Loading...
HomeMy WebLinkAbout2177 SALK AVE; 150 | 250; PC130005; Permit06-18-2013 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Plan Check Permit No: PCI 30005 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation: Reference # Project Title 2177 SALKAV CBAD PLANCK 2120210300 Lot#. $0 00 Construction Type US FISH & WILDLIFE- SHELL TO OFFICE Status Applied: Entered By Plan Approved. Issued Inspect Area. Applicant: DESIGNCORP CHIE HONDA 4944 COLLINGWOOD DR SAN DIEGO CA 92109 858-794-3222 Owner VENTANA REAL LLC 1525 FARADAY AVE #100 CARLSBAD CA 92008 ISSUED 01/15/2013 JMA 03/06/2013 03/06/2013 Plan Check Fee $0 00 Additional Fees $0 00 Total Fees $0.00 Total Payments To Date $0 00 Balance Due: $0.00 Inspector FINAL APPROVAL Date Clearance. NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: BUILDINQ RE Q HEALTH Q HAZMAT/APCO ^ CITY or CARLSBAD Building Permit Application 1635 Faraday Ave , Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: buidling@carlsbadca.gov www carlsbadca gov Plan Ctieck No. P(C^\30^0-S~ Est. Value Plan Ck. Deposit SWPP JOB ADDRESS SUITE#/SPACE#/UNIT# CT/PROJECT # L0T# PHASE# # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR TYPE DESCRIPTION OF WORK: /ncfude Square Feet of Affected Areafs) EXISTING USE PROPOSED USE GARAGE (SF) o PATIOS (SF) DECKS (SF) FIREPLACE YES • # NO •AIR CONDITTONING YES^ non FIRE SPRINKLERS YES c/ NOD APPLICANT NAME (Primary Contact) APPLICANT NAME (Secondary Contact) ADDRESS —/ ~r tj STATE ADDRESS PHONE _ A ZIP ZIP PHONE PROPERTY OWNER NAME CONTRACTORBUS. NAME ADDRES SS ^ Ti 1 / STATE.^ 1 ZIP ADDRESS l^2,tvo CITY 3TATE>, 1 ZIP FAX CITY STATE ZIP PHONE PHONE EMAIL ARCH/DESIGNER NAME & ADDRESS il 5 Business and Profeslions 1 STATE uc # CITY BUS UC# (Sec 7031 5 Business and Professions Code Any City or County which requires a permitto construct, alter, improve, demolish or repair any structure, pnor to its issuance, also requires the applicantfor such permitto file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law jphapler 9 commendingwith Sectton 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)) Workers' Compensation Declaration / hereby affinn under penalty of pequry one ofthe following declarations O I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this perm it is issued iSjl have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance ot the work for which this permit is issued My wortiers' compensalion insurance carrier and policy ' number are InaurorioOiOo y(eO OOP 2-<-{ "2.7 j'2^) Pilioy Mo Bi/<r^S^ MMiyv^ t*^S. Expiration Date "7— I —t"^ This section need not bs complet^ luSTpermit is for one hundred dollars ($100) or less ^ ^^^/^ O Certificate of Exemption. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California WARNING Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition tothe cost of compensation, damagesias provided for in Section 3706 of theJ.abor code, interest and attomey's fees CONTRACTOR SIGNATURE ^GENT DATE I hereby affirm thai I am exempt from Contractor's License Law for the following reason 0 i, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended oi offered for sale (Sec 7044, Business and Professions Code The Contractor's bcense Law does not apply lo an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or ottered for sale If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) "IS I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Profejsions Code The Contractor's License Law does not apply to an owner of 1 property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law) O I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and matenals for construction of the proposed property improvement • Yes O No 2 I (have / have not) signed an application for a building permit for the proposed work 3 I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / co ntractoi s' license number) 4 I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number) 5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work) ygS'pROPERTY OWNER SIGNATURE ^^^^^^ AGENT DATE Is the applicant or future building occupant required to submit a business plan acutely hazardous matenals registration form or nsk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account AcP • Yes • No Is the applicant or future building occupant required to obtain a permit from the air pollution control distnct or air quality management distncP • Yes • No Is the facility to be constructed withm 1,000 feet of the outer boundary of a school site'' • Yes • No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS IVIET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code) Lender's Name Lender's Address I certify that! have read the application and state Itiat ttie above informabon is conect and that the infomialion on Itie plans is accurate. I agree to comply with all Cityordmances and State laws relating to building constuction. I hereby authorize representative of the City of Carisbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMiT OSHA An OSHA pemi is required for excavations over 5'0' deep and demolition or constmction of stmctures over 3 stones in height EXPIRATION Every permit issued by the Building Official under ttejsieyisions of this CMe shall expire by limitation and become null and void i the building or vrork authorized by such pemiit is not commenced within 180 days trom the date of such penmit or if the building onaiprk^jadiop^ by suoh perjwt is/uspended or abandoned at any time after the work is commenoed fbr a penod of 180 days (Section 106 4 4 Uniform Building Code) APPLICANT'S SIGNATURE DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. CERTIF iCA TE^Of CC U P A Pi CY ^ | C <> m m c » a r a^^^ts^^^^Oji Fax (760) 602-8560, Email www buildinqtajcarlsbadca gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008 C0#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE STATE ZIP Carlsbad CA EMAIL OCCUPANT'S BUS LIC No DEUVERYOPTIONS • PICK UP: o CONTACT (Listed above) • OCCUPANT (Listed above) 11 CONTRACTOR (On Pg 1) • MAIL TO: • CONTACT (Listed above) • OCCUPANT (Listed above) • CONTRACTOR (On Pg 1) • IVIAIL/FAX TO OTHER: • ASSOCIATED CB#- • NO CHANGE IN USE/NO CONSTRUCTION D CHANGE OF USE/NO CONSTRUCTION ^APPLICANT'S SIGNATURE DATE EsGil Corporation In (Partnersliip witR government for (BuiCding Safety DATE: 2/14/13 • APPLICANT ^•<JURIS. JURISDICTION: City of Carlsbad '"^a PLAN REVIEWER • FILE PLAN CHECK NO.: PC13-05 SET: II PROJECT ADDRESS: 2177 Salk Ave Suite 150 8s 250 PROJECT NAME: U. S. Fish and Wildlife Service - TI ^ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant contact person. I I The applicant's copy of the check list has been sent to: 1X1 EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person • REMARKS: By: Doug Moody (by KC) Enclosures: EsGil Corporation • GA • EJ • PC 2/8/13 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 EsGil Corporation In <Partnersfivp wttA Qovemment for (BuiCdmg Safet^y DATE: 1/25/13 • APPtlQANT C("JURIS^ JURISDICTION: City of Carlsbad crPL7\-N REVIEWER • FILE PLAN CHECK NO.: PC13-05 SET I PROJECT ADDRESS: 2177 Salk Ave Suite 150 8B 250 PROJECT NAME: U. S. Fish and Wildlife Service - TI I ] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. X] The applicant's copy of the check list has been sent to: DesignCorp / Chie Honda 4944 Collingwood Dr, San Diego, CA 92109 ^ I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. Xl EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Chie Honda Telephone #: 858-794-3222 Date contacted: i /']2)(by:|C_ ) Email: chonda@designcorpsd.com Fax #: 6 Mail Telephone Fax In Person • REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • PC 1/15/13 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad PC13-05 1/25/13 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: PC13-05 JURISDICTION: City ofCarlsbad OCCUPANCY: B/A3 USE: Office TYPE OF CONSTRUCTION: VB ACTUAL AREEA: 20766sf ALLOWABLE FLOOR AREA: STORIES: 2 HEIGHT: SPRINKLERS?: Yes OCCUPANT LOAD: 388 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 1/15/13 DATE PLANS RECEIVED BY ESGIL CORPORATION: 1/15/13 DATE INITIAL PLAN REVIEW COMPLETED: 1/25/13 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or olher departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. City of Carlsbad PC 13-05 1/25/13 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. A complete description of the activities and processes that will occur in this tenant Wet Lab should be provided. A listing of all hazardous materials should be included. The materials listing should be stated in a form that would make classification in Tables 307.7(1) and 307.7(2) possible. The building official may require a technical report to identify and develop methods of protection from hazardous materials. Section 307.7. 2. Clearly indicate on the plans the fume hood exhaust ventilation system compliance with UMC Chapters 5 & 6. a) Detail the required make-up air as per UMC, Section 505.3. b) Detail the exhaust outlet clearances as per UMC, Sections 504.5 (Environmental) & 506.9 (Product conveying). c) Clearly show the type of material to be exhausted by each exhaust system. d) Clearly show the duct materials are suitable for the intended use. UMC, Section 506.1 & 610.1. e) Clearly show the exhaust duct material and gage used for each duct size. See UMC Table 6-7. f) Separate and distinct systems shall be provided for incompatible matenals. UMC Section 505.1 g) Detail ducts conveying explosives or flammable vapors, fumes or dusts shall extend directly to the exterior of the building without entering other spaces. UMC Section 505.1. h) Detail minimum duct conveying velocities as per UMC Section 505.2 and Table 5-1. i) Detail duct cleanouts as per UMC Section 506.3. City of Carlsbad PC13-05 1/25/13 j) Detail required explosion venting of dust collection systems as per UMC Section 506.4 & 610.4. k) Detail duct support as per UMC Sections 506.5 & 610.5. I) Detail fire protection as per UMC Sections 506.6 & 610.6. m) Detail clearances from combustibles as per UMC Sections 506.7 & 610.7. n) Detail protection from physical damage as per UMC Sections 506.8 & 610.8 3. Please provide the listing and installation for the storage shelving. Section 107.2. 4. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural bracing of the shelving. Include all calculations and finding on the plans. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. 5. Please show the suspended ceilings plan for office 246/240 in Seismic Design Categories D, E & F comply with ASCE 7-05 Section 13.5.6.2.1 as follows: a) Ceiling areas over 2500 ft.^ must have seismic separation joints or full height partitions that break the ceiling into areas not exceeding 2500 ft.^ . 6. Each door ( 33 and E-3) in a means of egress from an occupancy of Group A having an occupant load of 50 or more shall not be provided with a latch or lock unless it is panic hardware. Section 1008.1.10. 7. When additional doors are provided for egress purposes, they also shall conform to the requirements of Section 1008 (width, swing, hardware, etc.). Section 1008.1. 8. Please indicate the location on the plans and the single line diagram to show the grounding of the new transformer to be per section 250-30 A (4) of the NEC. • GREEN BUILDING STANDARDS • (for nonresidential additions and tenant improvements) The California Building Standards Commission (BSC) has adopted the Green Building Standards Code which became effective January 1, 2011, revised on July 1, 2012 and must be enforced by the local building official. The Green Building Standards apply to nonresidential additions or tenant improvements throughout California. These standards apply to Nonresidential additions of 2,000 sq. ft. or lamer or alterations (tenant improvements) with a value of $500,000 or more constructed after July 1. 2012. CGC 101.3 & Section 5.701.1 City of Carlsbad PC13-05 1/25/13 9. Note on the plans that a minimum of 50% of nonhazardous construction waste is to be recycled. CGC 5.713.8.1 10. Note on the plans that testing and adjusting of new systems as outlined in CGC Section 5.713.10.4.2. 11. Note on the plans that a building " Operations & Maintenance Schedule" (O&M ) as listed in CGC Section 5.713.10.4.5 shall be delivered to the building owner or representative and the facilities operator. 12. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 5.714.4.3. 13. Note on the plans that VOC's must comply with the limitations listed in Section 5.504.4 and Tables 4.504.1, 5.504.4.1 5.504.4.2, 5.504.4.3 and 5.504.4.5 for: Adhesives, Sealants, Paints and Coatings, Carpet and Composition Wood Products. CGC 5.714.4.4. 14. Provide calculations prepared by a licensed engineer that will show water consumption reduction of 20% below the baseline water consumption for the addition as listed in 5.303.2.2. In lieu of providing the calculations, imprint on the plans Table 5.303.2.3, which lists fixtures that meet the 20% reduction. CGC 5.303.2 TABLE 5.303.2.3 FIXTURE FLOW RATES FIXTURE TYPE MAXIMUM FLOW RATE AT 20 % REDUCTION Kitchen faucets 1.8 gpm (g 60 psi 15. Imprint on the plumbing plans Table 5.303.6 in the CGC. Note on the plans that waste water fixtures shall comply with the standards listed in CGC Table 5.303.6. & 5.712.3.5 16. Note on the plans that prior to final approval of the building the licensed contractor, architect or engineer in responsible charge ofthe overall construction must complete and sign the City approved Green Building Standards Certification form or other documentation required by the city and given to the building department official prior to building final approval to be filed with the approved plans. Note : When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion ofthe building affected, is required to comply with all of the requirements for new buildings, per Section 1134B.2. These requirements apply as follows' City of Carlsbad PC13-05 1/25/13 a) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 17. Show a level area, or landing, per Section 1133B.2.4.2: a) >60" in the direction of door swing for door 12. 18. It is unclear from the plans if the restrooms servicing the tenant improvement are disabled accessible, please provide a dimensioned restroom plans showing the restroom to be accessible compliant. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulling from this correction list? Please indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad PC 13-05 1/25/13 [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: PC13-05 PREPARED BY: Doug Moody DATE: 1/25/13 BUILDING ADDRESS: 2177 Salk Ave Suite 150 8B 250 BUILDING OCCUPANCY: B/ A3 TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA ( Sq. Ft.) Valu ation Multiplier Reg. Mod. VALUE ($) Tl 20766 37.12 770,834 Air Conditioning Fire Spnnklers TOTAL VALUE 770,834 Junsdction Code cb By Ordinance Bldg. Permit Fee by Ordinanoe • $3,163.34 Plan Check Fee by Ordinance Type of Review I ^Repetitve Fee ~ Repeats 0 Complete Review • Other |—j Hourly EsGil Fee • Structural Only Hr. @ * $2,056.17 $1,771.47 Comments. Sheet 1 of 1 macvalue doc + PLAN CHECK PLAN CHECK Community & Economic CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: VSrmrn PROJECT NAME: U.S. FishaWildlife (Ventana Real Lot 3) PLAN CHECK NO: PC 13 05 VALUATIOIHlj $770,834 SET#: I ADDRESS: 2177 Salk Av PROJECT ID:CT 00 20 APN: 212-021-03 You may have corrections from one or more of the divisions listed in the table below. To determine status by one or more these divisions, please contact 760-602-2719 This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by the Construction IVIanagement Division is required QYes(xj No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: ' PLANNING ? V60-602-4610 S • ENGINEERING 760-602-2750 FIRE PREVENTION * ! , . .760-602-4665 I - J j 1 Chris Sexton i—J 760-602-4624 Chris.Sexton(§carlsbadca.gov r 1 Kathleen Lawrence [ 1 760-602-2741 Kathleen.Lawrence@carlsbadca.gov 1 1 Greg Ryan i L_J 760-602-4663 Gregory.Ryan@carlsbadca.gov j j Gina Ruiz 1 ! 760-602-4675 Glna.Ruiz@carlsbadca.gov \/ Linda Ontiveros /\ 760-602-2773 Linda.Ontlveros@carlsbadca.gov r I Cindy Wong L_J 760-602-4662 Cynthia.Wong@carlsbadca.gov • 1 Dominic Fieri L... 760-602-4664 \ Dominic.Fieri@carlsbadca.gov For questions or clarifications on the attached checklist please contact the reviewer as marked above. Remarks: U.S. Fish&Wildlife (Ventana Real Lot 3) PC 13-05 Stop ft . Please Read lAiiy outstanding issues ivill he marked ivitJi |X| • Make the necessary corrections for Icompliance xvith applicable codes and standards. Submit corrected plans and/or Ispecifications to the Building division for re-suhniittal to thc Engineeringjlivision. Items that confonn to permit requirements are marked u)ith \j/J 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show f / I North arrow Existing & proposed structures [~/~] Property line dimensions I I Easements Tl Show on site plan: I I Drainage patterns I I [ 1 Existing & proposed slopes I I ! j Existing topography Retaining Walls (location and height) Indicate what will happen with soil excavated from pool area Include on title sheet: / I Site address l/i Assessor's parcel number (ZZJ Legal descnption/lot number nn PREVIOUS PERMITS: CB70833 : SHELL 21,149 SF ***SHELL TO OFFICE SPACE FOR THIS TENANT IMPROVEMENT. 7,626 SF* Lot/Map No.: LOT 3 / MAP 15253 Subdivision/Tract: VENTANA REAL Reference No(s): DWG418-6A E-37 Page 2 of 4 REV 6/2012 U.S. Fish&Wildhfe (Ventana Real Lot 3) PC 13-05 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11 06.030 of the Municipal Code N/A j Inadequate information available on site plan to make a determination on grading requirements Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" I Minor Grading Permit reauired NOTE: The grading permit must be issued and grading approval obtained prior to Issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached Graded Pad Certification required All required documentation must be provided to your Construction Management & Inspection division inspector. The inspector will then provide the Land Development Engineering counter with a release for the building permit See attached checklist for minimum submittal requirements 3. MISCELLANEOUS PERMITS / J RIGHT-OF-WAY PERMIT is required to do work in city nght-of-way and/or pnvate work adjacent to the public right-of-way A separate nght-of-way issued by the engineenng division is required for the following. N/A Attachments: Engineering Application [_j Storm Water Form [_] RIglit-of-Way Application/lnfo Reference Documents E-37 Page 3 of 4 REV 6/2012 THIS CALCULATION WORKSHEET IS NOT ALL-INCLUSIVE OF FEES THAT MAY BE DUE FOR THIS PROJECT* Fee Calculation Worksheet ENGINEERING DIVISION \ Prepared by: Linda Ontiveros Date: 1/24/13 GEO DATA:LFMZ: 5 /B&T:i Address: 2177 Salk Avenue: Suite 150 & 250 (TOTAL SQ. FT: 20,766) Bldg. Permit #: PC 13-05 Fees Update by: Date: Fees Update by: Date: EDU CALCULATIONS: List types and square footages for all uses. Refer to CMC 13.10.020(c): Sq,Ft./Unitg422SF/1800 Sq.Ft./Unit(iy,344 SF /J800 Sq.Ft./Units [20,766 SFTSOOO] Sq.Ft./Units Current calc > EDU's: 1.90, EDU's: 9.64 EDU's: [4.15; EDU's ADT's Types of Use:150: WHSE TO OFFICE Types of Use: 250: WHSE TO OFFICE Types of Use: [WHSE CREDIT] Types of Use: ADT CALCULATIONS: List types and square footages for all uses. Refer Types of Use; 150: WHSE TO OFFICE Sq.Ft./Units 20/1000 (3,422 SF) Types of Use 250: WHSE TO OFFICE Sq.Ft./Units 20/100 (17,344 SF) ADT's Types of Use: [WHSE CREDIT] Sq.Ft./Units [5/1000 (20,766 SF)] ADT'S Types of Use: Sq.Ft./Units Current calc > ADT'S FEES REQUIRED: Within CFD;|7]YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) DNO 1. PARK-IN-LIEU FEE: DNW QUADRANT • NE QUADRANT QSE QUADARANT DSW QUADRANT 7.39 EDIJi r57o20(^ 68 C' [104] 311 5i X X ADT'S/UNITS: | X FEE/ADT: 2. TRAFF1C IMPACT FEE: ADT'S/UNITS: 311 3. BRIDGE & THOROUGHFARE FEE; ADT'S/UNITS; 4. FACILITIES MANAGEMENT FEE ADT'S/UNITS: 5. SEWER FEE EDU's 7.39 BENEFIT AREA: E EDU's 7.39 I X 6. DRAINAGE FEES: PLDA: ACRES: IX 7. POTABLE WATER FEES: UNITS CODE CONN. FEE FEE/ADT; 95.00 • DIST #1 FEE/ADT; ZONE; FEE/SQ.FT./UNIT; X FEE/EDU; 842 FEE/EDU: 3,116 •HIGH FEE/AC: • MED METER FEE =$ =$ 29,545 D1ST.