HomeMy WebLinkAbout2100 COSTA DEL MAR RD; ; CB110949; Permit08-05-2011 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB110949 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Applicant: TOM MCCABE 2011 BSANELIJOAV CARDIFF CA 92007 760-207-5720 2100 COSTA DEL MAR RD CBAD Tl Sub Type: COMM 2165900100 Lot#: 0 Status: $240,174.00 Construction Type: 3A Applied: Reference #: Entered By: LA COSTA RESORT: 952 SF ADDITI Plan Approved: TO MEMBERS LOUNGE//214 SF REMODEL OF LOUNGE Issued: Inspect Area: Plan Check#: Owner: ISSUED 05/05/2011 JMA 08/05/2011 08/05/2011 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedited Plan Review $1,159.17 MeterSize $0.00 Add'l Reel. Water Con. Fee $753.46 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $50.44 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees $8.00 HMP Fee $520.00 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $4,371.17 $4,034.92 $0.00 $0.00 $0.00 $0.00 $69.00 $145.00 $28.50 $0.00 $0.00 $0.00 $0.00 $11,139.66 Total Fees:$11,139.66 Total Payments To Date:$11,139.66 Balance Due:$0.00 Inspector: FINALAPPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. 08-05-2011 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW110187 2100 COSTA DEL MAR RD CBAD SWPPP Lot#: LA COSTA RESORT ADDTIION TO MEMBER LOUNGE Status: ISSUED Applied: 05/05/2011 Entered By: JMA Issued: 08/05/2011 Inspect Area: Tier: 1 Priority: Applicant: TOM MCCABE 2011 BSANELIJOAVE CARDIFF CA 92007 760-207-5720 Emergency Contact: JEFF ROBERSON Owner: 760-438-4111 SWPPP Plan Check SWPPP Inspections Additional Fees $45.00 $54.00 $0.00 TOTAL PERMIT FEES $99.00 Total Fees:$99.00 Total Payments To Date:$99.00 Balance Due:$0.00 FINAL APPROVAL DATE SIGNATURE CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717/2718/2719 Fax: 760-602-8558 www.carisbadca.gov Plan Check No. Est. Value Plan Ck. Deposit DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires theapplicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of theBusiness and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to acivil penalty of not more than five hundred dollars {$500}). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: O I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this perm it is issued. O I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co.. _ __ _ _ Policy No. _ Expiration Date __ _ This section need not be completed if the permit is for one hundred dollars ($100) or less. O Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (£100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. CONTRACTOR SIGNATURE [~| OAGENT DATE / hereby affirm that I am exempt from Contractor's License Law for the following reason: Q I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). rSrvLas owner of ^e property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of \/ property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). D I am exempt under Section Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. O Yes C3 No 2.1 (have / have not) signed an application for a building permit for the proposed work. 3.1 have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): 5.1 will provide some of th>wof1?5|Mt I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): D .GENT DATE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYes \P*lo Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D Yes Is (he facility to be constructed within 1,000 feet of the outer boundary of a school site? C3 Yes IF ANY OF THE ANSWERS ARE YES, t EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address I certify that I have lead the application and state that the above information Is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of thi^itfcK^rlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUI OSHA: An OSHA permit is requj^d for exca EXPIRATION: Every permit S AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. or construction of structures over 3 stories in height, of this Code shall expire by limitation and become null and void if the building or work autiorized by such permit is not commenced within is suspended or abandoned at any time after the work is commencedfor a period of 180 days (Section 106.4.4 Uniform Building Code). DATE Inspection List Permit*: CB110949 Type: TI COMM Date Inspection Item 09/22/2011 152 Final Bldg Inspection - Fire 09/20/2011 84 Rough Combo 09/20/2011 84 Rough Combo 09/20/2011 89 Final Combo 08/15/2011 17 Interior Lath/Drywall 08/08/2011 14 Frame/Steel/Bolting/Weldin 08/08/2011 21 Underground/Under Floor 08/08/2011 22 Sewer/Water Service 08/08/2011 24 Roggh/Topout 08/08/2011 34 Rough Electric 08/08/2011 44 Rough/Ducts/Dampers Inspector GR PD PD PD PD PD PD PD PD PD Act AP Rl WC AP AP AP AP AP AP AP WC UA COSTA RESORT: 952 SF ADDITI TO MEMBERS LOUNGE//214 SF REMODE Comments NO INSP TYPE LEFT PENDING FIRE Friday, September 23, 2011 Page 1 of 1 City of Carlsbad Bldg Inspection Request For: 09/20/2011 Permit# CB110949 Title: LA COSTA RESORT: 952 SF ADDITI Description: TO MEMBERS LOUNGE/7214 SF REMODEL OF LOUNGE Inspector Assignment: PD 2100 COSTA DEL MAR RD Lot: 0 Type:TI Job Address: Suite: Location: APPLICANT TOM MCCABE Owner: Remarks: NO INSP TYPE LEFT Sub Type: COMM Phone: 7604986677 Inspector: Total Time:Requested By: JEFF Entered By: JANEAN CD Description Act Comments 14 Frame/Steel/Bolting/Welding ^ *- 24 Rough/Topout 34 Rough Electric 44 Rough/Ducts/Dampers Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# CV000348 CLOSED ELEC W/OUT PERMITS @ MAIN POOL; CV040642 CLOSED O-STAGNANT WATER W/DEBRIS; CAUSED BY EMPLOYEES, BAD ODOR CV060188 CLOSED Z- 4 BANNERS; CV1 10591 OPEN O-LANDSCAPE NOISE; CV990248 CLOSED POSSIBLE BLDG SAFETY VIOLATION; PCR0321 8 ISSUED LA COSTA RESORT AND SPA; ROOF OVER EXISTING COVERED WALKWAY PCR04005 ISSUED LA COSTA RSRT& SPA-LIGHTING; DESIGN REV. (RETAIL 1-4) PCR04184 ISSUED LACOSTA RESORT REV TO STRUCT; STEEL SHOP DRAWINGS SW1 00550 ISSUED LA COSTA CLUB HOUSE; EXTERIOR STAIR AT BACK OF CLUBHOUSE FACING GOL SW110187 ISSUED LA COSTA RESORT; ADDTIION TO MEMBER LOUNGE SW1 10258 ISSUED LA COSTA RESORT; POOL, RETAINING WALLS SW1 10283 PENDING ; 860 SF RETAINING WALL FOR NEW POOL LOCATIONPENDING Inspection History Date Description Act 08/15/2011 17 Interior Lath/Drywall AP Insp PD Comments City of Carlsbad Final Building inspection Dept: Building Engineering Planning CMWD St Lite Fire IJ Plan Check #: Permit #: Project Name: Address: Contact Person: Sewer Dist: Inspected By: / Inspected Bv: Inspected Bv: Comments: CB1 10949 LA COSTA RESORT: 952 SF ADDITI TO MEMBERS LOUNGE//214 SF REMODEL OF 2100 COSTA DEL MAR RD Phone: LC Water Dist: CA / *j Date /o / /•f Al *«---" Inspected: 7 [%£/££&( Date Inspected: Date Inspected: Date: Permit Type: Sub Type: LOUNGE Lot: 0 ' Approved: S Approved; Approved: 09/20/2011 Tl COMM Disapproved: Disapproved: Disapproved: EsGii Corporation In <PartnersKip -with government for (Buitcfing Safety DATE: 7/22/2011 O_APPLICANT __ JURISDICTION: City of Carlsbad ^~Q~ PLAN REVIEWER Q FILE PLAN CHECK NO.: 110949 SET: III PROJECT ADDRESS: 2100 Costa Del Mar PROJECT NAME: La Costa Resort & Spa Clubhouse member Lounge Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. XI The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. XI Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Dan Telephone #: Date contacted: 7/22 (by: DY) Email: Fax #: Mail Telephone Fax In Person XJ REMARKS: 1. All sheets of the plans shall be signed by the architect. (Mr. Tom McCabe) 2. Two complete sets (City III and Owner III) were included. 3. The applicant (Dan) hand carried the approved plan back to city. By: David Yao Enclosures: EsGil Corporation D GA D EJ D PC log 9320 Chesapeake Drive, Suite 208 «• San Diego, California 92123 * (858)560-1468 * Fax (858) 560-1576 EsGil Corporation In Partnership with government for <BuiCding Safety DATE: 7/19/2O11 a APPLICANT JURISDICTION: City of Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO.: 11O949 SET: II PROJECT ADDRESS: 2100 Costa Del Mar PROJECT NAME: La Costa Resort & Spa Clubhouse Member Lounge Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. Xj The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Tom McCabe 2011 B San Elijo Ave. Cardiff, CA 92007 Esgil Corporation staff did not advise the applicant that the plan check has been completed. XJ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tom McCabe Telephone #: 760-207-5720 Date contacted: T-fzWt, (by: \&— ) Email: tmccabe@McCabearch.com Fax #: t- Mail-' Telephone Fax In Person REMARKS: By: David Yao Enclosures: EsGil Corporation E3 GA D EJ D PC 7/12 9320 Chesapeake Drive, Suite 208 *• San Diego, California 92123 * (858)560-1468 * Fax (858) 560-1576 City of Carlsbad 11O949 7/19/2011 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning. Engineering and Fire Departments until review by EsGil Corporation is complete. 2. All sheets of the plans and the first sheet of the calculations are required to be signed by the licensed architect or engineer responsible for the plan preparation. California State Law. 4. What is the total construction cost of the "member lounge revisions"? 5. Each door in a means of egress from an occupancy of Group A or E having an occupant load of 50 or more (and any occupancy of Group H) shall not be provided with a latch or lock unless it is panic hardware. Section 1008.1.10. 6. All doors and gates, within the exit path to a public way from an occupancy of Group A or E having an occupant load of 50 or more (and any occupancy of Group H) shall not be provided with latches or locks unless they are equipped with panic hardware. Sections 1008.1.10 and 1002. 7. When additional doors are provided for egress purposes, they also shall conform to the requirements of Section 1008 (width, swing, hardware, etc.). Section 1008.1. Please clearly shows the "seating for the lounge are permanently attached to the floor". Otherwise the occupant load will be based on 15 sq ft/occupant. The total occupant load at "member lounge" will be over 50. All doors shall swing out with panic hardware. City of Carlsbad 110949 7/19/2O11 13. Please refer to the following corrections for mechanical, plumbing items. 14. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 15. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Q Yes Q No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at Esgil Corporation. Thank you. DISABLED ACCESS REVIEW LIST DEPARTMENT OF STATE ARCHITECT TITLE 24 GROUP A OCCUPANCIES 22. Show that dining, banquet and bar facilities are accessible, per Section 1104B.5, as follows: (60" long 28"-34" high access section of the bar) Please clearly note on the plan that "the bar is service bar no member will be served at the bar". Otherwise provide accessible bar counter, (section 1104.5.4 shows the bar for customers seated or standing at counter shall be accessible.) PLUMBING AND MECHANICAL CORRECTIONS PLAN REVIEWER: Glen Adamek GENERAL AND ARCHITECTURAL PME ITEMS 19. The final set of corrected drawings to be reviewed for signing and sealing just before the permits are to be issued. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. 22. The City Building Official to review evidence of Health Department approval for new Bar area. City of Carlsbad 110949 7/19/2011 PLUMBING (2010 CALIFORNIA PLUMBING CODE) 27. Please correct the following for the new plumbing systems: A complete plumbing review will be done when complete plumbing plans and calculations are provided. A) Please provide complete gas line plans and sizing calculations for existing and new gas lines from the public gas meter to the new gas fired fire pit. clearly showing gas pressures, piping types, pipe lengths, gas demands and pipe sizing method used. UPC Section 1217.0. B) Include the gas piping sediment trap installed downstream of the appliance shutoff valve as close to the inlet of the appliance as practical. Exceptions: Appliances with an internal sediment trap,(or) ranges, clothes dryers, gas fireplaces, and outdoor grilles. UPC 1212.7. C) Clearly show the below grade iron gas lines are factory wrapped. MECHANICAL (2010 CALIFORNIA MECHANICAL CODE) 29. On sheet M2.1 please provide the data for the existing fan coil unit #FC/1E and compressor unit #CU/1E to show equipment data to match the required complete energy design for the new conditioned space. Please provide cut-sheets, listing data, and installation instructions for the proposed gas fired fire pit. Provide complete mechanical plans showing existing and proposed HVAC equipment, ducts, and access to all equipment. 31. The energy designs on the Title 24 sheets of the plans do not include complete envelope and mechanical energy design for the new conditioned space. No MECH-forms provided and complete envelope design for the new space has not been provided. Please provide the MECH-3-C forms showing the required mechanical ventilation rates for the new or revised conditioned spaces. Coordinate the mechanical and the Title 24 outside air design. CMC 403.0 & Title 24 121(b)2 & (d). 32. A complete mechanical review will be done when complete mechanical plans and calculations are provided. Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Glen Adamek at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. END OF DOCUMENT EsGil Corporation In Partnership tvitH government for <Buifefing Safety DATE: 5/18/2011 a A£ELJt3ANT JURISplCTION: City of Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO.: 110949 SET: I PROJECT ADDRESS: 2100 Costa Del Mar PROJECT NAME: La Costa Resort & Spa Clubhouse Member Lounge Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Tom McCabe 2011 B San Elijo Ave. Cardiff, CA 92007 Esgil Corporation staff did not advise the applicant that the plan check has been completed. XI Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tom McCabe Telephone #: 760-207-5720 Date contacted: s(i$iti (by:v^) Email: tmccabe@McCabearch.com Fax #: Mail<xxTelephone«>'x Fax In Person REMARKS: By: David Yao Enclosures: EsGil Corporation I3 GA EI-EJ D PC 5/9 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 City of Carlsbad 11O949 5/18/2011 PLAN REVIEW CORRECTION LIST COMMERCIAL PLAN CHECK NO.: 110949 OCCUPANCY: A2 TYPE OF CONSTRUCTION: III-A ALLOWABLE FLOOR AREA: SPRINKLERS?: Y REMARKS- DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 5/18/2011 JURISDICTION: City of Carlsbad USE: clubhouse ACTUAL AREA: STORIES: HEIGHT: OCCUPANT LOAD: DATE PLANS RECEIVED BY ESGIL CORPORATION: 5/9 PLAN REVIEWER: David Yao FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad 110949 5/18/2O11 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. • PLANS 2. All sheets of the plans and the first sheet of the calculations are required to be signed by the licensed architect or engineer responsible for the plan preparation. California State Law. 3. Does the floor area been increased? Is the member lounge under existing roof? No new floor area increased? If new floor area was created, complete area analysis is required. Table 503. 4. What is the total construction cost of the "member lounge revisions"? EXITS 5. Each door in a means of egress from an occupancy Of Group A or E having an occupant load of 50 or more (and any occupancy of Group H) shall not be provided with a latch or lock unless it is panic hardware. Section 1008.1.10. 6. All doors and gates, within the exit path to a public way from an occupancy of Group A or E having an occupant load of 50 or more (and any occupancy of Group H) shall not be provided with latches or locks unless they are equipped with panic hardware. Sections 1008.1.10 and 1002. 7. When additional doors are provided for egress purposes, they also shall conform to the requirements of Section 1008 (width, swing, hardware, etc.). Section 1008.1. 8. Sheet A2.0 of the plan shows "exit balcony" at upper floor. If eliminate the stairway, the balcony has no exit. Does the stairway at balcony a required exit from the "function room #2"? Please clarify the exit still adequate with eliminate the stairway. City of Carlsbad 11O949 5/18/2011 GLASS AND GLAZING 9. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.4 (see exceptions): a) Fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface.(window A, B. C. F) • ACCESSIBILITY 10. Provide notes and details on the plans to show compliance with the enclosed "Disabled Access" Review List. • ADDITIONAL 11. Provide complete structural calculation to justify all the framing and foundation revisions. (No structural calculation was provided) 12. Provide the following note on the plans: "The contractor responsible for the construction of the seismic-force-resisting system shall submit a written Statement of Responsibility to the building official prior to the commencement of work on the system." Section 1709. 13. Please refer to the following corrections for mechanical, plumbing, electrical and energy items. 14. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 15. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: FJ Yes Q No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake. Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at Esgil Corporation. Thank you. City of Carlsbad 110949 5/18/2011 ELECTRICAL and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen ELECTRICAL (2010 CALIFORNIA ELECTRICAL CODE) 16. The kitchen designer's electrical outlet layout has been provided but not the building electrical design plans. Please provide. * The plans should include: Panel locations, room electrical receptacle layout, lighting, both normal and emergency (exit and egress), fixture schedule, the mechanical electrical, and the branch circuit design. ENERGY CONSERVATION 17. Provide the energy design for the new Members Lounge, because the new room addition must be heated. Please provide complete mechanical, envelope and lighting energy designs, 18. For lighting energy design, please demonstrate the following energy lighting requirements: bi-level switching and whole building shut-off. Note: If you have any questions regarding this Electrical and Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. PLUMBING AND MECHANICAL CORRECTIONS PLAN REVIEWER: Glen Adamek GENERAL AND ARCHITECTURAL PME ITEMS 19. The final set of corrected drawings to be reviewed for signing and sealing just before the permits are to be issued. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. 20. Show compliance with CBC, Section 1204.1: "Interior spaces intended for human occupancy shall be provided with active or passive space-heating systems capable of maintaining a minimum indoor temperature of 68°F. at a point 3 feet above the floor on the design heating day." 21. Correct the statement on the Title Sheet of the plans to show compliance with the current Codes, as of the first day of 2011. The following are the correct current Codes: a) The 2010 edition of the California Electrical Code (CEG) adopts the 2008 National Electrical Code (NEC) and the 2010 California Amendments. City of Carlsbad 11O949 5/18/2011 b) The 2010 edition of the California Mechanical Code (CMC) adopts the 2009 Uniform Mechanical Code (UMC) and the 2010 California Amendments. c) The 2010 edition of the California Plumbing Code (CPC) adopts the 2009 Uniform Plumbing Code (UPC) and the 2010 California Amendments. d) The 2010 edition of the California Fire Code (CFG) adopts the 2009 International Fire Code (IFC) and the 2010 California Amendments. 22. The City Building Official to review evidence of Health Department approval for new Bar area. PLUMBING (2010 CALIFORNIA PLUMBING CODE) 23. Provide plumbing plans for the new Lounge Bar Area. 24. Provide a plumbing material schedule on the plans describing the following systems: Potable water piping, the drain, waste,'and vent piping, gas piping, and the roof drains. 25. Provide water line sizing calculations for the new water piping: Include the water pressure, pressure loss calculations, water demands, and the developed pipe lengths. UPC 610.0 or Appendix 'A'. 