HomeMy WebLinkAbout219 CHESTNUT AVE; ; 79-4985; PermitNOjT_
Applicant to complete numbered spaces only.
BUILDING PERMIT APPLICATION
City of CARLSBAD, CALIFORNIA 92008
Phone 729-1181 BR
243
ASSESSOR'S
PARCEL NUMBER
LEGAL
DESCR.e>
MAIL ADDRESS
VI
ENGINEER
COMPENSATION INS. CARRIER
LIC ENSE NO.
MAIL ADDRESS
U5C OF BUILDING
NO. BDRMS NO. BATHS
8 Class of work: D NEW H.AODITION D ALTERATION D REPAIR D MOVE D REMOVE
10 Change of use from
Change of use to
1 1 Valuation of work:
SPECIAL CONDITIONS:
1}
AF/LICA/ION/ACCEPTED BY. PLANS CHECKED BY
NOTICE
•SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED'WITH WHETHER SPECIFIED
HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE ^PERFORMANCE OF CONSTRUCTION.
(/E OF CONTRACTOR OR ^ujTHORIZED AGENT
SIGNATURE OF OWNER II f OWNER BUILDER)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK.M.O.CASH PERMIT VALIDATION CK.M.O.CASH
TOTAL FEES $.
USE BALL.POINT PEN AND PRESS FIRMLY
ELECTRICAL PERMIT APPLICATION
City of CARLSBAD, CALIFORNIA 92008
Applicant to complete numbered spaces only. Phone 729-1181 Perm it No. _
JOB ADDRESS
r .A
,LEOAL
1 DESCR.
B i/k .? * \f %nr-
ATTACHED SHEET)
I" I V/
MAIL 'A'D'D'R ESS' /"
"9 li 0>.f
'"" *"" "* "^ *«*"zji p*1 !».•<•« «f, ^i <jj RHONE
CONTRACTOR MAIL ADDRESS STAT.E LIC. NO.CITY LIC. NO.
.-' • -•• fit•ARCHITECT" OR" DESIGNER"
> ,1
"MAIL'ADbRESS"LICENSE NO.
MAIL ADDRESS LICENSE NO.
COMPENSATION INS CARRIER MAIL ADDRESS
use or BUILDING
_ .^. . &" <
8 Class of work: D NEW ID/ADDITION D ALTERATION D REPAIR
9 Describe work:
•"*• I TW,*^SlM«- " ^ /
SPECIAL CONDITIONS:
APPLICATION ACCEPTED BY PLANS CHECKED BY APPROVED FOR ISSUANCEfBY
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THISAPPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THISTYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIEDHEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOTPRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THEPROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATINGCONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
I t\hn\
SIGNATURE OF CONTRACTOR CR AUf(HOR'l'z'ED*'AG ENT
f I .' J'•*-S '- <*
SIGNATURE OFOWNER (IF OWNER BUILDER)(DATE)
PERMIT FEES
SWIMMING POOL WIRING,
NO INCREASE IN SERVICE
NEW CONSTRUCTION. FOR EACH
AMPERES OF MAIN SERVICE, SWITCH
FUSE OR BREAKER
NEW SERVICE ON EXISTING BLDG.
FOR EA. AMPERE OF INCREASE
IN MAIN SERVICE, SWITCH, FUSE
OR BREAKER
REMODEL, ALTERATION. NO CHANGE
IN SERVICE, FOR EA. AMPERE OF
INCREASE
TEMP. SERVICE UP TO AND INCLUD-
ING 200 AMP.
TEMP. SERVICE OVER 200 AMP.
PER 100
ISSUANCE FEE
TOTAL FEES
No. Each Fee
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK.M.O.CASH PERMIT VALIDATION CK.M.O.CASH
BLDG DEPT ( WHITE)APPLICANT ( PINK)TEMP. FILE (GOLD)INSPECTOR (MANILLA HARD COPY)
REQUEST FOR INSPECTION
IMSPFPTOR /p/)a*&* PERMIT NO._
OWNER QL
re tim
'/)>//£
TIME:.
.DATE:.
C
BUILDING
EH FOUNDATION
EH REINFORCING STEEL
EH MASONRY
EH GROUT -GUNITE
EH FLOOR AND CEILING FRAME
EH SHEATHING
EH FRAME
EH EXTERIOR LATH
EH INSULATION
EH INTERIOR LATH OR DRYWALL
ELECTRICAL
O TEMPORARY SERVICE
CD ELECTRIC UNDERGROUND
CZ1 ROUGH ELECTRIC
IZ1 POOL BONDING
d ELECTRIC SERVICE
CH CEILING HEAT
D G.F.I.
