Loading...
HomeMy WebLinkAbout2173 SALK AVE; ; PC090006; Permit07-13-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Permit No PC090006 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation Reference # Project Title Applicant CHIE HONDA DESIGN CORP 858-794-3222 2173SALKAVCBAD PLANCK 2120210200 Lot* $0 00 Construction Type VENTANAREAL 5396SF Tl TO SUITES #100 &120//SPEC SUITES Status Applied Entered By Plan Approved Issued Inspect Area PENDING 03/19/2009 JMA Owner RIO SD PLAZA II MASTER LLC C/0 NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBAD CA 92008 Plan Check Fee Additional Fees $630 43 $000 Total Fees $630 43 Total Payments To Date $630 43 Balance Due $000 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired 04-20-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No Building Inspection Request Line (760) 602-2725 CB090506 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title Applicant DESIGN CORP CHIE HONDA 858-794-3222 2173SALKAVCBADSt 100 Tl Sub Type 2120210200 Lot# $113,890 00 Construction Type Reference # SPEC SUITE 3254SF SHELL TO OFFICE INDUST 0 5B Status PENDING Applied 03/26/2009 Entered By JMA Plan Approved Issued Inspect Area Plan Check* PC090006 Owner RIO SD PLAZA II MASTER LLC C/O NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBAD CA 92008 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Green Bldg Stands (SB1473) Fee $696 89 $000 $452 98 ($31523) $000 $2392 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $400 Meter Size Add'l Reel Water Con Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (31 05540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee TOTAL PERMIT FEES $000 $000 $000 $000 $2,072 80 $000 $000 $000 $3,920 00 $000 $3400 $16625 $4850 $000 $4,723 52 $000 $000 9? $11,82763 Total Fees $11,827 63 Total Payments To Date $0 00 Balance Due $11,82763 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. 04-20-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No Building Inspection Request Line (760) 602-2725 CB090507 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title Applicant DESIGN CORP CHIE HONDA 858-794-3222 2173SALKAVCBADSt 120 Tl Sub Type 2120210200 Lot# $75,390 00 Construction Type Reference # SPEC SUITE 2154SF SHELL TO OFFICE INDUST 0 5B Status PENDING Applied 03/26/2009 Entered By JMA Plan Approved Issued Inspect Area Plan Check* PC090006 Owner RIO SD PLAZA II MASTER LLC C/O NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBAD CA 92008 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Green Bldg Stands (SB1473) Fee $536 73 $000 $348 87 ($31520) $000 $1583 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $000 $1 00 Meter Size Add'l Reel Water Con Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (31 05540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee TOTAL PERMIT FEES $000 $000 $000 $000 $1,37210 $000 $000 $000 $2,560 00 $000 $34 00 $16625 $4850 $000 $3,13544 $000 $000 9? $7,903 52 Total Fees $7,903 52 Total Payments To Date $0 00 Balance Due $7,903 52 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired City of Carlsbad 1635 Faraday Ave . Carlsbad. CA 92008 760-602-2717 / 2718 / 2719 Fax 760-602-8558 Building Permit Application C-FD - ' Plan Check No. Est Value Plan Ck. Deposit^ ££Q. Date {JOB ADDRESS SCRIPTION OF WORK TLOT» " ~'~ I _ _a I^OFU . \_O SUITE#/SPACE#/UNIT# O TENANT BUSINESS NAME CONSTR TYPE" occf GROUP ($0 -- 2.1SI/ SF EXISTING USE PROPOSED USE GARAGE (SF) 0$ PATIOS (SF)DECKS (SF)FIREPLACE YES D #_ NO L/ AIRCONDITIONINC, YES D NO FIRE SPRINKLERS YES D NOO d CONTACT NAME (If Different Fom Applicant) ADDRESS APPLICANT NAME .DDRESS"^_CiU^_U,OttD4_ CITY 'PHONE FMAll" STATE ZIP FAX CITY PHONE gjg< EMAIL STATE ZIP PROPERTY OWNER NAME ™DBKS CITY STAt£~ZIP .13m (Wk Cf- «te.|5o PHONE 3to_o.._u>(n_._^EMAIL FAX PHOBE-1U?O.U>O1. 4-2 8 (O EMAIL ARCH/DESIGNER NAMF & ADDRESS fer Acu, I STATE LIC # *\2WI« STATE LIC #_ .. xn /n v-i /•' cwss5025^0? 61 CITY BUS Llc * [Sec 7031 S Business and Professions Code Any City or County which requires a permit to construct, alter, improve demolish or repair any structure, prior to its issuance also requires the applicant for such permit (o Fie a signed statement that he islicensed pursuant to the provisions of the Contractor s License Law {Chapter 9 commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom and the basis for the alleged exemption Any violation ofSection 70315 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}) Workers Compensation Declaration / hereby affirm under penalty of perjury one of the following declarations : O I have and will maintain a certificate of consent to self insure for workers compensation as provided by Section 3700 of the Labor Code for the performance of the work for which this permit is issued | jS I have and will maintain workers' compensation as required by Section 3700 of the Labor Code for the performance of the work for which this permit is issued My workers compensation insurance carrier and policy j ' number are Insurance Co £)(_,P (?j£ffiC<Lj^t-V, C, Policy No A- \ (L<jO 5 Co t> ^O^O &~ Expiration Date _<5/_/J? This section need not be completed if the permit is for one hundred dollars (S100) or less L"U Certificate of Exemption I certify that in the performance of the work for which this permit is issued I shall not employ any person in any manner so as to become subject to the Workers Compensation Laws of California WARNING Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100.000) in addition to the cost of compensation damages as provided for in Section 3706 of the Labor code interest and attorney s fees J&$ CONTRACTOR SIGNATURE DATE ft. / hereby affirm that 13m exempt from Contractor s License Law for the following reason n I as owner of the property or my employees with wages as their sole compensation will do the work and the structure is not intended or offered for sale (Sec 7044 Business and Professions Code The Contractor s License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees provided that such improvements are not intended or offered for sale If however the building or improvement is sold within one year of completion the owner builder will have the burden of proving that he did not build or improve for the purpose of sale) n I as owner of the properly am exclusively contracting with licensed contractors to construct the project (Sec 7044 Business and Professions Code The Contractors License Law does not tipply to an owner of property who builds or improves thereon and contracts for such projects with conlractor(s) licensed pursuant to Ihe Contractor s License Law) D I am exempt under Seclion Business and Professions Code for this reason 1 I personally plan to provide the major labor and materials for construction of the proposed property improvement O Yes O Mo 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with Ihe following person (firm) to provide Ihe proposed conslruction (include name address / phone / contractors license number) 4 I plan to provide portions of the work but I have hired the following person to coordinate svipervise and provide the map woik (include name / address / phone I contractors license number) 5 I wi'l provide some of Ihe work but I have contracted (hired) the following pe^on; tn rirowrle the work Tdraied (include name / address / phone / type of work) vSS'pROPERTY OWNER SIGNATURE DATE ll^^.U^M^:^;^^., i^iffbjlujl;-/fct ^.yfe :< Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505 25'>33 or 25534 of the Presley Tanner Hazardous Substance Account Act' O Yes BfNo Is Ihe applicant or future building occupant required to obtain a permit from the air pollution conlrol district or air quality management district' Cl Yes rf No Is ttie facility to be constructed within 1 000 lent of the outer boundary of a school site' O Yes C/INo IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code) Lender s Name Lender s Address I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all City ordinances and State laws relating to building construction thereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE. INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An OSHA permit is required for excavations over 5 0' deep and demolition or construction of structures over 3 stones in height EXPIRATION Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the buildingpr work authorized by such permrtis suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106 4 4 Uniform Building Code) ^rAPPI ICANT S SIGNATURE EsGil Corporation In (partnership -with government for (BuiCding Safety DATE April 2, 20O9 a APPLICANT JURIS JURISDICTION Carlsbad ~^J~PLAFTREVIEWER a FILE PLAN CHECK NO PC09-06 SET II PROJECT ADDRESS 2173 Salk Avenue PROJECT NAME Spec Suite(s) #1OO & #120 XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person The applicant's copy of the check list has been sent to XI Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) Fax # Mail Telephone Fax In Person REMARKS By Bryan Zuppiger Enclosures Esgil Corporation GA D MB D EJ D PC O3/01/2009 trnsmtl dot 9320 Chesapeake Drue, Suite 208 * San Diego, California 92123 * (858)560-1468 + Fax (858) 560-1576 EsGil Corporation In Partnership with government for Quitting Safety DATE March 25, 2009 CI_APPl IGANT JURISDICTION Carlsbad a PLAN REVIEWER G FILE PLAN CHECK NO PC09-06 SET I PROJECT ADDRESS 2173 Salk Avenue PROJECT NAME Spec Suite(s) #100 & #120 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck Xj The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person XI The applicant's copy of the check list has been sent to Chie Honda 444 South Cedros Avenue Solana Beach, CA 92075 Esgil Corporation staff did not advise the applicant that the plan check has been completed XJ Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Chue Honda Telephone # 858 794 3222 Date contacted 3' **'* (by &£) Fax # 858 794 3220 Mail(/ Telephone Fax./^\n Person REMARKS By Bryan Zuppiger Enclosures Esgil Corporation GA D MB D EJ D PC 03/23/2009 trnsmtl dot 9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 +• (858)560-1468 * Fax (858) 560-1576 Carlsbad PC09-06 March 25, 2009 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO PCO9-06 OCCUPANCY B TYPE OF CONSTRUCTION IIA SPRINKLERS'? yes DATE PLANS RECEIVED BY JURISDICTION DATE INITIAL PLAN REVIEW COMPLETED March 25, 2009 JURISDICTION Carlsbad USE office ACTUAL AREA 5396 ft2 OCCUPANT LOAD unknown DATE PLANS RECEIVED BY ESGIL CORPORATION 03/23/2009 PLAN REVIEWER Bryan Zuppiger This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled This plan review is based on regulations enforced by the Building Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments Clearance from those departments may be required prior to the issuance of a building permit Code sections cited are based on the 2007 CBC that adopts the 2006 IBC The following items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per IBC Section 105 4 of the 2006 International Building Code, the approval of the plans does not permit the violation of any state, county or city law To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i e , plan sheet number, specification section, etc Be sure to enclose the marked up list when you submit the revised plans Carlsbad PCO9-06 