26. Show 1/4 inch per 12 inch slope on drain and waste lines. UPC Section 708.0 27. A complete plumbing review will be done when complete plumbing plans and calculations are provided. MECHANICAL (2010 CALIFORNIA MECHANICAL CODE) 28. Provide mechanical plans for the new Members Lounge & Bar. Detail how the new Members Lounge & Bar spaces is to be heated. CBC, Section 1204.1 29. Provide complete mechanical plans showing existing and proposed HVAC equipment, ducts, and access to all equipment. 30. Clearly show the existing uses of all areas of the new Members Lounge. 31. Please provide the MECH-3-C forms showing the required mechanical ventilation rates for the new or revised conditioned spaces. Coordinate the mechanical and the Title 24 outside air design. CMC 403.0 & Title 24 121 (b)2 & (d). 32. A complete mechanical review will be done when complete mechanical plans and calculations are provided. Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Glen Adamek at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. City of Carlsbad 110949 5/18/2011 DISABLED ACCESS REVIEW LIST DEPARTMENT OF STATE ARCHITECT TITLE 24 • REMODELS. ADDITIONS AND REPAIRS 1. When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per Section 1134B.2. These requirements apply as follows: a) The area of specific alteration, repair or addition must comply as "new" construction. b) A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. c) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. d) Existing drinking fountains (if any) must be shown to comply with all accessibility features. e) Existing public telephones (if any) must be shown to comply with all accessibility features. DOORS 2. Show or note that all hand-activated door opening hardware meets the following requirements, per Section 1133B.2.5.2: a) Latching, or locking, doors in a path of travel are operated with a single effort by lever type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. b) Is to be centered >30" but <44" above floor. 3. Show or note that the maximum effort to operate doors shall not exceed 8-% pounds for exterior doors and 5 pounds for interior doors, with such pull or push effort being applied at right angles to hinged doors and at the center plane of sliding or folding doors. When fire doors are utilized, the maximum effort to operate the door may be increased to not exceed 15 pounds. Section 1133B.2.5. 4. Show or note that the lower 10" of all doors comply with Section 1133B.2.6, as follows: (See detail for door type on sheet A5.0?) a) To be smooth and uninterrupted, to allow the door to be opened by a wheelchair footrest, without creating a trap or hazardous condition. b) Narrow frame doors may use a 10" high smooth panel on the push side of the door. City of Carlsbad 11O949 5/18/2011 SANITARY FACILITIES 5. Note that the doorways leading to sanitary facilities shall be identified, per Section 1115B.6, as follows: a) An equilateral triangle %" thick with edges 12" long and a vortex pointing upward at men's rest rooms. b) A circle %" thick, 12" in diameter at women's rest rooms. c) A 12" diameter circle with a triangle superimposed on the circle and within the 12" diameter at unisex rest rooms. d) The required symbols shall be centered on the door at a height of 60". e) Braille signage shall also be located on the wall adjacent to the latch outside of the doorways leading to the sanitary facilities, per Section 1117B.5.1. City of Carlsbad 110949 5/18/2011 • MULTIPLE ACCOMMODATION SANITARY FACILITIES (Show all bathrooms details on the plan) 59" MIN. AT FLOOR-MOUNTED W.C. WHEN DOOR SWINGS IN 56" MIN. AT WALL-MOUNTED W.C. WHEN DOOR SWINGS IN 54" MIN. FLUSH ACWATOR ON WIDESIDE MIN. V 42" MIN GRABBAR 44" MIN. 60" X 60" LEVEL AND CLEAR Show that the accessible rest room is to be provided with a 60" minimum diameter clear space measured from the floor to a height of 27 inches. NOTE: Doors (other than the door to the accessible toilet compartment) in any position may encroach into this space by not more than 12 inches, per Section 1115B.3.1. Doors shall not swing into the clear floor space required for any fixture within the toilet facility. Section 1115B.3.1.2. City of Carlsbad 110949 5/18/2011 8. Show that at least one water closet fixture, located in a compartment, shall provide the following, per Section 1115B.3.1.4: a) >28" clear space from a fixture (or >32" clear space from a wall) at one side. b) The other side of the water closet shall provide 18" from the centerline of the water closet to the wall. c) The compartment shall be a minimum of 60" wide. d) Clear space in front of the water closet shall be: i) >48" if the compartment has an end opening door, ii) >60" is required for side opening doors. e) Grab bars shall not project more than 3" into the clear spaces indicated. 9. 10. 11. If the water closet compartment has an end-opening door (facing the water closet), the door shall be located on a diagonal to the water closet, with a maximum stile width of 4 inches (see the figure below). Additionally, the door must be provided with a clearance of at least 18" at the strike side. CENTERLINE OF FIXTURE 18" FLUSH ACTIVATOR ON WIDE SIDE 4" MAX. ACCESSIBLE WATER CLOSET COMPARTMENT WITHIN A MULTIPLE-ACCOMMODATION TOILET FACILITY Show or note, per Section 1115B.3.1.4thatthe doors to the accessible water closet compartment will be equipped with a self closing device with: a) >32" clear opening width when located at the end of the compartment. b) >34" clear opening width when located at the side of the compartment. The door into the accessible water closet compartment shall be provided with a clearance of at least 18" at the strike side of the door, per Section 1115B.3.1.4.5. Additionally, such doors shall have a clear space of not less than 48" as measured at right angles to the door in its closed position. City of Carlsbad 110949 5/18/2O11 12. When 6 or more water closets are provided within a multiple-accommodation toilet room, show the additional requirements given in Section 1115B.3.1.5. • RESTROOM FIXTURES AND ACCESSORIES 13. Show, or note, on the plans that the accessible water closets meet the following requirements, per Section 1115B.4.1: a) The seat is to be >17" but <19" in height. b) The controls for flush valves shall be: i) Mounted on the side of the toilet area, ii) Be <44" above the floor. 14. Show, or note, on the plans that accessible urinals meet the following requirements, per Section 1115B.4.2: a) The rim of at least one urinal shall: i) Project at least 14" from the wall, ii) Be <17" above the floor. b) The control mechanism is to be located ^44" above the floor. c) >30" x 48" clear floor space is provided in front of the accessible urinal. Section 1115B.4.2. 15. Show that accessible lavatories comply with the following, per Sections 1115B.4.3: a) >30" x 48" clear space is provided in front for forward approach. The clear space may include knee and toe space beneath the fixture. b) When lavatories are adjacent to a side wall or partition, there shall be a minimum of 18" to the center line of the fixture to the wall. c) The counter top is ^34" maximum above the floor. d) >29" high, reducing to 27" at a point located 8" back from the front edge. e) >9" high x 30" wide and 17" deep at the bottom. f) Hot water pipes and drain lines are insulated. 16. Show that grab bars comply with the following, per Section 1115B.4: a) Grab bars shall be located on each side or one side and the back of the water closet stall or compartment. b) They shall be securely attached 33" above the floor, and parallel. NOTE: Where a tank-type toilet is used which obstructs placement at 33", the grab bar may be installed as high as 36". c) Grab bars at the side shall be located: i) 15" to 16!4" (±1") from the center line of the water closet stool. City of Carlsbad 110949 5/18/2011 ii) Be >42" long with the front end positioned 24" in front of the stool. iii) Total length of bars at the back shall be >36". d) The diameter, or width, of the grab bar gripping surface is >1 %" but <17z\ or the shape shall provide an equivalent gripping surface. e) If mounted adjacent to a wall, the space between the wall and the grab bar shall be 11/2". 17. Per Section 1115B.8, show on the plans <40" height for: a) The operable parts of at least one: i) Paper towel dispenser. ii) Sanitary napkin dispenser. iii) Waste paper disposal. iv) Other similar dispensing and/or disposal fixtures. b) The bottom edge of mirrors. • SIGNAGE 18. Per Section 1011.3, tactile exit signs shall be required at the following locations: a) Wherever basic CBC provisions require exit signs from a room or area to a corridor or hallway. The tactile exit sign shall have the words, "EXIT ROUTE." b) Each grade-level exit door. The tactile exit sign shall have the word, "EXIT." c) Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure or an exit passageway. The tactile exit sign shall have the words, "EXIT ROUTE." d) Each exit door through a horizontal exit. The tactile exit sign shall have the words, "TO EXIT." 19. Tactile stair level identification signs (complying with Section 1117B.5.1) shall be located at each floor level landing in all enclosed stairways in buildings two or more stories in height to identify the floor level. At the exit discharge level, the sign shall include a raised five-pointed star located to the left of the identifying floor level. Section 1020.1.6. 20. Where permanent identification is provided for rooms and spaces, raised letters shall also be provided and shall be accompanied by Braille. Section 1117B.5. 