Loading...
HomeMy WebLinkAbout2050 LAURIE CIR; ; CBR2019-0490; Permit(city of Carlsbad Residential Permit Print Date: 02/19/2020 Permit No: CBR2019-0490 Job Address: 2050 Laurie Cir Permit Type: BLDG-Residential Work Class: Addition Status: Closed - Finaled Parcel No: 2051521900 Lot #: . Applied: 03/05/2019 Valuation:, . $73,587.39 . Reference #: - . Issued: 05/20/2019 Occupancy Group: Construction Type: Permit Finaled: # Dwelling Units: Bathrooms: Inspector: TAlva Bedrooms: Orig. Plan Check #: . Final Plan Check #: Inspection: 2/19/2020. 12:53:37PF. Project Title: Description: WILLIS: 384 SF ADDITION /321 SF ROOFTOP DECK Applicant: Owner: BRIETTE SNOOK TRUST WILLIS FAMILY TRUST 05-02-88 2050 Laurie Cir, CARLSBAD, CA 92008 310-266-2695 BUILDING PERMIT FEE ($2000+) . . . . . $512.32 BUILDING PLAN CHECK FEE (BLDG) $361.72 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL . $43.00 GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION . $175.00 MANUAL BUILDING PLAN CHECK FEE $32.03 MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL . $52.00 PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL $80.00 5B1473 GREEN BUILDING STATE STANDARDS FEE . . $3.00 STRONG MOTION-RESIDENTIAL . . $9.57 SWPPP INSPECTION FEE TIER 1 - Medium BLDG $246.00 SWPPP PLAN REVIEW FEE TIER 1 - MEDIUM . $58.00 Total Fees: $1,572.64 Total Payments To Date: $1,572.64 Balance Due: $0.00 Please take NOTICE that approval ofyour project includes the"lmposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information -with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad, CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov DESI( Narn Addr' City: Phon Emai Architect State License: RESIDENTIAL Plan CheckitV I01'9O 4 r of BUILDING PERMIT __________ Est. Value if?/.4/1f(o. 74 Carlsbad APPLICATION PC Deposit B1 Date ____________ Job Address 2050 Lvp 0-fac Suite: APN:Z05' - 1'JOO CT/Project #: Lot U: Fire Sprinklers: yes / Air Conditioning: no BRIEF DESCRIPTION OF WORK: + 321 fktdt I' Addition/New: O' Living SF, ._. bEkSi, Patio SF0 o f _____Garage SF Is this to create an Accessory Dwelling Unit? Yes i)New Fireplace? Yes / yes how many? 0 Remodel: SF of affected area Is the area a conversion or change of use? Yes D Pool/Spa: SF Additional Gas or Electrical Features? Solar: KW, ______ Modules, Mounted: Roof! Ground, Tilt: Yes / No, RMA: Yes / No, Battery: Yes / No Panel Upgrade: Yes / No 0 Reroof: El Plumbing/Mechanical/Electrical Only: Other: PROPERTY OWNER Name: "r \jiiS Address: R) CAI LtXie Cicci\ City: ki1FQtk7I State: £2 Zip: 1,607 Phone: ft '!!! Email: nakUC, co CONTRACTOR BUSINESS Name: Address: City: State: Zip: Phone: Email: State License: Bus. License:________________ (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov B-I Page 1 of 2 Rev. 06/18 (OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one of the following declarations: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. 0 I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: Policy No. Expiration Date: O Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code, Interest and attorney's fees. CONTRACTOR SIGNATURE: DAGENT DATE: (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that! am exempt from Contractor's License Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). alri, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). O I am exempt under Section Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 Yes 0 No I (have / have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address / phone I contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): S. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): OWNER SIGNATURE: DAGENT DATE: el CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: Lender's Address: ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 Yes 0 No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes 0 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school Site? 0 Yes 0 No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5,0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at anytime after the work is commenced for a period of 180 days (Section APPLICANT SIGNATURE: —.--7i..-_ DATE: U I 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: BuiIdingcarIsbadca.gov B-I Page 2 of 2 Rev. 06/18 Permit Type: BLDG-Residential Application Date: 03/05/2019 Owner: TRUST WILLIS FAMILY TRUST 05-02-88 Work Class: Addition Issue Date: 05/20/2019 Subdivision: CARLSBAD GARDENS UNIT# 2 Status: Closed - Finaled Expiration Date: 04/13/2020 Address: 2050 Laurie Cir Carlsbad, CA 92008-2023 IVR Number: 17444 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date 1010712019 1010712019 BLDG-17 Interior 106845.2019 Partial Pass Michael Collins Reinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Shower lath only Yes 1010912019 10109/2019 BLDG-16 Insulation 107066-2019 Passed Paul York Complete Checklist Item COMMENTS Passed BLDG 'Building Deficiency No BLDG-18 Exterior 107067-2019 Passed Paul York Complete Lath/Drywall • Checklist Item COMMENTS Passed • BLDG-Building Deficiency No BLDG-24 107146-2019 Passed Paul York Complete RoughlTopout Checklist Item COMMENTS Passed BLDG-Building Deficiency • • No 1011512019 1011512019 BLDG-17 Interior 107509-2019 Partial Pass Tony Alvarado Reinspection Incomplete Lath/Drywall • . 