Loading...
HomeMy WebLinkAbout2175 SALK AVE; 150-190; PC110040; Permit03-07-2012 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Permit No: PC110040 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: Project Title: Applicant: CHIE HONDA PO BOX 99429 SAN DIEGO CA 92109 858-794-3222 2175 SALKAV CBAD PLANCK 2120210800 Lot#: $0.00 Construction Type: TENANT IMPROV : SHELL TO OFFIC TO CREATE SUITES 150,160,180,185,190 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 09/07/2011 JMA 03/07/2012 10/17/2011 Owner: RIO SD PLAZA II MASTER LLC C/O NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBADCA 92008 Plan Check Fee Additional Fees $1,115.00 $0.00 Total Fees: $1,115.00 Total Payments To Date: $1,115.00 BalanceDue: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes the "Imposition* of fees, dedications, resen/ations, or other exactions hereafter collectively refen'ed to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest Imposition of these fees/exactlons. If you protest them, you must follow the protest procedures set forth In Government Code Section 66020(a), and file the protest and any other required infomnation with the City Manager for processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactlons DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or sen/Ice fees in connection with this project NOR DOES IT APPLY to any fees/exactlons of which vou have previously been given a NOTICE similar to this, or as to whli^ the statute of limitations has previouslv othenwise expired. ^ CITY CARLSBAD O F Building Perinit Application 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717/2718/2719 Fax 760-602-8558 www.carisbadca.gov Plan Check No. Est Value Plan Ck. Deposit Date SWPPP JOBADDRESS 2175 Salk Ave. « BEDROOMS 0 150-190 TENANT BUSmtSS NAME 212 - 021 02 00 CONSTR. TYPE VB occ. GROUP B/A CT/PROJECT # * BATHROOMS Spec. Suites DESCRIPnONOFWORK: Indude Squan Fet otMfeetedAnaC) TENANT IMPROVEMENT IN EXISTING SHELL - SCOPE OF WORK: CONSTRUCTION OF NEW TENANT IMPROVEMENTS FOR TYPICAL OFFICE USE INCLUDING OFFICES, BREAKROOM AND MEETING ROOMS PER PLAN. NEW MECHANKAL UNITS TO ACCOMMODATE NEW LAYOUT. NEW CEIUNG AND LIGHTING SYSTEMS TO BE INSTALLED TO ACCOMMODATE NEW LAYOUT AND ENERGY SAVINGS REQUIREMENTS. Suite 150 = 3,248SQFT/ Suite 160 = 1,792 SQFT/ Suite 180 = 1,618 SQFTI Suite 185 = 1,238 SOFT/ Suite 190 = 2,527 SQFT PROPOSED USE Office GARAGE (SF) 0 DECKS (SF) 0 FIREPLACE YEsQ*. NO[23 AIR CONOmONING YEs(7)N0rn FiRE SPRINKLERS YESQNOQ EXISTINQUSE Existing Sitell PATIOS (SF) 0 APPUCANTNAME (Primary Contact) T>eiijiM^ Chie Honda APPUCANT NAME (Secondary Contact; Amy Tobia ADDRESS P.O. Box 99429 ADDRESS crrv San Diego STATE CA ZIP 92109 crrv STATE ZIP PHONE 858-794-3222 FAX 858-490-0364 PHONE FAX EMAIL cltonda@designcorpsd.com EMAIL atobia@de8igncorpsd.com PROPERTY OWNER NAME JEFF BRUSSEAU CONTRACTOR BUS. NAME / ADDRESS 1525 Faraday Ave. Suite 100 ADDRESS crrv Carlsbad STATE CA ZIP 92008 CnrV STATE ZIP PHONE 760-6074282 FAX 760-607-4286 PHONE FAX EMAIL Jbrusseau@newportnational.biz EMAIL ARCH/DESIGNER NAME i AODRESS STATE UC. # CITY BUS. UC.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permit to fiie a siaied statement that he is licensed pursuant to the provisions of the Contractor's Ucense Law (Chapter 9, commending with Section 7000of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant fOr a permit subjects the appiicant to a civil penalty of not more than five hundred doiiars $500}). WORKERS COIVIPENSATION Worken' Compansitlon Daclwitlon: / hereby affinn under penalty 01 perjury one of the fbllowing declarations: LJUMVS and wHIimlntalnicaillficat* of concent lo«*lf.4n«urafv 3700 of the Labor Code, for the peifomianM of the worti fbr whi(^ this pennH is issued. (P^JHitye and wNI maintain workers' compensatian, as required bv Section 3700 of the Labor Code, fbr the peribrmance of the work for which Ms pemiit Is issued. My workere' compensation insurance cairier and policy number are: Insurance Co. •"^"^j^n^ '^p^jA^r^ Policy No. Expiration Dale. insuranoe earner ana poi Bsectkin need not be compleled if the pennK is fbr one hundred dollars ($100) or less. CartHlcata of Exemption: I certily that in the performance of the w»k k)r which this pemiit is issued, I shall n^ Calilbmia WARNING: Falftii* to secure workere' compannUon eovarage It unlawful, and «haR w^act an amployar to criminal penalties and dvll fine* up to on* hundrad thou*and dollare (&100,000), In addition to the cost of compensation, damages >»iMovid*d for^iKSa^t^ 3706 of the Labor code, intemt and attomey't feet. , CONTRACTOR SIGNATURE ( P~^^-^^ ""^i^ QAGENT DATE lo|\g'li/ OWNER-BUILOER DECLARATION //lerely affinn tfiaf/am exempt ton Contactys Lfcense Law for (he r~| I, as ownerof the property or my empkiyees with wages as Iheirsolecompensatlon.win do the woik and the stmcture is noting Lk»nse Law does not apply to an owner of property who buikis or improves thereon, and who does such work himself or th^ sale. If, however, the building or improvement is scM within one year of complelkin, the ovmer-buiUer will have the burden ol proving that he (M not bi^ or improve for Ihe purpose of sale). I I I, as owner of the property, am exclusively contracting with lk»nsed contractois to constract the project (Sec. 7044, Business and Piolessnns Code: The Contractor's License Law does not apply to an owner of pioperty who buiUs or improves thereon, and contracts tor such projects with contractor(s) tensed pursuant to the Conlractor's Ucense Law). (~| I am exempt under Section. .Business and Proiesskms Code tor this reason: 1.1 personally plan to provkle the ma|or labor and materials tor constnictkin of the preposed property Imp^ FTYes I ho 2.1 (have / have not) signed an applcafon tor a buikling pemiH tor the preposed work. 3.1 have contracted with the folkiwing peison (fimi) to prevkie the preposed constnjctton (Include name address / phone / contractors' iksnse numbe^: 4.1 plan to provkle porttons of the wori(, but I have hired the folkiwing peison to cooidinate, supenrise and prevkie the maior woik (inckxJe name / address / phone / contractors' lk»nse number): 5.1 will provkle some of the woik, but I have contracted (hired) the toltowing persons to provkle the woric indkated (inckide name / address / phone / type of wori(): ^PROPERTY OWNER SIGNATURE •AGENT DATE COMPLETE THIS SECTION FOR N O N - R E S 1 D E N T I A L BUILDING PERMITS ONLY Is the appitoant or future buiklkig occupant required to submit a business plan. acutely hazantous materials registratton Ibmi or risk management and preventton program under Secttons 25505,25533 or 25534 of the Presley-Tanner Hazantous Substance Account Art? Cjl^** L^to f—, — Is Ihe appfcant or future buiklkia occupant leauired to obtain a pemiit from the air pollutton control dlsWrt or air qualitv management district? [_|Yes I INo Is the facility to be constmcted within 1,000 feet of the outer boundary of a school site? LDYBS IINO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVKXS AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby afRnn that there is a construction lending agency fbr the perfbmiance of the work this permit is issued (Sec. 3097 (i) Chril Code). Lender's Name Lender's Address APPLICANT CERTIFICATION I certHy that I haw read the applcatkm and State thatttie abow Infomiatton is conect and thatthe Intonnati I heieby authorize representadvs of the City of Carisbad to enter upon the above mentkxied pioperty for Inspectton puiposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE QTY OF CARLSBAD AGAINST ALL LIABIUTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An ()SHA pennit is required kx excavations over 5'a deep and demolllkxi or constractkxi of st^ EXPIRAT10^I: Every permit Issued by Ihe BuMIng Oflkjal un^the proviskxis of this 180 days fiom Ihe date of such pemiit or If the buikllngoniM^a^ ^t^APPLICANT'S SIQNATURE DATE ^. 6. // City of Carlsbad BIdg Inspection Request For: 01/30/2012 Permit* CB112409 Title: ZYNGA-8,863 SF SHELL TO OFFICE Description: Inspector Assignment: PY Type:TI Sub Type: INDUST Job Address: 2175 SALKAV Suite: 290 Lot: 0 Location: APPLICANT DESIGNCORP Owner: VENTANA REAL LLC Remarks: Phone: 8585831191 Inspector: Total Time: Requested By: BRIAN Entered By: CHRISTINE CD Description Act Comments 14 Frame/Steel/Bolting/Welding 24 Rough/Topout 34 Rough Electric 44 Rough/Ducts/Dampers Com ments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# Inspection Historv Date Description Act Insp Connments 01/27/2012 84 Rough Combo CA PD roll to 1-30 01/03/2012 17 Interior Lath/Drywall AP PY 12/27/2011 14 Frame/Steel/Bolting/Welding AP PY 12/27/2011 24 Rough/Topout AP PY 12/27/2011 34 Rough Electric PA PY' NJ? CITY OF CARLSBAD Unscheduled Buiiding Inspection Building Department 1635 Faraday Avenue Carlsbad CA 92008 760-602-2700 DATE: INSPECTOR: s 1 1 PERMIT#: // " ^^^9 CONTACT: ¥/ PHONE #: JOB ADDRESS: 2 ll 6^ DESCRIPTION: CODE DESCRIPTION 3y JZJLAT COMMENTS /| 2J^ 0 6 BIdg Inspection Form Page 1 of 1 Rev. 06/09 EsGil Corporation In Partnersfiip witA government for (BuiCSing Safety DATE: 10/12/11 • APPLICANT • JURIS. JURISDICTION: Carlsbad • PLAN REVIEWER • FILE PLAN CHECK NO.: PCll-40 SET III PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190 PROJECT NAME: Office TI ^ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. [~~] The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant contact person. I I The applicant's copy of the check list has been sent to: ^ Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: IVIail Telephone Fax In Person • REMARKS: By: Chuck Mendenhall Enclosures: EsGil Corporation • GA • EJ • PC 10/6/11 EsGil Corporation In (Partnerstiip •witli government for <BuiCding Safety DATE: 10/3/11 • AEELICANT •JURIS; JURISDICTION: Carlsbad a^HAFTREVIEWER • FILE PLAN CHECK NO.: PCll-40 SET: II PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190 PROJECT NAME: Office TI I 1 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant contact person. The applicant's copy of the check list has been sent to: Design Corp, Att'n: Chie Honda P.O. Box 99429, San Diego, CA 92109 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Chie Honda Telephone #: (858) 794-3222 x304 Date contacted:' o l2>l,t (by: (^c__) Email: chonda@designcorpsd.com Fax #: (858) 490-0364 ^ IVIail Telephone Fax ^ In Person • REMARKS: By: Chuck Mendenhall Enclosures: EsGil Corporation • GA • EJ • PC 9/26/11 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 Carlsbad PCll-40 10/3/11 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in CAPS & bold font are current. • Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. EXITS 1. The common path of egress travel shall not exceed 75 feet Section 1014.3. • In Group B, F and S occupancies, this may be increased to 100' ifthe building has an automatic sprinkler system. The common path of travel within suite 190 exceeds 100ft from the most extreme location in the Break Rm 142 to the primary exit door at Reception 131. THE REVISED PLANS NOW SHOW THE THE COMMON PATH OF TRAVEL FOR PEOPLE IN THE IT ROOM WILL EXCEED THE CODE LIMIT OF 100FT. MISCELLANEOUS 2. The all glass wall conference Rm 132 in suite 190 is referenced to detail 'B' on sheet Tl-1.1 which references detail 14/TI-5.2. Detail 14/TI-5.2 does not show how you intend to resist the code required out-of-plane load of 5 PSF where the glass joins the framed wall. Clarify how you resist the out-of-plane wall loads for this condition. THE RESPONSE DIRECTS ME TO DETAIL 18/TI-5.2. DETAIL 18 ON TI-5.2 INDICATES THAT LATERAL BRACING IS PROVIDED AT 4'-0" OC BUT THE BRACING IS NOT SHOWN IN THE DETAIL. MECHANICAL 5. Detail the primary and secondary mechanical condensate waste design: Pipe sizing, routing, and termination area forthe ceiling mounted HP's.. CMC 309.0 & CPC 807.0. THE PRIMARY CONDENSATE DRAIN IS SHOWN ON SHEET MOI.2 BUT THE SHEET M-1.2 DOES NOT ADDRESS THE SECONDARY CONDENSATE DRAIN AS REQUIRED BY CMC SECTION 309.2 END OF RECHECK To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Carlsbad PCll-40 10/3/11 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Chuck Mendenhall at Esgil Corporation. Thank you. EsGil Corporation In (Partnerstiip witfi government for (BuidCing Safety DATE: 9/16/11 • AEELIQANT • ^URIS^ JURISDICTION: Carlsbad • PLAN REVIEWER • FILE PLAN CHECK NO.: PCll-40 SET: I PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190 PROJECT NAME: Office TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant contact person. XI The applicant's copy of the check list has been sent to: Design Corp, Att'n: Chie Honda P.O. Box 99429, San Diego, CA 92109 I I Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: chie Honda Telephone #: (858) 794-3222 x3oH Date contacted:'^f,'^! ,v {by. ) Email: chonda@designcorpsd.com Fax #: (858) 490-0364 !^ Mail^ Telephoned Fax In Person • REMARKS: By: Chuck Mendenhall Enclosures: EsGil Corporation • GA • EJ • PC 9/9/11 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 Carlsbad PCll-40 9/16/11 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: PCll-40 JURISDICTION: Carlsbad OCCUPANCY: B USE: Offices TYPE OF CONSTRUCTION: V B ACTUALAREA: 10,423 ALLOWABLE FLOOR AREA: no change STORIES: 3 HEIGHT: no change SPRINKLERS?: Yes OCCUPANT LOAD: Suite 150= 58 max REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE PLANS RECEIVED BY ESGIL CORPORATION: 9/9/11 DATE INITIAL PLAN REVIEW COMPLETED: 9/16/11 PLAN REVIEWER: Chuck Mendenhall FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. Carlsbad PCll-40 9/16/11 • Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . EXITS 1. The common path of egress travel shall not exceed 75 feet Section 1014.3. a) In Group B, F and S occupancies, this may be increased to 100' if the building has an automatic sprinkler system. The common path of travel within suite 190 exceeds 100ft from the most extreme location in the Break Rm 142 to the primary exit door at Reception 131 • MISCELLANEOUS 2. The all glass wall conference Rm 132 in suite 190 is referenced to detail 'B' on sheet TI-1.1 which references detail 14/TI-5.2. Detail 14/TI-5.2 does not show how you intend to resist the code required out-of-plane load of 5 PSF where the glass joins the framed wall. Clarify how you resist the out-of-plane wall loads for this condition. • ENERGY CONSERVATION 3. Imprint on the plans the signed MECH-1 C forms. 