March 25, 2OO9 • PLANS 1 Please make all corrections on the original tracings, as requested in the correction list Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects) For expeditious processing, corrected sets can be submitted in one of two ways a) Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Avenue, Carlsbad, CA 92008, and (760) 602-2700 The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments b) Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, and (858) 560-1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments NOTE Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete 2 Please revise the Building Code Data Legend Include the following code information for each building proposed • Occupant Load , 3 The wall Legend on Sheet TI-1 appears to be reversed New walls appear to be existing and visa-versa 4 Glazing in the fixed panels in swinging doors should be of safety glazing material in accordance with CBC Section 2406 3 5 Please assign the ceiling details to the reflected ceiling plan 6 Please note that suspended ceilings in Seismic Design Categories D, E & F per ASCE 7-05 Section 135621 shall have the following, a) A heavy duty T-bar system shall be used b) The width of the perimeter supporting closure angle shall be no less than 2" In each orthogonal horizontal direction one end of the ceiling grid shall be attached to the closure angle The other end in each horizontal direction shall have a %" clearance from the wall and shall rest upon and be free to slide on a closure angle c) Note on plan that suspended ceilings shall comply with ASTM C 635 & ASTM C 636 7 The City requires the following notes on the plans • WIRING METHODS AC Cable is not allowed in A, B, E, H, and I occupancies NM cable is restricted (without City approval) to one and two family dwellings Note on plans that an equipment ground conductor is to be installed in all flexible conduits • The use of flexible metal conduit as a grounding means must comply with City Policy 84-36 • No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official City Policy Carlsbad PC09-O6 March 25, 2009 8 The HVAC unit weight(s) exceed 400lbs an analysis of the existing roof framing from an engineer or architect licensed by the State of California is required ASCE 1314 The person responsible for their preparation must sign all final sheets of plans (California Business and Professions Code) To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i e , plan sheet, note or detail number, calculation page, etc The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of 858/560-1468, to perform the plan review for your project If you have any questions regarding these plan review items, please contact Bryan Zuppiger at Esgil Corporation Thank you Carlsbad RC09-06 March 25, 2009 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION Carlsbad PLAN CHECK NO PCO9-06 PREPARED BY Bryan Zuppiger DATE March 25, 2009 BUILDING ADDRESS 2173 Salk Avenue BUILDING OCCUPANCY B TYPE OF CONSTRUCTION IIA BUILDING PORTION ti Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code Bldn Pprmit FPP hv Drriina AREA (Sq Ft) 5396 cb Valuation Multiplier 34 37 By Ordinance Reg Mod VALUE ($) 185,461 1 185,461 $88521 Plan Check Fee by Ordinance ^ ! Type of Review [Zi Complete Review I I Repetitive Fee " "'; Repeats^^ i D Other |—| Hourly EsGil Fee Structural Only Hr $575 39 $495 72 Comments macvalue doc PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB DATE ADDRESS RESIDENTIAL RESIDENTIAL ADDITION MINOR « $17,000.00) TENANT IMPROVEMENT PLAZA CAMINO REAL CARLSBAD COMPANY STORES VILLAGE FAIRE COMPLETE OFFICE BUILDING OTHER PLANNER ENGINEER ATE DOCS'" inning f Approvals p ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET D Estimate based on unconfirmed information from applicant D Calculation based on buildipg-plancheck plan submittal Address <^^ V j_Tx X^A-**—?- ^ Bldg Permit No C Prepared by ^^r==s~£r^ EDU CALCOLA TION&-7 Types of Use 0-^ Types of Use _ Types of Use ^fe^T iTypes of Use Qi* ^/?>\ t "u^t types and ^ Sq Sq Sq Sq APT CALCULATIONS List types and Types of Use £^-pnr~"" Sq Types of Use Types of Use Types of Use ^\ Sq Sq Sq ^ ) Decked by / square footages for all uses Ft /Units 7-< ^V Ft /Units Ft /Units Ft /Units square footages for all uses Ft /Units -T_J(. (^f Ft /Units Ft /Units Ft /Units ^^^Ro^-L-D^ Date EDU's / / EDU's EDU's EDU's ADT's $ ~l ADT's ADT's ADT's FEES REQUIRED \ WITHIN CFD D YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO D Q a Q Q Q Q 1 PARK-IN-LIEU FEE NW QUADRANT NE FEE/UNIT X 2 TRAFFIC IMPACT FEE -o ADT's/UNITS 3 BRIDGE AND THOROUGHFARE FEE ADT's/UNITS 4 FACILITIES MANAGEMENT FEE UNIT/SQ FT 5 SEWER FEE EDU's I r - BENEFIT AREA ^3 EDU's / / 6 DRAINAGE FEES PLDA ACRES 7 POTABLE WATER FEES UNITS CODE CONNECTION ^ — "X (DIST X ZONE X X X X FEE QUADRANT SE QUADRANT SW QUADRANT NO UNITS =$ r^*"' FEE/ADT C^> ^ =$ ^J^O #1 DIST #2 DIST #3 ) FEE/ADT =$ <^^ ' FEE/SQ FT /UNIT = $ FEE/EDU / ^ ) ^ =$ O ^ -'' ' ^ FEE/EDU ^- J / fJ = $ ~2^~L )\ '* HIGH /LOW •^^- FEE/AC - $ -^^"^ * METER FEE SDCWA FEE IRRIGATION : \FARMER\KATHY\MASTERS\FEE CALCULATION WORKSHEET doc2008 doc Rev 7/14/00 /'yi \V ENGINEERING DEPARTMENT FEE CALCULA TION WORKSHEET D Estimate based on unconfirmed information from applicant D Calculation based on building plancheck plan submittal Address e=^ ^i , ^ Prepared by S*l°[\ EDU CALCULATIONS Types of Use d>J-^ Types of Use Types of Use Types of Use APT CALCULATIONS Types of Use Qbf-* Types of Use Types of Use Types of Use ;} (LU&. B|dg Permit No Date J/'b/O -^Checked by List types and square footages for all uses Sq Ft /Units 3> i^ *>""*•/ Sq Ft /Units Sq Ft /Units Sq Ft /Units List types and square footages for all uses Sq Ft /Units 3^-^ ^ Sq Ft /Units Sq Ft /Units Sq Ft /Units OS z>S> - ^" ® C Date EDU's M C0 EDU's EDU's EDU's ADT's T^ i ADT's ADT's ADT's FEES REQUIRED WITHIN CFD D YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO D 1 PARK-IN-LIEU FEE NW QUADRANT NE QUADRANT SE QUADRANT SW QUADRANT FEE/UNIT X NO UNITS = $_ D 2 TRAFFIC IMPACT FEE ADT's/UNITS ( V X FEE/ADT TJ Q =$ D 3 BRIDGE AND THOROUGHFARE FEE (DIST #1 DIST #2 DIST #3 = $ADT's/UNITS D 4 FACILITIES MANAGEMENT FEE UNIT/SQ FT D 5 SEWER FEE EDU's X FEE/ADT ZONE 3 X FEE/SQ FT /UNIT = $ X D BENEFIT AREA EDU's 6 DRAINAGE FEES ACRES j2- I I W PLDA X FEE/EDU 2-"^ 'S^> HIGH /LOW X FEE/AC D 7 POTABLE WATER FEES UNITS CODE CONNECTION FEE METER FEE SDCWA FEE IRRIGATION F \FARMF.R\KATHY\MASTERS'-FEE CALCULATION WORKSHEET tfoc2008 doc Rev 7/14/00 * tr -^ 7 ^ o— f5 75Q Q Q PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No PC 09-06 Address 2173SalkAve Planner Chris Sexton Phone (760) 602- 4624 APN 212-021-02 Type of Project & Use Net Project Density DU/AC Zoning General Plan Facilities Management Zone _ CFD (in/out) #_Date of participation Remaining net dev acres. Circle One (For non-residential development Type of land used created by this permit o D D D n D n n Legend Item Complete Environmental Review Required. DATE OF COMPLETION Item Incomplete - Needs your action YES D NO D TYPE Compliance with conditions of approval' If not, state conditions which require action Conditions of Approval Discretionary Action Required YES D NO D TYPE APPROVAL/RESO NO DATE PROJECT NO OTHER RELATED CASES Compliance with conditions or approval9 If not, state conditions which require action Conditions of Approval _ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES Q NO Q CA Coastal Commission Authority? YES Q NO Q If California Coastal Commission Authority Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402, (619) 767-2370 Determine status (Coastal Permit Required or Exempt) _ Habitat Management Plan Data Entry Completed? YES D NO D If property has Habitat Type identified m Table 1 1 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE') Inclusionary Housing Fee required YES CD NO Q (Effective date of Inclusionary Housing Ordinance - May 21 , 1993 ) Data Entry Completed? YES D (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE') ' H \ADMIN\Template\Building Plancheck Review Checklist doc Rev 4/08 •Site Pfan 13 D C Provide a fully dimensional site plan drawn to scale Show North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes) Provide legal description of property and assessor's parcel number DD Policy 44 - Neighborhood Architectural Design Guidelines 1 Applicability YES D NO Q 2 Project complies YES D NOQ Zoning- 1 Setbacks Front Interior Side Street Side Rear Top of slope Required. Required. Required. Required. Required. 2 Accessory structure setbacks Front Interior Side Street Side Rear Structure separation Shown Shown Shown Shown Shown Required Required Required Required Required Shown Shown Shown Shown Shown D D 3 Lot Coverage Required Shown D 4 Height Required.Shown D D D 5 Parking Spaces Required 22 Shown 22 (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE^nlfj - H \ADMIN\Template\Building Plancheck Review Checklist doc Rev 4/08 Carlsbad Fire Department Plan Review Requirements Category PLANCK , Date of Report 04-17-2009 Reviewed by Name CHIE HONDA Address DESIGN CORP BLBO. DEPT COPYPermit # PC090006 Job Name VENTANA REAL 5396SF TI TO Job Address 2173 SALK AV CBAD INCOMPLETE The item you have submitted for review is incomplete At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards Please review carefully all comments attached Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval Conditions: Cond CON0003397 [MET] Sheet TI-1 - Doors used for egress (breakroom) shall meet the following requirements Only main exterior door or doors are permitted to be equipped with key-operated locking devices from the egress side in accordance with CFC 1008 1 6 All others shall be no knowledge, single action in accordance with CFC 1008 1 8 and 1008 1 8 4 Entry 04/15/2009 By cwong Action AP Cond CON0003401 [MET] ** APPROVED THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW Entry 04/17/2009 By cwong Action AP SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE Hit ONLY BP DATE / / SA/M APCD Business Name Contact Person L.UC. JgF^ Telephone Mailing Address City 'Slate 00 Plan File* Site Address City State Zip Plan File#/Permlt/l> Av/jg-. CO. PART I. FIRE DEPARTMENT . HAZARDOUS MATERIALS-MANAGEMENT DIVISION. OCCUPANCY CLASSIFICATION Indicate by circling the item, whether your business will use, process, or store any o( the tallowing hazardous materials (/ any of the rtemj are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan jubmittal. 