D SMO>«t DETECTOR
PLUMBING
O UNDERGROUND PLUMBING
CH UNDERGROUND WATER
LZl ROUGH PLUMBING
1Z1 TOP OUT PLUMBING
D SEWER AND PL/CO
n TUB OR SHOWER PAN
LZ1 GAS TEST
n WAfER HEATER
El FINAL
[5MOI\
MISCELLANEOUS
EH PLENUM AND DUCTS
n COMBUSTION AIR
EH PATIO
EH SIGN
EH GRADING
EH DRIVEWAY
EH CONDITIONED AIR SYSTEMS
EH RB1FER PIPING
0 FINAL
READY FOR INSPECTION: DMONDAY DTUESDAY DWEDNESDAY DTHURSDAY D FRIDAY
SPECIAL INSTRUCTIONS.
-fi.
REQUESTED BY G,.PHONE NO.
PERSON TAKING REPOR
REQUEST FOR INSPECTION
INSPFr.TDR
*
OWNER _
PERMIT NO..
TIME:_
ADDRESS.
CU FOUNDATION
CU REINFORCING STEEL
CU MASONRY
CU GROUT-GUNITE
CU FLOOR AND CEILING FRAME
CU SHEATHING
CU FRAME
CU EXTERIOR LATH
CU INSULATION
a INTERIOR LATH OR DRYWALL
FINAL
ELECTRICAL
CU TEMPORARY SERVICE
D ELECTRIC UNDERGROUND
a ROUGH ELECTRIC
d POOL BONDING
CU ELECTRIC SERVICE
CD CEILING HEAT
a G.F.I.
a SMOKE DETECTOR
CD FINAL
PLUMBING
GD UNDERGROUND PLUMBING
CD UNDERGROUND WATER
CU ROUGH PLUMBING
CU TOP OUT PLUMBING
CD SEWER AND PL/CO
CJ TUB OR SHOWER PAN
CU GAS TEST
CU WATER HEATER
CD FINAL
READY FOR INSPECTION:D MONDAY
a A.M.
D P.M.
D TUESDAY
SPECIAL INSTRUCTIONS.
MISCELLANEOUS
[H PLENUM AND DUCTS
O COMBUSTION AIR
CD PATIO
CU SIGN
CU GRADING
CU DRIVEWAY
CU CONDITIONED AIR SYSTEMS
CU REFER PIPING
CU FINAL
D THURSDAY D FRIDAY
REQUESTED BY..PHONE NO..
PERSON TAKING REPORT.
f
- J.
7-2.F-
•REQUEST FOR INSPECTION
INSPECTOR— 7~^n^^
TIME:.
PERMIT NO...DATE:'c.^-3>
,/ BUILDING
n FUNDATIONS'''
CD REmF&Ff6TNG STEEL
O MASONRY
C] GROUT -GUNITE
CH FLOOR AND CEILING FRAME
CD SHEATHING
O FRAME
CH EXTERIOR LATH
CU INSULATION
CH INTERIOR LATH OR DRYWALL
ED FINAL
ELECTRICAL
CD TEMPORARY SERVICE
O ELECTRIC UNDERGROUND
d RpUGH ELECTRIC
O POOL BONDING
D ELECTRIC SERVICE
CH CEILING HEAT '
D G.F.I.
a SMOKE DETECTOR
CD FINAL
PLUMBING
d UNDERGROUND PLUMBING
C] UNDERGROUND WATER
CU ROUGH PLUMBING
d TOP OUT PLUMBING
CD SEWER AND PL/CO
ID TUB OR SHOWER PAN
O GAS TEST
CU WATER HEATER
CU FINAL
READY FOR INSPECTION: (\3 M
SPECIAL INSTRUCTIONS.
MISCELLANEOUS
d PLENUM AND DUCTS
CD COMBUSTION AIR
CU PATIO
CD SIGN
CZI GRADING '••..'
O DRIVEWAY ;'
CU CONDITIONED AIR SYSTEMS
CU REFER PIPING
D FINAL
D WEDNESDAY') D THURSDAY- D FRIDAY
REQUESTED BY..PHONE NO,
PERSON TAKING REPORT-
6
~~—
REQUEST FOR INSPECTION TIME:
INSPECTOR..'*£"*5-
' : «lft
OWNER
PERMIT NO...DATE:
ADDRESS-
\ BUILDING )
It::]
REINFORCMG STEEL «,
MASONRY'
GROUT-GLNITE
FLOOR ANO CEILING FRAME
SHEATHING
FRAME
EXTERIOR LATH '
INSULATION
INTERIOR LATH OR DRYWALL
FINAL ••"•
ELECTRICAL
0 TEMPORARY SERVICE
CH ELECTRIC UNDERGROUND
CU ROUGH ELECTRIC
CD POOL BONDING
O ELECTRIC SERVICE
CU CEILING HEAT
CD G.F.I.
