HomeMy WebLinkAbout2175 SALK AVE; 150-190; PC110040; Permit03-07-2012
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Permit No: PC110040
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
Applicant:
CHIE HONDA
PO BOX 99429
SAN DIEGO
CA 92109
858-794-3222
2175 SALKAV CBAD
PLANCK
2120210800 Lot#:
$0.00 Construction Type:
TENANT IMPROV : SHELL TO OFFIC
TO CREATE SUITES 150,160,180,185,190
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
09/07/2011
JMA
03/07/2012
10/17/2011
Owner:
RIO SD PLAZA II MASTER LLC
C/O NEWPORT NATIONAL CORPORATION
1525 FARADAY AVE #100
CARLSBADCA 92008
Plan Check Fee
Additional Fees
$1,115.00
$0.00
Total Fees: $1,115.00 Total Payments To Date: $1,115.00 BalanceDue: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project Includes the "Imposition* of fees, dedications, resen/ations, or other exactions hereafter collectively
refen'ed to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest Imposition of these fees/exactlons. If you protest them, you must
follow the protest procedures set forth In Government Code Section 66020(a), and file the protest and any other required infomnation with the City Manager for
processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactlons DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or sen/Ice fees in connection with this project NOR DOES IT APPLY to any
fees/exactlons of which vou have previously been given a NOTICE similar to this, or as to whli^ the statute of limitations has previouslv othenwise expired.
^ CITY
CARLSBAD
O F
Building Perinit Application
1635 Faraday Ave., Carlsbad, CA 92008
760-602-2717/2718/2719
Fax 760-602-8558
www.carisbadca.gov
Plan Check No.
Est Value
Plan Ck. Deposit
Date SWPPP
JOBADDRESS 2175 Salk Ave.
« BEDROOMS
0
150-190
TENANT BUSmtSS NAME
212 - 021 02 00
CONSTR. TYPE
VB
occ. GROUP
B/A
CT/PROJECT # * BATHROOMS
Spec. Suites
DESCRIPnONOFWORK: Indude Squan Fet otMfeetedAnaC)
TENANT IMPROVEMENT IN EXISTING SHELL - SCOPE OF WORK:
CONSTRUCTION OF NEW TENANT IMPROVEMENTS FOR TYPICAL OFFICE USE INCLUDING OFFICES, BREAKROOM AND MEETING ROOMS PER PLAN. NEW MECHANKAL UNITS TO
ACCOMMODATE NEW LAYOUT. NEW CEIUNG AND LIGHTING SYSTEMS TO BE INSTALLED TO ACCOMMODATE NEW LAYOUT AND ENERGY SAVINGS REQUIREMENTS.
Suite 150 = 3,248SQFT/ Suite 160 = 1,792 SQFT/ Suite 180 = 1,618 SQFTI Suite 185 = 1,238 SOFT/ Suite 190 = 2,527 SQFT
PROPOSED USE
Office
GARAGE (SF)
0
DECKS (SF)
0
FIREPLACE
YEsQ*. NO[23
AIR CONOmONING
YEs(7)N0rn
FiRE SPRINKLERS
YESQNOQ
EXISTINQUSE
Existing Sitell
PATIOS (SF)
0
APPUCANTNAME (Primary Contact)
T>eiijiM^ Chie Honda APPUCANT NAME (Secondary Contact; Amy Tobia
ADDRESS P.O. Box 99429 ADDRESS
crrv San Diego
STATE
CA
ZIP
92109 crrv STATE ZIP
PHONE
858-794-3222
FAX
858-490-0364
PHONE FAX
EMAIL cltonda@designcorpsd.com EMAIL atobia@de8igncorpsd.com
PROPERTY OWNER NAME JEFF BRUSSEAU CONTRACTOR BUS. NAME /
ADDRESS
1525 Faraday Ave. Suite 100 ADDRESS
crrv Carlsbad
STATE
CA
ZIP
92008 CnrV STATE ZIP
PHONE
760-6074282
FAX
760-607-4286
PHONE FAX
EMAIL
Jbrusseau@newportnational.biz
EMAIL
ARCH/DESIGNER NAME i AODRESS STATE UC. # CITY BUS. UC.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicantfor such permit to fiie a siaied statement that he is licensed pursuant to the provisions of the Contractor's Ucense Law (Chapter 9, commending with Section 7000of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant fOr a permit subjects the appiicant to a civil penalty of not more than five hundred doiiars $500}).
WORKERS COIVIPENSATION
Worken' Compansitlon Daclwitlon: / hereby affinn under penalty 01 perjury one of the fbllowing declarations:
LJUMVS and wHIimlntalnicaillficat* of concent lo«*lf.4n«urafv 3700 of the Labor Code, for the peifomianM of the worti fbr whi(^ this pennH is issued.
(P^JHitye and wNI maintain workers' compensatian, as required bv Section 3700 of the Labor Code, fbr the peribrmance of the work for which Ms pemiit Is issued. My workere' compensation insurance cairier and policy
number are: Insurance Co. •"^"^j^n^ '^p^jA^r^ Policy No. Expiration Dale.
insuranoe earner ana poi
Bsectkin need not be compleled if the pennK is fbr one hundred dollars ($100) or less.
CartHlcata of Exemption: I certily that in the performance of the w»k k)r which this pemiit is issued, I shall n^
Calilbmia WARNING: Falftii* to secure workere' compannUon eovarage It unlawful, and «haR w^act an amployar to criminal penalties and dvll fine* up to on* hundrad thou*and dollare (&100,000), In
addition to the cost of compensation, damages >»iMovid*d for^iKSa^t^ 3706 of the Labor code, intemt and attomey't feet. ,
CONTRACTOR SIGNATURE ( P~^^-^^ ""^i^ QAGENT DATE lo|\g'li/
OWNER-BUILOER DECLARATION
//lerely affinn tfiaf/am exempt ton Contactys Lfcense Law for (he
r~| I, as ownerof the property or my empkiyees with wages as Iheirsolecompensatlon.win do the woik and the stmcture is noting
Lk»nse Law does not apply to an owner of property who buikis or improves thereon, and who does such work himself or th^
sale. If, however, the building or improvement is scM within one year of complelkin, the ovmer-buiUer will have the burden ol proving that he (M not bi^ or improve for Ihe purpose of sale).
I I I, as owner of the property, am exclusively contracting with lk»nsed contractois to constract the project (Sec. 7044, Business and Piolessnns Code: The Contractor's License Law does not apply to an owner of
pioperty who buiUs or improves thereon, and contracts tor such projects with contractor(s) tensed pursuant to the Conlractor's Ucense Law).
(~| I am exempt under Section. .Business and Proiesskms Code tor this reason:
1.1 personally plan to provkle the ma|or labor and materials tor constnictkin of the preposed property Imp^ FTYes I ho
2.1 (have / have not) signed an applcafon tor a buikling pemiH tor the preposed work.
3.1 have contracted with the folkiwing peison (fimi) to prevkie the preposed constnjctton (Include name address / phone / contractors' iksnse numbe^:
4.1 plan to provkle porttons of the wori(, but I have hired the folkiwing peison to cooidinate, supenrise and prevkie the maior woik (inckxJe name / address / phone / contractors' lk»nse number):
5.1 will provkle some of the woik, but I have contracted (hired) the toltowing persons to provkle the woric indkated (inckide name / address / phone / type of wori():
^PROPERTY OWNER SIGNATURE •AGENT DATE
COMPLETE THIS SECTION FOR N O N - R E S 1 D E N T I A L BUILDING PERMITS ONLY
Is the appitoant or future buiklkig occupant required to submit a business plan. acutely hazantous materials registratton Ibmi or risk management and preventton program under Secttons 25505,25533 or 25534 of the
Presley-Tanner Hazantous Substance Account Art? Cjl^** L^to f—, —
Is Ihe appfcant or future buiklkia occupant leauired to obtain a pemiit from the air pollutton control dlsWrt or air qualitv management district? [_|Yes I INo
Is the facility to be constmcted within 1,000 feet of the outer boundary of a school site? LDYBS IINO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVKXS AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby afRnn that there is a construction lending agency fbr the perfbmiance of the work this permit is issued (Sec. 3097 (i) Chril Code).
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I certHy that I haw read the applcatkm and State thatttie abow Infomiatton is conect and thatthe Intonnati
I heieby authorize representadvs of the City of Carisbad to enter upon the above mentkxied pioperty for Inspectton puiposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE QTY OF CARLSBAD
AGAINST ALL LIABIUTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An ()SHA pennit is required kx excavations over 5'a deep and demolllkxi or constractkxi of st^
EXPIRAT10^I: Every permit Issued by Ihe BuMIng Oflkjal un^the proviskxis of this
180 days fiom Ihe date of such pemiit or If the buikllngoniM^a^
^t^APPLICANT'S SIQNATURE DATE ^. 6. //
City of Carlsbad BIdg Inspection Request
For: 01/30/2012
Permit* CB112409
Title: ZYNGA-8,863 SF SHELL TO OFFICE
Description:
Inspector Assignment: PY
Type:TI Sub Type: INDUST
Job Address: 2175 SALKAV
Suite: 290 Lot: 0
Location:
APPLICANT DESIGNCORP
Owner: VENTANA REAL LLC
Remarks:
Phone: 8585831191
Inspector:
Total Time: Requested By: BRIAN
Entered By: CHRISTINE
CD Description Act Comments
14 Frame/Steel/Bolting/Welding
24 Rough/Topout
34 Rough Electric
44 Rough/Ducts/Dampers
Com ments/Notices/Holds
Associated PCRs/CVs/SWPPPs Original PC#
Inspection Historv
Date Description Act Insp Connments
01/27/2012 84 Rough Combo CA PD roll to 1-30
01/03/2012 17 Interior Lath/Drywall AP PY
12/27/2011 14 Frame/Steel/Bolting/Welding AP PY
12/27/2011 24 Rough/Topout AP PY
12/27/2011 34 Rough Electric PA PY'
NJ? CITY OF
CARLSBAD
Unscheduled
Buiiding Inspection
Building Department
1635 Faraday Avenue
Carlsbad CA 92008
760-602-2700
DATE: INSPECTOR: s 1 1
PERMIT#: // " ^^^9 CONTACT:
¥/
PHONE #:
JOB ADDRESS: 2 ll 6^
DESCRIPTION:
CODE DESCRIPTION
3y JZJLAT
COMMENTS /|
2J^ 0 6
BIdg Inspection Form Page 1 of 1 Rev. 06/09
EsGil Corporation
In Partnersfiip witA government for (BuiCSing Safety
DATE: 10/12/11 • APPLICANT
• JURIS.
JURISDICTION: Carlsbad • PLAN REVIEWER
• FILE
PLAN CHECK NO.: PCll-40 SET III
PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190
PROJECT NAME: Office TI
^ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
[~~] The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
^ Esgil Corporation staff did not advise the applicant that the plan check has been completed.
I I Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email:
Fax #:
IVIail Telephone Fax In Person
• REMARKS:
By: Chuck Mendenhall Enclosures:
EsGil Corporation
• GA • EJ • PC 10/6/11
EsGil Corporation
In (Partnerstiip •witli government for <BuiCding Safety
DATE: 10/3/11 • AEELICANT
•JURIS;
JURISDICTION: Carlsbad a^HAFTREVIEWER
• FILE
PLAN CHECK NO.: PCll-40 SET: II
PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190
PROJECT NAME: Office TI
I 1 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
^ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Design Corp, Att'n: Chie Honda
P.O. Box 99429, San Diego, CA 92109
I I Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Chie Honda Telephone #: (858) 794-3222 x304
Date contacted:' o l2>l,t (by: (^c__) Email: chonda@designcorpsd.com
Fax #: (858) 490-0364
^ IVIail Telephone Fax ^ In Person
• REMARKS:
By: Chuck Mendenhall Enclosures:
EsGil Corporation
• GA • EJ • PC 9/26/11
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576
Carlsbad PCll-40
10/3/11
NOTE: The items listed below are from the previous correction list. These remaining items
have not been adequately addressed. The numbers of the items are from the previous check
list and may not necessarily be in sequence. The notes in CAPS & bold font are current.
• Please make all corrections, as requested in the correction list. Submit FOUR new complete
sets of plans for commercial/industrial projects (THREE sets of plans for residential projects).
For expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad
Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will
route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining
sets of plans and calculations/reports directly to the City of Carlsbad Building Department for
routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete.
EXITS
1. The common path of egress travel shall not exceed 75 feet Section 1014.3.
• In Group B, F and S occupancies, this may be increased to 100' ifthe building has an
automatic sprinkler system. The common path of travel within suite 190 exceeds 100ft
from the most extreme location in the Break Rm 142 to the primary exit door at
Reception 131. THE REVISED PLANS NOW SHOW THE THE COMMON PATH OF
TRAVEL FOR PEOPLE IN THE IT ROOM WILL EXCEED THE CODE LIMIT OF 100FT.
MISCELLANEOUS
2. The all glass wall conference Rm 132 in suite 190 is referenced to detail 'B' on sheet Tl-1.1
which references detail 14/TI-5.2. Detail 14/TI-5.2 does not show how you intend to resist the
code required out-of-plane load of 5 PSF where the glass joins the framed wall. Clarify how
you resist the out-of-plane wall loads for this condition. THE RESPONSE DIRECTS ME TO
DETAIL 18/TI-5.2. DETAIL 18 ON TI-5.2 INDICATES THAT LATERAL BRACING IS
PROVIDED AT 4'-0" OC BUT THE BRACING IS NOT SHOWN IN THE DETAIL.
MECHANICAL
5. Detail the primary and secondary mechanical condensate waste design: Pipe sizing, routing,
and termination area forthe ceiling mounted HP's.. CMC 309.0 & CPC 807.0. THE PRIMARY
CONDENSATE DRAIN IS SHOWN ON SHEET MOI.2 BUT THE SHEET M-1.2 DOES NOT
ADDRESS THE SECONDARY CONDENSATE DRAIN AS REQUIRED BY CMC SECTION
309.2
END OF RECHECK
To speed up the review process, note on this list (or a copy) where each correction item has
been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
Carlsbad PCll-40
10/3/11
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the
plan review for your project. If you have any questions regarding these plan review items,
please contact Chuck Mendenhall at Esgil Corporation. Thank you.
EsGil Corporation
In (Partnerstiip witfi government for (BuidCing Safety
DATE: 9/16/11 • AEELIQANT
• ^URIS^
JURISDICTION: Carlsbad • PLAN REVIEWER
• FILE
PLAN CHECK NO.: PCll-40 SET: I
PROJECT ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 & 190
PROJECT NAME: Office TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
^ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to fonvard to the applicant
contact person.
XI The applicant's copy of the check list has been sent to:
Design Corp, Att'n: Chie Honda
P.O. Box 99429, San Diego, CA 92109
I I Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: chie Honda Telephone #: (858) 794-3222 x3oH
Date contacted:'^f,'^! ,v {by. ) Email: chonda@designcorpsd.com
Fax #: (858) 490-0364
!^ Mail^ Telephoned Fax In Person
• REMARKS:
By: Chuck Mendenhall Enclosures:
EsGil Corporation
• GA • EJ • PC 9/9/11
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576
Carlsbad PCll-40
9/16/11
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: PCll-40 JURISDICTION: Carlsbad
OCCUPANCY: B USE: Offices
TYPE OF CONSTRUCTION: V B ACTUALAREA: 10,423
ALLOWABLE FLOOR AREA: no change STORIES: 3
HEIGHT: no change
SPRINKLERS?: Yes OCCUPANT LOAD: Suite 150= 58 max
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 9/9/11
DATE INITIAL PLAN REVIEW
COMPLETED: 9/16/11
PLAN REVIEWER: Chuck Mendenhall
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2009 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e.. plan sheet number, specification section, etc.