1 Explosive or Blasting Agents 4 Flammable Solids 2 Compressed Gases 5 Organic Peroxides 3 Flammable or Combustible Liquids 6 Oxldizers 7 Pyrophoncs 10 Cryogenics 8 Unstable Reactives 11 Highly Toxic or Toxic Materials 9 Water Reactives 12 fladioactiyes 13 Corrosives 14 Other Health Hazards PART II. SAN DIEGO COUNTY PEPARTMENT OF ENVIRONMENTAL HPflj fH . HAZARDOUS MftTpP|A'-S MANAGEMENT DIVISION (HMMOI. If the answer to eny of the questions is yes. applicant must contact the County of San Oiego Hazardous Materials Management Division, 1265 Imperial Avenue, 3rd Floor, San Oiego, CA 92101 Telephone 16191 338-2222 prior to the issuance of a building department permit FEES MAY BE REQUIRED Yes „ No Is your business listed on the reverse side of this form? Will your business dispose of Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities equal to or greater than SS gallons, 500 pounds, 200 cubic feet or carcinogens/reproductive toxins in any quantity? Will your business use an existing or Install an underground storage tank? Will your business store or handle Regulated Substances (CalARP)? Will your business Use or install a Hazardous Waste Tank System (Title 22, Article 101 M nicnn rnnniVv A IB oni i IITIDMC rnurorM nicToii*T— CalARP Exempt Date Initials CalARP Required Date Initials Q CalARP Complete Date Initials If the answer to eny of the questions is yes, applicant must contact the Air Pollution Control District, 9160 Chesapeake Onve, San Oiego, CA 92123 Telephone '- (856) 650-4590 prior to the issuance of a building department permit 1 O wi" tfw Intended occupant install or use any of the equipment listed on the Listing of Air Pollution Control District Permit Categories, on the i reverse side of this form? 2 D (\) (ANSWER ONLY IF QUESTION 1 IS YES ) Will the subject facility be located within 1 ,000 feet of the outer boundary of a school IK through 1 2) as listed In the current Directory of School and Community College Districts, published by the San Diego County Office of Education and the current California Private School Directory, compiled in accordance with provisions of Education Code Section 33190? 3- f~l P^s Ooes the building or structure for which thj« permit is requested contain an fnatrfe asbestos? Briefly describe business activity and proposed project •pg&\ fca ULAJ s o v^ Name of Owner or Authorized Agent Signature o/'t>wnefW Authorized Agent Date I declare under penalty of perjury that to the best of my knowledge and belief the responses made herein are true and correct FOR OFFICIAL USE ONLY FIRE DEPARTMENT OCCUPANCY CLASSIFICATION _. 8V Date EXEMPT OR NO FURTHER INFORMATION REQUIRED COUNTY HMMO APCD 1 RREAStD fOR 6UU.DINC PlftMIT BUT NOT TOfl OCCUPANCY COUNTY-HMMO APCD ftflEASEO FOR OCCUPANCY COUNrr-HMMD APCD APR-12-2006 WED 07:12 AM CITY OF CARSLBAD FAX NO. 760 602 8558 P, 02 Community Facilities District No. 1 NON-RESIDENTIAL CERTIFICATE: Non-ReSIdential Land Owner, please read this option carefully and be sure you thoroughly understand the options before signing. The option you chose will affect your payment of the developed Special Tax assessed on your property, this option is available only at the time of the first building permit issuance. Property owner signature is required before a building permit will be issued. Your signature is confirming the accuracy of all information shown. 3T /Mr Name of Owner Telephone (13 Addresa Project Addrctt Carlsbad. California 9200 City, State Zip Code City, State Zip Code Assesioi 'i Parcel Number or APN and Lot Number if not yet subdivided by County Assessor, Building Permit Numbers) As cited by Ordinance No NS-153 and adopted by the City of Carlsbad, California, the City is authorized to levy a Special Tax in Community Facilities District No I. All non-iBsidentwl property, upon the issuance of a bxnldlfig permit, shall have die option to (1) pay the SPECIAL DEVELOPMENT TAX ONE- TIME or (2) assume the ANNUAL SPECIAL TAX - DEVELOPED PROPERTY for a period not to exceed twenty-five (25) years Please indicate your choice by initialing the appropriate line below I elect to pay the SPECIAL TAX - ONE-TIME DJJ.W, as a one-tune payment Amount of One-Tune Special Tax- $ foZ. Q^S • _ __ Owner's Initials OPTION ( 1 ). OPTION (2) I 00 HEREBY CERTIFY UNDER PENALTY OP PERJURY THAT THE UNDERSIGNED IS THE PROPERTY OWNER nr TTTF mmmfTT rnnrPJlTY AND THAT I UNDERSTAND AND WTLT, COMPLYJV1TH THE PROVISIONS AS STATED ABOVE I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to exceed JrwEnt-frvt .(25) years Maximum Annual /Special Tax' Owner's Imtiala ' Title Print N Date The City of Carlsbad has not independently verified (he information shown above Therefore, we accept no responsibility as to the accuracy or cornplete Land Use. FY . Factor &ug»xAsquareFt S/lg) ~ (01* ,~ C O \ S U LTJ: N C. S T R_UCT V R A L EN G I N jiE_R_S M-'IS1. i:': -\.I.;LH.' L \i \, poll '>>. •.., \\ « iilir. >'•••., '•-'< !!':^; STRUCTURAL CALCULATIONS MECHANICAL UNIT SUPPORTS VENTANA REAL LOT2 (SUITE 100) 15750 ALTON PARKWAY IRVINE, CA ALL SHEETS March, 2009 KLT# 09019 ( O N S L LT1 N^i_STj? IH. T_l J R A 1 I7 N G I N E T R S ! ' \ ' Oi'lli' |: .Sit fy TI ,n i-L...!! f ,;!!-. ,,'-i;f.'.( ••-,'•;. .VH I ^iiK '-\\ t <•;' i .:•(>. i :in STRUCTURAL CALCULATIONS MECHANTCAL UNIT SUPPORTS VENTANA REAL LOT2 (SUITE 120) 3 5750 ALTON PARKWAY IRVINE, CA ALL SHEETS March, 2009 KLT#09019 KLT CONSULTING STRUCTURAL ENGINEERS 3430 Irvine Avenue, Newport Beach, CA 92660 Tel (949)263-1308 Fax (949)263-1310 PROJECT SUBJECT tm 2 DATE 3 ~ /////CALC BY ,TC SHEET . JOB OF 3.4* PL 2 LL - K) \SZA\t t ft) ,P \ /<,? fe) KIT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 _FAX.(?49)263-1310 Composite Steel Beam Design Lie. *: KW-06004033 Description CHECK (E)FLOOR BEAM W16x26 FOR (N)MECH UNITWT=441# Material Properties Analysis Method Load Resistance Factor Design Beam Bracing Beam is Fully Braced against lateral-torsion buckling by attached sla Load Combination 2006 IBC & ASCE 7-05 Fy Steel Yield 50 0 ksi E Modulus 29,000 0 ksi Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes File L \VENTANAWentanaec6 ENERCALC INC 1983-2008 Ver 6021 NM2«2 License Owner: KLT Calculations per IBC 2006. CBC 2007 13th AISC Composite Beam Section Data Total Slab Thickness 6 50 in Effective Width 40ft Metal Deck Ribs Perpendicular Concrete fc Concrete Density Rib Height Rib Spacing Beam is UNSHOREO for Concrete Placement 4 0 ksi Stud Diameter 3/4" in 1450pcf Qn Stud Capacity 110k 30 in Top Width 60 in 120 in BtmWidth 550m T „ ' W16X26 370ft Applied Loads Service loads entered Load Factors will be applied for calculations Load for Span Number 1 Uniform Load 0 = 0 9060, L = 0 640 k/ft, Tributary Width = 1 0 ft, Applied after cunnq Point Load D = 0 4410 k @ 18 50 ft, Applied after cunnq_ Maximum Bending Stress Ratio = Section used for this span Percent Composite Action Construction Mu Applied 00 Mn'Phi Allowable 165750 0 978 1 W1 6X26 100% After Cunng 366 125 k-ft 374 458 k-ft Load Combination After Curing Location of maximum on span Span # where maximum occurs +1 200*0 50Lr+1 60L+1 60H 186242ft Span#1 Maximum Deflection Max Downward L+Lr+S Deflection 0 972 in Max Upward L+Lr+S Deflection 0 000 in Live Load Deflection Ratio 456 Max Downward Total Deflection 0 972 in Max Upward Total Deflection 0 000 in Total Deflection Ratio 456 Shear StucLRequirements _________ From Support 1 @ to 18 62 ft use 35 studs From 18 62 ft to support 2 use 35 studs Maximum Forces & Stresses for Load Combinations Load Comb & Design Length Span* 1 4 Dl on StIBm Before Curing Span L = 37 ft 1 1 4 DL on StIBm After Curing Span L = 37 ft 1 After Curing +1 40D Span L = 37 ft 1 After Cunng +1 20D-0 50Lr+1 60L* Span L = 37 ft 1 After Curing +1 200+1 60U+0 SOL Max Stress Ratios M V Ma-Const 0595 0978 0135 0223 Maximum Shear Stress Ratio = Section used for this span Vu Applied Vn*Phi Allowable Load Combination Location of maximum on span Span # where maximum occurs Bending Summary MnS«rPru Ma-NonConst MnTr*Phi 16575 16575 22272 36613 37446 37446 Design OK 0223 1 W16X26 393218 k 176625 k span 1 00 ft Span # 1 Shear Summary Va Vn * Phi 2377 3932 17663 17663 KLT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 FAX (949)263-1310 Composite Steel Beam Design Lie. *: KW-06004033 Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes 3 Fite L \VENTANAWentanaec6 ENERCALC INC 1983-2008 Ver 6021 Lfctnse Owmr: Description CHECK (E)FLOOR BEAM W16x26 FOR (N) MECH UNIT WT=4413 Load Comb & Design Length Span* 1Span L = 37 ft After Curing +120D+0 50L+1 60S Span L = 37 ft 1 Max Stress Ratios "M v 0656 0149 Ma-Const Bending Summary MnStTPhi " "~165"75"" 0656 0149 16575 Maximum Deflections for Load Combinations • Unfactored Loads Ma-NonConst "245 66 24566 MnTr*Phi 37446" 37446 Shear Summary Va Vn'Phi 26 30 176 63 Location Dead Load Defl Dead Load Defl Load Combination DL on Steel Alone BEFORE Curing DL on Steel Atone BEFORE Cunng DL on Steel Atone AFTER Cunng DL on Steel Atone AFTER Curing After Cunng D after + Lr+L+S After Curing D after + Lr+L+S After Curing Dafter + D + Lr + L After Cunng D after + D + Lr + L AfterCunng Dafter + D + L + S After Cunng Dafter + D+L+S AfterCunng Dafter + D + L + W AfterCunng Dafter + D+L+W AfterCunng Dafter + D+L + S After Curing Dafter + D + L + S AfterCuring Dafter + D+L + S AfterCunng Dafter + D + L + S Span in Span Before Cunng Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward 1 1 1 1 37000 37000 37000 37000 18624 0000 18624 0000 16624 0000 18624 0000 18624 0000 18624 0000 Maximum Vertical Reactions • Unfactored Load Combination CveralTMAXimum DL Applied Before Cunng Lr+L+S (Dbc-Dac)+Lr + L (Dbc-Dac) + L + S (Dbc-Dac)+L + W+S/2 (Dbc-Dac) + L + S+W/2 (Dbc-Dac) + L + S+E/14 . Steel Section Properties : Depth Web Thick Flange Width Flange Thick Area = Weight 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000ooooo 00000 ooooo Support notation AfterCunng 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Far !efi is #1 Const Loads Net Defl 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Support 1 Support 2 11840 11840 11840 11840 11840 11840 11840 W16X26 15700 in 0250 in 5500 in 0345 in 7680 m*2 26143 plf 11840 11840 11840 11840 11840 11840 11840 Ixx Sxx Rxx Zx 301 00 m"4 = = = 3840 in 6 260 in 44 200 in A3 A3 lyy Syy Ryy Zyj Composite Section Properties Span Number Plastic N A Location Span"1 PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web Analysis % Shear Type Connection 1000 950 900 850 800 750 700 650 600 550 500 450 400 350 300 250 Plastic N A from Bottom 15700 15665 15630 15595 15560 15525 15491 15456 15421 15386 15265 14497 13729 12961 12193 11425 SumQn Shear (k) 384000 364800 345600 326400 307200 288000 268800 249600 230400 211200 192000 172800 153 600 134400 115200 96000 # Studs per 1/2 Span 35 34 32 30 28 27 25 23 21 20 18 16 14 13 11 9 Mn - Capac k-ft 41606 40942 40253 39541 388 Of, 38045 37261 36454 35623 34769 34322 33538 32619 31558 30349 28984 Non-Dead Load_Defl_ FOOT 0000 0000 0000 0972 0000 0972 0000 0972 0000 0972 0000 0972 0000 0972 0000 2630 Total Deflection "6 obooooo 0.000 0000 0972 0000 0972 0000 0972 0000 0972 0000 0972 0000 0972 0000 17663 Ixx - Used 30100 30100 30100 30100 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 9 590 mA4 3490 m*3 1 120 in 5 480 mA3 0 262 in*4 Moment of Inertia l-Steel l-Trans l-Lwr Bound 9674 9561 9437 9299 9147 8980 8796 8594 8371 8127 7858 7563 7237 6878 6482 6045 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 12166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 12166 12166 1,2166 12166 KLJ CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 ._FAXJ94?J263-1310 Composite Steel Beam Design Lie. *: KW-06004033 Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes Job# File L \VENTANA\ventanaec6 • 198J-2008 Vet 6021 N 54252 I Liccns* Owntr: KLT Description CHECK (E)FLOOR BEAM W14x22 FOR (N) MECH UNIT WT=441# Material Properties Analysis Method Load Resistance Factor Design Beam Bracing Beam is Fully Braced against lateral-torsion buckling by attached sla Load Combination 2006 IBC & ASCE 7-05 Fy Steel Yield SOOksi E Modulus 29,000 0 ksi Calculations per IBC 2006, CBC 2007.13th AISC 401 - SJ '"' Vl: "">' vt: '"' ' vfr ' X - >mposite Beam Section Data tal Slab Thickness 6 50 in Concrete fc ectove Width 40ft Concrete Density ital Deck Rib Height » Perpendicular Rib Spacing Beam is UNSHORED for Concrete Placement 0(0,4 0(0 902| m Y ji7A.. ;'*.'