O SMOKE DETECTOR
O FINAL
PLUMBING
||p .UNDERGROUND PLUMBING
.f|p UNDERGRCUIMD WATER
;^J. ROUGH PLUMBING
Ijfp TOP OUT. PLUMBING .
J|p SEWER ANO" PL/CO
||::] TUBORSHCiWERPAN
"•^'j .GAS TEST : : . '_ •
•||:i WATER HEATER
.1:1 FINAL • ' '•
READW FOR INSPECTION
MISCELLANEOUS
CD PLENUM AND DUCTS
CU COMBUSTION AIR
CU PATIO
Q SIGN
LT] GRADING
a DRIVEWAY
Q CONDITIONED AIR SYSTEMS
Cl REFER PIPING
n FINAL
DTUESDAY D WEDNESDAY D THURSDAY D FRIDAY
SPECIAL.INSTRUCTIONS.
•m
REQUESTED BY..PHONE NO.
PERSON TAKING REPORT.
G
REQUEST FOR INSPECTION TIME:.
INSPECTOR /^-//
BUILDING
CD FOUNDATION
CD REINFORCING STEEL
CD MASONRY
CD GROUT -GUNITE
CD FLOOR AND CEILING FRAME
CD SHEATHING
CD FRAME
CD EXTERIOR LATH
[M INSULATION
CD INTERIOR LATH OR DRYWALL
CD FINAL
ELECTRICAL
CJ TEMPORARY SERVICE
C] ELECTRIC UNDERGROUND
[Zl ROUGH ELECTRIC
EH POOL BONDING
C] ELECTRIC SERVICE
[H CEILING HEAT
D G.F.I.
E3 SMOKE DETECTOR
CH FINAL
PLUMBING
CU UNDERGROUND PLUMBING
CH UNDERGROUND WATER
CH ROUGH PLUMBING
CD TOP OUT PLUMBING
CD SEWER AND PL/CO
CD TUB OR SHOWER PAN
CD GAS TEST
CD WATER HEATER
CD FINAL
MISCELLANEOUS
READY FOR INSPECTION: /D MONDAY
SPECIAL INSTRUCTIONS.
a P.M.
CD PLENUM AND DUCTS
CH COMBUSTION AIR
CD PATIO
CD SIGN
CD GRADING
CD DRIVEWAY
CD CONDITIONED AIR SYSTEMS
CD REFER PIPING
CD FINAL
TUESDAY D WEDNESDAY D THURSDAY D FRIDAY
REQUESTED BY..PHONE NO..
PERSON TAKING REPORT.
J
jcr 7
REQUEST FOR INSPECTION TIME:
INSPECTOR
OWNER
PERMIT NO.
c.(TY—
ADDRESS.
BUILDING
CD FOUNDATION
CD REINFORCING STEEL
CD MASONRY
CD GROUT-GUNITE
CD FLOOR AND CEILING FRAME
CD SHEATHING
CD EXTERIOR LATH
CD INSULATION
CD INTERIOR LATH OR DRYWALL
CD FINAL
ELECTRICAL
CD TEMPORARY SERVICE
CD ELECTRIC UNDERGROUND
(^TROUGH ELECTRIC
CD POOL BONDING
CD ELECTRIC SERVICE
CD CEILING HEAT
CD G.F.I.
CD SMOKE DETECTOR
CD FINAL
PLUMBING
CD UNDERGROUND PLUMBING
CD UNDERGROUND WATER
CD ROUGH PLUMBING
CD TOP OUT PLUMBING
CD SEWER AND PL/CO
CD TUB OR SHOWER PAN
CD GAS TEST
CD WATER HEATER
CD FINAL
MISCELLANEOUS
CD PLENUM AND DUCTS
CD COMBUSTION AIR
CD PATIO
CD SIGN
CD GRADING
CD DRIVEWAY
CD CONDITIONED AIR SYSTEMS
CD REFER PIPING
CD FINAL
READY FOR INSPECTION: DMQNDAY a TUESDAY D WEDNESDAY D THURSDAY /KJFRIDAY
SPECIAL INSTRUCTIONS.
Q P.M.
REQUESTED BY >M ITr^A A S V^ (M~K-.PHONE NO
PERSON TAKING REPORT-A.
J&EQUEST FOR INSPECTION
4 INSPECTOR.
OWNER
PERMIT NO,
ADDRESS.
