HomeMy WebLinkAbout2101 FARADAY AVE; ; CB080657; Permitf City of Carlsbad ·
06;.23-2008
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit· Permit No: CB080657
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2101 FARADAY AV CBAD
Tl Sub Type: INDUST
Lot#: 0 Status:
Valuation:
2120700100
$1,890,000.00 Construction Type: NEW Applied:
ISSUED
04/11/2008
KG
06/23/2008
06/23/2008
Occupancy Group: Reference #: Entered By:
Project Title: COVIDIEN-54,000 SF Tl OF A Plan Approved:
64,946 SF BLDG, INCLUDING R/D, SOME LAB & MANUF TO Issued:
Applicant:
DOTY RICHARD
2101 FARADAY AVE
CARLSBAD CA 92008
925-260-9086
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD#2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$5,047.35
$0.00
$3,280.78
$0.00
$0.00
$396.90
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Inspect Area:
Plan Check#:
Owner:
BLACKMORE FARADAY PARTNERS
PO BOX424
RANCHO SANTA FE CA 92067
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
TOT AL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$10,785.05
$0.00
$0.00
$0.00
$4,200.00
$0.00
$188.00
$160.00
$37.50
$0.00
$11,820.27
$0.00
$0.00
??
$35,915.85
Total Fees: $35,915.85 Total Payments To Date: $35,915.85 Bal~nce Due: $0.00
FINAL ~~PROVAL
Date: ~ J_ 7 · 0 g,'
BU2_LDING PLANS
-er 1NSTORAGE 'sca.;.AeO
_ATTACHED
Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
1635 Faraday Ave., Carlsbad, CA 92008
__ 760-602-2717 / 2718 / 2719 / 2721
Fax: 760-602-8558
Building Permit Application
JOB ADDRESS 2101 Faraday Avenue SUITEII/SPACE/1/UNITI/
00
CT/PROJECT II LOT// PHASE// I/BATHROOMS OCC.GROUP
Covidien VN B
DESCRIPTION OF WORK: S'f,~
Tenant improvement of existing 64,946 s.f. building comprisinginterior partition and finish modifications, new restrooms:
and mechanical, electrical and plumbing reconfigurations.The revised space shall be utilized by the tenant as research,
development, testing, customer service and training for medical devices manufactured elsewhere.
SC) ()v'E led, h 0 _(+)1u
EXISTING USE PROPOSED USE
Office/R&D Lab
GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS
Office/R&D Lab YESO# NO[a YES[a NOD YESIZ) NOD
CONTACT NAME Kyle Sobczak, Pacific Cornerstone Architects
ADDRESS 4105 Sorrento Valley Blvd.
CITY San Diego STATE CA ZIP 92121
858-677-9880 FAX 858-677 -9886
kyle@paccornerstone.com
PROPERTY owNER NAME The Blackmore Company
ADDRESS • 1811 Aston Avenue, suite 102
CITY Carlsbad STATE CA ZIP 92008
PHONE 760-804-9600 FAX 760-804-9607
EMAIL
colleen@theblackmorecompany.com
ARCH/OESIGNER NAME & ADDRESS
See Contact Info Above
STATE LIC. #
C-24846
APPLICANT NAME Richard Doty, Covidien
ADDRESS 2101 Faraday Avenue
ciTY Carlsbad STATE CA
PHONE
925-260-9086
. EMAIL
richard.doty@covidien.com
FAX
CONTRACTOR BUS. NAME Good and Roberts
ADDREss 1330 Park Center Drive
ZIP 92008
CITY Vista STATE CA ZIP 92081
PHONE 760-598-7614 FAX 760-598-7659
EMAIL
.iradwanski@goodandroberts.com
STATELIC.#
377551
CLASS CITY BUS. LIC.#
1195553
'070' ... ______________________ _.
Workers' CompensaUon Declaratlon: / hereby affirm under penally of perjury one of the following declaru11011~: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. IZJ I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
number are: Insurance Co._ State Compensation Insurance Fund Policy No. 0000345-2007 Expiration Date 10-1-2008
This section need not be completed if the permit is for one hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the p ormance of e work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure wor rs' ompe ali n coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damag s as rovi d for Sectlon 3706 of the Labor code, interest and attorney's fees.
,HJ5 CONTRACTOR SIGNATURE DATE
@Wfi'J@@o@(!)O(M!)@@ . .
I hereby affirm that I am exempt from Contractor'. icense Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
D
D
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply lo an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0Yes 0No
2. I (have I have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address /phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address/ phone/ contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work):
,HJ5 PROPERTY OWNER SIGNATURE DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? D Yes 0No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or ai!Jl!!ality management district?
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? OYes LJNo
[Jves
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
I certifythatl have read the application and state that the above infonnation is correct and that the lnfonnation on the plans is accurate. I agree to comply with ail City onlinances and State Jaws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA pennit is required for excavations over 5'0' deep and demolition or consbuction of sbuctures over 3 stories in height
EXPIRATION: Every pennit issued by the Building Official under the provisions of this Code shall ex_m,re by limitation and become null and void if the building or work authorized by such permit is not commenced within
180 days from the date of such permit or if ~ bu' (:f or work authorized bys h pe · is sus ended or abandoned at anytime after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code).
,HJ5 APPLICANT'S SIGNATURE c.. DATE ....-, ~ --ct y-
I
CilY of Carlsbad
-Final Building Inspection
D:~e..-;Jp~t:~B\u\J"il,,
1
ding Engineering Planning CMWD St um=O
Plan Check#: ~ 08/20/2008
Permit#: CB080657 Permit Type: Tl
Project Name: COVIDIEN-54,000 SF Tl OF A Sub Type: IN DUST
64,946 SF BLDG, INCLUDING R/D, SOME LAB & MANUF
Address: 2101 FARADAY AV
Contact Person: LANCE
Sewer Dist: CA
Phone: 7604583413
Water Dist: CA
Lot: 0
·················································································································~········································ ~;pected44..._ Date ~u./4r /Disapproved: __ Inspected: Approved: l
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __ ............................................................................................................................................................
Comments: ______________________________ _
Inspection List
~
Permit#: CB080657 Type: Tl INDUST COVIDIEN-54,000 SF Tl OF A
64,946 SF BLDG, INCLUDING RID, SOME
Date Inspection Item Inspector Act Comments
08/27/2008 89 Final Combo PD AP
08/27/2008 89 Final Combo RI
08/20/2008 89 Final Combo RI
08/20/2008 89 Final Combo PD co
08/12/2008 84 Rough Combo PD PA CEILING
08/05/2008 84 Rough Combo PD PA CEILING
08/04/2008 14 Frame/Steel/Bolting/Weldin TP AP T-CLNG RM 417
08/04/2008 24 Rough/Topout TP WC
08/04/2008 34 Rough Electric TP AP CLNG LITES
08/04/2008 44 Rough/Ducts/Dampers TP AP DUCTS
07/31/2008 84 Rough Combo PD PA CEILING
07/30/2008 14 Frame/Steel/Bolting/Weldin TP AP T-CLNG@ RM 317
07/30/2008 34 Rough Electric TP AP CLNG LITES
07/30/2008 44 Rough/Ducts/Dampers TP AP DUCTS
07/28/2008 84 Rough Combo PD PA CEILING
07/25/2008 84 Rough Combo PD PA CEILING @ RM 422
07/18/2008 14 Frame/Steel/Bolting/Weldin PY PA KIOSK
07/07/2008 12 Steel/Bond Beam PD PA
07/02/2008 11 Ftg/Foundation/Piers PD AP 5 POLE FTGS
06/30/2008 17 Interior Lath/Drywall PD AP
06/24/2008 11 Ftg/Foundation/Piers PD WC
06/24/2008 14 Frame/Steel/Bolting/Weldin PD AP
06/24/2008 17 Interior Lath/Drywall PD . PA
06/24/2008 21 Underground/Under Floor PD AP
06/24/2008 34 Rough Electric PD PA
Thursday, August 28, 2008 Page 1 of 1
City of Carlsbad Bldg Inspection Request
For: 08/27/2008
Permit# CB080657 Inspector Assignment: PD
Title: COVIDIEN-54,000 SF Tl OF A
Description: 64,946 SF BLDG, INCLUDING RID, SOME LAB & MANUF
TO OFFICE,LAB TO CONF ROOM,MANUF TO
.,.L.11nn1 .. ,,....,ru~I""" BIIA .. I -r" I AO
---
Type:TI
Job Address:
Suite:
Location:
Sub Type: INDUST
2101 FARADAY AV
Lot: 0
Phone: 7604583413
Inspect~
APPLICANT DOTY RICHARD
Owner: BLACKMORE FARADAY PARTNERS
Remarks:
Total Time:
CD Description Act Comments
19 Final Structural ~
29 Final Plumbing
3~ Final !=lectrical
49 Final Mechanical
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
Requested By: LANCE JORDAN
Entered By: CHRISTINE
PCR99092 ISSUED LUCENT TECHNOLOGIES; ELECTRICAL REVISIONS
lns12ection History
Date Description Act lnsp Comments
08/20/2008 89 Final Combo co PD
08/12/2008 84 Rough Combo PA PD CEILING
08/05/2008 84 Rough Combo PA PD
08/04/2008 14 Frame/Steel/Bolting/Welding AP TP T-CLNGRM 417
08/04/2008 24 Rough/Topout WC TP
08/04/2008 34 Rough Electric AP TP CLNG LITES
08/04/2008 44 Rough/Ducts/Dampers AP TP DUCTS
07/31/2008 84 Rough Combo PA PD CEILING
07/30/2008 14 Frame/Steel/Bolting/Welding AP TP T-CLNG@ RM 317
07/30/2008 34 Rough Electric AP TP CLNG LITES
07/30/2008 44 Rough/Ducts/Dampers AP, TP DUCTS
07/28/2008 84 Rough Combo PA PD CEILING
07/25/2008 84 Rough Combo PA PD CEILING @ RM 422
EsGil Corporation
In (Partnersfi.ip witfi. <;overnment for <Bui[aing Safety
DATE: June 20, 2008
JURISDICTION: Carlsbad
PLAN CHECK NO.: 08-0657
PROJECT ADDRESS: 2101 Faraday Ave.
PROJECT NAME: Covidien Office -R&D Lab. TI
SET: III
d_APPI !CANT
D JURIS.=:::>
D PLAN REVIEWER
D FILE
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Fax#:
Mail Telephone Fax In Person
~ REMARKS: Applicant hand carried the approved plans to the City.
By: Sergio Azuela
Esgil Corporation
D GA D MB D EJ D PC
Enclosures:
LOG
EsGil Corporation
In (J!artnersfiip witfi (jovemment for (]Jui{aing Safety
DATE: June 17, 2008
JURISDICTION: Carlsbad
PLAN CHECK NO.: 08-0657 SET: III
ANT
s
EVIEWER
D FILE
PROJECT ADDRESS: 2101 Faraday Ave.
PROJECT NAME: Covidien Office -R&D Lab. TI
D
D
D
D
D
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person. ·
The applicant's copy of the check list has been sent to:
Kyle Sobczack, Pacific Cornerstone Architects
4105 Sorrento Valley Blvd., San Diego, CA 92121
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Kyle Sobczack Telephone#: (858) 677-9880
Date contacted:6/11 (of(_~) Fax #: (858) 677-9886
MailVTelephone Faxvin Person
REMARKS:
By: Sergio Azuela
Esgil Corporation
D GA D MB D EJ D PC
Enclosures:
06/10/08
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
I I
, Carlsbad 08-0657
Jane 1~1, 2008
RECHECK CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: 2101 Faraday Ave.
PLAN CHECK NO.: 08-0657
SET: III
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 06/10/08
REVIEWED BY: Sergio Azuela
FOREWORD (PLEASE READ):
DATE RECHECK COMPLETED:
June 17, 2008
This plan review is limited to the technical requirements contained in the Building Code,
Plumbing Code, Mechanical Code, Electrical Code and state laws regulating energy
conservation, noise attenuation and disabled access. This plan review is based on regulations
enforced by the Building Department. You may have other corrections based on laws and
ordinances enforced by the Planning Department, Engineering Department or other
departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
A. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
B. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
C. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
DYes DNo
, Carlsbad 08-0657
June 1,7, 2008
-1. Please make all corrections, as requested in the correction list. Submit three new
complete sets of plans for commercial/industrial projects (two sets of plans for residential
projects). For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
2. Plans and calculations shall be signed by the California state licensed engineer or
architect where there are structural changes to existing buildings or structural additions.
Please include the California license number, seal, date of license expiration and date
plans are signed. California Business and Professions Code. This correction will be
rechecked at Final Submittal.
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT
TITLE 24
The following disabled access items are taken from the 2007 edition of California Building Code,
Title 24. Per Section 109.1, all publicly and privately funded public accommodations and
commercial facilities shall be accessible to persons with disabilities.
NOTE: All Figures and Tables referenced in this checklist are printed in the California Building
Code, Title 24.
• REMODELS, ADDITIONS AND REPAIRS
1. When alterations, structural repairs or modifications or additions are made to an existing
building, that building, or portion of the building affected, is required to comply with all of the
requirements for new buildings, per Section 1134B.2. These requirements apply as follows:
a) Existing sanitary facilities that serve the remodeled area must be shown to comply
with all accessibility features.
• SANITARY FACILITIES
• Clearly show on plans full compliance for all existing Sanitary Facilities. Full
compliance will be rechecked.
• CLEARLY SHOW ON PLANS ALL APPLICABLE DIMENSION FOR THE EXISTING
SANITARY FACILITIES: 205,206, 107,108,304,305,322 AND 323.
l •
, Carlsbad 08-0657
June· 1\7, 2008
• MULTIPLE ACCOMMODATION SANITARY FACILITIES
FLUSH
PCOVATOR ON WIDE SIDE--
59" MIN. AT
FLOOR-MOUNTED W.C. WHEN DOOR SWINGS IN
56" MIN.AT
WALL-MOUNTED W.C.
WHEN DOOR SWINGS IN
54" MIN.
36" MIN. z
GRABBAR ~
60"MIN.
42" MIN.
GRABBAR --, l // I 1 34" I
MIN. CLEAR I
/
/1s·
MIN.
60" MIN.
DIAMETER
\ CLEAR /
\ '-/ ___ ,,,,..
.------30" X 48"
lcLEAR SPACE I
I L __ _
44"MIN.
CLEAR r---
1
I
I 60" x 60" I LEVEL AND CLEAR
I
I
0 <0
, cartsbad 08-0657
J,une l 7, 2008
2. Show that at least one water closet fixture, located in a compartment, shall provide the
following, per Section 11158.3.1.4:
a) ~28" clear space from a fixture (or 232" clear space from a wall) at one side.
b) The other side of the water closet shall provide 18" from the centerline of the water
closet to the wall.
c) The compartment shall be a minimum of 60" wide.
d) Clear space in front of the water closet shall be:
i) 248" if the compartment has a end opening door.
ii) ~60" is required for side opening doors.
e) Grab bars shall not project more than 3" into the clear spaces indicated.
3. Show or note, per Section 11158.3.1.4 that the doors to the accessible water closet
compartment will be equipped with a self closing device with:
a) 232" clear opening width when located at the end of the compartment.
b) 234" clear opening width when located at the side of the compartment.
4. The door into the accessible water closet compartment shall be provided with a clearance
of at least 18" at the strike side of the door, per Section 11158.3.1.4.5. Additionally, such
doors shall have a clear space of not less than 48" as measured at right angles to the door
in its closed position.
If you have any questions regarding these plan review items, please contact Sergio
Azuela at Esgil Corporation. Thank you.
'• ...
DATE: May 29, 2008
JURISDICTION: Carlsbad
PLAN CHECK NO.: 08-0657
EsGil Corporation
In <Partnersnip witn <Jovernment for (Bui{aing Safety
SET: II
PROJECT ADDRESS: 2101 Faraday Ave.
PROJECT NAME: Covidien Office -R&D Lab. TI
D APPLICANT cr=r JORID
D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
IX] The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
IX] The applicant's copy of the check list has been sent to:
Kyle Sobczack, Pacific Cornerstone Architects
4105 Sorrento Valley Blvd., San Diego, CA 92121
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
IX] Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Kyle Sobczack Telephone#: (858) 677-9880
Date contacte£ f 1 /a f[by//tg) Fax #: (858) 677-9886
Mail ~elephone Fax v' In Person
D REMARKS:
By: Sergio Azuela . Enclosures:
Esgil Corporation
D GA !SJ MB D EJ D PC 05/22/08
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
' ' •,_ Catlsbad 08-0657
May 29, 2008
RECHECK CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: 2101 Faraday Ave.
PLAN CHECK NO.: 08-0657
SET: II
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 05/22/08
REVIEWED BY: Sergio Azuela
FOREWORD (PLEASE READ):
DATE RECHECK COMPLETED:
May 29, 2008
This plan review is limited to the technical requirements contained in the Building Code,
Plumbing Code, Mechanical Code, Electrical Code and state laws regulating energy
conservation, noise attenuation and disabled access. This plan review is based on regulations
enforced by the Building Department. You may have other corrections based on laws and
ordinances enforced by the Planning Department, Engineering Department or other
departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
A. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
B. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
C. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
DYes DNo
' . , Ca:rlsbad 08-0657
May 29, 2008
1. Please make all corrections, as requested in the correction list. Submit three new
complete sets of plans for commercial/industrial projects (two sets of plans for residential
projects). For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
2. Plans and calculations shall be signed by the California state licensed engineer or
architect where there are structural changes to existing buildings or structural additions.
Please include the California license number, seal, date of license expiration and date
plans are signed. California Business and Professions Code. This correction will be
rechecked at Final Submittal.
3. Provide a Building Code Data Legend on the Title Sheet. Include the following code
information for each building proposed:
• For Mixed Occupancy Buildings, state whether the "nonseparated" or "separated"
option was chosen from Section 508.3.
• Justification to exceed allowable area in Table 503:
o The justification calculations shall be done using the most restrictive case;
the calculations shown on sheet T1 .0 are using 29,000 SF as the basic
allowable area. Please clarify to which occupancy this allowable area is
corresponding to. Additional corrections may follow.
o Please clearly show the % of FRONTAGE increase. Please note that the
maximum allowed is 75%.
o Please show compliance for exceeding the allowable floor area at the first
floor and also for the entire building.
o Under the justification calculations provided there was a statement
indicating that the "UNLIMITED ALLOWABLE AREA", per Section 507.4, is
adequate. If this is to be the intend of the applicant; please provide evidence
of approval from the Building Department to overpass the property line with
the 60' yard separation on the South Side.
6. Clearly designate any side yards used to justify increases in allowable aiea based on
Section 506.2, Please provide evidence of approval from the Building Department
to overpass the property line with the 60' yard separation on the South Side.
> l
I I
, Ca:rlsbad 08-0657
May 29, 2008
9. A 1-hour fire barrier separation is required between the A-3 occupancy and the B
occupancy. Table 508.3.3 (see exceptions). Please show the aggregate floor area of all
accessory occupancies, to be less than 10% of the floor area of the story in which they
are located, or provide the required fire barriers. Additional corrections may follow.
Please include a complete breakdown of the calculations, showing all the rooms
included and their floor areas. Additional corrections may follow.
14. Exit signs are required whenever two exits are required. Show all required exit sign
locations. Section 1011.1. Exits signs are still missing at: Teleconference Room 309,
Training Room 317, etc. Original correction is still applicable.
18. Provide notes and details on the plans to show compliance with the enclosed "Disabled
Access" Review List.
If you have any questions regarding these plan review items, please contact Sergio
Azuela at Esgil Corporation. Thank you.
+ ELECTRICAL PLAN REVIEW
+ 2002 NEC
+ PLAN REVIEWER: Morteza Beheshti
Show exit signs on the lighting plan(s) at all required exits and specify them as being self-
luminous or having a second source of power (battery or generator). This is required when two
exits are required per the UBC. UBC 1003.2.8.5 and NEC 700.16. ARCHITECTURAL REVIEW
INDICATES "Exits signs are still missing at: Teleconference Room 309, Training Room
317, etc. Original correction is still applicable". PLEASE VERIFY AND COORDINATE
WITH THE ARCHITECT.
Note: If you have any questions regarding this Electrical or Energy plan review list
please contact Morteza Beheshti at (858) 560-1468. To speed the review process, note
on this list (or a copy) where the corrected items have been addressed on the plans.
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT
TITLE 24
The following disabled access items are taken from the 2007 edition of California Building Code,
Title 24. Per Section 109.1, all publicly and privately funded public accommodations and
commercial facilities shall be accessible to persons with disabilities.
NOTE: All Figures and Tables referenced in this checklist are printed in the California Building
Code, Title 24.
> >
) ' ,, , Ca,\-lsbad 08-0657
May 29, 2008
• REMODELS, ADDITIONS AND REPAIRS
1. When alterations, structural repairs or modifications or additions are made to an existing
building, that building, or portion of the building affected, is required to comply with all of the
requirements for new buildings, per Section 1134B.2. These requirements apply as follows:
a) Existing sanitary facilities that serve the remodeled area must be shown to comply
with all accessibility features.
• SANITARY FACILITIES
• Clearly show on plans full compliance for all existing Sanitary Facilities. Full
compliance will be rechecked.
END OF DOCUMENT
EsGil Corporation
In Cl'artnersnip witn government for (}JuiMing Safety
DA TE: April 23, 2008
JURISDICTION: Carlsbad
PLAN CHECK NO.: 08-0657
PROJECT ADDRESS: 2101 Faraday Ave.
PROJECT NAME: Covidien Office -R&D Lab. TI
SET:I
&fPI~ jlJRIS.
0 PLAN REVIEWER
0 FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ · The applicant's copy of the check list has been sent to:
Kyle Sobczack, Pacific Cornerstone Architects
4105 Sorrento Valley Blvd., San Diego, CA 92121
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacte~i Kyle Sobczack Telephone#: (858) 677-9880
Date contacted-!//~t.//of(by4/cl Fax #: (858) 677-9886
Mail 0elephone
D REMARKS:
Fax vin Person
By: Sergio Azuela
Esgil Corporation
~ GA ~ MB D EJ D PC
Enclosures:
04/15/08
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
1
C~rlsbad 08-0657
April 23, 2008
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 08-0657
OCCUPANCY: B, F-1 & S-1
TYPE OF CONSTRUCTION: V-B
ALLOWABLE FLOOR AREA:
SPRINKLERS?: YES
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: April 23, 2008
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
USE: Office/R&D Lab.