•'>!, ;.'••.! f> . • 40ksi 1450pcf 30 m 120 in 41) L(064) ^P-':* • ' ••' ' Stud Diameter Qn Stud Capacity Top Width Btm Width T ji< 3/4" m 110k 60 in 5 50 in T W16X26 240ft Applied Loads Load for Span Number 1 Uniform Load D = 0 9020, L = 0 640 k/ft, Tributary Width = 1 0 ft, Applied after curing Point Load D = 0 4410 k @ 12 0 ft, Applied after cunnq DESIGN SUMMARY Maximum Bending Stress Ratio = 0413 1 Section used for this span W16X26 Percent Composite Action 100% Consfrudion After Curing Mu Applied 00 154808k-ft Mn'Phi Allowable 165750 374458k-ft Load Combination After Curing Location of maximum on span Span # where maximum occurs Service loads entered Load Factors will be applied for calculations +1 20D-K) 50Lr+1 60L+1 60H 119195ft Span#1 Maximum Deflection Max Downward L+Lr+S Deflection 0 172 in 0 000 in 1673 0 172 in 0 000 in 1673 Max Upward L+Lr+S Deflection Live Load Deflection Ratio Max Downward Total Deflection Max Upward Total Deflection Total Deflection Ratio Shear Stud Requirements From Support 1 @ to 12 72 ft use 35 studs From 12 72 ft to support 2 use 35 studs Maximum Forces & Stresses for J.oad Combinations Load Comb & Design Length "~ Max Stress Ratios Span* M V Ma Const 1 4 DL on SliBm Before Curing Span L = 24 ft 1 1 4 DL on StIBm After Curing Span L = 24 ft 1 After Curing +1 40D Span L = 24 ft 1 0253 0088 After Cunng +1 20D-0 50LM 60L' Span L = 24 ft 1 0413 0145 After Cunng +1 ?OD-1 60Lr*€ 501 Maximum Shear Stress Ratio = Section used for this span Vu Applied Vn*Phi Allowable Load Combination Location of maximum on span Span # where maximum occurs Bending Summary MnStr'Phi Ma-NonConst MnTr'Phi 165 75 94 60 374 46 16575 15481 37446 Design OK 0.145 W16X26 255414 k 176625 k spanl 00 ft Span # 1 1 Shear Summary Va Vn * Phi 1546 17663 2554 17663 KLT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 FAX (949)263-1310 Composite Steel Beam Design Lie. *: KW-M004033 Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes Job * File I \VENTANA\ventanaec6 ENERCALC INC 19832008 Ver 6021 N 54792 Lic«ns* Ownw: KL Description CHECK (E)FIOOR BEAM W14x22 FOR (N) MECH UNIT WT=441S Load Comb & Design Length Span* ~SpanTT24~fT " "1" AfterCunng +1 20D«0 50L+160S Span L = 24 ft 1 Max Stress Ratios M V" "0278 0097 Ma-Const Bending Summary MnSlvPhi Ma-NonConst " 16575 104 12 MnTr'Phi "37446" Shear Summary Va " Vn'Phi 1709 17663 0278 0097 16575 10412 Maximum Deflections for Load Combinations • Unfactored Loads 37446 1709 17663 Location Dead Load Defl Dead Load Defl Load Combination DL on Steel Alone BEFORE Cunng OL on Steel Atone BEFORE Cunng DL on Steel Atone AFTER Cunng DL on Steel Atone AFTER Cunng After Cunng D after + LH.+S After Cunng D after + Lr-H.+S After Cunng D after + D + Lr + L After Cunng D after + 0 + Lr + L After Cunng D after + D + L+S AfterCunng D after + D + L + S After Cunng Dafter + D + L+W AfterCunng D after + D+L + W AfterCunng D after + D + L + S AfterCunng Dafter + D+L + S AfterCunng D after +D + L+S AfterCunng Dafter + D + L+S Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Span 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 in Span Before Cunng After Cunng 24000 24000 24000 24000 12081 0000 12081 0000 12081 0000 12081 0000 12081 0000 12081 0000 vMMmum Vertical Reactions • Unfactored Load Combination Overall MAXimum DL Applied Before Cunng Lr+L+S (Dbc-Dac) + Lr + L (Dbc-Dac) + L + S (Dbc-Dac) + L+W + S/2 (Dbc-Dac) + L + S + W/2 (Dbc-Dac) + L + S + E/14 Steel Section Properties : Depth = Web Thick Flange Width Flange Thick = Area = Weight 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Const Loads Non-Dead Toy Net Defl Load Defl Deflection Ixx 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0172 0000 0172 0000 0172 0000 0172 0000 0172 0000 0172 0000 0000 0000 0000 0000 0172 0000 0172 0000 0172 0000 0172 0000 0172 0000 0172 0000 Used 301 00 30100 30100 30100 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 96740 Support notation FariefhsfH Support 1 Support 2 7680 7680 7680 7680 7680 7680 7680 W16X26 15700 in 0250 in 5500 in 0345 in 7680 in*2 26143 plf 7"680 7680 7680 7680 7680 7680 7680 Ixx Sxx Rxx Zx = = = = " 301 00 mA4 3840 m*3 6 260 in 44 200 mA3 lyy Syy Ryy Zy J 9590 3490 1 120 5480 0262 "" m*4 m»3 in in"3 mA4 Composite Section Properties Span Number Plastic N A Location Span 1 PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web Analysis % Shear Type Connection 1000 950 900 850 800 750 700 650 600 550 500 450 400 350 300 250 Plastic N A from Bottom 15700 15665 15630 15595 15560 15525 15491 15456 15421 15386 15265 14497 13729 12961 12193 11425 Sum On Shear (k) 384000 364800 345600 326400 307200 288000 268800 249600 230400 211200 192000 172800 153600 134400 115200 96000 # Studs per 1/2 Span 35 34 32 30 28 27 25 23 21 20 18 16 14 13 11 9 Mn - Capacity k-ft 41606 40942 40253 39541 38805 38045 37261 36454 35623 34769 34322 33538 32619 31558 30349 28984 Moment of Inertia l-Steel 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 3010 l-Trans l-Lwr Bound 1,2166 1.2166 1.2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 1,2166 12166 1,2166 1,2166 9674 9561 9437 9299 9147 8980 8796 8594 8371 8127 7858 7563 7237 6878 6482 6045 KLT CONSULTING STRUCTURAL ENGINEERS (, c 3430 Irvine Avenue, Newport Beach, CA 92660 Tel (949)263-1308 Fax (949)263-1310 PROJECT SUBJECT \/fH7ANA .J.DATE 4 ~'i ! -SHEET OF CALC BY JOB \4JOc. -2>3 L- 2,7/ 3 - KLT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 __FAXJ9J9)263;1310 _ Composite Steel Beam Design Lie. *: KW-06004033 Description CHECK (E)FLOOR BEAM W27x84 FOR (N) MECH UNIT LOADS Material Properties Analysis Method Load Resistance Factor Design Beam Bracing Beam is Fully Braced against lateral-torsion buckling by attached sla Load Combination 2006 IBC & ASCE 7-05 Fy Steel Yield SOOksi E Modulus 29,000 Oksi Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes JOb* ;//„«,-' 7 File LAVENTANA\ventanaec6 ENERCALC INC 1963-2008. Ver 6021 License Owner: KLT Calculations per IBC 2006 CBC 2007 13th AISC Composite Beam Section Data Total Slab Thickness 6 50 in Effective Width 40ft Metal Deck Ribs Parallel Concrete f c Concrete Density Rib Height Rib Spacing 40ksi 1450pcf 30 in 120 in Beam is UNSHORED for Concrete Placement Stud Diameter 3/4" in Qn Stud Capacity 11 Ok Top Width 60 in Btm Width 5 50 in D(0 882) DO 714J L(2 64) W27X84 320ft Service loads entered Load Factors will be applied for calculations Load for Span Number 1 Uniform Load D = 3 7140, L = 2 640 k/ft, Tnbutary Width = 1 0 ft, Applied after cunnq Point Load 0 = 0 8820 k @ 16 0 ft, Applied after cunnq Maximum Bending Stress Ratio = Section used for this span Percent Composite Action Consfrucfton Mu Applied 00 Mn'Phi Allowable 9150 0771 1 W27X84 100 % Alter Cunng 1,11950k-ft 1,452 87 k-ft Load Combination After Cunng Location of maximum on span Span # where maximum occurs *-120D-tQ50Lr-t-160L+160H 158926ft Span # 1 Maximum Deflection Max Downward L+Lr+S Deflection Max Upward L+Lr+S Deflection Live Load Deflection Ratio Max Downward Total Deflection Max Upward Total Deflection Total Deflection Ratio 0 374 m 0 000 in 1026 0 374 m 0 000 in 1026 Shear Stud Requirements From Support 1 @ to 1611 ft use 74 studs From 1611 ft to support 2 use 74 studs Maximum Forces & Stresses for J.oad Combinations Max Stress RatiosLoad Comb & Design Length Span# M 1 4 DL on SUBm Before Curing Span L = 32 It 1 1 4 DL on StIBm After Cunng Span L = 32 ft 1 After Curing +1 40D Span L = 32 ft 1 0 465 After Cunng +1 200*0 50LM 60L- SpanL = 32ft 1 0771 After Cunng +1 200*1 60Lr+0 50L Ma-Const 0152 0252 Maximum Shear Stress Ratio = Section used for this span Vu Applied Vn*Phi Allowable Load Combination Location of maximum on span Span # where maximum occurs pending Summary MnStrPhT "Ma-NonConst MnTr'Phi 91500 67533 145287 91500 1,11950 145287 Design OK 0252 1 W27X84 139422 k 552690 k span 1 00 ft Span # 1 Shear Summary Va Vn'Phi 8381 55269 13942 55269 KIT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 .. FAX.(94?)263-1310 Composite Steel Beam Design Lie. #: KW-06004033 Description CHECK (E)FLOOR BEAM W27x84 FOR (N) MECH UNIT LOADS Load Comb & Design Length Max Stress Ratios Span# M V ~SpanL = 32~ft ~"l " " 0515 0"168 After Cunng +1 200*0 50L+1 60S Span L = 32 ft 1 0515 0168 Maximum DeflectionsJor LpadjCombinations • U Load Combination Spar "DUbn Steel Aione"B"EF6RE"Cunng Upward 1 DL on Steel Atone BEFORE Cunng Downward 1 DL on Steel Atone AFTER Cunng Upward 1 DL on Steel Atone AFTER Cunng Downward 1 After Cunng D after + LN.+S Upward 1 After Cunng D after + LH.+S Downward 1 After Cunng D after + D + Lr + L Upward 1 After Cunng D after+ D + Lr + L Downward 1 AfterCunng Dafter + D+L+S Upward 1 After Cunng D after + D + L + S Downward 1 AfterCunng Dafter + D + L+W Upward 1 After Cunng D after+ D+L + W Downward 1 AfterCunng Dafter + D + L + S Upward 1 AfterCunng D after+ D+L+S Downward 1 AfterCunng D after+ D + L+S Upward 1 After Cunng D after + D + L + S Downward 1 Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes File L \VENTANAWentanaec6 ENERCALC INC 1983-2008 Ver 6 0 21 N 54292 LJc«ns» Owntr: KLT Bending Summary a-Const tared ication Span "32000" 32000 32000 32000 16107 0000 16107 0000 16107 0000 16107 0000 16107 0000 16107 0000 MnStl * Phi "~9iToo~ 91500 Loads Dead Load Defl Before Cunng 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 Ma-NonConst " "74781 74781 Dead Load Defl After Cunng 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 MnTr'Phi 1,45287 1 452 87 Const Loads Net Defl 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Non-Dead Load Defl 0000 0000 0000 0000 0374 0000 0374 0000 0374 0000 0374 0000 0374 0000 0374 0000 Shear Summary Va 9296 9296 Total Deflection 0000 0000 0000 0000 0374 0000 0374 0000 0374 0000 0374 0000 0374 0000 0374 0000 Vn * Phi 55269 55269 Ixx Use 2,850 2850 2,850 2.850 5,801 5,801 5801 5,801 5801 5,801 5,801 5801 5801 5,801 5,801 5,801 Maximum Vertical Reactions • Unfactored Support notation f<tf «rt ;> #' Load Combination OverairMAXimum DL Applied Before Cunng LH.