21. Provide a note on the plans stating that the signage requirements of Section 1117B.5 will be satisfied. GROUP A OCCUPANCIES 22. Show that dining, banquet and bar facilities are accessible, per Section 1104B.5. as follows: (60" long 28-34" high access section of the bar) END OF DOCUMENT City of Carlsbad 110949 '5/18/2011 [DO NOT PAY-THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 110949 PREPARED BY: David Yao DATE: 5/18/2011 BUILDING ADDRESS: 2100 Costa Del Mar BUILDING OCCUPANCY:TYPE OF CONSTRUCTION: BUILDING PORTION Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA ( Sq. Ft.) Bldg. Permit Fee by Ordinance ^ Plan Check Fee by Ordinance ^ Type of Review: 1 1 Repetitive Fee ^ Repeats Comments: Valuation Multiplier » j ^ / ^2. #N/A Reg. Mod. ' $^ firvc^* /$ rs$\ xC^ /)/* / f 1 L- r^V ^^^X-/ 0 Complete Review Q D Other PI Hourly EsGil Fee VALUE ($) -dP^/jr i^N /^jy- \y /JP\ (V•1 - 1 /I/ // . />{A{^/ ^JZA/* Structural Only Hr. @* 4c #N/A #N/A #N/A Sheet of macvalue.doc + JUL-22-2011 13:07 ESGIL 858 560 1576 P.002 City of Carlsbad 110949 5/18/2O11 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN JURISDICTION: City of Carlsbad PREPARED BY: David Yao BUILDING ADDRESS: 2100 Costa Del Mar BUILDING OCCUPANCY: TYPE Op CONSTRUCTION: PLAN CHECK NO.: 110949 DATE: 5/18/2011 BUILDING PORTION remodel & T.K Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA (Sq.Ft.) cb Valuation Multiplier By Ordinance Reg. Mod. estimate VALUE ($) 80,000 $240,174 ononnVVJWV $1,159.17 Bldg. Permit Pee by Ordinance Plan Check Fee by Ordinance Type of Review: D Repetitive FeeRepeats .Complete Review D Other Q Hourly E«Gil Fee $753.46 $649.14 $310.76 Comments: total construction value»240174 per response from architect Sheet 1 of 1 macvalue.doc + TOTAL P.002 City of Carlsbad 110949 5/18/2011 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE(Reyised 7/22/2011 dy) JURISDICTION: City of Carlsbad PLAN CHECK NO.: 110949 PREPARED BY: David Yao DATE: 5/18/2011 BUILDING ADDRESS: 2100 Costa Del Mar BUILDING OCCUPANCY:TYPE OF CONSTRUCTION: BUILDING PORTION remodel & T.I. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA ( Sq. Ft.) cb Valuation Multiplier By Ordinance Reg. Mod. estimate VALUE ($) 80,000 $240,174 80 000 $1,159.17 Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: f~1 Repetitive FeeRepeats Complete Review D Other r—I Hourly EsGil Fee Structural Only Hr. @ $554.93 $753.46 $360.70 $649.14 $310.76 Comments: total construction value=240174 per response from architect Sheet 1 of 1 macvalue.doc + PLANNING/ENGINEERING APPROVALS PERMIT NUMBER ADDRESS RESIDENTIAL RESIDENTIAL ADDITION MINOR « $20,000.00) SOLAR PANELS DATE TENANT IMPROVEMENT PLAZA CAMINO REAL PREMIER OUTLETS VILLAGE FAIRE COMPLETE OFFICE BUILDING OTHER PLANNER ENGINEER DATE DATE Docs/Misforms/Planning Engineering Approvals PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB110949 DATEMay 10, 2011 ADDRESS 2100 Costa Del Mar RESIDENTIAL ADDITION- MINOR (< 17,000.00) RETAINING WALL POOL/SPA TENANT IMPROVEMENT COMPLETE OFFICE BUILDING VILLAGE FAIRE SOLAR PANELS OTHER enclosure of covered patio area to members lounge (< 952 sq ft) at L Costa Resort and Spa - parking per parking program PLANNER Van Lynch ENGINEER DATE May 10, 2011 DATE H:\ADMlN\COUNTER/PUNNING/ENG[«ING APPROVALS RECOMMENDATION FOR APPROVAL Page: 1 of 2 HBLDG. DEPT.COPYDaryl K.James & Associates, Inc. Checked by: Susan Guzzetta Date: July 27. 2011 APPLICANT: KSL Resorts JURISDICTION: Carlsbad Fire Department PROJECT NAME: La Costa Resort PROJECT ADDRESS: 2100 Costa Del Mar Carlsbad PROJECT DESCRIPTION: CB110949 Closure of space into new members lounge INSTRUCTIONS • This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. 1 Please direct any questions regarding this review directly to: Susan Guzzetta at 949-573-1558 or stquzzetta@gmail.com CORRECTIONS: V Please indicate if this project is in a "High Hazard Severity Zone" as defined by Carlsbad Fire Department. * Not High Hazard zone per San Diego hazard map. V Provide note on plans that all finishes will comply with C.B.C. Section 803 Wall and Ceiling Finishes * A2.1 note added A2.1 V Show an exit analysis from the proposed enclosed member lounge areas. Indicate the occupant loads from the member lounge areas. * Provided sheet Ex3 V Indicate fire extinguisher locations * Note #17 sheet A2.1 V Show proposed and existing exit signs. Exit signs are required to be illuminated as per CBC Sec. 1011.2. * Shown Sheet E3.0 V As per CBC 1011.5.3 indicate that emergency power supply has been provided with a duration of not less than 90 minutes. * Shown £3.0 Page 2 of 2 A5.0 V Hardware schedule indicates "Key Lock" for new doors. As per CBC Sec. 1008.1.10 Doors serving spaces with a occupant load over 50 or more in a Group A occupancy shall not be provided with a latch or lock unless it is panic hardware. If the occupant load is under 50 persons than the hardware must not require a key from the egress side of the door and the unlatching of any door shall not require more than one operation. *Note#10A5.0 V Indicate hardware for gate #12 located near the bar and members patio. * Detail #8 sheet A5.0 Carlsbad Fire Department Plan Review Requirements Category: 11, COMM Date of Report: 08-04-2011 Reviewed by; Name: Address: TOM MCCABE 2011BSANELIJOAV CARDIFF CA 92007 Permit #: CB110949 Job Name: LA COSTA RESORT: 952 SF ADDITI Job Address: 2100 COSTA DEL MAR RD CBAD Conditions; Cond: CON0004807 [MET] ** CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. Entry: 08/04/2011 By: GR Action: AP STRUCTURAL CALCULATIONS LA COSTA RESORT & SPA MEMBERS LOUNGE CARLSBAD, CA Prepared For: 1C TRS, INC. MEC Project No.: 1049.3 Date Issued: 5/10/11 Revision Dates: Prepared By: McNeFF ENGINEERING & CONSULTING A PRO! [SSI O N A I. f O R P O K A T 1 O N 1991 VILLAGE PARK WAY SUITE 115 ENCINITAS, CA 92024 T (760) 479-9838 F (760) 479-9837 www.mcneffengineering.com McNEFF ENGINEERING & CONSULTING A PROFESSIONAL CORPORATION 1991 Village Park Way, Suite 115 Encinitas, CA 92024 Tel: (760) 479-9838 • Fax: (760) 479-9837 JOB.LA SHEET NO..OF_ CALCULATED BY- CHECKED BY SCALE. ww\DATE_ DATE_ 7" McNEFF ENGINEERING & CONSULTING A PROFESSIONAL CORPORATION 1991 Village Park Way, Suite 115 Encinttas,CA92024 Tel: (760) 479-9838 • Fax: (760) 479-9837 SHEET NO.. CALCULATED BY_ CHECKED BY SCALE OF DATE- DATE. ^^4-J^i4- McNEFF ENGINEERING A PROFESSIONAL CORPORATION 1991 Village Park Way, Suite 115 Encinitas, CA 92024 Tel: (760) 479-9838 • Fax: (760) 479-9837 LJ J. M-J—U<°u^_..4-J _ MCNEFF ENGINEERING & CONSULTING A PROFESSIONAL CORPORATION 1991 Village Park Way, Suite 115 Encinitas, CA 92024 Tel: (760) 479-9838 • Fax: (760) 479-9837 4. CERTIFICATE OF COMPLIANCE (Part AND FIELD INSPECTION ENERGY CHECKLIST 1 of 4) Project Name Clubhouse Members Lounge Addition Project Address 2100 Costa del Mar Carlsbad GENERAL INFORMATION Building Type: ^ D Schools (Public School) D Nonresidential Relocatable Bldg. Climate Zone 7 Total Cond. Floor Area 949 D High-Rise Residential D Public School 121 Conditioned Spaces ENV-1C Date 7/5/2011 Addition Floor Area 0 Hotel/Motel Guest Room D Unconditioned Spaces D Skylight Area for Large Enclosed Space > 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: D Approach of Compliance: D New Construction Component Front Orientation: N, E, S, W or in Degrees: | 90 deg 2 Addition D 3 Overall Envelope D Alteration Unconditioned (file affidavit) FIELD INSPECTION OPAQUE SURFACE DETAILS Tag/ID1 1 2 3 4 5 6 Assembly Type2 Wall Wall Wall Wall Roof Slab I I 463 154 236 52 952 949 OrientationN, E, S, W(E) (N) (S) (W) (S) (N)U-Factor0.072 0.072 0.106 0.106 0.035 0.73C ENERGY CHECKLIST INSULATION ID ||Si R-19 R-19 R-19 R-19 R-30 None Exterior R-Value4.C 4.C 4.C 4.C w £ None None None None Interior R-Value11.0 11.0 £- Metal Metal JointAppendix 44.3.3-A5 4.3.3-A5 4.3.3-A5 4.3.3-A5 4.2.2-A17 4.4.7-A1 *!o SO W New New New New Altered New | D n D D D D D D D D s D D D D D D D D a D 1 . See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compl ance. FENESTRATION SURFACE DETAILS Tag/ID1 1 2 3 4 5 Fenestration Type2 Window Window Window Window Window i 233 214 53 29 53 OrientationN,E,S,W(E) (E) (N) (N) (W) i! 0.300 0.300 0.300 0.300 0.300 U-FactorSource3COG COG COG COG COG o0 gss. 0.310 0.310 0.310 0.310 0.310 in w COG COG COG COG COG OverhangD D D D D D D D D n ConditionsStatus4New New New New New inin£ n n D D D D D D D n I D D D D D D D D D a 1 . See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropr ate action to correct. Verify building plans if necessary. EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 201 1-07-05710:04:03 ID: 1 1 055 Page 1 of 13 f ( Project Name Clubhouse Members Lounge Addition Date 7/5/2011 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 4)ENV-1C ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:Pass Fail1 N/A D Roofing compliance not required in Climate Zones 1 and 16 with a Low-Sloped. 2:12 pitch or less.n D Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.D Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C.D Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV-2C. The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enerav.ca.aov/title24/ [-1 Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 II the Cool Roof criteria below. are exempt from D PI High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9,12 and 16 are exempted from the low-sloped roofing criteria. 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number1 Roof Slope S 2:12 >2:12 D D D D D D D D D D D D Product Weight < Slb/ft2 2: 5lb/ft2 D D D D D D D D D D D D Product Type2 Aged Solar Reflectance3 D4 D4 n4 n4 n4 n4 Thermal Emmitance SRI5 Pass D D D D D n Fail6 D D D D D D 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.org/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pirt,iai - 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.enerav.