4. The OSA listed on sheet M-0.1 must be consistent with the energy design limits listed on the MECH-2C for each of the proposed units. • MECHANICAL 5. Detail the primary and secondary mechanical condensate waste design: Pipe sizing, routing, and termination area for the ceiling mounted HP's. . CMC 309.0 & CPC 807.0. END OF REVIEW To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Chuck Mendenhall at Esgil Corporation. Thank you. Carlsbad PCll-40 9/16/11 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: PCll-40 PREPARED BY: Chuck Mendenhall DATE: 9/16/11 BUILDING ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 SB 190 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) spec offices Tl 10423 37.12 386,902 Air Conditioning Fire Sprinklers TOTAL VALUE 386,902 Jurisdiction Code cb By Ordinance Bidg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: • Repetitive Fee Repeats Q Complete Review • Other j-| Hourly EsGil Fee • Structural Only Hr. @ * $1,690.61 $1,098.90 $946.74 Comments: Sheet 1 of 1 macvalue.doc + CITY OF CARLSBAD BUILDING PLANCHECK CHECKLIST E-36 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for PC 11-40 Review # 1 Date: Septembers,2011 Project Address: 2175 Salk Avenue - Suite 150,160,180,185 & 190 APN: 212-021-02-00 Project Description: Tenant improvement - convert 10,423 sf of existing Valuation: shell space to office (Ste 150:3,248 / Ste160:1,792 / Ste 180:1,618 / Ste 185:1,238 / Ste 190:2,527) ENGINEERING Contact: Linda OntiverOS Phone: 760-602-2773 Email: linda.ontlveros@carlsbadca.gov Fax: 760-602-1052 STOP! Please Read Any outstanding issues will be marked with I X I. Please make the necessary corrections to the plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specification to the Building division for resubmittal to the Engineering Division. Items that conform to permit requirements are marked with / ATTACHMENTS: Engineering Application stomn Water Fonn Right-of-Way Application/Info. Sheet Reference Documents OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY REMARKS DATE: September 23,2011 Notification of Engineering APPROVAL has been sent to via • on E-36 Page 1 of 6 REV 4/30/11 PC11-40 Review # 1 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: I / J North arrow [ZJ Existing & proposed structures CZU Existing street improvements Property lines (show ali dimensions) m Easements dZ] Right-of-way width & adjacent streets / I Driveway widths 3 Existing or proposed sewer lateral I Existing or proposed water service I Submit on signed approved plans: DWG No. Show on site plan: • I Drainage patterns Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. ri_. J ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building". I Existing & proposed slopes and topography ]Size, location, alignment of existing or proposed sewer and water service(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. J Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: / I Site address """1 Assessor's parcel number ~~| Legal description/lot number I For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. I Show all existinq use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. Lot/Map No.: Subdivision/Tract: Reference No(s): E-36 Page 2 of 6 REV 4/30/10 PC11-40 Review # 1 2. DISCRETIONARY APPROVAL COMPLIANCE / I Project does not comply with the following engineering conditions of approval for project no. NA 3. DEDICATION REQUIREMENTS Dedication for all street rights-of-way adjacent to the building site and any stomri drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 20.000.00 , pursuant to Carlsbad Municipal Code Section 18.40.030. For single family residence, easement dedication will be completed by the City of Carlsbad, cost $605.00. Dedication required as follows: 4. IMPROVEMENT REQUIREMENTS 1 All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $100,000.00. pursuant to Carlsbad Municipal Code Section 18.40.040. / I Public improvements required as follows: NA Construction of the public improvements must be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee nf $ 441 nn so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the city prior to issuance of a building permit. /I Future public improvements required as follows: NA E-36 Page 3 of 6 REV 6/30/10 BC11-40 Reviews 1 5. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. TENANT IMPROVEMENT Jinadequate infonnation available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" I I Grading Permit required. NOTE: The grading permit must be issued and rough qradina approval obtained prior to issuance of a building permit. I Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) Ail required documentation must be provided to your Engineering Construction Inspector per the attached list. The inspector will then provide the engineering counter with a release forthe building permit. j/J No grading permit required. [_] Minor Grading Permit required. See attached marked-up submittal checklist for project- specific requirements. 6. MISCELLANEOUS PERMITS ~71 RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. I Right-of-way permit required for: E-36 Page 4 of 6 REV 6/30/10 PC 11-40 Review #1 7. STORM WATER Construction Compliance I [ / I Project Threat Assessment Form complete. I Enclosed Project Threat Assessment Form incomplete. Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW ) I I Requires Tier 2 Stonn Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance Storm Water Standards Questionnaire complete. Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. Project is subject to Standard Stomn Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http://www.carlsbadca.aov/business/buildinq/Documents/EnaStandsw-stds-vol4-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: I I Rainwater harvesting (rain barrels or cistern) I I Vegetated Roof n Bio-retentions cell/rain garden [ZU Pervious pavement/pavers EZI Flow-through planter/vegetated or rock drip line IZZ] Vegetated swales or rock infiltration swales I I Downspouts disconnect and discharge over landscape I I Other: E-36 Page 5 of 6 REV 4/30/10 PC11-40 Review* 1 9. WATER METER REVIEW . Domestic (potable) Use Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. NOTE: the connection fee, SDCWA system capacity charge and the water treatment capacity charge will be based on the size of the meter necessary to meet the water use requirements. For residential units the minimum size meter shall be 5/8", except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be V*. 8. FEES • Required fees have been entered in building pennit. Drainage fee applicable Added square feet Added square footage in last two years? Permit No. Permit No. Project built after 1980 Impervious surface > 50% Impact unconstructed facility Fire sprinklers required | |yes Upgrade • yes No fees required • yes Qno [Zlyes [ZZno I 1 yes ZZ] no yes LJno IZZ] no (is addition over 150' fronri center line) •no 10. Additional Comments E-36 Page 6 of 6 REV 4/30/10 Fee Calculation Worksheet ENGINEERING DIVISION PC 11-40 (CB 11-1934 THRU CB 11-1938) Prepared by: Linda Ontiveros Date: September 23,2011 GEO DATA: LFMZ: / B&T: Address: 2175 Salk Avenue (Suite 150 /160 /180 /185 /190 BIdg. Permit #: SEE ABOVE Fees Update by: Date: Fees Update by: Date: EDU CALCULATIONS: List types and square footages for all uses, Types of Use: Warehouse to Office Types of Use:Ste 150,160,180,185,190 Sq,Ft,/Units 10,423/1800 Types of Use: [EDU CREDIT FROM Types of Use; ======Current charge Sq.Ft./Units Sq.Ft/Units CB 08-1193] Sq.Ft./Units calculations==== ADT CALCULATIONS: List types and square footages for all uses. Sq.Ft,/Units Sq,Ft,/Units 20/1000 (10,423)_ Sq,Ft,/Units CB 08-1193] Sq.Ft./Units calculations==== Types of Use; Warehouse to Office Types of Use Ste 150,160,180,185,190 Types of Use; [ADT CREDIT FROM Types of Use; =====Current charge FEES REQUIRED; Within CFD; DYES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) EDU's EDU's 5.79 EDU's [2.09] EDU's = 3.7 ADT's ADT's 209 ADT's [52] ADT's = 157 ]N0 1. PARK-IN-LIEU FEE;DNW QUADRANT DNE QUADRANT DSE QUADARANT DSW QUADRANT ADT'S/UNITS; 2, TRAFFIC IMPACT FEE; ADT'S/UNITS: 157 3, BRIDGE & THOROUGHFARE FEE; ADT'S/UNITS; 4, FACILITIES MANAGEMENT FEE ADT'S/UNITS; 5, SEWER FEE EDU's 3.7 BENEFIT AREA: E EDU's 3.7 6, DRAINAGE FEES; ACRES; 7, POTABLE WATER FEES; UNITS CODE X FEE/ADT; X FEE/ADT; 93 • DIST.#1 X FEE/ADT: ZONE; X FEE/SQ.FT./UNIT; X FEE/EDU; 1.096 =$ =$ 14,601 • DIST,#2 =$ =$ =$ 4,055.20 • DIST,#3 PLDA; X FEE/EDU; 2.960 •HIGH nMED X FEE/AC; =$ 10,952 UM LOW CONN, FEE METER FEE SDCWA FEE TOTAL -Tenant improvement - convert 10, 423 sf jppof existing sliell space to offic^T^ .05 (Ste 150: 3^248 / 1 ^^{\C]i>^lmsrr /.2M4o/3^if 3^Stel60: 1,792 / loo^^^ H)3<^^J>r .)^Stel80:1,618 / . 9^ FDMfe)324/j -25Ste 185:1,238/^^^ ^^{fc)^^|vj>r S Ste 190: 2,527) \ H-oQ>i^((p\5^^^ S. 7p <!•> ^ CiTY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Construction SWPPP Tier Level Construction Threat Assessment Criteria* Perceived Threat to Storm Water Quality Tiers Tier 3 - Hiah Constmction Threat Assessment Criteria High Tiers • Project site Is 50 acres or more and grading will occur during the rainy season • Project site Is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soli at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion fectors kt greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Stomri Water Notice of Violation within past two years High Tiers Tier 3 - Medium Construction Threat Assessment Criteria Medium Tiers • All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium Tier 2 Tier 2 Hiah Constmction Threat Assessment Criteria High Tier 2 • Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site Is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Constmction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Stonn Water Notice of Violation within past two years • Site results in one half acre or more of soil disturbance High Tier 2 Tier 2 - Medium Constmction Threat Assessment Criteria Medium Tier 2 • All projects not meeting Tier 2 High Constmction Threat Assessment Criteria Medium Tierl Tier 1 - Medium Insoection Threat Assessment Criteria Medium Tierl • Project Is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA • Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion fectors kf greater than or equal to 0.4) • Site slope is 5 to 1 or steeper • Constmction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). • Owner/contractor received a Storm Water Notice of Violation within past two years • Site results in one half acre or more of soil disturijance Medium Tierl Tier 1 - Low Insoection Threat Assessment Criteria Low Tierl • All projects not meeting Tier 1 Medium Constmction Threat Assessment Criteria Low Exempt - Not Applicable - ^ *The city engineer may authorize minor variances from the constmction threat assessment criteria in special circumstances where it can be shown that a lesser or higher amount of stomi water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 ^ STORIVIWATER 4M> STANDARDS oevelopment ferv.ces Engineering Department ^ CITV Of QUESTIONNAIRE ISSSFaradavA,enue CARLSBAD E-34 760-602-2750 www.carlsbadca.gov INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stonnwater Management Plan (SUSk^). Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary pennits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, yow projaet wM etther be subject to 'Standard Stormwater Re(^,rir«m«nl8' or be si^!^ additional criteria called 'Priortty Devalopment Project Requirements'. Many aspects of project ttte design are dependent t^n the storm water standards applied to a project. Applicant responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff detennines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by the applicant, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If applicants are unsure about the meaning of a question or need help in detennining how to respond to one or more of the questions, they are advised to seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, applicants for construction permits must also complete, sign and submit a Project Threat Assessment Fomi to address construction aspects of the project. Please answer the questions below, follow the Instructions and sign the form at the end. 1. Is your project a significant redevelopment? DEFINITION: Significant redevelopment is defined as the creation, addition or replacement of at least 5.000 square feet of impervious surface on an already existing developed site. Significant redevelopment Includes, but is not limited to: the expansion of a building footprint; addition to or replacement of a structure; structural development Inctuding an Increase In gross floor area and/or exterior constmction remodeling; replacement of an Impervious surface that Is not part of a routine maintenance activity; and land disturbing activities related with structural or Impervious surfaces. Replacement of impervious surfaces Includes any activity that is not part of a routine maintenance activity where Impervious material(s) are removed, exposing underiying soil during construction. If your project IS considered significant redevelopment, then please skip Section 1 and proceed with Section 2. If your project IS NOT considered significant redevelopment, then please proceed to Section 1. E-34 Page lof 3 REV 3/23/10 ^ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 1 NEW DEVELOPiMENT PRIORITY PROJECT TYPE Does you project meet one or more of the foilowing criteria: YES NO 1. Housina sulxflWslons of 10 or more dwellina units. Examples: sinale familv homes, multi-familv homes, condominium and apartments y 2. Commercial - areater than 1-acre. Anv develooment other than heaw industrv or residential. Examples: hosoitals: laboratories and other medical facilities; educational Institutions; recreational fecillties; municipal fecllitles; commercial nurseries; multi-apartment buildings; car wash fecillties; minl-malls and other business complexes; shopping malls; hotels; office bulkJInQs; public warehouses; automotive dealerships; airfields; and other light industrial fecillties. / 3. Heavy Industrial / Industrv- areater than 1 acre. Examples: manufacturing plants, food processing plants, metal working fecillties, printing plants, and fleet storage areas (bus, tmck, etc.). 