Loading...
HomeMy WebLinkAbout2195 FARADAY AVE; J | K; CB951601; Permit11/22/95 16:50 Page 1 of 1 B U I L D I N G Job Address: 2195 FARADAY AV P E R M I T Suite: Permit Project Development J&K No: CB951601 No: A9502331 No: Permit Type: INDUSTRIAL TENANT IMPROVEMENT Parcel No: Valuation: 31,200 Lot#: 4810 11/22/95 0001 01 G-Prs'.MT Construction Type: ,v·; V•-.. NEW ISSUED 11/01/95 11/22/95 DC Occupancy Group: Reference#: Status: Description: 1200 SF OFFICE INLIGHT COMM Applied: Apr/Issue: Appl/Ownr : CSI GENERAL CONTRACTORS 619 Entered By: 471-9388 145 LOA VALLECITOS DE ORO #F SAN MARCOS, CA 92069 ,, ,..,. ~ ,, ----..... , -~_,_ .... ,/"' ~--.... ,_ *** Fees Required *** /; **"?~:· .. ,: Fe~s 'Gqllected & Credits *** ------------------------,' _,.~-_,,,....-~~ --, ,:__ __ I ,. ', --, ----~., ------------------------ Fees: 5}(3. op;-~\°( <·. ;:: , ':,, />·> /.~ ·,~ Adjustments: / . 01~'.,_,· • Totar ·,Cre?.j. ts~ Total Fees: ,,. St?. 00'" /; .. , Toyql 'J?~y.ments :\ "'\'\ ,,.,-/ \,-·'Ba1.ctn'ce;~oUe:\ Fee description / , ' \; "\~Uni ts\, \~Efe/Un\ t / I,., ". / ~',•o-.. ,,". " ... , .. ,,, , ,,, • ', , : .. : '. \ Building Penni t , ···._: , Plan Check : · · 1. 7 Strong Motion Fee; ' . ..· ·.; . c·) * BUILDING TOTAL '. . ., 'f[ ,,·., .:-·, /.,·-.:/:...._; · Enter "Y" for Plun\bing Iss~~ .. ,~J,l >t f.t /I (: · ·:;, Enter "Y" for Electric Is~ue,,,Fe~?\ :~;):: r: Enter "Y" for Remo2'el \, · · ·--2> ,:::, · 1 . -> ·$ * ELECTRICAL TOTAL \ ... · .... / , \; , ' I Enter 'Y' for Mechan\ca,¥"_>:rss~e-..._fe~)';;:'i~:~f"':·Eo Install Furn/Ducts/Heat -.p~m9$ ' · -.. > . . ±-\ .. , ~/ 00 * MECHANICAL TOTAL '.., '. '"'-~ ,' 1 · , \ · . ,. / ,._.1·,1· __ ._;·::·: _::::: ::-, ,., . ' ;_ -~) \ .00 194.00 349.00 Ext fee 298.00 194.00 7.00 499.00 Data N 10.00 Y 10,00 Y 20.00 15.00 Y 9.00 24.00 I APPROVA;j../~, i lNSP. ,r-;;r;..---DATE~ CLEARANCE------, CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 : ~ \ PERMIT APPIJCATION PIAN CHECK NO. f f-/60 ( City of Carlsbad Building Department FSr. VAL ~ /4~ ~ 2075 Las Palmas Dr •• Carlsbad, CA 92009 (619) 438-1161 1. PEIIMtT 'M>E PLAN CK DEPOSIT / <;?' U VAIJD. BY r 7 D~ ' From List 1 (see back) give code of Permit-Type: ___ _.,:1Tl;;..""""_.,_-=------ DATE. _____________ _ For Residential Projects Only: From List 2 (see back) give 4452 .1..1/0j_/95 {)001 01 C-PRMT 02 Code of Structure-Type: ___________________ _ Net Loss/Gain of Dwelling Units __________________ _ 2. PROJECT INFORMATION FOR OFFICE USE ONLY Building or Suite No. mt o. D 2 Soils Report Cl 1 Addressed Envelope EXISTING USE PROPOSED USE DESCRIPTION OF WORK 0f'l="l Ce; SQ.Ff. laoo # OF BEDROOMS # OF BA1HROOMS CITY 4. .APPLICAN I ~N l'MC'IOR NAME (last na e fi t) ZIP CODE 0 AGENT FOR CoNTMC'l'OR ADDRESS DAY TELEPHONE 4 71 ~3,¥8 0 OWNER O AGENT F'OR OWNER CITI STATE ZIP CODE DAY TELEPHONE S. PROPER1Y oWNRR NAME (last name first) ADDRESS Z,~;) rcra..att STATE ,:,,_ ZIPCODE DAY TELEPHONE '? 3 NAME (last name first) C,S':J CITI SM VV\?r-co.s STA~Q.,. ADDRESS t'"b-S-V'ctLlecC+t,.s ~ at, ~ STATE UC. ZIP coDq'Zc64 DAY TELEPHONE/ti I-OJ J~ UCENSE CIASS l3 CITY BUSINESS UC. # ast name 1rst CITI STATE ZIP CODE DAY TELEPHONE STATE UC. # 1. W01U<£RS' OOMPENSATION Cl Cl 0 Workers' Compensat1on beclaratlon: I hereby affirm that I have a cert1hcate of consent to self-insure issued by the Director of lndustnal Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof file with the Building Inspection Department (Section 3800, Lab. C). '17;>EXPIRATION DATE DATE Owner-Bmlder Declarat10n: I hereby afhrm that I am exempt from the Contractofs License Law for the following reason: I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section ________ Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed_Fursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and P"fessions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). SIGNATIJRE DATE COMPLE'rE THIS SECTION FOR NON-RESIDENTIAL BUiLDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES ONO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES Cl NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? DYES Cl NO IF ANY OF TI-IE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE~ AFfERJULY 1, 1989 UNLESS TI-IE APPUCANT HAS MET OR IS MEETING TI-IE REQUIREMENTS OF TI-IE OFFICE OF EMERGENCY SERVICES AND TI-IE AIR POILUTION OONTilOL DISI'RICT. 1s permit 1s issue I cerufy that I have read the apphcat1on and state that the above mformanon 1s correct. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I AI.50 AGREE 10 SAVE INDEMNIFY AND KEEP HARMLESS TI-IE Cl1Y OF CARlSBAD AGAINSf All IJABIIITIFS, JUDGMENTS, OOSfS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINSf SAID CITY IN OONSEQUENCE OF TI-IE GRANTING OF TillS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Expiration. Every permit issued by the B building or work authorized by such pe such permit is suspended or abandoned a APPUCANT'S SIGNATURE Finance 0 CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB951601 FOR 05/10/96 DESCRIPTION: 1200 SF OFFICE INLIGHT COMM TYPE: ITI INSPECTOR AREA TP PLANCK# CB951601 OCC GRP CONSTR. TYPE NEW STE: J&K LOT: JOB ADDRESS: 2195 FARADAY AV APPLICANT: CSI GENERAL CONTRACTORS CONTRACTOR: PHONE: 619 PHONE: 471-9388 OWNER: REMARKS: MW/DAVE/471-9388 SPECIAL INSTRUCT: TOTAL TIME: --RELATED PERMITS--PERMIT# TYPE AS950072 ASTI PHONE: STATUS ISSUED CD LVL DESCRIPTION ACT COMMENTS 19 ST Final structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical £._ ________ _ t--- --------------------------------------------------------- ***** INSPECTION HISTORY***** DATE DESCRIPTION ACT INSP COMMENTS 011196 Final Combo co TP JOB CARD,LIST ATTCH 122995 Final Combo NS PD 122895 Final Combo co PD 120695 Frame/Steel/Bolting/Welding AP TP T-BAR GRID 120695 Rough Electric AP TP CEIL LITES 120695 Rough/Ducts/Dampers AP TP DUCTS 120195 Interior Lath/Drywall AP MP 113095 Frame/Steel/Bolting/Welding AP TP 113095 Rough Electric AP. TP WALLS 112895 Frame/Steel/Bolting/Welding co TP 112895 Rough Electric co TP FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING ft__I.BE'.. PLANNING U/M WATER PLAN CHECK#: CB951601 PERMIT#: CB951601 PROJECT NAME: 1200 SF OFFICE INLIGHT COMM ADDRESS: 2195 FARADAY AV SUITE# J&K CONTACT PERSON/PHONE#: BJN/DAVE/471-9388 SEWER DIST: WATER DIST: DATE: 12/28/95 PERMIT TYPE: ITI ==================================================== :;r===========-·==== INSPECTED DATE J BY: M. A_~ INSPECTED: I/ f /y£ APPROVED _ DISAPPROVED _ INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: APPROVED DISAPPROVED APPROVED DISAPPROVED ========================================================================== COMMENTS: ·' EsGil Corporation Professiona{ Pfan ~view 'Engineers DATE: 11/17/95 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1601 PROJECT ADDRESS: 2195 Faraday, Suite J PROJECT NAME: Office TI SET: II • The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil. Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: Dave Johnson, CSI General 135 Vallecitos De Oro, Suite A, San Marcos, CA 92069 • Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone #: D REMARKS: By: Pete Fischer Enclosures: Esgil Corporation [g] GA DCM D GP [g] PC 11/15/95 trnsmtl.dot EsGil Corporation Professiona{ PCan P.f,view 'Engineers DATE: 11/7/95 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1601 PROJECT ADDRESS: 2195 Faraday, Suite J PROJECT NAME: Office TI SET: I D NT D FILE D FIRE EVIEWER D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's *********** codes. D The plans transmitted herewith will substantially comply with th~ jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. • The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. • The applicant's copy of the check list has been sent to: Dave Johnson, CSI General 135 Vallecitos De Oro, Suite A, San Marcos, CA 92069 • Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone #: D REMARKS: By: Pete Fischer Enclosures: Esgil Corporation ~ GA 0 CM 0 GP ~ PC 11/2/95 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 Carlsbad 95-1601 11/7/95 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 95-1601 OCCUPANCY: B2 TYPE OF CONSTRUCTION: VN SPR ALLOWABLE FLOOR AREA: NO CHANGE SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 11/7/95 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: OFFICE ACTUAL AREA: TI = 1200 STORIES: 1 HEIGHT: NO CHANGE OCCUPANT LOAD: 12 DATE PLANS RECEIVED BY ESGIL CORPORATION: 11/2/95 PLAN REVIEWER: Pete Fischer This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1991 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), 1991 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1991UBC) tiforw.dot Carlsbad 95-1601 11/7/95 1. Please make all corrections on the original tracings and submit two new sets of prints, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468. . OR The jurisdiction's building department. 2. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. 3. Indicate the use of all spaces adjacent to the area being remodeled or improved. 4. Show any existing fire rated area separation walls, occupancy separation walls, shafts or rated corridors. Identify and provide construction details for proposed new fire rated walls. 5. Show safety glazing in the following locations, per Section 5406(d): a) V\(here the nearest edge of glazing is within a 24-inch arc of either side of a door in a closed position (unless there is an intervening wall between the door and the glazing or if the glazing is 5'-0" or higher above the walking surface). b) Glazing greater than 9 square feet with the bottom edge less than 18" above the floor and the top edge greater than 36" above the floor (unless the glazing is more than 36" horizontally away from walking surfaces or if a complying protective bar is installed). 6. The tenant space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled. See the attached correction sheet. Title 24, Part 2. 7. Specify lever-type hardware for passage doors on floors accessible to the disabled. Section 2-3304, Title 24. 