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: D Aluminum-Pigmented Asphalt Roof Coating D Cement-Based Roof Coating D Other Discrepancies: EnergyPro 5.1 by EneravSoft User Number: 8004 RunCode: 2011-07-05710:04:03 ID: 11055 Page 2 of 13 CERTIFICATE OF COMPLIANCE (Part 3 of 4) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Clubhouse Members Lounge Addition 7/5/201 1 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description Fenestration Products Name or ID Requiring Testing or Verification ML Window ML Glass Door Area of like Products 339 243 ENV-2A Building Envelope Acceptance Test 0 m n n n n n n n D n D n n n n D n n n n n n n n n Test Performed By: EnergyPro 5.1 by EnemvSoft User Number: 8004 RunCode: 2011-07-05T10:04:03 ID: 11055 Page 3 of 13 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4)ENV-1C Project Name Clubhouse Members Lounge Addition Date 7/5/2011 Project Address 2100 Costa del Mar Carlsbad Climate Zone CA Climate Zone 07 Total Cond. Floor Area 949 Addition Floor Area 0 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name Brandon T. Plum, PE, LEEDAP Company Plum Engineering, Inc. Signature Date 7/5/2011 Address 11835 Camel Min Road, #1304 CEA# CEPEf City/State/Zip San Diego, CA 92128-4609 Phone 658-672-2100 The Principal Envelope Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the envelope design. • This Certificate of Compliance identifies the envelope features and performance specifications required for compliance with Title-24, Parts 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Thomas McCabe Signature Company McCabe Architecture Date Address 2011B San Elijo Avenue License # City/State/Zip ^rtiffby the Sea, CA 92007 Phone 760-479-0735 Envelope Mandatory Measures Indicate location on building plans of Mandatory Envelope Measures Note Block:_ INSTRUCTIONS TO APPLICANT ENVELOPE COMPLIANCE & WORKSHEETS (check box If worksheet to Included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual published by the California Energy Commission. E3 ENV-1C Certificate of Compliance. Required on plans for all submittals. ENV-2C Use with the Envelope Component compliance approach. Optional on plans. 0 ENV-3C Use with the Overall Envelope compliance approach. Optional on plans. Use with Prescriptive compliance for the minimum skylight requirements for large enclosed spaces in climate zones 2 through 15. Optional on plans. EhergyPro 5.1 byEnergySoft User Number 8004 RunCode: 2011-07-05710:04:0 ID: 11055 Page 4 of 13 OVERALL ENVELOPE TDV ENERGY APPROACH (Part 1 of 6 ) ENV-3C Project Name Clubhouse Members Lounge Addition Date 7/5/2011 WINDOW RATIO CALCULATION for ALL WALLS A. Total linear display perimeter B. Total Gross Exterior Wall Area C. Enter Larger of A or B D. Enter. Proposed Window Area 1,487 ftxett ft2 X 0.40 = Oft2 595 595 582 ft2 Display Area 40% of Gross Exterior Wall Area Maximum Standard Area Proposed Area If the proposed Window Area is greater than the Maximum Standard Area, then the envelope component method may not be used. See RSHG in Table 143-A, 143- E. Window Wall Ratio = (Row D) Divided by (Row B)39.14%B, or143-C WEST WINDOW RATIO CALCULATION F. West Linear Display G. West Exterior Wall Area H. Enter Larger of F or G I. Enter Proposed West Window Area 105 ftXGft ft2 X 0.40 = °ft2 ft2 53 ft2 West Display Area 40% of West Exterior Wall Area Maximum Standard West Area Proposed West Window Area If the proposed West Window Area is greater than the Maximum Standard West Area, then the envelope component method may not be used. See West RSHG in Table 143-A, J. Window Wall Ratio = (Row I) Divided by (Row G)50.48 %143-B, OM43-C COMBINED AREA FOR NORTH, EAST AND SOUTH WALLS K. N/E/S Display Perimeter (A Minus E) L. N/E/S Exterior Wall Area (B Minus G) M. Enter Larger of K or L N. Proposed N/E/S Window Area (D Minus I) 1,382 ftX6ft ft2 X 0.40 Oft2 553 553 529 N/E/S of West Exterior Wall Area 40% N/E/S Area Maximum Standard N/E/S Area Proposed N/E/S Area WINDOW ADJUSTMENT O. If D > C and/or if I > H, proceed to the calculation steps 1 for all walls or 2 for west wall. If not, go to the skylight area test on page 6. 1. If D > C: Use the calculated Window Adjustment Factor (WAF) for all walls. PROPOSED WINDOW MAX. STANDARD AREA AREA WINDOW (from C) (from D) ADJUSTMENT FACTOR Go to Page 6 to calculate Adjusted Area 2. If I > H: Calculate one Window Adjustment Factor (WAF) for the West wall. MAX. STANDARD WEST PROPOSED WEST AREA AREA (from H) (from I) WEST WINDOW ADJUSTMENT FACTOR 42 *53 =0.792 MAX. STANDARD AREA (from C) PROPOSED AREA (from D) WEST WINDOW ADJUSTMENT FACTOR Go to Page 6 to calculate Adjusted Area EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2011-07-05710:04:0 ID: 11055 Page 5 of 13 OVERALL ENVELOPE TDV ENERGY APPROACH (Part 2 of 6 ) ENV-3C Project Name Clubhouse Members Lounge Addition SKYLIGHT RATIO CALCULATION §1 43(b) Actual Gross Roof Maxii Area A. If Atrium/Skylight Height is £ 55 ft; or B. If Atrium/Skylight Height is > 55 ft C. Proposed Skylight Area 952 ft2 X 0.05 ft2 X 0.10 V D. Skylight Ratio = Proposed Skylight Area (Row C) Divided by Actual Gross Roof Area E. Maximum Allowed Skylight Roof Ratio = Maximum Allowed Standard Skylight Area (Row A or B) Divided by Total Gross Exterior Roof Area Date 7/5/2011 num Allowed Standard Skylight Area 48 ft2 ft2 0.0 % SRRprop 5 % SRRsiD IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT, GO TO PAGE 3 OF 6. SKYLIGHT AREA ADJUSTMENT IF F > D, Proceed To Calculation Step 1 Step 1 . Calculated the Skylight Adjustment Factor (WAF). STANDARD SKYLIGHT AREA - PROPOSED SKYLIGHT SKYLIGHT ADJUSTMENT AREA (IF E = 0 ENTER 1 ) FACTOR (SAF) "• • CARRY THE WINDOW ADJUSTMENT FACTOR (SAF) TO PAGE 6 OF 6 TO CALCULATE THE ADJUSTED AREA EnergyPro 5.1 by EnergySoft . User Number: 8004 RunCode: 2011-07-05710:04:0 ID: 11055 Page 6 of 13 I OVERALL ENVELOPE TDV ENERGY APPROACH (Page 3 of 6) ENV-3C |Date7/5/2011IProject NameClubhouse Members Lounge Addition| TDV for the Standard Design Building, See Reference Nonresidential Appendix NA5-2 Iiv 0) rS <Bn) O D Retail, See Table NA5-5CD J3 £ $CO 8 i_Z!OT*Sgnl B Nonresidential, SeeTable NA5-3(Occupancy Type and CoefficientsTablesE _i * -> - I <5 u. UJ a u m <Standard TDVEnergy10*k. | 0.1 9 i « 0 "_0 1=) .iS cl- ef' J \ bo <n ii PenetrationType3O Sw'F S S£ t 2X 3 <fUJ W Roofs orFloor MassType5lit*.E-1 S 9;io|^ "co OrientalAssembly Type1IV 5! CO sid §oci CO<orj- i Ul 1 i COCM OSf <O S R'CM T— 00 w §M-ci 1cj Sci Site-built%CM UJ s 0)CMT- CM § «5 SsCM T-00 w §M- c> 1ci &o Site-built•*t CM UJ s §t— T- Sid §oci 3 1 2 1 T- CM^»- «3 IV (0ci s? *~10T- IVo> •^ sci o T-COci gci Site-builtCO«5 2 1 WindowCMOCO CM tvto & SWU5^^ IV0) •^ S Ci OT-<0ci gci Site-built<3lCM 2 1 Window^ Z *- Sid 1ci %CM i CO 1 <o(0•««• s 15 CO§ci 8 I £ i §T- 10 enCO § CO55 S CM §^1- Ci OsCi gIVci Site-builtCMM- £| WindownS <d oM- $ IV § O eg § 3 1 O) <0<3>of<0 C Ul'<n & I 8<n I •8 E CO , Skylight & Door). One assembly type for each row.ight and F = Fabricated,number in column E.< 7), medium mass (7 & HC,15), and heavy mass (HC S 15).cable. Note: Not all vertical windows have an overhang then assume SHGC as value entered,umn G by 1 .2.i Table NA5-2, through Table NA5-5 of the Reference Nonresidential Appendices NA5. The Coefficient for SHGC and VT aree.e: TDVstd = Column C x [Column E x ((U-factorsl x CSui) + (SHGCsi x CSsi) + (VTSi x Cs«))] for each Assembly Type. See1 Hi fail? i ilS o *?b- fl^og = ' I^| |nfS|| 0 0) | .2 £ C *JC <D£ S|l.si5ia*& .n « o3o,< •5^0 "35 J2 1 ffljsls?3^'fcgs§ w§Sm°.£-o|llJ« q. El^^^trS^lcs Indicate type of assembly for the Envelope (eEnter the area of each different assembly.Enter the type of fenestration; M = ManufactuGrouping of like assemblies in the same orierEnter Roofs, Floors, Walls and for Mass WallsStandard Design U-factor are from Table 1 43Standard Design SHGC are from Table 143-/1To calculate the fenestration standard designCoefficients for; U-factor (Csu,i), SHGC (Cs,,0only entered for the fenestration productsD. Calculate the TDV Standard Design for for eonresidential Manual Examples in Section 3.7T-CMco^i-iotorvcocn -^"Z. co *-•5 IV <D 1 1 T«- Q ssoc!2 V" 3 1 CO11 1 sXo^*. id 1 fi ENV-3CCD»*— O <DoiccQ_ O Ooc Q. Q. ODCUJ UJ | UJ 0.O UJ>z LU VERA^ I5251II * -SCD -Q •?3- O Dz 0 0 Z .£> |jgw o UJ CD t 0 o c CO" > S t LU W VJrs Eli*, S UJ UJ CM UJ SS "fe 00 § 1 o I 35 ii^iigll^ill21Sk=3;k £5 cfiCC .-> o>i-i- i- % Ul OVERALL ENVELOPE TDV ENERGY APPROACH (Part 5 of 6 ) ENV-3C Project Name Clubhouse Members Lounge Addition Date 7/5/2011 Cool Roof Multiplier (MCR) Occupancy Type and Coefficients Tables El Nonresidential, See Table NA5-3 D 24-Hour Use, See Table NA5-4 D Retail, See Table NA5-5 Climate Zone: Coefficients of Calculation Reflectance -3.270 Emittance -0.930 Proposed Aged Solar Reflectance 0.10 Standard Aged Solar Reflectance1 0.55 Proposed Thermal Emittance 0.75 Standard Thermal Emittance Cool Roof Multiplier2 0.75 2.472 Enter multiplier in Page 4 of 6, Column J. Where: Standard design values for Solar Reflectance and Thermal Emittance. Except from Table NA5-2 Standard Aged Solar Reflectance (Column D) Standard Thermal Emittance (Column F) Low-Rise, Low-Sloped, CZ2 through CZ15 0.55 0.75 Low-Rise, Low-Sloped, CZ1 through CZ16 0.10 0.75 High-Rise, Low-Sloped, CZ10 through CZ15 0.55 0.75 High-Rise, Low-Sloped, CZ1-9 through CZ16 0.10 0.75 Steep-Sloped, CZ2 through CZ15 0.25 0.75 Steep-Sloped, all other 0.10 0.75 1. Proposed Aged Design Solar Reflectance; pafled prop = 0.7 X (Pmit prop + 0.06). Where (pinit prop) reflectance value is found in the CRRC Directory. Enter results of the Cool Roof Multiplier equation in footnote 2. 2. Cool Roof Multiplier McR.i = 1 + CRe( X (paged prop - Paged std) + CM X (Eprop - Estd) or 1 + Col A X (Col C - Col D) + Col B X (Col E - Col F) Overhang Multiplier (MOH) Occupancy Type and Coefficients Tables El Nonresidential, See Table NA5-3 D 24-Hour Use, See Table NA5-4 D Retail, See Table NA5-5 Climate Zone: Orientation Coefficients of B Projection Factor1 Projection Factor1 Fenestration Overhang Calculation Horizontal Projection (ft2) Vertical Distance (ft2) Projection Factor2 Overhang Multiplier Enter multiplier in Page 4 of 6 Column K. 1. Where a, and b, are he coefficients for the overhang projection factor (see tables) and is climate zone dependent. 