HomeMy WebLinkAbout2181 CORTE ARBOLES; ; CB990163; Permit02/18/1,999
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
01/14/1999
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
Residential Permit Permit No CB990163
Building Inspection Request Line (760) 438-3101
2181 CORTE ARBOLES CBAD
RESDNTL
2552520800
$244,026 00
Sub Type
Lot#
Construction Type
Reference #
1 Structure Type
5 Bathrooms
PLN4,PHSE 6,2788 SF.670SF GAR
SFD
27
VN
CB972716
Status
Applied
Entered By
GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03
Applicant
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
760-804-7700
Owner
GREYSTONE HOMES INC
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
760-804-7700
ISSUED
04/22/1998
JM
Plan Approved
Issued 02/18/1999
Inspect Area
Plan Check# 990001
Total Fees $11,687 46 Total Payments To Date $000 Balance Due $11,68746
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
$1,12858 .--Reel Water Con Fee .
: $000 - Meter Size •-'."••;
$73358 Add'l Reel Water Con Fee
'. $000 ; CFD Payoff Fee
($5869) ,PFF
$2440 (PFF (CFD Fund)
$000 -License Tax
$0 00 - License Tax (CFD Fund)
$31000 Traffic Impact Fee
$000 Traffic Impact (CFD Fund)
$000 :., PLUMBING TOTAL
$000 ELECTRICAL TOTAL
$000 MECHANICAL TOTAL
$0 00 Housing Impact Fee
$0 00 Housing InLieu Fee
$0 00 Master Drainage Fee
Sewer Fee
$0 00 TOTAL PERMIT FEES
$000
$000
$4,254 32
$4,441 27
$000
$000
$000
$550 00
$000
$18900
$6000
$5500
$000
$000
$000
$000
$11,68746
Inspecto
FINAL APPROVAL
Date =Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE sinfiilar to this, or as to which the statute of limitations has previously otherwise expiredCITr Or CARLSBAD
2075 Las Palmas Dr, Carlsbad, CA 92009 (760) 438-1161
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite Fire
Plan Check*
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected <c-
Bv (
Inspected
Bv
Inspected
Bv
Comments
990001 Date
CB990163 Permit Type
PLN4 PHSE 6 2788 SF,670SF GAR Sub Type
GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03
2181 CORTEARBOLES Lot 27
Phone
Water Dist
xr-\ (~^ Date
V\. " Inspected ( f"5 ~ XjTx^pproved A
Date
Inspected Approved
Date
Inspected Approved
•
6/25/9970912
RESDNTL
SFD
Disapproved
Disapproved
Disapproved
City of Carlsbad Inspection Request
For 7/15/99
Permit# CB990163
Title PLN4.PHSE 6,2788 SF.670SF GAR
Description GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03
Inspector Assignment NF
2181 CORTEARBOLES
Lot 27
Type RESDNTL
Job Address
Suite
Location
APPLICANT GREYSTONE HOMES
Owner GREYSTONE HOMES INC
Remarks
Total Time
Sub Type SFD
Phone 7607538918
Inspector
Requested By DAVE WATSON
Entered By CHRISTINE
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comments
Inspection History
Date
6/1/99
6/1/99
5/27/99
5/27/99
5/25/99
5/25/99
5/21/99
5/20/99
5/4/99
3/26/99
3/24/99
3/15/99
3/15/99
Description
18 Exterior Lath/Drywall
23 Gas/Test/Repairs
17 Interior Lath/Drywall
23 Gas/Test/Repairs
16 Insulation
16 Insulation
84 Rough Combo
84 Rough Combo
83 Roof Sheathing/Ext Shear
1 1 Ftg/Foundation/Piers
81 Underground Combo
21 Underground/Under Floor
22 Sewer/Water Service
Act
CA
CA
AP
AP
CA
AP
AP
CO
AP
AP
NR
AP
AP
Insp Comments
NF APPD ON 5/27
NF
NF
NF
NF APPD ON 5/24
NF
NF
NF
NF
PD
RB ND PT REPORT FIRST
NF
NF