8. If both sexes will be employed and the number of employees exceeds four, provide separate toilet facilities for men and women. If "both sexes will be employed and the total number of employees will not exceed four", and only one restroom is provided, note the words in quotation above on the floor plan. Section 705(c). 9. Provide a note on the plans stating "Penetrations of fire-resistive walls shall be protected as required in UBC Section 4304 ". Carlsbad 95-1601 11/7/95 10. Indicate the weight of the new roof mounted equipment. Verify the existing roof framing is adequate to support the new roof equipment. • CITY OF CARLSBAD SUPPLEMENT 11. Roof mounted equipment must be screened and roof penetrations should be minimized (City Policy 80-6). Provide structural detailing for the screening. 12. No wiring is permitted on the roof of a building and wiring on the exterior of a building requires approval by the Building Official. (City Policy) • MISCELLANEOUS 13. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet;· note or detail number, calculation page, etc. 14. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No D 15. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Pete Fischer at Esgil Corporation. Thank you. + PLUMBING, MECHANICAL AND ENERGY CORRECTIONS + PLAN REVIEWER: Glen Adamek 16. 17. Detail ladder access to roof mounted HVAC equipment. Clearly show on the plans all the new light fixtures are three tube 2 x 4, 108 watt fixtures, as per the energy design. Note: If you have any questions regarding this plan review list please contact Glen Adamek at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. Carlsbad 95-1601 11/7/95 DISABLED ACCESS REQUIREMENTS FOR REMODELS' {alterations, structural repairs, additions. tenant improvements and occupancy changes) A GENERAL Full access compliance is required for remodels, including: 1. The specific area being remodeled, (i.e., the "new" work). 2. Existing elements in the path of travel to the remodeled area. (a)Parking, (b)Walks, (c)Hazards, (d)Curb Ramps, (e) Ramps, (f)Elevators, (g) Stairs. Show the complying path of travel from the disabled parking to the tenant space on the site plan. 3. Entrance to the remodeled area. (a)Entrance doors, (b)Exit doors. 4. Existing sanitary facilities serving the remodeled area. Indicate whether the existing restroom complies. If it does not comply, then show what is required to bring it into compliance. 5. Existing drinking fountains and telephones serving the remodeled area. 1 Based on the provisions in Title 24, Part 2 of the California Building Code, Effective April 1, 1994 2Note: In determining the value of a remodel, the total costs of all improvements over the last 3 years along the same path of travel must be included (even if the previous remodels were done by other tenants). The 20-percent provisions for determining if upgrade costs are disproportionate and for determining the amount to spend on upgrades shall be based on this total value. Please complete the attached declaration form (Form HA-1). DATI 11/7/95 Carlsbad 95-1601 11/7/95 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1601 PREPARED BY: Pete Fischer DATE: 11/7 /95 BUILDING ADDRESS: 2195 Faraday, Suite J BUILDING OCCUPANCY: B2 BUILDING PORTION BUILDING AREA (sq. ft.) Tl VALUE PER CITY . Air Conditioning Fire Sprinklers TOTAL VALUE USC Building Permit Fee: USC Plan Check Fee: Comments: TYPE OF CONSTRUCTION: VN SPR VALUATION MULTIPLIER APPLICATION .. VALUE 31,200 31,200 $ 297.50 $ 193.38 ($) Sheet 1 of 1 valuefee.dot City of Carlsbad M ¥i h· 1 i ,1441 i h· 1 •14·1= i Ii, ,i§ ,; I ffe !-BUILDING PLANCHECK CHECKLIST DATE: /~ l!/.f PLANCHECK NO. CB ,ffs-/6 t:1 / BUILDINh AIDDRESS: ~I~ £4,e,4 iJA-'f #-..:;r- PROJECT DESCRIPTION:' ):o" s;; #6. -ff11?at£.uti11"c..s Mia /(/l)ir; ASSESSOR'S PARCEL NUMBER: ' EST. VALUE .s½" Y'dcJ ENGINEERING DEPARTMENT APPROVAL The item you have submitte_d for review has been approved. The approval , is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with Instructions In this report can result in suspension of permit to build. DENIAL Ple~e the attached report of deficiencies marked with J2S{ Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. g; A~eJ v--.r ~c ,e;-cJ r y9'4!_,,,;r /ltf'/4/"e 1/(o~ s-; ~r ,/~ ~ -,;-cJ,t/ f?/4,v1s--/:J.Ji> f.r,, ZI~~ :.::::-- By: :4/4 ./ ~ Date: ~5 D ~ ~ A Right-of-Way permit is required prior to construction ------------- of the following improvements: ATTACHMENTS D Dedication Appllcatlon D Dedication Checklist 0 Improvement Application D Improvement Checklist D Future Improvement Agreement D Grading Permit Application 0 Grading Submittal Checklist D Right of Way Permit Application D Right of Way Permit Submittal Checklist and Information Sheet D Sewer Fee Information Sheet By: _________ Date: ___ _ ENGINEERING DEPT. CONTACT PERSON NAME: _____________ _ City of C8rlsbad ADDRESS: 2075 Las Palmas Dr., Carlsbad, CA 92009 PHONE: {619) 438-1161. Ext. A-4 P:\DOCS\CHKLST\BP0001.FRM REV 05/11 /94 2075 Las Palmas Dr.