Loading...
HomeMy WebLinkAbout2051 PALOMAR AIRPORT RD; 250; CB070121; PermitCity of Carlsbad - 1635 Faraday Av Carlsbad, CA 92008 S 02-152007 . Commercial/Industrial Permit Permit No: CB070121 Building Inspection Request Line (760) 602-2725 Job Address: 2051 PALOMAR AIRPORT RD,CBAD Permit Type: TI - . -'Sub Type: INDUST" - Parcel No: 2130503900 Lot #: 0 Status: ISSUED Valuation: $662,788.00 Construction Type: VN Applied: 01/16/2007 Occupancy Group: Reference #: Entered By: JMA Project Title: SPEC SUITE: 23956 SF OFFICE TO Plan Approved: 02/15/2007 OFFICE . Issued: • 02/15/2007 Inspect Area: Plan Check#: Applicant: . -Owner: ANDREW TARANGOM SMITH CONSULT. JCCE-PALOMAR L'LC 12220 EL CAMINO REAL C/O JAMES COXETER 23554 OLD 44 DR / ç MILLVILLE CA, 96062) 8587934777 el / .- ' Building Permit / . $2,203.99 Meter Size N \. Add'I Building Permit Fee / '-. / $0.00?, Add'I Recl. Water Con. Fee,,,' -, $0.00 Plan Check ' .- // $1432.59 /'Meter Fee \ C ,- $0.00 Add'I Plan Check Fee/ $0.00 •'SDCWA Fee '--f . $0.00 Plan Check Discount .,. J $0.00 CFD Payoff Fee - \ $0.00 Strong Motion Fee - $139.19. -PFF(3105540)'>2,/ \ / $0.00 Park Fee "- . , 1 $0.00<PFF-(43O5540) r ' [/ - $0.00 LFM Fee ,- '&$0 00 License Tax (3104193) $0.00 Bridge Fee , $0.00 License Tax (4304193) .f . t ) ; $0.00 BTD #2 Fee 'I $0.00 ,Traffic Impact Fee (3105541) / $0.00 BTD#3 Fee . J'$0.00., Tràfficimpact Fe&(4305541) $0.00. Renewal Fee . / $0.00 -' PLUMBING TOTAL\'5 - I $48.00 Add'I Renewal Fee ' , k $0.00 ELECTRICAL TOTAL. / / $110.00 Other Building Fee . . $0.00. ''MECHANICAL TOTAL / 1 . $24.00' Pot. Water Con. Fee '. ""-. $0.00\ 'Master Drainage Fee" / / $0.00 Meter Size ' /' ' Sewer Fee ' - " / $0.00 Add'I Pot. Water Con. Fe ' / $0.00 Redev Parking Fee /. $0.00 Red. Water Con. Fee \ K $0.00,cc:Additional.Fees /5 . I $0.00 HMF Fee , \it ,— / ?? TOTAL PERMIT FEES\\ / $3,957.77 Total Fees $3,957.77 Total Payments To Date $3,957.77 Balance Due $0.00 5--,- - UDING PLANS IN TOpE Y I I FINAL APPROVAL Inspector: V\\ Date: 4I ( I i Clearance: - NOTICE: Please takeNOTICE that aproval of your project includes the "lmpjtion ofees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, "-.. review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY 10 any PERMIT APPLICATION 0 • ' CITY OF CARLSBAD BUILDING DEPARTMENT • 1635 Faraday Ave., Carlsbad, CA 92008 I' FOR OFFICE USE ONLY - • PLAN CHECK NO.C30-70 (21 EST. VAL. _______ Plan Ck. Deposit - / s/ Validated By rZ R0CTN FOR MATlON. -:- J I I ) - Binss4çme (at this address( Name Address • City State/Zip Telephone # Fax # (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for aRermit subjects the applicant to a civil penalty of not more than five hundred doltars IS5001). Name j Address - T State Liceiise # ?) 7rfØ License Class City Business License # Designer NamVP!%L., • State Licse hpne P' .M IddressIVO l' C/tl fl* , Statep Telep W 1 06010- OES, ON Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to s'elf-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance.. of the work for which this permit is issued. I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is ' issued. My worker's compensation insurance carrier and policy number are: Insurance Company ç47 /:;',jo Policy No. ,)QO?3,$ - Expiration Date J41116 (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$1001 OR LESS) CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code. Interest and attorney's fees. SIGNATURE DATE. DATE a7/J7 -=---==----..... 0 •• I hereby affirm that I am exempt from the Contractor's License Law for the following reason: C3 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds br improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). - C] I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 I am exempt under Section Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO I (have / have not) signed an application for a building permit for the proposed work. - I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address I phon'é number / contractors license number): I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address I phone number / type of work): - - PROPERTY OWNER SIGNATURE DATE LY. 11-771 Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO ' Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE•'', REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I8jCONSTRUCTIONENDINGAGEV.I ..