BUILDING
CD FOUNDATION
CD REINFORCING STEEL
CD MASONRY
CD GROUT-GUNITE
CD FLOOR AND CEILING FRAME
CD SHEATHING
CD FRAME
CD EXTERIOR LATH
CD INSULATION
CD INTERIOR LATH OR DRYWALL
CD FINAL
PLUMBING
CD UNDERGROUND PLUMBING
CD UNDERGROUND WATER
CD ROUGH PLUMBING
CD TOP OUT PLUMBING
CD SEWER AND PL/CO
CD TUB OR SHOWER PAN
STEST
1LJ WATER HEATER
CD FINAL
4^
READY FOR INSPECTION: D MONDAY/XjUESDAY
a A.M. /*
SPECIAL INSTRUCTIONS
ELECTRICAL
CD TEMPORARY SERVICE
CD ELECTRIC UNDERGROUND
CD ROUGH ELECTRIC
CD POOL BONDING
CD ELECTRIC SERVICE
CD CEILING HEAT
a G.F.I.
CD SMOKE DETECTOR
CD FINAL
MISCELLANEOUS
CD PLENUM AND DUCTS
CD COMBUSTION AIR
CD PATIO
CD SIGN
CD GRADING
CD DRIVEWAY
CD CONDITIONED AIR SYSTEMS
CD REFER PIPING
CD FINAL
WEDNESDAY D THURSDAY D FRIDAY
<LuJn\ ^a&Jx*^"0"^
REQUESTED BY D,\U ^ ' / -J— L»A r— 1 ( I d~64PHONE NO. / Cr^l IU &^l
PERSON TAKING REPORT J < '
0
TIME:.REQUEST FOR INSPECTION , ,- -,—
^^— PERM1T •» 7f- ^fflTc.^/W/fINSPECTOR
OWNER
REINFORCING STEEL
d MASONRY
CH GROUT -GUNITE
E] FLOOR AND CEILING FRAME
O SHEATHING
CH FRAME
CU EXTERIOR LATH
[H INSULATION
CU INTERIOR LATH OR DRYWALL
0 FINAL
n TEMPORARY SERVICE
CD ELECTRIC UNDERGROUND
a ROUGH ELECTRIC
CU POOL BONDING
CD ELECTRIC SERVICE
[H CEILING HEAT
D G.F.I.
C3 SMOKE DETECTOR
0 FINAL
PLUMBING
Q UNDERGROUND PLUMBING
CU UNDERGROUND WATER
CU ROUGH PLUMBING
O TOP OUT PLUMBING
[ZI SEWER AND PL/CO
IZ1 TUB OR SHOWER PAN
LZl GAS TEST
a WATER HEATER
a FINAL
MISCELLANEOUS
READY FOR INSPECTION
SPECIAL INSTRUCTIONS
a PLENUM AND DUCTS
CD COMBUSTION AIR
CU PATIO
CU SIGN
CU GRADING
CU DRIVEWAY
D CONDITIONED AIR SYSTEMS
Q REFER PIPING
a FINAL
TUESDAY D WEDNESDAY a THURSDAY D FRIDAY
REQUESTED BY.PHONE
PERSON TAKING RFPORT
/
INTERDEPARTMENTAL INFORMATION SHEET
BUILDING DEPARTMENT
BUILDING ADDRESS: „£ /J
DATE:
OCT * ° 1973
noy./7y 7 r OF CARLSBAD
Building Department
PLANNING DEPARTMENT
ZONE LOT SIZE LOT WIDTH
UNITS ALLOWED
PARKING SPACES REQUIRED
*% COVERAGE ALLOWED
NITS PROVIDED
BUILDING HEIGHT ALLOWED
FRONT SETBACK:
ALLOWED
PROVIDED
PROVIDED_
^PROVIDED
PROVIDED
SIDE SETBACK:REAR SETBACK:
INTRUSIONS
LANDSCAPE & IRRIGATION PLAN COMMENTS:
ENVIRONMENTAL PROTECTION REQ :
ADDITIONAL COMMENTS:
£V
OK TO ISSUE:
ENGINEERING DEPARTMENT
R.O.W.INDUSTRIAL WASTE IMPROVEMENTS
SEWER CONNECTION
GRADING PERMIT
DRIVEWAY LOCATIONS
EASEMENTS DRAINAGE
LEGAL DESCRIPTION
ADDITIONAL COMMENTS
OK TO ISSU DATE 'PWI OK TO FINAL DATE
FIRE DEPARTMENT
SPRINKLING SYSTEM
FIRE ALARMS
JIRE HYDRANTS
ADDITIONAL COMMENTS
_FIRE PROTECTION EQUIP.
EXITS
LOCATION
OK TO ISSUE:DATE OK TO FINAL DATE
WATER DEPARTMENT
REQUIREMENTS \)F APPROPRIATE DISTRICTS MET_DATE
\