02/1912020 0211812020 BLDG-Final. 119799.2020 Passed Tony Alvarado Complete Inspection Checklist Item COMMENTS Passed BLDG-Plumbing Final Yes BLDG-Mechanical Final • Yes BLDG-Structural Final • Yes BLDG-Electrical Final • Yes F' February 19, 2020 • Page 20f2 Permit Type: BLDG-Residential Application Date: 03/05/2019 Owner: TRUST WILLIS FAMILY TRUST 05-02-88 Work Class: Addition Issue Date: 05/20/2019 Subdivision: CARLSBAD GARDENS UNIT #2 Status: Closed - Finaled Expiration Date: 04/13/2020 Address: 2050 Laurie Cir Carlsbad, CA 92008-2023 IVR Number: 17444 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date 0811612019 0811612019 BLDG-31 101086-2019 Passed Paul York . Complete UndergroundlCond ult - Wiring Checklist Item COMMENTS Passed BLDG-Building Deficiency . . Yes 0812312019 08/2312019 BLDG-Il .101864-2019 Cancelled Paul York Reinspection Complete Foundation/Ftg!Pier . S (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency . No 08/2612019 0812612019 BLDG-11 101918-2019 Failed Paul York Reinspection Complete FoundationlFtglPier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 08127/2019 08/27/2019 BLDG-81, 102171-2019 Passed Peter Dreibelbis .. Complete Underground Combo(11,12,21,31) Checklist Item COMMENTS Passed BLDG-11 Foundation-Ftg-Piers . Yes (Rebar) BLDG-12 Steel-Bond Beam . Yes 09/09/2019 09/09/2019 BLDG-14 103487-2019 Partial Pass Paul York Reinspection Incomplete FramelSteel/Boltin . 9/Welding (Decks) Checklist Item COMMENTS . . Passed BLDG-Building Deficiency . No 09/19/2019 09/19/2019 BLDG-15 104689-2019 Passed Tony Alvarado . • Complete RooflReRoof (Patio) 10/02/2019 10/02/2019 BLDG-84 Rough 106252-2019 Partial Pass Peter Drelbelbis Reinspection Incomplete Combo(14,24,3444) . Checklist Item COMMENTS . Passed BLDG-Building Deficiency • Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout . No BLDG-34 Rough Electrical . . • Yes BLDG-44 . Yes Rough-Ducts-Dampers February 19, 2020 . Page 1 of 2 Carlsbad CBR2019-0490 March 13, 2019 lvo CITY OF CAR LSBAD SPECIAL INSPECTION AGREEMENT B-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carisbadca.gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special inspection, structural observation and construction material testing. rPVP 'roject/Permit: C2.09 Project Address:_Z0) LOfl(i e Ckc. THJS SECTION MUST BE COMPLETED BY THE PROPERTY OWN AUTHORIZED AGENT. ease check if you are Owner-Builder you checked as owner-builder you must also complete Section B of this agreement. Name: (Please print) IL.) Sj 001c rirt CMII (Last) Mailing Address: 1S /(w1 C. C)v ZC3 Phone, 3jQi&GJ?_ I am: oProperty Owner (Property Owners Agent of Record IJArchitect of Record OEngineer of Record State of California Registration Number Expiration Date: AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural observations, construction materials testing and off-site fabrication of building components, as prescribed in the statement of special inspections noted on the approved pi and, as required by the California Building Code. Date: CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor/ builder! owner-builder. Contractor's Company Name: Please check if you are Owner-Builder Name: (Please print) i\J 5flCX,k.. (First) - (MI) (t.2) Mailing Address:_ Phone: State of California Contractor's License Number: Expiration Date: I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of reporting and the distribution of the reports; and I certify that I will have a qualified person within our (the contractor's) organization to exercise such control. I will m0v1de a final renort/letter in compliance with CBC Section 1704.1.2 nrior to reauestina final inspection. Signatu — .29-J-1 8-45 Page 1 of I Rev. 08/11 EsGil A SAFEbulittompany DATE: May 8, 2019 JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490 SET: III PROJECT ADDRESS: 2050 Laurie Cir. PROJECT NAME: Addition with Roof Deck to Willis Residence U APPLICANT U JURIS. LI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. F-1 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [=1 The applicant's copy of the check list has been sent to: Briette EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Briette Telephone #: 310-266-5695 Date contacted: (b a Person Email: briette@healthyhomeco.com Mail Telephone Fax In REMARKS: 1. Scope of work increased; additional fee sheet enclosed. 