Be sure to enclose the marked up list when vou submit the revised plans.
Carlsbad PCll-40
9/16/11
• Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of
plans for commercial/industrial projects (THREE sets of plans for residential projects). For
expeditious processing, corrected sets can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building
Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the
plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake
Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and
calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning,
Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City
Planning, Engineering and Fire Departments until review by EsGil Corporation is complete.
. EXITS
1. The common path of egress travel shall not exceed 75 feet Section 1014.3.
a) In Group B, F and S occupancies, this may be increased to 100' if the building has an
automatic sprinkler system. The common path of travel within suite 190 exceeds
100ft from the most extreme location in the Break Rm 142 to the primary exit door
at Reception 131
• MISCELLANEOUS
2. The all glass wall conference Rm 132 in suite 190 is referenced to detail 'B' on sheet TI-1.1
which references detail 14/TI-5.2. Detail 14/TI-5.2 does not show how you intend to resist the
code required out-of-plane load of 5 PSF where the glass joins the framed wall. Clarify how
you resist the out-of-plane wall loads for this condition.
• ENERGY CONSERVATION
3. Imprint on the plans the signed MECH-1 C forms.
4. The OSA listed on sheet M-0.1 must be consistent with the energy design limits listed on the
MECH-2C for each of the proposed units.
• MECHANICAL
5. Detail the primary and secondary mechanical condensate waste design: Pipe sizing, routing,
and termination area for the ceiling mounted HP's. . CMC 309.0 & CPC 807.0.
END OF REVIEW
To speed up the review process, note on this list (or a copy) where each correction item has
been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the
plan review for your project. If you have any questions regarding these plan review items,
please contact Chuck Mendenhall at Esgil Corporation. Thank you.
Carlsbad PCll-40
9/16/11
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: PCll-40
PREPARED BY: Chuck Mendenhall DATE: 9/16/11
BUILDING ADDRESS: 2175 Salk, Suite 150, 160, 180, 185 SB 190
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB
BUILDING
PORTION
AREA
( Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
spec offices Tl 10423 37.12 386,902
Air Conditioning
Fire Sprinklers
TOTAL VALUE 386,902
Jurisdiction Code cb By Ordinance
Bidg. Permit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review:
• Repetitive Fee
Repeats
Q Complete Review
• Other
j-| Hourly
EsGil Fee
• Structural Only
Hr. @ *
$1,690.61
$1,098.90
$946.74
Comments:
Sheet 1 of 1
macvalue.doc +
CITY OF
CARLSBAD
BUILDING PLANCHECK
CHECKLIST
E-36
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
ENGINEERING Plan Check for PC 11-40 Review # 1 Date: Septembers,2011
Project Address: 2175 Salk Avenue - Suite 150,160,180,185 & 190 APN: 212-021-02-00
Project Description: Tenant improvement - convert 10,423 sf of existing Valuation:
shell space to office (Ste 150:3,248 / Ste160:1,792 /
Ste 180:1,618 / Ste 185:1,238 / Ste 190:2,527)
ENGINEERING Contact: Linda OntiverOS
Phone: 760-602-2773
Email: linda.ontlveros@carlsbadca.gov
Fax: 760-602-1052
STOP!
Please
Read
Any outstanding issues will be marked with I X I. Please make the necessary
corrections to the plans or specifications for compliance with applicable codes
and standards. Submit corrected plans and/or specification to the Building
division for resubmittal to the Engineering Division.
Items that conform to permit requirements are marked with /
ATTACHMENTS:
Engineering Application
stomn Water Fonn
Right-of-Way Application/Info. Sheet
Reference Documents
OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
BY
REMARKS
DATE: September 23,2011
Notification of Engineering APPROVAL has been sent to
via • on
E-36 Page 1 of 6 REV 4/30/11
PC11-40 Review # 1
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
I / J North arrow
[ZJ Existing & proposed structures
CZU Existing street improvements
Property lines (show ali dimensions)
m Easements
dZ] Right-of-way width & adjacent streets
/ I Driveway widths
3 Existing or proposed sewer lateral
I Existing or proposed water service
I Submit on signed approved plans:
DWG No.
Show on site plan:
•
I Drainage patterns
Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining
street or an approved drainage course.
ri_. J ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale
5' away from building".
I Existing & proposed slopes and topography
]Size, location, alignment of existing or proposed sewer and water service(s) that serves the project.
Each unit requires a separate service; however, second dwelling units and apartment complexes are an
exception.
J Sewer and water laterals should not be located within proposed driveways, per standards.
Include on title sheet:
/ I Site address
"""1 Assessor's parcel number
~~| Legal description/lot number
I For commercial/industrial buildings and tenant improvement projects, include: total building
square footage with the square footage for each different use, existing sewer permits
showing square footage of different uses (manufacturing, warehouse, office, etc.) previously
approved.
I Show all existinq use of SF and new proposed use of SF.
Example:
Tenant improvement for 3500 SF of warehouse to 3500 SF of office.
Lot/Map No.:
Subdivision/Tract:
Reference No(s):
E-36 Page 2 of 6 REV 4/30/10
PC11-40 Review # 1
2. DISCRETIONARY APPROVAL COMPLIANCE
/ I Project does not comply with the following engineering conditions of approval for project no.
NA
3. DEDICATION REQUIREMENTS
Dedication for all street rights-of-way adjacent to the building site and any stomri drain or
utility easements on the building site is required for all new buildings and for remodels with a
value at or exceeding $ 20.000.00 , pursuant to Carlsbad Municipal Code Section 18.40.030.
For single family residence, easement dedication will be completed by the City of Carlsbad,
cost $605.00.
Dedication required as follows:
4. IMPROVEMENT REQUIREMENTS
1 All needed public improvements upon and adjacent to the building site must be constructed
at time of building construction whenever the value of the construction exceeds
$100,000.00. pursuant to Carlsbad Municipal Code Section 18.40.040.
/ I Public improvements required as follows:
NA
Construction of the public improvements must be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or current grant
deed on the property and processing fee nf $ 441 nn so we may prepare the necessary
Neighborhood Improvement Agreement. This agreement must be signed, notarized and
approved by the city prior to issuance of a building permit.
/I Future public improvements required as follows:
NA
E-36 Page 3 of 6 REV 6/30/10
BC11-40
Reviews 1
5. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 15.16 of the Municipal
Code.
TENANT
IMPROVEMENT
Jinadequate infonnation available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
I I Grading Permit required. NOTE: The grading permit must be issued and rough qradina
approval obtained prior to issuance of a building permit.
I Graded Pad Certification required. (Note: Pad certification may be required even if a grading
permit is not required.) Ail required documentation must be provided to your Engineering
Construction Inspector per the attached list. The inspector will then
provide the engineering counter with a release forthe building permit.
j/J No grading permit required.
[_] Minor Grading Permit required. See attached marked-up submittal checklist for project-
specific requirements.
6. MISCELLANEOUS PERMITS
~71 RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way. Types of work include, but are not limited to: street
improvements, tree trimming, driveway construction, tying into public storm drain, sewer and
water utilities.
I Right-of-way permit required for:
E-36 Page 4 of 6 REV 6/30/10
PC 11-40 Review #1
7. STORM WATER
Construction Compliance
I [ / I Project Threat Assessment Form complete.
I Enclosed Project Threat Assessment Form incomplete.
Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW )
I I Requires Tier 2 Stonn Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
Storm Water Standards Questionnaire complete.
Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
Project is subject to Standard Stomn Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.aov/business/buildinq/Documents/EnaStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
I I Rainwater harvesting (rain barrels or cistern)
I I Vegetated Roof
n Bio-retentions cell/rain garden
[ZU Pervious pavement/pavers
EZI Flow-through planter/vegetated or rock drip line
IZZ] Vegetated swales or rock infiltration swales
I I Downspouts disconnect and discharge over landscape
I I Other:
E-36 Page 5 of 6 REV 4/30/10
PC11-40 Review* 1
9. WATER METER REVIEW
. Domestic (potable) Use
Where a residential unit is required to have an automatic fire
extinguishing system, the minimum meter size shall be a 1" meter.
NOTE: the connection fee, SDCWA system capacity charge and the
water treatment capacity charge will be based on the size of the meter
necessary to meet the water use requirements.
For residential units the minimum size meter shall be 5/8", except where
the residential unit is larger than 3,500 square feet or on a lot larger than
one quarter (1/4) acre where the meter size shall be V*.
8. FEES
• Required fees have been entered in building pennit.
Drainage fee applicable
Added square feet
Added square footage in last two years?
Permit No.
Permit No.
Project built after 1980
Impervious surface > 50%
Impact unconstructed facility
Fire sprinklers required | |yes
Upgrade • yes
No fees required
• yes Qno
[Zlyes [ZZno
I 1 yes ZZ] no
yes LJno
IZZ] no (is addition over 150' fronri center line)
•no
10. Additional Comments
E-36 Page 6 of 6 REV 4/30/10
Fee Calculation Worksheet
ENGINEERING DIVISION
PC 11-40
(CB 11-1934 THRU
CB 11-1938)
Prepared by: Linda Ontiveros Date: September 23,2011 GEO DATA: LFMZ: / B&T:
Address: 2175 Salk Avenue (Suite 150 /160 /180 /185 /190 BIdg. Permit #: SEE ABOVE
Fees Update by: Date: Fees Update by: Date:
EDU CALCULATIONS: List types and square footages for all uses,
Types of Use: Warehouse to Office
Types of Use:Ste 150,160,180,185,190 Sq,Ft,/Units 10,423/1800
Types of Use: [EDU CREDIT FROM
Types of Use; ======Current charge
Sq.Ft./Units
Sq.Ft/Units CB 08-1193]
Sq.Ft./Units calculations====
ADT CALCULATIONS: List types and square footages for all uses.
Sq.Ft,/Units
Sq,Ft,/Units 20/1000 (10,423)_
Sq,Ft,/Units CB 08-1193]
Sq.Ft./Units calculations====
Types of Use; Warehouse to Office
Types of Use Ste 150,160,180,185,190
Types of Use; [ADT CREDIT FROM
Types of Use; =====Current charge
FEES REQUIRED;
Within CFD; DYES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee)
EDU's
EDU's 5.79
EDU's [2.09]
EDU's = 3.7
ADT's
ADT's 209
ADT's [52]
ADT's = 157
]N0
1. PARK-IN-LIEU FEE;DNW QUADRANT DNE QUADRANT DSE QUADARANT DSW QUADRANT
ADT'S/UNITS;
2, TRAFFIC IMPACT FEE;
ADT'S/UNITS: 157
3, BRIDGE & THOROUGHFARE FEE;
ADT'S/UNITS;
4, FACILITIES MANAGEMENT FEE
ADT'S/UNITS;
5, SEWER FEE
EDU's 3.7
BENEFIT AREA: E
EDU's 3.7
6, DRAINAGE FEES;
ACRES;
7, POTABLE WATER FEES;
UNITS CODE
X FEE/ADT;
X FEE/ADT; 93
• DIST.#1
X FEE/ADT:
ZONE;
X FEE/SQ.FT./UNIT;
X FEE/EDU; 1.096
=$
=$ 14,601
• DIST,#2
=$
=$
=$ 4,055.20
• DIST,#3
PLDA;
X FEE/EDU; 2.960
•HIGH nMED
X FEE/AC;
=$ 10,952
UM LOW
CONN, FEE METER FEE SDCWA FEE TOTAL
-Tenant improvement - convert 10, 423 sf
jppof existing sliell space to offic^T^
.05 (Ste 150: 3^248 / 1 ^^{\C]i>^lmsrr /.2M4o/3^if
3^Stel60: 1,792 / loo^^^ H)3<^^J>r
.)^Stel80:1,618 / . 9^ FDMfe)324/j
-25Ste 185:1,238/^^^ ^^{fc)^^|vj>r
S Ste 190: 2,527) \ H-oQ>i^((p\5^^^
S. 7p
<!•>
^ CiTY OF
CARLSBAD
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Construction
SWPPP Tier
Level
Construction Threat Assessment Criteria*
Perceived
Threat to
Storm Water
Quality
Tiers
Tier 3 - Hiah Constmction Threat Assessment Criteria
High
Tiers
• Project site Is 50 acres or more and grading will occur during the rainy season
• Project site Is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA
• Soli at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion fectors kt greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Stomri Water Notice of Violation within past two years
High
Tiers
Tier 3 - Medium Construction Threat Assessment Criteria Medium
Tiers
• All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium
Tier 2
Tier 2 Hiah Constmction Threat Assessment Criteria
High
Tier 2
• Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site Is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Constmction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Stonn Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
High
Tier 2
Tier 2 - Medium Constmction Threat Assessment Criteria Medium
Tier 2
• All projects not meeting Tier 2 High Constmction Threat Assessment Criteria Medium
Tierl
Tier 1 - Medium Insoection Threat Assessment Criteria
Medium
Tierl
• Project Is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion fectors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Constmction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturijance
Medium
Tierl
Tier 1 - Low Insoection Threat Assessment Criteria Low
Tierl
• All projects not meeting Tier 1 Medium Constmction Threat Assessment Criteria Low
Exempt - Not Applicable - ^
*The city engineer may authorize minor variances from the constmction threat assessment criteria in special circumstances
where it can be shown that a lesser or higher amount of stomi water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
^ STORIVIWATER
4M> STANDARDS oevelopment ferv.ces
Engineering Department
^ CITV Of QUESTIONNAIRE ISSSFaradavA,enue
CARLSBAD E-34 760-602-2750
www.carlsbadca.gov
INSTRUCTIONS:
To address post-development pollutants that may be generated from development projects, the City requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMP's) into the project design per the City's Standard Urban Stonnwater Management Plan (SUSk^).
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application
(subdivision, discretionary pennits and/or construction permits). The results of the questionnaire determine the level of
storm water standards that must be applied to a proposed development or redevelopment project. Depending on the
outcome, yow projaet wM etther be subject to 'Standard Stormwater Re(^,rir«m«nl8' or be si^!^ additional criteria
called 'Priortty Devalopment Project Requirements'. Many aspects of project ttte design are dependent t^n the
storm water standards applied to a project.
Applicant responses to the questionnaire represent an initial assessment of the proposed project conditions and
impacts. City staff has responsibility for making the final assessment after submission of the development application.
If staff detennines that the questionnaire was incorrectly filled out and is subject to more stringent storm water
standards than initially assessed by the applicant, this will result in the return of the development application as
incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If applicants are unsure about the meaning of a question or need help in detennining how to respond to one or more of
the questions, they are advised to seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission.
Only one completed and signed questionnaire is required when multiple development applications for the same project
are submitted concurrently. In addition to this questionnaire, applicants for construction permits must also complete,
sign and submit a Project Threat Assessment Fomi to address construction aspects of the project.
Please answer the questions below, follow the Instructions and sign the form at the end.
1. Is your project a significant redevelopment?
DEFINITION:
Significant redevelopment is defined as the creation, addition or replacement of at least 5.000 square feet of
impervious surface on an already existing developed site.
Significant redevelopment Includes, but is not limited to: the expansion of a building footprint; addition to or
replacement of a structure; structural development Inctuding an Increase In gross floor area and/or exterior
constmction remodeling; replacement of an Impervious surface that Is not part of a routine maintenance activity; and
land disturbing activities related with structural or Impervious surfaces. Replacement of impervious surfaces Includes
any activity that is not part of a routine maintenance activity where Impervious material(s) are removed, exposing
underiying soil during construction.
If your project IS considered significant redevelopment, then please skip Section 1 and proceed with Section 2.