+S (Dbc-Dac)+Lr + L (Dbc-Dac) + L + S (Dbc-Dac) + L+W + S/2 (DboDac) + L+S+W/2 (Dbc-Dac)+L+S+E714 Steel Section Properties Depth ' = Web Thick Flange Width Flange Thick Area = Weight Support 1 42240 Support 2 42240 42240 42240 42240 42240 42240 42240 W27X84 42240 42240 42240 42240 42240 42240 26700 in I xx 0460 in Sxx 10000 in Rxx 0640 in Zx 24800 inA2 84419 plf Composite Section Properties Span Number Analysis % Shear Plastic N A Location Type Connection Span~1 " PNA in Flange 1000 PNA in Flange 95 0 PNA in Flange 900 PNA in Flange 85 0 PNA in Flange 800 PNA in Flange 75 0 PNA in Web 700 PNA in Web 650 PNA in Web 60 0 PNA in Web 55 0 PNA in Web 50 0 PNA in Web 45 0 PNA in Web 40 0 PNA in Web 350 PNA in Web 30 0 PNA in Web 25 0 2,85000 inM 213 00 inA3 10700 in 244 000 m*3 lyy Syy Ryy zy J Plastic N A from Bottom 26266 26226 26185 26145 26105 26064 25279 24403 23527 22651 21775 20899 20023 19148 18272 17396 Sum On Shear (k) 805 800 765 510 725220 684 930 644 640 604350 564060 523 770 483 480 443 190 402900 362610 322 320 282 030 241 740 201 450 # Studs per 1/2 Span 74 70 66 63 59 55 52 48 44 41 37 33 30 26 22 19 Mn • Capacity k-ft 1,61430 1,60752 1,59978 1,59110 1,58147 1,57090 1,59055 1,581 63 1,56910 1 552 85 1,53279 1,50879 1,48074 1 448 49 141189 1 370 77 106000 inM 21 200 in«3 2 070 in 33 200 in»3 2 810 inA4 Moment of Inertia l-Steel l-Trans l-Lwr Bound 5,801 1 5,750 6 56940 5,630 7 5,5604 5,482 5 5,3964 5,301 6 5,1974 5,083 0 4,957 6 4,820 4 46704 45065 4,327 5 41321 2,8500 2,8500 2,8500 2,850 0 2,8500 2,8500 2,8500 2,8500 2,8500 2,850 0 2,8500 2,8500 2,850 0 28500 2,850 0 28500 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 6,924 7 KLT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 _£AXJ949)263-1310 Composite Steel Beam Design Lie. #: KW-06004033 Description CHECK (E)FIOOR BEAM W24x68 FOR (N) MECH UNIT LOADS Material Properties Analysis Method Load Resistance Factor Design Beam Bracing Beam is Fully Braced against lateral-torsion buckling by attached sla Load Combination 2006 IBC & ASCE 7-05 Fy Steel Yield 50 0 ksi E Modulus 29,000 0 ksi Composite Beam Section Data Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes File L \VENTANAWentanaec6 • ENERCALC INC 1983-2008 Ver 6021 N 542?; I Llctns* OWMT : KLT Calculations per IBC 2006, CBC 2007 13th AISC . „-r Beam is UNSHORED for Concrete Placement al Slab Thickness 6 50 in sctive Width 40f| talDeck s Parallel Concrete f c Concrete Density Rib Height Rib Spacing D(271] 40 ksi 1450pcf 30 in 120 in 323) JL(1 92) Stud Diameter On Stud Capacity Top Width Btm Width 3/4" in 11 Ok 60 in 5 50 in r y 5l> w W27X84 330ft Applied loads Load for Span Number 1 Uniform Load D = 2 710, L = 1 920 k/ft, Tnbutary Width = 1 0 ft, Applied after cunnq Point Load D = 1 3230 k (5> 16 50 ft, Applied after cunnq Service loads entered Load Factors will be applied for calculations Maximum Bending Stress Ratio = Section used for this span Percent Composite Action Construction Mu Applied 0 0 Mn*Phi Allowable 9150 0601 1 W27X84 100 % After Cunng 873 826 k-ft 1.452 87 k-ft Load Combination After Curing +1 20D-K) 50Lr+1 60L+1 60H Location of maximum on span 16 3893ft Span # where maximum occurs Span # 1 Maximum Deflection Max Downward L+Lr+S Deflection 0 308 m Max Upward L+Lr+S Deflection 0 000 m Live Load Deflection Ratio 1286 Max Downward Total Deflection 0 308 m Max Upward Total Deflection 0 000 m Total Deflection Ratio 1286 Sheaiffud Requirements From Support 1 @> to 16 83 ft use 74 studs From 16 83 ft to support 2 use 74 studs Maximum Forces & Stresses for Load Combinations Max Stress RatiosLoad Comb & Design Length Span# M 1 4 DL on StlBm Before Cunng Span L = 33 ft 1 1 4 DL on StlBm After Curing Span L = 33 ft 1 After Curing *1 40D SpanL = 33ft 1 0366 After Cunng +1 20D-K) 50LM 60L+ Span L = 33 ft 1 0601 After Cunng +1 20D+1 60Lr-0 501 Ma Const 0115 0190 Maximum Shear Stress Ratio = Section used for this span Vu Applied Vn*Phi Allowable Load Combination Location of maximum on span Span # where maximum occurs Bending Summary MnStT* PhT " Ma-NonConst MnTr * Phi 91500 91500 53161 87383 1,45287 145287 Design OK 0.190 1 W27X84 105140 k 552690 k span 1 330 ft Span # 1 Shear Summary Va Vn'Phi 63 53 10514 552 69 55269 KLT CONSULTING STRUCTURAL ENGINEERS 3430 IRVINE AVE NEWPORT BEACH CA 92660 TEL (949)263-1308 _FAX [949)263-1310 Composite Steel Beam Design Lie. #: KW-06004033 Description CHECK (EjFLOOR BEAM W24x68 FOR (N) MECH UNIT LOADS Title VENTANA LOT 2 T I Dsgnr Project Desc Project Notes Job# W File L \VENTANAWentanaec6 ENERCALC INC 1983-2008 Ver 6021 N 54292 Lictns* Owner: KL Load Comb & Design Length Span* Max Stress Rate " M ~ V 0404 " 0127 Bending Summary Ma-Const MnStTPhi 91500 Ma-NonConst 58634 MnTr'Phi 1,45287 Shear Summary Va Vn'Phi 7029 55269 After Curing +1 20D+0 50L+1 60S Span L = 33 ft 1 0404 0127 91500 Maximum Deflections for Load Combinations • Unfactored Loads 58634 1,45287 7029 Load Combination DL on Steel Alone BEFORE Curing DL on Steel Alone BEFORE Cunng DL on Steel Atone AFTER Cunng DL on Steel Alone AFTER Curing After Cunng D after + Lr+U+S After Cunng D after + Lr+L+S After Cunng Dafter + D + Lr + L After Cunng Dafter + D + Lr + L After Curing Dafter + D + L + S After Cunng D after +D+L+S AfterCunng Dafter + D + L+W AfterCunng Dafter + D+L + W AfterCunng Dafter + D + L + S AfterCunng Dafter + D + L+S AfterCunng Dafter+D + L+S AfterCunng Dafter + D + L + S Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Upward Downward Span 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Location in Span 33000 33000 33000 33000 16611 0000 16611 0000 16611 0000 16611 0000 16611 0000 16611 0000 Dead Load Defl Before Cunng 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 Dead Load Defl AfterCunng 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Const Loads Net Defl 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 0000 Non-Dead Load Defl 0000 0000 0000 0000 0308 0000 0308 0000 0308 0000 0308 0000 0308 0000 0308 0000 Total Deflection 0000 0000 0000 0000 0308 0000 0308 0000 0308 0000 0308 0000 0308 0000 0308 0000 55269 Ixx - Used " "2,85000 2 850 00 2,850 00 2,850 00 5 801 06 5 801 06 5.801 06 5,801 06 5,801 06 5,80106 5,801 06 5,801 06 5,801 06 5,801 06 5,801 06 5 801 06 Maximum Vertical Reactions - Unfactored Support notation Far left is *1 Load Combination Overall MAXifnum DL Applied Before Cunng Lr+L+S (Dbc-Dac)+Lr + L (Dbc-Dac) + L + S (Dbc-Dac) + L + W + S/2 {Dbc-Dac) + L+S+W/2 (Dbc-Dac) + L + S+E/14 Steel Section Properties Depth Web Thick Flange Width Flange Thick Area Weight Support 1 31680 31680 31680 31680 31680 31680 31680 . W27X84 26700 in 0460 in 10000 in 0640 in 24800 in»2 84419 plf Support 2 31 680 31680 31680 31680 31680 31680 31680 Ixx Sxx Rxx Zx Composite Section Properties Span Number Plastic N A Location Spa~h~1 PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Flange PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web PNA in Web Analysis Type % Shear Plai Connection froir 1000 ; 950 2900 2 850 2 800 2 750 2 700 2 650 2 600 2 550 2 500 2 450 2 400 2 350 1 300 1 250 1 2,85000 mM 213 00 m"3 10700 in 244 000 m«3 lyy Syy Ryy Zy j 106000 in*4 21 200 m*3 2070 in 33200 m*3 2 810 in"4 A SumQn # Studs per Mn- Capacity Moment of Inertia >m Shear (k) 1/2 Span k-ft l-Steel l-Trans l-Lwr Bound 26266 805800 74 1,61430 2,8500 6,9247 58011 26226 765510 70 1,60752 2,8500 6,9247 57506 26185 725220 66 1,59978 2,8500 6,9247 5,6940 26145 684930 63 1,59110 2,8500 6,9247 5,6307 26105 644640 59 1,58147 2,8500 6,9247 5,5604 26064 604350 55 1,57090 2,8500 6,9247 5,4825 25279 564060 52 1,59055 2,8500 6,9247 5,3964 24403 523770 48 1,58163 2,8500 6,9247 53016 23527 483480 44 1,56910 2,8500 6,9247 5,1974 22651 443190 41 1,55285 2,8500 6,9247 5,0830 21775 402900 37 1,53279 2,8500 6,9247 4,9576 20899 362610 33 150879 2,8500 6,9247 48204 20023 322320 30 1,48074 2,8500 69247 4,6704 19148 282030 26 1,44849 2,8500 6,9247 45065 18272 241740 22 1,41189 2,8500 69247 43275 17396 201450 19 1,37077 28500 6,9247 41321 KLT CONSULTING STRUCTURAL ENGINEERS c PROJECT SUBJECT Alffti ^ /H&H. f£) / TIP i Aft &. p'7 i Sit, 3430 Irvine Avenue, Newport Beach, CA 92660 Tel (949)263-1308 Fax (949)263-1310 DATE 3~3I~<?'? SHEET OF CALC BY JOB fort 7t? S>£ A HO } - ¥?/# "if 1HXWPIV KfV 1^ UJ I 1 CO Of rJu. § §m JNIT SUPPORT e (•^a^ On: ^ tziUJ ( 'x ,L;00 'rr. C." a ^.. CT)0 I rO I ro O UJ 0 CM s t- <"§ iO LU £ > luJ U-! 5! £ <-> ^7-in ^ 9V. \ ^'xN !s ! m i ^ ^ENOINEERS•Jx CatHomia 62660263-1310in I P ' - zB a0 - 0d S*2II i«3 IS lai »8(!«: ! oCO3 * N\ a O DCen £_-; c.I—<£C_Ju^cc<t CD O I K) O 1 CM § < gs OS !55 ; !i TITLE 24 REPORT Title 24 Report for: Ventana Real Lot 2 - Suite 100 & 120 2173SalkAve. Carlsbad, CA 92008 Project Designer: Design Corp 444 South Cedros Ave. Studio 175 Solana Beach, CA 92075 (858) 794-3222 Report Prepared By: Tom Harinton HARINTON MECHANICAL DESIGN INC 225 Franklin ST. Suite A Grand Haven, Ml 49417 (858) 435-4803 Job Number: Date: 3/17/2009 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonrestdential 2005 Building Energy Efficiency Standards This program developed by EnergySoft, LLC - www energysoft com EnergyPro 4 4 byEnengySoft Job Number User Number 4945 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MECH-1 -C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 5 Form MECH-3-C Mechanical Ventilation 8 Form MECH-4-C HVAC Misc. Prescriptive Requirements 9 Form MECH-MM Mechanical Mandatory Measures 15 HVAC System Heating and Cooling Loads Summary 17 EnergyPno44 byEnergySoft Job Number User Number 4945 CERTIFICATE OF COMPLIANCE (Parti of2) MECH-1-CI PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 PROJECT ADDRESS 2173 Salk Ave Carlsbad PRINCIPAL DESIGNER • MECHANICAL All Soheili DOCUMENTATION AUTHOR HARINTON MECHANICAL DESIGN INC TELEPHONE (619)446-5004 TELEPHONE (858) 435-4803 MINERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA 5,405 Sq Ft CLIMATE ZONE BUILDING TYPE NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION | | ADDITION Q ALTERATION UNCONDITIONED (File Affidavit) METHOD OF MECHANICAL COMPLIANCE PRESCRIPTIVE || PERFORMANCE PROOF OF ENVELOPE COMPLIANCE PREVIOUS ENVELOPE PERMIT ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations This certificate applies only to building mechanical requirements The documentation preparer hereby certifies that the documentation is accurate and complete DOCUMENTATION AUTHOR Tom Hannton SIGNATURE DATE 3-17-09 The Principal Mechanical Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application The proposed building has been designed to meet the mechanical requirements contained in the applicable parts of Sections 100,101,102,110 through 115,120 through 125,142,144, and 145 |x] The plans & specifications meet the requirements of Part 1 (Sections 10-103a) [jj] The installation certificates meet the requirements of Part 1 (10-103a 3) [xl The operation & maintenance information meets the requirements of Part 1(10-103c) Please Check one (These sectionsof the Business and Professions Code are printed in full in the Nonresidential Manual) fc] I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation, and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect |—| I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537 2 or 6737 3 to sign — this document as the person responsible for its preparation, and that I am a licensed contractor performing this work I I I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a — structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 67371 PRINCIPAL MECHANICAL DESIGNER - NAME All Soheili SIGNATURE ^ /^DATE 3-17-09 LIC # 23110 INSTRUCTIONS TO APPLICANT I MECH-1-C Certificate of Compliance Part 1,2,3 of 3 are required on plans for all submittals IMECH-2-C Air/Water/Service/Water Pools Requirements Part 1 of 3, 2 of 3, 3 of 3 are required for all submittals, but may be on IMECH-3-C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation, but may be on plans 3 MECH-4-C HVAC Misc Prescriptive Requirements is required for all prescriptive submittals, but may be on plans I] MECH-5-C Mechanical Equipment Details are required for all