2 Change made on sheet S-2, please make this change on all others By: Kat Frankowski Enclosures: EsGil 4/30/2019 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad CBR20 19-0490 May 8, 2019 [DO NOT PAY — THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490 PREPARED BY: Kat Frankowski DATE: May 8, 2019 BUILDING ADDRESS: 2050 Laurie Cir. BUILDING OCCUPANCY: BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Deck 108 20.03 2,163 Air Conditioning Fire Sprinklers TOTAL VALUE 2,163 Jurisdiction Code 1cb IBY Ordinance 1997 UBC Building Permit Fee V 1997 UBC Plan Check Fee V I I Type of Review: Complete Review Structural Only Repetitive Fee El Other El V Repeats El Hourly Hr. © * EsGil Fee I $32.03 Comments: Deck area increased from 213 Sf to 321 SF Sheet 1 of 1 ' 'I EsGil A SAFEbulittompany DATE: April 10, 2019 JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490 SET: II PROJECT ADDRESS: 2050 Laurie Cir. PROJECT NAME: Addition with Roof Deck to Willis Residence U APPLICANT U JURIS. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. liii The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Briette EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Briette Telephone #: 310-266-5695 Date contacted: (by: ) Email: briettehealthyhomeco.com Mail Telephone Fax In Person LI REMARKS: By: Kat Frankowski Enclosures: EsGil 4/2/2019 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad CBR20 19-0490 April 10, 2019 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. PLANS Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. 2. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). Will be checked on final. ROOFS/DECKS/BALCONIES 17. Wood balconies and decks that support moisture-permeable floors shall be provided with an impervious moisture barrier system under the moisture-permeable floor, with positive drainage. CBC Section 2304.12.2.5, as amended by emergency building standards. Please show moisture barrier. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required vent is located no more than 3' below the ridge). Show on the plans the area required and area provided. Section R806.2. When using a radiant barrier, California energy design affects the attic ventilation area requirement: If using the Prescriptive method for energy compliance, then the attic vent area must be at the 1/150 area: If using the Performance method, either the 150 or 300 areas may be used, as documented on the energy forms. Section RA4.2.1. Please note on plans the sizes and locations of proposed vents. Enclosed rafter spaces do not require venting if the following specific insulation design is used, per Sections R806.5/EM3.9.6: Carlsbad CBR20 19-0490 April 10, 2019 If the insulation is air-permeable and it is installed directly below the roof sheathing with rigid board or sheet insulation with a minimum R-4 value installed above the roof sheathing. (or) If the insulation is airimpermeable and it is in direct contact with the underside of the roof sheathing. (or) If two layers of insulation are installed below the roof sheathing: An air- impermeable layer in direct contact with the underside of the roof sheathing and an additional layer of air permeable insulation installed directly under the air- impermeable insulation. Please coordinate plans and sections to show how this condition will be achieved. Sections on A3.1 show R-30 insulation in roof deck, which contradicts the above. FOUNDATION REQUIREMENTS 29. Show minimum underfloor access of 16" x 24". Section R408.4. Note size of access panel on plans. PLUMBING 40. An instantaneous water heater is shown on the plans. Please include a gas pipe sizing design (isometric or pipe layout) for all gas loads. The gas pipe sizing for a tank type water heater shall be based upon a minimum 199,000 Btu gas input rating. Energy Standards 150.0(n). The gas piping as shown is undersized. Please review. MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No E3 The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kat Fran kowski at EsGil. Thank you. EsGul A SAFEbuiItCompany DATE: March 13, 2019 JURISDICTION: Carlsbad U APPLICANT U JURIS. PLAN CHECK #.: CBR2019-0490 SET: I PROJECT ADDRESS: 2050 Laurie Cir. PROJECT NAME: Addition with Roof Deck to Willis Residence The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. LII The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficienciers identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Briette LI EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Briette Telephone #: 310-266-5695 Date contacted: (by: ) Email: briette@healthyhomeco.com Mail Telephone Fax In Person LI REMARKS: By: Kat Frankowski Enclosures: EsGil :3/7/2019 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad CBR2019-0490 March 13, 2019 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK #.: CBR2019-0490 PROJECT ADDRESS: 2050 Laurie Cir. FLOOR AREA: Addition = 388 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 3/5/2019 DATE INITIAL PLAN REVIEW COMPLETED: March 13. 