If your project IS NOT considered significant redevelopment, then please proceed to Section 1.
E-34 Page lof 3 REV 3/23/10
^ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Engineering Department
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
SECTION 1 NEW DEVELOPiMENT
PRIORITY PROJECT TYPE
Does you project meet one or more of the foilowing criteria: YES NO
1. Housina sulxflWslons of 10 or more dwellina units. Examples: sinale familv homes, multi-familv homes,
condominium and apartments y
2. Commercial - areater than 1-acre. Anv develooment other than heaw industrv or residential. Examples: hosoitals:
laboratories and other medical facilities; educational Institutions; recreational fecillties; municipal fecllitles; commercial
nurseries; multi-apartment buildings; car wash fecillties; minl-malls and other business complexes; shopping malls;
hotels; office bulkJInQs; public warehouses; automotive dealerships; airfields; and other light industrial fecillties.
/
3. Heavy Industrial / Industrv- areater than 1 acre. Examples: manufacturing plants, food processing plants, metal
working fecillties, printing plants, and fleet storage areas (bus, tmck, etc.).
4. Automotive reoalr shoo. A fecllltv cateaorized in anv one of Standard Industrial Classification (S\C) codes 5013.
5014. 5541, 7532-7534, and 7536-7539 /
5. Restaurants. Anv fecllltv that sells prepared foods and drinks for consumotion. inciudina stationarv lunch counters
and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the
land area fbr development Is greater than 5,000 square feet. Restaurants where land development Is less than 5,000
square feet shall meet all SUSMP requirements except for stmctural treatment BMP and numeric sizing criteria
requirements and hydromodification requirements.
A"
6. Hillside develooment. Anv development that creates 5.000 sauare feet of imoenflous suriace and is located in an
area with known erosive soil conditions, where the development will grade on any natural slope that Is twenty-five
percent (25%) or greater. /
7. Envlropmentallv Sensitive Area (ESA)\ All development located within or directiv adiacent^ to or discharaina
directly' to an ESA (where discharges from the development or redevelopment will enter receiving waters within the
ESA), which either creates 2,500 square feet of impervious surfece on a proposed project site or increases the area
of Imperviousness of a proposed project site to 10% or more of its naturally occurring condition.
8. Parkina lot. Area of 5.000 sauare feet or more, or with 15 or more oarkina spaces, and potentially exposed to urban
mnoff A"
9. Streets, roads, hlahvravs. and fireewavs. Anv paved surface that is 5.000 sauare feet or areater used for the
transportation of automobiles, tmcks, motorcycles, and other vehicles /
10. Retail Gasoline Outlets. Sennna more than 100 vehicles per dav and areater than 5.000 sauare feet /
11. Coasta/ Oeve/ooment Zone. Anv project located within 200 feet of the Pacific Ocean and creates more than
2500 square feet of impermeable surface or (2) increases impermeable surface on property by more than 10%. /
12. More than 1-acre of disturbance. Proiect results In the disturisance of more than 1-acre or more of land and is
considered a Pollutant-generating Development Project*. /
1 Envlronnnentally Sensitive Areas include but are not limited to ali Clean Water Act Section 303(d) impaired water txxlies; areas designated as Areas of Speciai
Biological Significance by the State Water Resources Control Board (Water Quaiity Control Plan for the San Diego Basin (1994) and amendments); water bodies
designated with the RARE beneficial use by the State Water Resources Control Board (Water Quaiity Control Plan for the San Diego Basin (1994) and amendments);
areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Oiego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
2 't>inG<y a^acanr means sttuaM within 200 faet of the EnvironiiMnMy Se^
3 'DiscftarBing diraely to' means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site, and
not commingled with ftow from adjacent lands.
4 Pollumnt-generating Development Projects are those projects that generate pollutants at levels greater than bacitground levels. In generai, these include ali projects
that contribute to an exceedance to an impaired water body or which create new impervious surfaces greater than 5000 square feet and/or introduce new landscaping
areas that require routine use of fertilizers and pesticides, in most cases linear pathway projects that are for infrequent vehicle use, such as emergency or maintenance
access, or for pedestrian or bicycle use, are not considered Pdiutant-generating Development Projects if they are built with pervious surfaces or if they sheet flow to
surrounding pervious surfaces.
SectlonI Results:
.If you answered YES to ANY of the questions atx>ve your project is subject to Priority Development Project requirements. Please check the
"meets PRIORITY DEVELOPMENT PROJECT requirements* box In Section 3. A Storm Water Management Plan, prepared In accordance with City
Stonn Water Standards, must be submitted at time of application.
If you answered NO to ALL of the questions above, then your project is subject to Standard Stormwater Requirements. Please check the "does
not meet PDP requirements" box in Sectton 3.
E-34 Page 2 of 3 REV 3/23/10
<<#>
^ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Engineering Department
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
SECTION 2 SIGNIFICANT REDEVELOPMENT
Complete the questions below regarding your redevelopment project: YES NO
1. Project results In the disturbance of more than 1 -acre or more of land and is considered a Pollutant-generating
Development Project (see definition In Section 1). A If you answered NO, please proceed to question 2.
If you answered YES, then you ARE a significant redevelopment and you ARE subject to PRIORITY DEVELOPMENT PROJECT
iVQUiremw^. Please check the "meets PRIORHY DEVELOPIi^NT WO^CT rwwiramwrts'box in SM^
2. Is the project redeveloping an existing priority project type? (Priority projects are defined In Section 1) /
If you answered YES, please proceed to question 3.
If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER
REQUIREMENTS. PtoM* check the'does meet POP requiramw4s'box in Section 3 below.
3. Is the project solely limited to just one of the following:
a. Trenching and resurfecing associated with utility wort<?
b. Resurfacing and reconfiguring existing surface paridng lots?
c. New sklewalk constmction, pedestrian ramps, or bike lane on public and/or private existing roads?
d. Replacement of existing damaged pavement?
If you answered NO to ALL of the questions, then proceed to question 4.
If you answered YES to ANY of the questions then you ARE NOT a significant redevelopment and your project Is subject to Standard
Stormwater Requirements. Ptsese check the "does not meet PDP mqiAwnenIs'box in Section 3 betow.
4. Will your redevelopment project create, replace, or add at least 5,000 square feet of impervious surfeces on an existing
development or, be located within 200 feet of the Pacific Ocean and (l)create more than 2500 square feet of
Impenneable surfece or (2) Increases impermeable surface on the property by more than 10%? A If you answered YES, you ARE a significant redevelopment, and you ARE subject to PRIORITY DEVELOPMENT PROJECT requirements.
Ptease check ihe "meets PRIORITY DEVELOPMENT PROJECT rsquiretnents' box in Sectkm 3 bekmr.
If you answered NO, then you ARE NOT a significant redevelopment and your project Is subject to STANDARD STORMWATER
REQUIREMENTS. Please check the "does not meet PDP requirements' box in Sectton 3 betow.
SECTION 3
Questionnaire Results
• My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria
per the SUSMP and must prepare a Storm Water Management Plan for submittal at time of application.
My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the
SUSMP.
Applicant Infonnation and Signature Box TMsBoxIbrCityUse Only
Address:
5*1*^ A«^^
Assessor's Parcel Number(s):
Applicant Name: Applicant TtS|$:
Applicant Signature:/ Date: ^
E-34 Page 3 of 3 REV 3/23/10
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER PC 11-40 PATE9/7/11
ADDRESS 2175 Salk Avenue
RESIDENTIAL ADDITION-
MINOR (<17,000.00)
RETAINING WALL
POOUSPA
COMPLETE OFFICE BUILDING
VILLAGE FAIRE SOLAR PANELS
OTHER
PLANNER dhuU J^^M^^ti/^ DATE ^'"7-1/
ENGINEER DATE
H:\ADMIN\C011NTER/PLANN1NG/ENCINEER1NC APPROVAIS
Carlsbad Fire Department fUSLDING DEPt
'OFY
Plan Review Requirements Category: PLANCK,
Date of Report: 10-07-2011 Reviewed by:
Name:
Address:
CHIE HONDA
PO BOX 99429
SAN DIEGO
CA
92109
Pennit #: PCI 10040
Job Name: TENANT IMPROV : SHELL TO OFFIC
Job Address: 2175 SALK AV CBAD
yWX/WWWX/X/X/WVX/X/VX/WX/VWX/X/X/X/X/X/X/X/WX/X/X/X/X/V/X/V /VW\/W\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/V
Conditions;
Cond: CON0004970
[MET]
CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
Entry: 10/07/2011 By: GR Action: AP
CONDITIONAL RECOMMENDATION FOR APPROVAL Page: 1 of 1
CONDITION;
Emergency egress lighting and exit signs In existing rated corridor, servlna Jiew suites to be
field verififedi BLDG. DEPT COPY
Daryl K. James & Associates, Inc. Checked by: Darvl Kit James
205 Co//na Terrace Date: September 27. 2011
Vista, CA 92084
T. f760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Chie Honda JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Spec Stes 150-190 PROJECT ADDRESS: 2175 Salk Ave
PROJECT DESCRIPTIOfirPC11-40^ C 6 III ^ 3f
This plan review has beeR.5onsluet^ in order to verify conformance to minimum requirements of codes adopted by
the Carlsbad Fire Department. The items below require correction, clarification or additional information before this
plan check can be approved for permit issuance.
Tl.1.2
Door Schedule
V Indicate Hardware Set #s for El, E2, E3 & E4.
E-1
Tprovide a note that means of egress illumination shall be not less than 1 foot-candle at the walking surface on
RCP.
V Provide a lighting plan showing wiring to illuminated exit signs and egress illumination.
Denote emergency lighting and exit signs in existing rated corridor serving new suites. To be field verified.
M-1.1
V Denote SD locations as denoted on Sheet M-0.1
MEP
V Denote locations of fire dampers N/A
V Where applicable, denote penetrations of any rated assemblies. Provide a detail and listings for penetration
of fire rated assemblies as per CBC 713. Existing conditions
PROJEa NUMBER
CARLSBAD FIRE DEPARTMENT
EXPEDITED PLAN CHECK REQUEST
I, '-^(Name of At>Diicanti am rsquestlng 'Expedited Plan Check Services' and
understand I will be levied an additional fee assessed at the rate of $90.00 dollars per hour plus
$25.00 dollars administration fee.
I understand that my plans shall not be released until all fees are paid.
I, of A^i!^!!tii the applicant, am solely responsible for all fees due should the
project be withdrawn or otherwise not completed.
And by signing below I acknowledge that my plans shail be forwarded by the City of Carlsbad to an
independent contractor/consultant.
I, acknowledge that the expected 'first review' time for ali expedited Fire plan reviews will be
fourteen- (14) business days from date of submittal.
I. 0M\1ir Hr»ioh _the applicant, acknowledge that revised plans shall be sent directiv
to the plan checker, at the address specified on the Correction List, at my cost, parcel post or
other means.
Andl , acknowledge that a turnaround time for re-submittals is seven- (7)
business days from the date plans are received at the address specified by the plan checker on the
Correction List.
The Carlsbad Fire Department does not perform 'Over-the-counter' plan review services.
Plans submitted to the Carisbad Fire Department for review by CFD shaii be checked on a 'first
come, first served' basis and couid take 60 days or more to be completed.
NO
PLEASE CIRCLE YOUR SELEaiON
Applicant Signature A^^^/ >A/kA^ Date 9 .6 JI
Copy to Building and Fire Prevention file
BURKETT & WONG
Structural & Civil Engineers & Surveyors
3434 Fourth Avenue e San Diego, CA 92103-4911
Tel: (619) 299-5550 • Fax: (619) 299-9934
DATE- SEPTEMBER 2011
ENGINEER - JD
JOB No. 11199A
STRUCTURAL CALCULATIONS
FOR
2175 SALK AVE. - CARLSBAD
TENANT IMPROVEMENT
CARLSBAD, CA
<5
NEWPORT NATIONAL CORPORATION
1525 FARADAY AVE., SUITE 100
CARLSBAD, CA 92008
DATE. II
FKir.B Jt?
PROJECI 217^ 5A«-«C AV£ "n:
burkett Ijk
ftujong
ttructurol t clv« toqlneen
SH«T.
K» NO—lLill±.
IT ( 4.S0 * f-m< j
o,e>7 h^A^
OJ- Z-S^HY'I-'^ C5oi>P'5(Mi»C?t» wu/yitsr^T-io-c (5o«-<|.TOIt,S J
Tvr O.Z 5.^3 vVp ' O.lfe Wp
7_
Contenninous 48 States
2003 NEHRP Seismic Design Provisions
Latitude = 33.139
Longitude = -117.278
Spectral Response Accelerations Ss and SI
Ss and SI = Mapped Spectral Acceleration Values
Site Class B - Fa = 1.0 ,Fv = 1.0
Data are based on a 0.01 deg grid spacing
Period Sa
(sec) (g)
0.2 1.146 (Ss, Site Class B)
1.0 0.434 (SI, Site Class B)
Contenninous 48 States
2003 NEHRP Seismic Design Provisions
Latitude = 33.139
Longitude = -117.278
Spectral Response Accelerations SMs and SMI
SMs = Fa X Ss and SMI = Fv x SI
Site Class D - Fa = 1.042 ,Fv = 1.566
Period Sa
(sec) (g)
0.2 1.194 (SMs, Site Class D)
1.0 0.680 (SM1, Site Class D)
Contenninous 48 States
2003 NEHRP Seismic Design Provisions
Latitude = 33.139
Longitude = -117.278
Design Spectral Response Accelerations SDs and SD1
SDs = 2/3 X SMs and SDI = 2/3 x SMI
Site Class D - Fa = 1.042 ,Fv = 1.566
Period Sa
(sec) (g)
0.2 0.796 (SDs, Site Class D)
1.0 0.453 (SDI, Site Class D)
DATE.
ENG«.
PROiECI
burkett
&uiong
•tructural t dvR tngbWM
SHUT.
KM NO.
p
1 7^ (4-) HAfAl^OSW
^T&*l5'«»«t Or4f-Yj
r««- = = • r i3o 4 H&l»-»
IC*»'
T=T 333
^ C4pt SO
'tt,or>-' "^t^^e ft'V^S-O-^ •=^Ob* (fcoHTIi«?'<*')
I, '/
w, # BURKETT&WONG _ .
DATE ^ ENGINEERS ^HEET ±_
FNGR -JP JOS NO.
PROJECT
1^
_^iiL - o.S'l C^.^-)
ESR-3037 I Afosf Wfctoy Accepted and Tnjsted Page 6 of 13
TABLE 2—STRONG-BOLT 2 TENSION STRENGTH DESIGN DATA'
CHAR^TERISTIC SYMBOL UNITS
NOMINAL ANCHOR DIAMETER
CHAR^TERISTIC SYMBOL UNITS CaitwnStael Stainless Steel CHAR^TERISTIC SYMBOL UNITS
%inch Vjinch | %inch '/.inch
Anchor Calegofy 1,2 or 3 -1 1
Nominal Emiiedment Deptti hnom
in.
(mm)
2
(51)
2'/.
(73)
2\
(70)
3'/.
(98)
3%
(86)
5V,
(130)
2
(51)
2't,
(73)
StMl Strength In TmMlonj|A^i318 8«ctlon D.S.1)
Seei Strength In Tension A/-
Ib
(kN) (24.9)
12.100
(53.S)
19,070
(84.8)
5,140
(22.9)
strength Rsdudkm Factor -
Steeil Feikue^ -0.75 0.75
Concrate BrMkout Strength in Tension (ACI 318 Section D.S.2)
EffecHvB Embedment Depth in.
(irwn)
1V.
(41)
2V,
(64)
2\
(57)
3%
(86)
2%
(70)
4'/,
(114)
1»/.