#2 =$ =$ =$ 6,222.38 =$ 23,027.24 UM [IJLOW =$ SDCWA FEE • D1ST,#3 TOTAL ENGINEERING DEPARTMENT O 'I O n fk FEE CALCULATION WORKSHEET ^"^^ V a^^stimate based on unconfimrod information from applicant. C?Cc^ ^ m Calculation based on building plancheck plan submittal. Address: Bldg. Pemiit No._ Prepared by:. Date:. Checked by:. Date: EDU CALCULATIONS; List types and square footages for al) uses. Types of Use: i^6^lrK^ sq. FtAJnlta: ^"^z '^'^ ^ Types of Use; Sq. Fl/Umts: ADT CALCULATIONS: List types and square footages for all uses. Types of Use: U) ^vN^-t^ Sq. Ft./Unte; ^'^z ^^-^ Types of Use: Sq. Ft.AJnlt8: EDU's: EDU's: ADT's:. ADT's:. FEES REQUIRED; WITHIN CFD: • YES (no bridge & thoroughfare fee In District #1, reduced Traffic Impact Fee) • NO • 1. PARK-IN-LIEU FEE FEE/UNIT: PARK AREA &#:. X NO. UNITS:_ • 2. TRAFRC IMPACT FEE ADTs/UNITS:, X FEE/AD,. • 3. BRIDGE AND THOROUGHFARE FEE (DIST #1 DIST. #2. =4.. DIST. #3_ ^10 8 ADTsAJNITS:. • 4. FACILITIES MANAGEMENT FEE UNIT/SQ.FT.:<^^>^2 2- • 5. SEWER FEE EDU's: X FEE/ADT:. Z0NE:__ii__ BENEPrTARGA: EDU's: X FEE/SQ.FTAINIT: 9^ X FEE/EDU: X FEE/EDU; =$_ • 6. SEWER LATERAL ($2,500) • 7. DRAINAGE FEES PLDA^ ACRES; HIGH. X FEE/AC; • 8. POTABLE WATER FEES UNITS CODE COfjlNECTlON FEE METER FEE SDCWA FEE SDCWA FEE 1 of 2 P:\FEE C/U-CULATION WORICSHEET doe Bav. 7/14A» CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www carlsbadca.eov DATE: 2-11-13 PROJECTNAME: PROJECTID: PLAN CHECK NO: PC 13-05 SET#: 2 ADDRESS: 2177 Salk Av APN: 212-021-03 ^ This plan check review Is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Finallnspection by the Planning Division Is required DYes ^NO You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance ofa building permit. Resubmitted plans should include corrections from all divisions. Q This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: chonda@designcorpsd.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 X Chris Sexton 760-602-4624 Ch ris.Sexton@ca risbadca .gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov 1 1 Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca gov 1 1 Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: Plan Check No. PC 13-05 Address 2177 Salk Av Date 2-11-13 Review # 2 Planner Chns Sexton Phone (760) 602-4624 Type of Project & Use- H Net Project Density N/A DU/AC Zoning- O General Plan- O Facilities Management Zone: 5 CFD (in/out) #_Date of participation. Remaining net dev acres' (For non-residential development: Type of land use created by this permit; ) REVIEW #: 12 3 Legend: ^ Item Complete • Item Incomplete - Needs your action Kl • • Environmental Review Required: YES • NO • TYPE DATE OF COMPLETION Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval • • Discretionary Action Required: YES • NO • TYPE APPROVAL/RESO NO DATE PROJECT NO. OTHER RELATED CASES Compliance with conditions or approval? If not, state conditions which require action Conditions of Approval • • Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES • NO Q CA Coastal Commission Authonty? YES Q NO • If California Coastal Commission Authority; Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt) • O Habitat Management Plan Data Entry Completed'? YES • NO • if property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) D n Inclusionary Housing Fee required: YES • NO • (Effective date of Inclusionary Housing Ordinance - May 21, 1993 ) Data Entry Completed'? YES • NO • (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) • • Housing Tracking Form (form P-20) completed: YES • NO • N/A • p-28 Page 2 of 3 07/11 Site Plan: ^ • • Provide a fully dimensional site plan drawn to scale Show; North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal descnption of property and assessor's parcel number. City Council Policy 44 - Neighborhood Architectural Design Guidelines • • 1 Applicability; YES • NO ^ • • 2. Project complies YES • NOQ • • • • Zoning; 1 Setbacks Front. Intenor Side; Street Side; Rear; Top of slope- Required Required Required Required Required 2. Accessory structure setbacks Front: Required Intenor Side. Required Street Side; Required Rear; Required Structure separation; Required Shown. Shown. Shown. Shown. Shown Shown. Shown. Shown. Shown Shown S • • S • • S • • • ^ • 3 Lot Coverage. 4. Height; 5. Parking; Required Required Spaces Required Shown Shown Shown (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Additional Comments 1) Please correct the parcel number on sheet 'TS" from 212-020-23 to 212-021-03 2) Will the new roof mounted equipment be screened? If so, please show how it will be screened. Attached is an example OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 2-11-13 P-28 Page 3 of 3 07/11 HOLDING DEPT. PLAN CHECK Cori(;«4 Economic CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: 03/0S/2013 PROJECTNAME: USFWS PROJECT ID: PC130005 PLAN CHECK NO: 2 SEr#: 1 ADDRESS: 2177SALKAV APN: Kl • This plan check review Is complete and has been APPROVED by the FIRE Division. By: GR A Final Inspection by the FIRE Division is required |^ ves • No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: DesignCorp Vou may also have corrections from one or more of the divisions Usted below. Approval from these divisions may be required prior to the issuance ofa building permit Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING ' 760-602-2750 FIRE PREVENTION 760-602-4665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carIsbadca.gov X Greg Ryan 760-602-4663 Gregory.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: See Attached Carlsbad Fire Department iUILDING DEPT. COPY Plan Review Date of Report: Name: Address: Permit #: Job Name: Job Address: Requirements Category: PLANCK, 03-05-2013 DESIGNCORP - C. Honda 4944 COLLINGWOOD DR SAN DIEGO CA 92109 PC130005 US FISH & WILDLIFE: SHELL TO 2177 SALK AV CBAD Reviewed by: Please review carefully all comments attached. CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. No Interior Photometric plan was submitted so determining the interior emergency and Means of Egress Illumination is not possible. However at or prior to Final Fire and Building inspection an Emergency lighting facilities test shall be conducted by CFD personnel during pre-dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle. This test shall be conducted to test the initial loss of power reading of illumination that is at least an average of 1 foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level. And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFC Ch. 10, Sec. 1006. Additionally, please change the EXIT sign over door 37 to a perpendicular-to-the-wall double-faced EXIT sign. Please change the EXIT sign outside of Office 218 to a directional EXIT sign parallel to the wall between Offices 217 and 218. Please provide a perpendicular-to-the-wall double-faced EXIT sign between Open Office 230 and Work Room 231. Entry: 03/05/2013 By:GR Action: AP Page 1 of 3 BLDG. DEPT COPY RECOMMENDED FOR APPROVAL Daryl K. James & Associates, Inc. I 205 Colina Terrace Vista, CA 92084 T. 1760) 724-7001 Email; kitfire@sbcglobal.net Checked by: Daryl Kit James Date: Februarv 22. 2013 APPLICANT: Chie Honda PROJECT NAME: US Fish & Wildlife JURISDICTION: Carlsbad Fire Department ADDRESS: 2177 Salk Ave #150/250 PROJECT DESCRIPTION: PCI30005 3,422 & 17,344(1. Tenant improvement in existing office building. Walls, doors, windows, ceiling, lighting, power & signal and finishes. New roof mounted equipment. This plan was reviewed in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. CORRECTIONS •IS •Scope of Work Provide a complete description of work. See Building Permit Application Description of Work. Project Data •Construction Type; Denote Construction Type in accordance with CBC Table 601. V-B? •Denote intended function and occupancy group(s) CBC Chapter 3. • Denote the square footage of each occupancy group for this project •T.2.1 •Label Suite number on Egress Plan. Wi^lf»|9ln?W ^M^\^me (Group L). Occupancy Type under Project Data shows Group B. This is not a Laboratory suite (Group L) See CBC 1004.1.1 and CBC 443. Coordinate with revised Project Data on Sheet TS. Revised to 100 OLF/ Revised Total G.L. on ST •It Is my opinion that an OL factor of 50 is applicable to a lab that includes instruction. See CBC Table 1004.1.1. REVISED TO OLF 50/ REVISED OL ON TS •T2.2 • Door E2 shall swing in the direction of egress travel. Doors shall swing in the direction of travel where serving an occupant load of 50 or more persons CBC 1008.1.2 • Indicate the square footage of Storage Room 220. •Specify the Assembly Group in Training Room 219. •Verify 15$ per occupant is applicable to seating conditions in Lecture Hall. Describe seating conditions and apply correct w per occupant for in Lecture Hall CBC Table 1004.1.1. Assembly without fixed seats - Unconcentrated (Tables and chairs) = 15 net per Table 1004.1.1 Page 2 of3 •TI-1.1 •Provide reference to Library Book shelving details that include but are not limited to elevations and shelving dimensions. • Provide seismic calculations and anchor details. • Provide a descriptive narrative of Wet Lab operations including the storage use and handling of hazardous materials and oven operations. • Demonstrate compliance with CFC Chapter 30 for the proposed storage, use and handling of compressed gasses. (1) C02 Oxygen tank 20L • Show location of Flammable Liquid Storage Cabinet on floor plan. Showed on TI-1.1 Not shown on TI-1.1. Verify compliance with CFC 3404 3 (cut sheets and listings may be required upon request by fire official) •Verify that Lab Hood provides adequate CFM based on chemical properties. Include manufacturer's specifications and listings for Wet Lab equipment. See the attachment for Calculating Vapor Volume & Flammable Mixtures From the NFPA Fire Protection Handbook and Provide calculations to determine required CFM to maintain LEL for the worse-case flammable liquid in order to verify that CFM exhausted from the fume hood is adequate in the event of a worse-case scenario in which a gallon of flammable liquid is released in a fume hood over a one-hour period. See the attachment for Calculating Vapor Volume & Flammable Mixtures From the NFPA Fire Protection Handbook. • Provide the following note: Card reader/Electnc hardware will comply with CBC 1008.1.9.8 and will be field-tested •Clarify if Wall Type 2/TI-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720.1(2). • If penetrating any rated assemblies, provide details including fireproofing product listings. Type 2 is not rated wall Project Specific Partition Note • Note 5 Revise reference to details. Reference to TI-1 3 Door Hardware Describe how this locking device is readily openable from the egress side without the use of a key or special knowledge or effort. SEE GENERAL DOOR & HARDWARE NOTES #6 AND #13. •TI-1.2 • Provide panic hardware on Training Room 219 (Assembly Occupancy) doors. •Denote the location of an occupant load sign CBC 1004.3. •Clarify whether egress from Hallway 261 leads to fire rated area. Provide a symbol on Wall Type Legend. • Detail reference 1B/T1-5 cannot be found on Sheet T1-5. Detail 1 shows 6" above grid. • Please show compliance with required occupancy separations in all areas where applicable in accordance with CBC 508.4 (S-1/A-3/B). Show rated all doors on door schedule equipped with closing devices and smoke seals. No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. N/A •Verify that Server 234 is occupied or show compliance with CBC 508.2.5. IT IS OCCUPIED AS OFFICE: T.2.2 REVISED OLF TO 100 AND REVISED OL ON TS •Clarify if Wall Type 2/T1-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720.1(2). Type 2 is not rated wall If penetrating any rated assemblies, provide details including fireproofing product listings. N/A Page 3 of 3 •Project Specific Partition Note •Note 5. Revise reference to details. Reference to TI-1.3 Door Hardware Describe how this locking device is readily openable from the egress side without the use of a key or special knowledge or effort. SEE GENERAL DOOR & HARDWARE NOTES #6 AND #13. •TI-1.3 Door Schedule Suite 150 • Revise hardware designation on Door El. Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals. It is equipped with existing closing device and existing smoke seals to remain. Hardware Set 3 shows only new items. PLEASE CLARIFY THIS ON THE PLAN CLEARFIED ON HARDWARE SCHEDULE - HARDWARE SET 3 •Door Schedule Suite 250 • Provide panic hardware on Door 35. Clarify why Door 35 is not rated. See CBC 508.4. (A-3/B) How is door self-latching using push-plates? Provide smoke seals as well on Door 35 and denote on Door Schedule. No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. The Door 35 is not required panic hardware. •Revise hardware designation on Door E4. Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals. It is equipped with existing closing device and existing smoke seals to remain. Hardware Set 3 shows only new items. PLEASE CLARIFY THIS ON THE PLAN CLEARFIED ON HARDWARE SCHEDULE - HARDWARE SET 3 •TI1-4.1 &TI1-4.2 •Provide specifications and California State Fire Marshal listings as well as other acceptance criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC 804 •Assembly Occupancy Training Room Provide specifications and California State Fire Marshal listings as well as other acceptance cntena for flame spread and smoke developed index for decorative materials. CFC 807. • No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. • E-1.0&E-1.1 Add the following note: The means of egress, including the exit discharge, shall be illuminated at all times the building space, served by means of egress, is occupied with a level not less than 1 foot- candle at the walking surface. •M1.2 Detail B Revise code reference to UMC Sec. 608 to CMC Sec. 609. ^' • • BLDG.DEPTC@@eYof4 CORRECTION LIST 3 PDF Review Daryl K. James & Associates, Inc. Checked by: Darvl Kit James 205 Colina Terrace Date: Februarv 18, 2013 Wsfa, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Chie Honda JURISDICTION: Carlsbad Fire Department PROJECT NAME: US Fish & Wildlife ADDRESS: 2177 Salk Ave #150/250 PROJECT DESCRIPTION: PCI30005 3,422 & 17,344*. Tenant improvement in existing office building. Walls, doors, windows, ceiling, lighting, power & signal and finishes New roof mounted equipment. This plan was reviewed in order to verify conformance to minimum requirements of codes adopted by the Carisbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. RESUBMITTAL INSTRUCTIONS TO AVOID DELAY IN EXPEDITED RECHECK SERVICES • Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates • Provide a written response following each comment, On This Correction List, explaining how and where each plan review comment has been addressed. • Provide a copy of Building Department (EsGil) comments. Input fire revisions onto the Building Dept. plan check. • Please direct any questions regarding this review to. Daryl K. James 760-724-7001 or kitfire@sbcglobal.net • COMMENTS MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS, NO SIGNATURE REQUIRED. TO AVOID DELAY: DARYL K. JAMES & ASSOCIATES, INC. 205 COLINA TERRACE VISTA, CA 92084 CORRECTIONS PLEASE ADDRESS ALL REMAINING COMMENTS SHOWN ON TI-1.1 IN PURPLE FONT •IS •Scope of Work Provide a complete descnption of work. See Building Permit Application Description of Work. Project Data •Construction Type: Denote Construction Type in accordance with CBC Table 601 V-B? • Denote intended function and occupancy group(s) CBC Chapter 3. • Denote the square footage of each occupancy group for this project. Page 2 of 4 •T.2.1 • Label Suite number on Egress Plan. ^M^amm^^iW'SBliSm^M ^^M\^me (Group L). Occupancy Type under Project Data shows Group B. This is not a Laboratory suite (Group L) See CBC 1004 1.1 and CBC 443. Coordinate with revised Project Data on Sheet TS. Revised to 100 OLF/ Revised Total O.L. on ST •It is my opinion that an OL factor of 50 is applicable to a lab that includes instruction. See CBC Table 1004.1.1. REVISED TO OLF 50/ REVISED OL ON TS •T2.2 • Door E2 shall swing in the direction of egress travel. Doors shall swing in the direction of travel where serving an occupant load of 50 or more persons. CBC 1008.1.2 • Indicate the square footage of Storage Room 220. •Specify the Assembly Group in Training Room 219. •Verify ISu per occupant is applicable to seating conditions in Lecture Hall. Describe seating conditions and apply correct d per occupant for in Lecture Hall CBC Table 1004.1.1. Assembly without fixed seats - Unconcentrated (Tables and chairs) = 15 net per Table 1004.1.1 TI-1.1 •Provide reference to Library Book shelving details that include but are not limited to elevations and shelving dimensions. •Provide seismic calculations and anchor details. • Provide a descriptive narrative of Wet Lab operations including the storage use and handling of hazardous materials and oven operations. • Demonstrate compliance with CFC Chapter 30 for the proposed storage, use and handling of compressed gasses. (1) C02 Oxygen tank 20L Show location of Flammable Liquid Storage Cabinet on floor plan. Showed on TI-1.1 Not shown on TI- LL Verify compliance with CFC 3404.3 (cut sheets and listings may be required upon request by fire official) Verify that Lab Hood provides adequate CFM based on chemical properties. Include manufacturer's specifications and listings for Wet Lab equipment. See the attachment for Calculating Vapor Volume & Flammable Mixtures From the NFPA Fire Protection Handbook and Provide calculations to determine required CFM to maintain LEL for the worse-case flammable liquid in order to verify that CFM exhausted from the fume hood is adequate in the event of a worse-case scenario in which a gallon of flammable liquid is released in a fume hood over a one-hour period. See the attachment for Calculating Vapor Volume & Flammable Mixtures From the NFPA Fire Protection Handbook. • Provide the following note: Card reader/Electric hardware will comply with CBC 1008.1.9 8 and will be field-tested. •Clarify if Wall Type 2/TI-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720.1(2). • If penetrating any rated assemblies, provide details including fireproofing product listings. Type 2 is not rated wall Project Specific Partition Note • Note 5 Revise reference to details. Reference to TI-1.3 Door Hardware Describe how this locking device is readily openable from the egress side without the use of a key or special knowledge or effort. SEE GENERAL DOOR & HARDWARE NOTES #6 AND #13. Page 3 of 4 •TI-1.2 •Provide panic hardware on Training Room 219 (Assembly Occupancy) doors. •Denote the location of an occupant load sign CBC 1004.3. •Clarify whether egress from Hallway 261 leads to fire rated area. Provide a symbol on Wall Type Legend. •Detail reference IB/TI-S cannot be found on Sheet T1-5 Detail 1 shows 6" above grid. •Please show compliance with required occupancy separations in all areas where applicable in accordance with CBC 508.4 (S-1/A-3/B). Show rated all doors on door schedule equipped with closing devices and smoke seals. No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. N/A •Verify that Server 234 is occupied or show compliance with CBC 508.2.5. IT IS OCCUPIED AS OFFICE: T.2.2 REVISED OLF TO 100 AND REVISED OL ON TS •Clarify if Wall Type 2/T1-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720.1(2). Type 2 is not rated wall If penetrating any rated assemblies, provide details including fireproofing product listings. N/A • Project Specific Partition Note • Note 5 Revise reference to details. Reference to TI-1.3 Door Hardware Describe how this locking device is readily openable from the egress side without the use of a key or special knowledge or effort. SEE GENERAL DOOR & HARDWARE NOTES #6 AND #13. •TI-1.3 Door Schedule Suite 150 •Revise hardware designation on Door EL Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals. It is equipped with existing closing device and existing smoke seals to remain. Hardware Set 3 shows only new items. PLEASE CLARIFY THIS ON THE PLAN CLEARFIED ON HARDWARE SCHEDULE - HARDWARE SET 3 •Door Schedule Suite 250 • Provide panic hardware on Door 35. Clarify why Door 35 is not rated. See CBC 508.4. (A-3/B) How is door self-latching using push-plates? Provide smoke seals as well on Door 35 and denote on Door Schedule. No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. The Door 35 is not required panic hardware. •Revise hardware designation on Door E4. Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals. It is equipped with existing closing device and existing smoke seals to remain. Hardware Set 3 shows only new items. PLEASE CLARIFY THIS ON THE PLAN CLEARFIED ON HARDWARE SCHEDULE - HARDWARE SET 3 •Til-4.1 & Til-4.2 •Provide specifications and California State Fire Marshal listings as well as other acceptance criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC 804 •Assembly Occupancy Training Room Provide specifications and California State Fire Marshal listings as well as other acceptance criteria for flame spread and smoke developed index for decorative materials. CFC 807. Page 4 of 4 • No Separation is required between accessory occupancies and the main occupancy per section 508.2.4. Training room is Assembly A-3/ accessory occupancies to B occupancy per section 508.2.1. • E-1.0&E-1.1 Add the following note: The means of egress, including the exit discharge, shall be illuminated at all times the building space, served by means of egress, is occupied with a level not less than 1 foot- candle at the walking surface. • M1.2 Detail B Revise code reference to UMC Sec. 608 to CMC Sec. 609. BLDG. DEPT COPY Page 1 of 3 CORRECTION LIST Daryl K. James & Associates, Inc. Checked by: Darvl Kit James 205 Co//na Terrace Date: Februan/ 9, 2013 Vista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Chie Honda JURISDICTION: Carlsbad Fire Department PROJECT NAME: US Fish & Wildlife ADDRESS: 2177 Salk Ave #150/250 PROJECT DESCRIPTION: PCI30005 3,422 & 17,3440]. Tenant improvement in existing office building. Walls, doors, windows, ceiling, lighting, power & signal and finishes. New roof mounted equipment This plan was reviewed in order to verify conformance to minimum requirements of codes adopted by the Carisbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. RESUBMITTAL INSTRUCTIONS TO AVOID DELAY IN EXPEDITED RECHECK SERVICES • Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates. • Provide a written response following each comment, On This Correction List, explaining how and where each plan review comment has been addressed. • Provide a copy of Building Department (EsGil) comments. Input fire revisions onto the Building Dept. plan check. • Please direct any questions regarding this review to: Daryl K. James 760-724-7001 or kitfire@sbcglobal.net • COMMENTS MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS, N^ SIGNATURE REQUIR^^ TO AVOID DELAY: DARYL K. JAMES & ASSOCIATES, INC. 205 COLINA TERRACE VISTA, CA 92084 CORRECTIONS PLEASE ADDRESS ALL REMAINING COMMENTS SHPOWN IN BLUE FONT IS •Scope of Work Provide a complete description of work. See Building Permit Application Description of Work. Project Data •Construction Type: Denote Construction Type in accordance with CBC Table 601. V-B? Denote intended function and occupancy group(s) CBC Chapter 3. •Denote the square footage of each occupancy group for this project. Page 2 of3 T.2.1 • Label Suite number on Egress Plan. •Specify occupancy classifications of wet lab and library. Justify applying lOO^a per occupant for a Laboratory Suite (Group L). Occupancy Type under Project Data shows Group B. This is not a Laboratory suite (Group L) See CBC 1004 1.1 and CBC 443 Coordinate with revised Project Data on Sheet TS. T2.2 • Door E2 shall swing in the direction of egress travel. Doors shall swing in the direction of travel vi/here serving an occupant load of 50 or more persons. CBC 1008.1.2 • Indicate the square footage of Storage Room 220. •Specify the Assembly Group in Training Room 219. Verify ^5^^ per occupant is applicable to seating conditions in Lecture Hail. Describe seating conditions and apply correct [D per occupant for in Lecture Hall CBC Table 1004.1 1. TI-1.1 • Provide reference to Library Book shelving details that include but are not limited to elevations and shelving dimensions. • Provide seismic calculations and anchor details. •Provide a descriptive narrative of Wet Lab operations including the storage use and handling of hazardous materials and oven operations. Demonstrate compliance with CFC Chapter 30 for the proposed storage, use and handling of compressed gasses. Verify that Lab Hood provides adequate CFM based on chemical properties. Include manufacturer's specifications and listings for Wet Lab equipment. Show location of Flammable Liquid Storage Cabinet on floor plan and verify compliance with CFC 3404.3. Provide calculations to determine required CFM to maintain levels <10% and 25% LEL for flammable liquids in order to verify that CFM exhausted from Fume Hood is adequate in the event of a worse-case scenario in which a gallon of flammable liquid is released in a fume hood over a one-hour period See Calculating Vapor Volume and flammable mixtures. NFPA Fire Protection Handbook. •Provide the following note; Card reader/Electric hardware will comply with CBC 1008.1.9.8 and will be field-tested. Clarify if Wall Type 2/T1-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720 1(2). If penetrating any rated assemblies, provide details including fireproofing product listings. Project Specific Partition Note Note 5 Revise reference to details. TI-1.2 • Provide panic hardware on Training Room 219 (Assembly Occupancy) doors. Denote the location of an occupant load sign CBC 1004.3. Where are project specific signage notes? Clarify whether egress from Hallway 261 leads to fire rated area. Provide a symbol on Wall Type Legend. Detail reference 1B/T1-5 cannot be found on Sheet T1-5. Detail 1 shows 6" above grid. Please show compliance with required occupancy separations in all areas where applicable in accordance with CBC 508 4 (S-1/A-3/B). Show rated all doors on door schedule equipped with closing devices and smoke seals. Clarify if Wall Type 2/T1-5 is rated. Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2010 CBC Table 720.1(2) If penetrating any rated assemblies, provide details including fireproofing product listings Page 3 of 3 Project Specific Partition Note Note 5. Revise reference to details. TI-1.3 Door Schedule Suite 150 Revise hardware designation on Door EL Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals. Door Schedule Suite 250 Provide panic hardware on Door 35. Clarify why Door 35 is not rated See CBC 508.4. (A-3/B) How is door self-latching using push-plates? Provide smoke seals as well on Door 35 and denote on Door Schedule. Revise hardware designation on Door E4. Hardware Set 3 is not rated. Please clarify why hardware on existing rated door (Hardware Set 3) is not equipped with closing device and smoke seals Til-4.1 & Til-4.2 • Provide specifications and California State Fire Marshal listings as well as other acceptance criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC 804 Assembly Occupancy Training Room Provide specifications and California State Fire Marshal listings as well as other acceptance criteria for flame spread and smoke developed index for decorative materials CFC 807. • E-1.0&E-1.1 Add the following note: The means of egress, including the exit discharge, shall be illuminated at all times the building space, served by means of egress, is occupied with a level not less than 1 foot- candle at the walking surface. • M1.2 Detail B Revise code reference to UMC Sec. 608 to CMC Sec. 609. BLDG. DEPT COPY ^ CORRECTION LIST Daryl K. James & Associates, Inc. 205 Colina Terrace Vista, CA 92084 T. (760) 724-7001 Email: kltfire@sbcglobal.net Checked by: Darvl Kit James Date: Januarv 17, 2013 APPLICANT: Chie Honda PROJECT NAME: US Fish & Wildlife JURISDICTION: Carlsbad Fire Department ADDRESS; 2177 Salk Ave #150/250 PROJECT DESCRIPTION: PCI30005 3,422 & 17,344[ti. Tenant improvement in existing office building Walls, doors, windows, ceiling, lighting, power & signal and finishes New roof mounted equipment This plan was reviewed in order to verify conformance to minimum requirements of codes adopted by the Carisbad Fire Department The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. RESUBMITTAL INSTRUCTIONS TO AVOID DELAY IN EXPEDltED RECHECK SERVICES • Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates • Provide a written response following each comment. On This Correction List, explaining how and where each plan review comment has been addressed. • Provide a copy of Building Department (EsGil) comments. Input fire revisions onto the Building Dept plan check. • Please direct any questions regarding this review to. Daryl K. James 760-724-7001 or kitfire@sbcglobal net - COMMENTS MUST BE SUBMITTED DIRECTLY TO THE FOLLOWING ADDRESS TO AVOID DELAY: DARYL K. JAMES & ASSOCIATES, INC. 205 COLINA TERRACE VISTA, CA 92084 CORRECTIONS IS Scope of Work Provide a complete descnption of work. See Building Permit Application Descnption of Work Project Data Construction Type Denote Construction Type in accordance with CBC Table 601. V-B? Denote intended function and occupancy group(s) CBC Chapter 3 Denote the square footage of each occupancy group for this project T.2.1 Label Suite number on Egress Plan Specify occupancy classifications of wet lab and library. Coordinate with revised Project Data on Sheet TS. Page 2 of 2 T2.2 Door E2 shall swing in the direction of egress travel Doors shall swing in the direction of travel where serving an occupant load of 50 or more persons CBC 1008 1 2 Indicate the square footage of Storage Room 220 Specify the Assembly Group in Training Room 219 TI-1.1 Provide reference to Library Book shelving details that include but are not limited to elevations and shelving dimensions Provide seismic calculations and anchor details Provide existing spnnkler design density for Library and venfy that library bookshelves are adequately protected Provide a descnptive narrative of Wet Lab operations including the storage use and handling of hazardous materials and oven operations Venfy that Lab Hood provides adequate CFM based on chemical properties include manufacturer's specifications and listings for Wet Lab equipment Provide the following note- Card reader/Electnc hardware will comply with CBC 1008 1 9 8 and will be field-tested TI-1.2 Provide panic hardware on Training Room 219 (Assembly Occupancy) doors Denote the location of an occupant load sign CBC 1004 3 Clarify whether egress from Hallway 261 leads to fire rated area Provide a symbol on Wall Type Legend. TI-1.3 Door Schedule Suite 150 Revise hardware designation on Door El Hardware Set 3 is not rated. Door Schedule Suite 250 Provide panic hardware on Doors 33 and 35 Revise hardware designation on Door E4 Hardware Set 3 is not rated TI1-4.1 & TI1-4.2 Provide specifications and California State Fire Marshal listings as well as other acceptance cnteria for flame spread and smoke developed index for new carpet, padding and carpet base CFC 804 Provide specifications and California State Fire Marshal listings and other acceptance critena for flame spread and smoke developed index for wall finish matenal and corner guards CBC 803 1 2 Assembly Occupancy Training Room Provide specifications and California State Fire Marshal listings as well as other acceptance critena for flame spread and smoke developed index for decorative matenals CFC 807 E-1.0 & E-1.1 Add the following note The means of egress, including the exit discharge, shall be illuminated at all times the building space, served by means of egress, is occupied with a level not less than 1 foot-candle at the walking surface M1.2 Detail B Revise code reference to UMC Sec 608 to CMC Sec 609 End of Comments Orie Engineering structural & Bridge Engineers 9750 Miramar Road, Suite 310 San Diego, CA 92126 Phone; (858) 335-7643 Fax: (858) 586-0911 Structural Calculations PROJECT: USFWS Bookcase Anchorage (Project # 364.005-13) CLIENT: Newport National Corporation DESIGNED BY: KCL DATE: 1/13 On'ei^ - Structural Engineers Page 1 One' Engineenng Stnjctural & Bndge Engineers Project No 364 005-13 9750 Miramar Road, Suite 310 San Diego, CA 92126 Phone # (858)335-7643 FAX# (858)586-0911 PROJECT tJSFWS Bookcase Anchorage DATE BY 01/25/13 KCL Seismic Design Parameters Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33 157 Longitude = -117 337 Spectral Response Accelerations Ss and SI Ss and SI = Mapped Spectral Acceleration Values Site Class B - Fa = 1 0 ,Fv = 1.0 Data are based on a 0 01 deg grid spacing Period Sa (sec) (g) 0 2 1 290 (Ss, Site Class B) 1 0 0.485 (SI, Site Class B) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33.157 Longitude = -117.337 Spectral Response Accelerations SMs and SMI SMs = Fa X Ss and SMI = Fv x SI Site Class D - Fa = 1.0 ,Fv = 1 515 Period Sa (sec) (g) 0.2 1 290 (SMs, Site Class D) 1 0 0 735 (SMI, Site Class D) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 33 157 Longitude = -117 337 Design Spectral Response Accelerations SDs and SDI SDs = 2/3 X SMs and SDI = 2/3 x SMI Site Class D - Fa = 1 0 ,Fv = 1 515 Penod Sa (sec) (g) 0 2 0 880 (SDs, Site Class D) 1 0 0 490 (SD1, Site Class D) Page 2 One Engineering Stnjctural & Bndge Engineers 9750 Miramar Road, Suite 310 Phone # (858)335-7643 San Diego, CA 92126 FAX# (858)586-0911 Project No 364 005-13 PROJECT USFWS Bookcase Anchorage HSS Anchor Check DATE BY 01/29/13 KCL Check Anchorage at top of HSS Col BASEPLATE SPAN OVER (2) DECK FLUTES Seismic Desiqn Parameters -igr 7\ \ Max Shear, V = 677 lbs (from RISA) No of Bolts = 2 Bolts V = 338 5 lbs Bolts 1/2" Dia X 2" Embed Hilti KBTZ Capacity = (pv = V Capacity = 3000 lbs 0.65 1950 lbs/bolt VA/allow = 0.17 < 1.0, OK Page 3 Company Designer Job Number 0rie2 Engineering KCL USFWS Book Case Jan 29, 2013 3.20 PM Checked By_ Joint Reactions (Bv Combination) LC Joint Label Xrib] Y[lb] MX [Ib-ft] MY [Ib-ftl MZ fib-fll 153.68 -676.475 0 _2_ _3_ _4_ _5_ _6_ 7_ 8 153.68 142.09 -579.025 142.09 -579.025 0 NC NC NC NC LOCKED NC NC NC NC NC LOCKED NC Totals; 591.539 -2511 COG (ft). X: 13.5 Y- 6.755 Z: 0 RISA-3D Version 11 0.0 ' [J \...\...\005-13 - USFWS Bookcase Anchorage\calcs\HSS r3d] Page 1 ESR-1917 I Most Widely Accepted and Trusted Page 4 Page 9 of 12 Sdesign Cdesign O) c 'o ro o. u (0 •^design design edge distance c FIGURE 4—INTERPOLATION OF MINIMUM EDGE DISTANCE AND ANCHOR SPACING TABLE 5—HILTI KWIK BOLT TZ (KB-TZ) CARBON STEEL ANCHORS TENSION AND SHEAR DESIGN DATA FOR INSTALLATION IN THE UNDERSIDE OF CONCRETE-FILLED PROFILE STEEL DECK ASSEMBLIES^'''^'' DESIGN INFORMATION Symbol Units Loads According to Figure 5A Loads According to Figure SB DESIGN INFORMATION Symbol Units Anchor Diameter Anchor Diameter DESIGN INFORMATION Symbol Units 3/8 1/2 5/8 3/8 1/2 5/8 Effective Embedment Depth h„ in 2 2 3-1/4 3-1/8 4 2 2 3-1/4 3-1/8 Minimum Hole Depth he in 2-5/8 2-5/8 4 3-3/4 4-3/4 2-5/8 2-5/8 4 3-3/4 Pullout Resistance, (uncracked concrete) Np^dock.uncr Ib 2,060 2,060 3,695 2,825 6,555 1,845 1,865 3,375 4,065 Pullout Resistance (cracked concrete)' Ib 1,460 1,460 2,620 2,000 4,645 1,660 1,325 3,005 2,885 steel strength in Shear* Ib 2,130 3,000 4,945 4,600 6,040 2,845 2,585 3,945 4,705 Steel Strength in Shear, Seismic' Ib 1,340 3,000 1 4,945 4,320 5,675 1,790 2,585 3,945 4,420 'installation must comply with Sections 4 110 and 4 3 and Figure 5A and 58 of this report. ^The values listed must be used in accordance with Section 4 1.4 of this report 'The values listed must be used in accordance with Section 4 1 4 and 4 18 2 ofthis report 'The values listed must be used in accordance with Section 4 1 5 of this report 'The yajue^ hstedjmust be used in^cordancewth 4 1 8^qf thisxeport^ Values are applicable to both static and seismic load combinations (^The values for^(*p intension and the values forjSjs injhear can be foundjnjable^ of this reporT ^The charactenstic pullout resistance for concrete compressive strengths greater than 3,000 psi may be increased by multiplying the value in the table by (r^3,000)'" for psi or (fV20 7)'" for MPa 'Evaluation of concrete breakout capacity in accordance with ACI 318 D 5 2, D 6 2, and D 6 3 is not required for anchors installed in the deck soffit TABLE 6—HILTI KWIK BOLT TZ (KB-TZ) CARBON STEEL ANCHORS SETTING INFORMATION FOR INSTALLATION ON THE TOP OF CONCRETE-FILLED PROFILE STEEL DECK ASSEMBLIES ACCORDING TO FIGURE SC' "" DESIGN INFORMATION Symbol Units Nominal anchor diameter DESIGN INFORMATION Symbol Units 3/8 1/2 Effective Embedment Depth in 2 2 Minimum concrete thickness' tlmin.deck in 3-1/4 3-1/4 Critical edge distance 0BC.dBCh.IOp in 9 9 Minimum edge distance Cmin.dBck.top in 3 4-1/2 Minimum spacing Smin.dBck.top in 4 6-1/2 Installation must comply with Sections 4 110 and 4 3 and Figure 5C of this report ^For all other anchor diameters and embedment depths refer to Table 3 and 4 for applicable values of h, 'Design capacity shall be based on calculations according to values in Table 3 and 4 ofthis report ^Applicable for 3V4-in < h„,i„ d„k < 4-in For hm,„,deck ^ 4-inch use setting information in Table 3 of this report 'Minimum concrete thickness refers to concrete thickness above upper flute See Figure 5C mini ^min and Sm Page 5 13.3 Orie Engineering structural and Bridge Engineers 9750 Miramar Road, Suite 310 San Diego, CA92126 Seismic Demands on Nonstructural Components Fp= 0.4apSDsWp(1+2z/h) (Rp/lp) ap= 1 Max Fp Min F„ 7ft 1 eSoslpWp 0 aSoslpWp h= 13ft = 1 376Wp = 0 258Wp (13 3-1) Date 1/25/2013 Descnption Seismic Design Loads SDS = 0 860 T-13 5-1 or 13 6-1 13 1 3 Fp= 0 286 Wp (13 3-2) (13 3-3) Fp= 0.286 Wp Each Book Shelf Size, 1' depth x 3' wide x 7' height * 2(back to back) Weight of bookcase = 33pcf x 2' wide x 7' height = 462 plf Seismic force (ASD) = (.7x.286) x 462 plf = 93 plf Considering Full height of Book Shelf weight applying to HSS beam Page 6 Results for LC 1, L Orie2 Engineering KCL USFWS Book Case Nodes and Members SK -1 Jan 25, 2013 at 3:26 PM HSS r3d Page 7 Section Sets r HSS8x2x3/16 Results for LC 1, L Orie2 Engineering KCL USFWS Book Case Section Sets SK-2 Jan 25, 2013at3;26 PM HSS r3d Page 8 Member Code Checks Displayed Loads LC 1, EQ One2 Engineering KCL USFWS Book Case EQ SK-5 Jan 25, 2013 at 4:00 PM HSS.rSd Page 9 Code Check E No Calc > 1.0 .90-1.0 .75-.90 .50-.75 0-.50 ASD Code Checks < 1 ~> OKAY Member Code Checks Displayed Results for LC 1, D+EQ Orie2 Engineering KCL USFWS Book Case Code Check SK-5 Jan 28,2013at10;33AM HSS.rSd Page 10 Company Designer Job Number Orie2 Engineenng KCL USFWS Book Case Jan 28, 2013 10 31 AM Checked By _ Global Display Sections for Member Calcs 5 Max Internal Sections for Member Calcs 97 Include Shear Deformation? Yes Include Warping? Yes Trans Load Btwn Intersecting Wood Wall? Yes Increase Nailing Capacity for Wind? Yes Area Load Mesh (in'^2) 144 Merge Tolerance (in) .12 P-Delta Analvsis Tolerance 0.50% Include P-Delta for Walls? Yes Automaticly Iterate Stiffness for Walls? Yes Maximum Iteration Number for Wall Stiffnes s3 Gravity Acceleration (ft/sec'^2) 32.2 Wall Mesh Size (in) 12 Eigensolution Convergence Tol. (1.E-) 4 Vertical Axis Y Global Member Orientation Plane XZ Static Solver Sparse Accelerated Dynamic Solver Accelerated Solver Hot Rolled Steel Code AISC 14th(360-10) ASD Adiust Stiffness? Yes(lterative) RISAConnection Code AISC 13th(360-05). ASD Cold Formed Steel Code AISI SI00-07. ASD Wood Code AF&PA NDS-05/08- ASD Wood Temperature < 100F Concrete Code ACI 318-11 Masonry Code ACI 530-08: ASD Aluminum Code AA ADM1-05: ASD - Buildinq Number of Shear Regions 4 Region Spacing Increment (in) 4 Biaxial Column Method Exact Integration Pamne Beta Factor (PCA) .65 Concrete Stress Block Rectangular Use Cracked Sections? Yes Bad Framing Warnings? No Unused Force Warnings? Yes Min 1 Bar Diam. Spacing? No Concrete Rebar Set REBAR SET ASTMA615 Min % Steel for Column 1 Max % Steel for Column 8 RISA-3D Version 11.0 0 [J \...\...\005-13 - USFWS Bookcase Anchorage\calcs\HSS.r3d] Page 9 Page 11 Company Designer Job Number 0rie2 Engineering KCL USFWS Book Case Jan 28, 2013 10 31 AM Checked By _ Global. Continued Seismic Code ASCE 7-10 Seismic Base Elevation (ft) Not Entered Add Base Weight? Yes ctz .02 ctx .02 T Z (sec) Not Entered T X (sec) Not Entered RZ 3 RX 3 Ct Exp. Z .75 Ct Exp. X .75 SDI 1 SDS 1 SI 1 TL (sec) 5 Risk Cat lor II Seismic Detailing Code ASCE 7-05 OmZ 1 OmX 1 RhoZ 1 RhoX 1 Hot Rolled Steel Properties Label E fksil Gfksil Nu Therm (\1.. Densityfk/f.. Yieldrksi] Ry Furksil Rt 1 A36 Gr.36 29000 11154 .3 65 .49 36 1.5 58 1.2 2 A572 Gr.50 29000 11154 .3 .65 .49 50 1.1 65 1.1 3 A992 29000 11154 .3 .65 .49 50 1.1 65 1.1 4 A500 Gr.42 29000 11154 .3 .65 .49 42 1.4 58 1.3 5 A500 Gr.46 29000 11154 .3 .65 .49 46 1.4 58 1.3 6 A53 Gr. B 29000 11154 .3 .65 .49 35 1.5 60 1.2 Hot Rolled Steel Section Sets Label Shape Type Design List Material Desian R.. A [in2] lyy [in41 Izz [in41 J fin41 1 HSS8x2x3/16 HSS8x2x3 Column Tube A500 Gr.. TvDical 3.28 2.39 22.4 7.48 2 HSS6x2x3/16 HSS6x2x3 Column Tube A500 Gr.. Typical 2.58 1.8 10.5 5.24 Member Primarv Data Label 1 Joint J Joint K Joint Rotate(dep) Section/Shape Type Design List Material Desian Rules 1 Ml 1 3 90 HSS8x2x3/16 Column Tube A500 Gr 46 TvDical 2 M2 4 6 90 HSS8x2x3/16 Column Tube A500 Gr 46 Typical 3 M3 2 5 90 HSS8x2x3/16 Column Tube A500 Gr.46 TvDical Joint Coordinates and Temperatures 1 1 0 0 0 0 2 2 0 7 0 0 3 3 0 13 0 0 4 4 27 0 0 0 5 5 27 7 0 0 6 6 27 13 0 0 RISA-3D Version 110 0 [J \...\ .\005-13 - USFWS Bookcase Anchorage\calcs\HSS.r3d] Page 10 Page 12 Company Designer Job Number 0rie2 Engineenng KCL USFWS Book Case Jan 28, 2013 10.31 AM Checked By _ Joint Boundarv Conditions 1 3 Reaction Reaction Reaction 2 6 Reaction Reaction Reaction 3 1 Reaction Reaction Reaction 4 4 Reaction Reaction Reaction Basic Load Cases BLC DescriDtion Category X GravitvY Gravitv Z Gravity Joint Point Distributed Area(Member) Surface(Plate/Wall) 1 D None -1 2 EQ None 1 Member Distributed Loads (BLC 2 : EQ) Member Label Direction Start Maqnitudepb/ft.FI End Magnitudeflb/ft.FI Start Location[ft.%] End Locationffl.