ACTUAL AREA: 64,946 SF
STORIES: 2
HEIGHT:
OCCUPANT LOAD:
DATE PLANS RECENED BY
ESGIL CORPORATION: 04/15/08
PLAN REVIEWER: Sergio Azuela
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 2007 CBC, which adopts the 2006 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2006 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose 'the marked up list when you submit the revised plans.
Carlsbad 08-0657
April 23, 2008
• GENERAL
1. Please make all corrections, as requested in the correction list. Submit three new
complete sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
• PLANS
2. Plans and calculations shall be signed by the California state licensed engineer
or architect where there are structural changes to existing buildings or structural
additions. Please include the California license number, seal, date of license
expiration and date plans are signed. California Business and Professions
Code.
3. Provide a Building Code Data Legend on the Title Sheet. Include the following
code information for each building proposed:
+ Occupancy Classification(s)
+ For Mixed Occupancy Buildings, state whether the "nonseparated" or
"separated" option was chosen from Section 508.3.
+ Type of Construction
+ Occupant Load
+ Justification to exceed allowable area in Table 503
4. Provide a note on the plans indicating if any hazardous materials will be stored
and/or used within the building which exceed the quantities listed in IBC Tables
307.7(1) and 307.7(2).
• SITE PLAN
5. Provide a statement on the site plan stating: "All property lines, easements and
buildings, both existing and proposed, are shown on this site plan."
6. Clearly designate any side yards used to justify increases in allowable area
based on Section 506.2.
Carlsbad 08-0657
April 23, 2008
• BUILDING AREA
7. When a building has more than one occupancy, the area shall be such that the
sum of the ratios of the actual area divided by the allowable area for each
occupancy shall not exceed one. This only applies if the "separated
occupancies" option is chosen from Section 508.3.3.
• INTERIOR WALL AND CEILING FINISHES
8. Provide a note on the plans or on the finish schedule, stating, "Wall and ceiling
materials shall not exceed the flame spread classifications in IBC Table 803.5."
• FIRE BARRIERS
9. A 1-hour fire barrier separation is required between the A-3 occupancy and the B
occupancy. Table 508.3.3 (see exceptions). Please show the aggregate floor
area of all accessory occupancies, to be less than 10% of the floor area of the
story in which they are located, or provide the required fire barriers. Additional
corrections may follow.
• EXITS
10. Please revise the sheet EX1 .0 provided with the exit analysis plan. To show the
correct symbol in the Occupant Load Legend. For example Conference Room
203 and 212 are shown as Office Area, using an occupant load factor of 1: 100,
instead of 1: 15. Section A 106.1.2.
11. Exit doors shall swing in the direction of exit travel when serving an occupant
load of 50 or more persons. Section 1008.1.2. Please show it on plans for the
existing exit door at TELECONFERENCE ROOM 309. Also please clarify the
note provided on the Door Type Elevations that reads: "WERE OCCURS SEE
PLANS /HARDWARE GROUPS". Please clarify.
12. All doors and gates, within the exit path to a public way from an occupancy of
Group A having an occupant load of 50 or more shall not be provided with
latches or locks unless they are equipped with panic hardware. Sections
1008.1.9 and 1002. Please show it on plans for the existing exit door at
TELECONFERENCE ROOM 309. Also please clarify the note provided on the
Door Type Elevations that reads: "WERE OCCURS SEE PLANS /HARDWARE
GROUPS". Please clarify.
13. Regardless of occupant load, a floor or landing not more than½ inch below the
threshold is required on each side of an egress door. Section 1008.1.4.
Carlsbad 08-0657
April23,2008
• EXIT SIGNS
14. Exit signs are required whenever two exits are required. Show all required exit
sign locations. Section 1011.1.
15. Show two sources of power for the lamps at exit signs. Section 1011.5.3.
16. Show that the means of egress path will be lighted with at least one foot candle
at floor level. Section 1006.
17. Show separate sources of power may be required for exit illumination. Review
Section 1006.3.
• ACCESSIBILITY
18. Provide notes and details on the plans to show compliance with the enclosed
"Disabled Access" Review List.
• ADDITIONAL
19. See attached lists for: electrical, energy and plumbing corrections.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate: ·
a Yes a No
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Sergio Azuela at
Esgil Corporation. Thank you.
Carlsbad 08-0657
April 23, 2008
+ ELECTRICAL PLAN REVIEW
+ 2002 NEC
+ PLAN REVIEWER: Morteza Beheshti
20. Show or note on the plans the method used to limit fault currents to 10,000 amps
or lower on branch circuits.
21. Provide multiple switch light controls so that the lighting can be reduced by one
half in a uniform pattern. The switches must be located within sight of the lights
which they control. CBC Title 24, Sec 131 a-b
22. Show exit signs on the lighting plan(s) at all required exits and specify them as
being self-luminous or having a second source of power (battery or generator).
This is required when two exits are required per the USC. USC 1003.2.8.5 and
NEC 700.16.
23. In all occupancies where the exit system serves 100 or more occupants, provide
a minimum of 1 foot-candle of emergency illumination at the floor level and
specify a second source of power for the emergency illumination (battery or
generator). USC 1003.2.9.2 & NEC 700.16.
24. If utilizing a series-rated system, note on plans: "Overcurrent device enclosures
will be identified as series-rated and labeled in accordance with NEC 110-22"
and" The overcurrent devices shall be AIC rated per manufacturers. labeling of
the electrical equipment".
• ENERGY CONSERVATION
25. Specify the following mandatory measures and provide the electrical design for
the exterior lighting:
o All outdoor luminaries with lamps rater over 100 watts must have a lamp
efficacy of at least 60 lumens/watt or be controlled by a motion sensor.
(mercury vapor & large incandescent do not comply)
o Cut-off shielding for outdoor luminaries rated greater than 175 watts.
o The method of providing automatic shut-off controls (and)
o The method of providing multilevel switching.
26. Include completed exterior site lighting energy calculation forms to demonstrate
compliance with the outdoor lighting illumination levels for general site
illumination and for specific lighting application locations.
Note: If you have any questions regarding this Electrical or Energy plan review
list please contact Morteza Beheshti at (858) 560-1468. To speed the review
process, note on this list (or a copy) where the corrected items have been
addressed on the plans.
Carlsbad 08-0657
April 23, 2008 _
PLUMBING AND MECHANICAL CORRECTIONS
PLAN REVIEWER: Glen Adamek
• PLUMBING (2006 UNIFORM PLUMBING CODE)
27. Provide complete water line sizing plans and calculations for the new rest room
combined with the existing water fixtures Include the water pressure, pressure
loss calculations, water demands, and the developed pipe lengths. UPC 610.0 or
Appendix 'A'. Plans for new water piping were not included in the plans.
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone numbe~ of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Glen Adamek at Esgil Corporation. Thank you.
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT
TITLE 24
The following disabled access items are taken from the 2007 edition of California Building
Code, Title 24. Per Section 109.1, all publicly and privately funded public
accommodations and commercial facilities shall be accessible to persons with disabilities.
NOTE: All Figures and Tables referenced in this checklist are printed in the California
Building Code, Title 24.
' '
Carlsbad 08-0657
April 23, 2008
• REMODELS, ADDITIONS AND REPAIRS
1. When alterations, structural repairs or modifications or additions are made to an
existing building, that building, or portion of the building affected, is required to
comply with all of the requirements for new buildings, per Section 1134B.2. These
requirements apply as follows:
2.
3.
4.
5.
6.
a) The area of specific alteration, repair or addition must comply as "new"
construction.
b) A primary entrance to the building and the primary path of travel to the
altered area, must be shown to comply with all accessibility features.
c) Existing sanitary facilities that serve the remodeled area must be shown to
comply with all accessibility features.
d) Existing drinking fountains (if any) must be shown to comply with all
accessibility features.
e) Existing public telephones (if any) must be shown to comply with all
accessibility features.
• SITE PLAN REQUIREMENTS
• Clearly show on plans all accessible routes of travel, by lines of arrows,
including the slope of the route c---x%--->
Clearly show that the site development and grading are designed to provide
access to all entrances and exterior ground floor exits, as well as access to normal
paths of travel, per Section 1127B.1. Where necessary to provide access, shall
incorporate pedestrian ramps, curb ramps, stairways and handrails, etc.
When more than one building or facility is located on a site, accessible routes of
travel shall be provided between buildings and accessible site facilities, per Section
1127B.1.
The accessible route of travel shall be the most practical direct route between
accessible building entrances, accessible site facilities, and the accessible
entrance to the site. Section 1127B.1.
Show, or note that at every primary public entrance, and at every major function
area along, or leading to, an accessible route of travel, there is to be a sign
displaying the international symbol of accessibility. Signs are required to indicate
the direction to accessible building entrances and facilities, per Sections 1117B.5. 7
and 1127B.3.
Show that an accessible route of travel is to be provided to all portions of the
building, to accessible building entrances and between the building and the
public way, per Section 1114B.1.2.
Carlsbad 08-0657
April 23, 2008
7. Where more than one route of travel is provided, all routes shall be accessible.
Section 11148.1.2.
8. Show that a 36" wide detectable warning material is provided at boundaries
between walkways and vehicular ways. Section 11338.8.5.
9. Show that stairways occurring outside a building comply with Section 11338 as
. follows:
a) The upper approach and all treads shall be marked with a strip of
contrasting color as follows:
i) 2::2" in width.
ii) Placed parallel to and :51" from the nose of the step or landing.
iii) The strip is required to be as slip resistant as the treads of the stairs.
b) Treads shall be:
i) Smooth, rounded or chamfered exposed edges.
ii) Have no abrupt edges at the nosing projecting 2:1 ½" past the face of
the riser above.
iii) Open risers are not permitted.
• ACCESSIBLE PARKING
10. The words "NO PARKING" shall be painted on the ground within each loading and
unloading access aisle (in white letters no less than 12" high and located so that it
is visible to traffic enforcement officials). Section 11298.3.3.
11. Ramps shall not encroach into any accessible parking space or the adjacent
access aisle. Section 11298.3.3.
• CURB RAMPS
• Clearly show on plans full compliance for all curb ramps included within the
accessible routes of travel. Full compliance will be rechecked.
• WALKS AND SIDEWALKS
• Clearly show on plans full compliance for all walks and sidewalks included
within the accessible routes of travel. Full compliance will be rechecked.
• PEDESTRIAN RAMPS
• Clearly show on plans full compliance for all pedestrian ramps included within
the accessible routes of travel. Full compliance will be rechecked.
" Carlsbad 08-0657
April 23, 2008
• SANITARY FACILITIES
• Clearly show on plans full compliance for all existing Sanitary Facilities. Full
compliance will be rechecked.
• RESTROOM FIXTURES AND ACCESSORIES
12. If showers are proposed, show or note compliance with the following requirements,
per Section 1115B.4.4:
a) Size and Clearance. Accessible showers shall comply with one of the
following:
i) Roll-in shower 60 inches minimum in width between wall surfaces
and 30 inches in depth with a full opening width on the long side.
Shower compartment size and clear floor space shall comply with
Figure 11 B-2A.
>
ii) Alternate roll-in shower 60 inches minimum in ·width between the wall
surfaces and 36 inches in depth with an entrance opening width of
36 inches minimum. Shower compartment size and clear floor space
shall comply with Figure 11 B-28.
iii) Alternate roll-in shower 60 inches minimum in width between the wall
surfaces and 36 inches in depth as long as the entrance opening
width is a minimum of 36 inches. Shower compartment size and
clear floor space shall comply with Figure 11 B-2C.
b) Threshold in roll-in type showers shall be ½ inch in high maximum and shall
comply with Section 11248.2.
c) Water controls shall be of a single-lever design, operable with one hand,
and shall not require grasping, pinching or twisting of the wrist. The center
line of the controls shall be located at 40 inches above the shower floor.
i) Controls in a 60-inch minimum by 30-inch minimum shall be located
on the back wall of the compartment adjacent to the seat and the
centerline of the controls shall be within a range of no less than 19
inches and no more than 27 inches from the seat wall as shown in
Figure 11 B-2A.
ii) Controls in a 60-inch minimum by 36-inch minimum alternate roll-in
shower shall be located on the side wall of the compartment
adjacent to the seat and the centerline of the controls shall be within
a range of no less than 19 inches and no more than 27 inches from
the seat wall as shown in Figure 11 B-2B.
iii) Controls in a 60-inch minimum by 36-inch minimum alternate roll-in
shower with optional enclosure shall be located on the back wall of
the compartment adjacent to the seat and the centerline of the
controls shall be within a range of no less than 19 inches and no
more than 27 inches from the seat wall as shown in Figure 11 B-2C.
, ~ Carlsbad 08-0657
April 23, 2008
d) A flexible hand-held shower unit is required with at least a hose 60 inches
long that can be both used as a fixed shower head and hand held. This unit
shall be mounted such that the top of the mounting bracket is a maximum
of 48 inches above the shower floor.
i) The hand held sprayer unit a 60-inch minimum by 30-inch minimum
shall be located on the back wall of the compartment adjacent to the
seat and the centerline of the controls shall be within a range of no
less than 19 inches and no more than 27 inches from the seat wall
as shown in Figure 11 B-2A
ii) The hand held sprayer unit in a 60-inch minimum by 36-inch
minimum alternate roll-in shower shall be located on the side wall of
the compartment adjacent to the seat and the centerline of the
controls shall be within a range of no less than 19 inches and no
more than 27 inches from the seat wall as shown in Figure 11 B-2B.
iii) The hand held sprayer unit in a 60-inch minimum by 36-inch
minimum alternate roll-in shower with optional enclosure shall be
located on the back wall of the compartment adjacent to the seat
and the centerline of the controls shall be within a range of no less
than 19 inches and no more than 27 inches from the seat wall as
shown in Figure 11 B-2C.
e) Two wall-mounted heads may be installed in lieu of the hand-held unit in
areas subject to excessive vandalism. Each shower head shall be installed
so that it can be operated independently of the other and shall have swivel
angle adjustments both vertically and horizontally. One head shall be
located at a height of 48 inches above the floor.
f) Indicate on the plans a folding seat, located on the wall adiacent to the
controls, 18" above the floor and shall not extend more than 6 inches from
the wall. The seat dimensions and mounting position shall comply with
Figures 11 B-2A, 11 B-2B, 11 B-2C.
END OF DOCUMENT
> •
' Carisbad 08-0657
• l -· y
April 23, 2008
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Sergio Azuela
BUILDING ADDRESS: 2101 Faraday Ave.
BUILDING OCCUPANCY: B, F-1 & S-1
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
PLAN CHECK NO.: 08-0657
DATE: April 23, 2008
Covidien Office -R&D Lab. TI
TYPE OF CONSTRUCTION: V-B
Reg. VALUE ($)
Mod.
Office Tl 54000 y !? c;_ /)() I J?q n Dc-9o -~~ -vv
'
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance j ..-j
Plan Check Fee by Ordinance I ,.. I
Type of Review: D Complete Review D Structural Only
D Repetitive Fee L Repeats
Comments:
D Other
0 Hourly ,__ ___ __.I Hour*
Esgil Plan Review Fee
~-,4!1.0 I /7otJoo
$5,773.111
$3,752.521
$3,232.94/
Sheet 1 of 1
macvalue.doc
' City of Carlsbad
1@b11¥rZ·iitt•#iH·••li44i•h~i
BUILDING PLANCHECK CHECKLIST
DATE· lf /cl-t!fo8 PLANCHECKNO.: cs(260GS:Z
BUIL~ING ½DRE:SS: __.rl-~I D:;...:..I__._Fo~~::..=--=-~----'IN-<==4-=-=-------
PROJECT DESCRIPTION: ~
ASSESSOR'S PARCEL NUMBER: d,l!J.--b7o -t:>1 EST. VALUE:
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report ean result in
suspension of permit to build.
D A Right-of-Way permit is required prior to
construction of the following improvements:
DENIAL
Please see th ttached report of deficiencies·
marked with . Make necessary corrections to plans
or speci atio s for compliance with applicable
codes and stan rds. Submit corrected plans and/or
specifications to this office for review.
Date: ~At3
Date: 6/q,ffe?
Date:
FOR OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT:
By:
D Dedication Application
D Dedication Checklist
D Improvement Application
D lmprqvement Checklist
D Neighborhood Improvement Agreement
D Grading Permit Application
D Grading Submittal Checklist
D Right-of-Way Permit Application
D Right-of-Way Permit Submittal Checklist
and Information Sheet
D Storm water Applicability Checklist
Date:
Name:
ENGINEERING DEPT. CONTACT PERSON
JOANNE JUCHNIEWICZ
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2775
CFO INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
\
F:1Bu1L01Ni:jf@l1fflE~a:mjjlE!fY0A venue • Carlsbad, CA 920013-7314 • (760) 602-2720 • FAX (760) 602~'8'&ee @
' ' I •
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1ST 2ND 3RD
D D D . 1. Provide a fully dimensioned site plan drawn to scale. Show:
D D D
A North Arrow F. Right-of-Way Width & Adjacent Streets
8. Existing & Proposed Structures G. Driv~way widths
C. Existing Street Improvements H. Existing or proposed sewer lateral
D. Property Lines I. Existing or proposed water service
E. Easements J. Existing or proposed irrigation service
2. Show on site plan:
A Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
8. Existing & Proposed Slopes and Topography
C. Size, type, location, alignment of existing or proposed sewer and water service (s)
t t serves the project. Each unit requires a separate service, however, second
tlwelling units and apartment complexes are an exception.
Sewer and water laterals should not be located within proposed driveways, per
standards. }V.-* 3. Include on title sheet: .
--~ Q A Site address
J,;:l .J 8. Assessor's Parcel Number see, -~ ~Ari C. Legal Description . . . .
'~ ~~ -. ~or commercial/industrial buildings and tenant improvement projects, include:
K\ 4f'...total building square footage with the square footage for each different use,
~-existing sewer permits showing square footage of different uses (manufacturing, (j2>Y'v--warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
F:IBUILDING PLANCHECK CKLST FORM.doc 2 Rev. 7/14/00
"'
BUILDING PLANCHECK CHECKLIST
1 sr 2ND 3RD DISCRETIONARY APPROVAL COMPLIANCE
D D D 4a. Project does not comply with the following Engineering Conditions of approval for Project No. _______________________ _
D D D 4b. All conditions are in compliance: Date: _________ _
D D D
D D D
F:IBUILOING PLANCHECK CKLST FORM.doc
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 17,000 , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows: -----------,--------
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare ,the appropriate legal description together with an 8 ½" x 11'" plat map and
submit with a title report. All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication ·completed by:____________ Date: ___ _
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $ 82,000 , pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows: ____________ _
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
3 Rev. 7/14/00
D D
D D
D D
D D
D D
D D
D
D
D
D
D
BUILDING PLANCHECK CHECKLIST
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: _________ _ Date: ----
6b .. C~nstruction of the publiq improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $430 so we may
prepare the necessary Neighborhood· improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as follows:
6c. EncJosed please find your Neighborhood Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Neighborhood Improvement
Agreement completed by:
Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
15.16.010 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import,
export and remedial). This information must be included on the plans.
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by: __________ Date:
D . 7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
F:IBUILDING PLANCHECK CKLST FORM.doc 4 Rev. 7/14/00
D
D
D
D
D
BUILDING PLANCHECK CHECKLIST
3RD
D 7d .No Grading Permit required.
D 7e. If grading is not required, write "No Grading" on plot plan.
D
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
D-D 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7138,
for assistance.
D D
D D
Industrial Waste permit accepted by:
Date:
10. NPDES PERMIT
Complies with the City's requirements -0f the National Pollutant Discharge
Er ination System (NPDES) permit. The applicant shall provide best
anagement practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior· to issuance of grading or building permit, whichever
occurs·first. · · ·_
~TER APPLICABILITY CHECKLIST
equires PSWP (project storm water permit): #
Not required
11. FEES
D Required fees are attached
· D No fees required ·
F:\BUILDING PLANCHECK CKLST FORM.doc 5 Rev. 7114/00
' ,
.J
D D D
F:IBUILOING PLANCHECK CKLST FORM.doc
BUILDING PLANCHECK CHECKLIST
WATER METER REVIEW
12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
• All single. family dwelling units received "standard" 1" service with 5/8" service.
• If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations, which
include total fixture counts and maximum water demand in gallons per minute
(gpm). A typical fixture count and water demand worksheet is attached. Once
the gpm is provided, check against the "meter sizing schedule" to verify the
anticipated meter size for the ·uriit. ,
• Maximum service and meter size is a 2" service with a 2" meter.
• If a developer is proposing a meter greater.than 2", suggest the installation of
multiple 2" services as needed to provide the anticipated demand. (manifolds
are considered on case by case basis to limit multiple trenching into the
street).
12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior to
approval. The developer must provide these calculations. Please follow these
guidelines:
1. If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typi_cally a circled "W". The irrigation service should
look like:
STA 1 +00 Install 2" service and
1.5: meter (estimated 100 gpm)
2. If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
_irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
• Hydraulic grade line
• Elevation at point of connection (POC)
• Pressure at POC in pounds per square inch (PSI)
• Worse case zone (largest, farthest away from valve
• Total Sprinkler heads listed (with gpm use per head)
• Include a 10% residual pressure at point of connection
6 Rev. 7/14/00
•'
D D D
BUILDING PLANCHECK CHECKLIST
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
12c. Irrigation Use (where recycled water is available)
1. Recycled water meters are sized the same as the irrigation meter above.
2. _ If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should hc;1ve been identified, and implemented on the
improvement plans.' Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
-~+:::-J.-;?=!:~~.J,.L...a__~~~=+1--~0'\;\.~tz::::::c-Z-Z::=S..,._.J~o~ixlWl'ce ~
~
J
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
D ~timate bas.ad on UflCOnfirmed information from applicant. ;P' Calculation based on building plancheck plan submittal. .
Add~ess: rJ.{ 0 ·1 ~, . , Bldg. Permit No. ___ Q~G---"-~(Jc=-O"'--G"-"-·-$_7 __
Prepared by: err-Date: b /j 5/46 Checked by: ____ D,ate: ____ _ r t .