2. PF = HA/ (Horizontal (H) projection of the overhang from the surface of the window in feet, but no greater than V and the Vertical (V) distance from the window sill to the bottom of the overhang, in feet.) Enter results in Column F. 3. MOH.i = 1+ (a, X PFi) + bi X PF(2. Enter results in Column G. EnergyPro 5.1 by EnergySo User Number: 8004 RunCode: 2011-07-05710:04:03 ID: 11055 Page 9 of 13 OVERALL ENVELOPE TDV ENERGY APPROACH (Part 6 of 6 ) ENV-3C Project Name Date Clubhouse Members Lounge Addition 7/5/201 1 WINDOW AREA ADJUSTMENT CALCULATION A Wall Name (e.g. Wall-1, Wall-2) Front Wall Right Wall Left Wall Back Wall Orientation N D m n D D n n n nn n nn n nn n n n nn E El D D D D D D D D D D Dn n nn n n n nn S D D m nn n n n n n nnn n n n n n n nn w D D n 0 n n n n n n nnn n n n nn n nn Totals: B Gross Area 910 236 236 105 1,487 C Door Area 0 0 0 0 0 D Window Area 447 82 0 53 582 E Window Adjustment Factor (From Pagel) 1.000 1.000 1.000 0.792 F Adjusted Window Area (DXE) 447 82 0 42 571 G Adjusted Wall Area B - (F + C) 463 154 236 63 916 SKYLIGHT AREA ADJUSTMENT CALCULATIONS A B Roof Name (e.g. Roof-1 , Roof-2) Gross Area Totals: c Skylight Area D Skylight Adjustment Factor (From Page 1) E F Adjusted Skylight Adjusted Area Roof Area (C X D) (B - E) EnergyPro 5.1 bv EnerqySoft User Number: 8004 RunCode: 2011-07-05T10:04:0 ID: 11055 Page 10 of 13 Project Name Clubhouse Members Lounge Addition Date 7/5/2011 MINIMUM SKYLIGHT AREA WORKSHEET (Part 1 of 3 ) ENV-4C MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES (definition in §131 (c), requirements in §143c) / 0 This worksheet applies to buildings with three or fewer stories, in climate zones 2 through 15, having an enclosed space > 8,000 ft2 that is directly under a roof, with a ceiling height > 15 ft and the exception below does not apply. Go to Step 1. • Name or reference of Large Enclosed Space on building plans . • Proposed daylight area is indicated on page of the building plans. •f D Skylights not required as fully designed lighting system on page of building plans has general lighting power density of W/ft2, which is less than 0.5 W/ftz. Note: this exemption applies only to buildings with a fully designed lighting system. This exception does not apply to core & shell buildings. STOP HERE IF THIS BOX IS CHECKED. Space is exempt from minimum skylight area requirement. NOTE: The minimum skylight area requirements can be met using skylit daylight areas, primary sidelit daylight areas, or a combination of both. Use Step 1 below if using skylit daylight areas for compliance. Use Step 2 below if using sidelit daylight areas for compliance. Use Step 3 below to add together skylit daylight and primary sidelit daylight areas. Step 1 Calculate if Proposed Skylit Daylight Area is greater than or equal to Minimum Daylight Area. 0 Criterion 1: Check if Total Proposed Skylit Daylight Area is greater than or equal to Minimum Daylit Area. (C > B) If Criterion 1 is checked, skip step 2. Go to Step 3. Floor Area of proposed design large enclosed space Minimum Daylight Area = 0.5 x Floor Area (A) Proposed design skylit daylight area in accordance with §131(c)1D and as shown on the plans. A B C °ft2 °ft2 Oft2 Space floor area Minimum Daylight Area = 0.5 x (A) Proposed Skylit Daylight Area Step 2 Calculate if Proposed Primary Sidelit Daylight Area is greater than or equal to Minimum Daylight Area D Criterion 2: Check if Total Proposed Skylit Daylight Area is equal to or greater than Minimum Daylit Area (D > B). Primary sidelit daylit area determined in accordance with §1 31 (c)1 B and as shown on the plans D ft2 Proposed Primary Sidelit Daylight Area Step 3 Confirm that Proposed Primary Sidelit + Skylit Daylight Area is greater than or equal to Minimum Daylight Area D Criterion 3: Check if Total Proposed Daylight Area is greater than or equal to Minimum Daylit Area (E > B). Total Proposed Daylight Area = Skylight Area + Primary Sidelit Area Add C + D and enter into E E ft2 Total Proposed Daylight Area If Criterion 3 is checked, complete both Steps 4 & 5 on Page 2 D If Criterion 3 is unchecked. Space FAILS, not enough daylight area, do not continue. EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2011-07-05T10:04:0 ID: 11055 Page 11 of 13 Project Name Clubhouse Members Lounge Addition Date 7/5/2011 MINIMUM SKYLIGHT AREA WORKSHEET (Part 2 of 3 )ENV-4C SKYLIGHT AREA FOR LARGE ENCLOSED SPACES (§143c) Step 4 - If using SKYLIGHT to comply with the minimum skylight area requirements, calculate compliance with minimum skylight area using Step 4a, or compliance with minimum effective aperture using Step 4b. Also verify compliance with skylight haze criteria is met in Step 4c . Step 4a - If Complying with minimum skylight area: IZ Criterion 4a: Check if Proposed Skylight Area is equal or greater than Minimum Skylight Area (H > G). Proposed Skylight Daylight Area from cell (C), Step 1 , on ENV-4C (Page 1 of 3) Minimum Skylight Area = Skylight Area (F) X 0.033 Total Proposed Skylight Area = Sum of the areas (rough opening) of each individual skylight F G H Oft2 Oft2 Oft2 Proposed Skylight Daylight Area Minimum Skylight Area Total Proposed Skylight Area Step 4b - If complying with minimum effective aperture: D Criterion 4b: Check if Proposed Skylight Effective Aperture is equal to or greater than Minimum Skylight Effective Aperture (J > I). If this criterion checked, shall also fill out ENV-4-C (Page 3 of 3) Minimum Skylight Effective Aperture Proposed Skylight Effective Aperture. Shall be taken from ENV-4C (Page 3 of 3) Cell (AB) Minimum Skylight Effective Aperture Proposed Skylight Effective Aperture Step 4c Required Q Criterion 4c: Check if Proposed Skylight glazing or diffuser haze rating is equal or greater than 90% (K 2 0.9). Skylight glazing or diffuser haze rating according to ASTM D1003 K Haze rating is indicated on page Haze rating of plans D Complies with all of Criterion 4 if either Criterion 4a or Criterion 4b is checked, AND Criterion 4c is checked. Step 5 - If using PRIMARY SIDELIGHT to comply with the minimum skylight area requirements: D Criterion 5: Check if Proposed Primary Sidelit Effective Aperture is greater than or equal to Minimum Sidelit Effective Aperture (M > L). Fill out remaining questions on Step 6 below. Minimum Sidelit Effective Aperture Enter Proposed Primary Sidelit Effective Aperture from Equation 146-Acell (Q) below M Minimum Sidelit Effective Aperture Proposed Primary Sidelit Effective Aperture EQUATION 146-A: Effective Aperture for Primary Sidelit Area Rough opening of windows adjacent to the sidelit are in square feet Visible light transmittance of window Primary sidelit daylight area determined according to §1 31 (c)1 from cell (D), step 2 on ENV-4C (Page 1 of 3) Primary Sidelit Effective Aperture = (N X O) / (P) Enter results for Primary Sidelit Effective Aperture from cell (Q) into cell (M) in Step 5 N O P Q Total window area Average VLT Primary Sidelit Area Primary Sidelit EA Step 6 0 Space PASSES: Check if Criterion 1 and 3 (page 1); and, Criterion 4 (page 2) are checked. D Space PASSES: Check if Criterion 2 and 3 (page 1); and Criterion 5 (page 2) are checked, n Space PASSES: Check only if Criterion 1 through 5 are all checked. EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2011-07-05T10:04:0 ID: 11055 Page 12 of 13 Project Name Clubhouse Members Lounge Addition Date 7/5/2011 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM DESCRIPTION Building Envelope Measures: §118(a):Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c):All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f):The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117(a):All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the app|jcab|e defaim SHGC §116fbV ^lte C°nstructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be _ ^ '' weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2011-07-05710:04:03 ID: 11055 Page 13 of 13 CERTIFICATE OF COMPLIANCE (Part 1 of 3) Project Name La Costa Resort Membership Lounge LTG-1 C Date 6/27/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG-1- INST (Retain a copy and verify form is completed and signed.) Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.) Field Inspector D Field Inspector D A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE D UNCONDITIONED SPACE in The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with§146(a). Only for offices: Up to the first 0.2 watts per square foot of portable I ghting shall not be required to be included in the 0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. A None or Item Tag A L3 L4 L5 L6 L9 Luminaire (Type, Lamps, Ballasts) B Complete Luminaire Description1 (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts) Acan20WMR16 L3(1)60WINCAN60w L4 PENDANT 100W L5 SCONCE (2)25W L6 (2)60W L9 DOWN 10W LED Installed Watts C D Watts perLuminaire120.0 60.0 100.0 50.0 120.0 10.0 E How wattage Was determined CEC Default From NA8 n a 0 n D n n n n n n n n n n i_ D n n n n 0> §t< (- E E n 0 0 0 n n n a a a a a a a a a a a F Number ofLuminaires24 3 2 4 1 6 Installed Watts Page Total: Building total number of pages: Installed Watts Building Total (Sum of all pages) Enter into LTG-1 C Page 4 of 4 G InstalledX. 1 480 180 200 200 120 60 1, 1 240 H Field Inspector2 |; O Q, •ti' J3 m .ff ^9 ' ,"•&- ,-Jp& I8N $1$ ''Hi*%iw"ill •$$\jiiy j^jpif <y v ^f^r tlffj *ta . is£ a a D D d a a ti "JD , *'$•• Jl ijl'; ilP, 'itr IJIf >M '•^b :l3 ; ^M3 H 240 1 . Wattage shall be determined according to Section 1 30 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5. 1 by EnergySoft User Number: 2875 RunCode: 2011-06-27711:17:42 ID:Page 8 of 18 CERTIFICATE OF COMPLIANCE (Part 2 of 3)LTG-1C Project Name La Costa Resort Membership Lounge Date 6/27/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2, automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls - general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft2, in accordance with Section 131. MANDATORY LIGHTING CONTROLS - FIELD INSPECTION ENERGY CHECKLIST Field Inspector Type/ Description Number of Units Location in Building Special Features Fail D D D D a D P a a IfiL a "Q .By.'