Loading...
HomeMy WebLinkAbout2181 CORTE ARBOLES; ; CB990163; Permit02/18/1,999 Job Address Permit Type Parcel No Valuation Occupancy Group 01/14/1999 # Dwelling Units Bedrooms Project Title City of Carlsbad Residential Permit Permit No CB990163 Building Inspection Request Line (760) 438-3101 2181 CORTE ARBOLES CBAD RESDNTL 2552520800 $244,026 00 Sub Type Lot# Construction Type Reference # 1 Structure Type 5 Bathrooms PLN4,PHSE 6,2788 SF.670SF GAR SFD 27 VN CB972716 Status Applied Entered By GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03 Applicant GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 Owner GREYSTONE HOMES INC 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 ISSUED 04/22/1998 JM Plan Approved Issued 02/18/1999 Inspect Area Plan Check# 990001 Total Fees $11,687 46 Total Payments To Date $000 Balance Due $11,68746 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee $1,12858 .--Reel Water Con Fee . : $000 - Meter Size •-'."••; $73358 Add'l Reel Water Con Fee '. $000 ; CFD Payoff Fee ($5869) ,PFF $2440 (PFF (CFD Fund) $000 -License Tax $0 00 - License Tax (CFD Fund) $31000 Traffic Impact Fee $000 Traffic Impact (CFD Fund) $000 :., PLUMBING TOTAL $000 ELECTRICAL TOTAL $000 MECHANICAL TOTAL $0 00 Housing Impact Fee $0 00 Housing InLieu Fee $0 00 Master Drainage Fee Sewer Fee $0 00 TOTAL PERMIT FEES $000 $000 $4,254 32 $4,441 27 $000 $000 $000 $550 00 $000 $18900 $6000 $5500 $000 $000 $000 $000 $11,68746 Inspecto FINAL APPROVAL Date =Clearance NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE sinfiilar to this, or as to which the statute of limitations has previously otherwise expiredCITr Or CARLSBAD 2075 Las Palmas Dr, Carlsbad, CA 92009 (760) 438-1161 City of Carlsbad Final Building Inspection Dept Building Engineering Planning CMWD St Lite Fire Plan Check* Permit # Project Name Address Contact Person Sewer Dist Inspected <c- Bv ( Inspected Bv Inspected Bv Comments 990001 Date CB990163 Permit Type PLN4 PHSE 6 2788 SF,670SF GAR Sub Type GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03 2181 CORTEARBOLES Lot 27 Phone Water Dist xr-\ (~^ Date V\. " Inspected ( f"5 ~ XjTx^pproved A Date Inspected Approved Date Inspected Approved • 6/25/9970912 RESDNTL SFD Disapproved Disapproved Disapproved City of Carlsbad Inspection Request For 7/15/99 Permit# CB990163 Title PLN4.PHSE 6,2788 SF.670SF GAR Description GREYSTONE AT LA COSTA VALLEY-VILLAGE I-CT88-03 Inspector Assignment NF 2181 CORTEARBOLES Lot 27 Type RESDNTL Job Address Suite Location APPLICANT GREYSTONE HOMES Owner GREYSTONE HOMES INC Remarks Total Time Sub Type SFD Phone 7607538918 Inspector Requested By DAVE WATSON Entered By CHRISTINE CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Act Comments Inspection History Date 6/1/99 6/1/99 5/27/99 5/27/99 5/25/99 5/25/99 5/21/99 5/20/99 5/4/99 3/26/99 3/24/99 3/15/99 3/15/99 Description 18 Exterior Lath/Drywall 23 Gas/Test/Repairs 17 Interior Lath/Drywall 23 Gas/Test/Repairs 16 Insulation 16 Insulation 84 Rough Combo 84 Rough Combo 83 Roof Sheathing/Ext Shear 1 1 Ftg/Foundation/Piers 81 Underground Combo 21 Underground/Under Floor 22 Sewer/Water Service Act CA CA AP AP CA AP AP CO AP AP NR AP AP Insp Comments NF APPD ON 5/27 NF NF NF NF APPD ON 5/24 NF NF NF NF PD RB ND PT REPORT FIRST NF NF