~
EDU CALCULATIONS: List !YP~S and square.{ootl;!.ges for all uses. s:e-e..-~ aes ~ rJW ~; Types of Use:_______ Sq. Ft/Units: _____ _ EDU's:
Types of Use:----"-,----.____ Sq. Ft/Units: _____ _ EDU's: _____ _
ADT CALCULATIONS~~~~ ~otages for all uses.
t?r%fo¥ti:f O'() Sq. Ft./Units: _____ _ ADT's: -~) '-t~O __
Types of Use:_______ Sq. Ft/Units: _____ _ ADT's: _____ _
WITHIN CFO: YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) ONO
~~PARK-IN-LIEU FEE . PARKAREA&#: __ _
r FEE/UNIT:____ X NO. UNITS:__ _;$ 7
RAFFIC IMPACT FEE ,/"
ADT's/UNITS: /¥0 X FEE/ADT: 30 =$ 4,;;. 6t) /
niA.VsRIDGE AND THOROUGHFARE FEE (DIST. #1 __ DIST. #2 __ · DIST. #3 __ ) r ... ADT's/UNITS:,____ X F_!::E/ADT:___ =$ ¢
~FACILITIES MANAGEMENT FEE ZONE: __ _
UNIT/SQ.FT.:____ X FEE/SQ.FT./UNIT:.___ =$ ,#
SEWER FEE . ~
EDU's: '3 .. 0 ( X FEE/EDU: /DSB =$ 3 J Bl/~ 5 48 /
BE.NEFIT AREA: f
--· EDU's: '3 , 0 ( X FEE/EDU:2BG~
SEWER LATERAL ($2,500)
. DRAINAGE FEES PLDA. ___ . HIGH ___ /LOW __
ACRES:----
~8. POTABLE~ ATER FEES
X FEE/AC:, __ _
UNITS CODE CONNECTION FEE METER FEE SDCWAFEE
1 of 2
F:\FEE CALCULATION WORKSHEET.doc
=$-~-
SDCWAFEE
Rev. 7/14/00
fi? \)'S I
., ... : ,.. ... ,, ..
t . --
. ( 7 0 ,, 0
-. . , .,.
--~
s7.
I
'
., 9 . '
s~
/Jf {1t)0(8({;c )"'
J..
,, ·,. 7
~-rt • rl, , . . '
·r "',r . 'J-..., 'd" •
',,1,, J,
' ' ' !· '
,e •
7
:·,-· -~c~£
~?K"\
_1,.·-.-~
~~~~ ~'
1/f~r,q)--
. 5
1@0~119}-
;i !).
3,D\
\\o ..
,06/20/~0?8 FRI 10:20 FAX
Fl~ST FLOOR:
I.fl OCC· I-IAZA~OUS
Fl OCC-MANUFACTUrclNG
51 OCC· &TOrcAGE/EGUIP.
A3 OCC• ASSEMBLY
A2 OCC· ASSEMBLY
e QCC-LAB
6 OCC· OFFICE
SECOND FLOOR:
e OCC· OFFICE
1,1~5F
13,101 SF
:,_3!;& SF
1.&E.>3 SF
0 SF
10,&14 SF
~ 40/#-$
1,918 .SF
-1,1W SF
-&.~14 SF
-~!:12 SF
+~e,9 SF
+l.~e>S SF
·92& SF
+1,1~S SF
-291 SF
~ 001/001
' To.:' ',JoPr~"'e
, it: tlol ~OA-"{
7t,t?. ~o"Z .. \ o5-i.
FIRST FLOOR:
, 1-13 OCC-I-IAZARt;:>OUS 1:1s0 SF . 0 SF -l,1S0 SF
. Fl OCC-MANUFACTURINC, 1.3,101 SF !:i,021 SF -8,614 SF
SI OCC-STORA'1E/EQUIF. &,.3!:18 SF 4,106 5F -6&2 SF
A.3 OCC-ASSEM6L Y l,!:16.3 5F 2,412 5F +S0S SF
A2 OCC-ASSEM6L Y · 0 SF 1,608 SF +l,608 SF
6 OCC-LAS 10,&14 SF S,646 5F -S28 SF
6 OCC· OFFICE 1,l.3S SF 14,S04 SF +1,16:, SF
SECOND FLOOR:
6 OCC-OFFICE 1,S18 5F -2S1 SF
NOTE: SEE SI-IEET EXl.0 FOR SQUARE FOOT AC,E BREAKDOWN SY ROOM OR SPACE
BUILDING USAGE CHANGE CALCULATION
MANUFACTURINC, TO LA6ORATORY= 7,842 SF
\ I-IAZARDOUS TO LA6ORATORY= 840 SF
( LABORATORY TO OFFICE= :,,0!:il SF
LA6ORATORY TO MANUFACTURIN'1= 2,SSI SF
~ MANUFACTURINC, TO SI-IIFFIN'1/RECEIVIN'1= 4,88!:i 5F
(>
LA6ORATORY' TO CONFERENCE ROOMS/ASSEMBLY= 2,07S SF <
I-IAZARDOUS TO STORA'1E= S50 SF <
MANUFACTURINC, TO OFFICE= 1,IIS SF ;
OFFICE TO REMAIN= 8,7.34 5F
( LA6ORATORY TO REMAIN= S64 SF
( ASSEMBLY TO REMAIN=· 1,!:i6.3JF
~,-1
'--....A..~~,'---------~.....______,,~
~ -=J~-Ery -It} C/J; tfJ 1::/_;_;
1 ~} 01 xJ5' ~sr;,s~)( ;.,tl % 2v11c:; ·1tts-,c:>s
4
06/20/2008 FRI 10:20. FU
, .,_ ' fo: J c>l(Hl'1-f·-. . .
. it: t.lO-l ~R''l
71,·iJ ~ e,o~. \ o51-.
Fl~T FLOOR: -
1-13 OCC• I-IAZAROOU& 1,1~t1) SF 0 5F
Fl OCC-MANUFACTU~iNG . 13 :'IA\l c.F i:; n121 SF
e, occ-si'oRAdseieQlJ1i=>: ~.;sa SF 4,W6 SF ·
A3 OCC· ASSEM$LY . l,!:163' &F 2,412 SF
A2 QCC~ ASSSMBL Y (b SF 1,612>8 SF
6 QCC· LAS . l0p1:4 SF <a,646 ei:·
e ace-o1=F1ce 1.13~ 14°'"'4 a
. . ~~$ ·-~ Qt. j~! 5ECOND. FLOOR: '1-t /
-1,1~ SF
-&,614 5F
. -6~2 SF
·~0~ er=
+f,60& SF
.g2e SF
•1,1E>S SF
6 OCC-OFFICE 1,918 5F 1,621 .. 5F -2~1 SF.
~001/001
: NOTE:. See· 5J.4EET EXI.IZ> FOr;e 5QUAr;eE FOOT AG~ e~~OWN 6: r;eaOM· ope· SPAC~_)"
}~~
( BUllDl:NG USAGE CHANGE ~ALCULATl:ON . '
( MANIJi='A.CTU~I~ TO LAeb~ATOFe'T'•. , ' 2 -..
<L-r~ r· , I-IAZ-:A~~ TO 1-~0.RATO~'r'= . . ; ·
'~ <P • o·· · '·-LA~~tOR't' TO OfEICE= ·, .' · -· , .
. LASS~iOl(,f ·:r,~t ~..W=Ft:l~!Ner . . . • ---. .. ' .
I ,M~~Gftlflttt*!i'.*5WiP-PINetR!eetYIN&_•"""":',_., ............ ------... , .. af.J '.-".· .. ·, '
T LABOr;eATO,rr·_ra Cat\Ff;!SEN~e~e • ' .,a-~-~" -M-A!A~-TO, .5.~Elr."-... ~ _ __,.,.;_:--· . -
~q" T <)« MANYl=~C.!URING)'O ~t~i:':s , . · ---. . · 1, ~$ -.
'> ~Mfil!IAIN"""'"~----.. ---· ( ~~~ .......... ~--.. ,,,.... ....... ,..,.,.,,..,..,.,,,..,,,._,,,,,_,~~"'II' c~~-~
\ ... .,,, . .__.."-,~/·_.A.../',.__ . ./'-._ ..... "-..,_..."-.~'-._ .. ,"'-_.,....__ .. ,·"-~···"--.. /'····A... ___ _.,,r .. __ .,,, ... _.,/ ..... ~·''J
. . ......... __ . .... .. .. . . . . . ............. --............ ·-. ... . .... .. --...... . . -. /
.)
. ,· '· •••• •' 0 00 • ••o • • OoOOo O o• 0 00 •O-M• .............. • ... .. ..
~-•. ,, ~ ~-:
. ..
' Storm Water Compliance
Exemption Form
I am applying to the City of Carlsbad for the following type(s) of construction permit:
~ Right-of-Way Pennlt
CJ My project is categorically exempt from the requirement to prepare ·a storm water pollution
prevention· plan {SWPPP) because it only requires issuance of one or more of the following
permit types:
Electrical Permit
Fire Additional Permit
Fire Alarm Permit
Fixed Systems Permit
Haul Route Permit
Mechanical Permit
Mobile Home Permit
Oversize Load Permit
Patio Deck
Plumbing Permit
Sign Permit
Spa -Factory Made
Sprinkler Permit
-
Water Discharge Permit
Water Meter Permit
/ project Is exempt from. !he re~ulrement to prepare a storm water pollution prevention plan
/ ~':"PPP) because it meets the "no threat' assessment criteria on the City's Project Threat
· Assessment Worksheet for Determination of Construction SWPPP Tier Level. .
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE ABOVE CHECKED STATEMENTS
ARE TRUE AND CORRECT .
. I UNDERSTAND AND ACKNOWLEDGE THAT EVEN THOUGH THIS PROJECT DOES NOT
REQUIRE PREPARATION OF A CONSTRUCTION SWPPP, I MUST STILL ADHERE TO, AND AT
ALL TIMES DURING CONSTR~CTION ACTIVITES FOR THE PERMIT TYPE{S) CHECKED
ABOVE, COMPL y WITH THE STORM WATER BEST MANAGEMENT PRACTICES PURSUANT ro
TITLE 15 OF THE CARLSBAD MUNICIPAL CODE AND TO CITY STANDARDS.
Owner/Owner's Authorized Agent Information and Signature Box
This Box.for City Use Only
Address/Locallon: Assessor Parcel
Number(s): ·1-10'2... FArl..A DA'(
Construction SWPPP Standards and Requirements 3/24/2008
1+~
.l!l .B .B "' "' "' Cl Cl Cl
~~
>, ~ >, .c .c
* ~ i ~ "' "' (,) 0 0 Q) Q) Q) ..r: .s::; .s::; u 0 0
C C: C: "' "' .!!! a: 1[ 0..
~DD
~DD
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB080657 Address 2101 Faraday Ave.
Planner Deborah Milam Phone ...,(7c..a6=0.,_) =60=2=--....:.4-=-6.:....;19=------------
APN: 212-070-01
Type of Project & Use: Tl Net Project Density: DU/AC
Zoning: C-M General Plan: Pl Facilities Management Zone: §
CFD (in/out) #_Date of participation: __ Remaining net dev acres: __
Circle One
(For non-residential development: Type of land used created by this permit:
)
Legend: [g) Item Complete D Item Incomplete -Needs your action
Environmental Review Required: YES O NO O TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action RequireQ: YES D NOD TYPE __
APPROVAURESO.NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: __
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES D NO D
CA Coastal Commission Authority? YES O NO D
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103,
San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Habitat Management Plan
Data Entry Completed? YES D NO D
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and
assess fees in Permits Plus.
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type
impacted/taken, UPDATE!)
lnclusionary Housing Fee required: YES D NO D
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.)
Data Entry Completed? YES D NO D
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing YIN,
Enter Fee, UPDATE!)
F:\Plan Checks\CB080657 .doc Rev 3/06
I
rzl· o,o.
~DD
·IE]• D :o
fZI DD
~LDD
, t11: -~-:"'; {.;~ .. ·:' -,~
Site Plan:
.Provide a fully dimensional site plan dri;tVvn to· scale .. $now: North arrow., property lines, -easements,
existing and proposed strlJctures, slree·ts, existing-stre·et improvements, right-of-way width,
oimensional setbacks; and exi?ting topographical lines (Including all sicle and rear yard slopes).-·-.
Provide, legal ·description of-property arid' asse§isor's .parc$1 number. ··
Policy 44 -·Neighborhood Arc~itectural Design -GuideUnes
1. Applic~bility:YES D ~o.D
2., Project complies: YES D NOD
Zoning:
1. Setoacks:
Front:
Interior Side:
· Street Side: ·
Rear::
Top·of slope:
Required_. __ Shown· __
Required_._ Shown_. · __ .
Req8ired ___ Shown __ . _
Required_ .. __ Showr:r_. __
Required_. _._. _· -Shown. __ _,·._, .
' . ' '
2. Acc;:essory structure s.e.tbc:J.cks: .
Front: · Required ____ Shown __ ·
Interior Side: Req~ired . __ Shown-_. __
Street Side:. Required. __ Shown __
Rear: Required __ Shown __ ..
Structure separation: Required · . Shovvn . __ _
' . ' , ,. , -
3. Lot Coverage:. Reejt,Jired ____ Shown. __ -·-. __ .
4. Height: · Hequirecl -.. ___ .. Shown __ ._.
5. P:arkirig: Spaces.Hequired._. __ · Shown __ ---·
(breakdown by uses for commercial and .industrial projects required)
Residential 'Guest Spaces Required __ .--. Shown ____ : ___ _
Addition/;ll Comments: Correction #1: Please snow .square footage .of existing office, research and
development, :warehouse, .and· manufacturing. Parking requirerri·ents are . t space per 250· square.
feet ·-for.· ·office, 1 /360,. for · research and development, 1 /1000 for warehouse and· 1 /400 for
manufacturing. Parking calcuiation Ort title -page should be .re-done to reflect required and provided
.parking:.:Correction #2:. Please in.elude' .1:f side elevation of the buildihg showintr how roof~mounted
:equipment wiU be screened from views within ·a .500' radius of the bulldincl, . . .
' ' . '
OK TO.ISSUE AND ENTERED APPROVAL INTO COMPUTER __ ·.---.~ ·DAJE$t1T
· I . , . . _f'IJ1J1Alv ~--. ' d(!
' F:\Plari Checks\CBOS0657.doc ijev 3/96
, I '
Carlsbad Fire Department
Plan Review Requirements Category: TI , INDUST
Date of Report: 06-23-2008
Name:
Address:
Permit #: CB080657
DOTY RICHARD
2101 FARADAY AVE
CARLSBAD CA
92008
Job Name:
Job Address:
COVIDIEN-54,000 SF TI OF A
2101 FARADAY AV CBAD
IN~E-T.JL___J)}~item you have submitted for review is inc~t~--A~annot
adequately conduct a review to-deter-m:i:1':re::co.mpliance-wit11;!,l~=ficab~s and/or standards. Please review
carefully all om.me· ~ .. ae e ·-:-· ·ea'S~ the necessaiyp].a1rs-andfor-spe01-f:amt,it>ns;::w.i.t1.r.c:hafige?'c'Iouded",
ice for review and approval.
' Conditions:
Cond: CON0002776
[NOT MET]
1. Sheet EX 1.0 Square footage & occupant load calculations shall be shown within each area.
Confirm all rooms have correct occupant load factor i.e. Room 212 should utilize OLF of 15 not 100,
Room 319 utilize 50 not 100, etc.
2. Sheet EX 1.0 When more than one exit is required, show diagonal distance and seperation distance
between exits.
3. Sheet EX 1.0 When 2 or more exits required or when morethan one door could be construed as an
exit, an illuminated exit sign with battery back up shall be place above the required exit.
4. Sheet EX 1.0 When two exits are required, the doors shall swing in the direction of travel along
the entire path of egress. (Room 309)
5. Sheet EX 1.0 Control Area Summary shall reflect most recent Hazardous Materials Report.
6. Sheet Al.3 405 (a) shall be a 20 minute rated door and assembly.
7. Sheet A7.0 Add Note: Only main exterior door or doors are permitted to be equipped with
key-operated locking devices from the egress side in accordance with CFC 1008.1.6. All others shall
be no knowledge, single action in accordance with CFC 1008.1.8 and 1008.1.8.4.
Except as specifically permitted by this section egress doors shall be readily openable from the
egress side without the use of a key or special knowledge or effort. CFC 1008.1.8
j
I 1 _,,,
' ' Fire-protection-rated safety glazing in excess of 100 square inches shall be permitted in fire door
assemblies when tested in accordance with NFP A 252; In a 20 minute fire door assembly, that glazing
material in the door itself have have a minimum fire protection rating of20 minutes. CBC 715.4
8. Card Readers shall not inhibit egress. All card readers shall disengage in the case of power
outage or water flow. This will be demonstrated at acceptance testing.
9. Sheet A I 02 Locations of FE not shown -Fire Extinguishers shall be located in conspicuous
locations, readily accessible, and along normal paths of travel CFC 906 and 906.5.
10. Sheet E3 .1 A, B & C Exit Signs shall be placed .in accordance with CFC 1011.1. Show on electrical
sheets to coincide with placement on Sheet EXl.0 after recalculation of occupant load with correct
occupant load factors.
11. Complete plans shall be submitted for 6000 gallon liquid oxygen tank in accordance with Chapter
27, 3, 30, 32, 40 of the CFC and NFPA 55.
12. Signs and placards shall be provided and placed as stated in Hazardous Materials Report. These
shall include but is not limited to NFPA 704 placarding, compressed gas and No Smoking signs.
Entry: 05/13/2008 By: cwong Action: CO
Cond: CON0002799
[NOT MET]
* * * Condution Items # 3 and 10 not met in regards to exit sign placement (EXl. 0 or RCP?). If on
another sheet please notify us. Exit signs shall be shown on elecrical sheets a~ stated in
condition# 10. Add directional exit sign to open office area.
***Condition# 4 needs to address Room 308 too. Check all doors meet this requirement.
Entry: 05/27/2008 By: cwong Action: CO
Cond: CON0002863
[MET]
**APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT
NOTATIONS,
CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND
REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW.
Entry: 06/23/2008 By: cwong Action: AP
Carlsbad Fire Department
Plan Review Requirements Category: TI , INDUST
Date of Report: 05-27-2008
Name:
Address:
DOTY RICHARD
2101 FARADAY AVE
CARLSBAD CA
92008
Permit#: CB080657
Job Name:
Job Address:
COVIDIEN 64,946 SF TI--OFFICE
2101 FARADAY AV CBAD
Reviewed by: ~
-Dr: DEPT COI)lY BL '-1 •
INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot
adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review
carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded",
to this office for ~eview and approval.
Conditions:
Cond: CON0002776
[NOT MET]
1. Sheet EX 1.0 Square footage & occupant load calculations shall be shown within each area.
Confirm all rooms have correct occupant load factor i.e. Room 212 should utilize OLF of 15 not 100,
Room 319 utilize 50 not 100, etc.
2. Sheet EX 1.0 When more than one exit is'required, show diagonal distance and seperation distance
between exits.
3. Sheet EX 1.0 When 2 or more exits required or when morethan one door could be construed as an
exit, an illuminated exit sign with battery back up shall be place above the required exit.
4. Sheet EX 1.0 When two exits are required, the doors shall swing in the direction of travel along
the entire path of egress. (Room 309)
5. Sheet.EX 1.0 Control Area Summary shall reflect most recent Hazardous Materials Report.
6. Sheet Al.3 405 (a) shall be a 20 minute.rated door and assembly.
7. Sheet A7.0 Add Note: Only main exterior door or doors are permitted to be equipped with
key-operated locking devices from the egress side in accordance with CFC 1008.1.6. All others shall
be no knowledge, single action in accordance with CFC 1008.1.8 and 1008.1.8.4.
· Except as specifically permitted by this section egress doors shall be readily openable from the
egress side without the use of a key or special knowledge or effort. CFC 1008.1.8
Fir.e-protecti6n-rated safety glazing in excess of 100 square inches shall be permitted in fire door
assemblies when tested in accordance with NFP A 252; In a 20 minute fire door assembly, that glazing
materiat in the door itself have have a minimum fire protection rating of 20 minutes. CBC 715.4
8. Card Readers shall not inhibit egress. All card readers shall disengage in the case of power
outage orwater flow. This will be demonstrated at acceptance testing.
9. Sheet A102 Locations of FE not shown -Fire Extinguishers shall be located in conspicuous
locations, readily accessible, and along normal paths of travel CFC 906 and 906.5.
10. Sheet E3.1A, B & C Exit Signs shall be placed in accordance with CFC 101 I.I. Show on electrical
sheets to coincide with placement on Sheet EXl .0 after recalculation of occupant load with correct
occupant load factors.
11. Complete plans shall be submitted for 6000 gallon liquid oxygen tank in accordance with Chapter
27, 3, 30, 32, 40 of the CFC and NFPA 55.
12. Signs and placards shall be provided and placed as stated in Hazardous Materials Report. These
shall include but is not limited to NFPA 704 placarding, compressed gas and No Smoking signs.
Entry: 05/13/2008 By: cwong Action: CO
Cond: CON0002799
[NOT MET]
*** Condition Items# 3 and 10 not met in regards to exit sign placement (EXl .0 or RCP?). If on
another sheet please notify us. Exit signs shall be shown on eletlrical sheets as stated in
condition# 10. Add directional exit sign to open office area:
***Condition# 4 needs to address Room 308 too. Check all doors meet this requirement.
Entry: 05/27/2008 By: cwong Action: CO
. a ,~arlsbad Fire Department
Plan Review Requirements Category: TI , INDUST
Date of Report: 05-13-2008
Name:
Address:
DOTY RICHARD
2101 FARADAY AVE
CARLSBAD CA
92008
Permit #: CB080657
Job Name:
Job Address:
COVIDIEN 64,946 SF TI--OFFICE
2101 FARADAY AV CBAD
Reviewed by:()< ,,( JO.~
BLDG·. DE.PT COPY
INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot
adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review
carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded",
to this office for review and approval.
Conditions:
Cond: CON0002776
[NOT MET]
1. Sheet EX 1.0 Square footage & occupant load calculations shall be shown within each area.
Confirm all rooms have correct occupant load factor i.e. Room 212 should utilize OLF of 15 not 100,
Room 319 utilize 50 not 100, etc.
2. Sheet EX 1.0 When more than one exit is required, show diagonal distance and seperation distance
between exits.