• Carlsbad, CA 92009-1576 • (619) 438-1161 • FAX (619) 438-0894 t / BUILDING PLANCHECK CHECKLIST SITE PLAN 1s~,/ 3rd,/ C0 D D 1. Provide a fully dimensioned site plan drawn to scale. Show: D A. North Arrow D. Property Lines Easements B. Existing & Proposed Structures E. Easements C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets 2. Show on site plan: A. Drainage Patterns C. Existing Topography B. Existing & Proposed Slopes 3. Include note: "Surface water to be directed away from the building foundation at a 2% gradient for no less than 5' or 2/3 the distance to the property line (whichever is less)." [Per 1985 UBC 2907(d)5]. On graded sites, the top of any exterior foundation shall extend above the elevation of the street gutter at point of discharge or the inlet of an approved drainage device · a minimum of 12 inches plus two percent" (per 1990 USC 2907(d)5.). D . 4. Include on title sheet A. Site address B. Assessor's Parcel Number C. Legal Description For commercial/industrial buildings and tenant improvement projects, include: Total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION P:\DOCS\CHKLS1\BP0001.FRM Page 1 of 4 REV05/11/M • • BUILDING PLANCHECK CHECKLIST DISCRETIONARY APPROVAL COMPLIANCE ,/ .2nd./ 3rd./ rt1 D D 5. Project does not comply with the following Engineering Conditions of approval for ft Project No. _______________________ _ Conditions were complied with by: ______ _ Date: ______ _ DEDICATION REQUIREMENTS 6. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ _ __,.. ____ -pursuant to Code Section 18.40.030. Dedication required as follows: ________________ _ Attached please find an application form and submittal checklist for the dedication process. Provide the completed application form and the requirements on the · checklist at the time of resubmittal. Dedication completed by ___________ _ Date: ___ _ IMPROVEMENT REQUIREMENTS 7a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ -pursuant to Code Section 18.40.040. Public improvements required as follows: _____________ _ Please have a registered Civil Engineer prepare appropriate improvement plans and · submit them together with the requirements on the attached checklist for a separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. Attached please find an application form and submittal checklist for the public improvements require~ents. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Improvement Plans signed by: __________ _ Date: --- P:\DOCS\CHKLS1\BP0001.FRM Page 2 of 4 REV 05/11 /94 BUILDING PLANCHECK CHECKLIST 1 stv' 2ndv' 3rdv' D D D 7b. Construction of the public improvements may be deferred pursuant to code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ ________ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future public improvements required as follows: ___________ _ Improvement Plans signed by: __________ _ Date: ---- D D D 7c. Enclosed please find your Future Improvement Agreement. Please return signed and notarized Agreement to the Engineering Department. Future Improvement Agreement completed by: ____________ _ Date: _______ _ 7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. D D D Ba. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). D D D Sb. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be Submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: ________ Date: ___ _ Sc. No Grading Permit required. P:\DOCS\CHKLST\BP0001.FRM Page 3 of 4 REVOS/11/94 , ., ~D D X D D BUILDING PLANCHECK CHECKLIST MISCELLANEOUS PERMITS A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, trees, driveways, tieing into public storm drain, sewer and water utilities. Right-of-Way permit required for ________________ _ A separate Right-of-Way permit issued by the Engineering Department is required for the following: ____ -__________________ _ 1 o. A SEWER PERMIT is required concurrent with the building permit issuance. The fee is noted in the fees section on the following page. 11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Permit. ft&, /f 'H'/f S//cd;- lndustrial waste permit accepted by: ~ Date: ___ _ P:\DOCS\CHKLS1\BP0001,FRM Page 4 of 4 REVOS/11/94 41 • • .. .. .. ~ ~ ~ ~I I I PLANNING CHECI<IJST Plan Check No. 95-/60 I Address Z/ q L fi&fb&:.,'/ #-J Planner VAN Ly NCH Phone 438-{16 l ext. "32 s ----------(Name) APN: ------------------------- Type of Project and Use 1/i)l)fl.r 1'f?4AL--7T Zone fcM Facilities Management Zone __ .r-___ _ crD~# ,... - . ~ (If property in, complete SPECIAL TAX CALCULATION WORKSHEET provided by Building Department.) ~ ~ ~-· -~ ; [ZJ ... ... .,, ~ ~ ~ 41 • rs) .A: .A: 5 u u i i i --Q, Q, Q, Item Complete Ctem [ncomplete -Nffds your action l, 2, 3 Number in circle indicates plancheck number where deficiency was identified · (P{'o O F.nvironmelltal Review Required: YES _ NO /!S__ TYPE __ _ DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval---~----------------- rntJ O Discretionary Action Required: YES _ NO ~ TYPE __ _ APPROVAL/R£SO. NO. ___ DATE: _____ _ PROJECT NO. ___ _ OTHER RELATED CASES:----------------------- Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval _____________________ _ ~ califomia Coastal <"onrminim ""'1ait Required: ~ -NOL DATE OF APPROVAL: San Diego Coast Disaict, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725 (619) 521-8036 Compliance with· conditions of approval? If not, state conditions which require action. Conditions of Appro~----------------------- ) ~L -, -, .. \, Wf'D· CJ Cnclu,io~ HolJSini :F~::~::-.