performance submittals EnergyPro44 byEnergySoft User Number 4945 Job Number Page 3 of 22 CERTIFICATE OF COMPLIANCE (Part 2 of 2) MECH-1-C PROJECT NAME Ventana Real Lot 2 - Suite 1 00 & 120 DATE 3/17/2009 Designer: This form is to be used by the designer and attached to the plans Listed below are all the acceptance tests for mechanical systems The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test Also indicate the person responsible for performing the tests (i e the installing contractor, design professional or an agent selected by the owner) Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately Building Departments* SYSTEM ACCEPTANCE Before an occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance Information meet the requirements of Section 10-103(b) and Title 24 Part 6 STATEMENT OF COMPLIANCE £] MECH-2-A Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Pq,,ipm«nt ™q,,!rina arroptanro tasting All Ventilation Systems Shall Be Certified By The Installing ContractorTest revised on el New systems both New Construction and RelmK ** \y\ MECH-3-A Packaged HVAC Systems Acceptance Document Fquipment requiring wTflptancft toting AN HVAC Systems Shall Be Certified By The Installing Contractor Teat required on al New systems boOi New Construction ana Retrofit [H MECH-4-A Air-Side Economizer Acceptance Document Equipment requiring arrAptanr.fi tasting Test reo^ilred on all New systenvbrjlh New Construction and RelroH Urtowtheccmrrizertttet are Installed at the factory and certified with the commission do not require equipment testing but do require construction Inspection G MECH-5-A Air Distribution Acceptance Document Equipment requiring acceptance testing 71* test required If the unit serves 4000 H2 of space or less and 25* or iron of the duds an In noncondtttoned or semtcondUoned space Ike an attic. New systems that met the above requirements Retrofit systems that meet the above requirements and either extend ducts replace duett or replace the packaged un/l CH MECH-6-A Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing ~] MECH-7-A Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA V tan volume controls Installed on new or existing systems must be tested [J MECH-8-A -Hydronic System Control Acceptance Document -Variable Flow Controls Apples to chUed and hot water systems -Automatic Isolation Controls App**> IB new boters and chUers and the primary pumps an connected to a common header -Supply Water Temperature Reset Controls Applies lo new constant How chHed and hot water systems that have a design capacity greater than or equal to 500,000 BtuAr -Water-loop Heat Pump Controls Applies to al nun watertoop heat pump systems when the combined loop pumps are greater than 5 hp -Variable Frequency Controls Apr^ to alnew distribute rMrrwc* new varlat* How chlled hydmnlc heat pump Equipment requiring acceptance testing Installing Contractor Installing Contractor EnergyPn>44 byEnergySott User Number 4945 Job Number Page 4 of 22 |AIR SYSTEM REQUIREMENTS Parti of2 MECH-2-C PROJECT NAME Ventana Real Lot 2-Suite 100 &120 DATE 3/17/2009 ISYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS, Central or Single Zone 1F 1 1E 1 10 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Section Reference on Plans or Specification 1 112(a) 112(a) 112(b) 112(c),115(a) 121(b) 121(b) 121(c) 121(0 121(c). 122(e) 122(e) 122(0 122(g) 123 124 5 00 COP 153EER Yes n/a Yes 184 cfm No No Programmable Switch No Setback Required Auto n/a R-42 5 00 COP 159EER Yes n/a Yes 139 cfm No No Programmable Switch No Setback Required Auto n/a R-42 5 00 COP 15 9 EER Yes n/a Yes 60 cfm No No Programmable Switch No Setback Required Auto n/a R-42 PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1 43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1 212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance3 144 (a & b) 144 (a & b) 144 (a & b) 144 (a & b) 144 (c) 144 (c) 144 (c) 144 (d) 144 (e) 144 (f) 144 (f) 144 (k) 10,200 btuh 53,232 btuh 44,739 btuh 43,774 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No 23.580 btuh 61 ,782 btuh 56,422 btuh 55,087 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No 29.335 btuh 61,179 btuh 55.363 btuh 54,699 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No required features are documented If a requirement Is not applicable, put "N/A" In the column 2 Not required for hydronic heating and cooling Either enter a value here or put in reference ot plans and speclficatons per footnote 1 3 Enter Yes If System Is Constant Volume, Single Zone, Serves < 5 000 sqft, Has > 25% duct In unconditioned space Duct sealing Is required for Prescriptive Compliance, see PERF-1 for performance method duct sealing requirements EnergyPro44 byEnergySoft User Number 4945 Job Number Page 5 of 22 ^IR SYSTEM REQUIREMENTS PROJECT NAME Ventana Real (SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Lot 2 - Suite 1 00 & 120 Parti of 2 MECH-2-C DATE 3/17/2009 AIR SYSTEMS, Central or Single Zone T-24 Section 1C 1B 1 1 1A 1 Reference on Plans or Specification 1 Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(1) 112(a) 112(b) 112(c), 115(a) 121(b) 121(b) 121(c) 121(0 121(c). 122(e) 122(e) 122(0 122(g) 123 124 5 00 COP 159EER Yes n/a Yes 75cfm No No Programmable Switch No Setback Required Auto n/a R-42 5 00 COP 159EER Yes n/a Yes 251 cfm No No Programmable Switch No Setback Required Auto n/a R-42 5 00 COP 15 3 EER Yes n/a Yes 90 cfm No No Programmable Switch No Setback Required Auto n/a R-42 PRESCRIPTIVE MEASURES Calculated Heating Capacity x 143 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1 212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1 For each central and single zone air systems (or | required features are documented If a requirement is not applicable put "N/A" in the column 2 Not required for hydronlc heating and cooling Either enter a value here or put In reference ot plans and speclficatons per footnote 1 3 Enter Yes if System is Constant Volume, Single Zone Serves < 5 000 sqft. Has > 25% duct in unconditioned space Duct sealing is required for Prescriptive Compliance see PERF-1 for performance method duct sealing requirements 144 (a & b) 144 (a & b) 144 (a &b) 144 (a & b) 144 (c) 144 (c) 144 (c) 144 (d) 144 (e) 144 (f) 144(f) 144 (k) 28,823 btuh 61,297btuh 55,080 btuh 54,838 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No 13,956 btuh 62,645 btuh 57,781 btuh 56,595 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No 20.141 btuh 52,482 btuh 44.490 btuh 43,016 btuh Constant Volume Yes No No Economizer Constant Temp Constant Temp No EnergyPro44 byEnergySoft User Number 4945 Job Number Page 6 of 22 [WATER SIDE SYSTEM REQUIREMENTS'Part 2 of 2 MECH-2-C PROJECT NAME Ventana Real Lot 2 - Suite 100 &120 DATE 3/17/2009 ISYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems 2 WATER SIDE SYSTEMS' Chillers, Towers, Boilers, Hydronlc Loops T-24 Section 123 Reference on Plans or Specification1MANDATORY MEASURES Equipment Efficiency Pipe Insulation PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1 For each chiller, cooling lower, boiler, and hydronte loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented If a requirement Is not applicable, put TJ/A' in the column 2 Water side systems include wet side system using other liquids such as glycol or brine 144 (a & b) 144 (a & b) 144 (h) 144 (h) 1440) 144 (j) 144Q) 144(1) 144 0) 1440) Service Hot Water, Pool Heating DHW Heater 1 Reference on Plans or Specification1 ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Water Heater Certification Water Heater Efficiency Service Water Heating Installation Pool and Spa Efficiency and Control Pool and Spa Installation Pool Heater - No Pilot Light Spa Heater - No Pilot Light 1 For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented If a requirement Is not applicable, put "N/A" Ins the column 113 (a) 113 (b) 113(c) 114 (a) 114(b) 115(c) 115 (d) Standard Gas 50 gal or Less 78% n/a n/a n/a n/a EnergyPro44 byEnergySoft User Number 4945 Job Number Page 7 of 22 MECHANICAL VENTILATION MECH-3-Cl PROJECT NAME Ventana Real Lot 2 - Suite 100 &120 DATE 3/17/2009 MECHANICAL VENTILATION (Section 121(b)2) A ZONE/SYSTEM 1F 1F 1E 1E 1D 10 1C 1C 1B 1B 1A 1A C E H 1 J K L M N AR B ConditionArea(SF)98C 555 660 750 1,760 700 EABAS C CFMperSquare Foot015 015 015 015 015 050 S D Min CFMby Area(BxC)147 83 99 113 264 350 occu E Number ofPeoplePANCY F S-a O|ls BASIS G MIn CFMby Occupant(ExF)Total Total Total Total Total Total H REQD V.AMax of(DorG)147 147 83 83 99 99 113 113 264 264 350 350 I *H 184 184 139 139 60 60 75 75 251 251 90 90 PRESCRIPTIVE REHEAT LIMITATION (Section 144(d)) VAVMI J 30% of DesignZone SupplyCFMK 8- I* NIMUM L Max ofColumns H, J,K or 300 CFMM Design MIn AirSetpolntN Transfer Air39 38 13 260 MMmmn ventMton rah per Section 121 Table 121-A Based on fend teat or the grwMr of the exp«cted number of occupants mi 50% of the CBC occupant load tor agran DUTDOWS far spaces without fixed seating Required Ventilation Air (REQD V A) Is the lerger of the ventilation ratot calculated on and AREA or OCCUPANCY BASIS (column D or G) Mint be greater than or equal to H or im Transfer Air (colurmN) to make up the difference Design fan supply dm (Fan CFM) x 30% or Condition area (ft. sq)x 04 cfm/flsq or Maximum of Column* H J K or 300dm This must be less tan or equal to Column L and greater that or actual to the turn of Columns H + N (•quired VenMatkm Air (column I) Is greater than the Design Minimum Air (column M) Where required transfer air must be greater than or equal initiation Air (column I) and the Design Minimum Air (column M), column H M EnergyPno 4 4 by EnergySoft User Number 4945 Job Number Page 8 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME DATE 3/17/2009 FLOOR AREA980 IFAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1.000 C D EFFICIENCY MOTOR 85.5% DRIVE 97.0% E NUMBER OF FANS 10 F PEAK WATTS BxEx746/(CXD) 899 Total Adjustment* FILTER PRESSURE ADJUSTMENT EQUATION144-A A) If filter pressure drop is greater than 1 inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLineS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watte. Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)SPf 6) Fan Adjustment - 1-(SPa - 1)/SPf 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 1,600 0.562 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1 25 W/cfm for VAV systems ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation 3 T-24 Section 144 (g) 144 (h) 144(1) Capacity Exception Notes 1 Total Installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for neat pumps If etocfclc heat Is used, explain which e>ceptlon(s) to SedkxXg) apply 2 Are centrifugal fan cooling towers used on this project? (Enter "Yes* or 'No') If centrifugal fan cooling tower are used explain which wceplk»(s) to Section 144(h) apply 3 Total Instated capacity (tons) of an water and air cooled chillers under this permit If there are more than 100 tons of air-coded differ capacity being installed explain which exception)*) to Section 144(1) apply EnergyPro44 byEnergySoft User Number 4945 Job Number Page 9 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1E DATE 3/17/2009 FLOOR AREA 555 IFAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1000 C D EFFICIENCY MOTOR 85.5% DRIVE 97.0% E NUMBER OF FANS 1.0 F PEAK WATTS BxEx746/(CXD) 899 Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION144-A A) If filter pressure drop is greater than 1 inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLineS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watts, Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)SPf 6) Fan Adjustment - 1-(SPa - 1)/SPf 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 2,000 0450 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/cfm tor Constant Volume systems or 1.25 W/cfrn for VAV systems ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation 3 T-24 Section 144 (g) 144 (h) 144(1) Capacity Exception Notes 1 Total Installed opacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps If electric heat Is used explain which exception!