3. Sheet EX 1.0 When 2 or more exits required or when morethan one door could be construed as an
exit, an illuminated exit sign with battery back up shall be place above the required exit.
4. Sheet EX 1.0 When two exits are required, the doors shall swing in the direction of travel along
the entire path of egress. (Room 309)
5. Sheet EX 1.0 Control Area Summary shall reflect most recent Hazardous Materials Report.
6. Sheet AL3 405 (a) shall be a 20 minute rated door and assembly.
7. Sheet A 7. 0 Add Note: Only main exterior door or doors are permitted to be equipped with
key-operated locking devices from the egress side in accordance with CFC 1008.1.6. All others shall
be no knowledge, single action in accordance with CFC 1008.1.8 and 1008.1.8.4.
Except as specifically permitted by this section egress doors shall be readily openable from the
egress side without the use of a key or special knowledge or effort. CFC 1008.1.8
~ "' y,. ' • Fire-protection-rated safety glazing in excess of 100 square inches shall be permitted in fire door
assemblies when tested in accordance with NFP A 252; In a 20 minute fire door assembly, that glazing
material in the door itself have have a minimum fire protection rating of20 minutes. CBC 715.4
8. Card Readers shall not inhibit egress. All card readers shall disengage in the case of power
outage or water flow. This will be demonstrated at acceptance testing.
9·. Sheet A102 Locations of FE not shown -Fire Extinguishers shall be located in conspicuous
locations, readily accessible, and along normal paths of travel CFC 906 and 906.5.
10. Sheet E3.1A, B & C Exit Signs shall be placed in accordance with CFC 1011.1. Show on electrical
sheets to coincide with placement on Sheet EXl .0 after recalculation of occupant load with correct
occupant load factors.
11. Complete plans shall be submitted for 6000 gallon liquid oxygen tank in accordance with Chapter
27, 3, 30 , 32, 40 of the CFC and NFPA 55.
12. Signs and placards shall be provided and placed as stated in Hazardous Materials Report. These
shall include but is not limited to NFP A 704 placarding, compressed gas and No Smoking signs.
Entry: 05/13/2008 By: cwong Action: CO
,,
,J, ,: . ~·~-
-.. ,a.::::-::S • --·
'
PRIME STRUCTURAL ENGINEERS
11858 Bernardo Plaza Court, Suite 105C
San Diego, California 92128
Tel (858) 487-0311
STRUCTURAL
CALCULATIONS
Covedien Tl
Additional Calculations
2K8-6()
Sheet 22 thru 41
-Sheet L34 thru L64
•
•
•
Covedien TI
Summary of Additional Calculations
o Out-of-plane check of existing panels along Line E with new openings (sheets 22
thru 32)
:::o 7' O" flee 1,,tanding can1@d stad walls. (8heets 33 tlna %J ·
o Removal of existing goal posts and replace with w-beam. (Sheets 37 thru 41)
o Lateral analysis and in-plane check of existing panels along Line E with new
openings. (L34 thru L64)
I ,__ l
,
/E/1·'6 HD
12'-6· e•.,;•
F'ANEI-EI-EYAilON Ai 1-INE
).JJ> -:: c~/irj{/1,,rs'F) ~ r;.z1tt
v-lL ; ( l/1..,)('IP ,,F) ~ '80 f J..r
PF! i ME Job: ~1;~
~1"/'lil('T'ID~I 0· 1·::,· ddf>" ,.d,'\,.J,,,,:Ui\1-,~ a.,;,. ,~ ..
E·1r:-1·1rErJ/'I ·, .f~-:i fh: 1\i:l Sht: 2~
(El 2·'1/YI EA FACE
• 4' O.C. (TOT 41
/El 3-'S/Y) EA. FACE (TOT 61
(E>Z•'l HD
t .
'-1 :f:°9~ Cf[~I)~ J2/41\-Cll111,JJ _ O/J UN f (fJ
'··
G-l(l.,pfi /AN~ ()
5f J\-v,J ~ 4 8'-1
r
f f f p f
<{I t.. '? I J i I i g' t 8' I t t I
-Pl> ~ /{,.,'>tst ( '?J( 1t-): 5. 011. /c-
f"' ~ J'21 sf(?J(1 1/~)= 3.,11/~
G-) ~l)(ll I.AN e'@
Sf/,-1J :: o/ </ I
PR!l\/lEJob: ~e
SHWCTURAL Date: ~--0 ~
ENGiNEERS stit: .-!:.L
I I\ ~ s('ifJ( zt) :: I ~i-o 1P
~-u., :: 'r-i. ;st
~ ~ .fti, ~ /2-,'S~ k
, ft,: ~.Ii.~
~ ., fos " IS-, 1 z.. ~
P,._, ~ II, "5 <J ~
-,.
' l
LI CON.dRETE SLENDER WALL PER CBC 2007, ACI 318-0514.8 ' Considering P-Delta Effects
PROJECT #: 2K8-60
DESCRIPTION:
DESIGN CRITERIA:
fe =
fy =
Concrete Weight =
Clear Height, I e =
Parapet Heigh( =
Wall Thickness, t =
hit=
Depth to Rebar, d =
Vertical Rebar =
Spacing=
Steel @ Each Face =
Reveal Depth =
Reveal to Bottom =
d at Reveal=
COVIDIEN Tl
LINE E • PIER A
3000 psi
60000 psi
150 pcf
28.00 ft
4.00 ft
7.50 in
44.80
3.750 in
#5
10 in
1 (# layers)
0.75 in
16 ft
3.000 in
Muo =
XMuO =
Amax=
At Reveal:
Mo=
Ao=
(16-3)
0.00
14.00
0.00E+00
0
0.00E+00
LOAD COMBINATIONS (CBC 1605.2.1)
(16-3) U= 1.20 D + 1.60 L
(16-4) U= 1.20 D + 0.50 L
(16-5) U= 1.36 D + 0.00 L
(16-6) U= 0.90 D + 1.60 W
(16-7) U= 0.74 D + 1.00 Qe
(16-17) A= 1.00 D + 0.00 L
(16-20) A= 1.11 D + 0.00 L
12.4.2.3 E= Oe± 0.2SosD
= QE± 0.16 D
DESIGN SUMMARY:
Strength: (16-3)
<PMn= 75,509
Mu= 1,606
%Over= 0.0%
At Reveal:
<PMn = 57,927
Mu= 1,204
% Over= 0.0%
Deflection: Wind
le/ 150 = 2.2400
Max A= 0.2059
% Over= 0.0%
e=
Eccentric, D =
Eccentric, L =
Add'/ From Above, D =
Add'l From Above, L =
Girder, D =
7.00 in
52 plf
80 plf
0 plf
0 plf
0.00 kips
Girder, L = 0.00 kips
D Girder Load Eccentric?
LL for Seismic? = 0 (Y=1, N=0)
LL Factor, f1 = 0.5
(16-4) (16-5) (16-6) (16-7)
29314 42103 29314 42103
13.72 13.44 13.72 13.44
3.42E+08 4.84E+08 3.42E+08 4.84E+08
28500 40360 28500 40360
3.32E+08 4.70E+08 3.32E+08 4.70E+08
!
I Wind (1.6W)
35.00
+ 1.60 W
+ 1.00 Qe
+ 1.30 W
+ 0.71 Qe ~~ £ C. a, 1!:~ "' -a, t:::. Q) :c. N C: r CT ~ CT
(16-4) (16-5) (16-6) (16-7)
75,299 76,224 73,383 72,504
49,659 75,942 42,135 56,246
0.0% 0.0% 0:0% 0.0%
57,682 5.8,179 56,427 55,810
35,798 51,360 32,880 45,071
0.0% 0.0% 0.0% q.q%
Seismic At Reveal: Wind
2.2400 in le/ 150 = 2.2400
0.3122 in Max A= 0.2227
0.0o/o o/o Over= 0.0o/o
Min Vertical Steel =
Min Horizontal Steel =
Max Vert Spacing =
(/):
/31 =
Ee=
Es=
n=
Ccu =
E:y =
0.6pb =
Sos=
QE =Fp =
Wind Load, W =
(16-17) (16-20)
23818 30074
13.72 13.44
2.78E+08 3.46E+08
23156 28828
0.0025
0.0025
18.00 in
0.9
0.85
3321 ksi
29000 ksi
8.73
0.003
0.00207
0.0128
0.804 g
0.322 Wp
11.50 psf
lb-in/ft
ft
/El
lb-in/ft
2.70E+08 3.36E+08 /El
Seismic (1.0 E)
35.00
-~--·--··----~ ··-
"ii-·-·-·-· -t'> . --··
5.00
0.00
<-C-£ £ ~ a. C. C.
::i: II.; :.: ,:; r ia l:. £
N .. <ll r Q. CT CT CT
---------
lb-in
lb-in
lb-in
lb-in
Seismic
2.2400 in
1.6504 in
0.0%
l
'. 1 CON{:RETE SLENDER WALL PER CBC 2007, ACI 318-0514.8
'-' I Considering P-Delta Effects
PROJECT#: 2K8-60
COVIDIEN Tl
LINE E -PIER A
DESCRIPTION:
Strength at Factored Load:
Factored ecc, Pur =
Factored axial, Puaxial =
Factored wall, Puw =
Factored, Pu=
(14-7)
(14-4)
(14-5)
Pu/ Ag = 34.17 s 0.06fc ... OK!
As = 0.372 S 0.6p(bd) = 0.577
Ase= ( Pu + As fy ) / fy
a = ( Pu + As fy) / (0.85 f c b)
c = a I 0.85
E1 = (ecu / c) d -Ecu
2: 0.005 For Tension Control
Mn= (Ase fy)(d -a/2)
lcr = n Ase (d -cf + b c3 / 3
Mua = Muo + P uf e X / 10
Mu= Mua + Pu Au
Au= (5 Mu h2) / (0.75 (48) Ee le,)
<!>Mn=
Check that <!>Mn 2: Mu
Deflection at Service Load:
Service ecc, P sr =
Service axial, Psax1a1 =
Service wall, Psw =
Service, Ps = Pst + Psw =
lg=bt3 /12
(9-9) Mer= 7.5 f/5 lg/ 0.5 t
Ac,= 5 Mc, I// (48 Ee lg)
Mn= (Ase fy)(d • a/2)
An= 5 Mn I/ I (48 Ee le,)
Msa = Mso + Pst e X / le
(14-9) M = Msa + Ps As
(14-8) As= ¾·Ac,+(M.-¾·M0,)(An·¾·Ae,)/(Mn·¾·Me,)
Allowable A = le / 150
Check that As S Aa11ow
Shear at Factored Load:
Weq = 8 Mu/ ( 121/)
Vu=lcWeq/2
(11-3) <l>Vc = 0.75 (2) f/2 b d
Check that <l>Vc 2: Vu
... OK
(16-3)
= 268.80
= 0.00
= 2534.56
= 2803.36
= 31.15
= 0.419
= 0.821
= 0.966
= 0.0086
= OK
= 83899
= 31.95
= 941
= 1606
= 0.24
= 75509
OK
Wind
= 73.41
= 0.00
= 2149.19
= 2222.60
= 421.88
= 46214
= 0.39
= 83665
= 9.21
= 24070
= 24527
= 0.21
= 2.24
OK
(16-3)
= 1.37
= 19.12
= 3697.13
OK
(16-4) (16-5) (16-6) (16-7)
144.56 99.90 66.07 54.27 lbs
0.00 0.00 0.00 0.00 lbs
2579.03 2974.97 1934.27 1616.15 lbs
2723.59 3074.87 2000.34 1670.42 lbs
30.26 34.17 22.23 18.56 psi
0.417 0.423 0.405 0.400 in2
0.818 0.830 0.795 0.784 in
0.963 0.976 0.935 0.922 in
0.0087 0.0085 0.0090 0.0092
OK OK OK OK
83665 84693 81537 80560 lb-in
31.89 32.16 31.32 31.06 in4
29810 42439 29541 42286 lb-in
49659 75942 42135 56246 lb-in
7.29 10.90 6.30 8.36 in
75299 76224 73383 72504 lb-in
OK OK OK OK
Seismic
81.84 lbs
0.00 lbs
2437.30 lbs
2519.15 lbs
421.88 in4
46214 lb-in s<t>Mn ... OK
0.39 in
84693 lb-in
9.11
30349
31135 lb-in
0.31 in
2.24 in
OK
(16-4) (16-5) (16-6) (16-7)
42.23 64.58 35.83 47.83
591.18 904.08 501.60 669.59
3697.13 3697.13 3697.13 3697.13
OK OK OK OK
'
1 \ CONCR.ETE SLENDER WALL PER CBC 2007, ACI 318-0514.8
' Considering P-Delta Effects
(AT LOCATION OF REVEAL)
PROJECT#: 2K8-60
DESCRIPTION: COVIDIEN Tl
LINE E -PIER A
Strength at Factored Load: (16-3) (16-4) (16-5) (16-6) (16-7)
Factored ecc, Pur = = 268.80 144.56 99.90 66.07 54.27 lbs
Factored axial, Puax1a1 = = 0.00 0.00 0.00 0.00 0.00 lbs
Factored wall, Puw = = 2216.91 2216.91 2513.91 1662.68 1365.68 lbs
Factored, Pu= = 2485.71 2361.48 2613.81 1728.75 1419.95 lbs
Pu/ Ag= 29.04 s 0.06fc ... OK! = 27.62 26.24 29.04 19.21 15.78 psi
As= 0.372 s 0.6p(bd) = 0.577 ... OK
Ase= ( Pu + As fy) / fy = 0.413 0.411 0.416 0.401 0.396 in2
a= (Pu+A5 fy)l(0.85f0 b) = 0.811 0.807 0.815 0.786 0.776 in
C =a/ 0.85 = 0.954 0.949 0.959 0.925 0.913 in
Mn= (Ase fy)(d -a/2) = 64363 64091 64643 62696 62011 lb-in
(14-7) lcr= = 28.75 28.70 28.94 28.19 27.95 ir\4
Mua = Muo + Put e XI le = 941 28996 40695 28727 40542 lb-in
(14-4) Mu= Mua + Pu 6u = 1204 35798 51360 32880 45071 lb-in
(14-5) 6u = (5 Mu h2) / (0.75 (48) Ee le,) = 0.26 7.70 11.37 6.70 8.89 in
<!>Mn= = 57927 57682 58179 56427 55810 lb-in
Check that <!>Mn c: Mu OK OK OK OK OK
Deflection at Service Load: Wind Seismic
Service ecc, P sr = = 73.41 73.41 lbs
Service axial, Psaxial = = 0.00 0.00 lbs
Service wall, Psw = = 1847.43 2059.57 lbs
Service, P 5 = = 1920.84 2132.98 lbs
lg= bt3 /12 = 379.69 379.69 in4
(9-9) Mer= 7.5 f/·5 lg/ 0.5 t = 41593 41593 lb-in s<t>Mn ... OK
6er = 5 Mer I/ I (48 Ee 19) = 0.39 0.39 in
Mn= (Ase fy)(d -a/2) = 64091 64643
6n= 5 Mn I// (48 Ee ler) = 10.34 10.73
(14-7) ler= nA,,(d-c)2 +bc3 /3 = 28.70 28.94
Msa = Mso + P sr e X / le = 23450 29122
(14-9) M = Msa + Ps6s = 23878 32633 lb-in
(14-8) 65 = ¾·6e,+(Ma·¾·Me,)(6n·¾·6er)/(Mn·½·Me,) = 0.22 1.65 in
Allowable 6 = le / 150 = 2.24 2.24 in
Check that 65 S 6a11ow OK OK
Shear at Factored Load: (16-3) (16-4) (16-5) (16-6) (16-7)
Weq = 8 Mu/ ( 12 I/') = 1.02 30.44 43.67 27.96 38.33
Vu=leWeq/2 = 14.33 426.17 611.43 391.43 536.56
<PVe = 0.75 (2) f/2 b d = 3697.13· 3697.13 3697.13 3697.13 3697.13
Check that <l>Ve c: Vu OK OK OK OK OK
-----.
I
1 l ,CON,C~ETE SLENDER WALL PER CBC 2007, ACI 318-0514.8
Considering P-Delta Effects
PROJECT #: 2K8-60
DESCRIPTION:
DESIGN CRITERIA:
re=
fy =
Concrete Weight =
Clear Height, I c =
Parapet Height =
Wall Thickness, t =
hit=
Depth to Rebar, d =
Vertical Rebar=
Spacing=
Steel @ Each Face =
Reveal Depth =
Reveal to Bottom =
dat Reveal=
COVIDIEN Tl
LINE E -PIER B
3000 psi
60000 psi
150 pcf
28.00 ft
4.00 ft
7.50 in
44.80
5.250 in
#5
6.5 in
2 (# layers)
0.75 in
16 ft
5.250 in
Muo =
XMuO =
Llmax =
At Reveal:
Mo=
Llo =
(16-3)
0.00
14.00
0.00E+00
0
0.00E+00
LOAD COMBINATIONS (CBC 1605.2.1)
(16-3) U= 1.20 D + 1.60 L
(16-4) U= 1.20 D + 0.50 L
(16-5) U= 1.36 D + 0.00 L
(16-6) U= 0.90 D + 1.60 W
(16-7) U= 0.74 D + 1.00 Qe
(16-17) A= 1.00 D + 0.00 L
(16-20) A= 1.11 D + 0.00 L
12.4.2.3 E= QE± 0.2S05D
= QE± 0.16 D
DESIGN SUMMARY:
Strength: (16-3)
<!>Mn= 141,733
Mu= 19,064
%Over= 0.0%
At Reveal:
<!>Mn= 141,893
Mu= 17,309
% Over= 0.0%
Deflection: Wind
10 / 150 = 2.2400
MaxLl = 0.2524
% Over= 0.0%
e=
Eccentric, D =
Eccentric, L =
Add'/ From Above, D =
Add'/ From Above, L =
7.00 in
52 plf
80 plf
0 plf
0 plf
Girder, D = 12.54 kips
Girder, L = 9.12 kips
0 Girder Load Eccentric?
LL for Seismic?= 0 (Y=1, N=0}
LL Factor, f 1 = 0.5
(16-4) (16-5) (16-6) (16-7)
29314 42103 29314 42103
13.72 13.44 13.72 13.44
3.42E+08 4.84E+08 3.42E+08 4.84E+08
28500 40360 28500 40360
3.32E+08 4.70E+08 3.32E+08 4.70E+08
• •------• 1·
' Wind (1.6W)
! ! 35.oo 1
30.00
25.00
+ 1.60 W 20.00
+ 1.00 Qe 15.00
10.00
5.00 ·
+ 1.30 W 0.00 · I + 0.71 Qe I Pi~ c:-
I a.
J! ~ co I ~ ! -co we i C: ~ N
"' O' O'
' a. I..·----·-· .. _________ ,. .. ---
(16-4) (16-5) (16-6) (16-7)
142,369 142,343 143,228 143,515
50,350 65,549 41,099 53,474
0.0% 0.0% 0.0% 0.0%
142,552 142,575 143,366 143,641
44,623 56,552 37,241 48,420
0.0% 0.0% 0.0% 0.0%
Seismic At Reveal: Wind
2.2400 in le/ 150 = 2.2400
0.5870 in MaxLl = 0.3995
0.0% %Over= 0.0o/o
PF< I ME .Job: • 2/f.r::_.c ~
S·~Dl 'c'-l''' {I, . a°-::-I ii,} ,I 1r<ti:.. Dare: .. <!:1
ENGINEERS Sht: __ e/J
Min Vertical Steel = 0.0025
Min Horizontal Steel =
Max Vert Spacing =
cp =
/31 =
Ee=
Es=
n=
&cu =
ty =
0.6pb =
Sos=
QE=Fp=
Wind Load, W =
(16-17) (16-20)
23818 30074
13.72 13.44
2.78E+08 3.46E+08
23156 28828
2.70E+08 3.36E+08
0.0025
18.00 in
0.9
0.85
3321 ksi
29000 ksi
8.73
0.003
0.00207
0.0170
0.804 g
0.322 Wp
11.50 psf
I b-in/ft
ft
/El
lb-in/ft
/El
-·-----. -------~
Seismic (1.0 E)
35.00
30.00 · t 25.00
20.00
10.00
5.00
0.00
,-.c:, c:-~ ~ C. a. C.
II '<I' ~ :i: .c ~ j§, £ £ "'~ N ... a. O' O' O'
----· ------··--·--------------
lb-in
lb-in
lb-in
lb-in
Seismic
2.2400 in
0.7333 in
0.0%
' , ; CONCRFTE SLENDER WALL PER CBC 2007, ACI 318-0514.8 ,
Consid!;!ring P-Delta Effects
PROJECT#: 2K8-60
COVIDIEN Tl
LINE E -PIER B
DESCRIPTION:
Strength at Factored Load:
Factored ecc, Pu1 =
Factored axial, Puaxlal =
Factored wall, P uw =
Factored, Pu=
Pu/ Ag=
As=
69.89 s 0.06fc ... OK!