- i.. ________ • ..... .. I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code). - LENDER'S NAME - , ' LENDER'S ADDRESS 0 - - jAPPLICANTCERTWICATION . I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.' I hereby authorize representatives of the Cit, of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. ' EXPIRATION: Every permit is by the building Official under the provisions of his Code shall expire by limitation and become null and void if the building or work authorized by such permit is n Co menced within 180 y from the date of s permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is c a perio ys (ection 6.4.4 Uniform Building Code). DATE 01 _JW _. I I - VV V • - • WHITE: Fil ELLOW: Applicant PINK: Finance City of Carlsbad Bldg Inspection Request i Pj For: 04/05/2007 L Permit# CB070121 Inspector Assignment: RB Title: SPEC SUITE: 23956 SF OFFICE TO Description: OFFICE Type: TI Sub Type: INDUST Phone: 7604588577 Job Address: 2051 PALOMAR AIRPORT RD Suite: 200 Lot 0 1 Location: - Inspector: OWNER JCCE-PALOMAR L L C '- ( Owner: JCCE-PALOMAR L L C Remarks: Total Time: Requested By: ED Entered By: CHRISTINE CD Description 19 Final Structural 29 FinalPlumbing 39 Final Electrical 49 Final Mechanical Act Comment Comments/Notices/Holds Associated PCRs/CVs Original PC# Inspection History Date Description Act lnsp Comments 04/04/2007 89 Final Combo CO RB SEE NOTICE ATTACHED 03/05/2007 84 Rough Combo AP RB T-BAR SYSTEM 03/01/2007 17 Interior Lath/Drywall AP RB 03/01/2007 24 Rough/Topout AP RB 02/26/2007 84 Rough Combo CO RB SEE NOTICE ATTACHED 02/23/2007 17 Interior Lath/Drywall AP TP SUITE 250 N/INCL INT. CONF. RM 02/23/2007 24 Rough/Topout NR TP 02/21/2007 14 Frame/Steel/Bolting/Welding AP RB @ WALLS & HARD LIDS 02/21/2007 17 Interior Lath/Drywall WC RB 02/21/2007 21 Underground/Under Floor WC RB 02/21/2007 24 Rough/Topout CO RB SEE NOTICE ATTACHED 02/20/2007 14 Frame/Steel/Bolting/Welding AP RB WALLS ONLY 02/20/2007 24 Rough/Topout NR RB EsGil Corporation In Partners/lip with government for (Bui&hing Safety DATE: 2/15/07 U4DPLICANT 1JRIS. JURISDICTION: City of Carlsbad U PLAN REVIEWER LI FILE PLAN CHECK NO.: 07-121 - SET: III PROJECT ADDRESS: 2051 Palomar Airport Rd PROJECT NAME: Palomar Center - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. Lii The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencie identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. LI The check list transmitted herewith is for your information'. Jhe plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person LII REMARKS: By: Doug Moody Enclosures: Esgil Corporation LI GA LI MB LI EJ LI PC 2/13/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 EsGil Corporation In (Partnership with Government for iBui&ing Safety DATE: 2/13/07 LI APLICANT RIS. JURISDICTION: City of Carlsbad . /ti PLAN REVIEWER LI FILE PLAN CHECK NO.: 07-121 SET: II PROJECT ADDRESS: 2051 Palomar Airport Rd PROJECT NAME: Palomar Center - TI El The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your informatiOn. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Smith Consulting Architects I Andrew Tarango 12220 El Camino Real Suite 200, San Diego, CA 92130 LI Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted f\nrewTarango Telephone #: 858-793-4777 Date contacted: (by: 'V) Fax #: 858-793-4787 Mail ._'Ilephone Fax--"'In Person LII REMARKS: By: Doug Moody Enclosures: Esgil Corporation El GA LIMB LIEJ [1 PC 2/8/07 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 City of Carlsbad 07-121 2/ 13/07 RECHECK PLAN CORRECTION LIST JURISDICTION: City of Carlsbad PLAN CHECK NO.: 07-121 PROJECT ADDRESS: 2051 Palomar Airport Rd SET: II DATE PLAN RECEIVED BY DATE RECHECK COMPLETED: ESGIL CORPORATION: 2/8/07 2/13/07 REVIEWED BY: Doug Moo FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. Please make all corrections on the original tracings and submit two new complete sets of prints to: See below. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? DYes E3No City of Carlsbad 07-121 '2/l3/07 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. These corrections are in response to items not fully addressed or as the result of information provided, the text in bold print indicates the unresolved issue. 6. Please provide evidence the controlled access hardware is an approved component of the egress system or indicate it to be under a separate permit. No information provided. 15. Show that passageways leading to sanitary facilities have required clear access widths, per Section 111 5B.4. Show that all doorways have: The restrooms are still shown as non- compliant. a) All strike edge clearance dimensions are required to be met (i.e. 18" strike edge distance). To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes El No U The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In(Partnership with Government for tBuirding Safety DATE: 1/26/07 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 07-121 SET:I PROJECT ADDRESS: 2051 Palomar Airport Rd PROJECT NAME: Palomar Center - TI U APPLICANT JURI U PLAN REVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. LI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Smith Consulting Architects I Andrew Tarango 12220 El Camino Real Suite 200, San Diego, CA 92130 LI Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: ndrew Tarango Telephone #: 858-793-4777 Date contacted: Fax #: 858-793-4787 Mail Telephone Fax In Person LII REMARKS: By: Doug Moody Enclosures: Esgil Corporation E:1 GA EMB EEJ [:1 PC 1/18/07 tmsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 07-121 1/26/07 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 07-121 OCCUPANCY: B TYPE OF CONSTRUCTION: VN ALLOWABLE FLOOR AREA: SPRINKLERS?: YES DATE PLANS RECEIVED BY JURISDICTION: 1/16/07 DATE INITIAL PLAN REVIEW COMPLETED: 1/26/07 JURISDICTION: City of Carlsbad USE: Office ACTUAL AREA: 23956sf STORIES: 2 HEIGHT: OCCUPANT LOAD: 260 DATE PLANS RECEIVED BY ESGIL CORPORATION: 1/18/07 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2001 CBC, which adopts the 1997 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot V City of Carlsbad 07-121 1/26/07 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 2. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.4 a) Fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. 3. Please clarify the section view of all new interior partitions. Show: Type, size and spacing of studs. Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approved". Method of attaching top plates to structure. C) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 4. If exit signs are required, provide the following notes on the plans, per Section 1003.2.8.2: Exit signs shall be located as necessary to clearly indicate the direction of egress travel. No point shall be more than 100 feet from the nearest visible sign. Exit signs shall be readily visible from any direction of approach. 5. Please revise the door schedule to show doors 203 -207 to be equipped with a latch for the rated assemblies per section 713.6.3 of the UBC. 6. Please provide evidence the controlled access hardware is an approved component of the egress system or indicate it to be under a separate permit. City of Carlsbad 07-121 1/26/07 7. It is unclear if the lighting system is to be altered, if so please provide complete plans. Please provide the required energy compliance forms. The LTG-1-C forms shall be signed and imprinted on the plans. 8. Please revise the plans to show the required emergency egress lighting per section 1003.2.9 of the UBC. 9. On the mechanical plans clearly show the limits of ceiling space used as duct or plenum. Clearly show that all material exposed within the plenum complies with UMC Section 604.2. "Materials shall have a mold-, humidity-, and erosion-resistant face that meets the requirements of UL 181." Combustibles within the plenum space must comply with UMC Section 601.3. Flame-spread index of not more than 25 and a smoke-developed rating of not more than 50. 