., .43 . D D ',&/:• 3D SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of LTG-1C) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number 2875 RunCode: 2011-06-27711:17:42 ID:Page 9 of 18 CERTIFICATE OF COMPLIANCE Project Name La Costa Resort Membership Lounge (Part 3 of 3) LTG-1C Date 6/27/20 1 1 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned Spaces Installed Lighting (from Conditioned LTG-1C, Page 2) Lighting Control Credit Conditioned Spaces (from LTG-2C) Adjusted Installed _ Lighting Power Complies if Installed £ Allowed Allowed Lighting Power Conditioned Spaces (from LTG-3C or PERF-1 ) Watts 1,240 118 1,122 I 1,122 Indoor Lighting Power for Unconditioned Spaces Watts Installed Lighting „ (from Unconditioned LTG-1C, Page 2) Light ng Control Credit . Q Unconditioned Spaces (from LTG-2C) Adjusted Installed = 0 Lighting Power Complies if Installed £ Allowed £ Allowed Lighting Power Unconditioned Spaces (from LTG-3C) Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Luminaires Controlled Equipment Requiring Testing Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Description Acan20WMR16 L5 SCONCE (2)25W L3 (1)60W INCAN 60w L4 PENDANT 100W L6 (2)60W L4 PENDANT 1 00 W L5 SCONCE (2)25W Number of Luminaires controlled 24 2 3 1 1 1 2 Location new area new area new area new area new area exist area exist area LTG-2A and LTG-3A Controls and Sensors and Automatic Daylighting Controls Acceptance m m m m m EJ El n D n n n o n n D EnergyPro 5. 1 by EnergySofi User Number: 2875 RunCode: 2011-06-27711:17:42 ID: Page 10 of 18 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG-2C Project Name Date La Costa Resort Membership Lounge 6/27/201 1 POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: 0 CONDITIONED SPACES D UNCONDITIONED SPACES A Room # Zone ID Areas new area new area new area new area new area exist area exist area B Lighting Control Description1 Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual Dimming - Manual C Plan Reference A L5 L3 L4 L6 L4 L5 D Room Area (ft2) 832 832 832 832 832 360 360 E Watts of Control Lighting 480 100 180 100 120 100 100 F Power Adjustments Factor2 0.70 0.10 0.10 0.10 0.10 0.10 0.10 PAGE TOTAL Note: Conditioned and Unconditioned Space shall be separately totaled Building total of non-daylight control credit watts for all pages of LTG-2C Page 1 of 2 Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2 BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces G Control Credit Watts (E x F) 48 10 18 10 12 10 10 118 0 118 1 . Description shall be consistent with Type of Control defined in Table 1 46-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro 5. 1 by EnergySoft User Number: 2875 RunCode: 2011-06-27711:17:42 ID: Page 11 of 18 Project Name La Costa Resort Membership Lounge Date 6/27/2011 LIGHTING MANDATORY MEASURES: NONRESIDENT!AL LTG-MM Indoor Lighting Measures: §131 (d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2.Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. §119(h):Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111:Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131 (a): individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor-to-ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131 (b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. • §131(c): Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year Is included on plans. §131 (c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a):All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens per Watt or are controlled by a motion sensor. 6132/bV A" Luminaires w'*h larnps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, s * '• canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanently installed outdoor lighting meets the control requirements listed. Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi-Level Lighting Requirements listed. EnergyPro 5.1 by EnergySoft User Number: 2875 RunCode: 2011-06-27711:17:42 ID:Page 13 of 18 Project Name La Costa Resort Membership Lounge Project Address 2100 Costa Del MarRd Carlsbad, CA 92009 Date 6/27/2011 Total Illuminated Area 750 CERTIFICATE OF COMPLIANCE (Parti of4) OLTG-1C GENERAL INFORMATION Phase of Construction: El New Construction D Addition D Alteration Documentation Author's Declaration Statement 1 certify that this Certificate of Compliance documentation is accurate and complete. Name Mark Gallant, CEPE Company Gallant Energy Consulting Address 508 W Mission Ave Ste 201 City/State/Zip Escondido, CA 92025 Signature /Y) rJJcJ^C^^ Date 6/27/207? CEA# CEPE# Phone 760-743-5408 Principal Lighting Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Company Address City/State/Zip Thomas A. McCabe McCabe Architecture 2051 San Elijo Ave Cardiff, CA 92007 Signature Phone 760-479-0735 License # Date Principal Lighting Designer's Declaration 0 I certify that this Certificate of Compliance documentation is accurate and complete, and accounts for all outdoor lighting power, including building mounted, pole mounted, as well as all other lighting designed for the site, and that Additional Lighting Power Allowances for Specific Applications or Additional Lighting Power Allowances for Ordinance Requirements have not been counted more than one time for the same area, in accordance with Section 147 of the Standards. Outdoor Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures Note Block:. LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published by the California Energy Commission. OLTG-1C Certificate of Compliance. All 4 pages required on plans for all submittals. D OLTG-2C (Pages 1 of 3) Lighting Wattage Allowances for General Hardscape, Sales Frontage, or Ornamental Lighting. Optional on plans. 0 OLTG-2C (Pages 2 of 3) Lighting Wattage Allowance for Per Application or Per Area. Optional on plans. OLTG-2C (Pages 3 of 3) Additional Lighting Power Allowance for Ordinance Requirements. Optional on plans. EnergyPro 5.1 by EnergySoft User Number 2875 RunCode: 2011-06-27T11:17:42 ID:Page 14 of 18 CERTIFICATE OF COMPLIANCE (Part 2 of 4) OLTG-1C Project Name La Costa Resort Membership Lounge Date 6/27/2011 COMPLIANCE FIXTURE / LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST INSTALLATION CERTIFICATE, OLTG-1INST (Retain a copy and verify form is completed and signed.) CERTIFICATE OF ACCEPTANCE, OLTG-2A (Retain a copy and verify form is completed and signed.) Luminafre Schedule Installed Watts B Name or Item Tag Luminaire Description1 See footnote below (i.e.: 1 lamp pole-top shoe-box 400 watt metal halide)O D SL-a &•-I! I 1Q. V) How wattage was determined p m <QZ fteW Inspector2 3 c =5 LU II1!< 10WLED 10.0 n 60 L7 40.0 200 13' D D D D D Enter total into OLTG-1 C; Page 4 of 4: Row H; Total Installed Watts:260 1. Type of luminaire (i.e.: post top, wall pack, surface, shoe box); for non-incandescent luminaires, indicate nominal lamp wattage and lamp type (i.e.: fluorescent, incandescent, HID); ballast type (i.e.: electronic or magnetic); number of lamps and number of ballasts per luminaire. For incandescent luminaires, the luminaire wattage listed in column D shall be the maximum relamping rated wattage on a permanent factory-installed label on the luminaire, NOT the wattage of the lamp (bulb) used, in accordance with Section 130(d or e). 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EXEMPT LUMINAIRES Name or Symbol Description of exempt luminaires in accordance with §147 MANDATORY CONTROLS Description Location Description Location SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of OLTG-1 C) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Filed Inspector Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 2875 RunCode: 2011-06-27T11:17:42 ID:Page 15 of 18 CERTIFICATE OF COMPLIANCE (Part 3 of 4) OLTG-1C Project Name La Costa Resort Membership Lounge Date 6/27/2011 A. OUTDOOR LIGHTING ZONE OUTDOOR LIGHTING ZONE: D OLZ 1 D OLZ2 0 OLZ 3 D OLZ 4 Is the Outdoor Lighting Zone: El Default in accordance with §10-114, or D Amended by JHA Complete the information below if the default Outdoor Lighting Zone has been amended by the local jurisdiction having authority (JHA): ^ The site is a government designated park, recreational area, wildlife preserve, or portion thereof, and has been designated as LZ2 or LZ3, in accordance with Table 10-114-A, because the site is contained within such a zone. E The local jurisdiction having authority has officially adopted a change to the State Default Lighting Zone and has notified the Energy Commission by providing the materials required in §10-114(d) to the Executive Director. D The adopted change is posted on the Energy Commission website. B. ADDITIONAL LIGHTING POWER ALLOWANCE FOR ORDINANCE REQUIREMENTS Are additional lighting power allowances for ordinance in Table 147-C used? D Yes IZ No Complete the information below if additional lighting power allowances for ordinance requirements are used: D The local jurisdiction having authority has officially adopted specific outdoor light levels, which are expressed as average or minimum footcandle levels, by following a public process that allowed for formal public notification, review, and comment about the proposed change. D The local jurisdiction having authority which adopted specific outdoor light levels and has notified the Commission by providing the following materials required §10-114(f) to the Executive Director. C. ACCEPTANCE FORMS Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, OLTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The OLTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the OLTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Certificate of Acceptance Equipment Requiring Testing Luminaires Controlled Description Qty. of Like Controls Location OLTG-2A1 Outdoor Lighting