0.572 s 0.6p(bd) = 1.071
(14-7)
(14-4)
(14-5)
Ase = ( Pu + As fy ) / fy
a = ( Pu + As fy) / (0.85 f c b)
C =a/ 0.85
E1 = (Ecu / c) d • Ecu
.: 0.005 For Tension Control
Mn= (Ase fy)(d • a/2)
le,= n Ase (d -c)2 + b c3 / 3
Mua = Muo + Puf e X / le
Mu= Mua + Pu Au
Au= (5 Mu h2) / (0.75 (48) Ee 10,)
<PMn=
Check that <PMn .: Mu
Deflection at Service Load:
Service ecc, Ps1 =
Service axial, Psax1a1 =
Service wall, Psw =
Service, Ps = Psr + Psw =
lg= bt3 /12
(9-9) Mc,= 7.5 f'c0·5 lg I 0.5 t
Ac,= 5 Mc, I// (48 Ee lg)
Mn= (Ase fy)(d • a/2)
An= 5 Mn I// (48 Ee le,)
Msa = Mso + P sf e X / le
(14-9) M = Msa + Ps As
(14-8) As= ½·Ac,+(M8·½·Mc,)(An·½·Acr)/(Mn·½·Mc,)
Allowable A = lc / 150
Check that As S Aauow
Shear at Factored Load:
Weq = 8 Mu/ ( 121/)
Vu=lcWeq/2
(11-3) <PVc = 0.75 (2) fc112 b d
Check that <DVc.: Vu
... OK
(16-3)
= 3755.86
= 0.00
= 2534.56
= 6290.42
= 69.89
= 0.677
= 1.328
= 1.562
= 0.0071
= OK
= 157481
= 95.68
= 13146
= 19064
= 0.94
= 141733
OK
Wind
= 1548.71
= 0.00
= 2149.19
= 3697.90
= 421.88
= 46214
= 0.39
= 158188
= 5.92
= 29130
= 30063
= 0.25
= 2.24
OK
(16-3)
= 16.21
= 226.95
= 5175.98
OK
(16-4) (16-5)
2451.39 2107.43
0.00 0.00
2579.03 2974.97
5030.42 5082.40
55.89 56.47
0.656 0.657
1.287 1.288
1.514 1.516
0.0074 0.0074
OK OK
158188 158158
93.87 93.95
37722 49184
50350 65549
2.51 3.22
142369 142343
OK OK
Seismic
1726.55 lbs
0.00 lbs
2437.30 lbs
4163.85 lbs
421.88 in4
46214 lb-in
0.39 in
158158 lb-in
5.83
35875
38319 lb-in
0.59 in
2.24 in
OK
(16-4) (16-5)
42.81 55.74
599.41 780.35
5175.98 5175.98
OK OK
PF~ll\/1.EJob: ~-0
STRUCTUf(/J1L Date: .P_<t._
ENGINEERS Sht: 3,1 __ _
(16-6) (16-7)
1393.84 1144.86 lbs
0.00 0.00 lbs
1934.27 1616.15Ibs
3328.11 2761.01 lbs
36.98 30.68 psi
0.628 0.618 in2
1.231 1.212 in
1.448 1.426 in
0.0079 0.0080
OK OK
159143 159461 lb-in
91.39 90.56 in4
34095 45950 lb-in
41099 53474 lb-in
2.10 2.73 in
143228 143515 lb-in
OK OK
s<DMn ... OK
(16-6) (16-7)
34.95 45.47
489.28 636.59
5175.98 5175.98
OK OK
, I CONC~fTE SLENDER WALL PER CBC 2007, ACI 318-0514.8 PI~ IM E Job: !::;f:.J-t..C>
Considering P-Delta Effects STRUCTURAl Date:_.f(0 ~ (AT LOCATION OF REVEAL) Er'GIN~., .. HS ~2 V I b: ,. Sht:
PROJECT#: 2K8-60
DESCRIPTION: COVIDIEN Tl
LINE E -PIER B
Strength at Factored Load: (16-3) (16-4) (16-5) (16-6) (16-7)
Factored ecc, Pur = = 3755.86 2451.39 2107.43 1393.84 1144.86 lbs
Factored axial, Puax1a1 = = 0.00 0.00 0.00 0.00 0.00 lbs
Factored wall, Puw = = 2216.91 2216.91 2513.91 1662.68 1365.68 lbs
Factored, Pu= = 5972.77 4668.30 4621.34 3056.52 2510.54 lbs
Pu/ Ag= 66.36 s 0.06fc ... OKI = 66.36 51.87 51.35 33.96 27.89 p;,i
As= 0.572 s 0.6p(bd) = 1.071 ... OK
Ase = ( Pu + As fy ) / fy = 0.672 0.650 0.649 0.623 0.614 in2
a= (Pu+Asfy)/(0.85feb) = 1.317 1.275 1.273 1.222 1.204 in
C =a/ 0.85 = 1.550 1.500 1.498 1.438 1.417 in
Mn= (Ase fy)(d -a/2) = 157659 158391 158417 159295 159601 lb-in
(14-7) le,= = 95.23 93.35 93.28 90.99 90.19 in4
Mua = Muo +Pure X / le = 13146 36908 47440 33281 44206 lb-in
(14-4) Mu= Mua + PuL'.u = 17309 44623 56552 37241 48420 lb-in
(14-5) t:,,u = (5 Mu h2) / (0.75 (48) Ee 10,) = 0.93 2.42 3.09 2.03 2.63 in
ct>Mn= = 141893 142552 142575 143366 143641 lb-in
Check that ¢Mn .:: Mu OK OK OK OK OK
Deflection at Service Load: Wind Seismic
Service ecc, P st = = 1548.71 1548.71 lbs
Service axial, Psaxlal = = 0.00 0.00 lbs
Service wall, Psw = = 1847.43 2059.57 lbs
Service, P5 = = 3396.13 3608.28 lbs
lg= b t3 / 12 = 379.69 379.69 in4
(9-9) Mc,= 7.5 fc°·5 J9 / 0.5 t = 41593 41593 lb-in sct>Mn ... OK
t:,,c,= 5 Mer I// (48 Ee lg) = 0.39 0.39 in
Mn= (Ase fy)(d -a/2) = 158391 158417
t:,,n= 5 Mn I// (48 Ee le,) = 6.44 6.50
(14-7) le,= n As (d -c)2 + b c3 / 3 = 93.35 93.28
Msa = Mso + Psr e XI le = 29351 35023
(14-9) M= Msa+Pst:,,s = 30708 37669 lb-in
(14-8) t:,,s = ½·t:,,c,+(Ma·½·Mc,)(l::,,n-½·t:,,c,)/(Mn·½·Mc,) = 0.40 0.73 in
Allowable l'::. = lc / 150 = 2.24 2.24 in
Check that t:,,5 S t:,,allow OK OK
Shear at Factored Load: (16-3) (16-4) (16-5) (16-6) (16-7)
Weq = 8 Mu/ ( 12 I/) = 14.72 37.94 48.09 31.67 41.17
Vu= leWeq/2 = 206.05 531.23 673.24 443.34 576.43
¢Ve= 0.75 (2) f/2 b d = 5175.98 5175.98 5175.98 5175.98 5175.98
Check that ¢Ve.:: Vu OK OK OK OK OK
'
, i CONCRJ:TE SLENDER WALL PER CBC 2007, ACI 318-0514.8 '
PR! ME ,Job: '2J.4f-£:.6
STRUCTUf{AL Date: s-/oJt' Considering P-Delta Effects
PROJECT#: 2K8-60
DESCRIPTION:
DESIGN CRITERIA:
fc =
fy =
Concrete Weight =
Clear Height, I c =
Parapet Height =
Wall Thickness, t =
hit=
Depth to Rebar, d =
Vertical Rebar =
Spacing=
Steel@ Each Face =
Reveal Depth =
Reveal to Bottom =
datReveal=
COVIDfEN Tl
LINE E -PIER C
3000 psi
60000 psi
150 pcf
28.50 ft
3.50 ft
7.50 in
45.60
3.750 in
#5
8 In
1 (# layers)
0.75 in
16 ft
3.000 in
Muo =
XMuO =
Llmax =
At Reveal:
Mo=
l::.o =
(16-3)
0.00
14.25
0.00E+00
0
0.00E+00
LOAD COMBINATIONS (CBC 1605.2.1)
(16-3) U= 1.20 D + 1.60 L
(16-4) U= 1.20 D + 0.50 L
(16-5) U= 1.36 D + 0.00 L
(16-6) U= 0.90 D + 1.60 W
(16-7) U= 0.74 D + 1.00 Qe
(16-17) A= 1.00 D + 0.00 L
(16-20) A= 1.11 D + 0.00 L
12.4.2.3 E= QE± 0.2S05D
= QE± 0.16 D
DESIGN SUMMARY:
Strength: (16-~)
<l>Mn = 89,662
Mu= 1,505
%Over= 0:0%
At Reveal:
<!>Mn= 68,464
Mu= 1,169
%.Qver= 0.0%
Deflection: Wind
lc/150= 2.2800
Max t. = 0.2234
%Over= 0.0%
e=
Eccentric, D =
Eccentric, L =
Add'/ From Above, D =
Add'/ From Above, L =
7.00 in
52 plf
80 plf
0 plf
0 plf
Girder, D = 0.00 kips
Girder, L = 0.00 kips
D Girder Load Eccentric?
LL for Seismic? = 0 (Y=1, N=0)
LL Factor, f 1 = 0.5
(16-4) (16-5) (16-6) (16-7)
30701 44113 30701 44113
13.97 13.68 13.97 13.68
3.72E+08 5.28E+08 3.72E+08 5.28E+08
30100 42735 30100 42735
3.64E+08 5.16E+08 3.64E+08 5.16E+08
r-··
I Wind (1.6W) !
, 35.00
I ! 30.00
25.00
+ 1.60W 20.00
+ 1.00 Qe 15.00
10.00
5.00 ·
+ 1.30W 0.00 ·
+ 0.71 Qe ~~ £' C.
1~ co "'! -co t::. m:s. N ~ 0-[T I: ! !
ENGINEERS Sht: 3 D
Min Vertical Steel =
Min Horizontal Steel =
Max Vert Spacing =
cp:
/31 =
Ee=
E, =
n=
'cu = •y =
0.6pb =
Sos=
QE = Fp =
Wind Load, W =
(16-17) (16-20)
24944 31509
13.97 13.68
3.02E+08 3.77E+08
24456 30525
0.0025
0.0025
18.00 in
0.9
0.85
3321 ksi
29000 ksi
8.73
0.003
0.00207
0.0128
0.804 g
0;322 Wp
11.50 psf
lb-in/ft
ft
/El
lb-in/ft
2.96E+08 3.69E+08 /El
Seismic (1.0 E)
35.00 ., -·----------------
10.00
5.00
0.00
.--c-![ ![ ~ a.
II <r ~ :; .c ~ :::-o ~ ~ :g~ "'~ N <r Q. r;r [T [T
-t_ _____ •• ---_____ ___J
(16-4) (16-5) (16-6) (16-7)
89,467 90,324 87,693 86,882 lb-in
48,933 74,269 42,367 57,106 lb-in
0.0% 0:0% 0.0% 0.0%
68,239 68,695 67,088 66,522 lb-in
36,875 52,894 34,211 47,188 lb-in
0.0% 0.0% 0.0% 0.0%
Seismic At Reveal: Wind Seismic
2.2800 in le/ 150 = 2.2800 2.2800 in
0.6181 in Maxt. = 0.2436 1.8867 in
0.0% ro Qver= o.o.o/o 0.0%
' , i CONCRETE SLENDER WALL PER CBC 2007, ACI 318-0514.8 , I I
Considering P-Delta Effects
PROJECT#:
DESCRIPTION:
2K8-60
COVIDIEN Tl
LINE E -PIER C
Strength at Factored Load:
Factored ecc, Pur = ·
Factored axial, P uaxIaI =
Factored wall, Puw =
Factored, Pu=
Pu/ Ag = 33.68 s 0.06fc ... OKI
A5 = 0.465 s 0.6p(bd) = 0.577
Ase = ( Pu + As fy ) / fy
a= (Pu+Asfy)l(0.85fcb)
C =a/ 0.85
e1 = (ecu / c) d·-tcu
;a 0.005 For Tension Control
Mn= (Ase fy)(d -a/2)
(14-7) le,= n Ase (d -c)2 + b c3 / 3
Mua = Muo +Pure X / le
(14-4) Mu= Mua+PuAu
(14-5) 6u = (5 Mu h2) / (0.75 (48) Ee le,)
<J)Mn=
Check that <J)M0 c: Mu
Deflection at Service Load:
Service ecc, P st =
Service axial, P saxlal =
Service wall, Psw =
Service, Ps = Psr + Psw =
lg= b !3 / 12
(9-9) Me, = 7 .5 r /·5 19 / 0.5 t
Acr = 5 Mer I// (48 Ee lg)
Mn= (Ase fy)(d -a/2)
6n= 5 Mn I/ I (48 Ee le,)
Msa = Mso + Psr e X / le
(14-9) M = Msa + Ps 6s
(14-8) As= ¾·Ae,+(Ma-¾·Me,)(A0-¾·A0,)/(M0-¾·Mcr)
Allowable t, = le/ 150
Check that 6s S 6anow
Shear at Factored Load:
Weq= 8Mu/(12I/)
Vu= lcWeq/2
(11-3) <J)Ve= 0.75(2)f0
112 bd
Check that <J)Ve c: Vu
... OK
(16-3)
= 268.80
= 0.00
= 2494.85
= 2763.65
= 30.71
= 0.511
= 1.002
= 1.179
= 0.0065
= OK
= 99625
= 36.06
= 941
= 1505
= 0.20
= 89662
OK
Wind
= 73.41
= 0.00
= 2116.76
::: 2190.18
= 421.88
= 46214
= 0.40
::: 99408
= 10.07
= 25196
= 25686
= 0.22
= 2.28
OK
(16-3)
= 1.24
::: 17.60
= 3697.13
OK
(16-4) (16-5)
144.56 99.90
0.00 0.00
2540.12 2931.75
2684.68 3031.65
29.83 33.68
0.510 0.516
0.999 1.011
1.176 1.189
0.0066 0.0065
OK OK
99408 100360
36.00 36.25
31197 44449
48933 74269
6.61 9.84
89467 90324
OK OK
Seismic
81.84 lbs
0.00 lbs
2401.89 lbs
2483.73 lbs
421.88 in4
46214 lb-in
0.40 in
100360 lb-in
9.97
31784
33319 lb-in
0.62 in
2.28 in
OK
(16-4) (16-5)
40.16 60.96
572.32 868.65
3697.13 3697.13
OK OK
PHHV1EJob: ~o
STRUCTURi\L Date:~
El''Gii\.l'"E··~,, · ~ ·mt·K0Sht: 3L
(16-6) (16-7)
66.07 54.27 lbs
0.00 0.00 lbs
1905.09 1592.67 lbs
1971.16 1646.94 lbs
21.90 18.30 psi
0.498 0.492 in2
0.976 0.966 in
1.148 1.136 in
0.0068 0.0069
OK OK
97437 96536 lb-in
35.49 35.25 in4
30928 44295 lb-in
42367 57106 lb-in
5.80 7.78 in
87693 86882 lb-in
OK OK
s <t>Mn ... OK
(16-6) (16-7)
34.77 46.87
495.52 667.91
3697.13 3697.13
OK OK
' , ; CONCRETE SLENDER WALL PER CBC 2007, ACI 318-0514.8
-' ' Considering P-Delta Effects
(AT LOCATION OF REVEAL)
PROJECT#: 2K8-60
DESCRIPTION: COVIDIEN Tl
LINE E -PIER C
Strength at Factored Load: (16-3)
Factored ecc, Pur = = 268.80
Factored axial, Puax1a1 = = 0.00
Factored wall, Puw = = 2216.91
Factored, Pu= = 2485.71
Pu/ Ag= 29.04 s 0.06fc ... OKI = 27.62
As= 0.465 s 0.6p(bd) = 0.577 ... OK
Ase= ( Pu + As fy } / fy = 0.506
a= (Pu+ As fy} / (0.85 fc b) = 0.993
C =a/ 0.85 = 1.168
Mn= (Ase fy)(d • a/2) = 76071
(14-7) le,= = 32.45
Mua = Muo +Pure X / le = 941
(14-4) Mu= Mua + Pu b.u = 1169
(14-5} b.u = (5 Mu h2) / (0.75 (48) Ee 10,) = 0.23
<PMn= = 68464
Check that cl>Mn ~ Mu OK
Deflection at Service Load: Wind
Service ecc, Psr = = 73.41
Service axial, Psax1a1 = = 0.00
Service wall, Psw = = 1847.43
Service, Ps = = 1920.84
lg= bt3/12 = 379.69
(9-9) Mc,= 7.5 f/·5 lg/ 0.5 t = 41593
60,= 5 Mc, I// (48 Ee lg) = 0.40
Mn= (Ase fy)(d • a/2) = 75821
60 = 5 Mn I// (48 Ee le,) = 10.96
(14-7) le,= n As {d-c)2 + b c3 / 3 = 32.40
Msa = Mso + Psr e X / le = 24745
(14-9) M= Msa+Psb.s = 25213
{14-8) 65 = ¾·60,+{M8-¾'Mc,)(60-¾·60,)/(M0-¾·M0,) = 0.24
Allowable 6 = 10 / 150 = 2.28
Check that 65 S b.auow OK
Shear at Factored Load: {16-3)
Weq = 8 Mu/ ( 121/) = 0.96
Vu= lcWeq/2 = 13.68
cl>Vc = 0.75 (2) f/2 b d = 3697.13
Check that cl>Ve ~ Vu OK
(16-4) (16-5)
144.56 99.90
0.00 0.00
2216.91 2513.91
2361.48 2613.81
26.24 29.04
0.504 0.509
0.989 0.997
1.163 1.173
75821 76328
32.40 32.63
30596 43071
36875 52894
7.11 10.47
68239 68695
OK OK
Seismic
73.41 lbs
0.00 lbs
2059.57 lbs
2132.98 lbs
379.69 in4
41593 lb-in
0.40 in
76328
11.34
32.63
30814
34836 lb-in
1.89 in
2.28 in
OK
{16-4) (16-5)
30.27 43.41
431.28 618.64
3697.13 3697.13
OK OK
z./4"-<e-e> PRiMEJob: __
STRUCTURAL D,!te: _.!f:._'C
E'l'""l"·i"l"lj" ?,z__. M:i i;tb.:: \\i Sht: .>
(16-6) (16-7)
66.07 54.27 lbs
0.00 0.00 lbs
1662.68 1365.68 lbs
1728.75 1419.95 lbs
19.21 15.78 psi
0.494 0.489 in2
0.968 0.958 in
1.139 1.127 in
74542 73913 lb-in
31.94 31.73 in4
30327 42917 lb-in
34211 47188 lb-in
6.26 8.38 in
67088 66522 lb-in
OK OK
:.cl>Mn ... OK
(16-6) (16-7)
28.08 38.73
400.13 551.91
3697.13 3697.13
OK OK
., ' •
~ ' ~\SM IC, lle?t&r-l f'-o/Z.-G-ol'\1., f1>Sf fl.;t.rt--kv~li\,ft"NI
Sl>.s : 0 ,'"6 O"/
'Sb, ': fJ. ~5''1
( /7, / j -7)
Cb : o:c7/6
X = O.'b
-"' £.:. ~. 0 i_ -r. ., ·-= 0-, ;,'.'Z,,c,-
'2' 5"
Y-ru,.l :::o,o/
P .. , l.\ Mfr· .. · '2.-1,,,.JJ---tz 6 R ! 1-v1 c JoTo: 0 ···-s-rRl;f\TU' .,, 'ti e-/o-?j I ••• ,, r ~· V, ....... , ,v, Ktu.,Dak __ _
ENGINEERS ~t,t: ,,,,_,}._~
.
··(: _B~ r,;,~1c;-w (~D)
(1t1sc H)
~x :
150/jj·
/1, eft)*";; ~~
I I ij
PRIME Job: .?d<:c!:-1:. '13
STRUCTURAL Date:'Jl.~!:
· t:NG11"1,ir:.rcRs ''ht· ?f-t. ~ L. ,\ ,)I . ---
'%..
M)( = />"Or).F ('fo,r) 12/g-; ]{0 Jc,,'r·!"
1-Aj ; , 1. -u, .1P c 'f ll.$/l-, i-/ i -.: 12-, '1 Ar-1~,.
.A~ :c 5 (o,,~)(l/(),s--f11n.l1 = (' ~ I>'"" 3/3,'11'1 <Yu-/~1
1-111 ( "ti? o.i.., ) Ix
W I 7r X. S-3 f'f¼f~63 ,
Ix-= fu-,~i-
I~ 't °Is-/~ ;" ,z..
Sx -:. 70., i11 1
s'j ; ,1.i ,,,"
z:x ~ 77,1r~i
-::z. I , z bl " 2.."), In
. l--17 ~ z. 7~ .fJr
1-i--:. 2.g', io f+
_b.r-/-it, " '6,6 i
i;l..i ~ ?.$,/
FtA-fiJ(r~;
)., -:. o.~r ¾
:; 1,/f
6Yu, < >--r
wa:
Ar • '5;,76 ~
,,. °lo->>
·--
' J
( '
f"\J\16f2.: KK cs sn-i b1"1 G--
: Y.1.fl1)1i:Jfr:
_fvl(\, = /:-\ ~ Fj ~it = So /e-si ( 77,~) :: >2'?~ f-/1-,~-
/,,~t, r, /2-S /'0/J kl-!f V.. f'//(:-1.A rJ (,, :
LL <-Lr 3.., ~f"B ts NjA ,
,.A I Nof.. bt")V$ ,g <:rJ.f> I rJ (r i
,
'/1@.;~1,J(r ~ .
t-1\(\ -; J1 r ~ ry -z 1 6 I. , F'J s 'I
ry i 1 -:;: n ( 1-~1.,) ~ 1 'i s-s-f-,,1 ~111. ~ G-o v-e>t-1-1~
/,try 51 ~ /.(; c~){t°J,i):; /5'!){,, ~1-i11
F -;t-1,( -;
l:,)( ,, /.fl$,,_ 3r?>/(1,1,1t<7°,,) ; 3'3rotfki
/'-js-s-/(1., 7 ... l~.1-) -:: 'I~ J'if b:5;
tb,: ~ IVl.;,./51-; > ,47 ;;=;.-;,,/ 1°-, i,-3 ;; 5, '.2. 3 k;
t~ ; Jlll~ · ::: 'fi. y 1rJ·r-i11 J.(,~.1/i) ~ 1, 'f 2. fo,J;
y (5'!1~) / I I
t r,1$(/(,1/ k'1'1 1/W't,y
y<>fi-~p.;,~...i
"j. 2,3 f-.o;
3'3.oo/ k;
-o u L.. I ,o
PR If-JI E Job: ~·0
ST"l' l('''l''"'I'/ ,::; ft, JY 1tH.111 !1ir\1. Date:_~
ENGINEERS Sht: --1..J'-
,.
• <
( l
/J...M/>rt,. B ,Tof' -:: /lo71 bl 1 = y/'
fJ:[
re :: ~e ; /'f, i
t :: '$ 7, 5" i/
~ :; :2,-, 0 f-o,'t-C/t-N-n l,{Vf Je. ,
/_= l~,'5'1 r-.:. -~r0 tf,ri
Jc-1,.. :-'Y-f r (, > /¥,
,q di9 I =11s.& ,fl
M11 ~ Mf -: l/C /c,i (:n,~ ,/) ~ 11 2-s--~f-i"
[hft ; !Lf,1.J < [ A = z.11. j G/0 ~ bo, 7~ J
W-= IS? fl(
p RIME dab: zJcg,-.-t6
STRUCTUf<AL Date:~ 9(!-t"'
ENGINEERS Sht: _ 'fo
§"aSµ1e, :: f7, 1£ /f f {)'>r; 7
I~:, ( fo Z. Z? /r) :: ~, 7 6 It..