(41)
2%
(64)
Critical Edge Distance Cm
in.
(mm) (165)
6
(152)
eVi
(165)
7%
(191)
7%
(191)
9
(229)
6V2
(165)
8V2
(216)
Effectiveness Factor - Uncracked
Concrete -24 24 24 24
Effectiveness Factor - Cracked
Concrete -17 17 17 17
Modmcatkxi Factor „ • -1.00 1.00 1.00 1.00
strength Reductkm Factor -
Concrete Breakout Faiure' -0.65 0.65
PuN-Out Strwigth in Tension (ACI 318 Section D J.3)
PulOut Strangtti Cracked
Concrete (fc = 2500 psi)
lb
(kN)
1,300*
(6.8)'
2.775'
(12.3)'
N/A' 3,735'
(16.6)'
N/A* 6.M6^
(30.7)*
1,720*
(7.7)'
3.145'
(14.0)'
Pull-Oul Strength Uncracked
Concrete (fc-2500 psi)
lb
(kN)
N/A* 3.340'
(14.9)'
3.616'
(16.1)'
5.256°
(23.4)'
N/A' 9,025'
(40.1)'
N/A' 4,770'
(21.2)"
Strength Reduction Factor -
PiMout Faiure' -0.65 0.65
Tensile Strwigth for Seismic ApplteaUons (ACI Section D.3.3J)
Tension ReaiBtance of Skigle
Anchor tbr Saiamic Loads
(r.<: 2500 psi)
Ib
(kN)
1.300*
(5.8)'
2,775'
(12.3)'
3.735'
(16.6f
N/A' 6.885*
(30.7)'
I.TZO*
(7.7)'
2,830'
(12.6)'
Strength Reducflon Factor -
PuHoutFaHure' -0.65 0.65
For SI: 1 inch > 25.4 mm, 11bf = 4.45 N.
'The infomiatkMi presented In this table must be used in conjundk>n with the design criteria of ACI 318 Appendix D.
^he tabulated vakje of A> applies Mfhen the h>ad combincMons of Sectkm 1605.2.1 ofthe IBC. or ACI 318 Sectkm 9.2 are usad. H the toad
conMiatkins of ACI 318 Appendix C are used, ttie appropriate value of A« must be determined in accordance virflh ACI 318 D.4.5. Strong-
BOH'* 2 anchors are ductile steel elements as defined in ACI 318 D.1.
'Thetabutatedvalueof At apples when both the kiad combinattons of Sectkin 1605.2.1 of the IBC, or ACI 318 Sectton 9.2 are used and the
requirements of ACI 318 D.4.4(c) for Conditton B are met. Conditton B epplies where supplemmtary reintorcement is not provMed. For
Installations where complying supplementary reinforcement can be verified, the A* factors described ki ACI 318 0.4.4 fbr Condttton A are
allowed. If the toad combinattons of ACi 318 Sectton 9.2 are used and ttie requirements of ACI 318 D.4.4 fbr CondHton A are met. the
appropriate value of must be determined in accordance with ACI 318 0.4.4(c). If the toad combinattons of ACI 318 Appendix C are used,
ttie appropriate vatoe of A* "iust be determined in accordance wHh ACI 318 D.4.5(c).
'As rtflOTttMri in ."Wtinn A1 nf thie rnpwt M/A (Mm AppMrahia) riAtintes that puiiout resistancB do«s not need to be considered,
^he charaderistto pulkHit strengti for greater concrete compressive strengths must be inoeased by multiplying the tabular value by
(/'c/2,500p8i)'"or(rc/ 17.2MPa)".
'The characterislto pull-out strength for greater concrete compressive strengths must be increased by multiplying the tabiMar value by
(f'c / 2,500psi)'" or {f, 117.2MPa)"
'The tabulated value of A or Aq applies when the toad combinattons of IBC Section 1605.2.1 or ACI 318 Sectton 9.2 are used and the
requirements of ACI 318 D.4.4(c) for Conditton B are met. If the load combinations of ACI 318 Appendix C are used, appropriate value of ^
must be detennined In accordance with ACI 318 D.4.5(c).
'For the 2003 IBC W, replaces w^ n.
ESR-30371 Most Widely Accepted arui Tm^ed Page 7 of 13
TABLE 3-STR0NG-B0LT"2 SHEAR STRENGTH DESIGN DATA*
CHARACTERISnC SYMBOL UMTS
NOMINAL ANCHOR DIAMETER
CHARACTERISnC SYMBOL UMTS Carbon SIMI Stainless Steel CHARACTERISnC SYMBOL UMTS
'/, inch VI inch %lnch V.inch
Anchor Category 1,2 or 3 -1 1
Nominal Embedment Depth in.
(mm)
2
(51)
2'/.
(73)
tu
(70)
3'/.
(98)
3'/.
(»)
5V.
(130)
2
(51)
2'l.
(73)
Steel Sirangth In ShMr (Aa 318 Section D.6.1)
Shear Resistance of Steel V« lb
(kN)
1.800
(8.0)
7.235
(32.2)
11,035
(49.1)
3.085
(13.7)
Strength Reduce Factor -
Steet Failure^ A< -0.66 0.65
Concrate Breakout Strength In Shear (ACI 318 Sectian D.6.2)
Outside Diameter d.' to.
(mm)
0.375
(9.5)
0.500
(12.7)
O.KS
(15.9)
0.375
(9.5)
Load Bearing Lengtti of Anchor
in Shear /. in.
(mm)
1.625
(41)
2.500
(64)
2.250
(57)
3.375
(86)
2.750
(70)
4.500
(114)
1.625
(41)
2.500
(64)
Strand^ Reductton Factor -
Concr^ Breakout FaHure' A« -0.70 0.70
Concrate Pryout Sirangth In Shear (ACI 318 Section D.6.3)
Coefficient for Piyoiri Strength -1.0 2.0 1.0 2.0 2.0 1.0 2.0
Effective Embedment Depth /w in.
(mm)
1'/.
(41)
2%
(64)
2%
(57)
3'/.
(86)
tu
(70)
*\
(114)
A
(41)
tl,
(64)
Strengtti Reductton Factor -
Concrete Pryout Failure' -0.70 0.70
Steel Strength In ShMV fbr S^smte Applications (ACI 318 Seclion a3.3.3)
Shear Strength of Single
Anchor for Seismic Loads
(r, = 2500 pei) v« Ib
(kN)
1.800
(8.0)
6.510
(29.0)
9.930
(44.2)
3.085
(13.7)
^rengtti i^educUon Factor-
Steel Falkire' A. -0.65 0JS5
For SI: 1 inch • 25.4 mm. 11bf« 4.45 N.
*The infomiation imsenied In ttils table must be used in conjunction withthe design criteria of ACI 318 Appwidix D.
^he tabulatad vakje of A* appHes when ttie toad combinattons of Sectton 1605.2.1 of ttie IBC, or ACI 318 Sectton 9.2 are used and ttie
requirements of ACI 318 D.4.4(c) for CoMNtton B ate met. If the toad combinattons of or ACI 318 Appendix C are used, the appropriate vahie
of A* must be detennined in accordance witti AO 318 D.4.5. Strong-Bolt™ 2 anchors are ductle steel elements as defined ki ACI 318 D.1.
^The tabulated value of AK applies wlwn botti ttie k»d combinattons of Sectton 1605.2.1 of ttie IBC, or ACI 318 Sectton 9.2 are used and ttie
requiraments of ACI 318 D.4.4(c) for Condition B are met. Conditton B applies wtiere supptamentaiy retofbrcement Is not provkled. For
InstaNMtons where complying supplementaiy reinforcement can be verified, ttie A* factors descrfoed in ACI 318 0.4.4 fbr CondiUon A are
altowed. If ttie load combliiattons of ACI 318 Sectton 9.2 are used and ttie requirements of AQ 318 D.4.4 for Conditton A are met, the
appropriate value of A* must be detennined in accordance with ACI 318 D.4.4(c). If ttie toad combinattons of ACI 318 Appendta C are us^,
ttie appropriate value of At must be determined in accordance with ACI 318 D.4.5(c).
*The tabuiaied vtrtue of Av applies when ttie toad combinattons of IBC Sectton 1605.2.1 or ACI 318 9.2 are used and the requirements of ACI
318 D.4.4(c) fbr Conditton B are met. If the toad combinations of ACI 318 Appendix C are used, ttie appropritfe value of AP nmst be
detemiined in accordance with ACI 318 D.4.^c).
'for the 2006 IBC d, replaces
ESR-M37I Mo^miely Accepted and Tmsted Pages of 13
TABLE 4-STR0N6-B0LT"2 TENSION AND SHEAR STRENGTH DESIGN DATA FOR
THE SOFFIT OF CONRETE OVER PROHLE STEEL DECK, FLOOR AND ROOF ASSEMBUES^''
CHARACTERISTIC SYMBOL UNITS
NOMINAL ANCHOR DIAMETER
CHARACTERISTIC SYMBOL UNITS
Carbon Steel SUIniess Steel
CHARACTERISTIC SYMBOL UNITS Lower FhAe Upper Flute Lower Fhite Upp«r
Rute
CHARACTERISTIC SYMBOL UNITS
'/a Inch Viinch '/.Inch '/.inch Vjlnch '/.ifKdl '/.inch
Embedment Deptti hnm
in.
(mm)
2
(51)
3'/.
(86)
tu
(70)
4%
(114)
3'/.
(86)
5'/,
(143)
2
(51)
2'/4
(70)
2
(51)
tu
(86)
2
(51)
Effective Embedment
Deptti ty
in.
(mm)
1%
(41)
3
(76)
tu
(57)
4
(102)
tu
(70)
5
(127)
1V.
(41)
tu
(57)
1*/.
(41)
3
(76)
iVa
(41)
Installatton Torque TM
fl4bf
(N-m)
30 60
(81.3)
90
(122.0)
30
(40.7)
60
(81.3)
30
(40.7)
30
(40.7)
Pulout Sttengtti,
concrete on metal deck
(cracked)'
Nf,ata.cr
lb
(kN) (5.6)'
»2j230^
(9.9)'
) 2.040'
(9.1)'
2,730'
(12.1)'
2,615'
(11.6)'
4,980'
(22.2)'
1,610'
(7.2)'
3,785'
(16.8)'
1,120'
(5.0)'
2.785"
(12.4)'
1.410*
(6.3)*
Pulout Sttangth,
concrete on metal deck
(uncracked)' Np^dtdt,uner
tb
(kN)
1,765'
(7.0)'
3,150'
(14.0)'
2,580'
(11.5)'
3.840'
(17.1)'
3,685'
(16.4)'
6,565'
(20.2)'
2.275'
(10.1)'
4,795'
(21.3)'
1,580'
(7.oy
3,850'
(17.6)'
1,890*
(8.9)'
Steel Sttangth b)
Stiear, concrele on
metal deck'
Vum*
lb
(kN) (7.1) (15.5)
2.135
(9.5)
4,580
(20.4)
2,640
(11.7)
7,000
(31.1)
4,060
(18.1)
5,820
(26.3)
2,285
(10.2)
3,785
(16.8)
3,830
(17.0)
For 81:1 inch = 25.4 mm. 1 W " 4.45 N.
*lnstaNatton must comply wtth Sectton 4.3 and Figure 4.
^>roflle steel deck must comply wtth Figure 4 and Sectton 3.3 of this report.
*rhe vakies mM be used In accordance witti Secfion 4.1.3 and 4.1.7.2 of ttiis report.
*The vakies mwt be used In accordance witti Seclion 4.1.3 of this report
'The vakies must be used In accordance vMh SecUon 4.1.4 and 4.1.7.3 of this report
'The minimum anchor spacing atong ttie flute must be ttie greater of 3/i,r or 1.5 ttmes ttie fhjtewkMh.
'The characterisUc pull-oul strengtti fbr greater concrete compressive sbangths must be IncreaMd by multiplying ttie
(fi / a.OOOpsI)" or (f, 120.7MPaf *.
*The characteristic pull-out strengtti for greater concrete compressive strengths must be increased Iiy mulUplyIng the
{f'c 13,000p8l)" or (f i / 20.7MPa)°^.
tabular vakje by
tabular value by
^eURKETT&VONG DATE . ^ • • ENGINIERS ^""^ —
ENGR JO"
PROJECT
.^bL_4. i^L, c..'.? ^/.-i Co.IcO
ESR-2S02 I t^mtely/UxeptedandTnisted "F. T/S4 S-PZ Page 8 of 12
TABLE 3—TENSION DESIGN INFORMATION FOR P0WER-STUD4- SD2 ANCHOR IN CONCRETE
(For use wMh load combinations taken from ACI 318, Section 9.2)'''
Design Ctiaracterfsek: Notation Units
Nominal Anchor Sine (inch) Design Ctiaracterfsek: Notation Units '/, •/. '/4
Anchor category 1,2ar3 -1 1 1 1
STEEL STIENGTH IN TENSION'
MInknum specified yieM strengtti (neck) f, ksi
(N/mm^
96.0
(682)
85.0
(586)
85.0
(586)
700
(483)
Minimum specified ultimate strengtti (neck) fJ' ksi
(N/mm^)
120.0
(827)
106.0
(731)
106.0
(731)
90.0
(620)
Efiecttve tensile stress area (neck) Am«, in'
(mm*)
0.0552
(35.8)
01007
(65.0)
0.1610
(104.5)
0.2359
(153.2)
Steel slren^ in tenston ««" for
(kN)
10,445
(46.5)
13.080
(58.2)
21,230
(94.4)
Reduction factor for steel strength' 4 -0.75
CONCRETE BREAKOUT STRENGTH IN TENSION"
Eftective embedment /V to.
(mm)
2.00
(51)
2.00
(51)
3.25
(63)
3.K
(83)
4.25
(106)
3.75
(95)
5.O0
(12?)
Eftocttveness tador for uncracked concrate -24 24 24 24
Eftocttveness foctor tor cracked concrete kcr -17 17 17 17
Modificatton foctor for cracked and unciacked concrMe' -1.0
See notes
1.0
SeenotoS
1.0
Sea notes
1.0
See note 5
Critical edge distance Cm to.
(tnm) SeeTaUel
Reduction factor for concrete breekout strength in tenston' -0.65 (Condttton B)
PULLOUT STRENGTH M TENSION (NO»MEISMIC APPLICATIONS)'
Charactortstlc pultout strengVi, uncracked concrete (2,500 psi)* Ibf
(kN)
2,775
(12.3)
See
note7
6,615
(29.4)
See
note7
See
note?
See
note?
SM
note?
ChwaderisUc pultout strength,
cradcad concrete (2,S00 psi)'
Ibf
(kN)
2,165
(9.6)
See
note?
4,375
(19.5)
See
note?
4,880
(22.4)
See
note?
7.7B5
(35.1)
Reduction factor for pulout strength' -0.65 (Condition B)
PULLOUT STRENGTH IN TENSION FOR SEISMIC APPUCATIONS*
Characteristic pultout strengtti, seismic (2,500 psi)" At," tof
(kN)
2,165
(8.6)
See
note7
4.375
(19.5)
See
note?
4.080
(22.4)
See
note?