4. Automotive reoalr shoo. A fecllltv cateaorized in anv one of Standard Industrial Classification (S\C) codes 5013. 5014. 5541, 7532-7534, and 7536-7539 / 5. Restaurants. Anv fecllltv that sells prepared foods and drinks for consumotion. inciudina stationarv lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the land area fbr development Is greater than 5,000 square feet. Restaurants where land development Is less than 5,000 square feet shall meet all SUSMP requirements except for stmctural treatment BMP and numeric sizing criteria requirements and hydromodification requirements. A" 6. Hillside develooment. Anv development that creates 5.000 sauare feet of imoenflous suriace and is located in an area with known erosive soil conditions, where the development will grade on any natural slope that Is twenty-five percent (25%) or greater. / 7. Envlropmentallv Sensitive Area (ESA)\ All development located within or directiv adiacent^ to or discharaina directly' to an ESA (where discharges from the development or redevelopment will enter receiving waters within the ESA), which either creates 2,500 square feet of impervious surfece on a proposed project site or increases the area of Imperviousness of a proposed project site to 10% or more of its naturally occurring condition. 8. Parkina lot. Area of 5.000 sauare feet or more, or with 15 or more oarkina spaces, and potentially exposed to urban mnoff A" 9. Streets, roads, hlahvravs. and fireewavs. Anv paved surface that is 5.000 sauare feet or areater used for the transportation of automobiles, tmcks, motorcycles, and other vehicles / 10. Retail Gasoline Outlets. Sennna more than 100 vehicles per dav and areater than 5.000 sauare feet / 11. Coasta/ Oeve/ooment Zone. Anv project located within 200 feet of the Pacific Ocean and creates more than 2500 square feet of impermeable surface or (2) increases impermeable surface on property by more than 10%. / 12. More than 1-acre of disturbance. Proiect results In the disturisance of more than 1-acre or more of land and is considered a Pollutant-generating Development Project*. / 1 Envlronnnentally Sensitive Areas include but are not limited to ali Clean Water Act Section 303(d) impaired water txxlies; areas designated as Areas of Speciai Biological Significance by the State Water Resources Control Board (Water Quaiity Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quaiity Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Oiego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. 2 't>inG<y a^acanr means sttuaM within 200 faet of the EnvironiiMnMy Se^ 3 'DiscftarBing diraely to' means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and not commingled with ftow from adjacent lands. 4 Pollumnt-generating Development Projects are those projects that generate pollutants at levels greater than bacitground levels. In generai, these include ali projects that contribute to an exceedance to an impaired water body or which create new impervious surfaces greater than 5000 square feet and/or introduce new landscaping areas that require routine use of fertilizers and pesticides, in most cases linear pathway projects that are for infrequent vehicle use, such as emergency or maintenance access, or for pedestrian or bicycle use, are not considered Pdiutant-generating Development Projects if they are built with pervious surfaces or if they sheet flow to surrounding pervious surfaces. SectlonI Results: .If you answered YES to ANY of the questions atx>ve your project is subject to Priority Development Project requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements* box In Section 3. A Storm Water Management Plan, prepared In accordance with City Stonn Water Standards, must be submitted at time of application. If you answered NO to ALL of the questions above, then your project is subject to Standard Stormwater Requirements. Please check the "does not meet PDP requirements" box in Sectton 3. E-34 Page 2 of 3 REV 3/23/10 <<#> ^ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Engineering Department 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SECTION 2 SIGNIFICANT REDEVELOPMENT Complete the questions below regarding your redevelopment project: YES NO 1. Project results In the disturbance of more than 1 -acre or more of land and is considered a Pollutant-generating Development Project (see definition In Section 1). A If you answered NO, please proceed to question 2. If you answered YES, then you ARE a significant redevelopment and you ARE subject to PRIORITY DEVELOPMENT PROJECT iVQUiremw^. Please check the "meets PRIORHY DEVELOPIi^NT WO^CT rwwiramwrts'box in SM^ 2. Is the project redeveloping an existing priority project type? (Priority projects are defined In Section 1) / If you answered YES, please proceed to question 3. If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. PtoM* check the'does meet POP requiramw4s'box in Section 3 below. 3. Is the project solely limited to just one of the following: a. Trenching and resurfecing associated with utility wort<? b. Resurfacing and reconfiguring existing surface paridng lots? c. New sklewalk constmction, pedestrian ramps, or bike lane on public and/or private existing roads? d. Replacement of existing damaged pavement? If you answered NO to ALL of the questions, then proceed to question 4. If you answered YES to ANY of the questions then you ARE NOT a significant redevelopment and your project Is subject to Standard Stormwater Requirements. Ptsese check the "does not meet PDP mqiAwnenIs'box in Section 3 betow. 4. Will your redevelopment project create, replace, or add at least 5,000 square feet of impervious surfeces on an existing development or, be located within 200 feet of the Pacific Ocean and (l)create more than 2500 square feet of Impenneable surfece or (2) Increases impermeable surface on the property by more than 10%? A If you answered YES, you ARE a significant redevelopment, and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements. Ptease check ihe "meets PRIORITY DEVELOPMENT PROJECT rsquiretnents' box in Sectkm 3 bekmr. If you answered NO, then you ARE NOT a significant redevelopment and your project Is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements' box in Sectton 3 betow. SECTION 3 Questionnaire Results • My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and must prepare a Storm Water Management Plan for submittal at time of application. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. Applicant Infonnation and Signature Box TMsBoxIbrCityUse Only Address: 5*1*^ A«^^ Assessor's Parcel Number(s): Applicant Name: Applicant TtS|$: Applicant Signature:/ Date: ^ E-34 Page 3 of 3 REV 3/23/10 PLANNING/ENGINEERING APPROVALS PERMIT NUMBER PC 11-40 PATE9/7/11 ADDRESS 2175 Salk Avenue RESIDENTIAL ADDITION- MINOR (<17,000.00) RETAINING WALL POOUSPA COMPLETE OFFICE BUILDING VILLAGE FAIRE SOLAR PANELS OTHER PLANNER dhuU J^^M^^ti/^ DATE ^'"7-1/ ENGINEER DATE H:\ADMIN\C011NTER/PLANN1NG/ENCINEER1NC APPROVAIS Carlsbad Fire Department fUSLDING DEPt 'OFY Plan Review Requirements Category: PLANCK, Date of Report: 10-07-2011 Reviewed by: Name: Address: CHIE HONDA PO BOX 99429 SAN DIEGO CA 92109 Pennit #: PCI 10040 Job Name: TENANT IMPROV : SHELL TO OFFIC Job Address: 2175 SALK AV CBAD yWX/WWWX/X/X/WVX/X/VX/WX/VWX/X/X/X/X/X/X/X/WX/X/X/X/X/V/X/V /VW\/W\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/V Conditions; Cond: CON0004970 [MET] CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. Entry: 10/07/2011 By: GR Action: AP CONDITIONAL RECOMMENDATION FOR APPROVAL Page: 1 of 1 CONDITION; Emergency egress lighting and exit signs In existing rated corridor, servlna Jiew suites to be field verififedi BLDG. DEPT COPY Daryl K. James & Associates, Inc. Checked by: Darvl Kit James 205 Co//na Terrace Date: September 27. 2011 Vista, CA 92084 T. f760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Chie Honda JURISDICTION: Carlsbad Fire Department PROJECT NAME: Spec Stes 150-190 PROJECT ADDRESS: 2175 Salk Ave PROJECT DESCRIPTIOfirPC11-40^ C 6 III ^ 3f This plan review has beeR.5onsluet^ in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. Tl.1.2 Door Schedule V Indicate Hardware Set #s for El, E2, E3 & E4. E-1 Tprovide a note that means of egress illumination shall be not less than 1 foot-candle at the walking surface on RCP. V Provide a lighting plan showing wiring to illuminated exit signs and egress illumination. Denote emergency lighting and exit signs in existing rated corridor serving new suites. To be field verified. M-1.1 V Denote SD locations as denoted on Sheet M-0.1 MEP V Denote locations of fire dampers N/A V Where applicable, denote penetrations of any rated assemblies. Provide a detail and listings for penetration of fire rated assemblies as per CBC 713. Existing conditions PROJEa NUMBER CARLSBAD FIRE DEPARTMENT EXPEDITED PLAN CHECK REQUEST I, '-^(Name of At>Diicanti am rsquestlng 'Expedited Plan Check Services' and understand I will be levied an additional fee assessed at the rate of $90.00 dollars per hour plus $25.00 dollars administration fee. I understand that my plans shall not be released until all fees are paid. I, of A^i!^!!tii the applicant, am solely responsible for all fees due should the project be withdrawn or otherwise not completed. And by signing below I acknowledge that my plans shail be forwarded by the City of Carlsbad to an independent contractor/consultant. I, acknowledge that the expected 'first review' time for ali expedited Fire plan reviews will be fourteen- (14) business days from date of submittal. I. 0M\1ir Hr»ioh _the applicant, acknowledge that revised plans shall be sent directiv to the plan checker, at the address specified on the Correction List, at my cost, parcel post or other means. Andl , acknowledge that a turnaround time for re-submittals is seven- (7) business days from the date plans are received at the address specified by the plan checker on the Correction List. The Carlsbad Fire Department does not perform 'Over-the-counter' plan review services. Plans submitted to the Carisbad Fire Department for review by CFD shaii be checked on a 'first come, first served' basis and couid take 60 days or more to be completed. NO PLEASE CIRCLE YOUR SELEaiON Applicant Signature A^^^/ >A/kA^ Date 9 .6 JI Copy to Building and Fire Prevention file BURKETT & WONG Structural & Civil Engineers & Surveyors 3434 Fourth Avenue e San Diego, CA 92103-4911 Tel: (619) 299-5550 • Fax: (619) 299-9934 DATE- SEPTEMBER 2011 ENGINEER - JD JOB No. 11199A STRUCTURAL CALCULATIONS FOR 2175 SALK AVE. - CARLSBAD TENANT IMPROVEMENT CARLSBAD, CA <5 NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE., SUITE 100 CARLSBAD, CA 92008 DATE. II FKir.B Jt? PROJECI 217^ 5A«-«C AV£ "n: burkett Ijk ftujong ttructurol t clv« toqlneen SH«T. K» NO—lLill±. IT ( 4.S0 * f-m< j o,e>7 h^A^ OJ- Z-S^HY'I-'^ C5oi>P'5(Mi»C?t» wu/yitsr^T-io-c (5o«-<|.TOIt,S J Tvr O.Z 5.^3 vVp ' O.lfe Wp 7_ Contenninous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.139 Longitude = -117.278 Spectral Response Accelerations Ss and SI Ss and SI = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0 ,Fv = 1.0 Data are based on a 0.01 deg grid spacing Period Sa (sec) (g) 0.2 1.146 (Ss, Site Class B) 1.0 0.434 (SI, Site Class B) Contenninous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.139 Longitude = -117.278 Spectral Response Accelerations SMs and SMI SMs = Fa X Ss and SMI = Fv x SI Site Class D - Fa = 1.042 ,Fv = 1.566 Period Sa (sec) (g) 0.2 1.194 (SMs, Site Class D) 1.0 0.680 (SM1, Site Class D) Contenninous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 33.139 Longitude = -117.278 Design Spectral Response Accelerations SDs and SD1 SDs = 2/3 X SMs and SDI = 2/3 x SMI Site Class D - Fa = 1.042 ,Fv = 1.566 Period Sa (sec) (g) 0.2 0.796 (SDs, Site Class D) 1.0 0.453 (SDI, Site Class D) DATE. ENG«. PROiECI burkett &uiong •tructural t dvR tngbWM SHUT. KM NO. p 1 7^ (4-) HAfAl^OSW ^T&*l5'«»«t Or4f-Yj r««- = = • r i3o 4 H&l»-» IC*»' T=T 333 ^ C4pt SO 'tt,or>-' "^t^^e ft'V^S-O-^ •=^Ob* (fcoHTIi«?'<*') I, '/ w, # BURKETT&WONG _ . DATE ^ ENGINEERS ^HEET ±_ FNGR -JP JOS NO. PROJECT 1^ _^iiL - o.S'l C^.^-) ESR-3037 I Afosf Wfctoy Accepted and Tnjsted Page 6 of 13 TABLE 2—STRONG-BOLT 2 TENSION STRENGTH DESIGN DATA' CHAR^TERISTIC SYMBOL UNITS NOMINAL ANCHOR DIAMETER CHAR^TERISTIC SYMBOL UNITS CaitwnStael Stainless Steel CHAR^TERISTIC SYMBOL UNITS %inch Vjinch | %inch '/.inch Anchor Calegofy 1,2 or 3 -1 1 Nominal Emiiedment Deptti hnom in. (mm) 2 (51) 2'/. (73) 2\ (70) 3'/. (98) 3% (86) 5V, (130) 2 (51) 2't, (73) StMl Strength In TmMlonj|A^i318 8«ctlon D.S.1) Seei Strength In Tension A/- Ib (kN) (24.9) 12.100 (53.S) 19,070 (84.8) 5,140 (22.9) strength Rsdudkm Factor - Steeil Feikue^ -0.75 0.75 Concrate BrMkout Strength in Tension (ACI 318 Section D.S.2) EffecHvB Embedment Depth in. (irwn) 1V. (41) 2V, (64) 2\ (57) 3% (86) 2% (70) 4'/, (114) 1»/. (41) 2% (64) Critical Edge Distance Cm in. (mm) (165) 6 (152) eVi (165) 7% (191) 7% (191) 9 (229) 6V2 (165) 8V2 (216) Effectiveness Factor - Uncracked Concrete -24 24 24 24 Effectiveness Factor - Cracked Concrete -17 17 17 17 Modmcatkxi Factor „ • -1.00 1.00 1.00 1.00 strength Reductkm Factor - Concrete Breakout Faiure' -0.65 0.65 PuN-Out Strwigth in Tension (ACI 318 Section D J.3) PulOut Strangtti Cracked Concrete (fc = 2500 psi) lb (kN) 1,300* (6.8)' 2.775' (12.3)' N/A' 3,735' (16.6)' N/A* 6.M6^ (30.7)* 1,720* (7.7)' 3.145' (14.0)' Pull-Oul Strength Uncracked Concrete (fc-2500 psi) lb (kN) N/A* 3.340' (14.9)' 3.616' (16.1)' 5.256° (23.4)' N/A' 9,025' (40.1)' N/A' 4,770' (21.2)" Strength Reduction Factor - PiMout Faiure' -0.65 0.65 Tensile Strwigth for Seismic ApplteaUons (ACI Section D.3.3J) Tension ReaiBtance of Skigle Anchor tbr Saiamic Loads (r.<: 2500 psi) Ib (kN) 1.300* (5.8)' 2,775' (12.3)' 3.735' (16.6f N/A' 6.885* (30.7)' I.TZO* (7.7)' 2,830' (12.6)' Strength Reducflon Factor - PuHoutFaHure' -0.65 0.65 For SI: 1 inch > 25.4 mm, 11bf = 4.45 N. 'The infomiatkMi presented In this table must be used in conjundk>n with the design criteria of ACI 318 Appendix D. ^he tabulated vakje of A> applies Mfhen the h>ad combincMons of Sectkm 1605.2.1 ofthe IBC. or ACI 318 Sectkm 9.2 are usad. H the toad conMiatkins of ACI 318 Appendix C are used, ttie appropriate value of A« must be determined in accordance virflh ACI 318 D.4.5. Strong- BOH'* 2 anchors are ductile steel elements as defined in ACI 318 D.1. 