10. Please note on the plans the water closets shall be elongated type, with open front seats and shall use no more than 1.6 gallons per flush. UPC 11. Please correct the waste line plans to show the drain for the water closets to be a minimum of a 3" and the vent for the water closets to be a minimum of a 2'. 12. When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per Section 113413.2. These requirements apply as follows: A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 13. Show on the site plan the complying disabled accessible path of travel from the disabled accessible parking spaces to the primary entrance of the tenant space. Please provide detailed plans of the path of travel, indicate slope and width,, any pedestrian ramps, curb ramps, walks, handrails, provide dimensioned parking stall details etc. 14. It appears the restrooms are not disabled compliant. Please provide fully dimensioned plans (sheet A3) for the restrooms. 15. Show that passageways leading to sanitary facilities have required clear access widths, per Section 111 5B.4. Show that all doorways have: a) All strike edge clearance dimensions are required to be met (i.e. 18" strike edge distance). City of Carlsbad 07-121 1/26/07 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: YesU No El The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 07-121 1/26/07 VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 07-121 PREPARED BY: Doug Moody DATE: 1/26/07 BUILDING ADDRESS: 2051 Palomar Airport Rd BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VN BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) TI 23956 34.37 823,368 Air Conditioning Fire Sprinklers TOTAL VALUE 823,368 Jurisdiction Code Icb IBY Ordinance Bldg. Permit Fee by Ordinance $2,624.20 I ri I $1,705.731 Plan Check Fee by Ordinance Type of Review: 21 Complete Review E Structural Only Repetitive Fee LI Other LI Repeats Hourly Hour * Esgil Plan Review Fee I $1,469.551 Comments: Sheet 1 of 1 macvalue.doc PLANNING/ENGINEERING APPROVALS PERMIT NUMBER C3 07 O 21 DATE _1 1 19 107 ADDRESS 2051 PabmR Iccôr4 Rd RESIDENTIAL (cNcMPROVEII) RESIDENTIAL ADDITION MINOR PLAZA CAMINO REAL (<$109000.00) CARLSBAD COMPANY STORES POOL 1 SPA VILLAGE FAIRE RETAINING WALL COMPLETE OFFICE BUILDING OTHER PLANNER m DATE 1—t —O7 ENGINEE7j4A,l9,. 'DATE fi7c7 5' BLDG. DEPT COPY Carlsbad Fire Department. Plan Review Requirements Category. TI , II'JDUST Date of Report: 02-15-2007 Name: Address: Reviewed by: Permit #:CB070121 Job Name: SPEC SUITE: 23956 SF OFFICE TO Job Address: 2051 PALOMAR AIRPORT RD CBAD adequately conduct a review to determine compliance with the carefully all comments attacheLd. Please . At this time, this office cannot o e eview or specifications, with changes 'c ouded", Conditions: Cond: C0N0001869 [NOT MET] Show full rated envelope of corridor 202b on all sheets. Show exiting paths of travel on sheet AX to show which exits are covering what areas. Doors 2-201 and 207 conflict. Doors 207 & 205 not shown on sheets AX1, AF1, M01 etc. Entry: 02/08/2007 By: MS Action: CO Cond: C0N0001890 [MET-]'€onditions ñ-iet itiy02/15/2007 By-: MS Action-AP, BLDG. DEPT COPY Carlsbad Fire Department Plan Review Requirements Category: TI , INDUST Date of Report: 02-08-2007 Name: Address: Reviewed by: Permit #: CB070121 Job Name: SPEC SUITE: 23956 SF OFFICE TO Job Address: 2051 PALOMAR AIRPORT RD CBAD INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Cond: CON000 1869 [NOT METI Show full rated envelope of corridor 202b on all sheets. Show exiting paths of travel on sheet AX to show which exits are covering what areas. Doors 2-201 and 207 conflict. Doors 207 & 205 not shown on sheets AX I, AF I, MO etc. Entry: 02/08/2007 By: MS Action: CO Sm t'hConsu tingArchitects ARCHITECT'S FIELD BULLETIN NO. I continued DESCRIPTION: Refer to attached Field Drawings I and lb for additional information. K:06 Projects106273. T - JCCE-2051 PAR T!lCAD103-CDFieId Drawings06273. T-fldb0l-021607.doc 2220 El Camino Real Suite 200 San Diego, CA 92130 858.793.4777 858.7934787 Fax SmithConsult ngArch-lte'cts ARCHITECT'S FIELD BULLETIN DISTRIBUTION OWNER N CONTRACTOR N ARCHITECT N FIELD N CONSULTANTS El OTHER 0 Field Bulletin #: I Owner: JCCE Palomar Contractor: Good and Roberts Issued By: Andrew Tarango This Bulletin directs you to proceed as indicated: Date: 2116/07 Project No: 06273.T Project: Palomar Centre 2051 Palomar Airport Road CHANGE AUTHORIZATION: N Detail modification per field inspector In order to expedite the work and avoid or minimize delays in the work which may affect Contract Sum or Contract Time, the Contract Documents are hereby amended as described below. Proceed with this work promptly and submit final costs for Work involved and change in Contract Time (if any), for inclusion in a subsequent Change Order. CLARIFICATION NOTICE: El Execute promptly the instructions given herein, which interpret the Contract Documents or order minor changes in the work without change in Contract Sum or Contract Time. Indicate your acceptance of these instructions as consistent with the Contract Documents and return a signed copy to the architect. If you consider that a change in Contract Sum or Contract Time is required, submit an itemized proposal to the architect immediately and before proceeding with this work. If your proposal is found to be satisfactory and in proper order, this Bulletin will be superseded by a Change Order. REQUEST FOR PROPOSAL: El Changes described herein are being considered for incorporation into the work. Submit an itemized quotation, in format required by the Contract Documents, indicating your proposed changes to the Contract Sum or Contract Time. Do not proceed with the changes described herein until further written instructions are issued by the Architect 12220 El Camino Real Suite 200 San Diego, CA 92130 858.793.4777 85&793.4787 Fax LNE F-5e METAL STUD BRACES AT 4-0 O.C. STACGERED ATTACHED TO STRUCTURE .4E.'OVE METAL CEILING JOISTS AT I O.C. WI TYPE X GYP. BD. 5011-I SIDES SUSPENDED ACOUSTICAL CEILING (WHERE OCCURS) Na' TYPE 'X 'GYP. SD. SOIl-I SIDES BOTTOM TRACK 1. lIft WMMIL)UM DL I Al I 0. li::; Tenant Improvement Plans for: SmithConsultingArchitects FB 1 P A L 0 M A R CENTRE CA "IV S. Okvx Sheet Modified 2051 Palomar Airport (S5)73.777 - CM 793-4787 1. A Dl Carlsbad, California 92009 Field Drawing No. DeydoMertt PalomarLLC la Date 2 /16/07 METAL VERTICAL COMF'RE55ION STRUTS PER HEIGHT REQUIRED IN NOTES (FASTEN TOGETHER w/ I/2 SELF-TAPPING SCREWS 6 I2 O.C.) WALL ANGLE TWO OPPOSITE SPLAY WIRES '.N PLANE OF MAIN TEES HANGER WIRES 6 48 O.C. (MAX) ALONG MAIN TEES (ALL WIRES TO BE No. 12 GA. WIRES) TWO OPPOSITE SPLAY WIRES IN PLANE OF CROSS TEES- 1/5" FURRING CHANNELS 24' O.C. MAX. TIED wl (I) No. ls or (2) No. IS GA. WIRE PER USC SECTION 2504.4. \— 1-1/2" 16 GA. C.R. CHANNEL Q 4-0" O.C. SUSPENDED GYPSUM BOARD CEILING NOTES: I. BRACE SUSPENDED CEILING LATERALLY AS FOLLOWS: -HORIZ. RESTRAINT SHALL BE EFFECTED BY 4- No. 12 WIRES SECURED TO THE MAIN RUNNER INTERSECTION 4 SPLAYED 4E' DEG. FROM THE PLANE OF THE CEILING. THESE I-IORIZ. RESTRAINT PTS SHALL BE PLACED 12'-0' O.C. IN BOTH DIRECTIONS WITH THE FIRST POINT WITHIN 4'-0 FROM EACH WALL. PROVIDE COMPRESSION STRUTS TO THE STRUCTURAL MEMBERS SUPPORTING THE ROOF OR FLOOR ASOvE AT I2'-0 O.C. IN BOTH DIRECTIONS WITH THE FIRST POINT WITHIN '-0' FROM EACH WALL. PLACE STRUT WITHIN 2 OF THE FOUR SPLAYED WIRES. ATTACH TOP AND BOTTOM WITH 2 /2' SELF-TAPPING SCREWS -STRUT SIZES: LESS THAN 4-0' (I) MTL. STUD W/ 1/8' FLANGES x 25 GA. LESS THAN 5-0" (I) MTL. STUD 1-5/8" FLANGES AND 1/2 LIPS x 25 GA. GRATER THAN 5-0" STRUCTURAL CALCULATIONS MUST BE PROVIDED SUSPENDED CEILING TO BE DESIGNED FOR LATERAL FORCES (Cp 0.30 4 Wp: 4 PSF (MIN)) LATERAL BRACING TO BE MIN. OF s' FROM HORIZONTAL PIPING OR DUCT WORK WITHOUT BRACING WIRES TO BE ATTACHED TO GRID AND STRUCTURE IN A MANNER TO SUPP A LOAD OF NOT LESS THAN 200 LSS. OR ACTUAL LOAD WITH A SAFETY FACTOR 9 kCH4, SUSPENDED CEILINGS SHALL COMPLY WITH U.S.C. TABLES 25-A AND CHAPTER X06273d24.dwg OF c SUSPENDED GYPSUM BOARD CEILING Tenant Improvement Plans for: PALOMAR CENTRE 2051 Palomar Airport Road Carlsbad, California 92009 ADoal' J.CCE.. Palomar LLC SmithConsultingArchitects 12230 0C.,*,ONo! -- S.Dqp. CA 92130 (0513 793.4W ft— M11) 793-47P F. FB No. Sheet Modified AD1 Field Drawing No lb Date 2/16/07