2019 JURISDICTION: Carlsbad STORIES: HEIGHT: DATE PLANS RECEIVED BY ESGIL CORPORATION: 3/7/2019 PLAN REVIEWER: Kat Frankowski FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2016 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2015 IRC, 2015 IBC, 2015 UPC, 2015 UMC and 2014 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed.. i.e., plan sheet number, specification section. etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBR2019-0490 March 13, 2019 [DO NOT PAY - THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490 PREPARED BY: Kat Frankowski DATE: March 13, 2019 BUILDING ADDRESS: 2050 Laurie Cir. BUILDING OCCUPANCY: BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Addition 388 74,147 Air Conditioning Fire Sprinklers TOTAL VALUE 74,147 Jurisdiction Code ICb IY Ordinance 1997 UBC Building Permit Fee 1997 UBC Plan Check Fee v I I Type of Review: El Complete Review Il Structural Only Lj E Repetitive Fee Other 1 1.Repeats El Hourly Hr. @* EsGil Fee I $312.231 Comments: Sheet 1 of 1 Carlsbad CBR2019-0490 March 13, 2019 PLANS Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. 2. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). Structural sheets are not signed. 3. Please define the addition area. Is it an ADU? Or an extra bedroom? If it is an ADU, separation must be shown between the units and a cooking appliance must be shown. I am adding corrections that will apply if this is an ADU, if it doesn't apply please disregard. Please update the plans according to use of space. 4. Please complete the Carlsbad special inspection form. GENERAL RESIDENTIAL REQUIREMENTS 5. Sleeping rooms shall have a window or exterior door for emergency escape. Section R310. Windows must have an openable area of at least 5.7 square feet, with the minimum openable width 20" and the minimum openable height 24". The bottom of the clear opening shall not exceed 44" above the floor. Do not measure to the window sill. This generally applies to windows that have a height of 3' or less. See the figure below to see the correct method of measurement. New windows in existing master bedroom do not comply. 6. Glazing in the following locations should be shown on the plans as safety glazing material in accordance with Section R308.4: a) Glazing in doors. Carlsbad CBR20 19-0490 March 13, 2019 7. Wall assemblies separating units in a duplex shall be of one-hour fire resistive construction. Provide details of the assemblies. Section R302.3. Such wall assemblies shall extend to the underside of the roof sheathing, where applicable. Exceptions: A fire-resistance rating of Y2-hour shall be permitted in buildings equipped throughout with an automatic sprinkler system installed in accordance with NFPA 13. Wall assemblies need not extend through attic spaces when the ceiling is protected by not less than %-inch Type X gypsum board and an attic draft stop constructed as specified in Section R302.12.1 is provided above and along the wall assembly separating the dwellings. The structural framing supporting the ceiling shall also be protected by not less than % -inch gypsum board or equivalent. 8. Provide a note on the plans stating: "Penetrations of fire-resistive walls, floor-ceilings and roof-ceilings shall be protected as required in CRC Section R302.4." 9. Walls and floors separating units in a duplex shall have a sound transmission class (STC) of not less than 50. Additionally, floors must have an impact insulation class (IIC) rating of not less than 50. CBC Section 1207. Show the location of and provide details of the listed wall and floor/ceiling assemblies, and indicate the listing agency and listing number for the tested ratings. EXITS, STAIRWAYS, AND RAILINGS 10. Guards (Section R312): Shall be installed along open-sided walking surfaces that are located more than 30" above the floor or grade below. Shall have a height of 4" (may be 34" along the sides of stairs). Openings between railings shall be less than 4". The triangular openings formed by the riser, tread and bottom element of a guardrail at a stair shall be less than 6". Shall be detailed to show capability to resist a concentrated load of 200 pounds in any direction along the top rail. Table R301.5. 11. Provide stairway and landing details. Section R311.7. Maximum rise is 7-3/4" and minimum run is 10", measured from the nosing projection. Where there is no nosing, the minimum run is 11". Minimum headroom is 6-8". Minimum width is 36". The greatest riser height within any flight of stairs shall not exceed the smallest by more than 3/8 inch. The greatest tread depth within any flight of stairs shall not exceed the smallest by more than 3/8 inch. Carlsbad CBR20 19-0490 March 13, 2019 12. Open risers are only permitted if the opening between treads does not permit the passage of a 4" diameter sphere. Section R311.7.5.1. 