· YES __ NO·~ . . (Effective date .of enciusionary Housing Ordinance·-May 21, 199:t) S1t~·Plm l!YO ·CJ. . crt6 0 Al ft crri:i ·o N /) CfYo o //lo G!IJV-f/5' , . . ' '~ ""-, . ' . . 1. . . Provid~ a fully -dim~nsion'efi; sire plan drawn to scale. Sl\ow: North : · · arrow; property lines, e~·e;nenrs, exi$ting and proposed, structures, , stteifts~ e~ting $.q:ee~ :improvemen~~ -right-of-way width, ~ensfort~d · · setb~t,ks azic:J ejQ.sting ·topographical .lin4!S. ·. . . · ~-· ~_Yide-:legal d~ptic;>1t•of fropetty, and assessor's parcel rt'umber. L Setbacks: . Front:-. .rn~ .. Side: Stteet::Side: ' " -1 ~, .,, • Rear: ~. Lot. cov~ge: ~-'Height: _ 4. · . · :Par.kin,g: Reqw,re<l _ " R ·uired: -eq ... R .uired eq . Required· Requited: Required . . s·paces Reqwred . Gue$?. Spaces. ~w.red __ Shown ____ __ Shown· __ .· ___ _ __ Shown __ __ -Shown __ __ Shown ____ __Shown __ __ Shown __ __ Shown ___ ' o· Cl D Additional Comments .....,. ___________________ ~......., ........ ~....,_-----------~ '\ DATE ... " / J ., ,. , , •':."•I City of Carlsbad 95248 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check ,, Date of Report: Wednesday, November 8, 1995 R~~~~:--~-~ __ ._A_~-~-'-- Contact Name C.S.I. General Inc Address 145 Vallecitos De Oro #F City, State San Marcos CA 92069 Bldg. Dept. No. 95-1601 Planning No. Job Name Spec Suite/J ---'----------------- Job Address _2_1_95_F_a_ra_d....,ay _______________ _ Ste. or Bldg. No. _J ___ _ ~ Approved -The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. D Disapproved -Please see the attached report of deficiencies. Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1st. __ _ 2nd. __ _ 3rd. __ _ Other Agency ID CFO Job# __ 95_2_4_8 __ File# ___ _ 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 Sl0 J //er(IJI odec; ua tY o~: Roa/" /-:Jv,,-/,·ns r- aclcl ecl J/1/AC U/1/li - f 35"x6 -= 2../ O¼F /. V 8i, 110 ., /,too'' · !;'70.34 :::- I ;;-;;,4 I ::- ,'. ::.:-· .. .... ~~-.·- Sx 2.10 1< 2..4 4-'I-11 z .!!.. _ "'J3f 1, /, 7y,ID~>: I,' - 35'Tl. /5/ZOX/2- 14,;;o ~ /2~. !~/ in 3 I -7/ -d ..... , .. ::} <o , '.;;, r-~ 7, {3 )< /~IZ-0 ;_ I/ 7 lb/ ;:! S:BB' z.c,o \ :2.i q5 FARADAY i/er/zy ade7 v er t'1'" added JI//A C I 3Sx6 -= 2./ O%F ·' /,rc,o'( I o("· Ro(J/'" /Jvr/·ns UN /1 -- Tr/b SxZJO K 2.,4·f-1, 17 Z_!!_ _ J'8f''!, /, 7¥,/0~>: I, r:, - 74,s-% 3STL /,5;.,z5z..O --15' - /5/ZCJX/'?- l4G'O .= /25"°, f~/ in 3 •• . t 7, 8 . x Is JZ..o :;. I I 1 l,b / ~ ~ '638 1 z_oo I o "?4 ?lat:e 1-c:c/lf f/VAC UNIT :"· .:,• .. ~-~~-,. \ TITLE 24 REPORT FOR: 2195 Faraday Ave., Suites J & K 2195 Faraday Ave., Suites J & K Carlsbad, CA 92008 PROJECT DESIGNER: C.S.I 145 Los Vallecitos De Oro, Suite F San Marcos, CA 92069 (619)471-9388 REPORT PREPARED BY: Steve Balderrama Haynal & Co., Inc. 425 West Fifth Street Escondido, CA 92025 (619) 743-5408 Job Number: Date: 11/1/1995 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential Building Energy Efficiency Standards. This program developed by Gabel Dodd Associates (510) 428-0803. Table Of Contents for Title 24 Report Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Form ENV-1 Envelope Certificate of Compliance ....................... 3 Form ENV-2 Envelope Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Form ENV-3 Construction Assemblies 9 Form LTG-1 Lighting Certificate of Compliance ....................... 11 Form LTG-2 Lighting Compliance Summary .............................. 13 Form MECH-1 Mechanical Certificate of Compliance .................... 14 Form MECH-2 Mechanical Summary ...................................... 17 Form MECH-3 Mechanical Equipment Summary ............................ 18 Form MECH-4 Mechanical Ventilation .................................. 19 CERTIFICATE OF COMPLIANCE (part 1 of 2) Project Name: 2195 Faraday Ave., Suites J & K Address: 2195 Faraday Ave., Suites J & K Carlsbad, CA 92008 Envelope Designer: C.S.I Documentation: Haynal & Co., Inc. ENV-1 page 3 of 19 Date: 11/1/1995 Building Permit No Checked by/ Date COMPLY 24 User 2875 GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 1200 sf 7 Building Type: Nonresidential Climate Zone: Phase of Construction: O New Construction X Addition O Alteration Method of Envelope Compliance: Prescriptive -Overall Envelope STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building envelope requirements. The Principal Envelope Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in sections 110, 116 through 118, and 143 or 149 of Title 24, Part 6, Chapter 1. Please check one: 0 0 I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer or architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section..,....,,...