HomeMy WebLinkAbout2045 CORTE DEL NOGAL; ; CB032496; Permit10-20-2003
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Electrical Permit Permit No CB032496
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Reference #
Project Title
2045 CORTE DEL NOGAL CBAD
ELEC
2130610900 Lot#
SEASILVER-INSTALL MOTOR CONTRO
& WIRING TO MOTORS
Applicant
ALPHA ELECTRIC SERVICE
14320 ISELI RD 90670
562 741-0704
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
PENDING
09/09/2003
RMA
Owner
TEYSSIER LEONARC&MONICA FAMILY TRUST 10-14-92
3200 HIGHLAND AVE #B4-2
NATIONAL CITY CA G1950
Electric Issue Fee
Single Phase per AMP
Three Phase per AMP
Three Phase 480 Per AMP
Remodel/Alteration per AMP
Remodel Fee
Temporary Service Fee
Test Meter Fee
Other Electrical Fees
Additional Fees
TOTAL PERMIT FEES
$1000
$000
$000
$000
$000
$000
$000
$000
$230 00
$000
$240 00
Total Fees $240 00 Total Payments To Date
n
0 00 Balance Due
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise exoired
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave , Carlsbad CA 92008
FOR OFFICE USE ONLY
PLAN CHECK NO Ok (P> pi *~/ tyfc
EST VAL
Plan Ck Deposit.
Validated By.
Date
. :..,
.1
Address (include Bldg/Suite #)Business Name (at this addre ss)
Legal Description Lot No Subdivision Name/Number Unit No Phase No Total # of units
Assessor s Parcel #Existing Use
O
I
Proposed Use
Description of Work SQ FT # of Stories # of Bedrooms # of Bathrooms
I CONTMTl'|RSpNi(if^iff6rent from applicant
Name Address City
[3!:";,... APPLICANjl jS,,/CQntraclpr, D Agent for Cpntractor^^ ., D Owner
State/Zip Telephone #
__ A irnrnrrtiu Ag^Tt^forvvyner
Fax#
Name!
17 PROPEJ
Name
J5-. CONTR,
Address
Address
ACTOR;:-, COMPANY NAME
City
City
State/Zip '
. ... , ^ — V. ,,„*,<
State/Zip
:"'
Telephone #
Telephone #
7 :'.:''.t
(Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct alter improve demolish or repair any structure prior to its issuance
Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom and the ba is for the alleged exemption Any violation of Section 7031 5 by
py Applicant fqr a pe/mit subjects the applicant to a civil penalty of not mor.e thapjfive t/undrgd dollars
•>*, 5tW
/ame 'rT3£}3l 1State License # 1* ' C* fc> fc?
Designer Name ^^^ , /
Address ^ '
License Class (— ID
Address
- — U H"^
City/
City
" State/Zip
City Business License #
State/Zip
*- Telephones
l£L*fc£"O
Telephone #
;6. WORKER'S COMPENSAf ION
Workers Compensation Declaration I hereby affirm under penalty of perjury one of the following declarations
D I have and will maintain a certificate of consent to self insure for workers compensation as provided by Section 3700 of the Labor Code for the performance of the work
for which this permit is issued
M, I have and will maintain workers compensation as required by Section 3700 of the labor Code for the performance of the work for which this permit is issued My
worker s compensatiorunsurance earner arid pajicy rujmber are I~O*f\ I ~7 L'ZLQ/-~O@
Insurance Company ^J^^^MCfflJlV C(it Pofccy No _5jOB-±JL!°3M— Expiration Date
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS)
D CERTIFICATE OF EXEMPTION I certify that in the performance o* the work for \hich 'iis perrr t is issued I shali rot errp'cy a", person in any t"ai"er so a« *o
become subject to the Workers Compensation Laws of California
WARNING Failure to secure workers compensation coverage Is unlawful and shall subject an employer to criminal penalties and civil fines up to one hundred thousand
dollars($100 000) Uj-afltiition to the cost obcampe/sation damages are provided for In Section 3706 of the Labor Code interest and attorne
SIGNATURE C2*»*i ^g^L DATE
I hereby affirm that I am exempt from the Contractor's License Law for the following reason
D I as owner of the property or my employees with wages as their sole compensation will d the work and the structure is not intended or offered for sale (Sec 7044
Business and Professions Code The Contractors License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or
through his own employees provided that such improvements are not intended or offered :for-sale If however the building or.improvement is sold within one year of
completion the owner builder will have the burden of proving that lie' did not buildto'r improve for the purpose.'of sale) A \ / p-iilLj f '- '"~\
D I as owner of the property am exclusively contracting withjlicensed contractors to construct the project (Sec 7044' Business and Professions Code The Contractor's
License Law does not apply to~an owner of property who builds or improves thereon and'contracts/forlsuch projects;with cqntractor(s) licensed pursuant to the Contractors
License Law) II / \ \ .... ^/ I '