7,785
(35.1)
Reduction (ador tor pultout strengtti' # -0.66 (CondHton B)
PULLOUT STRENGTH IN TENSION FOR SAND UGHTVWEIGHT AND NORMAL-WEIGHT CONCRETE OVER STEEL DECK
CharaderisUe pulout strengtti, uncracked concrete over
steel deck, acooniing to Figure 4A"* Np.amit.uner
Ibf
(kN)
1,855
(8.3)
2,065
(9.2)
3,930
(17.6)
4,665
(20.8)
7.365
(32.8)
4,900
(21.8)
Charactsrfitic pulout strengtti, cracked concrete over steel deck,
according to Figure 4A"<' Np.amti.or tof
(kN)
1,445
(6.4)
1,463
(6.5)
2,600
(11.6)
3,305
(14.7)
3,490
(15.5)
3,470
(18.4)
Characteristic pulout strength, increcked concrete over
steel deck, acoordina to Figure 4B''"' NpamKuner bf
(kN)
1,600
(7.1)
2,025
(8.0)
Not
Applkabto
Not
Appitoabto
Not
AppHcabto
Not
AppHcabto
Characteristic pulout strengtti, cracked concrete over steet deck,
according to Figure 4B"° Np,aK*.a Ibf
(kN)
C1.250 ; 1,435
(6.4)
Not
Applcable
Not
AppHcabto
Not
Applcabto
Not
Applcat^
Reductkxi factor tor fxillout strength' * -0 65 (Condition B)
For SI: 1 toch - 25.4 mm, 1 fl-bf ^ 1.356 N-m. 1 ksi = 6.895 N/mm'. 1 Ibf = 0.0044 kN
'The data in Mils tatile is Intended to be used with ttie design provistons of ACI 318 Appendix D; for anchors resisting seismto toad combinations the
additional requirements of ACI 318 D.3.3 shaH apply,
'installatton must comply with published instructions and details.
'AH values of ^were determined fnxn ttie toad combinations of IBC Section 1605.2. ACI 318 Section 0.2 or UBC Sectton 1612.2. If ttie toad combinations of
ACI 3ieAppendixC or IBC Sectton 1908.2 are used, Iheaivnipnate value of #must be detennined in accordance with ACI 318 D.4.5. For retoforcement
that meets ACI 318 Appendix D requirements for Condition A, see ACI 31B D.4.4 for ttie appropriate ^ factor
'The Power-Stud+ SD2 is considered a ductite steel etement In tension as defined by ACI 318 D 1 Tabulated values for steel strengtti in tenston are based
on test results per ACI 355.2 and must be used for design
^For an design cases VC N=1 0 The appropriate effectiveness fador for cracked concrete (ka) or uncracked concrete {k^ncr) must be used
'For all design cases ft p=10 For the calculation of/V^, see Section 4 l 4 of this report
^Pultout strength does not control design of indicated anchors Do not cakxilate pulkxjt strength for indicated anchor size and embedment
'Anchors are permitted to tie used in sand-lightweigtit concrele in accordance with Section 4 112 of tNs report
tabulated values for characteristic pullout strength in tension are for seismic appttoations are based on test results per ACI 355 2. Sedion 9.5
"Values for Npomt are lor sand-lightweight concrete (/"c mn = 3,000 psi) and addittonal lightweight concrete reduction factors need not be applied In addition.
evaluation (or the concrete breakout capacity m accordance wtth ACI 318 0 5 2 is nol required for anchors installed in tne deck soffit (flute)
"For 2003 IBC code basis, IM replaces f^ . W„replaces N, : replaces Wj. and /V„ replaces Wp .„„
''The notation in brackets is for the 2006 IBC
IO
ESR-2602 I Mo^ Widely Accef^ed and Tnisted Page > of 12
TABLE 4-SHEAR DESIGN INFORMATKW POR POWER-STUD» S02 ANCHOR IN CONCRETE
(Ftnr usa with load combinations tahan from ACI 318, Section 9.2)'^
Design CharacterisUc Notatton UnHs
Nominal Anctior Diameter Design CharacterisUc Notatton UnHs '/. '/, '/.
Arx^ior category 1,2or3
•
1 1 1 1
STEEL STRENGTH M SHEAR*
Minimum specified yteto stiength (tiireads) ksi
(Nftnm^
76.8
(530)
68.0
(469)
68.0
(469)
56.0
(386)
Minimum specified uKlmate Mrengtti (ttimads) fu,.'" ksi
(N/mm*)
96.0
(662)
84.8
(685)
84.8
(585)
72.0
(496)
Effedh/e tensile stress area (threads) A„.WA»1" to"
(mm')
0.0776
(50.0)
0.1419
(65.7)
0.2260
(104.9)
0.3345
(2158)
Steel sttengtti In shear' tof
(kN)
2,190
(9.7)
4.640
(20.6)
9,800
(44.1)
10,175
(46.3)
Reductton factor Ibr steel strength' -0.00 0.65
CONCRETE BREAKOUT STRENGTH IN SHEAR'
Load-bearing lengtti Of anchor
(tiaior Bdp, whichever is less)
to.
(mm)
2.00
(51)
2.00
(51)
3.25
(83)
3.25
(83)
4.25
(108)
3.75
(05)
5.00
(127)
Nominal anchor dtomrter d.ldj" in.
(mm)
0.375
(8.5)
0.500
(12.7)
0.625
(15.9)
0.750
(18.1)
Reductton factor for conaete breakout ttiengtti in
shear' -0.70 (Condition B)
PRYOUT STRENGTH IN SHEAR'
CoefRcient for pryout strength
(1.0 for ()«< 2.5 in., 2.0 Ibr/If 2 2.5 to.) -1.0 1.0 2.0 2.0 2.0 2.0 2.0
Eftective embedment in.
(mm)
2.00
(51)
2.00
(51)
3.25
(83)
3.25
(83)
4.25
(108)
3.75
(M)
5.00
(127)
Reduction factor for pryout strength' # -0.70 (Condition B)
STEEL STRENGTH IN SHEAR FOR SEISMIC APPLICATK>N8
Steel strengtti ki stiear,
seismto'
tof
(kN)
1,955
(8.7)
4,640
(20.6)
6,530
(28.0)
0.635
(28.S)
Reduction factor for steel strengtti In shear, seismk:' * -0.60 0.65
STEEL STISN6TH IN SHEAR FOR SAND-U6HTWEIGHT ANO NORMAL-WEIOHT CONCRETE OVER STEEL OECK*
Steel streni^ In shear.
concrete over steel deck, according to Figure 4A'
Ibf
(kN)
2.170
(9.7)
3,815
(17.0)
5,040
(22.4)
4.015
(178)
6,670
(29.7)
4,325
(18.2)
Steel strengtii in shear,
concrete over steel deck, Seismto
according te FIgura 4A* VitatOtaq Ibf
(kN)
1.940
(8.6)
3,815
(17.0)
5,040
(22.4)
2,675
(11.9)
4,445
(19.8)
2,820
(12.5)
Steel strengtii In shear,
concrete over sieel deck, accortting to Figure 4B* Vm.atek Ibf
(kN)
2,170
(0.7)
2,860
(12,8)
Not
Appitoabto
Not
Applkabto
Not
AppHcabto
Not
AppHcabto
Steel strengtti In shear,
concrete over steel deck, Seismk:
according to Figure 48' Vuamk.pq Ibf
(kN)
) 2,880
(12.8)
Not
AppHcabto
Not
Applicable
Not
Appitoabto
Not
Appitoabto
Reduction tedor for steel stiengtii In shear, concrete
over steel deck' * -0.60 065
For SI: 1 inch « 25.4 mm. 1 ll-lbf = 1.356 N-m, 1 ksi = 6.895 N/mm', 1 tof • 0.0044 kN.
^Tiie data in tills tabto is Intended to be used witti ttie design proviskxis of ACI 318 Appendix 0: for anchors resisting seismic toad combinations ttte addiUonal
lequireinents of ACi 316 0.3.3 sbal appty.
instellatton must comply with published instiuctions and deteils.
'AI values of ^were determined from ttw toad combinations of IBC Section 1605.2, ACI 318 Section 9.2 or UBC Sedkxi 1612.2. If the toad combinations of
Appendix C or UBC Section 1909.2 are used, ttie appropriate value of ^must be detennined in accordance witti ACI 318 D 4 5 For reinforcement ttiat meets
ACI 318 Appendix D requiremente for Condition A, see ACI 318 D.4.4 for ttie appropriate ^ fador.
'The Power-Slud+ SD2 is consklered a ductile steel element as defined by ACI 318 D1 except for tiie '/rinch-diameter anchors In she»^.
h'abulated values fOr steel strengtii In shear are tiased on test resutts per ACI 3SS.2, Section 9 4 and must be used for design These tebulated values are
lower than cateuiated results using equatton D-20 In ACI 318-08 (318-05).
'Anchors are permitted to tie used in sand-Hghhveight concrete in accordance with Sectton 4.1.12 of this repon.
'Tabulated values for steel strength in stiear are for seismic appltoations are tiased on test results per ACI 35S.2, Sedion 9 6
^/alues for VsAtiKk and ^sad«*«Qare for sand-lightweight concrete {f'c, min - 3.000 psi) and additional lightweight concrete redudion fadors need not be applied.
In addition, evaluation for the concrete breakout capacity in accordance witti ACI 318 D.6 2 and ttie pryout capacity in accordance with Sedion D 6 3 is not
required for anchors Installed in the deck soffit (flute)
'Shear loads for anchors installed tiirough steel deck into concrete may be applied In any direction
"For 2003 IBC code basis.^u,, replaces /L,. l/'„replaces V,; /, replaces /, and V,, replaces V„,„,
"The notation in brackets is for the 2006 IBC
:JjmROPE LTD ; : Wire Ropes : : :
('SUMQMAX/
/I
rti WiiiliiiiiiWwMiiitiiiritW^
hnrne >> products >> wire ropes >> Galvanized Cable (Carbon Steel)
ING I ABOUT US I CONTACT
I BaMtMarriMUfiO
» wire Rooe Selection
I Technical Information
Detailed Wire Rope Data:
* ex.19 Cl^ss
* 6x37 IWRC and FC
« 6- and S-sLraniCQMEAC®
Die-Drawn
I 8x 19./. axi& m&cj.DoPm
f Python® Super-8
I PythPn® Multi
M
I Elastie fiUed e-Jit.rand_wire
rsce
I Rotary.maaed wirsjiQes
' 9 Spin Resistant
^..x7 Rotation Resistant
I COMPAC(Si 19
I CQM PACJg) .34
I Python® .Haist
I Python® Lift
I Galvanized Cable (Carbon
SiefiU
cat?ig
Galvanized Cable (Carbon Steel)
to Wire Ropes Main Page
Available Construction:
7x 19 (Bexible)
7x7 (Coated) 7 X 19 (Coated)
Galvanized Cable 1x7 Galvanized Cable 1 x 19
Rope Nominal Weight Rope Nominal Welglit
dia. Strength 1000 ft dia. Strength lOOO rt
inch Ibs Ibs inch Ibs Ibs
1/64 50 0.7 1/32 185 2.5
•1 1/32 185 2.5 m 3/64 375 5.5 • 3/64 375 5.5 BS 1/16 500 8.5
1/16 500 8.5 o 5/64 800 14.0
5/64 800 14.0 3/32 1200 20.0
3/32 1200 20.0 B 7/64 1600 27.0
7/64 1600 27.0 B o 1/8 21|» 35.0
1/8 2100 35.0 B o 5/32 3300 SS.O
O Available to MIL-W-87161 3/16 4700 77.0
Non stock Item. Ask for delivery time. 7/32 6300 102.0
1/4 6200 135.0
O Available to MIL-W-887161
Non stock Item. Ask for delivery time.
Galvanized Cable 7x7 Galvanized Cable 7 x 19
Rope Nominal Weight Rope Nominal Weight
dia. Strength 1000 ft dia. Strength 1000 ft
Inch Ibs Ibs inch Ibs Ibs
# 3/64 270 4.2 H ft 3/32 1000 16.0
1/16 480 7.5 1/B 2000 29.0
5/64 650 11.0 & o 5/32 2800 45.0
MM •i 3/32 920 16.0 3/16 4200 65.0
7/64 1260 22.0 ^^1 7/32 56O0 86.0
1/8 1700 28.S o 1/4 7000 110.0
5/37 2600 43.0 o 9/32 8000 • 139.0
tip ./'/WWW iinirnpc.com/wireropes/wr galvanized cable..shtml 8/26/03
Dimensions
50PSH006-070 UPflTS
50PSH
OVERALL
CABINET
WATER CONNECTIONS (In)
WATER
CONNEC-TIONS (in.).
UNrrs WrfH HWR
ELECTRICAL
KNOCKOUTS
(In.)
OlSCHARQE CONNECTKIN (In)
DUCT FLANOE INSTALLED
(sO.IOin.)
CON
USI
Al
RETURN
WIECTNM (in.)
INQ RETURN
n OPENING
(±010 In.)
UNrr
SIZE ,,,,,, 1 2 3 4 5 Loop
Water
rrr
HWG
t 2
J
Cond
K
V,
Cond
L
v.
Cond M
(LH
rtm)
N 0
Supply Height
0
(RH
rtm)
R S
Return
Deptti
T
Retum
Height
U V
A
width
B
D«ptti
C
Hdghl
D
In
E
Oul
F
HWG
In
G
HWG
Out
H
Con
depute
Loop
Water
rrr FPT Loop
In D
Loop
Oul t
Low
Voltage
Ext
Pump
Powmi
Supply
M
(LH
rtm)
0
Supply Height
0
(RH
rtm)
S
Return
Deptti
T
Retum
Height
oos.oos.
012 22 J 43 1 173 3 7 9 7 M'A N'A 0 B V; N/A N/A N/A 3 8 63 SB 5 3 4 1 90 90 53 4 1 17 1 16 3 2 1 1 0
01. 22 4 62,2 19 3 2 1 100 139 16 9 06 'h 2 1 10 0 36 6 1 86 36 20 125 15.5 36 2.0 28 1 162 2-3 1.5
024.
030 ?7 4 6? 2 19 3 7 1 too 139 16 8 0 6 'I: 5 26 13 13 36 6 1 86 36 20 12 5 15 5 3 6 20 338 16 2 23 1 5
036 25 4 71 2 21 3 34 108 156 189 06 'h 596 13.13 36 6 1 8.6 3 1 1.2 19.0 17 5 3 1 1 0 348 18 2 3 1 15
042.
04. 25 4 76 2 21 3 34 10 8 15 6 189 06 1 S96 13 13 36 61 86 3 1 1 2 190 175 3 1 1 0 39 B 18 2 3 1 1 5
060.
070 25 4 81 2 21 3 34 108 156 18 9 06 1 'h 596 13 13 36 6 1 86 3 1 1 2 190 17 6 3 1 1 0 448 18 2 3 I 1 5
NOTES;
1 Condensate is V^-in FPT copper.
2 Horizontal unit s^^ped with mor bracket onfy This bracket shoofd be
removed lot return duel connection.
3 Discharge flange and hanger kit is taclory installed.
4 Shaded areas are recommerxied service areas, not required
LEFT RETURN
CSP
ASP
BSP CAP
CSP
FPT
HWG
HWR
LH
RH
LEGEND
Allemale Service Panel
Blower Service Panel
Control Access Parwl
Compressor Service Panel
Female Pipe Thread
Hol Waler Generator
Hol Water Reheat
Lett Hand
nighl Hand
Pomt Supoly
W Knockout
Disctiorge
Bkmer
OuW
T ' 1 k. in.
*J ' J*S
ii 1 Us ibi ID» 71 1 jr.!
jo«7-o*a n.%
|»CKI«1 • 11 713 J
Configuration E - Lafl Return / Back Diacharge
Btower
OuHel
CoMlguratlon S • Lett Retum / Right Dtochaiga - Air CoU Opening
Len
View
-B-
Conflguratlon S • Leh Return / flight Dikcharge Atr Coll Operting
PSC BLOWER AIRFLOW
CONRGURATION
CODE RETURN DISCHARGE
E Led Back
a Right Back
s LeII Right
z Right Lett
11
^p64.. Su^ ISO
«: m
^ CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
B-18
Development Services
Building CHvislon
1635 Faraday Avenue
760-602-2719
www.carisbadca.gov
Project Address: ^J^^t/'^Bmiit No.: C& U • H ^ Sk-iU (50
Informatton provkfed below refers to worh being done on the abcjve mentioned permit only.