%1 M3 93 93 Load Combinations Descnption Solve PDelta SRSS BLC D+EQ I Yes I Y I 111 Fador BLC Fact..BLCFact...BLCFact..BLCFact..BLCFad..BLCFacl..BLC Fact.. Member Section Deflections LC Member Label Sec xfin] y fmi zfin] X Rotate[rad] (n) Uy Ratio (n) Uz Ratio 1 1 Ml 1 0 0 0 0 NC NC 2 2 0 .129 0 0 1213.446 NC 3 3 0 .191 0 0 816.808 NC 4 4 0 .134 0 0 1162.76 NC 5 5 0 0 0 0 NC NC 6 1 M2 1 0 0 0 0 NC NC 7 2 0 .129 0 0 1213.446 NC 8 3 0 .191 0 0 816.808 NC 9 4 0 .134 0 0 1162.76 NC 10 5 0 0 0 0 NC NC 11 1 M3 1 0 191 0 -3.746e-4 NC NC 12 2 0 1.715 1.715 -3.746e-4 212.508 188.93 13 3 0 2.33 2.407 -3.746e-4 151.412 134.613 14 4 0 1.715 1.715 -3.746e-4 212.508 188.93 15 5 0 .191 0 -3.746e-4 NC NC Joint Reactions (Bv Combination) LC Joint Label X[lb] Y[lb] Z[lb] MX [Ib-ft] MY [Ib-ft] MZ [Ib-ft] 1 1 3 0 153.68 -676.475 0 0 0 2 6 0 153.68 -676.475 0 0 0 3 -j 1 0 142.09 -579.025 0 0 0 4 1 4 0 142.09 -579.025 0 0 0 5 1 2 NC NC NC NC LOCKED NC 6 1 5 NC NC NC NC LOCKED NC 7 1 Totals: 0 591 539 -2511 8 1 COG (ft) X- 13.5 Y. 6.755 Z 0 RISA-3D Version 11 0.0 [J \ \...\005-13 - USFWS Bookcase Anchorage\calcs\HSS.r3d] Page 11 Page 13 Company Designer Job Number 0rie2 Engineenng KCL USFWS Book Case Jan 28, 2013 10 31 AM Checked By._ Member AISC 14th(360-10): ASD Steel Code Checks LC Member Shape UC Max Loc[ftl Shear UC Loc[ftl Dir Pnc/om. Pnt/om .. Mnyy/o... Mnzz/o .. Cb Eqn 1 1 Ml HSS8x2x3 .234 6.906 .016 7.042 v 14761.4 90347 3. 4928.765 17238.5. 1.347 Hl-lb 2 1 M2 HSS8x2x3 .234 6.906 .016 7.042 y 14761.4.. 90347.3 4928.765 17238 5. .1.347 Hl-lb 3 1 M3 HSS8x2x3 .698 13.5 .029 0 y 3422.069 90347.3.. 4928.765 17238.5 . 1 136 Hl-lb RISA-3D Version 11.0.0 [J.\. \...\005-13 - USFWS Bookcase Anchorage\calcs\HSS.r3d] Page 12 Page 14 Column: M3 Shape HSS8x2x3 Matenal. A500 Gr,46 Length: 27 ft I Joint: 2 J Joint: 5 LC 1: D+EQ Code Check: 0.698 (bending) Report Based On 97 Sections 2.33 at 13.5 ft Dy in .191 at 27 ft 2.407 at 13.5 ft Oat Oft 1255.5 at 27 ft Ib 150.675 at 27 ft Vz L—— ' Ib -150.675 at Oft -1255.5 at Oft 8474.625 at 13.5 ft Ib-ft My -1017.056 at 13.5 ft Ib-ft Ib-ft fa 23.266 at 13.5 ft ksi -23.266 at 13.5 ft AISC 14th(360-10): ASD Code Check Direct Analysis Method Max Bending Check 0.698 Location 13.5 ft Equation H1-1b Bending Flange Compact Bending Web Compact Max Shear Check Location Max Deft Ratio Compression Flange Compression Web 0.029 (y) Oft U135 Non-Slender Slender Qs=1 Qa=.899 46 ksi Pnc/om 3422.069 Ib Pnt/om 90347.305 Ib Mny/om 4928.765 Ib-ft Mnz/om 17238.523 Ib-ft Vny/om 43008.799 Ib Vnz/om 8500.536 Ib Tn/om 6821.038 Ib-ft Cb 1.136 Lb KL/r y-y 27 ft 379.562 z-z 27 ft 123.982 L Comp Flange 27 ft Warp Length NC L-torque 27 ft Tau b 1 BUILDING ENERGY ANALYSIS) REPORT PROJECT: U.S. Fish and Wildlife Service 2177 Salk Ave Carlsbad, CA 95800 Project Designer: Designcorp 4944 Collingwood Dr. San Diego, CA 92109 Report Prepared by: Tom Harinton HARINTON MECHANICAL DESIGN INC 27475 Ynez Rd #246 Temecula, CA 92591 858-435-4803 Job Number: Date: 1/11/2013 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards This program developed by EnergySoft, LLC - www energysoft.com EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-1 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MECH-1-C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 18 Form MECH-3-C Mechanical Ventilation 25 Form MECH-4-C HVAC Misc. Prescriptive Requirements 28 Form MECH-MM Mechanical Mandatory Measures 49 HVAC System Heating and Cooling Loads Summary 50 EnergyPro 5 1 by EnergySoft Job Number ID User Number 4945 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name U.S. Fishi and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,^75 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Onentation: N, E, S, W or in Degrees Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AG-1, RTU-1, HP-1) 1A • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 19,862 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 48,087 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit IVIEGH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) 1B • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 45,998 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 62,169 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11X16:46:48 ID Page 3 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,175 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. 121 Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction • New Construction • Addition • Alteration Approach of Compliance: • Component [-] Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Onentation: N, E, S, W or in Degrees Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (I.e. AC-1, RTU-1, HP-1) IC • • Equipment Type^: Sp//f DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 23,849 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 64,413 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2A • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 9,946 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 23,672 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment pertormance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number: 4945 RunCode: 2013-01-11716:46:48 ID Page 4 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name U.S. Fisfi and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,^75 Addition Floor Area n/a GENERAL INFORMATION Building Type: Q Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction • New Construction • Addition • Alteration Approach of Compliance-• Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees-Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2B • • Equipment Type^ Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 31,263 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 65,338 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2C • • Equipment Type^. Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 7,531 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 24,337 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number- 4945 RunCode: 2013-01-11716:46:48 ID Page 5 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,175 Addition Floor Area n/a GENERAL INFORMATION Building Type. • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg Q Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Onentation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (re. AC-1, RTU-1, HP-1) 2D • • Equipment Type^-SpW DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 17,563 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 48,669 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e AC-1, RTU-1, HP-1) 2E • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 14,836 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 47,444 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy comphance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type- Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 6 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2^77 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type: Q Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction • New Construction • Addition • Alteration Approach of Compliance-• Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation. N, E, S, W or m Degrees-Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2F • • Equipment Type^-Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 17,459 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 49,283 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2G • • Equipment Type^: Sp//f DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 7,876 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 24,029 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MEGH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3. Indicate Equipment Type. Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, orother EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 7 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond. Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type. [Q Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction-• New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation. N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2H • • Equipment Type^-Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 23,268 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 65,434 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2J • • Equipment Type^-Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 18,683 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 64,290 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 8 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C project Name U.S. Fish and Wildlife Service Date 1/11/2013 project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond. Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type Q Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance. • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2K • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 13,138 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 30,460 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2L • • Equipment Type^ Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 16,513 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 61,588 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Paqe9 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 Of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. IZ Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction. • New Construction • Addition • Alteration Approach of Compliance • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation. N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2M • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 30,193 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 79,205 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.9 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2N • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 15,060 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 63,498 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 10 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond. Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type. • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Onentation: N, E, S, W or in Degrees-Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Meets Criteria or Requirements Equipment' inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2P • • Equipment Type^-Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 16,362 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 61,165 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2Q SERVER ROOM • • Equipment Type^. Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' -1,364 Btu/hr • • Minimum Heating Efficiency' n/a • • Max Allowed Coolinq Capacity' 52,813 Btu/hr • • Cooling Efficiency' 14.0 SEER/10.0 EER • • Duct Location/ R-Value n/a • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type. Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 11 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. Bl Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees-Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' inspection Criteria Meets Criteria or Requirements Equipment' inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2R • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 13,957 Btu/hr • • Minimum Heating Efficiency' 8.00 HSPF • • Max Allowed Cooling Capacity' 65,690 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 2S • • Equipment Type^-Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 18,172 Btu/hr • • Mmimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 80,357 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.9 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1 If fhe Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 12 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Project Address 2177 Salk Ave Carlsbad Climate Zone Total Cond Floor Area 20,775 Addition Floor Area n/a GENERAL INFORMATION Building Type. • Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. IZ Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Onentation: N, E, S, W or in Degrees. Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Meets Criteria or Requirements Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (i.e. AC-1, RTU-1, HP-1) 27 • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 10,635 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 23,766 Btu/hr • • Cooling Efficiency' 13.0 SEER/11.0 EER • • Duct Location/ R-Value Attic, Roof Ins/4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment' Inspection Criteria FIELD INSPECTION ENERGY CHECKUST Equipment' Inspection Criteria Pass Fail - Describe Reason' Item or System Tags (I.e. AC-1, RTU-1, HP-1) • • Equipment Type^. • • Number of Systems • • Max Allowed Heating Capacity' • • Minimum Heating Efficiency' • • Max Allowed Cooling Capacity' • • Cooling Efficiency' • • Duct Location/ R-Value • • When duct testing is required, submit MECH-4A & MECH-4-HERS • • Economizer • • Thermostat • • Fan Control • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3. Indicate Equipment Type Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or olher EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 13 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Discrepancies: EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 14 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices sen/ing the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Titte-24 Part 6. The buiiding inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A Equipment Requmng Testing or Venfication Qty. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitary Air Distnbution Ducts Economizer Controls Demand Control Ventilation DCV Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Vanable Flow Control Automatic Demand Shed Control Carrier 25HBC3-36 w/FV4B003 4 • m • • • • • • • • Carrier 25HBC3-48 w/ FV4B006 9 • m • • • • • • • • Carrier 25HBC3-18 w/ FV4B002 4 • • • • • • • • • • Carrier 25HBC3-24 w/FV4B002 1 • IZI • • • • • • • • Carrier 25HBC3-60 w/FV4B006 2 • • • • • • • • • Can-ier 24ABB3-36 w/FV4B003 1 • [Zl • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID-Page 15 of 70 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C project Name U.S. Fish and Wildlife Service Date 1/11/2013 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By. Carrier 25HBC3-36 v//FV4B0Q3 4 • • • • Canier 25HBC3-48 w/ FV4B006 9 • • • • Camer 25HBC3-18 w/FV4B002 4 • • • • Carrier 25HBC3-24 w/FV4B002 1 • • • • Carrier 25HBC3-60 W/FV4B006 2 • • • • Carrier 24ABB3-36 w/FV4B003 1 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 51 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID: Paqe 16 of 70 CERTIFICATE OF COMPLIANCE (Part 5 of 5) MECH-1 C Project Name U.S. Fish and Wildlife Seivice Date 7/77/2073 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name Tom Hannton Signature Company HARIN70N MECHANICAL DESIGN INC Date 1/11/2013 Address 27475 Ynez Rd #246 CEA# CEPE# City/State/Zip remecula. CA 92591 Phone 858-435-4803 The Principal Mechanical Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title-24, Parts 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Victor Newman Signature OjiC(Xo\, ^^[SMM^^ Company Date 1-11-13 Address 21 Windsor St License* 23110 City/State/Zip H,^,,, ^ 01830 Phone Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures_ MECHANICAL COMPLIANCE FORMS & WORKSHEETS (checl< box if worl<sheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans GZI MECH-1 C Certificate of Compliance. Required on plans for all submittals. Bl MECH-2C Mechanical Equipment Summary is required for all submittals. Bl MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. Bl MECH-4C Fan Power Consumption is required for all prescriptive submittals EnerpyPfo 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 17 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U.S. Fish and Wildlife Service 1/11/2013 Item or System Tags (I.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Pacicag e, VAV, or etc..) Item or System Tags (I.e. AC-1, RTU-1, HP-1) 1A 1B IC Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pac je Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 8 00 HSPF 8.00 HSPF 8.00 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13 0 SEER/11 0 EER 13 0 SEER/11.0 EER 13 0 SEER/11 OEER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 155 cfm 880 cfm 218 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4 2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 19,862 Btu/tir 45,998 Btu/hr 23,849 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 26,010 Btu/hr 35,189 Btu/hr 35,189 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 33,661 Btu/hr 43,518 Btu/hr 45,089 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 32,947 Btu/hr 41,676 Btu/hr 43,895 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant 7emp Constant 7emp Constant 7emp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant 7emp Constant 7emp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(q) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 18 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U.S. Fish and Wildlife Service 1/11/2013 item or System Tags (le AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Pacl<ag e, VAV, or etc..) item or System Tags (le AC-1, RTU-1, HP-1) 2A 28 2C Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa< je Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 8 00 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 130 SEER/11 OEER 13 0 SEER/11 OEER 13.0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 53 cfm 143 cfm 30 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4 2 Attic, Roof Ins/4.2 Attic, Roof Ins/4 2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 9,946 Btu/hr 31,263 Btu/hr 7,531 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 13,464 Btu/hr 35,189 Btu/hr 13,464 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 16,570 Btu/hr 45,736 Btu/hr 17,036 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 16,482 Btu/hr 45,376 Btu/hr 16,591 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electnc heat on this project exclusive of electric auxiliary heat for heat pumps If electnc heat is used explain which exception(s) to §144(g) apply. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 19 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U. S. Fish and Wildlife Service 1/11/2013 Item or System Tags (le AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (le AC-1, RTU-1, HP-1) 2D 2E 2F Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pac )e Reference on Plans or Schedule and indicate the applicable exceptlon(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 8.00 HSPF 8 00 HSPF 8 00 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.OEER 13.0 SEER/11.0 EER 13.0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 91 cfm 90 cfm 91 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Conlrols/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4 2 Attic, Roof Ins/4 2 Attic, Roof Ins/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 17,563 Btu/hr 14,836 Btu/hr 17,459 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 26,010 Btu/hr 26,010 Btu/hr 26,010 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 34,069 Btu/hr 33,211 Btu/hr 34,498 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a& b) 33,000 Btu/hr 32,991 Btu/hr 33,004 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(0) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 20 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U. S. Fish and Wildlife Service 1/11/2013 Item or System Tags (i e AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Paclcag e, VAV, or etc..) Item or System Tags (i e AC-1, RTU-1, HP-1) 2G 2H 2J Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pac je Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 8 00 HSPF 8.00 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11 OEER 13.0 SEER/II OEER 13 0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121 (b) 32 cfm 166 cfm 104 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Pmgrammable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4.2 Attic, Roof Ins/4 2 Attic, Roof Ins/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 7,876 Btu/hr 23,268 Btu/hr 18,683 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 13,464 Btu/hr 35,189 Btu/hr 35,189 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 16,820 Btu/hr 45,804 Btu/hr 45,003 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 16,577 Btu/hr 44,779 Btu/hr 44,401 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(0) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(0 Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps If electric heat is used explain which exception(s) to §144(g) apply EnergyPro 51 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 21 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U. S. Fish and Wildlife Service 1/11/2013 item or System Tags (I.e. AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Paclcag e, VAV, or etc..) item or System Tags (I.e. AC-1, RTU-1, HP-1) 2K 2L 2/W Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 8 00 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11 OEER 13 0 SEER/11 OEER 13 0 SEER/10 9 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 165 cfm 302 cfm 564 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4.2 Attic, Roof Ins/4 2 Attic, Roof Ins/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 13,138 Btu/hr 16,513 Btu/hr 30,193 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 17,442 Btu/hr 35,189 Btu/hr 43,987 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 21,322 Btu/hr 43,112 Btu/hr 55,444 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a& b) 20,833 Btu/hr 42,538 Btu/hr 48,494 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant 7emp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps If electric heat is used explain which exception(s) to §144(g) apply EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11T16:46:48 ID Page 22 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U.S. Fish and Wildlife Service 1/11/2013 Item or System Tags (I.