchboard and Ground Fault System 4 PROCEDURES 4 1 Ground Fault Systems 411 Visual and Mechanical Inspection 1 Inspected for physical damage Visually inspected the components for errors in polarity or conductor routing 2 Inspected neutral mam bonding connection to assure • Proper size • Zero sequence system was grounded upstream of sensor • Ground connection was made ahead of neutral disconnect link eti Reference No E004280 < Page 1 3 Verified the grounding conductors do not pass through zero sequence sensors 4 Verified ground electrode conductor(s) for proper size and connection 5 Checked proper operation of ground fault monitor panel (if present) 6 Inspected zero sequence sensor for proper installation 7 Verified that the control power transformer has adequate capacity for the system and that a proper disconnect and overcurrent protection were provided 8 Verified that neutral sensors are connected with correct polarity on both primary and secondary 4 1 2 Electrical Tests 1 Measured the system neutral-to-ground insulation resistance with the neutral disconnect link temporarily removed Replaced the neutral disconnect link after testing 2 Measured pickup current by primary injection at sensor 3 Verified the relay did not operate at ninety percent of the pickup setting 4 Mpasured-time de'ay at tv/c pcir.ts above-pickup currem ievei by injecting current into the sensor Total trip time was electrically monitored 5 Tested system operation at fifty-five percent rated voltage for systems with external control power (Reference UL 1053) 6 Verified correct polarities on summation type systems utilizing separate phase and neutral current sensors by applying current to each phase-neutral current transformer pair eti Reference No E004280 Page 2 RESULTS AND RECOMMENDATIONS 5 1 The ground fault relay system was found correctly installed and operating properly 5 2 The neutral feeder conductors and/or distribution buses were not verified to be not grounded downstream of the neutral disconnect link Neutral grounds will tend to desensitize the ground fault system and may cause nuisance tripping The neutral feeder grounds should be verified to be cleared prior to job completion 53 In the absence of engineered settings, pickup current and time delay settings were left at minimum for service energization ETI accepts no liability for these settings It is recommended that a ground fault coordination study be performed Minimum settings for long time pick-up may result in nuisance tripping after the facility is energized eti Reference No E004280 Page 3 electro«t<?/t GROUND FAULT SYSTEM TEST REPORT Ill •SHOP ORDERSWITCHBOARD MANUFACTURER MAIN OVERCURRENT DEVICE I 1 CIRCUIT BREAKER FUSED SWITCH MODEL/CAT NO CURRENT RATING SYSTEM VOLTAGE VOLTAGE RATING GROUND FAULT SYSTEM [ I NEUTRAL GROUND STRAP ZERO SEQUENCE SENSOR/C T 2,00 <0 PICK UP RANGE 200-1IOO AS FOUND SETTING PICKUP CURRENT SETTINGS SUPPLIED BYAS LEFT SETTING PICKUPCURRENT GROUND ELECTRODE CONDUCTOR AWG I I MCM MAIN BONDING NEUT"R>!VL-GROUND LOCATION CORRECT I I INCORRECT CONTROL POWER TRANSFORMER CORRECTED BY CONTRACTOR MJ\-1 TOR/TEST PANEL OPERATION OTHER CORRECT [j INCORRECT |~1 CORRECTED TlWlE'-CuHHt'NT CALIBRATION TESTS PRIMARY CURRENT AMPERE-TURNS PERCENT PICKUP MFGR TOLERANCE REMARKS(i }-m 3FSTR/90 '1990 ETI PAfiF,^_OF_4- Quality Installations Since 1959 720 E Walnut Avenue © Fullerton, CA 92831-4530 © (714)578-8896 © Fax (714) 578-8899 January 28, 2003 CITY OF CARLSBAD To whom it may concern. Please accept this letter as authorization for Mitch De Young to obtain Permits, Business license and submit plans for Mimdy Electric Thank vou nar Michael Mundy President •.