This form must be completed and ratHmad to Hw Bulidinu Mvlslon b«few the pwmit can be Isintd. Bulidins Dept FcDC (760) 602-8558
Nun^MT of new or relocofted fixtures, traps* or floor drains.
New building sevwer line?
Numlser (rf new roof drains?.
Install/after water line?.
Number of new water heoften?.
Numlier of new, relocated or replaced gas outlets?...
Number of new hose bibs?..
1SINK
Ves_ 1 No.
TeiWBit hnprewement/Remodete
Numbo'of exhting Panek Onvdved in thb proiect).
Remodel only - (rekxcte/add outlets/swftdies)
Amps per panel On thb prqi«Q
Vto No
New CoiMlnicUens Numtier of new paneb or subpanels?
Amps per Panel:
Single Phase
Three Phase.
Three Pilose 480
X
... 2-
.... Nunber of new amperes
....Number of new amperes lOO ^^^^
.Number of new ampe.«s.e£P
Number of new fumaas, A/C or heat pumps?..
New or relocated duct worit?.
Number of new fireplaces?
Number of new exhaust fans?.
Relocate/lnstcril vent?
Numiier of new exhaust hoods?..
Number of new boilers or compressors?.
...Ves V: No
.NumberofHP
12.
il
B-ia Page 1 of 1 Rev. 03/09
^ CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
B-18
Development Services
BuiidbigDhfiSion
1635 Faraday Avenue
760-602-2719
www.carisbadca.gov
ai9SSalh/i/e. _
Proied Address: SuriM. Iho Pemilt No.: CS> U \^ 3 S
tnfomwtkw provkled below reto to wofhbalnB done on tlie dwwe mentioned
This fam west he lowpfeted oed retermd to fhe BiiiidiiMi Mviilaii hefore the aermH cm he lisued.
Buldbie i3epL l=dx: (760) 602^8558
Number of new or relocated fixtures, traps, or floor drains.
New buildtng sewer Hne?
Number of new roof draim?.
Instcd/oKer water Hne? »
1SINK
Ves_ 1 No.
Numbtf of new water heodiMs?.
Number of new, relocated or replaced gas oiAieb?.
Number of new hose bibs?
Tenant Improvement/Remoddst
Number of exiting Parak (bwokMd In tiib proieeO. o
Remodel only-(relocate/add outlets/swftdies) .^..M....
New CerolnicUeiit Number of new pands or subpaneb?,
Amps per Panel:
SIngte Phase ........^.......................^^
TTwee Phase. ~ „ .
Amps per panel (in thb project)
Ves No
Tiiree Phase 480.
. Nunber of new arr^Mres.
.Number of new amperes /OO A^*'^
.NiOTiberof newomperes 7.oc>
Number of new fumaces, A/C or hecft pumps?..
New or relocated duct worfc?
Number of new firepkKes?
Number of new exiiaust fans?
Rek>cate/inAa]l veiri:?..... „
Number of new exhaist hoods?.
Number of new boilers or compressors?.
..Ves 'A No.
, O
. O
.NumberofHP
B-18 Page 1 of 1 Rev. 03/09
r
A^
CARLSBAD
CITY OF
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
B-18
Development Services
BulMirv Division
1635 Faraday Avenue
760-602-2719
www.carisbadca.gov
Projed: Address: Permit No.: OCP^ I • Pp
Informatton provkltd below refers to worti being done on the above menttoned permit only.
This form most he cowpletwl end wtonied to the BeMdIeo Dhiiloe befot* the eermit con be iiseed.
Buldbifl Dept 1^ (760) 602-8ra8
Number of new or rekMxfted fixtures, traps, or fk)or drakis.
New buiklkig sewer Rne? ......
Number of new roof drains?.
Imtcril/after water line?..
1SINK
Ves 1 No
1
Number of new water hooters?.
Number of new, relocated or r^>kxed gas ouUeb?.
Number of new hose t^Ww? mi..-.. i
Tenonl imimwen sent/Remodels:
Nun^^ndstkigPcneb (Involved b) thb prajecO_i!^ Amps per panel (Ni thb pnjKt) 2^2^
Ves No V
Z.
Remodel only - (rekxxfte/add outlets/switdies)
New CbnitoncUoiK Nurnber of new paneb or subpoRids?.
Amps per Panel:
Singh Phase
Three Phase>......>.
Three Phase 480
. Number of new onnperes.
.Number of new amperes l€SO
.Number of new ampetes-g-OO "
Number of new fumaces, A/C or heat pumps?.
New or rekxcAed dud worfc?
Numiser of new fhepkxes? ............
Nurrdser of new exhaust fans?
RekKoAe/Instoril vent? ................
..Ves No
Number of new exhaust hoods?
Number of new boilers or compressors?
o_
o_
o
.NumberofHP 3
B-18 Page 1 of 1 Rev. 03/09
^ CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
B-18
Development Services
Building Dhfision
1635 Faraday Avenue
7B0-6O2-271S
www.carist>adca.gov
M7SSall<M. ^_
Proied Address: /gj PermitNo.- Cc>l \ ' ^^9/
tnfornKitlon prcjuided below refen to word bdng done on the above menttoned permit only.
This form most he ceemleted eed retemed to the Bettdiiia BhrisioB before the perwH caw he Isseed.
Buiklng DepL |!cDe (760) 602-8558
Number of new or rekKoted fixtures, traps, or floor ckxdns.
New buHding sewer Ine?
Number of new roof chains?.
InstaH/dftM- wcAor Nne?
Ves_
Number of new water heaters?.
Number of new, relocated or rephxed gas oiAleb?..
Number of new hose Mas? •
No.
1
1
IT
Tenonl hnpvowemenl/Reniodeisi
Number of eidstkig Paneb Onwoived bl thb pn^Ki)-
RemocM oniy - (rekKcAe/cdd outiets/iwftches)
Amps per panel On thb prqiaci) .
Ves No.
New Cemtnidieni Ninnb«r of new paneb or subpomeb?.
Amps per Paneb
Skigle Phase
Three Phase.
Three Phase 480,
.Number of newomperes
. Number of new amperes ioO
Number of new amperes 'Z^^
Number of new fumaces, A/C or heat pumps?.
New or reheated dud worfc?.
Numbw* of new fbepkices?...-
Number of new exiiaust tans?.......
Rekxate/kistall vent?~..~..»
.Ves X No.
O
Number of new exhaust hoods?..
Number of new boilers or compressors? ••••••••••«•••••••«••«•• .NumberofHP
_C2_ 2-
B-18 Page 1 of 1 Rev. 03/09
^ CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL.
MECHANICAL
WORKSHEET
B-18
Development Services
BuikUngDh^n
1635 Faraday Avenue
760-602-2719
www.carisbadca.gov
PitJjed Address: Suitt. (^O PermH No-- (3i3 W • \^ 5 ^
biformatton providsd below refers to wori? being done «i the above merfttoned permit only.
This fonn must be cewBleled eed returned to the Beildiiw BMstee hefore the Dormtt cae be isseed.
Buiklhie Dept Fox: (760) 602-8558
Number of new or rekKoted fixtures, traps, or floor drains.
New buHcRng Mwer Rne? .»
Nunnber of new roof drains?
kHtaH/criter wcfter Ihie? ...•.•.•.•„.••..••... ....„.•..•.....••„.„
1 NEW SINK
Ves_ 1 No.
Number of new water heaten?.
NundMr of new, relocated or repkiced gas oulMs?.
Nuniber of now hose Vb£t. JL
Tenant Impiowenient/ReiiiedMR
Number of exktkig Paneb OnvoMd bl thb prctecQ
Remodel only - Oekxate/add oiAlets/fWftchos)
Amps per panel On thb prqiM^
Ves No
Al/A
X
New CMMlnictient Number of new paneb or subpaneb?.
Amps per Panel:
Skigle Phase ........... ...M.....^....,...—.._....™.....«..
Three Phase............-...^.. ...............
Tlwee Pilose 460.
• Number of new amperes
. Number of new anmeres lOO^
. Number of new amperes lA*^
1 Number of new fumces, A/C, or heat pumps?.
FNlew or relocated duct wori?? Ves X No
Number of new flrepkxes?...—« —............................ ^
Number of new e)diaust ferns? ................................................................................ 1
RekKOte/install uent?._ ..... « ...» Q
Number of new exhaust hoods?........»..~.~......._~............~....~.~~...~.».....—.......................
Number of new boilers or compressors? ............................................Number of HP ^
B-18 Page 1 of 1 Rev. 03/09
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
. , SCREENING SURVEY
DateJj_^£jA;
Business Name h^/A- ^MT'^^ -
Street Address ^ (1^ CAIT^U^
Email Address
PLEASE CHECK HEFIE IF YOUR BUSINESS IS EXE!\flPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS)
Check all below that are present at your facility:
Add Cleaning
Assembly
Automotive Repair
Battery Manufat^ring
Biofuel Manufacturing
Biotech Laboratory
Bulk (Chemical Storage
Car Wash
Ciiemical Manufaduring
Chemical Puriflcatton
Dry Cleaning
Electrical (Component
Manufacturing
Fertiiizer Manufancturing
Film / X-ray Processing
Food Processing
Glass Manufactuiing
industrial Laundry
Ink Manufacturing
Laboratory
Machining/Milling
Manufacturing
Membrane Manufacturing
(i.e. water Alter membranes)
Metal Casting / Fonning
Metal Fabrication
Metal Finishing
Electroplating
Electrol^s plating
Anodizing
Coating (i.e. phosphating)
Chemical Etching / Milling
Printed Circuit Board
Manufacturing
Metai Powders Forming
Nutritional Supplement/
Vitamin Manufacturing
Painting/Finishing
Paint Manufacturing
Personai Care Products
Manufacturing
Pestidde Manufacturing /
Packaging
Phamnaceuticai Manufacturing
(including precursors)
Porcelain Enameling
Power Generation
Print Shop
Research and Development
Rubber Manufacturing
Semteonductor Manufacturing
Soap / Detergent Manufacturing
Waste Treatment / Storage
SIC Code(s) (if known):
Brief description of business activities (Production / Manufacturing Operations):.
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):
Estimated volume of industrial wastewater to be discharged (gal / day):
List hazardous wastes generated (type / volume):
Date operation began/or will begin at this location:
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority?
Yes (No/ If yes, when:
Site Contad C,7r^/^ '^^u^«-' Title
SAm^\xxxfyAA.^.^'iA^AA^ ' Phone No.__—zA
ENCINA WA^TBV?ATER AUTHORITY, 6200 Avenida Encinas Carisbaif, CA 92011 (760)438-3941
F/\X: (760)476-9852
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUESTIONNAIRE
OFFICE USE ONLY
UPFPHI
HV#
BP DATE. /
Business Name , , ^ ^ Business Contact Telephone* . _ ^ ^
t c^n^'M^ Project /^dress
a.i*f^ ^(k Mf.m
Clty^ , , , State. Zip Code APN#
Mailing Address .
i^zh Aye..
City , State Zip Code Plan File#
Project Contact^ - / Teleptione #
(7^<?) ^«>7 The following questions represent the facility's activities, NOT the specific project description.
AIS P^JIpW.:. OqgVJ'ftN9Y <?I.A§?lf I' Pfti^T li PIRE PEP/^TMENT - H^RPftV? WATE . . . , ,.
will use, process, or store any of ttie following hazardous materials. If any of the items are jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives
2. Compressed Gases 6. Oxidizers 10. Cryogenics
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
|TION; Indicate by circling the item, whether your business
, applicant must contact the Fire Protection Agency with
Occupancy Rating:
13. Corrosives
14. Other Health Hazards
15. NoneofThese.
2m • ll: SAN DIEGO COUNTY DEPARTMENT OF EyjVIRONIIIIENTAL HEALTt^ - HA^RDOUS MATERIALS DIVI^IOWS mMD); If th
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overiand Ave., Suite 110, San Diego,
Call (858) 505-6700 prior to ttie issuance of a building permit.
the answer to any of the
CA 92123.
FEES ARE REQUIRED. Project Completion Date: / / Expected Date of Occupancy:. / / • CalARP Exempt
Date Initials
• CalARP Required
JL.
Date Initials
• CalARP Complete
Date Initials
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds,
200 cubic feet, or carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to
or greater than 1,320 gallons? (Califomia's At>oveground Petroleum Storage Act).
im PJE99 9SaMIY,<ffi F9|alj^TI9^^ if the answer to any of the questions below is yes, appUcant must contact the Air
Pollution Control District (APCD), 10124 Okj Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 pnor to the issuance of a building or demolition
pemiit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification fbrm to ttie APCD at least 10 woridng days prior to
commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information.
YES
Will the subject fecility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD factsheet at httD://wvwv.sdaDcd.oro/info/facts/permits.pdf, and the list of typical equipment requiring an APCD permit on the reverse side
of this from. Contact APCD if you have any questions).
(ANSWER ONLY IF QUESTION 1 IS YES) Will ttie subject fecility be located within 1,000 feet of the outer boundary of a school (K through 12)?
(Search the Califomia School Directory at httD:/Awww.cde.ca.aov/re/sd/ for public and private schools or contact the appropriate school district).
Has a sunrey been perfonned to determine the presence of Asbestos Containing Materials?
Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos?
Will there be demolition involving the removal of a load supporting structural memtter?
1. •
NO
Briefly describe business activities:
I declare under penalty or peijui y that to the best of my knowledge and belief the resoonafls made
Name of Owner or Authorized Agent
Briefly describe proposed project:
aret
Signature of Owner or Autiiorized Agent
! and conect.
Date
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:.
BY:
FOR OFFICIAL USE ONLY:
DATE:
EXEMPT OR NO FURTIIER INFORMATION REQUIRED RELEASED FOR BUILOING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD
HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division
STORM WATER Development Services
^ CITY OF
CARLSBAD
COMPLIANCE Building Division
^ CITY OF
CARLSBAD ASSESSMENT
B-24
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s) of construction permit:
• Building Permit • Right-of-Way Permit
JK^My project is categorically EXEMPT from
' the requirement to prepare a storm water
pollution prevention plan (SWPPP) because It
only requires issuance of one or more of the
following permit types:
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Water Discharge
Project Storm Water Threat Assessment Criteria*
Afo Threat Assessment Criteria
My project qualifies as NO THREAT and is exempt from ttie requirement to prepare a stonm water pollution prevention plan (SWPPP) because
it mMli flw'no lN«ar aiMssfflanl crilm on IM City's Pni^
Level. My project does not meet any of the High, Moderate or Low Threat criteria described betow.
Tierl • LomrTifireatAssessmentCiiHerfa
• My project does not meet any of ttie Significant or Moderate Threat criteria. Is not an exempt pemilt type (See list above) and ttie project
meets one or more of ttie foitowing criteria:
• Results in some soil disturtiance; and/or
• Includes outdoor consbuction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 • JMbde/ate TTireat Assessment Cr/ter?a
• My project does not meet any of tiie Significant Threat assessment Criteria described below and meets one or more of ttie foitowing criteria:
• Project requires a grading plan pursuant to the Carisbad Grading Ordinance (Chapter 15.16 of ttie Carisbad Municipal Code); or,
• Pn^ will result in 2,500 squ^ feet or more of soils disturtiance inciuding any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and pioject meets one or more of ttie additional fbllowing criteria:
• Located wittiin 2(X) fbet of an environmentally sensitive area or ttie Pacific Ocean, and/or
• DIsturtied area is kxiated on a slope wiUi a grade at or exceeding 5 horizontel to 1 vertical, and/or
• DIsturtied area is located aking or wittiin 30 feet of a stonn drain inlet, an open drainage channel or watercourse, and/or
• Ctonstnjction will be Initiated during ttie rainy season or will extend into ttie rainy season (Oct. 1 ttirough April 30).