'Thetabutatedvalueof At apples when both the kiad combinattons of Sectkin 1605.2.1 of the IBC, or ACI 318 Sectton 9.2 are used and the requirements of ACI 318 D.4.4(c) for Conditton B are met. Conditton B epplies where supplemmtary reintorcement is not provMed. For Installations where complying supplementary reinforcement can be verified, the A* factors described ki ACI 318 0.4.4 fbr Condttton A are allowed. If the toad combinattons of ACi 318 Sectton 9.2 are used and ttie requirements of ACI 318 D.4.4 fbr CondHton A are met. the appropriate value of must be determined in accordance with ACI 318 0.4.4(c). If the toad combinattons of ACI 318 Appendix C are used, ttie appropriate vatoe of A* "iust be determined in accordance wHh ACI 318 D.4.5(c). 'As rtflOTttMri in ."Wtinn A1 nf thie rnpwt M/A (Mm AppMrahia) riAtintes that puiiout resistancB do«s not need to be considered, ^he charaderistto pulkHit strengti for greater concrete compressive strengths must be inoeased by multiplying the tabular value by (/'c/2,500p8i)'"or(rc/ 17.2MPa)". 'The characterislto pull-out strength for greater concrete compressive strengths must be increased by multiplying the tabiMar value by (f'c / 2,500psi)'" or {f, 117.2MPa)" 'The tabulated value of A or Aq applies when the toad combinattons of IBC Section 1605.2.1 or ACI 318 Sectton 9.2 are used and the requirements of ACI 318 D.4.4(c) for Conditton B are met. If the load combinations of ACI 318 Appendix C are used, appropriate value of ^ must be detennined In accordance with ACI 318 D.4.5(c). 'For the 2003 IBC W, replaces w^ n. ESR-30371 Most Widely Accepted arui Tm^ed Page 7 of 13 TABLE 3-STR0NG-B0LT"2 SHEAR STRENGTH DESIGN DATA* CHARACTERISnC SYMBOL UMTS NOMINAL ANCHOR DIAMETER CHARACTERISnC SYMBOL UMTS Carbon SIMI Stainless Steel CHARACTERISnC SYMBOL UMTS '/, inch VI inch %lnch V.inch Anchor Category 1,2 or 3 -1 1 Nominal Embedment Depth in. (mm) 2 (51) 2'/. (73) tu (70) 3'/. (98) 3'/. (») 5V. (130) 2 (51) 2'l. (73) Steel Sirangth In ShMr (Aa 318 Section D.6.1) Shear Resistance of Steel V« lb (kN) 1.800 (8.0) 7.235 (32.2) 11,035 (49.1) 3.085 (13.7) Strength Reduce Factor - Steet Failure^ A< -0.66 0.65 Concrate Breakout Strength In Shear (ACI 318 Sectian D.6.2) Outside Diameter d.' to. (mm) 0.375 (9.5) 0.500 (12.7) O.KS (15.9) 0.375 (9.5) Load Bearing Lengtti of Anchor in Shear /. in. (mm) 1.625 (41) 2.500 (64) 2.250 (57) 3.375 (86) 2.750 (70) 4.500 (114) 1.625 (41) 2.500 (64) Strand^ Reductton Factor - Concr^ Breakout FaHure' A« -0.70 0.70 Concrate Pryout Sirangth In Shear (ACI 318 Section D.6.3) Coefficient for Piyoiri Strength -1.0 2.0 1.0 2.0 2.0 1.0 2.0 Effective Embedment Depth /w in. (mm) 1'/. (41) 2% (64) 2% (57) 3'/. (86) tu (70) *\ (114) A (41) tl, (64) Strengtti Reductton Factor - Concrete Pryout Failure' -0.70 0.70 Steel Strength In ShMV fbr S^smte Applications (ACI 318 Seclion a3.3.3) Shear Strength of Single Anchor for Seismic Loads (r, = 2500 pei) v« Ib (kN) 1.800 (8.0) 6.510 (29.0) 9.930 (44.2) 3.085 (13.7) ^rengtti i^educUon Factor- Steel Falkire' A. -0.65 0JS5 For SI: 1 inch • 25.4 mm. 11bf« 4.45 N. *The infomiation imsenied In ttils table must be used in conjunction withthe design criteria of ACI 318 Appwidix D. ^he tabulatad vakje of A* appHes when ttie toad combinattons of Sectton 1605.2.1 of ttie IBC, or ACI 318 Sectton 9.2 are used and ttie requirements of ACI 318 D.4.4(c) for CoMNtton B ate met. If the toad combinattons of or ACI 318 Appendix C are used, the appropriate vahie of A* must be detennined in accordance witti AO 318 D.4.5. Strong-Bolt™ 2 anchors are ductle steel elements as defined ki ACI 318 D.1. ^The tabulated value of AK applies wlwn botti ttie k»d combinattons of Sectton 1605.2.1 of ttie IBC, or ACI 318 Sectton 9.2 are used and ttie requiraments of ACI 318 D.4.4(c) for Condition B are met. Conditton B applies wtiere supptamentaiy retofbrcement Is not provkled. For InstaNMtons where complying supplementaiy reinforcement can be verified, ttie A* factors descrfoed in ACI 318 0.4.4 fbr CondiUon A are altowed. If ttie load combliiattons of ACI 318 Sectton 9.2 are used and ttie requirements of AQ 318 D.4.4 for Conditton A are met, the appropriate value of A* must be detennined in accordance with ACI 318 D.4.4(c). If ttie toad combinattons of ACI 318 Appendta C are us^, ttie appropriate value of At must be determined in accordance with ACI 318 D.4.5(c). *The tabuiaied vtrtue of Av applies when ttie toad combinattons of IBC Sectton 1605.2.1 or ACI 318 9.2 are used and the requirements of ACI 318 D.4.4(c) fbr Conditton B are met. If the toad combinations of ACI 318 Appendix C are used, ttie appropritfe value of AP nmst be detemiined in accordance with ACI 318 D.4.^c). 'for the 2006 IBC d, replaces ESR-M37I Mo^miely Accepted and Tmsted Pages of 13 TABLE 4-STR0N6-B0LT"2 TENSION AND SHEAR STRENGTH DESIGN DATA FOR THE SOFFIT OF CONRETE OVER PROHLE STEEL DECK, FLOOR AND ROOF ASSEMBUES^'' CHARACTERISTIC SYMBOL UNITS NOMINAL ANCHOR DIAMETER CHARACTERISTIC SYMBOL UNITS Carbon Steel SUIniess Steel CHARACTERISTIC SYMBOL UNITS Lower FhAe Upper Flute Lower Fhite Upp«r Rute CHARACTERISTIC SYMBOL UNITS '/a Inch Viinch '/.Inch '/.inch Vjlnch '/.ifKdl '/.inch Embedment Deptti hnm in. (mm) 2 (51) 3'/. (86) tu (70) 4% (114) 3'/. (86) 5'/, (143) 2 (51) 2'/4 (70) 2 (51) tu (86) 2 (51) Effective Embedment Deptti ty in. (mm) 1% (41) 3 (76) tu (57) 4 (102) tu (70) 5 (127) 1V. (41) tu (57) 1*/. (41) 3 (76) iVa (41) Installatton Torque TM fl4bf (N-m) 30 60 (81.3) 90 (122.0) 30 (40.7) 60 (81.3) 30 (40.7) 30 (40.7) Pulout Sttengtti, concrete on metal deck (cracked)' Nf,ata.cr lb (kN) (5.6)' »2j230^ (9.9)' ) 2.040' (9.1)' 2,730' (12.1)' 2,615' (11.6)' 4,980' (22.2)' 1,610' (7.2)' 3,785' (16.8)' 1,120' (5.0)' 2.785" (12.4)' 1.410* (6.3)* Pulout Sttangth, concrete on metal deck (uncracked)' Np^dtdt,uner tb (kN) 1,765' (7.0)' 3,150' (14.0)' 2,580' (11.5)' 3.840' (17.1)' 3,685' (16.4)' 6,565' (20.2)' 2.275' (10.1)' 4,795' (21.3)' 1,580' (7.oy 3,850' (17.6)' 1,890* (8.9)' Steel Sttangth b) Stiear, concrele on metal deck' Vum* lb (kN) (7.1) (15.5) 2.135 (9.5) 4,580 (20.4) 2,640 (11.7) 7,000 (31.1) 4,060 (18.1) 5,820 (26.3) 2,285 (10.2) 3,785 (16.8) 3,830 (17.0) For 81:1 inch = 25.4 mm. 1 W " 4.45 N. *lnstaNatton must comply wtth Sectton 4.3 and Figure 4. ^>roflle steel deck must comply wtth Figure 4 and Sectton 3.3 of this report. *rhe vakies mM be used In accordance witti Secfion 4.1.3 and 4.1.7.2 of ttiis report. *The vakies mwt be used In accordance witti Seclion 4.1.3 of this report 'The vakies must be used In accordance vMh SecUon 4.1.4 and 4.1.7.3 of this report 'The minimum anchor spacing atong ttie flute must be ttie greater of 3/i,r or 1.5 ttmes ttie fhjtewkMh. 'The characterisUc pull-oul strengtti fbr greater concrete compressive sbangths must be IncreaMd by multiplying ttie (fi / a.OOOpsI)" or (f, 120.7MPaf *. *The characteristic pull-out strengtti for greater concrete compressive strengths must be increased Iiy mulUplyIng the {f'c 13,000p8l)" or (f i / 20.7MPa)°^. tabular vakje by tabular value by ^eURKETT&VONG DATE . ^ • • ENGINIERS ^""^ — ENGR JO" PROJECT .^bL_4. i^L, c..'.? ^/.-i Co.IcO ESR-2S02 I t^mtely/UxeptedandTnisted "F. T/S4 S-PZ Page 8 of 12 TABLE 3—TENSION DESIGN INFORMATION FOR P0WER-STUD4- SD2 ANCHOR IN CONCRETE (For use wMh load combinations taken from ACI 318, Section 9.2)''' Design Ctiaracterfsek: Notation Units Nominal Anchor Sine (inch) Design Ctiaracterfsek: Notation Units '/, •/. '/4 Anchor category 1,2ar3 -1 1 1 1 STEEL STIENGTH IN TENSION' MInknum specified yieM strengtti (neck) f, ksi (N/mm^ 96.0 (682) 85.0 (586) 85.0 (586) 700 (483) Minimum specified ultimate strengtti (neck) fJ' ksi (N/mm^) 120.0 (827) 106.0 (731) 106.0 (731) 90.0 (620) Efiecttve tensile stress area (neck) Am«, in' (mm*) 0.0552 (35.8) 01007 (65.0) 0.1610 (104.5) 0.2359 (153.2) Steel slren^ in tenston ««" for (kN) 10,445 (46.5) 13.080 (58.2) 21,230 (94.4) Reduction factor for steel strength' 4 -0.75 CONCRETE BREAKOUT STRENGTH IN TENSION" Eftective embedment /V to. (mm) 2.00 (51) 2.00 (51) 3.25 (63) 3.K (83) 4.25 (106) 3.75 (95) 5.O0 (12?) Eftocttveness tador for uncracked concrate -24 24 24 24 Eftocttveness foctor tor cracked concrete kcr -17 17 17 17 Modificatton foctor for cracked and unciacked concrMe' -1.0 See notes 1.0 SeenotoS 1.0 Sea notes 1.0 See note 5 Critical edge distance Cm to. (tnm) SeeTaUel Reduction factor for concrete breekout strength in tenston' -0.65 (Condttton B) PULLOUT STRENGTH M TENSION (NO»MEISMIC APPLICATIONS)' Charactortstlc pultout strengVi, uncracked concrete (2,500 psi)* Ibf (kN) 2,775 (12.3) See note7 6,615 (29.4) See note7 See note? See note? SM note? ChwaderisUc pultout strength, cradcad concrete (2,S00 psi)' Ibf (kN) 2,165 (9.6) See note? 4,375 (19.5) See note? 4,880 (22.4) See note? 7.7B5 (35.1) Reduction factor for pulout strength' -0.65 (Condition B) PULLOUT STRENGTH IN TENSION FOR SEISMIC APPUCATIONS* Characteristic pultout strengtti, seismic (2,500 psi)" At," tof (kN) 2,165 (8.6) See note7 4.375 (19.5) See note? 4.080 (22.4) See note? 7,785 (35.1) Reduction (ador tor pultout strengtti' # -0.66 (CondHton B) PULLOUT STRENGTH IN TENSION FOR SAND UGHTVWEIGHT AND NORMAL-WEIGHT CONCRETE OVER STEEL DECK CharaderisUe pulout strengtti, uncracked concrete over steel deck, acooniing to Figure 4A"* Np.amit.uner Ibf (kN) 1,855 (8.3) 2,065 (9.2) 3,930 (17.6) 4,665 (20.8) 7.365 (32.8) 4,900 (21.8) Charactsrfitic pulout strengtti, cracked concrete over steel deck, according to Figure 4A"<' Np.amti.or tof (kN) 1,445 (6.4) 1,463 (6.5) 2,600 (11.6) 3,305 (14.7) 3,490 (15.5) 3,470 (18.4) Characteristic pulout strength, increcked concrete over steel deck, acoordina to Figure 4B''"' NpamKuner bf (kN) 1,600 (7.1) 2,025 (8.0) Not Applkabto Not Appitoabto Not AppHcabto Not AppHcabto Characteristic pulout strengtti, cracked concrete over steet deck, according to Figure 4B"° Np,aK*.a Ibf (kN) C1.250 ; 1,435 (6.4) Not Applcable Not AppHcabto Not Applcabto Not Applcat^ Reductkxi factor tor fxillout strength' * -0 65 (Condition B) For SI: 1 toch - 25.4 mm, 1 fl-bf ^ 1.356 N-m. 1 ksi = 6.895 N/mm'. 1 Ibf = 0.0044 kN 'The data in Mils tatile is Intended to be used with ttie design provistons of ACI 318 Appendix D; for anchors resisting seismto toad combinations the additional requirements of ACI 318 D.3.3 shaH apply, 'installatton must comply with published instructions and details. 'AH values of ^were determined fnxn ttie toad combinations of IBC Section 1605.2. ACI 318 Section 0.2 or UBC Sectton 1612.2. If ttie toad combinations of ACI 3ieAppendixC or IBC Sectton 1908.2 are used, Iheaivnipnate value of #must be detennined in accordance with ACI 318 D.4.5. For retoforcement that meets ACI 318 Appendix D requirements for Condition A, see ACI 31B D.4.4 for ttie appropriate ^ factor 'The Power-Stud+ SD2 is considered a ductite steel etement In tension as defined by ACI 318 D 1 Tabulated values for steel strengtti in tenston are based on test results per ACI 355.2 and must be used for design ^For an design cases VC N=1 0 The appropriate effectiveness fador for cracked concrete (ka) or uncracked concrete {k^ncr) must be used 'For all design cases ft p=10 For the calculation of/V^, see Section 4 l 4 of this report ^Pultout strength does not control design of indicated anchors Do not cakxilate pulkxjt strength for indicated anchor size and embedment 'Anchors are permitted to tie used in sand-lightweigtit concrele in accordance with Section 4 112 of tNs report tabulated values for characteristic pullout strength in tension are for seismic appttoations are based on test results per ACI 355 2. Sedion 9.5 "Values for Npomt are lor sand-lightweight concrete (/"c mn = 3,000 psi) and addittonal lightweight concrete reduction factors need not be applied In addition. evaluation (or the concrete breakout capacity m accordance wtth ACI 318 0 5 2 is nol required for anchors installed in tne deck soffit (flute) "For 2003 IBC code basis, IM replaces f^ . W„replaces N, : replaces Wj. and /V„ replaces Wp .„„ ''The notation in brackets is for the 2006 IBC IO ESR-2602 I Mo^ Widely Accef^ed and Tnisted Page > of 12 TABLE 4-SHEAR DESIGN INFORMATKW POR POWER-STUD» S02 ANCHOR IN CONCRETE (Ftnr usa with load combinations tahan from ACI 318, Section 9.2)'^ Design CharacterisUc Notatton UnHs Nominal Anctior Diameter Design CharacterisUc Notatton UnHs '/. '/, '/. Arx^ior category 1,2or3 • 1 1 1 1 STEEL STRENGTH M SHEAR* Minimum specified yteto stiength (tiireads) ksi (Nftnm^ 76.8 (530) 68.0 (469) 68.0 (469) 56.0 (386) Minimum specified uKlmate Mrengtti (ttimads) fu,.'" ksi (N/mm*) 96.0 (662) 84.8 (685) 84.8 (585) 72.0 (496) Effedh/e tensile stress area (threads) A„.WA»1" to" (mm') 0.0776 (50.0) 0.1419 (65.7) 0.2260 (104.9) 0.3345 (2158) Steel sttengtti In shear' tof (kN) 2,190 (9.7) 4.640 (20.6) 9,800 (44.1) 10,175 (46.3) Reductton factor Ibr steel strength' -0.00 0.65 CONCRETE BREAKOUT STRENGTH IN SHEAR' Load-bearing lengtti Of anchor (tiaior Bdp, whichever is less) to. (mm) 2.00 (51) 2.00 (51) 3.25 (83) 3.25 (83) 4.25 (108) 3.75 (05) 5.00 (127) Nominal anchor dtomrter d.ldj" in. (mm) 0.375 (8.5) 0.500 (12.7) 0.625 (15.9) 0.750 (18.1) Reductton factor for conaete breakout ttiengtti in shear' -0.70 (Condition B) PRYOUT STRENGTH IN SHEAR' CoefRcient for pryout strength (1.0 for ()«< 2.5 in., 2.0 Ibr/If 2 2.5 to.) -1.0 1.0 2.0 2.0 2.0 2.0 2.0 Eftective embedment in. (mm) 2.00 (51) 2.00 (51) 3.25 (83) 3.25 (83) 4.25 (108) 3.75 (M) 5.00 (127) Reduction factor for pryout strength' # -0.70 (Condition B) STEEL STRENGTH IN SHEAR FOR SEISMIC APPLICATK>N8 Steel strengtti ki stiear, seismto' tof (kN) 1,955 (8.7) 4,640 (20.6) 6,530 (28.0) 0.635 (28.S) Reduction factor for steel strengtti In shear, seismk:' * -0.60 0.65 STEEL STISN6TH IN SHEAR FOR SAND-U6HTWEIGHT ANO NORMAL-WEIOHT CONCRETE OVER STEEL OECK* Steel streni^ In shear. concrete over steel deck, according to Figure 4A' Ibf (kN) 2.170 (9.7) 3,815 (17.0) 5,040 (22.4) 4.015 (178) 6,670 (29.7) 4,325 (18.2) Steel strengtii in shear, concrete over steel deck, Seismto according te FIgura 4A* VitatOtaq Ibf (kN) 1.940 (8.6) 3,815 (17.0) 5,040 (22.4) 2,675 (11.9) 4,445 (19.8) 2,820 (12.5) Steel strengtii In shear, concrete over sieel deck, accortting to Figure 4B* Vm.atek Ibf (kN) 2,170 (0.7) 2,860 (12,8) Not Appitoabto Not Applkabto Not AppHcabto Not AppHcabto Steel strengtti In shear, concrete over steel deck, Seismk: according to Figure 48' Vuamk.pq Ibf (kN) ) 2,880 (12.8) Not AppHcabto Not Applicable Not Appitoabto Not Appitoabto Reduction tedor for steel stiengtii In shear, concrete over steel deck' * -0.60 065 For SI: 1 inch « 25.4 mm. 1 ll-lbf = 1.356 N-m, 1 ksi = 6.895 N/mm', 1 tof • 0.0044 kN. ^Tiie data in tills tabto is Intended to be used witti ttie design proviskxis of ACI 318 Appendix 0: for anchors resisting seismic toad combinations ttte addiUonal lequireinents of ACi 316 0.3.3 sbal appty. instellatton must comply with published instiuctions and deteils. 