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Paclcag e, VAV, or etc..) Item or System Tags (I.e. AC-1, RTU-1, HP-1) 2N 2P 20 SERVER ROOM Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value indicate Pac )e Reference on Pians or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 8 00 HSPF 8 00 HSPF n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/11.0 EER 13.0 SEER/11.0 EER 14.0 SEER/IOO EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(0), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 280 cfm 299 cfm 17 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4 2 Attic, Roof Ins/4 2 n/a PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a& b) 15,060 Btu/hr 16,362 Btu/hr -1,364 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 35.189 Btu/hr 35,189 Btu/hr 0 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 44,448 Btu/hr 42,815 Btu/hr 36,969 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a&b) 42,852 Btu/hr 42,565 Btu/hr 35,529 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Conlrol DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electnc auxiliary heat for heat pumps If electric heat is used explain which exception(s) to §144(g) apply EnergyPro 5 1 by EnergySoft User Number: 4945 RunCode: 2013-01-11716:46:48 ID Page 23 of 70 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date U.S. Fish and Wildlife Service 1/11/2013 Item or System Tags (le AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Paclcag e, VAV, or etc..) Item or System Tags (le AC-1, RTU-1, HP-1) 2R 2S 27 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pac je Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 8.00 HSPF 7 70 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/II OEER 13.0 SEER/10.9 EER 13.0 SEER/11.0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 263 cfm 326 cfm 223 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Attic, Roof Ins/4 2 Attic, Roof Ins/4.2 Attic, Roof Ins/4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a& b) 13,957 Btu/hr 18,172 Btu/hr 10,635 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 35,189 Btu/hr 43,987 Btu/hr 13,464 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 45,983 Btu/hr 56,250 Btu/hr 16,637 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted I44(a&b) 43,109 Btu/hr 52,624 Btu/hr 15,218 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1 Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 51 by EnergySoft User Number 4945 RunCode: 2013-01-11T16:46:48 ID Page 24 of 70 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft^) CFM per ft' Mm CFM By Area BXC Number Of People CFM per Person Mm CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM / ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air 1A 1,030 0 15 155 20.6 75 155 155 155 1A 7otal 155 155 IB 875 0 30 263 4.4 60 0 263 263 880 1B 7otal 263 880 1C 1,450 015 218 14.5 15 0 218 218 218 1C Total 218 218 2A 355 0 15 53 3.6 15.0 53 53 53 2A Total 53 53 2B 950 015 143 95 15 0 143 143 143 2B Total 143 143 2C 200 0.15 30 2.0 15.0 30 30 30 2C Total 30 30 2D 550 015 83 60 15 0 91 91 91 2D Total 91 91 2E 445 0.15 67 6.0 15 0 90 90 90 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larqer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be qreater than or equal to H, or use Transfer Air (column N) to make up the difference. J Desiqn fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. K Condition area (ft^) x 0.4 CFM / ft^; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPro 5 1 by EnergySoft User Number: 4945 RunCode: 2013-01-11716:46:48 ID-Page 25 of 70 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft") CFM per ft' Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM / ft' Max of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air 2£ 7otal 90 90 2F 580 0.15 87 60 15 0 91 91 91 2F 7otal 91 91 2G 210 0.15 32 21 15 0 32 32 32 2G Total 32 32 2H 665 015 100 11.1 15.0 166 166 166 2H Total 166 166 2J 695 015 104 70 15.0 104 104 104 2J Total 104 104 2K 330 0.50 165 6.6 25 0 165 165 165 2K Total 165 165 2L 2,010 0.15 302 20 1 15 0 302 302 302 2L Total 302 302 2M 1,485 0 38 564 74 3 7.6 564 564 564 2M Total 564 564 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be qreater than or equal to H, or use Transfer Air (column N) to make up the difference. J Design fan supply CFM (Fan CFM) x 50%; or the design zone outdoor airflow rate per §121. K Condition area (ft ') X 0.4 CFM / ft'; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M) Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPro 5 1 by EnergySoft User Number. 4945 RunCode: 2013-01-11716:46:48 ID Page 26 of 70 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft' Mm CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of D orG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX0.4 CFM/ft' Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air 2N 1,865 015 280 18.7 15.0 280 280 280 2N Tofa; 280 280 2P 1,995 0 15 299 20.0 15 0 299 299 299 2P Total 299 299 20 110 015 17 1.1 15.0 17 17 17 20 SERVER ROOM Total 17 17 2R 1,755 0 15 263 17.6 15 0 263 263 263 2R 7otal 263 263 2S 2,175 015 326 21 8 15.0 326 326 326 2S Total 326 326 2T 445 0.50 223 89 25 0 223 223 223 27 Total 223 223 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupaint load for egress purposes for spaces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of fhe ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Desiqn fan supply CFM (Fan CFM) x 50%, or the design zone outdoor airflow rate per §121. K Condition area (ft') x 0.4 CFM / ft', or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M. EnergyPro 51 by EnergySoft User Number: 4945 RunCode: 2013-01-11716:46:48 ID: Paqe 27 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption ot tan §144(c). B Fan Description Design Bralce HP Efficiency Motor Drive Number of Fans Pealc Watts B X E X 746 / (CXD) 1A - Supply Fan 0.500 76 0% 97 0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0422 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11T16:46:48 ID Page 28 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE- Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach. See Power Consumption ot tan §144(c). B Fan Description Design Bralce HP Efficiency Motor Drive Number of Fans Pealc Watts B X E X 746 / (CXD) IB- Supply Fan 0 750 77.0% 97 0% 1.0 749 Exhaust Fan 0.250 64 0% 97 0% 1.0 300 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 1,050 FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment =1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 656 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft UserNumber 4945 RunCode: 2013-01-11X16:46:48 ID Page 29 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach. See Power Consumption of tan §144(c) B Fan Description Design Bralce HP Efficiency Motor Drive Number of Fans Pealc Watts B X E X 746 / (CXD) 1C- Supply Fan 0 750 77.0 % 97.0% 1 0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adiustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 30 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE- Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption ot tan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Pealc Watts B X E X 746 / (CXD) 2A - Supply Fan 0 500 76 0% 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 843 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number: 4945 RunCode: 2013-01-11716:46:48 ID Page 31 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Sen/ice Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 26 - Supply Fan 0.750 77.0 % 97.0% 1 0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 32 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Svstems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption ot tan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 20 - Supply Fan 0 500 76.0% 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment =1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.843 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/GFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 33 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption of fan §144(c) A B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2D - Supply Fan 0 500 76.0% 97.0% 1 0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 8)' 0.422 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 34 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption ot fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2£ - Supply Fan 0.500 76 0% 97 0% 10 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.422 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 35 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2F - Supply Fan 0.500 76.0 % 97 0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 7,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPi) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 422 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 36 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of tan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2G - Supply Fan 0 500 76.0 % 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 843 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM tor VAV systems. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 37 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2H - Supply Fan 0 750 77 0% 97 0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number. 4945 RunCode: 2013-01-11716:46:48 ID Page 38 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE- Provide one copy of this worksheet lor each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption ot tan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2J - Supply Fan 0 750 77.0% 97 0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Tolal Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Tolal Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Tolal Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 39 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Svstems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption ot fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2K - Supply Fan 0 500 76.0 % 97 0% 1 0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 800 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 632 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft UserNumber 4945 RunCode: 2013-01-11716:46:48 ID Page 40 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2L - Supply Fan 0 750 77.0 % 97.0% 1 0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 41 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) A B C D E F Fan Description Design Brake HP Efficiency Number of Fans Peak Watts B X E X 746 / (CXD) Fan Description Design Brake HP Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2M' Supply Fan 0.750 77.0 % 97.0 % 1 0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 2,000 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 375 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 42 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption of fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2N - Supply Fan 0.750 77 0% 97 0% 1 0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 8) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 468 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 43 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach See Power Consumption ot tan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2P - Supply Fan 0 750 77 0% 97 0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A m §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 7,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 8 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 44 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of tan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 20 SERVER ROOM - Supply Fan 0.500 76 0% 97 0% 1 0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 7,200 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 422 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number. 4945 RunCode: 2013-01-11716:46:48 ID Page 45 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE. Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescnptive Approach See Power Consumption of fan §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2R - Supply Fan 0 750 77 0% 97 0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 7,600 A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W C or 245 Pascal then enter SPa on line 4 Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1 -( SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 468 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 46 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 2S - Supply Fan 0 750 77.0% 97 0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards 2) SUPPLY DESIGN AIRFLOW (CFM) 2,000 A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment = 1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.375 W/CFM 1 TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 47 of 70 FAN POWER CONSUMPTION MECH-4C Project Name U.S. Fish and Wildlife Service Date 1/11/2013 NOTE Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Vanable Air Volume (VAV) Systems when using the Prescnptive Approach. See Power Consumption ol Ian §144(c) B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) 27 - Supply Fan 0.500 76.0% 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6 6) Fan Adjustment =1-( SPa-1)/SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0 843 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0 8 W/CFM for Constant Volume systems or 1 25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft UserNumber 4945 RunCode: 2013-01-11716:46:48 ID-Page 48 of 70 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name U.S. Fish and Wildlife Service Date 1/11/2013 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123-Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual overnde that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or IB. An occupancy sensor to control the operating period of the system; or IC. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as descnbed above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone §122(a&b): Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified §121(e) on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings §121(f)- Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water IHeating Systems §113(c) Installation 3. Temperature controls for public lavatories The controls shall limit the outlet Temperature to 110° F. 2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 49 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 1A Floor Area 1,030 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 34,000 Total Room Loads 978 22,641 4,120 505 8,796 Total Output (Btuh) 34,000 Return Vented Lighting 0 Output (Btuh/sqft) 33 0 Return Air Ducts 1,132 440 Cooling System Return Fan 0 0 Output per System 34,000 Ventilation 155 1,187 2,531 155 5,941 Total Output (Btuh) 34,000 Supply Fan 1,727 -1,727 Total Output (Tons) 28 Supply Air Ducts 1,132 440 Total Output (Btuh/sqft) 33.0 Total Output (sqft/Ton) 363 5 TOTAL SYSTEM LOAD 27,819 6,651 13,890 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Can-ier 25HBC3-36 w/ FV4B003 32,947 0 26,010 Airflow (cfm/sqft) 1 17 Airflow (cfm/Ton) 423 5 Outside Air (%) 12 9% Total Adjusted System Output 32,947 0 26,010 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 5 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 155 cfm 70 °F A 65 °F • 85 °F 87 °F —• Heating Coil Supply Fan 1,200 cfm i 86 °F ROOM ^ 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 82 / 67 "F 76 / 61 "F 50 / 49 °F • jar-. Outside Air 155 cfm 75 / 60 "F < 52 / 50 °F • Cooling Coil Supply Fan 1,200 cfm i 53 / 50 °F 43 1 % ROOM 74 / 60 °F I EnergyPro 5 1 by EnergySoft User Number- 4945 RunCode: 2013-01-11716:46:48 ID Page 50 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name IB Floor Area 875 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Totai Room Loads 1,284 23,188 932 12 526 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 52 6 Return Air Ducts 1,159 26 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 880 7,902 10,737 880 34,145 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,159 26 Total Output (Btuh/sqft) 53 7 Total Output (sqft/Ton) 223 4 TOTAL SYSTEM LOAD 35,965 11,669 32,166 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Camer 25HBC3-48 w/ FV4B006 41,676 6,377 35,189 Airflow (cfm/sqft) 1 83 Airflow (cfm/Ton) 408.5 Outside Air (%) 55 0 % Total Adjusted System Output 41,676 6,377 35,189 Outside Air (cfm/sqft) 1 01 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 880 cfm 70-F -4 50 °F • 110°F 111 "F —• Heating Coil Supply Fan 1,600 cfm 111 °F ROOM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 "F Outside Air 880 cfm 75 / 61 °F 79 / 65 °F 55 / 54 °F • 57 / 54 "F • Cooling Coil Supply Fan 1,600 cfm i 57 / 55 °F 47 8 % ROOM 74 / 61 "F I EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 51 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 10 Floor Area 1,450 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Total Room Loads 1,311 30,032 2,900 556 9,872 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 31 7 Return Air Ducts 1,502 494 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 218 1,672 3,926 218 8,376 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,502 494 Total Output (Btuh/sqft) 32 4 Total Output (sqft/Ton) 370 2 TOTAL SYSTEM LOAD 37,264 6,826 16,678 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 earner 25HBC3-48 w/ FV4B006 43,895 1,361 35,189 Airflow (cfm/sqft) 1 10 Airflow (cfm/Ton) 408 5 Outside Air (%) 13.6% Total Adjusted System Output 43,895 1,361 35,189 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 5 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 218 cfm 70 "F 65 °F • 85 "F 87 °F —• Heating Coil Supply Fan 1,600 cfm R001W I 1 86 "F "i.. 'jS" 70 °F _| COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 82 / 67 °F 76 / 60 °F 50 / 49 "F Outside Air 218 cfm 75 / 60 °F •4 52 / 50 °F Cooling Coil Supply Fan 1,600 cfm 53 / 50 °F 41 1 % ROOM 74 / 59 "F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 52 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2A Floor Area 355 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 17,600 Total Room Loads 474 10,452 710 289 6,038 Total Output (Btuh) 17,600 Return Vented Lighting 0 Output (Btuh/sqft) 49 6 Return Air Ducts 523 302 Cooling System Return Fan 0 0 Output per System 17,400 Ventilation 53 470 1,024 53 2,040 Total Output (Btuh) 17,400 Supply Fan 1,727 -1,727 Total Output (Tons) 1 5 Supply Air Ducts 523 302 Total Output (Btuh/sqft) 49.0 Total Output (sqft/Ton) 244 8 TOTAL SYSTEM LOAD 13,695 1,734 6,955 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow (cfm) 600 Camer 25HBC3-18 w/ FV4B002 16,482 0 13,464 Airflow (cfm/sqft) 1 69 Airflow (cfm/Ton) 413.8 Outside Air (%) 89% Totai Adjusted System Output 16,482 0 13,464 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F 66 "F 87 °F 90 "F Outside Air 53 cfm 70 °F < Heating Coil Supply Fan 600 cfm 89 °F ROOM ]g 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 "F Outside Air 53 cfm 75 / 59 °F < « 76 / 60 "F 50 / 49 °F • 53 / 50 °F • Cooling Coil Supply Fan 600 cfm 54 / 50 °F 39 8 % ROOM I 74 / 59 "F I EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 53 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2B Floor Area 950 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Total Room Loads 1,291 31,692 1,900 902 17,240 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 48 4 Return Air Ducts 1,585 862 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 143 381 2,996 143 5,455 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,585 862 Total Output (Btuh/sqft) 49 5 Total Output (sqft/Ton) 242 6 TOTAL SYSTEM LOAD 37,799 4,896 21,862 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Camer 25HBC3-48 w/ FV4B006 45,376 0 35,189 Airflow (cfm/sqft) 1 68 Airflow (cfm/Ton) 408.5 Outside Air (%) 89% Total Adjusted System Output 45,376 0 35,189 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 10 AM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 "F Outside Air 143 cfm 70 °F 66 °F • 87 "F 88 "F —• Heating Coil Supply Fan 1,600 cfm 88 °F ROOM I L. 