Tier 3 - Sign'rficant Threat Assessment Criteria
• My project includes clearing, grading or ottier disturijances to the ground resulting in soil disturisance totaling one or more acres including any
associated constiuction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
• My project Is part of a phased devetopment plan ttiat will cumulatively result in soil disturtiance totaling one or more acres inciuding any
associated constiuction staging, equipment storage, refueling and maintenance areas: or,
• My project is located inside or wittiin 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential tor contiibuting pollutants to neartiy receiving waters by way of stonn water njnoff or non-stonn water discharge(s).
/ certify to the best of my knowledge ttiat ttie above
ctiecked statement are true and correct I understand
and acknoyriedge that even though this project does
not require preparaSon ofa construction SWPP, I must
still adhere to, and at all times during constmctton
activities for (he pernitt type(s) check above comply
with the storm water best management fmctices
pursuant to Title 15 of the Carlsbad Municipal Code
and to CHy Standards.
'The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construdion SWPPP Tier Level is
wan'anted.
Project Address: Assessor Parcel No.
OwnerA>inier's Aulhoilztd Agent ttame: Title:
Dale: \/
I Date: / Prcjectipr
B-24 Page 1 of 1 Rev.03/09
VIKING
October 18, 2011
To Whom It May Concern:
Please use this as authorization for Rick Bramble on behalf of Viking Commercial
Constmction, Inc., to sign and pull Building Permits with the City of Carlsbad.
Please feel free to call with any questions or concerns at (760)931-9990.
Sincerely,
Stephanie Fabian
Office Manager
Viking Commercial Construction, Inc.
Lie. #804831
U:\Office\Letter Library\Letter of Authorization.doc
Telephone: 760-931-9990 • Fax: 760-931-9955
1825 Aston Avenue • Carisbad, CA 92008 • www.vikingcc.com
C3 >J ^ 01 ^ 8-
7^
f
-I-I ^ 5^ S eo -1 < m • • IO -"•I S S5 rn rs O
12-01-2011
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision Permit No:PCR11135
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC #:
Project Title:
2175 SALKAV CBAD
PCR
2120210800 Lot#: 0
$0.00 Construction Type: NEW
PC110040
REVISIONS TO "M" SHEETS ONLY
FOR TVS TO SUITES 150, 160,180,185 & 190
Applicant:
NATIONAL AIR & ENERGY
ATTN: TONY BRUNELL
2053 KURTZ ST
SANDIEGO CA 92110
619 299-2500
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
11/16/2011
RMA
12/01/2011
12/01/2011
Owner:
RIO SD PLAZA II MASTER LLC
C/O NEWPORT NATIONAL CORPORATION
1525 FARADAY AVE #100
CARLSBAD CA 92008
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
$108.00
$0.00
$0.00
Total Fees: $108.00 Total Payments To Date: $108.00 BalanceDue: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project Includes the "Imposition" of fees, dedications, reseivations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this peimit was issued to protest imposition of these fees/exactlons. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required Infonnation with the City Manager for
processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow tfiat procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or servtee fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has prevtouslv othenwise expired.
^ CITY OF
CARLSBAD
PLAN CHECK REVISION
APPLICATION
B-15
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Plan Check Revision No. Original Plan Check No. _/t /10^^ ^0
Project Address ^/7S fs^uuL. Avfc Date t({to/<(
ContacrT2MV gAt^MCcug. ptffecqJ^'?y-A^co Fax
Contact Address ^oS3 U^tiATZL •Sy
Email LOH.K^)O(9^tJ.Arjn-Af.e..Ce>t^
City^S^t*_Pugsfc,o_ Zip c^\\x>
General Scope of Work M\ifi^HA»^tjC-.At
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 Elements revised:
• Plans • Calculations • Soils • Energy • Other
2
Describe revisions in detail
3
List page(s) where
each revision is
shown
4
List revised sheets
that rep/ace
existing sheets
XAAfAif. A^y/ r///hC <^/^ r^^'Tf
Cl CA\ ntAx/i o Jjty^ <^IAA^ A^7>^
^ cr ^
5 Does this revision, in any way, alter the exterior of the project? Q Yes
6 Does this revision add ANY new floor area(s)? • Yes Q No
7 Does this revision affect any fire related issues? Q Yes No
8 Is this a complete set? • Yes ^ No M6:HW64C ^H«jtT5 ^/^Y
>gS'Signature_
B No
1635 FaracJay Avenue, Carlsbad, CA 92008 Phone: 760-602-2717 / 2718 / 2719
vvww.car1sbadca.gov
Fax: 760-602-8558
Gafl^bad 11-0040 ( PCRl 1-135 )
11/28/11
EsGil Corporation
lit VartnersHvp witfi government for <BuiUitig Srfety
DATE: 11/28/11 •APPLICANT
[fi/JURIS.
JURISDICTION: Carlsbad • PLAN REVIEWER
• FILE
PLAN CHECK NO.: 11-0040 ( PCRl 1-135 ) SET: REV 1, Set I
PROJECT ADDRESS: 2175 Salk, Suits 150, 160, 180, 185 & 190
PROJECT NAME: Office TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
^ The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your infonnation. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to fon/vard to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
I I Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email:
^ REMARKS: A. The note clouded in red on the approved revised plan sheet M-2 must be
made to the city set of revised plans to make a 2"^ set of approved revised plans. B. The
cover sheet of the original approved plans should be changed to reflect the revised
mechanical contractor/ designer, National Air & Energy
By: Chuck Mendenhall Enclosures:
EsGil Corporation
• GA • EJ • PC 11/21/11
iJkbad 11-^armad 11-0040 ( PCRl 1-135 )
11/28/11
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 11-0040 ( PCRl 1-135 )
PREPARED BY: Chuck Mendenhall DATE: 11/28/11
BUILDING ADDRESS: 2175 Salk, Suits 150, 160, 180, 185 & 190
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB
BUILDING
PORTION
AREA
{ Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Refv Mech Plans 10001 Hrly
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
BIdg. Pernfiit Fee by Ordinance
Plan Check Fee by Ordinance
Type of Review:
• Repetitive Fee
Repeats
• Connplete Review
• Other
[3 Hourly
EsGil Fee
• structural Only
Hr.@
$86.00
Based on tiourly rate
Comments:
Sheet 1 of 1
nnacvalue.doc +
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
VANTANA REAL PHASE II
2175 SALK AVE.,SUITE 150,160,180,185,190
CARLSBAD, CA 92008
Project Designer:
Report Prepared by:
HADI MAHZARI
ENERGY CONSULTING GROUP
8015 BALBOA AVE.
SAN DIEGO, CA 92111
858-268-0660
^
Job Number:
Date:
10/10/2011
Tfie EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - virtiw.energysoft.com.
EnergyPro S. 1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID:
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Form MECH-1 -C Certificate of Compliance 3
Form MECH-2-C Air & Water System Requirements 15
Form MECH-3-C Mechanical Ventilation 20
Form MECH-4-C HVAC Misc. Prescriptive Requirements 22
Form MECH-MM Mechanical Mandatory Measures 37
EnergyPro 5.1 by EnergySoft Job Number: ID: User Number 2984
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALKAVE.,SUITE 150,160,180,185,190 Cf-
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: Cl Nonresidential • HIgh-Rlse Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. EH Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or In Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Equipment^ Inspection Criteria
Meets Criteria or Requirements
Equipment^ Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/150-1 • •
Equipment Type^: Hydronic Heat Pump • •
Number of Systems 1 • •
Max Allowed Heating Capacity^ 14,277 Btu/hr • •
Minimum Heating Efficiency^ 5.30 COP • •
Max Allowed Cooling Capacity^ 42,844 Btu/tir • •
Cooling Efficiency' 15.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setbacl< Required • •
Fan Control Constant Votume • •
Equipment' Inspection Criteria
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Descrit>e Reason'
Item or System Tags
(I.e. AC-1, RTU-1, HP-1) HP/150-2 • •
Equipment Type^: Hydronic Heat Pump • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 13,322 Btu/tir • •
Minimum Heating Efficiency' 5.20 COP • •
Max Allowed Cooling Capacity' 64,851 Btu/tir • •
Cooling Efficiency' 15.9 EER • •
Duct Location/ R-Vaiue R-4.2 • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setbacl< Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment perfomnance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 3 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 Of 5) MECH-1 C
Project Name
VANTANA REAL PHASE 11
Date
10/10/2011
Project Address
2175 SALKAVE.,SUITE 150,160,180,185,190 0/
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. EZI Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compilance: • Component Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(I.e. AC-1, RTU-1, HP-1) HP/150-3 • •
Equipment Type': Hydronic Heat Pump • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 7,662 Btu/tir • •
Minimum Heating Efficiency' 5.90 COP • •
Max Allowed Cooling Capacity' 20,936 Btu/tir • •
Cooling Efficiency' 16.5 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setoacic Required • •
Fan Control Constant Votume • •
Equipment' Inspection Criteria
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(I.e. AC-1, RTU-1, HP-1) HP/150-4 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 11.337 Btu/hr • •
Minimum Heating Efficiency' 5.80 COP • •
Max Allowed Cooling Capacity' 47,318 Btu/hr • •
Cooling Efficiency' 17.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Forni. Compliance falls if a Fall box Is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 4 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti Of5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALKAV£.,SU/T£ 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Roor Area
n/a
GENERAL INFORMATION
Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. • Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component Overall Enveiope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/160-1 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 16,045 Btu/hr • •
Minimum Heating Efficiency' 5.20 COP • •
Max Allowed Cooling Capacity' 64,113 Btu/hr • •
Cooling Efficiency' 15.9 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setbacl< Required • •
Fan Control Constant Volume • •
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/160-2 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 9,054 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 42,067 Btu/hr • •
Coolinq Efficiency' 15.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setoac/c Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails If a Fall box Is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 5 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALK AVE.,SUITE 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. ES Conditioned Spaces — Unconditioned Spaces
" (affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or In Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(I.e. AC-1, RTU-1, HP-1) HP/180-1 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 11,769 Btu/hr • •
Minimum Heating Efficiency' 5.80 COP • •
Max Allowed Cooling Capacity' 49,553 Btu/hr • •
Cooling Efficiency' 17.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
Equipment' Inspection Criteria
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Descrlt>e Reason'
Item or System Tags
(I.e.AC-1, RTU-1, HP-1) HP/180-2 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 12,843 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 36,952 Btu/hr • •
Coolinq Efficiency' 15.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity Is less than the Proposed (from the energy compilance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Forni. Compliance fails if a Fail box Is checked.
3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 6 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti Of5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALKAVE.,SUITE 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: B) Nonresidential • HIgh-Rlse Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. IZ Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Constnjction • Addition • Alteration
Approach of Compliance: • Component Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(i.e. AC-1, RTU-1. HP-1) HP/180-3 • •
Equipment Type': Hydronic Heat Pump • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 7,082 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 28,626 Btu/hr • •
Cooling Efficiency' 17.0 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Votume • •
Equipment' Inspection Criteria
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/185-1 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 30,351 Btu/hr • •
Minimum Heatina Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 38,440 Btu/hr • •
Cooling Efficiency' 15.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fail box Is checked.
3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 bv EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 7 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALK AVE.,SUITE 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Roor Area
n/a
GENERAL INFORMATION
Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. ES Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component • Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/185-2 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 6,002 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 39,197 BtuAir • •
Cooling Efficiency' 17.0 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Descrit>e Reason'
Item or System Tags
(i.e. AC-1. RTU-1, HP-1) HP/190-1 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 7,686 Btu/hr • •
Minimum Heating Efficiency' 5.90 COP • •
Max Allowed Cooling Capacity' 21,896 Btu/hr • •
Cooling Efficiency' 16.5 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance falls if a Fall box Is checked.
3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 8 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 1 Of 5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALKAVE.,SUITE 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: Bl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. Bl Conditioned Spaces P, Unconditioned Spaces
'-' (affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component Overall Envelope
Energy
TDV • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/190-2 • •
Equipment Type': Hydronic Heat Pump • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 15,011 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 35,371 Btu/hr • •
Cooling Efficiency' 17.0 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Settiack Required • •
Fan Control Constant Volume • •
Equipment' Inspection Criteria
RELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Descrlt>e Reason'
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP/190-3 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heatinq Capacity' 9,169 Btu/hr • •
Minimum Heating Efficiency' 5.30 COP • •
Max Allowed Cooling Capacity' 39.646 Btu/hr • •
Cooling Efficiency' 15.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 9 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti Of5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Project Address
2175 SALKAVE.,SUITE 150,160,180,185,190 CA
Climate Zone Total Cond. Floor Area
10,675
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: Bl Nonresidential • High-Rise Residential • Hotei/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. tia Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compiiance: • Component Overall Envelope TDV
Energy • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS RELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria
Meets Criteria or Requirements
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(I.e.AC-1, RTU-1, HP-1) HP/190-4 • •
Equipment Type': Hydronic Heat Pump • •
Number of Svstems 1 • •
Max Allowed Heating Capacity' 15,582 Btu/hr • •
Minimum Heating Efficiency' 5.80 COP • •
Max Allowed Cooling Capacity' 50.517 Btu/hr • •
Cooling Efficiency' 17.6 EER • •
Duct Location/ R-Value R-4.2 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setback Required • •
Fan Control Constant Volume • •
Equipment' Inspection Criteria
RELD INSPECTION ENERGY CHECKUST
Equipment' Inspection Criteria Pass Fail - Describe Reason'
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) • •
Equipment Type': • •
Number of Systems • •
Max Allowed Heating Capacity' • •
Minimum Heating Efficiency' • •
Max Allowed Cooling Capacity' • •
Cooling Efficiency' • •
Duct Location/ R-Value • •
When duct testing Is required, submit
MECH-4A & MECH-4-HERS • •
Economizer • •
Thermostat • •
Fan Control • •
1. If the Actual installed equipment perfonnance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 10 of 37
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 2 Of 5) MECH-1 C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 11 of 37
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 Of 5) MECH-10
Project Name Date
VANTANA REAL PHASE 11 10/10/2011
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed betow are all the acceptance tests for mechanical systems. The designer Is required to check the applicable
boxes by all acceptance tests Itiat apply and listed aH equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA nuniber designates the Sectton in the Appendix of the Nonresidential Reference Appendtoes Manual that describes the test. Since this form will be
part of the plans, completton of this sectton will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Accsptanca: Before occupancy permit Is granted for a newly constructed buikfing or space, or a new space-condittoning system sen/ing a buitoing or space is operated for
normal use, all control devices senring the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form Is not considered a completed fomn and Is not to be accepted by the building department unless the con'ect boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The foitowing checked-off forms are required for ALL newly installed equipment. In addition a Certiftoate of Acceptance forms shall be submitted to the buitoing department that certifies plans,
speciftoations, installatton, certificates, and operaUng and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before tfie buikling can receive final occupancy.
TESTDESCnp-nON MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A
Eouipmenl Reauiring Testing or Verilication Qtv.
Outdoor
Ventilation
For
VAV & CAV
Constant
Volume &
Single-Zone
Unitarv
Air
Distribution
Ducts
Economizer
Controls
Demand
Control
VentUation
DCV
Supply
Fan
VAV
Vah/e
Leakage
Test
Supply
Water
Temp.