D I am exempt under Section Business and Professions Code for this reason I i
1 I personally plan to provide the major labor and materials for construction of the proposed property improvement D YES D NO '
2 I (have/have not) signed an application for a building permit for the proposed work ; ' ) '
3 I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone1 number / contractors'license number)II
4 I plan to provide portions of the work but I have hired the following person to coordinate supervise and provide the major work (include name / address / phone number /
/ontractors license number)
5 I will provide some of the work but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work)
PROPERTY OWNER SIGNATURE DATE
WHITE File YELLOW Applicant PINK Finance
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave , Carlsbad CA 92008
Page 2 of 2
(CpMPLETEfHIS SECTION FOp^RES/DENTML BUILDING PERMITS ONLY ~ ~ r -1
Is the applicant or future building occupant required to submit a business plan acutely hazardous materials registration for or risk management and prevention program under
Sections 25505 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act' D YES S-1TO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district' D YES 43~NO
Is the facility to be constructed within 1 000 feet of the outer boundary of a school site? D YES O&KT~
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
]6" CONSTRUCtiOM LENDING AGENCY ' —•-- --^ • ,..-.,- v,v-,r-: ,--„----- -.___..-. --. ^ _- -_ - - - ^ ^
I hereby affirm that there is a construction lending agency for the performance of the work for which tins permit i > issued (Sec 3097(lj Civil Code)
LENDERS NAME LENDERS ADDRESS
I certify that I have read the application and state that the above information is correct and that the inform ation on the plans is accurate I agree to comply with all City
ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES JUDGEMENTS COSTS AND
EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An OSHA permit is required for excavations of 5 0 deep and demolition or construction of structures over 3 stories in height
EXPIRATION Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after
the work is commenced for a period of 180 days (Section 106 4/ Uniform Building Code)
APPLICANT S SIGNATURE ^—^tS^&L JtyTZ^'''~-> DATE
WHITE File YELLOW Applicant PINK Finance
07/08/2004
ALPHA ELECTRIC SERVICE
14320 ISELI RD90670
Re
Application Date 09/09/2003 0 00 00
Plan Check # CB032496
Address 2045 CORTE DEL NOGAL
Expiration Date 09/08/2004 0 00 00
Permit Type ELEC
Description SEASILVER-INSTALL MOTOR CONTRO
& WIRING TO MOTORS
You applied to have your plans checked on the date noted above To date, the related building
permit has not been obtained The original plan review application will expire as no building permit
has been issued
Plans submitted and not retrieved from the building department prior to the plan check expiration
date noted above will be destroyed
The provisions of sections 304 (d) of the Uniform Building Code state
"Section 304 9d) Expiration of Plan Review
Applications for which no permit is issued within one year following the date of
application shall expire by limitation, and plans and other data submitted for review
may thereafter be returned to the applicant or destroyed by the Building Official
In order to renew action on an application after expiration, the applicant shall
resubmit plans and pay a new plan review fee "
In order to provide better service, please indicate your handling choice for the plans originally
submitted and return this letter to the Building Department
Project Abandoned - I will pick up plans within 10 days
Project Abandoned - Plans may be destroyed
If you have any questions, please contact the Building Department at (760) 602-2702
Robin Nuschy
Building Department
EsGil Corporation
In Partnership witfi. government for <BmCding Safety
DATE 4/28/04 a APPLICANT
a CUJRISJ>
JURISDICTION City of Carlsbad a PLAN REVIEWER
a FILE
PLAN CHECK NO 03-276.PCR03-94 SET II
PROJECT ADDRESS 2045 Corte Del Nogal
PROJECT NAME Seasilver- Revision to Electrical
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The item transmitted herewith in the remarks below is for your information The plans are being
held at Esgil Corporation until corrected plans are submitted for recheck
I | The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
1X1 The applicant's copy of the check list has been sent to
Mitch DeYoung
720 E Walnut, Fullerton, CA 92831
Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Mitch DeYoung Telephone # 714-578-8896
Date contacted ^fifr/o^by fa*) Fax # 714-578-8899
Mail c^-Telephone Fa*-' In Person
REMARKS Per Mike Peterson with the City of Carlsbad all plan reviews for this project have