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 77 / 66 "F Outside Air 143 cfm 75 / 59 "F A =• 75 / 59 "F 49 / 47 °F • 50 / 48 °F • Cooling Coil Supply Fan 1,600 cfm 1 51 / 49 °F 37 9 % ROOM 74 / 58 °F I EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 54 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 20 Floor Area 200 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 17,600 Total Room Loads 489 11,117 400 236 5,311 Total Output (Btuh) 17,600 Return Vented Lighting 0 Output (Btuh/sqft) 88 0 Return Air Ducts 556 266 Cooling System Return Fan 0 0 Output per System 17,400 Ventilation 30 124 423 30 1,151 Total Output (Btuh) 17,400 Supply Fan 1,727 -1,727 Total Output (Tons) 1 5 Supply Air Ducts 556 266 Total Output (Btuh/sqft) 87 0 Total Output (sqft/Ton) 137 9 TOTAL SYSTEM LOAD 14,079 823 5,266 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow (cfm) 600 Camer 25HBC3-18 w/ FV4B002 16,591 0 13,464 Airflow (cfm/sqft) 3 00 Airflow (cfm/Ton) 413 8 Outside Air (%) 5.0 % Totai Adjusted System Output 16,591 0 13,464 Outside Air (cfm/sqft) 015 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 "F Outside Air 30 cfm 70 "F •4 68 °F • 89 °F 91 "F —• Heating Coil Supply Fan 600 cfm i 91 "F ROOM 70 "F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 79 / 64 "F 75 / 59 °F 49 / 48 °F Outside Air 30 cfm 75 / 59 "F < 52 / 49 °f :®'? • Cooling Coil Supply Fan 600 cfm 53 / 50 "F 38 0 % ROOM 74 / 58 °F EnergyPro 5 1 by EnergySofi User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 55 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2D Floor Area 550 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 34,000 Total Room Loads 998 23,958 1,209 493 9,569 Total Output (Btuh) 34,000 Return Vented Lighting 0 Output (Btuh/sqft) 61 8 Return Air Ducts 1,198 478 Cooling System Return Fan 0 0 Output per System 34,000 Ventilation 91 76 961 91 3,483 Total Output (Btuh) 34,000 Supply Fan 1,727 -1,727 Total Output (Tons) 28 Supply Air Ducts 1,198 478 Total Output (Btuh/sqft) 61 8 Total Output (sqft/Ton) 194.1 TOTAL SYSTEM LOAD 28,156 2,169 12,282 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Camer 25HBC3-36 w/ FV4B003 33,000 0 26,010 Airflow (cfm/sqft) 2 18 Airflow (cfm/Ton) 423 5 Outside Air (%) 76% Total Adjusted System Output 33,000 0 26,010 Outside Air (cfm/sqft) 016 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Nov 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 91 cfrn 70 °F •4 67 °F • 87 °F 88 "F —>• Heating Coil Supply Fan 1,200 cfm 88 °F ROOM a 70 °F I COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 76 / 63 °F 75 / 59 °F 49 / 48 °F Outside Air 91 cfm 75 / 59 °F •4 « 51 / 49 °F • Cooling Coil Supply Fan 1,200 cfm 52 / 49 °F 38 6 % ROOM 74 / 58 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 56 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2E Floor Area 445 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 34,000 Total Room Loads 969 23,311 1,203 401 7,845 Total Output (Btuh) 34,000 Return Vented Lighting 0 Output (Btuh/sqft) 76 4 Return Air Ducts 1,166 392 Cooling System Return Fan 0 0 Output per System 34,000 Ventilation 90 78 958 90 3,472 Total Output (Btuh) 34,000 Supply Fan 1,727 -1,727 Total Output (Tons) 28 Supply Air Ducts 1,166 392 Total Output (Btuh/sqft) 76 4 Total Output (sqft/Ton) 157 1 TOTAL SYSTEM LOAD 27,447 2,161 10,375 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Camer 25HBC3-36 w/ FV4B003 32,991 0 26,010 Airflow (cfm/sqft) 2 70 Airflow (cfm/Ton) 423 5 Outside Air (%) 75% Total Adjusted System Output 32,991 0 26,010 Outside Air (cfm/sqft) 0 20 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Nov 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 90 cfm 70 °F M 87 °F 88 "F —• Heating Coil Supply Fan 1,200 cfm 88 °F ROOM 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 76 / 63 °F 75 / 59 °F 49 / 48 °F Outside Air 90 cfm 75 / 59 "F < 51 / 49 "F • lr Cooling Coil Supply Fan 1,200 cfm 52 / 49 °F 38 5 % ROOM 74 / 58 °F EnergyPro 5.7 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 57 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2F Floor Area 580 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 34,000 Totai Room Loads 1,013 24,281 1,208 489 9,504 Total Output (Btuh) 34,000 Return Vented Lighting 0 Output (Btuh/sqft) 58 6 Return Air Ducts 1,214 475 Cooling System Return Fan 0 0 Output per System 34,000 Ventilation 91 74 959 91 3,482 Total Output (Btuh) 34,000 Supply Fan 1,727 -1,727 Total Output (Tons) 28 Supply Air Ducts 1,214 475 Total Output (Btuh/sqft) 58 6 Total Output (sqft/Ton) 204 7 TOTAL SYSTEM LOAD 28,511 2,168 12,209 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Carrier 25HBC3-36 w/ FV4B003 33,004 0 26,010 Airflow (cfm/sqft) 2 07 Airflow (cfm/Ton) 423 5 Outside Air (%) 7.6 % Total Adjusted System Output 33,004 0 26,010 Outside Air (cfm/sqft) 016 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Nov 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 91 cfm 70 °F M ^ 67 °F • 87 °F 88 °F Heating Coil Supply Fan 1,200 cfm 88 °F ROOM 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 76 / 63 "F • jar. Outside Air 91 cfm 75 / 59 °F •4 75 / 59 °F 49 / 48 °F • 51 / 49 °F • Cooling Coil Supply Fan 1,200 cfm 52 / 49 °F 38 6 % ROOM 74 / 58 "F I EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 58 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2G Floor Area 210 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 17,600 Totai Room Loads 482 10,939 420 245 5,479 Total Output (Btuh) 17,600 Return Vented Lighting 0 Output (Btuh/sqft) 83.8 Return Air Ducts 547 274 Cooling System Return Fan 0 0 Output per System 17,400 Ventilation 32 141 440 32 1,208 Total Output (Btuh) 17,400 Supply Fan 1,727 -1,727 Total Output (Tons) 1 5 Supply Air Ducts 547 274 Total Output (Btuh/sqft) 82 9 Total Output (sqft/Ton) 144 8 TOTAL SYSTEM LOAD 13,901 860 5,508 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow (cfm) 600 Carrier 25HBC3-18 w/ FV4B002 16,577 0 13,464 Airflow (cfm/sqft) 2 86 Airflow (cfm/Ton) 413 8 Outside Air (%) 53% Totai Adjusted System Output 16,577 0 13,464 Outside Air (cfm/sqft) 015 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 32 cfm 70 °F •4 68 °F • 89 °F 91 °F —• Heating Coil Supply Fan 600 cfm ROOM 91 °F 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 79 / 65 °F 75 / 59 °F 49 / 48 °F Outside Air 32 cfm 75 / 59 "F < 52 / 49 "F • 1 Cooling Coil Supply Fan 600 cfm 53 / 50 °F 38 1 % ROOM 74 / 58 T I EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 59 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2H Floor Area 665 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Totai Room Loads 1,307 30,931 2,217 598 11,303 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 69 2 Return Air Ducts 1,547 565 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 166 1,273 3,250 166 6,395 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,547 565 Total Output (Btuh/sqft) 70 7 Total Output (sqft/Ton) 169 8 TOTAL SYSTEM LOAD 37,854 5,466 16,271 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Carrier 25HBC3-48 w/ FV4B006 44,779 0 35,189 Airflow (cfm/sqft) 2 41 Airflow (cfm/Ton) 408 5 Outside Air (%) 10 4% Total Adjusted System Output 44,779 0 35,189 Outside Air (cfm/sqft) 0 25 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 5 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 166 cfm 70 °F 66 "F • 86 °F 88 °F —• Heating Coil Supply Fan 1,600 cfm 88 °F ROOM ll 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 82 / 67 -F 76 / 60 °F 50 / 48 °F • Jtr, Outside Air 166 cfm 75/59°F < =• 51 / 49 °F • Cooling Coil Supply Fan 1,600 cfm 1 52 / 49 °F 39 4 % ROOM 74 / 59 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 60 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2J Floor Area 695 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Totai Room Loads 1,296 30,761 1,390 517 10,554 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 66 2 Return Air Ducts 1,538 528 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 104 799 2,110 104 4,012 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,538 528 Total Output (Btuh/sqft) 67 6 Total Output (sqft/Ton) 177 4 TOTAL SYSTEM LOAD 37,192 3,500 13,065 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Carrier 25HBC3-48 w/ FV4B006 44,401 0 35,189 Airflow (cfm/sqft) 2 30 Airflow (cfm/Ton) 408 5 Outside Air (%) 65% Total Adjusted System Output 44,401 0 35,189 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 5 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 104 cfm 70 °F 67 °F • 88 °F 89 °F P- Heating Coil Supply Fan 1,600 cfm 1 89 °F ROOM 70 °F _l COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 82 / 67 °F 75 / 59 °F 50 / 48 °F Outside Air ^ 104 cfm 75 / 59 "F •4 =• 51 / 49 °F • i Cooling Coil Supply Fan 1,600 cfm 52 / 49 "F 38 6 % ROOM JL 74 / 58 °F I EnergyPro 5 7 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 61 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2K Floor Area 330 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 22,800 Total Room Loads 644 13,280 1,023 267 4,138 Total Output (Btuh) 22,800 Return Vented Lighting 0 Output (Btuh/sqft) 69 1 Return Air Ducts 664 207 Cooling System Return Fan 0 0 Output per System 23,000 Ventilation 165 1,286 2,657 165 6,362 Total Output (Btuh) 23,000 Supply Fan 1,727 -1,727 Total Output (Tons) 1 9 Supply Air Ducts 664 207 Total Output (Btuh/sqft) 69 7 Total Output (sqft/Ton) 172 2 TOTAL SYSTEM LOAD 17,621 3,680 9,187 Air System CFM per System 800 HVAC EQUIPMENT SELECTION Airflow (cfm) 800 Carrier 25HBC3-24 w/ FV4B002 20,833 1,670 17,442 Airflow (cfm/sqft) 2 42 Airflow (cfm/Ton) 417 4 Outside Air (%) 20 6 % Total Adjusted System Output 20,833 1,670 17,442 Outside Air (cfm/sqft) 0 50 (Adjusted for Peak Design conditions) Note: values above given at ARi conditions TIME OF SYSTEM PEAK Jul 5 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 165 cfm 70 °F •4 62 °F • 83 °F 85 "F —• Heating Coil Supply Fan 800 cfm 84 °F ROOM 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 82 / 67 °F 76 / 61 °F 52 / 51 °F Outside Air 165 cfm 75 / 60 "F •4 * 54 / 52 °F [®'? • Cooling Coil Supply Fan 800 cfm i 55 / 52 °F 43 4 % ROOM 74 / 60 "F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 62 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2L Floor Area 2,010 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Total Room Loads 1,281 27,733 4,020 136 2,201 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 22 9 Return Air Ducts 1,387 110 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 302 2,567 4,664 302 11,683 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,387 110 Total Output (Btuh/sqft) 23 4 Total Output (sqft/Ton) 513 2 TOTAL SYSTEM LOAD 35,630 8,684 11,547 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 earner 25HBC3-48 w/ FV4B006 42,538 3,339 35,189 Airflow (cfm/sqft) 0 80 Airflow (cfm/Ton) 408 5 Outside Air (%) 18 8% Totai Adjusted System Output 42,538 3,339 35,189 Outside Air (cfm/sqft) 015 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 "F Outside Air 302 cfm 70 °F •4 =•= 63 °F • 84 "F 85 "F —> Heating Coil Supply Fan 1,600 cfm 1 85 °F ROOM 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F • jar. Outside Air 302 cfm 75/60''F •4 =•<=- 76 / 62 "F 52 / 50 °F • 53 / 51 °F • 1 Cooling Coil Supply Fan 1,600 cfm 54 / 51 °F 44 1 % ROOM 1 74 / 60 °F _J EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 63 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2M Floor Area 1,485 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 57,500 Total Room Loads 1,858 34,968 11,509 133 1,626 Total Output (Btuh) 57,500 Return Vented Lighting 0 Output (Btuh/sqft) 38 7 Return Air Ducts 1,748 81 Cooling System Return Fan 0 0 Output per System 58,000 Ventilation 564 4,800 4,236 564 21,882 Total Output (Btuh) 58,000 Supply Fan 2,557 -2,557 Total Output (Tons) 48 Supply Air Ducts 1,748 81 Total Output (Btuh/sqft) 39 1 Total Output (sqft/Ton) 307 2 TOTAL SYSTEM LOAD 45,821 15,745 21,114 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,000 earner 25HBC3-60 W/FV4B006 48,494 10,320 43,987 Airflow (cim/sqft) 1 35 Airflow (cfm/Ton) 413 8 Outside Air (%) 28 2 % Totai Adjusted System Output 48,494 10,320 43,987 Outside Air (cfm/sqft) 0 38 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 564 cfm 70 "F -4 60 °F • 80 °F 81 °F —• Heating Coil Supply Fan 2,000 cfm 81 °F ROOM "1 70 °F _l COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F 77 / 64 °F 55 / 53 °F • jar. Outside Air 564 cfm 75 / 63 °F < 56 / 54 °F • Cooling Coil Supply Fan 2,000 cfm 57 / 54 "F 53 2 % ROOM 74 / 63 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 64 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2N Floor Area 1,865 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Totai Room Loads 1,321 28,915 3,730 122 2,042 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 24 7 Return Air Ducts 1,446 102 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 280 2,372 4,491 280 10,841 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,446 102 Total Output (Btuh/sqft) 25 2 Total Output (sqft/Ton) 476 2 TOTAL SYSTEM LOAD 36,734 8,221 10,531 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Carrier 25HBC3-48 w/ FV4B006 42,852 2,851 35,189 Airflow (cfm/sqft) 0 86 Airflow (cfm/Ton) 408 5 Outside Air (%) 17 5% Totai Adjusted System Output 42,852 2,851 35,189 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 280 cfm 70 °F 64 °F • 84 °F 86 °|- —• Heating Coil Supply Fan 1,600 cfm 85 °F ROOM i 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 T Outside Air 280 cfm 75 / 60 °F •4 =* 76 / 61 °F 51 / 50 °F • 53 / 51 °F • Cooling Coil Supply Fan 1,600 cfm 54 / 51 °F 43 4 % ROOM r f -li. 74/60 T EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 65 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2P Floor Area 1,995 ENGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 46,000 46,000 23 1 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 47,000 47,000 39 23 6 509 4 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,269 299 Sensible 27,526 1,376 0 2,550 2,557 1,376 Latent 3,990 COIL HTG. PEAK CFM 135 4,649 299 35,385 8,639 Sensible 2,185 109 11,596 -2,557 109 11,442 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (dm) 1,600 Carrier 25HBC3-48 w/ FV4B006 Airflow (cfm/sqft) 0 80 Airflow (cfm/Ton) 408 5 Outside Air (%) 18 7% Outside Air (cfm/sqft) 015 Note: values above given at ARI conditions Totai Adjusted System Output (Adjusted tor Peak Design conditions) TIME OF SYSTEM PEAK 42,565 42,565 3,291 3,291 35,189 35,189 Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 299 cfm 70 °F •4 63 °F • 84 °F 85 °F — Heating Coil Supply Fan 1,600 cfm 1 85 °F ROOM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F 76 / 62 °F 52 / 50 °F Outside Air 299 cfm 75 / 60 °F •4 * 53 / 51 °F • Cooling Coil Supply Fan 1,600 cfm 54 / 51 °F 44 0 % ROOM 74 / 60 °F EnergyPro 5 1 by EnergySoft UserNumber 4945 RunCode: 2013-01-11716:46:48 ID Page 66 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2Q SERVER ROOM Floor Area 110 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 0 Total Room Loads 1,009 26,259 220 3 120 Total Output (Btuh) 0 Return Vented Lighting 0 Output (Btuh/sqft) 00 Return Air Ducts 1,313 6 Cooling System Return Fan 0 0 Output per System 34,000 Ventilation 17 -59 147 17 640 Total Output (Btuh) 34,000 Supply Fan 1,727 -1,727 Total Output (Tons) 28 Supply Air Ducts 1,313 6 Total Output (Btuh/sqft) 309 1 Total Output (sqft/Ton) 38 8 TOTAL SYSTEM LOAD 30,553 367 -954 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 Camer 24ABB3-36 w/ FV4B003 35,529 0 0 Airflow (cfm/sqft) 1091 Airflow (cfm/Ton) 423 5 Outside Air (%) 14% Total Adjusted System Output 35,529 0 0 Outside Air (cfm/sqft) 015 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 17 cfm 70 °F •4 70 °F • 110 "F 111 °F —• Heating Coil Supply Fan 1,200 cfm 111 °F ROOM 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F • jar. Outside Air 17 cfm 86 / 66 °F •4 86 / 66 °F 59 / 57 "F • 60 / 57 °F • 1 Cooling Coil Supply Fan 1,200 cfm 36 0 % 61 / 58 °F ROOM 85 / 66 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 67 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2R Floor Area 1,755 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,000 Total Room Loads 1,369 30,204 3,510 112 1,922 Total Output (Btuh) 46,000 Return Vented Lighting 0 Output (Btuh/sqft) 26 2 Return Air Ducts 1,510 96 Cooling System Return Fan 0 0 Output per System 47,000 Ventilation 263 2,221 4,344 263 10,203 Total Output (Btuh) 47,000 Supply Fan 2,557 -2,557 Total Output (Tons) 39 Supply Air Ducts 1,510 96 Total Output (Btuh/sqft) 26 8 Total Output (sqft/Ton) 448 1 TOTAL SYSTEM LOAD 38,002 7,854 9,760 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION /Urflow (cfm) 1,600 Camer 25HBC3-48 w/ FV4B006 43,109 2,462 35,189 Airflow (cfm/sqft) 0 91 Airflow (cfm/Ton) 408 5 Outside Air (%) 16 5 % Total Adjusted System Output 43,109 2,462 35,169 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 263 cfm 70 °F 64 °F • 84 °F 86 "F —• Heating Coil Supply Fan 1,600 cfm 1 86 "F 70 °F I COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 -F Outside Air ^ ^ 263 cfm 75 / 60 °F •4 76/61 °F 51/50°F • 53 / 51 °F • Cooling Coil Supply Fan 1,600 cfm 54 / 51 °F 42 9 % ROOM 74 / 60 °F EnergyPro 5 1 by EnergySoft UserNumber 4945 RunCode: 2013-01-11716:46:48 ID Page 68 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2S Floor Area 2,175 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 57,500 Total Room Loads 1,718 37,432 4,350 142 2,382 Total Output (Btuh) 57,500 Return Vented Lighting 0 Output (Btuh/sqft) 26 4 Return Air Ducts 1,872 119 Cooling System Return Fan 0 0 Output per System 58,000 Ventilation 326 2,755 5,121 326 12,645 Total Output (Btuh) 58,000 Supply Fan 2,557 -2,557 Total Output (Tons) 48 Supply Air Ducts 1,872 119 Total Output (Btuh/sqft) 26 7 Total Output (sqft/Ton) 450 0 TOTAL SYSTEM LOAD 46,488 9,471 12,708 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,000 earner 25HBC3-60 W/FV4B006 52,624 3,789 43,987 Airflow (cfm/sqft) 0 92 Airflow (cfm/Ton) 413 8 Outside Air (%) 16.3% Total Adjusted System Output 52,624 3,789 43,987 Outside Air (cfm/sqft) 0 15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F 64 °F • 84 °F Outside Air • • m -4 326 cfm r- Heating Coil I 70 °F •4 4— 86°l- —>• Supply Fan 2,000 cfm 86 °F ROOM 70 °F _l COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 "F • Jtr, Outside Air 326 cfm 75 / 60 °F •4 im 76 / 61 °F 52 / 50 °F • 53 / 51 "F • Cooling Coil Supply Fan 2,000 cfm 54 / 51 °F 43 8 % ROOM 74 / 60 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 69 of 70 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name U.S. Fish and Wildlife Service Date 1/11/2013 System Name 2T Floor Area 445 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 17,600 Totai Room Loads 517 9,120 1,380 11 487 Total Output (Btuh) 17,600 Return Vented Lighting 0 Output (Btuh/sqft) 39 6 Return Air Ducts 456 24 Cooling System Return Fan 0 0 Output per System 17,400 Ventilation 223 1,990 2,601 223 8,628 Total Output (Btuh) 17,400 Supply Fan 1,727 -1,727 Total Output (Tons) 1 5 Supply Air Ducts 456 24 Total Output (Btuh/sqft) 39 1 Total Output (sqft/Ton) 306 9 TOTAL SYSTEM LOAD 13,749 3,981 7,437 Air System CFM per System 600 HVAC EQUIPMENT SELECTION Airflow (cfm) 600 Camer 25HBC3-18 w/ FV4B002 15,218 2,295 13,464 Airflow (cfm/sqft) 1 35 Airflow (cfm/Ton) 413 8 Outside Air (%) 37 1 % Total Adjusted System Output 15,218 2,295 13,464 Outside Air (cfm/sqft) 0 50 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 223 cfm 70 "F •4 110°F 113 °F —• Heating Coil Supply Fan 600 cfm 1 113 °F ROOM IF 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F 78 / 64 °F 54 / 53 "F Outside Air 223 cfm 75 / 62 "F •4 57 / 54 "F • Cooling Coil Supply Fan 600 cfm 1 58 / 54 °F 48 4 % ROOM 74 / 61 °F EnergyPro 5 1 by EnergySoft User Number 4945 RunCode: 2013-01-11716:46:48 ID Page 70 of 70 fAiJ-T THE #1 CHOICE OF PAINTING PROFESSiONALSf MATERIAL SAFETY DATA SHEET MSDS FORM A: COATINGS WITH NO REPORTABLE HAZARDOUS INGREDIENTS The following Material Safety Data Sheet (MSDS) is being provided pursuant to requirements of the Fed/OSHA (29 CFR 1910.1200) and Cal/OSHA (8 CCR 5194) Hazard Communication Standards. The health and hazards information given here is based on data believed to be accurate by Dunn-Edwards Corporation; we do not, however, assume any liability for the accuracy or completeness of this information. We neither suggest nor guarantee that any hazards mentioned are the only ones that may exist. All persons intending to rely on any recommendation, or to use any technique, equipment, or material mentioned should first satisfy themselves that they can meet all applicable safety and health standards. The following MSDS supersedes any previously issued MSDS for each product covered. The reader is advised to destroy any obsolete MSDS and refer only to this MSDS. As permitted by OSHA, each MSDS may apply to a class of products which have similar hazards and contents. Products covered by this MSDS are listed below: ACHS10-0: ACRI-HUES Flat ACWL10-0: ARCI-WALL Flat ENSOOO-0: ENSO Primer ENSO10-0: ENSO Flat ENSO30-0: ENSO Eggshell ENSO50-0: ENSO Semi-Gloss EVSH10-0: EVERSHIELD Flat EVSH20-0: EVERSHIELD Velvet EVSH30-0: EVERSHIELD Eggshell EVSH30-2: EVERSHIELD Eggshell EVSH40-0: EVERSHIELD Low Sheen EVSH40-2- EVERSHIELD Low-Sheen EVSH50-0: EVERSHIELD Semi-Gloss EVSH60-2: EVERSHIELD Gloss EZPROO-1: EZ-PRIME Premium PMCE10-0: CONTRACTOR'S EDGE Flat PMCE30-0: CONTRACTOR'S EDGE Eggshell PMCE50-0: CONTRACTOR'S EDGE Semi-Gloss SPMA10-0: SUPREMA Flat SPMA10-1:SUPREMA Flat SPMA20-0: SUPREMA Velvet SPMA20-1: SUPREMA Velvet SPMA30-0: SUPREMA Eggshell SPMA40-0: SUPREMA Low Sheen SPMA50-0- SUPREMA Semi-Gloss SSHL10-0: SPARTASHIELD Flat SSHL20-0: SPARTASHIELD Velvet SSHL30-0: SPARTASHIELD Eggshell SSHV10-0: SPARTASHIELD VA Flat SWLL10-0: SPARTAWALL Flat SWLL20-0: SPARTAWALL Velvet SWLL30-0: SPARTAWALL Eggshell SWLL40-0: SPARTAWALL Low Sheen SWLL50-0: SPARTAWALL Semi-Gloss UGPROO-1: ULTRA-GRIP Premium UGSLOO-0: ULTFIA-GRIP Select ULDMOO-O-GR: ULTRASHIELD DTM Gray Primer ULDM50-0: ULTRASHIELD DTM Semi-Gloss Paint ULMSOO-O-WH: ULTRASHIELD Multi-Surface Primer ULSH40-0: ULTRASHIELD Low Sheen Paint ULSH60-0: ULTF^SHIELD Gloss Paint VNSLOO-0: VINYLASTIC Select W 360V: ENDURASEAL W 370: ENDURAWALL W 600: ECOSHIELD Primer W601: ECOSHIELD Flat W 602: ECOSHIELD Low Sheen W 603. ECOSHIELD Semi-Gloss W615: ACOUSTIKOTE W 5361 • Athletic Field Striping Paint W 6079: AQUAFALL Flat W 6240: VERSAFLAT W6310: DURA-TILT W 6401V: QUIK-WALL W 6402V: SUPER-WALL W 6403V SUPER-WALL Ready-To-Use 12/05/12 (10/18/12) MATERIAL SAFETY DATA SHEET DUNN-EDWARDS CORPORATION EMERGENCY TELEPHONE NUMBER: 4885 EAST 52ND PLACE 1-800-222-1222 (TOLL-FREE) LOS ANGELES, CA 90058-5507 INFORMATION TELEPHONE NUMBER: DATE OF PREPARATION: 12/05/2012 (323) 771-3330, EXTENSION 2663 ^^l9.I'9!!'Jj_f??Pi!?JJPf^'I^I?