*) to SadorXa) »PPly 2 Am centrifugal fan cooling towers used on this project? (Enter-Yes-or-No'llfcentitfuaal fan cooling tower ere used explain which exceptions) to Section 144{h) apply 3 Total totaled capacity (tons) of all water and air cooled chillers under this permit. If there are more than 1(M tons of alr-cooMchMar capacity being Installed explain which exceptions) to Section 144(1) apply EnergyPro44 byEnergySoft User Number 4945 Job Number Page 10 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1D DATE 3/17/2009 FLOOR AREA Q FAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1 000 C D EFFICIENCY MOTOR 85.5% DRIVE 97 0% E NUMBER OF FANS 10 F PEAK WATTS BxEx746/(CXD) 899 Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION144-A A) If filter pressure drop is greater than 1 inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLineS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watte, Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)SPf 6) Fan Adjustment - 1-<SPa 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 2,000 0450 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/cfm for Constant Volume systems or 1 29 W/cfm for VAV systems ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation T-24 Section 144 (g) 144 (h) 144(1) Capacity Exception Notes 1 Total totaled capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps If electric heel Is used explain which exceptton(s) to Sectonfj) «PPly 2 Are centrifugal f*n cooing towers used on this project? (Enter-Yes' or f*r) IfcenMfugal fen cooling tower are used explain which exception^) to Section m(h) apply 3 Total Installed capacity (tons) of all water and air cooled chillers under this permit If there are more than 100 tons of air-cooled chiller capacity being Installed explain which excepKcnfs) to Section 144<l) apply EnergyPro44 by Energy-Soft User Number 4945 Job Number Page 11 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1C DATE 3/17/2009 FLOOR AREA 750 IFAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1 000 C D EFFICIENCY MOTOR 85.5% DRIVE 97 0% E NUMBER OF FANS 1.0 F PEAK WATTS BxEx746/(CXD) 899 Total Adju«tm«nt» FILTER PRESSURE ADJUSTMENT EQUATION 144-A A) If filter pressure drop is greater than 1 inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLmeS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watte, Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)SPf 6) Fan Adjustment» 1-(SPa -1 VSPf 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 2,000 0.450 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/cfrn for Constant Volume systems or 1 25 W/cfm for VAV systems ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation 3 T-24 Section 144 (g) 144 (h) 144(1) Capacity Exception Notes 1 Total Instated capacity (MBtu/hr) of all electric heat on this project exclusive of etodricauxllary heat for heat pumps If electric heat Is used explain which excaptkxXi) to Sedlon(9) apply 2 Are centrifugal fan cooling towers used on this project? (Enter "Yes" or "No") rf centrifugal fen cooling tower are used explain which excep«on(s) to SecDon144(h) apply 3 Total Installed capacity (tons) of aH water and air cooled chillers under Oils permit. If there are more than 100 tons of air-cooled chiller capacity being Installed explain which exceptions) to Section 144(1) apply EnergyPro44 byEnergySoft User Number 4945 Job Number Page 12 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1B DATE 3/17/2009 FLOOR AREA1,760 FAN POWER CONSUMPTION I A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1.000 C 0 EFFICIENCY MOTOR 85 5% DRIVE 97 0% E NUMBER OF FANS 1.0 F PEAK WATTS BxEx746/(CXD) 899 Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION 144-A A) If filter pressure drop is greater than 1 inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLmeS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watte, Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)SPf 6) Fan Adjustment - 1-(8Pa -1 VSPf 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 2,000 0450 ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation T-24 Section 144 (g) 144 (h) 144(1) Capacity Exception Notes 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps If electric heat Is used explain which exceptional to Sectton(g) apply 2 Are centrifugal fan cooling towers used on this project? (Enlw*f«- or "No") K centrifugal fan cooling tower are used explain which exceptions) to Section 144(h) apply 3 Total installed capacity (tons) of all water and air cooled chillers under this permit If there are more than 100 tons of air-cooled chiller capacity being Installed explain which exception^) to Section 144(1) apply Err8fgyPro44 byEnergySoft User Number 4945 Job Number Page 13 of 22 MECHANICAL SIZING AND FAN POWER MECH-4-C PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1A DATE 3/17/2009 FLOOR AREA (FAN POWER CONSUMPTION A FAN DESCRIPTION Supply Fan B DESIGN BRAKE HP 1.000 C D EFFICIENCY MOTOR 85 5% DRIVE 97 0% E NUMBER OF FANS 1.0 F PEAK WATTS BxEx746/(CXD) 899 Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION144-A A) If filter pressure drop is greater than 1 Inch W C enter filter pressure drop SPa on line 4 and Total Fan pressure SPfonLineS B) Calculate Fan Adjustment and enter on Line 6 C) Calculate Adjusted Fan Power Index and enter on Line 7 1) TOTAL FAN SYSTEM POWER (Watte. Sum Column F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/Row 2) 4) SPa 5)8Pf 6) Fan Adjustment - 1-(8Pa - 1)/8Pf 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 899 1,600 0.562 ITEM or SYSTEM TAG(S) PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation 3 T-24 Section 144 (g) 144 (h) 144 (i) Capacity Exception Notes 1 Total l«opacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary haat for heat pumps If electric heat Is used ex which «<s) to SecflorKg) apply 2 Are centrifugal fan cooling towers used on this project? (Enter "Yes1 or -No') If centrifugal fan cooling tower are used explain which exceptions) to Section 144<h) apply 3 Total Installed capacity (tons) of an water and air cooled chillers under this permit If then are more than 100 tons of air-cooled chiller capacity being Installed explain which excepfcnfs) to Section 144(1) apply EnergyPro44 byEnergySoft User Number 4945 Job Number Page 14 of 22 MECHANICAL MANDATORY MEASURES Parti of2 MECH-MMI PROJECT NAME Ventana Real Lot 2 -Suite 1 00 & 120 DATE 3/17/2009 DESCRIPTION Equipment and Systems Efficiencies [X"| g 1 1 Any appliance for which there to a California standard established In the Appliance Efficiency Regulations will comply with the applicable standard [X~l §11 5<a) Fan type central furnaces shall not have a pilot light [X~| §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be Insulated in accordance with Standards Section 123 [X] §124 Air handling duct systems shall be Installed and Insulated In compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards Controls §!22(e) Each space conditioning system shall be installed with one of the following [X~| §122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be Installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours If power Is Interrupted, or [ | §| 22(e)1 B An occupancy sensor to control the operating period of the system, or | [ §l22(e)1C A 4-hour timer that can be manually operated to control the operating period of the system [X] §!22(e)2 Each space conditioning system shall be Installed wtth controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpolnt | | §!22(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with Isolation zones Each zone shall not exceed 25,000 square feet, shall be provided wtth isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other Isolation areas, and shall be controlled by a time control device as described above Ivl &!99faJLhl FjiAli *n«r* ennHltlAnlnn ftv*tom chiill ha eontralted hv mn InHliHHiuil ffiMmnatat that responds to temperature within the zone Where used to control heating, the control shall be adjustable down to 55 degrees F or lower For cooling, the control shall be adjustable up to 85 degrees F or higher Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling Is shut off or reduced to a minimum |X~| §1 22(c) Thermostats shall have numeric setpolnts in degrees Fahrenheit (F) and adjustable setpolnt stops accessible only to authorized personnel Q & 12(b) Heat pumps shall be Installed wtth controls to prevent electric resistance pump alone Designer Enforcement EnergyPro 4 4 by EnergySoft User Number 4945 Job Number Page 15 of 22 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME Ventana Real Lot 2 - Suite 1 00 & 120 DATE 3/17/2009 Description Ventilation [X~| §!21(e) Control* shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans [X~| §!22(f) Gravity or automatic dampers Interlocked and closed on fan shutdown shall be provided on the outside air Intakes and discharges of all space conditioning and exhaust systems [X~[ §)22(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings | | §!21(f)1 Air Balancing The system shall be balanced In accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989), or [X~| §121(f)2 Outside Air Certification The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (Z) tne installing licenced c-zo mechanical contractor, or (3) | [ §i21(f)3 Outside Air Measurement The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display dlvlce, or | | §t21(f)4 Another method approved by the Commission Service Water Heating Systems | | §H3(b)2 If a circulating hot water system Is Installed, It shall have a control capable of automatically turning off the circulating pump(s) when hot water Is not required | | §| 1 3(c) Lavatories In restrooms of public facilities shall be equipped wtth controls to limit the outlet temperature to 110 degrees F Designer Enforcement EnergyPro 4 4 by EnergySoft User Number 4945 Job Number Page 16 of 22 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 DATE 3/17/2009 SYSTEM NAME 1F FLOOR AREA 980 NGINEER1NG CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 60,000 60,000 612 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 47,000 47,000 39 480 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,321 184 Sensible 32,160 1,608 1,598 1,608 36.975 Latent 2,450 COIL HTG. PEAK CFM 3,352 184 2502 5.802 Sensible 7,133 7,133 Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) 1,600 1,600 163 4085 115 019 Note