__ J -17,U:-(62.i,;~), o,s~ /.,f,.
A:1>011, Mo~'/\rj' ~M. ~Q,f N~ C
B~ C<JrJNe-0?cuJ, A$S:-vl,';1(f J 1'
fu., 'fo/2... 1\1,v g~ wf. (utJ{c"'llYKnta
µ\t-~ '1. 7' /: ( > ") ~ I 1i · 3 Jc. -/t1
,.
-• CoJ,/lf'kC,-t
No l,18 <'Cv<,t,e,S,
'1,71r, t ( 11,n (,-z-) t 1'i,'3) :;; 0,/1 z/,o
2...(100) /72,.S" /1,t..7
. ' . '
' f
PRiME,.Job: -~
STRUCTUf?AL Date:!/!.!_
ENGIMEEHS s11t: i-L
DEPTH REQUIREMENTS FOR EMBEDDED POLES
Per Sec. 1805.7, 2007 C.B.C
DESCRIPTION: CANTILEVER COLUMN
ALLOWABLE LATERAL EARTH PRESSURES
Allowable Passive Pressure =
Maximum Allowable Passive Pressure =
Does lateral restraint at ground surface exist?
Load Duration Factor =
LOADING DATA
Applied point load, P =
Load height above base, h =
Uniform lateral load =
Distance from base to bottom =
Distance from base to top =
771.0 lbs.
16.5 ft.
0.0 plf
0.0 ft.
0.0 ft.
POLE TYPE (1=ROUND, 2=RECTANGULAR): 1
POLE WIDTH NOMINAL TO FORCE :
MINIMUM REQUIRED EMBEDMENT
Non-Restrained :
24 in.
Depth = (A/2)*{1 +SQRT{1 +4.36*h/A)} =
where A=2.34*P/(S1*b)
Restrained :
Depth= SQRT(4.25* P*h/S3*b) =
LATERAL PRESSURES
Allowable @ 1 /3 of Embedment = 448
Actual@ 1/3 of Embedment = #N/A
Allowable @ base of Embedment = 1,345
Actual @ 1 /3 of Embedment = 1,345
Surface Restraint Force = 4,613
225 psf / ft of depth
2000 psf
{For No Limit, enter "0")
1 (Y=1, N=0)
1.33
Point Load
Moment@ base= 12,722 ft-#
Uniform Load
Moment @ base = 0 ft-#
Total Moment= 12,722 ft-#
#N/A ft
psf
psf
psf
psf
#
I \ ,,
'I ' ,'
( '
' i i i
j r
l
I
• "' l • ~
l
... '3
"" $ ~
\
1/> 3
~--J _ 6 ,°11-1,
S,'11·-lc-
.,,-
'>
~,~//<.
l
PRIME Job: ?%8..U
STRUCTURAL Date:~
ENGINEERS Sht: !:!!J:..
..
... ~
~ -::s: ::r-oil
l ~
!i
~l-~-------'~_i-1~-------------~----~r~ ~ ~ I"' • ~l ~~ ~~ ~
' \, ,
' l { I
' '.~It kt' A'vj s 15
T:i/vJ D ttte~o,J
)
W, .. ; f.-t>o(&-"'q70 plf., (o,UJ//o,/1'})
M,r~t;,-~ ;7io l),P, (or1,,ofjd1~r1)
;;J?Aof ~ :l('f, ~ k ,fl 27. r'
?M6n i"l.~lc-"" l1r
/~7,9k
f.OOf 'Pl~ lh-117 ""' :: IT ~ 1
~oi-(. /W>"f'", -: O, 7f
" , (> ~ 7 ;1-r. I
t0 6'S" ,tr, rt,'17
('7',C, r-1't_ t. 0,7~ -:::
PHiMEJob: ~
STRUCTURAL Date: ;:;_,-t'l~
ENGINEERS Sht: / .... :35
IS-&~ (if,
l'17 > 1.Af,
' ,,
• l
(s3B
s0b3T
E/W 2
(s1p12v1s0b4148TBEAM ANALYSIS PROGRAM (s1p9v1s0b4148T
SPAN LENGTH= 78.00 :et
(Simp1e Span)
UNIFORM LOADS (k/:ft & :ft)
wd wl. Xl X2
0.268 0.000 0.00 78.00
0.288 0.000 0.00 24.00
0.154 0.000 53.00 78.00
REACTIONS (k)
LOAD LEFT
Dead 16.918
Live 0.000
Tota1 16. 918
MAXIMUM FORCES
V max = 1_6.92 k @
Vd max= 16.92 k @
M max = 269. 72 kft @
Md max= 269. 72 k:ft @
DEFLECTIONS (EI = kin"'2)
LOAD Defl. (in)
Tota1 303745545/EI
Live 0/EI
Dead 303717061/EI
TOTAL Defl.
L / 180
L / 240
L / 360
EI
58412604
77883472
116825208
RIGHT
14. 748
0.000
14. 748
0.00 :ft
0.00 :ft
37.33 ft
37.33 :et
X (ft)
38.65
0.00
midspan
p RIME Job: .~.J,,:.:e-1:,,=
STRUCTURAL Date: s-o"6
ENGINEERS sht: !:..li:._
(s0B02/28/08
(6.60) (s0p10.00h12v0
, l
' I
(s3B
s0b3T
l ,,
E/W 3
(s1p12v1s0b4148TBEAM ANALYSIS PROGRAM (s1p9v1s0b4148T
SPAN LENGTH =108.58 ft
(Simp1.e Span)
UNIFORM LOADS (k/ft & ft)
wd w1. Xl X2
0.268 0.000 0.00 108.58
0.154 0.000 0.00 1.00
0.164 0.000 54.00 78.00
REACTIONS (k)
LOAD LEFT RIGHT
Dead 16.247 16.943
Live 0.000 0.000
Total. 16.247 16.943
MAXIMUM FORCES
V max = 16.94 k @ 108.58 ft
Vd max= 16. 94 k @ 108.58 ft
M max = 481.37 kft @ 57. 75 ft
Md max= 481.37 kft @ 57. 75 ft
DEFLECTIONS (EI= kinA2)
LOAD Def1. (in)
Total. 1004519016/EI
Live 0/EI
Dead 1004402378/EI
TOTAL Def1.
L / 180
L / 240
L / 360
EI
138771280
185028368
277542560
X (ft)
54.82
0.00
midspan
PR l !Vi E Job: 2 b--o -~0
STRUC·r1j,;fl D . ~ ~ Ii K,\. me: __ _
ENGINEERS Sht: _ _i:}/
(s0B02/28/08
(6. 60) (s0pl0. 00h12v0:
'
,~-7/.,..g-rl..c)
II i \1. ~ ~ '"-' \ .,..._ ., '" .f-.r-..J?,..:,.,.,':?-111,, ' ~ .
' : t;{\1~t\-'t. ~~t..-"fSI.! . ,-----·-----' ~I-hi c~ i.trnoN
STRUCTURAL Date~
ENGINEERS Sht: ·
°'J /l{MoVIJ1..-~P f4-f,Jf~ :J ·3 ((..e7Ut.-1J' /,J :> ::,:J YfLtNlrTif lo?$.
h) l+O'(~, .. (i,o,{111"4-t.-/~W~ '/:>Vil( T'f:I (U"~~-NflV/ a,olf...Nfi)t-'11
: , r = 1, '3 fof<. ()t0'(H 01~,:,"j' •
{;;/NC 0 -ie,oor
S ~ /,'3 [111,~ ~ + 0,1,,o/ (7,s-,Az..)(lc;-opcl)(1i,u 1)(1s-cr,~1)]-: ($/', o \::.. .
;< /
l,1~ (p -te.;,of
~: /.'3 [ii.,;~ + .O,v,/ (1s(,i-)(1n 1,t)(!1.1,,S"1)Cr'f~Jn 1ij -c /72-. Z ~
vtrJe' ® -~f
c: /.3[,z.1,71' f o,io1(7sj11)(1n1,t)fi.1--rj1°i.i)] ._,. 2/'J_,o /<:.
,· '
LATERAL ANALYSIS· PANEL RIGIDITY AND LOADS
2K8-60
Load includes shear wall weight and rho
PANELS AT LINE E V_tot = 212.0 k
~ B Y. %LOAD
S-7 0.0616 16.234 56.576 0.267
S-8 0.0771 12.970 45.202 0.213
S-9 0.0771 12.970 45.202 0.213
S-10 0.0536 18.657 65.020 0.307
SUM 60.831 212.000 1.000
1, .....
ASD Design V for
(V/1.4) Exist. Bldg.
40.41 k 36.9
32.29 k 32.4
32.29 k 32.4
46.44 k 45.7
n, !R"' H, n i:.,-· J b· Zf,/,..t;,.. o r" ,1:hnt::,o .. ·-·--
(''"R'''~·,,·,·s. ~'-P I ,'1 !1 '· 1·h,: Date· 00
1..1 \,.r\,1:i..11,11·," .. -.
Ef~,-.,··i~·,--ero 1 2 P-1",l'l ;. .. t .. ,"ii,,., !""; ' t--/0 ... i.l ,_ ... , ,1..< ~tit. ··------···
% Diff. Greater
9.5% 0.0'/V µ..-""'""'····,..,) 0.0% €1 r '!>o/o ;, ~~
1 6'¼ 1il p1t,ov11>t r ~ &ur w6 ft.oVfDfl>: q, N t; C,prvt'5 1>1116 I
off:"Nl,J 6-f,
. ~
~.v' ,
; ..
_l
4.716k _:I o2_1f k
,..-
..... .,,-,..-
; Loads: LC 2, SEISMIC ONLY
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
'""' k .1.:71'k ..... ...
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
-,__
l:.d'/
-~--------------, ·-·----·-----. --···------·-------· -----------·----------· -----,
7.5 7.5 7.5
4.°""' 4.716"'--,'--7· 6k ,L716k ., '16k .... ..... ... .... ...
7.5 12 12 7.5 7.5
75 12 12 7.5 7.5
7.5 12 12 7.5 7.5
7.5 12 12 7.5 7.5
7.5 12 12 7.5 75
7.5 12 12 7.5 7.5
7.5 12 12 7.5 7.5
7.5 12 12 7.5 7.5
7.5 12 12 7.5 7.5
7.5 12 12 7.5 7.5
"-·-... .. o' ,o"
~716k 4.71""--4.71""--.... ... ..
7.5 7.5 7.5
7.5 75 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 75
7.5 7.5 7.5
7.5 7.5 7.5
7.5 75
7.5 7.5
7.5 7.5
PI~ I fVi E Jop: !M~-t
('·"',;/ f"T' !t-< I ~ \.dr1.\,;!.,1dn1A1 f.1"'-;-.+~· "1> .. , j ·-• t.. ~i_... 0
I rn,:u~'":C•):' .... , L,.,;i.-iL1 1,,, c,, .. ,,.. ,V1' •••• ,,.,t. __ l_t
I
..._ ....
7.5
7.5
7.5
7.5
75
7.5
7.5
75
75
7.5
-"'" --~
-· • Resulls for LC 2, SEISMIC ONLY
'leaclion unils are k and k-ft .. -1
I Pr!rn_~ Structural Engineers!
--. ---· ..... ··--·· .. ---·-----------·· ··----------------I l .... _____ ---_______ ______ --------I S-7
'. PSE 1
... ,
· 2K8-60
! May 8, 2008 at 4:19 PM .
f-·· --------· ----·-·---···-------l I ' i S-7-~2d J
l· -.. ·-
.i:.,.v-
.. ~---. '
·····------------------·----------------------------.-:,--./; /
P r-:~ I iV! E.:. .Job: -~.:!.:::--0
-6.6 891
--.
a
87.9
; Loads: LC 3, 1.2D+1.6L
--·. Results for LC 3, 1.20+ 1.6L Reaction units are k and k-ft
,n-'"
7.5
u
7.5
7.5
7.5
7.5
7.5
7,5
7.5
75
7,5
7.5
7.5 •.4251 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7,5 7.5
7.5 7.5
7.5 7.5
7.5 75
7.5 7.5
7,5 7,5
•,4251 7·5-.4251 t-.~251 -.425k,
12 12 7.5
12 12 7.5
12 12 7.5
12 12 7.5
•,3641 ._354;
12 12 7.5
12 12 7,5
12 12 7.5
12 12 7.5
12 12 7.5
12 12 7.5
S-7
•.425k -.425k I I
7.5 7.5 75
75 7.5 75
7.5 7.5 7.5
7.5 7.5 7.5
-.3641 -.364k
75 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
-.425k
• 3641
{\'•·•., :1,·t1 ·,~r' 1" [ ~I /Y 1'!11 • lj ''>t!Y (1" ,:; , r.1A, ! I., ,r,., ,.;,:, ¼•,
l"' ''""!'"•'R"' L 0 'I" jr-:_.~~ ... l<~•·t f~ ~1,. •, , , •• •J\;\ I, l. \,r v I(, ••---;--
-.425k -.425k I
7.5 75
7.5 7.5
7,5 7.5
7.5 7.5
• 3641 -.3641
7.5 7.5
7.5 7.5
7.5 7.5
7.5 75
7.5 7.5
7.5 7.5
~i>
----------~-----·------------------1 ~~i~-~-~ ef~~~~t~~~~--~-~~~Jci~~~!i --··--·------· -·-----·---
i--~~-~---·----------------p"'-May 8, 2008 at 4:1~_!:_fy! __ ~
i 2K8-60 S-7.r2d I '··· ··-· ···-···· ----· ··-. -· --.. -. . ·--·--·· -·· ---·-----·· ·-------· ---··-~-----··--. ------------. --··------____________ ,______ __,
..I i.. ,I i. ,, ' '
CONCRETE SHEAR WALL DESIGN -For Intermediate Precast
(PER CBC 2007, ACI 318-05)
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-7
PIERA
f'c = 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 20.00 ft
E = pEh +Ev= 35.40 kip
Pier Fixed@ base (Y=1, N=O) a:: 0
Seismic Load factor = 1.00
Pu = 87.90 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7 .50 in
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
ct:>Vc =
<PVn.max =
Vu=
ct:>*1 0*(fc)"(0.5)*h*d =
319.92 kip
0.00 kip
239.94 kip
727.10 kip
35.40 kip
<PVs.req = Vu -ct:>Vc = 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for > #5 bars)
(11.10.9.1) Asv.req = (Vu-ct:>Vc)/(ct:>fy d) = 0.0000 in"2/ft
µ = 0.6
<P = 0.75
Ag = 1800.00 in"2
d = 236.00 in
USE
#4@
#5@
#6@
#7@
[11.7.4.3]
[ 9.3.2.3]
13.3 in
18.0 in
18.0 in
18.0 in
Avf.req = Vu / (ct:>*fy*µ) = 1.31 in"2
7 #4 dowels at slab on grade /
FLEXURAL DESIGN:
<PMn =
Mu=
see interaction diagram = 7899.28 ft-kip
Vu*Hp = 247.80 ft-kip
Flexural Design ... OK! /
8.00 . Rebar Layout (Bending over Y-Axis)
Ill 6.00 ....................... .. J: 4.00 u .5 • • • • • • •
2.00
0.00
0.00
.......................
50.00 100.00 150.00
Inches
··---·----------
-~--·=::J~ 200.00 250.00 300.00
-··--···· ·····-····-· ---·
. ~·-.. ---··· ----····· .... ·-··-·-----------------·---------------
C: Q,
Rebar Layout:
2#7@d =2 in
2#7@d =6 in
2 #5 @ d = 12.5 in
2#5@d = 19 in
2 #5 @ d = 25.5 in
2#5@d = 32 in
2 #5 @ d = 38.5 in
2#5@d =45 in
2 #5@ d = 51.5 in
2#5@d = 58 in
2 #5 @ d = 64.5 in
2#5@d = 71 in
2 #5 @d = 77.5 in
2#5@d = 84 in
2 #5 @ d = 90.5 in
2 #5 @ d = 95.5 in
2 #6 @ d = 100.5 in
2 #6 @ d = 105.5 in
2 #6 @ d = 110.5 in
2 #6 @ d = 115.5 in
2#6@d = 120.5 in
2 #6 @ d = 125.5 in
2 #6 @ d = 130.5 in
2 #6 @ d = 135.5 in
2 #6@ d = 140.5 in
14.3.5
o.c.__,,/
o.c.
o.c.
o.c.
. '-' (. ' . ) ,_
CONCRETE SHEAR WALL DESIGN· For Intermediate Precast
(PER CBC 2007, ACI 318-05)
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-7
PIERB
fc = 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 3.79 ft
Pier Fixed@ base (Y=1, N=O) = 0
Seismic Load factor = 1.00
µ = 0.6
<P = 0.75 E = pEh + Ev = 21.20 kip
Pu= 51.90 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7.50 in
Ag = 341.25 in"2
d = 41.50 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve =
ct>Vc=
<PVn.max =
Vu=
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
¢*1 O*(fc)"(0.5)*h*d =
56.26 kip
26.06 kip
19.54 kip
127.86 kip
21.20 kip
<PVs.req = Vu -ct>Vc = 1.66 kip
p.min = 0.0020 (for :5 #5 bars) = 0.0025 (for > #5 bars)
(11.10.9.1) Asv.req = (Vu-ct>Vc)/(ct>fy d) = 0.0106 in"2/ft
Avf.req = Vu/ (ct>*fy*µ) = 0.79 in"2
4 #4 dowels at slab on grade
USE
#4@
#5@
#6@
#7@
FLEXURAL DESIGN:
<PMn =
Mu=
see interaction diagram =
Vu*Hp =
269.39 ft-kip
148.40 ft-kip
Flexural Design ... OK!
.... ·-···-··------···1
i
Rebar Layout:
2#7@d = 2 in
[ 11.7.4.3]
[ 9.3.2.3]
13.3 in
18.0 in
18.0 in
18.0 in
ID .c u ·=
:::: 1· . 4.00
Rebar Layout (Bending over Y-Axis)
• • : I -
i 2 #5 @ d = 15.83 in
2 #5 @ d = 29.65 in
2 #5 @ d = 43.48 in
C a.
2.00 • • •
0.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Inches
··--·-· --------. --. --· -··1
1000 ·
-200-i
Interaction Diagram 1200 1---·· ··;··-···· ·-,----··-··· -·-··-··-···--·---,-·----r···!--Pn-Mn 1
.......,._-i--___ ~--'-. --. .L .. ------1-----L~~~~~~~c:~'.::) I
' ! / j--·--All Design I
800 . ..I.... . .. -1. ·--···-----------·-----1---·-· __ .,_ ___ --::=:j
' I ' ' I .
eoo t-·--··-·-·-+ __ J I ----1------+----' ~
400 ~~a~_P:i-Pn· .. i~~-~-----~-J=~~-s~~::~-J _J___ ------1
: I i j ~~I I : 1
200 ~-----··-----i --.. ·-· ----l---·--· ----·}-· -·-. --·~---=::·-·_-. --~-~lL--i-----H--·-!
I au-Mu : ---J. . i
-___ : .. =----,=---.. ·---· ·r _J ·---· ~ . __ : __ ~ .: -------~~
·; . .. . . ·: · .. . .. -i . I
-400 .:
I . . ., . . . .. __ ..... _ ... .. l . . .I. . __ I . Mn :
-······--·------·--------·-----····-------···--.. --·----------·--·--··----J
14.3.5
o.c.
o.c.
o.c.
o.c.
(' '
..... ·--------------------··· --------------·-···· -------------. ' 1.,v ,
lZ...L.x
-2
3.367k
8391
-
7.5
3 367k
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
~
Loads: LC 4, 0.785D+E/1.4
--· Results for LC 4. 0.785D+E/1.4
1eaclion units are k and k·CI
7-5-.09H , ,
3 367k
7.5
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
7.5
0
: P~i~~:·str~ctur~I ~n~i~:~ir~'f
;PSE I
7.5 • 09H
3.367k
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5 __ 09H 7--~911 -.091k -091k -.091k
I
3 367k ""67k 3 367k 3.367k 3,367k
12 12 7.5 7,5 7.5
12 12 7.5 7.5 7.5
12 12 7.5 7.5 7.5
12 12 7.5 7.5 7.5
-.0781 -.078k -.0781 -.078k
,
12 12 7.5 7.5 7.5
12 12 7.5 7.5 75
12 12 7.5 7.5 7.5
12 12 7.5 7.5 7.5
12 12 7.5 7.5 7.5
12 12 7.5 7.5 7.5
S-7
'. 2K8-60 .. --------. -·1 /rSD (,ofJ(1) ~"(
. -·· •. ···-___ _! ___________________________________ _
0,7&S--b -t-'G /1,'1
-.091k -.091k -.091k
; 3 367k ! 367k !,367k -~
7.5 7.5 7.5
7.5 75 7.5
7.5 7.5 75
7.5 7.5 7.5
•.078k -.078k -.078<
7.5 7.5 7.5
7.5 7.5 7,5
7.5 7.5 7.5
7.5 7.5
75 7.5
7.5 7.5
l l
I
I 75.6
May 8, 2008 at 4:20 PM
__ ____.__s._1_.r2_ct _____________________ l
iz.,_.x
!· _, .I
n -. ••
-2.8 391 7.5 7.5 -.0911 7.5 -.0911 7·5-.0911 7-·.~911 -.091k , .
-3.367k -3.367k -3.367k -3.367k -3.3 6rk .3 367k
7.5 75 7.5 12 12 7.5
7.5 7.5 7.5 12 12 75
7.5 7.5 7.5 12 12 7.5
7.5 7.5 7.5 12 12 7.5
-.0781 -.078j
7.5 7.5 7.5 12 12 7.5
75 7.5 7.5 12 12 7.5
7.5 7.5 7.5 12 12 7.5
7.5 7.5 7.5 12 12 7.5
7.5 7.5 7.5 12 12 7,5
7,5 7.5 7.5 12 12 7.5
I •
,89.4
· i Loads: LC 4, 0.785D+E/1.4
-.091k -.091k -.091k
I
-3.367k -3.367k -3.367k
7.5 7.5 7.5
7.5 7.5 75
7.5 7.5 7.5
7.5 7.5 7.5
-.0781 -.0781 -.0781
7.5 7.5 7.5
7.5 7.5 7.5
75 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
P F~ ! f\/~ r:.: Job: z#-.Z:1
n-n11e"•M·, : w-\ !)c., !1:'c'i.J· 0'-''0' 0/..,, v 11 u .. .1v, 1.,1,1 :i.. ...-~ ......