- iiiii CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT No 5907 County of On \-"X8 'before me, DATE personally appeared NAME TITLE OF OFFICER E G JANE DOE NOTARY PUBLIC personally known to me - OR - NAME(S) OF SIGNER(S) proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and ac- knowledged to me that he/she/they executed the... same. m_...his/her/their _author_ized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument WITNESS my hand and official seal SIGNATURE OF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form CAPACITY CLAIMED BY SIGNER LJ INDIVIDUAL D CORPORATE OFFICER D PARTNER(S) TITLE(S) D LIMITED D GENERAL LJ ATTORNEY-IN FACT D TRUSTEE(S) D GUARDIAN/CONSERVATOR D OTHER SIGNER IS REPRESENTING NAME OF PERSON(S) OR ENTITY(IES) DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE ©1993 NATIONAL NOTARY ASSOCIATION • 8236 Remmet Ave P 0 Box 7184 • Canoga Park CA 91309 7184 Q § C3O2 UJ O UJ Ko:Oo10sCM > UJ S y a. p5 w LU Q2 OOO Cxi «=eUJ UJ> o S^oft*DO UJ Q i -t; O 03 D uj 3 Q/0 o J f\ S! ^ 5a 1 1rT ^ vn* ^ ^ City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 02-11-2009 Plan Check Revision Permit No PCR03094 Building Inspection Request Line (760) 602-2725 Job Address 2045 CORTE DEL NOGAL CBAD Permit Type PCR Status EXPIRED Parcel No 2130610900 Lot# 0 Applied 05/09/2003 Valuation $0 00 Construction Type NEW Entered By SB Reference # Plan Approved PC # CB030276 Issued Project Title SEASILVER REV ELEC SCH Inspect Area Applicant Owner MITCH DEYOUNG TEYSSIER LEONARD&MONICA FAMILY TRUST 10-14-92 3200 HIGHLAND AVE #B4-2 720 E WALNUT 92831 NATIONAL CITY CA 91950 714-578-8896 Plan Check Revision Fee $0 00 Additional Fees $0 00 Total Fees $0 00 Total Payments To Date $0 00 Balance Due $0 00 FINAL APPROVAL Inspector Date Clearance NOTICE Please take NOTICE that approval of your project includes the Imposition" of fees dedications reservations or other exactions hereafter collectively referred to as lees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any othei required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any tees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired )( CS0302.76 PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave , Carlsbad, CA 92008 FOR OFFICE USE ONLY PLAN CHECK NO EST VAL Plan Ck Deposit Validated By, Date Address (include Bldg/Suite #)Business Name (at this address) Legal Description Lot No Subdivision Name/Number Unit No Phase No Total # of units Assessor s Parcel # ^Description of Work CONTACT PERSON (if different from applicant) Existing Use Proposed Use ~ # of Bathrooms U)/U-iivrr Name Address CD .Contractor CLAgent for Contractor Owner City .^genf for.Owtier State/Zip Telephone #Fax # Name Address City State/Zip Telephone # Name Address City State/Zip Telephone tt 5"" COWRACJOR COMPANY NAM if "^flBfTF '' "" ^" "IS "J; -*•?•-••••• —r • '•••• :S::S:: "',. :^fSg""""" (Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct alter improve demolish or repair any structure prior to its issuance also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor s License Law [Chapter 9 commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars I $500]) Name Address State License # License Class City State/Zip Telephone # City Business License # Designer Name Address State License # City State/Zip Telephone ib°- WORKERS-iCOMPENSATIONttNf i •• ^ ', . 3jT '-\. B;SI- ' ... bE* :v * Workers Compensation Declaration I hereby affirm under penalty of perjury one of the following declaiations 0 I have and will maintain a certificate of consent to self insure for workers compensation as provided by Section 3700 of the Labor Code for the performance of the work for which this permit is issued n I have and will maintain workers compensation as required by Section 3700 of the Labor Code for the performance of the work for which this permit is issued My worker s compensation insurance carrier and policy number are Insurance Company Policy No Expiration Date (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) L3 CERTIFICATE OF EXEMPTION I certify that m the performance of the work for which this permit is issued I shall not employ any person in any manner so as to become subject to the Workers Compensation Laws of California WARNING Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100 000) in addition to the cost of compensation damages as provided for in Section 3706 of the Labor code interest and attorney s fees SIGNATURE DATE 7 fTOWNER BUiLDER DECLARATION L: : Mr" ,;..ii;i ;1;T "''^""" , ;F 1 hereby affirm that I am exempt from the Contractor s License Law for the following reason l~l I as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044 Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees provided that such improvements are not intended or offered for sale If however the building or improvement is sold within one year of completion the owner builder will have the burden of proving that he did not build or improve for the purpose of sale) n I as owner of the property am exclusively contracting with licensed contractors to construct the project (Sec 7044 Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon and contracts for such projects with contractor(s) licensed pursuant to the Contractor s License Law) f~l I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and materials for construction of the proposed property improvement l~l YES C]NO 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number) 4 I plan to provide portions of the work but I have hired the following person to coordinate supervise and provide the major work (include name / address / phone number / contractors license number) 5 I will provide some of the work but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work) PROPERTY OWNER SIGNATURE DATE ^Mi>LETE f HIS sECTioj^ •::.:SL,.,:kbL ..... • ..... ' ...-^JL. ....^BBli ........... ^..... ":::'ll *V.b?T .1 ........ , ,••: Is the applicant or future building occupant required to submit a business plan acutely hazardous materials registration form or risk management and prevention program under Sections 25505 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act? D YES C] NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? l~l YES l~l NO Is the facility to be constructed within 1 000 feet of the outer boundary of a school site? l~l YES l~l NO IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(i) Civil Code) LENDER S NAME _ _ LENDER S ADDRESS !9::r APPLICANT CERTIFICATION.-, i.i-iiir^ "" "">'" "SPf"' "" ' " --•^••i^"- Jjp >••• _- I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all City ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An OSHA permit is required for excavations over 5 0" deep and demolition or construction of structures over 3 stories in height EXPIRATION Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for Mgripd of 180 days (Section 106 4 4 Uniform Building Code} V/APPLICANT s SIGNATURE "A ft.j < -» JN'S-5v\\. y—«^-— """ DATE /YELLOW Applicant PINK Finance 02/27/2004 MITCH DEYOUNG 720 E WALNUT92831 Re Application Date 05/09/2003 0 00 00 Plan Check # PCR03094 Address 2045 CORTE DEL NOGAL Expiration Date 05/08/2004 0 00 00 Permit Type PCR Description SEASILVER REV ELEC SCH You applied to have your plans checked on the date noted above To date, the related building permit has not been obtained The original plan review application will expire as no building permit has been issued Plans submitted and not retrieved from the building department prior to the plan check expiration date noted above will be destroyed The provisions of sections 304 (d) of the Uniform Building Code state "Section 304 9d) Expiration of Plan Review Applications for which no permit is issued within one year following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee " In order to provide better service, please indicate your handling choice for the plans originally submitted and return this letter to the Building Department Project Abandoned - I will pick up plans within 10 days Project Abandoned - Plans may be destroyed If you have any questions, please contact the Building Department at (760) 602-2718 Raenette Abbey Building Department •fo -^^^= . ..— EsGil Corporation In (Partnership with government for (RuiUmg Safety DATE 5/20/03 Q APPLICANT JURISDICTION City of Carlsbad a PCATfREViEWER a FILE PLAN CHECK NO 03-276 PCRO3-94 SET I PROJECT ADDRESS 2045 Corte Del Nogal PROJECT NAME Seasilver - Revision to Electrical The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewth will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck XI The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person X] The applicant's copy of the check list has been sent to Mitch DeYoung 720 E Walnut, Fullerton, CA 92831 Esgil Corporation staff did not advise the applicant that the plan check has been completed X] Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Mitch DeYoung Telephone # 714-578-8896 ^^-^ ><->' *> Date contacted 3}i>)oj> (by ^_) Frax # Mail -^Telephone Fax /' In Person REMARKS By Doug Moody Enclosures Esgil Corporation D GA D MB D EJ D PC 5/12/03 trnsmtldot 9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 <> (858)560-1468 * Fax (858) 560-1576 City of Carlsbad O3-276 PCRO3-94 5/2O/O3 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO 03-276 PCR03-94 OCCUPANCY Fl TYPE OF CONSTRUCTION VN ALLOWABLE FLOOR AREA SPRINKLERS'? YES REMARKS DATE PLANS RECEIVED BY JURISDICTION 5/9/03 DATE INITIAL PLAN REVIEW COMPLETED 5/2O/03 JURISDICTION City of Carlsbad USE Manufacturing ACTUAL AREA N/A STORIES HEIGHT OCCUPANT LOAD N/A DATE PLANS RECEIVED BY ESGIL CORPORATION 5/12/03 PLAN REVIEEWER Doug Moody FOREWORD (PLEASE READ) This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled This plan review is based on regulations enforced by the Building Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments Clearance from those departments may be required prior to the issuance of a building permit Code sections cited are based on the 1997 UBC The following items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i e . plan sheet number, specification section, etc Be sure to enclose the marked up list when you submit the revised plans TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC)tiforw dot City of Carlsbad O3- 276 PCRO3-94 -5/20/O3 Please make all corrections on the original tracings, as requested in the correction list Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects) For expeditious processing, corrected sets can be submitted in one of two ways 1 Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760) 602-2700 The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments 2 Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 1 Per conversation with Mike Peterson with the City of Carlsbad all work pertaining to the relocation of the mechanical equipment room shown on sheet E-8 must be removed from this revision and is to be included as part of the new permit for the new mechanical room 2 The resubmitted plans included a new sheet E-6 and E-7 not part of the previous scope of work Is this area to be included in the revision to this permit? If it is to be included please provide • Provide a complete equipment schedule • Provide a enlarged plans with equipment identification • Provide revised panel schedules and indicate on the plans the circuit number • Indicate on the plan the panel location of the circuits feeding the equipment • Provide complete load calculations for the new equipment • Provide listing and installation information for all equipment To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i e , plan sheet, note or detail number, calculation page, etc Please indicate here if any changes have been made to the plans that are not a result of corrections from this list If there are other changes, please briefly describe them and where they are located in the plans Have changes been made to the plans not resulting from this correction list7 Please indicate Yes a No a City of Carlsbad O3-276 PCRO3-94 5Y2O/03 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to perform the plan review for your project If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation Thank you City of Carlsbad O3-276 PCRO3-94 5/20/O3 VALUATION AND PLAN CHECK FEE JURISDICTION City of Carlsbad PLAN CHECK NO 03-276 PCRO3-94 PREPARED BY Doug Moody DATE 5/2O/03 BUILDING ADDRESS 2045 Corte Del Nogal BUILDING OCCUPANCY Fl TYPE OF CONSTRUCTION VN BUILDING PORTION Revision Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA (Sq Ft) cb Valuation Multiplier By Ordinance Reg Mod VALUE ($) 1994 UBC Building Permit Fee 1994 UBC Plan Check Fee Type of Review JZ1 Repetitive Fee\^~] Repeats * Based on hourly rate Comments $12000 Complete Review D Other m Hourly Structural Only Hour Esgil Plan Review Fee $9600 Sheet 1 of 1 macvalue doc (r0>0O ,0 ?xA r~ "D2- O O Dm O zQ O) 13m o> % -1 m < Pm Om OO o 5 D m -n /••» »*l pM • TJC-o O> TJ3 b> I [! 2 SOX^-nmTicH CH>m52c1^ S?N>j£0}>;im Q BO T] 2 33 m 55 go m m ^