13. A nosing (between %" and 1-%") shall be provided on stairways with solid risers. Exception: No nosing is required if the tread depth is at least 11 inches. Section R311.7.5.3. 14. Handrails (Section R311.7.8): Shall be provided on at least one side of each stairway with four or more risers. Handrails and extensions shall be 34" to 38" above nosing of treads and be continuous. The handgrip portion of all handrails shall be not less than 1-% inches nor more than 2 inches in cross-sectional dimension. See Section R311.7.8.3 for alternatives. Handrails projecting from walls shall have at least 1-1/2 inches between the wall and the handrail. Ends of handrails shall be returned or shall have rounded terminations or bends. 15. Every stairway landing shall have a dimension, measured in the direction of travel, at least equal to the stairway width. If a door occurs at the landing, such dimension need not exceed 36 inches. Section R311.7.6. Exception: At the top of an interior flight of stairs, provided a door does not swing over the stairs. ROOFS/DECKSIBALCONIES 16. Enclosed framing in wood exterior balconies and decks shall be provided with openings that provide a net free cross ventilation area not less than 1/150 of the area of each separate space. CBC Section 2304.12.2.6, as amended by emergency building standards. 17. Wood balconies and decks that support moisture-permeable floors shall be provided with an impervious moisture barrier system under the moisture-permeable floor, with positive drainage. CBC Section 2304.12.2.5, as amended by emergency building standards. 18. Specify on the plans the following information for the deck/balcony surfacing materials, per Section R106.1.1: Manufacturer's name and product name/number. ICC approval number, or equal. 19. Specify on the plans the following information for the roof materials, per Section R106.1.1: Manufacturer's name and product name/number. ICC approval number, or equal. 20. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required Carlsbad CBR20 19-0490 March 13, 2019 vent is located no more than 3' below the ridge). Show on the plans the area required and area provided. Section R806.2. a) When using a radiant barrier, California energy design affects the attic ventilation area requirement: If using the Prescriptive method for energy compliance, then the attic vent area must be at the 1/150 area: If using the Performance method, either the 150 or 300 areas may be used, as documented on the energy forms. Section RA4.2.1. 21. Enclosed rafter spaces do not require venting if the following specific insulation design is used, per Sections R806.5/EM3. 9.6: If the insulation is air-permeable and it is installed directly below the roof sheathing with rigid board or sheet insulation with a minimum R-4 value installed above the roof sheathing. (or) If the insulation is air-impermeable and it is in direct contact with the underside of the roof sheathing. (or) If two layers of insulation are installed below the roof sheathing: An air-impermeable layer in direct contact with the underside of the roof sheathing and an additional layer of air permeable insulation installed directly under the air-impermeable insulation. Where eave vents are installed, insulation shall not block the free flow of air. A minimum of 1" of air space shall be provided between the insulation and the roof sheathing. To accommodate the thickness of insulation plus the required 1" clearance, member sizes may have to be increased for rafter-ceiling joists. Section R806.3. Note on the plans: "Attic ventilation openings shall be covered with corrosion-resistant metal mesh with 1/16" minimum to 1/4" maximum openings. Section R806.1. Show location of attic access with a minimum size of 22"x30", unless the maximum vertical headroom height in the attic is less than 30". Access must be provided to each separated attic area (if over 30 sq. ft.), shall be located in a hallway or other readily accessible location and 30" headroom clearance is required above the opening. Section R807.1. Show the sizes/locations of roof drains and overflows. Section R903.4. Please address drainage in the area where the stairs reach the deck, there seem to be stairs going down from the deck to the other stairs. Show a drain. FOUNDATION REQUIREMENTS Applicant to sign soil stamp at the city. Note on plans that surface water will drain away from building and show drainage pattern. The grade shall fall a minimum of 6" within the first 10 feet. Section R401.3. Foundation anchorage in Seismic Design Categories C, Do, Di and D2. In addition to the requirements of Section R403.1.6, the following requirements shall apply to wood light-frame structures in Seismic Design Categories Do, Di and 02 and wood light-frame townhouses in Seismic Design Category C. R403.1.6.1 Carlsbad CBR2019-0490 March 13, 2019 1. Plate washers conforming to Section R602.11.1, 0.229"x3"x3", shall be provided for all anchor bolts over the full length of required braced wall lines. Properly sized cut washer shall be permitted for anchor bolts in wall lines not containing braced wall panels. 