ENGINEERS Sht: _f___" :
-.091k
-3.367
7.5
7.5
7.5
75
-.0781
7.5
7.5
7.5
7.5
7.5
7.5
-.091k
I
-3.367 --3.367k
7.5
7.5
7.5
7.5
-.0781
7.5
7.5
7.5
7.5
7.5 I
A-r"1= I~
~ D , o;,f },
f,,/', I
i.. J:/-7 f,r:.,,v1r,i'(,""fJ
I , i. ,~ l,. 16 3S,,
:, o (FI
l •
' --Results for LC 4, 0.785D+E/1.4
Reaction unils are k and k-ft
i ::Kt":"~·:~n~!~i··-· -----·----··----------·------------,---------··----·--------··--~
S-7 f-----------l
May 8, 2008 at 4:20 PM -i
S-7.r2d
~.
1 • Y\ ·\r
. •.· .z. .• x
75 7.5
7.5 7.5
'""' 3.767k, 3.7 3,70.:Zk 3.7""' -...
....
/;;,h-.C
Loads: LC 2, SEISMIC ONLY
--Results for LC 2, SEISMIC ONLY
~eaction units are k and k-ft
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
...
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
-22.6
. .
Prime Structural Engineers! . . . . -I
,,,..
7.5 7.5
7.5 7.5
3.7""' 3.1111\7 ... ,,,..
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
75 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
... ·--------------.. --------------1-------------------c--~
PF{ I Mf:::jt\b: ~-::0 I
7.5 75 7.5 7.5
7.5 7.5 7.5 75
3.•n, 3.•n, 3,7"'1k 3.7'"'0 .. ,,,.. ... ...
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5
7.5
7.5
7.5 7.5 7.5 7.5
7.5 7.5 75 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5
7.5
7.5
S-8
7.5
7.5
3,70.:Zk ,,,..
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
7.5
7.5
smuGTURAL Dtl t~: .~t i
rl'G1·1r'f""'" ~ ; r ~ i~~t '~1f.j~j l'::OI:: 'I
• '' -L. \ \, i;\ i It ""'-'-"""'''"·""
7.5
75
3,7"'1.I ... .... ...
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 75
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
-In·:'>....,. -n.G
~-
'PSE
' . ------.
: 2K8-60 -___ L ________ ~--~-~-~-~---~~~---------------··· I May 8, 2008 at 4:23 PM
I S-8.r2d ________ .... ·-_ . _______ .
.i r tl . ,, ___ -·-· -----------
.. t : ~ L.;1
.z ..... x
-.3 611 7-~.3611 7-~.3611
Loads: LC 3, 1.2D+1.6L
Results for LC 3, 1.20+1.6L
Reacoon units are k and k-11
H
.. ~ A l
' 38.7
7.5
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
7,5 1,
7.5
7,5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
-T .....
: Prime Structural Engineers I ; . -----. ~ -·· ... --i
PSE
· 2K8-60 . ----L
,,
7-~.361,
7.5 ,,
75
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
7.5
7.5
7.5
7-~.381, 7-5-.361,
7.5 7.5 ,, ,,
7.5 7.5
7.5 7.5
7.5
7.5
7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5
7.5
7.5
7·5-361, 7·5-.361< 7-~.3811 7-~.3811
7.5 7.5 7.5 7.5 ,, ,, ,, ,,
7.5 75 7.5 75
7.5 7.5 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7_5 75 7.5 7.5
7.5 7.5 7.5 7.5
75 7.5 7.5 75
7.5 7.5 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
S-8 I
!
7-~.38H
7.5 ~,
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7,5
7.5
7.5
7.5
7.5
7-~.381k
7.5
75
75
7.5
7.5
75
7.5
7.5
7.5
7.5
75
7.5
7.5
,,
H
I 307
May 8, 2008 at 4:24 PM
S-8.r2d
I
-·· . .J
' \
,
t ' '
.
j
> '
CONCRETE SHEAR WALL DESIGN -For Intermediate Precast
(PER CBC 2007, ACI 318-05)
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-8
PIERA
f'c = 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 8.50 ft
Pier Fixed@ base (Y=1, N=0) = 0
Seismic Load factor= 1.00
E = pEh + Ev = 22.60 kip
Pu= 38.70 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7.50 in
µ = 0.6
cp = 0.75
[11.7.4.3]
[ 9.3.2.3]
Ag = 765.00 in"2
d= 98.00 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
<!>Ve=
cJ)Vn.max =
Vu=
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
<1>*1 O*(fc)"(0.5)*h*d =
132.85 kip
179.70 kip
99.64 kip
301.93 kip
22.60 kip
cJ)Vs.req = Vu -<!>Ve= 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for> #5 bars)
(11.10.9.1) Asv.req = (Vu-<l>Vc)/(<l>fy d) = 0.0000 in"2/ft
Avf.req = Vu / (<l>*fy*µ) = 0.84 in"2 /
5 #4 dowels at slab on grade/
USE
#4@ 13.3 in
#5@ 18.0 in
#6@ 18.0 in
#7@ 18.0 in
FLEXURAL DESIGN:
cJ)Mn=
Mu=
see interaction diagram = 1030.05 ft-kip
Vu*Hp = 158.20 ft-kip
Flexural Design ... OK! //
:a .c: u .5
s:: Q.
-----···-------.. ---·------·---. -----'
8.00 I
:: : ............ -l_ __ _
0.00 __________________ __._ ,
Rebar Layout (Bending over Y-Axis)
0.00 20.00 40.00 60.00 80.00 100.00 120.00
Inches
.. -.. _____ .. ___ ··----·------------·----.. -· ---------'
---_..,_ --------1
2500 ., -· Interaction Diagram
: T
i
I I -· .. -i-----Pn·M~---1 ' I I
' ·• • • ···Max Ph1-Pn :
' 2000 j .. ---l · · -Phl'(Pn-Mn) i
"I I
1 • ... -----·Alt~,::ign _ I
'
1500 [. · -
-500 ,_
i
-• -· -----· -----·-·--J
Rebar Layout:
2#_5@d = 2 in
1 #5 @ d = 9.54 in
1#5@d=17.08in
1 #5 @ d = 24.62 in
1#5@d=32.15in
1 #5 @ d = 39.69 in
1 #5@ d = 47.23 in
1 #5@ d = 54.77 in
1 #5@ d = 62.31 in
1 #5 @ d = 69.85 in
1 #5@ d = 77.39.in
1 #5 @ d = 84.92 in
1 #5 @ d = 92.46 in
1 #6 ·@ d = 100 in
14.3.5 o.c. / o.c.
o.c.
o.c.
,··~' -· r.. --
' ' ' y ! '
. ',' --:1 :i \ -----··-·· -------------------~--;;cp:::-c:;_cc:--::_,,_ t-.,-,M,.:-=. ----.-. --,SIJ.n~~o . k;:} . ~ ¾~~ .. J -\ l~ ~ .. l"'\ n:: bu: :.-:::·-·-.. =
S'i'f'l//l">'f":r-•1 -~~ .. 'i' ;z. ! .x
7.5
-0821 7_5,0821
2.692k ? .6!1:lk . 2.6""k .. r
7.5
75
7.5
7.5
75
75
7.5
75
7.5
7.5
7.5
)
GD 7.5
i~~ ;!11 ;,..
_ Loads: LC 4, 0.785D+E/1.4
Results for LC 4, 0.785D+E/1.4
Reaction units are k and k-ft
7.5
7_5,0821
2.60.?0 ...
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7,5
7.5
7.5
7.5
7.5
7,5 7.5 7.5
7_5,0821 7_5,0821 7_5 •. 0521
2.6""" 2."1? 2.c:.a? .. .... ...
7.5 7.5 7.5
7.5 7.5 7,5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5 75
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7,5
7.5 7.5
7.5 7.5
.. -.... . .. . ....... ---r .. --·· ---····-------------... .
; Prime Structural Engineers I.
: ·P~E--~--~--· ·--~---~.:~--~~~~:-~i·
; 2K8-60
1,1~~, U1V\1.. D.=rte:_::?.r.t-,q..1
. t'tl(l'il'-'['l''t' I· J/..P-· 1 1:; 1 ~ ··" r~ ;,; ~= 1,~ Slit :'::::::::.E:'::; 1
I
75 7.5 7.5 7.5 7.5 7.5
7_5-.0821 7_5-.0821 7_5,0821 7,5,0821 7,5-0821 7,5.0821
2 C:.O? 2.600• 2.6""• 2.6""• 2.6""• .... .. .. ... .. .... ,...
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 75 7.5 7,5 7,5 7.5
7.5 75 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
n
62 7
I
. ·----·--------· ---1 I
S-8 -----·-·· --·---·----··------------------.. ·1
May 8, 2008 at 4:24 PM j
S-8.r2d !
··-·-·-·--__ ,. _________ --------------·--------··-··-·--------------·--·'
' ' t .,Y
.z .x
.
i
, ) s'
3,767k 3.7
7.5
7,5 ..,, 3.7""' ,,. ....
7.5
7.5
7.5
7.5
7,5
7.5
7.5
7.5
7.5
7,5
7.5
7.5
....
7,5 7.5
7.5 7.5
3,7"'1k 3,70:Zk ,, ,,....
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7,5
7,5 7.5
7.5 7,5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7,5
7,5 7.5
7.5 7.5
-22.6
Vv.. :. i,,i,. b t-
' Loads: LC 2, SEISMIC ONLY
-., Resulls for LC 2, SEISMIC ONLY
Reaction unils are k end k-rt . ·--·--·-·-·-
' Prime Structural Engineers i
. -•• -·--. • . •• -.•• ·-· --J
PSE
; 2K8-60
7.5
7.5
3.il.m ,,.
7,5
7.5
7.5
7.5
7.5
7,5
7.5
7,5
7.5
7.5
7.5
7.5
7.5 7,5
7.5 7.5
3,iE.71 3 iE.71 .... ,,....
7,5 75
7.5 7.5
7,5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
S-9
7.5 7.5 7.5
7.5 7.5 7.5
3.7""• 371ioZJ< 3.7""'' .... ,,. ...
75 7.5 7.5
7.5 7.5 7.5
7.5 7,5
7.5 7,5
7,5 7.5
7.5 7,5 7.5
75 7.5 7,5
7,5 7,5 7.5
7.5 7.5 7.5
7.5 7,5
7.5 75
7,5 7.5
7.5
75
3.7""• ....
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
....... t"" i 1jl Ji E I b· 2,fp-.£;(!) i""'i"'< I !\ti ...... o · .
S·r-r,··~,·-ll"'PL ~r 1r1Ul,I ,r\r\ Date:n_ ·
ENGINEERS Sht: -~1 I
I
75
7.5
..... ,...-
75
7,5
7.5
7,5
7,5
7.5
7,5
7.5
7.5
7.5
7.5
7,5
-2? 6
·-·. ·-·-·-· -----------------,-------.. ----·-··
~------l i ~ay 8, 2008 a~ 4:27 PM
, S-9.r2d
,----,-.... _ .... , '----,------------------~-----.:___--,,,----=:P:--=:R=--:--:::-::----lf :,, v i• • !ME,Job: ·
! ' ' !-··-11· I {'"" ..... 1 '"'''i"'J'' AJ c:-}ytr iz.L.x ,J!KJ,!\l{r .. Date: 71+:,_
-2.
1 Loads: LC 3, 1.20+ 1.6L ~ ! Results for LC 3, 1.20+ 1.6L
Reaction units are k and k•ft
124k
1i
! 65.9
?28-2691 7.5
7.5 7_5,3811 ,,
7.5 7.5
7.5 75
7,5 7.5
7.5 7.5
7.5 75
,
7.5 7.5
7,5 7,5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
-------------------. ·-----------·-r·
i Prime Structural Engineers! . . , .... --• -. • -...• -... i
; PSE 1
: 2K8-60 I .I
) o~ 1~ 11,H:: c·· ri\ S ... 1. ;,. L Jro i:.r "' \ ,_ ., ~ i,.. ···-·----
7.5 7.5 75 7.5 7.5 7.5 7.5 7.5 7.5
7,5,381k 7_5,381k 7_5-,381k 7_5·,3811 7_5·,381k 7,5-3811 7_5,381' 7_5,381k 7.5.381k
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 75 7.5 7.5 7.5 7.5 75 7 5 75
7.5 7.5 7.5 7.5 7.5 7,5
7.5 7.5 7.5 7.5 7,5 7.5
7.5 75 75 7.5 75 75
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7,5
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 75
7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 75 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 75 7.5
>l_t> . f v.. , vi I, 7,-/c
--------------------------------------, .. -----------
S-9 I .
1 May 8, 2008 at 4:28 PM , l-----------· --------j
S-9.r2d I
. -·. ----. --. .. --· ----. . . .
> < f
,,
CONCRETE SHEAR WALL DESIGN -For Intermediate Precast
(PER CBC 2007, ACI 318-05)
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-9
PIERA
f'c = 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 8.50 ft
Pier Fixed@ base (Y=1, N=O) = 0
Seismic Load factor= 1.00
E = pEh + Ev = 22.60 kip
Pu = 65.90 kip
Wall Thk = 7 .50 in
Eff. Wall THK = 7.50 in
µ = 0.6
(J) = 0.75
[ 11.7.4.3]
[ 9.3.2.3]
Ag = 765.00 in"2
d = 98.00 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
C!>Vc =
(J)Vn.max =
Vu=
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
<P*1 O*(fc)"(0.5)*h*d =
132.85 kip
179.70 kip
99.64 kip
301.93 kip
22.60 kip
(J)Vs.req = Vu -C!>Vc = 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for> #5 bars)
(11.10.9.1) Asv.req = (Vu-C!>Vc)/(C!>fy d) = 0.0000
USE
#4@ 13.3 in
#5@ 18.0 in
#6@ 18.0 in
in"2/ft #7@ 18.0 in
Avf.req = Vu/ (C!>*fy*µ) = 0.84 in"2
5 #4 dowels at slab on grade /
FLEXURAL DESIGN:
(J)Mn =
Mu=
see interaction diagram = 1123.42 ft-kip Flexural Design ... OK! ~-
Vu*Hp = 158.20 ft-kip
a.oo , Rebar Layout (Bending over Y-Axis)
· 1 ::~~ 1· · · · · · · · · · · · · · · ·I 2.00 • e
0.00 --------------------'--~
I "
0.00 20.00 40.00 60.00 80.00 100.00 120.00
Inches
. ---.. --·· -·--------------
---------·---·--------·---
2500 , .. lnt~raction Diagram_ ............... f Pn-Mn ·--1
, I
. • • • • • • Max Phi-Pn . : ;
2ooo L. -L-·--···-·-·-l -·-......... ---·--J----... _: .. ··· ·-Phi'(Pn-Mn) : i 1, ' I i · ····--· Alt Design
1500 i. .. · · .!. · · · -·,, · · ·-___ __,_ ... ·---·--1-..
c: ~ Ma·x P~i:~~--·=···! :·--::-:--:-:~k.aRsioA . ! .. .
0.. 1000 I ......... --··!·-·---·-·,--~+-------<,....._---+--'\-----I : i
' .
-500 , ..... ··---·--· --· · · M~ I
~
_~ ... I
Rebar Layout:
2 #5@d = 2 in
1 #5 @ d = 8.53 in
1 #5@d = 15.07 in
1#5@d=21.6in
1 #5 @ d = 28.13 in
1 #5 @ d = 34.67 in
1 #5 @ d = 41.2 in
1 #5@ d = 47.73 in
1 #5 @ d = 54.27 in
1 #5 @ d = 60.8 in
1 #5@ d = 67.33 in
1 #5 @ d = 73.87 in
1 #5 @ d = 80.4 in
1 #5 @ d = 86.93 in
1 #5 @ d = 93.47 in
1#5@d=100in
14.3.5
o.c. / o.c.
o.c.
o.c.
'' I
•
' I
f"'.'I ,::::i, l !l. ll r-· I t. QjJ' ,-{eO r· f'\. !Vi f.:: ·· O J. --6_
i::rnt1c-r1a:iJ)11'"'·.t"· .S:. :p-, •• if\ ! ' ".I! •.. ,•. !..IQ'" .......... -r-~
·~ nr.1.t'.l:\,.'',r! .. r, L.-4> 2----
CONCRETE SHEAR WALL DESIGN • For Intermediate Precast
(PER CBC 2007, ACI 318-05)
•, '·~p t"'·;\.~i .. ;.,.~\··. C:1··[• · 1.. ~ • •. ,i,, 1... ,.., ,,..r ,,;r.. --Pfe.ject #: 2K8-60
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-9
PIERS
f'c = 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 8.50 ft
Pier Fixed@ base (Y=1, N=O) = 0
Seismic Load factor= 1.00
µ = 0.6
4> = 0.75 E = pEh +Ev= 22.60 kip
Pu= 41.20 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7 .50 in
Ag = 765.00 in112
d = 98.00 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
<PVc=
4>Vn.max =
Vu=.
3.3*sqrt{fc)*h*d =
0.6*sqrt{fc)+ ... =
=
<P*1 0*(fc)11(0.5)*h*d =
132.85 kip
179.70 kip
99.64 kip
301.93 kip
22.60 kip
4>Vs.req = Vu -<PVc = 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for > #5 bars)
(11.10.9.1) Asv.req = (Vu-<PVc)/(<Pfy d) = 0.0000 in112/ft
Avf.req = Vu I (CD*fy*µ) = 0.84 in112
5 #4 dowels at slab on grade
USE
#4@
#5@
#6@
#7@
(11.7.4.3]
[ 9.3.2.3]
13.3 in
18.0 in
18.0 in
18.0 in
FLEXURAL DESIGN:
4>Mn =
Mu=
/
Flexural Design ... OK! / see interaction diagram= 1030.05 ft-kip
Vu*Hp = 158.20 ft-kip
f' --
'
'-----___ H _________________ --------Rebar Layout:
2#5@d =2 in i '
ill .l! ' " .!: :~1: · · · · · · · · · · · · ·I
0.00 ... ---------------------
Rebar Layout (Bending over Y-Axis)
'
0.00 20.00 40.00 Inches 60.00 60.00 120.00 I 100.00
..... --··-···---------· ---------------------____ _j
r ·-----· ·-···---·--···-.
2500 r Interaction Diagram ___ _, ___ Pn·Mn
i • • • • • •Max Phi·Pn
---+-==---=::+-----1------!---~ --Phi.(Pn·Mn)
I -··--All Design
I . I..
• • • • • • • • ·• • • ·• • • -•/ir-i4e,o-T∋ign •••••• &, 1000 : Max Phi·P_n. . , .. . _;_ · _ _ ;.
i r
500 f-----+----+---+--::;-'------,:;;0_::j;i,Aoi;G M----
O ~. _ _.,u-Mu. -· ~--··· ~=d:,~:=:::=::::::r __
k-. ')'
-500 .L_ ---·-··· -·-····-' .. -----_____ L_ ______ .,__ __ Mn
1 #5 @ d = 9.54 in
1 #5@d = 17.08 in
1 #5 @ d = 24.62 in
1 #5@ d = 32.15 in
1 #5 @ d = 39.69 in
1 #5@ d = 47.23 in
1 #5@ d = 54.77 in
1 #5 @ d = 62.31 in
1 #5 @ d = 69.85 in
1 #5 @ d = 77.39 in
1 #5 @ d = 84.92 in
1·#5@d = 92.46 in
1#6@d=100in
o.c. 19.5
o.c.
o.c.
o.c.
: ,. • .I, ·1 .,
.. !v•
; ~.;.
iz, .x
--i
.
'
2.692k
7.§.3451
.6611 7.5
; ' 2.692k
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
'
7.5
I)) 0) 7.5
,,,,,
~~
Loads. Le'li. 0.785D+E/1.4
7.5 7.5 75
7_5.0821 7_5.0821 7_5.0821
2.692k 2.692k 2.692k
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
75 75 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 75 75 7.5 7.5 7.5 7.5
7_5-.0821 7_5-.D821 7 5-.0821 7_5.0821 7_5.0821 7_5.0821 7_5.0821
2.692k 2.692k 2 692k 2.692k 2.692k 2.692k 2.692k
7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 75 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5 75
7.5 7.5 7.5 7.5 7.5 7.5 7.5
7.5 75 75 7.5
7.5 75 7.5 7.5
7.5 7.5 7.5 7.5
~ :.-\ H
I 63.5
••• · Results for LC 4, 0.785D+E/1.4
Reaction units are k and k-fl
: ::;e Structural 1,n9i~.;e~j -------------3:9·_ -_··-_---_-_------------____ · _-_·_ --h~-~---'-2 __ o_o_ ~ a~ 4:2~ !'_·-__ !'-11 __ -_____ ._--~
[ 2K8-60 ____ -· -· ·----·--...L. ···-··--·-·-·--·----------·---·-···-_ ~
• 'l
··--------·-------------------·-····-------------------F-> R-.. \-1-fV-J. E----.Jo-,b-: --=-~--.::-f-.=~~-,.,1"
STRUCTUR1~.L Dats: ___ ~_t ~z .x
6611
Loads· LC 4, 0.785D+E/1 4
· ... Results for LC 4, 0.785D+E/1.4
Reaction units are k and k-ft
i ~
71.7
7,i 345]
7.5 i r
-2 692k
75
7.5
7.5
.7.5
7.5
7.5
7.5
7.5
7,5
7.5
75
75
7.5
7.5,0821
-2,692k
7.5
7.5
75
7.5
7.5
7.5
7,5
7,5
7.5
7.5
7.5
7.5
----·---------------------~----
' Prime Structural Engineers
!PSE 1·2t<a-60 .. ... --... _____ .. ____ --,
I
7.5 7.5 7.5
7,5,0821 7.5.0821 7.5-.0821
•2.692k -2.692k -2.692k
7.5 7.5 7.5
7.5 7.5 7.5
7,5 7,5
7,5 7.5
7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7,5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
.1,{:I-'i,:;~ft~: .. H/; iN Ems s ht: .... ~
I
7.5 75 7.5 7.5 7.5 7.5
7.5-.0821 7.5-.0821 7.5.0821 7.5.0821 7.5.0821 7_5,0821
-2.692k -2.692k -2.692k -2.692k -2.692k -2.692k -2.692k
7.5 75 7.5 75 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
75 7.5 7.5 7.5
75 7,5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5 7.5
75 7.5 7.5 7.5 75 7.5
75 7.5 7.5 7.5 7.5 7,5
7.5 7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
75 7.5 7,5 7·5 -13 2
l?l'h
S-9 --------r~---=~~=---~~-=~~-=-~-=-__ 1,1
May 8, 2008 at 4:28 PM
. -----·---· ------------------
! S-9.r2d
J 6' I \ \ \ ,f \
! {f-
, z. .i .• x
--I
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
6.5k. --·-·· ·-· ..._ 5.5k .... ; 5k .... .5k .... S.5k ... ... .... ...