---of the Code to sign this document as the person responsible for its preparation; and for the following re PRINCIPAL ENVELOPE DESIGNER C.S.I (619)471-9388 ENVELOPE MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 2) Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. ENV-1 page 4 of 19 Date: 11/1/1995 COMPLY 24 User 2875 --------------------------------------------------------------------------- Const OPAQUE SURFACES Assembly Name Type Location/Comments R-11 Metal Stud Metal _Demising Wall _________ _ R-19 Roof(R.19 on Tile) Wood FENESTRATION Frame Orient Panes Type Exterior Shade OH Glazing Type Note to Field OVERALL ENVELOPE METHOD Part 1 of 4 Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. WINDOW AREA TEST A. Display Perimeter 0.0 ft X 6 ft = B. Gross Exterior Wall Area 0.0 sf X 0.40 = C. Gross Exterior Wall Area 0.0 sf X 0.10 = D. Enter Larger of A or B E. Enter Proposed Window Area If Eis greater than Dor less than C, proceed to for window area adjustment. If not, go to part 2 1. If Eis greater than D: D. Maximum Standard Area N/A 2. If Eis less than C: C. Minimum Standard Area N/A SKYLIGHT AREA TEST I I E. Proposed Area N/A E. Proposed Area N/A = = ENV-2 page 5 of 19 Date: 11/1/1995 COMPLY 24 User 2875 0.0 sf Display Area 0.0 sf 40% Area 0.0 sf Min Std Area 0.0 sf Max Std Area 0.0 sf Proposed Area the next calculation of 4. Window Adjustment Factor N/A Window Adjustment Factor N/A Atrium Height 0.0 ft If Height< 55 ft If Height>= 55 ft Standard= 5% ----------+----------Standard= 10% I V A. Gross Exterior Roof Area 1200.0 sf X 0.05 = 60.0 sf Standard Area B. Enter Proposed Skylight Area 0.0 sf Proposed Area If the Proposed Skylight Area is greater than the Standard Skylight Area, proceed to the next calculation for the skylight area adjustment. If not got to part 2 of 4. 1. If Proposed Skylight Area> Standard Skylight Area: Standard Skylight Area N/A I Proposed Skylight Area N/A = Skylight Adjustment Factor N/A OVERALL ENVELOPE METHOD Part 2 of 4 Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. OVERALL HEAT LOSS PROPOSED Assembly Name Area HC U-Val ----- R-19 Roof(R.19 on Tile) 1200.0 1.4 0.043 Total ** OVERALL HEAT LOSS COMPLIES UxA ------ 52.1 ------ 52.1 PROPOSED ENV-2 page 6 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Adj. STANDARD Area U-Val UxA ----------------- 1200.0 0.078 93.6 ------ Total 93.6 UA <= STANDARD UA ** OVERALL ENVELOPE METHOD Part 3 of 4 ENV-2 page 7 of 19 ---------------------------------------------------------------------------Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. Date: 11/1/1995 COMPLY 24 User 2875 --------------------------------------------------------------------------- OVERALL HEAT GAIN Glazing WF PROPOSED Area SC H ** OVERALL HEAT GAIN COMPLIES V OHF Total Total 0.0 STANDARD Area RSHG Total Total 0.0 PROPOSED HG<= STANDARD HG** OVERALL ENVELOPE METHOD Part 4 of 4 Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. Window Area Adjustment Calculations Gross Wall Name Dir Area ---------------------------- ----- TOTALS 0.0 Skylight Area Adjustment Calculations Roof Name R-19 Roof Gross Dir Area H 1200.0 TOTALS 1200.0 Door Window Area Area ------------------------ 0.0 0.0 Skylt Area ------ 0.0 ------ 0.0 ENV-2 page 8 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Adjust Factor ------ Adjust Factor ------ 0.0000 Adjusted Window Wall Area Area 0.0 0.0 Adjusted Skylt Roof Area Area ------------ 0.0 1200.0 ------------ 0.0 1200.0 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 9 of 19 Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. Date: 11/1/1995 COMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Gypsum or Plaster Board 2. Insulation, Mineral Fiber, R-11 3. Gypsum or Plaster Board 4. 5 . 6. 7 • 8 . 9. Inside Air Film Assembly Name: R-11 Metal Stud Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Framing Material: Metal Framing Spacing: II 0.C. Framing Percent: 15.0 % Absorptivity: 0.70 Roughness: Smooth Plaster, Metal Th R-Value Fr (in) Cavity Frame 0.625 * 3.500 0.625 0.17 0.56 11.00 0.56 0.17 0.56 11.00 0.56 Unadjusted R-Values 0.68 12.98 0.68 0.00 Weight: Heat Capacity: 5.4 lb/sqft 1.38 TOTAL U-VALUE = TOTAL R-VALUE = 0.189 ===== 5.29 ===== PROPOSED CONSTRUCTION ASSEMBLY Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. ENV-3 page 10 of 19 Date: 11/1/1995 COMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of Construction Assembly Assembly Name: R-19 Roof(R.19 on Tile) Assembly Type: Roof Assembly Tilt: 22 deg (Tilted Up) Framing Material: Wood Framing Spacing: II 0.C. Framing Percent: 10.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R-Value ASSEMBLY U-VALUE Construction Components Outside Air Film Fr (in) Cavity Frame 1. Roofing, Built-Up 2. Membrane, Vapor-Permeable Felt 3. Plywood 4. Air Space 5. Insulation, Mineral Fiber, R-19 6. Acoustical Tile, Interior Finish 7 . 8 . 9 . Inside Air Film 0.375 0.010 0.500 12.000 6.000 0.500 0.17 0.33 0.06 0.62 0.80 19.00 1.43 Unadjusted R-Values 0.61 23.02 ADJUSTMENT FOR FRAMING (1 /23.02) X (0.90) + (1 /23.02) X (0.10) Weight: Heat Capacity: 4.6 lb/sqft 1.45 = 0.043 TOTAL U-VALUE = TOTAL R-VALUE = 0.17 0.33 0.06 0.62 0.80 19.00 1.43 0.61 23.02 0.043 ===== 23.02 ===== ·.~ CERTIFICATE OF COMPLIANCE (part 1 of 2) LTG-1 page 11 of 19 Project Name: 2195 Faraday Ave., Suites J & K Date: 11/1/1995 Address: 2195 Faraday Ave., Suites J & K Carlsbad, CA 92008 Building Permit No Lighting Designer: Checked by/ Date Documentation: Haynal & Co., Inc.