'AI values of ^were determined from ttw toad combinations of IBC Section 1605.2, ACI 318 Section 9.2 or UBC Sedkxi 1612.2. If the toad combinations of Appendix C or UBC Section 1909.2 are used, ttie appropriate value of ^must be detennined in accordance witti ACI 318 D 4 5 For reinforcement ttiat meets ACI 318 Appendix D requiremente for Condition A, see ACI 318 D.4.4 for ttie appropriate ^ fador. 'The Power-Slud+ SD2 is consklered a ductile steel element as defined by ACI 318 D1 except for tiie '/rinch-diameter anchors In she»^. h'abulated values fOr steel strengtii In shear are tiased on test resutts per ACI 3SS.2, Section 9 4 and must be used for design These tebulated values are lower than cateuiated results using equatton D-20 In ACI 318-08 (318-05). 'Anchors are permitted to tie used in sand-Hghhveight concrete in accordance with Sectton 4.1.12 of this repon. 'Tabulated values for steel strength in stiear are for seismic appltoations are tiased on test results per ACI 35S.2, Sedion 9 6 ^/alues for VsAtiKk and ^sad«*«Qare for sand-lightweight concrete {f'c, min - 3.000 psi) and additional lightweight concrete redudion fadors need not be applied. In addition, evaluation for the concrete breakout capacity in accordance witti ACI 318 D.6 2 and ttie pryout capacity in accordance with Sedion D 6 3 is not required for anchors Installed in the deck soffit (flute) 'Shear loads for anchors installed tiirough steel deck into concrete may be applied In any direction "For 2003 IBC code basis.^u,, replaces /L,. l/'„replaces V,; /, replaces /, and V,, replaces V„,„, "The notation in brackets is for the 2006 IBC :JjmROPE LTD ; : Wire Ropes : : : ('SUMQMAX/ /I rti WiiiliiiiiiWwMiiitiiiritW^ hnrne >> products >> wire ropes >> Galvanized Cable (Carbon Steel) ING I ABOUT US I CONTACT I BaMtMarriMUfiO » wire Rooe Selection I Technical Information Detailed Wire Rope Data: * ex.19 Cl^ss * 6x37 IWRC and FC « 6- and S-sLraniCQMEAC® Die-Drawn I 8x 19./. axi& m&cj.DoPm f Python® Super-8 I PythPn® Multi M I Elastie fiUed e-Jit.rand_wire rsce I Rotary.maaed wirsjiQes ' 9 Spin Resistant ^..x7 Rotation Resistant I COMPAC(Si 19 I CQM PACJg) .34 I Python® .Haist I Python® Lift I Galvanized Cable (Carbon SiefiU cat?ig Galvanized Cable (Carbon Steel) to Wire Ropes Main Page Available Construction: 7x 19 (Bexible) 7x7 (Coated) 7 X 19 (Coated) Galvanized Cable 1x7 Galvanized Cable 1 x 19 Rope Nominal Weight Rope Nominal Welglit dia. Strength 1000 ft dia. Strength lOOO rt inch Ibs Ibs inch Ibs Ibs 1/64 50 0.7 1/32 185 2.5 •1 1/32 185 2.5 m 3/64 375 5.5 • 3/64 375 5.5 BS 1/16 500 8.5 1/16 500 8.5 o 5/64 800 14.0 5/64 800 14.0 3/32 1200 20.0 3/32 1200 20.0 B 7/64 1600 27.0 7/64 1600 27.0 B o 1/8 21|» 35.0 1/8 2100 35.0 B o 5/32 3300 SS.O O Available to MIL-W-87161 3/16 4700 77.0 Non stock Item. Ask for delivery time. 7/32 6300 102.0 1/4 6200 135.0 O Available to MIL-W-887161 Non stock Item. Ask for delivery time. Galvanized Cable 7x7 Galvanized Cable 7 x 19 Rope Nominal Weight Rope Nominal Weight dia. Strength 1000 ft dia. Strength 1000 ft Inch Ibs Ibs inch Ibs Ibs # 3/64 270 4.2 H ft 3/32 1000 16.0 1/16 480 7.5 1/B 2000 29.0 5/64 650 11.0 & o 5/32 2800 45.0 MM •i 3/32 920 16.0 3/16 4200 65.0 7/64 1260 22.0 ^^1 7/32 56O0 86.0 1/8 1700 28.S o 1/4 7000 110.0 5/37 2600 43.0 o 9/32 8000 • 139.0 tip ./'/WWW iinirnpc.com/wireropes/wr galvanized cable..shtml 8/26/03 Dimensions 50PSH006-070 UPflTS 50PSH OVERALL CABINET WATER CONNECTIONS (In) WATER CONNEC-TIONS (in.). UNrrs WrfH HWR ELECTRICAL KNOCKOUTS (In.) OlSCHARQE CONNECTKIN (In) DUCT FLANOE INSTALLED (sO.IOin.) CON USI Al RETURN WIECTNM (in.) INQ RETURN n OPENING (±010 In.) UNrr SIZE ,,,,,, 1 2 3 4 5 Loop Water rrr HWG t 2 J Cond K V, Cond L v. Cond M (LH rtm) N 0 Supply Height 0 (RH rtm) R S Return Deptti T Retum Height U V A width B D«ptti C Hdghl D In E Oul F HWG In G HWG Out H Con depute Loop Water rrr FPT Loop In D Loop Oul t Low Voltage Ext Pump Powmi Supply M (LH rtm) 0 Supply Height 0 (RH rtm) S Return Deptti T Retum Height oos.oos. 012 22 J 43 1 173 3 7 9 7 M'A N'A 0 B V; N/A N/A N/A 3 8 63 SB 5 3 4 1 90 90 53 4 1 17 1 16 3 2 1 1 0 01. 22 4 62,2 19 3 2 1 100 139 16 9 06 'h 2 1 10 0 36 6 1 86 36 20 125 15.5 36 2.0 28 1 162 2-3 1.5 024. 030 ?7 4 6? 2 19 3 7 1 too 139 16 8 0 6 'I: 5 26 13 13 36 6 1 86 36 20 12 5 15 5 3 6 20 338 16 2 23 1 5 036 25 4 71 2 21 3 34 108 156 189 06 'h 596 13.13 36 6 1 8.6 3 1 1.2 19.0 17 5 3 1 1 0 348 18 2 3 1 15 042. 04. 25 4 76 2 21 3 34 10 8 15 6 189 06 1 S96 13 13 36 61 86 3 1 1 2 190 175 3 1 1 0 39 B 18 2 3 1 1 5 060. 070 25 4 81 2 21 3 34 108 156 18 9 06 1 'h 596 13 13 36 6 1 86 3 1 1 2 190 17 6 3 1 1 0 448 18 2 3 I 1 5 NOTES; 1 Condensate is V^-in FPT copper. 2 Horizontal unit s^^ped with mor bracket onfy This bracket shoofd be removed lot return duel connection. 3 Discharge flange and hanger kit is taclory installed. 4 Shaded areas are recommerxied service areas, not required LEFT RETURN CSP ASP BSP CAP CSP FPT HWG HWR LH RH LEGEND Allemale Service Panel Blower Service Panel Control Access Parwl Compressor Service Panel Female Pipe Thread Hol Waler Generator Hol Water Reheat Lett Hand nighl Hand Pomt Supoly W Knockout Disctiorge Bkmer OuW T ' 1 k. in. *J ' J*S ii 1 Us ibi ID» 71 1 jr.! jo«7-o*a n.% |»CKI«1 • 11 713 J Configuration E - Lafl Return / Back Diacharge Btower OuHel CoMlguratlon S • Lett Retum / Right Dtochaiga - Air CoU Opening Len View -B- Conflguratlon S • Leh Return / flight Dikcharge Atr Coll Operting PSC BLOWER AIRFLOW CONRGURATION CODE RETURN DISCHARGE E Led Back a Right Back s LeII Right z Right Lett 11 ^p64.. Su^ ISO «: m ^ CITY OF CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development Services Building CHvislon 1635 Faraday Avenue 760-602-2719 www.carisbadca.gov Project Address: ^J^^t/'^Bmiit No.: C& U • H ^ Sk-iU (50 Informatton provkfed below refers to worh being done on the abcjve mentioned permit only. This form must be completed and ratHmad to Hw Bulidinu Mvlslon b«few the pwmit can be Isintd. Bulidins Dept FcDC (760) 602-8558 Nun^MT of new or relocofted fixtures, traps* or floor drains. New building sevwer line? Numlser (rf new roof drains?. Install/after water line?. Number of new water heoften?. Numlier of new, relocated or replaced gas outlets?... Number of new hose bibs?.. 1SINK Ves_ 1 No. TeiWBit hnprewement/Remodete Numbo'of exhting Panek Onvdved in thb proiect). Remodel only - (rekxcte/add outlets/swftdies) Amps per panel On thb prqi«Q Vto No New CoiMlnicUens Numtier of new paneb or subpanels? Amps per Panel: Single Phase Three Phase. Three Pilose 480 X ... 2- .... Nunber of new amperes ....Number of new amperes lOO ^^^^ .Number of new ampe.«s.e£P Number of new fumaas, A/C or heat pumps?.. New or relocated duct worit?. Number of new fireplaces? Number of new exhaust fans?. Relocate/lnstcril vent? Numiier of new exhaust hoods?.. Number of new boilers or compressors?. ...Ves V: No .NumberofHP 12. il B-ia Page 1 of 1 Rev. 03/09 ^ CITY OF CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development Services BuiidbigDhfiSion 1635 Faraday Avenue 760-602-2719 www.carisbadca.gov ai9SSalh/i/e. _ Proied Address: SuriM. Iho Pemilt No.: CS> U \^ 3 S tnfomwtkw provkled below reto to wofhbalnB done on tlie dwwe mentioned This fam west he lowpfeted oed retermd to fhe BiiiidiiMi Mviilaii hefore the aermH cm he lisued. Buldbie i3epL l=dx: (760) 602^8558 Number of new or relocated fixtures, traps, or floor drains. New buildtng sewer Hne? Number of new roof draim?. Instcd/oKer water Hne? » 1SINK Ves_ 1 No. Numbtf of new water heodiMs?. Number of new, relocated or replaced gas oiAieb?. Number of new hose bibs? Tenant Improvement/Remoddst Number of exiting Parak (bwokMd In tiib proieeO. o Remodel only-(relocate/add outlets/swftdies) .^..M.... New CerolnicUeiit Number of new pands or subpaneb?, Amps per Panel: SIngte Phase ........^.......................^^ TTwee Phase. ~ „ . Amps per panel (in thb project) Ves No Tiiree Phase 480. . Nunber of new arr^Mres. .Number of new amperes /OO A^*'^ .NiOTiberof newomperes 7.oc> Number of new fumaces, A/C or hecft pumps?.. New or relocated duct worfc? Number of new firepkKes? Number of new exiiaust fans? Rek>cate/inAa]l veiri:?..... „ Number of new exhaist hoods?. Number of new boilers or compressors?. ..Ves 'A No. , O . O .NumberofHP B-18 Page 1 of 1 Rev. 03/09 r A^ CARLSBAD CITY OF PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development Services BulMirv Division 1635 Faraday Avenue 760-602-2719 www.carisbadca.gov Projed: Address: Permit No.: OCP^ I • Pp Informatton provkltd below refers to worti being done on the above menttoned permit only. This form most he cowpletwl end wtonied to the BeMdIeo Dhiiloe befot* the eermit con be iiseed. Buldbifl Dept 1^ (760) 602-8ra8 Number of new or rekMxfted fixtures, traps, or fk)or drakis. New buiklkig sewer Rne? ...... Number of new roof drains?. Imtcril/after water line?.. 1SINK Ves 1 No 1 Number of new water hooters?. Number of new, relocated or r^>kxed gas ouUeb?. Number of new hose t^Ww? mi..-.. i Tenonl imimwen sent/Remodels: Nun^^ndstkigPcneb (Involved b) thb prajecO_i!^ Amps per panel (Ni thb pnjKt) 2^2^ Ves No V Z. Remodel only - (rekxxfte/add outlets/switdies) New CbnitoncUoiK Nurnber of new paneb or subpoRids?. Amps per Panel: Singh Phase Three Phase>......>. Three Phase 480 . Number of new onnperes. .Number of new amperes l€SO .Number of new ampetes-g-OO " Number of new fumaces, A/C or heat pumps?. New or rekxcAed dud worfc? Numiser of new fhepkxes? ............ Nurrdser of new exhaust fans? RekKoAe/Instoril vent? ................ ..Ves No Number of new exhaust hoods? Number of new boilers or compressors? o_ o_ o .NumberofHP 3 B-18 Page 1 of 1 Rev. 03/09 ^ CITY OF CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development Services Building Dhfision 1635 Faraday Avenue 7B0-6O2-271S www.carist>adca.gov M7SSall<M. ^_ Proied Address: /gj PermitNo.- Cc>l \ ' ^^9/ tnfornKitlon prcjuided below refen to word bdng done on the above menttoned permit only. This form most he ceemleted eed retemed to the Bettdiiia BhrisioB before the perwH caw he Isseed. Buiklng DepL |!cDe (760) 602-8558 Number of new or rekKoted fixtures, traps, or floor ckxdns. New buHding sewer Ine? Number of new roof chains?. InstaH/dftM- wcAor Nne? Ves_ Number of new water heaters?. Number of new, relocated or rephxed gas oiAleb?.. Number of new hose Mas? • No. 1 1 IT Tenonl hnpvowemenl/Reniodeisi Number of eidstkig Paneb Onwoived bl thb pn^Ki)- RemocM oniy - (rekKcAe/cdd outiets/iwftches) Amps per panel On thb prqiaci) . Ves No. New Cemtnidieni Ninnb«r of new paneb or subpomeb?. Amps per Paneb Skigle Phase Three Phase. Three Phase 480, .Number of newomperes . Number of new amperes ioO Number of new amperes 'Z^^ Number of new fumaces, A/C or heat pumps?. New or reheated dud worfc?. Numbw* of new fbepkices?...- Number of new exiiaust tans?....... Rekxate/kistall vent?~..~..» .Ves X No. O Number of new exhaust hoods?.. Number of new boilers or compressors? ••••••••••«•••••••«••«•• .NumberofHP _C2_ 2- B-18 Page 1 of 1 Rev. 03/09 ^ CITY OF CARLSBAD PLUMBING, ELECTRICAL. MECHANICAL WORKSHEET B-18 Development Services BuikUngDh^n 1635 Faraday Avenue 760-602-2719 www.carisbadca.gov PitJjed Address: Suitt. (^O PermH No-- (3i3 W • \^ 5 ^ biformatton providsd below refers to wori? being done «i the above merfttoned permit only. This fonn must be cewBleled eed returned to the Beildiiw BMstee hefore the Dormtt cae be isseed. Buiklhie Dept Fox: (760) 602-8558 Number of new or rekKoted fixtures, traps, or floor drains. New buHcRng Mwer Rne? .» Nunnber of new roof drains? kHtaH/criter wcfter Ihie? ...•.•.•.•„.••..••... ....„.•..•.....••„.„ 1 NEW SINK Ves_ 1 No. Number of new water heaten?. NundMr of new, relocated or repkiced gas oulMs?. Nuniber of now hose Vb£t. JL Tenant Impiowenient/ReiiiedMR Number of exktkig Paneb OnvoMd bl thb prctecQ Remodel only - Oekxate/add oiAlets/fWftchos) Amps per panel On thb prqiM^ Ves No Al/A X New CMMlnictient Number of new paneb or subpaneb?. Amps per Panel: Skigle Phase ........... ...M.....^....,...—.._....™.....«.. Three Phase............-...^.. ............... Tlwee Pilose 460. • Number of new amperes . Number of new anmeres lOO^ . Number of new amperes lA*^ 1 Number of new fumces, A/C, or heat pumps?. FNlew or relocated duct wori?? Ves X No Number of new flrepkxes?...—« —............................ ^ Number of new e)diaust ferns? ................................................................................ 1 RekKOte/install uent?._ ..... « ...» Q Number of new exhaust hoods?........»..~.~......._~............~....~.~~...~.».....—....................... Number of new boilers or compressors? ............................................Number of HP ^ B-18 Page 1 of 1 Rev. 03/09 INDUSTRIAL WASTEWATER DISCHARGE PERMIT . , SCREENING SURVEY DateJj_^£jA; Business Name h^/A- ^MT'^^ - Street Address ^ (1^ CAIT^U^ Email Address PLEASE CHECK HEFIE IF YOUR BUSINESS IS EXE!\flPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Add Cleaning Assembly Automotive Repair Battery Manufat^ring Biofuel Manufacturing Biotech Laboratory Bulk (Chemical Storage Car Wash Ciiemical Manufaduring Chemical Puriflcatton Dry Cleaning Electrical (Component Manufacturing Fertiiizer Manufancturing Film / X-ray Processing Food Processing Glass Manufactuiing industrial Laundry Ink Manufacturing Laboratory Machining/Milling Manufacturing Membrane Manufacturing (i.e. water Alter membranes) Metal Casting / Fonning Metal Fabrication Metal Finishing Electroplating Electrol^s plating Anodizing Coating (i.e. phosphating) Chemical Etching / Milling Printed Circuit Board Manufacturing Metai Powders Forming Nutritional Supplement/ Vitamin Manufacturing Painting/Finishing Paint Manufacturing Personai Care Products Manufacturing Pestidde Manufacturing / Packaging Phamnaceuticai Manufacturing (including precursors) Porcelain Enameling Power Generation Print Shop Research and Development Rubber Manufacturing Semteonductor Manufacturing Soap / Detergent Manufacturing Waste Treatment / Storage SIC Code(s) (if known): Brief description of business activities (Production / Manufacturing Operations):. Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Estimated volume of industrial wastewater to be discharged (gal / day): List hazardous wastes generated (type / volume): Date operation began/or will begin at this location: Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes (No/ If yes, when: Site Contad C,7r^/^ '^^u^«-' Title SAm^\xxxfyAA.^.^'iA^AA^ ' Phone No.__—zA ENCINA WA^TBV?ATER AUTHORITY, 6200 Avenida Encinas Carisbaif, CA 92011 (760)438-3941 F/\X: (760)476-9852 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY UPFPHI HV# BP DATE. / Business Name , , ^ ^ Business Contact Telephone* . _ ^ ^ t c^n^'M^ Project /^dress a.i*f^ ^(k Mf.m Clty^ , , , State. Zip Code APN# Mailing Address . i^zh Aye.. City , State Zip Code Plan File# Project Contact^ - / Teleptione # (7^<?) ^«>7 The following questions represent the facility's activities, NOT the specific project description. AIS P^JIpW.:. OqgVJ'ftN9Y <?I.A§?lf I' Pfti^T li PIRE PEP/^TMENT - H^RPftV? WATE . . . , ,. will use, process, or store any of ttie following hazardous materials. If any of the items are jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 4. Flammable Solids 8. Unstable Reactives 12. Radioactives |TION; Indicate by circling the item, whether your business , applicant must contact the Fire Protection Agency with Occupancy Rating: 13. Corrosives 14. Other Health Hazards 15. NoneofThese. 2m • ll: SAN DIEGO COUNTY DEPARTMENT OF EyjVIRONIIIIENTAL HEALTt^ - HA^RDOUS MATERIALS DIVI^IOWS mMD); If th questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overiand Ave., Suite 110, San Diego, Call (858) 505-6700 prior to ttie issuance of a building permit. the answer to any of the CA 92123. FEES ARE REQUIRED. Project Completion Date: / / Expected Date of Occupancy:. / / • CalARP Exempt Date Initials • CalARP Required JL. Date Initials • CalARP Complete Date Initials (for new construction or remodeling projects) Is your business listed on the reverse side of this form? (check all that apply). Will your business dispose of Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity? Will your business use an existing or install an underground storage tank? Will your business store or handle Regulated Substances (CalARP)? Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to or greater than 1,320 gallons? (Califomia's At>oveground Petroleum Storage Act). im PJE99 9SaMIY,<ffi F9|alj^TI9^^ if the answer to any of the questions below is yes, appUcant must contact the Air Pollution Control District (APCD), 10124 Okj Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 pnor to the issuance of a building or demolition pemiit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification fbrm to ttie APCD at least 10 woridng days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information. YES Will the subject fecility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at httD://wvwv.sdaDcd.oro/info/facts/permits.pdf, and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). (ANSWER ONLY IF QUESTION 1 IS YES) Will ttie subject fecility be located within 1,000 feet of the outer boundary of a school (K through 12)? (Search the Califomia School Directory at httD:/Awww.cde.ca.aov/re/sd/ for public and private schools or contact the appropriate school district). Has a sunrey been perfonned to determine the presence of Asbestos Containing Materials? Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Will there be demolition involving the removal of a load supporting structural memtter? 1. • NO Briefly describe business activities: I declare under penalty or peijui y that to the best of my knowledge and belief the resoonafls made Name of Owner or Authorized Agent Briefly describe proposed project: aret Signature of Owner or Autiiorized Agent ! and conect. Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. BY: FOR OFFICIAL USE ONLY: DATE: EXEMPT OR NO FURTIIER INFORMATION REQUIRED RELEASED FOR BUILOING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division STORM WATER Development Services ^ CITY OF CARLSBAD COMPLIANCE Building Division ^ CITY OF CARLSBAD ASSESSMENT B-24 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: • Building Permit • Right-of-Way Permit JK^My project is categorically EXEMPT from ' the requirement to prepare a storm water pollution prevention plan (SWPPP) because It only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge Project Storm Water Threat Assessment Criteria* Afo Threat Assessment Criteria My project qualifies as NO THREAT and is exempt from ttie requirement to prepare a stonm water pollution prevention plan (SWPPP) because it mMli flw'no lN«ar aiMssfflanl crilm on IM City's Pni^ Level. My project does not meet any of the High, Moderate or Low Threat criteria described betow. Tierl • LomrTifireatAssessmentCiiHerfa • My project does not meet any of ttie Significant or Moderate Threat criteria. Is not an exempt pemilt type (See list above) and ttie project meets one or more of ttie foitowing criteria: • Results in some soil disturtiance; and/or • Includes outdoor consbuction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 • JMbde/ate TTireat Assessment Cr/ter?a • My project does not meet any of tiie Significant Threat assessment Criteria described below and meets one or more of ttie foitowing criteria: • Project requires a grading plan pursuant to the Carisbad Grading Ordinance (Chapter 15.16 of ttie Carisbad Municipal Code); or, • Pn^ will result in 2,500 squ^ feet or more of soils disturtiance inciuding any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and pioject meets one or more of ttie additional fbllowing criteria: • Located wittiin 2(X) fbet of an environmentally sensitive area or ttie Pacific Ocean, and/or • DIsturtied area is kxiated on a slope wiUi a grade at or exceeding 5 horizontel to 1 vertical, and/or • DIsturtied area is located aking or wittiin 30 feet of a stonn drain inlet, an open drainage channel or watercourse, and/or • Ctonstnjction will be Initiated during ttie rainy season or will extend into ttie rainy season (Oct. 1 ttirough April 30). Tier 3 - Sign'rficant Threat Assessment Criteria • My project includes clearing, grading or ottier disturijances to the ground resulting in soil disturisance totaling one or more acres including any associated constiuction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or • My project Is part of a phased devetopment plan ttiat will cumulatively result in soil disturtiance totaling one or more acres inciuding any associated constiuction staging, equipment storage, refueling and maintenance areas: or, • My project is located inside or wittiin 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential tor contiibuting pollutants to neartiy receiving waters by way of stonn water njnoff or non-stonn water discharge(s). / certify to the best of my knowledge ttiat ttie above ctiecked statement are true and correct I understand and acknoyriedge that even though this project does not require preparaSon ofa construction SWPP, I must still adhere to, and at all times during constmctton activities for (he pernitt type(s) check above comply with the storm water best management fmctices pursuant to Title 15 of the Carlsbad Municipal Code and to CHy Standards. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construdion SWPPP Tier Level is wan'anted. Project Address: Assessor Parcel No. OwnerA>inier's Aulhoilztd Agent ttame: Title: Dale: \/ I Date: / Prcjectipr B-24 Page 1 of 1 Rev.03/09 VIKING October 18, 2011 To Whom It May Concern: Please use this as authorization for Rick Bramble on behalf of Viking Commercial Constmction, Inc., to sign and pull Building Permits with the City of Carlsbad. Please feel free to call with any questions or concerns at (760)931-9990. Sincerely, Stephanie Fabian Office Manager Viking Commercial Construction, Inc. Lie. #804831 U:\Office\Letter Library\Letter of Authorization.doc Telephone: 760-931-9990 • Fax: 760-931-9955 1825 Aston Avenue • Carisbad, CA 92008 • www.vikingcc.com C3 >J ^ 01 ^ 8- 7^ f -I-I ^ 5^ S eo -1 < m • • IO -"•I S S5 rn rs O 12-01-2011 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Plan Check Revision Permit No:PCR11135 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC #: Project Title: 2175 SALKAV CBAD PCR 2120210800 Lot#: 0 $0.00 Construction Type: NEW PC110040 REVISIONS TO "M" SHEETS ONLY FOR TVS TO SUITES 150, 160,180,185 & 190 Applicant: NATIONAL AIR & ENERGY ATTN: TONY BRUNELL 2053 KURTZ ST SANDIEGO CA 92110 619 299-2500 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 11/16/2011 RMA 12/01/2011 12/01/2011 Owner: RIO SD PLAZA II MASTER LLC C/O NEWPORT NATIONAL CORPORATION 1525 FARADAY AVE #100 CARLSBAD CA 92008 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $108.00 $0.00 $0.00 Total Fees: $108.00 Total Payments To Date: $108.00 BalanceDue: $0.00 Inspector: FINAL APPROVAL Date: Clearance: NOTICE: Please take NOTICE that approval of your project Includes the "Imposition" of fees, dedications, reseivations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this peimit was issued to protest imposition of these fees/exactlons. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required Infonnation with the City Manager for processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow tfiat procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or servtee fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has prevtouslv othenwise expired. ^ CITY OF CARLSBAD PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. Original Plan Check No. _/t /10^^ ^0 Project Address ^/7S fs^uuL. Avfc Date t({to/<( ContacrT2MV gAt^MCcug. ptffecqJ^'?y-A^co Fax Contact Address ^oS3 U^tiATZL •Sy Email LOH.K^)O(9^tJ.Arjn-Af.e..Ce>t^ City^S^t*_Pugsfc,o_ Zip c^\\x> General Scope of Work M\ifi^HA»^tjC-.At Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 Elements revised: • Plans • Calculations • Soils • Energy • Other 2 Describe revisions in detail 3 List page(s) where each revision is shown 4 List revised sheets that rep/ace existing sheets XAAfAif. A^y/ r///hC <^/^ r^^'Tf Cl CA\ ntAx/i o Jjty^ <^IAA^ A^7>^ ^ cr ^ 5 Does this revision, in any way, alter the exterior of the project? Q Yes 6 Does this revision add ANY new floor area(s)? • Yes Q No 7 Does this revision affect any fire related issues? Q Yes No 8 Is this a complete set? • Yes ^ No M6:HW64C ^H«jtT5 ^/^Y >gS'Signature_ B No 1635 FaracJay Avenue, Carlsbad, CA 92008 Phone: 760-602-2717 / 2718 / 2719 vvww.car1sbadca.gov Fax: 760-602-8558 Gafl^bad 11-0040 ( PCRl 1-135 ) 11/28/11 EsGil Corporation lit VartnersHvp witfi government for <BuiUitig Srfety DATE: 11/28/11 •APPLICANT [fi/JURIS. JURISDICTION: Carlsbad • PLAN REVIEWER • FILE PLAN CHECK NO.: 11-0040 ( PCRl 1-135 ) SET: REV 1, Set I PROJECT ADDRESS: 2175 Salk, Suits 150, 160, 180, 185 & 190 PROJECT NAME: Office TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ^ The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your infonnation. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fon/vard to the applicant contact person. I I The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. I I Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: ^ REMARKS: A. The note clouded in red on the approved revised plan sheet M-2 must be made to the city set of revised plans to make a 2"^ set of approved revised plans. B. The cover sheet of the original approved plans should be changed to reflect the revised mechanical contractor/ designer, National Air & Energy By: Chuck Mendenhall Enclosures: EsGil Corporation • GA • EJ • PC 11/21/11 iJkbad 11-^armad 11-0040 ( PCRl 1-135 ) 11/28/11 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 11-0040 ( PCRl 1-135 ) PREPARED BY: Chuck Mendenhall DATE: 11/28/11 BUILDING ADDRESS: 2175 Salk, Suits 150, 160, 180, 185 & 190 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA { Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Refv Mech Plans 10001 Hrly Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance BIdg. Pernfiit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: • Repetitive Fee Repeats • Connplete Review • Other [3 Hourly EsGil Fee • structural Only Hr.@ $86.00 Based on tiourly rate Comments: Sheet 1 of 1 nnacvalue.doc + BUILDING ENERGY ANALYSIS REPORT PROJECT: VANTANA REAL PHASE II 2175 SALK AVE.,SUITE 150,160,180,185,190 CARLSBAD, CA 92008 Project Designer: Report Prepared by: HADI MAHZARI ENERGY CONSULTING GROUP 8015 BALBOA AVE. SAN DIEGO, CA 92111 858-268-0660 ^ Job Number: Date: 10/10/2011 Tfie EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - virtiw.energysoft.com. EnergyPro S. 1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MECH-1 -C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 15 Form MECH-3-C Mechanical Ventilation 20 Form MECH-4-C HVAC Misc. Prescriptive Requirements 22 Form MECH-MM Mechanical Mandatory Measures 37 EnergyPro 5.1 by EnergySoft Job Number: ID: User Number 2984 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALKAVE.,SUITE 150,160,180,185,190 Cf- Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: Cl Nonresidential • HIgh-Rlse Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. EH Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/150-1 • • Equipment Type^: Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity^ 14,277 Btu/hr • • Minimum Heating Efficiency^ 5.30 COP • • Max Allowed Cooling Capacity^ 42,844 Btu/tir • • Cooling Efficiency' 15.