29. Show minimum underfloor access of 16" x 24". Section R408.4. Is underfloor access to existing house impacted by remodel? 30. Show minimum underfloor ventilation equal to 1 sq. ft. for each 150 sq. ft. of underfloor area. One such opening shall be within 3' of each corner of the building. Section R408.1. Please show proposed vent sizes and quantities. There are also 2 different underfloor vent caics. Please coordinate. STRUCTURAL 31. Show size of spread footings on plans. 32. Please review lateral analysis. Provide lateral analysis for shear line c. Include the stairs in the later analysis. Provide a development of the loads. The dimension on sheet 15 of the calcs doesn't match the plans. 33. Provide straps for discontinuous top plates. 34. Note on plans the grade of beams. 35. Not all beams show a post to support them. 36. In calcs, address the 2x6 that are being ripped. MECHANICAL 37. Show on the plans the location, type and size (Btu's) of all heating and cooling appliances or systems. Note, ADU cannot share a mechanical system with the house. ELECTRICAL 38. Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. 39. Note on the plans that receptacle outlet locations will comply with CEC Article 210.52. Carlsbad CBR2019-0490 March 13, 2019 PLUMBING An instantaneous water heater is shown on the plans. Please include a gas pipe sizing design. (isometric or pipe layout) for all gas loads. a) The gas pipe sizing for a tank type water heater shall be based upon a minimum 199,000 Btu gas input rating. Energy Standards 150.0(n). Provide a note on the plans: The control valves in showers, tub/showers, bathtubs, and bidets must be pressure balanced or thermostatic mixing valves. CPC Sections 408, 409,410. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8 GPM, lavatories are limited to 1.2 GPM, and showerheads may not exceed 1.8 GPM of flow. CPC Sections 407, 408, 411,412. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California 5B407. RESIDENTIAL GREEN BUILDING STANDARDS Indoor water use. Show compliance with the following table, per CGC Section 4.303.1. FIXTURE FLOW RATES FIXTURE TYPE MAXIMUM FLOW RATE Water closets 1.28 gallons/flush Urinals (wall-mounted) 0.125 gallon/flush Urinals (others) 0.5 gallon/flush Showerheads 1.8 gpm @ 80 psi Lavatory faucets . 1.2 gpm @ 60 psi' Kitchen faucets 1.8 gpm @ 60 psi Metering faucets 0.25 gallons per cycle 1• Lavatory faucets shall not have a flow rate less than 0.8 gpm at 20 psi. Note on the plans that when a shower is provided with multiple shower heads, the sum of flow to all the heads shall not exceed 1.8 gpm @ 80 psi, or the shower shall be designed so that only one head is on at a time. CGC Section 4.303.1.3.2. Carlsbad CBR20 19-0490 March 13, 2019 ENERGY CONSERVATION 46. T-24 doesn't show tankless water heater, please update. 47. Include on the Title Sheet of the plans the following statement: "Compliance with the documentation requirements of the 2016 Energy Efficiency Standards is necessary for this project. Registered, signed, and dated copies of the appropriate CFIR, CF2R, and CF3R forms shall be made available at necessary intervals for Building Inspector review. Final completed forms will be available for the building owner." 48. Note or provide the following design requirements for gas water heaters installed to serve individual dwelling units: ES 150.0(n) Gas piping sizing based upon a minimum input of 200,000 btu/hr. A condensate drain installed no higher than 2" above the base of the heater that also allows for gravity drainage. The "B" vent installed in a straight position from the room containing the water heater to the roof termination. (For future possible sleeving for high efficiency heater venting.) A 120 volt receptacle accessible to the heater installed within 3'. 49. Instantaneous water heaters shall have isolation valves on both the cold and the hot water piping leaving the water heater complete with hose bibs or other fittings on each valve for flushing the water heater when the valves are closed. ES 110.3 50. All domestic hot water piping to have the following minimum insulation installed: 1/21' pipe (1/2" insulation); W pipe (1" insulation); 1" to 1-W pipe (1-W insulation). CPC 609.11 & ES 150.00) a) Additionally, the 1/2" hot water pipe to the kitchen sink, and the cold water pipe within 5' of the water heater both require 1" minimum insulation. ES 150.00) 51. Below grade hot water piping is required to be installed in a waterproof and non- crushable sleeve or casing that allows for replacement of both the piping and insulation. Residential Energy Lighting Requirements: ES 150.0(k) 52. All installed luminaires shall be high-efficacy in accordance with ES TABLE 150.0-A. Light sources that are not marked "JA8-2016-E" shall not be installed in enclosed luminaires. ES 150.0(k) 53. In bathrooms, garages, laundry rooms, and utility rooms at least one luminaire shall be controlled by a vacancy sensor. 