~~~~-=-COMPLY 24 User 2875 GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 1200 sf Building Type: Nonresidential Climate Zone: 7 Phase of Construction: 0 New Construction X Addition 0 Alteration Method of Lighting Compliance: Prescriptive STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building lighting requirements. The Principal Lighting Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in sections 110, 119, 130 through 132 and 146 or 149. Please check one: 0 I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer electrical engineer or architect. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. O I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section.,....,,..---of the Code to sign this document as the person responsible for its preparation; and for the following rea n· ---------------- PRINCIPAL LIGHTING DESIGNER LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 2) Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. INSTALLED LIGHTING SCHEDULE No of Name Lamp Type Lamps ----------------------- Fluorescent 3 MANDATORY AUTOMATIC CONTROLS Control Watts/ Ballast Lamp Type ---------------- 34 Standard LTG-1 page 12 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Ballasts/ No of Note to Luminaire Fixt. Field --------------------- 1.5 17 Control Location ID Control Type Space Controlled Note to Field CONTROLS FOR CREDIT Control Control Location ID Control Type Space Controlled Note to Field LIGHTING COMPLIANCE SUMMARY Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. ACTUAL LIGHTING POWER No of LTG-2 page 13 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Watts Name Description Lumin per Default Total Watts 48" T-12 Low Watt / 3 Lamp ( Tandem) 17 108.0 Y 1836.0 SubTotal 1836 Less Control Credits (LTG-3) O Total Proposed Watts 1836 * If not CEC Default value, please provide supporting documentation. ALLOWED LIGHTING POWER BY SPACE Allowed Floor LPD Total Tailored Space Name Occupancy Area (w/sf) (watts) (watts) ------------------------- New Office Area Office 1200 1. 600 1920 0 ------------------------- TOTALS 1200 1.600 1920 0 * Note: Tailored Allotment requires supporting documentation on form LTG-4. CERTIFICATE OF COMPLIANCE (part 1 of 3) Project Name: 2195 Faraday Ave., Suites J & K Address: 2195 Faraday Ave., Suites J & K Carlsbad, CA 92008 Mechanical MECH-1 page 14 of 19 Date: 11/1/1995 Building Permit No Designer: Checked by/ Date Documentation: Haynal & Co., Inc. ~~"°""---------fCOMPLY 24 User 2875 GENERAL INFORMATION Date of Plans: Building Conditioned Floor Area: 1200 sf Building Type: Nonresidential Climate Zone: 7 Phase of Construction: O New Construction X Addition O Alteration Method of Mechanical Compliance: Prescriptive Proof of Envelope Compliance: O Previous Permit X Compliance Attached STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building mechanical requirements. The Principal Mechanical Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in sections 110 through 115, 120 through 124, 140 through 142,144 and 145. Please check one: O I hereby affirm that I am eligible under ~he provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer mechanical engineer or architect. Ali I affirm that I am eligible under the exemption to Division 3 of the v'--Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. O I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section~---of the Code to sign this document s person responsible for its preparation; and for the following r. as PRINCIPAL MECHANICAL DESIGNER Date MECHANICAL MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 3) Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. SYSTEM FEATURES Zone Name New Office Area Time Control S Setback Control None-- # of Isolation Zonesn/a HP Thermostat Yes Electric Heat o.o KW Fan Control Constant Volume VAV Min Position n/a Simul. Heat/Cool n/a Heat Supply Reset Constant Temp Cool Supply Reset Constant Temp Ventilation B OA Damper Control __ A_._ Economizer Type No Economizer Outdoor Air CFM 180 Heat Equip Type Heat Pump Make & Model No. Rheem RPND-043J Cool Equip Type DX Make and Model Code Tables Time Control S:Prog Switch O:Occ Sensor M:Man Timer Ventilation B:Air Balance C:OA Cert. M:OA Measure D:Demand Cont N:Natural OA Damper A:Auto G:Gravity MECH-1 page 15 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Note to Field CERTIFICATE OF COMPLIANCE (part 3 of 3) Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. DUCT INSULATION System Name -----------------------Rheem RPND-043J PIPE INSULATION System Name Domestic Hot Water Type Duct Location -------------------------- Heating Ducts in Attic Cooling Ducts in Attic Insul Pipe Type Required y I N NOTES TO FIELD -For Building Department Use Only MECH-1 page 16 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Duct Tape Allowed ------- y I N y I N Insul R-Val ----- 4.2 4.2 Note to Field ------- Note to Field MECHANICAL SIZING AND FAN POWER Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. SIZING