Loading...
HomeMy WebLinkAbout2077 Caleta Ct; ; CB163301; RecycleCarlsbad 16-3301 09/07/16 Ccicyof Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.cartsbadca.gov Owner. John Goforth John Goforth Contractor. Job Addl'C$;, .. _2_0_7_7_C_a_le_t_a_C_t~, _C_a_r1_sb_a_d__ Phone Number~: _4-'--'-15;;._-....;.4..c.0.;..7-.....;;9.....;;6...c.0...;...7 _______ _ Pennit #: ___ 1_6-_3_3_0_1_______ Estimated Cost of Protect: $'----'-$_9_0.._0_Q_Q ______ _ Type of Project: gNew Construction O Remodel or T.I. fi(Residential O Commercial OOemo!ition (check all that apply) D Other----------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking. that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) rs/ Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area 336 X 2 lbs. • ___ 6_7_2 ____ lbs. of allowable waste. D I plan on using a WASTE MANAGEMENT roll off bin. All receipts shall be proVided to the Building Official prior to final. Table 1-Estimated Waste (To be filled out prior to permit issuance. refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method t.ANDALL RE-USED or RECYCLED Asphalt/ Concrete 0 200 Hyperion Construction Brick I Masorvy 0 0 cardboard 0 20 Waste Management Drywall 20 0 Waste Management landscape Debris 0 0 Lumber/ Wood 20 20 Waste Management Metals 0 0 Mixed Waste 20 0 Waste Management Trash I Garbete 20 0 Waste Manaaement Other. 0 0 TOTAL lbs: 80 240 Estimated Percentage to be Re-Used or Recycled ___ 7_5 ___ % I certify that the inrormauon provided herein, to the best of my knowledge, is true and correct. John Goforth ~::) Oiite 11/03/16 om:ruse Only 0 Plan ApprO¥ed O Plan Denied D Project Valuation Approved Reviewed/ Approved by._· ----------------- Pa&e 1of2