HomeMy WebLinkAbout2077 Caleta Ct; ; CB163301; RecycleCarlsbad 16-3301
09/07/16
Ccicyof
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.cartsbadca.gov
Owner. John Goforth John Goforth Contractor.
Job Addl'C$;, .. _2_0_7_7_C_a_le_t_a_C_t~, _C_a_r1_sb_a_d__ Phone Number~: _4-'--'-15;;._-....;.4..c.0.;..7-.....;;9.....;;6...c.0...;...7 _______ _
Pennit #: ___ 1_6-_3_3_0_1_______ Estimated Cost of Protect: $'----'-$_9_0.._0_Q_Q ______ _
Type of Project: gNew Construction O Remodel or T.I. fi(Residential O Commercial OOemo!ition
(check all that apply) D Other-----------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at
a minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking. that have a combined weight of new construction disposal that does not exceed
2 lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
rs/ Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area 336 X 2 lbs. • ___ 6_7_2 ____ lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll off bin. All receipts shall be proVided to the Building Official prior to final.
Table 1-Estimated Waste (To be filled out prior to permit issuance. refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method t.ANDALL RE-USED or RECYCLED
Asphalt/ Concrete 0 200 Hyperion Construction
Brick I Masorvy 0 0
cardboard 0 20 Waste Management
Drywall 20 0 Waste Management
landscape Debris 0 0
Lumber/ Wood 20 20 Waste Management
Metals 0 0
Mixed Waste 20 0 Waste Management
Trash I Garbete 20 0 Waste Manaaement
Other. 0 0
TOTAL lbs: 80 240
Estimated Percentage to be Re-Used or Recycled ___ 7_5 ___ %
I certify that the inrormauon provided herein, to the best of my knowledge, is true and correct.
John Goforth
~::) Oiite 11/03/16
om:ruse Only
0 Plan ApprO¥ed O Plan Denied D Project Valuation Approved
Reviewed/ Approved by._· -----------------
Pa&e 1of2