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setbacl< Required • • Fan Control Constant Votume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Descrit>e Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) HP/150-2 • • Equipment Type^: Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 13,322 Btu/tir • • Minimum Heating Efficiency' 5.20 COP • • Max Allowed Cooling Capacity' 64,851 Btu/tir • • Cooling Efficiency' 15.9 EER • • Duct Location/ R-Vaiue R-4.2 • • When duct testing Is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setbacl< Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment perfomnance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 3 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name VANTANA REAL PHASE 11 Date 10/10/2011 Project Address 2175 SALKAVE.,SUITE 150,160,180,185,190 0/ Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. EZI Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compilance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) HP/150-3 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 7,662 Btu/tir • • Minimum Heating Efficiency' 5.90 COP • • Max Allowed Cooling Capacity' 20,936 Btu/tir • • Cooling Efficiency' 16.5 EER • • Duct Location/ R-Value R-4.2 • • When duct testing Is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setoacic Required • • Fan Control Constant Votume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) HP/150-4 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 11.337 Btu/hr • • Minimum Heating Efficiency' 5.80 COP • • Max Allowed Cooling Capacity' 47,318 Btu/hr • • Cooling Efficiency' 17.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing Is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Forni. Compliance falls if a Fall box Is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 4 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALKAV£.,SU/T£ 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Roor Area n/a GENERAL INFORMATION Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Enveiope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/160-1 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 16,045 Btu/hr • • Minimum Heating Efficiency' 5.20 COP • • Max Allowed Cooling Capacity' 64,113 Btu/hr • • Cooling Efficiency' 15.9 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setbacl< Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/160-2 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 9,054 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 42,067 Btu/hr • • Coolinq Efficiency' 15.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setoac/c Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails If a Fall box Is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 5 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALK AVE.,SUITE 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. ES Conditioned Spaces — Unconditioned Spaces " (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or In Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' item or System Tags (I.e. AC-1, RTU-1, HP-1) HP/180-1 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 11,769 Btu/hr • • Minimum Heating Efficiency' 5.80 COP • • Max Allowed Cooling Capacity' 49,553 Btu/hr • • Cooling Efficiency' 17.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Descrlt>e Reason' Item or System Tags (I.e.AC-1, RTU-1, HP-1) HP/180-2 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 12,843 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 36,952 Btu/hr • • Coolinq Efficiency' 15.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing Is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity Is less than the Proposed (from the energy compilance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Forni. Compliance fails if a Fail box Is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 6 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALKAVE.,SUITE 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: B) Nonresidential • HIgh-Rlse Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. IZ Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Constnjction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' item or System Tags (i.e. AC-1, RTU-1. HP-1) HP/180-3 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 7,082 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 28,626 Btu/hr • • Cooling Efficiency' 17.0 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Votume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/185-1 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 30,351 Btu/hr • • Minimum Heatina Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 38,440 Btu/hr • • Cooling Efficiency' 15.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fail box Is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 bv EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 7 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALK AVE.,SUITE 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Roor Area n/a GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. ES Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component • Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/185-2 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 6,002 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 39,197 BtuAir • • Cooling Efficiency' 17.0 EER • • Duct Location/ R-Value R-4.2 • • When duct testing Is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Descrit>e Reason' Item or System Tags (i.e. AC-1. RTU-1, HP-1) HP/190-1 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 7,686 Btu/hr • • Minimum Heating Efficiency' 5.90 COP • • Max Allowed Cooling Capacity' 21,896 Btu/hr • • Cooling Efficiency' 16.5 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fall box Is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 8 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALKAVE.,SUITE 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. Bl Conditioned Spaces P, Unconditioned Spaces '-' (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/190-2 • • Equipment Type': Hydronic Heat Pump • • Number of Systems 1 • • Max Allowed Heating Capacity' 15,011 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 35,371 Btu/hr • • Cooling Efficiency' 17.0 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Settiack Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria RELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Descrlt>e Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP/190-3 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heatinq Capacity' 9,169 Btu/hr • • Minimum Heating Efficiency' 5.30 COP • • Max Allowed Cooling Capacity' 39.646 Btu/hr • • Cooling Efficiency' 15.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 9 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti Of5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Project Address 2175 SALKAVE.,SUITE 150,160,180,185,190 CA Climate Zone Total Cond. Floor Area 10,675 Addition Floor Area n/a GENERAL INFORMATION Building Type: Bl Nonresidential • High-Rise Residential • Hotei/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. tia Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compiiance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS RELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e.AC-1, RTU-1, HP-1) HP/190-4 • • Equipment Type': Hydronic Heat Pump • • Number of Svstems 1 • • Max Allowed Heating Capacity' 15,582 Btu/hr • • Minimum Heating Efficiency' 5.80 COP • • Max Allowed Cooling Capacity' 50.517 Btu/hr • • Cooling Efficiency' 17.6 EER • • Duct Location/ R-Value R-4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria RELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) • • Equipment Type': • • Number of Systems • • Max Allowed Heating Capacity' • • Minimum Heating Efficiency' • • Max Allowed Cooling Capacity' • • Cooling Efficiency' • • Duct Location/ R-Value • • When duct testing Is required, submit MECH-4A & MECH-4-HERS • • Economizer • • Thermostat • • Fan Control • • 1. If the Actual installed equipment perfonnance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EneravPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 10 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 Of 5) MECH-1 C Project Name VANTANA REAL PHASE II Date 10/10/2011 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 11 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 Of 5) MECH-10 Project Name Date VANTANA REAL PHASE 11 10/10/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed betow are all the acceptance tests for mechanical systems. The designer Is required to check the applicable boxes by all acceptance tests Itiat apply and listed aH equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA nuniber designates the Sectton in the Appendix of the Nonresidential Reference Appendtoes Manual that describes the test. Since this form will be part of the plans, completton of this sectton will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Accsptanca: Before occupancy permit Is granted for a newly constructed buikfing or space, or a new space-condittoning system sen/ing a buitoing or space is operated for normal use, all control devices senring the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form Is not considered a completed fomn and Is not to be accepted by the building department unless the con'ect boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The foitowing checked-off forms are required for ALL newly installed equipment. In addition a Certiftoate of Acceptance forms shall be submitted to the buitoing department that certifies plans, speciftoations, installatton, certificates, and operaUng and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before tfie buikling can receive final occupancy. TESTDESCnp-nON MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Eouipmenl Reauiring Testing or Verilication Qtv. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitarv Air Distribution Ducts Economizer Controls Demand Control VentUation DCV Supply Fan VAV Vah/e Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control CARRIER SOPSH030 4 El a • • • • • • • • CARRIER S0PSH018 2 a a • • • • • • • • CARRIER S0PSH04e 1 a a • • • D • • • • CARRIER SOPSH024 3 a a • • • • • • • • CARRIER SOPSH036 1 a O • • • • • • • a • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EneravPro 5.1 by EneravSoft User Number. 2964 RunCode: 2011-10-10T11:33:3S ID: Paoe 12 of 37 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C Project Name Date VANTANA REAL PHASE II 10/10/2011 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-1 SA Eguipment Reguiring Testing Qtv. Fault Detection & Diagnostics lor DX Units Automatic Faun Detection & Diagnostics lor Air & Zone Distributed Energy Storage DXAC Systems Thermal Energy Storage (TES) Systems Test Performed Bv: CARRIER S0PSH030 4 • • • • CARRIER S0PSH018 2 • • a • CARRIER S0PSH04a 1 • • • • CARRIER S0PSHO24 3 • • • • CARRIER SOPSH036 1 D • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnerovPro 5.1 bv EneravSofl User Number 29S4 RunCode: 2011-10-10T11:33:3e ID: Paae 13 of 37 CERTIHCATE OF COMPUANCE (Part 5 Of 5) MECH-1 C Prt^lName VANTANA REAL PHASE II Date 10/10/2011 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation Is accurate and complete. Name HADI MAHZARI Signature //^ /^A7t/tj^^ Company ENERGY CONSULVNG GROUP Date iono/2011 Address 8016 BALBOA AVE. CEA# CEPE# City/State/Zip SAN DIEGO .CA 92111 Phone 858-268-0660 The Principal Mechanical Designer's Declaration Statement • I am elgible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and perfomiance specifications required for compliance wilh Title-24, Parts 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the infonnation provided to document this design on the olher applicable compliance forms, worksheets, calculations, plans and specifications submitted lo the enforcement agency for approval with this building pemnit application. Date 10/10/2011 Name ANTHONY BRUNELLE Company NA7I0NAL & AIR & ENERGY Address 2053 RUTZ STREET License # 706889 City/State/Zip SANDIEGO, CA02110 Phone 619-298-2S00 Mandatory Meamires Indicate locatton on buikling plans of Note Bkxsk for Mandatory Measures. MECHANICAL COMPUANCE FORMS & WORKSHEETS (check box W worksheet Is Included) For detailed inslrucltons on the use of this and all Energy Efficiency Standards compliance forms, please refer to Ihe 2008 Nonresktential Manual. Note: The Enforcement Agency may require aH forms to t>e incorporated onto the buiMing plans. Bl MECH-1 C Certificale of Compiiance. Required on plans for ali submittals. MECH-2C Mechanical Equipmenl Summary Is required for ali submittals. El MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical venliiation. Bl MECH-4C Fan Power Consumption is required for ail prescriptive submittals. EnergyPro 5.1 by EnergySofl User Number 2984 RunCode: 2011-10-10709:10:20 ID: Page 14 of 37 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date VANTANA REAL PHASE II 10/10/2011 Item or System Tags (i.e.AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e.AC-1, RTU-1, HP-1) t^AgSiM^^d HP/150-1 HP/150-2 HP/150-3 Number of Systems ^^^^^m 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Page Reference on Plans or Schedule and Indicate the appiicable exceptlon(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 5.30 COP 5.20 COP 5.90 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) t5.6 EER 15.9 EER 16.