values above given at ARI conditions HVAC EQUIPMENT SELECTION 1 Carrier 50PSH-048 Total Adjusted System Output(Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 43,774 43,774 Jan 11 prn 53,232 53,232 Jan 12 am HEATING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Heating Peak) 340°F -»—*Outside Air 184 cfm 967°F >' 700°F < *• Supply Air Ducts^ Heating Coil Supply Fan 1600 cfm Return Air Ducts S 967°F iocw 700°F _| POOLING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Cooling Peak) 830/678°F > Jt Outside Air 184 cfm 749/594 F 759/603°F • 505/491°F 505/491°F, Supply Air Ducts S Cooling Coil Supply Fan 1600 cfm 409% RH Return Air Ducts EnetgyPro44 byEnergySoft User Number 4945 Job Number Pay 17 of 22 • JHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 SYSTEM NAME 1E ENGINEERING CHECKS Number of Systems 1 Heating System Output per System 70,400 Total Output (Btuh) 70,400 Output (Btuh/sqft) 1 26 8 Cooling System Output per System 61 ,000 Total Output (Btuh) 61 ,000 Total Output (Tons) 5 1 Total Output (Btuh/sqft) 1099 Total Output (sqft/Ton) 1 09 2 Air System CFM per System 2,000 Airflow (cfm)2,000 Airflow (cfm/sqft) 3 60 Airflow (cfm/Ton) 393 4 Outside Air (%) 6 9 Outside Air (cfm/sqft) 025 Note* values above given at ARI conditions DATE FLOO 3/17/2009 RAREA 555 SYSTEM LOAD Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK Cl CFM 1,664 139 Sensible 41,884 0 2,094 0 558 0 2,094 46,630 Latent C 1,850 1,862 3,712 OIL HTG. PEAK FM Sensible 365 10,126 506 0 139 5,351 0 506 16,489 HVAC EQUIPMENT SELECTION 1 Carrier 50PSH-060 Total Adjusted System (Adjusted for Peak Design Cor TIME OF SYSTEM Output idlHons) . PEAK 55,087 55,087 0 0 Nov 2pm 61,782 61,782 Jan 12 am HEATING SYSTEM PSYCHROMETRICS fAirstream Temperatures at Time of Heating Peak) 340°F > X | Outside Air 139 cfm j t 698°F ^ ^ 673°F •• 959°F * \ 1 •Heating Coil V f 1 •*^m 95 £ • .OF ^t + '"- Supply Fan 2000 cfm 1 Return Air Ducts 'J<)^ Supply Air Di*S^ 957°F ROOMS 700°F 1 COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 787/645°F *— *-]Outside Air 139 cfm , t 75 0 / 58 8 °F X EnergyPro 4 4 752/59 1°F • 497/482°F ^ )M -— Cooling Coil t -* by EnergySoft User Number 4945 497/< V Supply Fan 2000 cfm ft Return Air Ducts 1«9°F ^ }^ Supply Air Ducts ^ — ( 38 8% R H Job Number 507/487°F ROOMS 74 0 / 58 5 °F 1 Page 18 of 22 IHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 DATE 3/17/2009 SYSTEM NAME 1D FLOOR AREA 660 ENGINEERING CHECKS SYSTEM LOAD Cooling System Number of Systems Heating System Output psr System Total Output (Btuh) Output (Btuh/sqft) 70,400 70,400 1067 Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 61,000 61,000 51 924 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM 1,643 60 1298 Sensible 41,181 2,059 456 2,059 45,755 Latent 800 CFM 579 1,233 60 2.033 Sensible 16,554 828 2,304 828 20.514 Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) 2,000 HVAC EQUIPMENT SELECTION 2,000 303 3934 30 009 Note valuss above given at ARI conditions 1 Carrier 50PSH-060 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 54,699 54,699 Jul 5pm 61,179 61,179 Jan 12am HEATING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Heating Peak) 340°F -»—*Outside Air 60 cfm 696°F 685°F 969°F 969°F Supply Air Ducts^ Heating Coil Supply Fan 2000 cfm Return Air Ducts^ 965°F IQOIV 700°F I COOLING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time off Cooling Peak) 820/675°F > ;•Outside Air 60 cfm 752/588°F • 498/483°F 498/483°^ 75 0 / 58 7 F < y- ;'/ k Supply Air Ducts S Cooling Coil Supply Fan 2000 cfm 38 3% R H Return Air Ducts 740/583 F I EnergyPro44 byEnetgySoft User Number 494S Job Number Page 19 of 22 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 DATE 3/17/2009 SYSTEM NAME 1C FLOOR AREA 750 ENGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 70,400 70,400 939 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 61,000 61,000 51 813 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,629 75 Sensible 40,864 2,043 570 2,043 45.521 1475 Latent 1,000 COIL HTG. PEAK CFM 553 1,535 75 2.535 Sensible 15,704 785 2,882 785 20.156 Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cffti/Ton) Outside Air (%) Outside Air (cfm/sqft) 2,000 HVAC EQUIPMENT SELECTION 2,000 267 3934 38 010 Note values above given at ARI conditions 1 Carrier 50PSH-060 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 54,838 54,838 Jul 5pm 61.297 61,297 Jan 12 am HEATING SYSTEM PSYCHROMETRICS fAll-stream Temperatures at Time of Heating Peak) 340°F -*—.*Outside Air 75 cfm 967°F 696 °F J' i \ Supply Air Ducts S Heating Coil Supply Fan 2000 cfm Return Air Ducts 964°F IOOM 700°F I POOLING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Coollno Peak) 820/675°F Outside Air 75 Cfm jf 74 9/58 7 "F 752/589°F • 498/483°F 49 8/48 3 °F. Supply Air Ducts ^ Cooling Coil Supply Fan 2000 cfm 384% RH 1 Return Air Ducts EnergyPro44 byEnergySoft User Number 4945 Job Number Page 20 of 22 IHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 DATE 3/17/2009 SYSTEM NAME 1B FLOOR AREA 1.760 NGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 70,400 70.400 400 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 61.000 61,000 51 347 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,648 251 Sensible 41,430 2,072 2,180 2,072 47.753 Latent 3,352 COIL HTG. PEAK CFM 4,809 251 3462 8.162 Sensible 9,760 9.760 Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) 2,000 HVAC EQUIPMENT SELECTION 2,000 1 14 3934 126 014 Note values above given at ARI conditions 1 Carrier 50PSH-060 Total Adjusted System Output(Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 56,595 56,595 Jan 11 pm 62,645 62,645 Jan 12 am HEATING SYSTEM PSYCHROMETRICS (All-stream Temperatures at Time of Heating Peak) 340°F -*~~*Outside Air 251 cfm 700°F 655°F 945°F 945°F Supply Air Ducts ^ Heating Coil Supply Fan 2000 cfm Return Air Ducts 945°F 700°F I POOLING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Cooling Peak) 830/678°F 760/601°F« 497/484°F — * — •*— Outside Air 251 cfm j > r50/592°F <• af ^Cooling Coil t 497/484°F, Supply Air Ducts ^ Supply Fan 2000 cfm 399% RH ^ Return Air Ducts 74 0 / 58 8 F I EnergyPro 4 4 byEnergySoft User Number 4945 Job Number Page 21 of 22 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Ventana Real Lot 2 - Suite 100 & 120 DATE 3/17/2009 SYSTEM NAME 1A FLOOR AREA 700 NGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per Sy«tem Total Output (Btuh) Output (Btuh/sqft) 60,000 60,000 857 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 47,000 47,000 39 671 1787 Air System CFM per System Airflow (cfm) Airflow (cfm/sqft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sqft) 1,600 1,600 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,344 90 Sensible 32,804 1,640 685 1,640 36.768 Latent 1.871 COIL HTG. PEAK CFM 321 1,695 90 3.566 Sensible 9,651 483 3,469 483 14.085 229 4085 56 013 Note values above given at ARI conditions HVAC EQUIPMENT SELECTION 1 Canter 50PSH-048 Total Adjusted System Output (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK 43.016 43.016 Jul 5pm 52.482 52,482 Jan 12am HEATING SYSTEM PSYCHROMETRICS (All-stream Temperatures at Time of Heating Peak) 340°F 677°F 981°F 981°F Outside Air 90 cfm ;' 697 °F < ff- Heating Coil Supply Fan 1600 cfm 700"F Return Air Ducts POOLING SYSTEM PSYCHROMETRICS (Alrstream Temperatures at Time of Cooling Peak) 820/675°F > *Outside Air 90 cfm 75 0/59 3 F 753/596°F 504/490°F 504/490°F. Supply Air Ducts * Cooling Coil Supply Fan 1600 cfm 40 3% R H Return Air Ducts EnergyPro44 byEnergySoft User Number 4945 Job Number Page 22 of 22 s jl1s ^^o-o ~fc$""-SIf^* -tl <**fc^ ^^5Jar ^-^C£1Jft>?rN OiiOJifl?r|!•!3.- II010^r•^r\^D^>^-(fcfi* -4.S. 2\i3$s s£ ^«bn> ^ X^0 en <c mpo>menvito&80)" C ^ 05-29-2009 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Revision Permit No PCR09062 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation Reference # PC# Project Title Applicant CHRIS SASS 619-456-4500 2173SALKAVCBAD PCR Status ISSUED 2120210200 Lot* 0 Applied 05/18/2009 $0 00 Construction Type NEW Entered By JMA Plan Approved 05/29/2009 PC090006 Issued 05/29/2009 VENTANAREAL NEW ELECTRICAL Inspect Area CONTRACTOR/ NO CHANGE TO SCOPE OF WORK//STES 100 Owner RIO SD PLAZA II MASTER LLC C/0 NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBAD CA 92008 Plan Check Revision Fee Additional Fees $120 00 $000 Total Fees $120 00 Total Payments To Date $12000 Balance Due $000 Inspector FINAL APPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the 'Imposition* of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired City of Carlsbad Building Department Plan Check Revision Project Address ZH6 Sa(k /We., Original Plan Check No Date_5l-l&/£ Name of Business at Project Address Contact _ Ph Fax Email .City..Zip.Contact Address. General Scope of Work. Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised D Plans D Calculations Q Soils Q Energy JT^nthpr £\\a(\of. <pF 2 Describe revisions in detail CJnanqt. of e\ecteivL\ Cwfo&ctoe~o ' PCR09062 2173 SALKAV VENTANA REAL NEW ELECTRICAL CONTRACTOR/ NO CHANGE TO SCOPE f~>F WORK//STES 100&120 KC/K Lot# CHRIS SASS 3 List page(s) where each revision is shown fc-l,fcio-«,iV> P-2.-&-"! 4 List revised sheets that replace existing sheets 5 Does this revision, in any way, alter the exterior of the project? Q Yes O Does this revision add ANY new floor area(s)? n Yes 7 Does this revision affect any fire related issues? [H Yes O Is this a complete set? Q Yes ^Signature 1635 Faraday Avenue, Carlsbad, CA 92008 Phone 760-602-2717/2718/2719 Fax 760-602-8558 V EsGil Corporation * In (Partners/lip with government for (BmCifing Safety DATE May 28, 20O9 O^PPI IQANT JURISDICTION Carlsbad T3-PDtfTREVlEWER Q FILE PLAN CHECK NO PC09-06 REV (PCRO9-62) SET I PROJECT ADDRESS 2173 Salk Avenue PROJECT NAME Spec Suite(s) #100 & #120 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes I | The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information The plans are being held at Esgil Corporation until corrected plans are submitted for recheck The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person The applicant's copy of the check list has been sent to Esgil Corporation staff did not advise the applicant that the plan check has been completed Esgil Corporation staff did advise the applicant that the plan check has been completed Person contacted Telephone # Date contacted (by ) Fax # Mail Telephone Fax In Person D REMARKS By Bryan Zuppiger Enclosures Original Approved Plans Esgil Corporation D GA D MB D EJ D PC 05/21/2009 trnsmtl dot 9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 4 (858)560-1468 * Fax (858) 560-1576 Carlsbad PC09-06 REV (PCRO9-62) May 2*, 20O9 * [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION Carlsbad PLAN CHECK NO PC09-06 REV (PCR09-62) PREPARED BY Bryan Zuppiger DATE May 28, 2OO9 BUILDING ADDRESS 2173 Salk Avenue BUILDING PORTION ti rev Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code AREA ( Sq Ft ) cb Rlrln Pprmit FPP hv OrrlinanrP ^ Valuation Multiplier By Ordinance Reg Mod VALUE ($) Plan Check Fee by Ordinance Type of Review CD Repetitive Fee Repeats D Complete Review $107.50 D Other j— | Hourlv EsGil Fee 1 $8600 Structural Only Hr @ $86.00 * Based on hourly rate Comments