54. Dimmers or vacancy sensors shall control all LED style luminaires. Two exceptions: Fixtures installed in hallways or (closets under 70 square feet). 55. Recessed can light fixtures shall be IC listed, air-tight labeled, and not be equipped with a standard medium base screw shell lamp holder. ES 150.0(k) 56. SF0 outdoor lighting fixtures that are attached to a building are required to be high efficacy, be manually on/off switch controlled, and have both motion sensor and Carlsbad CBR2019-0490 March 13, 2019 photocell control. See ES 150.0(k) 3 for additional control options. Residential ventilation requirements: ES 150.0(o)/ASHRAE 62.2 Kitchens require exhaust fans with a minimum 100 cfm ducted to the exterior. Detail compliance by including a complying exhaust fan or a ducted range hood to the exterior. Bathrooms require exhaust fans (minimum 50 cfm) to be ducted to the exterior. A bathroom is defined "as a room with a bathtub, shower, or spa or some similar source of moisture" Residential bathroom exhaust fans shall be energy star rated and shall be control by a humidistat capable of an adjustment between 50 and 80% humidity. CalGreen 4.506.1. Exception: Control by a humidistat is not required if the bathroom exhaust fan is also the dwelling whole house ventilation. MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No U 62. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kat Frankowski at EsGil. Thank you. SPECIAL INSPECTION AGREEMENT B-45 4 110*30> CITY OF CARLSBAD Dewelonment Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Carlsbad CBR20 19-0490 March 13, 2019 In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special Inspection, structural observation and construction material testing. 'roject/Permit: Project Address:________________________________________ THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNERIAUTHORIZED AGENT. Please check if you are Owner-Builder 0. (if you checked as owner-builder you must also complete Section B of this agreement.) Name: (Please (Plist) (MI.) (Last) Mailing Address: Email: Phone:________________________ lam: OProperty Owner OProperty Owners Agent of Record DArchitect of Record DEngineer of Record State of California Registration Number Expiration Date:__________________ AGREEMENT: I, the undersigned1 declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections1 structural observations, construction materials testing and off-site fabrication of building components, as prescribed in the statement of special inspections noted on the approved plans and, as required by the California Building Code. Signature Date: CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the ,contractor / builder / owner-builder. Contractor's Company Name: Please check if you are Owner-Builder 0 Name: (Please print) (First) (Last) Mailing Address: Email: Phone: State of California Contractor's License Number: Expiration Date: I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of reporting and the 'distribution of the reports; and I certify that I will have a qualified person within our (the contractor's) organization to exercise such control. I will provide a final report/letter in compliance with CBC Section 1704.1.2 prior to requesting final inspection. Signature: Date: B-45 Page 1 of 1 Rev. 08/11 STORM WATER COMPLIANCE FORM TIER I CONSTRUCTION SWPPP J!UL iLq, BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials BMPs Control BMPs Management BMPs Pollution Control BMPs C C g . - - — co 00 - Im .t 0 a) Best Management Practice* 3:C- .W . LU (BMP) Description - - . . — Im - g . . . >, 0 0 a a) i..- E o -0 u, .r° o 0 0. U . a, C 0' 00 5q, D 4-0 — C C NC CC W 0 0 _ LU .2 Cl) = Cl) a) C/) .0 C.) L ( - 0 Cl)> 0 Cl) 00 — I— Cl) O — C/) .E ...' 0 U) CX 0 ._ Q a a 0 0 0 0 aj .! > C.) a .,... Cl) 0 0 Cl) 0. 0 U) C.) 0 0 U) 0 0 0 0 0 CASQA Designation -3 N Go rn .- in to I— cc — c'.i r' F- Co T 04 ? 1 L? T T JJJJJJJJLIJJJLIJLL J C3CJ Construction Activity LU LU LU LU Cl) Cl) Cl) Cl) Cl) Cl) C/) C/) . Grading/Soil Disturbance - — - - — - - — - - - - — - - - - — - — — - - - — — — Trenching/Excavation - Stockpiling - — -- - - — - - - - — - - - - - - - — — - Drilling/Boring - - -— — — - - — — - - - - - - - - - - - Concrete/Asphalt Sawcutting - - - — - - - — - - - - - - - — — - - - Concrete Ratwork — - --- — - - - - - - - - - - - — — - -;7- - .J Paving — - --- - - - — — - - - - - - - - - - Z - - Conduit/Pipe Installation - — --- --- - - - - - - — - - — - - - — — - ( Stucco/Mortar Work - - --- - - - — - - - - - - - - - - - Waste Disposal — - --- - - - — - - - - — - - — — - - - — - Staging/Lay Down Area - - - — - - - - — - - - - - - - — - - - --- - - - - - - - - — - - - - - - — - - Substance Use/Storage _Hazardous - Dewatering Equipment Maintenance and Fueling--- - — - - - - - - - — - - - - - - - - Site Access Across Dirt --- - Other (list): --- - - - — - - - - — - - — — - - - — - - STORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SA11SFAC110N OF THE CITY INSPECTOR AFTER EACH RUN—OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDI110NAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE PROTEC11VE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT (407.). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTEC110N BEST MANAGEMENT PRAC110E MEASURES MUST BE INSTALLED AND MAINTAINED. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER THIS PLAN DURING OR BEFORE CONSTRUC110N AS NEEDED TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY REGULATIONS. Instructions: Check the box to the left of all applicable constructon activity (first column) expected to occur during construction. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. OWNER'S CERTIFICATE: I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES, COMPLY NTH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. p\ \4 r- OWNER(S)/OWNER'S AGENT NAME (PRINT) OWNER'S AGENT NAME (SIGNATURE) DATE PROJECT INFORMATION Site Address: _2OO \ocUc I e Assessor's Parcel Number: Emergency Contact: Name: 24 Hour Phone: 36o - 5\ 1 Construction Threat to Storm Water Quality (Check Box) 'MEDIUM 0 LOW Page 1 of 1 REV 11/17 hty of PERMIT REPORT Carlsbad Print Date: 03/03/2020 Permit No: PREV2019-0113 2050 Laurie Cir BLDG-Permit Revision 2051521900 $ 0.00 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: Description: Work Class: Residential Permit Revisi Status: Closed - Finaled Lot #: Applied: 06/13/2019 Reference #: Issued: 07/03/2019 Construction Type : PermitFinal 02/19/2020 Close Out: Bathrooms: Inspector: Orig. Plan Check #: Final Plan Check if: inspection' WILLIS: MOVED UNDERFLOOR ACCESS/ REMOVED VENTS// UPDATED FOUNDATION AND STRUCTURAL PLANS Applicant: Owner: BRIETTE SNOOK TRUST WILLIS FAMILY TRUST 05-02-88 2050 Laurie Cir CARLSBAD, CA 92008 310-266-2695 FEE AMOUNT BUILDING PLAN CHECK REVISION ADMIN FEE $35.00 MANUAL BUILDING PLAN CHECK FEE $112.50 Total Fees: $ 147.50 Total Payments To Date : $ 147.50 Balance Due: $0.00 Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov Page 1 of 1 PLAN CHECK REVISION OR Development Services (Citv ty of DEFERRED SUBMITTAL Building Division Carlsbad APPLICATION 1635 Faraday Avenue 760-602-2719 B-15 www.carlsbadca.gov Original Plan Check Number L7 P CZO 1.jq(') Plan Revision Number ~91V-Zolq— 0/13 Project Address Lome C44 General Scope of Revision/Deferred Submittal:CW -i),&OPt i'v 6&06 kw IV 7 cV qcaOLc' L U CONTACT INFORMATlN: Name Elf Alp 5ncthI Phone 2' STh Fax Address_?9.75 64 A of City Zip 2c23 Email Address Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1. Elements revised: NPians iJ Calculations LJ Soils E Energy E Other 2. Describe revisions in detail 3. List page(s) where each revision is shown Mani- ~N" bmc crz; A5L1,1cL1 1 tiovf) yeS NJ,AIZ ()çv1o2k ?tcj1Uv' ci 9e'nc gkA itu s dohh 52-F 97 LI Does this revision, in any way, alter the exterior of the project? L1 Yes s/No Does this revision add ANY new floor area(s)? E1 Yes "No. Does this revision affect any fire related issues? E Yes jj' No Is this a complete set? El Yes Signature_.7 T2-- Date 6 [ [1 1635 Faraday Avenue, Carlsbad, CA 92008 j: 760-602- 2719 E: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadcagov EsGil A SAFEbuI1t Company DATE: June 28, 2019 • APPLICANT JURIS. JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490.rev (PREV2019-01 13) SET: I PROJECT ADDRESS: 2050 Laurie Cir. PROJECT NAME: Addition with Roof Deck to Willis Residence - Revision, Foundation The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list andshould be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Briette EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Briette Telephone #: 310-266-5695 Date contacted: (by: ) Email: briettehealthyhomeco.com Mail Telephone Fax In Person LI REMARKS: By: Kat Frankowski Enclosures: EsGil 6/17/2019 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 I ' Carlsbad CBR2019-0490.rev (PREV2019-01 13) June 28, 2019 [DO NOT PAY— THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBR2019-0490.rev (PREV2019-01 13) PREPARED BY: Kat Frankowski DATE: June 28, 2019 BUILDING ADDRESS: 2050 Laurie Cir. BUILDING OCCUPANCY: BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) 74,147 Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code I I #N/A 1997 UBC Building Permit Fee V 1997 UBC Plan Check Fee v Type of Review: El Complete Review Repetitive Fee El Other Repeats Hourly EsGil Fee * Based on hourly rate fl Structural Only I Hr.©* $90.00 I $90.00 Comments: Fee for revision. Sheet 1 of 1