HomeMy WebLinkAbout2060 BASSWOOD AVE; ; 79-695; Permitr“
LOT NO. LCGAL 1 DCSCR.
MECHANICAL PERMIT APPLICAVIBN’
BLI TRACT (OSEE ATTACHED SHEET)
e/ 13/73
- ~ - -~ Refrigeration Units-H.P Ea.
Boilers-H.P. Ea.
Gas Fired A.C. Units-Tonname Ea.
APPROVED FOR ISSUA
i 9 */hi .$/ff&t
r APPLICATION I(CCEPTE BY PLANS CHECKED BY
i Y. s’
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TlON AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF CONSTRUCTION OR WORK ISSUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
-.
Type of Fuel. Oil 0 Nat. Gas 0 LPG. 0 Weed>
PERMIT FEES
SPEC1 AL CONDITIONS: t No. 1 Type of Equipment F8e 1 Air Cod. Units-H.P. Ea is 1
Forced Air Systems-B.T.U. M Ea.
Gravity Systems-B.T.U. M Ea.
Floor Furnaces-B.T U. M
Wail Heaters-B .TU. M
Unit Hebten-B.T.U. M
Evaporative Coolers
Clothes Dryers
Ventilation Fan
Range Hood
Air Handling Unit- C.F.M.
Incinerator
4 c , t / I --rT
6: p
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
#% ISSUANCE FEE 8 ’,” ,d U
aTURC DC OWNCR (IC DWNCI SUILDCR) (DATE) I TOTAL FEES i
c
c
II/
WHEN ?ROTERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERM IT VALIDATION CK. M.O. CASH
INSPECTOR
_* . ~
I 14 mc,
INSPECTION REPORTS 1
DATE ITEM REMARKS INSPECTOR