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) 98 cfm 95 cfm 135 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Setback Reguired Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(f) Aulo Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 124 R-4.2 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted U4(a & b) 14,277 Blu/hr 13,322 Btu/hr 7,662 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 34,052 Btu/hr 59,190 Btu/hr 22,342 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 29,991 Btu/hr 45,396 Btu/hr 14,655 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 23,523 Btu/hr 44,605 Blu/hr 14,369 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No No No ' Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating^ Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 15 of 37 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date VANTANA REAL PHASE II 10/10/2011 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) i^tS"] HP/150^ HP/160-1 HP/160-2 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 5.80 COP 5.20 COP 5.30 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 17.6 EER 15.9 EER 15.6 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) 230 cfm 105 cfm 183 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Selback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Themiostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 124 R-4.2 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 11,337 Btu/hr 16,045 Btu/hr 9,054 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 39,629 Btu/hr 59,303 Blu/hr 34,699 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 33,122 Btu/hr 44,879 Btu/hr 29,447 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 27,122 Btu/hr 44,597 Btu/hr 22,074 Blu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(0) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 16 of 37 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date VANTANA REAL PHASE II 10/10/2011 Item or System Tags (i.e.AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e.AC-1, RTU-1, HP-1) HP/180-1 HP/180-2 HP/180-3 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Page Reference on Plans or Schedule and Indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 5.80 COP 5.30 COP 5.30 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 17.6 EER 15.6 EER 17.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) 63 cfm 147 cfm 110 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 124 R-4.2 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 11,769 Btu/hr 12,843 Btu/hr 7,082 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 38,365 Blu/hr 34,432 Btu/hr 29,171 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 34,687 Btu/hr 25,866 Btu/hr 20,038 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 29,249 Btu/hr 23,221 Btu/hr 19,305 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(C) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 17 of 37 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date VANTANA REAL PHASE II 10/10/2011 Item or System Tags (i.e.AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e.AC-1, RTU-1, HP-1) '^L^ • . ..: HP/185-1 HP/185-2 HP/190-1 Numtier of Svstems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Page Reference on Plans or Schedule and Indicate the applicable exceptlon(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 5.30 COP 5.30 COP 5.90 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 15.6 EER 17.0 EER 16.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) 71 cfm 122 cfm 95 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Themiostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 124 R-4.2 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 30,351 Btu/hr 6,002 Btu/hr 7,686 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 33,947 Btu/hr 29,261 Btu/hr 22,001 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 26,908 Btu/hr 27,438 Blu/hr 15,327 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 23,176 Btu/hr 19,057 Btu/hr 14,944 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) No Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 18 of 37 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date VANTANA REAL PHASE II 10/10/2011 Item or System Tags (i.e.AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e.AC-1, RTU-1, HP-1) 'a.'^r'WS^ HP/190-2 HP/190-3 HP/190-4 Number of Systems 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Page Reference on Plans or Schedule and indicate the appiicable exceptlon(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 5.30 COP 5.30 COP 5.80 COP MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(a) 17.0 EER 15.6 EER 17.6 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(b) 65 cfm 63 cfm 259 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(e) Setback Required Setback Required Selback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(f) Auto Aulo Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thennostat Furnace Controls/Thennostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation 124 R-4.2 R-4.2 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 15,011 Btu/hr 9,169 Btu/hr 15,582 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 28,844 Btu/hr 33,735 Btu/hr 39,881 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 24,760 Btu/hr 27,752 Btu/hr 35,362 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & b) 19,524 Btu/hr 23,223 Btu/hr 27,124 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simuhaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exceptlon(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 19 of 37 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name VANTANA REAL PHASE II Date 10/10/2011 MECHANICAL VENTILATION (i121(b)2) REHEAT LHWTAIION (S144(d)) AREA BASIS OCCUPANCY BASIS VAVUMMUM A 8 C D E F G H 1 J K L M H Zone/System Condition Area (If) CFM ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFMIlf Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transier Air HP/150-1 655 0.»5 98 98 98 HP/150-1 Total 98 98 HP/150-2 630 O.f 5 95 95 95 HP/150-2 Totel 95 95 HP/150-3 270 0.50 135 135 135 HP/1S0-3 Total 13S 135 HP/150-4 f,530 0.15 230 230 230 HP/150-4 Total 230 230 HP/160-1 700 0.15 105 105 105 HP/160-1 Total IOS 105 HP/160-2 1,222 0.15 183 183 183 HP/160-2 Total 183 183 HP/ieo-i 420 0,16 63 63 63 HP/1 SO-1 Total 63 63 HP/180-2 980 0.15 147 147 147 Totals Column 1 Total Design Ventiiation Air C Minimum ventHatian rate per Section S121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed setting. H Reouired Ventiiation Air (REQ'D VA) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or Ql. 1 Must be greater than or egual to H, or use Transfer Air (column N) to make up the difference. J Design fan suoDlv CFM (Fan CFM) x 50%: or the design zone outdoor airflow rate per $121. K Condition area (ft') x 0.4 CFM / ft' or L Maximum ol Columns H. J, K. or 300 CFM M This must be less than or egual to 0>lumn L and greater than or egual to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) Is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or egual to the difference between the Reouired Ventilatnn Air (Column H) and the Design Minimum Air (Column M), Coiumn H minus M. EneravPro 5.1 W EneravSofl User Number 2984 RunCode: 2011-10-10711:33:36 ID: Paae 20 of 37 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name VANTANA REAL PHASE II Date 10/10/2011 MECHANICAL VENTILATION (i121(b)2) REHEAT LHIMTATION (i144(d» AREA BASIS OCCUPANCY BASIS VAVIMNMUM A B C D E F Q H 1 J K L M N Zone/System Conditnn Area (ft") CFM per fl' Min CFM By Area BXC Number 01 People CFM per Person Min CFM by Occupant EXF REQD V.A. Maxol DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max.ol Columns H,J, K, 300 CFM Design Minimum Air Setpoint Transier Air HFi/180-2 Total 147 147 HP/180-3 220 0.50 110 110 110 HP/180-3 Total 110 110 HP/185-1 470 0.15 71 71 71 HP/185-1 Total 71 71 HP/185-2 810 0.15 122 122 122 HP/185-2 Total 122 122 HP/190-1 190 0.50 95 95 95 HP/190-1 Total 95 95 HP/190-2 430 0.15 65 65 65 HP/190-2 Total 65 65 HP/190-3 420 0.15 63 63 63 HP/190-3 Total 63 63 HP/190^ 1,728 015 259 259 259 HP/190-4 Total 259 259 Totals Column 1 Total Design Ventilation Air C Minimum ventlation rate per Sectton $121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes (or spaces without fixed setting. H Reguired Ventilation Air (REQ'D VA) is the larger of the ventiiation rat es calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). i Must be greater than or equal to H, or use Transier Air (column N) to make up the difference. J Design fan supolv CFM (Fan CFM) x 50%: or the design zone outdoor airflow rate per $121. K Conditton area dt*) x 0.4 CFM / ft*; or L Maximum of Columns H. J. K, or 300 CFM M This must be less than or egual to Coiumn L and greater than or egual to the sum of Columns H plus N. N Transfer Air must be piovided where the Required Ventlation Air (Coiumn H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or egual to tfw difference between the Reauired Ventlation Air (Column H) and the Design Minimum Air ((Column M), Column H minus M. EneravPro 5.1 W EneravSoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Paae 21 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.330 64.0% 100.0% 1.0 385 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) f,000 A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 4) SP. A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP.-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: 22 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: ProvKle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variafcile Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.750 77.0% 100.0% 1.0 727 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 727 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.454 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 23 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.167 60.0% 100.0% 1.0 208 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 208 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.346 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 24 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) A B C D E F Fan Description Design Brake HP Efficiency Number of Fans Peak Watts BXEX746/ (CXD) Fan Description Design Brake HP Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.500 76.0% roo.0% 1.0 491 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1-(SP.-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 25 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provkje one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) A B c D E F Fan Description Design Brake HP Efficiency Number of Fans Peak Watts BXEX746/ (CXD) Fan Description Design Brake HP Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.750 77.0% 100.0% f.O 727 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 727 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.454 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 26 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.330 64.0% 100.0% 1.0 385 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,000 A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 27 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.500 76.0% 100.0% 1.0 491 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 28 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.330 64.0% 100.0% 1.0 385 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,000 A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 29 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provkle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Svstems when using ttie Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.200 60.0% 100.0 % 1.0 249 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 800 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 51 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 30 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) A B C D E F Fan Description Design Brake HP Efficiency Number of Fans Peak Watts BXEX746/ (CXD) Fan Description Design Brake HP Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.330 64.0% 100.0% 1.0 385 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,000 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0385 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 31 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.200 60.0% 100.0% 1.0 249 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 800 A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP. on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 32 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(0). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.167 60.0% 100.0% 1.0 208 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 208 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP.) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.346 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 33 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provkfe one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Svstems or Variat^e Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c'). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) Supply Fan 0.200 60.0% 100.0% 1.0 249 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 800 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP.-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySofl User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 34 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provkle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.330 64.0% 100.0 % 1.0 385 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,000 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 35 of 37 FAN POWER CONSUMPTION MECH-4C Project Name VANTANA REAL PHASE II Date 10/10/2011 NOTE: Provkle one copy of this woricsheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts BXEX746/ (CXD) Supply Fan 0.500 76.0% 100.0% 1.0 491 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SP. A) If filer pressure drop (SP,) is greater than 1 inch W. C. or 245 Pascal then enter SP, on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 36 of 37 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name VANTANA REAL PHASE II Date 10/10/2011 Equipment and System Efficiencies §111: Any appliance for which there is a California standard estat>lished in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602,603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: IA. Each space conditioning system sen/ing building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or IB. An occupancy sensor to control the operating period of the system; or IC. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with Isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independentiy of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shail have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone §122(a&b): Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controis shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. §121(f): Ventiiation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a new ventilating system serving a building or space is operated for normal use, ail ventilation systems serving the buiiding or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 37 of 37 .S,j&vi,.^pg^ ^>LAaj^ fidoS^^ m ujfe. 0-56: ^ At^ p^^,^^ '.A t4i £2 tc §5 ^