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 75 7.5 75
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 75
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 75 75
7.5 7.5 75 7.5
7.5 7.5 7.5 7.5
_... ~,,.~ -33.1
· Loads: LC 2, SEISMIC ONLY
·· •· Results for LC 2. SEISMIC ONLY
Reaction units are k and k-rt
I Prime ·st~uctural Engi~~~r;r-··-·-
1-·--·-·-------·---· -· ' · ···----·--···-----1
i PSE I
... ----·--·---~
7.5 7.5 7.5
7.5 7.5 7.5 .... 6.5k .... 6.5k ....S5k ....S 5k ... ....-....-....
7.5 7.5 7.5
75 7.5 75
7.5
7.5
7.5
75 75 7,5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5
7.5
7.5
S-10
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
I r.:i· r.:,'l ii\ II r.:· Job· z+,f-C ~ r r,11,f!I\._ . ·-·-,
(' y;, l !(· T' In ~ 1 r·~ ~ ,... . fl~ ,,P--•1' ,rt. "'i ,t• ! ..... v ,,•.l .. ,,, ,f., ./,· •• ,~l~, ..... ~--
[_g-i
75
75
...a 5k ..._ .... ...
7.5
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
75
-h ,,~ -31.9
i -----l
May 8, 2008 at 4:34 PM
1, , S-10.r2d
······----····· ---· -·-----· -·· --·------··---·-------·--·--··--------'---··-·------------i 2K8-60 ·-·-· -.. --· .. ----
,, ..
' ~ l : l,
> ~
I I J J'
iz.' .• x
5331
,,
i,i
46.8
I
) Loads: LC 3, 1.2D+1.6L
-Results for LC 3. 1.2D+1.6L
Reaction units are k and k-rt
75 -5331
75 ,,
7.5
75
7.5
7.5
75
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5 -5331
7.5 ,,
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
75
7.5
: Prime Structural Engineers:
PSE
2K8-60
··-.. i !
I ..• ·-L
7.5 -.5331 7 5 -.5331
7.5 ' ,. 7.5 1J
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
-----··.---· ----··---·--·---, --------PR -il\XE-~lob:-ef-P-Z: f
STf:Jljf"'flJr111l Da'e· Y-/.,4,rf"i I 1-1.,. fV1. l ·-· -'
EN tl"t'"'"i')Q L,,..../' 1·
11\Jif~i:t1,0Sht: -~-~~-,
7.5 -.5331 7.5 -.5331 7.5 • 5331 7.5 • 5331 7.5 • 5331
7.5 ,,. 7.5 ,,. 7.5 11' 75 , .. 7.5 1'
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 75 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
75 7.5 75
'i> , ,.
I
45 3
S-10
: May 8, 2008 at 4:34 PM
t----·-·------------------··
S-10.r2d
--------------.. . -
\ \
\"" 'I•\\ e j • w \ I,
CONCRETE SHEAR WALL DESIGN • For Intermediate Precast
(PER CBC 2007, ACI 318-05)
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-10
PIERA
re= 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 12.50 ft
E = pEh +Ev= 33.10 kip
Pier Fixed@ base (Y=1, N=0) = 0
Seismic Load factor= 1.00
µ = 0.6
({J = 0.75
[ 11.7.4.3]
[ 9.3.2.3]
Pu = 46.80 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7 .50 in
Ag = 1125.00 in112
d = 146.00 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
ct>Vc =
({JVn.max =
Vu=
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
ct>*1 0*(fc)11(0.5)*h*d =
197.92 kip
1285.48 kip
148.44 kip
449.82 kip
33.10 kip
({JVs.req = Vu -ct>Vc = 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for> #5 bars)
(11.10.9.1) Asv.req = (Vu-ct>Vc)/(ct>fy d) = 0.0000
USE
#4@ 13.3 in
#5@ 18.0 in
#6@ 18.0 in
in112/ft #7@ 18.0 in
Avf.req = Vu / (ct>*fy*µ) = 1.23 in112 /
7 #4 dowels at slab on grade /
FLEXURAL DESIGN:
({)Mn=
Mu=
see interaction diagram= 1850.47 ft-kip
Vu*Hp = 231.70 ft-kip
Flexural Design ... OKI /'
..... --·-· --
Rebar Layout (Bending over Y-Axis) I
1 ~f .. _· __ · __ ·_· __ · __ · __ · __ · __ ·_· __ · __ · __ · __ ._1_
0.00 •
0.00 20.00 40,00 60.00 80.00 100.00 120.00 140.00 160.00
Inches
.. -. ·--~---·· ··---·-·· ------·-------------_______ _j
. --·----··· -• ·-·-------------------------·------
3500 ,---...... ----.-----ln_t~er_a_c_ti_o_n_D_ia_,,g'-ra_m ___ -----'
' I
• • • • • • Max Phi-Pn
3000 ··t-j ---"~-I-=----!-------+----+---+.,-·--Phi·(Pn-Mn)
!
2500 -t-----·--·-·· ---Alt Design
I ------...... . -. ---------------------------------·------_________ ;
Rebar Layout:
1 #6@d = 2 in
1 #6@d = 6 in
1 #5@d = 16.14 in
1 #5 @ d = 26.29 in
1 #5 @ d = 36.43 in
1 #5 @ d = 46.57 in
1 #5@ d = 56.71 in
1 #5 @ d = 66.86 in
1 #5@d = 77 in
1 #5 @ d = 87.14 in
1 #5@ d = 97.29 in
1 #5@ d = 107.43 in
1 #5 @ d = 117.57 in
1#5@d=127.71in
1 #5 @ d = 137 .86 in
2 #5@ d = 148 in
o.c. / o.c.
o.c.
o.c.
' 'l
--..
7 , ' ,,
CONCRETE SHEAR WALL DESIGN • For Intermediate Precas
(PER CBC 2007, ACI 318-05)
PR I !Vi E Job: 'Zf!._~
STRUCTUR1~L Dat.2.: Y/6 <f'
ql1''i·r',lf',r;,·, Lr-c;;, Project#: 2K8-60
C:1l •. n VJ:t:(~~V Sht: >o
DESCRIPTION:
DESIGN CRITERIA:
PANEL S-10
PIERB
Pier Fixed@ base (Y=1, N=0) = 0
Seismic Load factor= 1.00
re= 3.00 ksi
fy = 60.00 ksi
Pier Height, Hp= 7.00 ft
Pier Length, Lp = 8.50 ft
E = pEh +Ev= 31.90 kip
Pu = 45.30 kip
Wall Thk = 7.50 in
Eff. Wall THK = 7.50 in
µ = 0.6
cJ) = 0.75
[ 11.7.4.3]
[ 9.3.2.3]
Ag = 765.00 in/\2
d = 98.00 in
SHEAR DESIGN:
(Eq. 11-29) Ve=
(Eq. 11-30) Ve=
ct:>Vc=
cJ)Vn.max =
Vu=
3.3*sqrt(fc)*h*d =
0.6*sqrt(fc)+ ... =
=
ct:>*1 O*(fc)"(0.5)*h*d =
132.85 kip
179.70 kip
99.64 kip
301.93 kip
31.90 kip
cJ)Vs.req = Vu -ct:>Vc = 0.00 kip
p.min = 0.0020 (for s #5 bars) = 0.0025 (for> #5 bars)
(11.10.9.1) Asv.req = (Vu-ct:>Vc)/(ct:>fy d) = 0.0000 inA2/ft
USE
#4@
#5@
#6@
#7@
Avf.req = Vu/ (ct:>*fy*µ) = 1.18 inA2 /.
6 #4 dowels at slab on grade /
FLEXURAL DESIGN:
cJ)Mn =
Mu=
see interaction diagram= 837.94 ft-kip
Vu*Hp = 223.30 ft-kip
Flexural Design ... OK!
~ .t: " ,5
C: a.
Rebar Layout (Bending over Y-Axis)
8.00 I
:::: ~ . . . . . . . . . -1·
2.00 e 0.00 ,__ __________________ .,.. ---
0.00 20.00 40.00 60.00 80.00 100.00 120.00 Inches
-.•. --····-·-·---------------·-···-··----·-··"····-····-------.... --·-------_______ __J
2500 ·
1500 :. · · ·
-500 ,. · --. ! .... L ..
·--Pn-Mn
l······MaxPhi-Pn'
, I ----Phi'(Pn-Mn) ----+-----~---·1-· ----l 1----Alt Design
-.. . ·-t---------,
J --------_J I
----------. .J
Rebar Layout:
2 #5@d = 2 in
1 #5 @ d = 11.8 in
1 #5 @ d = 21.6 in
1 #5@d = 31.4 in
1 #5 @ d = 41.2 in
1 #5@d = 51 in
1 #5 @ d = 60.8 in
1 #5 @ d = 70.6 in
1 #5 @ d = 80.4 in
1 #5 @ d = 90.2 in
1#5@d=100in
13.3 in
18.0 in
18.0 in
18.0 in
14.3.5
o.c. /" o.c.
o.c.
o.c.
~ 0 l • I "
·,r; ) I ,, , I. ,,,
.... ,r
,z: .x
-.1141
4.64 k ... '64k ..-
~~ l,O
\) ~ 11.f)
~b·ir
-,,).
J Loads: LC 4, 0.785D+E/1.4
-, Results for LC 4, 0.785D+E/1.4
ReacUon units are k and k-fl
7.5
7.5 • 1141 -, "'4k .....
' 7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7,5
7.5
7.5
7.5
7.5 7,5 7.5
7.5 •,1141 7.5 ·.1141 7 5 -.1141
-""k -"4k ... ...-,.. ,..
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
PR ! ~111 E Job: ::f:-!:-:!:6
11i"i•/J'''P Jrl n ! F-~ IY \.')I(\,, 1,.., i { 111\~~: l)atr-~~ ./ I 6(/ 1 .> ,,. ......... '6, ... 11, ... ._..~ ,:. "'!Gli.ir····· ·· L ('"'Ct ·t~f"I\ · 11H·i,i,h ... , t > ' ,.. • -1 .. i ·,\,/ ;.">;)': ,,_ .. .:,.._.., -
7.5 7.5 7.5 7,5 75
7.5 •.1141 75 · 1141 7.5 -.1141 7 5 -.1141 7.5 ·.1141
4.64k -4.64k ...., k ....,, "k '"'' k -..... ...-...-,.. ,..
7.5 7.5 7.5 75 75
7.5 7.5 7.5 7.5 7.5
7.5 7.5 75
7.5 75 7 5
7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5 7.5
7.5 7.5 7,5 7.5 7.5
7.5 7.5 7.5
7,5 75 7.5
7.5 75 7.5
H
75.7
.. ··--------·. ····-····-----··-·---,----------··--· --···· ----·----------------------·-1-----. ·--·--------
, Prime Structural Engineers I
:. . . . .. . .. -. . .. .. /
!
L ... S-10
.PSE I May 8, 2008 at 4:35 PM
l . -~ . . . -· -...
· 2K8-60 , S-10.r2d
" ' ;,
7.5 7.5
1141 7.5 -.1141 7.5 --... -4.6 ....
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 75
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
. ~ (•
76.7
; Loads: LC 4, 0.785D+E/1.4
-· Results rorLC 4. 0.785D+E/1.4
Reaction unils are k and k-0 . . . . .. ... ... .. .. ... _._ ... ··r ..
: Prime Structural Engineers, ; .... -· . _., . -. ----............. _ ·!
:psE !
2K8-60
7.5 7.5 7.5
·.1141 7.5 -.1141 7.5 -.1141 7.5 -114k
~ ~ .... ....
-4.6 ..... -4.6 , .... -4.6 '" ... -4.64k .....
75 7.5 7.5
-----
7.5 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5 7.5
7.5 i5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5
7.5 7.5 7.5 75
7.5 •.1141 7.5 ·.1141 7.5 -.1141 7.5 •.1141 --.... ....
-4.64 k ..... •4 O'fll' .4 "'" .4 ""'
7.5 7.5 7.5 7.5
-----------·---· -----·--
75 7.5 7 5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7,5
----
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 7.5 7.5 7.5
7.5 75 7.5 7.5
7.5 7.5 7.5
7.5 7.5 7.5
7.5 7.5 75 (;}
I=,
t /'t•1i.. tp,/N" .. ,11~1\lf f(/..?;,,1 5-1
z.,~b jc. ~ fo,3, /,:
u.sr 1. fo~> (tl~ffl1k€b -11-PiU/ Cm l'-ll'G'ur,:>,J "("() V"I'"'"' .
L\-P I> 'L-!:J:l:: f"ll ]1:..C.. e'> -
Jc
-4.64k
--------··------------~ ___ , ____ ., _______ _ ·-r--· -----·----. -·-
S-10 1-------··----· .. __ ,. ______ , ..
: May 8, 2008 at 4:35 PM
! s:1·o~r2d
.I
,_ I I ( )
I • ,t.-,t.l , ·1<1 ,1 "-•' f o~-r ~I/II $-llru,f b H-1>i.,tJ pow,J
' '
,.-----._ H(Vfl u-r:z... W~f"/ tSll;"Stl> ON 1'-0 11
>/l 4' 801,,-n; i.,,/ q" e-x(lt7> µon:
o, c.
Ckf l((/ll'/. :: 7, ( $"" hf> ( IN r;v..c,r,1;( Flt1~· M.,ool)
,pa CPtJrtrc--n-oiJ,
. '· \ '( ( > '
' •
'-'.r, 1 i {;cfsT-INSTALLED ANCHOR BOLT DESIGN WORKSHEET (2007 CBC & ACI 318-05 Appendix D)
I
For use with Hiltl Kwik Bolt TZ in Concrete (ICC ESR-1917)
Project #: 2K8-60
Description: Anchor Connection
Design Loads:
N= 0.00
VL = 5.15
Concrete Pro1:1erties:
Slab Thk, h = 7.50
re= 3000
Cracked
kc= 17
Anchor Properties:
kips
kips
Oca3
s2
in Dca4
psi
t 0cal
6 00 in
0 lv 0
# Bolt rows=
# Bolt columns =
# Effective rows in tension =
0
0
Anchor Type= KB-TZ (Carbon) -5/8" 0 w/ 4" embed
Bolt, d = 5/8 in Design Summary:
Total Bolts =
Anchor Category= Ductile Failure Mode in Shear
Steel = Ductile
her= 4.00 in
D.4.4 • 4> Factors -Condition B:
Steel, 4>N = 0.75
Steel, 4>v = 0.65
Concrete, 4>N = 0.65
Concrete, 4>v = 0.70
1----·
1 4.oo
3.50
3.00
2.50
2.00
1.50
1.00 ·
0.50
. ····-· -------
n= 1.0
0 Loads Include Seismic
0.75 4>N = 3.63 kips
0.75 4>V = 5.15 kips
N=
V=
0.00
5.15
Interaction= 1.000
--------------·--I
0.00 -----,-----,-----.--------_,,,11111------!
0.00 1.00 2.00 3.00 4.00 5.00 6.00
j.
,. ~-,; ~;~T-INSTALLED ANCHOR BOLT DESIGN WORKSHEET (2007 CBC & ACI 318-05 Appendix D)
For use with Hilti Kwik Bolt TZ in Concrete (ICC ESR-1917)
Project#: 2K8-60
Description: Anchor Connection
Steel Strength in Tension:
<l>Nsa = <l>n·A59 ·fu1a = 12.88 k
n=
Ase= 0.162
bolts
in2 (From ESR-1917 TBL 3&4)
futa = 106.00 ksi
fy = 84.80 ksi
Concrete Breakout Strength in Tension:
<l>Ncbg = <l>ANc / Ar-.,co (4'ec,NH4'ed,N)(4'c,N)(4'cp,N)(Nb) = 4,84 k
ANc= 144.00 in2 4'8c,N:: 1.00
ANco = 144.00 in2 4' ed,N = 1.00
Nb= 7449 lb 4'c,N = 1.00
Ca,c= 8.75 4'cp,N = 1.00
Ca.min= 6.00 in
Pullout Strength in Tension:
<l>Np = Does NOT Govern Design
n = 1 bolts
Np (fc =2500psi) = NA kips (From ESR-1917 TBL 3&4)
(f c / 2500)°"5 = 1.095 kips (ESR-1917 4.1.5)
Steel Strength in Shear:
<l>Vsa = 6.86 k
Vsa = 10.555 kips (From ESR-1917 TBL 3&4)
n= bolts
Concrete Pryout in Shear:
<l>Vcpg = <l>kcp'Ncbg = 10.43 k
ANc = 144.00 in2
kcp = 2.00
Concrete Breakout Strength in Shear( Perp. To Edge): 1A1l Vlv-f,J(; .!>,'1,'2..,J Of~
<l>V cbg = <l>Avc / A.co (4' ec,vH'+' ed,v)(4' c,v)(4' cp,v)(Nb) = 96}; f'u~w f,Jf,. ~t..A'fi~r.u,
Ave= in2 1. = in
Avco= in2 4'ec,V =
vb= lb 4'ed,V =
Ca,4= in 4'c,V =
Concrete Breakout Strength in Shear( Parallel To Edge):
<l>Vcbg// = 2*<l>AVc/ AJco (4'ec,vH'+'ed,vH'+'c,vH4'cp,v)(Nb) = 7.53 k
Ave= 135.00 in2 18 = 4.00 in
Avco= 162.00 in2 4'ec,V = 1.00
vb= 6457 lb 4'ed,V = 1.00
Ca= 6.00 in 4'c,V = 1.00
I.! .
.,_ ~;,,~ )i~:-'" \11\vt,,D /tr< c;t.t t,.S, .:-e1.
l{wr,, 14s~ri; S/,t 11 f c-/tf-8 ~ vrcn
~ II ~d (1)/A-'f N'f
-A.err 3-1( .,.0f> Mfe'N'01;< "D · <-/,7., / $'f7(7""C,; Aivo""4r(fvf' 1)..$£ of
/N Jl/i.Pft,f"M-~ {Z,C?NF:>t<. C€J).fi;'i\JT To /Jf: t/4$r; 1> FOi<. fN~"t
(l.~lk, '/i~r10-n1 of /J.-Nvt:J-Q£$.
t;x,mN<--
~ MlcJ '}.-#-S" M· f.¥J~L eot,.,e,·
1\lB ·Tc:-&-01.-'f'"
,/
33..SJ ;;, S, IS'"k .-. ~t.~,i: oo!,(" V
-p-~n-ci,9 ~r (,.€1"(,.fl.f.
Irv':! I z., 7.. • z,
~t,fH G-ov~NJ.
Ir fi,{11, 5,t>Y-c4N 1:
~ ~ 1)€"V€'7,. .. f67.> 61' t'i efH ~~~ Gi){n~
<J /~ of s~ flA-Ntt. \ ~ QI ~'1) o) U f
coKO ~r h '!ft>
MP<l N1A1"1 '1 1
-0 ,, kiJ C,/fO(Z.. Sf /t'VI t,f (,
...J---f.&rN ((... f;b~ Dl>fA-NC,( fHM T -d-t.
Ar-l®t-_cA-f_AP\rJ : -~-tS' k-fourr/.,.~ fklw.4)
J / t(-a ~ ED 1re -r kl. sffr1.1 r.Jir
SEE
HAZMAT REPORT
SCANNED
SEPARATLEY
CB080657 2101 FARADAY AV
COVIDIEN-54,000 SF Tl OF A
64,946 SF BLOG, INCLUDING R/D 80Mi= 1 Ao O "• "' •-.,..,-.., ----·--
lf-11-oY-(/)w~~ {s~j~c-Ar, ~--q~ ~
1J ' I?-,""-€ :oz;u ~ p.e/) SF,( j}t,/4 ¼ ~
<-t\ \ cl \ c, 8 C\ffi\ -4-" 1 ~rv ,c.. , pr iJ ... .J.t..-d ,t v..1 cl
Loft ._5, c~ -\--"c_lt__ {L~i-
~ -to Eft::,f.r1 L ~ -m f-t RE 7'D tl.eru.,~--f\
{?3'1JY,OfJf 1c . c)JP
L(,)5d{ [s~CU'/ , S~
S/J1/o/ ~ J;fff:;x i~ ~) U?IL'1 C;l!jP:fe CJ;
r 4~ 1t .Jo r A/4(_; l /I~ OhL ~ r 1-J J Pluc/-1 . '~ i?1 CJj ,/~ <a-47
f J-9-t/f tscy)e,1:J1l . F _ =
/fl , TTtl 1 _ I. 1;,, &i/t,., I ffeiul c.P es _ (hi/lJI-:. CZ::, 0::4t v1 1 -0 '8' w~ .,_,,.... ~-I .,., r · r ~ -w't-f-9-
(r/z.<JY rflyf!Z;e -:;--c.
~e.., ,.,
·J
/
Aooroved Date By
Building ,:p/c-01oi ¼JIK
Planning 1/4-<;: --t0v ~
Engineering L /9..:J/nPi -?'fl-
Fire "To'/z"i,/o 8' ~
Health
HazMat/ Air Quality
Comments Date
Building J,_ 7..,-Z, 5--.;(Y In-I,
Planning !4?2~ I
Engineering V~2~ l,it-/'J.,,/
Fire 5/1?:>/m 5/;17/o:
Forms/Fees Sent Rec'd Due? By
School y N
CFD y N
PFF y N
PE&M .tf--;J< (....,/g y) N n<JJr-.
Special Insp. . y N
Fire y N
Sewer y N
Fees Complete ________________ _
Application & Related Docs. Complete ------
. ...... >