^^™^'_ MSDS FORM A: HMIS CODES: H F R PP 1 0 0 E COATINGS WITH NO REPORTABLE HA2aRD0US INGREDIENTS (SEE COVER PAGE FOR LIST OF PRODUCTS COVERED) U.S. DOT SHIPPING DESCRIPTION:(Non-Regulated) SECTION II - HAZARDOUS INGREDIENTS INGREDIENT ACGIH OSHA EXPOSURE LIMITS TLV/THA TWA STEL CAS NUMBER %WT PPM PPM MG/M^ PPM MG/M^ VAPOR PRESS mmHg @ TEMP [No reportable hazardous ingredients.] NOTE: Potential unusual allergic sensitivity to trace ingredients of this product can be minimized by following recommended procediires for safe handling, storage, disposal, and use. ^55™^! 1' L • .''JIX^J?^!: ^^IP_^^I1? 'i'Ah.P'^I^ BOILING RANGE: 200-225°F EVAPORATION RATE: Slower Than Ether. SPECIFIC GRAVITY (H20=l) : 1.4 -VAPOR DENSITY: Heavier Than Air. SOLUBILITY IN WATER: Partly Soluble. VOLATILE VOLUME: 60% APPEARANCE AMD ODOR: Liquid dispersion with mild odor. !!.^<iT!9?? JY j-.^'f'f_*1P l??!:9?L°1 b^?9 _R.*T^_ FLAMMABILITY CLASSIFICATION: N/A FLASH POINT: N/A LEL: N/A UEL: N/A EXTINGUISHING MEDIA: Foam, Alcohol Foam, CO2, Dry Chemical, Water Fog. UNUSUAL FIRE AND EXPLOSION HA2aRDS: Liquid material is non-combustible, but dried films are capable of supporting combustion when in contact with open flames. Closed containers can de-velop intemal pressure and may rupture when subjected to extreme heat. SPECIAL FIREFIGHTING PROCEDURES: Use self-contained breathing apparatus in confined spaces. Observe recommended procedures for handling ordinary combustible materials. l'I^I'9^'J{.::_'l'l*'iL"_5^?9_R^J* POTENTIAL ROUTES OF ENTRY / SIGNS AND SYMPTOMS OF EXPOSURE INHALATION: Exposure to high -vapor concentration may irritate mucous membranes and respiratory tract. Extreme overejqjosure may produce dizziness, headache, and nausea. EYE CONTACT: Direct contact rtiay cause eye irritation, redness, and tearing. SKIN CONTACT: Prolonged contact may cause transient reddening of the skin. SKIN ABSORPTION: Available infomnation provides no evidence of adverse effects. INGESTION: May cause gastrointestinal irritation, nausea, vomiting, and diarrhea. MEDICAL CONDITIONS GENERALLY AGGRAVATED BY EXPOSURE: Pre-existing eye, skin, and respiratory system disorders, and unusual allergic sensitivity. CHRONIC OR DELAYED HEALTH HAZARDS: Available information provides no evidence of chronic or delayed health hazards associated with exposure to this product. CARCINOGENICITY: NTP? NO. IARC MONOGRAPHS? NO. OSHA REGULATED? NO. PROP 65? NO. MSDS FORM A: COATINGS WITH NO REPORTABLE HAZARDOUS INGREDIENTS, PAGE 2 EMERGENCY AND FIRST AID PROCEDURES: If affected by inhalation of vapor, mo-ve victim to fresh air. If not breathing, apply artificial respiration and call emergency medical care. For eye contact, flush eyes with fresh water for at least 15 minutes. If irritation persists, seek medical attention. For skin contact, wash thoroughly with soap and water. Remove any contaminated clothing. If swallowed, ha-ve victim drink enough fresh water to ensure dilution. Call emergency medical care. SECTION yi^ _- _REACTiy ITYD ATA STABILITY: Stable. HA2ARD0US POLYMERIZATION: Will not occur. HAZARDOUS DECOMPOSITION PRODUCTS: Combustion can produce carbon monoxide and/or carbon dioxide. CONDITIONS TO A-VDID: Avoid storage or use at temperatures below 40°F. Avoid freezing. INCOMPATIBILITY (MATERIALS TO AVOID) : Avoid water-reacti-ve materials, strong oxidizers, acids and alkalis. ^?.l.9I'9!?J^'LiA'l^A'^4JJ9?!?JPA?*^^ PRECAUTIONS FOR HANDLING AND STORAGE: Keep containers closed when not in use. Do not handle or store near heat, flame, or strong oxidizers, acids and alkalis. Store in cool, well-ventilated area. Rotate stock, use older material first. Inspect all containers for leaks. STEPS TO TAKE IF MATERIAL IS RELEASED OR SPILLED: Dike and absorb spilled liquid with inert material such as clay granules, sand, earth, or sawdust. Use rags to clean up small amounts of spilled material. WASTE DISPOSAL METHOD: Collect contaminated absorbent inaterial and rags into a suitable container and dispose in accordance with all applicable local, state, and federal regulations. ?E9I!9_1Y'iL"_ 992!I?°j-_'!!! ?!? f9A'**'^'^'!. y?f RESPIRATORY PROTECTION: For spray application, use particulate filter mask to a-void breathing spray mist. Exposed persons with unusual allergic sensitivity may need organic -vapor respirator (NIOSH/MSHA TC 23C or equi-valent) . •VENTILATION: For interior use, general mechanical ventilation may be sufficient to disperse -vapor. Otherwise, open doors and windows or use portable fans to provide local exhaust. EYE PROTECTION: Use safety glasses, goggles, or face shield to protect eyes. PROTECTIVE GLOVES: Use waterproof gloves (e.g., latex, vinyl, rubber, neoprene) to a-void skin contact. OTHER PROTECTIVE CLOTHING OR EQUIPMENT: Waterproof headcovering and general protecti-ve clothing are recommended for protection as necessary. WORK/HYGIENIC PRACTICES: Wash hands and face before eating. H9I'9^'J?_-_ ???9L'ih-9'^4I'9^'J: Do not store in areas subject to freezing tenperatures. Keep abo\^ 40°F at all times. Use only with adequate ventilation or protection. Avoid breathing spray mist or -vapor. Do not ingest. Avoid contact with skin. Close container after each use. Keep out of reach of children. ??5T!9^L^J•_T?^!!!??9?I*I'Pil'J^'fP.?.M/lL^^ Shipping Requirements: Products covered by this MSDS are not subject to DOT, lATA/ICAO, or IMO/IMDG transportation regulations. Acceptable for air transport as non-liazardous goods. ******* DISCLAIMER ******* THE INFORMATION CONVEYED ABOVE, ALTHOUGH OBTAINED FROM SOURCES WE CONSIDER RELIABLE, IS FURNISHED BY DUNN-EDWARDS CORPORATION WITHOUT ANY WARRANTY (WHETHER EXPRESS OR IMPLIED) AS TO ITS ACCURACY, ADEQUACY, OR APPLICABILITY TO ANY PARTICULAR NEEDS OR CIRCUMSTANCES. Page 1 of 1 wni.i.iiiu.li.1.,... n 1,1.1.1.i.T-wmT—»"-t'gw^--— V/V/icI |V'o(Jlj|?:ir Jl Product Specifications Collection Name Visual Energy Style Number Product Type Construction Fiber Type Dye Method Gauge stitches Per Inch Tufted Pile Height Tufted Yarn Weight Finished Pile Thickness Tile Size Density Weight Density Pattern Repeat Protective Treatments Primary Backing Secondary Backing GSA Approved Product 10302 Modular Multi-Level Pattern Loop Eco Solution Q® Nylon 100% Solution Dyed English IVIetric 1/10 12 0 4/32" Low - 6/32" High 18 0 0 134 24" X 24" 4836 87,048 None SSP® Shaw Soil Protection Non-Woven Synthetic EcoWorx® Tile Yes 39 37 per 10 cm 47 24 per 10 cm 3 18mm - 4 76mm 610 30 g/m= 3 40 mm 60 96 cm X 60 96 cm 9 00 kilotex GSA Performance Specifications Radiant Panel NBS Smoke Electrostatic Propensity Class I Less Than 450 Less Than 3 5 KV Warranty Information Lifetime Commercial Limited Installation Methods uccwttmtc i/tiUH maai ASHLAR WIEnsCrWE EWTERNNa Hi Environmental Green Label Plus Certification Number NSF 140 Certification Cradle To Cradle Silver Certified Certified GLP9968 Platinum Certified patcraff com 800 241 4014 http://www.patcraft.com/ProductSpec/ShowFullSpec/I0302/00508 1/31/2013 p Professional Testing Laboratory, Inc. DATE: 02/10/2012 TEST REPORT TEST NUMBER: 144967 CLIENT Patcroft - DW TEST METHOD CONDUCTED AATCC 134-06 (Step Method) Electrostatic Propensity of Carpets DESCRIPTION OF TEST SAMPLE IDENTIFICATION 10302 Vivid COLOR 00725 ROLL QBOOEKO CONSTRUCTION Multi-Level Pattern Loop FIBER i 100% Eco Solution Q SD Nylon BACKING :> EcoWorx REFERENCE GSA INITIAL REFERENCE GSA SIN #31-303, 31-601 & 31-304(d) GENERAI PRINCIPLE This method is designed to assess the static propensity of flooring material by controlled laboratory simulation of conditions which are known from experience to be strongly contributory to excessive accumulation of static charges. A flooring material preconditioned to equilibrium at controlled atmospheric conditions is walked on by a test subject in a specified manner with specified shoe soles. The static charges which build up on the tester are monitored continuously by a recorder. A neolite shoe sole has been chosen as the primary reference material because its static performance is much like that of many common leathers. It is a commonly used shoe sole material and can be easily cleaned, while its chemical and physical properties are quite uniform. A chrome tanned leather shoe sole has been chosen for a secondary reference material because it is representative of a certain class of leathers whose performance differs significantly from that of neolite soles on certain carpet fiber. Statistically, chrome tanned leather comprises a very small percentage of the shoe sole market, but must be considered in critical applications. TEST CONDITIONS TEST CONDITIONS - - The sample is conditioned to equilibrium and tested at 70 ° ± 2° F and 20 ± 2% relative humidity SAMPLE PREPARATION Shampooed three times according to GSA specifications SUBSTRATE Tested Over Grounded Metal Plate DAY 1 DAY 2 AVERAGE TEST 1: SteD Test/Neollte Sole 2.7 KV 2.4 KV 2.6 KV TEST III: SteD Test/Leather Sole 3.2 KV 3.0 KV 3.1 KV MAXIMUM AVERAGE VOLTAGE 3.1 KV 'The results of this test relafe to the sample of flooring maferlal tested. Its static performance may be altered in service as a result of wear, soiling, cleaning, femperature. relative humidity, etc..." APPROVED BY: Uusfejcihtyis iccrediedbythe HAiaraJlfchjriLiiiyLabaratDiy Acatdaationl^ specific scape of iccndttanonxirdjer Lab Cede 1D0297 Uras iccrediation doe notcortt±iile mQ\di]irsaii6nl,certificatjm,or«ft^ liutsd States GOTairaiQil.£)rthe product tested Hus report is picnndedfijrthe exdusnre use of tlie chat ID Tviuiii it is addressed imay be used m its entirely to gamprodud acceptaiice ixm. duly constmited iitlJontieE Bus report ajphes omlyto 4xose samples tested »d IS notriecessarilymdicatre of spparaittr identical of smularpn -Dus repeat, orthe name of Ptafessional Testmg Laborjtaiy iic shal i-ctbe used under ai^ circumstance madrrertisingtotlK general piilc 714 Gleirwxid Pkce DaHDnGA 30721 Phone 706-2^-3283 F<ix 706-235.^787 email pi-otest@qptiMi us p Professional Testing Laboratory, Inc. TEST REPORT DATE: 02/10/2012 TEST NUMBER: 144967 CLIENT Patcraft - DW TEST METHOD CONDUCTED ASTM E662-09 Smoke Density (Non-Flaming) Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials also referenced as NFPA 258 DESCRiPTiON OF TEST SAMPLE IDENTIFICATION 9A220 Value Tile COLOR 1 , 00725 QBOOEKO ^^coNSTRucTioNf^lS^ ' ' ; ••" Multi-Level Pattern Loop i,FIBER^^^^^5,jj^^^^^J>.,,,j, •' ' '' 100% Eco Solution Q SD Nylon EcoWorx :REFEllErjfeEi:^5SllSS,'.''l'?."'*'-- ' TEST NO. 012512-15 GENERAL PRINCIPLE This procedure is designed to measure the specific optical density of smoke generated by the test specimen within a closed chamber. Each specimen is exposed to an electrically heated radiant-energy source positioned to provide a constant irradiance level of 2.5 watts/square cm on the specimen surface. Measurements are recorded through a photometric system employing a vertical beam of light and a photo detector positioned to detect the attenuation of light transmittance caused by smoke accumulation within the chamber. The light transmittance measurements are used to calculate specific optical density, a quantitative value which can be factored to estimate the smoke potential of materials. Two burning conditions can be simulated by the test apparatus. The radiant heating in the absence of ignition is referred to as the Non-Flaming Mode. A flaming CONDITIONS PREDRYING OF TEST SAMPLE CONDITIONING OF TEST SAMPLE 24 Hours at 140° F 24 Hours at 70° F and 50% Relative Humidity FURNACE VOLTAGE CHAMBER TEMPERATURE TEST MODE 118 V 95° F Non-Flaminq IRRADIANCE CHAMBER PRESSURE 2.5 watts/sq cm 3" H2O AVERAGE MAXIMUM DENSITY CORRECTED (Dmc) NON-FLAMING 62 AVERAGE SPECIFIC OPTICAL DENSITY AT 4.0 MINUTES 21 Specimen 1 Specimen 2 Specimen 3 Maximum Density (Dm) 63.0 71.0 54.0 Time to Dm (minutes) 17.5 17.5 18.0 Clear Beam (Dc) 1.0 1.0 1.0 Con. Max Density (Dmc) 62.0 70.0 53.0 Density at 1.5 minutes 1.0 1.0 1.0 Density at 4.0 minutes 21.0 25.0 16.0 Time to 90% Dm (minutes) 11.5 12.0 12.0 Specimen Weight (grams) 17.9 18.3 18.0 ' This sample PASSES the requirements of 450 or less. APPROVED BY: This fecihty IS accredtedbythe NSjctial \lbliiiiitary L*aratary Accreditation Program fcr the specific scope of acoeditatumunder Lab Code 100297 Bus accredlation dots not constiute an ei-idorsement, certification, or jjjproiialty HIST 01 aiiyageruryoftt^ Gcnremmeiitfbrthe product tested This report E pnraidedforthe exclisiFe use cfthe chert, to -'t/ttm. it is addressed Umaybe used TO. as tnaretyto gamprodud acceptance SOIL duly ccmstduted uthonties Bus report sjphes only to ftiose sauries tested jrd IS notnecessariymdKatre of qrparentl^ iJoitoal cfsmiWpnj^^ This repcoL citlve iiame cf Professional Testmg Libontioiy he shal notbe used imder ai^r circumstance madrrertismgID the generalpvblc 714 Gleitwood Place Dalton,GA 30721 Phone 706-226-3283 FaK 706-226-6787 email piotest@cjptiliiik us p Professional Testing Laboratory, Inc. TEST REPORT DATE: 02/10/2012 TEST NUMBER: 144967 CLIENT Patcraft - DW TEST METHOD CONDUCTED ASTM E648-08 Standard Test Method for Critical Radiant Flux of Floor Covering Systems Using A Radiant Heat Energy Source, also referenced as NFPA 253 and FTM Standard 372 •..., " DESCRIPTION OF TEST SAMPLE IDENTIFICATION 10302 Vivid • COLOR?;. 00725 QBOOEKO Multi-Level Pattern Loop 100% Eco Solution Q SD Nylon EcoWorx GSA INITIAL GSA SIN # 31-303, 31-601 & 31-304(d) GENERAL PRINCIPLE This procedure is designed to measure the critical radiant flux at flame out of horizontally mounted floor covering systems exposed to a flaming ignition in a test chamber which provides a graded radiant heat energy environment. The imposed radiant flux simulates the thermal radiation levels likely to impinge on the floors of a building whose upper surfaces are heated by flames from a fully developed fire in an adjacent room or compartment. The test result is an average critical radiant flux (watts/square cm) which indicates the level of radiant heat energy required to sustain flame propagation in the flooring system once it has been ignited. A minimum of three test specimens are tested and the results are averaged. Theoretically, if a room fire does not impose a radiant flux that exceeds this critical level on a corridor floor covering system, flame spread will not occur. The NFPA Life Safety Code 101 specifies as Class 1 Critical Radiant Flux of .45 watts/sq cm or higher and Class 2 Critical Radiant Flux as .22 • FLOORING SYSTEM ASSEMBLY SUBSTRATE Mineral-Fiber/Cement Board UNDERLAYMENT Direct Glue Down ADHESIVE Sure Set 5000 CONDITIONING Minimum of 96 hours at 70 + 5° F and 50 ± 5% relative humidity Distance Burned Time To Flame Out Critical Radiant Flux Specimen 1 34 cm 12 minutes 0.64 watts/square cm Specimen 2 31 cm 10 minutes 0.71 watts/square cm Specimen 3 32 cm 12 minutes 0.69 watts/square cm Average Critical Radiant Flux 0.68 Watts/Square Cm Standard Deviation 0.03 Watts/Square Cm Coefficient of Variation 4.33 % * NOTE: Meets or exceeds Class 1 rafing as specified in NFPA Ufe Safety Code 101 and IBC 804.2 Classification. APPROVED BY: Bus fecility IS acaediedbythe Ntitml \S)hiiitary Labooratory Accreditation Program for the specific scope of accreditatianunder Lab Code 100297 This accrediatm does notconsthite an et-idorsemeitt, certification, or !f(protial by HIST oraityager^ Gorremmentforthe product tested This report Kpromdedfbrthe exchisnre use of tlie cUeit to -vAca. it is adlressed imay be used n ns entirety to gunprodiKt acceptaiKe &cm duly (onstmited anhontMS Bus report qphes onlyto Siose sanfiles tefUd »d IS notnecessarily indicatire of jfiparentl^ ideiidKd cf similar products This repeat, orthe name of PrafessionallestingLaboriory inc shal iiotbe used under ai^ circumstance madrrertismgtotlie general pvthc 714 Gleiiwcjod Place Da}lon,GA 30721 Pliotie 706-226-3283 Fax 706-2^-6787 email prDtest@qptilink us HMD HARINTON MECHANICAL DESIGN INC. MEMORANDUM TO: ESGIL ATTN: FROM: TOM HARINTON DATE: 2-4-13 PROJECT: USFWS PLEASE NOTE THE FOLLOWING RESPONSE TO THE MECHANICAL PLAN CHECK ITEMS DATED 1-25-13 MECHANICAL NOTE: SEE ATTACHED INFORMATION FROM USFWS REGARDDsIG THE CHEMICALS USED AT THE FUME HOOD 1. a WE HAVE CHANGED THE WAY WE ARE BRINGING IN MAKE-UP AIR. WE NOW HAVE A MAKE-UP AIR FAN SF-1 2. b THE EXH. OUTLET CLEARANCE IS SHOWN ON DETAIL E/M1.2 2.C THE EXHAUST WILL BE CHEMICAL FUMES AS DETAILED IN THE ATTACHED LETTER FROM THE OWNER 2.d PVC LINED GALVANIZED IRON DUCT WILL BE USED - SEE M2.1 2.e PVC LINED GALVANIZED IRON DUCT WILL BE USED - SEE M2.1. THIS IS A LOW PRESSURE FAN SINCE NO PARTICULATE IS EXHAUSTED, THUS STANDARD DUCT GAGES SHOULD APPLY 2.f BASED ON OWNERS DILUTION RATES, THIS SHOULD NOT APPLY 2.g BASED ON OWNERS DILUTION RATES, THIS SHOULD NOT APPLY 2.h WE ARE EXHAUSTING FUMES, SO ANY VELOCITY IS ACCEPTABLE 2.1 WE ARE EXHAUSTING FUMES, SO CLEANOUTS ARE NOT REQUIRED 2.j NO DUSTS 2.k NO MATERIAL EXHAUSTED, STANDARD SUPPORTS SHOULD BE ACCEPTABLE 2.1 BASED ON OWNERS DILUTION RATES, THIS SHOULD NOT APPLY 2.m BASED ON OWNERS DILUTION RATES, THIS SHOULD NOT APPLY 2.n DUCTWORK IS ABV CEILING AND SHOULD NOT NEED PROTECTION 12. SEE THE GREEN BUILDING STANDARDS NOTES ON Ml. 1 27475 YNEZ RD #246 TEMECULA, CA 92591 B TEL: 858 435-4803 • FAX. 858 435-4843 HMD HARINTON MECHANICAL DESIGN INC. MEMORANDUM TO: CARLSBAD FIRE DEPT ATTN: FROM: TOM HARINTON DATE: 2-4-13 PROJECT: USFWS PLEASE NOTE THE FOLLOWING RESPONSE TO THE MECHANICAL PLAN CHECK ITEMS DATED 1-17- 13 MECHANICAL Ml.2: REVISED CODE REFERENCE 27475 YNEZ RD #246 TEMECULA, CA 92591 B TEL: 858 435-4803 H FAX: 858 435-4843 HAZARDOUS MATEWAL INVENTORY (April 17,2012) Building: Carlsbad Fish and Wildlife Office 6010 Hidden Valley Road, Suite 101, Carlsbad, CA 92011 Agency: tJ.S. Pish and Wildlife Service Point of Contact: Judy A. Gibson f760-431-9440. ertension 260) Name of Material Ethyl alcohol 5(<4L) . CFWO Lab Acetone 2(4L) CFWOLab Hcxanc U<4L) \ Gr CFWO Lab Fonnalin ] 3(<4L) CFWO Lab Ethyl acetate l(<8oz) CFWO lib Cooductivity calibration standard 3 (500 ml) CFWO Lab Electrode Cleanine Solution 1 (500 ml) CFWO Lab ,oH Buffers 3 (500 ml) CFWO Lab Nitric acid 3(2:5L>: ,:CFWOLab Nitric acid _ . . 24 (5 ml) CFWOLab Nitric acid 24 (2 ml) , r<H?