Acceptance Tests 1. Insert: QMS for Outdoor Motion Sensor; OLSC for Outdoor Lighting Shutoff Controls; OP for Outdoor Photocontrol; ATS for Astronomical Time Switch; and, STS for Standard (non-astronomical) Time Switch acceptance. EnergyPro 5.1 by EnergySott User Number: 2875 RunCode: 2011-06-27T11:17:42 ID:Page 16 of 18 CERTIFICATE OF COMPLIANCE (Part 4 of 4) OLTG-1C Project Name La Costa Resort Membership Lounge Date 6/27/2011 ALLOWED AND INSTALLED OUTDOOR LIGHTING POWER Lighting Wattage Power Allowance Lighting power allowance for general hardscape (from OLTG-2C Page 1 of 3) B Specific application lighting wattage allowance per unit length (from OLTG-2C Page 1 of 3) Specific application lighting wattage allowance for ornamental lighting (from OLTG-2C Page 1 of 3) D Specific application lighting wattage allowance per application (from OLTG-2C Page 2 of 3) Specific application lighting wattage allowance per area (from OLTG-2C Page 2 of 3)260 Specific application lighting wattage allowance for ordinance requirements (from OLTG-2C Page 3 of 3) G Total Allowed Wattage = Sum of rows A through F:260 H Total installed watts (from Compliance Fixture Schedule, (from OLTG-2C Page 1 of 3)260 Complies if wattage in row H is less than or equal to the wattages in row G El Yes DNo EnergyPro 5.1 by EnergySoft User Number: 2875 RunCode: 2011-06-27711:17:42 ID:Page 17 of 18 O CNI L_ ^1 0 fY\ H —o CM •cco Q_G WORKSHEETz ^F UTDOOR LIGhO ^O |^ § (U13Q CD 1O-J •S- 1 iject NameCosta Resort Mem£3 o5UZ3Q. Q. DC UJQ. UJ Oi50 SI LIGHTING WATTAGEOg SPECIFIC APPLICd UI 1go _J If5 z2ffiQ f ATT AGE ALLOWANCE9 UI s DETERI-j _ <3 u. UI Q O CD < S> O±s« Q f E3_ E •— • — >f l X Q 5 O - CD t -ffl 6 E §3 .£ s- io 0u>h oi 'Sc E LuminaireSymbol<D S -~D) c O S X ||S g 0ftss Number ofApplicationsSpecific LightingApplication0 c•S13 .0 Q.Q. ! ig= os c o "5 < o ^g Q CO Q $ cc • - 0 <D I O m :al into OLT(S c < UJ DCUJQ. UJo ^O 4 LIGHTING WATTAGE /O SPECIFIC APPLIC-UJ 1 O o UJ p. UJcc zi_j f ATT AGE ALLOWANCES UI 5 DETERI-3 — (S u. UI Q U m < ^ Om Q ^E> 13Je r- - — •f inx Q 5 CD 0) «Q-'| G '§ 53 |o (£ |_ 'Sc'E 3 Code forLuminaireTypeS>loS § x ||S SpecificApplicationAllowance(watts per ft2)IlluminatedArea ofApplicationct~*Specific Lighting Applicatii§ o(O oo to 10 0 -J o -J CO CM o ^: ADELTG\j oCM o 0*M- 10 ^ ^<o 1 —-J s.-J §CM (0S? ^<Dot 0i^ Si SCO I 1 S 13o I OT 1JJ § CC | 0) Q. O into OLTG-ra § 1UJ CO o 00 s Q_ Q ^1 ^N> 1to9 1 S User Number: 2875ergyPro 5. 1 by EnergySoft5 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY HV# BPDATE / / Project Contact The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE JBPMTMENT-HAZARDOUS MATEFiiALS DIVISIONiQjECUPAMCar CLMSIFICATION: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any:of the itemsareujgcleda applicant mustcontact(he Fire Protection Agency with jurisdiction prior to plan subrnittai. Ficility'.sSquare Footage ('including proposed project): V^L A ** "> Occupancy Rating: • ;• 1. Explosive or Blasting Agents 5, Organib Peroxides . 9, Water Reaeltves 13. Corrosives 2. Compressed Gases 6, Qxidizers 10, Cryogenics 1.4; Other Health Hazards 3. Flammable/Combustible Liquids 7, Pyrophoflcs 11. Highly Toxic or Toxic Materials /fC*jHoria: of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives HAZARDOUS MATERIALS PIVISIQMS (HMD); If theanswer to any of thePART H: SAN DIEGO GQUNTY DEPARTMENT OF ENVIRONMlNTAL HEALTH questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Ave., Suite 110, San Diego, CA 92123 Call (858) 505-6700 prior to the issuance of a building permit. i FEES ARE REQUIRED. Project Completion Date: |0. / * I /^Pj\ Expected Date of Occupancy; jD / {, 1. a2. a Date Initials O CalARP Required Date initials (for new construction or remodeling projects) an/Is your business listed on the: reverse side of this form? (check all that apply). STj/Vill your business dispose of Hazardous Substances or Medical Waste in any amount? 3- D B^Will your business store or handle Hazardous $ubstanees in quantities equal tear greater than 55 gallons, SOO pounds, j 200 cubic feet, or carcinogens/reproductive toxins in any quanfity? 4. Q 0C Wilt your business use an existing or install anundergrourid storage tank? 5. D :0f w'" your business store or handle Regulated Substances (CalARP)? 6. D ^, Will your.business use or Install a Hazardous Waste Tank System (Title 22, Article 10)? 7. D m Will your business Store petroleum in tanks or containers at your facility with a total storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL PISTRiCT: If the answer to any of the questions below is yes, applicant must contact the Air D CalARP Exempt D CalARP Complete Date Initials Ne: RPollution Control District ^APCD), TOT24 ©Id 6rove: Roadt San Diego, CA 92131r1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit -an asbestos notification form to the APCD at least 10 working days prior to commencing demolition or renovation, except dernoIJtion or renovation of residential structures of four units or less. Contact the APCD for more information, YES 1 .D N®S' HT Wil 2, D 3. 4. 5, Q D Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD faetsheet at-http://www.sdapcd.ofoJnfo/fac^stermltsM^ , and the list of typical equipment requiring an APCD permit on the reverse side /' of this from. Contact APGD if you have any questions). a (ANSWER ONLY IF QUESTION 1 1S YES) Will the subject facility be located within 1 .tiOfifeet of the outer boundary of a school (K through 12)?s (Search the California School Directory at h tto:/'/www.cde. ca.oov/re/sd/ for public and private schools or contact the; appropriate school district). SL<1Has a survey been performed to determine the presence of ^Asbestos Containing Materials? .K/^?ill there.be renovation that involves handling of any ffiable asbestos materials, or disturbing any material that contains non-friable asbestos? H Will there be demolition involving ^the removal of a load supporting structural member? Briefly describe business activities:Briefly describe proposed project: fjury that to the best of my knowledge and belief the responses made herein are true and correct. Signature of Owner or Authorized Agent Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. BY: ' FOR OFFICIAL USE ONLY: DATE: EXEMPT OR NO FURTHER INFORMATION REQUIRED COUNTY-HMD*APCD RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY COUNTY-HMD ARCD RE16ASBDFOR OCCUPANCY COUNTY-HMD APCD *A stamp in this boxonlv exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply. HM-9171 (02/11) County of San Diego - DEH -, Hazardous Materials Division 3MS3= \r y..__ . vnONSUBJEGT •NT&QF THE STATED LOCAL REGU' ?WW\\> IS NO ASSURANCE THAT THE PIA'^ TIONS ARE CORRECT IN EVERY RESPECT. \ GN OR CONSTRUCTION MUST BE ^*»«I-C 1*~~~ it EXISTING TRASH COMPACTOR AREA OF THE RESORT TO BE MULTI SERVICE CONSUMER UTENSILS LITY IS SERVED BY LEUCADIA SEWER AND JTRICT. > DYEES PER SHIFT ;0SRARTMEfiJT Of J^^^g^l^^S^^g^^i >^'HEPlA-MS^ff.p.X^jXi;.' i WILL Bt V?CH6SO^va*;.f CITY OF CARLSBAD CERTIFICATION OF SCHOOL FEES PAID B-34 Development Services Building Department 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit The City will not issue any building permit without a completed school fee form. Project Name: Building Permit Plan Check Number. Project Address: A.P.N.: Project Applicant (Owner Name): Project Description: Building Type: Residential: LA COSTA RESORT MEMBERS LOUNGE CB110949 2100 COSTA DEL MAR RD 216-590-01-00 KSL RESORTS NEW MEMBERS LOUNGE COMMERCIAL New Dwelling Unit(s) Square Feet of Living Area in New Dwelling Second Dwelling Unit: Residential Additions: Square Feet of Living Area in SOU Net Square Feet New Area Commercial/Industrial: 952 Net Square Feet New Area City Certification of Applicant Information:Date: 7/25/2011 SCHOOL DISTRICTS WITHIN THE CITY OF CARLSBAD J2SJ Carlsbad Unified School District 6225 Ei Camino Real Carlsbad CA 92009 (760-331-5000) n Vista Unified School District 1234 Arcadia Drive Vista CA 92083 (760-726-2170) O San Marcos Unified School District 255 Pio Pico Ave Ste 100 San Marcos, CA 92069 (760-290-2619) Contact: Nancy Dolce (By Appt. Only) | | Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 (760-944-4300 X1166) r~l San Dieguito Union High School District-By Appointment Only 710 Encinitas Blvd. Encinitas, CA 92024 (760-753-6491) Certification of Applicant/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's Knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to beJncorrecyand thaW2) the Owner is the owner/developer of the above described projects), or that the person execdflng tjrfs djlclaraj&jrns authorized to sign on behalf of the Owner. Signature: B-34 Date: Pagel of 2 Rev. 03/09 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION - (To be completed by the school district(s)) Mt^**feMr*^ THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL.BE SATISFIED. SCHOOL DISTRICT: The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other •applicable school mitigation determined by the School District. The City may issue building permits for this project. j 6-l/UA K^JtJ/J Sji f }1 , ~-v -\_ y SIGNATURE OF AUTHORIZED SCHOOL. DISTRICT OFFICIAL TITLE . ri , „ _ ~^0l) NAME OF SCHOOL DISTRICT CARLSBAD UNIFIED SCHOOL DISTRICT 6225 EL CAMIMQ fl^ DATE CARLSBAD, CA92009 PHONENUMBER ^,. . ^ , _, ^ \^JAVIARA OAKS ELEMENTARY Q CARLSBAD UNIFIED SCHOOL DISTRICT ^PACIFIC RIM ELEMENTARY R . . ... \^AVIARA OAKS MIDDLE SCHOOL Q CARLSBAD VILLAGE ACADEMY [^POINSETTIA ELEMENTARY r>6Ceipt INO. ^JBUENA VISTA ELEMENTARY QHOPEELEMENTARY [^PRESCHOOL O O C C ft QG4M^EB4HaSEL£MEWMf?V Qj£-FREnSOWaHM£NMRV' | | VALLEY MIDDLE SCHOOL O O O O U QG4LWER4 MLi.S MDDtE SCHOOL Q/fH-LV ELEMENTARY QOTHEfl ] ] CXIRLSBxlD H/GH SCHOOL | | M4G/VOLM ELEMENTARY RECEIVED FROM: (If Applicable) PARENT OF PAYMENT FOR: ACCOUNT NUMBER AMOUNT ^ 7^^ V ? RECEIVED BY: V X v^ / CASH ±L CHECK # • TOTAL T/T (JL/^ LV^L/ Rev. 03/09j V/ fe $ (^ ? fS8s w rs> I •& r= i ET iiity:it & XX ^x ^ ^ D Q