Reset
Hydronic
System
Variable
Flow
Control
Automatic
Demand
Shed
Control
CARRIER SOPSH030 4 El a • • • • • • • •
CARRIER S0PSH018 2 a a • • • • • • • •
CARRIER S0PSH04e 1 a a • • • D • • • •
CARRIER SOPSH024 3 a a • • • • • • • •
CARRIER SOPSH036 1 a O • • • • • • •
a • • • • • • • • •
• • • • • • • • • •
• • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
EneravPro 5.1 by EneravSoft User Number. 2964 RunCode: 2011-10-10T11:33:3S ID: Paoe 12 of 37
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-1 SA
Eguipment Reguiring Testing Qtv.
Fault
Detection &
Diagnostics
lor DX Units
Automatic Faun
Detection &
Diagnostics lor
Air & Zone
Distributed
Energy Storage
DXAC
Systems
Thermal Energy
Storage (TES)
Systems Test Performed Bv:
CARRIER S0PSH030 4 • • • •
CARRIER S0PSH018 2 • • a •
CARRIER S0PSH04a 1 • • • •
CARRIER S0PSHO24 3 • • • •
CARRIER SOPSH036 1 D • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
EnerovPro 5.1 bv EneravSofl User Number 29S4 RunCode: 2011-10-10T11:33:3e ID: Paae 13 of 37
CERTIHCATE OF COMPUANCE (Part 5 Of 5) MECH-1 C
Prt^lName
VANTANA REAL PHASE II
Date
10/10/2011
Documentation Author's Declaration Statement
I certify that this Certificate of Compliance documentation Is accurate and complete.
Name HADI MAHZARI Signature //^ /^A7t/tj^^
Company ENERGY CONSULVNG GROUP Date iono/2011
Address 8016 BALBOA AVE. CEA#
CEPE#
City/State/Zip SAN DIEGO .CA 92111 Phone 858-268-0660
The Principal Mechanical Designer's Declaration Statement
• I am elgible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical
design.
• This Certificate of Compliance identifies the mechanical features and perfomiance specifications required for compliance
wilh Title-24, Parts 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the infonnation provided to document
this design on the olher applicable compliance forms, worksheets, calculations, plans and specifications submitted lo the
enforcement agency for approval with this building pemnit application.
Date 10/10/2011
Name ANTHONY BRUNELLE
Company NA7I0NAL & AIR & ENERGY
Address 2053 RUTZ STREET License # 706889
City/State/Zip SANDIEGO, CA02110 Phone 619-298-2S00
Mandatory Meamires
Indicate locatton on buikling plans of Note Bkxsk for Mandatory Measures.
MECHANICAL COMPUANCE FORMS & WORKSHEETS (check box W worksheet Is Included)
For detailed inslrucltons on the use of this and all Energy Efficiency Standards compliance forms, please refer to Ihe 2008 Nonresktential Manual.
Note: The Enforcement Agency may require aH forms to t>e incorporated onto the buiMing plans.
Bl MECH-1 C Certificale of Compiiance. Required on plans for ali submittals.
MECH-2C Mechanical Equipmenl Summary Is required for ali submittals.
El MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical venliiation.
Bl MECH-4C Fan Power Consumption is required for ail prescriptive submittals.
EnergyPro 5.1 by EnergySofl User Number 2984 RunCode: 2011-10-10709:10:20 ID: Page 14 of 37
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
Item or System Tags
(i.e.AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags
(i.e.AC-1, RTU-1, HP-1) t^AgSiM^^d HP/150-1 HP/150-2 HP/150-3
Number of Systems ^^^^^m 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
Indicate Page Reference on Plans or Schedule and Indicate the appiicable exceptlon(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 5.30 COP 5.20 COP 5.90 COP
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) t5.6 EER 15.9 EER 16.5 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) 98 cfm 95 cfm 135 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Setback Reguired Setback Required Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(f) Aulo Auto Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(g) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation 124 R-4.2 R-4.2 R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
U4(a & b) 14,277 Blu/hr 13,322 Btu/hr 7,662 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 34,052 Btu/hr 59,190 Btu/hr 22,342 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) 29,991 Btu/hr 45,396 Btu/hr 14,655 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 23,523 Btu/hr 44,605 Blu/hr 14,369 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) No No No '
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer No Economizer No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(i)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating^
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 15 of 37
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags
(i.e. AC-1, RTU-1, HP-1) i^tS"] HP/150^ HP/160-1 HP/160-2
Number of Systems 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 5.80 COP 5.20 COP 5.30 COP
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 17.6 EER 15.9 EER 15.6 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) 230 cfm 105 cfm 183 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Selback Required Setback Required Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(f) Auto Auto Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(g) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Themiostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation 124 R-4.2 R-4.2 R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 11,337 Btu/hr 16,045 Btu/hr 9,054 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 39,629 Btu/hr 59,303 Blu/hr 34,699 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 33,122 Btu/hr 44,879 Btu/hr 29,447 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 27,122 Btu/hr 44,597 Btu/hr 22,074 Blu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(0)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer No Economizer No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(i)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 16 of 37
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
Item or System Tags
(i.e.AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags
(i.e.AC-1, RTU-1, HP-1) HP/180-1 HP/180-2 HP/180-3
Number of Systems 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
Indicate Page Reference on Plans or Schedule and Indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 5.80 COP 5.30 COP 5.30 COP
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 17.6 EER 15.6 EER 17.0 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) 63 cfm 147 cfm 110 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Setback Required Setback Required Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(f) Auto Auto Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(g) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation 124 R-4.2 R-4.2 R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 11,769 Btu/hr 12,843 Btu/hr 7,082 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 38,365 Blu/hr 34,432 Btu/hr 29,171 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 34,687 Btu/hr 25,866 Btu/hr 20,038 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 29,249 Btu/hr 23,221 Btu/hr 19,305 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(C)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer No Economizer No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(1)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 17 of 37
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
Item or System Tags
(i.e.AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags
(i.e.AC-1, RTU-1, HP-1) '^L^ • . ..: HP/185-1 HP/185-2 HP/190-1
Numtier of Svstems 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
Indicate Page Reference on Plans or Schedule and Indicate the applicable exceptlon(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 5.30 COP 5.30 COP 5.90 COP
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 15.6 EER 17.0 EER 16.5 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) 71 cfm 122 cfm 95 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Setback Required Setback Required Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(f) Auto Auto Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(g) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Themiostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation 124 R-4.2 R-4.2 R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 30,351 Btu/hr 6,002 Btu/hr 7,686 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 33,947 Btu/hr 29,261 Btu/hr 22,001 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 26,908 Btu/hr 27,438 Blu/hr 15,327 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) 23,176 Btu/hr 19,057 Btu/hr 14,944 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) No Yes Yes
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer No Economizer No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(1)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 18 of 37
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
VANTANA REAL PHASE II 10/10/2011
Item or System Tags
(i.e.AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..)
Item or System Tags
(i.e.AC-1, RTU-1, HP-1) 'a.'^r'WS^ HP/190-2 HP/190-3 HP/190-4
Number of Systems 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
Indicate Page Reference on Plans or Schedule and indicate the appiicable exceptlon(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 5.30 COP 5.30 COP 5.80 COP
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a) 17.0 EER 15.6 EER 17.6 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(b), 112(c) Yes Yes Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(c), 115(a) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(b) 65 cfm 63 cfm 259 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
121(c) No No No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Programmable Switch Programmable Switch Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(e) Setback Required Setback Required Selback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(f) Auto Aulo Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
122(g) n/a n/a n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thennostat
Furnace Controls/Thennostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation 124 R-4.2 R-4.2 R-4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 15,011 Btu/hr 9,169 Btu/hr 15,582 Btu/hr Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 28,844 Btu/hr 33,735 Btu/hr 39,881 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 24,760 Btu/hr 27,752 Btu/hr 35,362 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a & b) 19,524 Btu/hr 23,223 Btu/hr 27,124 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume Constant Volume Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Yes Yes Yes
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No No No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer No Economizer No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp Constant Temp Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(i)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simuhaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exceptlon(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 19 of 37
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
MECHANICAL VENTILATION (i121(b)2) REHEAT LHWTAIION (S144(d))
AREA BASIS OCCUPANCY BASIS VAVUMMUM
A 8 C D E F G H 1 J K L M H
Zone/System
Condition
Area (If)
CFM
ft'
Min CFM
By Area
BXC
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
EXF
REQ'D
V.A.
Max of
DorG
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
BX0.4
CFMIlf
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transier
Air
HP/150-1 655 0.»5 98 98 98
HP/150-1 Total 98 98
HP/150-2 630 O.f 5 95 95 95
HP/150-2 Totel 95 95
HP/150-3 270 0.50 135 135 135
HP/1S0-3 Total 13S 135
HP/150-4 f,530 0.15 230 230 230
HP/150-4 Total 230 230
HP/160-1 700 0.15 105 105 105
HP/160-1 Total IOS 105
HP/160-2 1,222 0.15 183 183 183
HP/160-2 Total 183 183
HP/ieo-i 420 0,16 63 63 63
HP/1 SO-1 Total 63 63
HP/180-2 980 0.15 147 147 147
Totals Column 1 Total Design Ventiiation Air
C Minimum ventHatian rate per Section S121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed setting.
H Reouired Ventiiation Air (REQ'D VA) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or Ql.
1 Must be greater than or egual to H, or use Transfer Air (column N) to make up the difference.
J Design fan suoDlv CFM (Fan CFM) x 50%: or the design zone outdoor airflow rate per $121.
K Condition area (ft') x 0.4 CFM / ft' or
L Maximum ol Columns H. J, K. or 300 CFM
M This must be less than or egual to 0>lumn L and greater than or egual to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) Is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
egual to the difference between the Reouired Ventilatnn Air (Column H) and the Design Minimum Air (Column M), Coiumn H minus M.
EneravPro 5.1 W EneravSofl User Number 2984 RunCode: 2011-10-10711:33:36 ID: Paae 20 of 37
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
MECHANICAL VENTILATION (i121(b)2) REHEAT LHIMTATION (i144(d»
AREA BASIS OCCUPANCY BASIS VAVIMNMUM
A B C D E F Q H 1 J K L M N
Zone/System
Conditnn
Area
(ft")
CFM
per
fl'
Min CFM
By Area
BXC
Number
01
People
CFM
per
Person
Min CFM
by
Occupant
EXF
REQD
V.A.
Maxol
DorG
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
BX0.4
CFM/ft'
Max.ol
Columns
H,J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transier
Air
HFi/180-2 Total 147 147
HP/180-3 220 0.50 110 110 110
HP/180-3 Total 110 110
HP/185-1 470 0.15 71 71 71
HP/185-1 Total 71 71
HP/185-2 810 0.15 122 122 122
HP/185-2 Total 122 122
HP/190-1 190 0.50 95 95 95
HP/190-1 Total 95 95
HP/190-2 430 0.15 65 65 65
HP/190-2 Total 65 65
HP/190-3 420 0.15 63 63 63
HP/190-3 Total 63 63
HP/190^ 1,728 015 259 259 259
HP/190-4 Total 259 259
Totals Column 1 Total Design Ventilation Air
C Minimum ventlation rate per Sectton $121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes (or spaces without fixed setting.
H Reguired Ventilation Air (REQ'D VA) is the larger of the ventiiation rat es calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G).
i Must be greater than or equal to H, or use Transier Air (column N) to make up the difference.
J Design fan supolv CFM (Fan CFM) x 50%: or the design zone outdoor airflow rate per $121.
K Conditton area dt*) x 0.4 CFM / ft*; or
L Maximum of Columns H. J. K, or 300 CFM
M This must be less than or egual to Coiumn L and greater than or egual to the sum of Columns H plus N.
N Transfer Air must be piovided where the Required Ventlation Air (Coiumn H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
egual to tfw difference between the Reauired Ventlation Air (Column H) and the Design Minimum Air ((Column M), Column H minus M.
EneravPro 5.1 W EneravSoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Paae 21 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.330 64.0% 100.0% 1.0 385
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) f,000
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SPi) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SPi) on Line 5. 4) SP.
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SPi) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: 22 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: ProvKle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variafcile Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.750 77.0% 100.0% 1.0 727
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 727 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,600
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.454 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 23 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.167 60.0% 100.0% 1.0 208
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 208 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 600
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.346 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 24 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
A B C D E F
Fan Description
Design Brake
HP
Efficiency Number of
Fans
Peak Watts
BXEX746/
(CXD) Fan Description
Design Brake
HP Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.500 76.0% roo.0% 1.0 491
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1-(SP.-1)/SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 25 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provkje one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
A B c D E F
Fan Description
Design Brake
HP
Efficiency Number of
Fans
Peak Watts
BXEX746/
(CXD) Fan Description
Design Brake
HP Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.750 77.0% 100.0% f.O 727
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 727 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,600
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.454 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 26 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.330 64.0% 100.0% 1.0 385
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 27 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.500 76.0% 100.0% 1.0 491
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 28 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.330 64.0% 100.0% 1.0 385
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If tiler pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 29 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provkle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when using ttie Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.200 60.0% 100.0 % 1.0 249
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 800
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 51 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 30 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
A B C D E F
Fan Description
Design Brake
HP
Efficiency Number of
Fans
Peak Watts
BXEX746/
(CXD) Fan Description
Design Brake
HP Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.330 64.0% 100.0% 1.0 385
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0385 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 31 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.200 60.0% 100.0% 1.0 249
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 800
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 32 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(0).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.167 60.0% 100.0% 1.0 208
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 208 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 600
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP.) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.346 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 33 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provkfe one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variat^e Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c').
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
B X E X 746 /
(CXD)
Supply Fan 0.200 60.0% 100.0% 1.0 249
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 249 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 800
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.311 W/CFM
TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySofl User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 34 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provkle one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.330 64.0% 100.0 % 1.0 385
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 385 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.385 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number 2984 RunCode: 2011-10-10711:33:36 ID: Page 35 of 37
FAN POWER CONSUMPTION MECH-4C
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
NOTE: Provkle one copy of this woricsheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
B
Fan Description
Design Brake
HP
Efficiency
Motor Drive
Number of
Fans
Peak Watts
BXEX746/
(CXD)
Supply Fan 0.500 76.0% 100.0% 1.0 491
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 491 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c)
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SP.
A) If filer pressure drop (SP,) is greater than 1 inch W. C. or
245 Pascal then enter SP, on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5.
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SP,-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.409 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 2984 RunCode: 2011-10-10T11:33:36 ID: Page 36 of 37
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
VANTANA REAL PHASE II
Date
10/10/2011
Equipment and System Efficiencies
§111: Any appliance for which there is a California standard estat>lished in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a): Fan type central furnaces shall not have a pilot light.
§123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602,603, 604, and 605 of
the CMC Standards.
Controls
§122(e): Each space conditioning system shall be installed with one of the following:
IA. Each space conditioning system sen/ing building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
IB. An occupancy sensor to control the operating period of the system; or
IC. A 4-hour timer that can be manually operated to control the operating period of the system.
2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
§122(g):
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
square feet shall be provided with Isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independentiy of other isolation areas; and shall be controlled by a time control device as described above.
§122(c): Thermostats shail have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
§122(a&b):
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e): Controis shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
§121(f):
Ventiiation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
new ventilating system serving a building or space is operated for normal use, ail ventilation systems serving the
buiiding or space shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c) installation
3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by EnergySofl User Number: 2984 RunCode: 2011-10-10711:33:36 ID: Page 37 of 37
.S,j&vi,.^pg^ ^>LAaj^ fidoS^^
m
ujfe. 0-56: ^
At^ p^^,^^
'.A
t4i
£2 tc
§5 ^