> CFWO Lab , Spill-X-(solvents) 2(0.45kE) CFWOLab SpiU-X - (formaldehyde) 6 (0.84 leg) CFWOLab Spill-X-(acids) 2 (1.3 ke) CFWOLab Spill-X - (caustics) 2(9Qke) CFWOLab Potassium chloride l(<lkg) CFWOLab Magnesium chloride lC<500km) CFWOUb Sodium chloride L(<500^) CFWOLab Calcium sulfate 1 C<500 pri) - -CFWOLab Sodium sulfate ^ 1 (<125g) _ CFWOLab HenegarEranulcs 1 {<500 Em) CFWOLab Mineral oil l(<473ml) CFWOLab Boric acid 1 «125 em) CFWOLab Hydrochloric acid 1 (<2.5 L) . Gr CFWOLab Sodium bicarbonate 1 {<125 Em) CFWOLab Sodium melaphosphate' 1 (<500 pm) CFWOLab Denatured Alcohol 8 0qt) 3. CFWOLab Local Fire Department; Carlsbad Fire Department Address: Fire Department Administration 2560 Orion Way Carlsbad, CA 92010 HAZARDOUS MATERIAL INVENTORY (April 17,2012) BuBdlngj Carlsbad Pish aid WHdUfe Office 6010 Hidden Valley Road, Suite 101, Carbbad, CA 92011 Point of Contact: Lisa M. Lvren (USGS) (760.931-1 lOn Agency; U.S. G«>loglcai Survev Euthasol 100 ml •CFWOLab "Ketamine/Xylazine IGml CFWOL* Kclamine 8 ml 1 ; CFWO Lab Yohimbine ! 28ni] CFWOLab , Telazol lOrol ^ : -CFWO:Lab 1 Atropine " ^ 40 ml CFWOLab Local Eire Department: CmlsbadFiie Dspariment Address: Fire Department Administnition 2560 Orion Way Cfflisbad, CIA 92010 Aliiias. DELIVERY ORDER For locatton neorest you visit 'vfm/,a\igdi.con\ mm StAGlNSAREA lOIAlPKCS •TOIAIC SM>. FREIGHT CHARGES SHIPPtKDIUVWtOVIA ' n« -01 «" niM count PCS lONE GSVrtlGHI" DtCl VAIUE $ PCS lONE GSVrtlGHI" DtCl VAIUE $ 2 - SOLD BY: AIRGAS -...WEST 1415 GRAND'AVE. SAN- WARCOS. CA 92078 [760J 744-1472 P/O NO; INTERNAL USE ONLV -SHIPTO; REL NO us FISH S WILDLIFE SERVICE -SOtfeTqpisH A WILDLirC SCRVICE 6010 HIDDEN VALLEV RO CARLSBAD CA 92011-4219 CUST. NO: ORDER NO: ORD DATE: 22-Jijl-lO 02:11PM CRT:TNA2f^t^'^°- 19019590836 IFZUW 360409-00 07/21/10 001 OF 00-2 J^lffG-COD flTV IMTT HH SEL m flRfBTf iTTOH. .^1 . rn cou -! TNF' g. HRZRRO CmSS HUHSER, Iffl , f.'K-ff ^ TOL CALL , HFH-r— Ifir RamNie •** COD CUSTMB ..catheritie , tU«M|Hillfl^P.CI^fcpl^0l^i^#t^^ m PER 8X RRDROR M...^ SB'HOSE'HIIM'fevlVEHE^B •;r,:^.;:?••^3*: ' CSflOZa, RDDHOli , , lOO PER BX t' Efi', 'MifHosE BMPTOR" i/m4/'m^6\'^'} RftOHOR ^ Efi. • .M 'mm ri:.^:^;.i.> • HRZflROOUS fiflrERIfil Fffc" :''9 i Rflb';iwO039krM^ .. . ••• . J I V"fl mmi *fe«L v-'/^t-UlttTf',:- f-tiiTEfiKai^g •:"i>» "'iX!'.;" '^K.Mj.if:.'"'.^ 5 't% 3-, I'. - 'jl^O... ."i:59'- aiim^BY: UPS SHIPPER NO. PK<^ 09-00 sKfS^^FISH & WILDLIFE SERVICE 6010 HIDDEN VALLEY RD CARLSBAD GA 92011-4219 °- ' " FZUW- \m - 0 >ROTO4O9-OO|D0T?/21/lO|SiPN!>l CALL -NONE- WIS ASREEfi^ SUBJECTTO AIRSAS'STANDARO TERMS ANO CONOmONS. SEE REVERSE SIDE K5R MPORTANT SAFEIY INFORMATION. ACCSPTEDFOR THE ABOVE CUSTOMER X . NAME PLEASE-gSOT - • • trniACCKOCE Emofgoncy Contact S66734443B flniemrtlonol - cdft i -7a3-5W_4S67) tMrehosm ogrMS te obtain MalortsI Solely.Oalo Saefs (MSE^ Irom ono ol ino loltewing Jtiurce^ Petnt el panttata, Aligea Wob dl«;ot <)ifi»ny.aHTqi.eiim>. er by eojOna )h» oti«w> Rstei emorgofic* eonjoef plwno inimb»r'ond »l»etl(ig opilon »J. WS B TO CaWIV 1H« IHE NMtS> MAIHS«A(!E fSW^Sy ClASSnfU OBCRBEa f»3!XSaK "BAIT T,O.D. ^ PLUWIBING, Development Services ELEGTRICAL, Building Oivisjon "^-^ 11 TV OF MECHANICAL 1635 Faraday Avenue CAR LSBAD ^°'B^18 ^^'"^ www.carlsbadca.gov •li^'?^ &AI^ Ave. ^ Project Address: :SUITE 150' Permit No,: jP^ ^ 1 ^ ^ ^ Inforrnotlon provided be/ow.refen to worte Being done on the above mentioned.permtt only. This form musi be completed and relurned lo the Buildina Division before the permit con be issued.. Building Dept. Fa)<_: (760) 602-8558, Number of new or relocated fixtures, traps, or floor drains ..ltl?.?.r.ir.il?,: New bulldliig sewer line? Ves x No Number of new robf drains?.. P Install/qlter water line? ^ Numiier of new wciter heaters?.......,.....,.......,....^.. ^ Number of new, relq^coted or replaced gas outlets? 0_ Number of new hose bibs? > ^ Residential Permitst New/expanded seivice: Ntiriiber of new dnips: Minor Remisdel o^j^' Ves.; No- Ctimmerciaf/lndustridl! Tenant Imprpyerrient: Nurnber of existing amps Invdhedin this proiect: Number of new?amps involved In this projed:: New Construction: , Amps per Panel: Single Phase ..;........>.........,.,....•,.;..,; .•....;.>......;.,.., I^urnb'er of ncw.ampei;es_ Three Phase a... iNlumber of new grnReres_ Three Phase 480 , Nuniberdf new arnperes_ Number of new furnaces, AlC, of, hedt' pumps? .„....i.....;>....i...;.r...-..i,. New or relocoted^duct worh? , , Ves >/ Number of new fireplaces? Number of new exhaust fans?.' No. Relocate/install went? '0 Nurnber of new exhaust hoods?.... ^ Number of.new boilers or compressors? Number of HP 0' B-18', Page ivOf 1 Rev. 03/09 ^ PLUMBINQ, Develdprneht Services ELECTRICAL, Building Division' CITY OF IMECHANICAL: d^S Faraday.Avenue WORKSHEET 76o 602 27i9 . . wwwxar sbadca.gov BT18 Project Address: SUITE 250 PermitNo.: / I ^ O M C^? Inforrnotlon prqvided below refers to Worte being done on the above mentioned permit 6nH/. ; This forni must be coinpleted ond returned to the Buildinq Divisiori-before the permit can be issued. Bullding Dept. Fox: (760) 602-8558 Number of new or relocated fbdures; traps; or floor drains ..!..?!.^.?. Newi>uildlng sewer line? Ves No Nijmber ofnew roof dreiins?..,......;,,.................,.^^^^ 0 Install/alter wreiter llne?„y.i.......i,.v I Numberof new water, heqteri?....^...;,;^;.;., t... ; ; • ^ Number of new, relocated or replaced gas outlets?.;,.;...;...........,....... 0 Number of new hose.blbs?... i Residential Permits: New/expanded service: Number of hew dmps: Miriof. Remodel on^ Ves No. Commercial/lndustriai: Tenarit Improvement: Nurnber of eKiiting qrrjipsr tnvoived Iri.this proiect k-BO^Al^^^ Nurnber of new amps Involved In this project: '^^^Y:^ AH New'Censtruction:: Amps pei; Panel: Single, Phase .........i..........;....;;..... Number of new amperes; Three Phase; Number of hew, amperes: Three Pha5et48b Number of new amperes Numberof new furnaces, A/,C, orhedt.isurrips? f3'' Newor relocated duct.worb? Ves X No ^ iNumber of new, fireplaces? ^ Number of new exhaust fans?! 'I Relbcate/instdll vent?. „..,... ; 0 Number of new .exhaust hoods? .. O" . Number of new:boilers or compressors?..,.......? Number^bf HP. U' B-18 ;Page"1 ofl Rev. ,03/09 t)E.iA^o\5-Vlvmb9- 0OO3&3 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTiONMAlRE OFFICE USE ONLYj UPFPtfiXCLtfiXXaia HV# BP DATE_ I L Business Name Business Contact Telephone # Garlsbad Fish and Wildlife Office Scott Sobiech (•760)431-9440 X Project Address Cily Slate Zip Code 2177 Salk Avenue Carlsbad CA 92008-M 2.-02-1 -03 Mailing Address • City Slate Zip Code Plan File* 6010 Hidden Valley Road Carlsbad C.^ 92011- Project Contact Telephone # Scott Sobiech or Judy Gibson ryeo) 431-9440 X The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT - HAZARDOUS FI/IATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling lhe item, whether your business will use, process, or store any of the following hazardous matenals If any of the items are circled, applicant must contact the Flre Protection Agency with iurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): Occupancy Rating: X. Explosive or Blasting Agents r\ 5. Organic Peroxides 9. Water Reactives ^^ Connpressed Gases / OiCf^in J6. Oxidizers 10. Cryogenics Fiammable/CombustiBle Liquias / 7 Pyrophoncs 11. Highly Toxic or Toxic Materials Flammable Solids ^ ,, 8. Unstable Reactives 12. Radioactives QZyCoirosWes 14 Other Health Hazards 15 None of These. PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONIVIENTAL HEALTH - HAZARDOUS IVIATERIALS DIVISIONS (HMDV. If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Matenals Division, 5500 Overland Avenue, Suite 110, San Diego, CA 92123 Call (858) 505-6700 prior to the issuance of a building permit FEES ARE REQUIRED YES NO 1. • 2. • 3. • 4. • 5. • • 6. • 7. • IS Project Completion Date; Expected Date of Occupancy; 2013-06-01 (for new construction^OTjgmodeling projects) Is your business listed on the reverse side of this fonnfi? (check all that apply). ^ Will your business dispose of Hazardous Substances or Medical Waste in any angounl? £^ ^ Will your business store or handle Hazardous Substances in quantities equal lo or greater than 55 gallonsv 500 pounds 200 cubic feet, or carcinogens/reproductive toxins In any quantity? | " '" 't=^' Will your business use an existing or install an underground storage tank? | Will your business store or handle Regulated Substances (CalARP)? | Will your business use or install a Hazardous Waste Tank Systern (Title 22, Article 10)7 WiH your busmess store petroleum in tanks or containers at your facility wilh a total facilty'Stdrage'cjpacity ( '"EB 8 REC'D or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Actk^^^ • CalARP Exempt I Date Initials • CalARP Required I / Date Initials • CalARP Complete Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the quesli5rA-be!owMyes,/i^pJicant,musl contact the Air Pollution Conlrol District (APCD). 10124 OkJ Grove Road, San Dego, CA 92131^1649, telephone (858) 586-2600 prior loine issiJ&nce'of'a-building or demolition penriit. Note; if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notificalion form iB-tberTVPCD at least 10 working days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less Contact the APCD for more inforniation Will lha subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at http //vww.sdspcd prq/info/fHcts/permlts pdf. and Ihe list of typical equipment requinng an APCD penmit on the reverse side of this from, Contact APCD if you have any questions). (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feel of the outer boundary of a school (K through 12)? (Search the California School Directory at http://wvw cde ca qov/re/sd/ for public and pnvate schools or contact the appropnate school dislnct) Has a survey been perfonned to detennine the presence of Asbestos Containing Matenals? Will Ihere be renovation that Involves handling of any friable asbestos materials, or disturbing any matenal lhat contains non-fnable asbestos? Will there be demolition involving the removal ofa load supporting structural member? YES NO 1 • 2 • • 3 P • 4 • • 5 • • Bnefly describe business activities Typical office work, clerical 1 declare und^r penalty of perjury that to the best of my knowledge and belief tile respansSTtiatie herein are true and correct Briefly descnbe proposed project Name orOwner or Authorized Agent < ' 7/ <C / .Signature of-dwnetorAuthorized Agent / / ZJi /? Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. BY. FOR OFFICAL USE ONLY: DATE. EXEMPT OR NQ FURTHER INFORMATION REQUmED RELEASED FOR BUILDING PERMrr BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY APCD COUNTY-HMD APCD COUNTY-HMD APCD in'jhis*8x only exempts businesses from completing or updating a Hazardous Matenals Business Plan Olher permitting requirenienls may slill apply -r c T^' LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISION Check all that apply: AUTOMOTIVE • Battery Manufacturing/Recycling • Boat Yard • Car Wash • Dealership Maintenance/Painting Q Machine Shop • Painting • Radiator Shop • Rental Yard Equipment • Repair/Preventive Maintenance • Spray Booth • Transportation Services • Wrecking/Recycling CHEMICAL HANDLING • Agricultural supplier/distributor • Chemical Manufacturer • Chemical Supplier/Distnbutor • Coatings/Adhesive • Compressed Gas Supplier/Distnbutor • Dry Cleaning • Fiberglass/Resin Application • Gas Station • Industnal Laundry • Laboratory • Laboratory Supplier/Distnbutor • Oil and Fuel Bulk Supply • Pesticide Operator/Distnbutor CHEMICAL HANDLING • Photographic Processing • Pool Supplies/Maintenance • Pnnting/Blue Printing • Road Coatings • Swimming Pool • Toxic Gas Handler • Toxic Gas Manufacturer METAL WORKING • Anodizing • Chemical Milling/Etching • Finish-Coating/Painting • Flame Spraying • Foundry • Machine Shop-Dnlling/Lathes/Mills • Metal Plating • Metal Prepping/Chemical Coahng • Precious Metal Recovery • Sand Blasting/Gnnding • Steel Fabncator • Wrought Iron Manufactunng AEROSPACE • Aerospace Industry • Aircraft Maintenance • Aircraft Manufacturing OTHERS AND MISCELLANEOUS • Asphalt Plant • Biotechnology/Research • Chiropractic Office • Co-Generation Plant • Dental Clinic/Office • Dialysis Center • Emergency Generator • Frozen Food Processing Facility • Hazardous Waste Hauler • Hospital/Convalescent Home • Laboratory/Biological Lab • Medical Clinic/Office • Nitrous Oxide (NO^ Control System • Pharmaceuticals • Public Utility • Refrigeration System • Rock Quarry • Ship Repair/Construction • Telecommunications Cell Site • Vetennary Clinic/Hospital • Wood/Furniture Manufactunng/Refinishing ELECTRONICS • Electronic Assembly/Sub-Assembly • Electronic Components Manufactunng • Pnnted Circuit Board Manufactunng NOTE THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE HAZARDOUS MATERIALS DIVISION (HMD) REVIEW OF BUSINESS PLANS FOR MORE INFORMATION CALL (858) 505-6880 LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control Distnct CHEMICAL COMBUSTION ROCK AND MINERAL 47-Organic Gas Stenlizers 34-Piston Internal - Combustion Engines 04-Hot Asphalt Batch Plants 32-Acid Chemical Milling 13-Boilers & Heaters (1 million BTU/hr or larger) 05-Rock Dnlls 33-Can & Coil Manufactunng 14-Incinerators & Crematones 06-Screening Operations 44-Evaporators, Dryers & Stills Processing 15-Burn Out Ovens 07-Sand Rock & Aggregate Plants Organic Matenals 16-Core Ovens 08-Concrete Batch, CTB, Concrete Mixers, Mixers 24-Dry Chemical Mixing & Detergent Spray 20-Gas Turbines, and Turbine Test Cells & Stands & Silos Towers 48-Landfill and/or Digester Gas Flares 10-Bnck Manufactunng 35-Bulk Dry Chemicals Storage ELECTRONICS OTHER 29- 42- Automated Soldering Electronic Component Mfg 55 - Chrome Electroplating Tanks COATINGS & ORGANIC SOLVENTS 27 - Coating & Painting 37 - Plasma Arc & Ceramic Deposition Spray Booths 38 - Paint, Stain & Ink Mfg 27 - Pnnting 27 - Polyester Resin/Fiberglass Operations METALS 18 - Metal Melting Devices 19 - Oil Quenching & Salt Baths 32 - Hot Dip Galvanizing 39 - Precious Metals Refining ORGANIC COMPOUND MARKETING (GASOLINE, ETC) 25 - Gasoline & Alcohol Bulk Plants & Terminals 25 - Intermediate Refuelers 26 - Gasoline & Alcohol Fuel Dispensing NOTE OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION CONTROL DISTRICT PERMIT IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600 FOOD 12 - Fish Cannenes 12 - Smoke Houses 50 - Coffee Roasters 35 - Bulk Flour & Powered Sugar Storage SOLVENT USE 28 - Vapor & Cold Degreasing 30 - Solvent & Extract Dners 31 - Dry Cleaning 01 - 03- 46- 51 - 11 - 17- 23- 45- 21 - 36- 40- 43- 41 - 40- 91 - 56- Abrasive Blasting Equipment Asphalt Roofing Kettles & Tankers Reverse Osmosis Membrane Mfg Aqueous Waste Neutralization Tire Buffers Brake Debonders Bulk Gram & Dry Chemical Transfer & Storage Rubber Mixers Waste Disposal & Reclamation Units Gnnding Booths & Rooms Asphalt Pavement Heaters Ceramic Slip Casting Periite Processing Cooling Towers - Registration Only Fumigation Operations WWTP (1 million gal/day or larger) & Pump Station llM-9171 (02/11) County ol San Dicgo- DEH - Hazaidous Maienals Division INDUSTRIAL WASTEWATER DISCHARGE PERMIT SCREENING SURVEY Date /• fb'fO ) J, / \ / J A / Cl Business Name T^*^^ ^ (jJ~iiM.((fe^ J/On/roz^^ Street Adcdress D^ll^ Safh Email Address pf^RnAo^t^ /.fe ,Qi^Cf) . CdyT) PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Acid Cleaning Ink Manufacturing Nutritional Supplement/ Assembly Laboratory Vitamin Manufacturing Automotive Repair Machining/Milling Painting/Finishing Battery Manufacturing Manufacturing Paint Manufacturing Biofuel Manufacturing Membrane Manufacturing Personal Care Products Biotech Laboratory (i.e. water filter membranes) Manufacturing Bulk Chemical Storage Metal Casting / Forming Pesticide Manufacturing / Car Wash Metal Fabrication Packaging Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing Chemical Purification Electroplating (including precursors) Dry Cleaning Electroless plating Porcelain Enameling Electrical Component, Anodizing Power Generation Manufacturing Coating (i.e. phosphating) Print Shop Fertilizer Manufacturing Chemical Etching / Milling Research and Development Film / X-ray Processing Printed Circuit Board Rubber Manufacturing Food Processing Manufacturing Semiconductor Manufacturing Glass Manufacturing Metal Powders Forming Soap / Detergent Manufacturing Industrial Laundry Waste Treatment / Storage SIC Code(s) (if known): Brief description of business activities (Production / Manufacturing Operations):. Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Estimated volume of industrial wastewater to be discharged (gal / day): List hazardous wastes generated (type / volume): Date operation began/or will begin at this location: Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes No If yes, when: Site Contact Title Signatur'e_ Phone No. ENCINA WASTEWATER AUTHORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760)438-3941 FAX: (760)476-9852 DISCHARGE PERMIT EXEMPT LIST The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge permitting under normal operating conditions. They are exempt because (a) they discharge no process wastewater {i.e., they only discharge sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no potential to negatively impact the EWPCF or other wastewater treatment plants In the ESS. Any questions regarding exemptions should be referred to EWA Source Control staff. Automobile Detailers Barber/Beauty Shops Business/Sales Offices Carpet/Upholstery Cleaning Services Chlldcare Facilities Churches Community Centers Consulting Services Contractors Counseling Services Educational Services (no auto repair/film developing) Financial Institutions/Services Fitness Centers Gas Stations (no car wash/auto repair) Grocery Stores (no film developing) Home-based Businesses Hotels/Motels (no laundry) Laundromats Libraries Medical Offices (no x-ray developing) Mortuaries Museums Nail Salons Nursing Homes Office Buildings (no process flow) Optical Services Pest Control Services (no pesticide repackaging for sale) Pet Boarding/Grooming Facilities Postal Services Public Storage Facilities Restaurants/Bars Retail/Wholesale Stores (no auto repair/film developing) Theaters (Movie/Live) f'ci'Soa)^ PROJCCNUMSER CARLSBAD FIRE DEPARTMENT EXPEDITED PLAN CHECK REQUEST am requesting 'Expedited Plan Check Services' and understand I will be levied an additional fee assessed at the rate of $90.00 dollars per hour plus $25.00 dollars administration fee. I understand that my plans shall not be released until all fees are paid. I, ' ' ^ \^ Ho4t^ the applicant, am solely responsible for all fees due should the project be withdrawn or otherwise not completed. And by signing below I acknowledge that my plans shall be forwarded by the City of Carlsbad to an independent contractor/consultant. I, ^^H(B H^t^^A acknowledge that the 'first review' time for all expedited Fire plan reviews will be ten- (10) business days from date of submittal. These additional day account for acceptance and delivery of your plans and then the parcel return to our office if recommended for approval. I, (3Hl h HotJi^A: the applicant, acknowledges that corrected or revised plans shall be sent directiv to the plan checker, at the address specified on the Correction List, at my cost, parcel post or other means. acknowledge that a turn-around time for re-submittals is five- (5) business days from the date plans are received at the address specified by the plan checker on the Correction List. Once all corrections are made, your plans are then returned to the Carlsbad Fire Department with a "Recommendation for Approval" based solely on the adopted Codes and Standards. This is not an approval. Your plans are then forwarded to the Carlsbad Fire Department, and once your plans are received by our office they are subject to an additional review to ensure conformance with Carlsbad Municipal Code. This additional review is subject to an additional review period of seven- (7) 'Government Business' days from date that we receive the plans from the plan reviewer. The Carlsbad Fire Department does not perform 'Over-the-counter' plan review services. Plans submitted to the Carlsbad Fire Department for review by CFD staff shall be checked on a 'first come, first served' basis and could take 10 days or more for 'First' review. C!^S^ NO Applicant Signature, Date / '/<5'/S Copy to Building and Fire Prevention file Revised 10/15/2012 PC130005 2177 SALKAV us FISH & WILDLIFE SHELL TO OFFICE CB130115 2177 SALKAV 150 us FISH 8. WILDLIFE 3422 SF SHELL TO OFFICE CB130116 2177 SALKAV 250 us FISH & WILDLIFE 17 344SF SHELL TO OFFICE ///5-7/3 - To Fl^. /^''^f^ 4^ 3^^^ An //3 fJb^ ^ ^ I I n f (S> pt OMM^ AAee^ rs/rl- /. I /rr . z/rr -;|s LOh^ '^1 T'g' Oifp^^^ 3/5/5 12,-ri: • 1^ v^- ft£>-^ • CV Final Insp Approved Date BUILDING PLANNING ENGINEERING FIRE Expedite? 2^ I Thp :2Jnl.i ^ AFS Checked by 7:M Bjr_ HazMat APCD Health Forms/Fees Sent Reed Due? Encina HazHealthAPCD PE&M School Sewer Stormwater Special Inspection '//S'//> By CFD (g^^ I pAt'r? i(^c5r/^^^-^ LandUse -/l/ldft\ QSfV!/p{ /ll'llKrea rFvTl/lSAnnex5/<^( Factor Factored. 5 Wo Comments Date Building Planning Engineenng Fire Date Date Date £3^ Need? ouP^weer set; zjvk/ii SW Done • Done - • Done • Done • Issued