AND EQUIPMENT SELECTION HVAC Zone Name: Heating System Name: Cooling System Name: System Multiplier: Peak Load Method: Relative Humidity: 1. DESIGN CONDITIONS FOR Carlsbad 2. SIZING SPACES SERVED BY SYSTEM Btu/hr ------- MECH-2 page 17 of 19 Date: 11/1/1995 COMPLY 24 User 2875 New Office Area Rheem RPND-043J HEATING 38 F PEAK 1 COINCIDENT 50 %- COOLING SENSIBLE LATENT 83 F 67 F Btu/hr Btu/hr -------------- New Office Area Warehouse PEAK (Jan 12am) (Jan 12am) 4774 (Aug 3pm) 25146 1714 0 (Aug 3pm) 0 0 --------------------- TOTAL SPACE LOAD 4774 25146 1714 Duct Gains & Losses: 477 2515 Ventilation: ( 171 CFM) 5915 924 219 Return Air Lighting Gain 0 --------------------- TOTAL SYSTEM LOAD 11166 28585 1933 3. SELECTION 1.43 1.21 15967 34588 A. Safety/Warmup Factor B. Maximum Adjusted Load C. Installed Equipment Capacity 34019 30879 11572 If Line 3-C > Line 3-B, Explain:_E.E.S. -SECTION 144(a) _______ _ FAN POWER CONSUMPTION No. Efficiency Peak Conv Peak Supply Fan Description Sys BHP Motor Drive HP Fact Watts CFM ---------------------------------------------------- Supply Fan 1 X 0.28 I [0.64 X 1.00] = 0.44 X 746 = 326 1400 ---------------- Totals 0.44 326 1400 FAN POWER DEMAND 326 watts/ 1400 cfm = 0.233 watts/cfm MECHANICAL EQUIPMENT SUMMARY Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. CENTRAL SYSTEM SUMMARY Sys No MECH-3 page 18 of 19 Date: 11/1/1995 COMPLY 24 User 2875 No System Name System Type Sys Economizer Type 1 Rheem RPND-043J Packaged Heat Pu 1 No Economizer CENTRAL SYSTEM RATINGS Sys-------Heating----------------------------------Cooling---------- No Type Output Aux KW EFF Type Output Sensible EER SEER 1 Heat Pump 41500 0.0 7.10 DX 40000 30000 9.90 11.00 CENTRAL FAN SUMMARY------------Supply Fan-----------Return Fan Mtr Drv CFM BHP Eff Eff Sys Mtr Drv No Fan Type Motor Location CFM BHP Eff Eff 1 Constant Volume Draw-Through 1400 ZONAL FAN SUMMARY Space Name None ---------Zonal Fan Mtr No CFM BHP Eff 0.28 64 100 None ------------Exhaust Fan Drv Mtr Eff No CFM BHP Eff Drv Eff MECHANICAL VENTILATION Project Name: 2195 Faraday Ave., Suites J & K Documentation: Haynal & Co., Inc. VENTILATION SUMMARY BY SPACE Floor Space Name T Occupancy Area ------------------------------------------ New Office Area Office 1200 sqft /Occ 143 MECH-4 page 19 of 19 Date: 11/1/1995 COMPLY 24 User 2875 Tran CFM Min Design sfer /Occ CFM CFM CFM ------ 21.5 180 180 ------ TOTALS 180 180 Note: If Tailored (T=*), user must document sqft/Occ and/or CFM/Occ values. MANDATORY REQUIREMENTS ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL) 1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and Li-value certification requirements of Section 116(a). 2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b). 3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit infiltration and exfiltration per Section 117(a). 4. Certified insulation materials per Section 118(a). 5. Urea Formaldehyde foam insulation installed per Section 118(b). 6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c). LIGHTING MANDATORY MEASURES 1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions). 2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire (per Section 131 (b) and exceptions; exceptions include lights in corridors). 3. Daylit areas larger than 250 sfshall be separately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions). 4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions). 5. Display lighting shall be seperately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions). 6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions). 7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions). MECHANICAL AND PLUMBING MANDATORY MEASURES Equipment and Systems Efficiency 1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112. 2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in accordance with Section 123. 3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10. 4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115. Ventilation 1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e). 2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c). 3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section 121 (d). 4. Systems shall meet the completion and balancing requirements of Section 121 (f). Controls 1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a dead-band of 5 degrees between heating and cooling, Section 122(a) and (b). 2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b). 3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four hours, per Section 122{e)1. 4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions. 5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas served by the equipment, per Section 122(f). 6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be designed, installed, and controlled to serve isolation areas, per Section 122(g). SERVICE WATER HEATING SYSTEMS 1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113{a) and (b). 2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3. 3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.