been suspended until notice from the City of Carlsbad
By Doug Moody Enclosures
Esgil Corporation
D GA D MB D EJ D PC 4/21/04 trnsmtldot
9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 4 (858)560-1468 * Fax (858) 560-1576
EsGil Corporation
In (Partnership with government for (BuiCtfing Safety
DATE 10/17/03 Q APPLICANT
(2 JURIS
JURISDICTION Carlsbad a PLAN REVIEWER
a FILE
PLAN CHECK NO O3-2496 SET II
PROJECT ADDRESS 2045 Corte Del Nogal
PROJECT NAME Installation of a new motor control center
[XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to
XI Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the pkan check has been completed
Person contacted Telephone #
Date contacted (by ) Fax #
Mail Telephone Fax In Person
REMARKS
By Morteza Beheshti Enclosures
Esgil Corporation
D GA D MB D EJ D PC 10/8 trnsmtldot
9320 Chesapeake Drive, Suite 208 ^ San Diego, California 92123 * (858)560-1468 * Fax (858) 560-1576
EsGil Corporation
In (Partnership witfc government for (Buitd~ing Safety
DATE O9/22/03 Q APPtJCANT
JURISDICTION Carlsbad a PLAN REVIEWER
a FILE
PLAN CHECK NO cb03-2496 SET I
PROJECT ADDRESS 2045 Corte Del Nogal
PROJECT NAME Installation of a new motor control center ( >^A $< L\/££-)
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
XI The applicant's copy of the check list has been sent to
James Sehsker
14320 Santa l"e apeings CA-9967fr|H32o rrseLX R.D SA^TA £c bP£>^GSr <?A 9oC-?c
Esgil Corporation staff did not advise the applicant that the plan check has been completed
IX! Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted JAMk 5 (M M) Telephone # (562) 741-0704
Date contacted 9/z3/o^> (by £._ ) Fax #
Mail'—Telephone.^ Fax In Person
REMARKS
By Morteza Beheshti Enclosures
Esgil Corporation
D GA D MB D EJ D PC 9/11 trnsmtldot
9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 * (858) 560-1468 +• Fax (858) 560-1576
Carlsbad cb03-2496
O9/22/03
GENERAL PLAN CORRECTION LIST
JURISDICTION Carlsbad PLAN CHECK NO cb03-2496
PROJECT ADDRESS 2045 Corte Del Nogal
DATE PLAN RECEIVED BY DATE REVIEW COMPLETED
ESGIL CORPORATION 9/11 O9/22/O3
REVIEWED BY Morteza Beheshti
FOREWORD (PLEASE READ)
This plan review is limited to the technical requirements contained in the Uniform-Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and di&abled access This plan review is
based on regulations enforced by the Building Department You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments
The following items listed need clarification, modification or change All items must be satisfied
before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law
• Please make all corrections on the original tracings and submit two new complete sets of
prints to ESGIL CORPORATION
• To facilitate recheckmg, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list If there are other changes, please briefly describe them and where
they are located on the plans Have changes been made not resulting from this list?
Q Yes Q No
Carlsbad cbO3-2496
09/22/O3
* ELECTRICAL PLAN REVIEW
+ 1999 NEC
1 Please provide a service load calculation for the existing load to justify the new 220, 230-
23
2 Please address the emergency egress and exit lighting issues in the remodel area NEC
700
3 Please provide a schedule for "MC3000" and match with feeder schedule for each motor
in order to properly check the feeders and over-cuirent device size(s) Also, size the
disconnects shown at each equipment on the floor pUan NEC 430-22
4 Please clarify the conduit for the "MC3000" is existing or new Plans and single line and
schedule contradict Single line indicate all is new The plan and schedule indicate
conduit is existing If new show routing of conduit and demonstrate compliance The
conduit is shown to penetrate the outside wall and re-emerge in to "an engine" room'?
Provide details for penetrating the outside wall and the engine room
Note The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to perform
the plan review for your project If you have any questions regarding these plan review
items, please contact Morteza Beheshti at Esgil Corporation Thank you
Carlsbad cbO3-2496
O9/22/03
VALUATION AND PLAN CHECK FEE
JURISDICTION Carlsbad
PREPARED BY Morteza Beheshti
PLAN CHECK NO cb03-2496
DATE 09/22/03
BUILDING ADDRESS 2045 Corte Del Nogal
BUILDING OCCUPANCY TYPE OF CONSTRUCTION
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
1QQ4 lIRr RmlHinn Pormih
AREA
(Sq Ft)
cb
-oo IT
Valuation
Multiplier
By Ordinance
Reg
Mod
VALUE ($)
-
1994 UBC Plan CheckFee
Type of Review
CD Repetitive Fee
w j Repeats
$240 00
Complete Review
D Other
r-n Hourly
Structural Only
Hours *
Esgil Plan Review Fee $19200
* Based on hourly rate
Comments ELECTRICAL PLAN REVIEW ONLY
Sheet 1 of 1
macvalue doc
A
V